Groowe Groowe BETA / Newsroom
⏱ News is delayed by 15 minutes. Sign in for real-time access. Sign in

Form 8-K

sec.gov

8-K — Paramount Gold Nevada Corp.

Accession: 0001193125-26-303179

Filed: 2026-07-14

Period: 2026-07-14

CIK: 0001629210

SIC: 1000 (METAL MINING)

Item: Other Events

Item: Financial Statements and Exhibits

Documents

8-K — d112598d8k.htm (Primary)

EX-23.1 (d112598dex231.htm)

EX-23.2 (d112598dex232.htm)

EX-23.3 (d112598dex233.htm)

EX-23.4 (d112598dex234.htm)

EX-23.5 (d112598dex235.htm)

EX-99.1 (d112598dex991.htm)

GRAPHIC (g112598dsp004.jpg)

GRAPHIC (g112598dsp037.jpg)

GRAPHIC (g112598dsp039.jpg)

GRAPHIC (g112598dsp040.jpg)

GRAPHIC (g112598dsp048.jpg)

GRAPHIC (g112598dsp057.jpg)

GRAPHIC (g112598dsp059.jpg)

GRAPHIC (g112598dsp060.jpg)

GRAPHIC (g112598dsp063.jpg)

GRAPHIC (g112598dsp064.jpg)

GRAPHIC (g112598dsp066.jpg)

GRAPHIC (g112598dsp069.jpg)

GRAPHIC (g112598dsp072.jpg)

GRAPHIC (g112598dsp073.jpg)

GRAPHIC (g112598dsp075.jpg)

GRAPHIC (g112598dsp076.jpg)

GRAPHIC (g112598dsp078.jpg)

GRAPHIC (g112598dsp082.jpg)

GRAPHIC (g112598dsp084.jpg)

GRAPHIC (g112598dsp086.jpg)

GRAPHIC (g112598dsp088.jpg)

GRAPHIC (g112598dsp096.jpg)

GRAPHIC (g112598dsp097.jpg)

GRAPHIC (g112598dsp106.jpg)

GRAPHIC (g112598dsp107.jpg)

GRAPHIC (g112598dsp108.jpg)

GRAPHIC (g112598dsp109.jpg)

GRAPHIC (g112598dsp110.jpg)

GRAPHIC (g112598dsp111.jpg)

GRAPHIC (g112598dsp112.jpg)

GRAPHIC (g112598dsp114.jpg)

GRAPHIC (g112598dsp115.jpg)

GRAPHIC (g112598dsp117.jpg)

GRAPHIC (g112598dsp118.jpg)

GRAPHIC (g112598dsp119.jpg)

GRAPHIC (g112598dsp120.jpg)

GRAPHIC (g112598dsp121.jpg)

GRAPHIC (g112598dsp122.jpg)

GRAPHIC (g112598dsp137.jpg)

GRAPHIC (g112598dsp138.jpg)

GRAPHIC (g112598dsp139.jpg)

GRAPHIC (g112598dsp142.jpg)

GRAPHIC (g112598dsp146a.jpg)

GRAPHIC (g112598dsp146b.jpg)

GRAPHIC (g112598dsp147.jpg)

GRAPHIC (g112598dsp148.jpg)

GRAPHIC (g112598dsp156.jpg)

GRAPHIC (g112598dsp157.jpg)

GRAPHIC (g112598dsp158.jpg)

GRAPHIC (g112598dsp159.jpg)

GRAPHIC (g112598dsp169.jpg)

GRAPHIC (g112598dsp170.jpg)

GRAPHIC (g112598dsp171.jpg)

GRAPHIC (g112598dsp172.jpg)

GRAPHIC (g112598dsp178.jpg)

GRAPHIC (g112598dsp181.jpg)

GRAPHIC (g112598dsp183.jpg)

GRAPHIC (g112598dsp184.jpg)

GRAPHIC (g112598dsp185.jpg)

GRAPHIC (g112598dsp186.jpg)

GRAPHIC (g112598dsp187.jpg)

GRAPHIC (g112598dsp188.jpg)

GRAPHIC (g112598dsp189.jpg)

GRAPHIC (g112598dsp193.jpg)

GRAPHIC (g112598dsp194.jpg)

GRAPHIC (g112598dsp196.jpg)

GRAPHIC (g112598dsp197.jpg)

GRAPHIC (g112598dsp204.jpg)

GRAPHIC (g112598dsp206.jpg)

GRAPHIC (g112598dsp207.jpg)

GRAPHIC (g112598dsp208.jpg)

GRAPHIC (g112598dsp209.jpg)

GRAPHIC (g112598dsp210.jpg)

GRAPHIC (g112598dsp216.jpg)

GRAPHIC (g112598dsp217.jpg)

GRAPHIC (g112598dsp219.jpg)

GRAPHIC (g112598dsp220.jpg)

GRAPHIC (g112598dsp221.jpg)

GRAPHIC (g112598dsp222.jpg)

GRAPHIC (g112598dsp224a.jpg)

GRAPHIC (g112598dsp224b.jpg)

GRAPHIC (g112598dsp226.jpg)

GRAPHIC (g112598dsp228.jpg)

GRAPHIC (g112598dsp229.jpg)

GRAPHIC (g112598dsp230.jpg)

GRAPHIC (g112598dsp232.jpg)

GRAPHIC (g112598dsp233a.jpg)

GRAPHIC (g112598dsp233b.jpg)

GRAPHIC (g112598dsp234.jpg)

GRAPHIC (g112598dsp236.jpg)

GRAPHIC (g112598dsp242a.jpg)

GRAPHIC (g112598dsp242b.jpg)

GRAPHIC (g112598dsp246.jpg)

GRAPHIC (g112598dsp247.jpg)

GRAPHIC (g112598dsp256.jpg)

GRAPHIC (g112598dsp258.jpg)

GRAPHIC (g112598dsp261.jpg)

GRAPHIC (g112598dsp265.jpg)

GRAPHIC (g112598dsp269.jpg)

GRAPHIC (g112598dsp271.jpg)

GRAPHIC (g112598dsp311.jpg)

GRAPHIC (g112598dsp318.jpg)

GRAPHIC (g112598dsp322a.jpg)

GRAPHIC (g112598dsp322b.jpg)

GRAPHIC (g112598g0714210802380.jpg)

GRAPHIC (g112598g40o76.jpg)

GRAPHIC (g112598g57p55.jpg)

GRAPHIC (g112598g61o60.jpg)

GRAPHIC (g112598g80f55.jpg)

XML — IDEA: XBRL DOCUMENT (R1.htm)

8-K

8-K (Primary)

Filename: d112598d8k.htm · Sequence: 1

8-K

false 0001629210 0001629210 2026-07-14 2026-07-14

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

WASHINGTON, D.C. 20549

FORM 8-K

CURRENT REPORT

Pursuant to Section 13 or 15(d)

of the Securities Exchange Act of 1934

Date of Report (Date of earliest event reported): July 14, 2026

Paramount Gold Nevada Corp.

(Exact name of Registrant as Specified in Its Charter)

Nevada

001-36908

98-0138393

(State or Other Jurisdiction

of Incorporation)

(Commission

File Number)

(IRS Employer

Identification No.)

665 Anderson Street

Winnemucca, Nevada

89445

(Address of Principal Executive Offices)

(Zip Code)

Registrant’s Telephone Number, Including Area Code: 775 625-3600

(Former Name or Former Address, if Changed Since Last Report)

Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:

Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)

Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)

Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))

Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))

Securities registered pursuant to Section 12(b) of the Act:

Title of each class

Trading

Symbol(s)

Name of each exchange

on which registered

Common Stock, $0.01 Par Value Per Share

PZG

NYSE American LLC

Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§ 230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§ 240.12b-2 of this chapter).

Emerging growth company ☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Item 8.01

Other Events

On July 14, 2026, Paramount Gold Nevada Corp. (the “Company”) filed a technical report summary, effective as of May 27, 2026, which had been prepared in accordance with the requirements of subpart 1300 of Regulation S-K, for its Grassy Mountain Gold Project (the “Report”). The Report and the corresponding consent of the “Qualified Persons” are filed as Exhibits 99.1, 23.1, 23.2, 23.3, 23.4 and 23.5, respectively, to this Current Report on Form 8-K and are incorporated herein by reference.

Item 9.01

Financial Statements and Exhibits.

(d) Exhibits.

Exhibit

Number

Description

23.1

Consent of Qualified Person – Ausenco Engineering Canada Inc.

23.2

Consent of Qualified Person – RESPEC Company LLC

23.3

Consent of Qualified Person – WSP USA Inc.

23.4

Consent of Qualified Person – Geotechnical Mine Solutions

23.5

Consent of Qualified Person – SLR International Corporation

99.1

Technical Report Summary for the Grassy Mountain Gold Project effective May 26, 2026.

104

Cover Page Interactive Data File (embedded within the Inline XBRL document)

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

Paramount Gold Nevada Corp.

Date: July 14, 2026

By:

/s/ Rachel Goldman

Rachel Goldman, Chief Executive Officer

EX-23.1

EX-23.1

Filename: d112598dex231.htm · Sequence: 2

EX-23.1

Exhibit 23.1

Ausenco Engineering Canada ULC,

1050 West Pender Street, Suite 1200,

Vancouver,

British Columbia, V6E 3S7

Consent of Ausenco Engineering Canada ULC (Ausenco)

We had appropriate individual Qualified Persons prepare the content in the Sections they were responsible for, identified below, in the technical report

summary titled “Technical Report Summary on the Grassy Mountain Project, Oregon, U.S.A.” (the “TRS”) current as of May 27, 2026 for Paramount Gold Nevada Corp., portions of which are summarized on this Current Report on Form 8-K (the “Form 8-K”).

Furthermore, we state that:

i.

The TRS was prepared in accordance with Subpart 229.1300 of Regulations

S-K promulgated by the U.S. Securities and Exchange Commission and supports the Company’s Form 8-K;

ii.

We consent to the incorporation by reference of the TRS in the Registration Statements on Form S-3 (333-275376) and Form S-8 (No. 333-205024,

No. 333-262857 and No. 333-291058) (the “Registration Statements”);

iii.

We consent to the use of and references to our name in connection with the TRS,

Form 8-K and the Registration Statements; and

iv.

the information derived, summarized, quoted or referenced from the TRS, or portions thereof, that was prepared

by us, that we supervised the preparation of, and/or that was reviewed and approved by us, that is included or incorporated by reference in the Form 8-K and the Registration Statements.

Ausenco is responsible for authoring, and this consent pertains to, the following sections of the TRS: 1.1, 1.10, 1.16, 1.17.1, 1.18,

1.20, 1.21, 1.22, 2.1, 2.2, 2.3, 2.4.1, 2.5, 2.6, 2.7, 2.8, 9.2.1, 9.3.1, 10, 13.3, 14, 15.1, 15.2, 15.7.3, 15.8, 15.9, 15.10, 16, 18.1.1, 18.1.2, 18.1.3, 18.1.4, 18.1.5, 18.1.6, 18.1.7, 18.1.9, 18.1.10.2, 18.1.11, 18.1.12, 18.1.13, 18.2.1, 18.2.3,

18.2.4, 19, 22.1, 22.6, 22.11, 22.12.1, 22.12.2, 22.12.6, 22.13, 22.15, 22.16, 22.17, 22.18.1.2, 22.18.1.5, 22.18.1.9, 22.18.1.10, 22.18.2.2, 23.1, 23.2, 23.7, 24 and 25.

Dated at Vancouver, Canada this 14th day of July, 2026

/s/ Tommaso Roberto Raponi

Ausenco Engineering Canada ULC

EX-23.2

EX-23.2

Filename: d112598dex232.htm · Sequence: 3

EX-23.2

Exhibit 23.2

RESPEC Company, LLC,

3824 Jet Drive

Rapid City, SD 57703

Consent of RESPEC

Company, LLC (RESPEC)

RESPEC Company, LLC (RESPEC) had appropriate individual Qualified Persons prepare the content in the Sections they were

responsible for, identified below, in the technical report summary titled “Technical Report Summary on the Grassy Mountain Project, Oregon, U.S.A.” (the “TRS”) current as of May 27, 2026 for Paramount Gold Nevada Corp.,

portions of which are summarized on this Current Report on Form 8-K (the “Form 8-K”).

Furthermore, we state that:

i.

The TRS was prepared in accordance with Subpart 229.1300 of Regulations

S-K promulgated by the U.S. Securities and Exchange Commission and supports the Company’s Form 8-K;

ii.

We consent to the incorporation by reference of the TRS in the Registration Statements on Form S-3 (333-275376) and Form S-8 (No. 333-205024,

No. 333-262857 and No. 333-291058) (the “Registration Statements”);

iii.

We consent to the use of and references to our name in connection with the TRS, Form 8-K and the Registration Statements; and

iv.

the information derived, summarized, quoted or referenced from the TRS, or portions thereof, that was prepared

by us, that we supervised the preparation of, and/or that was reviewed and approved by us, that is included or incorporated by reference in the Form 8-K and the Registration Statements.

RESPEC is responsible for authoring, and this consent pertains to, the following sections of the TRS: Geology and Resources: 1.5, 1.6, 1.7, 1.8, 1.9, 1.11,

1.12, 2.4.3, 5, 6, 7, 8, 9.1, 9.2.2, 9.3.2, 11, 22.3, 22.4, 22.5, 22.7, 22.18.1.1, 22.18.1.3, 22.18.2.1, 23.3, 24, 25.2, 25.3 and 25.5 Mine Engineering: 1.13, 1.14, 1.15, 2.4.3, 12, 13.1, 13.7, 13.8, 13.9, 13.10, 13.11.1, 13.11.2, 13.11.3, 13.11.4,

13.11.5, 13.11.7, 13.11.8, 13.12, 13.13, 13.14, 18.1.8, 18.2.2, 22.8, 22.9, 22.18.1.4, 22.18.1.7, 22.18.1.8, 22.18.2.3, 22.18.2.4, 22.18.2.6, 22.18.2.7, 23.4, 24, 25.2, 25.3 and 25.5

Dated at Vancouver, Canada this 14th day of July, 2026

“signed”

/s/ Michael S. Lindholm

Michael S. Lindholm

Principal Geologist

RESPEC Company, LLC

EX-23.3

EX-23.3

Filename: d112598dex233.htm · Sequence: 4

EX-23.3

Exhibit 23.3

Christopher Jason MacMahon, PE

WSP USA Inc.

10615 Professional Circle, Suite 204

Reno, Nevada

89521

Consent of Qualified Person

I, Christopher Jason MacMahon, state that I am responsible for preparing or supervising the preparation of part(s) of the technical report summary titled

“Technical Report Summary on the Grassy Mountain Project, Oregon, U.S.A.”, with an effective date of May 27, 2026, as signed and certified by me (the “Technical Report Summary”) for Paramount Gold Nevada Corp. (the

“Company”).

Furthermore, I state that:

i.

The Technical Report Summary was prepared in accordance with Subpart 229.1300 of Regulations S-K promulgated by the U.S. Securities and Exchange Commission;

ii.

I consent to the Company’s public filing of the Technical Report Summary as an exhibit to and as

referenced in the Company’s Current Report on Form 8-K (“Form 8-K”), and to the incorporation by reference of the Technical Report Summary in the

Registration Statements on Form S-3 (333-275376) and Form S-8 (No. 333-205024, No. 333-262857 and No. 333-291058) (the “Registration Statements”) (collectively, the “Documents”);

iii.

I consent to the use of my name, or any quotation from or summarization in the Documents of the parts of the

Technical Report Summary for which I am responsible (as listed below);

iv.

I confirm that I have read the Documents, and that the Documents fairly and accurately reflect, in the form and

context in which it appears, the information in the parts of the Technical Report Summary for which I am responsible, as follows: 1.17.2 thru 1.17.5, 2.4.5, 15.3 thru 15.7.2, 18.1.10.1, 22.12.3 thru 22.12.5, 24 and 25.2 and 25.3.

Dated at Reno, Nevada this 14th day of July, 2026

“signed”

/s/ Christopher Macmahon

Christopher J, Macmahon, PE (OR)

EX-23.4

EX-23.4

Filename: d112598dex234.htm · Sequence: 5

EX-23.4

Exhibit 23.4

Geotechnical Mine Solutions Inc.,

2957 San

Sebastián Street,

Las Condes, Santiago de Chile

Consent of Geotechnical Mine Solutions Inc. (GMS)

We had appropriate individual Qualified Persons prepare the content in the Sections they were responsible for, identified below, in the technical report

summary titled “Technical Report Summary on the Grassy Mountain Project, Oregon, U.S.A.” (the “TRS”) current as of May 27, 2026 for Paramount Gold Nevada Corp., portions of which are summarized on this Current Report on Form 8-K (the “Form 8-K”).

Furthermore, we state that:

i.

The TRS was prepared in accordance with Subpart 229.1300 of Regulations

S-K promulgated by the U.S. Securities and Exchange Commission and supports the Company’s Form 8-K;

ii.

We consent to the incorporation by reference of the TRS in the Registration Statements on Form S-3 (333-275376) and Form S-8 (No. 333-205024,

No. 333-262857 and No. 333-291058) (the “Registration Statements”);

iii.

We consent to the use of and references to our name in connection with the TRS, Form 8-K and the Registration Statements; and

iv.

the information derived, summarized, quoted or referenced from the TRS, or portions thereof, that was prepared

by us, that we supervised the preparation of, and/or that was reviewed and approved by us, that is included or incorporated by reference in the Form 8-K and the Registration Statements.

GMS is responsible for authoring, and this consent pertains to, the following sections of the TRS: 2.4.2, 13.2, 13.4, 13.5, 13.6, 13.11.6, 22.10, 23.5

and 24.

Dated at Las Condes, Santiago de Chile this 14th day of July, 2026

“signed”

/s/ Andrés Torres L.

Andrés Torres L.

Geotechnical Mine Solutions Inc.

EX-23.5

EX-23.5

Filename: d112598dex235.htm · Sequence: 6

EX-23.5

Exhibit 23.5

SLR International Corporation,

1658 Cole Blvd, Suite

100

Lakewood, Colorado 80401

Consent of SLR International Corporation (SLR)

We had appropriate individual Qualified Persons prepare the content in the Sections they were responsible for, identified below, in the technical report

summary titled “Technical Report Summary on the Grassy Mountain Project, Oregon, U.S.A.” (the “TRS”) current as of May 27, 2026 for Paramount Gold Nevada Corp., portions of which are summarized on this Current Report on Form 8-K (the “Form 8-K”).

Furthermore, we state that:

i.

The TRS was prepared in accordance with Subpart 229.1300 of Regulations

S-K promulgated by the U.S. Securities and Exchange Commission and supports the Company’s Form 8-K;

ii.

We consent to the incorporation by reference of the TRS in the Registration Statements on Form S-3 (333-275376) and Form S-8 (No. 333-205024,

No. 333-262857 and No. 333-291058) (the “Registration Statements”);

iii.

We consent to the use of and references to our name in connection with the TRS, Form 8-K and the Registration Statements; and

iv.

the information derived, summarized, quoted or referenced from the TRS, or portions thereof, that was prepared

by us, that we supervised the preparation of, and/or that was reviewed and approved by us, that is included or incorporated by reference in the Form 8-K and the Registration Statements.

SLR is responsible for authoring, and this consent pertains to, the following sections of the TRS: 1.19, 2.4.4, 3.5, 9.2.3, 9.3.3, 17, 18.1.14, 22.14,

22.18.1.6, 22.18.2.5, 23.6, 23.8, 24, 25.2 and 25.3.

Dated at Colorado, USA this 14th day of July,

2026

“signed”

/s/ Jeremy Scott Collyard

Jeremy Scott Collyard, PMP, MMSA, QP

SLR

International Corporation

EX-99.1

EX-99.1

Filename: d112598dex991.htm · Sequence: 7

EX-99.1

Exhibit 99.1

Date and Signature Page

This technical report summary (the TRS), entitled “Grassy Mountain Project: S-K 1300 Technical Report Summary, Oregon, United States of

America” is current as of May 27, 2026 and has been prepared by:

Qualified Person or Firm

Responsible for the following sections

Signature

Date

Ausenco Engineering Canada ULC

1.1, 1.10, 1.16, 1.17.1, 1.18, 1.20, 1.21, 1.22, 2.1, 2.2, 2.3, 2.4.1, 2.5, 2.6, 2.7, 2.8, 9.2.1, 9.3.1, 10, 13.3, 14, 15.1, 15.2, 15.7.3, 15.8, 15.9, 15.10, 16, 18.1.1, 18.1.2, 18.1.3, 18.1.4, 18.1.5, 18.1.6, 18.1.7, 18.1.9,

18.1.10.2, 18.1.11, 18.1.12, 18.1.13, 18.2.1, 18.2.3, 18.2.4, 19, 22.1, 22.6, 22.11, 22.12.1, 22.12.2, 22.12.6, 22.13, 22.15, 22.16, 22.17, 22.18.1.2, 22.18.1.5, 22.18.1.9, 22.18.1.10, 22.18.2.2, 23.1, 23.2, 23.7, 24, 25

“signed”

July 14, 2026

Geotechnical Mine Solutions Inc.

2.4.2, 13.2, 13.4, 13.5, 13.6, 13.11.6, 22.10, 23.5, 24

“signed”

July 14, 2026

RESPEC Company LLC (Geology and Resources)

1.5, 1.6, 1.7, 1.8, 1.9, 1.11, 1.12, 2.4.3, 5, 6, 7, 8, 9.1, 9.2.2, 9.3.2, 11, 22.3, 22.4, 22.5, 22.7, 22.18.1.1, 22.18.1.3, 22.18.2.1, 23.3, 24, 25.2, 25.3, 25.5

“signed”

July 14, 2026

RESPEC Company LLC (Mine Engineering)

1.13, 1.14, 1.15, 2.4.3, 12, 13.1, 13.7, 13.8, 13.9, 13.10, 13.11.1, 13.11.2, 13.11.3, 13.11.4, 13.11.5, 13.11.7, 13.11.8, 13.12, 13.13, 13.14, 18.1.8, 18.2.2, 22.8, 22.9, 22.18.1.4, 22.18.1.7, 22.18.1.8, 22.18.2.3, 22.18.2.4,

22.18.2.6, 22.18.2.7, 23.4, 24, 25.2, 25.3, 25.5

“signed”

July 14, 2026

SLR International Corporation

1.19, 2.4.4, 3.5, 9.2.3, 9.3.3, 17, 18.1.14, 22.14, 22.18.1.6, 22.18.2.5, 23.6, 23.8, 24, 25.2, 25.3

“signed”

July 14, 2026

WSP USA Inc.

1.17.2, 1.17.3, 1.17.4, 1.17.5, 2.4.5, 15.3, 15.4, 15.5, 15.6, 15.7.1, 15.7.2, 18.1.10.1, 22.12.3, 22.12.4, 22.12.5, 24, 25.2, 25.3

“signed”

July 14, 2026

Paramount Gold Nevada Corp.

1.2, 1.3, 1.4, 3.1, 3.2, 3.3, 3.4, 3.6, 3.7, 3.8, 4, 20, 21, 22.2

“signed”

July 14, 2026

Table of Contents

1  Executive Summary

1

1.1  Introduction

1

1.1.1  Terms of Reference

1

1.1.2  Effective Dates

1

1.2  Property Description

2

1.3  Mineral Tenure, Surface Rights, Water Rights, Royalties and Agreements

2

1.4  Accessibility, Climate, Local Resources, Infrastructure and Physiography

3

1.5  History

3

1.6  Geological Setting, Mineralization and Deposit

4

1.7  Exploration

4

1.8  Sample Preparation, Analyses and Security

5

1.9  Data Verification

6

1.10  Mineral Processing and Metallurgical Testwork

7

1.11  Mineral Resource Estimate

8

1.12  Mineral Resource Statement

10

1.13  Mineral Reserve Estimate

10

1.14  Mineral Reserve Statement

12

1.15  Mining Methods

12

1.15.1 Overview

12

1.15.2 Mine Design

13

1.15.3 Mine Production Plan

14

1.16  Processing and Recovery Methods

15

1.17  Infrastructure

18

1.17.1 Overview

18

1.17.2 Temporary Waste Rock Storage Facilities (TWRSF) and Borrow Pits

18

1.17.3 Tailings Storage Facility

18

1.17.4 Water Management

19

1.17.5 Water Balance

19

1.18  Market Studies and Contracts

19

1.19  Environmental, Permitting and Social Considerations

20

1.19.1 Environmental Considerations

20

1.19.2 Permitting Considerations

20

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page i

May 27, 2026

1.19.3 Social Considerations

20

1.19.4 Closure and Reclamation Considerations

20

1.20  Capital and Operating Cost

20

1.20.1 Capital Cost Estimate

20

1.20.2 Operating Cost Estimate

21

1.21  Economic Analysis

22

1.21.1 Economic Summary

22

1.21.2 Sensitivity Analysis

23

1.22  Conclusions

23

2  Introduction

24

2.1  Introduction

24

2.2  Terms of Reference

24

2.3  Qualified Persons (QP)

24

2.4  Site Visits and Scope of Personal Inspection

25

2.4.1  Site Inspection by the Qualified Person of Ausenco

25

2.4.2  Site Inspection by the Qualified Person of GMS

25

2.4.3  Site Inspection by the Qualified Persons of RESPEC

26

2.4.4  Site Inspection by the Qualified Person of SLR

26

2.4.5  Site Inspection by the Qualified Person of WSP

26

2.5  Effective Dates

26

2.6  Information Sources and References

27

2.7  Previous Technical Reports

27

2.8  Currency, Units, Abbreviations and Definitions

28

3  Property Description

34

3.1  Introduction

34

3.2  Mineral Tenure

35

3.2.1  Mineral Concession Payment Terms

35

3.2.2  Land Access and Ownership Agreements

35

3.2.3  Seabridge Gold Corporation

35

3.2.4  Sherry and Yates, Inc.

36

3.2.5  Cryla LLC

36

3.3  Royalties and Additional Encumbrances

37

3.3.1  Seabridge Gold

37

3.3.2  Sherry and Yates

37

3.3.3  Cryla

38

3.3.4  Other Encumbrances

38

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page ii

May 27, 2026

3.4  Environmental Liabilities

38

3.5  Environmental Permitting

38

3.6  Surface Rights

39

3.7  Water Rights

39

3.8  Summary Statement

39

4  Accessibility, Climate, Local Resources, Infrastructure and Physiography

40

4.1  Access

40

4.2  Physiography

41

4.3  Climate

42

4.4  Water Supply

42

4.5  Power

42

4.6  Infrastructure

42

4.7  Community Services

42

5  History

44

5.1  Introduction

44

5.2  1986-1996 Exploration

44

5.2.1  Atlas 1986-1992

44

5.2.2  Newmont 1992-1996

45

5.2.3  1996 Exploration at Outlying Targets within the Grassy Mountain Claims

Group

45

5.3  1998-2016 Exploration

48

5.3.1  Tombstone 1998

48

5.3.2  Seabridge 2000-2010

48

5.3.3  Calico 2011-2016

49

5.4  Production

50

6  Geological Setting, Mineralization and Deposit

51

6.1  Introduction

51

6.2  Regional Geologic Setting

51

6.3  Local and Project Geology

51

6.4  Grassy Mountain Deposit

54

6.4.1  Geology

54

6.4.2  Structure

56

6.4.3  Alteration and Mineralization

56

6.5  Deposit Types

58

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page iii

May 27, 2026

7  Exploration

60

7.1  Exploration

60

7.2  Drilling

62

7.2.1  Historical Drilling, 1987-2012

66

7.2.2  Paramount 2016–2019

68

7.3  Drill-Hole Collar and Down-Hole Surveys

71

7.4  Sample Quality

72

7.4.1  Core Samples

72

7.4.2  RC Samples

74

7.5  Summary Statement

75

8  Sample Preparation, Analyses, and Security

76

8.1  Introduction

76

8.2  Sample Preparation, Analysis and Security

76

8.2.1  Atlas 1987-1992

76

8.2.2  Newmont 1992-1996

76

8.2.3  Tombstone 1998

77

8.2.4  Calico 2011-2012

77

8.2.5  Paramount 2016-2019

79

8.3  Quality Assurance/Quality Control Procedures

79

8.3.1  Atlas QA/QC, 1987–1992

79

8.3.2  Newmont QA/QC, 1992–1996

80

8.3.3  Tombstone QA/QC, 1998

80

8.3.4  Calico QA/QC, 2011–2012

81

8.3.5  Paramount QA/QC, 2016–2019

81

8.4  Quality Assurance/Quality Control Results

82

8.4.1  Atlas, 1987–1992

82

8.4.2  Newmont, 1992–1996

87

8.4.3  Tombstone 1998

89

8.4.4  Calico, 2011–2012

90

8.4.5  Paramount 2016–2017

93

8.4.6  Paramount 2018–2019

100

8.4.7  Discussion of QA/QC Results

100

8.5  Summary Statement

100

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page iv

May 27, 2026

9  Data Verification

101

9.1  Drill-Hole Data

101

9.1.1  Collar Data

101

9.1.2  Down-Hole Survey Data

102

9.1.3  Assay Data

102

9.1.4  Additional Data Verification

103

9.2  Site and Field Office Inspections

103

9.2.1  Ausenco

103

9.2.2  RESPEC

103

9.2.3  SLR

104

9.3  Summary Statement

104

9.3.1  Ausenco

104

9.3.2  RESPEC

104

9.3.3  SLR

105

10  Mineral Processing and Metallurgical Testing

106

10.1  Introduction

106

10.2  Historical Testwork Programs

107

10.2.1 Historical Studies 1989 to 2012

107

10.2.2 Historical Testwork from 2018 PFS

107

10.3  2020 FS Testwork

108

10.3.1 Objectives

108

10.3.2 SGS Testwork Program 15944-002 Scope of Work

108

10.3.3 McClelland Testwork Program MLI 4551 Scope of Work

108

10.3.4 Sample Selection for SGS Program 15944-02

108

10.3.5 Sample Selection for McClelland Program MLI 4551

109

10.4  Presentation and Discussion of Results

110

10.4.1 Ore Characterization and Deleterious Elements

110

10.4.2 Comminution Test Results

111

10.4.3 Mineralogical Analysis

112

10.4.4 Leach Tests

113

10.4.5 Cyanide Destruction

118

10.5  Metallurgical Variability

119

10.5.2 Sample Selection for SGS Program 15944-02

120

10.5.3 Sample Selection for McClelland Program MLI 4551

120

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page v

May 27, 2026

10.6  Recovery Estimation

120

10.6.1 Leach Recovery, SGS Program 15944-001, SGS Program 15944-002 and McClelland Program

MLI 4551

120

10.7  Summary

126

10.8  Qualified Person’s Opinion on Data Adequacy

127

11  Mineral Resource Estimates

128

11.1  Introduction

128

11.2  Grassy Mountain project Data

128

11.2.1 Drill-Hole Database

128

11.2.2 Topography

128

11.3  Deposit Geology Relevant to Resource Modelling

128

11.4  Geologic Modeling

130

11.5  Water Table and Oxidation Modeling

130

11.6  Density Modeling

130

11.7  Gold and Silver Modeling

131

11.7.1 Mineral Domains

131

11.7.2 Assay Coding, Capping, and Compositing

137

11.7.3 Block Model Coding

139

11.7.4 Grade Interpolation

139

11.7.5 Model Checks

141

11.8  Grassy Mountain Mineral Resources

141

11.8.1 Pit Optimizations, Cutoff Grades and Reporting Prices

141

11.8.2 Mineral Resources

143

11.8.3 Classification

150

11.9  Additional Comments on the Modeling of the Mineral Resources

152

12  Mineral Reserve Estimates

153

12.1  Introduction

153

12.1.1 Estimation Procedure

153

12.2  Mineral Reserve Statement

154

12.3  Economic Cut-off Grade Calculation

154

12.3.1 Gold Price

154

12.3.2 Silver Price

156

12.4  Stope Design

156

12.5  Dilution and Recovery

158

12.5.1 External Dilution

158

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page vi

May 27, 2026

12.5.2 Internal Dilution

159

12.5.3 Mining Recovery

159

12.6  Discussion of Mineral Reserves

159

12.7  Classification

159

13  Mining Methods

161

13.1  Mining Method Selection

161

13.1.1 Underhand Mechanized Cut-and-Fill Mining

161

13.1.2 Mining Method Sequence

165

13.2  Geotechnical Analysis

167

13.2.1 Overview

167

13.2.2 Geotechnical Characterization

168

13.2.3 Golder Geotechnical Appraisal

169

13.2.4 Ausenco Geotechnical Work

171

13.2.5 Feasibility Study Geotechnical Analysis

173

13.2.6 Geotechnical Model

176

13.2.7 Summary of Geotechnical Analysis and Evaluation for Underground Mining

178

13.3  Hydrogeological modelling

178

13.4  Excavation Design

178

13.4.1 Mining Method Selection

178

13.4.2 Drift Sizes and Stability Assessments

179

13.5  Numerical Modelling

182

13.5.1 Ground Support

189

13.5.2 Ground Monitoring Program

190

13.5.3 Global Extraction Sequence

190

13.6  Portal Design

191

13.7  Grade Control

192

13.8  Personnel

192

13.9  Development Design

192

13.9.1 Mine Design Parameters

192

13.9.2 Level Access

193

13.9.3 Station Design

194

13.10 Equipment Selection

195

13.11  Production and Development Productivity Assumptions

195

13.11.1 Drilling and Bolting

195

13.11.2 Shotcrete

197

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page vii

May 27, 2026

13.11.3 Blasting

200

13.11.4 Mucking

200

13.11.5 Hauling

201

13.11.6 Backfilling

203

13.11.7 Backfill Plant

206

13.11.8 Production Scheduling

208

13.12 Underground Infrastructure and Services

209

13.12.1 Ventilation

209

13.12.2 Underground Dewatering

211

13.12.3 Underground Power

212

13.12.4 Underground Communications

213

13.12.5 Underground Refuge and Escape Ways

213

13.13 Mining Costs

214

13.14 Life-of-Mine Production

214

14  Processing and Recovery Methods

220

14.1  Introduction

220

14.2  Process Design Criteria

220

14.3  Process Flowsheet Development

222

14.4  Overall Process Description

225

14.4.1 Crushing Circuit

225

14.4.2 Grinding Circuit

226

14.4.3 Leach/CIL

226

14.4.4 Carbon Management

227

14.4.5 Gold Room

228

14.4.6 Cyanide Detoxification and Tailings Deposition

229

14.4.7 Reagent Handling and Storage

229

14.4.8 Air Supply and Distribution

231

14.4.9 Water Supply and Distribution

231

14.5  Personnel

232

14.6  Sampling and Metallurgical Laboratory

232

14.7  Projected Energy Requirements

232

14.8  Project Water Requirements

232

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page viii

May 27, 2026

15  Infrastructure

234

15.1  Introduction

234

15.2  Access

236

15.3  Temporary Waste Rock Storage Facility (TWRSF)

236

15.4  Basalt Borrow Quarry

236

15.5  Tailings Storage Facility

237

15.5.1 Topography, Drainage, and Vegetation

239

15.5.2 Past Studies, Subsurface Investigations, and Civil Design

239

15.5.3 Design Objectives

240

15.5.4 TSF Design

241

15.5.5 Monitoring

243

15.5.6 Closure

244

15.6  Closure Cover Borrow Areas

245

15.7  Water Management

245

15.7.1 Non-Contact Water Management

245

15.7.2 Contact Water Management

247

15.7.3 Site-wide Water Balance

249

15.8  Built Infrastructure

250

15.9  Camps and Accommodation

251

15.10 Power and Electrical

251

16  Market Studies

252

16.1  Introduction

252

16.2  Market Studies

252

16.3  Metal Pricing and Projections

252

16.3.1 Economic Analysis

252

16.3.2 Metal Pricing Forecasts

253

16.4  Contracts

254

16.5  QP Comment

254

17  Environmental Studies, Permitting, Plans, Negotiations or Agreements with Local

Individuals or Groups

255

17.1  Introduction

255

17.2  Permit History

257

17.3  Project Permits

257

17.4  State of Oregon Permit Processing

257

17.4.1 Federal Plan of Operations Processing

260

17.4.2 Malheur County Permit Processing

261

17.5  Environmental Study Results and Known Issues

261

17.5.1 Baseline Studies

261

17.5.2 Geochemical Characterization and Groundwater Studies

263

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page ix

May 27, 2026

17.6  Waste Disposal, Monitoring, Water Management

264

17.7  Social and Community Issues

265

17.8  Closure

265

17.9  Environmental and Permitting Risks and Opportunities

266

17.10 Qualified Person’s Opinion

267

18  Capital and Operating Costs

268

18.1  Capital Cost Estimate

268

18.1.1 Introduction

268

18.1.2 Cost Estimate Summary – Initial Capital

269

18.1.3 Cost Estimate Summary – Sustaining Capital

271

18.1.4 Definition of Costs

271

18.1.5 Methodology

272

18.1.6 Exchange Rates

272

18.1.7 Market Availability

271

18.1.8 Mining Capital Cost Estimate

271

18.1.9 Processing and Overall Site Infrastructure Capital Cost Estimate

276

18.1.10 Tailings Storage and Temporary Waste Rock Storage Facilities Capital Cost

Estimate

281

18.1.11 Indirect Capital Cost Estimate

282

18.1.12 Owner’s Costs

284

18.1.13 Contingency

285

18.1.14 Reclamation and Closure Capital Cost Estimate

285

18.2  Operating Cost Estimate

285

18.2.1 Summary and Basis of Operating Cost Estimate

285

18.2.2 Mining Operating Cost Estimate

286

18.2.3 Process Operating Cost Estimate

288

18.2.4 General and Administrative Operating Cost Estimate

291

19  Economic Analysis

292

19.1  Forward-Looking Information

292

19.2  Methodology Used

293

19.3  Financial Model Parameters

294

19.4  Taxes

294

19.5  Royalty

294

19.6  Economic Analysis

295

19.7  Sensitivity Analysis

299

19.8  Conclusion – Economic Analysis

302

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page x

May 27, 2026

20  Adjacent Properties

303

21  Other Relevant Data and Information

304

22  Interpretation and Conclusions

305

22.1  Introduction

305

22.2  Mineral Tenure, Surface Rights, Water Rights, Royalties and Agreements

305

22.3  Geology and Mineralization

305

22.4  Exploration

306

22.5  Analytical Data Collection in Support of Mineral Resource Estimation

306

22.6  Metallurgical Testwork

306

22.7  Mineral Resource Estimation

307

22.8  Mineral Reserve Estimates

308

22.9  Mining Method

308

22.10 Geotechnical Considerations

309

22.11 Processing and Recovery Methods

310

22.12 Infrastructure

310

22.12.1 Key Infrastructure

310

22.12.2 Roads and Power

310

22.12.3 Waste Rock Storage and Borrow Pits

310

22.12.4 Tailings Storage Facility

310

22.12.5 Water Management

311

22.12.6 Water Supply

311

22.13 Markets and Contracts

311

22.14 Environmental, Permitting and Social Considerations

312

22.15 Capital Cost Estimate

312

22.16 Operating Cost Estimate

313

22.17 Economic Analysis

313

22.18 Risks and Opportunities

314

22.18.1 Risks

314

22.18.2 Opportunities

317

23  Recommendations

319

23.1  Introduction

319

23.2  Metallurgical Testing

319

23.3  Mineral Resource Estimate

319

23.4  Mining Methods

320

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page xi

May 27, 2026

23.5  Geotechnical

321

23.6  Hydrology

323

23.7  Infrastructure

323

23.8  Environmental Studies, Permitting and agreements with local individuals or

groups

324

24  References

325

25  Reliance on Information Provided by the Registrar

331

25.1  Introduction

331

25.2  Property Agreements, Mineral Tenure, Surface Rights and Royalties

331

25.3  Environmental, Permitting, Closure, and Social and Community Impact

331

25.4  Taxation

332

25.5  Markets

332

Appendix A – Claims List

333

List of Tables

Table 1-1:

Grassy Mountain Mineral Resource Estimate Inclusive of Mineral Reserves – Effective date: February 28, 2026

10

Table 1-2:

Cut-off Grade Input Parameters for Gold Metal

11

Table 1-3:

Gold and Silver Mineral Reserve Estimates

12

Table 1-4:

Initial Capital Cost Estimate Summary (direct and indirect)

21

Table 1-5:

Summary of forecast project economics

22

Table 2-1:

Abbreviations and Acronyms

28

Table 2-2:

Units of Measurement

31

Table 7-1:

Grassy Mountain Claim Block Drilling Summary

62

Table 7-2:

Paramount 2016–2019 RC Pre-Collar vs. Core Lengths

70

Table 8-1:

Grassy Mountain Certified Reference Materials for 2011–2012

81

Table 8-2:

Grassy Mountain Certified Reference Materials Employed by Paramount, 2016–2019

82

Table 10-1:

Metallurgical Testwork Summary

106

Table 10-2:

2018 PFS Testwork Scope

109

Table 10-3:

Metallurgical Test Matrix for SGS Program 15944-002

109

Table 10-4:

FS Production Composites Sample Composition

110

Table 10-5:

Head Assays

110

Table 10-6:

Hazen 1990 Comminution Results

111

Table 10-7:

Summary of JK DWT Results

111

Table 10-8:

Bond Rod Mill Grindability Test Results

112

Table 10-9:

Ball Mill Work Indices

112

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page xii

May 27, 2026

Table 10-10:

Average Cyanide and Lime Consumption

117

Table 10-11:

Cyanide Destruction Test Results from Historical Work

118

Table 10-12:

Cyanide Destruction Test Results – Continuous Test

118

Table 10-13:

Leach Test Data Used for Recovery Estimation

121

Table 10-14:

Estimated Additional Plant Losses for Gold

125

Table 10-15:

Estimated Additional Plant Losses for Silver

126

Table 11-1:

Hazen Research, Inc. tonnage Factors

130

Table 11-2:

Combined Atlas and Paramount tonnage Factors

131

Table 11-3:

Approximate Grade Ranges of Gold and Silver Domains

132

Table 11-4:

Grassy Mountain Gold and Silver Assay Caps by Domain

137

Table 11-5:

Descriptive Statistics of Grassy Mountain Coded Gold Assays

137

Table 11-6:

Descriptive Statistics of Grassy Mountain Coded Silver Assays

138

Table 11-7:

Descriptive Statistics of Grassy Mountain Gold Composites

138

Table 11-8:

Descriptive Statistics of Grassy Mountain Silver Composites

138

Table 11-9:

Estimation Parameters

140

Table 11-10:

Pit Optimization Parameters

142

Table 11-11:

Parameters Used to Determine Cut-Off Grade for Mineral Resources Potentially Amenable to Underground Mining Methods

143

Table 11-12:

Grassy Mountain Gold and Silver Resources – Exclusive of Mineral Reserves

144

Table 11-13:

Grassy Mountain Gold and Silver Resources – Inclusive of Mineral Reserves

145

Table 11-14:

Resource Classification Parameters

151

Table 12-1:

Mineral Reserves Statement

154

Table 12-2:

Cut-off Grade Input Parameters for Gold Metal

155

Table 12-3:

Total Mineral Reserves Multiplied by the Metal Price

156

Table 12-4:

Stope Optimization Parameters

157

Table 12-5:

Reserve Classification Parameters

160

Table 13-1:

Rock Quality Categories

170

Table 13-2:

Rock Quality Categories

172

Table 13-3:

Summary of RMR (Bieniawski, 1976) Values by Area

173

Table 13-4:

Intact Rock Strength for Geotechnical Units Calculated from PLTs

175

Table 13-5:

Summary of RQD, RMR76, and GSI 2013 Values by Geotechnical Unit

177

Table 13-6:

Strength Parameters for Geotechnical Units

177

Table 13-7:

Iso-Probability Contours for Stable Cases Results

180

Table 13-8:

Iso-Probability Contours for Failure Cases Results

181

Table 13-9:

Reinforcement and Support Design for Mine Development Under Rock Mass Environment

189

Table 13-10:

Reinforcement and Support Design for Mine Development Under Backfill Environment

189

Table 13-11:

Mine Design Parameters

192

Table 13-12:

Mining Mobile Equipment List

195

Table 13-13:

Drilling First Principles Assumptions

196

Table 13-14:

Bolting First Principles Assumptions

197

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page xiii

May 27, 2026

Table 13-15:

Shotcrete First Principals Assumptions

198

Table 13-16:

Blasting First Principles Assumptions

200

Table 13-17:

Haulage First Principles Assumptions

202

Table 13-18:

CRF Mix Recipe for UCS Testing

204

Table 13-19:

Calendars by Crew

208

Table 13-20:

Production Rates

208

Table 13-21:

Production Limits on Production Fields

208

Table 13-22:

Estimated Underground LOM Water Requirement

212

Table 13-23:

Mine Production Summary

217

Table 13-24:

Material to the Mill

218

Table 13-25:

Development Schedule

220

Table 14-1:

Process Design Criteria

241

Table 15-1:

Stage Capacity Relationship

249

Table 15-2:

Annual Average Water Balance

250

Table 15-3:

Built Infrastructure Requirements

252

Table 16-1:

Estimated Payability and Refining Costs

253

Table 16-2:

Gold Price Average (LBMA PM), $/oz

253

Table 16-3:

Silver Price Average (LBMA PM), $/oz

253

Table 16-4:

Mid-term gold price estimate by year from various organizations

255

Table 17-1:

Surface Disturbance for the Proposed Project

256

Table 17-2:

Permitting

268

Table 18-1:

Capital Cost Estimate Input Areas

270

Table 18-2:

Initial Capital Cost Estimate Summary (direct and indirect)

270

Table 18-3:

Initial Capital Cost Estimate by Major Discipline

271

Table 18-4:

Sustaining Capital Cost Estimate Summary (direct and indirect)

273

Table 18-5:

Exchange Rates used in the FS

273

Table 18-6:

Underground Capital Costs

275

Table 18-7:

Underground Leasing Costs

275

Table 18-8:

Initial Mining Capital Cost Estimate Summary

280

Table 18-9:

Initial Capital Cost Estimate Summary for Process and Site Infrastructure Areas

272

Table 18-10:

Initial TSF Capital Cost Estimate Summary

284

Table 18-11:

Initial Capital Cost Estimate Summary for Indirects

284

Table 18-12:

Initial Owner’s Cost Estimate Summary

284

Table 18-13:

Summary of operating costs over LOM

286

Table 18-14:

Summary of Underground Mining Costs per ton

286

Table 18-15:

Underground Labor Summary

287

Table 18-16:

Average Annual Process Operating Cost

289

Table 18-17:

Process Plant Labor

290

Table 18-18:

Annual Average G&A Operating Cost Summary

291

Table 19-1:

Summary of Forecast Project Economics

296

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page xiv

May 27, 2026

Table 19-2:

Project Cashflow on an Annualized Basis

296

Table 19-3:

Summary Pre-Tax Sensitivity Analysis

299

Table 19-4:

Summary Post-Tax Sensitivity Analysis

300

Table 23-1:

Phase 1 Recommended Work Program

318

Table 23-2:

Recommended Work Program for Mineral Resource Estimate

319

Table 23-3:

Recommended Work Program for Mining Methods

320

Table 23-4:

Recommended Geotechnical Program

322

List of Figures

Figure 1-1:

Proposed Mine Production Schedule (tons by period)

14

Figure 1-2:

Simplified Overall Flowsheet

16

Figure 1-3:

Proposed Plant Site Layout

17

Figure 2-1:

Project Location Plan

25

Figure 3-1:

Location of the Grassy Mountain Project

34

Figure 3-2:

Grassy Mountain Claim Group

36

Figure 3-3:

Sherry and Yates Area of Interest

37

Figure 4-1:

Access to Grassy Mountain Claims Group

40

Figure 4-2:

Photograph of Grassy Mountain Area Looking

41

Figure 4-3:

Proposed Power Source for the Planned Operation

43

Figure 5-1:

Outlying Target Area Map

46

Figure 5-2:

Map of 2012 CSMAT Lines

49

Figure 5-3:

CSAMT Inversion: Resistivity at 328 to 656 Feet Below Surface

50

Figure 6-1:

Grassy Mountain Regional Geology

52

Figure 6-2:

Stratigraphic Column for the Grassy Mountain Area

53

Figure 6-3:

Grassy Mountain Deposit Area Geologic Map

55

Figure 6-4:

Conceptual Hot-Springs Epithermal Deposit Model

59

Figure 7-1:

2018 Aerial Magnetic Survey of Grassy Mountain Area

61

Figure 7-2:

Locations of Drill Holes Within the Grassy Mountain Claims Group

63

Figure 7-3:

Locations of Holes Drilled in the Grassy Mountain Deposit Area

65

Figure 7-4:

Gold Grade vs. RQD

73

Figure 7-5:

Gold Grade vs. Core Recovery

74

Figure 8-1:

Cone Analyses of Preparation Duplicates Relative to Original Chemex Gold Assays

83

Figure 8-2:

Hunter Analyses of Preparation Duplicates Relative to Original Chemex Gold Assays

84

Figure 8-3:

Chemex Analyses of RC Field Duplicates Relative to Original Chemex Gold Assays

85

Figure 8-4:

Shasta Check Analyses Relative to Original Chemex Gold Assays

86

Figure 8-5:

RMGC Check Analyses Relative to Original RMGC Gold Assays

87

Figure 8-6:

RMGC Core Duplicate “B” Relative to RMGC “A” Gold Assays

88

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page xv

May 27, 2026

Figure 8-7:

AAL Preparation Duplicate Analyses Relative to AAL Original Gold Assays

89

Figure 8-8:

Chart of ALS Analyses of CRM CDN-GS-3J

91

Figure 8-9:

Chart of ALS Analyses of Coarse Blanks – Calico

92

Figure 8-10:

AAL Pulp Checks of ALS Original Gold Analyses

94

Figure 8-11:

Chart of ALS Analyses of Coarse Blanks – Paramount

95

Figure 8-12:

ALS Gold Analyses Preparation Duplicates – Paramount

96

Figure 8-13:

Core Duplicates Relative to Original Gold Assays – Paramount

97

Figure 8-14:

Second Set of Paramount Core Duplicates Relative to Original Gold Assays

98

Figure 8-15:

Paramount RC Duplicates Relative to Original Gold Analyses

99

Figure 10-1:

Gold Leach Extraction Rate

114

Figure 10-2:

Gold Leach Extraction Rate for Grade Variability Samples

115

Figure 10-3:

Silver Leach Extraction Rate for Grade Variability Samples

116

Figure 10-4:

Drill Hole and Interval Locations for Samples in the SGS 2018 and 2020 and McClelland Programs

119

Figure 10-5:

Relationship Between Leach Feed and Residue Grades for Gold

123

Figure 10-6:

Relationship Between Leach Feed and Residue Grades for Silver

123

Figure 10-7:

Predicted versus Measured Recovery for Gold

124

Figure 10-8:

Predicted versus Measured Recovery for Silver

125

Figure 11-1:

Cross-section 3050 Showing Geology and Gold Domains

133

Figure 11-2:

Cross-section 3050 Showing Geology and Silver Domains

134

Figure 11-3:

Cross-section 3250 Showing Geology and Gold Domains

135

Figure 11-4:

Cross-section 3250 Showing Geology and Silver Domains

136

Figure 11-5:

Cross-section 3050 Showing Block-Model Gold Grades

146

Figure 11-6:

Cross-section 3050 Showing Block-Model Silver Grades

147

Figure 11-7:

Cross-section 3250 Showing Block-Model Gold Grades

148

Figure 11-8:

Cross-section 3250 Showing Block-Model Silver Grades

149

Figure 12-1:

Monthly Average Gold Price, $/oz

155

Figure 12-2:

Mine Production Design of Level 3210, Plan View

158

Figure 12-3:

Ore and Waste Designation

160

Figure 13-1:

Grassy Mountain Mine Cross-section Looking North

161

Figure 13-2:

Proposed Grassy Mountain Mine Plan (plan view)

162

Figure 13-3:

Drift Profiles

163

Figure 13-4:

Production Drift Layout (Section Looking East)

164

Figure 13-5:

Detailed level Sequence for a Typical Level

165

Figure 13-6:

Mining Lifts

166

Figure 13-7:

Golder Rock Mass Rating (all 2016–2017 core)

170

Figure 13-8:

RMR 76 Histogram from 27 Drill Holes

171

Figure 13-9:

Examples of Three Geotechnical Rock Classes

173

Figure 13-10:

GM19-37 Core Trays (89.5 to 105.5 ft.) – High Variability in Geotechnical Conditions

174

Figure 13-11:

Iso-Probability Contours for Stable Cases

180

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page xvi

May 27, 2026

Figure 13-12:

Iso-probability contours for failure cases (Mawdesley, 2001)

181

Figure 13-13:

Modeling Results for Decline Ramp; a) Major Principal Stress, S1; b) Minor Principal Stress, S3; c) Strength Factor, SF; d) Displacements

183

Figure 13-14:

Modeling Results for Topcut A; a) Major Principal Stress, S1; b) Minor Principal Stress, S3; c) Strength Factor, SF; d) Displacements

184

Figure 13-15:

Modeling Results for Undercut B; a) Major Principal Stress, S1; b) Minor Principal Stress, S3; c) Strength Factor, SF; d) Displacements

185

Figure 13-16:

Modeling Results for Undercut C; a) Major Principal Stress, S1; b) Minor Principal Stress, S3; c) Strength Factor, SF; d) Displacements

186

Figure 13-17:

Three-Dimensional Model of Finite Difference

187

Figure 13-18:

Level Access Layout (Looking North)

193

Figure 13-19:

Station Design

194

Figure 13-20:

Sandvik DD422i

196

Figure 13-21:

GetMan Proshot Concrete Sprayer

197

Figure 13-22:

GetMan ProMix 6

198

Figure 13-23:

3360 Shotcrete Thickness (units in inches)

199

Figure 13-24:

Sandvik LH307 Underground Loader

201

Figure 13-25:

Sandvik TH320 trucks

201

Figure 13-26:

Waste Haulage by Year

203

Figure 13-27:

Mixing, Casting and Curing Process

205

Figure 13-28:

UCS Results vs Curing Time

206

Figure 13-29:

Simem WB100 Backfill Plant

207

Figure 13-30:

Ventilation Network (isometric view looking west)

209

Figure 13-31:

Ventilation Network (Section View Looking Northwest)

210

Figure 13-32:

Surface Ventilation Fan (Section View)

210

Figure 13-33:

Design of Vent Raises

211

Figure 13-34:

Mine Load Center (1000 kVA)

213

Figure 13-35:

Mobile Refuge Station

214

Figure 13-36:

Proposed Mine Production Schedule (tons by period)

218

Figure 13-37:

Mine Production Schedule (ounces by period)

218

Figure 14-1:

Simplified Overall Flowsheet

222

Figure 14-2:

Proposed Plant Site Layout

223

Figure 14-3:

Projected Daily Plant Water Balance, at average LOM throughput

232

Figure 15-1:

Proposed Infrastructure Layout Plan

234

Figure 15-2:

Overall TSF Layout

237

Figure 15-3:

TSF Main (North) Embankment Cross-section

241

Figure 15-4:

Site-wide Hydrologic Catchment Areas

245

Figure 15-5:

Process Plant Stormwater Contact and Non-contact Catchment Areas

247

Figure 18-1:

Proposed Mine Organizational Chart

287

Figure 19-1:

Forecast Project Post-Tax Unlevered, Undiscounted Free Cash Flow ($ M)

294

Figure 19-2:

Pre-Tax NPV & IRR Sensitivity Results

299

Figure 19-3:

Post-Tax NPV & IRR Sensitivity Results

299

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page xvii

May 27, 2026

1

EXECUTIVE SUMMARY

1.1

Introduction

Ausenco Engineering Canada ULC (Ausenco), Geotechnical Mine Solutions Inc. (GMS), RESPEC Company LLC (RESPEC), SLR International Corporation (SLR) and WSP USA

Inc. (WSP) compiled an updated technical report summary (the Report) on a feasibility study (the FS) completed on the Grassy Mountain Project (the Project) for Paramount Gold Nevada Corp. (Paramount), located in Oregon, USA.

This Report updates the previously filed technical report summary entitled, “Grassy Mountain Project: S-K 1300 Technical Report Summary on

Feasibility Study, Oregon, United States” with an effective date of June 30, 2022. Updates include the mineral resource estimate, mineral reserve estimate, capital costs, operating costs and the economic analysis.

Paramount holds its Project interest through an indirectly wholly owned subsidiary, Calico Resources USA Corp. (Calico).

1.1.1

Terms of Reference

Measurement units used in this Report are generally U.S. customary; however, certain data, such as analytical and metallurgical testwork units may be presented

in metric units. Unless otherwise stated, all monetary amounts are in United States dollars (USD).

Mineral resources and mineral reserves are reported

using the definitions in subpart 229.1300 – Disclosure by Registrants Engaged in Mining Operations in Regulations (S-K 1300).

1.1.2

Effective Dates

The Report has a number of effective dates as follows:

Mineral Resource estimates: February 28, 2026

Mineral Reserve estimate: May 15, 2026

Date of financial analysis that supports the Mineral Reserves: May 27, 2026.

The overall effective date of this Report is the effective date of the financial analysis, which is May 27, 2026.

Grassy Mountain Project, Property Location

S - K 1300 Technical Report Summary

Page 1

May 27, 2026

1.2

Property Description

The Grassy Mountain deposit is situated near the western edge of the Snake River Plain in eastern Oregon, 20 miles (mi) south of the town of Vale, Oregon and

about 70 miles west of the city of Boise, Idaho. Support services for mining and other resource sector industries in the region would primarily be provided by these communities. The closest major airport is at Boise, which is a commercial airport

served by all major U.S. airlines.

Access to the main Grassy Mountain deposit within the Grassy Mountain claims group is provided by Twin Springs Road, a

seasonally maintained unpaved road that originates at Russell Road, a paved two-lane county road that joins with U.S. Highway 20 approximately four miles west of Vale.

1.3

Mineral Tenure, Surface Rights, Water Rights, Royalties and Agreements

The Grassy Mountain Project is located within Malheur County and is comprised of the Grassy Mountain claims group, which covers 9,300 acres. The mineral tenure

holdings comprise 436 unpatented lode and mill site claims, three patented claims, and a land lease for 28 unpatented lode mining claims. Claims are held in the name of Paramount’s U.S. subsidiary, Calico.

Patented claims were individually surveyed at the time of location. Unpatented claim and fee land boundaries were established initially by handheld global

positioning system (GPS) units and were formally surveyed in 2011.

Calico acquired all right, title and interest in the Project, including all existing

exploration and water rights pertaining to the Grassy Mountain Project, pursuant to a “Deed and Assignment of Mining Properties” between Seabridge Gold Inc. (Seabridge Gold), Seabridge Gold Corporation (collectively Seabridge) and Calico

dated February 5, 2013. Paramount acquired Calico in July 2016 and amalgamated the two companies.

Paramount’s 100% ownership of the Grassy

Mountain project is subject to underlying agreements and royalties.

Seabridge Gold is entitled to a 10% net profits interest (NPI) royalty. Pursuant to

the Deed of Royalties, within 30 days following the day that Calico made a production decision and construction financing was secured, Seabridge may elect to cause Calico to purchase the 10% NPI for 10 million CAD. Otherwise Seabridge will

retain the 10% NPI. Seabridge, at the Report effective date, is the second largest Paramount shareholder and has indicated that it will convert its NPI into equity in Paramount, thus the Seabridge NPI has not been included in the FS.

Sherry and Yates, Inc. (Sherry and Yates) are entitled to a 1.5% royalty of the gross proceeds on any production from three patented and 37 unpatented mining

claims, and a surrounding 1⁄2 mile area of interest. The royalty is not subject to any advance-royalty payments. The royalty covers the area of the Grassy Mountain

deposit.

Cryla LLC (Cryla) leased 28 unpatented lode mining claims located west of Grassy Mountain to Calico in 2018. Calico is required to make an

annual lease payment of $60,000 for the ongoing 25-year lease agreement. Calico is eligible to acquire the Property for $560,000 plus $3/oz of gold reserves, as defined by a pre-feasibility or higher confidence-level study. Cryla is entitled to a 2%

net smelter return (NSR) if the gold price is ≤$1,500/oz and a 4% NSR if the gold price >$1,500/oz. Calico is entitled to reduce the NSR to 1% by paying Cryla $800,000 under any circumstances. No Mineral Resources or Mineral Reserves are

estimated on the Cryla claims.

Grassy Mountain Project, Property Location

S - K 1300 Technical Report Summary

Page 2

May 27, 2026

Paramount holds three patented claims over the Grassy Mountain deposit, which provides surface rights for

that area. The surrounding surface rights associated with the proposed locations of the Project surface facilities belong to the Federal government and are managed by the Vale District Bureau of Land Management (BLM) office.

Paramount holds a water right granted by the Oregon Water Resources Department to Calico. The water right was issued on April 5, 1990, through State of

Oregon Water Rights Application G-11847 and Permit G-10994. Use is limited to not more than 2.0 ft3/s (897.6 gpm) measured at the well. On October 16, 2019, the State of Oregon issued a new

Permit to Appropriate the Public Waters (G-18337) that replaces the previous permit and includes the requested modifications. This permit does not change the 2.0 ft3/s of water use allowed.

1.4

Accessibility, Climate, Local Resources, Infrastructure and Physiography

The climate is semi-arid and continental-interior in type. Average annual precipitation is approximately about nine inches, roughly half of which falls as snow

between November and March. Mining activities are expected to be conducted year-round.

The Project area is in the semi-arid high desert plateau region of

eastern Oregon. Elevations range from 3,330 to 4,300 ft above mean sea level at the main Grassy Mountain claims group area. The terrain is mainly open steppe with mesas, broad valleys, and gently rolling hills to steeper uplands.

Vegetation across the entire area consists of sagebrush, weeds, and desert grasses tolerant of semi-arid conditions.

As of the effective date of this Report, groundwater monitoring wells and unpaved access and drilling roads are the only existing infrastructure within the

Grassy Mountain Project area. The infrastructure required for the proposed operation is detailed in Section 15.

The nearest community to the Project

is Vale, which has a population of approximately 1,700. Vale provides fuel, restaurants, lodging, groceries, hardware supplies, and equipment-repair shops are available in Vale. Other logistical support is available in the nearby communities of

Nyssa and Ontario, both of which are located within 30 mi of the Project. The metropolitan area of Boise, Idaho, is approximately a 90-minute drive from the Project site. Mining personnel, equipment suppliers, engineering expertise, and

telecommunications services are all expected to be readily available within the region.

1.5

History

Companies and individuals involved in exploration prior to Paramount’s Project interest include prospectors Richard “Dick” Sherry and Eugene

“Skip” Yates (Sherry and Yates), Atlas Precious Metals (Atlas), Golden Predator Mines U.S. Inc., Newmont Exploration Ltd (Newmont), Tombstone Exploration Company Ltd. (Tombstone), Seabridge Gold, and Calico BC. Work completed included

reconnaissance, geological mapping, geochemical sampling (soil, float, rock chip), geophysical surveys [airborne magnetic and radiometric, ground-based gravity, gradient array (IP/resistivity) controlled-source audio-frequency magnetotelluric

(CSAMT)], core and reverse circulation (RC) drilling, and Mineral Resource estimation. This work defined the Grassy Mountain deposit, on which a feasibility study was completed in 1990 by Atlas assuming a combined heap leach/milling operation and

open pit mining methods.

Grassy Mountain Project, Property Location

S - K 1300 Technical Report Summary

Page 3

May 27, 2026

1.6

Geological Setting, Mineralization and Deposit

The geological setting, hydrothermal alteration, styles of gold-silver mineralization, and close spatial and timing association with silica sinter deposition,

indicate that Grassy Mountain is an example of the hot-springs subtype of low-sulfidation, epithermal precious-metals deposits.

The Miocene-age Lake

Owyhee volcanic field is the regional host to a number of recognized epithermal hot-spring precious-metal deposits, of which the Grassy Mountain deposit is the largest. Initial large-volume peralkaline and subalkaline caldera volcanism was followed

by subsidence, forming extensive grabens. These were filled by small-volume metaluminous high-silica rhyolite domes and flows, small-volume basalt flows and mafic vent complexes, and co-eval lacustrine and fluvial sediments.

The Grassy Mountain deposit extends for about 1,900 ft along a N60°E to N70°E axis, as much as 2,700 ft in a northwest–southeast direction, and

as much as 1,240 ft vertically.

The deposit is hosted in units of the Miocene Grassy Mountain Formation, consisting of interbedded conglomerate,

sandstone, siltstone, tuffaceous siltstone, mudstone, and several silica sinter deposits. It is situated within a zone of complex extensional block faulting and rotation, dominated by N30°W to N10°E striking normal faults (graben faults). A

set of orthogonal, N70°E-striking high-angle faults of minor displacement are inferred to link the graben faults.

Silicification (silica sinter,

pervasive silica flooding, and as cross-cutting chalcedonic veins, veinlets, and stockworks) is the principal hydrothermal alteration type associated with gold–silver mineralization. In some parts of the deposit, particularly within arkose and

sandy conglomerate units, silicification can be accompanied by potassic alteration in the form of adularia flooding.

Mineralization is developed largely

within the silicic and potassic alteration zones. Three distinct and overlapping types of gold–silver mineralization are recognized within the central core of the deposit. These are gold-bearing chalcedonic quartz ± adularia veins,

disseminated mineralization in silicified siltstone and arkose, and gold and silver in bodies of clay matrix breccia. Gold mostly occurs as electrum along the vein margins or within microscopic voids Lower-grade mineralization envelopes the

higher-grade core and, further from the core, extends outwards as stratiform, mineralized lenses parallel to bedding.

1.7

Exploration

Since acquiring its Project interest in 2016, Paramount has conducted an exploration review of the available Project data, helicopter-borne aeromagnetic and

radiometric and CSAMT ground geophysical surveys, drilling, Mineral Resource and Mineral Reserve estimation, baseline environmental studies, and mining studies. A feasibility study was completed in 2020, with further update completed in 2022 and in

2026 (the work covered in this report).

A number of prospects were located during the exploration programs. Of these, the Crabgrass, Bluegrass, North

Bluegrass, Ryegrass and Dennis’ Folly areas in the Grassy Mountain claims block were recommended for surface work with the goal of defining further exploration drill targets.

No production is known from the Project area.

Grassy Mountain Project, Property Location

S - K 1300 Technical Report Summary

Page 4

May 27, 2026

1.8

Sample Preparation, Analyses and Security

The database includes a total of 264,112 ft drilled by four historical operators (Atlas, Tombstone, Newmont, Calico BC), from 1987 through 2012, in 442 drill

holes. Paramount drilled 34 holes for a total of 25,511 ft in 2016–2019 to bring the Project total to 476 holes and 289,623 ft drilled. Approximately 77% of the footage drilled was at, and adjacent to, the Grassy Mountain deposit area,

although nearly 43% of the holes were drilled at outlying prospects, as well as for water wells.

The bulk of the drill holes in the Grassy Mountain

deposit area was drilled using RC, accounting for 77% of the footage drilled. Holes drilled using core methods account for about 12% of the footage drilled in the deposit area, and holes drilled with RC pre-collars and core tails account for about

11%. A total of 256 of the drill holes in the Grassy Mountain deposit area support Mineral Resource estimation, including 34 Paramount drill holes and 252 historical drill holes.

During the Calico BC and Paramount drill programs, logging recorded lithological, alteration, mineralization, and structural information, including the angle

of intersection of faults with the core, fault lineations, fractures, veins, and bedding. Up until Calico BC’s involvement in the Project in 2011, the Project coordinates were based on a local grid established by Atlas. All Calico and

subsequent drill-hole collar surveys were collected directly in UTM coordinates. Where information is recorded, drill collars were located using total station, Trimble, survey-grade GPS, and Topcon Hiper V GPS Receivers instrumentation. Down hole

surveys were performed, where recorded, using Eastman, REFLEX EZ-Track, gyroscopic, Goodrich-Humphrey surface-recording gyroscopic and Goodrich surface-recording gyroscopic instruments.

Wet RC cuttings were split using a variable or rotary wet-cone splitter positioned below the cyclone on the RC rigs. Dry cuttings were split under the cyclone

with a Jones splitter. During the Calico BC and Paramount drill programs, core sample lengths generally did not exceed 5 ft and, where possible, correlated to the 5 ft drilling runs. Competent core was cut using either a hydraulic splitter or a

diamond blade core saw. During the Newmont program material too fine to be sawed was carefully swept out of the core boxes for each sample interval, split into halves using a Jones splitter, and recombined with the half-core to be sent for assaying.

During the Calico BC and Paramount drill programs, core that was intensely broken or very soft was split in half using a small scoop or putty knife.

Laboratories used for sample preparation and analysis include Chemex Analytical Laboratories (Chemex; Boise and Vancouver), Rocky Mountain Geochemical

Corporation (RMCG; Salt Lake City); American Assay Laboratory (AAL; Reno); and ALS Minerals (ALS; Reno). All laboratories were independent. Accreditations for Chemex, RMCG and AAL at the time used are not known. ALS holds ISO 9001:2008 accreditation

for quality management and ISO/IEC17025:2005 accreditation for selected analytical techniques.

Laboratories used for check analysis included Chemex, AAL,

Cone Geochemical Laboratories (Cone; Denver), and Hunter Mining Laboratories (Hunter; Reno). Accreditations at the time are not known. The laboratories were independent.

Sample preparation and analytical methods included:

Chemex: dried, crushed to minus 1/8 inch, pulverized to 95% at minus 100 mesh. Gold and silver assays using 30 g

aliquots and fire assay fusion, primarily with an atomic absorption (AA) finish.

Grassy Mountain Project, Property Location

S - K 1300 Technical Report Summary

Page 5

May 27, 2026

RMCG: dried, crushed to minus 10 mesh, pulverized to minus 48 mesh and repulverized to nominal, minus

150 mesh. Fire assayed for gold with a gravimetric and AA finishes. Screen-fire assays completed where gold values were >0.20 oz Au/ton.

AAL: dried, crushed to 8–10 mesh, pulverized to 90% -150 mesh. Gold assays via fire assaying with an AA

finish. Silver via method D210, which included aqua-regia digestion.

ALS: dried, crushed to 75% at <6 mm, pulverized to 85% at <200 mesh (75 µm). Gold assays via fire

assaying with an AA finish. A separate five-gram aliquot was used for inductively coupled plasma atomic-emission spectrometric (ICP-AES) determination of silver and 32 major, minor, and trace elements following a four-acid digestion. Gold overlimits

re-assayed using fire assay with gravimetric finish. Silver overlimits re-assayed using 10-g aliquot with a four-acid digestion for silver and an AA finish or 30-g fire assay with a gravimetric finish.

The available Atlas quality assurance and quality control (QA/QC) data of consequence (the preparation and field duplicates) suggest that the original gold

assay results may be overstated to some extent. However, the average grade of the duplicate dataset is much higher than the average grade of the Grassy Mountain deposit and repeat analyses of only the higher-grade portion of a deposit with free gold

can yield lower results than original assays. Without further data, it is impossible to know whether there is a high bias in the Atlas results, although a comparison of resources with and without Paramount drill data suggests there are no material

issues with the Atlas data. The Newmont QA/QC data do not identify any issues, while it is possible that the Tombstone gold values are slightly understated. No issues were revealed by the Paramount certified reference material (CRM), blank, and

preparation-duplicate data. The core-duplicate data suggest that the Paramount gold assays of core, particularly at higher grades, may be understated to some degree. These data also serve to emphasize the importance of careful sampling and splitting

of core-box fines. The variability evidenced by the duplicate data from all operators at Grassy Mountain does not exceed normal bounds, especially considering the presence of visible gold.

1.9

Data Verification

The Project drill-hole database was subjected to data verification and corrections prior to the initiation of the 2016–2017 drilling program. This

verified database was periodically updated by RESPEC with information acquired during Paramount’s various drilling programs.

As part of the

2016–2017 drilling program, all prior drill-hole collars that could be identified in the field were re-surveyed. The collar locations of 82 Atlas drill holes, six Newmont drill holes, four Tombstone drill holes, and nine Calico drill holes

were surveyed. RESPEC was provided the original digital file produced by the survey contractor, and RESPEC used this file to compare the new survey locations with those in the existing database. The scale of the discrepancies in the drill hole

locations is not considered to be material due to the nature of the Grassy Mountain mineralization and the 10 x 10 x 10-ft block size used in modelling.

RESPEC compared the total depths of 47 historical drill holes against historical records and found no material errors.

Down-hole survey records from selected drill holes from the historical drilling were examined. No material errors were noted; errors that were identified were

corrected in the database. The drill-collar azimuths and dips for 40 drill holes were checked against historical records and no discrepancies were found.

Grassy Mountain Project, Property Location

S - K 1300 Technical Report Summary

Page 6

May 27, 2026

The database assay values for selected intervals from historical drill holes were checked against historical

documents. No material discrepancies were found; errors that were identified were corrected in the database.

RESPEC personnel conducted a number of site

visits that included inspection of outcrop, visiting core and RC drill sites with ongoing sampling and logging, review of numerous mineralized intervals in drill core, review of all Project procedures related to logging, sampling, and data capture,

and on-site evaluation of several target areas throughout the Project area.

The RESPEC QPs verified that the Grassy Mountain Project data are acceptable

as used in this Report, most significantly to support the estimation and classification of the Mineral Resources and Reserves.

1.10

Mineral Processing and Metallurgical Testwork

In support of the FS, historical work conducted by Hazen Research Inc., Golden Sunlight, Newmont and Resource Development Inc. (RDI) was reviewed. The degree

to which historical metallurgical samples are representative of the Grassy Mountain deposit is not known with certainty, but there is no evidence that the historical samples were not representative. Early historical work listed above is viewed as

indicative or informative only since the qualified person (QP) was not able to reconcile the test results to drill hole locations and depth to confirm that these drill holes represent the ore in the current mine plan.

In the 2018 PFS metallurgical testing program, Paramount completed head grade analyses, comminution tests (JK drop-weight tests), gravity and leach tests, and

rheology and solid/liquid separation tests on CIL tailings samples. This was supplemented in 2019 and 2020 FS metallurgical testing programs with chemical and mineralogical analysis, Bond ball and rod mill work index tests, and testwork on leaching,

oxygen demand, and cyanide destruction testing.

Tests were performed on mineralization that is considered to be representative of the material that will

be sent to the plant. Composite samples representing major lithologies, Year 1 and Year 2 production composites and a range of head grades aligned with the minimum and maximum values expected in the plant feed in the initial two years of production

were tested in the 2019 and 2020 FS metallurgical testing programs.

The grade variability composite samples calculated gold and silver grades ranged from

0.104–0.383 oz/ton Au (3.57–13.13 g/t Au) and 0.149–0.628 oz/ton Ag (5.1–21.5 g/t Ag).

Comminution testing showed that all the

samples tested are considered hard to very hard, with Bond ball mill work indices ranging from 20.8 to 32.0 kWh/ton.

Bottle roll and agitated batch leach

tests showed that the samples were highly responsive to recovery by cyanidation at a grind size of 80% passing 150 mesh (106 µm) or finer, with leach recoveries ranging from 82.1–97.5% for gold and 59.0–84.6%for silver,

dependent on leach feed grade.

Overall plant recoveries for gold are predicted to range from 89.5–94.9% for head grades of 0.096–0.58 oz/ton

Au (3.3–17.4 g/t Au) over the life of mine (LOM). Overall plant recoveries for silver are predicted to range from 62.7–80.4% for head grades of 0.161–0.523 oz/ton Ag (5.5–17.9 g/t Ag) over the LOM.

Grassy Mountain Project, Property Location

S - K 1300 Technical Report Summary

Page 7

May 27, 2026

Cyanide destruction tests achieved <0.2 mg/L

CNWAD, which is well within the maximum legislated value in Oregon of 30 mg/L.

Mercury

grades were in the range of 0.054–0.077 oz/ton (1.86–2.64 g/t) in the leach feed, and the concentration of mercury in solution after leaching ranged from 0.08–0.26 mg/L. A retort and gas collection and scrubbing system was

incorporated into the plant design to manage and control mercury in the process. Arsenic is present in the feed at concentrations ranging between 3.47–5.34 oz/ton (119–183 g/t) and is not expected to be problematic in

processing. No other elements that may cause issues in the process plant or concerns with product marketability were noted.

1.11

Mineral Resource Estimate

Paramount supplied RESPEC with a set of detailed cross-sectional lithological and structural interpretations that covers most of the extent of the Grassy

Mountain deposit. These cross-sections served as the base for RESPEC’s modeling of the gold and silver mineralization. During that process, RESPEC added some additional structures and made other minor modifications to Paramount’s

structural interpretations.

The density values RESPEC used in the estimation were based on water-displacement method measurements performed by Atlas and

Paramount. The density associated with the Grassy Mountain mineralization is consistent, and unmineralized rocks are distinctly less dense – likely a reflection of the strong silicification associated with all grades of mineralization compared

to weak or absent silicification in unmineralized rocks. RESPEC used tonnage factors of 13.5 ft3/ton for mineralized material and

14.8 ft3/ton for non-mineralized material.

The Grassy Mountain gold-silver deposit is hosted by

arkoses, siltstones, mudstones, and sinters of the Grassy Mountain Formation. From the assay data, RESPEC identified three gold-grade populations and three silver grade populations. The high-grade domains are comprised of a central core zone

characterized by gold grades greater than 0.03 oz/ton Au and silver grades over 0.15 oz/ton Ag. Sub-vertical structures and sub-horizontal stratigraphy control the high-grade central core mineralization and domains within a broad envelope of

primarily stratigraphically controlled low-grade mineralization. The highest-grade gold (>~0.25 oz Au/ton) and silver (>~0.4 oz/ton Ag) population strongly correlates with the presence of thin, often

banded, quartz–chalcedony veins and veinlets and/or breccias. However, the highest-grade mineralization does not have sufficient continuity for confident domain modeling. Therefore, RESPEC did not explicitly model it.

RESPEC determined assay caps by inspecting distribution plots of the coded assays by domain and identifying high-grade outliers appropriate for capping, then

capped gold at values ranging from 0.09–10 oz/ton Au and silver at values ranging from 0.12–7 oz/ton Ag.

RESPEC used level-plan gold and

silver mineral-domain polygons to code volume partial percentages into a three-dimensional block model with a model bearing of 340° that consisted of 5-ft x 10-ft x 10-ft blocks (model x, y, z). RESPEC also coded the block model using a digital

topographic surface.

RESPEC coded two estimation areas into the block model. In one, the stratigraphically-controlled mineralization dips shallowly at

about -15° and encompasses most of the in the Grassy Mountain deposit. The second estimation area is located in the west–southwestern portion of the deposit where the dips of the stratigraphic units steepen to approximately -20°.

Grassy Mountain Project, Property Location

S - K 1300 Technical Report Summary

Page 8

May 27, 2026

Using length-weighted composites, RESPEC completed the grade interpolation in three passes in two estimation

areas. In the outer estimation area, low-grade gold and silver domains, as well as areas outside modeled domains, were entirely estimated using search ellipses that reflect stratigraphic orientations. The high-grade gold and silver domains in

estimation area two exhibit both sub-horizontal (stratigraphic) and high-angle (structural) controls. The first pass in the high-grade domain reflects high-angle structural controls. The second estimation pass applied a search ellipse reflective of

stratigraphic control but did not overwrite grades estimated during pass 1. The third and final estimation pass was an isotropic pass that RESPEC used to estimate grades into blocks that had not been estimated by the first two passes.

The gold and silver high-grade domains captured multiple populations, which mandated restrictions on the search distances. The multiple populations lack

sufficient continuity to be explicitly modeled as separate domains. RESPEC also used search restrictions because initial estimation runs without the restrictions resulted in unrealistic volumes and distribution of estimated high grades in the block

model.

RESPEC interpolated gold and silver grades using inverse-distance to the third power (ID3), ordinary-kriging (OK), and nearest-neighbor (NN)

methods and chose to report the estimate of mineral resources using the ID3 interpolations because the ID3 results more closely represented the geology and distribution of drill-hole assay data than those obtained by OK. RESPEC performed estimation

passes independently for each mineral domain and coupled the estimated grades with the partial percentages of the mineral domains and the outside-domain volumes to enable the calculation of weight-averaged gold and silver grades for each block.

Therefore, this methodology fully block-dilutes the final resource grades and their associated resource tonnages.

The Grassy Mountain deposit has the

potential to be mined by open-pit methods. While Grassy Mountain’s mineral reserves are estimated on the basis of a proposed underground-mining scenario, the mineral reserves represent only a small subset of the entire gold-silver deposit. The

deposit’s mineral resources are reported to reflect potential open-pit extraction and milling as the primary scenario, with a secondary scenario of potential underground mining of a very small quantity of material lying outside of the lower

portions of the open pit.

RESPEC used a conceptual pit shell to constrain the Grassy Mountain deposit’s mineral resources, with the added

constraint of a gold equivalent (AuEq) cut-off grade of 0.008 oz/ton AuEq applied to all model blocks lying within the optimized pit and calculated the oz/ton AuEq grade of each model block as follows:

oz/ton AuEq = oz/ton Au + (oz/ton Ag ÷ 129).

The factor of 129 reflects metal prices of $3,100/oz gold and $34/oz silver, as well as recoveries of 80% for gold and 60% for silver.

RESEPC estimated mineral resources potentially amenable to underground mining methods by applying a cut-off of 0.070 oz/ton AuEq to blocks lying immediately

outside the optimized pit.

Both resource estimates are based on a 5,000 tons/day processing rate, with processing assumed to consist of crushing and

milling followed by carbon-in-leach recovery.

Grassy Mountain Project, Property Location

S - K 1300 Technical Report Summary

Page 9

May 27, 2026

1.12

Mineral Resource Statement

Mineral resources are reported to be inclusive of the mineral resources that have been converted to mineral reserves, using the mineral resource definitions

set out in S-K 1300. Mineral resources that are not mineral reserves do not have demonstrated economic viability. RESPEC is the qualified person firm responsible for the mineral resource estimate. The mineral resource estimates are presented in

Table 1-1.

Table 1-1: Grassy Mountain Mineral Resource Estimate

Inclusive of Mineral Reserves – Effective date: February 28, 2026

Amount

(tons)

Grade/qualities

(oz/ton Au)

Grade/qualities

(oz/ton Ag)

Cut-off grades (oz/

ton Au)

Metallurgical

Recovery

Measured Mineral Resource

33,999,000

0.016

0.063

Inside pit: 0.008

Au – 80%

Indicated Mineral Resource

23,795,000

0.034

0.098

Outside pit: 0.070

Ag—60%

Measured + Indicated Mineral Resource

57,794,000

0.023

0.077

Inside pit: 0.008

Au – 80%

Inferred Mineral Resource

3,779,000

0.019

0.056

Outside pit: 0.070

Au – 80%

Ag—60%

Notes:

RESEPEC is the qualified person firm responsible for the mineral resources estimate.

Mineral resources are comprised of all model blocks at a 0.008 oz/ton AuEq cut-off that lie within an optimized

pit plus blocks at a 0.070 oz/ton AuEq cut-off that lie outside the optimized pit.

oz/ton AuEq (gold equivalent grade) = oz/ton Au + (oz/ton Ag ÷ 129).

Mineral resources summarized in the table immediately above are reported inclusive of the mineral resources

converted to mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Mineral resources potentially amenable to open pit mining methods are reported using a gold price of $3,100/oz, a

silver price of $34/oz, a throughput rate of 5,000 tons/day, assumed metallurgical recoveries of 80% for Au and 60% for Ag, mining costs of $3.14/ton mined, processing costs of $16.33/ton processed, general and administrative costs of $2.79/ton

processed, and refining costs of $5.00/oz Au and $0.50/oz Ag produced. Mineral resources potentially amenable to underground mining methods are reported using a gold price of $3,100/oz, a silver price of $34/oz, a throughput rate of 5,000 tons/day,

assumed metallurgical recoveries of 92.8% gold equivalent, mining costs of $141.77/ton mined, processing costs of $39.09/ton processed, general and administrative costs of $20.15/ton processed, and refining costs of $5.00/oz gold equivalent

produced.

The effective date of the mineral resources estimate is February 28, 2026, and the effective date of the

database on which the Mineral Resources estimate is based is May 1, 2018.

Rounding may result in apparent discrepancies between tons, grade, and contained metal content.

Inclusive of mineral reserves, the mineral resources contain 540,000 oz of gold and 2,142,000 oz of silver classified as measured,

817,000 oz of gold and 2,325,000 oz of silver classified as indicated, and 73,000 oz of gold and 210,000 oz of silver classified as inferred. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

1.13

Mineral Reserve Estimate

An underground mining scenario is assumed using mechanized cut-and-fill methods, which, following ramp-up, will produce 1,200–1,400 tons/day, four days a

week. This mining rate will provide sufficient material for the 750 ton/day mill and processing plant to operate at full capacity for seven days a week.

Grassy Mountain Project, Property Location

S - K 1300 Technical Report Summary

Page10

May 27, 2026

The Proven and Probable reserves for Grassy Mountain have been estimated by first calculating an economic NSR

cut-off for mining underground stopes, then using the NSR cut-off to design stope shapes centered on Measured and Indicated Mineral Resource blocks with the mining revenue greater than or equal to the NSR cut-off. All Inferred material was

considered to be waste with no value or metal content. Internal and external dilution and mining recoveries (ore loss) were estimated and applied as modifying factors based on the total tonnage of material inside of the final designs.

The economic cut-off grade used for stope design is based on initial economic parameters shown in table below.

Table 1-2: Cut-off Grade Input Parameters for Gold Metal

Name

Quantity

Unit

UG Mining costs

141.18

$/ton processed

Surface Rehandle

0.22

$/ton processed

Process Costs

39.09

$/ton processed

General and administrative (G&A) Costs

20.15

$/ton processed

Total Operating Costs

200.64

$/ton processed

Refining Cost

6.00

$/oz processed

NSR Royalty

1.5%

percent

Gold Metal Recovery

92.8%

percent

Gold Selling Price

2,750

$/oz Au

Calculated Cutoff Grade

0.080

oz Au/ton

Mineral Reserve Cutoff Grade Used

0.080

oz Au/ton

NSR Economic Cutoff

201.00

$/ton processed

The calculated gold cut-off grade is 0.08 oz/ton Au. The economic stope NSR cutoff was used in the stope optimization to

identify the Measured and Indicated blocks available for consideration to be converted to Mineral Reserves. Measured and Indicated resource blocks with NSR value less than the economic stope NSR cut-off, as well as all Inferred resource blocks

irrespective of grade, were considered as waste and applied to internal dilution.

Each stope block was queried against the resource block model to

determine the tonnages and grades within the stope shapes. Stopes with an average measured or indicated gold grade equal to and above the economic NSR cut-off were selected to be included in the mine plan and Mineral Reserves estimate. Some isolated

stopes above the cut-off grade threshold were eliminated from consideration because the development to extract them would cost more than the economic return. Dilution and recovery were not considered during the stope optimization. The dilution and

recovery were applied as modifying factors later in the process.

A modifying factor of 8% was used for calculating external dilution tons. All Inferred

resource blocks or partial blocks within the stopes and all unclassified material within the stopes is considered internal dilution. The tons were accounted for with zero grade.

Mining recovery is estimated to be 97% based on an assumed ore loss of 3%. This is considered appropriate for the highly selective mechanized cut-and-fill

mining method selected for the Grassy Mountain deposit and it is based on similar operations in disseminated ore bodies.

Grassy Mountain Project, Property Location

S - K 1300 Technical Report Summary

Page 11

May 27, 2026

1.14

Mineral Reserve Statement

The reference point for the estimated Mineral Reserves is the crusher. The Mineral Reserves estimated for the Grassy Mountain Project are provided in Table 1-3 and have an effective date of May 15, 2026. The Qualified Person firm for the Mineral Reserve estimate is RESPEC.

Table 1-3: Gold and Silver Mineral Reserve Estimates

(US Imperial units)

tons

(‘000s)

Grade

(oz/ton Au)

Gold

(‘000 oz)

Grade

(oz/ton Ag)

Silver

(‘000 oz)

Proven mineral reserves

299

0.167

50

0.256

77

Probable mineral reserves

1,908

0.186

355

0.287

548

Total Proven and Probable reserves

2,207

0.184

405

0.283

625

Notes:

Mineral reserves have an effective date of May 15, 2026.

Mineral Reserves are reported inside stope designs assuming drift-and-fill mining methods, and an economic net

smelter return cutoff grade of $200.64 per ore ton processed. The economic cut-off grade estimate uses a gold price of $2,750/oz, mining costs of $141.18/ton processed, surface re-handle costs of $0.22/ton processed, process costs of $39.09/ton

processed, general and administrative costs of $20.15/ton processed, and refining costs of $6/oz Au recovered.

Metallurgical recovery utilizes the leach recovery schedule discussed in section 10 of the Technical Report

Summary

Mineralization that was either not classified or was assigned to Inferred Mineral Resources was set to waste.

A 1.5% NSR royalty is payable.

Rounding may result in apparent discrepancies between tons, grade and contained metal content.

1.15

Mining Methods

1.15.1

Overview

The Grassy Mountain mine will be an underground operation accessed via one decline and a system of internal ramps. One set of stacked ventilation raises is

included in the design to be used for ventilation and secondary egress. The underhand mechanized cut-and fill mining method was selected. Cemented rock fill (CRF) will be used for backfill. The underhand mechanized cut-and-fill method is highly

flexible and can achieve high recovery rates in deposits with complex geometries, as is the case at the Grassy Mountain deposit. The estimated mine life is 9.3 years.

The mining sequence contains a detailed level sequence and an underhand sequence. The level access is mined first. The mains are mined second. Typically, two

mains are mined at the same time providing multiple mining locations on a level. After the mains are mined, then the production drifts can begin mining. The production drifts are sequenced with primaries and secondaries. The primaries are mined and

backfilled first. This continues until the entire level is complete. After the entire level is complete the level access is backfilled. The underhand sequence is grouped into lifts. One level in each lift can be mining at any given time during the

life-of-mine. The underhand sequence starts at the top and works down in elevation. Constraints are applied to ensure that the bottom level of a lift does not influence the top level of the lift below.

Grassy Mountain Project, Property Location

S - K 1300 Technical Report Summary

Page 12

May 27, 2026

1.15.2

Mine Design

The portal is designed to allow access to the underground mine facilities while providing adequate space for equipment and vehicles. It will be located uphill

and south of the primary crusher. Weak rock mass ground conditions at the portal require that a shallow box-cut excavation be established to form a suitable face where tunneling can occur.

The Grassy Mountain orebody will be accessed using a 15ft x 15 ft main decline, developed from a portal on surface. The decline will provide a connection to

all services. The design intent is to have the decline located as close as possible to the mineralization to reduce transportation costs but sufficiently removed from mining activities to ensure that the decline is geotechnically stable for the

planned LOM.

Level stations will have a standoff distance from the orebody of approximately 300 ft. This distance is determined by the maximum gradient

of the level access of 12.5%, the geometry of accessing five levels for every one level station, and the geometry of the orebody. There are five stations planned for the mine, accessed off the decline, and each station will access up to five

production levels. Each station will have a truck loading bay (used to load trucks with load–haul–dump (LHD) vehicles), power bay (used to store the mobile load center), ventilation access (will connect on each station via vent raises),

stockpile (used to store material until it can be loaded into trucks), sump (used to collect mine water, and level access (provide access to the production stopes).

When a production stope gets within two rounds of the design, the stope will go on grade control. When a stope is on grade control, every round must be

sampled before the next round can be drilled. The stope may end prematurely or extend past the design if the assayed grade is below or above the cut-off grade.

The ventilation network was designed to comply with U.S. ventilation standards for underground mines. The planned ventilation will use a push/pull system and

will require a exhaust fan on the surface. A raise bore will be used to construct ventilation raises between level stations and connecting to the surface fan. Each vent raise will have a diameter of 12 ft. Each raise will be steel lined and

have an escape ladder. Auxiliary fans will take air from the main circuit and push the air to the working face on the level using vent ducting and vent bag. Each level will have an auxiliary fan at the level station.

Mine operations will be based on the usage of mobile mining equipment suitable for underground mines. The estimate of the fleet size was based on first

principles and equipment running-time requirements to achieve the mine production plan. Equipment is conventional for mechanized cut-and-fill mining operations.

Water will be needed for underground production drilling, bolting, shotcrete, and diamond drilling. The required LOM water supply has been estimated based on

the mine-equipment requirements.

Underground power will be provided by two transformers. The transformers will be moved, as required, depending on the

location of the mining activities. A main power line will be installed along the rib of the decline. Line power will also be extended to the locations of the ventilation raise to supply power to the ventilation fans.

Grassy Mountain Project, Property Location

S - K 1300 Technical Report Summary

Page 13

May 27, 2026

Two mobile emergency refuge stations will be provided in case of fire or rockfalls that would block access

and prevent full evacuation of personnel.

1.15.3

Mine Production Plan

The proposed production plan is shown in Figure 1-1.

Grassy Mountain Project, Property Location

S - K 1300 Technical Report Summary

Page 14

May 27, 2026

1.16

Processing and Recovery Methods

The process plant will be designed with conventional processing unit operations frequently used within the gold processing industry. The process plant will

treat 750 tons per day and will operate with two 12-h shifts per day, 365 days per year, producing gold doré bars. The major equipment within the process plant is specified in accordance with the climate, site conditions, ore grades and

metallurgical performance outlined in this report. Any deleterious metals present in the ore such as mercury will be abated by specialized equipment installed in the process plant and are not expected to impact payability terms. The plant will have

average head grades of 0.177 oz/ton Au and 0.277 oz/ton Ag.

The plant feed will be trucked from the underground mine to a modular crushing facility that

will include a jaw crusher as the primary stage and a cone crusher for secondary size reduction. The crushed ore will be ground by a ball mill in closed circuit with a hydrocyclone cluster. The hydrocyclone overflow with P80 of 150 mesh (106

µm) will flow to a hybrid leach/carbon-in-leach (CIL) recovery circuit via a pre-aeration tank. Gold and silver leached in the CIL circuit will be recovered onto activated carbon and eluted in a pressurized Zadra-style elution circuit and then

recovered by electrowinning in the gold room. The gold–silver sludge will be dried in a mercury retort oven and then mixed with fluxes and smelted in a furnace to pour doré bars. Mercury is condensed in the retort and collected for

off-site disposal. Carbon will be re-activated in a carbon regeneration kiln before being returned to the CIL circuit. CIL tailings will be treated for cyanide destruction prior to pumping to the tailings storage facility (TSF) for disposal.

The installed power for the process plant will be 4,445 hp and the power consumption is estimated to be 72 kWh/ton processed. Raw water will be pumped from

borehole wells to a raw-water storage tank. Potable water will be sourced from the raw water tank and treated by a potable water treatment plant. Gland water will be supplied from the raw-water tank. Process water will primarily consist of TSF

reclaim water. Reagents will include lime, sodium cyanide, sodium hydroxide, copper sulfate, hydrochloric acid and sodium metabisulfite.

The simplified

overall flowsheet is shown in Figure 1-2 The plant site layout is shown in Figure 1-3.

Grassy Mountain Project, Property Location

S - K 1300 Technical Report Summary

Page 15

May 27, 2026

Figure 1-2: Simplified Overall Flowsheet

Source: Ausenco, 2020

Grassy Mountain Project

S - K 1300 Technical Report Summary

Page 16

May 27, 2026

Figure 1-3: Proposed Plant Site Layout

Source: Ausenco, 2020

Grassy Mountain Project

S - K 1300 Technical Report Summary

Page 17

May 27, 2026

1.17

Infrastructure

1.17.1

Overview

The Project infrastructure includes a mining portal and decline, supported by an extensive network of access and haul roads connecting key facilities such as

the TSF, temporary waste rock storage facility (TWRFS) and other site areas. Surface infrastructure comprises site access controls, administrative and operational buildings, and specialized processing and support facilities including a gold room,

assay laboratory, reagent storage, workshops, warehouses and truck maintenance areas. Utilities and services include fuel storage and dispensing, water supply and treatment systems, water wells, a raw water tank and a 14.4 kV power line. Additional

components include waste and tailings management facilities and an explosives magazine to support the underground mining operations.

1.17.2

Temporary Waste Rock Storage Facilities (TWRSF) and Borrow Pits

During operation, a lined stockpile for waste rock will be temporarily managed on the surface to be used as CRF as needed. The containment and drainage

collection systems installed below the TWRSF will be the same systems used for the TSF impoundment basin.

A basalt borrow quarry will be located on the

east side of the mine area where there are basalts that are believed to be suitable for construction, mine-backfill and reclamation materials. A small borrow pit north of the processing area is planned for additional construction material. Borrow

material will be generated using contract mining.

Closure Cover Borrow Areas located immediately west of the basalt borrow quarry and south of the TSF

will be developed as additional vegetative closure cover material for final reclamation of the surface facilities.

1.17.3

Tailings Storage Facility

The proposed TSF will cover approximately 108 acres and will be located in a broad valley immediately west of the Grassy Mountain mine portal and process

facilities. The TSF will fill the valley and require embankments on the north and west sides to impound the tailings. The main embankment will cross the natural drainage on the north side of the TSF, and a secondary embankment will be constructed

along the western ridge. The TSF design envisages three overall stages, Stage 1 will be split into two intermediate phases.

Based on the TSF design, the

Stage 3 TSF will provide a total storage capacity of 3.64 Mtons. However, for the purposes of this Study, only approximately 2.4 Mtons are planned to be delivered to the TSF. Therefore, only Stages 1, 2, and a portion of Stage 3 are required for

this Study.

The TSF is designed as a “zero discharge” facility, capable of storing runoff from tributary areas and direct precipitation on

the facility resulting from the 500-year, 24-hour storm event, as well as an allowance for wave run-up due to wind action. It will be a 100% geomembrane-lined facility with a continuous, engineered lining system extending across the impoundment

basin and the upstream slope of the embankments.

Grassy Mountain Project

S - K 1300 Technical Report Summary

Page 18

May 27, 2026

A lined reclaim pond, to be located downstream (north) of the TSF, will capture all tailings draindown

collected in the underdrain collection system from the tailings and TWRSF draindown. A supernatant pool will be maintained away from the embankments on the eastern side of the TSF by controlled deposition of tailings from spigots installed around

the perimeter of the facility.

1.17.4

Water Management

Contact and non-contact surface water will be routed around the plant site:

Non-contact water runoff is designed to flow into natural drainages downstream of the site to unnamed tributaries

of Negro Rock Canyon which in turn discharges to the lower Malheur River.

Meteoric water contacting the process plant site and associated infrastructure will be diverted through contact

water diversion ditches and channels to a geomembrane-lined contact water pond to be located east of the process plant.

Permanent

channels are designed to convey the 100-year, 24-hour storm event with nine inches of freeboard, or 500-year, 24-hour storm event without overtopping. Temporary channels were designed to convey the 25-year, 24-hour storm event with nine inches of

freeboard, or 100-year, 24-hour storm event without overtopping.

1.17.5

Water Balance

Water supply from the raw water production wells and mine dewatering is projected to be sufficient to support the mine plan requirements and during seasonal

fluctuations. Water demands are expected to increase and decrease seasonally and during periods of extended dry and wet climactic years, respectively. During periods of extended dry conditions, additional make-up water from the production wells may

be required.

1.18

Market Studies and Contracts

The proposed Grassy Mountain operation will produce doré bars on site, which will then be shipped to an out of State refinery. There is currently no

contract in place with any refinery or buyer for the doré.

No market studies have been completed. Gold and silver are freely-traded commodities.

The doré that will be produced by the mine is considered to be readily marketable with no deleterious/penalty elements. Although mercury is present in the ore, a retort and recovery system has been included to maintain doré quality.

Metal pricing used in the economic analysis is based on long-term flat metal prices of $3,600/oz Au, and $48.00/oz Ag, which are based on consensus

forecasts from various financial institutions.

Paramount has no current contracts for property development, mining, concentrating, smelting, refining,

transportation, handling, sales and hedging, forward sales contracts or arrangements.

Grassy Mountain Project

S - K 1300 Technical Report Summary

Page 19

May 27, 2026

1.19

Environmental, Permitting and Social Considerations

The final Environmental Impact Statement (EIS) and record of decision were issued by BLM on January 29, 2026.

Draft state permits were issued for public comment on December 8, 2025. The public comment period has concluded and final state permits are anticipated

to be issued in the third quarter of 2026.

1.19.1

Environmental Considerations

Paramount is also currently working with BLM and local ranchers to develop and plan rangeland improvements in the vicinity of the mine site.

1.19.2

Permitting Considerations

Paramount is currently working with multiple tribal entities, BLM and the State Historical Preservation Office (SHPO) to finalize mine construction and

operation planning to minimize impacts to identified cultural resources. Following concurrence from SHPO, the final state permits are anticipated to be issued allowing for bonding and the progression of construction.

1.19.3

Social Considerations

Paramount continues to work with local, state, federal and tribal entities as the state permitting process is completed.

1.19.4

Closure and Reclamation Considerations

The closure plan and associated Reclamation Cost Estimate (RCE) were updated in February 2026 to account for updated unit rates and direction received from BLM

and Department of Geology and Mineral Industries (DOGAMI) during the permitting process. Both BLM and DOGAMI have accepted the closure plan and RCE.

1.20

Capital and Operating Cost

1.20.1

Capital Cost Estimate

The capital cost estimate is reported in Q2 2026 USD. The capital costs are at a minimum feasibility level of confidence of ±15% as is defined in S-K

1300, and are prepared using the AACE Class 3 estimate standards, with a contingency of 10%.

The estimate includes the cost to complete the design,

procurement, construction and commissioning of all the identified facilities. The estimate was based on the traditional engineering, procurement and construction management (EPCM) approach where the EPCM contractor oversees the delivery of the

completed project from detailed engineering and procurement to handover of a working facility. For equipment sourced in Canadian dollars (CAD), an exchange rate of 0.733 USD:CAD was assumed.

Grassy Mountain Project

S - K 1300 Technical Report Summary

Page 20

May 27, 2026

The estimate was derived from budgetary pricing for major items in the mechanical equipment list, electrical

equipment list and contractor work packages (e.g. concrete, structural steel, platework, etc.), benchmarked against similar projects and scaled/escalated accordingly. The estimates were based on a number of fundamental assumptions as indicated in

process flow diagrams, general arrangements, material take offs (MTOs), cable schedules, scope definition and a work breakdown structure. The estimate included all associated infrastructure as defined by the scope of work developed in 2020 FS and

carried in the 2022 FS update.

The initial capital cost estimate of $189.8 million is summarized in Table 1-4.

Table 1-4: Initial Capital Cost Estimate Summary (direct and indirect)

WBS

Description

$ M

% of Total Costs

1000

Mining

26.2

14

2000

Site development

7.2

4

3000

Mineral processing

43.4

23

4000

Tailings management & waste rock facility

13.3

7

5000

On-site infrastructure

17.3

9

6000

Off-site infrastructure

16.8

9

Direct Subtotal

124.6

66

7000

Project indirect costs

28.0

15

9000

Owner’s costs

15.6

8

Indirect Subtotal

43.6

23

8000

Provisions (Contingency)

19.8

10

N/A

Capitalized Operating cost

1.7

1

Project Total – Initial Capital

189.8

100

1.20.2

Operating Cost Estimate

The operating cost estimate has an accuracy of ±15% reported in Q2 2026 USD. The operating costs are at a minimum feasibility level of confidence of

±15% as is defined in S-K 1300.

The LOM underground mining costs are estimated at $332.9 million over the LOM, and average $141.18/ton

processed over the LOM. Excluding mining costs from the pre-production period (accounted for in the initial capital cost) results in an average mining cost of $140.60/ton processed over the LOM.

The LOM process operating cost is estimated at $89.3 million over the LOM, and averages $37.72/ton processed over the LOM.

The LOM general and administrative (G&A) costs are estimated at $5.4M/a or $48.7M over the LOM, and average $20.65/ton processed over the LOM.

Grassy Mountain Project

S - K 1300 Technical Report Summary

Page 21

May 27, 2026

1.21

Economic Analysis

1.21.1

Economic Summary

The economic analysis is based on proven and probable reserves. The capital and operating cost estimates were developed in Q2 2026 to target a level of

accuracy of ±15% which aligns with an AACE International Class 3 level estimate. The capital cost estimate includes a 10% contingency on the initial capital costs.

The Project has been evaluated using a discounted cashflow (DCF) analysis. Cash inflow consists of annual revenue projections for the Project. Cash outflows

such as capital costs, operating costs, taxes, and royalties are subtracted from the inflows to arrive at the annual cashflow projections.

The post-tax

net present value (NPV) at a 5% discount rate (NPV5%), is $374.7 million NPV5% with a post-tax internal rate of return (IRR) of 38.9%,

and an initial payback of 2.1 years. These economic results utilize base-case prices of $3,600/oz gold and $48.00/oz silver.

Table 1-5 below provides a summary of the forecast project economics.

Table 1-5:

Summary of forecast project economics

Area

Item

Units

LOM Total/Avg.

General

Gold price

$/oz

3,600

Silver price

$/oz

48.00

Mine life

years

9.3

Total mill feed tons

tons x 1,000

2,358

Production (gold)

Mill head grade Au

oz/ton

0.18

Mill recovery rate Au

%

92.6

Total mill ounces recovered Au

oz x 1,000

385.8

Total average annual production Au

oz x 1,000

41.4

Production (silver)

Mill head grade Ag

oz/ton

0.28

Mill recovery rate Ag

%

73.5

Total mill ounces recovered Ag

oz x 1,000

480.1

Total average annual production Ag

oz x 1,000

51.5

Operating Costs

Mining cost

$/ton processed

140.60

Processing cost

$/ton processed

37.72

G&A cost

$/ton processed

20.65

Total operating costs

$/ton processed

198.96

Refining cost Au

$/oz

5.00

Refining cost Ag

$/oz

0.50

*Cash costs net of by-products

$/oz Au

1,217.95

**AISC net of by-products

$/oz Au

1,441.57

Grassy Mountain Project

S - K 1300 Technical Report Summary

Page 22

May 27, 2026

Area

Item

Units

LOM Total/Avg.

Capital Costs

Initial capital

$M

189.8

Sustaining capital

$M

65.1

Closure costs

$M

21.1

Financials (pre-tax)

Gross Revenue

$M

1,410.6

Pre-tax unlevered free cash flow

$M

658.0

Pre-tax NPV, 5%

$M

458.9

Pre-tax IRR

%

42.8

Pre-tax Payback

years

2.1

Financials (post-tax)

Post-tax unlevered free cash flow

$M

540.7

Post-tax NPV, 5%

$M

374.7

Post-tax IRR

%

38.9

Post-tax Payback

years

2.2

Notes:

*

Cash costs consist of mining costs, processing costs, G&A and refining charges and royalties.

**

All-in sustaining costs (AISC) include cash costs plus sustaining capital and closure costs. AISC is at the

project level and does not include an estimate of corporate G&A.

1.21.2

Sensitivity Analysis

A sensitivity analysis was conducted on the base-case pre-tax and post-tax NPV5% and IRR of the Project

using the following variables: metal prices, discount rate, total operating costs, initial capital costs, recovery, and head grade. The analysis showed that the Project is most sensitive to metal price, head grade, metallurgical recovery rates, and

initial capital cost, and less sensitive to operating cost.

1.22

Conclusions

Based on the assumptions and parameters presented in the Report, the Grassy Mountain Project has a mine plan that is technically feasible and economically

viable. The positive financials of the Project ($374.7 million post-tax NPV5% and 38.9% post-tax IRR) support the mineral reserve. A single-phase work program at $4.0 million is recommended to

further derisk the project in advance of the next phase of the project.

Grassy Mountain Project

S - K 1300 Technical Report Summary

Page 23

May 27, 2026

2

INTRODUCTION

2.1

Introduction

Ausenco Engineering Canada ULC (Ausenco), Geotechnical Mine Solutions Inc. (GMS), RESPEC Company LLC (RESPEC), SLR International Corporation (SLR) and WSP USA

Inc. (WSP) compiled a technical report summary (the Report) on a feasibility study (the FS) completed on the Grassy Mountain Project (the Project) for Paramount Gold Nevada Corp. (Paramount), located in Oregon, USA (Figure 2-1).

This Report updates the previously filed technical report summary entitled, “Grassy Mountain Project:

S-K 1300 Technical Report Summary on Feasibility Study, Oregon, United States” with an effective date of June 30, 2022. Updates include the mineral resource estimate, mineral reserve estimate, capital costs, operating costs and the

economic analysis.

Paramount owns the Grassy Mountain Project through its wholly owned subsidiary, Calico Resources USA Corp. (Calico).

2.2

Terms of Reference

Measurement units used in this Report are generally U.S. customary; however, some units, such as analytical and metallurgical testwork units may be in metric

units. Unless otherwise stated, all monetary amounts are in United States dollars (USD).

Mineral Resources and Mineral Reserves are reported in

accordance with subpart 229.1300 of the S-K 1300 reporting requirements.

2.3

Qualified Persons (QP)

The following third-party QP firms contributed to the preparation of this Technical Report Summary:

Ausenco

GMS

RESPEC

SLR

WSP

Paramount contributed to Sections 1.2, 1.3, 1.4, 3.1, 3.2, 3.3, 3.4, 3.6, 3.7, 3.8, 4, 20, 21 and 22.2 of this Technical Report Summary.

Grassy Mountain Project

S - K 1300 Technical Report Summary

Page 24

May 27, 2026

Figure 2-1: Project Location Plan

Source: Gustin et al., 2018

2.4

Site Visits and Scope of Personal Inspection

2.4.1

Site Inspection by the Qualified Person of Ausenco

Ausenco’s QP, Robert Raponi, conducted a site visit on August 15, 2019, and inspected the area planned for the portal and the general site layout.

2.4.2

Site Inspection by the Qualified Person of GMS

GMS’ QP, Andres Torres, did not conduct a site visit, and relied upon information from other QPs’ site visits.

Grassy Mountain Project

S - K 1300 Technical Report Summary

Page 25

May 27, 2026

2.4.3

Site Inspection by the Qualified Persons of RESPEC

RESPEC’s QPs have visited the project site and/or Paramount’s field office and core logging facility in Vale, Oregon numerous times as the project

advanced. The most recent was by Mike Lindholm (geology and resources) and Sterling (Keith) Watson (mine engineering) for one day on January 30, 2026. Paramount provided RESPEC with an overview of the geology and other project information at

their core processing facility in Vale. RESPEC observed historical and Paramount paper files, QA/QC samples, core, RC samples, coarse rejects and pulps stored within the building. Although no drilling was being conducted at that time, Paramount

provided an overview of the core and RC logging, sample handling, storage and QA/QC procedures. RESPEC then reviewed the geology and observed planned locations for mine facilities at the Grassy Mountain site.

2.4.4

Site Inspection by the Qualified Person of SLR

SLR’s QP, Jeremy Scott Collyard, visited the project site on November 16, 2021 and met with senior technical staff from Paramount. The site visit

included an on-site tour with Paramount senior staff, local, State, and Federal permitting agencies to discuss the proposed TSF and TWRSF site.

2.4.5

Site Inspection by the Qualified Person of WSP

WSP’s QP, Christopher MacMahon, conducted a visit to the Project site on August 18, 2016; November 16, 2021, and January 29, 2026.

During these visits, Mr. MacMahon met with senior technical staff from Paramount. The August 18, 2016 site visit provided a general overview of the Grassy Mountain deposit area, including access to the Project, potential surface

infrastructure locations, and the site of the proposed portal for the underground mine access. The site visit included additional time at Paramount’s core storage and field office facilities in Vale, Oregon, which was used to further review

technical aspects of the Project. The November 16, 2021, site visit included an on-site tour with Paramount senior staff, local, State, and Federal permitting agencies to discuss the proposed TSF and TWRSF site. This site visit also included a

meet at the Vale field office. The January 29, 2026 site visit included a general overview of the proposed surface facility locations including the TSF, plant, and portal sites. The site visit included additional time at Paramount’s field

office facilities in Vale, Oregon, which was used to further review and discuss the Project.

2.5

Effective Dates

The Report has a number of effective dates as follows:

Mineral Resource estimates: February 28, 2026

Mineral Reserve estimate: May 15, 2026

Date of financial analysis that supports the Mineral Reserves: May 27, 2026.

The overall effective date of this Report is the effective date of the financial analysis, which is May 27, 2026.

Grassy Mountain Project

S - K 1300 Technical Report Summary

Page 26

May 27, 2026

2.6

Information Sources and References

This Report updates the previously filed technical report summary entitled, “Grassy Mountain Project: S-K 1300 Technical Report Summary on Feasibility

Study, Oregon, United States” completed in 2022. Updates include the mineral resource estimate, mineral reserve estimate, capital costs, operating costs and the economic analysis. This Report is also based in part on internal company

reports, maps, published government reports, and public information, as listed in Section 25. Additionally, Ausenco relied on recent updated budgetary quotations from vendors to develop the cost estimates for this report.

Additional information was sought from Paramount employees in their areas of expertise as required.

2.7

Previous Technical Reports

Paramount has previously filed the following technical reports on the Project in Canada which are publicly available on SEDAR+:

Raponi T. R., Seamons J., Collyard, J. S., MacMahon, C., Dyer, T., and Torres, A. (2022): Grassy Mountain

Project: S-K 1300 Technical Report Summary on Feasibility Study, Oregon, United States. Report prepared by Ausenco Engineering Canada Inc., Arrowhead, SLR, RESPEC, GMS, and WSP for Paramount Gold Nevada Corp., effective date June 30, 2022.

Raponi T. R., Gustin M. M., Seamons J., DeLong R., MacMahon C., Palma L., 2020: Feasibility Study and Technical

Report for the Grassy Mountain Project, Oregon, USA: report prepared by Mine Development Associates, Golder Associates, EM Strategies, Geotechnical Mine Solutions and Ausenco Canada Inc. for Paramount Gold Nevada Corp., effective date

September 15, 2020.

Gustin, M.M., Dyer, T.L., MacMahon, C., Caro, B., Raponi, T.R., and Baldwin, D., 2018: Preliminary Feasibility

Study and Technical Report for the Grassy Mountain Gold and Silver Project, Malheur County, Oregon, USA: report prepared by Mine Development Associates, Golder Associates and Ausenco Canada Inc. for Paramount Gold Nevada Corp., effective date

May 21, 2018.

Prior to Paramount’s Project interest, the following technical reports were filed on the Project:

Wilson, S.E., Pennstrom, W.J. Jr., Batman, S.B., and Black, Z.J., 2015: Amended Preliminary Economic Assessment,

Calico Resources Corp., Grassy Mountain Project, Malheur County, Oregon, USA: report prepared by Metal Mining Consultants Inc. for Calico Resources Corp., effective date January 13, 2015, amended July 9, 2015.

Brown, J.J., Malhotra, D., and Black, Z., 2012: NI 43-101 Technical Report on Resources, Grassy Mountain Gold

Project, Malheur County, Oregon: report prepared by Gustavson Associates for Calico Resources Corp., effective date September 26, 2012.

Hulse, D.E., Brown, J.J., and Malhotra, D., 2012: NI 43-101 Technical Report on Resources, Grassy Mountain Gold

Project, Malheur County, Oregon: report prepared by Gustavson Associates for Calico Resources Corp., effective date March 1, 2012.

Grassy Mountain Project

S - K 1300 Technical Report Summary

Page 27

May 27, 2026

Lechner, M.J., 2011: Grassy Mountain NI 43-101 Technical Report, Malheur County, Oregon: report prepared for

Calico Resources Corp., effective date June 6, 2011.

Lechner, M.J., 2007: Grassy Mountain Technical Report, Malheur County, Oregon: NI 43-101 Technical Report: report

prepared for Seabridge Gold Inc., effective date April 27, 2007.

2.8

Currency, Units, Abbreviations and Definitions

All units of measurement in this report are metric, and all currencies are expressed in US dollars (USD) unless otherwise stated. Contained gold metal is

expressed as troy ounces (oz), where 1 oz = 31.1035 g. All material tonnages are expressed as short tons (tons) unless stated otherwise. A list of abbreviations and acronyms is provided in Table 2-2, and

units of measurement are listed in Table 2-3.

Table

2-1: Abbreviations and Acronyms

Abbreviation

Description

AA

atomic absorption

ABA

acid-base accounting

AACE

Association for the Advancement of Cost Engineering

AAL

American Assay Laboratory

ABA

acid-base accounting

Ag

silver

AgEq

silver equivalent

As

arsenic

ASTM

American Society for Testing and Materials

Atlas

Atlas Precious Metals

Au

gold

AuEq

gold equivalent

Ausenco

Ausenco Engineering Canada ULC

AVRD

absolute value of relative differences

BLM

Bureau of Land Management

Calico

Calico Resources USA Corp./Calico BC

Chemex

Chemex Analytical Laboratories

CIL

carbon-in-leach

CIP

Carbon-in-pulp

CIM

Canadian Institute of Mining, Metallurgy, and Petroleum

CNWAD

Weak acid dissociable cyanide

COMEX

Commodity Exchange

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 28

May 27, 2026

Abbreviation

Description

Cone

Cone Geochemical Laboratories

CPA

Consolidated Permit Application

CRF

cemented rock fill

CRM

certified reference material

Cryla

Cryla LLC

CSAMT

controlled-source audio-frequency magnetotelluric

CT

carbon total

Cu

copper

CUP

Conditional use permit

DO

dissolved oxygen

DOGAMI

Department of Geology and Mineral Industries

EE

Environmental Evaluation

EIS

Environmental Impact Statement

EM Strategies

EM Strategies Inc.

EPCM

Engineering, Procurement, and Construction Management

Fe

iron

FS

Feasibility Study

G&A

General and Administrative

GCL

Geosynthetic clay liner

GMS

Geotechnical Mine Solutions

Golder

Golder Associates Inc.

GPS

global positioning system

Hazen

Hazen Research Inc.

HDPE

high-density polyethylene

Hg

mercury

Hunter

Hunter Mining Laboratories

ICP-AES

inductively coupled plasma atomic-emission spectrometry

ID3

inverse-distance to the third power

IDS

International Directional System

IEC

International Electrotechnical Commission

IP

Intellectual property

IRR

internal rate of return

ISO

International Organization for Standardization

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 29

May 27, 2026

Abbreviation

Description

JK

Julius Kruttschnitt

LHD

Load-haul-dump

LOM

Life of Mine

LTF

licencing timeframe

LUCS

Land Use Compatibility Statement

Major Drilling

Major Drilling America Inc.

MCC

Motor control centers

MDA

Mine Development Associates, Inc.

ML

metal leaching

MNP LLP

Meyers Norris Penny

MOP

Mean of pairs

MOU

Memorandum of Understanding

MSHA

Mine Safety and Health Administration

MTO(s)

Material Take-off(s)

NaCN

sodium cyanide

NAG

net-acid generating

NEPA

National Environmental Policy Act

Nevada Select

Nevada Select Royalty Inc.

Newmont

Newmont Exploration Ltd.

NGO

Non-governmental agency

NN

nearest neighbor

NNP

net-neutralizing potential

NOI

Notice of Intent

NPI

net profits interest

NPV

net present value

NSR

net sales revenue

OAR

Oregon Administrative Rule

ODEQ

Oregon Department of Environmental Quality

OK

ordinary-kriging

OWRD

Oregon Water Resources Department

Paramount

Paramount Gold Nevada Corp.

PCC

Project Coordinating Committee

PoO

Plan of Operation

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 30

May 27, 2026

Abbreviation

Description

Project

Grassy Mountain Project

QA

Quality assurance

QC

Quality control

QP

Qualified Person

RC

reverse circulation

RCE

Reclamation Cost Estimate

RD

relative difference

RDI

Resource Development Inc.

RESPEC

RESPEC Company LLC

RMCG

Rocky Mountain Geochemical Corporation

S2-S

sulfide sulfur

Sherry and Yates

Sherry and Yates, Inc.

SHPO

State Historical Preservation Office

SLR

SLR International Corporation

SO4-S

sulfate- sulfur

SRK

SRK Consulting U.S., Inc.

ST

sulfur total

TIMA

Tescan Integrated Mineral Analyzer

TOC

total organic carbon

Tombstone

Tombstone Exploration Company Ltd

TRT

Technical Review Team

TSF

Tailings Storage Facility

TWRSF

Temporary Waste Rock Storage Facility

UG

underground

U.S.

United States

UTM

Universal Transverse Mercator

WMC

Western Mining Corp

WSP

WSP USA Inc.

Table

2-2: Units of Measurement

Abbreviation

Description

%

percent

% solids

percent solids by weight

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 31

May 27, 2026

Abbreviation

Description

±

Plus or minus

°

angular degree

°C

degree Celsius

°F

degree Fahrenheit

µm

micron (micrometer)

$/ton

dollars per short ton

a

year (annum)

CAD

Canadian dollar

cm

centimeter

cm3

cubic centimeter

d

day

E

east

EGL

effective grinding length

ft

foot (12 inches)

ft3

cubic feet

g

gram

g/cm3

gram per cubic centimeter

g/L

gram per liter

g/t

gram per metric ton (tonne)

gal

US gallon

gpm

US gallons per minute

h

hour (60 minutes)

ha

hectare

hp

horsepower

in

inch

kg

kilogram

kg/t

kilogram per tonne

km, km2

kilometer, square kilometer

kPa

kilopascal

kV

kilovolt

kW

kilowatt

kWh/t

kilowatt-hour per tonne

L

liter

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 32

May 27, 2026

Abbreviation

Description

lb

pound

m, m2, m3

meter, square meter, cubic meter

M

million

Ma

million years (annum)

masl

meters above mean sea level

mg

milligram

mi

mile

mm

millimeter

Moz

million (troy) ounces

MPa

megapascal

Mt

million metric tonne

Mton

million short ton

MW

megawatt

N

north

oz

troy ounce

oz/ton

ounce (troy) per short ton (2,000 lbs)

ppb

parts per billion

ppm

parts per million

psi

pounds per square inch

Q

quarter

S

south

s

second

t, tonne

metric tonne (1,000 kg)

ton

short ton (2,000 lbs)

t/d

metric tonnes per day

USD

US dollars

W

west

yr

year

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 33

May 27, 2026

3

PROPERTY DESCRIPTION

3.1

Introduction

Paramount owns and controls 100% of the mineral tenure, through its wholly-owned subsidiary, Calico which owns and controls 100% of the mineral tenure of the

unpatented mining claims, patented mining claims, and mining leases that comprise the Grassy Mountain Project. The Grassy Mountain Project consists of two claims groups that are situated near the western edge of the Snake River Plain in eastern

Oregon, 20 miles (mi) south of the town of Vale, Oregon and about 70 miles west of Boise, Idaho (refer to Figure 2-1 and Figure 3-1).

Figure

3-1: Location of the Grassy Mountain Project

Source: Paramount, 2022

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 34

May 27, 2026

The Grassy Mountain claims group encompasses approximately 9,300 acres located within surveyed townships in

Malheur County.

The geographic center of the Grassy Mountain claims group is located at 43.674° N latitude and 117.362° W longitude, and the

principal zone of mineralization, the Grassy Mountain deposit, is located at approximately 43.670° N latitude and 117.359° W longitude.

3.2

Mineral Tenure

The Grassy Mountain Project consists of 436 unpatented lode and mill site claims, three patented claims, and a land lease for 28 unpatented lode mining claims

Figure 3-2 and Figure 3-3. Patented claims were individually surveyed at the time of location. Unpatented claim boundaries were established initially by handheld GPS

units, and in 2011 by onsite survey work. Claim information is provided in Appendix A.

Unpatented claims are subject to annual U.S. Bureau of Land

Management (BLM) fees of $200 per claim. The unpatented annual claim fees have been paid and are not due until September 1, each year. Patented claims are subject to annual property taxes of $122 per year. Taxes for the 2024–2025 tax year

have been paid; taxes for the coming year are due December 2026.

Calico, a wholly-owned subsidiary of Paramount, owns and controls 100% of the mineral

tenure of the unpatented mining claims, patented mining claims, and mining leases that comprise the Grassy Mountain Project. Calico acquired all right, title, and interest in the Project pursuant to a “Deed and Assignment of Mining

Properties” between Seabridge Gold Inc., Seabridge Gold Corporation (collectively Seabridge Gold), and Calico dated February 05, 2013.

3.2.1

Mineral Concession Payment Terms

Annual property holding costs, including those to the Bureau of Land Management and to Cryla LLC (Cryla), total $98,142.

3.2.2

Land Access and Ownership Agreements

Paramount’s 100% ownership of the Grassy Mountain Project is subject to the underlying agreements summarized in the following subsections.

3.2.3

Seabridge Gold Corporation

All claims and property were transferred to Calico by Seabridge Gold. Seabridge Gold Corporation (Seabridge Gold) is entitled to a 10% net profits interest

(NPI) royalty. Pursuant to the Deed of Royalties, dated February 5, 2013 and modified in 2015 (see Section 3.3.1), within 30 days following the day that Calico made a production decision and construction financing was secured, Seabridge

may elect to cause Calico to purchase the 10% NPI for C$10 million (M). Otherwise Seabridge will retain the 10% NPI. Seabridge, at the Report effective date, is the second largest Paramount shareholder and has indicated that it will convert its NPI

into equity in Paramount, thus the Seabridge NPI has not been included in the FS.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 35

May 27, 2026

3.2.4

Sherry and Yates, Inc.

On February 14, 2018, Calico exercised an Option to Purchase whereby Sherry and Yates agreed to sell to Calico all right, title, and interest in three

patented and 37 unpatented mining claims. The 2004 Lease and Agreement with Sherry and Yates was then terminated, although Sherry and Yates retained a 1.5% NSR royalty over the claims (see Section 3.3.2).

3.2.5

Cryla LLC

In 2018, Calico signed a 25-year lease agreement with Cryla that applies to 28 unpatented lode mining claims located to the west of the Grassy Mountain deposit

(Figure 3-2). Calico is required to make an annual lease payment of $60,000 for the duration of the lease agreement. Calico is eligible to acquire the property for $560,000 plus $3/oz of gold reserves, as

defined by a pre-feasibility or higher confidence-level study. Additionally, Cryla retains a NSR royalty based on gold price for mineral produced from their claims (see Section 3.3.3).

Figure

3-2: Grassy Mountain Claim Group

Source: Paramount, 2020

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 36

May 27, 2026

3.3

Royalties and Additional Encumbrances

3.3.1

Seabridge Gold

Pursuant to the Deed of Royalties, within 30 days following the day that Calico makes a production decision and construction financing is secured, Seabridge

Gold may elect to cause Calico to purchase the 10% NPI for 10 million CAD. Otherwise, Seabridge Gold will retain the 10% NPI. Seabridge Gold, as of the effective date of this Report, is the second largest Paramount shareholder.

3.3.2

Sherry and Yates

Sherry and Yates closed the purchase and sale of the three patented and 37 unpatented mining claims under terms of the 2004 Lease and Option Agreement. Sherry

and Yates retain a 1.5% royalty of the gross proceeds for the production of minerals from the patented and unpatented claims and a surrounding 1⁄2 mile area of

interest (Figure 3-3).

Figure

3-3: Sherry and Yates Area of Interest

Source: Paramount, 2020

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 37

May 27, 2026

3.3.3

Cryla

Pursuant to the Deed of Royalties, Cryla is entitled to a NSR royalty on mineral or products produced from their claims group. Cryla is entitled to a 2% NSR if

the gold price is below or equal to $1,500/oz and a 4% NSR if the gold price is above $1,500/oz. Calico is entitled to reduce the NSR to 1% by paying Cryla $800,000 under any circumstances. The Mineral Resources and Mineral Reserves discussed

in this Report are outside the area of the Cryla claims group.

3.3.4

Other Encumbrances

There are no other encumbrances, liens, mortgages or legal actions against the properties.

3.4

Environmental Liabilities

Except for the exploration surface disturbance, primarily related to drilling, and the network of groundwater monitoring wells that will need to be reclaimed,

there are no known environmental liabilities associated with the Grassy Mountain Project.

All exploration drill holes that are not part of the current

approved monitor-well program have been plugged according to Oregon regulations. Surface disturbance that has not been reclaimed will potentially be used for future development activities and access. The groundwater monitoring wells remain in use

for ongoing exploration activities and ongoing data-acquisition activities. The disturbance is bonded as described in Section 3.6.

The company has

not violated any regulatory requirements, and no fines have been imposed to date.

3.5

Environmental Permitting

There is a valid exploration permit with the DOGAMI and the U.S. Bureau of Land Management (BLM). A bond in the amount of $146,200 is associated with this

exploration permit. An existing Notice (OR-068894) with the BLM for four acres of surface disturbance and a monitor well has an associated bond in the amount of $28,211.

A Conditional Use Permit (“CUP”) from Malheur County was approved by the Malheur County Planning Commission in May 2019. The CUP was extended in

2021 and also in July 2025 for an additional two years.

The TSF dam was approved by the Oregon Water Resources Department in July 2020. The approval is

valid for five years, and an extension can be requested. However, as the company filed a new Consolidated permit application in December 2021, a new approval is expected. No changes were made to the dam design.

The National Environmental Policy Act (NEPA) permitting process concluded in the final EIS and record of decision being issued by BLM on January 29,

2026. Draft state permits were issued for public comment and review in December 2025 and state agencies are currently in the process of finalizing permits. State permits will be issued at one time and are anticipated to be issued in the second half

of 2026.

Permits not obtained but needed for the type and scope of potential mining at Grassy Mountain as outlined in this Report will involve a number

of State and local regulatory authorities. The Project will require the environmental permits covering the construction, operation, and closure of the envisioned mine as discussed in Section 17. State permits are anticipated to be received

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 38

May 27, 2026

Further information on environmental studies, permitting, and social and community impacts is discussed in

Section 17.

3.6

Surface Rights

Paramount owns the surface rights in the Grassy Mountain deposit area. The deposit is located within three patented mining claims. The surrounding surface

rights associated with the locations of the planned Project surface facilities belong to the Federal government and are managed by the Vale District office of the BLM.

3.7

Water Rights

Paramount holds a water right granted by the Oregon Water Resources Department to Calico. The water right was issued on April 5, 1990, through State of

Oregon Water Rights Application G-11847 and Permit G-10994. Use is limited to not more than 2.0 ft3/s (897.6 gpm) measured at the well.

On December 26, 2012, the Oregon Water Resources Department, Water Rights Services Division, granted Final Order Extension of Time for Permit Number

G-10994. This extension extended the date for Calico to fully develop and apply water to beneficial use to October 1, 2028. In 2019, Calico submitted an application to OWRD (T-13157) to modify the points of appropriation and place of use, and

to clarify language in the permit. On October 16, 2019, the State of Oregon issued a new Permit to Appropriate the Public Waters (G-18337) that replaces the previous permit and includes the requested modifications. This permit does not change

the 2.0 ft3/s of water use allowed.

3.8

Summary Statement

The QP is not aware of any significant factors and risks not discussed in this Report that may affect access, title, or the right or ability to perform work on

the Project, although the QP is not an expert with respect to such matters.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 39

May 27, 2026

4

ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY

4.1

Access

Access to the main Grassy Mountain deposit is provided by Twin Springs Road, a seasonally maintained unpaved road that originates at Russell Road, a paved

two-lane county road that joins with U.S. Highway 20 approximately four miles (mi) west of Vale, Oregon. The center of the Project area may be reached from the Twin Springs Road via 2.5 mi of secondary unpaved roads. Winter and wet weather

conditions occasionally limit access to the property, although on-site travel is generally possible year-round. Figure 4-1 shows the road access from Vale to the Grassy Mountain claims group.

Figure

4-1: Access to Grassy Mountain Claims Group

Source: Paramount, 2020

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 40

May 27, 2026

4.2

Physiography

The Project area is in the semi-arid high-desert plateau region of eastern Oregon. The terrain is mainly open steppe with mesas, broad valleys, and gently

rolling hills to steeper uplands (Figure 4-2).

Figure

4-2: Photograph of Grassy Mountain Area Looking

Source: photography by Paramount and modified by MDA, 2018

Elevations range from 3,330 to 4,300 ft above mean sea level (amsl) at the main Grassy Mountain area, while elevations at the Frost Area claims group range

from 4,400 to 5,000 ft (amsl). Vegetation across the entire area consists of sagebrush, weeds, and desert grasses tolerant of semi-arid conditions.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 41

May 27, 2026

4.3

Climate

The climate is of the semi-arid, continental-interior type, with average annual precipitation of about 9.25 inches (in), roughly half of which falls as snow

between November and March. Local weather data indicate a mean annual temperature of 52° F, with daily temperatures ranging from an extreme low of -20°F in the winter to extreme highs of 100°F and higher in the summer.

It is expected that mining activities will be conducted year-round. Seasonal road maintenance is anticipated to be sufficient to provide initial access to the

site for all personnel and any deliveries related to the mine site and construction. The road will be upgraded for year-round activities during mine construction.

4.4

Water Supply

Water to support current exploration activity is available from on-site wells. Long-term water needs for mining and processing will require additional wells to

ensure availability. Existing capacity is as much as 200 gpm from multiple water wells situated near the proposed mill and mine sites.

A new Permit to

Appropriate the Public Waters was issued in 2019 (T-18337); refer to Section 3.7. The water extraction rate is sufficient to support the requirements of the proposed mine and processing facility. Project water requirements and sources are

described in more detail in Section 15.

4.5

Power

A regional, 500-kV electrical transmission line runs through the southern part of the Project area, about 2.5 mi south of the proposed mine site. However, the

high voltage of this interstate transmission line makes it unsuitable as a source of power for the site. Studies and designs have been completed based on a power source from the Hope Substation owned by Idaho Power Company, located along U.S.

Highway 20 (Figure 4-3; see also discussion in Section 15).

4.6

Infrastructure

As of the effective date of this Report, groundwater monitoring wells and unpaved access and drilling roads are the only existing infrastructure within the

Grassy Mountain Project area. The infrastructure required for the proposed operation is detailed in Section 15.

4.7

Community Services

The community nearest the Project is Vale, Oregon, with a population of approximately 1,700. Vale is the seat of Malheur County and the home of all related

government offices. The regional BLM office is also located in Vale.

Fuel, restaurants, lodging, groceries, hardware supplies, and equipment-repair shops

are available in Vale. Other logistical support is available in Nyssa and Ontario, Oregon, both of which are located within 30 mi of the Project. Boise, Idaho, a major metropolitan city, is within a 90-minute drive of the Project area. Mining

personnel, equipment suppliers, engineering expertise, and telecommunications services are all expected to be available within the area.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 42

May 27, 2026

Figure

4-3: Proposed Power Source for the Planned Operation

Source: Paramount, 2018

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 43

May 27, 2026

5

HISTORY

5.1

Introduction

The information summarized in this section of the report has been extracted and modified from Wilson et al. (2015a), which was drawn from Hulse et al. (2012),

with additional information derived from multiple other sources, as cited. A concise early history of the discovery of the Grassy Mountain deposit and other events through to September 1988 was reported by Kelly (1988). RESPEC reviewed this

information and believes this summary accurately depicts the history of the Grassy Mountain Project.

Portions of the present Grassy Mountain Project were

first staked by two independent geologists, Richard “Dick” Sherry and Eugene “Skip” Yates, in 1984. Atlas Precious Metals (Atlas) acquired the Sherry and Yates interests in the Grassy Mountain area in 1986. Between 1986 and

1991, Atlas conducted extensive exploration of the property that culminated in the discovery and delineation of the Grassy Mountain deposit, as well as the identification of a number of other peripheral exploration targets. Atlas collected extensive

geological, mine engineering, civil engineering, metallurgical and environmental baseline data related to the Grassy Mountain deposit that were used to support a 1990 historical feasibility study for an envisioned open-pit heap-leach and milling

operation. Atlas then began to consider underground-mining scenarios, but declining gold prices and the perception of an unfavorable permitting environment discouraged Atlas from developing the Project, and the claims group was optioned to Newmont

Exploration Ltd (Newmont) in 1992 and Tombstone Exploration Company Ltd (Tombstone) in 1998. In February 2000, Seabridge entered an option agreement with Atlas to acquire a 100% interest in the Grassy Mountain claims group and completed the

acquisition in April 2003.

Seabridge did not carry out exploration at the Grassy Mountain Project. In April 2011, Seabridge signed an option agreement

granting Calico the sole and exclusive right and option to earn a 100% interest in the claims group. The acquisition of the Grassy Mountain claims group by Calico was completed in 2012. In 2011 and 2012, Calico carried out geologic mapping and

sampling and drilled a total of 13,634 feet in 17 holes. Calico also commissioned a geophysical survey to assist in their exploration efforts.

Paramount

acquired Calico in 2016.

5.2

1986-1996 Exploration

Historical exploration conducted by previous operators includes exploration programs carried out by Atlas, Newmont, Tombstone, Western Mining Corp. (WMC), and

Calico.

5.2.1

Atlas 1986-1992

Atlas carried out geologic mapping and recognized soil geochemistry as an important exploration tool at Grassy Mountain. Most Atlas exploration targets were

initially identified by claim-corner soil sampling on 600-ft by 1,500-ft spacings. Atlas conducted additional soil and float sampling on several anomalies and identified a genetic link between

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 44

May 27, 2026

gold mineralization and silicification. Of the 400 drill holes completed by Atlas, 196 were reverse circulation (RC) holes drilled on 75- to 100-ft centers within what became the Grassy Mountain

deposit area. The remaining holes were drilled at other targets within the Grassy Mountain claims group. Atlas also drilled 87 RC holes at the Crabgrass deposit and defined three separate near-surface zones of gold and silver mineralization.

Details and results of the drilling are provided in Section 7.2.1.1.

5.2.2

Newmont 1992-1996

Newmont carried out extensive and locally detailed geologic mapping and conducted both soil and rock-chip sampling. In 1993, Newmont geologists mapped 40

square miles at a scale of 1:6,000 and collected approximately 2,600 soil samples on a 400-ft by 200-ft grid in hopes of identifying anomalies missed by prior Atlas sampling. During 1993 and 1994, Newmont collected more than 400 rock-chip samples

and conducted several geophysical surveys, including a ground-based gravity survey along existing roads, airborne magnetic and radiometric surveys over the entire property, and ground-based gradient-array (IP/resistivity) surveys over the Grassy

Mountain deposit and several of the satellite prospects. Ground magnetic surveys were conducted at specific areas. Newmont geologists re-logged the remaining Atlas drill core during this period, and eventually the Atlas RC drill chips as well.

In 1994, Newmont drilled 11 inclined core holes designed to intersect and define the geometry of potential high-grade gold zones within the Grassy Mountain

deposit. These were followed with one core hole wedged off of the initial core hole, two holes pre-collared by RC and completed with core, and one additional core hole.

Newmont’s 15 holes were all angled and totaled 15,009.5 ft. This drilling defined what Newmont thought could be several gold zones in excess of 0.1

oz/ton Au within an area of the Grassy Mountain deposit measuring approximately 600-ft long by 350-ft wide by 250-ft thick. Mineralization was constrained to the northeast by a single drill hole that failed to encounter high-grade gold. Newmont

considered the western extent of the main high-grade zone effectively closed off after encountering only low-grade mineralization (0.012–0.019 oz/ton Au) and local barren quartz–chalcedony veins. Based on the core drilling and mapping

and sampling of surface exposures, Newmont geologists concluded that high gold grades at the Grassy Mountain deposit were controlled by narrow, steeply south-dipping quartz-chalcedony veins and clay matrix breccias that would need to be properly

represented by grade modeling and resource estimation.

Details and results from the drilling are provided in Section 7.2.1.2.

During 1995 and 1996, Newmont’s activities focused on estimating Mineral Resources at the main Grassy Mountain deposit. No new exploration work was done

during this period.

5.2.3

1996 Exploration at Outlying Targets within the Grassy Mountain Claims Group

By 1996, Atlas and Newmont identified and named a number of mineralized and potentially mineralized target areas peripheral to the main Grassy Mountain gold

deposit based primarily on rock-chip, float, and soil-sample data. These outlying targets, several of which were drilled to varying extents, are shown in Figure 5-1.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 45

May 27, 2026

Figure

5-1: Outlying Target Area Map

Note: Blue lines demark the outer limits of Paramount’s claims group; UTM NAD83 US Feet, Zone 11 projection; contour

interval is 10 ft. 5,000-ft grid lines for scale. Dots are drill hole collars through 2012 colored by gold values. Source: Paramount, 2016

5.2.3.1

Wheatgrass

This target area is approximately 1,500 ft southwest of the Grassy Mountain deposit area (Figure 5-1) and was the site

of the first drilling on the claims. Wheatgrass may be a lateral continuation of mineralization extending from the main Grassy Mountain deposit that is displaced by down-to-the-west faults. A number of RC drill holes tested this area with some

narrow, low-grade intersections being encountered. Most of these historical holes were drilled vertically and are widely spaced.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 46

May 27, 2026

5.2.3.2

North Spur

North Spur is 2,000 ft to the north–northeast of the main Grassy Mountain deposit (Figure 5-1). Resistant ledges

of silicified sandstone indicate hydrothermal fluids flowed through the North Spur area. Three widely spaced vertical RC holes south of the silicified ledges intercepted elevated gold grades. About 500 ft to the north, a fence of three vertical RC

holes is located approximately at the northern margin of the most strongly silicified outcrops. These holes penetrated intervals with generally low gold grades, but they are sporadically mineralized. Review of RC chips and logs from these holes

indicates that gold grades decrease down hole as the sandstone intervals transition to more clay-rich units with depth. All of these holes were drilled vertically and did not adequately test for steeply dipping mineralized structures.

5.2.3.3

Crabgrass

The three mineralized areas that comprise the Crabgrass prospect (Figure 5-1) appear to be stratiform and are contained

within the flat-lying to gently east-dipping sandstones above clay-rich units, but confidence in these observations is limited by the fact that all the historical holes are vertical and drilled by RC methods. Significant low-grade gold

mineralization was encountered in numerous holes, which formed the basis for a historical resource estimate.

5.2.3.4

Bluegrass and North Bluegrass

These targets are located 1.2 miles and 1.6 miles northeast of the Grassy Mountain deposit, respectively (Figure 5-1).

Sixteen RC holes were drilled in the area to follow up on rock-chip and float-chip samples with elevated gold contents. Further work is needed to warrant additional drilling.

5.2.3.5

Snake Flats

This area is 2.25 miles to the northeast of the Grassy Mountain deposit (Figure 5-1). The target was identified by

mapping float of silicified arkose and sinter boulders. A large mercury, arsenic, and antimony soil anomaly extends down-slope for approximately 3,500 ft to the northeast. This is the most aerially extensive surface geochemical anomaly at the

Project other than at Wheatgrass. Some of the samples from the altered boulders yielded elevated gold values; the source area for these boulders appears to be somewhere beneath post-mineral basalt that occurs in the area. Three RC holes were drilled

through about 100 ft of the post-mineral basalt before intersecting unaltered sandstone and siltstone. Additional work is necessary to better define drill targets.

5.2.3.6

Wood

The Wood target is 1.2 miles northwest of the main Grassy Mountain deposit area (Figure 5-1). Wood was identified by

surface rock and soil sampling, followed by surface trenching. Rock-chip samples that were taken from a small outcrop of weakly silicified volcanic rocks returned elevated gold values. Fifteen shallow RC drill holes were completed in the area, some

of which returned encouraging results.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 47

May 27, 2026

5.2.3.7

Wally

The Wally, or Big Wally, target is 1.5 miles north–northwest of the Grassy Mountain deposit (Figure 5-1). Soil

samples in the Wally area defined overlapping arsenic, mercury, antimony, and gold anomalies that straddle a north-northwest-trending fault shown on the district geology map. Drilling returned some favorable results.

5.2.3.8

Ryegrass

The Ryegrass, or Dennis’ Folly, target is located 1.2 miles north of the Grassy Mountain deposit (Figure 5-1).

This area was identified by mapping silicified zones that returned low-level gold values and anomalous mercury in rock-chip samples.

5.2.3.9

Clover

This target is one mile west of the Grassy Mountain deposit (Figure 5-1) and is identified as an area of weakly

silicified arkose adjacent to a northeast-trending fault. Rock-chip sampling identified an outcrop containing 25 ppb gold.

5.2.3.10

Bunchgrass

Bunchgrass is an area of modestly elevated mercury, arsenic, and antimony in soil samples located 0.5 miles south of Crabgrass (Figure 5-1). Wilson et al. (2015a) reported that the target area is approximately 750 ft wide.

5.2.3.11

Sweetgrass

Sweetgrass is located approximately 1.75 miles southwest of the Grassy Mountain deposit (Figure 5-1). Sampling of a

large float boulder of siliceous sinter returned elevated gold values. Although additional sampling in the area did not return any significant values, more work is warranted to determine the source of this siliceous sinter boulder.

5.3

1998-2016 Exploration

5.3.1

Tombstone 1998

Prior to finalizing their agreement with Atlas, Tombstone reviewed data from previous work and commissioned an economic study of alternative development

scenarios. Tombstone subsequently drilled 10 RC holes, six of which were completed with core tails, for a total of 8,071 ft. Tombstone relied heavily on Newmont’s gradient-array IP/resistivity geophysical surveys to define their drilling

targets. Details and results of the Tombstone drilling are provided in Section 7.2.1.3.

5.3.2

Seabridge 2000-2010

Seabridge acquired the Grassy Mountains claims group in 2000 and then optioned the property to Calico in early 2011. Seabridge did not conduct any exploration.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 48

May 27, 2026

5.3.3

Calico 2011-2016

Prior to the acquisition of Calico by Paramount, Calico geologists conducted geologic mapping and compiled the Atlas and Newmont geology and surface sample

data using a geographic information system (GIS) software. During 2011 and 2012, a total of 13,634 ft was drilled in 14 RC and three core holes. Thirteen of these holes were drilled at the Grassy Mountain deposit area and four were drilled to test

outlying targets. Details and results of the Calico drilling are provided in Section 7.2.1.4.

In 2012, Calico commissioned a 25.1 line-mile

controlled-source audio-frequency magnetotelluric (CSAMT) survey conducted by Zonge Geosciences Inc. (Zonge). The survey lines were oriented N20°W (Figure 5-2) and arranged to cross the trend of known

mineralization.

Figure

5-2: Map of 2012 CSMAT Lines

Note: Red lines show CSAMT lines. Blue lines demark the outer limits of Paramount’s claims group; UTM NAD83 US Feet,

Zone 11 projection; contour interval is 10 ft. 5,000-ft grid lines for scale. Dots are drill hole collars through 2012 by maximum gold assays. Source: Wright, 2012

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 49

May 27, 2026

The CSAMT survey was done under the supervision of consulting geophysicist J.L. Wright of Wright Geophysics,

Spring Creek, Nevada. Mr. Wright documented the survey methods and parameters, analyzed the processed data provided by Zonge, and made geologic and exploration interpretations in a 2012 report to Calico that included 18 inverted resistivity

sections and interpretive overlays in PDF format, as well as ArcGIS and MapInfo electronic data files (Wright, 2012).

The CSAMT survey identified a zone

of high resistivity that encompassed the main Grassy Mountain gold deposit (Figure 5-3), which is attributed to the zone of extensively silicified rocks in the deposit area. The high-resistivity response

was visible in sectional and plan views of the resistivity inversion; an example is shown in Figure 5-3.

Figure

5-3: CSAMT Inversion: Resistivity at 328 to 656 Feet Below Surface

Note: Blue lines demark the outer limits of Paramount’s claims group; UTM NAD83 US Feet, Zone 11 projection; contour

interval is 10 ft. 5,000-ft grid lines for scale. Grey dots are drill hole collars through 2012. Source: Wright, 2012

5.4

Production

There has been no production at the Grassy Mountain Project.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 50

May 27, 2026

6

GEOLOGICAL SETTING, MINERALIZATION AND DEPOSIT

6.1

Introduction

The information presented in this section of the report is derived from multiple sources, as cited. RESPEC reviewed this information and believes this summary

accurately represents the Grassy Mountain project geology and mineralization, as it is presently understood.

6.2

Regional Geologic Setting

The Grassy Mountain gold–silver deposit is the largest currently recognized epithermal hot-spring precious-metal deposit of the Lake Owyhee volcanic

field. The Lake Owyhee volcanic field is located at the intersection of three tectonic provinces: the buried North American cratonic margin, the northern Basin and Range, and the Snake River Plain. During mid-Miocene time, large-volume peralkaline

and subalkaline caldera volcanism occurred throughout the region in response to large silicic magma chambers emplaced in the shallow crust (Rytuba and McKee, 1984). The Lake Owyhee volcanic field includes several ash-flow sheets and rhyolite tuff

cones that erupted between 15.5 to 15Ma (Rytuba and Vander Meulen, 1991). The district geology surrounding the Grassy Mountain gold deposit is shown in Figure 6-1.

At about 15Ma, subsidence of the Lake Owyhee volcanic field triggered a change in volcanic eruption styles, which resulted in basaltic and rhyolite deposits

of limited extents. Volcanism during the middle to late Miocene was characterized by the eruption of small-volume metaluminous high-silica rhyolite domes and flows, small-volume basalt flows, and mafic vent complexes in north- and northwest-trending

Basin and Range-type fracture zones and ring structures related to resurgent calderas. Regional subsidence involved the development of extensive grabens and facilitated the formation of fluvial systems and large lacustrine basins. Large volumes of

fluvial sediments, sourced in part from the exhumed Idaho Batholith to the east and southeast, were deposited contemporaneously with volcanism and hot-spring activity during the waning stages of volcanic field development (Cummings, 1991). The

resulting regional stratigraphic section is a thick sequence of mid-Miocene volcanic rocks and coeval to Pliocene-age lacustrine, volcaniclastic, and fluvial sedimentary rocks. The oldest units encountered are the flow-on-flow Blackjack and Owyhee

Basalts (14.3 to 13.6Ma). These basalts are overlain by arkosic sandstone, tuffaceous sandstone, and conglomerates of the Deer Butte Formation.

6.3

Local and Project Geology

Bedrock outcrops in the vicinity of the Grassy Mountain project are typically composed of olivine basalt flows and siltstones, sandstones, and conglomerates of

the Miocene Grassy Mountain Formation. These rocks are locally covered with relatively thin, unconsolidated alluvial and colluvial deposits. Erosion-resistant basalt flows cap local topographic highs, including Grassy Mountain proper, which is a

prominent northeast-elongate ridge that forms a topographic crest about one mile southeast of the Grassy Mountain gold–silver deposit (Figure 6-1). Arkosic sandstones are encountered at the surface and

at depth, but individual beds or sequences have not been correlated across the project area, in part due to lateral sedimentary facies changes and structural offsets. Surface exposures and drill-defined stratigraphy at the Grassy Mountain deposit

area reveal complex facies produced during the waning stages of volcanism of the Lake Owyhee volcanic field and development of the coeval Ore-Ida graben (Lechner, 2011).

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 51

May 27, 2026

Figure

6-1: Grassy Mountain Regional Geology

Source: RESPEC, 2026

Figure

6-2 shows the local stratigraphic column in the vicinity of the Grassy Mountain project. The lowermost unit intersected by drilling at the Grassy Mountain deposit is the Kern Basin Tuff, a sequence of

pumiceous crystal tuff that in part displays cross beds and local surge structures and non-welded to densely welded rhyolite ash-flow tuff. Clast

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 52

May 27, 2026

size, thickness of individual ash units, and bedding structures suggest a source in the Grassy Mountain project area (Cummings, 1991). The Kern Basin Tuff ranges in thickness from 300 ft on the

south bluffs of Grassy Mountain proper to at least 1,500 ft in a drill hole beneath the Grassy Mountain gold–silver deposit.

Figure

6-2: Stratigraphic Column for the Grassy Mountain Area

Source: Paramount, 2020

A

small local flow-dome of approximately 12.5 Ma and known as the Butterfly Hill Rhyodacite overlies the Kern Basin Tuff (Figure 6-2). However, in most of the project area the Kern Basin Tuff is overlain by a

series of fluvial, lacustrine, and tuffaceous sediments that are assigned to the Grassy Mountain Formation (Cummings, 1991). These sedimentary

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 53

May 27, 2026

units include granitic-clast conglomerate, arkosic sandstone, fine-grained sandstone, siltstone, tuffaceous siltstone, and mudstone (Figure 6-2). The

sedimentary units of the Grassy Mountain Formation, which host the entirety of the current Grassy Mountain Resources, range from 300 ft to over 1,000 ft in thickness. Several siliceous “terraces” and siliceous-sinter deposits are

interbedded with silicified units of the Grassy Mountain Formation. Terrace construction was apparently episodic and intermittently inundated by fluvial and lacustrine sediments and ash, resulting in an interbedded sequence of siltstone, tuffaceous

siltstone, sandstone, conglomerate, and sinter-terrace deposits. Load casts, flame textures, convolute laminations, and other soft-sediment deformation textures are common in both the sinter beds and other sedimentary units (Siems, 1990). The amount

and size of the sinter clasts in the sedimentary rocks reflect relative proximity to a terrace. Proximal deposits are angular, heterogeneous, clast-supported breccias of sandstone, siltstone, and sinter with indistinct clast boundaries in a sulfidic

mud-textured matrix.

According to Lechner (2007), the sedimentary units of the Grassy Mountain Formation are unconformably overlain by 50 to 100 ft of

black-chert pebble conglomerate interbedded with unconsolidated siltstone. This unit is recessive, and it is overlain by flows of olivine basalt assigned to the Grassy Mountain Basalt, and, in the northwestern part of the project area, by the basalt

of Negro Rock (Figure 6-2). These mafic lavas are overlain by lacustrine and fluvial siltstone, sandstone, and conglomerate, which are successively overlain by the Rock Springs lacustrine deposits and basalt

lavas that together make up the late-Miocene Idaho Group.

6.4

Grassy Mountain Deposit

6.4.1

Geology

The geology of the Grassy Mountain deposit area is shown in Figure 6-3. The deposit is centered beneath a prominent,

150-ft-high, silicified and iron-stained hilltop that consists of hydrothermally altered arkose and interbedded conglomerate of the Grassy Mountain Formation. Bedding is horizontal at the hilltop and dips 10 to 25° to the north–northeast

on the northern and eastern flanks. The bedding steepens to 30 to 40° on the west side of the hill due to drag folding in the footwall of the N20°W-striking Antelope fault. The southwest slope is covered by landslide debris of silicified

arkose.

Several horizons of laminated silica, from a few inches to several feet in thickness, crop out southwest and north of the deposit area and are

interbedded within the arkose, siltstone, and conglomerate of the Grassy Mountain Formation. Geologists interpret these horizons as beds of silica sinter (Figure 6-2), due in part to the presence of fossil

reeds, petrified wood, and other fossilized plant debris. Drilling within the Grassy Mountain deposit penetrated through more numerous and much thicker sinter horizons, indicating the sinter was deposited from hydrothermal fluids venting at the

paleo-surface within the accumulating fluvial sedimentary sequence.

Drilling has also shown that in the subsurface of the deposit area the arkosic

sandstones and conglomerates are interbedded with numerous intervals of siltstone and mudstone, much of which is thinly laminated. Beds with clay-altered ash to lapilli-sized tephra are common, and there are abundant layers rich in organic carbon

± carbonized plant debris. The laminated siltstone and mudstone intervals reflect a predominantly lacustrine setting that was the site of frequent episodic influxes of fluvial sand- to cobble-sized material.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 54

May 27, 2026

Figure

6-3: Grassy Mountain Deposit Area Geologic Map

Source: RESPEC, 2026

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 55

May 27, 2026

6.4.2

Structure

The Grassy Mountain gold–silver deposit is situated within a zone of complex extensional block faulting and rotation. Faults at Grassy Mountain are

dominated by N30°W- to N10°E-striking normal faults developed during Basin and Range extension and are inferred to have post-mineral displacement. On the east side of the deposit, these faults are inferred to have down-to-the east movement

based on interpreted offsets of a prominent white sinter bed in drill holes, as well as drilled intersections of fault gouge. A set of orthogonal, N70°E-striking high-angle faults of minor displacement are inferred to link the graben faults. One

of these, the Grassy fault, has a vertical offset of only 10 to 40 ft or less, although it coincides with the axis of the high-grade core of the deposit.

6.4.3

Alteration and Mineralization

Hydrothermal activity and gold mineralization occurred during the accumulation of the Grassy Mountain Formation, coeval with active sedimentation. Therefore,

the water-saturated, unconsolidated sediments required silicic ± potassic alteration to develop sufficient competency to allow for the creation of fractures and structurally induced open space.

Silicification is the principal hydrothermal alteration type associated with gold–silver mineralization at the Grassy Mountain deposit. It takes the

form of silica sinter, pervasive silica flooding, and cross-cutting chalcedonic veins, veinlets, and stockworks. Silicification is inferred to be largely controlled by hot-spring vents active during accumulation of the Grassy Mountain Formation. The

300-ft deep main sinter is underlain by a zone of strong silicification with silica flooding and chalcedonic quartz veins.

Small amounts of fine-grained

pyrite are present in silicified rocks that have not undergone later oxidation. In some parts of the deposit, particularly within arkose and sandy conglomerate units, silicification is accompanied by potassic alteration in the form of adularia

flooding. Orthoclase, present primarily in sand-sized grains and in granitic clasts, is unaffected by potassic alteration, while plagioclase is replaced by adularia. Adularia is extremely fine-grained and is identified microscopically or by

cobaltinitrite staining. Silicic and potassic alteration zones are surrounded by barren, unaltered, clay-rich (20–40% montmorillonite), tuffaceous siltstone and arkose with minor diagenetic pyrite.

The Grassy Mountain gold–silver deposit is located largely within the zones of silicic and potassic alteration beginning approximately 200 ft below the

surface. The deposit has extents of 1,900 ft along a N60°E to N70°E axis, as much as 2,700 ft in a northwest-southeast direction, and as much as 1,240 ft vertically. The surface expression of mineralization is indicated by weak to moderately

strong silicification and iron-staining, accompanied by scattered, 1/8- to 1.0-inch-wide creamy to light-gray chalcedonic veins that fill joints.

The

deposit consists of a central, higher-grade core with gold grades of >~0.03 oz/ton Au that is surrounded by a broad envelope of lower-grade mineralization. The central, higher-grade core is almost 1,000 ft long on the N60°E to N70°E axis,

450 ft in width, and 450 ft in vertical extent, and it lies above the Kern Basin Tuff and below a distinctive sinter unit. Representative cross-sections through the deposit are provided in Section 11.7.1 (see Figure 11-1 to Figure 11-4).

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 56

May 27, 2026

6.4.3.1

Central Higher-Grade Core Zone

Three distinct and overlapping types of gold–silver mineralization are recognized within the central core of the Grassy Mountain deposit: gold-bearing

chalcedonic quartz ± adularia veins, disseminated mineralization in silicified siltstone and arkose, and gold and silver in bodies of clay matrix breccia.

Zones of high-grade mineralization are defined by the presence of chalcedonic quartz ± adularia veins. Mineralized quartz ± adularia vein types

include single, banded, colloform, brecciated, and calcite-pseudomorphed veins. Colloform veins tend to carry the highest grades (>0.5 oz/ton Au), with visible gold up to as much as 0.02 inches in the longest dimension associated with argentite.

Veins with relict bladed calcite texture also contain higher gold grades than the banded and single vein types. Gold mostly occurs as electrum along the vein margins or within microscopic voids. Some veins carry very little grade or are barren. At

least some of the higher-grade zones of veins are thought to strike approximately N70°E.

Vein widths range from 1/16 to ~2.0 inches. Individually,

such narrow veins are unlikely to have lateral or vertical extents of significance, but vein frequency can average one vein per foot in places. Zones of veining have strike lengths of 400 to 700 ft and vertical extents of 100 to 250 ft at elevations

of 3,150 to 3,400 ft. Individual veins are too narrow to trace or correlate from hole to hole. However, the zones of veining have continuity.

A

steep southerly dip of the veins (70–85°) is inferred from vein intersection angles with drill core axes and bedding. Veins are mostly perpendicular to bedding, which generally dips 10–25° NNE within the deposit. Vein

intersection angles of 10–25° to the core axis were mostly recorded in core holes GMC-001 to GMC-008 angled at -50° at S20°E, compared with 25° to 50° intersection angles in holes GMC-009 to GMC-011 angled -50° at

N20°W. The N70°E strike of the vein zones is supported by: 1) surface mapping, 2) vein orientation perpendicular to bedding, 3) grade-thickness contouring, and 4) the overall trend in mineralization with grades in excess of ~0.03 oz/ton Au.

The veins crosscut the silicified sediments and have extremely sharp grade boundaries with the sediments. Vein frequency diminishes abruptly below an

elevation of ~3,000 ft at the west–southwest limit of the higher-grade core to ~3,100 ft at the east-northeastern limit. Very few high-grade veins are encountered above the higher-grade core of the deposit.

Within the higher-grade core, high gold grades are also present in silicified siltstone and arkose with no visible veins. In these cases, gold and silver are

inferred to be very finely disseminated in a stratiform manner in the silicified rock. Fine-grained pyrite is commonly disseminated in the silicified siltstone and sandstone where oxidation has not occurred. Contacts between siltstone and arkose

beds seem to be more favorable and carry higher gold grades. In places, beds of tuff and tuffaceous siltstone appear to be particularly favorable hosts for higher-grade mineralization that lacks associated veins.

Newmont and other later operators referred to the third style of gold–silver mineralization as “clay matrix breccia,” bodies of which may be

more prevalent in the lower portion of the higher-grade core of the deposit. These bodies are interpreted to extend at near-vertical angles up and down into the surrounding, low-grade gold-silver envelope. Clay matrix breccias are mainly of

clast-supported types and contain sub-rounded to sub-angular, sand- to boulder-sized clasts of silicified and/or veined arkose and siltstone with minor amounts of clay and iron-oxide minerals between the clasts. In drill core, clay matrix breccia

intervals are intersected over lengths of as much as several tens of feet, but their

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 57

May 27, 2026

true thickness and exact orientations are poorly understood, in part because their margins are commonly irregular-to-gradational and not planar, except where structural fabrics related to fault

movement are evident. In some cases, it is difficult to discern where clay matrix breccias end and similar fault-related breccias begin. In some places the two are possibly genetically related.

Clay matrix breccias cut—and are therefore paragenetically later than—the silicification and veins. One interpretation is the clay matrix breccias

formed by explosive releases of over-pressured water vapor through faults and fractures during boiling in the waning stages of the hydrothermal activity.

6.4.3.2

Lower Grade Envelope

Lower-grade mineralization, generally less than 0.03 oz/ton Au, envelopes the higher-grade core and extends outwards as stratiform mineralized lenses (see

Figure 11-1 through Figure 11-4). There are very few visible chalcedonic veins. The gold and silver are inferred to be disseminated within the silicified arkose and

siltstone units. Contacts between arkose, siltstone, and sinter appear to have been preferentially mineralized, and beds of tuff and tuffaceous siltstone also were favorable sites for mineralization. Low-grade mineralization is also present in

numerous intervals of silica sinter. However, not all sinter intervals are mineralized. Sinter-hosted mineralization may be disseminated or within fractures where the sinter has been structurally disrupted.

6.5

Deposit Types

The geological setting, hydrothermal alteration, styles of gold-silver mineralization, and close spatial and timing associations of the mineralization with

siliceous-sinter deposition indicate that Grassy Mountain is an example of the hot-springs subtype of low-sulfidation, epithermal, precious-metals deposits. The Grassy Mountain deposit is characterized by stacked sinter terraces that demonstrate

hydrothermal fluids vented at the paleosurface concurrent with lacustrine and intermittent fluvial sedimentation. At a depth of 300 ft, the main sinter at Grassy Mountain is underlain by a zone of intense silicification, within which is located the

core of the deposit that is the focus of this report.

Figure 6-4 shows a conceptual, schematic section of a

low-sulfidation epithermal system and its variable form with increasing depth, and the typical alteration zonation, which include the distribution of sinter, a blanket of steam-heated advanced argillic alteration, and water-table silicification

(Buchanan, 1981; Sillitoe, 1993).

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 58

May 27, 2026

Figure

6-4: Conceptual Hot-Springs Epithermal Deposit Model

Source: Buchanan, 1981

In

the case of Grassy Mountain, the broader lower-grade mineralization extends up to and overlaps multiple, stacked deposits of sinter, reflecting near-surface epithermal mineralization as the sedimentary sequence accumulated.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 59

May 27, 2026

7

EXPLORATION

7.1

Exploration

In early 2017, Paramount commissioned an exploration review of the Grassy Mountain project data to evaluate and define exploration drilling opportunities for

potential expansion of the known mineralization. This study focused on the area within the Grassy Mountain claims group controlled by Paramount and was carried out and reported by RESPEC (Weiss, 2017).

RESPEC first compiled and evaluated geological and geophysical maps, soil and rock-chip assay data, and aerial images from files supplied by Paramount. During

March 2017, RESPEC reviewed RC drill cuttings and core, drill logs, paper maps, cross-sections, and other files at Paramount’s office in Vale. As part of this review, field traverses were made throughout the Grassy Mountain claim group to

better understand the geology, rock geophysical response, and effects of hydrothermal alteration.

Based on the field traverses, RESPEC noted the

high-potassium zones shown by the Newmont airborne radiometric data are likely controlled by abundant potassium-bearing clasts within exposed stratigraphic units of the Grassy Formation and concluded that they are not the result of extensive

potassic alteration. District patterns of low total magnetic intensity visible in the Newmont airborne magnetic maps also appear closely related to stratigraphy and regional faults of the Oregon-Idaho graben rather than major zones of hydrothermal

alteration.

Zones of high resistivity defined by the 2012 CSAMT survey correlate in part with the thick volume of silicified rocks that host the Grassy

Mountain gold deposit (refer to Section 5). Drill data, including RC chips, show the resistivity high that extends southwest from the deposit toward the Crabgrass deposit and the outlying resistivity high at the Wood area are not the result of

extensive silicification (Weiss, 2017). In these areas, the CSAMT high resistivity response may be from the underlying Kern Basin Tuff (Tkt) and rhyodacite of Butterfly Hill (Trd) units.

Weiss (2017) identified four drill targets within the immediate area of the Grassy Mountain deposit and recommended them for limited expansion drilling.

Drilling conducted to test these targets is summarized in Section 7.2.2. These near-mine targets have significant uncertainties in their locations due to a lack of confidence in the precise locations, dips, amount of displacement, and timing of

the Apache–Coyote and Gopher faults and the northeast-trending fault in the North Spur, all of which are potentially mineralized structures. Nevertheless, Weiss (2017) justified these targets based on their proximity to the proposed

underground mine and the opportunity they presented to expand known mineralization, even if only incrementally. Two holes drilled in 2018 as a preliminary test of the North Spur target returned anomalous values.

Weiss (2017) also recognized two separate targets in the outlying Wood prospect as having the potential to host structurally controlled vein or stockwork

mineralization.

In addition, Weiss (2017) recommended additional surface work to further define exploration drill targets. This included expansion

of the 2012 CSAMT coverage to better understand the subsurface at the Crabgrass, Bluegrass, North Bluegrass, Ryegrass, and Dennis’ Folly areas and infill soil sampling and trenching at the large geochemical anomaly north of Snake Flats.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 60

May 27, 2026

In October 2018, Paramount contracted Precision GeoSurveys of Langley, BC, Canada to fly helicopter-borne

aeromagnetic and radiometric geophysical surveys over the Grassy Mountain claim group. Precision GeoSurveys flew 734 line-miles with an Airbus AS350 helicopter at 50-meter spacings and a heading of 090°/270°; tie lines were flown at

500-meter spacings at a heading of 000°/180°. The results of this survey show the Grassy Mountain deposit lies within a large magnetic low (Figure 7-1). Magnetic highs outline the extents of intrusive

rocks and basaltic units.

Figure

7-1: 2018 Aerial Magnetic Survey of Grassy Mountain Area

Source: Paramount, 2018 and modified by RESPEC, 2026

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 61

May 27, 2026

7.2

Drilling

Drilling at the Grassy Mountain claim block is summarized in Table 7-1 and shown in Figure 7-2.

Table

7-1: Grassy Mountain Claim Block Drilling Summary

Year

Company

# Holes

Hole Type

Length (ft)

Area

1987–1991

Atlas

193

RC

154,963

Grassy Mtn

1989–1991

Atlas

5

Core

4,153

Grassy Mtn

1989–1991

Atlas

5

RC & Core

3,502

Grassy Mtn

1987–1991

Atlas

187

RC

62,895

Outlying

Prospects

1987–1991

Atlas

10

RC

1,884

Water wells

1992–1996

Newmont

13

Core

13,101

Grassy Mtn

1992–1996

Newmont

2

RC & Core

1,909

Grassy Mtn

1998

Tombstone

4

RC

3,145

Grassy Mtn

1998

Tombstone

6

RC & Core

4,926

Grassy Mtn

2011

Calico

3

Core

2,531

Grassy Mtn

2011–2012

Calico

10

RC

8,518

Grassy Mtn

2012

Calico

4

RC

2,585

Outlying

prospects

Historical Total

442

264,112

2016–2017

Paramount

3

RC

1,140

Grassy Mtn

2016–2017

Paramount

3

Core

1,933

Grassy Mtn

2016–2017

Paramount

24

RC & Core

19,907

Grassy Mtn

2018

Paramount

2

RC

1,600

North Spur Target

2019

Paramount

2

Core

931

Geotechnical

Paramount Total

34

25,511

All Drilling Total

476

289,623

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 62

May 27, 2026

Figure

7-2: Locations of Drill Holes Within the Grassy Mountain Claims

Group

5.2.3.6

Wood

Source: RESPEC, 2026

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 63

May 27, 2026

The project database includes a total of 264,112 ft drilled by four historical operators from 1987 through

2012 in 442 drill holes. From 2016–2019, Paramount drilled 34 holes for a total of 25,511 ft to bring the total drilled within the claims group to 476 holes and 289,623 ft. Approximately 77% of the footage drilled was at and adjacent to the

Grassy Mountain deposit area. Most of the holes at the Grassy Mountain deposit area were drilled entirely by RC (77% of the total footage). Holes drilled using core methods account for about 12% of the footage drilled in the deposit area, and holes

drilled with RC pre-collars and core tails account for about 11% of the total. Figure 7-3 shows the locations of the holes drilled in and near the Grassy Mountain deposit area. Figure 7-2 includes the collar locations of holes drilled to test outlying prospects within the Grassy Mountain claim block. The results of drilling at the outlying prospects are summarized in Section 5.2 and

Section 5.3.

Within the Grassy Mountain deposit area, approximately 80% of the holes were drilled vertically or within 3.0° of vertical.

Approximately 69% of the core and core-tail holes were inclined at angles less than -80°. Overall results of drilling within the Grassy Mountain deposit are summarized with representative cross-sections presented in Section 11.7.1. The

locations of these cross-sections are shown in Figure 7-3. At the outlying prospects—where all the drilling was done with RC methods—approximately 98% of the holes were vertical. Outside the Grassy

Mountain deposit area, the median hole depth was 300 ft.

In addition to the holes discussed above, three short, vertical core holes, for a total of 438

ft, were drilled in 2018 to the east of the Grassy Mountain deposit. These holes obtained samples of unaltered and unmineralized basalt that is a potential source of aggregate and mine-backfill material. These samples were used in various

geotechnical and geochemical evaluations. Four groundwater-monitoring wells (GM18-31 through GM18-34) drilled by Paramount in 2018 are not included in the drilling summarized in Table 7-1 or on Figure 7-2 and Figure 7-3.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 64

May 27, 2026

Figure

7-3: Locations of Holes Drilled in the Grassy Mountain Deposit Area

Source: RESPEC, 2026

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 65

May 27, 2026

7.2.1

Historical Drilling, 1987-2012

7.2.1.1

Atlas, 1987–1992

In early 1987, Atlas mobilized a small track-mounted rig to drill six holes in two target areas. Drill hole 026-004 intercepted 80 ft of mineralization

averaging 0.021 oz/ton Au. Atlas completed a follow up five-hole drill program in the spring of 1988. Drill hole 026-009 is considered the Grassy Mountain deposit discovery hole—it intersected 145 ft of mineralization that averaged 0.075

oz/ton Au. By the end of 1991, Atlas had drilled 227,397 ft in 400 holes. Of the total, Atlas drilled 13 holes as water wells and 187 holes at outlying prospects.

Eklund Drilling Company of Elko, Nevada drilled Atlas’s RC holes using Ingersoll Rand TH-60 and RD-10 truck-mounted drills with a nominal hole diameter

of 51⁄4 inches (Lechner, 2007). Atlas sampled the RC cuttings at 5-ft intervals. Twenty-three of the RC exploration holes were drilled to at least 1,000 ft in

depth. (All of the 1,000+-foot holes are in the Grassy Mountain deposit area.) Atlas’s RC drilling was “almost invariably” done dry, because groundwater wasn’t encountered above 750-ft depths except for some locally perched

water intersected along the northern portions of the deposit. Because the deposit is strongly silicified, drilling penetration rates were slow and caused excessive bit wear. Drilling in certain areas was difficult because of tight hole conditions

and caving of rubble zones. In many cases, historical documentation is not sufficient to determine whether a particular hole was drilled dry or wet.

Atlas drilled 10 core holes at Grassy Mountain to confirm the high-grade mineralization identified by RC drilling, obtain samples for metallurgical testwork,

and collect geotechnical data. Longyear, Incorporated (Longyear) drilled two confirmation core holes as NQ (1.875 inch) angle holes. Boyles Brothers drilled five core holes as vertical PQ (3.345 inch) diameter holes specifically to obtain

sample material for metallurgical testing (these holes were pre-collared with RC). Boyles Brothers also drilled three geotechnical holes. Assay records indicate that Atlas sampled the confirmation holes on intervals ranging from 0.5 to 7.5 ft in

length, with an average sample length of 4.5 ft. RESPEC is uncertain whether the core was mechanically split in half or sawed in half for sampling. Atlas shipped the whole core from the metallurgical holes to Hazen Research Inc. for metallurgical

testwork and logged the geotechnical holes for various geotechnical parameters such as rock quality designation (RQD), fracture frequency, etc.

The Atlas

geologist assigned to each drill rig was responsible for the placement of the rig, drilling and sampling methods, hole depths, and lithologic logging.

The Atlas drilling discovered and completed the initial delineation of the Grassy Mountain deposit. Atlas also discovered and completed all drilling of the

Crabgrass deposit.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 66

May 27, 2026

7.2.1.2

Newmont, 1994

In 1994, Newmont drilled 15 angled core holes (including a wedge drilled off the first hole), and pre-collared two of the last three core holes with RC.

Longyear of Spokane, Washington conducted this drilling, which totaled 15,010 ft. All these holes were drilled with HQ (2.5 inch) diameter core except for six drill holes in which poor ground conditions forced the HQ core to be reduced to NQ-size.

The RC pre-collars were sampled over intervals of 5.0 ft. Newmont sawed approximately 90% of the core in half for sampling and mechanically split the other 10% in half.

Newmont determined that steep, southeast-dipping quartz–chalcedony–adularia veins hosted the high-grade gold. They inferred the steep southeast

dip by comparing vein/core intersection angles from southeast-directed holes to those in northwest directed holes and also inferred that the high-grade gold mineralization had a relatively sharp base at an elevation of 3,000 to 3,100 ft.

7.2.1.3

Tombstone 1998

In 1998, Tombstone drilled six core holes with RC pre-collars and four complete RC holes that totaled 8,071 ft of drilling at the Grassy Mountain deposit.

Dateline Drilling Incorporated (Dateline) from Missoula, Montana performed all of Tombstone’s RC drilling. Tombstone collected RC samples over 2.5 and 5.0-ft intervals, with both interval lengths sometimes used in the same drill hole. They

conducted the RC drilling wet, as water and mud was used for hole conditioning. Ray Hyne Drilling of Winnemucca, Nevada, performed the core drilling. Tombstone sawed approximately 80% of the core in half for sampling and mechanically split the

remainder in half.

Tombstone concentrated their drilling in the higher-grade core of the deposit, aiming to better define the higher-grade

mineralization. However, the Tombstone results did not include the very high-grade component of the Grassy Mountain mineralization (>2 oz/ton Au) encountered in previous Atlas RC and Newmont core holes (French, 1998). French (1998) theorized

that the lack of very high-grade intersections might have been due to the program’s drilling and related sampling problems. French (1998) recommended using a more powerful RC rig that could better handle poor ground conditions and would

require less hole reaming and conditioning, which would allow uninterrupted drilling and sample collection.

7.2.1.4

Calico 2011-2012

Calico commenced drilling at the Grassy Mountain deposit in August 2011 and drilled three core holes using a modified track-mounted LF-90 core drill operated

by Marcus and Marcus Drilling Company, of Post Falls, Idaho (Marcus and Marcus). Marcus and Marcus drilled HQ diameter core using a triple-tube core recovery barrel. Operating 24 hours per day, Marcus and Marcus drilled an average of 39 ft per day

and completed 2,530.5 ft of drilling.

In October 2011, a truck-mounted Ingersoll-Rand TH-75 drill operated by Boart Longyear, of South Jordan, Utah,

began RC drilling at the Grassy Mountain property. The TH-75 drill utilized a cyclone wet splitter for sample collection, with an approximate 40% split retained in the sample bag. Drill cuttings passed through a cyclone and the splitter then divided

them into three streams: one for sampling, one for logging and retention for reference, and the third was discarded to the sump. The Calico geologist site placed a portion of the sample collected for logging into a plastic chip tray labeled with the

hole number and the depth from which the sample was taken. The drill helper collected one

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 67

May 27, 2026

sample for each 5-ft interval in bags pre-labeled with the sample number under supervision by Calico’s site geologist. The drill helper sealed each sample bag at the drill site. The sample

bags remained unopened until they reached the analytical laboratory. After each 20 ft length of drill rod was added to the drill string, Boart Longyear cleaned the hole of material which may have descended while they installed the new section

of pipe. The RC drill operated on a single 12-hour daily shift. A Calico on-site geologist monitored the drilling and sample collection, logged the drill cuttings, and collected and stored a portion of the drill cuttings for future reference. The RC

drill rig completed nine holes at the Grassy Mountain deposit area totaling 7,668 ft.

Calico allowed their 2011 RC samples to drain at the drill site

prior to shipment for assay. Samples received at the assay laboratory had an average weight of 20 lb.

During June 2012, Calico drilled a total of 3,435

ft in five RC holes—one in the Grassy Mountain deposit area, one in the Wheatgrass area, one at the Wood area, and two at the Wally area. Drill contractor Leach Drilling of Dayton, Nevada, performed the work using an Ingersoll-Rand DM25/RC

track-mounted rig. Leach Drilling used a cyclone wet splitter for sample collection and retained approximately 40% of each sample in a sample bag for analysis. Calico’s June 2012 sampling procedures were the same as those used in 2011. The

drill operated on a single 12-hour daily shift. An on-site Calico geologist monitored the drilling and sample collection, logged the drill cuttings, and collected a portion of the drill cuttings for future reference. Calico completed the 2012 drill

program on June 28.

Calico’s 13 holes drilled at the Grassy Mountain deposit area increased the drill density within the higher-grade core of

the deposit. Calico’s three core holes provided additional information regarding higher-grade mineralization. The hole drilled at Wheatgrass returned results consistent with existing holes in the target area. The hole drilled at the Wood

target was drilled almost 450 ft from the nearest drill hole and returned only very low-grade intersections. The first hole drilled in the Wally area unsuccessfully tested the western extension of previously defined mineralization. The second Wally

drill hole returned similar results to the existing Wally drill holes and therefore confirmed the extension of this low-grade mineralization about 200 ft to the north.

7.2.2

Paramount 2016–2019

From 2016–2019, Paramount conducted infill, geotechnical, hydrological, and metallurgical drilling at Grassy Mountain. Paramount’s drilling focused

on the central higher-grade core of the deposit and significantly improved Paramount’s knowledge of the continuity and styles of mineralization within the core zone. It also provided samples for geotechnical and metallurgical testing.

Paramount’s drill results made an important contribution to the estimation and confidence in the modeling of the Grassy Mountain gold and silver resources presented in Section 11 of this technical report summary.

In 2016 and 2017, Paramount drilled 22,980 ft in a total of 30 holes within the higher-grade core of the Grassy Mountain deposit. The goals of this drilling

program included: (i) verifying the historical drill data, particularly the historical RC holes; (ii) increasing the quantity of drill core derived from the higher-grade portion of the deposit; (iii) obtaining better definition of the

controls and extents of the higher-grade mineralization; and (iv) obtaining drill core for detailed geotechnical logging and metallurgical testing. In 2018, Paramount drilled two RC holes at the North Spur target, located a short distance to

the north of the Grassy Mountain deposit. In 2019, Paramount drilled two geotechnical core holes within the lower-grade peripheries of the Grassy Mountain deposit. The 2019 drilling included a short, 100-ft vertical hole near the planned mine portal

and a deeper 831-ft hole drilled at -70° to penetrate an area of the planned underground access ramp. Representative cross-sections of the drilling are in Section 11.7.1. The cross-section locations are shown on Figure 7-3.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 68

May 27, 2026

Historical core drilling programs often experienced significant problems due to poor ground conditions,

particularly from the uppermost portion of the deposit through to the bottom of the upper sinter package. Therefore, Paramount began to pre-collar the core holes with RC to depths of approximately 400–500 ft, then core drill through the

higher-grade core of the deposit.

Paramount contracted Major Drilling America Inc., of Salt Lake City, Utah (Major Drilling or Major) for both the RC and

core drilling. Major drilled RC pre-collars with a Schramm T450GT track-mounted drill operated on a single 12-hour daily shift. Major used a 61⁄2 inch diameter RC

bit to the planned pre-collar depth and then set 41⁄2 inch steel casing for the entire length of the hole. The RC drill rig moved to the next RC pre-collar location

and a core rig drilled the remainder of the hole (as discussed below).

During the RC drilling, Major Drilling injected small amounts of water down the

hole to control dust emissions. Major Drilling’s sampling assistant collected RC samples at nominal 5-ft intervals via a cyclone rotary splitter and center discharge tube into 20-inch by 24-inch sample bags that were pre-numbered by Paramount

geologists or geotechnicians. Typical samples weighed approximately 15–20 lb for each sample interval. The Major Drilling sampling assistant monitored the drilling, performed the sample collection, and collected and stored a portion of the

drill cuttings in plastic chip trays for future reference and logging. Paramount’s onsite geologist trained the sampling assistant on the first seven RC pre-collars.

Paramount and/or Major Drilling’s sampling assistant collected duplicate RC samples at the rate of approximately one per 40 regular sample intervals.

For duplicate samples, they collected the primary sample from the center discharge tube of the rotary splitter and collected the duplicate sample from the side discharge tube of the rotary splitter. (At no time did they use a “Y-type”

splitter to collect duplicate samples.)

Major Drilling completed the core drilling with two track-mounted drills: a Boart Longyear LF-90 drill and a

Boart Longyear LF-230 drill. Both rigs drilled HQ diameter core using a triple-tube type core barrel. Two-man crews operated the core drills 24 hours per day on two 12-hour shifts with a drill foreman also on site. A single water truck and driver

hauling water from a well approximately one mile north of the drilling area supplied adequate water for the two drills.

Major began drilling the first RC

pre-collar in November 2016 and completed seven RC pre-collars totaling 2,695 ft during the year. In 2016, core totaling 3,078 ft was drilled in six holes. Paramount suspended drilling from mid-December 2016 through early March 2017. During March,

April, and May of 2017, Major Drilling drilled 20 RC pre-collars totaling 8,556 ft. From March through June of 2017, Major drilled 8,651 ft of core in 21 holes. Table 7-2 shows the footages drilled by

pre-collar RC and core methods.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 69

May 27, 2026

Table 7-2: Paramount 2016–2019 RC Pre-Collar vs. Core

Lengths

Drill Hole

Pre-Collar

RC From (ft)

Pre-Collar RC To

(ft)

Core From (ft)

Core To (ft)

Total RC

Drill

Hole

Pre-Collar RC

From (ft)

GM16-01

0

380

380

0

Stuck hammer

GM16-02

0

400

400

742

400

342

GM16-03

0

380

380

785

380

405

GM16-04

0

744.5

0

744.5

Geotechnical hole

GM16-05

0

360

360

618

360

258

GM16-06

0

400

400

731

400

331

GM17-07

0

391

391

850.5

391

459.5

GM16-08

0

375

375

0

Twisted off rods

GM16-09

0

400

400

795

400

395

GM17-10

0

400

400

822

400

422

GM17-11

0

385

385

0

Stuck hammer

GM17-12

0

395

395

689

395

294

Re-drill of

GM16-08

GM16-13

0

438.5

0

438.5

Twisted off rods

GM16-14

0

750

0

750

Geotechnical hole

GM17-15

0

320

320

780

320

460

GM17-16

0

480

480

923

480

443

GM17-17

0

480

480

929.5

480

449.5

GM17-18

0

450

450

884.5

450

434.5

GM17-19

0

450

450

857.5

450

407.5

GM17-20

0

380

380

856

380

476

GM17-21

0

460

460

832

460

372

GM17-22

0

500

500

953.5

500

453.5

GM17-23

0

400

400

956

400

556

GM17-24

0

450

450

896

450

446

GM17-25

0

400

400

887

400

487

GM17-26

0

520

520

875

520

355

GM17-27

0

440

440

772

440

332

GM17-28

0

420

420

862

420

442

GM17-29

0

440

440

800

440

360

GM17-30

0

400

400

810

400

410

GM18-35

0

800

800

0

North Spur

GM18-36

0

800

800

0

North Spur

GM19-37

0

831

0

831

Geotechnical hole

GM19-38

0

100

0

100

Geotechnical hole

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 70

May 27, 2026

Major Drilling averaged 142 ft of RC drilling per 12-hour shift and 31.1 ft per drill, per 12-hour shift, for

core drilling. Three of the RC pre-collars encountered extremely bad ground conditions that led to premature terminations of the holes and precluded the drilling of core tails.

The drilling program achieved all the goals summarized above. Beyond obtaining core for detailed geotechnical logging and metallurgical testing, the drill

core aided in furthering the understanding of the deposit’s geology and confirmed many of Newmont’s conclusions. This understanding formed the base from which the resource model was constructed. Finally, the results of the Paramount

drilling program have aided in the verification of the historical data (see the discussion of estimating with and without Paramount drill data in Section 9.1.4).

The results and interpretations of the geotechnical and hydrological data derived from the Grassy Mountain deposit area drilling programs are discussed in

Section 13.2 and Section 13.3.

7.3

Drill-Hole Collar and Down-Hole Surveys

For the Atlas drilling, Apex Surveying from Riverton, Wyoming, surveyed the collar locations using a total station. Most holes were not surveyed for down-hole

direction and deviation, except four RC holes and all the core holes, which were surveyed using an Eastman down-hole camera (Lechner, 2007).

RESPEC does

not know whether Newmont surveyed their collar locations. Newmont had Scientific Drilling from Elko, Nevada, perform down-hole deviation surveys of their holes. Newmont’s handwritten “Drill Hole Summary” sheets indicate that

Scientific Drilling surveyed their holes using a “gyro” instrument.

There are no written records regarding the procedures for surveying the

Tombstone collar locations (Lechner, 2007). Silver State Surveys of Elko, Nevada, reportedly performed down-hole deviation surveys using a gyroscopic survey tool, but Paramount’s archives contain no written records. No down-hole survey data

are available for three of the Tombstone drill holes.

Until Calico’s involvement in the project in 2011, project coordinates were based on a local

grid established by Atlas. All Calico and subsequent drill-hole collar surveys were collected directly in UTM coordinates. Section 9.1includes a discussion on the transformation of historical mine-grid collar locations into UTM coordinates.

During 2011 and 2012, Calico personnel surveyed drill collar locations using hand-held Garmin GPS units with a horizontal accuracy on the order of

±10 ft. Later, the collar locations were surveyed with a Trimble, survey-grade GPS to ±0.1 ft. Drill holes were marked in the field with a lath and/or stake.

Marcus and Marcus surveyed the 2011 core holes for down-hole directional deviation using a REFLEX EZ-Track survey instrument to obtain multi-shot readings.

International Directional Services (IDS) surveyed the 2011 RC holes for down-hole deviation using a Goodrich-Humphrey surface-recording gyroscopic system. Deviations from planned orientations were generally on the order of 3° for core and RC

holes, although some of the RC holes deviated by up to 6° in azimuth and 8° in dip.

Down-hole surveys were not performed in the first four 2012

RC holes. IDS surveyed the final 2012 hole, CAL12R17, using a Goodrich-Humphrey surface recording gyroscopic system.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 71

May 27, 2026

During Paramount’s 2016–2017 drilling program, Atlas Land Surveying of Fruitland, Idaho, surveyed

the Paramount drill-collar locations and many of the historical drill collars (see Section 9.1.1). The coordinates for the 2018 and 2019 holes were determined by handheld GPS. The owner of Atlas Land Surveying, Dean J. Coon, is a Registered

Professional Land Surveyor (Oregon 65687LS) and was responsible for the field work, data processing, and reporting. Atlas Land Surveying completed all 2018–2019 survey work using real-time kinematic (RTK) surveying techniques with Topcon Hiper

V GPS Receivers. In RTK mode, the stated accuracy of the measurements is within 10 mm ±1 mm for horizontal data and 15 mm ±1 mm for vertical data. Atlas Land Surveying collected static data in the field and then submitted it to the

National Geodetic Service Online Positioning User Service to derive accurate geodetic coordinates tied to the National Spatial Reference System. Using these coordinates, a survey measurement adjustment program, “StarNET”, processed the

RTK data to determine the final coordinates for the located points, then projected to the Universal Transverse Mercator grid using the NAD83 datum in units of U.S. Survey feet.

Down-hole deviation surveys were obtained from 25 of the 2016 and 2017 Paramount drill holes, the two holes drilled in 2018, and the deeper of the two

geotechnical holes drilled in 2019. IDS of Elko, Nevada, performed these surveys using a Goodrich surface-recording gyroscopic system (SRG). The SRG is capable of mapping the direction of boreholes and is unaffected by steel pipe or local

magnetic-field anomalies. Five of the 2016–2017 drill holes had blockages, such as lost or stuck pipe, casing, or core barrel, that prevented down-hole surveys.

7.4

Sample Quality

7.4.1

Core Samples

Due to the presence of visible gold in the drill core, Newmont decided to evaluate the potential for unrepresentative loss of gold in the splitting of drill

core for sampling. During the sampling of their first hole (GMC-001), Newmont collected the minus 10 mesh fines produced during the sawing of drill core into halves for each sample and weighed and assayed them separately (Jory, 1993). Jory

(1993) reported that the mean of the gold assays of the 171 samples of saw fines collected was 86% higher (0.044 versus 0.024 oz/ton Au) than the associated half-core samples sent to the laboratory. Jory (1993) noted that since the saw

fines accounted for less than 0.5% of the total sample weight, sampling of the saw fines was discontinued. However, Newmont did take 38 additional saw-fines samples for hole GMC-001-9, a core wedge from GMC-001, for which the assay certificate is

available. The average of the saw-fines assays is 0.438 oz/ton Au and the mean of the half-core assays is 0.143 oz/ton Au. Newmont did not obtain silver assays for any of their drill samples. The high bias in the saw fines relative to the

half-core samples is present at all gold grades, but it increases as the grade increases.

While the unrepresentative loss of gold to the saw fines is not

material due to the small amount of these fines relative to half-core samples, these data suggest the potential unrepresentative loss of gold to fines generated by other means. One such possibility is in fines that collect in core boxes from broken

intervals, which clearly warrant careful collection and splitting along with the sawing of competent pieces of core. Newmont brushed fines out of the core boxes for each sample interval and split the fines into halves, with one half added to the

sample bags of sawed core sent to the assay laboratory and the other half bagged and returned to the core boxes.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 72

May 27, 2026

Fines can also be lost below the surface during core drilling. To evaluate this possibility, RESPEC conducted

a sample integrity study to evaluate the relationship between geotechnical data (core recovery and RQD) collected during the logging of the core and gold grades. Figure 7-4 summarizes the relationship between

gold grade and RQD for all Grassy Mountain core holes for which RQD data are available.

Figure

7-4: Gold Grade vs. RQD

Source: RESPEC, 2018

Each

blue bar in the graph includes data within a 20% RQD bin, as indicated on the x-axis (RQDs of 100% and greater report to the “100” bin). The heights of the bars are indicative of the average grade of all intervals within each recovery

bin, as shown on the y-axis of the left-hand side of the graph. The total number of RQD intervals in each recovery bin is displayed by the orange line, with the scale provided by the y-axis on the right-hand side of the graph.

Except for the lowest RQD bin, there is a consistent correlation between RQD and gold grade: gold grades increase as RQD decreases. This negative correlation

is at least in part due to the relationship of higher-grade mineralization with highly fractured zones that yield low RQD values. In some deposits, unrepresentative loss of soft, clay-rich, and relatively unmineralized material from the recovered

drill core occurs in low RQD zones, which would lead to increased grades in the recovered samples of core. However, the Grassy Mountain mineralization of all grade ranges is associated with uniformly strong silicification, so this mechanism of

apparent grade increases is unlikely. The negative correlation between RQD and gold grade does not provide evidence for the possibility of losing gold related to fines during drilling. However, the potential for losses cannot be definitively ruled

out.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 73

May 27, 2026

RESPEC extensively reviewed RQD measurements used in the sample integrity analysis and modified the data,

e.g. adjusted RQD values over 100%, to assure their validity. RESPEC did not validate the bulk of the core recovery data, so these data may contain many inconsistencies that should be resolved. The relationship between recovery and gold grade for

two Paramount holes is summarized in Figure 7-5. No clear trend is evident at core recoveries of 60% and greater. Gold grades decrease with decreasing recoveries for core recoveries lower than 60%. However,

the number of recovery intervals in each bin is relatively low and likely insufficient to support definitive conclusions.

Figure

7-5: Gold Grade vs. Core Recovery

Source: RESPEC, 2018.

7.4.2

RC Samples

Due to the nature of RC drilling, contamination of drill cuttings from intervals above the drill bit is a concern, especially when groundwater is encountered

or fluids are added during drilling. The Atlas reportedly drilled RC holes dry unless groundwater was intersected, while Tombstone, Calico, and Paramount drilled their RC holes entirely wet. Comments on geologic logs and other historical

documentation suggest that the water table at Grassy Mountain lies near the base of the higher-grade core of the deposit, with “perched” groundwater noted in a few holes at much higher elevations.

Careful inspection of the geological context of RC drill results can sometimes detect down-hole contamination (e.g., anomalous to significant assays returned

from samples from post-mineral units), by comparing RC results to adjacent core holes, and by examining down-hole grade patterns.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 74

May 27, 2026

Cyclic down-hole grade patterns are evident in some of the RC holes at Grassy Mountain. These cycles consist

of elevated gold grades (relative to adjacent samples) in every fourth 5-ft sample, which corresponds with the first sample collected after a 20-ft drill rod change. In a classic case, the first sample yields the highest grade for a given drill rod,

while the following three samples gradually decrease in grade. This “decay” pattern in grade is caused by the accumulation of mineralized material (derived from some level in the hole above the drill bit) at the bottom of the hole as the

drilling pauses to add a new drill rod to the drill string. When drilling resumes, the first sample has the greatest amount of contamination, and the successive samples are gradually “cleaner” as the accumulated contamination decreases.

This cyclical pattern is detectable only in barren or very weakly mineralized rock. Even in cases where low-grade cyclic gold contamination would have a minimal impact on resource estimation, its presence suggests that similar, and possibly more

serious, unrecognizable contamination may have occurred higher in the hole within a mineralized zone.

Atlas did not believe down-hole contamination in

Grassy Mountain drilling was a “significant or consistent problem,” but did recognize that the bottom of hole 026-034 was potentially contaminated over a 200-ft interval. During the resource modeling and related detailed review of the

project data, RESPEC identified 21 drill holes suspected of having down-hole contamination of precious metal values, primarily based on the cyclic pattern described above. These suspect intervals are all at the lowermost portions of holes. They were

either excluded from mineral domain modeling or were used to model but explicitly excluded from use in the resource estimation.

7.5

Summary Statement

RESPEC believes that the drilling and sampling procedures provided representative samples of sufficient quality for use in the resource estimations discussed

in Section 11. RESPEC is unaware of any sampling or recovery factors that have not been addressed that would materially impact the estimate of mineral resources discussed in Section 11.

Down-hole drilled lengths of the higher-grade gold and silver portions of the deposit, some of which are oriented at high angles, could significantly

exaggerate true mineralized thicknesses in cases where steeply dipping holes intersect steeply dipping mineralization. A very high percentage of the Atlas holes were drilled vertically. RESPEC carefully evaluated the possible effects of exaggerated

down-hole lengths on the estimation of current resources and believes the model appropriately represents the higher-grade volumes.

The average down-hole

length of the sample intervals used directly in the estimation of the resource’s gold and silver grades is 4.76 ft, with a minimum length of 0.3 ft and a maximum of 12 ft. RESPEC considers these sample lengths appropriate for the Grassy

Mountain deposit.

Only four of the 177 Atlas RC holes that directly contribute assay data to the resource estimation were surveyed for down-hole

deviation. The four Atlas RC holes that were surveyed deviated from 14 to 35 ft horizontally from the drill collar positions to the distinct lower contact of the higher-grade zone (see Section 11), which lies approximately 800 ft below the

surface. The average horizontal deviation is 22 ft. In consideration of the block size of the resource model (5 x 10 x 10 ft; model x, y, z) and other factors related to the resource estimation, RESPEC does not consider the

demonstrated magnitude of deviation to be a significant issue.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 75

May 27, 2026

8

SAMPLE PREPARATION, ANALYSES, AND SECURITY

8.1

Introduction

This section summarizes all information RESPEC knows relating to sample preparation, analysis, and security, and quality assurance and quality control (QA/QC)

procedures employed to amass the Grassy Mountain drilling data. RESPEC either supervised the compilation of information from historical records as cited, or received it from Mr. Michael McGinnis, Paramount’s Project Manager.

8.2

Sample Preparation, Analysis and Security

8.2.1

Atlas 1987-1992

Atlas split the RC samples at the drill site to weigh between 8–15 lb (Atlas’s RC samples averaged approximately 12 lb) Atlas collected their RC

samples in 10-inch by 17-inch olefin sample bags. At all times, an Atlas geologist was stationed at the drill rig with the drill samples. Atlas split wet RC cuttings using a variable wet-cone splitter positioned below the cyclone and split dry

cuttings under the cyclone with a Jones splitter. Project geologists delivered the samples to a secure storage facility in Vale at the end of each shift. Chemex Analytical Laboratories (Chemex) personnel routinely picked up the samples from the Vale

storage facility and delivered them to their preparation facility in Boise, Idaho, where Chemex dried the samples at 100°C and then cone-crushed them to minus 1/8 inch. Chemex took 300-g subsamples using a Jones riffle splitter, then reduced

these subsamples to 95% passing 100 mesh using a ring and puck pulverizer. They stored coarse-reject materials in storage at the Boise facility for possible future use. Chemex shipped the 300-g pulps to their assay facility in North Vancouver,

Canada, where they assayed for gold and silver using 30-g aliquots analyzed by fire assay fusion, primarily with an atomic absorption (AA) finish.

RESPEC

does not know what type of certification Chemex had in 1987–1990, if any, but Chemex was a well-known commercial assayer that was independent of Atlas.

8.2.2

Newmont 1992-1996

Jory (1993) reported that Newmont cut their core into halves at the Vale field office with vein apices oriented perpendicular to the saw blade. For

material too fine to be swanned, Newmont geologists carefully swept out the core boxes for each sample interval, split the material in half using a Jones splitter, and recombined one half with the half-core sent for assaying. Newmont core boxes in

Paramount’s possession include core fines inside zip-lock plastic sandwich bags—presumably representing the remaining half-split of fine material from each sample interval.

According to Jory (1993), Rocky Mountain Geochemical Corporation (RMGC) picked up the core samples from the Atlas storage facility in Vale and delivered them

to the RMGC facility in Salt Lake City, Utah, where RMGC prepared and analyzed the samples. A copy of a Newmont report that lacks a title page, states that, “Coarse gold (up to 500 microns) problems necessitated careful sample prep

procedures for Grassy Mountain core.” RMGC dried the samples at 100°C, crushed them to minus 10 mesh, split them in half with a Jones riffle splitter, and coarse pulverized them to minus 48 mesh. RMGC ring-pulverized a 200-g split

of the minus 48 mesh material to a nominal, minus 150 mesh particle size, and fire assayed a 30-g aliquot with gravimetric and AA finishes.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 76

May 27, 2026

Newmont requested screen-fire assays from RGMC on 20 samples from drill holes GMC-001 and -002, for which

original gold assays exceeded 0.20 oz/ton Au.

RESPEC has no documentation regarding the sample security methods Newmont employed during their drilling

campaigns.

RESPEC does not know what type of certification RMGC had in 1992–1996, if any. However, RMGC was a well-known, independent commercial

assayer of that era, and RMGC was independent of Newmont. Newmont completed their check analyses at their in-house laboratory. Those checks were not independent of Newmont, exist only in paper form, and should be added to the project database.

8.2.3

Tombstone 1998

Tombstone passed their RC cuttings through a rotary wet splitter below the cyclone to produce samples weighing 10–15 lb. Tombstone washed the splitter

before each new sample was taken and placed a five-gallon bucket under the splitter to collect the wet samples. They then partially decanted the water from the bucket and emptied the RC cuttings and the remaining fluid into the sample bags and

rinsed out the bucket to wash any remaining fines into the sample bag. Tombstone closed the sample bags with one-way plastic ties and transported them to the Vale field office, where American Assay Laboratory (AAL) took possession and transported to

their laboratory in Sparks, Nevada.

AAL prepared and analyzed Tombstone’s RC and half-core samples. Laboratory personnel dried the samples at

100°C, crushed them to 8 to 10 mesh, and passed the crushed material through a Jones riffle splitter to produce a four-pound subsample, then pulverized these subsamples to 90% -150 mesh, blended them, and took a 350-g split. AAL analyzed for

gold by fire assaying a 30-g aliquot of the 350-g split with an AA finish (AAL method FA30), and analyzed for silver with method D210, which included aqua-regia digestion. AAL was independent of Tombstone and remains a well-known commercial

laboratory. RESPEC does not know what certification AAL held in 1998, if any.

8.2.4

Calico 2011-2012

Calico personnel transported their 2011 and 2012 drilling samples from the drill sites to the Calico sample handling and core logging facility in Vale. Before

moving the core, Calico staff recorded the date, box number, number of boxes transported, and beginning and ending footages of the transported core on a core handling form.

At the logging facility, Calico personnel measured and recorded core recovery and RQD data. A Calico geologist then logged the core, recording lithological,

alteration, mineralization, and structural information that included the angle of intersection of faults with the core, fault lineations, fractures, veins, and bedding. Calico then prepared the entire length of core for sampling. Calico geologists

based the sample intervals on the geological logs in order to separate different lithologies and styles of mineralization and alteration. Calico’s sample lengths generally did not exceed 5 ft and, where possible, correlated to the 5-ft

drilling runs. After completing logging, Calico geologists marked the sample intervals and assigned each one a unique sample identification (sample tag), with the sample tag stapled inside of the

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 77

May 27, 2026

box at the end of each sample interval. They placed a duplicate sample tag for each interval inside the sample bag and recorded the sample number in the sample tag booklet. If they suspected or

observed contamination or down-hole caving, they flagged the interval and didn’t sample it. If any significant veins, veinlets, healed breccias, or other potentially mineralized planar features were present, Calico geologists marked a line

down the length of the core to indicate the line along which the core should be sawn or split to ensure the sampler took a representative sample.

Once

Calico geologists had completed the core logging and marked all the sample intervals, the core was sprayed with water and photographed. They then moved the core boxes to the sampling station, and a technician either split the core with a hydraulic

splitter or cut the core in half with a diamond-blade core saw. The technician placed one half of the split core into a cloth sample bag labeled with the sample number, returning the other half to the core box for future reference. The Calico

technician split intensely broken or very soft core in half using a small scoop or putty knife and placed one of the halves in the numbered sample bag. The sample number, the starting and ending footage of the sample interval, the date, and the

technician’s initials were recorded on a core cutting/splitting form. The technician then tied the sample bags shut and stored them in the secure core facility until a complete sample batch was ready for shipment.

Typically, Calico allowed the RC samples to drain at the drill site for two to three days before transporting them to their storage and core logging facility

in Vale, where they recorded the date and the number of samples transported on a sample handling form. A geologist or technician arranged the samples in a manner that accounted for all samples, blanks, and standards and photographed them prior to

shipment to the analytical lab. Calico then air-dried and stored the RC samples until a commercial freight service transported them to the ALS Minerals (ALS) laboratory in Reno, Nevada.

Calico filled out and maintained a complete sample inventory as an Excel spreadsheet to verify that all samples were accounted for and that bags were not

damaged prior to shipment. Calico personnel packed drill-core sample bags into rice bags and sealed each rice bag with a numbered security seal. They placed RC samples into super sacks and sealed each super sack with a numbered security seal. Each

shipment only included samples from a single drill hole. Calico prepared a sample submittal form with the shipment number, security seal numbers, the sample numbers, the type of analyses requested, and a list of samples to be duplicated. They

included a hard copy of the submittal form with the sample shipment and emailed an electronic copy to the laboratory. The personnel who prepared the shipment filled out a chain of custody form that included the sample shipment number, the location

the samples were shipped from, the total number of containers in the shipment, the security seal numbers, the name of the person who prepared the shipment, the name of the person who transported the shipment, and the name of the person who received

the shipment at the laboratory. The receiving individual at the laboratory completed the form and noted any damage or discrepancies and returned the form to Calico. The driver of each truck was also required to sign off on the chain of custody form.

A commercial freight service transported Calico’s 2011 and 2012 drilling samples to ALS. ALS was independent of Calico and maintained an ISO

9001:2008 accreditation for quality management and ISO/IEC17025:2005 accreditation for gold assay methods.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 78

May 27, 2026

ALS crushed the samples to 75% passing <6 mm and then split off a 250-g subsample for pulverization to 85%

passing <75 µm (200 mesh). Laboratory personnel processed clean sand through the crusher every five samples, when a technician noted any color change in the sample, and between every sample in the pulverizing step. ALS split pulps to

separate a 30-g aliquot for determining gold by fire assay with AA finish (ALS code Au-AA23) and used a separate 5-g aliquot for inductively coupled plasma atomic-emission spectrometric (ICP-AES) determination of silver and 32 major, minor, and

trace elements following a 4-acid digestion (ALS code ME-ICP61). If the original gold assay exceeded the 10 g/t Au (0.29 oz/ton Au) upper limit of the analyses, ALS took additional aliquots from the same pulp for fire assay with gravimetric

finish (ALS code Au-GRA21). Samples that yielded silver assays greater than 100 g/t Au (2.92 oz/ton Au) were reanalyzed using a 10-g aliquot with a four-acid digestion for silver and an AA finish (ALS code AG-OG62). Samples that assayed greater than

1,500 g/t Ag (44 oz/ton) were reanalyzed using a 30-g fire assay with a gravimetric finish (ALS code Ag-GRA21).

8.2.5

Paramount 2016-2019

Paramount personnel transported samples from Paramount’s drilling programs in 2016 through 2019 from the drill sites to Paramount’s storage and

logging facility in Vale. For sample handling, drying, logging, sample marking, core cutting, and packaging, Paramount applied the procedures Calico used for core and RC samples in 2011 and 2012 (Section 8.2.4), with the exception of the two

geotechnical core holes drilled in 2019 that remain unsampled as of the effective date. Paramount personnel cut competent core lengthwise into halves with a saw and split highly broken core by hand directly from the box using a brush and spoon in an

effort to take a representative half-core sample. (Approximately 10% of the core samples were split by hand.) After logging and sampling by Paramount geologists and technicians, ALS personnel transported core samples from the project office in Vale

to ALS sample preparation facilities in either Reno or Elko, Nevada. Paramount and ALS completed chain of custody paperwork and maintained sample security at all times. ALS is a commercial assayer independent from Paramount that maintains an ISO

9001:2008 accreditation for quality management and ISO/IEC17025:2005 accreditation for gold assay methods.

ALS crushed the samples to 75% passing a

6-millimeter mesh and then split off 250-g subsamples for pulverization to 85% passing -<75 µm (200 mesh). ALS technicians processed clean sand through the crusher every five samples, any time they noticed a color change in the sample, and

processed clean sand through the pulverizer between every sample in the pulverizing step. Laboratory personnel split the pulps to separate a 30-g aliquot for determining gold by fire assay with AA finish (ALS code Au-AA23), and used a separate 5-g

aliquot for ICP-AES determination of silver and 32 major, minor, and trace elements following a four-acid digestion (ALS code ME-ICP61). If the original gold assay exceeded the 10.0 g/t Au upper limit of detection, ALS split further aliquots from

the same pulp for fire assay with gravimetric finish (ALS code Au-GRA21). Samples that assayed greater than 100 g/t Ag were reanalyzed using a 10-g aliquot with a four-acid digestion for silver and an AA finish (ALS code AG-OG62) and samples that

assayed greater than 1,500 g/t Ag were reanalyzed using a 30-g fire assay with a gravimetric finish (ALS code Ag-GRA21).

8.3

Quality Assurance/Quality Control Procedures

8.3.1

Atlas QA/QC, 1987–1992

Atlas employed two primary QA/QC procedures:

Random re-sampling of coarse-reject material for samples where the initial assay was greater than approximately

0.020 oz/ton Au

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 79

May 27, 2026

Analyses of RC rig duplicates of original 5-ft samples collected at even 100-ft intervals

Periodically, Atlas geologists prepared a list of the initial Chemex assays greater than approximately 0.020 oz/ton Au, and for every 10th sample on the list, collected the coarse rejects and split them into two one-pound subsamples. Atlas sent these coarse-reject subsamples to Cone Geochemical Laboratories (Cone) in Denver, Colorado,

and Hunter Mining Laboratories (Hunter) in Reno, Nevada. Cone and Hunter were independent of Atlas, but RESPEC does not know if these laboratories held certifications at that time. The check samples sent to both laboratories were prepared using the

same procedures. Laboratory personnel dried the samples, cone-crushed them to minus 1/8 inch, and split them into 125-g subsamples that were then ring pulverized to minus 150 mesh. From these pulps, the labs analyzed 30-g aliquots by fire assay.

Atlas sent the duplicate samples collected at 100-ft down-hole intervals and the original samples to the Chemex preparation facility in Boise, and then to the Chemex assay laboratory in North Vancouver for analysis. Hunter assay certificates

indicate that they performed fire-assays with a gravimetrical finish. The available certificate documentation does not indicate what finish the Cone assays used.

Atlas sent the rig duplicates to Chemex along with the original drill samples.

8.3.2

Newmont QA/QC, 1992–1996

Newmont sent 163 check samples to their in-house Newmont Metallurgical Services laboratory in Salt Lake City, Utah for fire assays with AA finishes. The nature

of these samples (e.g., pulps, preparation duplicates, or field duplicates) is not known. RMGC assayed the original samples.

Text from an original

Newmont report or memorandum that lacks the header page describes the testing of drill core from hole GMC-001-9, which was a wedge off hole GMC-001. Testing three splits entirely consumed the core—both halves of the sawn core and samples of

the fines derived from the sawing of the core.

Newmont asked RMGC to reanalyze 98 samples originally analyzed by RMGC. RESPEC does not know the nature of

these check samples. Some evidence suggests they were preparation duplicates.

8.3.3

Tombstone QA/QC, 1998

Tombstone sent the following samples to Chemex for check analyses: 14 AAL pulps for pulp-check analyses, 15 two-pound splits of AAL coarse rejects as

preparation duplicates, 14 core duplicates, and 15 RC rig duplicates. (The RC rig duplicates were originally collected at approximately even 100-ft intervals.)

Chemex checked the mesh sizes of the 14 AAL pulps prior to analyses. The RC and core duplicates were dried at 100°C and crushed to 65% less than 10 mesh.

Laboratory personnel split these coarse-crush samples, along with the preparation duplicates, into 200–300-g subsamples using a Jones riffle splitter, and then ring-pulverized these subsamples to 95% passing 150 mesh. Chemex fire assayed 30-g

aliquots for gold and silver using gravimetric finishes.

In addition to the QA/QC testing described above, Tombstone selected 60 AAL coarse rejects from

storage and instructed AAL to coarse pulverize the entire sample to minus 60 mesh. AAL split the samples into halves with a rotary splitter, sent one set of the halved samples to Chemex for pulverization to 95% passing 150 mesh and 30-g fire assay

analysis with an AA finish. The lab prepared and analyzed the second set of halved samples using the same methods.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 80

May 27, 2026

Tombstone referred to these samples as “Assay Prep Checks” and called the more standard preparation duplicates described in the previous paragraph “Reject Checks.”

AAL also routinely completed replicate analyses of AAL original pulps.

8.3.4

Calico QA/QC, 2011–2012

Calico inserted QA/QC samples every 10th sample in sequence using pre-labeled bags in the same manner as

the primary core and RC-chip samples, and grouped drill samples in batches of 36 samples. Each batch contained a field duplicate, a commercially prepared certified reference material (CRM), and a blank. The blanks included commercial blank pulps and

coarse basalt rock barren of gold (coarse blanks). Calico inserted all four types of control samples with core samples, but only inserted CRMs and blank pulps with the RC samples.

Calico used the basalt rock coarse blank to monitor contamination potentially introduced during the coarse crushing and pulverization of core samples. The

blank pulps monitored for contamination introduced after pulverization.

Three commercial CRMs obtained from CDN Resource Laboratories Ltd. (CDN) were

inserted to assess the precision and accuracy of the analyses. These are listed in Table 8-1.

Table 8-1: Grassy Mountain Certified Reference Materials for 2011–2012

CRMID

Certified Value

(g/t Au)

2 Std. Dev.

(g/t Au)

Submitted

No.

CDNGS-P3A

0.338

0.022

55

CD-GS-3J

2.71

0.26

36

CD-GS-8A

8.25

0.60

21

To assess the homogeneity of the sample material and the overall sample variance, Calico had the analytical lab create a

preparation-duplicate approximately every 20 samples. During the 2011 drilling program, Calico retrieved 59 sample pulps representing about 5% of the samples from the higher-grade portion of the deposit and shipped them to ALS as check samples.

8.3.5

Paramount QA/QC, 2016–2019

Paramount compiled an electronic database containing all historical and 2016–2019 drilling information. This database was maintained using SQL software

and housed in an off-site remote server that is controlled by a third-party database expert. All database inquiries and data requests were routed through this third-party expert. To prevent any unauthorized changes to the Paramount database, their

designated data manager and the third-party expert controlled all data. Paramount established QA/QC protocols for data management, verification, validation, and data screening, which consisted of primary and secondary checks on electronic entry of

field data, drill-hole data, sample information, assays, and geochemistry. To ensure accuracy, Paramount and the third-party database expert verified and cross-checked all information.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 81

May 27, 2026

During the 2016–2019 drilling programs, Paramount inserted nine different commercially prepared CRMs

obtained from CDN into the sample sequence for QA/QC purposes (Table 8-2).

Table 8-2: Grassy Mountain Certified Reference Materials Employed by Paramount, 2016–2019

CRMID

Certified Value

(g/t Au)

2 Std. Dev.

(g/t Au)

Certified Value

(g/t Ag)

2 Std. Dev.

(g/t Ag)

Submitted

No.

CDN-GS-P3A

0.338

0.022

31

30

CDN-GS-P3C

0.263

0.02

26

CDN-GS-P4F

0.498

0.028

22

CDN-GS-P7E

0.766

0.086

28

CDN-GS-1Q

1.24

0.08

40.7

2.2

32

CDN-GS-3J

2.71

0.26

57

CDN-GS-8A

8.25

0.60

27

CDN-GS-10D

9.50

0.56

12

CDN-ME-1414

0.284

0.026

18.2

1.2

36

Paramount’s QA/QC protocols required that standards assayed within the three-standard deviation threshold of the

certified target gold value furnished by CDN. One of the CRMs had certified silver target values. If any assays of the CRMs returned values outside the three standard-deviation limits, Paramount evaluated the assays previous to and immediately after

the failed sample for accuracy and for cohesiveness with the geology and mineralization. If Paramount suspected that any of the assay results were problematic, the laboratory reanalyzed the samples.

For both core and RC samples, Paramount inserted a white marble chip blank sample. If any blank samples assayed above a 0.10 g/t Au limit, they examined the

preceding sample and the sample after the failed sample for contamination or a possible source of contamination. The laboratory reassayed any surrounding, potentially problematic sample assays.

RC rig-duplicate samples were collected at the drill rig.

8.4

Quality Assurance/Quality Control Results

8.4.1

Atlas, 1987–1992

To help verify their drill-hole gold results, Atlas made extensive use of preparation duplicates and field duplicates. Chemex, the primary assay laboratory

used by Atlas, analyzed the field duplicates. Atlas sent the preparation duplicates to Cone and Hunter.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 82

May 27, 2026

8.4.1.1

Preparation Duplicates

Preparation duplicates are analyses of pulps derived from secondary splits of the coarsely ground material (coarse rejects) that remain after the primary split

is taken for the original assay. Preparation duplicates evaluate the variability introduced by subsampling of the coarsely crushed material. Ideally, preparation duplicates should be analyzed by the primary analytical laboratory to eliminate any

variability introduced by different techniques employed at a second laboratory. However, Atlas sent their preparation duplicates to two secondary laboratories.

RESPEC compiled the data for Atlas’s 458 preparation duplicates derived from coarse rejects of samples from 89 Atlas drill holes analyzed by Cone. The

relative-difference (RD) graph in Figure 8-1 shows the percentage difference (plotted on the y-axis) of each Cone preparation-duplicate assay relative to its paired primary-sample analysis by Chemex. This RD

is calculated as follows:

The x-axis of the graph plots the means of the gold values of the paired data (the mean of pairs or MOP) in a sequential

but non-linear fashion. The red line shows the moving average of the RDs of the pairs, thereby providing a visual guide to trends in the data that aids in the identification of potential bias. Positive RD values indicate that the duplicate-sample

analysis is greater than the primary-sample assay. A total of 17 pairs characterized by unrepresentatively high RDs are excluded from Figure 8-1.

Figure 8-1: Cone Analyses of Preparation Duplicates Relative to Original Chemex Gold Assays

Source: RESPEC, 2018

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 83

May 27, 2026

The graph suggests a low bias in the Cone gold results relative to the original Chemex assays over

significant portions of the grade range of the data. The mean of Cone analyses (0.226 oz/ton Au) is lower than the mean of the original results (0.237 oz/ton Au), and the average RD of the pairs is -7%. (The average RD can be an approximate measure

of the degree of bias, although one must be aware of the statistical effects of pairs with anomalously high RDs.) The mean of the absolute value of the RDs (AVRD) is 29%, which is a measure of the average variability exhibited by the paired data.

Hunter analyzed 428 preparation duplicates from the same original sample set as analyzed by Cone (Figure 8-2).

Figure 8-2: Hunter Analyses of Preparation Duplicates Relative to Original Chemex Gold Assays

Source: RESPEC, 2018

In

this case, 25 extreme outlier pairs are removed for the purposes of this discussion. The mean of the Hunter analyses is lower than the mean of the original Chemex assays (0.208 vs. 0.221 oz/ton Au), and the average of the RDs is -9%. The AVRD is

34%.

The Hunter and Cone preparation-duplicate data are generally consistent, showing a low bias in the gold results relative to the original Chemex

analyses and average variability of approximately 30%. One difference in the duplicate versus original analyses is that the Chemex pulps were prepared to meet a 95% minus 100-mesh particle size, and the Hunter and Cone pulps were pulverized to minus

150 mesh.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 84

May 27, 2026

8.4.1.2

RC Field Duplicates

Field duplicates are secondary splits of drill samples that are mainly used to assess the natural grade variability of the deposit and to evaluate the total

subsampling variances attributable to splitting both in the field and in all subsequent subsampling steps in the laboratory. Atlas collected field duplicates at the RC drill sites at the same time as the original samples and sent the field

duplicates to Chemex together with the original samples. RESPEC compiled the results of 1,252 RC duplicates from 165 holes drilled by Atlas (Figure 8-3; thirty-eight pairs in which both the original and

field-duplicate analyses are less than the detection limit are removed, as are 14 extreme outlier pairs).

Figure

8-3: Chemex Analyses of RC Field Duplicates Relative to Original Chemex Gold Assays

Source: RESPEC, 2018

The

field duplicates compare well with the original results, and the means of the datasets are identical (0.016 oz/ton Au). The average of the RD is +4%, while the mean of the AVRD is 35%.

8.4.1.3

Miscellaneous QA/QC Samples

In addition to the preparation and field duplicates, in 1990, Atlas sent 32 samples of unknown type (e.g., sample pulps, coarse rejects, or field duplicates)

from drill hole 026-034 to Shasta Analytical Geochemistry Laboratory of Redding, California (Shasta) for 30-g fire assays. RESPEC does not know if Shasta had formal accreditation at the time of the Atlas assays. A handwritten note on the paper assay

certificate states that these samples consist of a “set of 4th check assays from [this] hole.” Figure 8-4 compares the Shasta check assays to

the original Chemex results. One outlier pair and two pairs in which Chemex overlimit assays were not performed are removed from the graph.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 85

May 27, 2026

Figure 8-4: Shasta Check Analyses Relative to Original Chemex Gold

Assays

Source: RESPEC, 2018

The

paired data compare reasonably well up to a MOP grade of ~0.2 oz/ton Au. At higher grades, the Shasta check assays tend to be lower grade than the Chemex original analyses, although there are too few pairs to make definitive conclusions. The mean of

the Shasta analyses (0.462 oz/ton Au) is significantly lower than the mean of the original Chemex assays (0.533 oz/ton Au), but this difference is largely due to the two highest-grade pairs.

In May 1988, Tombstone sent 12 high-grade Chemex pulps from eight Atlas drill holes to AAL for check assaying. One of the pulps did not have the 30 g needed

for the one-assay-ton (30 g) gravimetric fire assays. The mean of the 11 check assays (3.835 oz/ton Au) agrees well with the mean of the original Chemex results (3.866 oz/ton Au).

In late 1990, Phelps Dodge Mining Company had four pulps and 27 coarse-reject samples from nine Atlas holes sent to Chemex for assaying. Backup information is

not adequate to determine which of the check assays are from pulps versus the coarse rejects. The paired data compare well up to a MOP of approximately 0.14 oz/ton Au. The check assays in the seven pairs at higher grades are on average lower grade

than the original results, but again the quantity of data is insufficient to derive statistically valid conclusions.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 86

May 27, 2026

8.4.2

Newmont, 1992–1996

8.4.2.1

Preparation Duplicates

In 1993, Newmont had RMGC reanalyze 98 samples originally analyzed by RMGC. Five of the samples did not have sufficient material to assay. The nature of these

check samples is uncertain, but the assay certificate includes a column with the heading, “REMARKS”, that state, “To report Original Pulp and New Pulp values for Gold fire and Cyanide.” This suggests the samples were

preparation duplicates. Figure 8-5 compares the check results to the originals. Six outlier pairs are excluded.

Figure 8-5: RMGC Check Analyses Relative to Original RMGC Gold Assays

Source: RESPEC, 2018

The

duplicates and originals compare reasonably well, and the mean of the checks (0.903 oz/ton Au) is close to the original (0.923 oz/ton Au). The mean of the RD is +2%, while the mean of the AVRD is 15%.

8.4.2.2

Core Field Duplicates

Newmont wedged drill hole GMC-001-9 off drill hole GMC-001. Newmont submitted both halves of the sawed core from the wedge hole for analyses by RMGC.

Newmont’s split “A” is presumed to be the original sample in the following analysis and split “B” is considered a core-duplicate sample. In July 1993, Newmont sent the two sets of 73 core samples to RMGC for sample

preparation and fire assaying. Figure 8-6 is a RD plot of the data, excluding two pairs that did not have sufficient material to analyze and five outlier pairs.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 87

May 27, 2026

Figure 8-6: RMGC Core Duplicate “B” Relative to RMGC

“A” Gold Assays

Source: RESPEC, 2018

The

core-duplicate values are higher than the originals up to a MOP grade of approximately 0.020 oz/ton Au, then lower than the original at MOP grades of about 0.040 oz/ton Au and higher. The mean of the core duplicates is 0.085 and the mean of the

originals is 0.108 oz/ton Au, but if the highest-grade pair is removed, the duplicate mean becomes higher than the original (0.052 and 0.049 oz/ton Au, respectively). The mean of the RD is +2%, while the mean of the AVRD is 30%.

The preparation-duplicate data and core-duplicate data do not identify any significant issues. Taken together, the two datasets suggest the variability

attributable to the splitting of core into halves is approximately 15% (core-duplicate AVRD of 30% minus preparation-duplicate AVRD of 15%).

8.4.2.3

Miscellaneous QA/QC Samples

In December 1993, Newmont had RMGC reanalyze the “A” and “B” pulps. These pulp-check analyses for both datasets yielded results

extremely close to the original November 1993 assays, with means of RDs of 0% and 1% for the A and B pulp sets, respectively, and AVRDs of 2% in both cases.

As a check on the RMGC results, Newmont completed gold fire assays on 163 samples at their in-house metallurgical assay facility in Salt Lake City, Utah

(Jory, 1993). RESPEC does not know the nature of the check samples (pulps, coarse rejects, or field duplicates). The mean (0.970 oz/ton Au) and median (0.080 oz/ton Au) of the Newmont checks reported by Jory (1993) are both slightly higher than

the original RMGC mean (0.942 oz/ton Au) and median (0.078 oz/ton Au).

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 88

May 27, 2026

In addition to Newmont’s sampling and analytical verification programs discussed above, in April 1998,

Tombstone sent nine high-grade samples of Newmont “drill cuttings” from seven drill holes to AAL for preparation and 30-g gravimetric fire assays. The AAL analyses had a mean of 11.209 oz/ton Au, which compared well to the mean of

11.25 oz/ton Au from RMGC’s original assays.

8.4.3

Tombstone 1998

8.4.3.1

Replicate Analyses

AAL, Tombstone’s primary assay laboratory, routinely completed replicate analyses of some of the original assays. Replicate analyses use a second aliquot

taken from the primary sample pulp and are typically reported on the same certificate as the original assays. For the 10 holes drilled by Tombstone, AAL reported a total of 113 of these analyses on the same certificates that reported the original

assays. The replicate analyses show excellent reproducibility of the original assays, with a mean that is almost identical to the original and an average RD of +1%. The mean of the AVRD is 6%, which is somewhat high for replicate analyses.

8.4.3.2

Preparation Duplicates

Tombstone had AAL crush a total of 60 AAL coarse rejects from two drill holes to minus 60 mesh and split into halves. AAL pulverized and analyzed one set of

the halves. Tombstone had Chemex do the same to the second set. The results of this modified version of preparation duplicates completed by AAL are shown in Figure 8-7.

Figure 8-7: AAL Preparation Duplicate Analyses Relative to AAL Original Gold Assays

Source: RESPEC, 2018

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 89

May 27, 2026

The RD graph shows high biases at low and high grades, while a low bias is evident at MOP grades between

approximately 0.025 and 0.06 oz/ton Au. The duplicate mean is higher than that of the original samples (0.175 vs. 0.157 oz/ton Au), and the mean of the RDs is +11%.

A RD graph of the Chemex analyses versus the original AAL results shows a roughly similar form as seen in Figure 8-7,

although no bias is present. In this case the duplicate mean (0.159 oz/ton Au) matches the original mean well, and the mean of the RDs is +1%. The means of the AVRD is 20%.

The differences between the AAL and Chemex results are likely more a reflection of insufficient data to adequately evaluate the Tombstone preparation

duplicates than some internal differences between the two laboratories.

8.4.3.3

Miscellaneous QA/QC Samples

Tombstone sent Chemex a set of original AAL pulps for pulp-check analyses, splits of AAL coarse rejects as preparation duplicates, and some core and RC field

duplicates. The mean of 14 pulp-check analyses from three drill holes (0.523 oz/ton Au) is about 5% higher than that of the original AAL analyses (0.499 oz/ton Au). The mean of 15 Chemex preparation duplicates from six drill holes is also

higher than the AAL mean (0.447 vs. 0.412 oz/ton Au, respectively). A total of 13 core duplicates from four drill holes yielded a mean (0.119 oz/ton Au) much higher than the original analyses (mean of 0.085 oz/ton Au), but the elimination of one

extreme pair (0.414 oz/ton Au for the duplicate vs. 0.080 oz/ton Au for the original) brings the duplicate mean (0.094 oz/ton Au) much closer to the mean of the original samples (0.086 oz/ton Au). The mean of 15 RC duplicates from six drill

holes is again higher than the mean of the original samples (0.055 vs. 0.048 oz/ton Au, respectively).

While none of the miscellaneous testwork involves

sufficient samples to derive statistically significant conclusions, the check analyses of the various sample sets are consistently higher than the original AAL results.

8.4.4

Calico, 2011–2012

8.4.4.1

Certified Reference Materials

Calico used three sets of CRMs to evaluate the analytical accuracy and precision of ALS’s original analyses of the Calico drill samples. Calico inserted

the CRMs into the original sample stream and analyzed them with the drill samples. In the case of normally distributed data, 95% of the CRM analyses are expected to lie within the two standard-deviation limits of the certified value, while only 0.3%

of the analyses are expected to lie outside of the three standard-deviation limits. However, most assay datasets from metal deposits are positively skewed.

Figure 8-8 shows a plot of the ALS analyses of CRM CDN-GS-3J, which has a certified value of 2.71 g/t Au (0.079

oz/ton Au). The x-axis plots the certificate numbers by increasing dates.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 90

May 27, 2026

Figure 8-8: Chart of ALS Analyses of CRM CDN-GS-3J

Source: RESPEC, 2018

Samples exceeding the three standard-deviation limits are typically considered failures. As it is statistically unlikely that two consecutive analyses of

standards would lie between the two and three standard-deviation limits, such samples are also considered failures unless further investigations suggest otherwise. All potential failures should trigger investigation, possible laboratory

notification, and possible reassay of all samples included with the failed standard result.

Using the above criteria, two of ALS’s analyses of this

CRM are three standard-deviation failures. However, the CRM analyses are biased slightly low from the certified value. If this is taken into account, the low-side failure would not be a failure.

A similar analysis of the CRM CDN-GS-8, which has a certified value of 8.25 g/t Au (0.241 oz/ton Au) shows no bias and no failures, while CDN-GS-P3A has 12

failures out of the 56 ALS analyses. Although nine of the CDN-GS-P3A failures are on the high side (ALS value > certified value), no bias is evident in the data taken as a whole. CDN-GS-8A has a certified value of 0.338 g/t Au (0.010 oz/ton Au).

RESPEC does not know what actions, if any, Calico took in response to the CRM failures.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 91

May 27, 2026

8.4.4.2

Coarse Blanks

Calico also inserted coarse blanks into their sample stream. Coarse blanks are samples of barren material that are used to detect possible contamination in the

laboratory, which is most commonly introduced during sample preparation stages. For analyses of blanks to be meaningful, the blanks must be sufficiently coarse to require the same crushing and pulverizing stages as the drill samples. A significant

number of the blanks also need to be placed in the sample stream within—or immediately following—a set of mineralized samples, which would be the source of most contamination issues. In practice, this is much easier to accomplish with

core samples than RC. Blank results that are greater than five times the lower detection limit of the relevant analyses are typically considered failures that require further investigation and possible re-assaying of associated drill samples. The

detection limit of the ALS analyses was 0.005 g/t Au, so blank samples assaying over 0.025 g/t Au (0.0007 oz/ton Au) are considered failures.

ALS

analyzed a total of 18 Calico coarse blanks in 2011–2012 (Figure 8-9).

Figure 8-9: Chart of ALS Analyses of Coarse Blanks – Calico

Source: RESPEC, 2018

Three

of the coarse blank analyses exceeded the failure threshold, and the highest analysis of a blank was 0.100 g/t Au (0.003 oz/ton Au). All three of the failures are associated with previous samples that are significantly mineralized. Although the

blank data provide evidence of cross contamination during ALS sample preparation, the magnitude of this contamination is insignificant.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 92

May 27, 2026

8.4.4.3

Analytical Blanks

Analytical blanks are used to monitor possible contamination or calibration problems during the determination of gold concentrations. Calico used a blank

commercial pulp supplied by CDN Laboratories (CDN-BL-7) in their QA/QC program. ALS analyzed the analytical blank 62 times. Five of those analyses exceeded the 0.025 g/t Au (0.0007 oz/ton Au) threshold. The failures were 0.001, 0.001, 0.003, 0.004,

and 0.009 oz/ton Au. Analytical blanks do not commonly generate failures, and the latter three failures are levels that would warrant investigation and potentially corrective action. RESPEC does not know if Calico took any action in response.

8.4.4.4

Field Duplicates

Calico collected 40 RC duplicates and 10 core duplicates that were analyzed by ALS, the primary laboratory. The mean of the RC duplicates (0.030 oz/ton Au) is

close to the mean of the original assays (0.032 oz/ton Au). Although the average of the RDs is -9%, the removal of two of the higher-grade pairs with anomalously high RDs changes this average to 4%. The mean of the AVRD of the entire dataset is 21%.

The means of the duplicates and original samples are reasonably close (0.043 and 0.040 oz/ton Au, respectively) considering the lack of pairs. However,

the core-duplicate dataset is too small to derive meaningful conclusions.

8.4.4.5

Pulp-Checks

Pulp checks are reanalyzes of the remaining pulps from the original assays. These reanalyzes are typically completed by a second laboratory. Calico sent 59 of

ALS original sample pulps to AAL for check assays. Excluding one extreme outlier pair, the mean of the AAL checks compared well with the mean of the original samples (0.206 versus 0.208 oz/ton Au, respectively), and the average of the RDs is

-2%. However, the mean of the AVRD is 12%, which is relatively high for pulp-check analyses.

8.4.5

Paramount 2016–2017

8.4.5.1

Certified Reference Materials

Paramount inserted the nine certified CRMs listed in Table 8-2 into the RC and core sample stream.

Of the 270 ALS gold assays of the CRMs, nine analyses exceeded the three standard-deviation limits. Four of these are due to slight high biases in the ALS

analyses of GS-P3A and GS-P3C. Of the remaining five cases, three are from analyses of GS-P4F and each high result is only slightly above the high-side failure limits.

8.4.5.2

Pulp Checks

Paramount sent 569 ALS pulps from the 2016–2017 drilling program to AAL for pulp-check analyses (Figure 8-10;

eleven outlier pairs are excluded).

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 93

May 27, 2026

Figure 8-10: AAL Pulp Checks of ALS Original Gold Analyses

Source: RESPEC, 2018

While

the means of the duplicate and original analyses are identical (0.066 oz/ton Au), the graph provides evidence of a slight high bias in the AAL check assays. The mean of the RDs is +3%. The mean of the AVRD is 8%.

The silver results also show a high bias in the AAL results compared to the original ALS assays. The mean of the AAL silver analyses is 4% higher than the ALS

mean, the average of the RDs is +6%, and the mean of the AVRD is 10%.

8.4.5.3

Coarse Blanks

ALS analyzed a total of 151 of Paramount’s coarse blanks (Figure 8-11), eight of which exceeded the failure

threshold.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 94

May 27, 2026

Figure 8-11: Chart of ALS Analyses of Coarse Blanks –

Paramount

Source: RESPEC, 2018

The

failures range from 0.029 to 0.221 g/t Au (0.001 to 0.007 oz/ton Au). Three of the blank analyses exceeded 0.1 g/t Au (0.003 oz Au/t). The failures do not correlate well with mineralization in previous samples, but the data suggests some cross

contamination during ALS sample preparation. The magnitude of this potential contamination in the three highest-grade blank analyses warrants investigation and, if appropriate, the re-assaying of the samples that accompany the failures.

8.4.5.4

Preparation Duplicates

ALS prepared and analyzed a total of 153 of Paramount’s preparation duplicates that were analyzed along with the original samples in 29 of the 30 holes

drilled by Paramount (Figure 8-12; three outlier pairs were removed).

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 95

May 27, 2026

Figure 8-12: ALS Gold Analyses Preparation Duplicates –

Paramount

Source: RESPEC, 2018

The

mean of the gold analyses of the preparation duplicates is very close to the mean of the original assays (0.040 versus 0.039 oz/ton Au), and the average of the RDs is -1%. The mean of the AVRD is 9%. The silver results are very similar to those of

gold, with means of the duplicate and original samples of 0.172 and 0.174 oz/ton Ag, respectively. The mean of the RDs is -1% and the average of the AVRD of 9%.

8.4.5.5

Core Field Duplicates

Paramount regularly included RC and core field duplicates with their original samples submitted to ALS. The core duplicates consisted of half splits of the 1⁄2-core remaining, creating 1⁄4-core samples, from all 27 holes drilled at least in

part with core. Fines, consisting of pieces of core too small for sawing, were sampled using a scoop and putty knife to obtain an “eyeball”1⁄2-split, a

procedure identical to the procedure used for the primary 1⁄2-core samples. ALS analyzed a total of 136 core duplicates and 52 RC duplicates on behalf of Paramount.

The two datasets require separate evaluation because the splitting methodologies were completely different.

The

1⁄4-core duplicates are compared to the original results in Figure 8-13. Five outlier pairs were removed.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 96

May 27, 2026

Figure 8-13: Core Duplicates Relative to Original Gold Assays

– Paramount

Source: RESPEC, 2018

At

mean of pairs (MOP) of up to ~0.02 oz/ton Au, the means of the duplicate and original analyses are identical, although a slight low bias in the duplicate results is evident over much of this grade range. This bias is largely driven by spikes on the

graph that are predominantly pairs where the duplicates are lower than the originals. At MOP higher than 0.02 oz/ton Au, variability increases dramatically (AVRD = 40% versus 18% over the lower-grade range) and the duplicate data display both high-

and low-bias trends. On average, the duplicate data are lower grade than the original samples—means of duplicates and originals are 0.078 and 0.093 oz/ton Au, respectively, and the mean of the RDs is -16%.

Excluding seven outlier pairs, the silver results for the core duplicates compare well with the original results, with near identical means and an average RD

of -1%. The mean of the silver AVRD is 17%.

The core-duplicate gold results led to the submission of 59 additional core duplicates from 10 of the

Paramount drill holes that include core. In this case, 1⁄2-core samples were submitted, and, with the first set of core duplicates and Newmont results regarding

fines in mind (see Section 7.4.1), special care was taken to brush out all fines in the core boxes related to each sample interval and include them in the duplicate samples. The gold analyses of this second batch of core duplicates, excluding

two outlier pairs, show excellent correspondence with the original 1⁄2-core results up to a MOP grade of ~0.02 oz/ton Au (Figure

8-14).

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 97

May 27, 2026

Figure 8-14: Second Set of Paramount Core Duplicates Relative to

Original Gold Assays

Source: RESPEC, 2018

At

higher grades, the core duplicates are systematically higher grade (duplicate mean is 8% higher than the original mean, and average of the RDs is +18%), and as was the case for the first set of core duplicates, variability increases substantially

(mean of the AVRD is 33%).

The silver values of the second set of duplicate core samples compare reasonably well with originals. The mean of the

duplicates (0.167 oz/ton Ag) is close to the original mean (0.163 oz/ton Ag) considering the relatively small dataset, and the mean of the RDs is +3%. The average of the AVRD is 18%.

It is reasonable to postulate from the core-duplicate data that sampling of the core-box fines derived from higher-grade gold samples may have played a

significant role in the core-duplicate gold and silver results. Specifically, native gold particles collecting at the bottoms of the boxes in high-grade samples may have been unrepresentatively lost to both the original half-core samples and the

first set of 1⁄4-core duplicates. This loss of native gold particles can be attributed to the manual, unsystematic splitting of the core-box fines (fines were

sampled with a scoop and putty knife). In contrast, the second set of half-core duplicates likely oversampled gold in the higher-grade samples, as these samples would have incorporated the gold lost from the primary samples (all fines left in the

core boxes were brushed into the duplicate sample bags). The possibility of free gold preferentially collecting in fines is supported by the results of Newmont analyses of saw fines (Section 7.4.1). In contrast to gold, silver analyses of both sets

of core duplicates compare reasonably well with the original assays.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 98

May 27, 2026

8.4.5.6

RC Field Duplicates

A total of 52 RC duplicate samples were collected for assay for 27 of the Paramount drill holes. Most of these drill holes were completed with core. Figure 8-15 compares the duplicate RC assays to the original results.

Figure 8-15:

Paramount RC Duplicates Relative to Original Gold Analyses

Source: RESPEC, 2018

The

means of the RC duplicates and originals compare well (0.018 versus 0.019 oz/ton Au, respectively), and the mean of the RDs is -1%. There is a suggestion of a low bias in the graph, although this is not well supported due to the low number of pairs.

The average of the AVRD is 23%, which is somewhat lower than expected, but could be due to the lack of higher-grade pairs.

The silver analyses of the RC

duplicates are systematically lower than the originals. The mean of the duplicates is 0.092 oz/ton Ag while that of the originals is 0.099 oz/ton Ag, and the average of the RDs is -13%. The cause of this systematic low bias in the silver results is

difficult to explain, but perhaps the bias would lessen with more data. The mean of the AVRD is 23%. Considering the presence of native gold, one would expect the gold variability to be higher than that of silver, which supports the conclusion above

of the surprisingly low variability in the RC duplicate gold results.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 99

May 27, 2026

8.4.6

Paramount 2018–2019

RESPEC did not review in detail the QA/QC results associated with the two 2018 RC holes drilled at the North Spur target, which lies outside of the limits of

the current mineral resources. Nor did RESPEC evaluate the QA/QC results associated with the two 2019 geotechnical core—the results of the geotechnical holes were not available to RESPEC until the 2022 resource estimation had been completed.

The data for these four holes have not been compiled and evaluated for this report update.

8.4.7

Discussion of QA/QC Results

The available Atlas QA/QC data of consequence (the preparation and field duplicates) suggest that the original gold assay results may be overstated to some

extent. However, the average grade of the duplicate dataset is much higher than the average grade of the Grassy Mountain deposit and repeat analyses of only the higher-grade portion of a deposit with free gold can yield results that on average are

lower than original assays. Without additional data, it is impossible to know whether there is a positive bias in the Atlas results, although a comparison of resources with and without Paramount drill data suggests there are no material issues with

the Atlas data (see Section 8.2.1).

The Newmont QA/QC data do not identify any issues, while it is possible that the Tombstone gold values are

slightly understated.

Paramount’s CRM, blank, and preparation-duplicate data revealed no issues. The core-duplicate data suggest that the Paramount

gold assays of core, particularly at higher grades, may be understated. These data also serve to emphasize the importance of careful sampling and splitting of core-box fines.

The variability evidenced by the duplicate data from all operators at Grassy Mountain does not exceed normal bounds, especially considering the presence of

visible gold.

8.5

Summary Statement

RESPEC is satisfied that the procedures and methods used for the sample preparation, analyses, and security of the historical and Paramount samples are

adequate for generating reliable data that is acceptable as used in this report.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 100

May 27, 2026

9

DATA VERIFICATION

9.1

Drill-Hole Data

The current Grassy Mountain drill-hole database, which forms the basis for the resource estimates in Section 11, consists of information derived from 472

drill holes. A total of 286 of these holes were drilled in the general area of the Grassy Mountain resource estimates. They include 34 Paramount holes and 252 historical holes.

Prior to the 2016–2017 drilling program, Paramount provided RESPEC with the project drill-hole database. RESPEC then subjected this database to the data

verification procedures discussed below and corrections were made as appropriate. After the creation of this verified database, RESPEC updated this database with the information acquired during Paramount’s subsequent drilling programs.

9.1.1

Collar Data

Atlas established a local grid coordinate system following the discovery of the Grassy Mountain deposit in 1988. This local coordinate system remained in use

until Calico acquired the project in 2011. Calico transformed all relevant project location data, including the drill-hole coordinates, into UTM coordinates. Calico made the transformation by plotting all drill holes on digital topography of the

project area in the local coordinate system, projecting these data onto a USGS topographic base map in UTM zone 11 NAD27 coordinates, and rotating and scaling the local-grid data until the contours generated from the Atlas grid matched those from

the USGS topographic map contours as closely as possible. Calico then determined the UTM coordinates of each drill hole. All subsequent drilling programs surveyed holes in these UTM coordinates.

As part of the 2016–2017 drilling program, Paramount re-surveyed all historical drill-hole collars that could be identified in the field—82 Atlas

drill holes, six Newmont drill holes, four Tombstone drill holes, and nine Calico drill holes. The survey contractor provided RESPEC with the original digital file, who used this file to compare the new survey locations with those in the existing

database. Excluding one drill hole for which the location was known to be incorrect in the original project database, the northings from the new survey differed from the database locations by more than 3 ft in four drill holes, with a maximum change

of 7 ft. The eastings differed by more than 3 ft in four drill holes, with a maximum change of 8 ft, and elevations of four drill holes differed by more than 3 ft, with a maximum change of 5 ft. These discrepancies were found in eight of the 101

re-surveyed historical drill holes. Due to the nature of the Grassy Mountain mineralization and the 5 x 10 x 10-ft block size used in modelling, RESPEC does not consider the scale of the discrepancies in the drill-hole locations material to the

estimate of mineral resources presented in this report.

The contractor also surveyed the locations of all hole collars in Paramount’s

2016–2017 drill programs. RESPEC used the original digital survey data for the historical and Paramount drill holes to update the drill-hole locations in the project database.

In addition to the drill-hole locations, RESPEC checked the total depths of 47 of the historical drill holes against historical records. The depth of one

drill hole was found to be off by one foot.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 101

May 27, 2026

9.1.2

Down-Hole Survey Data

Down-hole survey data exists for 43 historical holes drilled in the Grassy Mountain resource area. RESPEC chose to verify 14 of them. Excluding the three

Newmont drill holes discussed below, a total of 168 survey intervals from six Atlas drill holes, two Tombstone drill holes, and three Calico drill holes were checked against historical records. RESPEC found two azimuth measurements in the database

that were off by <1°, and three inclination errors of <1.5°. One of the azimuth errors and two of the dip discrepancies occurred in a single drill hole (Atlas hole 079-001). RESPEC corrected the project database to match the historical

records. RESPEC also added two survey intervals to the project database as a result of the audit.

RESPEC checked the down-hole survey data for three

Newmont drill holes. Supporting documentation consisted of Newmont handwritten “Drill Hole Summary” sheets. The project database includes more than twice the number of survey intervals than are listed on the summary sheets, and the

database azimuths and inclinations have higher precision than those on the summary sheets. The database values are very close to those in the summary sheets, although the values only match exactly when the precision of the two datasets is identical.

The summary sheets appear to be exactly as named—they summarize the down-hole survey data.

There are 209 historical drill holes within in the

Grassy Mountain resource area that lack down-hole survey data in the project database. RESPEC checked the drill-collar azimuths and dips for 40 of these holes against historical records and found no discrepancies.

RESPEC used digital data derived directly from the down-hole survey instrument to add the deviation data from Paramount’s drilling programs to the

project database. Paramount completed down-hole surveys on 28 of their holes. Down-hole caving precluded surveys for five drill holes, and Paramount collected no deviation data from a short (100-ft depth) geotechnical hole.

9.1.3

Assay Data

The original database provided to RESPEC included a total of 39,124 assay sample intervals from historical holes drilled in the Grassy Mountain resource area.

Of these sample intervals, RESPEC checked the database assay values for 6,942 of the intervals from 38 Atlas drill holes, two Calico drill holes, seven Newmont drill holes, and four holes drilled by Tombstone against historical documentation. The

audit revealed a total of only five errors in the database gold values, including:

two intervals with assay values from the assay certificates (0.002 and 0.004 oz/ton Au) that had no values in the

database;

two transcription errors whereby certificate values of 0.001 and 0.002 oz/ton Au were entered into the database

as 0.010 and 0.020 oz/ton Au; and

a value of zero in the database which should have been 0.054 oz/ton Au according to the assay certificate (the

zero value was likely mistakenly transcribed from an adjacent column on the assay certificate).

RESPEC found one silver error whereby a

0.28 oz/ton Ag value on the certificate was entered in the database as 0.2 oz/ton Ag.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 102

May 27, 2026

In addition to the errors described above, there were 28 sample intervals with database gold and silver assay

values of “0” that had no corresponding assays on the certificates—these intervals presumably had no sample recovery.

RESPEC corrected

all identified errors and added silver values found for one Atlas drill hole and three Tombstone drill holes that were not in the database.

For

Paramount’s 2016–2017 drilling program, RESPEC updated the resource database with digital assay certificates received directly from ALS.

9.1.4

Additional Data Verification

In addition to the verification procedures discussed above, RESPEC conducted extensive verification of the project data throughout the process of resource

modeling. As described in Section 11.7.1, RESPEC’s detailed, explicit modeling of the gold and silver mineral domains within the context of the project geology resulted in iterative modifications to the critical mineral-controlling

structural model that had been initially interpreted by Paramount. Paramount recognized the importance of lithologic mineralizing controls, which RESPEC confirmed. RESPEC verified Paramount’s lithologic model and used it to guide modeling of

the Grassy Mountain deposit’s mineral-domains.

The Paramount drilling also helped verify the historical data. As mineral-domain modeling proceeded,

RESPEC continually evaluated the grade and geological consistency between the historical data and the assays of Paramount’s drill holes. This work led to the recognition of potentially contaminated RC sample intervals, which were then excluded

from use in the mineral resource estimation.

As a further verification of the historical drilling data, RESPEC completed a test resource estimate that

excluded all Paramount drill data. RESPEC then compared the results to the current resource model which included the Paramount data. RESPEC ran the check estimation using the same estimation parameters as those used to estimate the current

resources. On a global basis (no cut-off), exclusion of the Paramount drill data resulted in 0.4% fewer gold ounces compared to the current resource estimation. At various cut-offs from 0.005 to 0.090 oz/ton Au, the highest-magnitude change was a

0.9% decrease in gold ounces. The constancy in the ounces estimated using composited assays that included or excluded Paramount data supports the use of historical drilling data in resource estimation.

9.2

Site and Field Office Inspections

9.2.1

Ausenco

Ausenco’s QP visited the Grassy Mountain project on 15 August 2019 and inspected the area planned for the portal and the general site layout.

9.2.2

RESPEC

RESPEC QPs have visited the project site and/or Paramount’s field office and core logging facility in Vale, Oregon numerous times as the project

advanced. The most recent was for one day on January 30, 2026. Paramount provided RESPEC with an overview of the geology and other project information at their core processing facility in Vale. RESPEC

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 103

May 27, 2026

observed historical and Paramount paper files, QA/QC samples, core, RC samples, coarse rejects and pulps stored within the building. Although no drilling was being conducted at that time,

Paramount provided an overview of the core and RC logging, sample handling, storage and QA/QC procedures. RESPEC then reviewed the geology and observed planned locations for mine facilities at the Grassy Mountain site.

Prior visits by RESPEC QPs included one day in each of August and November 2016, three days in December 2016, a total of 30 days in January, February, and

March 2017, and one day in June 2018. During the past visits, RESPEC reviewed altered and sometimes mineralized outcrops in the Grassy Mountain deposit area at many of the exploration target areas discussed in various sections of this report. The

QPs also inspected active core and RC drill sites with ongoing sampling and logging. In addition, RESPEC reviewed drill core from several holes in detail, reviewed all project procedures related to logging, sampling, and data capture and made

recommendations where appropriate.

RESPEC assisted Paramount’s geological team with the cross-sectional geological modeling that served as the

basis for the resource modeling. These activities involved detailed checking, validation, and in some cases modifications of the Paramount and historical geological data, interpretations, and geological modeling of the Grassy Mountain deposit.

The site and field-office visits materially contributed to RESPEC’s understanding of the project and confidence in the project data.

9.2.3

SLR

SLR’s QP visited the project site on November 16, 2021 and met with senior technical staff from Paramount. The site visit included an on-site tour

with Paramount senior staff, local, State, and Federal permitting agencies to discuss the proposed TSF and TWRSF site.

9.3

Summary Statement

9.3.1

Ausenco

In Ausenco’s opinion, the data used for the development of the sections for which Ausenco is responsible are sufficient to support a feasibility study:

metallurgical testing and data was completed at certified laboratories and capital and operating costs were developed following AACE guidelines and included development of detailed mechanical and electrical equipment lists, electrical load lists,

reagent and consumable consumption calculations, vendor and supplier quotes, and material take-off and benchmarking from the Ausenco database.

9.3.2

RESPEC

RESPEC experienced no limitations in their data verification activities for the Grassy Mountain project. In consideration of the information summarized in

Sections 5 through 9 and 11 and 12 of the report, RESPEC consider the Grassy Mountain project data acceptable for use in this report, most importantly to support the estimation and classification of mineral resources and mineral reserves.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 104

May 27, 2026

9.3.3

SLR

SLR developed the closure plan and RCE. SLR is responsible for the data verification related to closure. Source data for the development of the closure plan

and RCE were provided to SLR by others as it pertains to individual facilities design responsibilities in the feasibility study. SLR has confidence in the validity of the data and the providers of the data considering these data were provided from

the PFS, design reports, etc. and utilized for the development and permitting of this project.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 105

May 27, 2026

10

MINERAL PROCESSING AND METALLURGICAL TESTING

10.1

Introduction

The Grassy Mountain deposit has been the subject of several historical metallurgical testwork programs between 1991 and 2020. The most recent test programs,

completed in 2018 and 2020 in support of this Feasibility Study Update, were carried out at SGS Canada Inc. (“SGS”) in Burnaby, BC and McClelland Laboratories Inc (“McClelland”) in Sparks, NV. A full breakdown of the results

for each metallurgical test program can be found in Table 10-1.

Table

10-1: Metallurgical Testwork Summary

Year

Laboratory/Location

Laboratory Certification

Relationship

to the

Registrant

Testwork Performed

1990, 1991

Hazen Research Inc.

https://www.hazenresearch.com/about/quality-safety

Independent

Comminution tests, gravity concentration tests, flotation tests, leach tests, column leach tests, cyanide detox tests, solids liquids separation tests

1991

Golden Sunlight Mines Inc.

N/A

Independent

Comminution tests, leach tests

1993

Newmont Exploration Inc.

None listed on website

Independent

Column leach tests

2015

RDI Inc.

N/A

Independent

Mineralogy, comminution tests, gravity concentration tests, flotation tests, leach tests, column leach tests, cyanide detox tests

2018, 2020

SGS Canada Inc.

Conforms to the requirements of the ISO/IEC 17025 standard for specific registered tests.

Independent

Mineralogy, comminution tests, gravity concentration tests, leach tests, oxygen uptake tests, solids liquids separation tests, cyanide detox tests

2020

McClelland Laboratories Inc.

ISO/IEC Standard 17025:2017

Independent

Leach tests

During the 2018 PFS, the testwork program was focused on a gravity, leach and adsorption flowsheet comprising:

Primary grind (80% passing or P80 of 100 mesh or 150

µm)

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 106

May 27, 2026

Gravity gold recovery

Cyanide leaching

Adsorption in a carbon-in-leach (CIL) circuit

Cyanide destruction.

During the 2020 FS, the leach flowsheet design was modified to a simpler, lower capital cost alternative comprising:

Primary grind (P80 of 150 mesh or 106 µm)

Hybrid leach–CIL circuit

Mercury removal circuit

Cyanide destruction.

10.2

Historical Testwork Programs

10.2.1

Historical Studies 1989 to 2012

In support of the FS, historical work conducted by Hazen, Golden Sunlight, Newmont, and Resource Development Inc. (RDI) was reviewed. The degree to which

historical metallurgical samples are representative of the Grassy Mountain deposit is not known with certainty, but there is no evidence that the historical samples were not representative. Early historical work listed above is viewed as indicative

or informative only since the QP was not able to reconcile the test results to drill hole locations and depth to confirm that these drill holes represent the ore in the current mine plan.

Historical results are presented in Section 10.4, where relevant to the current flowsheet.

10.2.2

Historical Testwork from 2018 PFS

In 2017, Ausenco oversaw metallurgical testing to develop data for the 2018 PFS for the Grassy Mountain Project.

10.2.2.1

2018 PFS Sample Selection

Nine samples were submitted for metallurgical testing. Lithologies were identified by Ausenco, under the guidance of the Paramount technical team. Samples were

described as Arkose, Mixed Lithology Drop Weight Test (MLDWT), Mixed Lithology Low Grade (ML-LG), Mixed Lithology Average Grade (ML-1), Mixed Lithology Average Grade (ML-2), Mixed Lithology High Grade (HG), Silt Stone (SLST), Mudstone and Clay Mixed

Breccia (CMB).

10.2.2.2

2018 PFS Testwork Scope

PFS testwork was completed but SGS Canada Inc. (SGS) in Burnaby, Canada conducted the metallurgical testing and associated assays shown in Table 10-2 under program 15944-001. SGS conforms to the requirements of ISO/IEC 17025 for specific tests as listed on their scope of accreditation which can be found at www.scc.ca/en/search/palcan/sga.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 107

May 27, 2026

10.3

2020 FS Testwork

10.3.1

Objectives

Metallurgical testwork in support of the FS was defined based on review of historical work and consideration of the mine plan prepared during the 2018 PFS.

Consideration was also given to potential for optimization, and flowsheet simplification.

The program was designed with the intent to confirm the

parameters for the process design criteria for comminution, leaching, carbon adsorption and cyanide destruction in the process plant and to assess recovery as a function of head grade. The metallurgical program was conducted at SGS.

Supplementary work to support recovery estimation was conducted at McClelland Laboratories, Inc (Sparks, Nevada); (McClelland).

10.3.2

SGS Testwork Program 15944-002 Scope of Work

Six samples were sent to SGS for metallurgical testing.

The

range of tests and samples used for each test is summarized in Table 10-3.

10.3.3

McClelland Testwork Program MLI 4551 Scope of Work

Twelve samples were sent to McClelland for metallurgical testing.

The testwork program scope included determination of head assays and leach tests.

10.3.4

Sample Selection for SGS Program 15944-02

The composite samples were selected by Paramount with input from Ausenco to represent the production composites for the proposed Year 1 and Year 2 of

operations, and the major lithologies, Arkose, Siltstone and Sinter (Table 10-3).

The metallurgical program was

performed on the following composites: Year 1, Year 2, Arkose, Siltstone, Sinter and un-used ML-LG sample from the 2017/2018 testwork program.

Since

there was insufficient sample available of the Year 1 composite for comminution testing, it was decided to test the comminution properties for each of the major lithologies for Year 1 as an alternative. A low-grade sinter sample was provided for

comminution testing.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 108

May 27, 2026

10.3.5

Sample Selection for McClelland Program MLI 4551

Samples tested at McClelland were made up from drill core as composites to represent the ore that will be mined during the first two years of production.

Twelve grade variability composite samples (4551-001 to 012) and one master composite sample (4551-013) were tested. Variability composite samples calculated gold and silver grades ranged from 3.57–13.13 g/t Au and 5.1–21.5 g/t

Ag.

Table 10-2: 2018 PFS Testwork Scope

Sample ID

Head Assay

JK drop-

weight

tests (DWT)

E-GRG

Gravity

Separation

Bulk

Leach on

Gravity

Tailing

Cyanide

Destruction

Carbon

Modelling

Rheology

Solid/

Liquid

Separation

Arkose

x

x

x

x

x

x

x

MLDWT

x

x

x

x

x

x

x

x

ML-LG

x

x

x

x

ML-1

x

x

x

x

ML-2

x

x

x

x

HG

x

x

x

x

SLST

x

x

x

x

x

x

Mudstone

x

x

x

CMB

x

x

x

x

Note: “x” = test performed; “—” = not performed or not applicable

Table 10-3: Metallurgical Test Matrix for SGS Program 15944-002

Sample ID

Head Assay

Mineralogy

Analysis

Comminution

BRWi & BBWi

Bottle Roll Leach

Oxygen

Uptake

Bulk

Leach

Cyanide

Destruction

Year 1

x

x

x

x

Year 2

x

x

x

x

Arkose

x

x

x

Siltstone

x

x

x

Sinter

x

ML-LG

x

x

x

Note: “x” = test performed; “—” = not performed or not applicable

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 109

May 27, 2026

Table 10-4: FS Production Composites Sample Composition

Sample

% Arkose

% Siltstone

% Sinter

Year 1

39.4

44.5

16.0

Year 2

49.4

44.3

6.3

Composites 4551-001 through 4551-006 were designated as Year 1 composites and composites 4551-007 through 4551-012 were

designated as Year 2 composites. Year 1 composites were prepared to represent a lithology make-up of 16% sinter, 44.5% siltstone and 39.4% arkose by mass. Year 2 composites were prepared to represent a lithology make-up of 6.3% sinter, 44.3%

siltstone and 49.4% arkose by mass as shown in Table 10-4.

A 15 kg master composite sample was generated, designated as 4551-013. This composite was

composed of select interval samples used in the variability composites. The lithology make-up of this composite was 6% sinter, 43% siltstone, and 51% arkose by mass.

10.4

Presentation and Discussion of Results

10.4.1

Ore Characterization and Deleterious Elements

Ore composition was investigated in SGS Program 15944-002. Selected head assays are presented in Table 10-5.

Table 10-5: Head Assays

Sample ID

Au

(g/t)

Au

(oz/ton)

Ag

(g/t)

Ag

(oz/ton)

Hg

(g/t)

ST

(%)

S2-S

(%)

SO4-S

(%)

CT

(%)

TOC

(%)

Cu

(g/t)

Fe

(%)

As

(g/t)

Year 1

9.56

0.306

12.9

0.413

2.054

0.22

0.08

0.14

0.09

0.09

13.7

0.69

167

Year 2

7.84

0.251

12.5

0.400

2.639

0.44

0.27

0.15

0.12

0.12

15.6

0.92

181

Arkose

9.66

0.309

11.7

0.374

2.066

0.18

0.08

0.1

0.06

0.06

11.6

0.58

119

Siltstone

24.71

0.791

34.2

1.094

2.156

0.42

0.26

0.14

0.35

0.35

15.7

0.93

183

ML-LG

1.69

0.054

8.48

0.271

1.858

0.43

0.25

0.15

0.04

<0.05

36.6

0.84

156

The conclusion of these results is that mercury is present in high enough concentrations to warrant removal and management,

and this has been incorporated into the flowsheet. Arsenic is present in the feed at concentrations ranging between 3.47–5.34 oz/ton (119–183 g/t) and is not expected to be problematic in processing. No other elements that may

cause issues in the process plant or concerns with product marketability were noted.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 110

May 27, 2026

10.4.2

Comminution Test Results

10.4.2.1 Hazen

1990

The historical comminution testwork conducted by Hazen in 1990 and as reported by RDI in 2012 is summarized in Table

10-6.

Table 10-6: Hazen 1990 Comminution Results

Description

Units

Sample Description

Zone 1

Zone 2

Zone 3

Composite

High Grade

Product Size,80% passing

µm

551

483

541

Bond rod mill work index, RWI

kWh/ton

18.0

17.2

17.6

18.2

Bond ball mill work index, BWI

kWh/ton

21.3

17.7

20.2

Bond abrasion index, Ai

0.711

0.783

0.529

0.714

10.4.2.2 SGS

Program 15944-001

JK drop-weight tests (DWT) were conducted on the Arkose Arkose Updated and MLDWT samples. The data were interpreted by JK Tech Pty Ltd (JK Tech) and a summary

of results is presented in Table 10-7.

Table 10-7: Summary of JK DWT

Results

Sample ID

SG

ta

A

b

Axb

Arkose

2.56

0.13

100

0.32

32.0

MLDWT

2.51

0.15

99.8

0.30

29.9

Note: The JKTech Drop-Weight test provides ore-specific parameters for use in the JKSimMet Mineral Processing Simulator

Software.

The ta parameter indicates resistance to abrasion. The Axb parameter indicates

resistance to Impact breakage.

The impact breakage data of these samples showed they can be classified as hard when compared to other samples in the

JKTech database. The JK DWT results were used by Ausenco to estimate the crusher work index at 20.9 kWh/ton.

10.4.2.3 SGS

Program 15944-002

Bond rod mill work indices are presented in Table 10-8.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 111

May 27, 2026

Table 10-8: Bond Rod Mill Grindability Test Results

Sample ID

Mesh of Grind

Work Index (kWh/ton)

Hardness Percentile

Category

Year 2

14

22.2

96

very hard

Arkose

14

19.2

82

hard

Siltstone

14

22.4

97

very hard

Sinter

14

22.5

97

very hard

Bond ball mill work indices are presented in Table 10-8.

Table 10-9: Ball Mill Work Indices

Sample ID

Mesh of Grind

Work Index (kWh/ton)

Hardness

Percentile

Category

Year 2

100

26.6

99

very hard

Arkose

100

20.8

88

hard

Siltstone

100

27.3

99

very hard

Sinter

100

32.0

100

very hard

Bond ball mill work indices were performed at a closing screen size of 100 mesh, or 150 µm.

The samples tested were categorized as hard to very hard; this finding aligns with previous findings from historical testwork.

10.4.3

Mineralogical Analysis

10.4.3.1

Hazen 1990

Mineralogical examinations of ore from Zones 1, 2 and 3 showed that they were similar and composed mainly of quartz and orthoclase feldspar. Minor amounts of

pyrite were noted, mostly less than 5 µm but ranging up to 20 µm, along with native gold ranging from 50–250 µm in Zones 1 and 3 and up to 600 µm in Zone 2.

10.4.3.2

SGS Program 15944-002

The mineralogical investigation was performed on the Year 1 sample which was stage crushed to a P80

size of 100 mesh (150 µm). A 100 g sample was extracted by riffle splitting for quantitative evaluation of materials by scanning electron microscopy (QEMSCAN) testing and 900 g was submitted for a gold deportment study. The gold

deportment subsample was concentrated using gravity methods and examined using the Tescan Integrated Mineral Analyzer (TIMA).

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 112

May 27, 2026

Findings included:

Electrum accounts for 77.4% of the total gold grade; the remainder is present as native gold.

Gold association: The liberation of gold is high at 77.5%. Most of the remainder is associated with light

silicates.

Gold exposure: The exposure of gold (>20% exposure) is good at 89.1%. Gold which is well exposed (>20%

exposure) should be readily amenable to leaching.

Gold association by size and gold mineral sizes: the majority (81%) of gold mineral grains are

<30 µm in size, the non-liberated grains typically occur in association with light silicates, complex particles and rarely with oxides, pyrite and silver minerals. Gold grains coarser than 30 µm are liberated. Most gold

grains would be leachable.

Mineral composition is predominantly quartz (63.6%) and K-feldspar (30,7%), with trace amounts (<2%) of

clays, sericite/muscovite, plagioclase and other minerals. Pyrite is detected in trace amounts (0.30%). Chalcopyrite and other copper sulfides are present in trace amounts (0.03%).

10.4.4

Leach Tests

10.4.4.1

Evaluation of Grind Size, SGS Program 15944-002

The Year 2 sample was crushed in three stages to -2 mm. A single point grind calibration was conducted on a 1 kg charge in a laboratory rod mill to

determine the grind time required to achieve the fineness of grind. A series of standard bottle roll tests were conducted on the Year 2 sample at three grind sizes (P80 of 100 µm, 75

µm and 53 µm ) and two cyanide concentrations (0.5 and 1.0 g/L).

Leaching conditions were a pulp density of 45% solids, pH of

10.5–11 with lime addition and leach time of 24, 48 and 72 hours.

Residue grades decreased with finer grind, for all leach times evaluated.

A P80 grind size of 150 mesh (106 µm) was used in the FS; however, provision to grind finer

to 200 mesh (75 µm) was considered in sizing the ball mill.

10.4.4.2

Evaluation of Leach Time, SGS Program 15944-001

A 20 kg sample of each lithology (all nine samples) was ground and passed by a Knelson MD-3 concentrator. The concentrate obtained was further upgraded with a

Mozley C800 laboratory separator. The tailings from the Knelson concentrator and Mozley separator were combined and ground to a target P80 size of 150 mesh (106 µm) and submitted for bulk

leach testing by CIP or CIL.

For the bulk agitated leach tests, approximately 10 kg of gravity tailings was pulped to 45% solids by weight, pH was

adjusted to 10.5–11 with lime, dissolved oxygen (DO) was maintained at >6 ppm, 0.5 g/L of NaCN was added and 0.25 g/L NaCN was maintained throughout the leaching process. Carbon concentrations of 12 g/L and 15 g/L were

added for CIL and CIP respectively. The residence times were 48 hours and 72 hours for the CIL and CIP tests respectively. Carbon was added to the pulp at 48 hours for the CIP test. Pre-aeration of three hours was included for both tests.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 113

May 27, 2026

Relevant results from SGS Program 15944-001 that align with the selected flowsheet and include samples

representative of ore that is included in the 2018 PFS mine plan are shown in Figure 10-1. These results show that gold leaching is fast and complete within 24 hours.

Figure 10-1: Gold Leach Extraction Rate

Source: Ausenco, 2020

10.4.4.3

Evaluation of Leach Time, SGS Program 15944-002

A series of standard bottle roll tests were conducted on the Year 1, Year 2 and Arkose and Siltstone samples at two grind sizes (P80 of 100 µm and 75 µm) and two cyanide concentrations (0.5 and 1.0 g/L).

For each

test a 1.0 kg charge was ground to the target grind size and pulped to 45% solids by weight. The pH was adjusted to 10.5–11 using lime and DO was maintained at > 6 mg/L. Three hours of pre-aeration using air were applied to all

samples.

A lower level of confidence was placed in these results as the solution assay results were erratic; however, the same trends were seen as in

more reliable testwork, i.e. a fast initial leach rate and completion of the gold leach reaction within 24 hours.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 114

May 27, 2026

10.4.4.4 Evaluation

of Leach Time, McClelland Program MLI 4551

Twelve grade variability composite samples of 1 kg each were prepared for mechanical agitation leach testing. The samples were stage ground to 80% passing

106 µm in a laboratory steel ball mill. Samples were prepared in order of estimated increasing gold grade. Following each composite, the mill was cleaned by grinding barren silica sand.

After grinding, samples were slurried to 45% solids by weight and pH was adjusted to 10.8–11.2 by adding hydrated lime. Slurries were sparged with air

for three hours prior to leaching at 0.5 g/L sodium cyanide. Leaching was conducted by mechanically agitating the slurries in baffled, air sparged leaching vessels for 48 hours.

Results are presented in Figure 10-2 and Figure 10-3 and show the gold leach

rate flattening by 24 hours, supporting the selection of the leach time at 24 hours.

Figure 10-2: Gold Leach

Extraction Rate for Grade Variability Samples

Source: Ausenco, 2020

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 115

May 27, 2026

Figure 10-3: Silver Leach Extraction Rate for Grade Variability

Samples

Source: Ausenco, 2020

McClelland commented that similar dips in the solution grades over time were observed as seen in the SGS program 15944-02 data, and that this is thought to be

indicative of the possible presence of preg- Updatedrobbing clays.

10.4.4.5

Effect of Pre-aeration, SGS Program 15944-002

A round of tests were carried out which included a three-hour pre-aeration step ahead of the leach. Tests were conducted at a P80 grind size of 100 µm, 45% solids, pH 10.5–11, and dissolved oxygen maintained at > Retained for consistency with the rest of Section 10 (and others in the report), where the

same notation is used7 mg/L for CN3 and >9 Added mg/L for CN9 and CN10 tests.

For tests conducted at 0.5 g/L cyanide addition with and

without pre-aeration, cyanide consumption reduced from 0.23 to 0.12 g/t with pre-aeration for the Year 1 sample and from 0.14 to 0.11 g/t for the Year 2 sample. From this investigation it can be concluded that pre-aeration is beneficial to

leach kinetics in all cases and to overall recovery, particularly for the Year 2 sample. A three-hour pre-aeration step was incorporated into the plant design.

10.4.4.6

Leach Reagent Consumption, SGS Program 15944-001, SGS Program 15944-002 and McClelland Program MLI

4551

Cyanide and lime consumption rates from all leach tests that included the three-hour pre-aeration step and conducted on

relevant lithologies are shown in Table 10-10.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 116

May 27, 2026

Table 10-10: Average Cyanide and Lime Consumption

Test Description

Cyanide addition (g/L)

Cyanide Consumption

Lime Consumption

(kg/t)

(lb/ton)

(kg/t)

(lb/ton)

Bottle roll, PFS

0.5

0.34

0.68

0.84

1.68

Bottle roll, FS

0.5

0.17

0.34

1.27

2.54

Bottle roll, FS

1.0

0.27

0.54

1.27

2.54

Agitated leach, FS

0.5

0.90

1.80

2.74

5.48

A cyanide consumption of 0.34 kg/t and lime consumption of 1.05 kg/t respectively were selected for use in

estimating plant operating costs. These values align with the bottle roll test results as these are believed to be a closer representation of plant consumption than the agitated leach tests.

10.4.4.7

Oxygen Uptake Test, SGS Program 15944-02

Two oxygen uptake tests were conducted on each of the Year 1 and Year 2 samples. Samples were ground to a

P80 size of 102 µm and pulped to 45% solids with water in a stirred glass reflux reactor at ambient temperature. The sample was agitated with an impeller using a Caframo mixer at 300 rpm

throughout the test (~150 rpm for readings). The pulp pH was adjusted to 10.5–11.0 and cyanide was added. Air was sparged into the pulp sample to maintain the dissolved oxygen at a target range of 10–13 mg/L for the first test and

6-8mg/L for the second test. The DO content of the slurry was measured for a total time of 15 minutes, at one-minute intervals. During these readings, the air sparge was removed from the pulp, remaining in the headspace of the vessel. DO readings

were taken at 0, 2, 4, 8, 12, 24, 30, and 36 hours.

The test results show that the oxygen uptake rate was very low, showing that the Year 1 and Year 2

samples were low oxygen consumers. Air was selected as the source of oxygen for the plant design.

10.4.4.8

Mercury Dissolution Test, SGS Program 15944-002

Mercury concentrations in the final (48 hour) solutions were 0.25 mg/L and 0.26 mg/L for arkose and siltstone samples, respectively. Mercury

analysis in the final (30 hour) solution samples for Year 1 pregnant solutions were 0.16 and 0.25 mg/L for tests with 0.5 and 1.0 g/L of cyanide addition respectively. For Year 2 pregnant solutions, the results were 0.08 and

0.18 mg/L for tests with 0.5 and 1.0 g/L of cyanide addition respectively.

Grassy Mountain Project

S- K 1300 Technical Report Summary

Page 117

May 27, 2026

10.4.5

Cyanide Destruction

10.4.5.1

Historical Results

Cyanide destruction was investigated by SGS (Table 10-11) and acceptable results were achieved relative to the Project

design value of <15 mg/L weakly acid dissociable cyanide (CNWAD).

Table 10-11: Cyanide Destruction Test Results from Historical Work

Test Program

Sample Description

Test

Feed

Concentration

(CNWAD mg/L)

Product

Concentration

(CNWAD mg/L)

SGS Program 15944-001

Three lithology samples, continuous tests

(MLDWT-CIP, Arkose-CIP, SLST-CIP)

SO2/air

110–149

0.04– 0.10

10.4.5.2

SGS Program 15944-002 Results

A 10 kg bulk cyanide CIP leach test was performed on the ML-LG sample to produce cyanide-leached pulp for cyanide destruction testwork. This sample was

selected as it contained sulfide sulfur and iron concentrations representing the upper limits in the Year 1 and 2 samples. The test was conducted in a 20 L pail with an overhead mixer with three hours of pre-aeration. The test conditions were a

sample mass of 10 kg, grind size (P80) of 106 µm, pulp density 45% solids, NaCN concentration of 0.5 g/L, pH of 10.5–11 with lime addition, Carbon addition of 15 g/L after

10-hour leach, and a leach time of 48 hours.

Test results are shown in Table 10-12. The test achieved very low

levels of CNWAD (0.13 mg/L) under continuous operation. Reagent addition rates (SO2, copper sulfate and lime) were typical for this

process.

Table 10-12: Cyanide Destruction Test Results – Continuous Test

Test

ID

Conditions

Total Continuous Test

Feed

Pulp

Volume

(L)

Pulp

Solids

(%w/w)

Feed

CNWAD

(mg/L)

Test

pH

Test

DO

(mg/L)

Discharge

Pulp

Volume

(L)

Total

Run

Time

(min)

Retention

Time

(min)

Discharge

CNWAD

(mg/L)

Discharge

CNTotal

(mg/L)

Discharge

SCN

(mg/L)

Discharge

CNO

(mg/L)

Ratio

of

SO2-

CNWAD

(g/g)

SO2

Addition

(g/L

pulp)

Ratio

of Cu-

CNWAD

(g/g)

Ratio

of

Lime-

CNWAD

(g/g)

ML-

LG

16.9

40

200

8.6

5.2

14.5

140

51

0.13

0.34

6.9

330

4.23

0.71

0.06

2.1

Grassy Mountain Project

S - K 1300 Technical Report Summary

Page 118

May 27, 2026

10.5

Metallurgical Variability

Metallurgical samples were selected in collaboration with Paramount to represent deposit variability with consideration of:

spatial variability of the mineralization, shown in Figure 10-4 below;

composites to investigate effect of feed grade variability over the grade range that occurs within the Mineral

Resource; and

composites to investigate variability due to lithology or rock group.

Figure

10-4: Drill Hole and Interval Locations for Samples in the SGS 2018

and 2020 and McClelland Programs

Source: RESPEC, 2026

Grassy Mountain Project

S - K 1300 Technical Report Summary

Page 119

May 27, 2026

10.5.1.1

2018 PFS Sample Selection

Nine samples were submitted for metallurgical testing. Lithologies were identified by Ausenco, under the guidance of the Paramount technical team. Samples were

described as Arkose, MLDWT, Mixed Lithology Low Grade (ML-LG), Mixed Lithology Average Grade (ML-1), Mixed Lithology Average Grade (ML-2), Mixed Lithology High Grade (HG), Silt Stone (SLST), Mudstone and Clay Mixed Breccia (CMB).

Comminution SMC testing (Axb) was carried out on Arkose and Mixed Lithology samples, leach tests were carried out on all samples and continuous cyanide

destruction tests were carried out on Arkose, Mixed lithology and Silt Stone samples.

10.5.2

Sample Selection for SGS Program 15944-02

Six composite samples were selected by Paramount with input from Ausenco to represent the production composites for the proposed Year 1 and Year 2 of

operations, and the major lithologies, Arkose, Siltstone and Sinter (Table 10-3).

The metallurgical program was

performed on composites: Year 1, Year 2, Arkose, Siltstone, Sinter and un-used ML-LG sample from the 2017/2018 testwork program.

Since there was

insufficient sample available of the Year 1 composite for comminution testing, it was decided to test the comminution properties for each of the major lithologies for Year 1 as an alternative. A low-grade sinter sample was provided for comminution

testing. Comminution testing was performed on Year 2, Arkose, Siltstone and Sinter samples.

Leach testing was performed on Year 1, Year 2, Arkose and

Siltstone samples. Cyanide destruction testing was performed on the Mixed Lithology Low Grade sample which was selected as it contained sulfide sulfur and iron concentrations representing the upper limits in the Year 1 and 2 samples.

10.5.3

Sample Selection for McClelland Program MLI 4551

Samples tested at McClelland were made up from drill core as composites to represent the ore that will be mined during the first two years of production.

Twelve grade variability composite samples (4551-001 to 012) and one master composite sample (4551-013) were tested. Variability composite samples calculated gold and silver grades ranged from 3.57–13.13 g/t Au and 5.1–21.5 g/t

Ag.

Supplementary leach testwork to support recovery estimation was conducted.

10.6

Recovery Estimation

10.6.1

Leach Recovery, SGS Program 15944-001, SGS Program 15944-002 and McClelland Program MLI 4551

The data in Table 10-12 were used as the basis for estimation of recovery for this Report.

While the data includes leach tests that ran for longer than the selected leach time of 24 hours, the leach curves shown in Section 10.4 flatten out after 24 hours, giving the same recovery at longer leach times. These data were considered to

be sufficiently valid to be included in recovery estimation.

Grassy Mountain Project

S - K 1300 Technical Report Summary

Page 120

May 27, 2026

Table 10-13: Leach Test Data Used for Recovery Estimation

Test

Campaign

Test

Number

Target

Grind

Size P80

(µm)

Retention

Time

(hours)

Leach/

CIL

Leach

Feed

Source

Cyanide

Addition

(g/L)

Cyanide

held at

(g/L)

Leach Feed

Grade,

Au

Calculated

(g/t)

Residue

Grade,

Au

(g/t)

Leach Feed

Grade,

Ag

Calculated

(g/t)

Residue

Grade,

Ag

(g/t)

Leach

Recovery,

Au

(%)

Leach

Recovery,

Ag

(%)

SGS

Program 15944-001

ML1-CIL-A

100

48

CIL

Whole ore

0.5

0.25

4.48

0.36

91.96

ML1-CIL-B

103

48

CIL

Whole ore

0.5

0.25

4.47

0.69

84.56

HG-CIL-A

89

48

CIL

Whole ore

0.5

0.25

10.01

0.67

93.30

ML1-CIL

99

48

CIL

Gravity

tailings

0.5

0.25

4.15

0.25

7.67

2.60

93.97

66.11

ML1-CIL2

104

48

Leach

CIP

Gravity

tailings

1.0

0.50

4.38

0.35

9.32

3.15

92.01

66.19

SLST-CIL

114

48

CIL

Gravity

tailings

0.5

0.25

3.96

0.25

10.13

2.75

93.69

72.85

LG-CIL

96

48

CIL

Gravity

tailings

0.5

0.25

1.62

0.29

8.41

2.85

82.07

66.11

HG-CIL

99

48

CIL

Gravity

tailings

0.5

0.25

8.88

0.34

15.60

2.40

96.17

84.62

Arkose-CIL

116

48

CIL

Gravity

tailings

0.5

0.25

2.89

0.39

8.17

3.35

86.51

59.00

MLDWT-CIL

107

48

CIL

Gravity

tailings

0.5

0.25

2.47

0.31

7.65

3.00

87.45

60.76

SGS Program 15944-002

Year 1-CN9

98

30

Leach

Whole ore

0.5

0.5

11.29

0.40

14.01

2.80

96.46

80.01

Year 1-CN10

98

30

Leach

Whole ore

1.0

1.00

11.33

0.37

14.07

2.70

96.73

80.82

Year 2-CN9

101

30

Leach

Whole ore

0.5

0.5

7.12

0.72

12.30

3.60

89.89

70.72

Year 2-CN10

101

30

Leach

Whole ore

1

1

7.15

0.51

12.26

2.70

92.87

77.98

Year 1-CN11

75

30

Leach

Whole ore

0.5

0.5

9.76

0.35

15.00

2.70

96.41

82.00

Year 2-CN11

74

30

Leach

Whole ore

0.5

0.5

7.10

0.39

15.04

3.20

94.51

78.73

Year 2-CN12

101

48

Leach

Whole ore

1

1

6.97

0.50

92.83

Year 2-CN13

74

48

Leach

Whole ore

1

1

6.99

0.42

93.99

Year 2-CN14

51

48

Leach

Whole ore

1

1

6.94

0.35

94.96

Arkose-CN1

99

48

Leach

Whole ore

0.5

0.5

11.80

0.51

13.33

2.60

95.68

80.49

Siltstone-CN1

105

48

Leach

Whole ore

0.5

0.5

17.92

1.18

18.07

2.20

93.42

87.83

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 121

May 27, 2026

Test

Campaign

Test

Number

Target

Grind

Size P80

(µm)

Retention

Time

(hours)

Leach/

CIL

Leach

Feed

Source

Cyanide

Addition

(g/L)

Cyanide

held at

(g/L)

Leach Feed

Grade,

Au

Calculated

(g/t)

Residue

Grade,

Au

(g/t)

Leach Feed

Grade,

Ag

Calculated

(g/t)

Residue

Grade,

Ag

(g/t)

Leach

Recovery,

Au

(%)

Leach

Recovery,

Ag

(%)

McClelland Program MLI 4551

AL-7 4551-001

106

48

Leach

Whole ore

0.50

0.50

8.85

0.61

14.6

3.5

93.11

76.03

AL-9 4551-002

106

48

Leach

Whole ore

0.50

0.50

10.18

0.59

14.6

3.9

94.20

73.29

AL-5 4551-003

106

48

Leach

Whole ore

0.50

0.50

7.10

0.45

13.5

3.5

93.66

74.07

AL-3 4551-004

106

48

Leach

Whole ore

0.50

0.50

5.20

0.45

11.1

3

91.35

72.97

AL-11 4551-005

106

48

Leach

Whole ore

0.50

0.50

11.17

1.19

21.5

4.8

89.35

77.67

AL-1 4551-006

106

48

Leach

Whole ore

0.50

0.50

3.57

0.37

9.3

2.5

89.64

73.12

AL-6 4551-007

106

48

Leach

Whole ore

0.50

0.50

8.01

0.47

11

2

94.13

81.82

AL-10 4551-008

106

48

Leach

Whole ore

0.50

0.50

13.13

0.42

9

1.5

96.80

83.33

AL-2 4551-009

106

48

Leach

Whole ore

0.50

0.50

4.29

0.23

9.1

2

94.64

78.02

AL-12 4551-010

106

48

Leach

Whole ore

0.50

0.50

11.02

0.48

9.4

1.7

95.64

81.91

AL-8 4551-011

106

48

Leach

Whole ore

0.50

0.50

8.75

0.22

13.9

2.4

97.49

82.73

AL-4 4551-012

106

48

Leach

Whole ore

0.50

0.50

6.21

0.27

5.1

1.1

95.65

78.43

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 122

May 27, 2026

10.6.1.1

Leach Recovery Estimate

The data in Table 10-12 were used to derive a relationship between leach feed and residue grades for both gold and

silver, as shown in Figure 10-4 and Figure 10-5.

Figure 10-5: Relationship Between Leach Feed and Residue Grades for Gold

Source: Ausenco, 2020

Figure 10-6: Relationship Between Leach Feed and Residue Grades for Silver

Source: Ausenco, 2020

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 123

May 27, 2026

The following relationships were derived from the data in Figure 10-4

and Figure 10-5 to calculate leach gold recovery:

Leach Residue Grade = 0.0336 (Leach Feed Grade) + 0.2173

Leach Recovery = (1-leach residue grade/leach feed grade) * 100.

The following relationships were derived from the data in Figure 10-4 and Figure

10-5 to calculate leach silver recovery:

Leach Residue Grade = 0.112 (Leach Feed Grade) +1.4188

Leach Recovery = (1-leach residue grade/leach feed grade) * 100.

Predicted leach recovery is compared to recovery achieved in testwork for gold and silver in Figure 10-6 and Figure 10-7, respectively.

Figure 10-7: Predicted versus Measured

Recovery for Gold

Source: Ausenco, 2020

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 124

May 27, 2026

Figure 10-8: Predicted versus Measured Recovery for Silver

Source: Ausenco, 2020

10.6.1.2

Estimation of Plant Losses

Additional plant losses for gold were estimated and are shown in Table 10-14.

Table 10-14: Estimated Additional Plant Losses for Gold

Description

Units

Values

Head Grade

g/t Au

≤6

>6 to ≤ 9

>9

Solution loss

%

0.33

0.35

0.37

Fine carbon loss

%

0.04

0.03

0.03

Other loss plant operation

%

0.10

0.10

0.10

Total additional plant losses

%

0.47

0.49

0.49

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 125

May 27, 2026

Additional plant losses for silver were estimated and are shown in Table

10-15.

Table 10-15: Estimated Additional Plant Losses for Silver

Description

Units

Value

Solution loss

%

0.33

Fine carbon loss

%

0.06

Other loss plant operation

%

0.10

Total additional plant losses

%

0.49

10.6.1.3

Overall Recovery Estimate

Overall plant recovery for gold and silver is calculated as the leach recovery less the plant losses. Recovery was calculated monthly as a function of head

grades for gold and silver based on the feasibility study mine plan.

Mercury has been identified as the only deleterious element of consequences and

provisions have been added to the process flowsheet to manage the removal of it from the final product and capture and control it safely.

Arsenic is

present in the feed but is not expected to be problematic in processing. No other elements that may cause issues in the process plant or concerns with product marketability were noted.

10.7

Summary

Three recent testwork programs (SGS Program 15944-001, SGS 15944-02 and McClelland MLI 4551) were completed between 2017 and 2020 on samples from the Grassy

Mountain deposit to confirm design information and metallurgical response which would provide a basis for process flowsheet selection and recovery estimation.

Between the various recent testwork programs, composite samples representing major lithologies, Year 1 and Year 2 production composites and a range of head

grades aligned with the minimum and maximum values expected in the plant feed in the initial two years of production were tested.

The grade variability

composite samples calculated gold and silver grades ranged from 0.104–0.383 oz/ton Au (3.57–13.13 g/t Au) and 0.149–0.628 oz/ton Ag (5.1–21.5 g/t Ag).

Comminution testing showed that all the materials tested are considered very hard, with Bond ball mill work indices ranging from 20.8 to 32.0 kWh/ton.

Bottle roll and agitated batch leach tests showed that the samples were highly responsive to recovery by cyanidation at a grind size of 80% passing 150 mesh

(106 µm) or lower, with leach recoveries ranging from 82.1–97.5% for gold and 59.0–84.6% 59.0–84.6% Updatedfor silver, dependent on leach feed grade.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 126

May 27, 2026

Overall plant recoveries for gold are predicted to range between 89.5 and 94.9% for head grades of

0.096–0.58 oz/ton Au (3.3–17.4 g/t Au) respectively over the life of mine. Overall plant recoveries for silver are predicted to range between 62.7 and 80.4% for head grades of 0.161–0.523 oz/ton Ag

(5.5–17.9 g/t Ag) respectively over the LOM.

Cyanide destruction tests achieved <0.2 mg/L CNWAD, which is well within the maximum legislated value in Oregon of 30 mg/L.

Mercury grades were

in the range of 0.054–0.077 oz/ton (1.86–2.64 g/t) in the leach feed, and the concentration of mercury in solution after leaching ranged between 0.08 and 0.26 mg/L. A retort and gas collection and scrubbing system was incorporated into

the plant design to manage and control mercury in the process. Arsenic is present in the feed at concentrations ranging between 3.47 and 5.34 oz/ton (119 and 183 g/t) and is not expected to be problematic in processing.

10.8

Qualified Person’s Opinion on Data Adequacy

In the QP’s opinion, based on the testwork summarized in the Report and predictions made from that testwork in terms of mineralogy, plant design

considerations, recovery forecasts, and presence of deleterious elements, the predictions of proposed throughput and metallurgical performance are acceptable.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 127

May 27, 2026

11

MINERAL RESOURCE ESTIMATES

11.1

Introduction

The qualified person firm RESPEC completed the estimate of mineral resource presented herein.

11.2

Grassy Mountain project Data

RESPEC performed this estimate of the Grassy Mountain project’s mineral resources using data generated by Paramount and the historical operators

discussed in Section 7. Paramount provided these data to RESPEC.

11.2.1

Drill-Hole Database

The drill-hole data are in UTM Zone 11 NAD83 coordinates in US Feet. The database includes information from a total of 485 drill holes, 282 of which were

drilled in the area of the Grassy Mountain resources. This estimation of the project’s mineral resources directly uses assay data from 256 of these drill holes.

Prior to the 2016–2017 drilling program, Paramount provided RESPEC with a project drill-hole database. As discussed in Section 9.1, RESPEC audited

the historical drill data and made corrections as appropriate. RESPEC periodically updated the database with information acquired during Paramount’s subsequent drilling programs, including gold and silver assay data received directly from the

analytical laboratory.

11.2.2

Topography

As part of their 2016–2017 work program, Paramount conducted a drone aerial survey over the resource area and collected detailed topographic data. RESPEC

used the survey’s raw data to create a three-dimensional digital topographic surface for use in resource modeling.

11.3

Deposit Geology Relevant to Resource Modelling

The Grassy Mountain gold-silver deposit is hosted by arkoses, siltstones, mudstones, and sinters of the Grassy Mountain Formation. As presently drilled, it has

extents of 1,900 ft in the strike direction of the higher-grade mineralization (060° to 070°), approximately 2,700 ft perpendicular to the strike, and 1,240 ft in the vertical direction. The deposit is comprised of a

high-grade central core zone characterized by gold grades in excess of 0.03 oz/ton Au that lies within a broad envelope of low-grade mineralization. The central core includes mineralization, that is the

subject of the economic analysis discussed in the following sections of this feasibility study.

The central core zone extends almost 1,000 ft along

strike, about 450 ft perpendicular to strike, and up to 450 ft in the vertical direction. Sub-horizontal and subvertical extensions of the high-grade central-core mineralization extend outward into the low-grade envelope, likely due to

stratigraphic and structural controls. The base of the central core is very sharp, marked by a distinct drop in precious-metal grades. It is the lower limit of the strong silicification that typifies the entire Grassy Mountain deposit, including the

lower-grade envelope.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 128

May 27, 2026

The highest-grade mineralization (>~0.25 oz/ton Au) within the high-grade central core zone and its

stratigraphic and structural extensions is most frequently associated with thin (<2 inches), often banded, typically steeply dipping chalcedonic quartz + adularia veins and veinlets. However, there are examples of highest-grade mineralization

that have no apparent association with veins. Nor does the presence of veins guarantee high grades. The distribution of the highest-grade mineralization is somewhat erratic, although some systematic distribution is evident. For example,

highest-grade mineralization is characteristic of the basal portion of the central core, even as continuity remains limited. In addition, project geologists have hypothesized that the Grassy fault is important in the formation of the deposit. There

is evidence of an association between the Grassy fault (and other high-angle structural zones) and higher vein density and grades.

The stratigraphic

control of mineralization is expressed by lenses of generally concordant mineralization that extend outwards from the margins of the central core of high-grade mineralization and the low-grade envelope. Similar mineralized lenses are associated with

the upper portions of the mineralized structural zones that extend above the central core zone. Mineralization within the central core of the deposit may also have been influenced by the host stratigraphy. Arkose and siltstone are the most common

hosts of stratigraphically controlled mineralization, and both sides of the contacts of the interbedded units appear to be particularly favorable.

RESPEC

believes the Grassy Mountain gold- and silver-bearing hydrothermal fluids were introduced into the Grassy Mountain Formation along a series of 060°- to 070°-striking, steeply dipping (primarily to the southeast) structural zones that occur

over the full extents of the central core of the deposit. Minimal displacement is common across individual structures. The planar base of the deposit and the abrupt change to weakly mineralized and altered rocks below likely reflect the elevation at

which boiling in ascending hydrothermal fluids deposited high-grade mineralization. The unfocussed nature of fluid flow along the complex and heavily fractured structural zones resulted in the generally erratic deposition of high-grade

mineralization throughout the central core zone.

The waning stages of the mineralizing system appear to be manifested by what Newmont termed “clay

matrix breccias.” The breccias are primarily, if not entirely, post-mineral and post-silicification. They are primarily matrix-supported with rotated fragments (some with mineralized quartz veinlets) that range up to boulder-size. Newmont

hypothesized that the breccias formed during, “a period of late-stage boiling along pre-existing conduits as H2S and CO2 were

expelled from the system” (Jory, 1993). Observations of Paramount drill core suggests that the pre-existing conduits are the mineralized structural zones described above. The clay matrix breccias are frequently unconsolidated and have

geotechnical implications.

Post-mineral faulting slightly tilted the Grassy Mountain deposit and its host stratigraphy to the east.

RESPEC performed the gold and silver resource modeling within the geological concepts described above.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 129

May 27, 2026

11.4

Geologic Modeling

Paramount supplied RESPEC with a set of detailed cross-sectional lithological and structural interpretations that covers most of the extents of the Grassy

Mountain mineral deposit. RESPEC used the cross-sections to guide their modeling of the gold and silver mineralization.

The structural interpretations

were particularly critical to the modeling of the gold and silver mineral domains discussed in Section 11.7. RESPEC made minor modifications to Paramount’s structural interpretations and modeled additional structures that provide some

control for higher-grade mineralization.

11.5

Water Table and Oxidation Modeling

Because oxidation within the Grassy Mountain deposit is variable, accurate modeling of discrete oxide and/or unoxidized zones proved impracticable. The entire

deposit is characterized as mixed oxidized, partially oxidized, and unoxidized material, although the unoxidized portions typically occurring only locally.

Hydrologic conditions are discussed in Section 13.3. Other than potential impacts of down-hole contamination in RC drill holes (discussed in

Section 7.4.2), the presence or absence of groundwater did not impact the resource modeling.

11.6

Density Modeling

In 1990, Hazen Research, Inc. (Hazen) completed 314 measurements of bulk density. In addition, Atlas collected 61 bulk density measurements. Hazen determined

bulk density using the water-immersion method on samples of drill core. RESPEC does not know if Hazen wax-coated the samples with open spaces. The samples were categorized by gold grade ranges, but the specific drill intervals tested are not known.

Table 11-1 summarizes the Hazen densities (tonnage factors are presented in ft3/ton).

Table 11-1: Hazen Research, Inc. tonnage Factors

Zone

Mean

Median

Min

Max

Count

Grade Range (oz/ton Au)

OZ-1

12.8

12.8

13.7

12.3

63

<0.005

OZ-2

12.8

12.8

14.4

12.3

166

0.003–0.050

OZ-3

13.1

13.0

24.6

11.0

85

0.050–0.750

The Atlas completed their 61 bulk density determinations at their Gold Bar mine in Nevada. Steele (1990) described their

methodologies as “wet tests.” The same memorandum described the Hazen procedures as “wet and dry.” Based on these descriptions, RESPEC believes that Atlas tests were performed using the water-displacement method. However,

RESPEC cannot confirm the exact methods employed. The drill-core samples tested by Atlas are identified by drill interval, and their spatial locations within the deposit are known.

Newmont density tested 10 samples of drill core (Jory, 1993). Although the test results are not available, Jory (1993) stated that the results suggest

“a Grassy Mountain tonnage factor closer to 13.3 ft3/ton.”

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 130

May 27, 2026

Paramount requested ALS complete bulk-density testing on 266 samples of core from the Atlas, Calico, and

Newmont drilling programs and 374 samples of core from Paramount’s 2016–2017 drill program. ALS made the determinations using the water-immersion method (ALS codes OA-GRA08). Coating with paraffin wax was implemented when necessary

(OA-GRA08A). Two of the sinter density determinations were anomalously high (low tonnage factors), and RESPEC removed them from the dataset.

RESPEC

examined the density data collected by Atlas and Paramount collectively and individually by rock types and gold domains. In general, average tonnage factors from the Atlas data for the lithological and grade subgroups are slightly lower (higher

density) than those determined by Paramount. Table 11-2 summarizes the combined Atlas and Paramount dataset grouped by modeled gold domain. The assay range for the low-grade gold domain (100) is ~0.006 to

~0.030 oz/ton Au, and the high-grade domain consists of assays > ~0.030 oz/ton Au.

Table 11-2: Combined

Atlas and Paramount tonnage Factors

Gold Domain

Mean

Median

Min

Max

Count

Block Model

100

13.3

13.0

21.5

11.6

341

13.5

200

13.0

12.9

14.7

12.4

275

13.5

100+200

13.2

12.9

21.5

11.6

616

n/a

0

14.8

14.5

23.0

11.2

83

14.8

Inclusive of the Hazen tests, the results indicate that the density associated with the Grassy Mountain mineralization is

consistent. Unmineralized rocks are distinctly less dense. This is likely a reflection of the strong silicification associated with all grades of mineralization. Unmineralized rocks have weaker silification or else lack it entirely.

RESPEC used the block model tonnage factors shown in Table 11-2 in the estimation of mineral resources. The tonnage

factors applied to mineralized material in the block model are slightly higher (lower density) than the measured mean values from core to account for voids related to the relatively high degree of fracturing in the Grassy Mountain deposit.

11.7

Gold and Silver Modeling

11.7.1

Mineral Domains

A mineral domain encompasses a volume of rock that ideally is characterized by a single natural grade population of a metal or metals that occurs within a

specific geologic environment. To define the mineral domains at Grassy Mountain, RESPEC identified the natural gold and silver populations by plotting all drill-hole assays on population-distribution graphs. Some distribution plots used only core

sample analyses. The analysis identified three grade populations each for gold and silver. However, the highest-grade populations of gold (>~0.25 oz/ton Au) and silver (>~0.4 oz/ton Ag) do not have sufficient continuity for confident modeling

of the domain. Therefore, RESPEC did not explicitly model these populations. Table 11-3 lists the approximate grade ranges of modeled gold and silver lower-grade (domain 100) and higher-grade (domain 200)

domains.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 131

May 27, 2026

Table 11-3: Approximate Grade Ranges of Gold and Silver Domains

Domain

oz/ton Au

oz/ton Ag

100

~0.006 to ~0.03

~0.04 to ~0.15

200

> ~0.03

> ~0.15

To model the gold and silver mineralization, RESPEC first interpreted gold and silver mineral-domain polygons individually on

a set of vertical, 50-ft spaced cross-sections looking northeast to azimuth 070° that span the extent of the deposit, then interpreted the mineral domains using the gold and silver drill-hole assay data, associated alteration and mineralization

codes, and Paramount’s sectional lithological and structural interpretations. During the sectional modeling, RESPEC extensively referred to core photographs, used them to discern the stratigraphic and structural controls of mineralization

discussed in Section 11.3 and modeled the domains accordingly. First, RESPEC modeled gold, then used the sectional gold-domain polygons to guide the silver domain modeling.

Due to the inherent variability of the Grassy Mountain mineralization, some of the high-grade domains (domain 200) included significant quantities of

low-grade mineralization. This variability precluded confident modeling of the highest-grade gold and silver population, and RESPEC did not define the mineralization separately from the high-grade gold and silver domains. From core observations, the

highest-grade gold population (>~0.25 oz/ton Au) strongly correlates with the presence of thin, often banded, quartz–chalcedony veins and veinlets and/or breccias. Visible gold is sometimes present. Most commonly, the high-grade veinlets

are steeply dipping—as assessed from drill-hole orientations and angles to core axes.

Although the grade change across the boundary between the

low– and high-grade domains is usually sharp, it is locally gradational. Commonly, the grade change across the sub-horizontal base of the high-grade domain is very abrupt, particularly in core holes, and is marked by a significant decrease in

the intensity of silicification.

The mineralization in the low-grade domain is much less variable than the higher-grade mineralization. This

mineralization is distal from the zone of boiling and related brecciation, and its distribution exhibits strong stratigraphic controls.

RESPEC pressed

the cross-sectional gold and silver mineral-domain envelopes horizontally to the drill data within each sectional window and sliced them at 10-ft vertical intervals to match the mid-bench elevations of the block model, then used these slices to

create gold and silver mineral-domain polygons on 10-ft spaced level plans at mid-block locations. Slices of triangulated surfaces of the steeply dipping structures that influence the distribution of higher-grade mineralized zones guided the level

plan interpretations.

Figure 11-1 to Source: RESPEC, 2026

Figure 11-4 provide cross-sections showing geology and gold and silver mineral domains in the central portion of the

Grassy Mountain deposit.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 132

May 27, 2026

Figure 11-1: Cross-section 3050 Showing Geology and Gold Domains

Source: RESPEC, 2026

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 133

May 27, 2026

Figure 11-2: Cross-section 3050 Showing Geology and Silver Domains

Source: RESPEC, 2026

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 134

May 27, 2026

Figure 11-3: Cross-section 3250 Showing Geology and Gold Domains

Source: RESPEC, 2026

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 135

May 27, 2026

Figure 11-4: Cross-section 3250 Showing Geology and Silver Domains

Source: RESPEC, 2026

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 136

May 27, 2026

11.7.2

Assay Coding, Capping, and Compositing

To code the drill-hole samples, RESPEC used the cross-sectional gold and silver mineral domain polygons and determined assay caps by inspecting the population

distribution plots of the coded assays, by domain, and identifying high-grade outliers appropriate for capping (Table 11-4). In the definition of the assay caps, RESPEC also considered descriptive statistics

of the coded assays by domain, visually reviewed the spatial relationships of the possible outliers and evaluated their potential impacts during grade interpolation. The number of samples subjected to capping and the chosen capping grades were

minimized because of the application of search restrictions described in Section 11.7.4.

Table 11-4:

Grassy Mountain Gold and Silver Assay Caps by Domain

Domain

oz/ton Au

Number Capped

(% of Samples)

oz/ton Ag

Number Capped

(% of Samples)

0

0.090

8(<1%)

0.120

12(<1%)

100

0.300

3(<1%)

0.600

4(<1%)

200

10.000

4(<1%)

7.000

2(<1%).

In addition to the low- and high-grade domain capping, RESPEC assigned samples outside the modeled domains as Domain 0 and

capped them as shown in Table 11-4. Table 11-5 and Table 11-6 provide descriptive statistics of the capped and uncapped coded

gold and silver assays.

Table 11-5: Descriptive Statistics of Grassy Mountain Coded Gold Assays

Domains

Assays

Count

Mean

(oz/ton Au)

Median

(oz/ton Au)

Std. Dev.

CV

Min

(oz/ton Au)

Max

(oz/ton Au)

0

Au

23,361

0.002

0.001

0.007

3.45

0.000

0.732

Au Cap

23,361

0.002

0.001

0.004

2.15

0.000

0.090

100

Au

24,808

0.013

0.011

0.011

0.82

0.000

0.561

Au Cap

24,808

0.013

0.011

0.010

0.77

0.000

0.300

200

Au

7,523

0.108

0.044

0.441

4.09

0.000

21.698

Au Cap

7,523

0.107

0.044

0.405

3.79

0.000

10.000

100+200

Au

32,331

0.033

0.013

0.209

6.27

0.000

21.698

Au Cap

32,331

0.033

0.013

0.193

5.81

0.000

10.000

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 137

May 27, 2026

Table 11-6: Descriptive Statistics of Grassy Mountain Coded Silver

Assays

Domains

Assays

Count

Mean

(oz/ton Ag)

Median

(oz/ton Ag)

Std. Dev.

CV

Min

(oz/ton Ag)

Max

(oz/ton Ag)

0

Ag

20,921

0.009

0.005

0.011

1.19

0.000

0.496

Ag Cap

20,921

0.009

0.005

0.010

1.11

0.000

0.120

100

Ag

13,292

0.071

0.064

0.040

0.57

0.003

1.138

Ag Cap

13,292

0.071

0.064

0.039

0.55

0.003

0.600

200

Ag

6,646

0.262

0.200

0.400

1.52

0.005

18.600

Ag Cap

6,646

0.260

0.200

0.310

1.19

0.005

7.000

100+200

Ag

19,938

0.132

0.085

0.246

1.86

0.003

18.600

Ag Cap

19,938

0.131

0.085

0.199

1.51

0.003

7.000

RESPEC composited the capped assays to 5-ft down-hole intervals that respected the mineral domain boundaries. The 5-ft composite length is equal to the sample length of RC drill samples. To retain the inherent variability of the Grassy Mountain mineralization in the resource modeling, RESPEC minimized the compositing and did

not apply a shorter composite length to avoid decomposition the majority of the assay samples. Descriptive statistics of Grassy Mountain composites are shown in Table 11-7 for gold and

Table 11-8 for silver.

Table 11-7: Descriptive Statistics of Grassy Mountain Gold Composites

Domain

Count

Mean

(oz/ton Au)

Median

(oz/ton Au)

Std. Dev.

CV

Min

(oz/ton Au)

Max

(oz/ton Au)

0

23,452

0.00

0.00

0.00

2.15

0.00

0.09

100

24,213

0.01

0.01

0.01

0.74

0.00

0.30

200

6,738

0.11

0.05

0.35

3.30

0.00

9.89

100+200

30,951

0.03

0.01

0.17

5.09

0.00

9.89

Table 11-8: Descriptive Statistics of Grassy Mountain Silver Composites

Domain

Count

Mean

(oz/ton Ag)

Median

(oz/ton

Ag)

Std.

Dev.

CV

Min

(oz/ton Ag)

Max

(oz/ton Ag)

0

20,910

0.009

0.005

0.010

1.100

0.000

0.120

100

12,985

0.071

0.067

0.038

0.530

0.003

0.600

200

6,137

0.260

0.200

0.295

1.140

0.005

7.000

100+200

19,122

0.131

0.085

0.191

1.460

0.003

7.000

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 138

May 27, 2026

11.7.3

Block Model Coding

RESPEC used level-plan mineral-domain polygons to code a three-dimensional block model comprised of 5 ft x 10 ft x 10 ft blocks (model x, y, z) with a model

bearing of 340°. RESPEC chose the block size most appropriate for the underground mining scenario evaluated in this feasibility study.

Using the

midblock level plan polygons, RESPEC coded the volume percentage of each of the two gold and silver domains into each model block, calculated the partial percentages of the model blocks that are partially or entirely outside the low- and high-grade

domains, and stored the volume percentages of the gold and silver mineral domains within each block. RESPEC also coded the block model using the digital topographic surface described in Section 11.2.2.

Employing the bulk density values discussed in Section 11.6, RESPEC assigned values so that blocks coded with any partial percentage of gold or silver

have a density of 13.5 ft3/ton, and entered a value of 14.8 ft3/ton all other blocks.

11.7.4

Grade Interpolation

Table 11-9 summarizes the parameters applied to the gold-grade estimations at Grassy Mountain. RESPEC completed the

grade interpolation in three passes using length-weighted composites within two estimation areas. Estimation area 10 dips shallowly at about -15° and encompasses most of the stratigraphically controlled mineralization in the Grassy Mountain

deposit. Estimation area 20 is comprised of mineralization in the west–southwestern portion of the deposit where the dips of the stratigraphic units steepen to approximately -20°. As Table 11-9

shows, the low-grade gold and silver domains and the areas outside modeled domains were entirely estimated using search ellipses that reflect these stratigraphic orientations.

The high-grade gold and silver domains exhibit both sub-horizontal (stratigraphic) and high-angle (structural) controls. To prioritize estimation of the

highest-grade mineralization—which is most commonly associated with steeply dipping veinlets—the first estimation pass of the high-grade domain reflects high-angle structural controls (Table 11-9,

estimation area 10, domain 200, pass 1). The second estimation pass of the high-grade domain applied a search ellipse reflective of stratigraphic control using the same search distance as pass 1 (50 ft). The second pass did not overwrite blocks

with grades estimated during pass 1. The third and final estimation pass was an isotropic pass without either a structural or stratigraphic bias. It was used to estimate domain 200 grades into blocks in the outer extents of the domain that were not

estimated by the first two passes.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 139

May 27, 2026

Table 11-9: Estimation Parameters

Estimation Pass – Au + Ag Domain

Search Ranges (ft)

Composite Constraints

Major

Semi-Major

Minor

Min

Max

Max/Hole

Pass 1 – Domain 0 + 100

100

100

50

2

15

3

Pass 2 – Domain 0 + 100

200

200

100

2

15

3

Pass 3 – Domain 0 + 100

310

310

310

1

15

3

Pass 1 + 2 – Domain 200

50

50

16.7

2

15

3

Pass 3 – Domain 200

110

110

110

1

15

3

Restrictions on Search

Ranges

Domain

Grade Threshold

Search Restriction Distance

Estimation Pass

Au 200

>0.30 oz/ton Au

35 ft

2

Au 0

>0.01 oz/ton Au

30 ft

1, 2, 3

Ag 0

>0.04 oz/ton Ag

30 ft

1, 2, 3

Search Ellipse Orientations

Estimation Area

Au + Ag Domains and Controls

Major Bearing

Plunge

Tilt

Estimation Pass

10

[Most of the Deposit]

Domain 0 + 100 – Stratigraphic

-15°

1, 2, 3

Domain 200 –Structural

070°

-85°

1

Domain 200 – Stratigraphic

070°

-10°

2

Domain 200 – Stratigraphic

3

20

[WSW End of the Deposit]

Domain 0 + 100 + 200 – Stratigraphic

070°

20°

1, 2, 3

Only a very limited portion of the high-grade gold and silver domains lie in estimation area 20.

Statistical analyses of coded assays and composites, including coefficients of variation and population-distribution plots, indicate that the high-grade gold

and silver domains capture multiple populations. RESPEC restricted the search distances because these multiple populations lack sufficient continuity to be explicitly modeled as separate domains and the initial estimation runs without the

restrictions resulted in unrealistic volumes and unrealistic distribution of high grades in the block model. The search restrictions limit the distance from a given composite above a chosen gold or silver grade that can be used in grade

interpolation. RESPEC finalized the search-restriction grades and distances after running multiple interpolation iterations to test the effects of various search-restriction parameters.

RESPEC interpolated gold and silver grades using inverse-distance to the third power (ID3), ordinary-kriging (OK), and nearest-neighbor (NN) methods and

reported this estimate of mineral resources using the ID3 interpolations because ID3 produced results more representative of the geology and distribution of drill-hole assay data than those obtained by OK. To check the ID3 and OK interpolations,

RESPEC completed the NN estimation.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 140

May 27, 2026

RESPEC performed the estimation passes independently for each of the mineral domains only using composites

coded to a particular domain to estimate grade into blocks coded by that domain. To enable the calculation of weight-averaged gold and silver grades for each block, RESPEC coupled the estimated grades with the partial percentages of their respective

mineral domains and the outside-domain volumes. Therefore, the final resource grades, and their associated resource tonnages, are fully block-diluted.

11.7.5

Model Checks

To assure close agreement, RESPEC compared gold and silver domain volumes coded into the block model as partial percentages to the volumes of both the

cross-sectional and level-plan mineral-domain polygons, visually checked all block-model coding, and used a polygonal estimate that used the cross-sectional domain polygons to check the ID3 estimation results and the NN and OK estimates. The checks

identified no unexpected relationships between the check estimates and the inverse-distance estimate. To check both the global and local estimation results, RESPEC evaluated various grade-distribution plots of assays, composites, and NN, OK, and ID3

block grades. Finally, RESPEC visually compared the ID3 grades to the drill-hole assay data in detail to assure that reasonable results were obtained, placing particular emphasis on the evaluation of the distribution and tenor of the high-grade gold

and silver estimates.

11.8

Grassy Mountain Mineral Resources

11.8.1

Pit Optimizations, Cutoff Grades and Reporting Prices

The Grassy Mountain deposit has the potential to be mined by open-pit methods. While the mineral reserves discussed in Section 12 are estimated on the

basis of a proposed underground-mining scenario, these mineral reserves represent only a small subset of the entire Grassy Mountain gold–silver deposit. The reported mineral resources reflect potential open-pit extraction and milling as the

primary scenario (mineral resources potentially amenable to open pit mining methods), with the potential underground mining of a very small quantity of material lying outside of the lower portions of the open pit as a secondary scenario (mineral

resources potentially amenable to underground mining methods). The mineral reserves discussed in Section 12 were converted primarily from the potential open-pit resources, with a small amount converted from the underground resource estimate.

To meet the requirement of reasonable prospects for eventual economic extraction for the portion of the mineral resources potentially amenable to open

pit mining methods, RESPEC ran a pit optimization using the parameters summarized in Table 11-10.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 141

May 27, 2026

Table 11-10: Pit Optimization Parameters

Item

Value

Unit

Mining Cost

3.14

$/ton

Processing Cost

16.33

$/ton processed

Process Rate

5,000

tons-per-day processed

General and Administrative (G&A) Cost

2.79

$/ton processed

Au Price

3,100

$/oz

Ag Price

34

$/oz

Au Recovery

80

Percent

Ag Recovery

60

Percent

Royalty

1.5%

NSR

Au Refining Cost

5.00

$/oz produced

Ag Refining Cost

0.50

$/oz produced

RESPEC used the pit shell created by this optimization to constrain the mineral resources potentially amenable to open-pit

mining methods, with the added constraint of a gold-equivalent cut-off grade of 0.008 oz/ton AuEq applied to all model blocks lying within the optimized pit. RESPEC calculated the gold-equivalent cut-off grade using the processing and general and

administrative costs and the gold price, recovery, refining cost, and royalty provided in Table 11-10. The mining cost is not included in the determination of the applied internal cut-off grade because all

material will potentially be removed from the conceptual pit and the cut-off grade is applied only to the decision to send the mined materials for processing or to the waste-rock storage facilities. Therefore, the reference point at which the

mineral resources are defined is at the top of the pit, where material equal to or greater than the cut-off grade would be processed.

The gold equivalent

grade (oz/ton AuEq) of each model block was calculated as follows:

oz/ton AuEq = oz/ton Au + (oz/ton Ag ÷ 129)

The silver-to-gold equivalency factor of 129 was derived from the metal prices and recoveries in Table 11-10.

The metal prices used in the pit optimization and the determination of the gold-equivalent cut-off grade and gold-equivalency factor were $3,100/oz for gold

and $34/oz for silver. RESPEC chose the metal prices based on consensus commodity price forecasts in March 2026 and on prices used to report resources recently filed on SEDAR. When this mineral resource estimate was completed, several recently filed

technical reports provided resources at gold prices between $2,500 and $3,100/oz Au, the spot price for gold was over $4,500/oz Au, and the three-year moving-average price was about $2,835/oz Au and rising. The spot price for silver was over $60/oz

Ag, and the three-year moving-average price was about $36/oz Ag and rising.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 142

May 27, 2026

To estimate mineral resources potentially amenable to underground mining methods, RESPEC applied a cut-off of

0.070 oz/ton AuEq to blocks lying immediately outside of the optimized pit that could reasonably be accessed from the resource pit. Table 11-11 lists the parameters used to calculate the underground

cut-off grade. The parameters used to estimate the very limited quantity of resources lying outside of the resource pit potentially amenable to underground extraction (less than 500 oz Au) are derived from, but more optimistic than, those used to

define the mineral reserves discussed in Section 12.

Table

11-11: Parameters Used to Determine Cut-Off Grade for Mineral

Resources Potentially Amenable to Underground Mining Methods

Item

Value

Unit

Mining Cost

141.77

$/ton

Processing Cost

39.09

$0/ton processed

Process Rate

5,000

tons-per-day processed

General and Administrative Cost

20.15

$/ton processed

Au Price

3,100

$/oz

Ag Price

34

$/oz

Royalty

1.5%

NSR

AuEq Recovery

92.8

Percent

Refining Cost

7.22

$/oz produced

RESPEC based both the open-pit and underground resource estimates on a 5,000-tons-per-day processing rate, with processing

assumed to consist of crushing and milling followed by CIL recovery.

11.8.2

Mineral Resources

The Grassy Mountain mineral resources exclusive of the resources that have been converted to mineral reserves are presented in Table 11-12. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 143

May 27, 2026

Table 11-12: Grassy Mountain Gold and Silver Resources –

Exclusive of Mineral Reserves

Resources

Cut-off Grades (oz/

ton Au)

Metallurgical

Recovery

Amount

(tons)

Grades

oz/ton Au

oz/ton Ag

Measured Mineral Resources

33,700,000

0.015

0.061

Inside Pit: 0.008

Outside Pit: 0.07

Au – 80

Ag – 60

%

%

Indicated Mineral Resources

21,887,000

0.021

0.081

Inside Pit: 0.008

Outside Pit: 0.07

Au – 80

Ag – 60

%

%

Measured + Indicated Mineral Resources

55,587,000

0.017

0.069

Inside Pit: 0.008

Outside Pit: 0.07

Au – 80

Ag – 60

%

%

Inferred Mineral Resources

3,779,000

0.019

0.056

Inside Pit: 0.008

Outside Pit: 0.07

Au – 80

Ag – 60

%

%

Notes:

RESPEC is the qualified person firm responsible for the mineral resources estimate.

Mineral resources are comprised of all model blocks at a 0.008 oz/ton AuEq cut-off that lie within an optimized

pit plus blocks at a 0.070 oz/ton AuEq cut-off that lie outside of the optimized pit.

oz/ton AuEq (gold equivalent grade) = oz/ton Au + (oz/ton Ag ÷ 129).

Mineral resources summarized in the table immediately above are reported exclusive of the mineral resources

converted to mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Mineral resources potentially amenable to open pit mining methods are reported using a gold price of $3,100/oz, a

silver price of $34/oz, a throughput rate of 5,000 tons/day, assumed metallurgical recoveries of 80% for Au and 60% for Ag, mining costs of $3.14/ton mined, processing costs of $16.33/ton processed, general and administrative costs of $2.79/ton

processed, and refining costs of $5.00/oz Au and $0.50/oz Ag produced. Mineral resources potentially amenable to underground mining methods are reported using a gold price of $3,100/oz, a silver price of $34/oz, a throughput rate of 5,000 tons/day,

assumed metallurgical recoveries of 92.8% gold equivalent, mining costs of $141.77/ton mined, processing costs of $39.09/ton processed, general and administrative costs of $20.15/ton processed, and refining costs of $5.00/oz gold equivalent

produced.

The effective date of the mineral resources estimate is February 28, 2026, and the effective date of the

database on which the Mineral Resources estimate is based is May 1, 2018;

Rounding may result in apparent discrepancies between tons, grade, and contained metal content.

The mineral resources exclusive of mineral reserves contain 490,000 oz of gold and 2,065,000 oz of silver classified as measured,

462,000 oz of gold and 1,777,000 oz of silver classified as indicated, and 73,000 oz of gold and 210,000 oz of silver classified as inferred.

The Grassy

Mountain project mineral resources inclusive of the resources that have been converted to mineral reserves are summarized in Table 11-13.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 144

May 27, 2026

Table 11-13: Grassy Mountain Gold and Silver Resources –

Inclusive of Mineral Reserves

Resources

Cut-off Grades

(oz/ton Au)

Metallurgical

Recovery

Amount

(tons)

Grades

oz/ton Au

oz/ton Ag

Measured Mineral Resources

33,999,000

0.016

0.063

Inside Pit: 0.008

Outside Pit: 0.07

Au – 80

Ag – 60

%

%

Indicated Mineral Resources

23,795,000

0.034

0.098

Inside Pit: 0.008

Outside Pit: 0.07

Au – 80

Ag – 60

%

%

Measured + Indicated Mineral Resources

57,794,000

0.023

0.077

Inside Pit: 0.008

Outside Pit: 0.07

Au – 80

Ag – 60

%

%

Inferred Mineral Resources

3,779,000

0.019

0.056

Inside Pit: 0.008

Outside Pit: 0.07

Au – 80

Ag – 60

%

%

Note: Footnotes to Table 11-12 are also applicable to this table, with the exception

that the mineral resources summarized in the table immediately above are inclusive of the resources that have been converted to mineral reserves. This table is not additive to Table 11-12.

The mineral resources inclusive of mineral reserves contain 540,000 oz of gold and 2,142,000 oz of silver classified as measured, 817,000 oz of gold and

2,325,000 oz of silver classified as indicated, and 73,000 oz of gold and 210,000 oz of silver classified as inferred.

As of the effective date, RESPEC

is not aware of any unusual environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors not discussed in this feasibility study that could materially affect the mineral resource estimates.

Figure 11-5 through Figure 11-8 are cross-sections through the central portion

of the Grassy Mountain deposit that show estimated block-model gold and silver grades. These figures correspond to the mineral-domain cross-sections presented in Figure 11-1 to Figure 11-4.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 145

May 27, 2026

Figure 11-5: Cross-section 3050 Showing Block-Model Gold Grades

Source: RESPEC, 2026

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 146

May 27, 2026

Figure 11-6: Cross-section 3050 Showing Block-Model Silver Grades

Source: RESPEC, 2026

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 147

May 27, 2026

Figure 11-7: Cross-section 3250 Showing Block-Model Gold Grades

Source: RESPEC, 2026

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 148

May 27, 2026

Figure 11-8: Cross-section 3250 Showing Block-Model Silver Grades

Source: RESPEC, 2026

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 149

May 27, 2026

11.8.3

Classification

Uncertainties that impact resource classification at Grassy Mountain include: (i) the preponderance of vertical RC holes drilled by historical operators;

(ii) the potential for poor sample quality in some portions of the RC holes; and (iii) the adequacy of the drill-hole spacing in the higher-grade core of the deposit, where the definition of structural controls on higher-grade

mineralization is critical and variability in the highest-grade gold population is high.

Atlas drilled 180 of the 256 holes that contributed data to the

grade estimation of the current mineral resources. All but four of Atlas’s holes were drilled vertically, and only nine of Atlas’s holes were core. Due to the emerging understanding of the importance of high-angle structural controls to

the higher-grade mineralization, all operators after Atlas, including Paramount, emphasized angled core holes in their drilling programs. A total of 59 core holes, including 27 drilled by Paramount, and 55 angled RC and core holes, including 18

drilled by Paramount, support the current resource estimates, almost all of them drilled within the central, higher-grade core of the deposit. This post-Atlas drilling, and particularly the Paramount program planned in coordination with RESPEC,

significantly enhanced RESPEC’s confidence in the geological understanding of the Grassy Mountain deposit and decreased uncertainties in the resource estimation related to the relative lack of angled core holes in the historical drilling.

There is an inherent risk of down-hole contamination in RC drilling, particularly below the water table. RESPEC identified 21 RC holes with suspected

intervals of down-hole contamination, all within the deepest portion of the central core of the deposit where groundwater was encountered in drilling. The samples from these intervals were excluded from use in the resource estimation.

The central, higher-grade core of the deposit—which is critical to the potential economic viability of any mining operation at Grassy Mountain—has

predominantly been drilled at hole spacings of about 30 to 50 ft. Even at this tight drill spacing, in many cases the highest-grade gold mineralization (>~0.2 oz/ton Au) could not be confidently correlated from drill hole to drill hole. Because

the highest-grade population could not be confidently modeled as its own mineral domain, these high-grade samples were included in domain 200, which encompassed grades greater than approximately 0.03 oz/ton Au. While RESPEC took special care to

properly represent the highest-grade population within this domain during grade estimation, its inclusion within the domain creates increased grade variability and adds uncertainties.

The risk imparted by the variability of the highest-grade gold mineralization influenced the choice of estimation parameters applied to mineral domain 200

(Table 11-9), including: (i) the use of a tight search ellipse (3:1 ratio of major and semi-major axes to the minor axis); (ii) limiting the search distances of estimation pass 1 and pass 2 to a

maximum of 50 ft (which still resulted in only a small proportion of the model blocks in the core zone of the deposit to be estimated in pass 3); and (iii) a further restriction on the search distance in pass 2 that limits the influence of

composites grading in excess of 0.3 oz/ton Au to 35 ft. (Pass 2 estimates grade respecting subhorizontal lithologic controls.)

In consideration of the

uncertainties discussed above and the steps taken to mitigate these uncertainties, the most significant risk that remains in the current Grassy Mountain mineral resource estimation is related to the modeling of the highest-grade gold mineralization

in the central core of the deposit. While visual and statistical evaluations give RESPEC confidence that the volume of the modeled highest-grade population properly respects its proportional representation as defined by the unclustered drill data,

the modeled locations of these grades in the block model likely vary from reality as distances from the drill data increase.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 150

May 27, 2026

RESPEC classified the Grassy Mountain mineral resources according to the criteria presented in Table 11-14 and applied the criteria to the estimation of gold grades because gold is much more economically significant than silver.

Table 11-14: Resource Classification Parameters

Class

Criteria

Distance of Block Centroid to Nearest

Composite

Measured

All estimated blocks coded to Au Domain 200 with or without Au Domain 100 coding

< 10 ft

All estimated blocks coded exclusively to Au Domain 100

< 50 ft

Indicated

All estimated blocks coded to Au Domain 200 with or without Au Domain 100 coding not classified as measured

< 50 ft

All estimated blocks coded exclusively to Au Domain 100 not classified as measured

< 100 ft

Inferred

All other estimated blocks

Considering the preceding discussion related to uncertainties in the resource modeling, RESPEC used two sets of criteria in

the definition of measured and indicated classifications of the resource model blocks. RESPEC applied one set of more restrictive parameters to all blocks coded as having any percentage of gold domain 200 (the high-grade domain), and another, less

restrictive set of criteria to all other blocks which are coded entirely to domain 100 (the lower-grade gold domain). Domain 200 includes the central core zone of the deposit and thin, structurally and stratigraphically controlled mineralization

that extends outward from the core zone. Domain 100 is comprised of the much larger, lower-grade halo of mineralization that encompasses domain 200. Domain 100 mineralization has much more extensive grade continuity and is less influenced by

discreet structural controls. Therefore, the distance criteria required in domain 100 for measured and indicated classifications are significantly less restrictive than those applied to blocks coded to domain 200.

Despite the relatively restricted distances of measured and indicated blocks from the drill data used to estimate grades, the tight drill spacing that

characterizes the deposit significantly limits the quantity of inferred material.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 151

May 27, 2026

11.9

Additional Comments on the Modeling of the Mineral Resources

RESPEC estimated the current Grassy Mountain mineral resources in consideration of potential mining by open pit methods and a very minor amount of potential

underground-mineable resources that lie immediately outside of the pit walls. However, an alternate scenario is also realistic, whereby only the higher-grade portion of the deposit is mined exclusively by underground methods. This latter scenario

was chosen to define the mineral reserves discussed in Section 12. RESPEC constructed the resource model to accommodate both potential open-pit and underground mining scenarios. The 5 x 5 x 10 ft block size fits seamlessly with the reserve

stope optimization discussed in Section 12, while the blocks could easily be re-blocked to a larger size (e.g., 20 x 20 x 20 ft) to accommodate open-pit engineering requirements. All other modeling steps and inputs RESPEC used to estimate

the Au and Ag resources—including the mineral-domain modeling, grade capping, compositing, grade estimation, density assignment, and classification—were completed independent of potential mining method.

As previously discussed, during resource modeling RESPEC identified structural zones as the principal controls of the high-grade mineralization within the

central core of the Grassy Mountain deposit. This structurally controlled mineralization has significant grade variability, which creates modeling uncertainties with respect to the location of the estimated high grades as distances from drill data

increase. While the risk imparted by the location uncertainty would be low in an open-pit mining scenario, underground mining requires far greater spatial accuracy. The current model is not sufficiently precise for use in underground mining. To

properly inform an underground mining operation’s short- and long-term resource models and refine geotechnical modeling and final stope designs, the central core of the Grassy Mountain deposit would require properly oriented, closely spaced

definition drilling. In the short term, RESPEC strongly recommends drilling from the surface prior to mining to reduce the uncertainties in the high-grade mineralization model. Drilling on tighter spacing for more precise delineation of the

high-grade mineralization and stope design would take place from underground. Additional drilling would also be important from a geotechnical standpoint, again primarily to inform an underground mining operation, because the mineralized structures

are typically characterized by poor to very poor rock quality.

There are 14,947 sample intervals in the drill-hole database that have gold assays but no

silver analyses. In most cases, entire drill holes were not assayed for silver. For example, some of the early Atlas holes and all the Newmont holes were not assayed for silver. A total of 4,720 of the sample intervals lacking silver assays lie

within the domains that form the basis of the gold and silver resource estimates, while 19,938 sample intervals used in the resource estimates do have silver analyses. The effect of the lower quantity of silver analyses on the resource estimate is

mitigated by the fact that relative to gold, silver adds little value to any potential mining operation.

RESPEC believes that any factors that would

likely influence the prospect of economic extraction have either been addressed or could be resolved by further drilling.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 152

May 27, 2026

12

MINERAL RESERVE ESTIMATES

12.1

Introduction

Mineral Reserves were estimated by Qualified Persons of RESPEC and classified in order of increasing confidence into Probable and Proven categories to be in

accordance with definitions in Subpart 229.1300 – Disclosure by Registrants Engaged in Mining Operations in Regulation S-K 1300. RESPEC is independent of Paramount and has no affiliations with Paramount except that of an independent

consultant/client relationship.

12.1.1

Estimation Procedure

The Mineral Reserve is composed of material which was classified as an open pit mineral resource. There was a negligible quantity of underground resources

reported outside of resource open pit shell, but these are not part of mineral reserve.

An underground mining scenario is assumed using mechanized

cut-and-fill methods, which, following ramp-up, will produce 1,200–1,400 ton/d, four days a week. This mining rate will provide sufficient material for the 750 ton/day mill and processing plant to operate at full capacity for seven days a

week. The underground cut-and-fill mining method was selected based on minimizing the environmental impacts. The underground cut-and-fill mining method has a significant smaller footprint compared to open pit mining methods. Underground stoping and

other larger underground mining methods were not selected because the size and geometry of the ore body do not support a higher production rate.

The

Proven and Probable reserves for Grassy Mountain have been estimated by first calculating an economic net smelter return (NSR) cut-off for mining underground stopes, then using the NSR cut-off to design stope shapes centered on Measured and

Indicated Mineral Resource blocks with the mining revenue greater than or equal to the NSR cut-off. The QP used the resource block model described in Section 11, in GEOVIA Surpac and Deswik formats. All Inferred material was considered to be

waste with no value or metal content. Internal and external dilution and mining recoveries (ore loss) were estimated and applied as modifying factors based on the total tonnage of material inside of the final designs. The following sections provide

details on the assumptions and design criteria used for estimating the reported Proven and Probable Mineral Reserves.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 153

May 27, 2026

12.2

Mineral Reserve Statement

The reference point for the estimated Mineral Reserves is the crusher. Section 11.8 describes the conversion of Mineral Resources to Mineral Reserves.

The Mineral Reserves estimated for the Grassy Mountain Project are provided in Table 12-1 and have an effective

date of May 15, 2026. An underground mining scenario is assumed in this study using mechanized cut-and-fill methods. The Qualified Person responsible firm for the mineral reserves estimate is RESPEC. The reference point at which the Mineral

Reserves are defined is the point where the ore is delivered to the FS mill crusher.

Table 12-1: Mineral

Reserves Statement

ktons

Grade (oz/ton Au)

Grade (oz/ton Ag)

Gold (k oz)

Silver (k oz)

Proven mineral reserves

299

0.167

0.256

50

76

Probable mineral reserves

1,908

0.186

0.287

355

548

Proven + Probable reserves

2,207

0.184

0.283

405

624

Notes:

Mineral reserves have an effective date of May 15, 2026.

Mineral Reserves are reported inside stope designs assuming drift-and-fill mining methods, and an economic net

smelter return cutoff of $201 per ore ton processed. The economic cut-off grade estimate uses a gold price of $2,750/oz, mining costs of $141/ton processed, surface re-handle costs of $0.22/ton processed, process costs of $39/ton processed, general

and administrative costs of $20/ton processed, and refining costs of $6/oz Au recovered. Cost inputs mentioned here are rounded except the surface re-handle costs.

Metallurgical recovery utilizes the recovery schedule discussed in Section 10.5.

Mineralization that was either not classified or was assigned to Inferred Mineral Resources was set to waste.

A 1.5% NSR royalty is payable.

Rounding may result in apparent discrepancies between tons, grade, and contained metal content.

12.3

Economic Cut-off Grade Calculation

12.3.1

Gold Price

The gold price used for the cut-off grade estimation is $2,750/oz Au. The gold daily closing monthly averages in $/oz Au from the World Gold Council is shown

in Figure 12-1 for the three-year period leading up to February 2026. The 24-month average for the period ending in February 2026 is $3,139/oz Au, the 36-month average is $2,752/oz Au, and the 18-month average

is $3,677/oz Au.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 154

May 27, 2026

Figure 12-1: Monthly Average Gold Price, $/oz

Source: World Gold Council, 2026

The economic cut-off grade used for stope design is based on initial economic parameters shown in Table 12-2.

Table 12-2: Cut-off Grade Input Parameters for Gold Metal

Name

Quantity

Unit

UG Mining costs

141.18

$/ton processed

Surface Rehandle

0.22

$/ton processed

Process Costs

39.09

$/ton processed

G&A Costs

20.15

$/ton processed

Total Operating Costs

200.64

$/ton processed

Refining Cost

6.00

$/oz processed

NSR Royalty

1.5%

percent

Gold Metal Recovery

92.8%

percent

Gold Selling Price

2,750

$/oz Au

Calculated Cutoff Grade

0.080

oz Au/ton

Mineral Reserve Cutoff Grade Used

0.080

oz Au/ton

NSR Economic Cutoff

201.00

$/ton processed

Note: G&A = general and administrative.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 155

May 27, 2026

The calculated gold cut-off grade is 0.08 oz/ton Au. Variable leach recovery depending on the feed grade was

used to assign NSR value in the block model. The NSR economic stope cutoff was used in the stope optimization to identify the Measured and Indicated blocks available for consideration to be converted to Mineral Reserves. Deswik SO 5.13878 version

was used for stope optimization. Measured and Indicated resource blocks with NSR value less than the economic stope NSR cut-off, as well as all Inferred resource blocks irrespective of grade, were considered as waste and applied to internal

dilution.

12.3.2

Silver Price

The silver price used for the economic NSR cut-off evaluation is $31.00/oz Ag. The 24-month average for the period ending in February 2026 is $39.49/oz Ag,

the 36-month average is $34.19/oz Ag, and the 18-month average is $43.18/oz Ag.

The silver metal at Grassy

Mountain has a minimal impact on the economics of the project. Table 12-3 shows the Total Mineral Reserves multiplied by the respective metal prices for gold and silver. The silver metal contributes to less

than 2% of the total revenue.

Table 12-3: Total Mineral Reserves Multiplied by the Metal Price

Metal

Total Mineral Reserves

(‘000 oz)

Metal Price

($/oz)

% Contribution to Revenue

Gold

405

2,750

98%

Silver

624

31

2%

A calculated silver cut-off grade was not used in the mine design due to its relatively small (<2%) contribution to total

economic value as shown in Table 12-3. The economic NSR cut-off grade of $201/ore ton processed was used for determining the stope designs in mineral reserve designs inclusions. Revenue for silver is included

in the financial model, and therefore silver grade and silver contained metal are reported in the estimated Mineral Reserves.

12.4

Stope Design

The Mineral Reserves were constrained by the design of mineable stope shapes centered on Measured and Indicated blocks with grades greater than the economic

stope cut-off. For stope optimization, the Stope Optimizer SO 5.1 3878 module from Deswik™ software was used. The stope optimization parameters are stated in Table 12-4.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 156

May 27, 2026

Table 12-4: Stope Optimization Parameters

Attribute

Quantity

Unit

Height

15

ft

Width

15

ft

Round length

10

ft

Minimum optimization length

20

ft

Maximum optimization length

50,000

ft

Minimum stope pillar

5

ft

Slice interval

2

ft

Evaluation method

Exact Geometric

-

Each stope block was queried against the resource block model to determine the tonnages and grades within the stope shapes.

Stopes with an average measured or indicated gold grade equal to and above the economic NSR cut-off were selected to be included in the mine plan and Mineral Reserves estimate. Some isolated stopes above the cut-off grade threshold were eliminated

from consideration because the development to extract them would cost more than the economic return. Dilution and recovery were not considered during the stope optimization. The dilution and recovery were applied as modifying factors later in the

process.

Development designs were generated concurrently for each stope shape with the purpose of minimizing development in waste. Figure 12-3 shows a typical mine production-level design. These designs were done every 15 vertical feet.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 157

May 27, 2026

Figure 12-2: Mine Production Design of Level 3210, Plan View

Source: MDA, 2020 (for representation purposes only, MDA is now part of RESPEC).

12.5

Dilution and Recovery

12.5.1

External Dilution

A modifying factor of 8% was used for calculating external dilution tons. Grade was assigned to the external dilution by expanding the stope limits by one foot

on all sides that are not adjacent to other stopes. The resource block model was queried against the expanded volume and 80% of the queried grade was used to determine the appropriate external dilution grades for silver and gold.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 158

May 27, 2026

12.5.2

Internal Dilution

All Inferred resource blocks or partial blocks within the stopes and all unclassified material within the stopes is considered internal dilution. The tons were

accounted for with zero grade.

12.5.3

Mining Recovery

Mining recovery is estimated to be 97% based on an assumed ore loss of 3%. This is considered appropriate for the highly selective mechanized cut-and-fill

mining method selected for the Grassy Mountain deposit and it is based on similar operations in disseminated ore bodies.

12.6

Discussion of Mineral Reserves

The QP is not aware of any mining, metallurgical, infrastructure, permitting or other relevant factors not discussed in this Report that could materially

affect the mineral reserve estimate. The economic viability of Grassy Mountain is disclosed in Section 19. Further conclusions are disclosed in Section 22.

12.7

Classification

All design solids were determined to be either ore or waste as shown in Figure 12-4. All mine design solids above the

cut-off-grade were designated as ore. All mine design solids below the cut-off-grade were designated as waste. The block model classified each block as either measured, indicated, or inferred as follows:

All tons within the ore mine design solids and classified as measured in the block model were classified as

Proven.

All tons within the ore mine design solids and classified as indicated in the block model were classified as

Probable.

All tons within the ore mine design solids and classified as inferred in the block model were classified as Ore

Loss.

These parameters are listed in Table 12-5. Please note that a single mine design solid

could contain multiple blocks with different block model classifications. These were segregated according to Table 12-5. Therefore, the classification was done at the block model resolution and not at the mine

design resolution.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 159

May 27, 2026

Figure

12-3: Ore and Waste Designation

Source: RESPEC, 2026

Table 12-5: Reserve Classification Parameters

Class

Mine Design Criteria

Classification from the Block

Model

Proven

Ore material above the Cut-Off-Grade

Measured

Probable

Ore material above the Cut-Off-Grade

Indicated

Ore Loss

Ore material above the Cut-Off-Grade

Inferred

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 160

May 27, 2026

13

MINING METHODS

13.1

Mining Method Selection

The mechanized underhand cut-and-fill mining method was selected using the methodology proposed by Nicholas (1981). Cemented rock fill (CRF) will be used for

backfill. The mechanized cut-and-fill method is highly flexible and can achieve high recovery rates in deposits with complex geometries, as is the case at the Grassy Mountain deposit. The estimated mine life is nine years.

13.1.1

Underhand Mechanized Cut-and-Fill Mining

The Grassy Mountain mine will be an underground operation accessed via one decline and a system of internal ramps. Stacked set of raise is included in the

design to be used for ventilation and secondary egress as shown in Figure 13-1. A plan view of the proposed mine design is shown in Figure 13-2.

Figure

13-1: Grassy Mountain Mine Cross-section Looking North

Source: RESPEC, 2026

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 161

May 27, 2026

Figure

13-2: Proposed Grassy Mountain Mine Plan (plan view)

Note: The mine design was based on an average production rate of 1,200 -1,400 tons per day using a four-day-on and

three-day-off schedule, with two 12-hour shifts per day, to provide 24-hour coverage during the four operating days at full operation. This will provide sufficient material to feed 750 tons/d to the mill on a seven day per week basis. Source:

RESPEC, 2026

The nominal development size will be 15 ft wide by 15 ft high as shown in Figure 13-3. The nominal

Topcut-A production size is to be 15 ft wide by 15 ft high as shown in Figure 13-3. The Topcut-A will be used when the material above is native rock. The nominal Undercut-B production size is to be 20 ft

wide by 15 ft high as shown in Figure 13-3. The Undercut-B will be used when the material above is cemented backfill from a Topcut-A production drift as shown in Figure

13-4. The nominal Undercut-C production size is to be 30 ft wide by 15 ft high as shown in Figure 13-3. The Undercut-C will be used when the material above is cemented

backfill from an Undercut-B as shown in Figure 13-4. This heading layout will tolerate weak ground conditions while still maximizing production in a cut-and-fill mine.

The sizes will allow the miners and associated diesel mining equipment access and flexibility to maximize production from the mine as well as minimize waste

haulage from the development headings.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 162

May 27, 2026

Figure

13-3: Drift Profiles

Source: MDA, 2020 and used unmodified by RESPEC in 2026

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 163

May 27, 2026

Figure

13-4: Production Drift Layout (Section Looking East)

Note: The mining cycle involves drilling, blasting, and mucking for the development and production access. The final part

of the mining cycle is to backfill the stopes. Source: MDA, 2020 and used unmodified by RESPEC, 2026

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 164

May 27, 2026

13.1.2

Mining Method Sequence

The mining sequence contains a mining level sequence and an underhand production stope sequence. The level sequence for a typical level can be seen in Figure 13-5. The level access is mined first. The mains are mined second. Typically, two mains are mined at the same time providing multiple mining locations on a level. After the mains are mined, then the production

drifts can begin mining. The production drifts are sequenced with primaries and secondaries. The primaries are mined and backfilled first allowing for a backfill minimum cure time of 14-days between the primaries and secondaries. This continues as

shown in Figure 13-5 until the entire level is complete. After the entire level is complete the level access is backfilled and a 28-day delay for the cure time is applied. After the cure time is complete the

level below can start.

Figure

13-5: Detailed level Sequence for a Typical Level

Note: The underhand mining sequence is grouped into lifts as shown in Figure 13-6. Source: MDA, 2020 and used unmodified by

RESPEC, 2026

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 165

May 27, 2026

Figure

13-6: Mining Lifts

Source: MDA, 2020 and used unmodified by RESPEC, 2026.

One level in each lift can be mining at any given time during the life of mine. The underhand sequence starts at the top and works down in elevation.

Constraints are applied to ensure that the bottom level of a lift does not conflict the top level of the lift below.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 166

May 27, 2026

13.2

Geotechnical Analysis

13.2.1

Overview

The Grassy Mountain deposit is situated is a horst block which has been raised 50–200 ft in a region of complex block faulting and rotation. Faulting is

dominated by post-mineral N30ºW to N10ºE striking normal faults developed during Basin and Range extension. On the northeast side of the deposit, these faults progressively down-drop mineralization beneath post-mineral cover. These offsets

are suggested by interpreted offsets in drill holes of a prominent white sinter bed, as well as intersections with a fault gouge. The N70ºE striking the Grassy Mountain fault shows a minor vertical offset of 10–40 ft.

The North and Grassy faults are significant fault structures that pose a risk to the stability of an open stoping method; hence, these areas are considered

suitable only for a limited man-entry mining method such as mechanized cut-and-fill, where conditions can be well controlled.

Degradation of the Grassy

Mountain Formation results in difficult mining conditions that can be mitigated through additional ground support, which would involve a higher mining cost with slower advance rates in those areas.

Stress measurements are not currently available. In the absence of this information, a stress regime based on the World Stress Map was used to obtain a range

of estimates. Based on the shallow depth, ground stress is relatively low, and rock damage due to higher mining-induced stress concentrations is only anticipated in high-extraction or sequence closure areas and weaker rock mass areas. However, a

reduction in the mining stresses around excavations is likely to adversely affect the stability of large open-span areas. Tensile failure and gravity-induced unraveling are foreseen as the main failure mechanisms.

The Grassy Mountain deposit is in a structurally complex, clay-altered, epithermal environment. Rock mass conditions in the infrastructure and production

areas vary from Poor to Fair quality (RMR 20–45; RMR mean 40–45) with the poorest conditions within major structures that run longitudinally through and bound the deposit. Outside of these fault areas, rock mass conditions are generally

Fair. However, localized zones of Poor ground potentially associated with secondary structures or locally elevated alteration intensity are present throughout the planned mining area.

Excavation stability assessments were completed using industry-accepted empirical relationships, with reference to analogue mines where possible. The rock

mass conditions (Poor to Fair) are considered suitable only for a selective underground mining methods and limited sizes.

Ground support design considers

industry-standard empirical guidelines and GMS’s experience in variable ground conditions. Compromises have been made in the extraction sequence due to the need to balance grade and production profiles, extraction of wide orebody areas, and

other geotechnical constraints. Ultimately, some aspects of the sequence may not be geotechnically optimal, and additional analysis or design may be required.

The North and Grassy faults are significant fault structures that pose a risk to the stability of an open stoping method; these areas are therefore considered

suitable only for a limited man-entry mining method such mechanized cut and fill, where conditions can be well controlled. Two secondary structural systems have been identified, which cut and cause slight dislocations in the veins and mineralized

bodies: one corresponding to normal-displacement structures with a north–northeast–south–southwest strike and the other with a northwest–southeast strike. Not all fault structures could be modelled, and the influence of

several secondary- and tertiary-level structures in the deposit are not well understood. Several fault structures will need to be further defined and interpreted during the decline ramp excavation program.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 167

May 27, 2026

13.2.1.1

Degradation Zones

Time-dependent drill core degradation has previously been identified at Grassy Mountain. In general, degraded zones are contained within siliceous sinter

bodies, conglomerates, and interbedded tuff beds within the Grassy Mountain Formation. Degradation is strongest in intervals that are observed or interpreted as having contained silicic and potassic alteration. Contacts of the Grassy Mountain

Formation were used to extrapolate degradation zones beyond areas of graphically-logged intervals in order to construct moderate- and high-confidence degradation shells. Across the deposit, the North and Grassy faults produce significant degradation

above and below the conglomerates and tuff strata, and the faults to the west appear to displace or bound the degradation zone.

Degradation of Grassy

Mountain Formation lithologic units results in difficult mining conditions that can be mitigated through additional ground support. This would result in a higher mining cost with slower advance rates in those areas.

13.2.1.2

Structural Fabric

The geotechnical holes drilled in the 2016–2017 campaign were drilled with “triple tube” techniques to increase core integrity and

preservation for best geotechnical logging and measurements. Observations of the core suggest that there is little systematic structure, except for the very steep features often sub-parallel to the core axis that are likely oriented similarly to the

interpreted northwest–southeast-striking faults associated with mineralization. The remaining structure is typically very small-scale, irregular, and generally related to micro-defects within the rock mass.

13.2.1.3

In-situ Stress

Stress measurements are not currently available. In the absence of this information, a stress regime based on the World Stress Map was used to obtain a range

of estimates. Uncertainty in the stress magnitude will need to be further assessed and interpreted during the decline ramp excavation program.

Based on

the shallow depth, ground stress is relatively low, and rock damage due to higher mining-induced stress concentrations is only anticipated in high-extraction or sequence closure areas and weaker rock mass areas. However, a reduction in the mining

stresses around excavations is likely to adversely affect the stability of large, open-span areas. Tensile failure and gravity-induced unraveling are foreseen as the main failure mechanisms. The pre-mining stress field should be further evaluated.

13.2.2

Geotechnical Characterization

A geotechnical investigation was carried out by Golder in 2017 and Ausenco in 2018 to characterize rock mass conditions in support of an underground design for

the 2018 PFS. A combined total of 27 core holes were drilled through the deposit and geotechnically logged and sampled for laboratory strength testing as part of the 2016–2017 program. Point load testing was also conducted on cores retrieved

from the geotechnical drill holes. After the 2016–2017 core holes program, GMS geotechnically logged two core holes from the 2019 program.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 168

May 27, 2026

The geotechnical database from the 2016–2017 program was checked against the respective core

photographs for internal data consistency and the data are considered to be suitable for a feasibility-level study.

Overall, the following information

was used to base geotechnical assessments:

2016–2017 core holes database with RQD and core recovery data

Core photographs for 2016–2017 core holes

Detailed geotechnical logging for 25 holes by Paramount under Golder training and review (2016–2017)

Detailed geotechnical logging for two holes by Golder (2016–2017)

Detailed geotechnical logging for two holes by Paramount (2019)

Field point load testing of cores from six holes (total of 300 tests) during the 2016–2017 program and from

two holes (total of 166 tests) during the 2019 program

Laboratory strength testing for two programs (2016–2017 and 2019) including uniaxial compressive strength

(UCS), Brazilian tensile strength, and elastic properties.

13.2.3

Golder Geotechnical Appraisal

A geotechnical appraisal of the proposed underground mine area was carried out by Golder during 2016–2017 (Golder Associates Inc, 2018). Geotechnical

data were available from three different drilling programs that were completed prior to the 2016–2017 drill program. Calico, Newmont, and Atlas carried out RQD measurements. Additional geotechnical data from Newmont and Calico drilling were

reviewed but not used directly in Golder’s 2016–2017 evaluation, due to uncertain reliability and consistency in the data.

Two holes were

logged in detail for geotechnical characterization by Golder personnel at the drill rig. The other 2016–2017 holes were logged by Paramount personnel according to Golder’s instructions and procedures (25 core holes).

Golder used the geotechnical log data to characterize the orebody and surrounding rock mass, based on an RMR calculation from the logged data. Figure 13-7 presents the RMR76 histogram for all core that was geotechnically logged from the 2016–2017 drill program. The pre-2016–2017 Calico, Newmont, and Atlas historical data were not evaluated with the

2016–2017 program. Golder did not consider the pre- 2016–2017 data usable with the 2016–2017 RMR log data.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 169

May 27, 2026

Figure

13-7: Golder Rock Mass Rating (all 2016–2017 core)

Source: Golder, 2018

Golder’s drill core review in 2016–2017 indicated the presence of a significant number of zones of broken rock fragments within what Golder termed

“a matrix of soil” and referred to as “Soil Matrix Breccia”. These zones are more correctly referred to as “Clay Matrix Breccia”. The Clay Matrix Breccia, an important contributor to Type III rock quality (Table 13-1) is readily observed in cores in split tubes immediately after drilling, but it is also clearly identifiable after the core has been boxed and somewhat disturbed.

Table

13-1: Rock Quality Categories

Rock Quality Category

Description

Approximate Expected Percent of

Excavations (a) (%)

Type I

Moderately fractured rock

20

Type II

Poor quality, highly fractured rock

40

Type III

Clay matrix breccia and other very poor-quality rock (clay, broken rock and rubble in core boxes)

40 (15% clay matrix breccia, 25% other poor-quality rock)

Note: Based on percent encountered within 2016–2017 drill holes.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 170

May 27, 2026

The geological and geotechnical data did not identify any trends or patterns that would allow the delineation

of rock quality domains for mine design, with the exception of Very Poor-quality rock encountered in and around the interpreted sub-vertical structures. However, Very Poor-quality rock was not limited to the vicinity of the structures; it was also

frequently observed between structures. This degree of variability required a selective mining method that can quickly respond to changing ground conditions.

Golder (2018) concluded that, in the absence of spatial patterns in rock quality, three categories of rock quality should be applied for PFS-level design

and cost estimating purposes (refer to Table 13-1).

13.2.4

Ausenco Geotechnical Work

In 2017, Ausenco’s geotechnical group conducted a review of all the available geotechnical information provided by Paramount, including core logs and

core photographs. The main objectives were to select a mining method and develop recommendations for support in underground openings.

Ausenco’s

geotechnical group reviewed all core photographs from the 2016–2017 core drilling program and estimated additional geotechnical parameters that were incorporated into the geotechnical review.

In order to characterize the rock mass of the deposit, a statistical analysis was performed on the geotechnical data derived from the core logging by

Paramount and Golder. The RMR76 results analyses are shown in Figure 13-8.

Figure

13-8: RMR 76 Histogram from 27 Drill Holes

Source: MDA, 2017

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 171

May 27, 2026

Per the analysis conducted by Ausenco, the majority of the ground conditions of the Grassy Mountain deposit

are classified as being of Fair to Poor rock quality, and the RMR is typically less than 49.

Based on RMR76 statistics and Ausenco’s interpretation

and correlation with the geological database, it can be concluded that Golder’s previous analysis (unknown at that time), with the same data, had very similar results.

The Grassy Mountain deposit was assigned by Ausenco to three rock classes by geotechnical quality:

Class 1: Rocks of Poor geotechnical quality according to RMR76; approximately 40% of the deposit.

Class 2: Rocks of Fair geotechnical quality according to RMR76; approximately 50% of the deposit.

Class 3: Rocks of Good geotechnical quality according to RMR76; approximately 10% of the deposit.

Table 13-2 shows the cumulative frequency values based on the RMR76 histogram from 27 drill

holes (Figure 13-9) with the rock classes assigned by Ausenco.

Table

13-2: Rock Quality Categories

Rock Quality

(RMR)

Frequency (%)

Rock Class

Deposit (%)

0–20

Very Poor

1.8

20–40

Poor

38.3

Class 1

40

40–60

Fair

49.4

Class 2

50

60–80

Good

9.3

Class 3

10

80–100

Very Good

1.2

The Very Poor and Very Good rock qualities, according to the RMR classification, are not representative of the deposit due to

the low frequencies measured, so they were omitted from the three rock classes assigned. However, they do exist and should be considered when mining, in particular the Very Poor quality, which may require additional support.

Examples of the three 2017 RMR classes are shown in Figure 13-9.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 172

May 27, 2026

Figure

13-9: Examples of Three Geotechnical Rock Classes

Source: MDA, 2017

13.2.5

Feasibility Study Geotechnical Analysis

The basic geotechnical parameters recorded in the field during the 2016–2017 and 2019 drill holes program were combined to form an RMR system

(Bieniawski, 1976). These data were used to create an RMR profile with depth for each of the geotechnical holes drilled. The RMR76 system consists of a rating scale accounting for intact rock strength (IRS), fracture frequency per meter (ff/m),

joint conditions, and groundwater. RMR values consider a maximum possible value of 100 for each run. Dry conditions were assumed for RMR calculations, as groundwater pressures are accounted for during the stability analysis using effective stress

type analyses. A summary of RMR values per area of the deposit is presented in Table 13-3.

Table

13-3: Summary of RMR (Bieniawski, 1976) Values by Area

Area Data

RMR (B76)

Data (no)

Mean

Standard Deviation

Decline ramp/mine infrastructure

38

18

226

Stopes (drifts)

40

18

1,123

Crown pillar

41

19

242

Centre of deposit (Section)

38

20

149

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 173

May 27, 2026

Data from the geotechnical core logging and the statistical analysis indicate that the geotechnical units

have similar geotechnical conditions. The data indicate that the deposit presents no substantial differences in geotechnical qualities among the stope areas and mine infrastructure location, including the intersections with faults or veins, which

present Poor to Very Poor qualities. In general, the deposit presents a high variability in geotechnical qualities over short distances, but with a similar behavior for the whole area of the proposed mine. This assumption can be refuted or confirmed

by the rock quality observed in the core trays shown in Figure 13-10.

Figure

13-10: GM19-37 Core Trays (89.5 to 105.5 ft.) – High

Variability in Geotechnical Conditions

Source: GMS, 2020

13.2.5.1

Intact Rock Strength

Physical testing of suitable rock core specimens allows determining the mechanical properties of intact rock required for mine design using rock mass

classification or numerical analysis methods. The IRS is commonly measured in uniaxial compression, point load, indirect tensile, and triaxial compression tests (Brady and Brown, 2004). Usually, a limited (but representative) number of cylindrical

specimens of each rock type should be tested for UCS in a suitable laboratory equipped with a stiff testing machine. A larger number of point load tests can be carried out during the core logging process for orebody delineation. A comprehensive set

of suggested testing methods has been published by the International Society for Rock Mechanics (ISRM) (Brown, 1981; Ulusay and Hudson, 2007).

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 174

May 27, 2026

Golder selected core samples for laboratory testing from six of the 2016–2017 geotechnical core holes.

Samples from one of the 2019 geotechnical core holes were also selected by GMS for laboratory testing. The samples were submitted to Golder’s laboratory in Burnaby, British Columbia.

Point load tests (PLTs) were conducted by Paramount geologists in the core shed after geotechnical logging, in keeping with the ASTM Standard D 5731-07:

Determination of the Point Load Strength Index of Rocks, and Application to Rock Strength Classifications. PLTs were performed at approximately 10-ft intervals down hole.

Table 13-4 provides a summary of the IRS parameters by geotechnical units considering the median depths where the

deposit is located.

Table 13-4: Intact Rock Strength for Geotechnical Units Calculated from PLTs

Geotechnical Unit

H (ft)

Intact Rock

mi*

CS (Mpa)

Ei** (Gpa)

γ(T/m3)

GTU-2 (sandstone/arkose (D=0.5))

492

12.7

116.70

60.2

2.47

984

GTU-2 (sandstone/arkose (D=0))

492

12.7

116.70

60.2

2.47

984

GTU-3 (siltstone (D=0.5))

492

7.0

101.92

46.9

2.49

984

GTU-3 (siltstone (D=0))

492

7.0

101.92

46.9

2.49

984

GTU-4 (tuff (D=0.5))

492

13.0

158.08

57.1

2.44

984

GTU-4 (tuff (D=0))

492

13.0

158.08

57.1

2.44

984

GTU-5 (sinter (D=0.5))

492

13.1

120.92

69.7

2.45

984

GTU-5 (sinter (D=0))

492

13.1

120.92

69.7

2.45

984

GTU- 6 (conglomerate (D=0.5))

492

21.0

90.41

69.45

2.47

984

GTU-6 (Conglomerate (D=0))

492

21.0

90.41

69.45

2.47

984

*

mi: material constant for the intact rock

**

Ei (Gpa): intact rock modulus

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 175

May 27, 2026

13.2.6

Geotechnical Model

The geotechnical model for this Report is the final result of the combination of the geological model, the rock mass fabric descriptions, the rock mass

strengths, and the hydrogeological model. This geotechnical model describes the rock mass units from an engineering perspective through geotechnical domains. Geotechnical domains are zones showing similar geotechnical properties, based on rock type,

rock mass strength, and geological characteristics. In particular, in the Grassy Mountain deposit the geotechnical domains are controlled by the lithology present and its alteration grade as geotechnical units. Seven geotechnical units were

identified:

Cover soil

Sandstone/arkose

Siltstone-mudstone

Tuff

Sinter

Conglomerate

Clay matrix breccia.

Overall, the first layer corresponds to cover soil with a thickness of less than 9.8 ft. Below that is a jointed rock mass mainly composed of a series of

layers of sandstone/arkose, siltstone, tuff, sinter, and conglomerate. The layers do not follow any sequence between geotechnical units, and clay matrix breccia can be located between every geotechnical unit combination around the deposit and,

especially, close to drifts. In general, all the geotechnical units are highly jointed and have strengths between 95–135 Mt/a.

A statistical

analysis was performed to provide the frequency of geotechnical qualities per each geotechnical unit. The RQD, RMR76, and GSI 2013 values are summarized in Table 13-5.

The rock mass quality of the deposit’s geotechnical units does not improve with depth. Around faults/veins, the geotechnical units are in Very

Poor-quality rock with an RMR of less than 30. However, Very Poor-quality rock is not limited to the vicinity of the faults/veins; it is also frequently observed between faults/veins. There is no clear evidence that these zones correspond to the

veins, but the statistical analysis of RMR76 and PLT values indicates that the geotechnical units have a separate population with low values in the approximate location of the faults/veins.

Based on the RMR76 statistics and the current interpretation and correlation with the previous geotechnical analysis conducted, it can be concluded that the

defined geotechnical units are classified as being of Fair to Poor rock quality, represented by an RMR76 of typically less than 48 and a GSI2013 of less than 45.

Core logging data suggest that the generalized Hoek-Brown failure criteria is a suitable method for calculating the rock mass strength parameters for all of

the units, because the majority of the rock mass is considered jointed hard rock material. When RMR values are less than 23, the Hoek-Brown failure criteria are no longer applicable because strength parameters are not strongly dependent on

confinement.

Table 13-5 provides a summary of rock mass strength parameters by geotechnical units considering the

median depths where the deposit is located.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 176

May 27, 2026

Table 13-5: Summary of RQD, RMR76, and GSI 2013 Values by

Geotechnical Unit

Geotechnical

Unit

(GTU)

Description

RQD

RMR76

GSI2013

Weighted

Mean

Weighted

Standard

Deviation

Weighted

Mean

Weighted

Standard

Deviation

Weighted

Mean

Weighted

Standard

Deviation

1

Cover soil

NA

NA

NA

NA

NA

NA

2

Sandstone, arkose

50.3

26.8

48.0

12.7

45.1

21.0

3

Siltstone, mudstone, breccia

41.2

26.8

42.6

12.4

37.4

20.4

4

Tuff

41.7

27.6

41.7

10.2

38.8

22.3

5

Sinter

35.0

30.4

44.7

11.1

37.1

22.0

6

Conglomerate

NA

NA

NA

NA

NA

NA

7

Clay matrix breccia

23.4

28.1

30.1

13.6

18.9

19.3

Note: NA = not applicable.

Table 13-6: Strength Parameters for Geotechnical Units

Geotechnical Unit

H (ft)

Rock Mass

GSI

mb

s

a

s TM

(Mpa)

E H-D2005

(Gpa)

v

C

(kPa)

∅ (°)

GTU-2 (sandstone/arkose (D=0.5))

492

45

0.929

0.0007

0.508

-0.082

6.37

0.26

798

48.0

984

1184

42.8

GTU-2 (sandstone/arkose (D=0))

492

45

1.788

0.0022

0.508

-0.145

13.46

0.26

1075

52.9

984

1542

48.0

GTU-3 (siltstone (D=0.5))

492

37

0.349

0.0002

0.514

-0.066

3.01

0.27

525

38.3

984

777

33.1

GTU-3 (siltstone (D=0))

492

37

0.738

0.0009

0.514

-0.126

6.10

0.27

743

44.5

984

1065

39.3

GTU-4 (tuff (D=0.5))

492

37

0.647

0.0002

0.514

-0.055

3.66

0.27

717

47.2

984

1088

42.0

GTU-4 (tuff (D=0))

492

37

1.370

0.0009

0.514

-0.105

7.42

0.27

987

53.0

984

1453

48.1

GTU-5 (sinter (D=0.5))

492

37

0.652

0.0002

0.514

-0.042

4.47

0.27

646

45.2

984

986

39.9

GTU-5 (sinter (D=0))

492

37

1.381

0.0009

0.514

-0.080

9.06

0.27

875

51.2

984

1308

46.2

GTU- 6 (conglomerate (D=0.5))

492

40

1.206

0.0003

0.511

-0.025

5.34

0.27

706

48.2

984

1099

43.0

GTU-6 (conglomerate (D=0))

492

40

2.464

0.0013

0.511

-0.047

11.09

0.27

916

53.7

984

1410

48.8

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 177

May 27, 2026

13.2.7

Summary of Geotechnical Analysis and Evaluation for Underground Mining

The QP believes the available geotechnical data are adequate for designing the mine openings associated with the estimation of the Grassy Mountain Mineral

Reserves at the current stage. Risks associated with the current level of geotechnical analysis are discussed in Section 22.18, and recommendations for additional work are presented in Section 23.4.

While the rock quality is variable and the deposit is mineable based on the chosen mining method, care must be taken during the execution of the mine plan.

The selected mining method and underground support recommendations are specified in Sections 13.4 and 13.5 of this Report.

As part of the 2026

Feasibility Study Update, GMS reviewed the updated mine planning information, underground mine layouts, mine sequencing information and production schedule provided by RESPEC. Based on the review completed, no material changes were identified that

would require modification of the geotechnical characterization, geotechnical domains, rock mass classifications or geotechnical design assumptions presented in this chapter.

13.3

Hydrogeological modelling

A hydrogeological assessment of the mine site was completed by Lorax Environmental Services (March 2020) in a report titled “Grassy Mountain Gold and

Silver Project Mine Dewatering Hydrogeologic Assessment”, which included baseline reports for groundwater and dewatering analysis. This report is used as the basis for underground dewatering requirements in Section 15.7.3.

13.4

Excavation Design

13.4.1

Mining Method Selection

The selection method assessment was carried out during the 2018 PFS according to the methodology proposed by Nicholas (1981), where the deposit geometry and

the geotechnical parameters are assessed as main parameters. In particular, the methodology provides a ranking of mining methods in order to incorporate economic parameters for the final selection.

The design factors that influence the choice of mining method include:

Orebody geometry (e.g. vein shape, thickness, dip, etc.) and grade distribution within the deposit

Rock mechanics characteristic of the veins, hanging wall, and footwall rock mass

Mining costs and capitalization requirements

Mining rate

Type and availability of mining labor

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 178

May 27, 2026

Environmental concerns

Other site-specific considerations.

The assessment suggested the mechanized cut-and-fill mining method would be most appropriate for the Grassy Mountain Project.

The mechanized cut-and-fill method is highly flexible and can achieve high recovery rates in deposits with complex and flat-dipping geometries, as is the case

at the Grassy Mountain deposit.

As part of the 2026 Feasibility Study Update, the revised underground mine plan, mine layouts, mine sequencing

information and production schedule prepared by RESPEC were reviewed by GMS from a geotechnical perspective. Based on the information provided, no material changes were identified that would affect the suitability of the selected mining method or

require revision of the geotechnical basis of design supporting the mining method selection.

13.4.2

Drift Sizes and Stability Assessments

Preliminary dimensioning was carried out during the 2018 PFS using the empirical design proposed by Mathews (1980). The analysis provided the hydraulic radius

for the maximum drift dimension under 60% stability conditions.

The stability graph is a function of the stability number, which represents the ability

of the rock mass to remain stable under certain operating stress conditions as a function of the hydraulic radius, which represents the geometry of the stope surface. The main concept associated with the stability graph is that the surface size of

an excavation can be related to the strength properties of the rock mass, so as to have an idea of the associated stability or instability.

The rock mass

conditions in the Poor to Fair rock mass range are considered suitable only for a man-entry method where conditions can be well controlled, such as mechanized cut-and-fill.

The current analysis aims to validate the drifts dimensioning defined for the 2020 FS. For that, the Q’ value was obtained from the geotechnical

characterization using RMR76, particularly considering GTU-2 as the most frequent geotechnical unit in the deposit.

Iso-probability contours, which

relate the stability number and the hydraulic radius, were used to calculate drift dimensions stability for stable cases (Figure 13-11; Table 13-7).

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 179

May 27, 2026

Figure

13-11: Iso-Probability Contours for Stable Cases

Source: GMS, 2020; after Mawdesley, 2001

Table 13-7: Iso-Probability Contours for Stable Cases Results

Drift

B–E Walls (Roof) Stable

(%)

H–F Walls (Wall) Stable

(%)

Topcut A

>95

>95

Undercut B

≈90

>95

Undercut C

≈80

>95

The results show that, for the current dimensions, the hanging wall and foot wall would present a probability of stability of

more than 95%, and the back and end walls would present a probability of stability of more than 95% for Topcut A, of around 90% for Undercut B, and of around 80% for Undercut C.

The iso-probability contours for failure cases are shown in Figure 13-12 and Table

13-8.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 180

May 27, 2026

Figure

13-12: Iso-probability contours for failure cases (Mawdesley, 2001)

Source: GMS, 2020

Table 13-8: Iso-Probability Contours for Failure Cases Results

Drift

B–E Walls (Roof)

Failure

(%)

H–F Walls (Wall)

Failure

(%)

Topcut A

<10

<10

Undercut B

<10

<10

Undercut C

~20

<10

The results show that, for the current dimensions, the Hanging and Foot Walls would present a probability of failure of less

than 10%, and the Back and End Walls would present a probability of failure of less than 10% for Topcut A and Undercut B, and of around 20% for Undercut C.

As part of the 2026 Feasibility Study Update, GMS reviewed the updated underground mine plan, mine layouts, mine sequencing information and production

schedule. Based on the review completed, no material changes were identified that would require revision of the excavation design criteria, excavation geometries or geotechnical design assumptions supporting the excavation designs presented herein.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 181

May 27, 2026

13.5

Numerical Modelling

Numerical assessments using RS2 and FLAC3D have been completed to evaluate the extraction sequence, decline ramp and drift stability, stress migration,

potential damage to infrastructure, and subsidence, even though the mine will be at relatively shallow depths (500–900 ft below ground surface).

To

complement empirical methods and validate the support design, a detailed two-dimensional numerical analysis was carried out using the RS2 program (Rocscience, 2020). The purpose of these numerical models is to assess the effect of the in-situ stress

on the excavation and the response of the reinforcement and support elements.

The results for the decline ramp (Figure 13-13) indicate the following:

In general, the maximum principal stress (S1) contours show high compressive stresses at the toe of the walls and

above the roof at 1.6 ft, and a relaxation of stresses in the walls and the bottom.

The minimum principal stress (S3) contours show a complete relaxation of stresses around the walls, the bottom,

and the roof. Therefore, no tensile stress problems are revealed.

The strength factor (SF) is higher than 1.0 around the walls and roof, with only the bottom presenting values

close to 1.0. However, there is a concentration of shear and tension yielding points. Yielding points reach up to 1.3 ft over the roof and 2.6 ft around the walls.

Displacement (D) contours show a maximum >1 cm in the walls and bottom.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 182

May 27, 2026

Figure

13-13: Modeling Results for Decline Ramp; a) Major Principal Stress,

S1; b) Minor Principal Stress, S3; c) Strength Factor, SF; d) Displacements

Source: GMS, 2020

The

results for Topcut A (Figure 13-4) indicate the following:

In general, the maximum principal stress (S1) contours show high compressive stresses on the shoulders and a

relaxation of stresses in the walls, the bottom, and the roof;

The minimum principal stress (S3) contours show a zone with tensile stress on the shoulders and relaxation of

stresses around the walls, the bottom, and the roof. Therefore, no major tensile stress problems are revealed;

The SF is higher than 1.0 around the walls and roof, with only the bottom presenting values close to 1.0.

However, there is a concentration of shear and tension yielding points. Yielding points reach up to 1.2 ft over the roof and 1.0 ft around the walls;

Displacement (D) contours shown a maximum >1 cm in the walls, the bottom, and the roof.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 183

May 27, 2026

Figure

13-14: Modeling Results for Topcut A; a) Major Principal Stress, S1;

b) Minor Principal Stress, S3; c) Strength Factor, SF; d) Displacements

Source: GMS, 2020

The

results for Undercut B (Figure 13-15) indicate the following:

In general, the maximum principal stress (S1) contours show high compressive stresses on the shoulders and a

relaxation of stresses in the walls, the bottom, and the roof.

The minimum principal stress (S3) contours show a zone with tensile stress on the shoulders and a relaxation of

stresses around the walls, the bottom, and the roof. Therefore, no major tensile stress problems are revealed.

The SF is higher than 1.0 around the walls and roof, with only the bottom presenting values close to 1.0.

However, there is a concentration of shear and tension yielding points. Yielding points reach up to 2.0 ft over the roof and 1.2 ft around the walls.

Displacement (D) contours shown a maximum > 1 cm in the walls, the bottom, and the roof.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 184

May 27, 2026

Figure

13-15: Modeling Results for Undercut B; a) Major Principal Stress,

S1; b) Minor Principal Stress, S3; c) Strength Factor, SF; d) Displacements

Source: GMS, 2020

The

results for Undercut C (Figure 13-6) indicate the following:

In general, the maximum principal stress (S1) contours show high compressive stresses on the shoulders and a

relaxation of stresses in the walls, the bottom, and the roof.

The minimum principal stress (S3) contours show a zone with tensile stress on the shoulders and relaxation of

stresses around the walls, the bottom, and the roof. Therefore, no major tensile stress problems are revealed.

The SF is higher than 1.0 around the walls and roof, with only the bottom presenting values close to 1.0.

However, there is a concentration of shear and tension yielding points. Yielding points reach up to 2.5 ft over the roof and the bottom, and 1.2 ft around the walls.

Displacement (D) contours shown a maximum >1 cm in walls, the bottom, and the roof.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 185

May 27, 2026

Figure

13-16: Modeling Results for Undercut C; a) Major Principal Stress,

S1; b) Minor Principal Stress, S3; c) Strength Factor, SF; d) Displacements

Source: GMS, 2020

To

optimize the mine design and mine plan, a three-dimensional model considering finite difference (Figure 13-17) was developed using the Flac 3D v.5.01 Program (Itasca, 2015).

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 186

May 27, 2026

Figure

13-17: Three-Dimensional Model of Finite Difference

Source: GMS, 2020

The model

was developed to perform the parametric analysis of the mine design and mine plan according to the excavation and backfill process for the LOM. In addition, potential caving on surface was assessed using the model results.

Excavation of adjacent drifts could not only result in loss of backfill strength, it could also generate high levels of stress, resulting in rock mass damage

and possible poor excavation performance related to low-strength rock mass. Maintaining at least three horizontal drifts of distance between excavations would help to cut off the horizontal stresses acting across the deposit.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 187

May 27, 2026

Rock mass damage will be particularly prevalent in the excavation intervals located within the fault zones

adjacent to advancing drifts. These cross-cut intervals will need to be well supported during initial development and may need rehabilitation in the more critical closure areas.

In general, the reduction in the mining stresses around excavations is more likely to adversely affect the stability of the areas immediately above the cut

and fill mining areas. The failure modes in these areas are likely to be tensile failure and gravity-induced unravelling. Preventing these types of failure will require high levels of support.

FLAC3D code was specifically used to review the potential for movement along faults and the potential for surface subsidence. The excavation and backfilling

sequences generate accumulated displacements of around 11–15 inches over the levels facing the north orientation of the mine. These displacements are considered the maximums identified in the global excavation of the model and represent a

contour area of at least five levels higher. In spite of the maximum displacements identified, the displacements are expected to be overestimated because the numerical analysis was modelled considering year-by-year excavation that strongly affects

the rock mass displacement values. Therefore, the monthly excavation may present lower displacement values.

Subsidence caused by extraction could cause

dilation or fracturing above the deposit and an increase in hydraulic conductivities and water inflows to the mine. Some level of dilation of fault and joint systems within the Grassy Mountain Formation can be expected as a result of mining. Under

the current extraction sequence, this is expected to occur during the initial stages of mining. The ground surface presents contour displacements of around 0.4–9.8 inches from year 1 to year 5 (increasing in lineal proportion), but from year 5

to year 8, the contour displacements are projected to stabilize at around 9.8 inches.

GMS noted the following:

Based on the prevailing ground conditions in the Poor rock conditions, cut and fill headings are recommended (30

ft wide x 15 ft high maximum dimension stope allowed). These dimensions will ensure that good quality backfill practices can be maintained through tight filling to manage open spans, side wall stability, and ultimately the stability of the mining

area. Smaller spans will require less ground support to ensure that cycle times and productivity are maintained.

The stand-off distance for long-term critical excavations, including decline ramp and ventilation shafts, is

recommended to be 200 ft from the drifts. For permanent foot wall drives, a 100 ft stand-off is recommended.

To ensure stability during

the mine sequence, lateral rock pillars should be wider than three drifts wide. These rock pillars known as Rib Pillar, also maintain control of mining and reduce possible high stress concentrations around the drifts in mining and backfilling

process. This is primarily dictated by the potential range of Fair–Poor rock mass conditions (especially near faulted areas).

GMS considers that

the best approach to manage risk in this environment is to plan a more conservative approach to the drift design and extraction sequence. The high-grade nature of the deposit means that ore recovery is critical to maintaining the grade profile, and

the stability and final recovery of drifts in the variable rock mass could be very challenging.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 188

May 27, 2026

13.5.1

Ground Support

The ground support design considers industry-standard empirical guidelines and GMS’s experience in variable ground conditions. The ground support

philosophy for underground excavations is sprayed concrete lining (fiber-reinforced shotcrete) with bolts installed through the concrete. Sprayed concrete was selected for overall simplicity and speed of application, longevity of surface support,

and sealing of rock blocks that may potentially fall from the roof and walls.

Enhanced ground support for poor ground areas includes the installation of

initial (pre-support), thicker shotcrete, reduced bolting spacing, and Swellex-type bolting. Cable bolts are considered for over-stressed accesses, cross-cuts in cut and fill areas, and drifts under rock mass environments (particularly the roof).

Table 13-9 and Table 13-10 provide the support designs under rock mass and backfill environments, respectively.

Table

13-9: Reinforcement and Support Design for Mine Development Under

Rock Mass Environment

Excavation

Section

(ft)

Bolts

Length(ft)

Bolts

Pattern (ft)

Cable

Bolts (ft)

Cable

Pattern (ft)

Fiber-Reinforced

Shotcrete (Inches)

Mesh (1)

Decline

15

7.9

4.3 x 4.3

No

8.2 x 8.2

4

Yes

Access (top)

15

7.9

19.7

Access (under)

15

7.3

No

No

Topcut A

15

7.9

19.7

Undercut B

20

8.4(2)

19.7

Undercut C

30

9.3(2)

19.7

Note: (1) Galvanized welded wire mesh. (2) Final length should be defined in-situ by geotechnical engineer on site

according to Boltec equipment to use (at this stage was necessary to use 7.9 ft. length as maximum bolt length).

Table

13-10: Reinforcement and Support Design for Mine Development Under

Backfill Environment

Excavation

Section

(ft)

Bolts Length

(ft)

Bolts Pattern

(ft)

Cable Bolts

(ft)

Cable Pattern

(ft)

Fiber-Reinforced

Shotcrete (inches)

Mesh (1)

Topcut A (3)

15

7.3

4.3 x 4.3

No

No

2

No

Undercut B (3)

20

7.5

Undercut C (3)

30

8.0(2)

Note: (1) Galvanized welded wire mesh. (2) Final length should be defined in-situ by geotechnical engineer on site

according to Boltec equipment to use (at this stage was necessary to use 7.9 ft. length as maximum bolt length). (3) Shotcrete and bolts in rock walls (not at CRF roof and/or walls).

Long-standing temporary development, over-stressed accesses, and cross-cuts in closure areas would require some level of rehabilitation. This has been

estimated as at least 30% of cross-cuts (in Poor and Fair–Poor rock conditions). A rehabilitation requirement for permanent development should also be considered and estimated based on the linear feet of development completed in Poor rock

conditions (mainly close to the North fault and the Grassy fault).

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 189

May 27, 2026

13.5.2

Ground Monitoring Program

Due to the rock quality and strength issues summarized in Sections 13.2 and 13.2.7, it will be necessary to install rock stability monitoring instrumentation

in the Grassy Mountain underground workings to monitor the geotechnical behavior of pillars in the different mined areas and backfilled areas. The configuration considers that data collection will be manual and continuous, and its ongoing

interpretation will be the responsibility of the mine operation. The instrumentation may be installed as the lower levels are developed and should focus on measuring the deformations and stresses that may develop during mining operations.

The Grassy Mountain instrumentation program will consider, at least, the following:

Underground monitoring:

Geotechnical inspections and permanent ground control during the operation.

Preparation of procedures for systematic convergence and stress changes measurements.

Topographic monitoring using total station, where the convergence of the decline ramp and drifts development will

be surveyed through the laser scanner.

Deformation monitoring using a tape extensometer, measuring stations every 98 or 164 ft, depending on visual

availability. This monitoring will be correlated with the topographic monitoring.

In-situ stress testing using overcoring. This will indicate those sectors subject to significant changes in

compression or relaxation due to stress redistribution during drift mining. This will be done twice a year by an external service to update the in-situ stress condition.

Surface monitoring:

Visual inspection of settlements and/or cracks on the surface.

Cross-crack measurements, either manual or by wireline extensometer.

Topographic monitoring using total station, where the surface deformation above the mine operation will be

measured monthly through an on-site prism network.

Satellite InSAR monitoring to measure the surface deformation of the general arrangement, especially the possible

subsidence above the underground portion of the mine. This will be an external service performed once a year, and the measures will be correlated with the topographic measuring above the mine.

13.5.3

Global Extraction Sequence

The mine should be programmed with fast drifts advances, keeping the initial support to the excavation face, the reinforcement, and the final support at 40 ft

as the maximum allowed. The backfill should be installed in reverse and according to schedule, to avoid damage from side drifts excavation, that affects its strength and/or its attachment to the bedrock.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 190

May 27, 2026

Special care should be taken of stability as excavations advance in areas where the North and Grassy faults

are present and in the area between them, due to the Poor quality of the rock mass conditions. Sub-parallelism between drifts and these faults result in slow excavations under poor geotechnical conditions with a high risk of instability in roofs and

walls during excavation, according to the trace of the fault. In general, the deposit presents this sub-parallelism condition for the mine design, so it is estimated to be a general operational condition for the mine.

If considered, the presence of a water surface in the upper levels of the mine is an additional variable to the probable instability conditions in the drifts,

so it will be necessary to implement and maintain a rigorous operation.

Compromises have been made in the extraction sequence as a result of the need to

balance grade and production profiles, extraction of wide orebody areas, and other geotechnical constraints. Ultimately, some aspects of the sequence may not be geotechnically optimal, and additional analyses or designs may be required.

13.6

Portal Design

The portal excavation and soft ground tunneling design was initially done by Ausenco during the 2018 PFS and its stability checked by GMS during the

Consolidated Permits stage.

The portal is designed to allow access to the underground mine facilities while providing adequate space for equipment and

vehicles. It will be located uphill and approximately 750 ft south of the primary crusher, at an approximate elevation of 3,749 ft. The portal pad was designed with a 1% inclination toward outside, to allow storm water to flow away from the portal

and toward the storm water drainage ditches. The portal pad will have sufficient space to install the required ventilator infrastructure to be used during the excavation of the decline ramp, construction facilities, and to allow the safe transit of

the development equipment. The pad area was expanded from the initial area designed during the Consolidated Permits process to allow more space for facilities. In addition, the general cut design was updated, increasing the total area of the portal

and the excavation volume.

The portal will have a waste rock excavation volume of 1,120 kft3, which

will be transported and disposed of in the waste rock dump facility designed for the mine operations.

Weak rock mass ground conditions at the portal

require that a shallow box-cut excavation be established to form a suitable face where tunneling can occur. Specialized soft ground tunneling techniques with full rock reinforcement and support will then be required to advance the tunnel for an

approximate 33 ft decline distance, to a point where conventional drill and blast tunneling can begin.

The current design is considered suitable for the

feasibility level. Additional work has been proposed to bring the design to construction level, including a numerical modeling of the excavation sequence to be completed prior to the start of pre-construction. Then, during construction perform site

investigations such as bench geotechnical mapping, portal slope re-design (if necessary), and numerical re-modeling of the excavation.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 191

May 27, 2026

13.7

Grade Control

The grade control will be done by the geologist daily. The geologist will collect samples from all producing stopes and send them to an assay laboratory. The

assay grades will be compared to the anticipated grades in the resource block model to monitor the accuracy of the model and maintain the desired head-grade.

When a production stope gets within two rounds of the design, the stope will go on grade control. When a stope is on grade control, every round must be

sampled before the next round can be drilled. The stope may end prematurely or extend past the design if the assayed grade is below or above the cut-off grade.

13.8

Personnel

Please refer to Section 18.2.2.1 for underground personnel requirements.

13.9

Development Design

13.9.1

Mine Design Parameters

The Grassy Mountain orebody will be accessed using a 15 x 15 ft main decline, developed from a portal on surface. The decline will provide the connection to

all services. The design intent is to have the decline located as close as possible to the mineralization in order to reduce transportation costs but sufficiently removed from mining activities to ensure that the decline is geotechnically stable for

the planned LOM. A summary of the mine design criteria is shown in Table 13-11.

Table

13-11: Mine Design Parameters

Design Parameters

Width (ft)

Height (ft)

Diameter (ft)

Length (ft)

Maximum

Gradient (%)

Decline

15

15

NA

varies

15

Level access

15

15

NA

varies

12.5

Power station

15

15

NA

50

0

Level station

15

15

NA

105

0

Stockpile

15

15

NA

50

0

Sump

15

15

NA

50

12

Truck loading bay

15

15

NA

50

0

Ventilation bay

15

15

NA

varies

0

Ventilation raise

NA

NA

12

varies

vertical

Topcut A

15

15

NA

varies

0

Undercut B

20

15

NA

varies

0

Undercut C

30

15

NA

varies

0

Decline turning radius

NA

NA

100

NA

NA

Note: NA = not applicable.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 192

May 27, 2026

13.9.2

Level Access

The level station will have a standoff distance from the orebody of approximately 300 ft. This distance is determined by the maximum gradient of the level

access of 12.5%, the geometry of accessing five levels for every one level station, and the geometry of the orebody as shown in Figure 13-18. Therefore, the standoff distance of 300 ft varies slightly

depending on these inputs.

Figure

13-18:  Level Access Layout (Looking North)

Source: MDA, 2020 and used unmodified by RESPEC, 2026

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 193

May 27, 2026

13.9.3

Station Design

There are five stations planned for the mine. Each station will access up to five production levels. The stations will be on the following levels: 3420, 3360,

3285, 3210, and 3135. Each station is to be accessed via the decline. Each station will have a truck loading bay, power bay, ventilation access, stockpile, sump, and level access as shown in Figure 13-19.

Figure

13-19: Station Design

Source: MDA, 2020 and used unmodified by RESPEC, 2026.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 194

May 27, 2026

The truck loading bay will be used to load trucks with load–haul–dump (LHD) vehicles. The power

bay will be used to store the mobile load center. The ventilation access will connect on each station via the vent raises. The sump is designed at a -12% gradient and will be used to collect mine water. The stockpile will be used to store material

until it can be loaded into trucks. The level access will provide access to the production stopes.

13.10

Equipment Selection

Mine operations will be based on the usage of mobile mining equipment suitable for underground mines. The estimate of the fleet size was based on first

principles and equipment running-time requirements to achieve the mine production plan. The estimate of the running time for the mine equipment was conducted through the usage of mine-operating factors. Maximum permanent equipment quantities are

summarized in Table 13-12.

Table

13-12: Mining Mobile Equipment List

Mining Mobile Equipment

Model

Quantity

Dual (drill + bolter)

Sandvik DD422i

3

LHD

Sandvik LH307

4

Truck with ejector bed

Sandvik TH320

3

Diamond drilling

Hydracore HC200UG

1

Shotcrete sprayer

GetMan Proshot Concrete Sprayer

1

Shotcrete truck

GetMan ProMix 6

1

Lube truck

Getman A64 SE Lube

1

Water truck

Getman A64 SE Water Sprayer

1

Scissor Lift

Getman A64 SE SL

2

Transportation – Tractor

Kubota 5100

4

Front-end loader

CAT 962H

2

Telehandler

CAT TL1255

2

Dozer

CAT D6T

1

Motor grader

CAT 160

1

4WD twin cab truck

Ford F-350

3

Mine rescue truck

Kovatera KT200

1

13.11

Production and Development Productivity Assumptions

13.11.1

Drilling and Bolting

Production and development drilling and bolting will be done using three Sandvik DD422i as shown in Figure 13-20.

This unit can setup in a heading and bolt the back and then drill the face all in one setup. Drilling and bolting productivities were built up from first principles and vary by heading profile. The results from the first principles are summarized in

Table 13-13 and Table 13-14. The bolting requirements were determined from the geotechnical analysis.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 195

May 27, 2026

Figure

13-20:  Sandvik DD422i

Source: Sandvik website, 2026

Table

13-13:  Drilling First Principles Assumptions

Drilling

Units

Development

15 Topcut

20 Undercut

30 Undercut

Penetration rate

ft/min

4.0

4.0

4.0

4.0

Effective time

%

80

%

80

%

80

%

80

%

Penetration rate

ft/min/eff

3.2

3.2

3.2

3.2

Non-drill time

min

90

90

90

90

Hole length

ft

12

12

12

12

Holes per round

holes

53

50

61

85

Length per round

ft

636

600

732

1,020

Time per round

min/rd

289

278

319

409

Time per round

h/rd

4.8

4.6

5.3

6.8

Operating hours per shift

h

10

10

10

10

Rounds per shift

rd/shift

2.1

2.2

1.9

1.5

tons per round

tons/rd

161

179

239

359

tons per hour

tons/hr

33

39

45

53

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 196

May 27, 2026

Table

13-14:  Bolting First Principles Assumptions

Bolting

Units

Development

15 Topcut

20 Undercut

30 Undercut

Bolting rate

bolts/min

0.2

0.2

0.2

0.2

Effective time

%

80

%

80

%

80

%

80

%

Bolting rate

bolts/min

0.16

0.16

0.16

0.16

Non-bolting time

min

45

45

45

45

Bolts per round

bolts/rd

33

37

43

50

Time per round

min/rd

251

276

314

358

Time per round

h/rd

4.2

4.6

5.2

6.0

Operating hours per shift

h

10

10

10

10

Rounds per shift

rd/shift

2.4

2.2

1.9

1.7

tons per round

tons/rd

161

179

239

359

tons per hour

tons/h

38

39

46

60

13.11.2

Shotcrete

Production and development shotcrete will be sprayed using a GetMan Proshot Concrete Sprayeras shown in

Figure 13-21.

Figure

13-21: GetMan Proshot Concrete Sprayer

Source: Getman website, 2026

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 197

May 27, 2026

The haulage of the shotcrete will be done using a GetMan ProMix 6 as shown in Figure 13-22.

Figure

13-22: GetMan ProMix 6

Source: Getman website, 2026

Shotcrete sprayer productivities were built up from first principles and vary by heading profile. The results from the first principles are summarized in

Table 13-15. The transmixer productivities are based on ton*miles. The distances used for the ton*mile calculation are shown in Figure 13-1.

Table

13-15: Shotcrete First Principals Assumptions

Shotcrete Spray

Units

Development

15 Topcut

20 Undercut

30 Undercut

Shotcrete rate

ft3/min

2.5

2.5

2.5

2.5

Effective time

%

80

%

80

%

80

%

80

%

Shotcrete rate

ft3/min

2

2

2

2

Non-shotcrete time

min

30

30

30

30

Shotcrete per Round

ft3/rd

134

150

167

202

Time per round

min/rd

97

105

114

131

Time per round

h/rd

1.6

1.8

1.9

2.2

Operating hours per shift

H

10

10

10

10

Rounds per shift

rd/shift

6.2

5.7

5.3

4.6

tons per round

tons/rd

161

179

239

359

tons per hour

tons/hr

100

102

126

164

Note: rd = round.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 198

May 27, 2026

Figure

13-23: 3360 Shotcrete Thickness (units in inches)

Source: RESPEC, 2026

The

location and thickness of shotcrete was based on geotechnical recommendations:

All long-term development will receive 4 inches of shotcrete

All access drifts will receive 4 inches of shotcrete

All stope accesses not under backfill will receive 4 inches of shotcrete

All stope accesses under backfill will receive 2 inches of shotcrete on the ribs.

An example of the shotcrete application is shown in Figure 13-23.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 199

May 27, 2026

13.11.3

Blasting

ANFO will be used for most production blasting and development rounds. Boosters, primers, detonators, detonation cord, and other ancillary blasting supplies

will also be required. Explosives will be stored in a secure powder magazine in accordance with current applicable explosives regulations.

Once the

drilling cycle is complete, the blasting agent will be loaded into the holes with the respective nonel blasting cap and booster. The timing of the round with the nonel caps is extremely important as it is critical to pulling the maximum amount of

distance per round.

Blasting will occur on-demand throughout the shift. Before blasting occurs, any affected areas will be cleared of personnel, and the

blasting location will be announced over the mine communication system. After the blast, an appropriate amount of time must pass to provide adequate ventilation to any affected areas before mining can resume. Blasting productivities were built up

from first principles and vary by heading profile. The results from the first principles are summarized inTable 13-16.

Table

13-16: Blasting First Principles Assumptions

Blasting

Units

Development

15 Topcut

20 Undercut

30 Undercut

Loading rate

ft/min

8

8

8

8

Effective time

%

80

%

80

%

80

%

80

%

Loading rate

ft/min

6.4

6.4

6.4

6.4

Non-blasting time

min

30

30

30

30

Hole length

ft

11

11

11

11

Holes per round

Holes

52

49

60

84

Length per round

ft

546

515

630

882

Time per round

min/rd

115

110

128

168

Time per round

h/rd

1.9

1.8

2.1

2.8

Operating hours per shift

h

10

10

10

10

Rounds per shift

rd/shift

5.2

5.4

4.7

3.6

tons per round

tons/rd

161

179

239

359

tons per hour

tons/h

84

97

112

128

13.11.

4 Mucking

The Sandvik LH307 underground loader as shown in Figure 13-25 with a nominal 4.8 cubic yard bucket capacity will be

used for all underground loading activities.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 200

May 27, 2026

Figure

13-24: Sandvik LH307 Underground Loader

Source: Sandvik website, 2026

Backfill placement will also be done using the same loader except the bucket will be replaced with a push plate. The blasted material will be transported to

the underground stockpile located on the level station using the loader. The material will then be loaded into haul trucks at the truck loading bay using the same loader. The material will then be transported to surface. The truck loading bay

intersection will be excavated to a height of 16 ft to provide clearance to load the trucks.

13.11.5

Hauling

The haulage fleet will use Sandvik TH320 trucks as shown in Figure 13-26.

Figure

13-25: Sandvik TH320 trucks

Source: Sandvik website, 2026

The Sandvik TH320 AT AD22 truck is a conventional low-profile underground-mining trucks. The haul trucks will be equipped with an ejector bed for the use of

dumping backfill in the headings. Trucks will be loaded at the truck loading bay. The trucks will transport the material to surface. Once unloaded on the surface, the trucks will be loaded at the backfill plant on surface and haul the backfill

underground to a location that is undergoing backfilling.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 201

May 27, 2026

Hauling productivities were built up from first principles. The results from the first principles are

summarized in Table 13-19.

Table

13-17: Haulage First Principles Assumptions

Haulage

Unit

Development

15 Topcut

20 Undercut

30 Undercut

Truck Size

tons

30

30

30

30

Average Haul Dist One Way

ft

9,940

9,940

9,940

9,940

Average Haul Dist One Way

miles

1.90

1.90

1.90

1.90

Average Haul Dist Round Trip

miles

3.80

3.80

3.80

3.80

Average Speed

mph

6

6

6

6

Time for 1 trip

h

0.63

0.63

0.63

0.63

Number of Trips Per Round

trips/rd

6.00

6.00

8.00

12.00

Time Per Round

min/rd

228

228

304

456

Time Per Round

h/rd

3.8

3.8

5.1

7.6

Operating Hours Per Shift

H

10

10

10

10

Rounds Per Shift

rd/shift

2.6

2.6

2.0

1.3

tons Per Round

tons/rd

161

179

239

359

tons Per Hour

tons/h

42

47

47

47

tons*Mile Per Hour

tons*miles/h

180

180

180

180

Ore that is hauled to surface will be placed in the ore stockpile. A front-end surface loader will feed the ore from the

stockpile into the primary crusher. Waste rock hauled to surface will be dumped at a waste-rock storage facility. The tonnage of waste hauled to surface over the LOM is summarized in Figure 13-28. This waste

will be fully utilized over the mine life as cemented rock-fill material, reducing the total amount of borrow material required over the mine life.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 202

May 27, 2026

Figure

13-26: Waste Haulage by Year

Source: RESPEC, 2026

13.11.6

Backfilling

Stopes are planned to be backfilled with CRF that will provide confinement on the stope walls.

The backfill method was selected based on the geological and geotechnical conditions of the deposit, as well as the selected mechanized cut and fill mining

method. The main objectives of the backfill is to provide stability to the drifts and to control dilution associated with ore extraction.

Rock from a

borrow pit close to the mine will be used as aggregate. An LHD equipped with a jamming boom and push plate will be used to place the CRF into the drifts.

Laboratory tests were conducted to define the CRF strength. For that, a testing plan was prepared for 12 CRF samples. The entire program involved different

phases such as:

Sieve analysis of the aggregate

Mixing of samples with two different compositions

Casting or molds preparation

Curing process

Mechanical properties measurements: laboratory testing.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 203

May 27, 2026

The sieve analysis of the aggregate was conducted by PACS Laboratory. Approximately 1,392 kg of GM-1mix and

1,392 kg of GM-2 mix were sieved separately and entirely. The aggregate was tested in the “as received” moisture content condition with no drying or washing. Testing was conducted in general accordance with ASTM D-422 Particle Size

Analyses of Soils and as specified by the testing plan on the following sieves:

3 inch (75 mm)

2 inch (50 mm)

1 1⁄2 inch (37.5 mm)

1 inch (25.0 mm)

3⁄8 inch (19.0 mm)

3⁄8 inch (9.5 mm)

Number 4 (4.75 mm)

Number 10 (2.0 mm).

The aggregate used was compared using Talbot grading. The material used was rock Basalt from a borrow pit near the mine. The material was crushed to less than

4” and sent to MetaRock Laboratories in two (2) bag packages. The results show that the distribution is similar to the Talbot grading. Talbot and Richard (1923) proposed a general equation for combined (fine and coarse) regularly

graded aggregate. Swan (1995) suggested that the Talbot grading equation can be used to make an optimal grading of waste rock for CRF design.

In

general, for a CRF application, a particle size >10 mm is classified as a coarse aggregate, while a particle size of <10 mm is defined as a fine aggregate.

The UCS testing program included 12 samples with a diameter of approximately eight inches and an approximate length of 16 inches. The design cement

percentages were 5% and 7%, both proper percentages used for CRF backfill in mining industry. The design curing times were 14 and 28 days, according to the standard curing time for concrete. Table 13-20

summarizes the CRF mix recipe prepared for UCS testing.

Table

13-18: CRF Mix Recipe for UCS Testing

Mix ID

GM-1

GM-2

Aggregate size

<2 mm to 51 mm

<2 mm to 51 mm

Cement % by weight

5

7

Aggregate for 2.79 ft3 CRF (lb) (material

from Sample 2, under 2 inches)

313.80

313.80

Sand for 2.79 ft3 CRF (lb) (fine material

from Sample 2, under 10 mesh)

47.07

43.93

Cement for 2.79 ft3 CRF (lb)

18.04

25.04

Water for 2.79 ft3 CRF (gal) (water/cement =

1.2)

2.59

3.60

Estimate fresh CRF mix density

(g/cm3)

2.30

2.37

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 204

May 27, 2026

The mixing, casting and curing processes are shown in Figure 13-29.

Figure 13-27: Mixing, Casting and Curing Process

Note: MetaRock Laboratories, 2020 (Rock Mechanics Testing Report for – CRF Testing. Houston, Texas).

The following CRF capacities and strength results were obtained (Figure 13-30):

3.9 to 5.3 MPa of CRF strength with 7% of cement content and 14 days of curing

5.2 to 6.1 MPa of CRF strength with 7% of cement content and 28 days of curing

1.8 to 2.4 MPa of CRF strength with 5% of cement content and 14 days of curing

3.0 to 3.2 MPa of CRF strength with 5% of cement content and 28 days of curing.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 205

May 27, 2026

Figure

13-28: UCS Results vs Curing Time

Source: MetaRock Laboratories, 2020 (Rock Mechanics Testing Report for – CRF Testing. Houston, Texas).

Samples with low fines content and large particle concentration, which make rock contact possible, produce a weak zone of failure. A large particle size

concentration can sometimes reduce the strength of CRF. A good relationship between sample density and strength was also found; therefore, a denser CRF with a low content of large particle sizes could have higher strengths.

Future work is required to assess the response of samples composed of 3% cement and 2% fly ash, and 4% cement and 3% fly ash, in order to compare these test

results with the results of 5% and 7% cement, respectively.

As part of the 2026 Feasibility Study Update, GMS reviewed the updated mine layouts,

extraction sequencing and production schedule provided by RESPEC. Based on the review completed, no material changes were identified that would require modification of the backfill design criteria, backfill performance assumptions or backfill

sequencing strategy presented in this section.

13.11.7

Backfill Plant

An Simem WB100 backfill plant, as shown in Figure 13-29, will be constructed near the portal.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 206

May 27, 2026

Figure

13-29: Simem WB100 Backfill Plant

Source: SIMEM, 2026

The

waste rock from underground operations will be used for CRF. Additional rock will be excavated and crushed from the surface borrow area. Cement and other supplies will be provided by local suppliers. The plant will produce approximately 3.27 cubic

yards per batch and will require 2 minutes per batch or approx. 2,970 tons per day. The maximum amount of backfill required on a single day in the mine plan is 1,200 tons. The plant is oversized to ensure that the backfill plant will not be a bottle

neck in the mining operation. This plant will also meet the requirement of shotcrete for ground support.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 207

May 27, 2026

It is assumed that the truck haulage fleet will get loaded with material underground and haul the material to

surface. After the haul truck dumps the material on surface the haul truck will be loaded on surface with backfill. Each truck will require four batches of backfill from the backfill plant to be fully loaded. The haul truck will haul the backfill

underground and place it in a backfilling location. To summarize, the haul trucks will be loaded with underground material on the way out of the mine and be loaded with backfill on the way into the mine. This is referred to as

“round-haul”. The backfilling assumptions are the same as the haulage assumptions in table 13-20.

13.11.8

Production Scheduling

The scheduling approach utilizes following production calendar, rates, and limits. These resources were assigned to each mining tasks and mine schedule was

developed utilizing these parameters. The calendars applied, production rates, and production limits are shown in tables below.

Table

13-19: Calendars by Crew

Crew

Hours Per Day

Days Per Week

Production mining

24

Mon–Thurs (4)

Production backfilling

24

Mon–Thurs (4)

Contractor development

24

Mon–Sun (7)

Contractor raise bore

24

Mon–Sun (7)

Table

13-20: Production Rates

Name

Quantity

Unit

Lateral development rate

18

ft/d

Vertical development rate

2

ft/d

Production rate

30

ft/d

Backfill rate

800

t/d

Limits were placed on production fields. The limits were based on the first-principle productivity rates, and the mill

capacity and the shotcrete plant capacity. The limits are shown in Table 13-21.

Table

13-21: Production Limits on Production Fields

Production Field

Limit

Unit

Economic material

1,600

t/d

Truck haulage

65,500

ton*mile/month

Transmixer haulage

5,500

ton*mile/month

Drill and Bolter equipment hours

72

h/d

Mucking equipment hours

96

h/d

Blasting equipment hours

24

h/d

Shotcrete sprayer equipment hours

24

h/d

Shotcrete volume

1,100

cubic ft/d

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 208

May 27, 2026

13.12

Underground Infrastructure and Services

13.12.1

Ventilation

The ventilation network was designed to comply with U.S. ventilation standards for underground mines (Code of Federal Regulations/Title 30. Underground metal

and nonmetal mines. Washington, DC: U.S. Government Printing Office, Office of the Federal Register). Regulatory concentrations for gases are specified by the 1973 American Conference of Industrial Hygienists (ACGIH) threshold limit values (TLVs)

[71 Fed. Reg. 3 28924 (2006)]. For diesel particular matter (DPM), a permissible exposure limit (PEL) of 160 µg/m3 total carbon is specified in the U.S. diesel rule for metal/nonmetal mines

(71 Fed. Reg. 28924 (2006)).

The Mine Safety and Health Administration (MSHA) sets an airflow requirement for the dilution of gas emissions, and an

additional airflow requirement for dilution of DPM. These values are published with the list of approved engines on MSHA’s internet website. Airflow of 100,000 cubic feet per minute (cfm) was selected as a minimum reference for the ventilation

design of each level to meet the MSHA ventilation standards. A mine ventilation network design was built using the VentSim software package as shown in Figure 13-31 and Figure

13-32.

As part of the 2026 Feasibility Study Update, RESPEC reviewed the updated mine layouts and production

schedule. Based on the review completed, no material changes were identified that would require modification of the ventilation requirements and system presented in this section.

Figure

13-30: Ventilation Network (isometric view looking west)

Note: No modifications made in 2026 FS update. Source: MDA, 2020

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 209

May 27, 2026

Figure

13-31: Ventilation Network (Section View Looking Northwest)

Note: No modification made in 2026 FS update. Source: MDA, 2020

Figure

13-32: Surface Ventilation Fan (Section View)

Source: Spendrup, 2026

Required airflows were determined at multiple stages during the mine life, using equipment numbers and utilization rates, specific engine types and exhaust

output, and the number of personnel expected to be working underground. The designed ventilation system includes the following parameters:

Main fan total pressure of 12 inches of water gauge

Main fan air flow of 467,000 cfm

Main fan power of 500 hp

Each active level air flow of 100,000 cfm

Only three active levels at any given time

Air density of 0.0722 lb/ft3.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 210

May 27, 2026

The planned ventilation will use a push/pull system and will require one exhaust fan on surface. A raise bore

will be used to construct ventilation raises between level stations and connecting to the surface fans as shown in Figure 13-34.

Figure

13-33: Design of Vent Raises

Source: MDA, 2020 and modified by RESPEC in 2026.

Each vent raise will have a diameter of 12 ft. Each raise will be steel lined and have an escape ladder. Auxiliary fans will take air from the main circuit

and push the air to the working face on the level using vent ducting and vent bag. Each level will have an auxiliary fan at the level station.

13.12.2

Underground Dewatering

Water will be needed for underground production drilling, bolting, shotcrete, and diamond drilling. The required LOM water supply has been estimated based on

the mine-equipment requirements as summarized in Table 13-24.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 211

May 27, 2026

Table

13-22:  Estimated Underground LOM Water Requirement

Equipment

Quantity

Water Requirements (gpm)

Operational Factors

Water Required (gpm)

Sandvik DD422i Drill

3

49

70%

103

Diamond Drill

1

20

70%

14

GetMan Proshot Concrete Sprayer

1

10

70%

7

Total Required

124

Factor

20%

Total with factor

150

Water at the face will be pumped to the station sump. From the station sump the water will either be used for equipment water

supply or pumped out to the plant for use in the process circuit. When used for equipment water supply, the sediments will be removed at the station sump. Excess water at the station sump will be pumped up to the next station sump. The water will

continue to be pumped up to the next station until it is pumped out of the mine

The connection between sumps will be a steel pipe in the ventilation

raise. The report titled “Grassy Mountain Gold and Silver Project Mine Dewatering Hydrogeologic Assessment” by Lorax Environmental Services (March, 2020) states the following: “The total estimated range of inflow rates is 12 US

gpm to 78 US gpm.” The dewatering system was designed for 250 gpm which will accommodate both the max inflow rates (78 gpm) and the equipment water requirements rates (150 gpm) in the event that water is not recirculated to the

equipment.

13.12.3

Underground Power

An underground 480 V transformer will be placed near the entrance to the portal at the start of mining. This will supply power to electrical equipment used to

develop the main decline and to portable fans. A main power line will be installed along the rib of the decline to carry 1.4 kV when development has advanced far enough that carrying power at 480 V becomes too inefficient. This line will be

connected to a transformer that will be moved underground. Line power will also be extended to the locations of the two ventilation shafts to supply power to the ventilation fans.

Both transformers will be placed underground in power bays. The transformers will be moved to other power bays depending on the location of the mining

activities.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 212

May 27, 2026

Figure

13-34: Mine Load Center (1000 kVA)

Source: Intermountain Electronics, Inc., 2026

13.12.4

Underground Communications

Inside the mine, a leaky-feeder very high frequency (VHF) radio system will be used as the primary means of communication. The system will allow for

communications between the underground mine and surface operations.

13.12.5

Underground Refuge and Escape Ways

Two emergency refuge stations will be necessary in case of fire or rockfalls that would block access and prevent full evacuation of personnel. These refuges

will allow the staff to remain safe in the underground mine for 36 hours. The refuge stations are mobile, each can accommodate up to 16 people within the protected chamber. They will be located strategically from where the mine operation personnel

are located. Figure 13-36 shows an example of a refuge station.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 213

May 27, 2026

Figure

13-35: Mobile Refuge Station

Note: Sixteen-person units are used for the 2026 update. Source: MDA, 2020, after MineARC, 2020

All vent raises will be steel lined and equipped with an escape way ladder for secondary evacuation. The primary route for evacuation will be the decline. The

secondary route for evacuation will be the vent raises.

13.13

Mining Costs

Mining costs are summarized in Section 18.

13.14

Life-of-Mine Production

The QP used the Proven and Probable Mineral Reserves to create a mining production schedule using Deswik Scheduler, which allows for the scheduling of both

underground development and production. The primary inputs used to develop the schedule include:

The resource block model with defined material types

Development centerlines drawn in the direction of mining

Solids representing the stopes or production areas to be mined

Attributes to define activity types, material types, profiles, etc.

Mining sequence among developments and production areas

Development and production rates by location

Definition of the periods to be used.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 214

May 27, 2026

The naming convention for material types considered either ore or waste. Ore was assigned to two categories

based on grade: high-grade or low-grade. High-grade is material that is above the economic cut-off grade. Low-grade is material that is below the mining economic cut-off grade, but above the mill cut-off grade. The basic assumption is that a stope

that is economic to be mined will be processed in its entirety. Thus, if internal waste in an economic stope is classified as Measured or Indicated Mineral Resources, these resources will be converted to Proven or Probable Mineral Reserves,

respectively, and will contribute to the revenue stream.

Waste comprises:

Material classified as Measured or Indicated Mineral Resources that is below both the mining cut-off grade and

the mill cut-off grade.

Material classified as Inferred Mineral Resources.

Waste is considered to be internal dilution within a stope, which would be mined and sent to the process plant. All waste material is considered to have zero

grade and therefore does not contribute to the revenue steam.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 215

May 27, 2026

The final production schedule was calculated in Deswik Scheduler and then summarized in Excel. The mine

production summary is presented in Table 13-25. The material to be sent to the mill is summarized in Table 13-26. The development schedule is summarized in Table 13-27.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 216

May 27, 2026

Table

13-23: Mine Production Summary

Year

0

1

2

3

4

5

6

7

8

9

10

Total

Mined Measured and Indicated Resource Above Cut-off Gradetons (tons x 1,000)

3

183

240

226

32

225

203

258

199

196

15

1,980

Grade (oz Au/ton)

0.277

0.187

0.217

0.208

0.217

0.217

0.234

0.174

0.158

0.181

0.126

0.199

Ounces (oz Au x 1,000)

1

34

52

47

50

49

48

45

31

36

2

395

Grade (oz Ag/ton)

0.282

0.264

0.292

0.273

0.312

0.294

0.279

0.319

0.308

0.314

0.255

0.295

Ounces (oz Ag x 1000)

1

48

70

62

72

66

57

82

61

62

4

585

Mined Measured and Indicated Resource Subgradetons (tons x 1,000)

2

29

30

29

33

26

20

22

19

15

1

226

Grade (oz Au/ton)

0.033

0.047

0.046

0.045

0.043

0.046

0.048

0.048

0.053

0.047

0.048

0.046

Ounces (oz Au x 1,000)

0

1

1

1

1

1

1

1

1

1

0

11

Grade (oz Ag/ton)

0.212

0.161

0.180

0.153

0.153

0.168

0.173

0.204

0.195

0.196

0.181

0.173

Ounces (oz Ag x 1000)

0

5

5

4

5

4

3

5

4

3

0

39

Total Mined to Stockpiletons (tons x 1,000)

5

212

269

255

265

251

223

280

217

212

17

2,207

Grade (oz Au/ton)

0.172

0.168

0.199

0.189

0.195

0.199

0.218

0.164

0.149

0.171

0.119

0.184

Ounces (oz Au x 1,000)

1

36

53

48

52

50

49

46

32

36

2

405

Grade (oz Ag/ton)

0.252

0.250

0.280

0.259

0.292

0.281

0.269

0.310

0.299

0.305

0.249

0.283

Ounces (oz Ag x 1000)

1

53

75

66

77

71

60

87

65

65

4

624

Total with Ore Loss & Dilutiontons (tons x 1,000)

5

226

287

272

284

265

240

298

234

227

19

2,358

Grade (oz Au/ton)

0.167

0.163

0.191

0.182

0.187

0.193

0.207

0.159

0.144

0.165

0.111

0.177

Ounces (oz Au x 1,000)

1

37

55

50

53

51

50

47

34

37

2

417

Grade (oz Ag/ton)

0.254

0.246

0.274

0.254

0.283

0.278

0.261

0.305

0.291

0.299

0.235

0.277

Ounces (oz Ag x 1000)

1

56

79

69

80

74

63

91

68

68

4

653

Waste

Waste tons (t x 1,000)

64

76

14

3

25

16

22

12

6

4

242

Backfill

Cemented Rockfill tons (tons x 1,000)

1

124

196

215

149

209

185

226

174

146

19

1,645

Footage

Lateral Footage (ft)

4,367

17,814

17,178

14,873

15,949

14,146

12,960

17,107

12,436

11,636

1,010

139,477

Vertical Footage (ft)

260

402

662

Total Footage (ft)

4,627

18,216

17,178

14,873

15,949

14,146

12,960

17,107

12,436

11,636

1,010

140,139

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 217

May 27, 2026

Table

13-24: Material to the Mill

Year

0

1

2

3

4

5

6

7

8

9

10

Total

Low-Grade Material

tons (tons x 1,000)

2

31

31

31

35

28

21

23

20

17

2

242

Grade (oz Au/ton)

0.035

0.047

0.047

0.047

0.044

0.048

0.048

0.050

0.053

0.047

0.049

0.047

Ounces (oz Au x 1,000)

0

1

1

1

2

1

1

1

1

1

0

11

Grade (oz Ag/ton)

0.216

0.156

0.178

0.155

0.150

0.171

0.170

0.206

0.186

0.190

0.179

0.171

Ounces (oz Ag x 1000)

0

5

6

5

5

5

4

5

4

3

0

41

High-Grade Material

tons (tons x 1,000)

3

195

256

241

249

237

219

275

213

210

17

2,116

Grade (oz Au/ton)

0.267

0.181

0.209

0.200

0.207

0.211

0.222

0.168

0.152

0.174

0.117

0.191

Ounces (oz Au x 1,000)

1

35

53

48

52

50

49

46

32

37

2

405

Grade (oz Ag/ton)

0.283

0.260

0.286

0.267

0.302

0.291

0.270

0.313

0.301

0.308

0.240

0.289

Ounces (oz Ag x 1000)

1

51

73

64

75

69

59

86

64

65

4

612

Total to Plant

tons (tons x 1,000)

5

226

287

272

284

265

240

298

234

227

19

2,358

Grade (oz Au/ton)

0.167

0.163

0.191

0.182

0.187

0.193

0.207

0.159

0.144

0.165

0.111

0.177

Ounces (oz Au x 1,000)

1

37

55

50

53

51

50

47

34

37

2

417

Grade (oz Ag/ton)

0.254

0.246

0.274

0.254

0.283

0.278

0.261

0.305

0.291

0.299

0.235

0.277

Ounces (oz Ag x 1000)

1

56

79

69

80

74

63

91

68

68

4

653

Table

13-25: Development Schedule

Year

-

1

2

3

4

5

6

7

8

9

10

Total

Development Type

Main Decline (ft)

3,084

2,057

5,141

Level Station (ft)

368

909

1,277

Level Development Waste (ft)

244

1,341

849

181

1,511

917

1,340

733

362

235

7,715

Level Development Ore (ft)

298

13,081

16,329

14,692

14,438

13,229

11,620

16,373

12,074

11,401

1,010

124,546

Vent Drift (ft)

374

424

798

Vent Raise (ft)

260

402

662

Total Development (ft)

4,627

18,216

17,178

14,873

15,949

14,146

12,960

17,107

12,436

11,636

1,010

140,139

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 218

May 27, 2026

Figure 13-36 and Figure 13-37

show the proposed yearly production schedule in terms of tons and gold and silver ounces for the LOM.

Figure

13-36: Proposed Mine Production Schedule (tons by period)

Source: RESPEC, 2026

Figure

13-37: Mine Production Schedule (ounces by period)

Source: RESPEC, 2026

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 219

May 27, 2026

14

PROCESSING AND RECOVERY METHODS

14.1

Introduction

Based on the information and metallurgical test results summarized in Section 10, the Grassy Mountain gold–silver mineralization is considered

amenable to cyanide leaching as a recovery method. The process plant will consist of a 750 tons/day, two-stage crushing, ball mill, carbon-in-leach (CIL), elution, and electrowinning circuit, all of which are well-known, conventional, processing

unit operations.

14.2

Process Design Criteria

The process plant is designed for treatment of 750 tons/day or 34 tons/hour based on an availability of 7,998 hours per annum or 91.3%. The crushing section

design is set at 70% availability, and the gold room availability is set at 52 weeks per year including two operating days and one smelting day per week. The plant is designed to operate with two 12-h shifts per day, 365 days per year, and

will produce doré bars.

Key design parameters derived from metallurgical testwork, as well as the resulting sizing parameters of major equipment,

are shown in Table 14-1.

Table

14-1: Process Design Criteria

Description

Units

Value

Plant throughput

tons/year

273,750

Mine life

years

7.8

LOM average grade, Au

oz/ton

0.177

LOM average grade, Ag

oz/ton

0.277

Design grade, Au

oz/ton

0.178

Design grade, Ag (corresponding to design grade for Au)

oz/ton

0.275

Operating Schedule and Stockpile

Crusher availability

%

70

Plant availability (milling and leach)

%

91.3

Crusher operating time

hours/year

6,132

Plant operating time

hours/year

7,998

Gold room operating days

days/year

104

Gold room smelting days

days/year

52

Stockpile type

Conical

Stockpile repose angle

°

37

Stockpile retention time

hours

24

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 220

May 27, 2026

Description

Units

Value

Ore Properties

Specific gravity (average)

2.6

JK Axb (25th percentile)

30.4

Bond rod work index (BRWi) (75th

percentile)

kWh/ton

22.3

Bond ball work index (BBWi) (75th

percentile)

kWh/ton

26.9

Bond abrasion index (Ai) (average)

g

0.641

Primary Crushing

Throughput, nominal

tons/hour

45

Primary crusher type

Jaw

Primary crusher model

Metso C80 or

equivalent

Closed size setting

inches

2.0

Feed size, F80

inches

8.3

Crushing product, P80

inches

1.9

Secondary Crushing

Circulating load, nominal

%

263

Secondary crusher type

Cone

Secondary crusher model

Metso HP200

or equivalent

Closed size setting

inches

0.6

Feed size, F80

inches

1.6

Milling and Classification

Throughput, nominal

tons/hour

34.2

Ball mill dimensions (diameter x effective grinding length)

Ø x EGL

(ft)

12 x 16

Ball mill required power

horsepower

1,021

Ball mill installed power

horsepower

1,341

Ball mill product P80

mesh (µm)

150(106)

Circulating load, max for design

%

350

Cyclone overflow solids

%

45

Carbon-In-Leach

Total leach time required

hours

24

Total leach time available

hours

27

Number of tanks

number

1 pre-aeration

+ 2

leaching + 7

adsorption

Cyanide addition

lb/ton

0.68

Lime addition

lb/ton

2.1

Carbon concentration

lb/gallon

0.21

Carbon loading (Au + Ag)

oz/ton

214

Carbon consumption

lb/ton

0.06

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 221

May 27, 2026

Description

Units

Value

Desorption/Electrowinning/Refining

Elution method

Pressure Zadra

Carbon batch size

ton

2.2

Elution cycles per week

number

7

Furnace capacity, Au + Ag

lb/smelt

57.5

Cyanide Destruction

Cyanide reduction system

SO2 /air

Residence time, max for design

minutes

90

CNWAD in feed, maximum for design

ppm

200

CNWAD discharge, not to exceed

ppm

30

CNWAD discharge target for design

ppm

15

SO2 addition

lb/lb CNWAD

6.4

Hydrated lime addition

lb/lb CNWAD

10.8

Cu addition

lb/lb CNWAD

0.11

14.3

Process Flowsheet Development

The process flowsheet was developed based on information from the metallurgical testwork as outlined in Section 10. The crushing and grinding circuit

sizing were determined using Bruno and Ausgrind (Ausenco’s in-house power-based comminution model) simulations, respectively. The flowsheet developed previously was modified to a simpler, lower capital cost alternative comprising:

two-stage crushing circuit

grinding circuit

hybrid leach-CIL circuit with pre-aeration

mercury removal circuit

cyanide destruction.

The simplified overall flowsheet is shown in Figure 14-1. The plant site layout is shown in Figure 14-2.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 222

May 27, 2026

Figure

14-1:  Simplified Overall Flowsheet

Source: Ausenco, 2020.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 223

May 27, 2026

Figure

14-2: Proposed Plant Site Layout

Source: Ausenco, 2020.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 224

May 27, 2026

14.4

Overall Process Description

The plant feed will be hauled from the underground mine to a mobile crushing facility that will include a jaw crusher as the primary stage and a cone crusher

for secondary size reduction. The crushed ore will be ground by a ball mill in closed circuit with a hydrocyclone cluster. The hydrocyclone overflow with P80 of 150 mesh (106 µm) will

flow to a leach-CIL recovery circuit via a pre-aeration tank.

Gold and silver leached in the CIL circuit will be recovered onto activated carbon and

eluted in a pressure Zadra-style elution circuit and then precipitated by electrowinning in the gold room. The gold-silver precipitate will be dried in a mercury retort and then mixed with fluxes and smelted in a furnace to pour doré bars.

Carbon will be re-activated in a carbon regeneration kiln before being returned to the CIL circuit. Mercury is collected and shipped off site for third party storage.

CIL tailings will be treated for cyanide destruction prior to pumping to the TSF for disposal.

14.4.1

Crushing Circuit

The crushing facility will be a two-stage crushing circuit that will process the run-of-mine (ROM) ore at an average rate of 45 tons/hour. The major

equipment and facilities at the ROM receiving and crushing areas will include:

ore stockpile

ROM hopper

vibrating pan feeder

primary jaw crusher

coarse ore screen

secondary crusher surge bin

secondary crusher vibrating feeder

secondary cone crusher

fine ore bin

feed and product conveyors.

Ore will be trucked from underground and dumped directly into the ROM hopper or onto the outdoor stockpile during crushing circuit downtime. A front-end

loader will reclaim ore from the stockpile and move it to the ROM hopper as necessary.

The ROM hopper will continuously feed a vibrating pan feeder which

will discharge into the primary jaw crusher. After primary crushing, the ore conveyor will bring the ore to a coarse ore screen. A belt magnet at the end of the ore conveyor will be present to prevent pieces of metal from continuing onto the coarse

ore screen.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 225

May 27, 2026

Oversize from this screen will be transferred by the secondary crusher feed conveyor to the secondary crusher

surge bin. This conveyor will be fitted with a metal detector for the secondary crushing circuit to be temporarily shut down for tramp metal removal. Ore from the secondary crusher surge bin will pass over the second crusher vibrating feeder and

into the secondary crusher. After secondary crushing, the ore will recirculate to the coarse ore screen in combination with ore from the primary jaw crusher via the ore conveyor.

Undersize from the coarse ore screen will be taken by the product conveyor to the fine ore bin. The product conveyor will have a weightometer to monitor the

crushing circuit throughput.

The fine ore bin discharge feeder will feed ore from the fine ore bin onto the ball mill feed conveyor and over to the

grinding circuit and will be fitted with a weightometer to provide data for feed-rate control to the grinding circuit.

14.4.2

Grinding Circuit

The grinding circuit will have an average feed rate of 34.2 tons/hour and will consist of a ball mill and a cyclone cluster in a closed circuit. The

recirculating load will have a maximum of 350%. The grinding circuit will be designed for a product size P80 of 150 mesh (106 µm). The major equipment in the primary grinding circuit will

include:

one 12-ft diameter (inside shell) by 16-ft effective grinding length (EGL) single-pinion ball mill driven by a

single 1,341 hp fixed-speed drive motor; and

one cyclone cluster.

As required, steel balls will be added into the ball mill using a ball bucket and ball charging chute to maintain grinding efficiency.

Crushed ore will travel along the ball mill feed conveyor and discharge directly into the ball mill via the mill feed chute. Process water will be added to

reach a pulp density of 72% solids (by weight) through the ball mill, which will then discharge to the cyclone feed pump box. Trash or broken mill balls will be discharged to a scats bunker and removed by a front-end loader. Additional process water

will be added to the cyclone feed pump box to achieve a density of 63.5% w/w solids, which will then be pumped to the cyclone cluster. The cyclone underflow will recirculate to the mill feed chute. The cyclone overflow will discharge at

45% w/w solids and report to a trash screen. Trash screen oversize will be sent to a trash bin. The slurry will then flow by gravity to the pre-aeration tank.

Maintenance activities in the grinding and classification area will be serviced by a mill area crane, and a grinding area hoist, which will be used for ball

mill charging duties and minor lifts. Spillages in the grinding and classification area will be pumped by the grinding area sump pump into the cyclone feed pump box.

14.4.3

Leach/CIL

A pre-aeration tank is included ahead of the leach circuit, as testwork showed this reduced consumption of cyanide and improved recovery. Testwork determined

that the optimal leach residence time for gold is 24 hours.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 226

May 27, 2026

The adsorption circuit configuration selected was a hybrid leach–CIL circuit (two leach, seven CIL

tanks). This circuit configuration is beneficial as it achieves higher loadings of gold on carbon (gold is fast-leaching and approximately 85% of gold is expected to be dissolved before adsorption, resulting in higher loaded carbon grades in the

first adsorption tank). This translates into lower soluble losses and a smaller elution circuit size. Selection of identical tank sizes for leach and CIL simplifies tank access and reduces maintenance spares holding. Each tank has a capacity of

42,250 gallons.

The pre-aeration tank will mix the cyclone overflow with low-pressure air. Slurry will overflow the pre-aeration tank to the first

leach tank, where lime will be added at a rate of 2.1 lb/ton of feed. Cyanide will be added into both leach tanks at a rate of 0.68 lb/ton of feed, together with low-pressure air.

The slurry will then overflow into seven CIL tanks. The first four CIL tanks will also be fed low-pressure air. Barren carbon will be added to the last CIL

tank and will travel up through the circuit in the opposite direction from the slurry flow (counter-current flow). Carbon will advance once per day with carbon transfer pumps, which pump carbon-laden slurry to the next tank in the train. Carbon will

be retained in the tanks after the transfer with inter-stage screens, which will have mesh baskets sized to allow slurry to pass through but not the loaded carbon.

Leached tailings will overflow the last tank to the detox tank which in turn will overflow to the carbon safety screen. This screen will collect carbon that

would otherwise be lost to the tailings in the event of a hole in one of the inter-stage screens. Loaded carbon will be pumped from the first CIL tank to the elution circuit via a loaded-carbon screen, which will separate the carbon from slurry and

send the slurry back to the leach circuit.

14.4.4

Carbon Management

14.4.4.1

Acid Wash

Loaded carbon from the leach circuit will be loaded into an acid-wash column, where it will be submerged in a 3% w/w hydrochloric acid solution in order

to dissolve lime scale that would otherwise interfere with the elution and adsorption process. After soaking for 30 minutes, the acid will be drained, and two bed volumes of raw water will be circulated through the column to rinse and neutralize the

acid from the carbon. After rinsing, the carbon will be pumped to the elution column via carbon-transfer water.

14.4.4.2

Carbon Elution

A pressure Zadra circuit was selected for elution of gold and silver from carbon due to the small carbon processing requirements of the CIL circuit and unknown

water quality from the raw water wells. A pressure Zadra circuit is less complicated than comparable alternatives, and is less sensitive to poor water quality, which makes it a better choice in this instance.

Strip solution (eluate) will be made up in the strip-solution tank using raw water dosed with 2% w/w sodium hydroxide and 0.2% w/w cyanide to form an

electrolyte for the electrowinning process. This solution will be circulated through the elution column via an eluate heater, which heats the solution, the carbon, and the column to 275°F. The elution system will be pressurized at a maximum

pressure of 65 psi (450 kPa) to keep the solution from flashing to steam in the heater or elution column.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 227

May 27, 2026

A recovery heat exchanger will transfer heat from the hot pregnant solution exiting the column to the

incoming solution before passing through the solution heater. This will reduce the energy required to maintain the solution temperature and cool the pregnant solution before it enters the electrowinning cell. Once the required system temperature is

reached, the hot pregnant eluate solution will be directed to the electrowinning cell, where the metals will be plated onto cathodes. Solution continues to circulate through the elution column and electrowinning cell. The process will continue to

deposit metals into the electrowinning cell for a maximum of 16 hours.

14.4.4.3

Carbon Regeneration

At the end of the elution cycle, the barren carbon will be transferred to the regeneration kiln feed hopper where it will be fed into the regeneration kiln.

The kiln will regenerate the carbon by burning off any organic material fouling the carbon that would hinder its ability to absorb metals in the CIL circuit. The kiln’s operating temperature will be 1,382°F. The kiln will be fitted with

mercury abatement equipment to capture residual mercury on barren carbon.

Regenerated carbon will exit the kiln and report to the water-filled quench

tank. The quench tank will serve as a holding place for the carbon while it is waiting to be returned to the circuit. Regenerated carbon will be pumped from the quench tank through a barren carbon screen to remove fines as well as dewater the

carbon. Oversize from the screen will then re-enter the CIL circuit via the CIL tank at the end of the bank.

14.4.4.4

Carbon Transport Water

All carbon movements in the elution and regeneration circuits will be accomplished using carbon transport water. A transport-water tank and pump will supply

transport water to carbon movement demands as needed. The acid wash and elution columns will be fitted with internal strainers to allow the transport water to drain out while the column retains the carbon.

Transport water will pick up fines when moving carbon due to the attrition associated with carbon movement. The transport water tank will be periodically

drained to tailings.

14.4.5

Gold Room

The gold room will house the electrowinning cell, smelting furnace, and associated support equipment within a secured area.

One day per week, the electrowinning cell will be opened so that sludge can be cleaned out manually with a high-pressure water hose. Sludge from the clean-up

will flow by gravity to the sludge settling tank and into the gold room sludge filter press to be dewatered. Dewatered sludge will then be transported manually using a tray to the mercury retort oven for mercury removal as well as simultaneous

drying. Mercury collected will be sent off site for third-party processing.

Dried sludge will be removed from the oven the following day and combined

with fluxes in a flux mixer before reporting to the smelt furnace. Once all the mixture has been added to the furnace and enough time has elapsed for the material to fully melt, the slag will be poured into a conical slag pot. The liquid metal will

then be poured into molds on a mound tray. Cooled doré will then be cleaned, weighed, and stamped. The bars will be placed in a vault to await shipment to a refinery.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 228

May 27, 2026

Dust collection will be provided in the gold room for smelting. Extraction fans are planned for the kiln,

electrowinning cell, retort/drying oven, and smelting-furnace off gasses. All extraction fans will lead to a gas scrubbing system.

14.4.6

Cyanide Detoxification and Tailings Deposition

A cyanide-destruction circuit will be included in the design to comply with tailings-discharge permit requirements. Testwork shows that SO2/air process was an effective detoxification method at reducing weak-acid dissociable (WAD) cyanide levels to 15 mg/L (30 mg/L maximum).

The CIL tailings will be pumped to the cyanide detoxification tank, where lime will be added to buffer pH, copper sulfate will be added as a reaction

catalyst, and sodium metabisulfite (SMBS) will be added as an SO2 source. The tank is sized to provide 90 minutes of residence time for the reaction to reach completion.

Detoxified slurry will overflow to the tailings pump box where it will be pumped to the TSF by the final tailings pumps. At the TSF, the tailings will be

deposited using spigot manifolds positioned along the rim of the impoundment to create low-angle deposition beaches. The position of the spigot manifolds will be moved periodically to produce an even beach head and push decant water towards the

decant water pool. A pontoon-mounted decant-return water pump will be provided to pump decant water back to the process water tank for re-use in the plant.

14.4.7

Reagent Handling and Storage

Reagents will be prepared and stored in separate self-contained areas within the process plant and delivered by individual metering pumps or centrifugal pumps

to the required addition points. Acidic and basic reagents will be stored and mixed in physically separated areas to ensure no exposure of cyanide to acidic chemicals, which would generate hydrogen-cyanide gas.

Estimated reagent consumptions are as follows:

Lime: 6.3 lb/ton of ore processed

Sodium cyanide: 0.91 lb/ton of ore processed

Sodium metabisulfite: 3.6 lb/ton of cyanide processed.

14.4.7.1

Hydrated Lime

Preparation of hydrated lime slurry will require:

a bulk storage silo

a mixing tank

dosing pumps feeding a ring main

automatically controlled dosing point from the ring main.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 229

May 27, 2026

Hydrated lime will be used in leaching and detoxification for pH control. Hydrated lime powder will be

delivered to site by bulk tankers and blown into the lime bulk storage silo. When the mixing-tank is low, hydrated lime will be added to the tank via a rotary valve and screw feeder. Process water will be added at the same time to maintain the

mixture strength of 20% w/w, forming a suspended lime slurry.

The suspended lime slurry will be distributed to the various dosage points via a ring main

that provides constant flow to various destinations. Dosing will be accomplished with drop lines off the ring main with automated on-off valves that open when pH is low and close when the target pH is reached.

14.4.7.2

Sodium Cyanide

Storage and distribution of sodium cyanide (NaCN) will require:

a bulk storage tank

a ring main

dosing pumps.

NaCN will be used in the leach circuit as a lixiviant and in elution as a carbon-stripping aid. Aqueous sodium cyanide will be delivered to site by bulk

tanker at 30% purity and emptied into the sodium cyanide storage tank. NaCN solution will be distributed to the various dosage points via a ring main that provides constant flow to various destinations.

14.4.7.3

Sodium Hydroxide

Preparation of sodium hydroxide (NaOH) will require dosing pumps. NaOH will be delivered to site in 264.2-gal totes at a solution strength of around 50% w/w.

New totes will be lifted onto a mount using a forklift. Dosing will be done at full strength using dedicated positive-displacement metering pumps. NaOH will be used as an electrolyte in carbon elution/electrowinning.

14.4.7.4

Sodium Metabisulfite

Preparation of SMBS will require:

a bulk handling system

mixing and holding tanks

dosing pumps.

SMBS will be a source of SO2 for cyanide destruction with the SO2/air process. It will be delivered to site in 1.1-ton bulk bags.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 230

May 27, 2026

SMBS will be held in the SMBS storage tank after it is mixed. When the storage-tank is low, a SMBS mixture

will be started by dropping a bulk bag of SMBS onto a bag breaker, which discharges SMBS into the mix tank. The mix tank will have been previously filled with the required amount of process water to produce a mixture strength of 20% w/w. Once

mixing is complete, the SMBS will be dosed from the storage tank to the cyanide detoxification circuit. There will be two positive displacement metering pumps dedicated to this process, one of which will be in place as a spare.

14.4.7.5

Copper Sulfate

Distribution of copper sulfate (CuSO4) will require dosing pumps. CuSO4 will be delivered to site in 53-gal drums at a solution strength of 15% w/w. New drums will be listed onto a mount using a forklift. Dosing to the detoxification circuit will be done using

dedicated positive-displacement metering pumps.

14.4.7.6

Hydrochloric Acid

Distribution of hydrochloric acid (HCl) will require a dosing pump. HCl will be used to remove lime scale from loaded carbon in the acid-wash column of the

elution circuit. HCl will be delivered in 264.2-gallon totes at 32% w/w solution strength and will be housed in the reagent handling area.

Raw water will

be added to the HCl to a strength of 3% w/w by inline mixing ahead of the acid-wash column.

14.4.8

Air Supply and Distribution

14.4.8.1

Low-Pressure Air

Two low-pressure air blowers will supply air to the pre-aeration, leach, and detoxification circuits. The installed blowers will be multiple-stage,

centrifugal-type blowers and will be used with a “blow-off” arrangement to adapt to fluctuations in air demand.

14.4.8.2

Plant and Instrument Air

Two plant-air compressors (duty/standby) will provide high-pressure compressed air, to meet the demand for plant and instrument-air requirements. Wet plant air

will be stored in the plant-air receivers to account for variation in demand prior to being distributed through the plant. Wet air will report to cyanide offloading. Instrument air will be filtered then dried in the instrument-air dryer before

reporting to the gold room or general plant distribution.

14.4.9

Water Supply and Distribution

14.4.9.1

Raw Water

Raw water will be pumped from borehole wells via a well water pump to the raw-water storage tank. Raw water in the raw-water storage tank will be used to

supply the process water tank, gland water, reagent mixing, and fire-protection requirements. The raw water tank is sized to include a fire water reserve.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 231

May 27, 2026

14.4.9.2

Potable Water

Potable water will be sourced from the raw water tank and treated in the potable water treatment plant. Treated water will then be stored in the potable-water

storage tank for distribution by two potable-water pumps in a duty/standby configuration.

14.4.9.3

Gland Water

Gland water will be supplied from the raw-water tank and distributed to the plant by two gland-seal water pumps in a duty/standby configuration.

14.4.9.4

Process Water

Process water primarily consist of TSF reclaim water. Process water will be stored in the process water storage tank and distributed by two process water

pumps, in a duty/standby configuration.

14.5

Personnel

The number of process operations and maintenance personnel is provided in Section 18.2.3.5.

14.6

Sampling and Metallurgical Laboratory

The process plant will be equipped with automatic samplers to collect shift and routine samples for aqua-regia digestion, AA analysis, and fire assays. Samples

to be taken will include head, intermediate products, tailings, and doré. The data obtained will be used for product quality control, metal accounting and process optimization.

The metallurgical laboratory will perform metallurgical tests for quality control and optimization of the process flowsheet. The laboratory will include

equipment such as laboratory crushers, ball mill, sieve screens, bottle rollers, leach reactors, balances, DO meters, and pH meters.

14.7

Projected Energy Requirements

The installed power for the process plant will be 4,445 hp and the power consumption is estimated to be 72 kWh/ton processed.

14.8

Project Water Requirements

The overall projected plant water balance is shown in Figure 14-3. Raw water demand is projected to be 47,023 gallons

per day (178 m3/day).

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 232

May 27, 2026

Figure

14-3: Projected Daily Plant Water Balance , at average LOM

throughput

Source: Ausenco, 2026.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 233

May 27, 2026

15

INFRASTRUCTURE

15.1

Introduction

Infrastructure contemplated in the FS includes:

Underground mine, including portal and decline

Roads: main access road, site access road, borrow pit haul road, tailings storage facility haul road, temporary

waste rock storage facility haul road, explosives light vehicle access road and ventilation raise and laydown light vehicle access road

Site main gate and guard house

Administration building, training, first aid, change house and car park

Control room

Reagent storage area

Gold room

Assay laboratory and sample preparation area

Plant workshop and warehouse

Truck shop, warehouse, wash pad

Fuel facility, fuel storage and dispensing

Water wells

14.4 kV overland power line

Fresh water supply and treatment

Raw water tank

TSF

Temporary Waste Rock Storage Facility (TWRSF)

Explosives magazine.

A layout of the proposed major infrastructure is included in Figure 15-1.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 234

May 27, 2026

Figure

15-1:  Proposed Infrastructure Layout Plan

Source: Ausenco, 2020

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 235

May 27, 2026

15.2

Access

Access to the Project area is described in Section 4. The FS envisages that the main access road to Grassy Mountain will use an existing BLM road to the

site. This road is approximately 17 miles long and will be upgraded to include some straightening and widening in portions.

15.3

Temporary Waste Rock Storage Facility (TWRSF)

The following summarizes the results and interpretations for the TWRSF based on data collected and engineering means and methods presented in the 2021 Detailed

Design Report (Golder, 2021d).

Waste rock materials generated during mining will be stockpiled in a TWRSF near the TSF for use as either cement rock

backfill to support the underground mining operation or as an operational layer above the tailings surface for closure as discussed in Section 15.5.6. As required by the Oregon Administrative Rule, the potential sulfides in the waste rock

material requires the TWRSF to be a geomembrane-lined facility. The containment and drainage collection systems installed below the TWRSF will be the same systems used for the TSF impoundment basin described in Section 15.5.

Above the geomembrane liner, a collection system consisting of perforated piping will be installed within the drainage layer to collect water coming in

contact with the waste rock. Captured precipitation infiltrating through the waste rock will be conveyed to the TSF reclaim pond for monitoring and management. The TWRSF collection pipe will remain isolated from the TSF underdrain collection system

so the water can be handled separately, if necessary.

The location of the TWRSF, adjacent to the TSF, will allow the lining system to tie into the TSF

lining system to provide continuous containment (see Figure 15-2). The TWRSF collection pipe will gravity drain through the TSF impoundment where it will be installed within the TSF drainage layer and

ultimately outlet at the TSF Reclaim Pond for independent monitoring and management.

During reclamation, remaining waste rock (if any) stockpiled on the

TWRSF will be removed and placed as an operation layer above the tailings surface as part of the TSF reclamation strategy. The TWRSF lining system will either be removed or buried upon completion of mining operations. Further discussion of the TWRSF

closure strategy is discussed in Section 17.8.

15.4

Basalt Borrow Quarry

The Basalt Borrow Quarry will be located on the east side of the mine area (refer to Figure 15-2) where there are

basalts that are believed to be suitable for construction, mine-backfill and reclamation materials:

Construction.

Run-of-mine (ROM) material for fill and TSF-embankment construction, as required.

Screened and processed materials for drainage and filter materials in the TSF and TWRSF, as required; Backfill:

backfill and CRF material for backfilling of underground stopes; crushed to -6 inches.

Reclamation: screened and processed materials for drainage and filter materials, as required.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 236

May 27, 2026

Borrow material from the Basalt Borrow Quarry will be mined using contract mining. During initial

construction, where more material is needed, the borrow mining will use larger equipment, while smaller equipment will be used during production when the amount of material required is reduced. A small contractor laydown-yard is planned near the

main borrow source area.

15.5

Tailings Storage Facility

The following summarizes the results and interpretations for the tailings storage facility based on data collected and engineering means and methods presented

in the 2021 Tailings Storage Facility and Temporary Waste Rock Storage Facility detailed design report (Golder, 2021d).

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 237

May 27, 2026

The TSF will be constructed in three primary stages to store a total of 3.64 Mt of tailings and

industry-accepted design criteria for geotechnical stability and flood events during operations and long-term closure (passive care). The combined tailings dam embankment and impoundment basin will occupy an ultimate footprint of approximately 108

acres (4.705 million sqft), as shown on Figure 15-2. The TSF centroid is located is located in mine grid at 15,865,300 N and 1,543,500 E approximately 0.3 mi west and 0.1 mi north of the overall mine site

centroid.

Figure 15-2:  Overall TSF Layout

Source: Golder, 2021d.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 238

May 27, 2026

Conventional tailings are transported to the TSF via a tailings delivery pipeline from the mill. Tailings are

then deposited into the TSF impoundment from the staged perimeter road via sub-aerial deposition. As tailings are deposited, free water separates from the slurry mix to form the supernatant pool. Through consolidation and seepage, additional water

reports to the impoundment underdrain system where it drains via gravity into the reclaim pond system. Water recovery from the TSF will include independent pumping and piping systems from the supernatant pool to and reclaim pond which will combine

into a single return water system for reuse at the mill.

Non-contact stormwater is managed through a series of permanent and temporary stormwater

diversion channels constructed upgradient of the TSF. Precipitation falling on the TSF and areas downgradient of the stormwater channels ultimately reports to the supernatant pool where it is incorporated into the process circuit.

Additional details regarding design criteria, methodology, and engineering evaluations of the TSF are presented in the following sections.

15.5.1

Topography, Drainage, and Vegetation

In general, the mine site and surrounding area has rolling topography with bedrock exposed at or near the ground surface in upland and hill areas, including

Grassy Mountain proper. Within the TSF area, as topographic elevation drops, the surrounding hills transition into broad valleys with shallow alluvial soils overlying deeper lacustrine clays.

The TSF area generally slopes from south to north at about two percent along the valley floor. Valley wall slopes to the east and west ranging from about 10%

to 15%, and about 5% in the south along the higher valley slopes in the southern portion of the TSF basin.

Vegetation across the site generally consisted

of moderately dense native shrubs and grasses. No surface water, perennial streams, or springs were observed within the TSF footprint or TWRSF areas at the time of the geotechnical field investigations.

15.5.2

Past Studies, Subsurface Investigations, and Civil Design

Several previous studies and investigations have been completed to support various scoping studies and designs of the TSF. Golder Associates USA Inc. (Golder)

utilized information obtained from the following prior studies for this TSF design in conjunction with the FS Project design criteria defined by Paramount and Ausenco:

Siting Study Letter Report titled Grassy Mountain Project – Tailings Storage Facility Siting and

Trade-off Study. December 2016 (Golder 2016b). Updated for Consolidated Permit Application in September 2019 (Golder 2019b).

Design Report titled Pre-feasibility Design, Tailings Storage Facility for Calico included a geotechnical

subsurface investigation at the proposed TSF site in December 2017 consisting of 15 geotechnical borings and excavating 44 test pits in the project area (Golder 2018b).

Design Report titled Detailed Design, Tailings Storage Facility and Waste Rock Dump for Calico (Golder 2019c)

included:

March 2019 – six geotechnical boreholes within the TSF area and laboratory testing;

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 239

May 27, 2026

April 2019 – geotechnical tailings testing program; and

July 2019 – 11 cone penetration test soundings within TSF area.

Design Report titled Detailed Design, Tailings Storage Facility and Temporary Waste Rock Storage Facility

for Calico (Golder 2021d) included a geotechnical subsurface investigation included 16 test pits at the proposed closure cover borrow areas and 2 test pits within the TWRSF footprint.

15.5.3

Design Objectives

The TSF design was developed by Golder using designs and methods that protect against impacts to groundwater in accordance with State and Federal environmental

and dam safety guidelines and regulations. The dam design as presented exceeds the dam safety requirements of OAR 625 Division 20 – Dam Safety for a Low Hazard dam.

In July 2020, the Oregon Water Resources Department (OWRD) issued approval for the TSF based on the November 2019 Revision 0 design confirming the Low Hazard

designation (OWRD 2020). In July 2025, WSP submitted a permit extension request to the OWRD provide approval continuation to the dam safety permit for an additional five years (WSP 2025). OWRD provided email approval extension in July 2025

(OWRD 2025).

15.5.3.1

Basis of Design

The TSF consists of an earth- and rock-fill dam spanning a shallow valley at the north limits of the TSF site to impound tailings to the south. A saddle dam

constructed along the western ridge will be required beginning in Stage 2. The dam will be developed using concepts that will provide a safe and stable dam during all stages of construction, operation, and closure. The impoundment basin will be

lined with multi-layered composite containment system consisting of an enhanced geosynthetic clay liner (GCL), leak detection, and high-density polyethylene (HDPE) geomembrane liner to contain the tailings

solids and fluids. The lining system will extend to the upstream crest of the embankment. Tailings will be transferred to the TSF with an average solids concentration of 42.4%, by weight through a slurry pipeline from the mill.

15.5.3.2

Mill Throughput

Upon completion of plant commissioning, tailings are anticipated to be delivered to the TSF via a slurry pipeline. Total mill throughput for LOM is

approximately 2.4 Mtons.

15.5.3.3

Tailings Density and Storage Capacity

Geotechnical testing and consolidation modelling performed by Golder estimates a tailings settled dry density of 80 lb/ft3. Based on the TSF design, the Stage 3 TSF will provide a total storage capacity of 3.64 Mtons. However, for the LOM, only 2.4 Mtons are planned to be delivered to the TSF, and, therefore, only Stages

1A, 1B, 2, and a portion of Stage 3 will be required for this Study’s LOM plan. The design capacity considerations for each stage are outlined in Table 15-1.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 240

May 27, 2026

Table 15-1:  Stage Capacity Relationship

Stage

Elevation (ft)

Maximum Tailings

Surface Area

(acres)

Storage Capacity (M tons)

Main Embankment Crest

Maximum Tailings

Surface

Stage

Cumulative

1A

Varies (Min. 3583)

3581

42.0

0.40

0.40

1B

Varies (Min. 3595)

3593

44.7

0.58

0.98

2

Varies (Min. 3609)

3607

59.5

1.06

2.04

3

Varies (Min. 3622)

3620

83.0

1.60

3.64*

*

Additional storage capacity is available with the Stage 3 expansion. During operation, construction of Stage 3

may be optimized for the LOM requirement, resulting in a lower Stage 3 capital construction cost.

15.5.4

TSF Design

15.5.4.1

Embankment Construction

The embankments will be constructed in three primary stages. Stage 1 will be separated into two intermediate stages (Stage 1A and 1B). Stage 2 and Stage 3 will

be constructed as downstream raises along the north and west embankments. The embankments will be constructed of soil and/or rock materials using downstream construction methods. Suitable embankment materials will be generated from the on-site

basalt borrow area and during impoundment grading operations.

The embankments will have a maximum overall upstream slope of 3H:1V, with a downstream

slope of 2.5H:1V. The overall embankment slopes are suitable for long-term geotechnical stability, closure, and meeting Oregon Administrative Rules requirements. The north and west embankments will have a maximum height of 84 feet and 30 feet,

respectively. The crest width of the north embankment will be 50 ft, and the smaller west embankment will have a 30-ft wide crest. The TSF is designed as a “zero discharge” facility to meet OAR requirements. To achieve this, the facility

will be a 100% geomembrane-lined facility with a continuous, engineered lining system extending across the impoundment basin and the upstream slope of the embankments.

Downstream construction will be accomplished by extending new embankment against the existing downstream slope of the previous stage and then raising the

embankment up to the new crest elevation for each stage as shown in Figure 15-3.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 241

May 27, 2026

Figure 15-3:  TSF Main (North) Embankment Cross-section

Source: Golder, 2021d.

15.5.4.2

Containment and Underdrain System

To achieve “zero discharge” and provide environmental containment as required by OAR, the composite lining system within the impoundment basin will

consist of (from bottom to top) a six-inch to 12-inch thick prepared subgrade, a 300-mil thick enhanced geosynthetic clay liner, 80-mil HDPE geomembrane liner, an 18-inch thick drainage layer, and a six-inch thick filter layer. An underdrain collection system consisting of perforated piping will be located within the drainage layer to promote drainage of the tailings. The upstream slope of the embankments will

use the same composite lining system, but without the overlying piping, drainage and filter layers.

15.5.4.3

Tailings Deposition Management and Return Water

A reclaim pond, located downstream (north) of the TSF, will capture all tailings draindown collected in the underdrain collection system from the tailings. To

achieve “zero discharge” and provide environmental containment as required by the Oregon Administrative Rules, the lining system for the reclaim pond will consist of (from bottom to top): a prepared-in-place subgrade, 60-mil HDPE

secondary geomembrane liner, HDPE geonet, and 80-mil HDPE geomembrane primary liner. The geonet located between the two geomembranes will serve as the leakage collection and recovery system.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 242

May 27, 2026

The supernatant pool will be maintained away from the embankments on the eastern side of the facility by

controlled deposition of tailings from spigots installed around the perimeter of the facility. Water separating from the tailings solids after deposition will be managed with two independent return-water systems. One will manage flows collected in

the reclaim pond from the underdrain collection systems and the other will manage water collected in the supernatant pool. The supernatant pool will be managed with a pump installed either on the eastern edge of the facility or on a floating barge

within the pool. Water from both systems will be returned to the mill for use in the process circuit. At all times, process fluid pipelines will be located above secondary containment that consists of either geomembrane liners or reinforced concrete

containment structures.

Precipitation falling on area downgradient of the diversion channels and above geomembrane-lined areas will is captured and

incorporated into the process circuit. Seasonal fluctuations in precipitation and evaporation are accounted for in the process fluid water balance prepared by Golder.

15.5.4.4

Surface Water Management

The TSF will be capable of storing runoff from tributary areas and direct precipitation on the facility resulting from a 500-year, 24-hour storm event, as well

as an allowance for wave run-up due to wind action. Permanent and temporary stormwater diversions will collect and divert a majority of the stormwater runoff around the facility to a natural drainage on the north side of the TSF.

15.5.4.5

Geotechnical Stability

The embankments are designed by Golder to be geotechnically stable during normal operation, and during the design seismic event. For this design, Golder

performed a site-specific seismic and faulting hazard assessment to estimate peak ground motions resulting from various seismic events. The maximum credible earthquake (MCE) was selected as the design seismic event for long-term closure. This

selected design seismic event is suitable for any hazard classification determined by regulatory agencies.

15.5.5

Monitoring

The TSF design was advanced to construction-level to support on-going State and Federal permitting. To support construction-level design and permitting, Golder

prepared a detailed geotechnical monitoring plan that defines the roles and responsibilities of key stakeholders (Owner, operator, engineer) for safe and stable TSF construction and operation. Monitoring will be accomplished through both

measurements of the monitoring points and visual observations of surface conditions.

The geotechnical monitoring plan (Golder 2021d) provides definition

on normal and abnormal operating conditions. A network of monitoring instruments will be installed during each stage of construction to monitor critical geotechnical conditions as they relate to dam stability and environmental containment. Trigger

actions response plans have also been developed by Golder to guide key stakeholders in their response to specific conditions.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 243

May 27, 2026

15.5.6

Closure

When mining operations are complete, active tailings deposition from the mill into the TSF will cease. Water collected in the reclaim pond will be recirculated

to the supernatant pool for active water management. Over time, the supernatant pool will evaporate and the underdrain flows reporting from the TSF will reduce as the tailings consolidate and drain.

Under the conceptual closure plan, once the tailings surface no longer has a free water surface and the tailings continue to desiccate and densify, a closure

cover will be constructed over the tailings surface and TSF embankments. The conceptual closure plan recommends that installation of the closure cover is at a point in time where majority of the tailings consolidation has occurred and is not

expected to negatively impact drainage of the closure cover.

The closure cover above the tailings surface will be constructed with the following (bottom

to top):

Operational layer of waste rock (if available) or other materials to provide vehicle access (as needed).

4 to 12 inches of Liner bedding (if required).

60-mil double sided textured linear low-density polyethylene (LLDPE) geomembrane liner.

12 inches of non-acid generating granular drainage layer.

12 ounce per square yard (oz/sy) non-woven geotextile.

12 inches of growth medium, scarified and revegetated.

The TSF embankment closure cover will consist of 12 inches of growth medium placed on the crest and downstream slopes of the TSF embankments. After placement,

the growth medium will be scarified and revegetated.

Closure cover material will be sourced from the Closure Cover Borrow Areas located northwest of the

basalt quarry and southwest of the TSF.

The remaining waste rock (if any) stockpiled on the TWRSF will be removed and placed as an operation layer above

the tailings surface when it is safe to do so. The TWRSF lining system will either be removed or buried upon completion of mining operations. Stormwater falling on the TSF and upgradient catchment areas, below the permanent diversion channels, will

be routed over the covered impoundment surface to a closure drop chute channel located at the eastern abutment of the north embankment. The closure drop chute and impoundment surface swale are designed to safely convey stormwater flows resulting

from a 500-year, 24-hour storm event.

Once tailings draindown flow rates reduce to levels suitable for passive water management (depending on the

long-term passive management system), the reclaim pond will be retrofitted to a geomembrane-lined evaporation pond. With installation of the closure cover and gravity drainage from the underdrain collection system, it is expected that draindown from

the TSF will cease. Once drainage from the TSF has ceased, the evaporation pond will be removed.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 244

May 27, 2026

15.6

Closure Cover Borrow Areas

To support final reclamation, closure cover will be sourced from growth media stockpiles generated during construction as well as designated closure cover

borrow areas as presented on Figure 15-2. During initial mine development, and staged construction of the TSF, growth media and topsoil will be stripped and stockpiled in designated locations north of the TSF

and immediately west of the Basalt Borrow Quarry. During reclamation, the growth media stockpiles will be excavated and placed as vegetative closure cover. Once depleted, the Closure Cover Borrow Areas located immediately west of the Basalt Borrow

Quarry and south of the TSF will be developed as additional vegetative closure cover material.

Growth media stockpiles will be constructed with maximum

2.5H:1V side slopes and re-vegetated. The Closure Cover Borrow Areas will be excavated as needed with maximum 2.5H:1V side slopes and the floor of the quarry will be graded to drain to natural drainages. Upon completion of reclamation activities,

the final Closure Cover Borrow Area quarries will be re-vegetated.

15.7

Water Management

15.7.1

Non-Contact Water Management

The following summarizes the results and interpretations for the stormwater diversion channels based on data collected and engineering means and methods

presented in the 2019 Hydrology Analysis and Stormwater Diversion Recommendations for the Process and Portal Pads (Golder, 2019a), 2021 Tailings Storage Facility and Temporary Waste Rock Storage Facility detailed design report (Golder, 2021d) and

2021 stormwater pollution control plan (Golder, 2021a).

The Project site is located approximately 6.5 miles northwest of Lake Owyhee in the semi-arid

plateau of eastern Oregon and local landscape is typical of high mountain desert environment and rangeland. The terrain is gentle to moderate with relatively low relief. Elevation ranges from approximately 4,050 feet above mean sea level at the

southeastern corner of the proposed borrow pit area to 3,330 feet above mean sea level north of the TSF reclaim pond. Drainage at the site is generally to the north in ephemeral natural drainages. No perennial streams or wetlands exist at the

site.

The Project site is divided into three main hydrologic catchment areas. Each catchment area was used to size temporary and permanent diversion

channels that route water around the zero-discharge process areas. The catchment areas are shown on Table 15-3 and defined as:

TSF area: All western hydrologic catchment areas draining to the TSF area; 688 acres.

Process pad and portal pad area: All interior hydrologic catchment areas draining to the processing area and

portal; 12.4 acres.

Site wide area: All eastern hydrologic catchment areas draining to the planned borrow pit area and the catchment

for the existing natural drainage immediately west of the borrow pit; 664 acres.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 245

May 27, 2026

The overall Project site catchment area has a total tributary area covering approximately 1,350 acres.

Hydrologic catchments areas were developed based on existing topographic features and identifying areas where calculated peak flows will be required for hydraulic design of drainage improvements.

Figure 15-4:  Site-wide Hydrologic Catchment Areas

Source: Golder, 2021a.

Hydrologic and hydraulic analyses were completed with weighted average soil characteristic curve numbers and time of concentrations. This model developed

flows from each sub-basin for the 25- year, 24-hour; 100-year, 24-hour; and the 500-year, 24-hour storm events. The flows were used to design the surface water diversion and contact water collection channels, culverts, and outlet aprons.

The following design storm events and freeboard capacity were applied:

Permanent channels: 100-year, 24-hour storm event with freeboard (9 inches), or 500-year, 24-hour storm event

without overtopping.

Temporary channels: 25-year, 24-hour storm event with freeboard (9 inches), or 100-year, 24-hour storm event

without overtopping.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 246

May 27, 2026

All culverts were designed to only be in place during operation and were therefore designed to convey the

25-year, 24-hour storm event. Channel velocities were reviewed by Golder during hydraulic design of the stormwater diversion channels to determine appropriate channel lining systems for erosion protection. In most areas, unless in permanent

diversion channels, the channels will be either unlined or riprap-lined with variable stone sizes.

In areas where channel velocities exceeded the

reliability limits of a natural soil lining, riprap lining systems will be used. Dissipation aprons will be located at permanent channel discharge points around the TSF where run-off will be discharged into existing natural drainages to encourage a

smooth transition into the existing drainage and minimize erosion to the natural slopes.

Non-contact water runoff is designed to flow into natural

drainages downstream of the site to unnamed tributaries of Negro Rock Canyon that in turn discharges to the lower Malheur River.

15.7.2

Contact Water Management

Meteoric water contacting impacted materials at the TSF and TWRSF will be managed within the TSF process fluid water balance a discussed in

Section 15.5.4.1. Meteoric water contacting process plant and associated infrastructure will be diverted through a network of contact water diversion ditches and channels to a geomembrane-lined contact water pond to be located east of the

process plant.

The process plant contact water pond will be a geomembrane-lined containment pond using a dual containment and leakage collection system.

Figure 15-4 shows the proposed locations of the structures to control contact and non-contact surface water

routing around the process plant site. The process plant contact water pond, designed by Ausenco, will be a geomembrane-lined containment pond using a dual containment and leakage collection system. The containment system consists of (from bottom to

top):

prepared subgrade

12 inches of soil liner bedding

60-mil HDPE geomembrane liner

Geonet

80-mil HDPE geomembrane liner.

Water entering the process plant containment pond will be used in the process circuit or evaporated.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 247

May 27, 2026

Figure 15-5: Process Plant Stormwater Contact and Non-contact

Catchment Areas

Source: Golder, 2019a.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 248

May 27, 2026

15.7.3

Site-wide Water Balance

A high-level site-wide water balance was developed based on the following assumptions:

Annual average water demands from the process plant mass balance (estimated by Ausenco).

Usage of water extracted from dewatering operations in the process circuit and to supply the underground mining

equipment (estimated by Lorax):

Low dewatering estimate = 12 gpm

Mid-range dewatering estimate = 23 gpm

High dewatering estimate = 78 gpm.

Water for underground equipment, of about 76 gpm (estimated by MDA) will be sourced from underground dewatering

and raw water production and recirculated as needed.

Tailings slurry concentration of 42.4% solids, by weight, during deposition (estimated by Ausenco).

Climate conditions based on TSF water balance (estimated by Golder, 2021d).

Water collected in the process plant contact water pond will be used in the process circuit or evaporated.

Additional raw water will be supplied by the proposed production wells as make-up water.

Water demands will vary seasonally (Table 15-2).

Table 15-2: Annual Average Water Balance

Item

M gallons/year

Demand

Total water for tailings discharge

92.8

Demand total

92.8

Source/supply

Raw water for elution circuit

17.2

Ore feed

3.6

Underground dewatering

12.1

TSF return water

47.5

Plant contact water pond

0.4

Source/supply total

80.7

Make-up water

12.1

Note: Table based on average annual climate and mid-range dewatering estimate.

Water supply from the raw water production wells and mine dewatering is projected to be sufficient to support the FS mine plan requirements and during

seasonal fluctuations. Water demands are expected to increase and decrease seasonally and during periods of extended dry and wet climactic years, respectively. During periods of extended dry conditions, additional make-up water from the production

wells may be required. During extended periods of wet conditions, raw water from the production wells will be reduced as needed. Additionally, if operated within the design parameters, the TSF supernatant pool may be used to provide seasonal buffer

for water demands. On an as needed basis, enhanced evaporation through the use of spray evaporators over the tailings surface during the dry season can be implemented.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 249

May 27, 2026

15.8

Built Infrastructure

The built infrastructure requirements are summarized in Table 15-3.

Table 15-3: Built Infrastructure Requirements

Item

Comment

Process plant

Steel-frame and metal clad building with an area of 7,000 ft2. Will include a bridge crane that comes with an electric chain hoist and trolley and control pendant

Process plant control room

Single-level modular steel container, modular building, preassembled. Will include insulated steel doors, windows, operator’s desk, soundproof and dustproof with an area of 135

ft2.

Gold room

Pre-cast masonry building of approximately 1,000 ft2. Will include an electric chain hoist and trolley

Assay laboratory

Single-level steel containers of approximately 2,715 ft2 to be situated adjacent to the process building. Will include sample receiving and preparation, fire assay, weighing room,

wet analytical laboratory, dry instrument room, and utilities and storage modules. Will house the laboratory equipment for assaying, metallurgical, and environmental requirements. Dust-collection equipment will be located external to the laboratory

building. The building will be serviced with power, water, air conditioning and heating, communications, air and mercury scrubbers, and fume hoods.

Process plant workshop and warehouse

Pre-engineered steel-frame and metal clad building of approximately 2,540 ft2. Will be used to perform maintenance for process equipment, as well as for the storage of equipment

spare parts

Administration building

Single level modular wood frame, 80 x 110 ft for a total footprint of approximately 8,800 ft2. Will house the site management team, including general management, commercial and

administration management, engineering, mine operations, senior processing, and maintenance personnel. Will be serviced with power, water, air conditioning and heating, communications.

Contractor office and laydown

Modular trailer with an area of 160 ft2

Truck workshop and warehouse

Pre-engineered steel-frame and metal-clad building with an area of 6,250 ft2. Will be positioned adjacent to the mine-office building. Will be divided into two sections, one for

warehousing spare parts and tool storage and the other for a maintenance workshop. A bridge crane will be included

Vehicle wash-bay

Open-air, 50 x 50-ft concrete slab with a fluid-collection sump and oil-water separator that will be located adjacent to the truck workshop and warehouse. Wash water will be collected in the sump where settling will occur prior to

the water being recirculated back to the wash system. The oil-water separation system will recover hydrocarbons prior to re-use of the wash water. The recovered hydrocarbons will be collected and shipped offsite for disposal in accordance with

applicable environmental regulations.

Security gate house

Pre-assembled wood-frame modular building with an area of 325 ft2. The building will include lift gates and one turnstile. 22,350 ft of security fencing will be installed around

the entire mine site, including the borrow source area. There will be a main gate where the main access road enters the site, and a second gate will be placed at the southern end of the property. The southern access gate is anticipated to remain

locked with access only allowed as needed.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 250

May 27, 2026

Item

Comment

Explosives-storage facilities

Will be constructed at the southwest side of the mine area. This location uses a hill as a natural barrier between the explosives-storage facility and other infrastructure. Will consist of a powder magazine in accordance with

current applicable explosives regulations. Dirt berms will be placed around the magazines for additional security. Explosives will be delivered to site by vendors using the main access.

Fuel

Two double-walled steel tanks will be used for diesel storage. The total volume between the two tanks is 8,250 gal. Will be used by the underground equipment. A fuel truck will be used to fuel underground equipment as required and

may be used to fuel surface equipment as needed.

Air

High-pressure compressed air will be provided by one duty screw compressor, one standby screw compressor, and a duty-plant air receiver. Two high-pressure air uses: instrument air and plant air. Instrument air will be dried and then

stored in a dedicated air receiver. Plant air will be fed straight from the plant air receiver without a drying step. Low-pressure air for pre-aeration tank air requirements will be provided by two duty and one standby rotary air

compressor.

Communications

On-site communications will comprise inter-connected mobile and fixed systems, including a land-line telephone network, portable two-way radios, and internet. Access for internet and corporate network connection will be made via

satellite connections. Underground communication with the surface will be via a leaky-feeder system

15.9

Camps and Accommodation

No accommodations camps are envisaged. Personnel are expected to reside in nearby communities such as Vale, OR, and Boise, ID.

15.10

Power and Electrical

The power supply will initially be from diesel power generators located on site. The diesel power generators will be used for approximately one year during

initial construction and the initial mining of the decline. During the construction period a new power line would be constructed along the main access road to site. Once construction of the primary power lines is completed, the generators will

remain on site for backup in case of power outages.

The construction of line power will deliver approximately 5.3 MW of power to site and will require a

23-mi distribution circuit, a new 69/34.5 kV to 14 MV transformer, and a new 34.5kV 67-amp regulator. The power line would be constructed from the Hope Substation near Vale to the mine site along the main access road.

The plant power distribution from the powerhouse will be via overhead powerlines. The distribution voltage to the local electrical rooms will be 14.4 kV.

There will be a combination control room and motor-control-center room. This room will be pre-fabricated and loaded with electrical equipment prior to delivery to site. The power distribution from the electrical rooms will be 480 V.

The total connected load for the process plant is expected to be 4.8 MW, with an average power draw of 3.6 MW. Power requirements for the underground mine are

discussed in Section 13.12.3.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 251

May 27, 2026

16

MARKET STUDIES

16.1

Introduction

The proposed Grassy Mountain operation will produce doré bars on site, which will then be shipped to an out of state refinery. There is currently no

contract in place with any refinery or buyer for the doré.

16.2

Market Studies

No market studies have been completed. Gold and silver are freely-traded commodities. The doré that will be produced by the mine is considered to be

readily marketable with no deleterious/penalty elements. Although mercury is present in the ore, a retort and recovery system has been included to maintain doré quality.

The doré bars are forecast to have a variable gold and silver content with an expected gold to silver ratio of 44–49% gold to 51–56%

silver.

The economic analysis in Section 19 assumes that Paramount will be paid 99.9% of the gold value and 99.5% of the silver value by a refinery

(Table 16-1). Ausenco conducted a benchmarking analysis that estimated refining charges of $5/oz payable gold and $0.50/oz payable silver, totaling direct refining costs of $2.0 million over the LOM.

Table 16-1: Estimated Payability and Refining Costs

Description

Units

Value

Proportion of Au

Percent by weight content in doré bars

46

Proportion of Ag

Percent by weight content in doré bars

54

Payable gold

%

99.9

Payable silver

%

99.5

Refining and sales charges Au

$/oz

5.00

Refining and sales charges Ag

$/oz

0.50

16.3

Metal Pricing and Projections

16.3.1

Economic Analysis

Project economics were estimated based on long-term flat metal prices of $3,600/oz Au, and $48.00/oz Ag, which are based on consensus forecasts from various

financial institutions.

The QP notes that the pricing used in the cash flow analysis is reasonably aligned with various long-term forward-looking

estimates from major international banks.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 252

May 27, 2026

Metal prices are defined daily by several commodity markets via contract trading. Some of these markets are

the London Metal Exchange (LME), the Commodity Exchange (COMEX), the New York Mercantile Exchange (NYMEX), the Chicago Mercantile Exchange (CME), and the London Bullion Market Association (LBMA).

Some exchanges define prices on the spot while others, like the LBMA, set prices based on offer and demand in the morning (AM) and in the afternoon (PM).

Prices are set each day, except weekends and holidays. The gold and silver PM contract values are used to define future and expected gold prices.

Given

the volatility of the metal prices, medium term average gold and silver prices are often used to inform the basis metal prices for economic analysis. The tables below show the average prices calculated for each time frame based on the PM daily gold

prices set at the (LBMA).

Table 16-2: Gold Price Average (LBMA PM), $/oz

Date

High (1-yr)

Low (1-yr)

1-yr Avg

2-Yr Avg

3-yr Avg

May 26 ‘26

5,297.87

3,273.17

4,152.49

3,440.98

2,976.99

Table 16-3: Silver Price Average (LBMA PM), $/oz

Date

High (1-yr)

Low (1-yr)

1-yr Avg

2-Yr Avg

3-yr Avg

May 26 ‘26

118.45

32.90

59.69

45.45

38.37

Based on long-term analysis and industry consensus, median analyst metal prices were selected as representative for the

economic analysis. The gold and silver prices used in the economic analysis are:

Gold price: $3,600/oz

Silver price: $48.00/oz

Metal prices were kept constant throughout the life of the Project.

16.3.2

Metal Pricing Forecasts

Paramount expects to commence production at Grassy Mountain within four years. Mid-term gold price forecasts by several institutions are listed in Table 16-4, seen to be in a similar range as those applied in the base case scenario in the FS.

Table 16-4: Mid-term gold price estimate by year from various organizations

Year

Units

2026

2027

2028

2029

Long-Term

Max

$

/oz Au

6,000

6,500

6,000

5,500

4,909

Min

$

/oz Au

3,600

3,600

3,600

3,022

2,500

Average

$

/oz Au

4,760

4,799

4,372

4,036

3,603

Median

$

/oz Au

4,713

4,663

4,250

3,825

3,600

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 253

May 27, 2026

16.4

Contracts

Paramount has no current contracts for property development, mining, concentrating, smelting, refining, transportation, handling, sales and hedging, forward

sales contracts or arrangements.

It is expected that when any such contracts are negotiated, they would be within industry norms for projects in similar

settings in the U.S.

16.5

QP Comment

The doré that will be produced by the planned operation is readily marketable with no deleterious/penalty elements.

Metal pricing used in the economic analysis in Section 19 are based long-term flat prices of $3,600/oz Au, and $48.00/oz Ag, which are based on consensus

forecasts from various financial institutions.

The QP has reviewed commodity pricing assumptions, marketing assumptions, and the potential major

contracts that may be entered into and considers the information acceptable for use in estimating Mineral Resources, Mineral Reserves, and in the economic analysis that supports the FS. The QP notes that the pricing used in the cash flow analysis is

reasonably aligned with various long-term forward-looking estimates from major international banks.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 254

May 27, 2026

17

ENVIRONMENTAL STUDIES, PERMITTING, PLANS, NEGOTIATIONS OR AGREEMENTS WITH LOCAL INDIVIDUALS OR GROUPS

17.1

Introduction

Permitting activities began in 2012 with engagement with the state and federal agencies and collection of baseline data. The draft Consolidated Permit

Application (CPA) was submitted to the Oregon Department of Geology and Mineral Industries (DOGAMI) in 2019 for review and comment by state agencies which were received by Calico and integrated into the final CPA. In December 2021, Calico submitted

the final CPA to DOGAMI. Calico and DOGAMI have been working together as the draft permits have been developed and are in the process of being finalized. The package of draft permits was issued for public review on December 8, 2025. Final

permits are anticipated to be issued by all required state agencies in the second half of 2026.

In December 2021, Calico submitted a Plan of Operation

(PoO) to the BLM. The draft Environmental Impact Statement (EIS) was published for public comment on August 8, 2025 and the final EIS and record of decision was published on January 29, 2026. This record of decision provides federal

authorization for the PoO following posting of a reclamation bond.

The mine plan includes a total of approximately 490 acres of proposed surface

disturbance including approximately 470 acres of disturbance occurring on public land (Table 17-1).

Table 17-1: Surface Disturbance for the Proposed Project

Component

Public Acres

Private Acres

Total Acres

Underground Mine

0.5

6.2

6.7

TSF

99.8

0.0

99.8

TWRSF

5.7

0.0

5.7

Process Plant1

2.5

0.0

2.5

Infrastructure & Ancillary

Facilities2

17.8

0.0

17.8

Roads

31.6

3.3

34.9

Yards & Laydown Areas

9.9

0.1

10.0

Growth Media Stockpiles

7.7

0.0

7.7

Water Supply3

7.9

0.0

7.9

Power Supply4

61.1

0.0

61.1

Stormwater Diversion Channels

11.6

0.2

11.8

Quarry

48.2

0.0

48.2

Reclamation Borrow Areas5

55.9

0.0

55.9

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 255

May 27, 2026

Component

Public Acres

Private Acres

Total Acres

Monitoring

0.0

0.0

0.0

Exploration6

10.0

0.0

10.0

Disturbed Areas7

98.6

9.1

107.8

Total

469.0

18.9

487.9

1.

Includes the mill, refining plant, administrative building, parking lot, security building, mining contractor

yard, reagent storage, assay laboratory, and substation.

2.

Includes the perimeter fence at 22,176 ft with a 20-ft construction disturbance width.

3.

Includes the water supply pipeline at 16,164 ft with a 20-ft construction disturbance width and well

locations each at 0.25 acre.

4.

Includes 20-ft area of disturbance for the 25.2 miles of new powerline.

5.

The area of disturbance for the Reclamation Borrow Area is the maximum area of disturbance.

6.

The actual location of the exploration activities within the Project Area is currently unknown and is assumed

to be equally on public and private lands. Annual exploration work plans will be submitted and reviewed by BLM and DOGAMI as defined at 43 CFR 3809.0-5.

7.

Disturbed Area is a 50-ft buffer on the mining facilities excluding the Reclamation Borrow Areas.

Table 17-2: Permitting

Permit/Approval

Granting Agency

Permit Purpose

Plan of Operations/EIS Record of Decision

BLM

Prevent unnecessary or undue degradation associated with Plan of Operations, EIS to disclose and evaluate environmental impacts and project alternatives. An EIS has been developed to analyze impacts of this Plan.

Oregon Department of Environmental Quality (ODEQ) Water Pollution Control Facility Permit and Water Pollution Control Facility-Individual Onsite system

ODEQ

Prevent degradation of waters of the state from mining, establishes minimum facility design and containment requirements. Regulates onsite septic system.

Standard Air Contaminant Discharge Permit

ODEQ

Regulates project air emissions from stationary and fugitive sources.

General Discharge Permit (Stormwater)

ODEQ

Protect waters of the state.

Oregon Water Resources Department (OWRD) Water Rights Amendment, Permit to Appropriate Water

OWRD

Water appropriation.

Public Drinking Water System (Non-Transient Non-Community Water System)

Oregon Health Authority

Regulates drinking water treatment systems.

OWRD Dam Safety Permit

OWRD

Design and construction of embankments 10 ft or higher and store at least 9.2 acre ft of water.

Malheur County Land Use Compatibility Statement (LUCS)

Malheur County

Permitting or approval activities that affect land use are required by Oregon law to be consistent with local comprehensive plans and have a process for determining consistency.

Explosives Permit

United States Department of the Treasury, Bureau of Alcohol, Tobacco, Firearms, and Explosives

Storage and use of explosives.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 256

May 27, 2026

Permit/Approval

Granting Agency

Permit Purpose

Hazardous Waste Identification Number

United States Environmental Protection Agency

Registration as a conditionally exempt small quantity generator of wastes regulated as hazardous.

Aggregate Operating Permit Application

DOGAMI

Operation and closure of the Basalt Quarry.

Chemical Process Mines Permit (Division 37)

DOGAMI

Operation and closure of the Project.

Chemical Mining Permit (Division 43)

ODEQ

Operation and closure of the Project.

2920 Permit – Leases, Permits and Easements*

BLM

Allow for the access road improvements and power line installation on property controlled by others

Note: * 2920 Permit required for a portion of Dripping Springs Road improvement.

17.2

Permit History

Permitting activities for the Grassy Mountain Project have spanned 30 years and includes multiple environmental permits for the purposes of exploration and

investigation to support the development of the CPA and PoO. During the late 1980s Atlas collected geologic, mine engineering, civil engineering, and environmental baseline data to support a feasibility study that was completed in 1990. During 2012

to 2016, Calico began the permitting process for an underground-mining operation at Grassy Mountain. Since the acquisition of Calico by Paramount in 2016, the permitting process has continued with DOGAMI, Malheur County, and the BLM including

submittals of the PoO and CPA in December 2021 and the issuance of a record of decision by the BLM in January 2026.

17.3

Project Permits

There is a valid exploration permit with the DOGAMI and the BLM although exploration activities have concluded.

The Project will require a PoO and numerous state and local permits to construct, operate, and close presented in

Table 17-2.

Since the acquisition of Calico by Paramount in 2016, the permitting process has continued with

DOGAMI, Malheur County, and the BLM including submittals of the PoO and CPA in December 2021. The BLM issued the final EIS and record of decision in January 2026. Malheur County issued a CUP for the Private Land portion of the Grassy Mountain

Project in May of 2019. Draft state permits were issued for public comment and review in December 2025 and state agencies are currently in the process of finalizing permits. State permits will be issued at one time and are anticipated to be issued

in the third quarter of 2026.

17.4

State of Oregon Permit Processing

Calico entered into a Memorandum of Understanding for Cost Recovery (MOU) with the Oregon DOGAMI on November 3, 2014. A new MOU was signed when the

initial CPA CPA was submitted in November 2019. The MOU provides a mechanism whereby Calico, as the Project proponent, agrees to reimburse DOGAMI and other primary State agencies for their involvement in processing the CPA for the Grassy Mountain

Project when those fees exceed their permit fees. In addition, DOGAMI hired consulting firms to provide expertise that is not available from the staff that the various agencies are involved with during the permitting process.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 257

May 27, 2026

The key components of the permitting program with the State of Oregon are as follows:

Environmental baseline studies for all resource categories described in Chapter 632, Division 37 Chemical Process

Mining Rules.

Meeting all requirements of Division 37 Rules which include, but are not limited to:

Preparation of a Consolidated Permit Application (CPA)

Obtaining all necessary federal, state, and local permits and authorizations

Satisfying any potentially applicable environmental evaluation requirements.

Implementing a pro-active community involvement and consultation process including:

Local hire preference

Local contracting and purchase where practicable

Mine worker job training to provide an experienced workforce.

A key authorization permit which will be required is the permit for Chemical Processing Mining, as required under Chapter 632, Division 37, 1991 Oregon Laws

(§632-037-0005). The Consolidated Permit also requires approval by ODEQ under Division 43, Chemical Mining Rules (OAR 430-043-000), which address other environmental stipulations. “Chemical Process Mining” means a mining and

processing operation for metal-bearing ores that uses chemicals to dissolve metals from ore. The Calico processing facility will employ cyanide in the metallurgical process. The Division 37 Rules provide a well-defined regulatory pathway with

definitive permitting requirements and timelines.

Calico has filed multiple Notices of Intent (NOIs) under Division 37, which initiate the State

permitting process and begin baseline data collection. The reason for the multiple NOIs is that the scope of the operation, as well as the configuration of the Project area have changed. Each change requires the submittal of a new NOI and a

re-initiation of the permitting process. In addition, the initial NOI filing was done to initiate the agency Division 37 permit process and provide for public notice that the Project is proceeding into the permitting phase. As part of initiating the

public notification, an interagency “Technical Review Team” (TRT) was organized to provide interdisciplinary review of technical permitting issues for the State Consolidated Permitting Process. This TRT has met numerous times and

accepted the NOIs.

In addition, DOGAMI administrators and the TRT have reviewed and approved the “Calico Resources Environmental Baseline Work

Plans Grassy Mountain Mine Project”, which was filed on May 17, 2017. In July 2017 a “Notice of Prospective Applicant’s Readiness to Collect Baseline Data” was issued to Calico by DOGAMI. The environmental baseline data

collection and reporting program is now complete. All Baseline Data Reports (BDRs) submitted by Calico have been accepted by the TRT. The three most current approvals were for the Wildlife Resources BDR accepted in March 2021, the Geochemistry BDR

accepted in June 2022 and the Groundwater BDR accepted in June 2022. The Cultural Resources BDR is confidential and relies on the SHPO to provide a recommendation to the TRT.

Calico prepared and submitted the Division 37 CPA for the Grassy Mountain Gold Mine in November 2019. This single application, as required under Oregon laws,

included the following elements:

General information

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 258

May 27, 2026

Existing environment-baseline data

Operating plan

Reclamation and closure plan

Alternatives analysis.

DOGAMI finished their completeness review with input from the TRT. DOGAMI determined that additional information was necessary before further processing of

the application. Comments were received in February 2020. Calico submitted the Revised CPA package to DOGAMI in December 2021. Calico has been working with DOGAMI since the submittal responding to questions and comments. The air application was

submitted separately in August 2022.

A Notice to Proceed with the preparation of draft permits was issued by DOGAMI in November 2023. This notice

included a directive by DOGAMI to use the third-party contractor to prepare an Environmental Evaluation (EE), which was accepted by the TRT in October 2024. This EE is not a Federal NEPA requirement. It is a State of Oregon requirement which

includes:

Impact analysis

Cumulative impact analysis

Alternatives analysis (OAR 632-037-0085).

Concurrent with this assessment, DOGAMI utilized the contractor to prepare a Socioeconomic Analysis. This analysis identified major and reasonably foreseeable

socioeconomic impacts on individuals and communities located in the vicinity of the proposed mine. In particular, the analysis will describe impacts on population, economics, infrastructure, and fiscal structure (OAR 632-037-0090).

This process for permit review and approval involved a consolidated public hearing on all draft permits, and the draft operating permit which was conducted on

January 29, 2026 in Vale, Oregon. Other applicable State of Oregon and Federal permits may include, but are not limited to the following:

Permits to appropriate groundwater or surface water, or to store water in an impoundment (ORS 537.130, ORS

537.400, and ORS 540.350)

Water Pollution Control Facility (ORS 468B.050)

Storm Water Pollution Prevention Plan (EPA)

Air Quality Permits (ORS 468A.040)

Solid Waste Disposal Permit (ORS 459.205)

Permit for Placing Explosives (ORS 509.140)

Hazardous Waste Storage Permit (OAR 340-102-0010)

Land Use Permit (OAR Chapter 632, Division 001)

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 259

May 27, 2026

Any other State permits, if applicable and required under Division 37.

A Project Coordinating Committee (PCC) was also formed for the purpose of sharing information; further coordinating the Federal, State, and local permitting

requirements; optimizing communication; facilitating the regulatory process; and avoiding duplicative effort. The PCC has met formally and conducted a series of public meetings in Ontario and Bend, Oregon. These meetings were attended by agencies,

public officials, Project supporters, and non-governmental organizations (NGOs).

Division 37 mandates DOGAMI to manage and facilitate the regulatory

permitting process. It requires that a series of public meetings are held, to be coordinated by DOGAMI or its contractor. This committee is charged with gathering comments from the public regarding Project specifics. DOGAMI acts as the facilitating

State agency and State clearinghouse for the mine permitting process. It is the applicant’s responsibility to secure other needed State permits such as air pollution control, storm water pollution prevention plan, and land use permits as may

be required. However, the Division 37 process is designed to promote a consolidated permitting pathway.

DOGAMI coordinates with the other agencies to

avoid duplication on the part of the applicants and related agency requests. The agency is also responsible for reviewing mine operating plans and issuing reclamation permits. It establishes reclamation bond amounts for the Project, working closely

with Calico.

The basic information for a Division 37 application involves:

Determining existing environmental baseline conditions

Providing an operating plan (mine plan and reclamation/closure plan)

Providing an alternatives analysis

Providing an environmental evaluation

Providing a socio-economic impact analysis

Developing a plan to minimize pollution and erosion

Protecting fish and wildlife during operations and closure (fish and wildlife standards)

Providing a water balance

Establishing financial assurance requirements

Inclusion of all other State, Federal, and local permit applications required under Division 37.

Draft state permits are anticipated to be issued in the second half of 2026.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 260

May 27, 2026

17.4.1

Federal Plan of Operations Processing

A PoO must be submitted to the BLM for any surface disturbance in excess of five acres. A PoO describes the operational procedures for the construction,

operation, and closure of a project. The PoO must also include a waste rock management plan, quality assurance plan, a storm water plan, a spill prevention plan, reclamation plan and cost estimate, a monitoring plan, and an interim management plan.

The content of the PoO is based on the mine plan design and the data gathered as part of the environmental baseline studies. The PoO includes all mine and processing design information and mining methods. The BLM determines the completeness of the

PoO and, when the completeness letter is submitted to the proponent, the NEPA process begins.

The initial submittal of the Grassy Mountain PoO was in

September 2017. A revised PoO was submitted to the BLM in February 2020. The BLM determined the PoO submitted in February 2020 was not complete and requested additional details. Calico submitted a new PoO in December 2021 and that the BLM determined

was incomplete and provided comments to Calico in March 2022. Calico responded to the comments in July 2022 and received further input from the BLM in September 2022. The final PoO will be submitted to the BLM in October 2022 and based on input

received from the BLM, acceptance of the PoO triggering the NEPA process.

17.4.1.1

National Environmental Policy Act

The NEPA process is triggered by a Federal action. In this case, the issuance of a completeness letter for the PoO triggered the Federal action. The BLM

determined that the NEPA review process for this Project was an EIS.

The EIS process was conducted in accordance with NEPA regulations (40 CFR 1500 et.

Seq.), BLM guidelines for implementing the NEPA in BLM Handbook H-1790-1 (updated January 2008), and BLM Washington Office Bulletin 94-310. The intent of the EIS is to assess the direct, indirect, residual, and cumulative effects of a project and to

determine the significance of those effects. Scoping is conducted by the BLM and includes a determination of the environmental resources to be analyzed in the EIS, as well as the degree of analysis for each environmental resource. The scope of the

cumulative analysis is also addressed during the scoping process. Following scoping and baseline information collection, a draft EIS is prepared and submitted to the public for review which occurred on August 8, 2025 followed by a public

meeting held in Vale, Oregon on August 28, 2025. Comments received from the public were incorporated into the final EIS, which is in turn updated by the BLM prior to the issuance of a record of decision. the final EIS and record of decision

were issued on January 29, 2026 completing the federal permitting process.

17.4.2

Malheur County Permit Processing

Malheur County requires the authorization of a CUP for the Private Land part of the Grassy Mountain Project. Calico obtained the CUP in May of 2019.

Additionally, building permits from the Malheur County will also be required to address plumbing, electrical, and structural design.

17.5

Environmental Study Results and Known Issues

17.5.1

Baseline Studies

Paramount has been conducting baseline data collection for over ten years for environmental studies required to support the State and Federal permitting

process. Results indicate limited biological and cultural issues, air quality impacts appear to be within State of Oregon standards, traffic and noise issues are present but at low levels, and socioeconomic impacts are positive. The result of the

geochemical characterization identified that the geochemistry of the ore and waste rock provide for a possible source of future environmental issues as the Grassy Mountain Project is developed.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page261

May 27, 2026

Data produced during the baseline and geochemical studies were used in the Project design process, including

the design and operation of the TSF and handling and use of waste rock as cemented backfill material, specifically considering environmental impacts. As outlined in Section 15, the design of the TSF and the waste rock management plan used the

results of this geochemical characterization work.

The following baseline studies have been submitted to the BLM and DOGAMI as part of the permitting

process:

Air Quality Resources Baseline Report

Aquatic Resources Baseline Report

Areas of Critical Environmental Concern Research Natural Areas Baseline Report

A Cultural Resource Inventory of 830 Acres for the Grassy Mountain Mine Project (withheld from public review)

Environmental Justice Baseline Report

Baseline Geochemical Characterization Report

Geology and Soils Baseline Report

Grazing Management Baseline Report

Grassy Mountain Gold Project Baseline Groundwater Reports

Land Use Baseline Report

Noise Baseline Report

Oregon Natural Heritage Resources Baseline Report

Outstanding Natural Areas Baseline Report

Recreation Baseline Report

Socioeconomics Baseline Report

Surface Water Baseline Report

Terrestrial Vegetation Baseline Report

Transportation Baseline Report

Transportation Baseline Traffic

Transportation Baseline Trip Generation

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page262

May 27, 2026

Visual Resources Baseline Report

Wetland Delineation Report

Wild, Scenic, or Recreational Rivers Baseline Report

Wildlife Resources Baseline Report

All BDR submitted by Calico have been accepted. The Cultural BDR is handled confidentially and separately by the BLM. The SHPO is expected to make a

recommendation to the TRT; the TRT will not review the report itself, nor will it be available for public comment.

17.5.2

Geochemical Characterization and Groundwater Studies

The geochemical characterization and groundwater studies are interrelated studies with both focused on predicting the potential for acid rock drainage on the

surface and in groundwater primarily due to the storage of tailings and the storage and use of waste rock as backfill. Paramount, DOGAMI, and the BLM have worked together to ensure the baseline reports including geochemical and hydrogeological

characterization and modeling is sufficient for the PoO and CPA to be accepted and move forward in the permitting process. The final reports were submitted to DOGAMI and BLM in 2022.

SRK Consulting U.S., Inc. (SRK) completed the baseline geochemical characterization study for the Grassy Mountain Project in 2022. The purpose of the baseline

geochemical characterization program was to provide a prediction of the potential geochemical reactivity and chemical stability of mine waste that will be produced by the Grassy Mountain Project. The results of the geochemical characterization

program assisted in determining the potential for acid rock drainage (ARD) and metal leaching (ML) associated with the Grassy Mountain Project. Data produced during this study were used in the Grassy design process and as an operational tool for

identifying material types that require special handling during operations. As outlined in Section 15 of the Report, the design of the TSF and the waste rock management plan used the results of this geochemical characterization work.

The Grassy Mountain Project waste rock shows variable geochemical behavior and each material type has a wide range of sulfide content and predicted acid

generation from the static test results. Overall, the waste rock has very limited acid neutralizing capacity due to the low inorganic carbon content and as such the predicted acid generating potential is strongly related to sulfide content. The

characterization results for the ore grade material are comparable to the waste rock material.

Based on the acid–base accounting (ABA) and net-acid

generating (NAG) results, six out of the 104 waste rock and ore samples contain greater than 0.5% sulfide sulfur indicating a higher potential for acid generation. The remaining samples have an uncertain potential for acid generation with

net-neutralizing potential (NNP) values between -20 and 20 kg CaCO3 eq/ton. The NAG results are consistent with the ABA data and show samples with sulfide sulfur greater than 0.5 wt% are

predicted to have a higher capacity for acid generation with NAG values greater than 20 kg H2SO4 eq/ton. Samples with

sulfide sulfur content between 0.05 and 0.5 wt% show a low to moderate potential for acid generation with NAG values between 1 and 20 kg

H2SO4 eq/ton.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page263

May 27, 2026

Based on a meteoric water mobility procedure test, the majority of the samples have neutral to alkaline paste

pH values (pH 6–8), indicating minimal readily-soluble acid sulfate salts from prior oxidation of the core material. The exceptions are a few samples of mudstone and siltstone with the highest sulfide sulfur content that generated acidic

leachate. Constituents above Oregon groundwater quality guidelines under the low pH conditions include sulfate, arsenic, cadmium, chromium, copper, fluoride, iron, manganese, selenium and zinc. For samples with neutral pH (i.e., pH >7) all

constituents were below the Oregon groundwater quality guidelines.

Eight of the 10 humidity cell tests generated acidic leachate throughout the test and

indicate that samples with an uncertain potential for acid generation from the ABA will generate acid under long term weathering conditions. The only two samples that maintained neutral conditions during the humidity cell test program consisted of

sinter material. All other material types are considered to be acid generating including the sandstone, siltstone and mudstone. A comparison of the HCT leachate chemistry to Oregon groundwater quality guidelines indicates the mudstone (HC-3 and

HC-4) had the greatest number of parameters that exceeded guidelines and the sinter cells (HC-8 and HC-9) had the least. Most cells that developed acidic conditions leached copper, iron, manganese, arsenic and sulfate at concentrations greater than

the guidelines, indicating these elements are mobile under acidic pH conditions. Other constituents that were leached above Oregon groundwater quality guidelines during the first few weeks of the test include cadmium, chromium, copper, fluoride,

lead, selenium, silver and zinc.

17.6

Waste Disposal, Monitoring, Water Management

Waste rock characterization has been conducted and results indicate that the waste rock and ore are generally reactive, acid generating, and have the potential

to leach metals (refer to Section 17.4). As a result, waste rock and tailings management have been and will remain key issues in the permitting of the mining operation. The TSF design, as described in Section 15, was developed to mitigate

the risk of groundwater impacts due to tailings storage and includes drainage layer for solution capture and repurposing, a dual liner, and leak detection. The waste rock generated during the operation will be temporarily stored on a dual lined

facility prior to utilization as cement rock fill (CRF), as described in Section 15.

Paramount has developed and submitted to BLM and DOGAMI for

approval, the following monitoring and management plans associated with waste disposal:

Stormwater Management Plan

Waste Management Plan

Groundwater and Facilities Monitoring Plan

Cyanide Management Plan

Petroleum-Contaminated Soil Management Plan

Tailings Chemical Monitoring Plan

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 264

May 27, 2026

17.7

Social and Community Issues

Social and community impacts have been considered and evaluated for the PoO in accordance with the NEPA and other Federal laws, and the State of Oregon

Socioeconomic Analysis. Potentially affected Native American tribes, tribal organizations and/or individuals were consulted during the preparation of the PoO and consultation continues to advise on the project that may have an effect on cultural

sites, resources, and traditional activities.

The most recent planning by Malheur County, Oregon, were considered during the preparation of PoO and CPA.

Potential community impacts to existing population and demographics, income, employment, economy, public finance, housing, community facilities and community services will be evaluated for potential impacts as part of the State of Oregon and the

NEPA process.

There are no known social or community issues that would have a material impact on the Project’s ability to extract Mineral Resources

and Mineral Reserves. Identified socioeconomic issues (employment, payroll, services and supply purchases, and State and local tax payments) are anticipated to be positive through the creation of direct, indirect and induced jobs.

Paramount plans to implement a proactive community involvement and consultation process including 1) local-hire preference; 2) local contracting and

purchasing where practicable; and 3) mine-worker job training to provide an experienced work force. Mining and milling jobs are expected to be sourced to local communities where possible, with limited relocation to supply the expertise reinforcing

the local skillsets.

As a commitment to the local community, Paramount has conducted site tours and discussions with the state and local senators,

representatives, regulators and the local school high school regarding the project. Paramount also has plans to further partnerships with local community colleges and vocational schools whereby “mining expertise” can be developed through

partnership curriculums. These partnerships are likely to include Treasure Valley Community College in Ontario, Eastern Oregon University in LaGrande, and College of Western Idaho in Boise. Paramount will coordinate with Eastern Oregon University to

develop and provide the MSHA safety training program.

17.8

Closure

A closure plan and RCE were submitted to the BLM and DOGAMI as part of PoO and CPA, respectively. The proposed reclamation approach for the Project includes

sealing the mine portal, lining, capping, and revegetating the TSF supported by temporary active solution management followed by passive solution management (evaporation) as the TSF drains down, the removal and offsite disposal of the temporary

waste rock storage facility liner, process plant and other infrastructure, the demolition and offsite disposal of the powerline and associated infrastructure, and in general the grading, capping, and revegetation of disturbed areas. This approach

will result in two post-reclamation landforms, the TSF and the quarry, and is anticipated to be completed within five years of ceasing operation. Post-reclamation monitoring, including groundwater and stormwater quality and revegetation success, is

proposed to meet Federal and State requirements and guidance and will be continue for up to 30 years following reclamation.

The RCE was developed using

the Nevada Standardized Reclamation Cost Estimator (SRCE Version 2.0) and includes direct and indirect costs, contingency, and post-reclamation monitoring assuming third-party costs. The RCE was updated in February 2026 to account for current unit

rates and in response to input from DOGAMI and BLM during the permitting process. The reclamation surety associated with the proposed reclamation plan is $21,086,123 including indirect costs such as contingency, contractor management and contractor

profit. The BLM and State of Oregon are in negotiations to establish an MOU allowing the State of Oregon to hold the bond and oversee the reclamation activities.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 265

May 27, 2026

17.9

Environmental and Permitting Risks and Opportunities

As with almost all mining projects, there are inherent risks and opportunities related to the final outcome of the Project. Most of these risks related to

environmental and permitting are based on uncertainty of the permitting program, and timing to obtain all necessary permits and authorizations. Other risks can involve new regulations, the modifications of environmental standards like air or water

quality, and legal challenges; however, the Project has limited applicable environmental standards as it relates to water quality (groundwater and surface water).

To facilitate Project permitting and development for the FS and permitting programs, and to design a sustainable project and reduce environmental risks,

Paramount adopted the following environmental principles for the Project:

Confirm the presence of potential threatened and endangered or sensitive amphibians, wildlife, or plant species

at the site.

Reduce the area of disturbance where possible by utilizing existing infrastructure and re-use of waste rock as

backfill.

Reduce environmental impacts such as emissions, noise and vibration, water consumption, etc. through operational

controls such as limiting traffic to and from the site and the re-use of water from the underground and TSF.

Protect local surface and ground water quality and quantity by applying best management practices and evaluating

and implementing new practices as they are identified.

Effectively manage all related mine waste including lining the TSF and use of waste rock underground as backfill.

Reduce the carbon footprint for the Project by processing the gold concentrate on site.

Conduct environmental monitoring to ensure compliance with all applicable State, Federal, and local laws,

regulations, and ordinances.

Transport all fuel to the mining operation according to accepted transport and spill prevention and response

standard operating procedures developed specifically for the Project.

Integrate pro-active wildlife habitat mitigation and enhancement proposals with an environmentally responsible

reclamation plan.

Provide adequate financial assurance for implementing an effective reclamation plan to ensure long-term

protection and rehabilitation of the mine site.

Implement a responsible community and statewide public affairs program to further open communications, maximize

local job opportunities and involvement, and meet environmental justice requirements for the Grassy Mountain Mine Project.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 266

May 27, 2026

Collectively, these objectives or environmental principles will guide Project development. They will also

serve to reduce risk and enhance related Project opportunities.

17.10

Qualified Person’s Opinion

The final EIS and record of decision were issued in January 2026 providing federal authorization for the PoO to progress into construction, operation and

closure. State permits authorizing the mine plan to progress are expected to be provided in the second half of 2026. Paramount’s engagement with the local, state, and federal regulatory agencies as well as the local community and tribal

engagement has been frequent resulting in a supportive local community and strong working relationship with the regulatory agencies.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 267

May 27, 2026

18

CAPITAL AND OPERATING COSTS

18.1

Capital Cost Estimate

18.1.1

Introduction

The capital cost estimate was developed with an accuracy of ±15% using the AACE Class 3 estimate standards, and includes the cost to complete the

design, procurement, construction and commissioning of all the identified facilities.

The entities involved in the estimate and their specific areas of

input are summarized in Table 18-1.

Table

18-1: Capital Cost Estimate Input Areas

Company Responsible

Area

Item

Ausenco

Site development & earthworks

Internal roads

Catchment pond

Diversion ditches from process plant to

pond

Crusher ROM pad

Plant site bulk earthworks

On-site infrastructure bulk earthworks

Crushing & material handling

Primary crushing

Secondary crushing

Fine ore bin

Process plant

Grinding and classification

Carbon-in-leach

Cyanide detox

Carbon elution and gold room

Reagents

Process utilities (process plant building, water systems, plant & instrument air, process control system)

Tailings management & waste rock

Tailings & reclaim water pipelines

On-site infrastructure & utilities

Power distribution (power distribution & supply, electrical rooms, control

rooms)

Water supply & distribution

Waste management (water treatment plant (grey

water))

Ancillary buildings (mine dry & office, mine maintenance/warehouse, underground truck shop, plant maintenance/warehouse, assay

laboratory)

Surface mobile equipment (surface mobile equipment &

facilities)

Bulk fuel storage &

distribution

Information technology and communications

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 268

May 27, 2026

Company Responsible

Area

Item

RESPEC

Mining pre-stripping

Portal construction

Portal laydown

Mine development

Decline

Level station

Level access

Underground sump

Underground stockpiles

Underground power stations

Underground truck loading bays

Ventilation infrastructure (ventilation bays, raises)

Underground mine equipment

Surface and Underground mobile equipment

Mine infrastructure & services

Main fans and housing

Auxiliary fans

Mine dewatering

Face pumps

Sump pumps

Backfill plant

Surface backfill plant infrastructure

Haul roads

Portal to WRSF

Ventilation laydown

Powder magazine

Borrow pit road

Golder

Tailings facility & water management

Construction material quantity estimate only

Reclamation & closure

Inputs to SRCE model

R&O Consulting (R&O)

Site access road

Main access roads

SPF Water Engineering (SPF)

Water distribution

Water distribution and management

Fire Safety Systems Ltd (FSS)

Fire systems

Fire suppression, detection and protection systems

Idaho Power

Powerlines

Main substation and power line to site

Paramount Gold

Owner’s costs

Owner’s costs and inputs to G&A

18.1.2

Cost Estimate Summary – Initial Capital

The estimate is derived from budgetary pricing for major items in the mechanical equipment list, electrical equipment list and contractor work packages (e.g.

concrete, structural steel, platework, etc.), benchmarked against similar projects and scaled/escalated accordingly. The estimates were based on a number of fundamental assumptions as indicated in process flow diagrams, general arrangements,

material take offs (MTOs), cable schedules, scope definition and a work breakdown structure. The estimate included all associated infrastructure as defined by the scope of work developed in 2020 FS and carried in the 2022 FS update.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 269

May 27, 2026

The capital cost estimate is summarized in Table 18-2 and Table 18-3. The estimate has a base date of Q1, 2026 with no provision for forward escalation and noted in US dollars unless stated otherwise.

Table 18-2: Initial Capital Cost Estimate Summary (direct and indirect)

WBS

Description

$ M

% of Total Costs

1000

Mining

26.2

14

2000

Site development

7.2

4

3000

Mineral processing

43.4

23

4000

Tailings management

& waste rock facility

13.3

7

5000

On-site infrastructure

17.3

9

6000

Off-site

infrastructure

16.8

9

Direct Subtotal

124.6

66

7000

Project indirect costs

28.0

15

9000

Owner’s costs

15.6

8

Indirect Subtotal

43.6

23

8000

Provisions

(Contingency)

19.8

10

N/A

Capitalized

Operating cost

1.7

1

Project Total – Initial Capital

189.8

100

Note: totals may not match due to rounding

Table 18-3: Initial Capital Cost Estimate by Major Discipline

Disc.

Major Discipline

$ M

A

Architectural

8.6

B

Earthworks

6.5

C

Concrete

4.1

S

Structural steelwork

2.8

F

Platework

4.9

M

Mechanical

equipment

20.5

P

Piping

3.9

E

Electrical equipment

8.2

L

Electrical bulks

2.3

I

Instrumentation

0.6

N

Mobile equipment

2.1

R-1

Third party estimates

60.0

Direct Subtotal

124.6

O

Owner’s costs &

bonding

15.7

R-2

Third party estimates

2.0

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 270

May 27, 2026

Disc.

Major Discipline

$ M

T

Project delivery (EPCM)

20.1

U

Field indirects

2.2

V

Spares & first fills

3.7

Indirect Subtotal

43. 6

Y

Provisions (Contingency)

19.8

N/A

Capitalized Operating cost

1.7

Project Total – Initial Capital

189.8

18.1.3

Cost Estimate Summary – Sustaining Capital

The sustaining capital cost estimate is provided in Table 18-4 and includes costs for mining operations (equipment

lease), mineral processing, tailings management and site infrastructure over the LOM.

Table 18-4: Sustaining

Capital Cost Estimate Summary (direct and indirect)

WBS

Description

$ M

1000

Mining

33.4

2000

Site development

3000

Mineral processing

3.9

4000

Tailings management & waste rock facility

20.4

5000

On-site infrastructure

6000

Off-site infrastructure

Direct Subtotal

57.7

7000

Project indirect costs

1.7

9000

Owner’s Costs

2.4

Indirect Subtotal

4.1

8000

Provisions (Contingency)

3.3

Project Total – Sustaining Capital

65.1

Note: totals may not match due to rounding

18.1.4

Definition of Costs

The capital cost estimate was developed for initial and sustaining capital, broken out into direct and indirect costs:

Initial capital is the capital expenditure required to start up a business to a standard where it is ready for

initial production.

Sustaining capital is the capital cost associated with the periodic addition of new plant, equipment or services

that are required to maintain production and operations at their existing levels, or a TSF expansion.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 271

May 27, 2026

Direct costs are those costs that pertain to the permanent equipment, materials and labor associated with the

physical construction of the process facility, infrastructure, utilities, buildings, etc. Contractor’s indirect costs were contained within each discipline’s all-in rates.

Indirect costs include all costs associated with implementation of the plant and incurred by the Owner, engineer

or consultants in the project design, procurement, construction, and commissioning.

18.1.5

Methodology

The estimate was updated in Q2 2026 based on a mix of budgetary quotations for major equipment supply, detailed material take-offs and engineered/factored

quantities and costs, and detailed unit costs supported by contractor bids, consistent with AACE Class 3 estimating guidelines.

The estimate was based on

an engineering, procurement and construction management (EPCM) approach where the EPCM contractor will oversee the delivery of the completed project from detailed engineering and procurement to the transfer of a working facility. The EPCM contractor

shall engage and coordinate several subcontractors to complete all work within the given scopes.

The structure of the estimate was a build-up of the

direct and indirect cost of the current quantities; this included the installation/construction hours, unit labor rates and contractor distributable costs, bulk and miscellaneous material and equipment costs, any subcontractor costs, freight and

growth.

The craft wages carried in the estimate were calculated based on current contractor bids and adjusted to align with current industry rates for

the project area. The labor rates reflect the composition of the project location using local Oregon labor and other surrounding regional workforces from neighboring states.

Percentages were added to the base labor rate for concrete, structural, mechanical, piping, electrical and instrumentation whilst earthworks was based on

sub-contractor rates. Distributable costs were allocated by percentage per discipline based on Ausenco’s historical data confirmed by back calculating contractor indirect costs from the returned bids.

Mechanical and electrical equipment were updated to a Q2 2026 basis with pricing for major equipment based on budget quotations. Other minor equipment costs

were from historical data from recent projects and studies or developed using engineering estimates.

18.1.6

Exchange Rates

The exchange rates used were determined from the XE.com website as of March 1, 2026 and were applied to foreign currency data. The exchange rates in Table

18-5 were used.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 272

May 27, 2026

Table 18-5: Exchange Rates used in the FS

Forex Rate

USD

1.000 CAD

0.733

1.000 AUD

0.711

1.000 USD

1.000

Note: CAD = Canadian dollar, AUD = Australian dollar, USD = US dollar

18.1.7

Market Availability

The pricing and delivery information for quoted equipment, material and services was provided by suppliers based on the market conditions and expectations

applicable at the time of estimated development.

Market conditions are susceptible to the impact of demand and availability at the time of purchase and

could result in variations in the supply conditions. The estimate in this report is based on information provided by suppliers and assumes that current challenges faced with the supply and availability of equipment and services are not applicable

during the proposed execution phase.

18.1.8

Mining Capital Cost Estimate

18.1.8.1

Underground Capital Costs

The underground capital costs were estimated using quotes and InfoMine cost estimates. The underground capital costs are listed in Table 18-6.

Table 18-6: Underground Capital Costs

Equipment

Model

Quantity

Quote

or

Estimate

Buy or

Lease

Total Cost

($ M)

Dual boom—development drill rig

Sandvik DD422i

3

Quote

Lease

4.9

Underground loader

Sandvik LH307

4

Quote

Lease

3.9

Truck with ejector bed

Sandvik TH320

3

Quote

Lease

3.2

Front-end loader (share with surface & underground)

CAT 962H

2

Quote

Lease

1.0

Powder loader

CAT 440

1

Quote

Lease

0.2

Telehandler

CAT TL1255

2

Quote

Lease

0.6

Dozer (share with surface & underground)

CAT D6T

2

Quote

Lease

1.2

Motor grader

CAT 160

1

Quote

Lease

0.8

Shotcrete Sprayer

GetMan Proshot Concrete Sprayer

1

Quote

Rent

0.8

Shotcrete Truck

GetMan ProMix 6

1

Quote

Rent

0.6

Lube Truck

Getman A64 SE Lube

1

Quote

Rent

0.6

Water Truck

Getman A64 SE Water Sprayer

1

Quote

Rent

0.5

Scissor deck

Getman A64 SE SL

1

Quote

Rent

1.2

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 273

May 27, 2026

Equipment

Model

Quantity

Quote or

Estimate

Buy or

Lease

Total Cost

($ M)

Mine Rescue Truck6

Kovatera KT200

1

Quote

Rent

0.3

Diamond Drilling

Hydracore HC200UG

1

Estimate

Buy

0.3

Tractor

Kubota 5100

4

Quote

Buy

0.3

4WD Twin Cab Utility

Light Vehicle 4WD Twin

Cab Utility 1/2 ton

3

Quote

Buy

0.3

Refuge Chambers

MineARC 16 person

2

Quote

Buy

0.2

Bio-Lavatories

MineARC EnviroLAV

4

Quote

Buy

0.1

UG Shop Equipment

Misc.

1

Estimate

Buy

0.7

Mine Remote Stench system

Remote and Manually

2

Quote

Buy

0.03

Main Fan

Spendrup 274-183-900-A-

D

1

Quote

Buy

0.8

Main Fan Installation

Misc.

1

Quote

Buy

0.4

Auxiliary fans

JetAir Axiflow fan Model

O-4150-B

5

Quote

Buy

0.2

Auxiliary pumps

Peak TD350HH

5

Quote

Buy

0.1

Pump Station supplies

Misc.

1

Estimate

Buy

0.2

Face pump

TD250HH 13HP

5

Quote

Buy

0.06

Initial supplies & inventory

Powder, bolts, pipe,

inventory

1

Estimate

Buy

0.2

Mobile load center (electrical)

Intermountain Electrical

Inc

3

Quote

Buy

0.7

Jumbo boxes

Terminator T2 Box

4

Quote

Buy

0.9

Portal preparation

Misc.

1

Quote

Buy

0.7

Capital Development Contractor Mobilization

Misc.

1

Quote

Buy

0.1

Compressed air

Sullair model LS16009 985

ACFM@125 PSIG

4

Quote

Buy

0.4

Spare parts – main fan

Spare main fan + starter

1

Quote

Buy

0.5

Spare parts – fans, MLC, jumbo box, compressor

1

Quote

Buy

0.1

Spare parts – pumps

1

Quote

Buy

0.04

Backfill plant

Master Plant – Simem

WetBaton 100

1

Quote

Buy

1.8

Backfill Plant Addon for shotcrete

Simem

1

Quote

Buy

0.2

Installation

Misc

1

Estimate

Buy

0.9

Mine Dispatch System

GroundHog Enterprise SIC

Software—Initial Setup

1

Quote

Buy

0.02

Mining Admin Office IT setup

Misc.

1

Estimate

Buy

0.04

Blast Logger iKon Logger

Orica iKon

3

Quote

Buy

0.01

iKon Blaster

Orica iKon Blaster 3000 or

equivalent

2

Quote

Buy

0.02

Leaky Feeder system

Cable, Amplifier, Install

1

Estimate

Buy

0.2

Note: Costs are rounded; therefore, minor variances from actual costs may occur in the table.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 274

May 27, 2026

The capital costs are categorized into ‘buy’, ‘lease’, or ‘rent’. Items

categorized as ‘lease’ will be lease-to-own. Items categorized as ‘rent’ will be rented for a period of three years, after which a lumpsum payment will be made to purchase them. A portion of those costs pertain to initial

capital, and the remaining amount has been apportioned to sustaining capital. The summary for leasing costs by year is shown in Table 18-7.

Table 18-7: Underground Leasing Costs

Item

Unit

Year 0

Year 1

Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

Year 8

Total

Down payment

$

M

1.7

1.5

0.0

0.0

0.0

0.0

0.0

0.0

0.0

3.2

Principal payment

$

M

0.4

1.7

2.3

2.5

2.7

2.3

0.7

0.0

0.0

12.8

Net capital

$

M

2.2

3.2

2.3

2.5

2.7

2.3

0.7

0.0

0.0

15.9

Interest payment

$

M

0.2

0.7

0.8

0.6

0.4

0.1

0.2

0.0

0.0

2.8

Total payments

$

M

2.4

3.9

3.1

3.1

3.1

2.4

0.7

0.0

0.0

18.7

Note: totals may not match due to rounding

18.1.8.2

Cost Estimate Summary (Mining)

Initial mining capital costs are summarized in Table 18-8.

Table 18-8: Initial Mining Capital Cost Estimate Summary

WBS

Description

$ M

1100

Mine portal construction

0.8

1200

Mine development/production

14.9

1300

Mine fixed equipment

1.6

1400

Mine infrastructure and services

0.9

1500

Mine fleet

4.0

1600

Mine dewatering

0.1

1700

Mine pre-production costs

0.2

1800

Backfill plant

1.9

2100

Bulk earthworks

0.8

2200

Road

0.3

7000

Other indirects

1.2

9100

Owner’s costs

0.8

8100

Contingency

2.5

Project Total – Initial mining-related capital costs

29.9

Note: Costs are rounded to the nearest million USD for reporting purposes; therefore, minor variances from the actual costs

may occur in the table.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 275

May 27, 2026

18.1.9

Processing and Overall Site Infrastructure Capital Cost Estimate

18.1.9.1

Basis of Estimate Methodology

18.1.9.1.1

Direct Costs

Direct costs are quantity-based and include all permanent equipment and materials associated with the physical construction of the facility. Cost estimates

include:

Direct labor-hours and labor

Contractor distributable

Permanent equipment and bulk materials

Freight and subcontracts.

18.1.9.1.2

Labor Productivity

Productivity factors were used to capture the productivity loss due to conditions experienced in the Project area.

Site productivity was assessed for each discipline using the scorecard method. Unit-labor hours were multiplied by the productivity factors for total

labor-hours per line item. Total labor-hours were then compared against returned contractor bids to ensure sufficient labor-hours were carried in the estimate.

18.1.9.1.3

Contractor Labor Rates

The contractor labor wages carried in the estimate were calculated from a recently completed project by Ausenco in Washington State. The rates were benchmarked

against historical data for labor in Oregon and Idaho. The labor rates reflect the use of local labor and surrounding regional workforces. The rates are fully burdened.

18.1.9.1.4

Contractor Distributable Costs

Percentages were added to the base labor rate for concrete, structural, mechanical, piping, electrical and instrumentation. Earthworks were based on

sub-contractor rates. Distributable costs were allocated by percentage per discipline based on Ausenco’s in-house database and confirmed by back calculating contractor indirect costs from the returned bids.

18.1.9.1.5

Earthworks & Site Preparation

Items such as engineered fill are to be sourced from borrow pits and stockpiles on site. MTOs were taken from an Autodesk Civil 3D model of the plant layout

and general arrangements.

Sub-contract rates were used in the estimate for bulk earthworks requirements. Prices carried in the estimate were a

combination of rates from local contractors and Ausenco’s in-house database for benchmarking.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 276

May 27, 2026

18.1.9.1.6

Concrete Supply & Installation

The scope of the concrete works allows for all concrete work in the process plant and relevant on-site facilities. MTOs were prepared by engineering and are

based on calculations derived from a 3D layout model, general arrangement drawings and sketches.

The basis for the development of installed concrete was

the product of concrete material supply and installation costs. Labor costs included the necessary consumables, reinforcement bar, and formwork. Supply of ready-mix concrete costs were sourced from contractors in the area for current pricing and

benchmarked against other reference projects in a similar geography. The overall unit rates were comparable to those in Ausenco’s in-house database for projects in Oregon and Idaho.

The cost of an on-site batch plant was excluded from the estimate as the mine site is located within driving distance to Vale and Boise. Both cities have

existing ready-mix plants.

18.1.9.1.7

Structural Steel

Structural steel quantities were prepared by engineering based on calculations derived from a 3D layout model, general arrangement drawings and sketches.

The basis for the development of installed structural steel was the product of steel material supply and installation costs. Labor-hours were based on local

contractors for the installation of the necessary structural sections and all associated items such as stair treads, hand railing and grating with adjustments by Ausenco for productivity.

Pricing was sourced from fabricators in Idaho, Montana and Arizona and allowed for the supply, fabrication, shop detailing and painting of bulk steel products

graded as light, medium, heavy and extra heavy structural steel designations, and miscellaneous steel including checker plate, grating and handrail.

The

structural, mechanical and piping (SMP) contractor will be free-issued the steel for assembly on site.

18.1.9.1.8

Architectural

A buildings list was developed from general arrangement drawings and historical data of similar facilities. Concrete and internal support steel for equipment

inside the buildings were accounted for in the engineer’s MTOs.

Pricing for the supply and installation of the building packages was from current

quotations and Ausenco’s in-house database from recent relevant projects. Allowances were carried in the estimate for furniture, fittings and fixtures. Overhead cranes were not included in the building costs as they were accounted for in the

mechanical equipment list.

18.1.9.1.9

Mechanical Equipment

A detailed mechanical equipment list was developed, generally sized by process and mechanical engineering, and emphasized the selection of proven designs.

Quantities were based on process flow diagrams, equipment list, equipment datasheets and general arrangement plans. Mechanical equipment was included in the capital cost estimate in accordance with the latest revision of the equipment list.

Pricing for major process mechanical equipment items was based on budget quotations. Other minor equipment costs were from Ausenco’s in-house database

and recent studies or estimated by engineering.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 277

May 27, 2026

18.1.9.1.10

Platework

A platework list was prepared for chute work, launders, hoppers, bins and major field erected tanks and silos, this list makes up part of the mechanical

equipment list. Platework and liners were quantified in short tons or square feet by engineering. Tanks were designed as panel-style bolted and welded construction. Mechanical bulks quantities were prepared by engineering based on design

calculations, previous similar designs, and forced quantity factors. Some minor structures were developed from drawings and sketches.

The basis for the

development of installed platework steel was the product of steel material supply and installation costs. Labor-hours were based on local contractors in the region for the installation of the bulk steel plate and rubber or carbon steel lining

products with adjustments by Ausenco for productivity.

Pricing was sourced from fabricators in Idaho, Montana and Arizona and allows for the supply,

fabrication, shop detailing of platework elements.

Rubber and carbon steel lining products were costed using historical data. Installation hours of

rubber liners have been based on increments of 1/4 inches (6 mm Updated) thickness. Installation hours of carbon steel liners were based on increments of 5/8 inches (16 mm) thickness. Tanks identified and designed as panel-style bolted

tanks were quoted as supply and install.

The SMP contractor will be free-issued the platework bulk steel for assembly on site.

18.1.9.1.11

Process Plant Piping

The process plant piping was factored from the total installed mechanical. The factor allowed for pipe, fittings, supports, valves, paint, special pipe items

and flanges. The piping bulks will be free issued to the SMP contractor for installation.

18.1.9.1.12

Fire Protection and Detection Piping

Fire protection and detection piping was included in the estimate based on a vendor quotation from FSS. The quote allowed for the supply and installation of

fire protection/detection equipment, pipes, fittings, supports, valves, special pipe items, and flanges.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 278

May 27, 2026

18.1.9.1.13

Water Supply and Distribution

Potable water, fresh water, raw water pipeline, wells and septic water supply and distribution piping were included in the estimate based on a vendor quotation

from SPF. The estimate included supply rates for pipe and fittings, civil works and mechanical equipment.

18.1.9.1.14

Pipelines

Ausenco’s scope included the installation of the decant line and tailings distribution lines. The supply rates included pipe and fittings with standard

install hours applied to the labor rate. The tailings pipelines will be free issued to the SMP contractor for installation.

18.1.9.1.15

Electrical Equipment

The proposed electrical equipment list aligns with the current mechanical equipment list and load list.

Pricing for major electrical equipment items was developed from a combination of budget quotations for major items and Ausenco’s in-house database.

A 15 kV overhead powerline branching off the main powerline from the mine site was included to feed the process plant, ancillary buildings and tailings

area.

18.1.9.1.16

Electrical Bulks

An electrical cable schedule was developed for the Project covering the major power and control cables between electrical equipment (transformers and

switchgears/motor control centers or MCCs) and between MCCs and motors. Based on the layout and e-room placement, MTOs for high voltage cables were developed via manual take-offs for major lines and an average length per area was established for

medium voltage cables.

Cable trays were estimated via manual take-offs for 6–36-inch trays together with allowances for cable tray covers. While

not all cables would travel the full length of the longest tray run, any over-supply is expected to cover costs for risers, bends, covers, fittings and fixtures.

An allowance for terminations, small lighting, and receptacles was developed by factoring from the mechanical equipment supply costs.

18.1.9.1.17

Instrumentation and Control

Instrumentation was developed by factoring from the mechanical equipment supply costs. The process control system for the process plant was priced separately.

18.1.9.1.18

Mobile Equipment

Equipment prices included price ex-factory, freight and erection at site if required.

The major equipment fleet for support to the completion of the site development and bulk earthworks was built up into the earthworks unit rates. Surface

mobile equipment to support the construction of the process plant and on-site infrastructure was included in the all-in labor rate provided by the contractors.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 279

May 27, 2026

18.1.9.1.19

Freight Costs

Freight costs included inland transportation, export packing, all forwarder costs, ocean freight and air freight where required, insurance, receiving port

custom agent fees, and local inland freight to the planned mine site for all bulk materials and process plant equipment.

The estimate freight costs were

determined by applying a percentage to the applicable items direct supply cost and then including this cost as a separate value on each line items build-up. Vendor-supplied freight costs were included for major equipment where available.

Vendor packages, third-party costs and any other subcontract and design and construct items were inclusive of any required freight to site

18.1.9.1.20

Import Duties

Import duties were excluded from the estimate.

18.1.9.2

Capitalized Operating cost

A total of $1.7 million of operating costs were included in the initial capital cost estimate, for costs incurred during the pre-production period.

18.1.9.3

Cost Estimate Summary (Processing and Overall Site Infrastructure)

The initial capital cost estimate for process and site infrastructure areas is provided in Table 18-9.

Table 18-9:  Initial Capital Cost Estimate Summary for Process and Site Infrastructure Areas

WBS1

Description

$ M

1400

Mine infrastructure and services

2.0

2100

Bulk earthworks

4.7

2200

Roads

1.1

2300

Surface water management

0.3

3100

Crushing & ore handling

7.2

3200

Grinding & classification

5.4

3300

Gravity separation

0.4

3400

Carbon-in-leach (CIL)

8.0

3500

Carbon elution and goldroom

6.8

3600

Cyanide detox

3.5

3700

Tailings thickening

0.3

3800

Reagents

2.0

3900

Plant building & services

10.0

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 280

May 27, 2026

WBS1

Description

$ M

4100

Tailings facility & water management

0.2

4200

Tailings & reclaim pipelines

0.5

5100

Power generation & distribution

1.1

5200

Water supply & distribution

6.2

5400

Ancillary buildings

7.2

5500

Surface mobile equipment

2.1

5600

Bulk fuel storage & distribution

0.3

5700

IT and communications

0.3

5800

General

0.3

6100

Main site access road

4.7

6200

Overhead power line

12.2

Direct Subtotal

86.5

7200

Field indirects

2.8

7300

Temporary utilities & services

0.6

7400

Temporary equipment

0.3

7600

Vendors representatives

0.4

7700

Spares & first fills

2.8

7800

Start-up& commissioning

0.6

7900

EPCM and expenses

15.4

Indirect Subtotal

23.0

8100

Provision (contingency)

15.0

N/A

Capitalized Operating cost

1.7

Project Total – Initial Process & On-Site Infrastructure

Capital

126.1

Note: totals may not match due to rounding

18.1.10

Tailings Storage and Temporary Waste Rock Storage Facilities Capital Cost Estimate

18.1.10.1

Material Take-off and Bid Solicitation

As discussed in Section 15.5 and presented in Table 15-1, the TSF is designed to be constructed in a total of

three primary construction stages (Stages 1 through 3). Stage 1 is separated into two intermediate construction phases (Stages 1A and Stage 1B). In this study, Stage 1A is designated as initial capital and Stage 1B and Stage 2 are denoted as

sustaining capital. Stage 3 is currently not required for the FS mine production.

Stage 1A will be the initial stage of construction and provides the

basic infrastructure to be able to operate the TSF and TWRSF, including underdrains, embankments, stormwater diversion channels, and a TSF reclaim pond. Stage 1B and Stage 2 will include construction of embankment raises and TSF basin

expansions to provide additional tailings storage.

The TSF design, as presented in Section 15.5 is of sufficient detail that construction quantity

estimates for major earthwork, geosynthetics, and gravity piping are to an accuracy of 10%. Construction quantities estimates were developed by WSP using Autodesk AutoCAD Civil 3D designs of the TSF and TWRSF facilities and general arrangements and

design details.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 281

May 27, 2026

Upon WSP receiving and compiling all quotations, the quotations were provided to Paramount and Ausenco for

inclusion in the overall capital cost estimate and financial model prepared by Ausenco. For this Report, the preferred general contractor provided an updated capital construction cost estimate to account for design revisions of the TSF and TWRSF as

presented in WSP’s 2021 Detailed Design Report, and reflect present unit prices for all construction equipment, labor and materials.

18.1.10.2

Cost Estimate Summary (Tailings Storage and Temporary Waste Rock Storage Facilities)

Ausenco and Paramount incorporated WSP’s preferred contractor’s bid to create a construction cost estimate for

Stage 1A, Stage 1B, and Stage 2 to develop the initial and sustaining cost estimates considering the timing required for construction of the TSF expansions as required by the FS mine life. Table 18-10

presents the initial capital cost applied for Stage 1A of the TSF in the economic analysis in Section 19.

Table

18-10: Initial TSF Capital Cost Estimate Summary

WBS

Description

$ M

4100

Tailings Facility & Water Management

12.7

Direct Subtotal

12.7

7000

Indirects

3.0

Indirect Subtotal

3.0

8100

Provision (Contingency)

2.4

Project Total – Initial Tailings Capital

18.1

Note: totals may not match due to rounding.

18.1.11

Indirect Capital Cost Estimate

18.1.11.1

Project Preliminaries (Field Indirects)

Project preliminaries are items or services which are not directly attributable to the construction of specific physical facilities of plant or associated

infrastructure but required to be provided as support during the construction period.

These costs may include:

Temporary construction facilities: site offices, induction center, first aid facilities, admin, portable toilets,

temporary fencing, temporary roads and parking.

Temporary utilities: power supply, temporary grounding and generators, construction lighting, and water supply.

Construction support: site clean-up and waste disposal, material handling, maintenance of buildings and roads,

testing and training, service labor, site transport, site surveys, QA/QC, and security.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 282

May 27, 2026

Construction equipment, tools and supplies purchased by the owner or EPCM contractor: heavy equipment and cranes,

large tools, consumables, scaffolding and purchased utilities.

Material transportation and storage incurred by the Owner or EPCM contractor: all types of freight, agents,

staging and marshalling.

Site office: local services and expenses, communications and office furniture.

Project preliminaries were developed from first principles and summarized in the estimate to cover the construction duration for the process plant and on-site

infrastructure. RESPEC and Golder accounted for field indirect costs in their respective discipline areas to support their scope of work.

18.1.11.2

Operational Spares

Mechanical and electrical spares for operations purposes were provided by vendor quotes for major equipment for the initial first year of operations. The

remaining equipment was factored using Ausenco’s in-house database.

18.1.11.3

Capital (Insurance) and Commissioning Spares

Major mechanical and electrical spares for capital/insurance and commissioning purposes were provided by vendor quotes for major equipment. The remaining

equipment was factored using Ausenco’s in-house database.

18.1.11.4

First Fills

First fills include the costs for the initial construction, first fills for installed equipment and process first fills. First fills were developed by process

engineering and separated in the estimate as either construction or commissioning first-fills.

18.1.11.5

Vendors

Costs for vendor representatives for commissioning were identified from the returned budget quotes as a cost per day or an allowance made by engineering. Costs

were separated in the estimate as either construction or commissioning vendor representatives.

18.1.11.6

Pre-commissioning, Commissioning

Commissioning assistance from mechanical completion to hand over was developed using Ausenco’s EPCM costs. A modification squad was allowed for in the

estimate. The modification squad was carried out to allow the commissioning team to make minor modifications or provide labor assistance for commissioning. The modification squad allowance has been estimated using Ausenco’s in-house database.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 283

May 27, 2026

18.1.11.7

Construction Camp and Catering

No onsite camp was allowed for in the estimate. It was assumed that all labor would be sourced from within the region and would reside in either Vale, OR or

Boise, ID.

18.1.11.8

EPCM

EPCM services costs covered such items as engineering and procurement services (home office based), construction management services (site based), project

office facilities, information technology, staff transfer expenses, secondary consultants, field inspection and expediting, corporate overhead and fees.

The overall EPCM budget for Ausenco’s scope of work was developed from first principles and was inclusive of allocations for other direct costs and

general expenses.

18.1.11.9

Cost Estimate Summary (Indirects)

The initial capital cost estimate for indirects provided in Table 18-11.

Table 18-11: Initial Capital Cost Estimate Summary for Indirects

WBS1

Description

$ M

7200

Field indirects

7.9

7300

Temporary utilities & services

0.6

7400

Temporary equipment

0.3

7600

Vendor representatives

0.4

7700

Spares & first fills

2.8

7800

Start-up& commissioning

0.6

7900

EPCM and expenses

15.4

Project Total—Indirects

28.0

Note: totals may not match due to rounding.

18.1.12

Owner’s Costs

The Owner’s initial capital cost estimate is provided in Table 18-12.

Table 18-12:  Initial Owner’s Cost Estimate Summary

Description

$ M

Corporate overheads

0.2

Environmental monitoring

0.3

Site office

0.4

Setup & running costs

0.7

Staff & labor

2.6

Bonding

11.5

Project Total – Initial Owner’s Capital

15.7

Note: totals may not match due to rounding.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 284

May 27, 2026

18.1.13

Contingency

18.1.13.1

Estimate Contingency

Estimate contingency was included to address anticipated variances between the specific items contained in the estimate and the final actual project cost.

The estimate contingency does not allow for the following:

Abnormal weather conditions

Changes to market conditions affecting the cost of labor or materials

Changes of scope within the general production and operating parameters

Effects of industrial disputes.

18.1.13.2

Contingency Analysis

Each of the contributing parties to the estimate provided a contingency value based on their engineering scope and cost development level of definition. These

inputs were applied as percentages to their respective base estimates, resulting in a contingency of $19.8 million, or 10% of the total initial project capital cost.

18.1.13.3

Management Reserve Analysis

No management reserve was allowed for.

18.1.13.4

Escalation

No escalation was proportioned to any part of the estimate.

18.1.14

Reclamation and Closure Capital Cost Estimate

Closure costs were provided in Section 17.7 and total approximately $21.1 million over the LOM.

18.2

Operating Cost Estimate

18.2.1

Summary and Basis of Operating Cost Estimate

A summary of the LOM operating costs is provided in Table 18-13.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 285

May 27, 2026

Table 18-13: Summary of operating costs over LOM

Cost Category

Unit Costs LOM Average

($ per ton processed)

Total LOM Costs

($ M)

Mining (excl. pre-production)

140.60

332.9

Process

37.72

89.3

G&A

20.65

48.7

Total

198.96

470.9

*

Note: totals may not match due to rounding

The basis for the operating cost estimates is included in the discussions provided in the following sub-sections by discipline area. The operating cost

estimates have an accuracy range of ±15% per AACE Class 3 estimate guidelines.

18.2.2

Mining Operating Cost Estimate

The mining costs were built up by first principles using the productivity assumptions in Section 13.11 and budgetary quotes. The mining costs were

applied in the model to each profile type and ground support type. The mining costs were summarized by year and totaled for the LOM ($332.9 million over the LOM) to determine the total mining costs.

A summary of the mining cost per ton is shown in Table 18-14.

Table 18-14: Summary of Underground Mining Costs per ton

Mine

Yearly (000’s of $/a)

Percentage of Total Cost (%)

Mill Feed ($/ton)

Drilling

17,093

5

%

7.25

Blasting

15,125

5

%

6.42

Mucking

6,593

2

%

2.80

Bolting

34,974

11

%

14.83

Shotcrete Spray

6,250

2

%

2.65

Shotcrete Transmixer

904

0

%

0.38

Haulage

6,543

2

%

2.78

Backfill

64,550

19

%

27.38

Subtotal mining operating cost

152,034

46

%

64.48

Labor cost operating

129,293

39

%

54.84

Electrical cost operating

10,951

3

%

4.64

Diesel fuel cost operating

7,602

2

%

3.22

General supplies/Indirect operating

2,999

1

%

1.27

Contingency

29,988

9

%

12.72

Subtotal general operating cost

180,832

54

%

76.70

Total (mining + general)

332,865

100

%

141.18

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 286

May 27, 2026

Excluding mining costs from the pre-production period (accounted for in the initial capital cost) results in

an average mining cost of $140.60/ton processed over the LOM.

18.2.2.1

Underground Labor

Staffing was estimated by benchmarking against similar projects. The labor costs incorporated requirements for underground operations such as operating

underground equipment, technical support, underground electricians, underground mechanics, and underground management. A summary of the underground labor required is included as Table 18-15.

Table 18-15:  Underground Labor Summary

Position

Labor Code

No. of Employees

Total Cost per Year ($’000/a)

Technical Service Engineer

Salary

1

226.2

Mine engineer

Salary

1

187.9

Mine surveyor

Salary

2

341.9

Mine geologist

Salary

2

325.1

Mine superintendent

Salary

1

226.2

Mine clerk

Hourly

1

74.3

Mine foreman

Salary

4

916.7

Underground miner

Hourly

33

5,802.1

Underground laborer

Hourly

25

2,483.3

Mine electricians

Hourly

2

401.1

Mine maintenance superintendent

Salary

1

251.1

Heavy equipment elec-mechanic

Hourly

10

2,097.2

Welder

Hourly

2

339.8

Serviceman

Hourly

2

270.8

Maintenance laborer

Hourly

2

270.8

Light vehicle mechanic

Hourly

1

129.0

Total Underground Personnel

83

3,759.9

The quantities shown in Table 18-15 do not include milling process personnel nor site

management/general & administrative staff. The total underground mine personnel required will be 83 workers. The shift system for administrative personnel is planned to be four days on and three days off, at 10 hours per day.

Production-related mining personnel (operators, fitters, electricians, and assistants) will work a shift system of four days on and three days off in two crews. Each crew will provide 12 hour/day coverage so that the mine can operate 24 hours/day,

four days per week. Some personnel may work additional overtime through weekends for backfill, dewatering, and care-and-maintenance requirements, as needed. The operating calendar is based on 360 operating days per year. The planned mine

organization chart is shown in Figure 18-1.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 287

May 27, 2026

Figure

18-1: Proposed Mine Organizational Chart

Source: MDA(RESPEC), 2022.

18.2.2.2

Other Underground Costs

Power costs were estimated using consumptions from the equipment manufacturer and the cost of power. A unit power cost of $0.0584 per kWh was used, based on a

December 2025 power rate schedule from Idaho Power.

Diesel costs were estimated using consumptions from InfoMine cost models, equipment specifications,

vendor information, and the cost of local diesel. The unit cost of diesel used for this study is $2.51/gallon.

General supplies were estimated using 1.0%

of the total underground operating costs. The total cost of general supplies is $1.27/ore ton. The general supplies included mining software, engineering supplies, geology supplies, survey supplies, and other general supplies.

18.2.3

Process Operating Cost Estimate

The process operating cost is estimated at $89.3 million over the LOM, or an average of $37.72/ton processed over the LOM. A breakdown of these costs is

presented in Table 18-16.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 288

May 27, 2026

Table

18-16: Average Annual Process Operating Cost

Cost Center

Annual Costs* ($’000/a)

Percentage of Total (%)

Unit Costs LOM Average

($ per ton processed)

Reagents & Operating Consumables

3,277

33

12.46

Power

1,292

13

4.91

General Maintenance

791

8

3.01

Mobile Equipment

156

2

0.59

Labor

4,404

44

16.75

Total

9,919

100

37.72

*Note: totals may not match due to rounding

18.2.3.1

Reagents and Operating Consumables

Individual reagent consumption rates were estimated based on the metallurgical testwork results, Ausenco’s in-house database and experience, industry

practice and peer-reviewed literature. Reagent costs were obtained through vendor quotes or benchmarking for similar projects performed by Ausenco.

Other

consumables (e.g., liners for the primary crusher, ball mill and ball media for the mills) were estimated using:

Metallurgical testing results (abrasion index)

Vendor inputs and recommendations

Ausenco’s in-house calculation methods, including simulations

Forecast nominal power consumption.

Reagents and consumables represent 33% of the total process operating cost at an average of $12.46/ton of plant feed over the LOM.

18.2.3.2

Fuel and Utilities

A unit power cost of $0.0584/kWh was used, based on a December 2025 power rate schedule from Idaho Power. Carson Fuel provided an all-in contract price for

diesel based on annual forecast usage for the Project at $2.51/gal, which was used for the Study.

The processing power draw was based on the average

power utilization of each motor on the electrical load list for the process plant and services. Power will be supplied by the Idaho Power Company to service the facilities at the site. The total average process plant power cost is $4.91/ton over the

LOM, or 13% of the total process operating cost.

18.2.3.3

Maintenance

General maintenance costs are 8% of the total operating cost at $3.01/ton over the LOM. Annual maintenance consumable costs were calculated based on a total

installed mechanical capital cost by area using a weighted average factor from 1–5%. The factor was applied to the cost of the installed mechanical equipment.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 289

May 27, 2026

18.2.3.4

Mobile Equipment

Vehicle costs were based on a scheduled number of light vehicles and mobile equipment, including fuel, maintenance, spares and tires, and annual registration

and insurance fees. This corresponds to an average of $0.59/ton over the LOM.

18.2.3.5

Labor

Staffing numbers and positions were estimated based on other similar projects and Ausenco references. The labor costs incorporate requirements for plant

operation, such as management, metallurgy, operations, maintenance and assay laboratory, and contractor allowance. The total operational labor is 38 employees, averaging 21 employees per shift.

Individual personnel were divided into their respective positions and classified as either 10-hour or 12-hour shift employees. Salaries were determined using

published U.S. labor market data and were also used to develop the total G&A labor cost. The rates were estimated as overall rates, including all burden costs.

Table 18-17: Process Plant Labor

Position

Labor Code

No. of Employees

Processing Superintendent

Salary

1

Gold Room Operator

Hourly

1

Reagents/TMF Operator

Hourly

1

Shift Foreman/Crusher Operator

Hourly

4

Control Room Operator/Mill Operator

Hourly

4

CIL Operator/Elution Operator

Hourly

4

CN Destruction Operator

Hourly

4

Plant Metallurgist

Salary

1

Chief Assayer

Hourly

1

Assayer

Hourly

1

Sample Bucker

Hourly

2

Maintenance Foreman

Salary

1

Mill Wright/Fitter (crew)

Hourly

2

Service Man

Hourly

2

Electrical Foreman

Hourly

1

Contract Electrician

Hourly

1

Trades Assistant

Hourly

4

Electrician

Hourly

1

Mill Wright/Fitter (shift)

Hourly

1

Instrument Tech

Hourly

1

Total

38

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 290

May 27, 2026

Labor costs represent 44% of the total process operating cost at an average of $16.75/ton of plant feed over

the LOM.

18.2.4

General and Administrative Operating Cost Estimate

A bottoms-up approach was used to develop estimates for G&A costs at $5.4M/a, or $48.7 million over the LOM, representing an average of

$20.65/ton processed over the LOM.

The G&A labor costs were estimated by developing a headcount profile for each department that was then forecast

over the LOM. Labor rates were determined based on published U.S. labor market data and were applied to develop the total G&A labor cost.

Health and

safety equipment, supplies, training, and environmental costs were provided by Paramount Gold, as were the information technology and telecommunications costs for telecommunication, networking, internet, computers, radio system and repairs.

A breakdown summary of forecast LOM G&A costs is shown in Table 18-18.

Table 18-18: Annual Average G&A Operating Cost Summary

Cost Center

Annual Cost*

($000’s/a)

% of total

Unit Cost LOM Average

($/ton processed)

G&A maintenance

100.0

2

0.38

Personnel (incl. bonuses and benefits)

3,093

58

11.90

Human resources and public relations

231.4

4

0.89

Power

15.0

0.3

0.06

Laboratory

86.4

2

0.33

Miscellaneous, supplies & equipment

151.0

3

0.58

Fees and consulting services

946.4

18

3.64

G&A vehicles & transportation

80.1

1

0.31

Environmental

15.3

0.3

0.06

IT & telecommunications

60.0

1

0.23

Contract services

479.9

9

1.85

Mine software

45.4

1

0.17

Mine hardware

61.3

1

0.24

Total

5,365

100

20.65

*

For a typical operating year.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 291

May 27, 2026

19

ECONOMIC ANALYSIS

19.1

Forward-Looking Information

Paramount is subject to the reporting requirements of the Exchange Act and this filing and other U.S. reporting requirements are governed by Subpart 1300 of

Regulation S-K promulgated by the Securities and Exchange Commission (SEC). The results of the economic analyses discussed in this section represent forward-looking statements within the meaning of applicable securities laws relating to Paramount

Gold Nevada Corp. These statements by their nature involve substantial risks and uncertainties. Statements involving the foregoing results of economic analysis are forward-looking statements. Without limiting the generality of the foregoing, words

such as “may”, “anticipate”, “intend”, “could”, “estimate”, or “continue” or the negative or other comparable terminology are intended to identify forward-looking statements.

Should one or more of these risks or uncertainties materialize or should the underlying assumptions prove incorrect, actual outcomes and results could differ materially from those indicated in the forward-looking statements.

Information that is forward-looking includes, but is not limited to, the following:

Proven and Probable Mineral Reserve estimates which have been modified from Measured and Indicated Mineral

Resource estimates

Assumed commodity prices and exchange rates

Proposed mine production plan

Projected mining and process recovery rates

Assumptions as to mining dilution and estimated future production

Assumptions as geotechnical support requirements for underground openings

Proposed sustaining costs and operating costs

Seabridge Gold’s intentions to convert the NPI royalty into Paramount equity upon Paramount securing

sufficient construction financing

Assumptions as to closure costs and closure requirements

Assumptions as to environmental, permitting, and social risks.

Additional risks to the forward-looking information include:

Changes to costs of production from what is assumed

Unexpected variations in quantity of mineralized material, grade or recovery rates

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 292

May 27, 2026

Geotechnical or hydrogeological considerations during mining being different from what was assumed

Failure of mining methods to operate as anticipated

Failure of plant, equipment or processes to operate as anticipated

Changes to assumptions as to the availability of electrical power, and the power rates used in the operating cost

estimates and financial analysis

Unrecognized environmental risks

Unanticipated reclamation expenses

Ability to maintain the social license to operate

Accidents, labor disputes and other risks of the mining industry

Changes to interest rates

Changes to applicable tax rates.

Calendar years used in the financial analysis are provided for conceptual purposes only. Additional permits still must be obtained in support of operations;

and approval to proceed is still required from Paramount’s Board of Directors.

19.2

Methodology Used

The Project has been evaluated using a discounted cashflow (DCF) analysis based on a 5% discount rate. Cash inflows consist of annual revenue projections. Cash

outflows consist of capital expenditures, operating costs, taxes, and royalties. These are subtracted from the inflows to arrive at the annual cash flow projections. Cash flows are taken to occur at the midpoint of each period. Tax calculations

involve complex variables that can only be accurately determined during operations and, as such, the actual post-tax results may differ from those estimated. A sensitivity analysis was performed to assess the impact of variations in metal prices,

discount rate, head grade, recovery, total operating cost, and total capital costs.

An economic model was developed to estimate annual pre-tax and

post-tax cash flows and sensitivities of the Project based on a 5% discount rate. Tax estimates involve complex variables that can only be accurately calculated during operations and, as such, the post-tax results are approximations.

The capital and operating cost estimates developed specifically for this Project are presented in Section 18 using second quarter (Q2) 2026 US dollars.

The economic analysis was run on a constant dollar basis with no inflation.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 293

May 27, 2026

19.3

Financial Model Parameters

The economic analysis contemplated in the FS uses metal prices that remain constant over the Project life and are based on the assessment outlined in

Section 16 at $3,600/oz gold and $48.00/oz silver prices. No price inflation or escalation factors were utilized as commodity prices can be volatile, and there is the potential for deviation from the forecast. Exchange rates used in the Report

are detailed in Section 18.1.6.

The economic analysis was performed using the following assumptions:

Construction period of 18 months

All construction and operating costs prior to achieving commercial operation are capitalized

Mine life of 9.3 years

Cost estimates in constant Q2 2026 US dollars with no inflation or escalation

Capital costs funded with 100% equity (no financing costs assumed)

All cash flows discounted at a 5% discount rate to the start of construction

Metal is assumed to be sold in the same year it is produced

No contractual arrangements for refining or offtake are in place.

19.4

Taxes

The Project was evaluated on a post-tax basis to provide an approximate value of the potential economics. The tax model was prepared by MNP LLP, an independent

tax consultant. The calculations are based on the tax regime as of the date of the FS, and include estimates for Paramount’s expenditures, and related impacts to various tax pool balances, between the FS and the assumed construction start

date.

At the Report effective date, the Project was assumed to be subject to the following tax regime:

US Federal corporate income tax system of a 21% tax rate;

Oregon tax rate of 7.6% for net proceeds of more than $1 million;

Total undiscounted tax payments are estimated to be $117.2 million over the LOM.

19.5

Ro yalty

A 1.5% net smelter revenue (NSR) royalty was assumed, resulting in approximately $21.1 million in undiscounted royalty payments over the LOM. The FS assumes

that Seabridge will convert its 10% NPI royalty into Paramount equity upon Paramount securing sufficient construction financing, and thus the NPI was not included in the financial model.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 294

May 27, 2026

19.6

Economic Analysis

The economic analysis was performed assuming a 5% discount rate.

The pre-tax net present value (NPV) discounted at 5% is $458.9 M; the IRR is 42.8%; and payback period is 2.1 years.

On a post-tax basis, the NPV discounted at 5% is $374.7 M; the IRR is 38.9 %; and the payback period is 2.2 years.

A summary of forecast Project economics is shown graphically in Figure 19-1 and listed in Table 19-1.

A cashflow on an annualized basis is provided in Table 19-2.

Figure 19-1: Forecast Project Post-Tax Unlevered, Undiscounted Free Cash Flow ($ M)

Source: Ausenco 2026

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 295

May 27, 2026

Table

19-1: Summary of Forecast Project Economics

Area

Item

Units

LOM Total/Avg.

General

Gold price

$/oz

3,600

Silver price

$/oz

48.00

Mine life

years

9.3

Total mill feed tons

tons x 1,000

2,358

Production (gold)

Mill head grade Au

oz/ton

0.18

Mill recovery rate Au

%

92.6

Total mill ounces recovered Au

oz x 1,000

385.8

Total average annual production Au

oz x 1,000

41.4

Production (silver)

Mill head grade Ag

oz/ton

0.28

Mill recovery rate Ag

%

73.5

Total mill ounces recovered Ag

oz x 1,000

480.1

Total average annual production Ag

oz x 1,000

51.5

Operating Costs

Mining cost

$/ton processed

140.60

Processing cost

$/ton processed

37.72

G&A cost

$/ton processed

20.65

Total operating costs

$/ton processed

198.96

Refining cost Au

$/oz

5.00

Refining cost Ag

$/oz

0.50

*Cash costs net of by-products

$/oz Au

1,217.95

**AISC net of by-products

$/oz Au

1,441.57

Capital Costs

Initial capital

$M

189.8

Sustaining capital

$M

65.1

Closure costs

$M

21.1

Financials(pre-tax)

Gross Revenue

$M

1,410.6

Pre-tax unlevered free cash flow

$M

658.0

Pre-tax NPV, 5%

$M

458.9

Pre-tax IRR%

%

42.8

Pre-tax Payback

years

2.1

Financials(post-tax)

Post-tax unlevered free cash flow

$M

540.7

Post-tax NPV, 5%

$M

374.7

Post-tax IRR%

38.9

Post-tax Payback

years

2.2

Notes:

*

Cash costs consist of mining costs, processing costs, G&A and refining charges and royalties.

**

All-in sustaining costs (AISC) includes cash costs plus sustaining capital and closure costs. AISC is at the

Project-level and does not include an estimate of corporate G&A.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 296

May 27, 2026

Table 19-2: Project Cashflow on an Annualized Basis

Dollar figures in Real 2026 $ M unless otherwise noted

Macro Assumptions

Units

Total/

Avg.

Y -2

Y -1

Y 1

Y 2

Y 3

Y 4

Y 5

Y 6

Y 7

Y 8

Y 9

Y 10

Gold Price

$/oz

3,600

3,600

3,600

3,600

3,600

3,600

3,600

3,600

3,600

3,600

3,600

3,600

3,600

Silver Price

$/oz

48.00

48.00

48.00

48.00

48.00

48.00

48.00

48.00

48.00

48.00

48.00

48.00

48.00

Revenue

$M

1,410.6

2.9

124.1

186.3

167.7

179.9

174.0

168.5

160.4

113.2

126.7

6.9

Operating Cost

$M

(469.1)

(44.8)

(54.3)

(53.4)

(51.9)

(52.9)

(50.7)

(55.9)

(49.7)

(47.8)

(7.7)

Refining Charges

$M

(2.2)

(0.0)

(0.2)

(0.3)

(0.3)

(0.3)

(0.3)

(0.3)

(0.3)

(0.2)

(0.2)

(0.0)

Royalties

$M

(21.1)

(0.0)

(1.9)

(2.8)

(2.5)

(2.7)

(2.6)

(2.5)

(2.4)

(1.7)

(1.9)

(0.1)

EBITDA

$M

918.2

2.9

77.2

129.0

111.6

125.0

118.3

115.0

101.9

61.6

76.7

(0.9)

Initial Capex

$M

(189.8)

(55.4)

(134.4)

Sustaining Capex

$M

(65.1)

(24.4)

(10.7)

(8.3)

(11.9)

(7.2)

(1.2)

(0.4)

(0.4)

(0.4)

Closure Capex

$M

(21.1)

(21.1)

Salvage Value

$M

15.8

15.8

Pre-Tax Unlevered Free Cash Flow

$M

658.0

(55.4)

(131.6)

52.8

118.2

103.2

113.1

111.0

113.8

101.4

61.1

76.3

(6.2)

Corporate Income Tax

$M

(117.2)

(2.0)

(4.5)

(3.9)

(18.4)

(20.9)

(22.6)

(19.5)

(10.9)

(14.5)

Post-Tax Unlevered Free Cash Flow

$M

540.7

(55.4)

(131.6)

50.8

113.7

99.3

94.8

90.1

91.2

81.9

50.2

61.7

(6.2)

Production Summary

Total Resource Mined

kt

2,357.8

5.2

226.3

287.4

272.0

284.1

265.2

240.4

298.0

233.6

226.9

18.8

Mill Head Grade (Au)

oz/t

0.18

0.17

0.16

0.19

0.18

0.19

0.19

0.21

0.16

0.14

0.16

0.11

Mill Head Grade (Ag)

oz/t

0.28

0.25

0.25

0.27

0.25

0.28

0.28

0.26

0.31

0.29

0.30

0.23

Mill Recovery (Au)

%

92.6

92.4

92.3

92.9

92.7

92.8

92.9

93.1

92.2

91.8

92.4

90.5

Mill Recovery (Ag)

%

73.5

72.2

71.6

73.4

72.2

73.8

73.6

72.6

74.9

74.2

74.6

70.8

Recovered Gold

koz

385.8

0.8

34.0

51.0

46.0

49.2

47.7

46.2

43.7

30.8

34.5

1.9

Recovered Silver

koz

480.1

0.9

39.9

57.8

50.0

59.4

54.3

45.6

68.0

50.5

50.5

3.1

Payable Gold

koz

385.5

0.8

33.9

51.0

45.9

49.2

47.6

46.2

43.7

30.8

34.5

1.9

Payable Silver

koz

477.7

0.9

39.7

57.6

49.7

59.1

54.0

45.4

67.7

50.3

50.3

3.1

Gold Revenue

$M

1,387.6

2.9

122.2

183.5

165.3

177.1

171.4

166.3

157.1

110.7

124.2

6.8

Silver Revenue

$M

22.9

0.0

1.9

2.8

2.4

2.8

2.6

2.2

3.3

2.4

2.4

0.1

Total Revenue

$M

1,410.6

2.9

124.1

186.3

167.7

179.9

174.0

168.5

160.4

113.2

126.7

6.9

Royalties

$M

21.1

(0.0)

(1.9)

(2.8)

(2.5)

(2.7)

(2.6)

(2.5)

(2.4)

(1.7)

(1.9)

(0.1)

Total Offsite Charges

$M

(2.2)

(0.0)

(0.2)

(0.3)

(0.3)

(0.3)

(0.3)

(0.3)

(0.3)

(0.2)

(0.2)

(0.0)

Total Operating Costs

$M

(469.1)

(44.8)

(54.3)

(53.4)

(51.9)

(52.9)

(50.7)

(55.9)

(49.7)

(47.8)

(7.7)

Mine Operating Costs

$M

(332.9)

(1.4)

(30.2)

(38.6)

(38.0)

(36.3)

(37.6)

(35.8)

(40.1)

(35.0)

(33.2)

(6.6)

Mill Processing

$M

(89.3)

(0.3)

(9.2)

(10.3)

(10.0)

(10.2)

(9.9)

(9.5)

(10.5)

(9.4)

(9.2)

(0.7)

G&A Costs

$M

(48.7)

(5.4)

(5.4)

(5.4)

(5.4)

(5.4)

(5.4)

(5.4)

(5.4)

(5.4)

(0.4)

Capitalized Operating Cost Transfer

$M

1.7

1.7

Total Initial Capital

$M

(189.8)

(55.4)

(134.4)

Capitalized Processing Operating cost

$M

(1.7)

(1.7)

1000—Mining

$M

(31.9)

(0.7)

(31.2)

2000—Site Development

$M

(6.2)

(2.2)

(4.0)

3000 – Min. Processing

$M

(43.5)

(15.2)

(28.2)

4000 – Tail/Waste Mgmt

$M

(13.4)

(4.7)

(8.7)

5000—Onsite Infra.

$M

(17.4)

(6.1)

(11.3)

6000—Off-Site Infra.

$M

(16.9)

(5.9)

(11.0)

7000—Indirects

$M

(26.0)

(9.1)

(16.9)

8000—Provisions

$M

(17.3)

(6.1)

(11.3)

9000—Owner Costs

$M

(15.7)

(5.5)

(10.2)

Total Sustaining Capital

$M

(65.1)

(24.4)

(10.7)

(8.3)

(11.9)

(7.2)

(1.2)

(0.4)

(0.4)

(0.4)

1000—Mining

$M

(40.8)

(22.4)

(7.2)

(4.0)

(3.6)

(2.9)

(0.8)

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 297

May 27, 2026

Dollar figures in Real 2026 $ M unless otherwise

noted

Macro Assumptions

Units

Total/Avg.

Y -2

Y -1

Y 1

Y 2

Y 3

Y 4

Y 5

Y 6

Y 7

Y 8

Y 9

Y 10

2000—Site Development

$M

3000 – Min. Processing

$M

(3.9)

(0.4)

(0.4)

(0.4)

(0.4)

(0.4)

(0.4)

(0.4)

(0.4)

(0.4)

4000 – Tailings/Waste Mgmt

$M

(20.4)

(1.6)

(3.1)

(3.9)

(7.9)

(3.9)

5000—Onsite Infra.

$M

6000—Off-Site Infra.

$M

7000—Indirects

$M

8000—Provisions

$M

9000—Owner Costs

$M

Total Capital Expenditures Including Salvage Value

$M

(260.2)

(55.4)

(134.4)

(24.4)

(10.7)

(8.3)

(11.9)

(7.2)

(1.2)

(0.4)

(0.4)

(0.4)

(5.3)

Notes:

All dollar figures are

in Real 2026 million USD unless otherwise noted.

Yearly cashflow figures for closure costs extend to 20+ years beyond end of mine life and are not shown above;

the total closure cost listed reflects the accurate closure costs over the LOM.

*

Cash costs consist of mining costs, processing costs, mine-level G&A and refining charges and royalties.

**

AISC includes cash costs plus sustaining capital and closure costs.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 298

May 27, 2026

19.7

Sensitivity Analysis

A sensitivity analysis was conducted on the base case pre-tax and post-tax NPV and IRR, using the following variables: commodity prices, mill head grades,

initial capital cost, operating cost, metallurgical recovery, and discount rate.

Figure 19-2 shows the summary

pre-tax sensitivity, and Figure 19-3 shows the post-tax sensitivity results, with detailed sensitivity tables presented in Table 19-3 and Table 19-4.

Figure

19-2: Pre-Tax NPV & IRR Sensitivity Results

Source: Ausenco, 2026.

Figure

19-3: Post-Tax NPV & IRR Sensitivity Results

Source: Ausenco, 2026.

The

analysis showed that the Project is most sensitive to metal price, head grade, metallurgical recovery rates, and initial capital cost, and less sensitive to operating cost.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 299

May 27, 2026

Table 19-3: Summary Pre-Tax Sensitivity Analysis

Pre-Tax Sensitivity to

Metal Price

Pre-Tax NPV5% (US$M)Sensitivity to Discount Rate

Pre-Tax IRR (%) Sensitivity to Discount Rate

Commodity Price

Commodity Price

Discount Rate

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

Discount Rate

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

1.0

%

218.4

349.5

480.6

611.8

742.9

874.0

1,005

1.0

%

19.2

%

27.8

%

35.5

%

42.8

%

49.6

%

56.1

%

62.3

%

3.0

%

177.9

295.1

412.3

529.5

646.8

764.0

881.2

3.0

%

19.2

%

27.8

%

35.5

%

42.8

%

49.6

%

56.1

%

62.3

%

5.0

%

143.1

248.4

353.7

458.9

564.2

669.4

774.7

5.0

%

19.2

%

27.8

%

35.5

%

42.8

%

49.6

%

56.1

%

62.3

%

8.0

%

99.9

190.2

280.4

370.7

460.9

551.2

641.4

8.0

%

19.2

%

27.8

%

35.5

%

42.8

%

49.6

%

56.1

%

62.3

%

10.0

%

76.0

157.8

239.7

321.5

403.4

485.2

567.1

10.0

%

19.2

%

27.8

%

35.5

%

42.8

%

49.6

%

56.1

%

62.3

%

Pre-Tax NPV5% (US$M) Sensitivity to OPERATING COST

Pre-Tax IRR(%)Sensitivity to OPERATING COST

Commodity Price

Commodity Price

Total OPERATING COST

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

Total OPERATING COST

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

(20

%)

213.4

318.7

423.9

529.2

634.4

739.7

844.9

(20

%)

24.9

%

32.9

%

40.3

%

47.2

%

53.8

%

60.1

%

66.3

%

(10

%)

178.3

283.5

388.8

494.0

599.3

704.6

809.8

(10

%)

22.1

%

30.4

%

37.9

%

45.0

%

51.7

%

58.1

%

64.3

%

143.1

248.4

353.7

458.9

564.2

669.4

774.7

19.2

%

27.8

%

35.5

%

42.8

%

49.6

%

56.1

%

62.3

%

10

%

108.0

213.3

318.5

423.8

529.0

634.3

739.5

10

%

16.1

%

25.1

%

33.1

%

40.5

%

47.4

%

54.0

%

60.3

%

20

%

72.9

178.1

283.4

388.6

493.9

599.2

704.4

20

%

12.9

%

22.3

%

30.6

%

38.2

%

45.2

%

51.9

%

58.3

%

Pre-Tax NPV5% (US$M) Sensitivity to Initial CAPEX

Pre-Tax IRR(%)Sensitivity to Initial CAPEX

Commodity Price

Commodity Price

Initial CAPEX

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

Initial CAPEX

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

(20

%)

179.7

285.0

390.2

495.5

600.7

706.0

811.3

(20

%)

25.8

%

35.5

%

44.3

%

52.6

%

60.5

%

68.0

%

75.3

%

(10

%)

161.4

266.7

371.9

477.2

582.5

687.7

793.0

(10

%)

22.2

%

31.3

%

39.6

%

47.3

%

54.5

%

61.5

%

68.2

%

143.1

248.4

353.7

458.9

564.2

669.4

774.7

19.2

%

27.8

%

35.5

%

42.8

%

49.6

%

56.1

%

62.3

%

10

%

124.8

230.1

335.4

440.6

545.9

651.1

756.4

10

%

16.6

%

24.8

%

32.1

%

38.9

%

45.3

%

51.5

%

57.3

%

20

%

106.6

211.8

317.1

422.3

527.6

632.8

738.1

20

%

14.3

%

22.1

%

29.1

%

35.6

%

41.7

%

47.5

%

53.0

%

Pre-Tax NPV5% (US$M) Sensitivity to Mill Recovery

Pre-Tax IRR(%)Sensitivity to Mill Recovery

Commodity Price

Commodity Price

Mill Recovery

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

Mill Recovery

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

(20

%)

(9.9

)

73.5

156.8

240.2

323.5

406.9

490.2

(20

%)

3.8

%

12.8

%

20.4

%

27.2

%

33.4

%

39.3

%

44.8

%

(10

%)

66.6

161.0

255.3

349.6

443.9

538.2

632.5

(10

%)

12.1

%

20.7

%

28.3

%

35.3

%

41.8

%

47.9

%

53.8

%

143.1

248.4

353.7

458.9

564.2

669.4

774.7

19.2

%

27.8

%

35.5

%

42.8

%

49.6

%

56.1

%

62.3

%

10

%

219.6

335.8

452.0

568.3

684.5

800.7

916.9

10

%

25.5

%

34.3

%

42.3

%

49.8

%

57.0

%

63.8

%

70.5

%

20

%

296.1

423.3

550.5

677.6

804.8

931.9

1,059

20

%

31.4

%

40.4

%

48.7

%

56.6

%

64.1

%

71.3

%

78.3

%

Pre-Tax NPV5% (US$M) Sensitivity to Head Grade

Pre-Tax IRR(%)Sensitivity to Head Grade

Commodity Price

Commodity Price

Head Grade

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

Head Grade

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

(20

%)

(3.9

)

80.3

164.5

248.7

332.9

417.1

501.3

(20

%)

4.5

%

13.5

%

21.0

%

27.8

%

34.1

%

40.0

%

45.5

%

(10

%)

69.6

164.4

259.1

353.8

448.5

543.3

638.0

(10

%)

12.4

%

21.0

%

28.6

%

35.6

%

42.1

%

48.2

%

54.2

%

143.1

248.4

353.7

458.9

564.2

669.4

774.7

19.2

%

27.8

%

35.5

%

42.8

%

49.6

%

56.1

%

62.3

%

10

%

201.9

315.5

429.2

542.9

656.5

770.2

883.9

10

%

24.1

%

32.8

%

40.7

%

48.2

%

55.3

%

62.0

%

68.6

%

20

%

203.1

316.9

430.7

544.6

658.4

772.2

886.1

20

%

24.2

%

32.9

%

40.8

%

48.3

%

55.4

%

62.1

%

68.7

%

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 300

May 27, 2026

Table 19-4: Summary Post-Tax Sensitivity Analysis

Post-Tax Sensitivity to Metal Price

Post-Tax NPV5% (US$M)Sensitivity to Discount Rate

Post-Tax IRR (%) Sensitivity to Discount Rate

Commodity Price

Commodity Price

Discount Rate

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

Discount Rate

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

1.0

%

195.8

298.6

400.8

502.3

603.5

704.7

805.9

1.0

%

17.9

%

25.5

%

32.4

%

38.9

%

44.9

%

50.7

%

56.2

%

3.0

%

158.2

250.9

342.6

433.7

524.5

615.1

705.6

3.0

%

17.9

%

25.5

%

32.4

%

38.9

%

44.9

%

50.7

%

56.2

%

5.0

%

125.9

209.8

292.7

374.7

456.5

537.9

619.4

5.0

%

17.9

%

25.5

%

32.4

%

38.9

%

44.9

%

50.7

%

56.2

%

8.0

%

85.7

158.5

230.1

300.9

371.3

441.3

511.3

8.0

%

17.9

%

25.5

%

32.4

%

38.9

%

44.9

%

50.7

%

56.2

%

10.0

%

63.4

129.9

195.2

259.6

323.7

387.3

450.9

10.0

%

17.9

%

25.5

%

32.4

%

38.9

%

44.9

%

50.7

%

56.2

%

Post-Tax NPV5% (US$M) Sensitivity to OPERATING COST

Post-Tax IRR(%)Sensitivity to OPERATING COST

Commodity Price

Commodity Price

Total OPERATING COST

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

Total OPERATING COST

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

(20

%)

180.1

263.0

345.0

426.8

508.3

589.7

671.1

(20

%)

22.8

%

29.9

%

36.5

%

42.7

%

48.5

%

54.1

%

59.5

%

(10

%)

153.1

236.5

318.9

400.8

482.4

563.8

645.2

(10

%)

20.4

%

27.8

%

34.5

%

40.8

%

46.7

%

52.4

%

57.9

%

125.9

209.8

292.7

374.7

456.5

537.9

619.4

17.9

%

25.5

%

32.4

%

38.9

%

44.9

%

50.7

%

56.2

%

10

%

97.8

183.0

266.2

348.6

430.5

512.0

593.5

10

%

15.2

%

23.2

%

30.3

%

36.9

%

43.1

%

48.9

%

54.5

%

20

%

65.1

155.7

239.5

322.3

404.5

486.1

567.6

20

%

12.1

%

20.8

%

28.1

%

34.9

%

41.2

%

47.1

%

52.8

%

Post-Tax NPV5% (US$M) Sensitivity to Initial CAPEX

Post-Tax IRR(%)Sensitivity to Initial CAPEX

Commodity Price

Commodity Price

Initial CAPEX

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

Initial CAPEX

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

(20

%)

162.5

246.4

329.2

411.3

493.0

574.5

655.9

(20

%)

24.4

%

33.1

%

41.1

%

48.6

%

55.6

%

62.3

%

68.7

%

(10

%)

144.2

228.1

310.9

393.0

474.7

556.2

637.6

(10

%)

20.9

%

29.0

%

36.4

%

43.3

%

49.8

%

56.0

%

61.9

%

125.9

209.8

292.7

374.7

456.5

537.9

619.4

17.9

%

25.5

%

32.4

%

38.9

%

44.9

%

50.7

%

56.2

%

10

%

107.6

191.5

274.4

356.5

438.2

519.6

601.1

10

%

15.3

%

22.5

%

29.0

%

35.1

%

40.8

%

46.2

%

51.3

%

20

%

89.4

173.2

256.1

338.2

419.9

501.4

582.8

20

%

13.1

%

19.9

%

26.1

%

31.8

%

37.2

%

42.3

%

47.2

%

Post-Tax NPV5% (US$M) Sensitivity to Mill Recovery

Post-Tax IRR(%)Sensitivity to Mill Recovery

Commodity Price

Commodity Price

Mill Recovery

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

Mill Recovery

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

(20

%)

(14.7

)

65.5

136.9

203.3

269.0

334.2

399.1

(20

%)

3.2

%

12.0

%

19.0

%

25.0

%

30.5

%

35.7

%

40.7

%

(10

%)

59.0

140.2

215.2

289.4

363.0

436.3

509.3

(10

%)

11.4

%

19.3

%

26.0

%

32.2

%

38.0

%

43.5

%

48.7

%

125.9

209.8

292.7

374.7

456.5

537.9

619.4

17.9

%

25.5

%

32.4

%

38.9

%

44.9

%

50.7

%

56.2

%

10

%

187.1

278.7

369.4

459.6

549.6

639.5

729.3

10

%

23.5

%

31.3

%

38.5

%

45.2

%

51.5

%

57.5

%

63.3

%

20

%

247.5

347.0

445.9

544.3

642.7

740.9

839.1

20

%

28.7

%

36.7

%

44.2

%

51.1

%

57.7

%

64.0

%

70.0

%

Post-Tax NPV5% (US$M) Sensitivity to Head Grade

Post-Tax IRR(%)Sensitivity to Head Grade

Commodity Price

Commodity Price

Head Grade

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

Head Grade

(30

%)

(20

%)

(10

%)

10

%

20

%

30

%

(20

%)

(8.9

)

72.1

143.1

210.0

276.4

342.2

407.8

(20

%)

3.9

%

12.7

%

19.5

%

25.5

%

31.1

%

36.4

%

41.4

%

(10

%)

61.8

142.9

218.2

292.8

366.7

440.3

513.6

(10

%)

11.7

%

19.5

%

26.2

%

32.4

%

38.3

%

43.8

%

49.0

%

125.9

209.8

292.7

374.7

456.5

537.9

619.4

17.9

%

25.5

%

32.4

%

38.9

%

44.9

%

50.7

%

56.2

%

10

%

173.0

262.8

351.6

440.0

528.0

615.9

703.8

10

%

22.2

%

30.0

%

37.1

%

43.7

%

49.9

%

55.9

%

61.6

%

20

%

173.9

263.9

352.8

441.3

529.4

617.5

705.5

20

%

22.3

%

30.1

%

37.1

%

43.8

%

50.0

%

56.0

%

61.7

%

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 301

May 27, 2026

19.8

Conclusion – Economic Analysis

Based on the assumptions and parameters presented, the FS shows positive economics supported by a post-tax

NPV5% of $374.7 million and post-tax IRR of 38.9%. The initial Capex is at $189.8 million, with undiscounted LOM revenue of $1,410.6 million, sustaining Capex of $65.1 million, all-in Operating

cost of $469.1 million, and closure costs of $21.1 million.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 302

May 27, 2026

20

ADJACENT PROPERTIES

This section is not relevant to the report.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 303

May 27, 2026

21

OTHER RELEVANT DATA AND INFORMATION

This section is not relevant to the report.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 304

May 27, 2026

22

INTERPRETATION AND CONCLUSIONS

22.1

Introduction

The QPs note the following interpretations and conclusions in their respective areas of expertise, based on the review of data available for this Report.

22.2

Mineral Tenure, Surface Rights, Water Rights, Royalties and Agreements

Information from legal experts support that the tenure held is valid and sufficient to support a declaration of Mineral Resources and Mineral Reserves. Tenure

is in the geographic area referred to as the Grassy Mountains claims group. The Grassy Mountain deposit is within the Grassy Mountains claims group.

Paramount’s 100% ownership of the Grassy Mountain Project is subject to underlying agreements and royalties.

Seabridge Gold is entitled to a 10% net profits interest (NPI) royalty. Seabridge Gold, at the Report effective date, is the second largest Paramount

shareholder and has indicated that it will convert its NPI into equity in Paramount, thus the Seabridge NPI has not been included in the FS.

Sherry and

Yates retain a 1.5% royalty of the gross proceeds for the production of minerals from the patented and unpatented claims and a surrounding 1⁄2 mile area of

interest. This area covers the Grassy Mountain deposit. There are an additional two royalty obligations in the Project area; however, these are not over claims that host Mineral Resources or Mineral Reserves.

Paramount holds three patented claims over the Grassy Mountain deposit, which provides surface rights for that area. The surrounding surface rights associated

with the proposed locations of the Project surface facilities belong to the Federal government and are managed by the Vale District BLM office.

Paramount

holds a water right granted by the Oregon Water Resources Department to Calico.

Except for the exploration surface disturbance, primarily related to

drilling, and the network of water wells that will need to be reclaimed, there are no known environmental liabilities associated with the Grassy Mountain Project.

To the extent known to the QP, there are no other significant factors and risks that may affect access, title, or the right or ability to perform work on the

Project that are not discussed in this Report.

22.3

Geology and Mineralization

The Grassy Mountain deposit is an example of a low-sulfidation epithermal deposit.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 305

May 27, 2026

The understanding of the Grassy Mountain deposit settings, lithologies, mineralization, and the geological,

structural, and alteration controls on mineralization is sufficient to support estimation of Mineral Resources and Mineral Reserves.

22.4

Exploration

The exploration programs completed to date are appropriate for epithermal-style mineralization.

22.5

Analytical Data Collection in Support of Mineral Resource Estimation

Sampling methods are acceptable for Mineral Resource estimation.

Sample preparation, analysis and security are generally performed in accordance with exploration best practices and industry standards at the time the

information was collected.

The quantity and quality of the logged geological data, collar, and downhole survey data collected in the exploration and

infill drill programs are sufficient to support Mineral Resource estimation.

No material factors were identified with the data collection from the drill

programs that could significantly affect Mineral Resource estimation.

The sample preparation, analysis, and security practices and are acceptable, meet

industry-standard practices at the time they were undertaken, and are sufficient to support Mineral Resource estimation.

QA/QC submission rates met

industry-accepted standards at the time of the campaign. The QA/QC programs did not detect any material sample biases in the data reviewed that supports Mineral Resource estimation.

The data verification programs concluded that the data collected from the Project adequately support the geological interpretations and constitute a database

of sufficient quality to support the use of the data in Mineral Resource estimation.

22.6

Metallurgical Testwork

Metallurgical testwork and associated analytical procedures were appropriate to the mineralization type, appropriate to establish the optimal processing route,

and were performed using samples that are typical of the mineralization styles found within the Grassy Mountain deposit. Whole ore gold/silver leaching with cyanide and recovery with activated carbon is a well-established and effective method for

extracting and recovering gold and silver from free milling deposits like Grassy Mountain.

Samples selected for testing were representative of the

mineralization. Samples were selected from a range of depths within the deposit. Sufficient samples were taken so that tests were performed on sufficient sample mass.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 306

May 27, 2026

Recovery factors estimated are based on appropriate metallurgical testwork and are appropriate to the

mineralization and the selected process route. Overall plant recoveries for gold are predicted to range from 89.5–94.9% for head grades of 0.096–0.508 oz/ton (3.3–17.4 g/t) Au over the LOM. Overall plant recoveries for silver are

predicted to range from 62.7–80.4% for head grades of 0.161–0.523 oz/ton (5.5–17.9 g/t) Ag over the LOM.

Mercury is present in

sufficient concentration in the ore to warrant removal and management, and a mercury retort step has been incorporated into the flowsheet. Arsenic is present in the feed but at low concentrations of 3.47–5.34 oz/ton (119–183 g/t)

that are not expected to be problematic in processing. No other elements that may cause issues in the process plant or concerns with product marketability were noted.

22.7

Mineral Resource Estimation

The Grassy Mountain project’s estimate of mineral resources is reported using the definition in Subpart 229.1300—Disclosure by Registrants Engaged

in Mining Operations in Regulations S-K 1300.

RESPEC estimated the Grassy Mountain project’s mineral resources considering potential mining by open

pit methods, with the addition of a minor amount of underground-mineable resources lying immediately outside the pit walls of the lower portion of the pit. An alternate scenario, comprised exclusively of mining the higher-grade portion of the

deposit by underground methods, is also realistic, and this scenario was chosen to define the project mineral reserves. RESPEC constructed the resource model to accommodate both mining scenarios.

During resource modeling, RESPEC identified structural zones as the principal controls of high-grade mineralization within the central core of the Grassy

Mountain deposit. This high-grade mineralization has significant grade variability, which creates modeling uncertainties with respect to the location of the estimated high grades as distances from drill data increase. While open-pit mining would

minimize the risk imparted by the location uncertainty, underground mining requires far greater spatial accuracy. The current model is not sufficiently accurate for use in mining, particularly from underground. Properly oriented, closely spaced,

definition drilling would therefore be required to update the operation’s short- and long-term resource models and to refine geotechnical modeling and final stope designs. To reduce the uncertainties in the high-grade mineralization model,

RESPEC strongly recommends drilling from the surface prior to mining. Drilling on tighter spacing for more precise delineation of the high-grade mineralization and stope design would take place from underground. Underground drilling would also be

important from a geotechnical standpoint, as the high-grade mineralized structures are typically characterized by poor to very poor rock quality.

A total

of 14,947 sample intervals in the drill-hole database have gold assays but no silver analyses. In most of these cases, entire drill holes were not assayed for silver. For example, some of the early Atlas holes and all the Newmont holes were not

assayed for silver. A total of 4,720 of the sample intervals lacking silver assays lie within the domains that form the basis of the gold and silver resource estimates, while 19,938 sample intervals used in the resource estimates do have silver

analyses. However, the fact that silver adds very little value relative to gold mitigates the risk posed by the lower quantity of silver analyses.

RESPEC

believes that all factors that influence the prospect of economic extraction have either been addressed or could be resolved by further drilling. RESPEC is not aware of any unusual environmental, permitting, legal, title, taxation, socio-economic,

marketing, political, or other relevant factors not discussed in this technical report that could materially affect the mineral resource estimates as of the effective date.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 307

May 27, 2026

22.8

Mineral Reserve Estimates

An underground mining scenario is assumed using mechanized cut-and-fill methods.

The Proven and Probable Mineral Reserves for Grassy Mountain were estimated by first calculating an economic cut-off grade for mining underground stopes, then

using the cut-off grade to design stope shapes centered on Measured and Indicated Mineral Resource blocks with gold grades greater than or equal to the cut-off grade.

The calculated gold cut-off grade is 0.08 oz/ton Au. Silver was not included in the cut-off grade calculation due to its relatively small contribution

(2%) to total economic value.

The economic stope cut-off grade was used in the stope optimization to identify the Measured and Indicated blocks

available for consideration to be converted to Mineral Reserves. Measured and Indicated resource blocks with grades less than the economic stope cut-off grade were applied to internal dilution.

A modifying factor of 8% was used for calculating external dilution tons. All Inferred resource blocks or partial blocks within the stopes and all

unclassified material within the stopes is considered internal dilution. The tons were accounted for with zero grade.

Mining recovery is estimated to be

97% based on an assumed ore loss of 3%. This is considered appropriate for the highly selective mechanized cut-and-fill mining method selected for the Grassy Mountain deposit and it is based on similar operations in disseminated ore bodies.

The Mineral Reserve estimation for the Project is reported using the definition in Subpart 229.1300—Disclosure by Registrants Engaged in Mining

Operations in Regulations S-K 1300.

The Mineral Reserve estimation for the Project conforms to industry-accepted practices and is reported using the 2014

CIM Definition Standards.

The QP is not aware of any mining, metallurgical, infrastructure, permitting or other relevant factors not discussed in this

Report that could materially affect the Mineral Reserve Estimate.

22.9

Mining Method

The estimated mine life is 9.3 years.

The Grassy Mountain mine

will be an underground operation accessed via one decline and a system of internal ramps. The decline will be 15ft x 15ft in dimensions, developed from a portal on surface.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 308

May 27, 2026

An underground mining scenario is assumed using underhand mechanized cut-and-fill methods, which, following

ramp-up, will produce 1,300–1,400 tons/day, four days a week. This mining rate will provide sufficient material for the 750 tons/day mill and processing plant to operate at full capacity for seven days a week. The mechanized cut-and-fill

method is highly flexible and can achieve high recovery rates in deposits with complex geometries, as is the case at the Grassy Mountain deposit.

Level

stations will have a standoff distance from the orebody of approximately 300 ft. There are five stations planned for the mine, accessed off the decline, and each station will access up to five production levels.

The ventilation network was designed to comply with U.S. ventilation standards for underground mines. The planned ventilation will use a push/pull system and

will require one exhaust fan on surface. One set of stacked ventilation raises is included in the design to be used for ventilation and secondary egress. Cemented rock fill (CRF) will be used for backfill. Mine operations will be based on the usage

of mobile mining equipment suitable for underground mines. Equipment is conventional for mechanized cut-and-fill mining operations.

22.10

Geotechnical Considerations

The Grassy Mountain deposit is in a structurally complex, clay-altered, epithermal environment. Rock mass conditions in the infrastructure and production areas

vary from Poor to Fair quality with the poorest conditions within major structures that run longitudinally through and bound the deposit. Outside of these fault areas, rock mass conditions are generally Fair. However, localized zones of Poor ground

potentially associated with secondary structures or locally elevated alteration intensity are present throughout the planned mining area.

The North and

Grassy faults are significant fault structures that pose a risk to the stability of an open stoping method; hence, these areas are considered suitable only for a limited man-entry mining method such as mechanized cut-and-fill, where conditions can

be well controlled.

Degradation of Grassy Mountain Formation lithologic units results in difficult mining conditions that can be mitigated through

additional ground support. This would result in a higher mining cost with slower advance rates in those areas.

Based on the shallow depth, ground stress

is relatively low, and rock damage due to higher mining-induced stress concentrations is only anticipated in high-extraction or sequence closure areas and weaker rock mass areas. However, a reduction in the mining stresses around excavations is

likely to adversely affect the stability of large open-span areas. Tensile failure and gravity-induced unraveling are foreseen as the main failure mechanisms.

Ground support design considers industry-standard empirical guidelines and GMS’s experience in variable ground conditions. Compromises have been made in

the extraction sequence due to the need to balance grade and production profiles, extraction of wide orebody areas, and other geotechnical constraints. Ultimately, some aspects of the sequence may not be geotechnically optimal, and additional

analysis or design may be required.

Ground support design considers industry-standard empirical guidelines and GMS’s experience in variable ground

conditions. The extraction sequence has been developed to balance geotechnical constraints, ore recovery, production requirements and project economics. Based on the 2026 FS Update review completed by GMS, the updated mine planning information

remains generally consistent with the previously established underground geotechnical design basis. Nevertheless, local refinements to excavation sequencing, support requirements and extraction strategies may be warranted during future detailed

engineering, mine development and operations as additional geotechnical information becomes available.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 309

May 27, 2026

22.11

Processing and Recovery Methods

The process plant will be designed with conventional processing unit operations frequently used within the gold processing industry. The process plant will

treat 750 tons/day and will operate with two 12-h shifts per day, 365 days per year, producing gold doré bars. The major equipment within the process plant is specified in accordance with the climate, site conditions, ore grades and

metallurgical performance outlined in this report. Any deleterious metals present in the ore such as mercury will be abated by specialized equipment installed in the process plant and are not expected to impact payability terms.

22.12

Infrastructure

22.12.1

Key Infrastructure

Key Project infrastructure as envisaged in the FS includes: underground mine, including portal and decline; roads; site main gate and guard house;

administration building, training, first aid, change house and car park; process plant e-room; crushing area e-room; control room; reagent storage and building; gold room; assay laboratory and sample preparation area; plant workshop and warehouse;

truck shop, warehouse, wash pad; fuel facility, fuel storage and dispensing; water wells; 14.4 kV overland power line; fresh water supply and treatment; raw water tank; TSF; TWRSF; and explosives magazine.

22.12.2

Roads and Power

The main access road will use an existing BLM road, which will be widened to support operations.

Power will initially be provided by diesel power generators during the construction period (year 1). A power line will be built to site in that first year and

will deliver approximately 5.3 MW. The generators will remain on site as backup.

22.12.3

Waste Rock Storage and Borrow Pits

Waste rock will be temporarily stored on surface in a lined facility and will be returned underground as CRF.

Two borrow pits are planned, using contract mining. Borrow material will be used for construction, backfill, and reclamation.

22.12.4

Tailings Storage Facility

The TSF uses conventional designs and assumes construction in three primary stages and zero discharge. The facility will be constructed in stages (with Stage 1

constructed in two intermediate phases), as only 2.4 million tons are planned to be delivered to the TSF, only Stage 1, 2, and a portion of Stage 3 will be required. The TSF will fill the broad valley

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 310

May 27, 2026

immediately west of the Grassy Mountain mine portal and process facilities and require embankments on the north and west sides to impound the tailings. The main embankment will cross the natural

drainage on the north side of the TSF, and a secondary embankment will be constructed along the western ridge. The facility will be a 100% geomembrane-lined facility with a continuous, engineered lining system extending across the impoundment basin

and the upstream slope of the embankments. The design is capable of storing runoff from tributary areas and direct precipitation on the facility resulting from the 500-year, 24-hour storm event, as well as an allowance for wave run-up due to wind

action.

The relevant results and interpretations related to the TSF design are based on the data and other information summarized in this Report.

Golder provided a detailed design for the TSF sufficient to contain the tailings projected from this study’s life of mine production (Golder, 2021d). At

this stage of the Project, there is reasonable certainty that the location and design of the TSF and TWRSF as presented for Study will be used as planned. No significant design changes are likely to be required provided that no material changes in

location or design are needed as a result of the on-going local, State, and Federal permitting process.

Provided that actual construction, operation,

management, and closure of the TSF do not differ materially from the results and design parameters summarized in this Report, there are no significant risks and uncertainties that could reasonably be expected to affect the reliability or confidence

in the TSF design and cost estimates.

If actual activities related to the construction, management, operation, and closure of the TSF do differ

materially from the results summarized in this Report, then the reasonably foreseeable impacts of these risks and uncertainties are most likely to be project delays and additional costs. However, any such delays or additional costs may reasonably be

expected to be managed in the ordinary course and should not impact overall Project viability.

22.12.5

Water Management

Contact and non-contact surface water will be routed around the plant site. Permanent channels were designed on a 100-year, 24-hour storm event with nine

inches of freeboard, or 500-year, 24-hour storm event without overtopping. Temporary channels were designed for a 25-year, 24-hour storm event with nine inches of freeboard, or 100-year, 24-hour storm event without overtopping.

22.12.6

Water Supply

Water supply from the raw water production wells and mine dewatering is projected to be sufficient to support the operational demands. Water demands are

expected to vary seasonally.

22.13

Markets and Contracts

No market studies have been completed. Gold and silver are freely-traded commodities. The doré that will be produced by the mine is considered to be

readily marketable with no deleterious/penalty elements. Although mercury is present in the ore, a retort and recovery system has been included to maintain doré quality.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 311

May 27, 2026

Metal pricing used in the economic analysis is based on long-term flat metal prices of $3,600/oz Au, and

$48.00/oz Ag, which are based on consensus forecasts from various financial institutions.

Paramount has no current contracts for property development,

mining, concentrating, smelting, refining, transportation, handling, sales and hedging, forward sales contracts or arrangements.

22.14

Environmental, Permitting and Social Considerations

Permitting activities began in 2012 with engagement with the state and federal agencies and collection of baseline data. The draft CPA was submitted to DOGAMI

in 2019 for review and comment by state agencies which were received by Calico and integrated into the final CPA. In December 2021, Calico submitted the final CPA to DOGAMI. Calico and DOGAMI have been working together as the draft permits have been

developed and are in the process of being finalized. The package of draft permits was issued for public review on December 8, 2025. Final permits are anticipated to be issued by all required state agencies in the second half of 2026.

In December 2021, Calico submitted a Plan of Operation (PoO) to the BLM. The draft EIS was published for public comment on August 8, 2025 and the final

EIS and record of decision was published on January 29, 2026. This record of decision provides federal authorization for the PoO following posting of a reclamation bond.

Paramount has been conducting baseline data collection for over ten years for environmental studies required to support the State and Federal permitting

process. Results indicate limited biological and cultural issues, air quality impacts appear to be within State of Oregon standards, traffic and noise issues are present but at low levels, and socioeconomic impacts are positive. The result of the

geochemical characterization identified that the geochemistry of the ore and waste rock provide for a possible source of future environmental issues as the Grassy Mountain Project is developed.

Data produced during the baseline and geochemical studies were used in the Project design process, including the design and operation of the TSF and handling

and use of waste rock as cemented backfill material, specifically considering environmental impacts. As outlined in Section 15, the design of the TSF and the waste rock management plan used the results of this geochemical characterization work.

A closure plan and RCE were submitted to the BLM and DOGAMI as part of PoO and CPA, respectively. The proposed reclamation approach for the Project

includes sealing the mine portal, lining, capping, and revegetating the TSF supported by temporary active solution management followed by passive solution management (evaporation) as the TSF drains down, the removal and offsite disposal of the

temporary waste rock storage facility liner, process plant and other infrastructure, the demolition and offsite disposal of the powerline and associated infrastructure, and in general the grading, capping, and revegetation of disturbed areas. This

approach will result in two post-reclamation landforms, the TSF and the quarry, and is anticipated to be completed within five years of ceasing operation. Post-reclamation monitoring, including groundwater and stormwater quality and revegetation

success, is proposed to meet Federal and State requirements and guidance and will continue for up to 30 years following reclamation.

The RCE was updated

in February 2026 to account for current unit rates and in response to input from DOGAMI and BLM during the permitting process. The reclamation surety associated with the proposed reclamation plan is $21,086,123 USD including indirect costs such as

contingency, contractor management and contractor profit. The BLM and State of Oregon are in negotiations to establish an MOU allowing the State of Oregon to hold the bond and oversee the reclamation activities.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 312

May 27, 2026

Social and community impacts have been considered and evaluated for the PoO in accordance with the NEPA and

other Federal laws, and the State of Oregon Socioeconomic Analysis. Potentially affected Native American tribes, tribal organizations and/or individuals were consulted during the preparation of the PoO and consultation continues to advise on the

project that may have an effect on cultural sites, resources, and traditional activities.

22.15

Capital Cost Estimate

The capital cost estimate is reported in Q2 2026 USD. The capital costs are at a minimum at a feasibility level of confidence of ±15% as is defined in S-K 1300.

Capital costs are estimated at $189.8 million of initial capital. This figure includes

$1.7 million of capitalized operating costs and $19.8 million in contingency (10%). In addition, there is $65.1 million of sustaining capital over the LOM and $21.1M in closure costs.

22.16

Operating Cost Estimate

The operating cost estimates are reported in Q2 2026 USD. The capital costs are at a minimum feasibility level of confidence of ±15% as is defined in

S-K 1300.

The LOM underground mining costs are estimated at $332.9 million over the LOM, and averages $141.18/ton processed over the LOM. Excluding

mining costs from the pre-production period (accounted for in the initial capital cost) results in an average mining cost of $140.60/ton processed over the LOM.

The LOM process operating cost is estimated at $89.3 million over the LOM, and averages $37.72/ton processed over the LOM.

The LOM general and administrative (G&A) costs are estimated at $5.4 million/a, or $48.7 million over the LOM, and average $20.65/ton processed

over the LOM.

22.17

Economic Analysis

An economic model was developed to estimate the project’s annual pre-tax and post-tax cash flows, sensitivities, and NPV results using a 5% discount

rate. Based on the assumptions and parameters, the economic analysis shows positive post-tax economics of $374.7 million NPV5% and 38.9% post-tax IRR. A sensitivity analysis was conducted on

the base-case pre-tax and post-tax NPV and IRR of the project using the following variables: metal prices, discount rate, operating costs, initial capex, metal recovery, and head grade.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 313

May 27, 2026

22.18

Risks and Opportunities

22.18.1

Risks

22.18.1.1

Geological Setting, Mineralization, and Deposit

Unlike states such as Nevada and Arizona, Oregon does not have a strong mining background. The Project may encounter a lack of mining skills and expertise at

the local level, which could affect Paramount’s ability to operate using local labor, until Paramount has trained sufficient local staff to suit Project requirements. There may also be effects on the Project caused by a lack of familiarity

with Mine Safety and Health Administration (MSHA) requirements at the local and State levels and at the local staff operator level, which may in turn lead to safety incidents. Such incidents could result in Project delays and affect the permitting

process.

22.18.1.2

Mineral Processing and Metallurgical Testing

If material flowability properties in the mined product are not aligned to the analysis and benchmarking completed in this FS, there is a risk of delayed

production ramp-up as well as remedial corrections required to the crushing circuit design. To mitigate this, additional materials flowability testwork should be completed on the mined product prior to detailed design.

22.18.1.3

Mineral Resource Estimate

During resource modeling, RESPEC identified structural zones as the principal controls of the high-grade mineralization in the central core of the Grassy

Mountain deposit. This mineralization has significant grade variability, which creates modeling uncertainties with respect to the location of the estimated high grades as distances from drill data increase. While an open-pit mining scenario would

minimize the risk imparted by the location uncertainty, underground mining would require far greater spatial accuracy. The current model is not sufficiently accurate for use in mining, particularly from underground. Updating the operation’s

short- and long-term resource models, refining geotechnical modeling, and making final stope designs requires properly oriented, closely spaced, definition drilling. RESPEC strongly recommends drilling from the surface prior to mining to reduce the

uncertainties in the high-grade mineralization model. Drilling on tighter spacing for more precise delineation of the high-grade mineralization and stope design would take place from underground. The underground drilling would also be important from

a geotechnical standpoint because the mineralized structures are typically characterized by poor to very poor rock quality.

22.18.1.4

Mining Methods

There is a risk that the estimated mining costs may not be achievable if additional support over that contemplated in the FS is required due to weak rock mass.

22.18.1.5

Infrastructure

Delays in the power line installation including the substation upgrade may result in delays to the Project schedule. As the Project power requirements are

relatively modest, there is a risk that the selected power provider may delay supply to the Project. However, power for the initial stages of project development can be generated using diesel-powered generators prior to the power supplier completing

the requisite power infrastructure for the Project.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 314

May 27, 2026

Water supply is envisaged to be partly from groundwater sources. Additional production wells may be required

to support operations, which will require permitting. In addition, well productivity may not be as envisaged, which may affect both the volume of water available for operations and the number of wells that must be pumped.

If additional borrow areas are required for construction and reclamation of the TSF that are more distant than contemplated in the FS, then reclamation

construction costs of the TSF will increase as compared to the costs estimated in this Report.

As construction work in Oregon is seasonal, poor weather

during the construction season may result in delays to the Project schedule. This is de-risked by scheduling earthworks and building construction in summer, with mill construction during winter months to be completed within a building.

22.18.1.6

Environmental Studies, Permitting and agreements with local individuals or groups

If non-governmental organizations object to the Project as envisaged in the FS, a number of risks may result. These could include additional capital costs or

increases in operating costs, delays in Project permitting, and delays in obtaining the social license to operate.

22.18.1.7

Capital Costs

There is a risk that the estimated mining capital costs may not be achievable due to the following factors:

Significant variations in tariffs could result in costs exceeding those assumed in the project estimates.

Additional ground support, beyond what is contemplated in the Feasibility Study (FS), may be required if a

greater extent of weak rock mass is encountered.

Increased demand for mining equipment may lead to delays in the delivery of planned equipment, potentially

impacting the project schedule. Furthermore, if alternative equipment must be procured, the costs may differ from those assumed in the current estimate.

22.18.1.8

Operating Costs

There is a risk that the estimated mining capital costs may not be achievable due to the following factors:

Additional ground support, beyond what is contemplated in the Feasibility Study (FS), may be required if a

greater extent of weak rock mass is encountered.

Increases in commodity prices (e.g., diesel, cement, steel) may lead to higher costs for raw materials and

supplies used in mining operations, resulting in increased operating costs.

Non-availability of skilled manpower may necessitate offering higher compensation to attract and retain qualified

personnel, potentially increasing operating costs. Additionally, there is a possibility that production mining activities may need to be outsourced, which could further increase operating costs, although it may help reduce capital expenditures.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 315

May 27, 2026

22.18.1.9

Economic Analysis

The economic analysis is based on long-term flat metal prices of $3,600/oz Au, and $48.00/oz Ag, which are based on consensus forecasts from various financial

institutions, with no considerations for escalation or inflation over the LOM. Large fluctuations to metals prices or drastic changes to inflation can negatively impact the project returns.

The risks or uncertainties that could reasonably be expected to affect the reliability or confidence in the projected economic outcomes are:

Geological and resource uncertainty

Metallurgical and processing uncertainty

Mining and geotechnical uncertainty

Infrastructure assumptions

Capital and operating cost uncertainties

Commodity price and market risks

Environmental, permitting, and regulatory risks

Social and community considerations

Political and jurisdictional risk

Project schedule assumptions

22.18.1.10

Operational Readiness

Mining is cyclical, and during an up-cycle, it can be difficult for any mining operation to attract quality staff. There is a cost risk to Paramount to source

a non-local operations team of sufficient experience and expertise, including additional costs to train and mobilize the team locally, to adequately support the Owner’s team.

Implementation of an effective operations readiness strategy and program is key to address the potential risk that Paramount currently has no active

operations. A lack of familiarity with the operational environment, particularly in Oregon, could otherwise result in unexpected Project delays or cost increases.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 316

May 27, 2026

22.18.2

Opportunities

22.18.2.1

Geological Setting, Mineralization, and Deposit

There is remaining exploration potential in the Project area. The Crabgrass, Bluegrass, North Bluegrass, Ryegrass and Dennis’ Folly areas in the Grassy

Mountain claims block were recommended for surface work with the goal of defining further exploration drill targets.

22.18.2.2

Mineral Processing and Metallurgical Testing

There is an opportunity to further optimize the flowsheet with respect to leach feed particle size and retention time that could positively affect the project

economics, further comminution and metallurgical testwork work should be completed to confirm the opportunity.

22.18.2.3

Mining Methods

The mine plan and cut-off grades used for the FS are based on conservative metal prices. There may be upside for the Project in higher metal pricing scenarios.

A higher metal price would potentially result in additional material meeting the cut-off grade criteria and being available to potentially convert to Mineral Reserves, thereby providing additional metal production and potentially, extending the mine

life.

22.18.2.4

Infrastructure

The mine plan requires sources of aggregate and borrow materials in support of road construction and CRF. Private sources for gravel construction along the

access route may be obtainable. There may also be an opportunity to source borrow material from local sources. This could lead to more simplified permitting for the development of these sources, and it could potentially reduce costs of the gravel

for the access road construction and borrow materials for CRF.

22.18.2.5

Environmental Studies, Permitting and agreements with local individuals or groups

The current post-closure land use is to return the site to a land use similar to current land uses (grazing, wildlife, recreation). There is the opportunity to

modify the closure plan to result in a beneficial post-closure land use that may be identified as the project progressed through construction and operation.

22.18.2.6

Capital Costs

The following factors present potential opportunities to optimize project outcomes and enhance value:

Tariff variability: potential fluctuations in tariffs provide an opportunity to optimize procurement strategies,

renegotiate contracts, or identify alternative suppliers to achieve cost efficiencies relative to current project estimates.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 317

May 27, 2026

Ground conditions and support requirements: encountering varying rock mass conditions offers an opportunity to

refine ground support design, improve geotechnical understanding, and implement more efficient or innovative support systems tailored to actual conditions.

Mining equipment market dynamics: increased demand for mining equipment creates an opportunity to reassess fleet

strategy, including evaluating newer or more efficient technologies. Exploring alternative equipment sourcing or leasing options may also optimize capital allocation and improve operational flexibility.

22.18.2.7

Operating Costs

The following factors present potential opportunities to optimize project outcomes and enhance value:

Ground conditions and support requirements: encountering varying rock mass conditions offers an opportunity to

refine ground support design, improve geotechnical understanding, and implement more efficient or innovative support systems tailored to actual conditions.

Commodity price movements: changes in commodity prices (e.g., diesel, cement, steel) present opportunities to

implement cost-control measures, adopt more efficient consumption practices, or explore bulk purchasing and long-term supply agreements to mitigate cost impacts.

Workforce availability and strategy: labor market constraints provide an opportunity to strengthen workforce

planning, invest in training and development, or adopt automation and productivity-enhancing technologies. Additionally, selectively contracting production mining could optimize the balance between operating and capital costs while improving

scalability and execution efficiency.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 318

May 27, 2026

23

RECOMMENDATIONS

23.1

Introduction

Based on the assumptions and parameters presented in the Report, the Grassy Mountain Project has a mine plan that is technically feasible and economically

viable. The positive financials of the Project ($374.7 million post-tax NPV5% and 38.9% post-tax IRR) support the mineral reserve.

A single work phase is proposed for recommended work to further derisk the project in advance of the next phase of the project (detailed engineering). The

estimated budget to complete the work program is set out by discipline area and summarized in Table 23-1.

Table 23-1: Phase 1 Recommended Work Program

Program Component

Cost ($ M)

Metallurgical testing

0.2

Drilling and Lithologic Modelling

2.5

Mining methods

0.1

Geotechnical

0.5

Hydrology

0.6

Infrastructure

0.1

Environmental Studies, Permitting and agreements with local individuals or groups

Total

4.0

Note: totals may not match due to rounding

23.2

Metallurgical Testing

It is recommended that further comminution and metallurgical testwork be completed, particularly on material to be processed in the first three years of

operations in order to investigate the opportunity of optimizing the comminution flowsheet and/or the opportunity to defer some equipment and capital costs into later years. Estimated cost $175,000.

It is recommended that material handling testwork be completed to optimize and de-risk material handling design of conveyors, bins and stockpiles and

potential operating issues associated with solids bridging or rat holes. Estimated cost $75,000.

23.3

Mineral Resource Estimate

The current lithologic model has not been fully rectified three-dimensionally. To support an active mining operation, a fully rectified lithological model is

recommended. This work is estimated to cost about $45,000.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 319

May 27, 2026

To mitigate some of the risks associated with significant grade variability observed in the structural zones

that are the principal controls of the high-grade mineralization within the central core of the Grassy Mountain deposit, a surface drilling program is recommended. The current model is not sufficiently accurate for use in mining, particularly from

underground. Properly oriented, closely spaced, definition drilling would be required to update the operation’s short- and long-term resource models, as well as to refine geotechnical modeling and final stope designs.

Before mining commences, drilling from the surface is strongly recommended to improve the understanding of the high-grade mineralization model. The drilling

would consist of 25 RC holes with core tails for a total of 19,250 ft and would target gaps in the high-grade core where the location and orientation of the mineralization is uncertain. The estimated cost for the drilling program is estimated at

$2,525,000, as given in Table 23-2.

Table 23-2: Recommended Work

Program for Mineral Resource Estimate

Program Component

Unit Cost ($)

Quantity

Task Cost ($)

3-D lithologic modeling

N/A

N/A

45,000

Drilling - RC

$66/ft

9,900 ft

654,000

Drilling - core

$131/ft

9,350 ft

1,229,000

Road and pad construction, reclamation

$233/hour

60 hours

14,000

Assays

$70/sample

4000 samples

280,000

Travel, lodging, field supplies, personnel

$1,685/day

180 days

303,000

Total

2,525,000

Drilling on tighter spacing from underground for more precise delineation of the high-grade mineralization and stope design

will be required following the surface drilling program. The drilling would also be important from a geotechnical standpoint as the mineralized structures are typically characterized by poor to very poor rock quality. The drilling would take place

during development of the mine, so no work program or cost estimate are included here. However, more precise definition of the deposit from underground will be critical for effective stope design, mine planning and geotechnical characterization.

23.4

Mining Methods

Additional optimization of mine design and underground production should be undertaken before construction begins. This should include:

Determination of an optimal gold price. A higher gold price will lower the cut-off grade and bring in more

economic material into the mine plan. Detailed mine plan will be required to design level access heading meeting design gradients such that it is ready for execution. This is estimated to require a budget of approximately $30,000 to complete.

Further analysis of the underground equipment types and sizes to identify possible improvements to the economics

and efficiencies. Support with bidding and bids evaluations will be required. A budget of $15,000 is recommended to complete this step.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 320

May 27, 2026

Contractor mining bids development and evaluation of bids. A budget of $15,000 is recommended to complete this

step.

Further analysis of the underground ventilation system should be completed. This analysis should include a

further detailing of the ventilation model, fan selection, and ventilation raise diameter. This is estimated to require a budget of approximately $15,000 to complete.

The mining recommendations overall have a completion cost estimated at approximately $75,000.

Table 23-3: Recommended Work Program for Mining Methods

Program Component

Unit

Cost ($)

Mine Design Detail

30,000

Equipment Selection and Bids

15,000

Contractor Mining

15,000

Ventilation Model and design

15,000

Total

75,000

23.5

Geotechnical

A geotechnical classification should be used for narrow zones of weakness, both in rock core descriptions and during underground geotechnical mapping, to allow

for the differentiation, characterization, and geotechnical classification of clay matrix breccias, faults, faults/veins or other weakness zones. This was not analyzed in the FS due to lack of structural information.

A study should be completed to geotechnically characterize the vein/faults and document strength properties and mean thicknesses.

The seismic hazard study should be updated to provide additional quantification of the seismic risk for the Project area.

The empirical design using a lower Q’ value standard deviation range should be reviewed to determine the stability condition of all development and

determine what additional stability measures may be required if designs change due to a more conservative assessment of the Q’ values.

A pillar

dimensioning and stability analysis is recommended to be completed to provide recommendations to the mine design and planning department.

Additional

tests should be undertaken to test CRF strength resistance in response to changes in the cement and fly ash percentages to reduce the amount of cement that may be required.

A limit equilibrium analysis should be completed to assess the typical failure modes of caving, flexural, sliding and rotational as proposed by Mitchell and

Roettger (1989).

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 321

May 27, 2026

Reinforcements should be installed during operations to intersect the vertical joints at an oblique angle to

improve the shear resistance. Otherwise, vertically-installed reinforcements may need to be longer than envisaged in this Report to penetrate beyond the potential height of the stable arch.

Wall response in permanent and temporary excavations must be measured during excavation to develop a better understanding of the interaction between bolts,

cable bolts and the rock mass.

A geotechnical risk model is recommended to economically quantify the risk of instabilities and prepare alternative plans

to ensure on time ore delivery.

An update should be undertaken to the reinforcement and support numerical analysis to support the shotcrete assumptions.

The three-dimensional numerical analysis of the timeframes assumed for excavation and backfill should be conducted on a month-by-month basis. This

monthly examination should evaluate displacement velocity against the stand-up time requirements for the excavations.

Rib pillars that are lower than

three drifts wide in drift excavations under rock mass environments (i.e. that are not under CRF) should be avoided, due to the risk of high stress concentrations in the pillar and therefore local instabilities.

The safety factor should be calculated as part of the numerical model update, to provide information on the response of the rock mass to the induced stress

through the excavation–backfill process.

Paramount should prepare a detailed monitoring plan for underground operations. The plan should include:

geotechnical inspections and permanent ground control during operations;

installation of vibrating wire extensometers to measure displacements along time in sectors considered critical

as the permanent infrastructure;

a measurement program for in-situ stress parameter, to indicate sectors subject to large compression or

relaxation changes due to stress redistribution during drift mining;

preparation of procedures for a systematic convergence measurement and stress changes measurement; and

surface displacements monitoring based on visual inspection, cross-crack measurements (either manual or by

wireline extensometer), survey monitoring and satellite imaging subsidence monitoring (InSAR).

The application of pre-splitting

blasting process or smooth blasting processes should be investigated to reduce blast damage and achieve blast design.

Blasting should be avoided beside

drifts that have recently been backfilled or where the CRF still undergoing the curing process (28 days) to prevent CRF damage and affect the CRF stability in undercut operations.

A vibrations study is recommended to define the maximum size of blasting to reduce the risk of underground collapses or instabilities.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 322

May 27, 2026

The effect of blasting on the weak rock mass should be quantified using techniques proposed by Caceres

(2011) related to peak particle velocity and scaled distance as a function of rock mass quality.

A workshop should be organized to review the mine

plan and geotechnical assumptions to optimize the mine plan so as to ensure stability between drifts and mine levels.

For the portal excavation, a 2D

numerical model should be completed to assess stability and deformation during the excavation process. The model should consider the updated geotechnical characterization and assess these conditions at different excavation stages.

The total geotechnical program is estimated to cost approximately $455,000 to complete, detailed in Table 23-4 below.

Table 23-4: Recommended Geotechnical Program

Program Component

Unit Cost ($)

Vein/faults geotechnical characterization

40,000

Seismic hazard study update

50,000

Design stability update and pillar assessment

10,000

CRF test update

200,000

CRF limit equilibrium assessment

10,000

Geotechnical risk model

15,000

Support numerical analysis update

10,000

3D stability numerical analysis update

35,000

Detailed ground monitoring plan

10,000

Effect blasting assessment

10,000

Numerical model for portal excavation sequence

10,000

Mining and geotechnical workshop

25,000

Other studies

30,000

Total

455,000

23.6

Hydrology

Wellfield construction should be initiated and pumping tests conducted to confirm the water flow available from the water well. This work is estimated at

approximately $600,000.

23.7

Infrastructure

Detailed engineering and design should be carried out on the incoming power line, by the local power provider. The anticipated cost for this study is

approximately $100,000.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 323

May 27, 2026

23.8

Environmental Studies, Permitting and agreements with local individuals or groups

Continued engagement with the local community, tribal entities and local, state and federal agencies is recommended as the project nears final state

permitting, construction and operation. Costs associated with this recommendation are a part of ongoing engagement and already included in Owner’s costs.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 324

May 27, 2026

24

REFERENCES

Barton, N., 2002: Some New Q-Value Correlations to Assist in Site Characterization and Tunnel Design: Int. J Rock Mech and Min Sci, (39), pp.

185–216.

Barton, N., 2008: Rock Engineering for a Drill

and Blast and TBM Tunneling, and Important Aspects of Rock Joint and Rock Mass Behavior: Short course presented 26–27 June 2008, Santiago, Chile.

Barton, N.; Lien, R. and Lunde, J., 1974: Engineering Classification of Rock Masses for the Design of Tunnel Support: Rock Mechanics, Vol. 6, N° 4.

Baxter, K., 2020: Grassy Mountain Gold and Silver Project Mine Dewatering Hydrogeologic Assessment: report prepared by Lorax Environmental Services, March

2020, Project Number A547-1.

Bieniawski, Z. T., 1976: Rock Mass Classification in Rock Engineering: in Z. T. Bieniawski, ed. Proceedings of the

Symposium on Exploration for Rock Engineering, Vol. 1. Johannesburg, 1–5 November 1976. Cape Town: A.A. Balkema, pp. 97–106.

Bieniawski,

Z. T., 1989: Engineering Rock Mass Classifications: New York: John Wiley & Sons, first edition.

Bieniawski, Z. T., 1990: Tunnel Design by Rock

Mass Classifications: Washington: US Army Corps of Engineers, first edition.

BMO Capital Markets, 2020: Material Precious Metal & Minerals:

September 2020.

Brady, B.H. & Brown, E.T., 2004: Rock Mechanics for Underground Mining: Kluwer Academic, third edition.

Brown, J.J., Malhotra, D., and Black, Z., 2012: NI 43-101 Technical Report on Resources, Grassy Mountain Gold Project, Malheur County, Oregon: report prepared

by Gustavson Associates for Calico Resources Corp., effective date September 26, 2012.

Buchanan, L.J., 1981: Precious Metal Deposits Associated with

Volcanic Environments in the Southwest: in Dickinson, W.R., and Payne, W.D., eds, Relations of Tectonics to Ore Deposits in the Southern Cordillera: Arizona Geological Society Digest, v. 14, pp. 237–261.

Caceres, C.A., 2011: Quantifying the Effect of Rock Mass Quality on Peak Particle Velocity for Underground Drift Development: PhD thesis, University of

British Columbia.

Canadian Securities Administrators (CSA), 2011: National Instrument 43-101, Standards of Disclosure for Mineral Projects, Canadian

Securities Administrators.

Cantor Fitzgerald, 2020: Precious Metals & Mining Macro: March 2020.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 325

May 27, 2026

Carter, T. G.,2000: An Update on the Scaled Span Concept for Dimensioning Surface Crown Pillar for New or

Abandoned Mine Workings: 4th North American Rock Mechanics Symposium, 31 July–3 August, Seattle, Washington.

Clark, A., Thompson, J., and Scanlon, T., 2018: Grassy Mountain Pre-Feasibility Dewatering Estimates RE: (1294.0010 - Task 6): Memorandum prepared by SPF

Water Engineering for Paramount Gold Nevada, January 2018, 129 p.

Cordova, M., Saw, H., and Villaescusa, E., 2015: Laboratory Testing of Cemented Rock

Fill for Open Stope Support.

Cummings, M.L., 1991: Relationships Among Volcaniclastic Sedimentation, Volcanism, Faulting, and Hydrothermal Activity West

of Lake Owyhee, Malheur County, Oregon: in Geology and Ore Deposits of the Great Basin: Geological Society of Nevada, Symposium Proceedings, v2, pp. 111–132.

Erwin, T.P., 2017: Mineral Status Report for the Grassy Mountain Project: Report prepared for Paramount Gold Nevada Corp. by Erwin & Thompson, LLP,

Reno, Nevada, 23 p.

Fashing, F. and Vanek, R., 2011: Engineering Geological Characterisation of Fault Rocks and Fault Zones: Geomechanics and Tunnelling,

4(3), pp. 181–194.

French, G.M., 1998: Possible Differences Between Tombstone and the Atlas and Newmont Drilling: internal Atlas Precious Metals

report, in Tombstone Exploration memorandum, 1 p.

Golden Sunlight Mines, 1991: Grassy Mountain Metallurgical Studies: May 1991.

Golder, 2016a: Collection of Geotechnical Data from Drill Core at Grassy Mountain: Field procedure manual, Lake Oswego, Oregon prepared by Golder Associates.

Golder, 2016b: Grassy Mountain Project – Tailings Storage Facility, Siting and Trade-Off Study, Malheur County, Oregon: Report prepared for

Paramount Nevada by Golder Associates Inc. December 9, 2016.

Golder, 2018a: Paramount Gold Nevada – Grassy Mountain Project, Geotechnical Data

Collection Factual Report: Report prepared for Paramount Gold Nevada Corp. by Golder Associates Inc., March 2018, 281 p.

Golder, 2018b. Report

Pre-Feasibility Design Tailings Storage Facility Grassy Mountain Project: Report prepared by Golder Associates Inc., June 29, 2018, 1633241.36.R.REV0.

Golder, 2019a: Grassy Mountain Project – Hydrology and Stormwater Diversion Recommendations for the Process and Portal Pads. Technical memorandum

prepared for Ausenco Minerals and Metals by Golder Associates Inc. Draft, June 7, 2019.

Golder, 2019b: Grassy Mountain Project – Tailings

Storage Facility, Tailings Storage Facility Location Options Analysis. Prepared for Calico Resources USA Corp. by Golder Associates Inc. September 13, 2019.

Golder, 2019c: Detailed Design, Tailings Storage Facility and Waste Rock Dump, Grassy Mountain Mine, Malheur County, Oregon: Report prepared for Calico

Resources USA Corp. by Golder Associates Inc., November 6, 2019.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 326

May 27, 2026

Golder, 2019d: Stormwater Pollution Control Plan, Grassy Mountain Mine, Malheur County, Oregon. Prepared for

Calico Resources USA Corp. by Golder Associates inc. November 6, 2019.

Golder, 2020: Rock Mechanics Laboratory Testing Results (Grassy Mountain

Project), Reno, Nevada.

Golder, 2021a: Stormwater Pollution Control Plan, Grassy Mountain Mine, Malheur County, Oregon, Revision 1. Prepared for Calico

Resources USA Corp. by Golder Associates USA Inc. October 27, 2021.

Golder, 2021b: Abbreviated Operating Permit Application – Grassy Mountain

Basalt Borrow Quarry, Revision 1. Prepared for Oregon Department of Geology and Minerals Industries by Golder Associates USA Inc. October 27, 2021.

Golder, 2021c: Abbreviated Operating Permit Application – Grassy Mountain Closure Cover Borrow Areas Quarry. Prepared for Oregon Department of Geology

and Minerals Industries by Golder Associates USA Inc. October 27, 2021.

Golder, 2021d: Detailed Design, Tailings Storage Facility and Temporary

Waste Rock Storage Facility, Grassy Mountain Mine, Malheur County, Oregon, Revision 1. Report prepared for Calico Resources USA Corp. by Golder Associates USA Inc., October 29, 2021.

Gonzalez de Vallejo, L., 2004: Ingeniería Geológica: Pearson Educación, Madrid.

Gonzalez de Vallejo, L., Ferrer, M., Ortuño, L., Oteo, C., 2002: Ingeniería Geológica, Madrid, España.

Goodman, R., 1989: Introduction to Rock Mechanics: John Wiley & Sons, New York, second edition.

Gustin, M.M., Dyer, T.L., MacMahon, C., Caro, B., Raponi, T.R., and Baldwin, D., 2018: Preliminary Feasibility Study and Technical Report for the Grassy

Mountain Gold and Silver Project, Malheur County, Oregon, USA: report prepared by Mine Development Associates, Golder Associates and Ausenco Canada Inc. for Paramount Gold Nevada Corp., effective date 21 May, 2018.

Hazen Research Inc., 1990: Grassy Mountain Metallurgical Studies: March 1990.

Hazen Research Inc., 1991: Gravity Concentrations Studies on the Grassy Mountain Gold Ore, July 1991.

Hoek, E.; Kaiser, P. and Bawden, W., 1995: Support for Underground Excavations in Hard Rock: A. A. Balkema.

Hulse, D.E., Brown, J.J., and Malhotra, D., 2012: NI 43-101 Technical Report on Resources, Grassy Mountain Gold Project, Malheur County, Oregon: report

prepared by Gustavson Associates for Calico Resources Corp., effective date March 1, 2012.

Itasca, 2012: FLAC3D (Fast Lagrangian Analysis of

Continua in 3 Dimensions), 2010: v5.0.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 327

May 27, 2026

Jory, J.C., 1993: Grassy Mountain Development Geology 1993 Year-End Report: internal Newmont Exploration

Limited draft memorandum, December 1993, 9 p. plus figures.

Kelly, J.M., 1988: Discovery History of the Grassy Mountain Deposit: unpublished

inter-office correspondence of Atlas Precious Metals Inc., September 1988, 4 p.

Laubscher D. H. and Jakubec J., 2001: The MRMR Rock Mass

Classification for Jointed Rock Masses: in W. A. Hustrulid & R. L. Bullock eds. Underground Mining Methods: Engineering Fundamentals and International Case Studies. New York, Society of Mining Engineers, pp. 474–481.

Laubscher, D. H., 1990: A Geomechanics Classification System for the Rating of Rock Mass in Mine Design: Journal of the South African Institute of Mining and

Metallurgy, 90(10), pp. 257–273.

Lechner, M.J., 2011: Grassy Mountain NI 43-101 Technical Report, Malheur County, Oregon: Report prepared for

Calico Resources Corp., effective date June 6, 2011.

Lechner, M.J., 2007: Grassy Mountain Technical Report, Malheur County, Oregon: NI 43-101

Technical Report: Report prepared for Seabridge Gold Inc., effective date April 27, 2007

MacMahon, C., Browne, R., and Barton, M., 2018: Draft

Report Pre-Feasibility Design Tailings Storage Facility Grassy Mountain Project: Report prepared by Golder Associates Inc., June 2018, 1633241.36. REVA, 30 p. plus appendices.

Mathews, 1981: Stability Graph Method: SME Mining Engineering Handbook, Third Edition, pp. 362–363.

McClelland Laboratories Inc., 2020: Report on Milling/ Cyanidation Testing – Grassy Mountain Composites MLI Job No. 4551, August 13,

2020.

MetaRock Laboratories, 2020: Rock Mechanics Testing Report for - CRF Testing. Houston, Texas.

Mitchell, R.J. and Roettger, J.J., 1989: Analysis and Modelling of Sill Pillars: in Innovations in Mining Backfill Technology, Balkema, Rotterdam,

pp 53–62.

Newmont Exploration Inc., 1993: Grassy Mountain Metallurgical Test Results: December 1993.

Nicholas, D.E., 1981: Method Selection – A Numerical Approach; Design and Operation of Caving and Sublevel Stoping Mines: SME-AIME, New York.

Oregon Water Resources Department (OWRD), 2020: Grassy Mountain Tailings Dam. Approval letter prepared by Oregon Water Resources Department, July 7,

2020.

OWRD, 2025. OWRD Tailings Dam Approval Extension Request – Grassy Mountain Mine, Malheur County. E-mail correspondence from Janicek, T. to

MacMahon, C. on July 3, 2025.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 328

May 27, 2026

Palmström, A., 1995: RMi - A Rock Mass Characterization System for Rock Engineering Purposes: PhD

thesis, University of Oslo.

Pakalnis, R.; Caceres, C., Clapp, K., and Morin, M., 2005: Design Spans – Underhand and Fill Mining.

Raponi T. R., Seamons J., Collyard, J. S., MacMahon C. (2022): Grassy Mountain Project: S-K 1300 Technical Report Summary on Feasibility Study, Oregon, United

States. Report prepared by Ausenco Engineering Canada Inc., Arrowhead, SLR, RESPEC, GMS, and WSP for Paramount Gold Nevada Corp., effective date June 30, 2022.

Raponi T. R., Gustin M. M., Seamons J., DeLong R., MacMahon C., Palma L., 2020: Feasibility Study and Technical Report for the Grassy Mountain Project,

Oregon, USA: report prepared by Mine Development Associates, Golder Associates, EM Strategies, Geotechnical Mine Solutions and Ausenco Canada Inc. for Paramount Gold Nevada Corp., effective date 15 September 2020.

Read J., and Stacey P., 2009: Guidelines for Open Pit Slope Design.

Resource Development Inc. (RDI), 2012: Review of Metallurgical Studies for the Grassy Mountain Project: January 2012.

Resource Development Inc., (RDI) 2015: Metallurgical Testing of Grassy Mountain Project, Malheur County Oregon: March 2015.

Riedmüller, G., Brosch, F. J., Klima, K. and Medley, E. W., 2001: Engineering geological Characterization of Brittle Faults and Classification of Fault

Rocks: Felsbau, 19(4), pp. 13–19.

Rocscience, 2020: RS2 v10.012. 2D Finite Element Program for Rock and Soil Applications.

Rytuba, J.J., and McKee, E.H., 1984: Peralkaline Ash Flow Tuffs and Calderas of the McDermitt Volcanic Field, Southeast Oregon and North Central Nevada:

Journal of Geophysical Research v. 89; doi: 10.1029/JB080i010p08616. issn: 0148-0227.

Rytuba, J.J., and VanderMuelen, D.B., 1991: Hot-Spring Precious

Metal Systems in the Lake Owyhee Volcanic Field, Oregon-Idaho: in Geology and Ore Deposits of the Great Basin: Geological Society of Nevada, Symposium Proceedings, v2, pp. 1085–1096.

Saw, N., De Vries, R., Hassel, R., and Villaescusa, E., 2017: Optimization of Cemented Rockfill Strength for Open Stope Support.

SGS, 2018: An Investigation into Metallurgical Testing of samples from the Grassy Mountain Gold Project (Project

15944-001), March 2018.

SGS, 2020a: An Investigation into Comminution and Metallurgical testing on Samples

from the Grassy Mountain Gold Project, Project Number 15944-02 – Final Report; June 23, 2020

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 329

May 27, 2026

SGS, 2020b: An Investigation by High-Definition Mineralogy into One Composite Sample from Grassy Mountain

Mine, Project Number 15944-02 – Final Report, September 18, 2020

Siems, P.L., 1990: Grassy Mountain Alteration and Geochemistry Report:

unpublished internal report prepared for Atlas Precious Metals Corporation.

Sillitoe, R.H., 1993: Epithermal Models: Genetic Types, Geometrical Controls

and Shallow Features: in Kirkham, R.V., Sinclair, W.D., Thorpe, R.I., and Duke, J.M. (eds.), Mineral Deposit Modeling, Geological Association of Canada Special Paper, n. 40, pp. 403–417.

Steele, G.L., 1990: Grassy Mountain Rock Density: internal Atlas Precious Metals, Inc. memorandum, 2 p.

Szwedzicki, T., 2003: Rock Mass Behavior Prior to Failure: Int. J Rock Mech and Min Sci, (40), pp. 573–584.

Villaescusa, E., 2014: Geotechnical Design for Sublevel Open Stoping.

Weiss, S.I., 2017: Summary Report on Drilling Targets for Augmenting Mill Feed, Grassy Mountain Gold Project, Malhuer County, Oregon: unpublished report

prepared for Paramount Gold Nevada Corp., June 2020, 20 p.

Werkman, D., 2026: Financial Model Rev A MNP Tax Edit: model prepared by MNP for Paramount

Nevada Gold Corp., May 19, 2026.

Wilson, S.E., Pennstrom, W.J. Jr., Batman, S.B., and Black, Z.J., 2015: Amended Preliminary Economic Assessment,

Calico Resources Corp., Grassy Mountain Project, Malheur County, Oregon, USA: report prepared by Metal Mining Consultants Inc. for Calico Resources Corp., effective date 13 January 2015, amended July 9, 2015.

Wright, J.L., 2012: Grassy Mountain Property CSAMT Survey GIS Compilation: unpublished report prepared for Calico Resources Corp., February 2012, 48 p., plus

data files on CD.

WSP 2025: Tailings Storage Facility Dam Safety Permit Extension Request, Grassy Mountain project, Malheur County, Oregon. Letter

prepared by WSP USA Inc. for Oregon Water Resources Department, July 3, 2025.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 330

May 27, 2026

25

RELIANCE ON INFORMATION PROVIDED BY THE REGISTRAR

25.1

Introduction

The QPs have relied upon the following other expert reports, which provided information regarding mineral rights, surface rights, property agreements, water

rights, royalties, environmental, permitting, social license, closure, taxation and marketing for sections of this Report.

25.2

Property Agreements, Mineral Tenure, Surface Rights and Royalties

The QPs have not independently reviewed ownership of the Project area and any underlying property agreements, mineral tenure, surface rights, or royalties. The

QPs have fully relied upon information derived from Paramount and legal experts retained by Paramount for this information through the following documents:

Erwin, T.P., 2017: Mineral Status Report: report prepared by Erwin, Thompson & Faillers LLP for

Paramount Nevada Gold Corp., September 26, 2017, 9 p. plus appendices

The information relied upon falls under the category

“Legal matters” under § 229.1302(f).

This information is used to present the executive summary in Section 1 and the interpretation

and conclusions in Section 22. This information is used in discussing property ownership information in Section 3 of the Report, the tailings facility design in Section 15, the permitting and closure discussions in Section 17,

and in support of the economic analysis in Section 19. It also supports the Mineral Resource estimate in Section 11 and the Mineral Reserve estimate in Section 12.

25.3

Environmental, Permitting, Closure, and Social and Community Impact

The QPs have fully relied upon information supplied by Paramount and experts retained by Paramount for information related to design reports, baseline and

supporting studies for environmental permitting, environmental permitting and monitoring requirements, environmental characterization reports, ability to maintain and renew permits, emissions controls, closure planning, closure and reclamation

bonding and bonding requirements, sustainability accommodations.

The information relied upon falls within the categories “Environmental

matters” and “Accommodations the registrant commits or plans to provide to local individuals or groups in connection with its mine plans” under § 229.1302(f).

This information is used in the executive summary in Section 1 and when discussing the property ownership information in Section 3. It is also used

when discussing the permitting, closure plan and RCE in Section 17, and the economic analysis in Section 19. It supports the Mineral Resource estimate in Section 11 and the Mineral Reserve estimate in Section 12.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 331

May 27, 2026

25.4

Taxation

The QPs have fully relied upon information supplied by experts retained by Paramount for information related to taxation as applied to the financial model as

follows:

Werkman, D., 2026: Financial Model Rev A MNP Tax Edit: model prepared by MNP for Paramount Nevada Gold Corp.,

May 19, 2026.

The information relied upon falls within the category “Governmental Factors” under § 229.1302(f).

This information is used to present the executive summary in Section 1 and the interpretation and conclusions in Section 22. This information

is used in the economic analysis in Section 19 of the Report.

25.5

Markets

The QPs have not independently reviewed the marketing or contract information. The QPs have fully relied upon information derived from Paramount and experts

retained by Paramount for information relating to market studies/markets for product, market entry strategies, marketing and sales contracts, product valuations, product specifications, refining and treatment charges, agency relationships, material

contracts (e.g. mining, concentrating, smelting, refining, transportation, handling, sales and hedging, forward sales contracts or arrangements) and contract status (in place, renewals).

The information relied upon by the falls within the category of “Marketing Information and Plans” under § 229.1302(f).

This information is used to present the executive summary in Section 1 and the interpretation and conclusions in Section 22. This information is

used when discussing the market, commodity price and contract information in Section 16, and in the economic analysis in Section 19. It supports the Mineral Resource estimate in Section 11 and the Mineral Reserve estimate in

Section 12.

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 332

May 27, 2026

APPENDIX A – CLAIMS LIST

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

36-2001-0141

Poison Springs 24

84-121773

Patented

05-04-84

Calico Resources

Grassy

36-2001-0141

36-2001-0141

Poison Springs 25

84-121774

Patented

05-03-84

Calico Resources

Grassy

36-2001-0141

36-2001-0141

Poison Springs 35

84-121775

Patented

04-05-85

Calico Resources

Grassy

36-2001-0141

ORMC106700

Winter Claim 33

88-20087

LODE

08-01-88

Cryla

Grassy

ORMC155919

Winter #1

2001-1031

LODE

02/18/2001

Cryla

Grassy

ORMC155920

Winter #2

2001-1032

LODE

02/18/2001

Cryla

Grassy

ORMC155921

Winter #3

2001-1033

LODE

02/18/2001

Cryla

Grassy

ORMC155922

Winter #4

2001-1034

LODE

02/18/2001

Cryla

Grassy

ORMC155923

Winter #5

2001-1035

LODE

02/18/2001

Cryla

Grassy

ORMC155924

Winter #6

2001-1036

LODE

02/18/2001

Cryla

Grassy

ORMC155925

Winter #7

2001-1037

LODE

02/18/2001

Cryla

Grassy

ORMC155926

Winter #8

2001-1038

LODE

02/18/2001

Cryla

Grassy

ORMC158876

Cryla #1

2004-2068

LODE

03/13/2004

Cryla

Grassy

ORMC158877

Cryla #2

2004-2069

LODE

03/13/2004

Cryla

Grassy

ORMC158878

Cryla #3

2004-2070

LODE

03/13/2004

Cryla

Grassy

ORMC158879

Cryla #4

2004-2071

LODE

03/13/2004

Cryla

Grassy

ORMC158880

Cryla #5

2004-2072

LODE

03/13/2004

Cryla

Grassy

ORMC158881

Cryla #6

2004-2073

LODE

03/13/2004

Cryla

Grassy

ORMC158882

Cryla #7

2004-2074

LODE

03/13/2004

Cryla

Grassy

ORMC158883

Cryla #8

2004-2075

LODE

03/13/2004

Cryla

Grassy

ORMC164789

Lucky Lucy #1

2009-3235

LODE

04-12-09

Cryla

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 333

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC164790

Lucky Lucy #2

2009-3236

LODE

04-12-09

Cryla

Grassy

ORMC164791

Lucky Lucy #3

2009-3237

LODE

04-12-09

Cryla

Grassy

ORMC164792

Lucky Lucy #4

2009-3238

LODE

04-12-09

Cryla

Grassy

ORMC164793

Lucky Lucy #5

2009-3239

LODE

04-12-09

Cryla

Grassy

ORMC164794

Lucky Lucy #6

2009-3240

LODE

04-12-09

Cryla

Grassy

ORMC164795

Lucky Lucy #7

2009-3241

LODE

04-12-09

Cryla

Grassy

ORMC164796

Lucky Lucy #8

2009-3242

LODE

04-12-09

Cryla

Grassy

ORMC164797

Lucky Lucy #9

2009-3243

LODE

04-12-09

Cryla

Grassy

ORMC164798

Lucky Lucy #10

2009-3244

LODE

04-12-09

Cryla

Grassy

ORMC76751

Winter Claim 32

84-122580

LODE

07-10-84

Cryla

Grassy

ORMC127904

Poison Springs 16A

90-1362

LODE

01/28/1990

Calico Resources

Grassy

ORMC127905

Poison Springs 17A

90-1363

LODE

01/28/1990

Calico Resources

Grassy

ORMC174063

PSR 1

2017-2056

LODE

03/30/2017

Calico Resources

Grassy

ORMC174064

PSR 2

2017-2057

LODE

03/29/2017

Calico Resources

Grassy

ORMC174065

PSR 3

2017-2058

LODE

03/29/2017

Calico Resources

Grassy

ORMC174066

PSR 4

2017-2059

LODE

03/29/2017

Calico Resources

Grassy

ORMC174067

PSR 5

2017-2060

LODE

03/29/2017

Calico Resources

Grassy

ORMC174068

PSR 6

2017-2061

LODE

03/29/2017

Calico Resources

Grassy

ORMC74965

Poison Springs #1

84-121750

LODE

05-01-84

Calico Resources

Grassy

ORMC74966

Poison Springs #2

84-121751

LODE

05-01-84

Calico Resources

Grassy

ORMC74967

Poison Springs #3

84-121752

LODE

05-01-84

Calico Resources

Grassy

ORMC74968

Poison Springs #4

84-121753

LODE

05-01-84

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 334

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC74969

Poison Springs #5

84-121754

LODE

05-01-84

Calico Resources

Grassy

ORMC74970

Poison Springs #6

84-121755

LODE

05-01-84

Calico Resources

Grassy

ORMC74971

Poison Springs #7

84-121756

LODE

05-01-84

Calico Resources

Grassy

ORMC74972

Poison Springs #8

84-121757

LODE

05-01-84

Calico Resources

Grassy

ORMC74973

Poison Springs #9

84-121758

LODE

05-01-84

Calico Resources

Grassy

ORMC74974

Poison Springs #10

84-121759

LODE

05-01-84

Calico Resources

Grassy

ORMC74975

Poison Springs #11

84-121760

LODE

05-01-84

Calico Resources

Grassy

ORMC74976

Poison Springs #12

84-121761

LODE

05-01-84

Calico Resources

Grassy

ORMC74977

Poison Springs #13

84-121762

LODE

05-02-84

Calico Resources

Grassy

ORMC74978

Poison Springs #14

84-121763

LODE

05-02-84

Calico Resources

Grassy

ORMC74979

Poison Springs #15

84-121764

LODE

05-02-84

Calico Resources

Grassy

ORMC74980

Poison Springs #16

90-1364

LODE

05-02-84

Calico Resources

Grassy

ORMC74981

Poison Springs #17

90-1365

LODE

05-02-84

Calico Resources

Grassy

ORMC74982

Poison Springs #18

84-121767

LODE

05-03-84

Calico Resources

Grassy

ORMC74983

Poison Springs #19

90-6119

LODE

05-03-84

Calico Resources

Grassy

ORMC74984

Poison Springs #20

90-6120

LODE

05-03-84

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 335

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC74985

Poison Springs #21

90-6121

LODE

05-03-84

Calico Resources

Grassy

ORMC74986

Poison Springs #22

84-121771

LODE

05-03-84

Calico Resources

Grassy

ORMC74987

Poison Springs #23

88-22375

LODE

05-03-84

Calico Resources

Grassy

ORMC74990

Poison Springs #26

84-121775

LODE

05/25/1984

Calico Resources

Grassy

ORMC74991

Poison Springs #27

84-121776

LODE

05/24/1984

Calico Resources

Grassy

ORMC74992

Poison Springs #28

84-121777

LODE

05/24/1984

Calico Resources

Grassy

ORMC74996

Poison Springs #32

84-121781

LODE

05/25/1984

Calico Resources

Grassy

ORMC82455

Poison Springs #36

88-22384

LODE

04-05-85

Calico Resources

Grassy

ORMC82456

Poison Springs #37

90-6130

LODE

04-05-85

Calico Resources

Grassy

ORMC104797

Frog #1

88-18804

LODE

05-06-88

Calico Resources

Grassy

ORMC104798

Frog #2

88-18805

LODE

05-06-88

Calico Resources

Grassy

ORMC104801

Frog #5

88-18808

LODE

05-06-88

Calico Resources

Grassy

ORMC104803

Frog #7

88-18809

LODE

05-06-88

Calico Resources

Grassy

ORMC104805

Frog #9

88-18811

LODE

05-06-88

Calico Resources

Grassy

ORMC104807

Frog #11

88-18813

LODE

05-06-88

Calico Resources

Grassy

ORMC104812

Frog #16

88-18819

LODE

05-06-88

Calico Resources

Grassy

ORMC104814

Frog #18

88-18821

LODE

05-06-88

Calico Resources

Grassy

ORMC104815

Frog #19

88-18822

LODE

05-06-88

Calico Resources

Grassy

ORMC104816

Frog #20

88-18823

LODE

05-06-88

Calico Resources

Grassy

ORMC104817

Frog #21

88-18824

LODE

05-06-88

Calico Resources

Grassy

ORMC104818

Frog #22

88-18825

LODE

05-06-88

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 336

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC104819

Frog #23

88-18826

LODE

05-06-88

Calico Resources

Grassy

ORMC104820

Frog #24

88-18827

LODE

05-06-88

Calico Resources

Grassy

ORMC104821

Frog #25

88-18828

LODE

05-07-88

Calico Resources

Grassy

ORMC104822

Frog #26

88-18829

LODE

05-07-88

Calico Resources

Grassy

ORMC104823

Frog #27

88-18830

LODE

05-07-88

Calico Resources

Grassy

ORMC104824

Frog #28

88-18831

LODE

05-07-88

Calico Resources

Grassy

ORMC104825

Frog #29

88-18832

LODE

05-07-88

Calico Resources

Grassy

ORMC104826

Frog #30

88-18833

LODE

05-07-88

Calico Resources

Grassy

ORMC104827

Frog #31

88-18834

LODE

05-07-88

Calico Resources

Grassy

ORMC104828

Frog #32

88-18835

LODE

05-07-88

Calico Resources

Grassy

ORMC104829

Frog #33

88-18836

LODE

05-07-88

Calico Resources

Grassy

ORMC104830

Frog #34

88-18837

LODE

05-07-88

Calico Resources

Grassy

ORMC104831

Frog #35

90-3396

LODE

05-07-88

Calico Resources

Grassy

ORMC104832

Frog #36

88-18839

LODE

05-07-88

Calico Resources

Grassy

ORMC104833

Frog #37

88-18840

LODE

05-07-88

Calico Resources

Grassy

ORMC104834

Frog #38

88-18841

LODE

05-07-88

Calico Resources

Grassy

ORMC104835

Frog #39

88-18842

LODE

05-07-88

Calico Resources

Grassy

ORMC104836

Frog #40

88-18843

LODE

05-07-88

Calico Resources

Grassy

ORMC104837

Frog #41

88-18844

LODE

05-07-88

Calico Resources

Grassy

ORMC104838

Frog #42

88-18845

LODE

05-07-88

Calico Resources

Grassy

ORMC104839

Frog #46

88-18846

LODE

05-07-88

Calico Resources

Grassy

ORMC104840

Frog #47

88-18847

LODE

05-07-88

Calico Resources

Grassy

ORMC104841

Frog #48

88-18848

LODE

05-07-88

Calico Resources

Grassy

ORMC104878

Frog #85

90-1366

LODE

05-08-88

Calico Resources

Grassy

ORMC104879

Frog #86

90-1367

LODE

05-08-88

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 337

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC104880

Frog #87

90-1368

LODE

05-08-88

Calico Resources

Grassy

ORMC104881

Frog #88

90-1369

LODE

05-08-88

Calico Resources

Grassy

ORMC104882

Frog #89

90-1370

LODE

05-08-88

Calico Resources

Grassy

ORMC104883

Frog #90

90-1371

LODE

05-08-88

Calico Resources

Grassy

ORMC104884

Frog #91

90-1372

LODE

05-08-88

Calico Resources

Grassy

ORMC104885

Frog #92

90-1373

LODE

05-08-88

Calico Resources

Grassy

ORMC104886

Frog #93

88-18893

LODE

05-08-88

Calico Resources

Grassy

ORMC104887

Frog #94

88-18894

LODE

05-08-88

Calico Resources

Grassy

ORMC104889

Frog #96

88-18896

LODE

05/17/1988

Calico Resources

Grassy

ORMC104891

Frog #98

88-18898

LODE

05/17/1988

Calico Resources

Grassy

ORMC104900

Frog #107

88-18907

LODE

05/20/1988

Calico Resources

Grassy

ORMC104901

Frog #108

88-18908

LODE

05/20/1988

Calico Resources

Grassy

ORMC104902

Frog #109

88-18909

LODE

05/20/1988

Calico Resources

Grassy

ORMC104903

Frog #110

88-18910

LODE

05/20/1988

Calico Resources

Grassy

ORMC104904

Frog #111

88-18911

LODE

05/20/1988

Calico Resources

Grassy

ORMC104905

Frog #112

88-18912

LODE

05/19/1988

Calico Resources

Grassy

ORMC104906

Frog #113

88-18913

LODE

05/19/1988

Calico Resources

Grassy

ORMC104926

Frog #133

88-18933

LODE

05/20/1988

Calico Resources

Grassy

ORMC104927

Frog #134

88-18934

LODE

05/20/1988

Calico Resources

Grassy

ORMC104928

Frog #135

88-18935

LODE

05/20/1988

Calico Resources

Grassy

ORMC104929

Frog #136

88-18936

LODE

05/20/1988

Calico Resources

Grassy

ORMC104940

Frog #147

88-18947

LODE

05/22/1988

Calico Resources

Grassy

ORMC104941

Frog #148

88-18948

LODE

05/22/1988

Calico Resources

Grassy

ORMC104942

Frog #149

88-18949

LODE

05/22/1988

Calico Resources

Grassy

ORMC104943

Frog #150

88-18950

LODE

05/22/1988

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 338

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC104960

Frog #167

88-18967

LODE

05/19/1988

Calico Resources

Grassy

ORMC104961

Frog #168

88-18968

LODE

05/19/1988

Calico Resources

Grassy

ORMC104962

Frog #169

88-18969

LODE

05/19/1988

Calico Resources

Grassy

ORMC104963

Frog #170

88-18970

LODE

05/19/1988

Calico Resources

Grassy

ORMC104964

Frog #171

88-18971

LODE

05/19/1988

Calico Resources

Grassy

ORMC104965

Frog #172

88-18972

LODE

05/19/1988

Calico Resources

Grassy

ORMC104966

Frog #173

88-18973

LODE

05/19/1988

Calico Resources

Grassy

ORMC104967

Frog #174

88-18974

LODE

05/19/1988

Calico Resources

Grassy

ORMC104968

Frog #175

88-18975

LODE

05/19/1988

Calico Resources

Grassy

ORMC104969

Frog #176

88-18976

LODE

05/19/1988

Calico Resources

Grassy

ORMC104988

Frog #195

88-18995

LODE

05/22/1988

Calico Resources

Grassy

ORMC104989

Frog #196

88-18996

LODE

05/22/1988

Calico Resources

Grassy

ORMC104990

Frog #197

88-18997

LODE

05/22/1988

Calico Resources

Grassy

ORMC104991

Frog #198

88-18998

LODE

05/21/1988

Calico Resources

Grassy

ORMC105000

Frog #207

88-19007

LODE

05/29/1988

Calico Resources

Grassy

ORMC105001

Frog #208

88-19008

LODE

05/29/1988

Calico Resources

Grassy

ORMC105002

Frog #209

88-19009

LODE

05/29/1988

Calico Resources

Grassy

ORMC105003

Frog #210

88-19010

LODE

05/24/1988

Calico Resources

Grassy

ORMC105004

Frog #211

88-19011

LODE

05/27/1988

Calico Resources

Grassy

ORMC105005

Frog #212

88-19012

LODE

05/27/1988

Calico Resources

Grassy

ORMC105006

Frog #213

88-19013

LODE

05/27/1988

Calico Resources

Grassy

ORMC105007

Frog #214

88-19014

LODE

05/27/1988

Calico Resources

Grassy

ORMC105008

Frog #215

88-19015

LODE

05/27/1988

Calico Resources

Grassy

ORMC105009

Frog #216

88-19016

LODE

05/27/1988

Calico Resources

Grassy

ORMC105017

Frog #224

88-19024

LODE

05/26/1988

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 339

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC105019

Frog #226

88-19026

LODE

05/26/1988

Calico Resources

Grassy

ORMC105021

Frog #228

88-19028

LODE

05/26/1988

Calico Resources

Grassy

ORMC105023

Frog #230

88-19030

LODE

05/26/1988

Calico Resources

Grassy

ORMC105025

Frog #232

88-19032

LODE

05/26/1988

Calico Resources

Grassy

ORMC105913

Frog #252

88-19861

LODE

07/21/1988

Calico Resources

Grassy

ORMC107597

Frog #649

88-21299

LODE

08/17/1988

Calico Resources

Grassy

ORMC107598

Frog #650

88-21300

LODE

08/17/1988

Calico Resources

Grassy

ORMC107599

Frog #651

88-21301

LODE

08/17/1988

Calico Resources

Grassy

ORMC107600

Frog #652

88-21302

LODE

08/17/1988

Calico Resources

Grassy

ORMC107703

Frog #755

88-21405

LODE

08/23/1988

Calico Resources

Grassy

ORMC107704

Frog #756

88-21406

LODE

08/23/1988

Calico Resources

Grassy

ORMC108077

Don #1

88-22025

MILLSITE

09/28/1988

Calico Resources

Grassy

ORMC108078

Don #2

88-22026

MILLSITE

09/28/1988

Calico Resources

Grassy

ORMC108079

Don #3

88-22027

MILLSITE

09/28/1988

Calico Resources

Grassy

ORMC108080

Don #4

88-22028

MILLSITE

09/28/1988

Calico Resources

Grassy

ORMC108081

Don #5

88-22029

MILLSITE

09/28/1988

Calico Resources

Grassy

ORMC108082

Don #6

88-22030

MILLSITE

09/28/1988

Calico Resources

Grassy

ORMC108083

Don #7

88-22031

MILLSITE

09/28/1988

Calico Resources

Grassy

ORMC108084

Don #8

88-22032

MILLSITE

09/28/1988

Calico Resources

Grassy

ORMC108085

Don #9

88-22033

MILLSITE

09/28/1988

Calico Resources

Grassy

ORMC108086

Frog #10A

88-22228

LODE

09/28/1988

Calico Resources

Grassy

ORMC108087

Frog #25A

88-22229

LODE

09/27/1988

Calico Resources

Grassy

ORMC108088

Frog #26A

88-22230

LODE

09/27/1988

Calico Resources

Grassy

ORMC108089

Frog #35A

88-22231

LODE

09/27/1988

Calico Resources

Grassy

ORMC108090

Frog #46A

88-22232

LODE

09/27/1988

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 340

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC108091

Frog #46B

88-22233

LODE

09/27/1988

Calico Resources

Grassy

ORMC125178

Frog #151

89-38517

LODE

10-04-89

Calico Resources

Grassy

ORMC126210

Frog #3

89-39554

LODE

10/29/1989

Calico Resources

Grassy

ORMC126212

Frog #1274

89-39556

LODE

10/27/1989

Calico Resources

Grassy

ORMC126213

Frog #1275

89-39557

LODE

10/27/1989

Calico Resources

Grassy

ORMC126215

Frog #1277

89-39559

LODE

10/27/1989

Calico Resources

Grassy

ORMC146318

Poison Spring 1A

93-6060

LODE

07/19/1993

Calico Resources

Grassy

ORMC146319

Poison Spring 3A

93-6061

LODE

07/19/1993

Calico Resources

Grassy

ORMC146320

Poison Spring 5A

93-6062

LODE

07/20/1993

Calico Resources

Grassy

ORMC146321

Poison Spring 6A

93-6063

LODE

07/20/1993

Calico Resources

Grassy

ORMC146322

Poison Spring 7A

93-6064

LODE

07/18/1993

Calico Resources

Grassy

ORMC146323

Poison Spring 8A

93-6065

LODE

07/18/1993

Calico Resources

Grassy

ORMC146324

Poison Spring 9A

93-6066

LODE

07/19/1993

Calico Resources

Grassy

ORMC146325

Poison Spring 11A

93-6067

LODE

07/19/1993

Calico Resources

Grassy

ORMC146326

Poison Spring 14A

93-6068

LODE

07/18/1993

Calico Resources

Grassy

ORMC146327

Poison Spring 18A

93-6069

LODE

07/18/1993

Calico Resources

Grassy

ORMC146328

Poison Spring 22A

93-6070

LODE

07/18/1993

Calico Resources

Grassy

ORMC146329

Poison Spring 26A

93-6071

LODE

07/18/1993

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 341

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC146330

Poison Spring 27A

93-6072

LODE

07/19/1993

Calico Resources

Grassy

ORMC146331

Poison Spring 38A

93-6073

LODE

07/18/1993

Calico Resources

Grassy

ORMC167998

GM 5058

2011-3790

LODE

09/15/2011

Calico Resources

Grassy

ORMC167999

GM 5059

2011-3791

LODE

09/15/2011

Calico Resources

Grassy

ORMC168000

GM 5060

2011-3792

LODE

09/15/2011

Calico Resources

Grassy

ORMC168001

GM 5061

2011-3793

LODE

09/15/2011

Calico Resources

Grassy

ORMC168002

GM 5062

2011-3794

LODE

09/15/2011

Calico Resources

Grassy

ORMC168003

GM 5063

2011-3795

LODE

09/17/2011

Calico Resources

Grassy

ORMC168004

GM 5064

2011-3796

LODE

09/17/2011

Calico Resources

Grassy

ORMC168005

GM 5065

2011-3797

LODE

09/17/2011

Calico Resources

Grassy

ORMC168006

GM 5066

2011-3798

LODE

09/17/2011

Calico Resources

Grassy

ORMC168007

GM 5067

2011-3799

LODE

09/17/2011

Calico Resources

Grassy

ORMC168008

GM 5068

2011-3800

LODE

09/17/2011

Calico Resources

Grassy

ORMC168009

GM 5069

2011-3801

LODE

09/17/2011

Calico Resources

Grassy

ORMC168010

GM 5070

2011-3802

LODE

09/17/2011

Calico Resources

Grassy

ORMC168011

GM 5071

2011-3803

LODE

09/17/2011

Calico Resources

Grassy

ORMC168012

GM 5072

2011-3804

LODE

09/17/2011

Calico Resources

Grassy

ORMC168013

GM 5150

2011-3805

LODE

09/15/2011

Calico Resources

Grassy

ORMC168014

GM 5151

2011-3806

LODE

09/15/2011

Calico Resources

Grassy

ORMC168015

GM 5152

2011-3807

LODE

09/15/2011

Calico Resources

Grassy

ORMC168016

GM 5153

2011-3808

LODE

09/15/2011

Calico Resources

Grassy

ORMC168017

GM 5154

2011-3809

LODE

09/15/2011

Calico Resources

Grassy

ORMC168018

GM 5155

2011-3810

LODE

09/15/2011

Calico Resources

Grassy

ORMC168019

GM 5156

2011-3811

LODE

09/15/2011

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 342

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC168020

GM 5157

2011-3812

LODE

09/15/2011

Calico Resources

Grassy

ORMC168021

GM 5158

2011-3813

LODE

09/15/2011

Calico Resources

Grassy

ORMC168022

GM 5159

2011-3814

LODE

09/15/2011

Calico Resources

Grassy

ORMC168023

GM 5160

2011-3815

LODE

09/15/2011

Calico Resources

Grassy

ORMC168024

GM 5161

2011-3816

LODE

09/15/2011

Calico Resources

Grassy

ORMC168025

GM 5162

2011-3817

LODE

09/15/2011

Calico Resources

Grassy

ORMC168026

GM 5163

2011-3818

LODE

09/17/2011

Calico Resources

Grassy

ORMC168027

GM 5164

2011-3819

LODE

09/17/2011

Calico Resources

Grassy

ORMC168028

GM 5165

2011-3820

LODE

09/17/2011

Calico Resources

Grassy

ORMC168029

GM 5166

2011-3821

LODE

09/17/2011

Calico Resources

Grassy

ORMC168030

GM 5167

2011-3822

LODE

09/17/2011

Calico Resources

Grassy

ORMC168031

GM 5168

2011-3823

LODE

09/17/2011

Calico Resources

Grassy

ORMC168032

GM 5169

2011-3824

LODE

09/17/2011

Calico Resources

Grassy

ORMC168033

GM 5170

2011-3825

LODE

09/17/2011

Calico Resources

Grassy

ORMC168034

GM 5171

2011-3826

LODE

09/17/2011

Calico Resources

Grassy

ORMC168035

GM 5172

2011-3827

LODE

09/17/2011

Calico Resources

Grassy

ORMC168036

GM 5250

2011-3828

LODE

09/15/2011

Calico Resources

Grassy

ORMC168037

GM 5251

2011-3829

LODE

09/15/2011

Calico Resources

Grassy

ORMC168038

GM 5252

2011-3830

LODE

09/15/2011

Calico Resources

Grassy

ORMC168039

GM 5253

2011-3831

LODE

09/15/2011

Calico Resources

Grassy

ORMC168040

GM 5254

2011-3832

LODE

09/15/2011

Calico Resources

Grassy

ORMC168041

GM 5255

2011-3833

LODE

09/15/2011

Calico Resources

Grassy

ORMC168042

GM 5256

2011-3834

LODE

09/15/2011

Calico Resources

Grassy

ORMC168043

GM5257

2011-3835

LODE

09/15/2011

Calico Resources

Grassy

ORMC168044

GM 5258

2011-3836

LODE

09/15/2011

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 343

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC168045

GM 5259

2011-3837

LODE

09/15/2011

Calico Resources

Grassy

ORMC168046

GM 5260

2011-3838

LODE

09/15/2011

Calico Resources

Grassy

ORMC168047

GM 5261

2011-3839

LODE

09/16/2011

Calico Resources

Grassy

ORMC168048

GM 5262

2011-3840

LODE

09/16/2011

Calico Resources

Grassy

ORMC168049

GM 5263

2011-3841

LODE

09/16/2011

Calico Resources

Grassy

ORMC168050

GM 5264

2011-3842

LODE

09/16/2011

Calico Resources

Grassy

ORMC168051

GM 5265

2011-3843

LODE

09/16/2011

Calico Resources

Grassy

ORMC168052

GM 5266

2011-3844

LODE

09/16/2011

Calico Resources

Grassy

ORMC168053

GM 5267

2011-3845

LODE

09/23/2011

Calico Resources

Grassy

ORMC168054

GM 5268

2011-3846

LODE

09/23/2011

Calico Resources

Grassy

ORMC168055

GM 5269

2011-3847

LODE

09/23/2011

Calico Resources

Grassy

ORMC168056

GM 5270

2011-3848

LODE

09/23/2011

Calico Resources

Grassy

ORMC168057

GM 5271

2011-3849

LODE

09/23/2011

Calico Resources

Grassy

ORMC168058

GM 5272

2011-3850

LODE

09/23/2011

Calico Resources

Grassy

ORMC168059

GM 5273

2011-3851

LODE

09/23/2011

Calico Resources

Grassy

ORMC168060

GM 5274

2011-3852

LODE

09/23/2011

Calico Resources

Grassy

ORMC168061

GM 5275

2011-3853

LODE

09/23/2011

Calico Resources

Grassy

ORMC168062

GM 5276

2011-3854

LODE

09/23/2011

Calico Resources

Grassy

ORMC168063

GM 5352

2011-3855

LODE

09/15/2011

Calico Resources

Grassy

ORMC168064

GM 5353

2011-3856

LODE

09/15/2011

Calico Resources

Grassy

ORMC168065

GM 5354

2011-3857

LODE

09/15/2011

Calico Resources

Grassy

ORMC168066

GM 5355

2011-3858

LODE

09/15/2011

Calico Resources

Grassy

ORMC168067

GM 5356

2011-3859

LODE

09/15/2011

Calico Resources

Grassy

ORMC168068

GM 5357

2011-3860

LODE

09/15/2011

Calico Resources

Grassy

ORMC168069

GM 5358

2011-3861

LODE

09/15/2011

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 344

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC168070

GM 5359

2011-3862

LODE

09/15/2011

Calico Resources

Grassy

ORMC168071

GM 5360

2011-3863

LODE

09/15/2011

Calico Resources

Grassy

ORMC168072

GM 5361

2011-3864

LODE

09/16/2011

Calico Resources

Grassy

ORMC168073

GM 5362

2011-3865

LODE

09/16/2011

Calico Resources

Grassy

ORMC168074

GM 5363

2011-3866

LODE

09/16/2011

Calico Resources

Grassy

ORMC168075

GM 5364

2011-3867

LODE

09/16/2011

Calico Resources

Grassy

ORMC168076

GM 5365

2011-3868

LODE

09/16/2011

Calico Resources

Grassy

ORMC168077

GM 5366

2011-3869

LODE

09/16/2011

Calico Resources

Grassy

ORMC168078

GM 5367

2011-3870

LODE

09/23/2011

Calico Resources

Grassy

ORMC168079

GM 5368

2011-3871

LODE

09/23/2011

Calico Resources

Grassy

ORMC168080

GM 5369

2011-3872

LODE

09/23/2011

Calico Resources

Grassy

ORMC168081

GM 5370

2011-3873

LODE

09/23/2011

Calico Resources

Grassy

ORMC168082

GM 5371

2011-3874

LODE

09/23/2011

Calico Resources

Grassy

ORMC168083

GM 5372

2011-3875

LODE

09/23/2011

Calico Resources

Grassy

ORMC168084

GM 5373

2011-3876

LODE

09/23/2011

Calico Resources

Grassy

ORMC168085

GM 5374

2011-3877

LODE

09/23/2011

Calico Resources

Grassy

ORMC168086

GM 5375

2011-3878

LODE

09/23/2011

Calico Resources

Grassy

ORMC168087

GM 5376

2011-3879

LODE

09/23/2011

Calico Resources

Grassy

ORMC168088

GM 5452

2011-3880

LODE

09/19/2011

Calico Resources

Grassy

ORMC168089

GM 5453

2011-3881

LODE

09/19/2011

Calico Resources

Grassy

ORMC168090

GM 5454

2011-3882

LODE

09/19/2011

Calico Resources

Grassy

ORMC168091

GM 5455

2011-3883

LODE

09/19/2011

Calico Resources

Grassy

ORMC168092

GM 5552

2011-3884

LODE

09/19/2011

Calico Resources

Grassy

ORMC168093

GM 5553

2011-3885

LODE

09/19/2011

Calico Resources

Grassy

ORMC168094

GM 5554

2011-3886

LODE

09/19/2011

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 345

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC168095

GM 5555

2011-3887

LODE

09/19/2011

Calico Resources

Grassy

ORMC168096

GM 5580

2011-3888

LODE

09/23/2011

Calico Resources

Grassy

ORMC168097

GM 5581

2011-3889

LODE

09/23/2011

Calico Resources

Grassy

ORMC168098

GM 5582

2011-3890

LODE

09/23/2011

Calico Resources

Grassy

ORMC168099

GM 5583

2011-3891

LODE

09/23/2011

Calico Resources

Grassy

ORMC168100

GM 5584

2011-3892

LODE

09/23/2011

Calico Resources

Grassy

ORMC168101

GM 5652

2011-3893

LODE

09/18/2011

Calico Resources

Grassy

ORMC168102

GM 5653

2011-3894

LODE

09/18/2011

Calico Resources

Grassy

ORMC168103

GM 5654

2011-3895

LODE

09/18/2011

Calico Resources

Grassy

ORMC168104

GM 5655

2011-3896

LODE

09/18/2011

Calico Resources

Grassy

ORMC168105

GM 5680

2011-3897

LODE

09/22/2011

Calico Resources

Grassy

ORMC168106

GM 5681

2011-3898

LODE

09/22/2011

Calico Resources

Grassy

ORMC168107

GM 5682

2011-3899

LODE

09/22/2011

Calico Resources

Grassy

ORMC168108

GM 5683

2011-3900

LODE

09/22/2011

Calico Resources

Grassy

ORMC168109

GM 5684

2011-3901

LODE

09/22/2011

Calico Resources

Grassy

ORMC168110

GM 5752

2011-3902

LODE

09/18/2011

Calico Resources

Grassy

ORMC168111

GM 5753

2011-3903

LODE

09/18/2011

Calico Resources

Grassy

ORMC168112

GM 5754

2011-3904

LODE

09/18/2011

Calico Resources

Grassy

ORMC168113

GM 5755

2011-3905

LODE

09/18/2011

Calico Resources

Grassy

ORMC168114

GM 5756

2011-3906

LODE

09/25/2011

Calico Resources

Grassy

ORMC168115

GM 5757

2011-3907

LODE

09/25/2011

Calico Resources

Grassy

ORMC168116

GM 5758

2011-3908

LODE

09/25/2011

Calico Resources

Grassy

ORMC168117

GM 5780

2011-3909

LODE

09/22/2011

Calico Resources

Grassy

ORMC168118

GM 5781

2011-3910

LODE

09/22/2011

Calico Resources

Grassy

ORMC168119

GM 5782

2011-3911

LODE

09/22/2011

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 346

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC168120

GM 5783

2011-3912

LODE

09/22/2011

Calico Resources

Grassy

ORMC168121

GM 5784

2011-3913

LODE

09/22/2011

Calico Resources

Grassy

ORMC168122

GM 5785

2011-3914

LODE

09/22/2011

Calico Resources

Grassy

ORMC168123

GM 5786

2011-3915

LODE

09/22/2011

Calico Resources

Grassy

ORMC168124

GM 5787

2011-3916

LODE

09/22/2011

Calico Resources

Grassy

ORMC168125

GM 5852

2011-3917

LODE

09/24/2011

Calico Resources

Grassy

ORMC168126

GM 5853

2011-3918

LODE

09/24/2011

Calico Resources

Grassy

ORMC168127

GM 5854

2011-3919

LODE

09/24/2011

Calico Resources

Grassy

ORMC168128

GM 5855

2011-3920

LODE

09/24/2011

Calico Resources

Grassy

ORMC168129

GM 5856

2011-3921

LODE

09/24/2011

Calico Resources

Grassy

ORMC168130

GM 5857

2011-3922

LODE

09/24/2011

Calico Resources

Grassy

ORMC168131

GM 5858

2011-3923

LODE

09/24/2011

Calico Resources

Grassy

ORMC168132

GM 5859

2011-3924

LODE

09/24/2011

Calico Resources

Grassy

ORMC168133

GM 5860

2011-3925

LODE

09/24/2011

Calico Resources

Grassy

ORMC168134

GM 5861

2011-3926

LODE

09/24/2011

Calico Resources

Grassy

ORMC168135

GM 5862

2011-3927

LODE

09/24/2011

Calico Resources

Grassy

ORMC168136

GM 5863

2011-3928

LODE

09/24/2011

Calico Resources

Grassy

ORMC168137

GM 5864

2011-3929

LODE

09/24/2011

Calico Resources

Grassy

ORMC168138

GM 5885

2011-3930

LODE

09/22/2011

Calico Resources

Grassy

ORMC168139

GM 5886

2011-3931

LODE

09/22/2011

Calico Resources

Grassy

ORMC168140

GM 5887

2011-3932

LODE

09/22/2011

Calico Resources

Grassy

ORMC168141

GM 5956

2011-3933

LODE

09/24/2011

Calico Resources

Grassy

ORMC168142

GM 5957

2011-3934

LODE

09/24/2011

Calico Resources

Grassy

ORMC168143

GM 5958

2011-3935

LODE

09/24/2011

Calico Resources

Grassy

ORMC168144

GM 5959

2011-3936

LODE

09/24/2011

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 347

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC168145

GM 5960

2011-3937

LODE

09/24/2011

Calico Resources

Grassy

ORMC168146

GM 5961

2011-3938

LODE

09/24/2011

Calico Resources

Grassy

ORMC168147

GM 5962

2011-3939

LODE

09/24/2011

Calico Resources

Grassy

ORMC168148

GM 5974

2011-3940

LODE

09/21/2011

Calico Resources

Grassy

ORMC168149

GM 5975

2011-3941

LODE

09/21/2011

Calico Resources

Grassy

ORMC168150

GM 5976

2011-3942

LODE

09/21/2011

Calico Resources

Grassy

ORMC168151

GM 5985

2011-3943

LODE

09/22/2011

Calico Resources

Grassy

ORMC168152

GM 5986

2011-3944

LODE

09/22/2011

Calico Resources

Grassy

ORMC168153

GM 5987

2011-3945

LODE

09/22/2011

Calico Resources

Grassy

ORMC168154

GM 6056

2011-3946

LODE

09/24/2011

Calico Resources

Grassy

ORMC168155

GM 6057

2011-3947

LODE

09/24/2011

Calico Resources

Grassy

ORMC168156

GM 6058

2011-3948

LODE

09/24/2011

Calico Resources

Grassy

ORMC168157

GM 6059

2011-3949

LODE

09/24/2011

Calico Resources

Grassy

ORMC168158

GM 6060

2011-3950

LODE

09/24/2011

Calico Resources

Grassy

ORMC168159

GM 6061

2011-3951

LODE

09/24/2011

Calico Resources

Grassy

ORMC168160

GM 6062

2011-3952

LODE

09/24/2011

Calico Resources

Grassy

ORMC168161

GM 6069

2011-3953

LODE

09/21/2011

Calico Resources

Grassy

ORMC168162

GM 6070

2011-3954

LODE

09/21/2011

Calico Resources

Grassy

ORMC168163

GM 6071

2011-3955

LODE

09/21/2011

Calico Resources

Grassy

ORMC168164

GM 6072

2011-3956

LODE

09/21/2011

Calico Resources

Grassy

ORMC168165

GM 6073

2011-3957

LODE

09/21/2011

Calico Resources

Grassy

ORMC168166

GM 6074

2011-3958

LODE

09/21/2011

Calico Resources

Grassy

ORMC168167

GM 6075

2011-3959

LODE

09/21/2011

Calico Resources

Grassy

ORMC168168

GM 6076

2011-3960

LODE

09/21/2011

Calico Resources

Grassy

ORMC168169

GM 6077

2011-3961

LODE

09/21/2011

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 348

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC168170

GM 6085

2011-3962

LODE

09/21/2011

Calico Resources

Grassy

ORMC168171

GM 6086

2011-3963

LODE

09/21/2011

Calico Resources

Grassy

ORMC168172

GM 6087

2011-3964

LODE

09/21/2011

Calico Resources

Grassy

ORMC168173

GM 6156

2011-3965

LODE

09/24/2011

Calico Resources

Grassy

ORMC168174

GM 6157

2011-3966

LODE

09/24/2011

Calico Resources

Grassy

ORMC168175

GM 6158

2011-3967

LODE

09/24/2011

Calico Resources

Grassy

ORMC168176

GM 6159

2011-3968

LODE

09/24/2011

Calico Resources

Grassy

ORMC168177

GM 6160

2011-3969

LODE

09/24/2011

Calico Resources

Grassy

ORMC168178

GM 6161

2011-3970

LODE

09/24/2011

Calico Resources

Grassy

ORMC168179

GM 6162

2011-3971

LODE

09/24/2011

Calico Resources

Grassy

ORMC168180

GM 6174

2011-3972

LODE

09/21/2011

Calico Resources

Grassy

ORMC168181

GM 6175

2011-3973

LODE

09/21/2011

Calico Resources

Grassy

ORMC168182

GM 6176

2011-3974

LODE

09/21/2011

Calico Resources

Grassy

ORMC168183

GM 6177

2011-3975

LODE

09/21/2011

Calico Resources

Grassy

ORMC168184

GM 6178

2011-3976

LODE

09/21/2011

Calico Resources

Grassy

ORMC168185

GM 6179

2011-3977

LODE

09/21/2011

Calico Resources

Grassy

ORMC168186

GM 6180

2011-3978

LODE

09/21/2011

Calico Resources

Grassy

ORMC168187

GM 6181

2011-3979

LODE

09/21/2011

Calico Resources

Grassy

ORMC168188

GM 6182

2011-3980

LODE

09/21/2011

Calico Resources

Grassy

ORMC168189

GM 6183

2011-3981

LODE

09/21/2011

Calico Resources

Grassy

ORMC168190

GM 6184

2011-3982

LODE

09/21/2011

Calico Resources

Grassy

ORMC168191

GM 6185

2011-3983

LODE

09/21/2011

Calico Resources

Grassy

ORMC168192

GM 6186

2011-3984

LODE

09/21/2011

Calico Resources

Grassy

ORMC168193

GM 6187

2011-3985

LODE

09/21/2011

Calico Resources

Grassy

ORMC168194

GM 6258

2011-3986

LODE

09/21/2011

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 349

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC168195

GM 6259

2011-3987

LODE

09/21/2011

Calico Resources

Grassy

ORMC168196

GM 6260

2011-3988

LODE

09/21/2011

Calico Resources

Grassy

ORMC168197

GM 6261

2011-3989

LODE

09/21/2011

Calico Resources

Grassy

ORMC168198

GM 6262

2011-3990

LODE

09/21/2011

Calico Resources

Grassy

ORMC168199

GM 6263

2011-3991

LODE

09/21/2011

Calico Resources

Grassy

ORMC168200

GM 6264

2011-3992

LODE

09/21/2011

Calico Resources

Grassy

ORMC168201

GM 6265

2011-3993

LODE

09/21/2011

Calico Resources

Grassy

ORMC168202

GM 6266

2011-3994

LODE

09/21/2011

Calico Resources

Grassy

ORMC168203

GM 6267

2011-3995

LODE

09/21/2011

Calico Resources

Grassy

ORMC168204

GM 6268

2011-3996

LODE

09/21/2011

Calico Resources

Grassy

ORMC168205

GM 6271

2011-3997

LODE

09/20/2011

Calico Resources

Grassy

ORMC168206

GM 6272

2011-3998

LODE

09/20/2011

Calico Resources

Grassy

ORMC168207

GM 6273

2011-3999

LODE

09/20/2011

Calico Resources

Grassy

ORMC168208

GM 6274

2011-4000

LODE

09/20/2011

Calico Resources

Grassy

ORMC168209

GM 6275

2011-4001

LODE

09/20/2011

Calico Resources

Grassy

ORMC168210

GM 6276

2011-4002

LODE

09/20/2011

Calico Resources

Grassy

ORMC168211

GM 6277

2011-4003

LODE

09/20/2011

Calico Resources

Grassy

ORMC168212

GM 6278

2011-4004

LODE

09/20/2011

Calico Resources

Grassy

ORMC168213

GM 6279

2011-4005

LODE

09/20/2011

Calico Resources

Grassy

ORMC168214

GM 6280

2011-4006

LODE

09/20/2011

Calico Resources

Grassy

ORMC168215

GM 6281

2011-4007

LODE

09/22/2011

Calico Resources

Grassy

ORMC168216

GM 6282

2011-4008

LODE

09/22/2011

Calico Resources

Grassy

ORMC168217

GM 6283

2011-4009

LODE

09/22/2011

Calico Resources

Grassy

ORMC168218

GM 6284

2011-4010

LODE

09/22/2011

Calico Resources

Grassy

ORMC168219

GM 6285

2011-4011

LODE

09/22/2011

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 350

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC168220

GM 6286

2011-4012

LODE

09/22/2011

Calico Resources

Grassy

ORMC168221

GM 6287

2011-4013

LODE

09/22/2011

Calico Resources

Grassy

ORMC168222

GM 6358

2011-4014

LODE

09/21/2011

Calico Resources

Grassy

ORMC168223

GM 6359

2011-4015

LODE

09/21/2011

Calico Resources

Grassy

ORMC168224

GM 6360

2011-4016

LODE

09/21/2011

Calico Resources

Grassy

ORMC168225

GM 6361

2011-4017

LODE

09/21/2011

Calico Resources

Grassy

ORMC168226

GM 6362

2011-4018

LODE

09/21/2011

Calico Resources

Grassy

ORMC168227

GM 6363

2011-4019

LODE

09/21/2011

Calico Resources

Grassy

ORMC168228

GM 6364

2011-4020

LODE

09/21/2011

Calico Resources

Grassy

ORMC168229

GM 6365

2011-4021

LODE

09/21/2011

Calico Resources

Grassy

ORMC168230

GM 6366

2011-4022

LODE

09/21/2011

Calico Resources

Grassy

ORMC168231

GM 6367

2011-4023

LODE

09/21/2011

Calico Resources

Grassy

ORMC168232

GM 6368

2011-4024

LODE

09/21/2011

Calico Resources

Grassy

ORMC168233

GM 6371

2011-4025

LODE

09/20/2011

Calico Resources

Grassy

ORMC168234

GM 6372

2011-4026

LODE

09/20/2011

Calico Resources

Grassy

ORMC168235

GM 6373

2011-4027

LODE

09/20/2011

Calico Resources

Grassy

ORMC168236

GM 6374

2011-4028

LODE

09/20/2011

Calico Resources

Grassy

ORMC168237

GM 6375

2011-4029

LODE

09/20/2011

Calico Resources

Grassy

ORMC168238

GM 6376

2011-4030

LODE

09/20/2011

Calico Resources

Grassy

ORMC168239

GM 6377

2011-4031

LODE

09/20/2011

Calico Resources

Grassy

ORMC168240

GM 6378

2011-4032

LODE

09/20/2011

Calico Resources

Grassy

ORMC168241

GM 6379

2011-4033

LODE

09/20/2011

Calico Resources

Grassy

ORMC168242

GM 6380

2011-4034

LODE

09/20/2011

Calico Resources

Grassy

ORMC168243

GM 6381

2011-4035

LODE

09/22/2011

Calico Resources

Grassy

ORMC168244

GM 6382

2011-4036

LODE

09/22/2011

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 351

May 27, 2026

Serial Number

Claim Name

County Number

Case Type

Location Date

Owner

Claims Group

Patent Number

ORMC168245

GM 6383

2011-4037

LODE

09/22/2011

Calico Resources

Grassy

ORMC168246

GM 6384

2011-4038

LODE

09/22/2011

Calico Resources

Grassy

ORMC168247

GM 6385

2011-4039

LODE

09/22/2011

Calico Resources

Grassy

ORMC168248

GM 6386

2011-4040

LODE

09/22/2011

Calico Resources

Grassy

ORMC168249

GM 6387

2011-4041

LODE

09/22/2011

Calico Resources

Grassy

ORMC174048

PGM 1

2017-2062

LODE

03/29/2017

Calico Resources

Grassy

ORMC174049

PGM 2

2017-2063

LODE

03/29/2017

Calico Resources

Grassy

ORMC174050

PGM 3

2017-2064

LODE

03/31/2017

Calico Resources

Grassy

ORMC174051

PGM 4

2017-2065

LODE

03/30/2017

Calico Resources

Grassy

ORMC174052

PGM 5

2017-2066

LODE

03/30/2017

Calico Resources

Grassy

ORMC174053

PGM 6

2017-2067

LODE

03/31/2017

Calico Resources

Grassy

ORMC174054

PGM 7

2017-2068

LODE

03/31/2017

Calico Resources

Grassy

ORMC174055

PGM 8

2017-2069

LODE

03/31/2017

Calico Resources

Grassy

ORMC174056

PGM 9

2017-2070

LODE

03/31/2017

Calico Resources

Grassy

ORMC174057

PGM 10

2017-2071

LODE

03/30/2017

Calico Resources

Grassy

ORMC174058

PGM 11

2017-2072

LODE

03/29/2017

Calico Resources

Grassy

ORMC174059

PGM 12

2017-2073

LODE

03/29/2017

Calico Resources

Grassy

ORMC174060

PGM 13

2017-2074

LODE

03/29/2017

Calico Resources

Grassy

ORMC174061

PGM 14

2017-2075

LODE

03/29/2017

Calico Resources

Grassy

ORMC174062

PGM 15

2017-2076

LODE

03/29/2017

Calico Resources

Grassy

Grassy Mountain Project

S - K 1300 Technical Summary and Feasibility Report

Page 352

May 27, 2026

GRAPHIC

GRAPHIC

Filename: g112598dsp004.jpg · Sequence: 11

Binary file (229649 bytes)

Download g112598dsp004.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp037.jpg · Sequence: 12

Binary file (84738 bytes)

Download g112598dsp037.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp039.jpg · Sequence: 13

Binary file (98290 bytes)

Download g112598dsp039.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp040.jpg · Sequence: 14

Binary file (131895 bytes)

Download g112598dsp040.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp048.jpg · Sequence: 15

Binary file (251273 bytes)

Download g112598dsp048.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp057.jpg · Sequence: 16

Binary file (137185 bytes)

Download g112598dsp057.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp059.jpg · Sequence: 17

Binary file (231105 bytes)

Download g112598dsp059.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp060.jpg · Sequence: 18

Binary file (196292 bytes)

Download g112598dsp060.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp063.jpg · Sequence: 19

Binary file (216911 bytes)

Download g112598dsp063.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp064.jpg · Sequence: 20

Binary file (183789 bytes)

Download g112598dsp064.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp066.jpg · Sequence: 21

Binary file (274559 bytes)

Download g112598dsp066.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp069.jpg · Sequence: 22

Binary file (197983 bytes)

Download g112598dsp069.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp072.jpg · Sequence: 23

Binary file (214158 bytes)

Download g112598dsp072.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp073.jpg · Sequence: 24

Binary file (209556 bytes)

Download g112598dsp073.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp075.jpg · Sequence: 25

Binary file (246600 bytes)

Download g112598dsp075.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp076.jpg · Sequence: 26

Binary file (103740 bytes)

Download g112598dsp076.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp078.jpg · Sequence: 27

Binary file (213892 bytes)

Download g112598dsp078.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp082.jpg · Sequence: 28

Binary file (123113 bytes)

Download g112598dsp082.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp084.jpg · Sequence: 29

Binary file (250887 bytes)

Download g112598dsp084.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp086.jpg · Sequence: 30

Binary file (255888 bytes)

Download g112598dsp086.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp088.jpg · Sequence: 31

Binary file (223375 bytes)

Download g112598dsp088.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp096.jpg · Sequence: 32

Binary file (64858 bytes)

Download g112598dsp096.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp097.jpg · Sequence: 33

Binary file (64417 bytes)

Download g112598dsp097.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp106.jpg · Sequence: 34

Binary file (159006 bytes)

Download g112598dsp106.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp107.jpg · Sequence: 35

Binary file (129206 bytes)

Download g112598dsp107.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp108.jpg · Sequence: 36

Binary file (169531 bytes)

Download g112598dsp108.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp109.jpg · Sequence: 37

Binary file (91375 bytes)

Download g112598dsp109.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp110.jpg · Sequence: 38

Binary file (119953 bytes)

Download g112598dsp110.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp111.jpg · Sequence: 39

Binary file (118427 bytes)

Download g112598dsp111.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp112.jpg · Sequence: 40

Binary file (121602 bytes)

Download g112598dsp112.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp114.jpg · Sequence: 41

Binary file (108607 bytes)

Download g112598dsp114.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp115.jpg · Sequence: 42

Binary file (85884 bytes)

Download g112598dsp115.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp117.jpg · Sequence: 43

Binary file (153998 bytes)

Download g112598dsp117.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp118.jpg · Sequence: 44

Binary file (192363 bytes)

Download g112598dsp118.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp119.jpg · Sequence: 45

Binary file (145966 bytes)

Download g112598dsp119.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp120.jpg · Sequence: 46

Binary file (130128 bytes)

Download g112598dsp120.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp121.jpg · Sequence: 47

Binary file (121229 bytes)

Download g112598dsp121.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp122.jpg · Sequence: 48

Binary file (108309 bytes)

Download g112598dsp122.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp137.jpg · Sequence: 49

Binary file (61226 bytes)

Download g112598dsp137.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp138.jpg · Sequence: 50

Binary file (84978 bytes)

Download g112598dsp138.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp139.jpg · Sequence: 51

Binary file (68725 bytes)

Download g112598dsp139.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp142.jpg · Sequence: 52

Binary file (109477 bytes)

Download g112598dsp142.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp146a.jpg · Sequence: 53

Binary file (38173 bytes)

Download g112598dsp146a.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp146b.jpg · Sequence: 54

Binary file (40015 bytes)

Download g112598dsp146b.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp147.jpg · Sequence: 55

Binary file (48242 bytes)

Download g112598dsp147.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp148.jpg · Sequence: 56

Binary file (47189 bytes)

Download g112598dsp148.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp156.jpg · Sequence: 57

Binary file (436513 bytes)

Download g112598dsp156.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp157.jpg · Sequence: 58

Binary file (414814 bytes)

Download g112598dsp157.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp158.jpg · Sequence: 59

Binary file (467384 bytes)

Download g112598dsp158.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp159.jpg · Sequence: 60

Binary file (472607 bytes)

Download g112598dsp159.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp169.jpg · Sequence: 61

Binary file (389610 bytes)

Download g112598dsp169.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp170.jpg · Sequence: 62

Binary file (334091 bytes)

Download g112598dsp170.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp171.jpg · Sequence: 63

Binary file (401107 bytes)

Download g112598dsp171.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp172.jpg · Sequence: 64

Binary file (334759 bytes)

Download g112598dsp172.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp178.jpg · Sequence: 65

Binary file (49127 bytes)

Download g112598dsp178.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp181.jpg · Sequence: 66

Binary file (166651 bytes)

Download g112598dsp181.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp183.jpg · Sequence: 67

Binary file (172013 bytes)

Download g112598dsp183.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp184.jpg · Sequence: 68

Binary file (161717 bytes)

Download g112598dsp184.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp185.jpg · Sequence: 69

Binary file (220943 bytes)

Download g112598dsp185.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp186.jpg · Sequence: 70

Binary file (62041 bytes)

Download g112598dsp186.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp187.jpg · Sequence: 71

Binary file (86866 bytes)

Download g112598dsp187.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp188.jpg · Sequence: 72

Binary file (179835 bytes)

Download g112598dsp188.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp189.jpg · Sequence: 73

Binary file (186935 bytes)

Download g112598dsp189.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp193.jpg · Sequence: 74

Binary file (75292 bytes)

Download g112598dsp193.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp194.jpg · Sequence: 75

Binary file (35787 bytes)

Download g112598dsp194.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp196.jpg · Sequence: 76

Binary file (260851 bytes)

Download g112598dsp196.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp197.jpg · Sequence: 77

Binary file (336076 bytes)

Download g112598dsp197.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp204.jpg · Sequence: 78

Binary file (156769 bytes)

Download g112598dsp204.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp206.jpg · Sequence: 79

Binary file (266930 bytes)

Download g112598dsp206.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp207.jpg · Sequence: 80

Binary file (260478 bytes)

Download g112598dsp207.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp208.jpg · Sequence: 81

Binary file (273271 bytes)

Download g112598dsp208.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp209.jpg · Sequence: 82

Binary file (208658 bytes)

Download g112598dsp209.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp210.jpg · Sequence: 83

Binary file (116855 bytes)

Download g112598dsp210.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp216.jpg · Sequence: 84

Binary file (196152 bytes)

Download g112598dsp216.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp217.jpg · Sequence: 85

Binary file (143427 bytes)

Download g112598dsp217.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp219.jpg · Sequence: 86

Binary file (194762 bytes)

Download g112598dsp219.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp220.jpg · Sequence: 87

Binary file (84116 bytes)

Download g112598dsp220.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp221.jpg · Sequence: 88

Binary file (72549 bytes)

Download g112598dsp221.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp222.jpg · Sequence: 89

Binary file (116132 bytes)

Download g112598dsp222.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp224a.jpg · Sequence: 90

Binary file (97104 bytes)

Download g112598dsp224a.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp224b.jpg · Sequence: 91

Binary file (98420 bytes)

Download g112598dsp224b.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp226.jpg · Sequence: 92

Binary file (38646 bytes)

Download g112598dsp226.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp228.jpg · Sequence: 93

Binary file (227158 bytes)

Download g112598dsp228.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp229.jpg · Sequence: 94

Binary file (58495 bytes)

Download g112598dsp229.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp230.jpg · Sequence: 95

Binary file (111053 bytes)

Download g112598dsp230.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp232.jpg · Sequence: 96

Binary file (188117 bytes)

Download g112598dsp232.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp233a.jpg · Sequence: 97

Binary file (103839 bytes)

Download g112598dsp233a.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp233b.jpg · Sequence: 98

Binary file (45041 bytes)

Download g112598dsp233b.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp234.jpg · Sequence: 99

Binary file (144499 bytes)

Download g112598dsp234.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp236.jpg · Sequence: 100

Binary file (138715 bytes)

Download g112598dsp236.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp242a.jpg · Sequence: 101

Binary file (61752 bytes)

Download g112598dsp242a.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp242b.jpg · Sequence: 102

Binary file (57749 bytes)

Download g112598dsp242b.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp246.jpg · Sequence: 103

Binary file (85446 bytes)

Download g112598dsp246.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp247.jpg · Sequence: 104

Binary file (112558 bytes)

Download g112598dsp247.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp256.jpg · Sequence: 105

Binary file (18741 bytes)

Download g112598dsp256.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp258.jpg · Sequence: 106

Binary file (239650 bytes)

Download g112598dsp258.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp261.jpg · Sequence: 107

Binary file (239650 bytes)

Download g112598dsp261.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp265.jpg · Sequence: 108

Binary file (72110 bytes)

Download g112598dsp265.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp269.jpg · Sequence: 109

Binary file (292731 bytes)

Download g112598dsp269.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp271.jpg · Sequence: 110

Binary file (391252 bytes)

Download g112598dsp271.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp311.jpg · Sequence: 111

Binary file (73147 bytes)

Download g112598dsp311.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp318.jpg · Sequence: 112

Binary file (65139 bytes)

Download g112598dsp318.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp322a.jpg · Sequence: 113

Binary file (40585 bytes)

Download g112598dsp322a.jpg

GRAPHIC

GRAPHIC

Filename: g112598dsp322b.jpg · Sequence: 114

Binary file (38179 bytes)

Download g112598dsp322b.jpg

GRAPHIC

GRAPHIC

Filename: g112598g0714210802380.jpg · Sequence: 115

Binary file (2779 bytes)

Download g112598g0714210802380.jpg

GRAPHIC

GRAPHIC

Filename: g112598g40o76.jpg · Sequence: 116

Binary file (2790 bytes)

Download g112598g40o76.jpg

GRAPHIC

GRAPHIC

Filename: g112598g57p55.jpg · Sequence: 117

Binary file (21379 bytes)

Download g112598g57p55.jpg

GRAPHIC

GRAPHIC

Filename: g112598g61o60.jpg · Sequence: 118

Binary file (2617 bytes)

Download g112598g61o60.jpg

GRAPHIC

GRAPHIC

Filename: g112598g80f55.jpg · Sequence: 119

Binary file (6383 bytes)

Download g112598g80f55.jpg

XML — IDEA: XBRL DOCUMENT

XML

Filename: R1.htm · Sequence: 121

v3.26.1

Document and Entity Information

Jul. 14, 2026

Cover [Abstract]

Amendment Flag

false

Entity Central Index Key

0001629210

Document Type

8-K

Document Period End Date

Jul. 14, 2026

Entity Registrant Name

Paramount Gold Nevada Corp.

Entity Incorporation State Country Code

NV

Entity File Number

001-36908

Entity Tax Identification Number

98-0138393

Entity Address, Address Line One

665 Anderson Street

Entity Address, City or Town

Winnemucca

Entity Address, State or Province

NV

Entity Address, Postal Zip Code

89445

City Area Code

775

Local Phone Number

625-3600

Written Communications

false

Soliciting Material

false

Pre Commencement Tender Offer

false

Pre Commencement Issuer Tender Offer

false

Security 12b Title

Common Stock, $0.01 Par Value Per Share

Trading Symbol

PZG

Security Exchange Name

NYSEAMER

Entity Emerging Growth Company

false

X

- Definition

Boolean flag that is true when the XBRL content amends previously-filed or accepted submission.

+ References

No definition available.

+ Details

Name:

dei_AmendmentFlag

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Area code of city

+ References

No definition available.

+ Details

Name:

dei_CityAreaCode

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Cover page.

+ References

No definition available.

+ Details

Name:

dei_CoverAbstract

Namespace Prefix:

dei_

Data Type:

xbrli:stringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

For the EDGAR submission types of Form 8-K: the date of the report, the date of the earliest event reported; for the EDGAR submission types of Form N-1A: the filing date; for all other submission types: the end of the reporting or transition period. The format of the date is YYYY-MM-DD.

+ References

No definition available.

+ Details

Name:

dei_DocumentPeriodEndDate

Namespace Prefix:

dei_

Data Type:

xbrli:dateItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The type of document being provided (such as 10-K, 10-Q, 485BPOS, etc). The document type is limited to the same value as the supporting SEC submission type, or the word 'Other'.

+ References

No definition available.

+ Details

Name:

dei_DocumentType

Namespace Prefix:

dei_

Data Type:

dei:submissionTypeItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Address Line 1 such as Attn, Building Name, Street Name

+ References

No definition available.

+ Details

Name:

dei_EntityAddressAddressLine1

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the City or Town

+ References

No definition available.

+ Details

Name:

dei_EntityAddressCityOrTown

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Code for the postal or zip code

+ References

No definition available.

+ Details

Name:

dei_EntityAddressPostalZipCode

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the state or province.

+ References

No definition available.

+ Details

Name:

dei_EntityAddressStateOrProvince

Namespace Prefix:

dei_

Data Type:

dei:stateOrProvinceItemType

Balance Type:

na

Period Type:

duration

X

- Definition

A unique 10-digit SEC-issued value to identify entities that have filed disclosures with the SEC. It is commonly abbreviated as CIK.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityCentralIndexKey

Namespace Prefix:

dei_

Data Type:

dei:centralIndexKeyItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Indicate if registrant meets the emerging growth company criteria.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityEmergingGrowthCompany

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Commission file number. The field allows up to 17 characters. The prefix may contain 1-3 digits, the sequence number may contain 1-8 digits, the optional suffix may contain 1-4 characters, and the fields are separated with a hyphen.

+ References

No definition available.

+ Details

Name:

dei_EntityFileNumber

Namespace Prefix:

dei_

Data Type:

dei:fileNumberItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Two-character EDGAR code representing the state or country of incorporation.

+ References

No definition available.

+ Details

Name:

dei_EntityIncorporationStateCountryCode

Namespace Prefix:

dei_

Data Type:

dei:edgarStateCountryItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The exact name of the entity filing the report as specified in its charter, which is required by forms filed with the SEC.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityRegistrantName

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The Tax Identification Number (TIN), also known as an Employer Identification Number (EIN), is a unique 9-digit value assigned by the IRS.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityTaxIdentificationNumber

Namespace Prefix:

dei_

Data Type:

dei:employerIdItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Local phone number for entity.

+ References

No definition available.

+ Details

Name:

dei_LocalPhoneNumber

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 13e

-Subsection 4c

+ Details

Name:

dei_PreCommencementIssuerTenderOffer

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 14d

-Subsection 2b

+ Details

Name:

dei_PreCommencementTenderOffer

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Title of a 12(b) registered security.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b

+ Details

Name:

dei_Security12bTitle

Namespace Prefix:

dei_

Data Type:

dei:securityTitleItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the Exchange on which a security is registered.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection d1-1

+ Details

Name:

dei_SecurityExchangeName

Namespace Prefix:

dei_

Data Type:

dei:edgarExchangeCodeItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as soliciting material pursuant to Rule 14a-12 under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 14a

-Subsection 12

+ Details

Name:

dei_SolicitingMaterial

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Trading symbol of an instrument as listed on an exchange.

+ References

No definition available.

+ Details

Name:

dei_TradingSymbol

Namespace Prefix:

dei_

Data Type:

dei:tradingSymbolItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as written communications pursuant to Rule 425 under the Securities Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Securities Act

-Number 230

-Section 425

+ Details

Name:

dei_WrittenCommunications

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration