Groowe Groowe BETA / Newsroom
⏱ News is delayed by 15 minutes. Sign in for real-time access. Sign in

Form 8-K

sec.gov

8-K — CADIZ INC

Accession: 0001213900-26-082311

Filed: 2026-07-28

Period: 2026-07-27

CIK: 0000727273

SIC: 4941 (WATER SUPPLY)

Item: Entry into a Material Definitive Agreement

Item: Financial Statements and Exhibits

Documents

8-K — ea0299424-8k_cadiz.htm (Primary)

EX-10.1 — AMENDED CONSTRUCTION MANAGEMENT AT-RISK AGREEMENT, DATED JULY 27, 2026, BY AND BETWEEN FENNER GAP MUTUAL WATER COMPANY AND W.M. LYLES CO (ea029942401ex10-1.htm)

EX-10.2 — CONSTRUCTION MANAGEMENT AT-RISK AGREEMENT, DATED JULY 27, 2026, BY AND BETWEEN FENNER GAP MUTUAL WATER COMPANY AND MIKE BUBALO CONSTRUCTION CO., INC (ea029942401ex10-2.htm)

GRAPHIC (ea029942401_ex10-1img1.jpg)

GRAPHIC (ea029942401_ex10-1img2.jpg)

GRAPHIC (ea029942401_ex10-1img3.jpg)

GRAPHIC (ea029942401_ex10-2img1.jpg)

XML — IDEA: XBRL DOCUMENT (R1.htm)

8-K — CURRENT REPORT

8-K (Primary)

Filename: ea0299424-8k_cadiz.htm · Sequence: 1

false

0000727273

0000727273

2026-07-27

2026-07-27

0000727273

CDZI:CommonStockParValue0.01PerShareMember

2026-07-27

2026-07-27

0000727273

CDZI:DepositarySharesEachRepresenting11000thFractionalInterestInShareOf8.875SeriesCumulativePerpetualPreferredStockParValue0.01PerShareMember

2026-07-27

2026-07-27

iso4217:USD

xbrli:shares

iso4217:USD

xbrli:shares

United

States

Securities

and Exchange Commission

Washington,

D. C. 20549

FORM 8-K

CURRENT REPORT

Pursuant to Section 13 or 15(d) of the

Securities Exchange Act of 1934

Date of Report (Date of earliest event reported):

July 27, 2026

Cadiz Inc.

(Exact Name of Registrant as Specified in its Charter)

Delaware

001-40579

77-0313235

(State or Other Jurisdiction

of Incorporation)

(Commission File Number)

(IRS Employer

Identification No.)

550 S. Hope Street, Suite 2850

Los Angeles, California

90071

(Address of Principal Executive Offices)

(Zip Code)

Registrant’s telephone number,

including area code: (213) 271-1600

Not Applicable

(Former Name or Former Address, if Changed Since Last Report)

Check the appropriate box below if the Form 8-K filing is intended

to simultaneously satisfy the filing obligation of the registrant under any of the following provisions (see General Instruction A.2.

below):

☐ Written communications pursuant to Rule 425 under the Securities

Act (17 CFR 230.425)

☐ Soliciting material pursuant to Rule 14a-12 under the Exchange

Act (17 CFR 240.14a-12)

☐ Pre-commencement communications pursuant to Rule 14d-2(b)

under the Exchange Act (17 CFR 240.14d-2(b))

☐ Pre-commencement communications pursuant to Rule 13e-4(c)

under the Exchange Act (17 CFR 240.13e-4(c))

Securities registered pursuant to Section 12(b) of the Act:

Title of each class

Trading Symbol(s)

Name of each exchange

on which registered

Common Stock, par value $0.01 per share

CDZI

The NASDAQ Global Market

Depositary Shares (each representing a 1/1000th

fractional interest in share of 8.875% Series A Cumulative Perpetual Preferred Stock, par value $0.01 per share)

CDZIP

The NASDAQ Global Market

Indicate by check mark whether the registrant is an emerging growth

company as defined in Rule 405 of the Securities Act of 1933 (§230.405 of this chapter) or Rule 12b-2 of the Securities Exchange

Act of 1934 (§240.12b-2 of this chapter).

Emerging growth company ☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying

with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Introductory Note

On July 27, 2026, Cadiz Inc. (the “Company,” or “Cadiz”),

through its affiliate Fenner Gap Mutual Water Company (“Fenner Gap”), entered into two agreements for the engineering, procurement

and construction of the Mojave Groundwater Bank Northern Pipeline project (the “Northern Pipeline”). As described in greater

detail below under Item 1.01, these agreements are Construction Manager at Risk (“CMAR”) agreements establishing guaranteed

maximum prices (“GMPs”) for the project’s principal construction packages , including pump stations and pipeline replacement;

and together with owner-procured equipment and materials subject to contractual pricing, purchase options or supplier quotations, these

agreements establish substantially all of the estimated construction capital expenditures required to place the Northern Pipeline into

service.

The CMAR delivery structure provides Fenner Gap with contractually

established guaranteed maximum prices for the project’s principal construction packages while allowing the Company to directly procure

major long-lead equipment and materials. This approach is intended to reduce construction cost uncertainty, preserve flexibility to competitively

procure major equipment and materials, and establish a defined construction capital budget that can be used in connection with the Company’s

project financing activities for the Mojave Groundwater Bank.

Item 1.01. Entry into a Material Definitive Agreement.

On July 27, 2026, Fenner Gap Mutual Water Company (“Fenner Gap”),

the mutual water company formed by Cadiz in 2010 to manage and operate the Mojave Groundwater Bank, entered into a CMAR agreement with

W.M. Lyles Co. (the “Lyles Agreement”). The Lyles Agreement establishes a GMP of approximately $218.9 million for the pump-station

facilities required for operation of the Northern Pipeline. The GMP includes 15% of project contingency and requires Lyles to complete

the covered work within the GMP. Accordingly, absent Fenner Gap-directed changes, delays or other adjustments permitted under the agreement,

cost increases associated with the covered work will be borne by Lyles or absorbed within the contingency.

Also on July 27, 2026, Fenner Gap entered into a separate CMAR agreement

with Mike Bubalo Construction Co., Inc. (the “Bubalo Agreement” and, together with the Lyles Agreement, the “GMP Agreements”).

The Bubalo Agreement establishes a GMP of approximately $54.9 million for the pipeline replacement and related facilities required to

convert the Northern Pipeline to water conveyance. The guaranteed maximum price includes 10% of project contingency and requires Bubalo

to complete the covered work within the GMP. Accordingly, absent Fenner Gap-directed changes, delays or other adjustments permitted under

the agreement, cost increases associated with the covered work will be borne by Bubalo or absorbed within the contingency.

Together, the GMP Agreements establish aggregate guaranteed

maximum prices of approximately $273.8 million for the primary pipeline replacement and pump-station construction packages required

to place the Northern Pipeline into service and deliver approximately 21,275 acre-feet per year under existing water supply

contracts. The potential total capacity of the Northern Pipeline is estimated at 25,000 acre-feet per year.

Based on the Company’s current capital budget, the construction

capital expenditures required to place the Northern Pipeline into service are estimated at approximately $403.3 million. This capital

budget consists of approximately $273.8 million covered by the GMP Agreements and approximately $129.5 million for owner-procured pumps,

replacement pipe and power generation equipment, necessary additional wellfield facilities and customary project contingency. Fenner Gap

has secured contractual pricing for the replacement pipe and power generation equipment through existing purchase options and has received

supplier quotations for the pumps.

The wellfield facilities, representing approximately 5% of the current

construction capital budget, or $22 million, are also being competitively procured under a separate GMP structure with contractors with

previous experience at the Cadiz Ranch wellfield, and a final GMP is not expected to materially affect the current capital expenditure

estimate.

The GMP Agreements are subject to customary adjustments for changes

in scope, owner-directed changes, delays, differing site conditions and other events specified in the agreements. They also provide for

50/50 sharing of unused contingency between Fenner Gap and the applicable contractor, return of unused allowances to Fenner Gap, and contract-specific

early-completion incentive and delay-damages provisions. Construction will commence following issuance of notices to proceed and satisfaction

of applicable financing, permitting and other customary preconstruction conditions, which is expected to occur this calendar year. The

agreements reflect pricing and scheduling assumptions based on a September 2026 notice to proceed, but do not automatically terminate

or reset the GMPs solely if notice to proceed occurs later, although later notice-to-proceed timing may support permitted schedule or

price adjustments.

1

The foregoing descriptions of the GMP Agreements do not purport

to be complete and are qualified in their entirety by reference to the full text of the Lyles Agreement and the Bubalo Agreement, copies

of which are filed as Exhibits 10.1 and 10.2, respectively, to this Current Report on Form 8-K and incorporated herein by reference.

Cautionary Note Regarding Forward-Looking Statements

This Current Report on Form 8-K contains “forward-looking statements”

within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the

Securities Exchange Act of 1934, as amended (the “Exchange Act”), including statements made pursuant to the safe harbor provisions

of the Private Securities Litigation Reform Act of 1995. Forward-looking statements generally can be identified by words such as “expects,”

“anticipates,” “plans,” “believes,” “estimates,” “intends,” “projects,”

“may,” “will,” “could,” “should,” and similar expressions.

Forward-looking statements in this report include, without

limitation, statements regarding the Company’s expectations, plans and estimates concerning the development, construction,

financing and operation of its infrastructure and water supply projects, including anticipated costs, schedules, capacities and

project milestones. These forward-looking statements are based on current expectations, estimates and assumptions and are subject to

significant risks and uncertainties. Actual results may differ materially from those expressed or implied by these forward-looking

statements due to a variety of factors, including, without limitation: the ability to obtain required financing on acceptable terms

or at all; delays in obtaining permits, approvals or other governmental authorizations; changes in construction schedules or project

scope; contractor performance issues; labor shortages; supply chain disruptions; equipment availability constraints; increases in

material, transportation, labor, energy or other project costs; differing site conditions; weather or environmental conditions;

changes in applicable laws, regulations or governmental policies; disputes under project agreements; lawsuits that have been filed

or may be filed against the Company and its projects; and other economic, business, regulatory and market factors that could affect

the Company’s projects, operations or financial condition.

Additional information regarding risks and uncertainties is contained

in the Company’s filings with the Securities and Exchange Commission, including its Annual Report on Form 10-K for the fiscal year

ended December 31, 2025 and subsequent filings under the Exchange Act and the Securities Act. The Company undertakes no obligation to

update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required

by applicable law.

Item 9.01 Financial Statements and Exhibits

(d) Exhibits

10.1*†

Amended Construction Management At-Risk Agreement, dated July 27, 2026, by and between Fenner Gap Mutual Water Company and W.M. Lyles Co.

10.2*†

Construction Management At-Risk Agreement, dated July 27, 2026, by and between Fenner Gap Mutual Water Company and Mike Bubalo Construction Co., Inc.

104

Cover Page Interactive Data File (embedded within the Inline XBRL document)

* Schedules and similar attachments have been omitted pursuant

to Item 601(b)(5) of Regulation S-K. The Company hereby undertakes to furnish copies of any of the omitted schedules upon request by

the SEC; provided, however, that the Company may request confidential treatment pursuant to Rule 24b-2 of the Exchange Act for any

schedules so furnished.

† Certain portions of this exhibit have been omitted in accordance

with Item 601(b)(10)(iv) of Regulation S-K because they are both (i) not material and (ii) the type of information that the Company customarily

and actually treats as private or confidential. The Company agrees to furnish supplementally an unredacted copy of the exhibit to the

SEC upon its request.

2

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934,

the Registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

CADIZ INC.

By:

/s/ Stanley E. Speer

Stanley E. Speer

Chief Financial Officer

Date: July 28, 2026

3

EX-10.1 — AMENDED CONSTRUCTION MANAGEMENT AT-RISK AGREEMENT, DATED JULY 27, 2026, BY AND BETWEEN FENNER GAP MUTUAL WATER COMPANY AND W.M. LYLES CO

EX-10.1

Filename: ea029942401ex10-1.htm · Sequence: 2

Exhibit

10.1

Note: Certain

portions of this exhibit (marked with [***]) have been omitted in accordance with Item 601(b)(10)(iv) of Regulation S-K because they

are both (i) not material and (ii) the type of information that the Company customarily and actually treats as private or

confidential.

Mojave

Water Bank Project

Northern

Pipeline Facilities

Construction

CONSTRUCTION

MANAGEMENT

AT-RISK

(CMAR)

Amended

Agreement

Mojave Groundwater Bank

NPL – Pump Stations

CONTENTS

ARTICLE 1 —

Definitions

2

ARTICLE 2 — CMAR Responsibilities

7

ARTICLE 3 — Owner

Responsibilities

9

ARTICLE 4 — Subcontracts

and Labor Relations

9

ARTICLE 5 — Time

10

ARTICLE 6 — Compensation

12

ARTICLE 7 — Changes

13

ARTICLE 8 — Payment

13

ARTICLE 9 — Liability

14

ARTICLE 10 — Dispute

Mitigation and Resolution

15

ARTICLE 11 — Miscellaneous

Provisions

15

Exhibit A—General

Conditions to Agreement

19

Exhibit A.1—Insurance

Requirements

42

Exhibit A.2—Performance

Bond and Payment Bond

43

Exhibit B—CMAR Phase

I Preconstruction Scope of Services

44

Exhibit C—Phase

I Notice to Proceed

45

Exhibit D—Phase

I Early Work(s) Package(s) (Not Used)

46

Exhibit D.1—Phase

I Early Work(s) Package(s) Amendment Form (Not Used)

47

Exhibit E—Phase

2 Construction Price Amendment

48

Exhibit F—Initial

Schedule of Work

Exhibit G—Project

Technical Scheduling Requirements

52

Exhibit H—Preconstruction

Phase Services Hourly Rate Schedule

53

Exhibit I—Project

Technical Performance Requirements (Not Used)

54

Exhibit J—Project

Labor and Vendor Requirements

55

Mojave Groundwater Bank

NPL – Pump Stations i

Mojave

Water Bank

Amended

Agreement Between Owner and Construction Manager

at-Risk

(CMAR)

Basis

of Payment is Cost of the Work Plus CMAR’s Fee Not to Exceed a

Guaranteed

Maximum Price

Agreement

This

Amended Agreement is made effective as of the 27th day of July in the year 2026 (the “Contract Date”), for good and valuable

consideration, the receipt and sufficiency of which are hereby acknowledged, by and between the

OWNER

Owner:

Fenner Gap Mutual Water Company

Address:

[***]

and the

CONSTRUCTION

MANAGER AT-RISK (CMAR):

Company:

W. M. Lyles Co.

Address:

[***]

for

services in connection with the following Project:

PROJECT

NO.: 20-001

PROJECT NAME:

MOJAVE WATER BANK PROJECT

NORTHERN PIPELINE FACILITIES CONSTRUCTION

PROJECT

LOCATION: CADIZ, CALIFORNIA

PROJECT

SUMMARY AND PHASING:

The

project site is located near Cadiz, California, through an existing pipeline Right of Way (ROW) towards the City of Barstow and potentially

extending beyond to the northern boundary of Edwards Air Force Base. The activities for the initial portion of the Northern Pipeline

(NPL) project in the larger context of the Mojave Groundwater Bank Program and overall NPL will be focused on conveyance from Reach 1-Point

A to Point B, as shown on the location map below and represents approximately 90 miles of an existing 30” diameter Natural Gas

pipeline that is being repurposed to convey water. Reach 1 of the NPL project will include either 4 or 5 new pump stations. Reach 2,

Point B to Point C with two additional pump stations, as shown on Figure 1 is part of the NPL overall Project budget and is included

as a portion of the Preconstruction activities. Construction of Reach 2 may be sequenced separately as part of the Phase 2 Construction.

Mojave Groundwater Bank

NPL – Pump Stations 1

FIGURE

1

The

full scope of the NPL repurposing including the addition of up to seven new pump stations, rehabilitation of an existing 30” oil

and gas pipeline to repurpose for water conveyance, on-Farm wellfield modifications, related buildings, turnout and receiving facilities

and possible treatment if determined necessary.

Other

Projects that may be pursued by the Owner at a separate time include the SPL and the Cadiz Farm Wellfield as shown on the Project

Location Map. These Projects may be added subsequently to the NPL Project with the budget for the SPL being approximately $[***]

million.

Notice

to the Owner and/or CMAR (each individually a “Party” and collectively, the “Parties”) shall be given at the

above addresses.

Accordingly,

the Parties hereto hereby agree as follows.

ARTICLE

1 — Definitions

1.1 Definitions

1.1.1

“Agreement” means this Agreement between Owner and CMAR where the Basis of Payment is the Cost of the Work plus CMAR’s

Fee with a Guaranteed Maximum Price, as modified by the Parties, and the exhibits and attachments made part of this Agreement upon its

execution, as modified by subsequent Amendments.

1.1.2

“Allowance” is an estimated sum to be used as Owner directs for categories of Work that cannot be established at the

time the GMP are agreed upon. Owner can direct Work under Allowances only up to the established amount. Any work directed over the established

Allowance amount is to be processed by Change Order to CMAR.

Mojave Groundwater Bank

NPL – Pump Stations 2

1.1.3

“Applicable Law” or “Applicable Laws” means, collectively, all applicable federal, state, and local laws,

statutes, rules, regulations, tariffs, levies, embargoes, ordinances, codes, and binding administrative or judicial precedents or authorities,

including the binding interpretation or administration thereof by any Governmental Authority charged with the enforcement, interpretation,

or administration thereof, and all applicable administrative orders, directed binding duties, licenses, authorizations, and permits of,

and binding agreements with, any Governmental Authority, in each case applicable to or affecting the Project or the Work of CMAR under

this Agreement or the other Contract Documents.

1.1.4

“Assumptions” and “Clarifications” are material terms associated with CMAR’s Guaranteed Maximum Price

upon which the Owner and CMAR agree and are more particularly described in Exhibit E - Phase 2 Construction Price.

1.1.5

“Bid Package” or “Bid Packages” means one or more design bid packages for specific scopes of the Work that

are developed and generated by the Engineer for bidding and award pursuant to this Agreement.

1.1.6

The term “Business Day” means any day other than a Saturday, Sunday, or legal holiday on which national banks located

in California are not required or permitted to be open for business to the public.

1.1.7

A “Change Order” is a written order signed by the Owner and the CMAR after execution of this Agreement indicating any

change to the Agreement including, among other things, changes in the Scope of the Work, the CMAR’s Fee for Preconstruction Phase

Services, the Phase 2 Construction Price and Date of Substantial Completion, or Date of Final Completion.

1.1.8

A “Change Order Proposal” is a proposal submitted by the CMAR or the Owner for a change in the Work as evidenced by a

Change Order.

1.1.9

The “CMAR” is W. M. Lyles Co.

1.1.10

The “CMAR Representative” is Grant Gourley.

1.1.11

“Construction Phase” or “Construction Phase Services” means the Work of the CMAR undertaken during Phase

2 pursuant to the Drawings and Specifications in accordance with Paragraph 2.2 of this Agreement and other applicable terms and provisions

of this Agreement and the other Contract Documents.

1.1.12

“Construction General Conditions Costs” are an element of the Cost of Work that is included in the Construction Price

as agreed to by the CMAR and the Owner and has the meaning set forth in Paragraph 5.6 of the General Conditions.

1.1.13

“Contingencies,” where applicable, is an estimated sum to be used by CMAR to cover potential (but undefined or underdefined)

costs of the work than may occur and are not the basis for a Change Order.

Mojave Groundwater Bank

NPL – Pump Stations 3

1.1.14

The “Contract Documents” represents the entire and integrated agreement between the Parties hereto and supersedes prior

negotiations, representations, or agreements, either written or oral. It consists of this Agreement, the General Conditions, the Phase

2 Construction Price, the Drawings, Specifications, addenda issued prior to execution of this Agreement, information furnished by the

Owner under Paragraph 3.8 of the General Conditions, any supplemental or other conditions attached as an exhibit to this Agreement, performance

Specifications attached as an exhibit to this Agreement, the CMAR’s qualifications, Assumptions, and Clarifications mutually agreed

upon by Owner and CMAR and identified in and attached to this Agreement and/or the Phase 2 Construction Price Amendment, the other documents

listed in this Agreement, and any modifications issued after its execution, including, without limitation, Change Orders and Owner Change

Directives. The Contract Documents do not include bidding instructions or sample forms not attached as exhibits to this Agreement.

1.1.15

The “Contract Time” is the overall time period allowed for performance of the Work.

1.1.16

“Cost of the Work,” where applicable, has the meaning of the sum of all allowed direct and indirect costs necessarily

and reasonably incurred and paid by CMAR in the performance of the Work including those set forth in the Phase 2 Construction Price.

1.1.17

The term “Day” or “day” shall mean calendar day unless otherwise specifically defined.

1.1.18

“Defective Work” is any portion of the Work that does not conform to the Contract Documents, as more fully described

in Paragraphs 2.4 and 2.5 of the General Conditions.

1.1.19

“Differing Site Conditions” means conditions at the Project site that are: (a) subsurface or other physical conditions

materially different from those indicated in the Contract Documents, or (b) unusual or unknown physical conditions materially different

from conditions ordinarily encountered and generally recognized as inherent in the Work provided for in the Contract Documents.

1.1.20

“Drawings” means the documents prepared by Engineer or other consultants of Owner showing the design, location, and dimensions

of the Work, generally including plans, elevations, sections, details, schedules, and diagrams.

1.1.21

“Early Work(s) Package(s)” is procurement or construction work that may be performed during Phase I or Phase 2 for the

benefit the Project.

1.1.22

“Engineer” means the licensed Engineer and its consultants, retained by Owner to perform design services for the Project.

The Engineer for the Project is Stantec.

1.1.23

“Engineer Contract” means the engineering contract dated February 18, 2025, and any subsequent contracts between Owner

and Engineer for the design and/or engineering of the Project or portions thereof.

1.1.24

“Fee” or “CMAR Fee” means, where a GMP has been selected by the Owner and CMAR as the basis for establishing

a Phase 2 Construction Price for the Project or Bid Package, as applicable, the Fee to be charged by the CMAR, which shall either be

(a) expressed as a percentage of the Cost of the Work, or (b) a fixed dollar amount based on the Cost of the Work, in each case agreed

upon by the Owner and the CMAR at the time of execution of, and in accordance with, the Phase 2 Construction Price for the CMAR’s

performance of the Work.

Mojave Groundwater Bank

NPL – Pump Stations 4

1.1.25

“Field Order” means minor changes in the Work if the changes do not involve an adjustment in the Phase 2 Construction

Price or the Contract Times and are compatible with the design of the completed Project as a functioning whole as indicated by the Contract

Documents.

1.1.26

“Final Completion” occurs on the date when the CMAR’s obligations under this Agreement are complete and accepted

by the Owner and final payment becomes due and payable in accordance with Paragraph 8.9 of the General Conditions. This date shall be

confirmed by a Certificate of Final Completion signed by the Owner and the CMAR.

1.1.27

“Final Payment” has the meaning set forth in Paragraph 8.9 of the General Conditions.

1.1.28

“Force Majeure,” as defined in the General Conditions in Paragraph 5.4.1.3.

1.1.29

The “General Conditions” to the Agreement is included as Exhibit A.

1.1.30

“GMP” or “Guaranteed Maximum Price” means, with regard to the Project as a whole or any Bid Package for construction

of any portion of the Work where a GMP is selected by the Parties as the basis for the Phase 2 Construction Price, as may be further

defined in the Phase 2 Construction Price Amendment for the Project, as applicable. The Guaranteed Maximum Price for the Work covered

thereby, as established by a Phase 2 Construction Price Amendment executed by and between Owner and CMAR, is further defined as the Cost

of Work plus Allowances and Fee for such Work. Subject to Change Orders and other allowable adjustments made pursuant to this Agreement

or the other Contract Documents, where the Phase 2 Construction Price for any Work is based on a GMP, the Phase 2 Construction Price

for such Work shall not exceed the GMP for such Work plus any approved additions or deductions to the GMP.

1.1.31

“Governmental Authorities” means any federal, state, local, or other political subdivision thereof, any agency, authority,

instrumentality, regulatory body, court, administrative tribunal, central bank, public office, court, arbitration or mediation panel,

or other entity exercising executive, legislative, judicial, taxing, regulatory, or administrative powers or functions of government.

1.1.32

A “Material Supplier” is a person or entity retained by the CMAR or a Subcontractor to provide material or equipment

for the Work.

1.1.33

“Others” means other contractors, Material Suppliers, and persons at the Worksite who are not employed by the CMAR or

Subcontractors.

1.1.34

“Owner” is Fenner Gap Mutual Water Company and includes the Owner’s representative and any other Owner authorized

person or entity.

1.1.35

“Owner’s Approved Budget” means the sum of $236,000,000.

1.1.36

“Owner Change Directive” means a directive issued by Owner to CMAR to undertake and perform a change in the Work prior

to the time such Parties have reached agreement on the adjustment, if any, of the Phase 2 Construction Price or the Contract Time.

Mojave Groundwater Bank

NPL – Pump Stations 5

1.1.37

The Owner’s authorized representative is Don Bunts (the “Owner’s Representative”).

1.1.38

“Phase 1” means the Preconstruction Phase and will include close collaboration with the Engineer and the Owner, to define

details appropriate to design milestones, establish logical work packages to the target schedules and develop early procurement packages

to equipment and materials determine to be long-lead elements and critical to project activities.

1.1.39

“Phase 2” means the Construction Phase Services performed by CMAR pursuant to this Agreement and the other Contract Documents.

1.1.40

“Phase 2 Construction Price” means the contract price established by the Parties for CMAR’s performance of the

Work during the Construction Phase in accordance with this Agreement and the other Contract Documents and as reflected in Exhibit

E, as the same may be modified by any Change Orders increasing or reducing such contract price.

1.1.41

“Phase 2 Construction Price” has the meaning given to it in Exhibit E.

1.1.42

“Phase 2 Construction Price Proposal” has the meaning given to it in Exhibit E

1.1.43

“Preconstruction Phase” or “Preconstruction Phase Services” means the Phase 1 Preconstruction

Services performed by CMAR in connection with the Project and described in Paragraph 2.1 of this Agreement.

1.1.44

“Project” is the building, facility, or other improvements for which the CMAR is to perform Work under this Agreement.

It may also include construction by the Owner or Others which is not part of the Work of this agreement.

1.1.45

“Project Component” refers to one of the three components of the Project, the Northern Pipeline, the Southern Pipeline,

or the Wellfield.

1.1.46

“Risk Register” is the result of an assessment led by either the Owner or the CMAR, and agreed to by both parties, that

identifies potential project risks and the likelihood of occurrence and allocates the responsibility for mitigation of each risk element.

1.1.47

“Schedule” is the critical path method (CPM) schedule prepared by the CMAR, and based on the current conceptual schedule

to be refined during Phase 1 preconstruction services, that specifies the dates on which the CMAR plans to begin and complete various

parts of the Work, including all activities during Phase 1 Preconstruction and Phase 2 Construction.

1.1.48

“Schedule Update” means any update to the Schedule prepared and submitted by CMAR to Owner concurrently with CMAR’s

submission to Owner of a Phase 2 Construction Price Proposal or as otherwise required or permitted hereunder.

1.1.49

“Specifications” means the documents prepared by Owner, Engineer, or other consultant of Owner consisting of the written

requirements for materials, equipment, construction systems, standards, and workmanship for the Work and performance of related services.

Mojave Groundwater Bank

NPL – Pump Stations 6

1.1.50

A “Subcontractor” is a person or entity retained by the CMAR as an independent contractor to provide the labor, materials,

equipment, or services necessary to complete a specific portion of the Work. The Subcontractor obligations within this Agreement shall

also apply to the CMAR for all self-perform trade work.

1.1.51

“Substantial Completion of the Work,” or “Substantially Complete” or a designated portion, occurs on the

date when the Work is sufficiently complete in accordance with the Contract Documents so that the Owner may occupy or utilize the Work,

or a designated portion, for the beneficial use for which it is intended. This date shall be confirmed by a certificate of Substantial

Completion signed by the Engineer and CMAR with Owner’s consent. The issuance of a certificate of occupancy is not a prerequisite

for Substantial Completion if the certificate of occupancy cannot be obtained due to factors beyond the CMAR’s control. In addition

to and without limiting the generality of the foregoing requirements of this Paragraph 1.1.51, “Substantial Completion” of

the Work or a portion of the Work shall not be deemed to have occurred unless and until the Project or a portion thereof is available

for beneficial use and satisfies any other requirements set forth in the General Conditions.

1.1.52

A “Sub-subcontractor” is a person or entity who has an agreement with a Subcontractor to perform any portion of the Work.

1.1.53

“Work” means the construction and services necessary or incidental to fulfill the CMAR’s obligations for the Project

in conformance with this Agreement and the other Contract Documents, including the Preconstruction Phase Services and the Construction

Phase Services as set forth in the Scope of Work.

1.1.54

“Worksite” means the location of the Project as identified in Article 1 where the Work is to be performed.

1.1.55

Capitalized terms used herein but not defined herein shall have the meanings given them in the Amended Agreement, General Conditions,

and other Contract Documents.

ARTICLE

2 — CMAR Responsibilities

2.1 Phase

1 Preconstruction Phase Services

2.1.1

Commencement. Preconstruction Phase Services, as described in Exhibit B attached hereto, shall commence no later than five

(5) calendar days following the Owner’s issuance of a Phase 1 Notice to Proceed in substantially the form of Exhibit C attached

hereto and incorporated herein by this reference with the appropriate box checked. For the performance of the Preconstruction Phase Services

CMAR shall be paid the Preconstruction Phase Services fees in the amount and in the manner set forth in Paragraph 6.1.

2.1.2

Early Work(s) Package(s). If applicable, Early Work(s) Package(s) commenced prior to mutual execution of a Phase 2 Construction Price

Amendment shall be performed and paid for pursuant to Exhibit D and Exhibit D.1 to this Agreement but otherwise subject

to the terms, covenants, and conditions of this Agreement and the other Contract Documents.

Mojave Groundwater Bank

NPL – Pump Stations 7

2.1.3

Completion. CMAR’s Preconstruction Phase Services shall be deemed to have been completed upon mutual execution of the Amended

Agreement for the Work, hereto attached as Exhibit E, covered by the Construction Phase Services. If the Owner and CMAR are unable

to reach a written agreement on an Amended Agreement, the Owner may terminate this Agreement for convenience on five (5) business days’

written notice to the CMAR in accordance with Paragraph 10.3 of the General Conditions. In the event of such termination for convenience,

the CMAR shall be compensated for (1) the portion of the CMAR’s Preconstruction or Construction Phase Services, if any, performed

to the date of such termination, but the CMAR shall not be entitled to compensation for Work not performed, plus (2) reasonable demobilization

costs, if any, which shall include, but not be limited to, reasonable cost(s) incurred by CMAR to break contractual obligations with

Subcontractors, Subconsultants, Suppliers, Vendors, and Materialmen entered prior to Subcontractor’s receipt of the notice of termination.

In such event, the CMAR shall have no obligation to perform the Scope of Work covered by such unexecuted Amended Agreement.

2.2 Phase

2 Construction Phase Services

2.2.1

Commencement. Unless otherwise provided to the contrary elsewhere in this Agreement or the other Contract Documents, CMAR’s

Construction Phase Services shall commence within ten (10) days of the Phase 2 Notice to Proceed.

2.2.2

Self-Perform Work. As part of the CMAR’s Construction Phase Services, the CMAR may be entitled to self-perform work with Owner

approval. Any self-perform Work, whether negotiated or competitively bid, that is approved by the Owner is subject to the terms and conditions

of and as identified in Exhibit B and the following provisions of this Paragraph 2.2.2.

2.2.2.1

The CMAR may seek to perform portions of the Work itself in addition to minor work that may be included in the CMAR’s Construction

General Conditions Costs. As part of CMAR’s Preconstruction Phase Services, CMAR shall communicate to Owner, in writing, which

portions of the Work that it intends to self-perform and the pricing for such portions shall be clearly identified within CMAR’s

Phase 2 Construction Price Proposal.

2.2.2.2

If a selected Subcontractor defaults in the performance of its Work or fails to execute a subcontract after being selected in accordance

with this paragraph, the CMAR may, without advertising, fulfill the contract requirements through selection of an alternate Subcontractor

or self-performance, in each case with the Owner’s prior written approval. Owner shall be notified in the event of a Subcontractor

default or failure to execute the subcontract.

2.2.2.3

Work identified pursuant to Exhibit B and performed directly by the CMAR shall be limited to 80% of the Phase 2 Construction

Price unless a lower or higher percentage is requested and approved by the Owner. The pricing for any Work that will be performed by

the CMAR shall be submitted to and reviewed by the Owner’s Representative, or any other neutral party as determined by the Owner,

for confirmation that the pricing is competitive and representative of the market value of the Work.

Mojave Groundwater Bank

NPL – Pump Stations 8

ARTICLE

3 — Owner Responsibilities

3.1 Owner

Responsibilities

Owner

shall be responsible for providing the information and delivering the materials set forth in Article 3 of the General Conditions.

ARTICLE

4 — Subcontracts and Labor Relations

4.1 Subcontractors

The

work not performed by the CMAR with its own forces shall be performed by approved Subcontractors. All subcontracts shall be issued on

a Lump-Sum basis unless the Owner has given prior written approval of a different method of payment to the Subcontractor. Owner may require

CMAR to competitively bid subcontracts for services or supplies that are over $200,000. CMAR may subcontract any services or supplies

that are under $200,000 without the approval or competitive requirement to Subcontractors.

4.2 Labor

Relations

4.2.1

Prevailing Wages.

4.2.1.1

Applicable laws. The current prevailing wage rate determinations for public works contracts by the Owner, the Director of the California

Department of INDUSTRIAL RELATIONS, and, if federal funding is used for the Project, the current General Wage Determination Decisions,

as determined by the US Secretary of Labor, as same may be changed during the term of this Agreement, are incorporated by this reference.

4.2.1.1.1

Davis-Bacon. Should Owner obtain federal funding for the Project, CMAR shall be responsible for ensuring that all subcontracts and

Subcontractors fully comply with all applicable requirements of the Davis-Bacon Act, including but not limited to applicable prevailing

wage, contractual provisions, and recordkeeping.

4.2.1.1.2

CMAR shall pay any person performing labor necessary to complete any portion of Work on the Project not less than the highest general

prevailing rate of wages. If federal funds are used for the Project, where the minimum rate of pay for any classification differs among

city, state, and federal wage rate determinations, the highest rate of pay shall prevail.

4.2.1.1.3

CMAR shall include, in any contract or subcontract relating to Work on the Project, a requirement that all persons performing labor

under such contract or subcontract shall be paid not less than the highest prevailing rate of wages for the labor so performed.

4.2.2

Compliance Monitoring. CMAR shall require every subcontractor to provide certified payroll reports with respect to all persons performing

labor necessary to complete any portion of Work on the Project. This input will be required as part of the CMAR monthly project/program

summaries and exceptional issues will be included in weekly project updates and reports. Failure to provide this information may result

in the withholding of progress payments until such information is provided to the Owner.

Mojave Groundwater Bank

NPL – Pump Stations 9

4.2.3

Nondiscrimination / Nonharassment. CMAR shall not engage in any form of discrimination or harassment because of race, color, creed,

national origin, ancestry, age, sex, sexual orientation, disability, or any other protected classification against any employee or applicant

for employment on the Project.

4.2.4

Additional Requirements. CMAR shall comply, and shall require every subcontractor to comply, with any local hire, labor relations,

or local procurement requirements required by any funding source or contractual obligation of the Owner. A current list of such obligations

is set forth in Exhibit J.

ARTICLE

5 — Time

5.1 Performance

of the Work

5.1.1

Date of Commencement. The Date of Commencement of the Preconstruction Phase Services and Construction Services, as applicable, shall

be as set forth in Subparagraph 5.1.1 of the General Conditions. The Work shall proceed in general accordance with the Schedule of Work

as such Schedule may be amended from time to time, subject to other provisions of this Agreement. The Schedule is subject to allowable

adjustments in the Contract Time as permitted herein or in the other Contract Documents.

5.1.2

Substantial / Final Completion. Unless the Parties agree otherwise, the Date of Substantial Completion and the Date of Final Completion

shall be established pursuant to the Phase 2 Construction Price Amendment, subject to adjustments as provided for in the Contract Documents.

If a Phase 2 Construction Price is not established and the Parties desire to establish a Date of Substantial Completion or Date of Final

Completion, it shall be set forth via Amendment.

5.1.3

The CMAR shall not knowingly commence the Work before the effective date of insurance to be provided by the CMAR and Owner as required

by the Contract Documents.

5.2 Schedule

of the Work

5.2.1

The initial Schedule is attached hereto as Exhibit F.

5.2.2

Owner will timely review the baseline Schedule submitted by CMAR. If the Owner determines that additional supporting data are necessary

to fully evaluate the Schedule, the Owner will request additional supporting data in writing. Such data shall be furnished no later than

five (5) days after the date of such request. Owner will render a decision promptly and in any case within ten (10) days after the latter

of the receipt of the Schedule update or the deadline for furnishing such additional supporting data. Owner shall review, approve, and/or

provide comments in a reasonable time.

5.2.3

Contemporaneously with CMAR’s submission of its Phase 2 Construction Price Proposal in accordance with Phase 2 Construction

Price Amendment, the CMAR shall submit to the Owner and, if directed, the Engineer, a Schedule Update, in compliance with the technical

scheduling requirements attached hereto as Exhibit G and the requirements of this Paragraph 5.2, that shall show the dates on

which the CMAR plans to commence and complete various parts of the Work, including dates on which information and approvals are required

from the Owner.

Mojave Groundwater Bank

NPL – Pump Stations 10

5.3 Contract

Time, Delays, and Extensions of Time

5.3.1

The Contract Time for the NPL Project shall be established with the Amended Agreement.

5.3.2

The Contract Time, as it may be modified from time to time in accordance with this Agreement and any other applicable Contract Documents,

shall control the determination of liquidated damages payable to CMAR under Paragraph 5.4 and in the determination of any delay under

Paragraph 5.3.

5.3.3

The CMAR will include 20 days of weather-related delays within the Project Construction Schedule. If the number of weather-related

delays exceeds 20 days, the CMAR may be entitled to a commensurate extension of time and reimbursement of costs associated with the delay,

including Construction General Conditions Costs, in each case as may be agreed upon by the Owner and CMAR but subject to the requirements

of Article 5 of the General Conditions.

5.3.4

In the event delays to the Work are encountered for any reason, the CMAR shall provide prompt written notice to the Owner of the

cause of such delays, in any event within three (3) days after the delay occurs. Excusable delays shall be adjusted upon and subject

to the terms and conditions of Article 5 of the General Conditions.

5.3.5

A waiver of or failure by the Owner or Owner’s Representative to enforce any requirement in this Article 5 hereof or the requirements

of Article 5 of the General Conditions, including, without limitation, the requirements in Paragraph 5.3 thereof, in connection with

any or all past delays shall not constitute a waiver of, and shall not preclude the Owner or Owner’s Representative from enforcing

such requirements in connection with any present or future delays.

5.4 Liquidated

Damages

5.4.1

Substantial Completion. The Owner and the CMAR agree that this Agreement shall provide for the imposition of liquidated damages for

any CMAR delay not excused by Paragraph 5.3 hereof or elsewhere in this Agreement.

5.4.1.1

The CMAR agrees that if the Work of the Project is not Substantially Completed on or before the Substantial Completion Dates applicable

to the Project or related Bid Package, the CMAR shall pay the Owner as liquidated damages and not as a penalty, as follows:

i)

Part A Pump Stations 1, 3 and 5 - the sum of [***] per day for each day of unexcused delay past the Part A Substantial Completion Date

per each of the three pump stations not completed

ii)

Part B All other Work, the sum of [***] per day for each day of unexcused delay past the Part B Substantial Completion Date.

Mojave Groundwater Bank

NPL – Pump Stations 11

The

liquidated damages provided herein shall be the sole and exclusive remedy for any unexcused delay in the performance of CMAR’s

obligations hereunder and shall be in lieu of any and all other liability to the Owner for extra costs, losses, expenses, claims, penalties

and any other damages of whatever nature (whether actual, compensatory, direct, indirect, special, consequential, punitive, or otherwise)

incurred by the Owner and which are caused by any unexcused CMAR delay in timely achieving Substantial Completion on or before the Substantial

Completion Date. The Parties acknowledge and agree that it would be extremely difficult, if not impossible, to quantify the economic

loss incurred by the Owner as a result of such unexcused delay, that the liquidated damages contemplated herein are reasonable and represent

a fair approximation of the economic loss to be incurred by Owner as a result of such unexcused delay, and that such liquidated damages

shall be enforceable to the maximum extent permitted under Applicable Law.

ARTICLE

6 — Compensation

6.1 CMAR’s

Compensation for Preconstruction Phase Services

6.1.1

The Owner shall compensate CMAR for performance of the CMAR’s Preconstruction Phase Services outlined in Paragraph 2.1 hereof

on the following basis: Cost of the Work plus the CMAR’s fee. Such compensation shall be based on the direct personnel costs incurred

by CMAR and includes the direct salaries of the CMAR’s personnel providing Preconstruction Phase Services on the Project and CMAR’s

customary and mandatory contributions and benefits related thereto, such as employment taxes and other statutory employee benefits, insurance,

sick leave, holidays, vacations, employee retirement plans and similar contributions and, unless otherwise provided, includes all sales,

use, consumer, and other taxes mandated by applicable law, and appropriate fee applied to such costs.

6.2 CMAR

Compensation for Early Work(s) Package(s) – Not Used

6.3 CMAR’s

Compensation for Construction Phase Services

6.3.1

The Owner shall compensate the CMAR for Work performed and described in a Phase 2 Construction Price Amendment on the basis of a

Phase 2 Guaranteed Maximum Price, in each case as set forth in such Phase 2 Construction Price Amendment and General Conditions.

6.3.2

The Owner shall have the right to directly procure equipment and materials and assign any such purchase orders or contracts to the

CMAR, for the CMAR to administer. Any such equipment or materials to be directly procured by the Owner shall be listed on the Phase 2

Construction Price Amendment. In the case of Owner procured purchase orders and contracts, CMAR’s obligations to Owner shall be

limited to the terms negotiated and included in said contract by Owner.

6.3.3

Recognizing that there will be both contingencies and allowances applied throughout the GMP, Owner and CMAR agree to split any monies

remaining in the contingencies with 50% going to Owner and 50% going to CMAR. Any remaining monies in allowances will be returned, in

full, to Owner.

Mojave Groundwater Bank

NPL – Pump Stations 12

6.4 Hourly

Rates

6.4.1

Where Work or portions thereof performed by the CMAR for Preconstruction Phase Services is charged on an hourly rate basis, such

Work shall be subject to and completed in accordance with the CMAR’s hourly rate schedule attached hereto as Exhibit H and

incorporated herein by this reference and shall be inclusive of markup for overhead and profit. A separate hourly rate schedule for Construction

Phase Services shall be attached to the Phase 2 Construction Price Amendment upon Owner’s and CMAR’s mutual execution of

the same and shall be at cost without markup for overhead and profit.

6.5 Early

Completion Incentive

6.5.1

The Owner and CMAR agree that this Agreement shall provide for the payment of an early completion incentive for achieving substantially

complete facilities that are fully functional earlier than the Contract Completion Date.

6.5.1.1

The Owner agrees that if the Work of the Project is Substantially Completed and fully functional before the Substantial Completion

Date applicable to the Project or related Bid Package, the Owner shall pay the CMAR as an early completion incentive the sum of [***]

per day for each day prior to the Phase 2 Substantial Completion Date.

ARTICLE

7 — Changes

Changes

in the Work that are within the general scope of this Agreement shall be accomplished, without invalidating this Agreement, by Change

Order, Owner Change Directive, and Field Order, in each case in accordance with and subject to the terms and provisions of Article 7

of the General Conditions and any Phase 2 Construction Price Amendment executed in connection herewith for the Project.

ARTICLE

8 — Payment

Payments

for Preconstruction Phase Services shall be made monthly in proportion to services performed and accompanied by supporting documentation

unless otherwise agreed, in writing, by Owner and CMAR. Payments are due and payable within thirty (30) days of the CMAR’s request

for payment for those amounts that are not contested by the Owner. Uncontested amounts unpaid more than sixty (60) days after the invoice

date shall bear interest at the rate of 1.5% per month or the maximum allowed by California law, whichever is greater.

8.1

Payments for Construction Phase Services performed following

the execution of a Phase 2 Construction Price Amendment for the same shall be made in accordance with such Amendment and the General

Conditions.

Mojave Groundwater Bank

NPL – Pump Stations 13

ARTICLE

9 — Liability

9.1 Waiver

of Consequential Damages

Except

for (a) damages mutually agreed upon by the Parties as liquidated damages in Paragraph 5.4 hereof, and (b) subject to the following provisions

set forth in this Paragraph 9.1, notwithstanding anything else herein to the contrary, the Owner and the CMAR agree to waive all claims

against each other for any consequential or other special damages that may arise out of or relate to this agreement. The Owner agrees

to waive consequential or other special damages including, but not limited to, the Owner’s loss of use of the Project, any rental

expenses incurred, loss of tax abatements or credits, cost of substitute facilities or services, cost of purchased or replacement product

or claims from customers or suppliers of Owner, loss of income, profit, or revenue related to the Project, as well as the loss of business,

opportunity, loss of financing, principal office overhead and expenses, loss of profits not related to this Project, loss of reputation

or goodwill and/or insolvency regardless of whether any of the foregoing are found to be direct or indirect. The CMAR agrees to waive

consequential damages including, but not limited to, loss of business, loss of financing, loss of profits not related to this Project,

loss of bonding capacity, loss of reputation and / or insolvency. The provisions of this paragraph shall also apply to the termination

of this Agreement and shall survive such termination.

9.2 CMAR’s

Limitation of Liability

Notwithstanding

anything to the contrary contained herein or in the other Contract Documents, the maximum liability, in the aggregate, of the CMAR, its

Subcontractors, sureties (if any) and their respective officers, directors, shareholders, employees, agents, successors and assigns to

Owner and anyone claiming by, through, or under Owner for any loss, damage, suit, action, liability, claim, or expense caused by, resulting

from, or arising out of or relating in any way to this Agreement or the Project from any cause whatsoever, including, without limitation,

the negligence, breach of contract, strict liability, express or implied warranty, indemnity, professional errors or omissions, or any

other cause arising at law or in equity, shall in all events be limited to and not exceed 50% of the Phase 2 Construction Price. This

limitation has been freely bargained for by the Parties for valuable consideration and shall be enforceable to the maximum extent permitted

by applicable law.

9.3 Releases,

Waivers and Remedies

Releases,

waivers, and limitations on liability and remedies expressed in the Contract Documents shall apply even in the event of the fault, tort

(including negligence), strict liability, breach of contract or warranty, or other basis of liability of the benefited Party, except

to the extent caused by intentional, reckless, or grossly negligent conduct, and shall extend to and benefit the Subcontractors, agents,

employees, officers, directors, assignees, affiliates, and vendors and each of their respective Subcontractors, agents, employees, officers,

directors, assignees, affiliates, and vendors of each Party.

Mojave Groundwater Bank

NPL – Pump Stations 14

ARTICLE

10 — Dispute Mitigation and Resolution

10.1 Claims

Procedures

Claims

procedures are governed by Article 11 of the General Conditions.

10.2 Preconstruction

Phase Services

If,

during the Preconstruction Phase Services the Parties cannot reach resolution on a matter relating to or arising out of the Agreement,

the Parties shall endeavor to reach resolution through good faith direct discussions between the Parties’ representatives, who

shall possess the necessary authority to resolve such matter and who shall record the date of first discussions. If the Parties’

representatives are not able to resolve such matter within five (5) business days from the date of first discussion, the Parties’

representatives shall immediately inform senior executives of the Parties in writing that resolution was not affected. Upon receipt of

such notice, the senior executives of the Parties shall meet within five (5) business days to endeavor to reach resolution. If the dispute

remains unresolved after fifteen (15) days from the date of first discussion, the Parties shall submit such matter to the mediation procedures

identified in Paragraph 11.2.2 of the General Conditions as a condition precedent to any judicial forum or voluntary binding alternative

dispute resolution proceeding subsequently agreed to by the Parties.

10.3 Construction

Phase Services

During

the Construction Phase Services, the Parties shall resolve any disputes between them in accordance with the dispute mitigation and resolution

procedures selected by them in Article 11 of the General Conditions.

ARTICLE

11 — Miscellaneous Provisions

11.1 Governing

Law

This

Agreement shall be governed by the laws of the State of California.

11.2 Severability

The

partial or complete invalidity of any one or more provisions of this Agreement shall not affect the validity or continuing force and

effect of any other provision.

11.3 No

Waiver of Performance

The

failure of either Party to insist, in any one or more instances, on the performance of any of the terms, covenants, or conditions of

this Agreement, or to exercise any of its rights, shall not be construed as a waiver or relinquishment of such term, covenant, condition,

or right with respect to further performance or any other term, covenant, condition, or right.

Mojave Groundwater Bank

NPL – Pump Stations 15

11.4 Titles

and Groupings

The

titles given to the articles of this Agreement are for ease of reference only and shall not be relied upon or cited for any other purpose.

The grouping of the articles in this Agreement and of the Owner’s Specifications under the various headings is solely for the purpose

of convenient organization and in no event shall the grouping of provisions, the use of paragraphs, or the use of headings be construed

to limit or alter the meaning of any provisions.

11.5 Joint

Drafting

The

Parties expressly agree that this Agreement was jointly drafted, and that both had opportunity to negotiate its terms and to obtain the

assistance of counsel in reviewing its terms prior to execution. Therefore, this Agreement shall be construed neither against nor in

favor of either Party but shall be construed in a neutral manner.

11.6 Federal

Financial Assistance.

There

are currently no Federal Financial Assistance provisions in place relative to the Project. If these funds, or those of a similar nature,

become available to the Project, the CMAR shall work with the Owner to make such modifications to the Agreement such the Project remains

qualified to receive the funds.

11.7 Counterparts;

Electronic Signatures

This

Agreement, the General Conditions, and other Contract Documents may be executed in counterparts, each of which shall be deemed an original

and all of which taken together shall constitute one and the same instrument. Facsimile or electronic signatures on this Agreement and/or

the other Contract Documents, as applicable, shall be deemed originals for all purposes.

11.8 Attorneys’

Fees

In

the event of any claim, controversy, or dispute involving this Agreement, the Parties’ performance hereunder or interpretation

hereof, the substantially prevailing Party in such claim, controversy, or dispute shall be awarded its reasonable attorneys’ fees

and costs, including attorneys’ fees and costs of any associated appeal.

11.9 Exhibits,

Schedules, and Addenda

Exhibits,

schedules, and addenda bearing on the payment and performance of the Construction Phase Services will be attached to the Phase 2 Construction

Price Amendment for such Construction Phase Services. The following exhibits pertaining to the Preconstruction Phase Services are attached

hereto and incorporated herein by this reference:

Exhibit A

General Conditions to Agreement

Exhibit A.1

Insurance Requirements

Mojave Groundwater Bank

NPL – Pump Stations 16

Exhibit A.2

Performance Bond and Payment Bond

Exhibit B

CMAR Phase I Preconstruction Scope of Services

Exhibit C

Phase I Notice to Proceed

Exhibit D

Phase I Early Work(S) Package(S) Not Used

Exhibit D.1

Phase I Early Work(S) Package(S) Amendment Form Not

Used

Exhibit E

Phase 2 Construction Price

Exhibit F

Initial Schedule of Work

Exhibit G

Project Technical Scheduling Requirements

Exhibit H

Preconstruction Phase Services

Hourly Rate Schedule

Exhibit I

Project Technical Performance Requirements –

Not Used

Exhibit J

Project Labor and Vendor Requirements

11.10 Other

Provisions

None

Mojave Groundwater Bank

NPL – Pump Stations 17

This

Agreement is entered into as of the date entered in Article 1.

OWNER

Fenner

Gap Mutual Water Company

BY:

/s/

Susan Kennedy

PRINT NAME

Susan Kennedy

PRINT TITLE

Chief Executive Officer

CONSTRUCTION

MANAGER AT-RISK (CMAR)

W.M.

Lyles Co.

BY:

/s/

Grant Gourley

PRINT NAME

Grant Gourley

PRINT TITLE

Senior Vice President / COO

Mojave Groundwater Bank

NPL – Pump Stations 18

Exhibit

A—General Conditions to Agreement

Mojave Groundwater Bank

NPL – Pump Stations 19

Mojave

Water Bank

Northern

Pipeline

Facilities

Construction

CONSTRUCTION

MANAGEMENT

AT-RISK

(CMAR)

Exhibit

A – General Conditions

to

Amended Agreement

Mojave Groundwater Bank

NPL – Pump Stations

CONTENTS

ARTICLE 1 — General Provisions

4

ARTICLE 2 — CMAR Preconstruction Phase and

Construction Phase Responsibilities

6

ARTICLE 3 — Owner’s Responsibilities

18

ARTICLE 4 — Subcontracts

20

ARTICLE 5 — Time

21

ARTICLE 6 — Compensation

25

ARTICLE 7 — Changes

26

ARTICLE 8 — Payment

27

ARTICLE 9 — Indemnity, Insurance, Waivers,

and Bonds

32

ARTICLE 10 — Suspension, Notice to Cure, and

Termination of the Agreement

34

ARTICLE 11 — Claims, Claims Procedures, Dispute

Mitigation, and Resolution

37

ARTICLE 12 — Miscellaneous Provisions

41

Mojave Groundwater Bank

NPL – Pump Stations ii

Mojave

Water Bank

Northern

Pipeline Facilities Construction

General

Conditions to Amended Agreement Effective as of

July

27, 2026 (“Amended Agreement”)

Between

OWNER

Owner:

Fenner Gap Mutual Water Company

Address:

[***]

and

the

CONSTRUCTION

MANAGER AT-RISK (CMAR):

Company:

W. M. Lyles Co.

Address:

[***]

for

services in connection with the following Project:

PROJECT

NO.: 20-001

PROJECT NAME:

MOJAVE WATER BANK PROJECT

NORTHERN PIPELINE FACILITIES CONSTRUCTION

PROJECT

LOCATION: CADIZ, CALIFORNIA

In

which Stantec is the Engineer (“Engineer”).

Capitalized

terms used herein but not defined herein shall have the meanings given them in the Agreement, Phase II Construction Price Amendment,

and other Contract Documents.

Mojave Groundwater Bank

NPL – Pump Stations 3

ARTICLE

1— General Provisions

1.1 Contract;

Order of Precedence

The

Contract Documents are enumerated in the Agreement and consist of the Agreement, Conditions of the Contract (General, Supplementary,

and other Conditions), Drawings, Specifications, addenda issued prior to execution of the Agreement, the CMAR’s proposal, other

documents or exhibits listed in or attached to the Agreement, and Modifications issued after execution of the Agreement. A “Modification”

is (a) a written amendment to the Agreement signed by both the Owner and the CMAR (each a “Party” and collectively, the “Parties”),

(b) a Change Order, (c) an Owner Change Directive, or (d) a written order for a minor change in the Work issued by the Engineer. Unless

specifically enumerated in the Agreement, the Contract Documents do not include the advertisement or invitation to bid, instructions

to bidders, sample forms, other information furnished by the Owner in anticipation of receiving bids or proposals, or portions of addenda

relating to bidding or proposal requirements. Conflicts, ambiguities, or inconsistencies between or amongst the Contract Documents are

governed by and subject to the order of precedence set forth in Paragraph 1.1.5 hereof.

1.1.1

The Drawings and Specifications are complementary. If Work is shown only on one but not on the other, the CMAR shall perform the

Work as though fully described on both, in all cases consistent with the Contract Documents.

1.1.2

In case of conflicts or inconsistencies between the Drawings and Specifications, the Owner and the CMAR shall attempt to resolve

the conflict or inconsistency through mutual and good faith discussions and if the Parties are unable to resolve the matter in a mutually

satisfactory manner, the CMAR shall be entitled to submit a Claim in accordance with Article 11 hereof for the increased cost and time

caused by or resulting from such conflict or inconsistency.

1.1.3

Where figures are given, they shall be preferred to scaled dimensions.

1.1.4

Any terms that have well-known technical or trade meanings, unless otherwise specifically defined in the Agreement or these General

Conditions, shall be interpreted in accordance with their well-known meanings.

1.1.5

In the event of a conflict between provisions of any of the Contract Documents which cannot be resolved by giving effect to both

provisions, the order of precedence of the Contract Documents in descending order, shall be as follows:

1.1.5.1

Amendments and Change Orders, with precedence of amendments and Change Orders in reverse order of execution;

1.1.5.2

The Agreement, including all exhibits thereto; in event of a conflict between the body of the Agreement and (or between) Agreement

exhibits which cannot be resolved by giving effect to both provisions, the order of precedence shall be the body of the Agreement followed

by the exhibits in the order they are attached to the body of the Agreement, with precedence of such exhibits given in the order in which

they are attached to the Agreement;

1.1.5.3

These General Conditions;

Mojave Groundwater Bank

NPL – Pump Stations 4

1.1.5.4

Drawings and Specifications; and

1.1.5.5

Notice to Proceed.

If

any provision of the Agreement conflicts with or is inconsistent with any other provision of other Contract Documents, the provisions

of the Agreement govern, unless the other provision specifically refers to the provision it supersedes and replaces it in the Agreement

or unless otherwise superseded by the order of precedence set forth above in this Paragraph 1.1.5.

1.1.6

The Agreement and other Contract Documents are solely for the benefit of the Owner and the CMAR except to the extent expressly provided

in the Agreement, represents the entire and integrated agreement between such Parties, and supersedes all prior negotiations, representations,

or agreements, either written or oral.

1.2 Relationship

of Parties

The

Owner and the CMAR agree to proceed with the Project based on mutual trust, good faith, and fair dealing.

1.2.1

The CMAR shall furnish preconstruction, construction, administration, and management services and use the CMAR’s reasonable

efforts to perform the Work in an expeditious manner consistent with the Contract Documents. The Owner and CMAR shall endeavor to promote

harmony and cooperation among all Project participants.

1.2.2

The CMAR represents that it is an independent contractor and that in its performance of the Work it shall act as an independent contractor.

1.2.3

Neither the CMAR nor any of its agents or employees shall act on behalf of or in the name of the Owner except as provided in the

Agreement unless authorized in writing by the Owner’s Representative.

1.2.4

The Owner’s Representative shall possess full authority to give instructions from the Owner and shall be able to issue directions

and Change Orders to the CMAR.

1.2.5

The CMAR Representative shall possess full authority to receive instructions from the Owner and to act on those instructions. The

CMAR shall notify the Owner in writing of a change in the designation of the CMAR Representative. Upon such notice, the Owner will have

five (5) Business Days to approve or reject the change in designation. Should the Owner reject the CMAR Representative, the CMAR and

Owner shall meet within five (5) Business Days to decide on who will serve as the CMAR Representative.

1.2.6

The Owner and the CMAR shall perform their obligations with integrity, ensuring, at a minimum, that:

1.2.6.1

Conflicts of interest shall be avoided or disclosed promptly to the other Party; and

1.2.6.2

The Owner and the CMAR warrant that they have not and shall not pay nor receive any contingent fees or gratuities to or from the

other Party, including their agents, officers, and employees, Subconsultants, or Others from whom they may be liable, to secure preferential

treatment.

Mojave Groundwater Bank

NPL – Pump Stations 5

1.3 Engineer

The

Owner, through its Engineer, shall provide all engineering and other design services necessary for the completion of the Work. The Owner

shall obtain from the Engineer either a license for the CMAR and Subcontractors to use the design documents prepared by the Engineer

or ownership of the copyrights for such design documents, and shall indemnify, defend, and hold harmless the CMAR against any suits or

claims of infringement of any copyrights or licenses arising out of the use of the design documents except if used by the CMAR or any

other entity on work not contemplated by this Agreement or work outside the Project.

ARTICLE

2 — CMAR Preconstruction Phase and Construction Phase Responsibilities

2.1 General

Responsibilities

2.1.1

The CMAR shall provide all labor, materials, equipment, and services necessary to complete the Work, all of which shall be provided

in full accord and consistent with the Contract Documents.

2.1.2

The CMAR shall be responsible for the supervision and coordination of the Work, including the construction means, methods, techniques,

sequences, and procedures used, unless the Contract Documents give other specific instructions. In such case, the CMAR shall not be liable

to the Owner for damages resulting from compliance with such instructions unless the CMAR recognized and failed to timely report to the

Owner any error, inconsistency, omission, or unsafe practice that it discovered in the specified construction means, methods, techniques,

sequences, or procedures. The CMAR shall not be required to provide professional services which constitute the practice of architecture

or engineering except as otherwise provided in Subparagraph 2.1.6 nor shall the CMAR be liable for professional services rendered by

or design documents prepared by the Engineer or any of its consultants or subconsultants at any tier. The CMAR shall be entitled to rely

upon the adequacy, accuracy, and completeness of all design, engineering, and other consulting services provided by the Engineer and

its consultants and subconsultants at all tiers and/or other consultants retained directly or indirectly by the Owner. The CMAR shall

have no liability to the Owner or any other Party for the failure of any Drawings, Specifications, or other design or engineering produced

by Others to be adequate, correct, complete, and free from defect for any purpose or to comply with Applicable Law, all of which shall

remain the responsibility of the Engineer.

2.1.3

The CMAR shall perform Work only within locations allowed by the Contract Documents, applicable permits, and Applicable Law.

2.1.4

The CMAR and its Subcontractors shall review and compare each of the Contract Documents with the others and with information furnished

or made available by Owner and shall, subject to limitations set forth in Subparagraph 2.1.2 hereof, promptly report in writing to Owner’s

Representative any errors, inconsistencies, or omissions it discovers in the Contract Documents or inconsistencies it discovers with

Applicable Law observed by the CMAR or its Subcontractors. The CMAR and its Subcontractors shall take field measurements, verify field

conditions, and compare with the Contract Documents with such field measurements and conditions before commencing any of the Work. The

observations and measurements are for the purpose of facilitating coordination and construction by the CMAR and are not for the purpose

of discovering errors, omissions, or inconsistencies in the Contract Documents; however, they are opportunities for the CMAR to identify

any readily observable or potential errors, omissions, or inconsistencies in the Contract Documents. Readily observable errors, inconsistencies,

or omissions discovered by the CMAR shall be promptly reported in writing to Owner’s Representative. The CMAR maintains responsibility

for losses, including the costs of correcting Defective Work involving an error, inconsistency, or omission by the CMAR and/or its Subcontractors

which are caused by or are attributable to the CMAR, but the CMAR does not have responsibility for losses arising from design or engineering

errors or omissions and it is recognized that the CMAR’s review, observations, and measurements are made in the CMAR’s capacity

as a construction manager and not as a licensed design or engineering professional.

Mojave Groundwater Bank

NPL – Pump Stations 6

2.1.5

Worksite Visit. The CMAR acknowledges that it has visited, or has had the opportunity to visit, the Worksite to visually inspect

the general and local conditions which could affect the Work and, during the Preconstruction Phase, has participated in Owner/Engineer

work sessions and provided input and feedback to the Owner and Engineer on the design and engineering of the Project, both from a constructability

and a budgeting and cost-trending analysis standpoint. The CMAR will advise the Owner if it requires additional visits to increase its

familiarity with the general and local conditions of the Worksite which may impact the Work.

2.1.6

Professional Services. The CMAR may be required to procure professional services to carry out its responsibilities for construction

means, methods, techniques, sequences, and procedures or as such services are specifically called for by the Contract Documents. The

CMAR shall obtain these professional services and any design certifications required from licensed design professionals. All Drawings,

Specifications, calculations, certifications, and submittals prepared by such design professionals shall bear the signature and seal

of such design professionals and the Owner and the Engineer shall be entitled to rely upon the adequacy, accuracy, and completeness of

such design services. If professional services are specifically required by the Contract Documents, the Owner, through the Engineer,

shall indicate all required performance and design criteria. The CMAR shall not be responsible for the adequacy of such performance and

design criteria. The CMAR shall not be required to provide such services in violation of Applicable Law in the jurisdiction where the

Project is located. Should the CMAR refuse to provide services based on the inadequacy of design criteria or because of a violation of

existing Applicable Law, the CMAR shall provide notice and an explanation to Owner within five (5) Business Days of the CMAR becoming

aware of the issue. The CMAR shall work with Owner to mitigate the issue.

2.2 Preconstruction

Phase Services

The

CMAR’s Scope of Work responsibilities include the Preconstruction Phase Services defined and described in the Agreement. The CMAR

shall perform such Preconstruction Phase Services at the time, in the manner, and for the Fee set forth in Article 2 of the Agreement.

Unless otherwise mutually agreed in writing by the Owner and the CMAR, such Preconstruction Phase Services do not require or obligate

the CMAR to generate or produce any design or engineering for the Project but will require the CMAR to participate in Owner/Engineer

work sessions and provide input and feedback to the Owner and Engineer on the design and engineering of the Project from a constructability,

budgeting, schedule, and cost- trending analysis standpoint. The CMAR, when providing input and feedback, shall not be responsible or

liable for any design or engineering related work or services. However, the CMAR shall be responsible for any temporary works or related

construction engineering necessary to implement the construction of the Project.

Mojave Groundwater Bank

NPL – Pump Stations 7

2.3 Construction

Phase Services

2.3.1

Commencement. Unless otherwise provided to the contrary elsewhere in this Agreement or the other Contract Documents, the CMAR’s

Construction Phase Services shall commence upon execution of a Phase 2 Construction Price Amendment for the Project or specific Bid Package

or other portion of the Work.

2.3.2

Coordination. The CMAR shall supervise, coordinate, and direct the Work using the CMAR’s ordinary skill and attention. Subject

to Subparagraph 2.1.2, the CMAR shall be solely responsible for and have control over construction means, methods, techniques, sequences,

procedures, and the coordination of all portions of the Work. The CMAR shall manage and administer all phases of construction activities

to achieve the completion of all Work within the requirements of the Contract Documents. The CMAR shall coordinate the Work of its Subcontractors

and Material Suppliers to optimize efficiency and minimize conflict and interference between the various Subcontractors on-site or with

any other contractors who may be working at the site concurrently. It is recognized, however, that the CMAR is not acting in the capacity

of a licensed design professional, and that the CMAR’s examination is to facilitate construction and does not create an affirmative

responsibility to detect errors, omissions, or inconsistencies in the design Drawings or plans created by the Engineer or to ascertain

from the design Drawings or plans created by the Engineer compliance with Applicable Laws. The CMAR does not have an affirmative responsibility

to detect errors or omissions by the Engineer.

2.3.3

Cost Reporting. The CMAR shall keep such full and detailed accounts as are necessary for proper financial management under this Agreement.

The CMAR shall maintain a complete set of all books and records prepared or used by the CMAR with respect to the Project. The CMAR’s

records supporting its performance and billings under this Agreement shall be current, complete, and accurately maintained. The Owner

shall be afforded access to all the CMAR’s records, books, correspondence, instructions, Drawings, receipts, vouchers, memoranda,

and similar data relating to this Agreement. The CMAR shall preserve all such records for a period of three years after the Final Payment

in accordance with Paragraph 8.9 hereof or longer where required by law.

2.3.4

Construction Personnel and Supervision

2.3.4.1

The CMAR shall provide competent supervision for the performance of the Work. Before commencing the Work, the CMAR shall notify the

Owner in writing of the name and qualifications of its proposed superintendent(s) and project manager so the Owner may review the individual’s

qualifications. If, for reasonable cause, the Owner refuses to approve the individual, or withdraws its approval after once giving it,

the CMAR shall name a different superintendent for the Owner’s review. Any disapproved superintendent shall not perform in that

capacity thereafter at the Worksite.

2.3.4.2

The CMAR shall be responsible to the Owner for acts or omissions of Parties or entities performing portions of the Work for or on

behalf of the CMAR or any of its Subcontractors and Material Suppliers.

Mojave Groundwater Bank

NPL – Pump Stations 8

2.3.4.3

The CMAR shall permit only fit and ordinarily skilled persons to perform the Work. The CMAR shall enforce safety procedures, discipline,

and good order among persons performing the Work. If the Owner reasonably determines that a particular person does not follow safety

procedures, or is unfit or unskilled for the assigned Work, the CMAR shall immediately reassign the person on receipt of the Owner’s

written notice to do so.

2.3.5

Submittals

2.3.5.1

The CMAR shall be responsible to the Owner for the accuracy and conformity of its submittals to the Contract Documents. The CMAR

shall prepare and deliver its submittals to the Owner and Engineer in such time and sequence so as not to delay the performance of the

Work or the work of the Owner and Others. When the CMAR delivers its submittals to the Owner, the CMAR shall identify in writing for

each submittal all changes, deviations, or substitutions from the requirements of the Contract Documents. The review and approval of

any CMAR submittal shall not be deemed to authorize changes, deviations, or substitutions from the requirements of the Contract Documents

unless express written approval is obtained from the Owner specifically authorizing such deviation, substitution, or change. To the extent

a change, deviation or substitution causes an impact to the Phase 2 Construction Price or Contract Time, such approval shall be promptly

memorialized in a Change Order. Further, the Owner shall not make any change, deviation, or substitution through the submittal process

without specifically identifying and authorizing such deviation to the CMAR. If the Contract Documents do not contain submittal requirements

pertaining to the Work, the CMAR agrees upon request to submit in a timely fashion to the Owner for review and approval any submittals,

samples, product data, manufacturers’ literature, or similar submittals as may reasonably be required by the Owner.

2.3.5.2

The CMAR shall perform all Work strictly in accordance with approved submittals. Approval does not relieve the CMAR from responsibility

for Defective Work resulting from errors or omissions of any kind on the approved submittals.

2.3.5.3

Record copies of the following, incorporating field changes and selections made during construction, shall be maintained at the Worksite

and available to the Owner upon request: Drawings, Specifications, addenda, and other Modifications, and required submittals including

product data, samples, and shop drawings.

2.3.5.4

No substitutions shall be made in the Work unless permitted in the Contract Documents and then only after the CMAR obtains all approvals

required under the Contract Documents for substitutions. All such substitutions shall be memorialized promptly by written approval by

the Owner no later than seven (7) days following the Owner’s receipt of a written request for approval thereof. If required, the

CMAR will prepare a Change Order request within seven (7) days following approval by the Owner and, if applicable, provide for an adjustment

in the Phase 2 Construction Price or Contract Time.

2.3.5.5

The CMAR shall prepare and submit to the Owner updated electronic data, in accordance with Subparagraph 3.8.1.

Mojave Groundwater Bank

NPL – Pump Stations 9

2.3.6

Cooperation with Work of Owners and Others

2.3.6.1

The Owner may perform work at the Worksite directly or by Others. Any agreements with Others to perform construction or operations

related to the Project shall include provisions pertaining to insurance, indemnification, waiver of subrogation, coordination, interference,

cleanup, and safety which are substantively the same as the corresponding provisions of this Agreement.

2.3.6.2

If the Owner elects to perform work at the Worksite directly or by Others, the CMAR and Owner shall coordinate the activities of

all forces at the Worksite and agree upon fair and reasonable schedules and operational procedures for Worksite activities. The Owner

shall require each separate contractor to cooperate with the CMAR and assist with the coordination of activities and the review of construction

schedules and operations. The Phase 2 Construction Price or the Date of Substantial Completion or the Date of Final Completion may be

equitably adjusted, as mutually agreed by the Parties, for changes made necessary by the coordination of construction activities, and

the Schedule of the Work shall be revised accordingly. The CMAR, Owner, and Others shall adhere to the revised Schedule of the Work until

it may subsequently be revised.

2.3.6.3

With regard to the work of the Owner and Others, the CMAR shall (a) proceed with the Work in a manner which does not hinder, delay,

or interfere with the work of the Owner or Others or cause the work of the Owner or Others to become defective, (b) afford the Owner

or Others reasonable access for introduction and storage of their materials and equipment and performance of their activities, and (c)

coordinate the CMAR’s construction and operations with theirs as required by Subparagraph 2.3.6.2.

2.3.6.4

Before proceeding with any portion of the Work affected by the construction or operations of the Owner or Others, the CMAR shall

visually examine such work performed by the Owner or Others and give the Owner prompt, written notification of any defects the CMAR discovers

therein of their work which will prevent the proper execution of the Work. The CMAR’s obligations in this Subparagraph 2.3.6.4

do not create a responsibility for the work of Others but are for the purpose of facilitating the Work. If the CMAR does not notify the

Owner of patent defects interfering with the performance of the Work, the CMAR acknowledges that to the CMAR’s reasonable knowledge

at the time, the work of the Owner or Others is not defective and is acceptable for the proper execution of the Work. Following receipt

of written notice from the CMAR of defects, the Owner shall promptly inform the CMAR what action, if any, the CMAR shall take regarding

the defects.

2.3.7

Cutting, Fitting, and Patching

2.3.7.1

The CMAR shall perform cutting, fitting, and patching necessary to coordinate the various parts of the Work and to prepare its Work

for the work of the Owner or Others, if within the CMAR’s Scope of Services.

2.3.7.2

Cutting, patching, or altering the work of the Owner or Others shall be done with the prior written approval of the Owner. Such approval

shall not be unreasonably withheld.

Mojave Groundwater Bank

NPL – Pump Stations 10

2.3.8

Cleaning Up

2.3.8.1

The CMAR shall regularly remove debris and waste materials at the Worksite resulting from the Work. Prior to discontinuing Work in

an area, the CMAR shall clean the area and remove all rubbish and its construction equipment, tools, machinery, waste, and surplus materials.

The CMAR shall minimize and confine dust and debris resulting from construction activities. At the completion of the Work, the CMAR shall

remove from the Worksite all construction equipment, tools, surplus materials, waste materials, and debris created by the CMAR and its

Subcontractors.

2.3.8.2

If the CMAR fails to commence compliance with cleanup duties within two (2) Business Days after written notification from the Owner of

noncompliance, the Owner may implement appropriate cleanup measures without further notice and the cost shall be deducted from any amounts

due or to become due the CMAR in the next payment period.

2.3.9

Access to Work. The CMAR shall facilitate the access of the Owner, its Engineer, and Others to Work in progress. The Owner, Engineer,

and Others shall follow safety protocols in effect and in compliance with OSHA.

2.3.10

Materials Furnished by the Owner or Others

2.3.10.1

In the event the Work includes installation of materials or equipment furnished by the Owner or Others, it shall be the responsibility

of the CMAR to visually examine the items so provided and thereupon handle, store, and install the items, unless otherwise provided in

the Contract Documents, with such skill and care as to provide a satisfactory and proper installation. Loss or damage due to acts or

omissions of the CMAR shall be the responsibility of the CMAR and may be deducted from any amounts due or to become due the CMAR. Any

defects discovered in such materials or equipment shall be reported at once to the Owner. Following receipt of written notice from the

CMAR of defects, the Owner shall promptly inform the CMAR what action, if any, the CMAR shall take regarding the defects.

2.3.11

Tests and Inspections

2.3.11.1

The CMAR shall schedule all required tests, approvals, and inspections of the Work or portions thereof at appropriate times so as

not to delay the progress of the Work or other Work related to the Project. The CMAR shall give proper notice to all required Parties

of such tests, approvals, and inspections. If feasible, the Owner and Others may timely observe the tests at the normal place of testing.

Except as provided in Subparagraph 2.3.11.3 below or unless otherwise required by the Contract Documents, the Owner shall bear all expenses

associated with tests, inspections, and approvals required by the Contract Documents which, unless otherwise agreed to, shall be conducted

by an independent testing laboratory or entity retained by the Owner. Unless otherwise required by the Contract Documents, required certificates

of testing, approval, or inspection shall be secured by the CMAR and promptly delivered to the Owner.

2.3.11.2

If the Owner or appropriate authorities determine that tests, inspections, or approvals in addition to those required by the Contract

Documents will be necessary, the CMAR shall arrange for the procedures and give timely notice to the Owner and Others who may observe

the procedures. Costs of the additional tests, inspections, or approvals are at the Owner’s expense except as provided in Subparagraph

2.3.11.3.

Mojave Groundwater Bank

NPL – Pump Stations 11

2.3.11.3

If the procedures described in Subparagraph 2.3.11.1 and 2.3.11.2 indicate that portions of the Work fail to comply with the Contract

Documents due to the negligence of the CMAR, the CMAR shall be responsible for costs of correction and retesting.

2.4 Warranty

2.4.1

The CMAR warrants that all materials and equipment furnished under the Construction Phase of this Agreement will be new unless otherwise

specified, of good quality, and in conformance with the Specifications set forth in the Contract Documents. The CMAR further warrants

that the Work shall be free from defects in materials and workmanship not intrinsic in the design or materials required in the Contract

Documents. The CMAR’s warranty does not include remedies for defects or damages caused by normal wear and tear during normal usage,

use, or operation for a purpose for which the Project was not intended, improper or insufficient maintenance, inadequate, incomplete,

or defective design, modifications performed by the Owner or Others, or abuse. The CMAR’s warranty pursuant to this Subparagraph

2.4.1 shall commence on the earlier of (a) the Date of Substantial Completion of the Work or the designated portion as agreed to by the

Owner and the CMAR, and (b) the date the Owner takes beneficial use of the Work or designated portion of the Work as agreed to by the

Owner and the CMAR.

2.4.2

The CMAR shall use commercially reasonable efforts to obtain from its Subcontractors and Material Suppliers any special or extended

warranties expressly required by the Contract Documents, and if any such special or extended warranty cannot be obtained, the CMAR shall

provide notice to the Owner and must obtain the Owner’s consent prior to contracting with any Subcontractor or Material Supplier

who cannot provide a special or extended warranty provided by the Contract Documents. The CMAR’s liability for such warranties

shall be limited to the one-year correction period referred to in Subparagraph 2.5. After that period, the CMAR shall assign them to

the Owner and provide reasonable assistance to the Owner in enforcing the obligations of Subcontractors and Material Suppliers.

2.5 Correction

of Defective Work

2.5.1

If prior to Substantial Completion and within one year after the date of Substantial Completion of the Work any Defective Work is

found, the Owner shall promptly notify the CMAR in writing. Unless the Owner provides written acceptance of the condition, the CMAR shall

promptly correct the Defective Work. If the Owner discovers a defect, the Owner shall notify the CMAR within five (5) Business Days of

the date of discovery. Work that is found not to conform to the requirements of the Agreement prior to Substantial Completion but does

not prevent achievement of Substantial Completion may be corrected prior to Final Completion.

2.5.2

If the CMAR fails to correct Defective Work within a mutually agreed time after receipt of written notice from the Owner prior to

Final Payment, the Owner may correct it in accordance with the Owner’s right to carry out the Work in Subparagraph 10.2.3. In such

case, an appropriate Change Order shall be issued deducting the cost of correcting such deficiencies from payments then or thereafter

due the CMAR. If payments then or thereafter due the CMAR are not sufficient to cover such amounts, the CMAR shall pay the difference

to the Owner.

Mojave Groundwater Bank

NPL – Pump Stations 12

2.5.3

If after the one-year correction period but before the periods of limitations and repose applicable to the Work in the jurisdiction

in which the Project is located have run the Owner discovers any Defective Work, the Owner shall, unless the Defective Work requires

emergency correction, promptly notify the CMAR. If the CMAR elects to correct the Work, it shall provide written notice of such intent

within fourteen (14) days of its receipt of notice from the Owner. The CMAR shall complete the correction of Work within a mutually agreed

time frame. If the CMAR does not elect to correct the Work, the Owner may have the Work corrected by itself or Others and charge the

CMAR for the reasonable cost of the correction. The Owner shall provide the CMAR with an accounting of correction costs it incurs.

2.5.4

If the CMAR’s correction or removal of Defective Work causes damage to or destroys other completed or partially completed Work

or existing building, the CMAR shall be responsible for the cost of correcting the destroyed or damaged property.

2.5.5

The one-year period for correction of Defective Work does not constitute a limitation period with respect to the enforcement of the

CMAR’s other obligations under the Contract Documents.

2.5.6

Prior to Final Payment, at the Owner’s option and with the CMAR’s agreement, the Owner may elect to accept Defective

Work rather than require its removal and correction. In such cases, the Phase 2 Construction Price may be equitably adjusted for any

diminution in the value of the Project, if any, caused by such Defective Work.

2.6 Correction

of Covered Work

2.6.1

On request of the Owner, Work that has been covered without a requirement that it be inspected prior to being covered may be uncovered

for the Owner’s inspection. The Owner shall pay for the costs of uncovering and replacement if the Work proves to be in conformance

with the Contract Documents, or if the defective condition was caused by the Owner or Others and the CMAR shall be entitled to a Change

Order adjusting the Contract Time and/or the Phase 2 Construction Price for any resulting delay or added cost. If the uncovered Work

proves to be defective, the CMAR shall pay the costs of uncovering and replacement and will not receive an adjustment to the contract

time.

2.6.2

If a portion of the Work is covered, contrary to specific requirements in the Contract Documents or contrary to a specific request

from the Owner, the Owner, by written request, may require the CMAR to uncover the Work, at a mutually convenient time, for the Owner’s

observation. In this circumstance, the Work shall be replaced at the CMAR’s expense and with no adjustment to the Contract Time.

2.6.3

The CMAR is required to correct in a timely fashion any Work rejected by the Owner which fails to comply with the Contract Documents

prior to the commencement of the warranty period(s) or during the correction period(s) established under Paragraph 2.5. The CMAR shall

correct at its own cost and time and bear the expense of additional services required for correction of any Defective Work for which

it is responsible.

2.7 Safety

of Persons and Property

2.7.1

Safety Precautions and Programs. The CMAR shall have overall responsibility for safety precautions and programs in the performance

of the Work. While this Paragraph 2.7 establishes the responsibility for safety between the Owner and CMAR, it does not relieve the Engineer

or Subcontractors of their responsibility for the safety of persons or property in the performance of their Work, nor for compliance

with the provisions of Applicable Laws.

Mojave Groundwater Bank

NPL – Pump Stations 13

2.7.2

The CMAR shall seek to avoid injury, loss, or damage to persons or property by taking reasonable steps to protect:

2.7.2.1

Its employees and other persons at the Worksite;

2.7.2.2

Materials and equipment stored at on-site or off-site locations for use in the Work; and

2.7.2.3

Property located at the Worksite and adjacent to Work areas, whether the property is part of the Work.

2.7.3

CMAR’s Safety Representative. The CMAR shall designate an individual at the Worksite in the employ of the CMAR who shall act

as the CMAR’s authorized safety representative with a duty to prevent accidents in accordance with Subparagraph 2.7.2. The CMAR

shall report within three (3) Business Days in writing all accidents and injuries occurring at the Worksite. When the CMAR is required

to file an accident report with a public authority, the CMAR shall furnish a copy of the report to the Owner concurrent with the report’s

distribution with the public authority.

2.7.4

The CMAR shall provide the Owner with copies of all notices required of the CMAR by Applicable Law. The CMAR’s safety program

shall comply with the requirements of Governmental Authorities having jurisdiction.

2.7.5

Damage or loss not insured under property insurance which may arise from the Work to the extent caused by negligent acts or omissions

of the CMAR, or anyone for whose acts the CMAR may be liable, shall be promptly remedied by the CMAR. If the Owner deems any part of

the Work or Worksite unsafe, and such safety concerns are due to the fault or neglect of the CMAR, its Subcontractors, or anyone else

for whom such Parties are responsible, the Owner, without assuming responsibility for the CMAR’s safety program, may require the

CMAR to stop performance of the Work or take corrective measures satisfactory to the Owner, or both. If the CMAR does not adopt corrective

measures, the Owner may perform them and deduct their cost from the Phase 2 Construction Price. The CMAR agrees to make no claim for

damages, or an increase in the Phase 2 Construction Price, or for a change in the Dates of Substantial or Final Completion based on the

CMAR’s compliance with the Owner’s reasonable request.

2.8 Emergencies

2.8.1

In an emergency, the CMAR shall act in a reasonable manner to prevent personal injury or property damage. If appropriate, an equitable

adjustment in the Phase 2 Construction Price or Date of Substantial Completion or Date of Final Completion shall be determined in a Change

Order.

2.9 Hazardous

Materials

2.9.1

A Hazardous Material is any substance or material identified now or in the future as hazardous under any federal, state, or local

law or regulation, or any other substance or material that may be considered hazardous or otherwise subject to statutory or regulatory

requirement governing handling, disposal, or cleanup. The CMAR shall not be obligated to commence or continue Work until any unknown

Hazardous Material discovered or encountered at the Worksite has been removed, rendered, or determined to be harmless by the Owner as

certified by an independent testing laboratory and approved by the appropriate government agency. The Owner shall retain generator status

of any preexisting hazardous materials contained on-site and shall sign manifests for removal of preexisting hazardous materials.

Mojave Groundwater Bank

NPL – Pump Stations 14

2.9.2

If after the commencement of the Work, unknown Hazardous Material is discovered or encountered at the Worksite, the CMAR shall be

entitled to immediately stop Work in the affected area. The CMAR shall report the condition to the Owner, the Engineer, and, if required,

the Governmental Authority with jurisdiction.

2.9.3

The CMAR shall not be required to perform any Work relating to or around Hazardous Material without written mutual agreement.

2.9.4

The Owner shall be responsible for retaining an independent testing laboratory to determine the nature of the material encountered

and whether the material requires corrective measures or remedial action. Such measures shall be the sole responsibility of the Owner

and shall be performed in a manner minimizing any adverse effects upon the Work. The CMAR shall resume Work in the area affected by any

Hazardous Material only upon written agreement between the Parties after the Hazardous Material has been removed or rendered harmless

and only after approval, if necessary, of the Governmental Authority with jurisdiction.

2.9.5

If the CMAR incurs additional costs or is delayed due to the presence or remediation of Hazardous Material, the CMAR shall be entitled

to an equitable adjustment in the Phase 2 Construction Price and in the Dates of Substantial and Final Completion.

2.9.6

To the extent not caused by the negligent acts or omissions of the CMAR, its Subcontractors and Sub-subcontractors, and the agents,

officers, directors, and employees of each of them (collectively, the “CMAR Indemnitees”), the Owner shall defend, indemnify,

and hold harmless the CMAR Indemnitees from and against any and all direct or indirect claims, suits, damages, losses, costs, and expenses

(including, but not limited to, attorneys’ fees and costs) incurred by any such CMAR Indemnitees in connection with or arising

out of or relating to the performance of the Work in any area contaminated or affected by Hazardous Material or any bodily injury or

property damage suffered or incurred by any CMAR Indemnitee, in each case arising out of, relating to, resulting from, or incurred in

connection with the generation, location, transportation, or the existence, remediation, or removal of any Hazardous Materials located

on, under, in, or adjacent to the Project Site or transported to or from such Project Site, in each case where such generation, location,

transportation, or the existence, remediation, or removal resulted from events or circumstances either (a) occurred prior to the CMAR’s

execution of any Phase 2 Construction Price Amendment and entry onto the Project site at commencement of the Construction Phase Services

covered by such Phase 2 Construction Price Amendment, and/or (b) did not result from or arise out of any errors or omissions of the CMAR

or its Subcontractors at any tier. To the fullest extent permitted by law, such indemnification shall apply regardless of the fault,

negligence, breach of warranty or contract, or strict liability of the Owner and such indemnity obligations shall survive the termination

of this Agreement and/or the completion of the Work and the transactions contemplated herein.

Mojave Groundwater Bank

NPL – Pump Stations 15

2.9.7

To the extent not caused by the acts or omissions of the Owner, its Engineer or other consultants, the agents, officers, directors, and

employees of any of them, or any person or entity in the chain of title to the real property comprising the Project or any portion thereof,

whether as owner, tenant, guest, licensee, invitee, or otherwise (collectively, the “Owner Indemnitees”), the CMAR shall

defend, indemnify and hold harmless the Owner Indemnitees from and against any and all direct or indirect claims, suits, damages, losses,

costs, and expenses (including, but not limited to, attorneys’ fees and costs) incurred by any such Owner Indemnitees in connection

with or arising out of or relating to any Hazardous Materials first introduced onto the Project site by the CMAR or its Subcontractors

on or after the date of the Agreement; provided however, that in no event shall such indemnity and defense obligations apply to (a) any

Hazardous Materials specified for the Work by the Owner, the Engineer, any consultants of such Parties or any other person or entity

for whom the Owner is legally responsible, or (b) common cleaning solvents used by the CMAR in the performance of the Work, provided

that any such common cleaning solvents are used in compliance with best practices and applicable permitting and legal requirements. To

the fullest extent permitted by law, such indemnification shall survive the termination of this Agreement and/or the completion of the

Work and the transactions contemplated herein.

2.9.8

Removal of Hazardous Materials

2.9.8.1

To the extent the Hazardous Materials not the subject of Subparagraph 2.9.7 above are identified in other applicable provisions above

of this Paragraph 2.9, the CMAR shall proceed with remediation and removal of such Hazardous Materials as agent for the Owner in accordance

with this Subparagraph 2.9.8.

2.9.8.2

The Owner hereby appoints the CMAR as its agent to act in the Owner’s name and on the Owner’s behalf to negotiate, enter,

and execute contracts with third parties to remove, transport, and/or dispose of Hazardous Materials. The CMAR’s scope of authority

as agent does not include the execution of any manifests or governmental documents related to the Hazardous Materials. All documents

executed by the CMAR acting within the CMAR’s scope of authority shall provide that the CMAR is acting solely as agent for the

Owner. The CMAR shall maintain appropriate records of all acts undertaken as agent for the Owner and all such documents shall be available

for audit by the Owner.

2.9.8.3

The authority of the CMAR to act as agent on behalf of the Owner shall terminate upon termination or assignment of the Construction

Agreement.

2.10 Materials

Brought to the Worksite

2.10.1

Material Safety Data (MSD) sheets as required by law and pertaining to materials or substances used or consumed in the performance

of the Work, whether obtained by the CMAR, Subcontractors, the Owner, or Others, shall be maintained at the Worksite by the CMAR and

made available to the Owner, Subcontractors, and Others.

2.10.2

The CMAR shall be responsible for the proper delivery, handling, application, storage, removal, and disposal of all materials and

substances brought to the Worksite by the CMAR in accordance with the Contract Documents and used or consumed in the performance of the

Work.

2.10.3

To the extent caused by the negligent acts or omissions of the CMAR, its agents, officers, directors, and employees, the CMAR shall

defend, indemnify, and hold harmless the Owner and the Engineer, its agents, officers, directors, and employees, in accordance with Paragraph

2.9.7 hereof, from and against claims, damages, losses, costs, and expenses, including, but not limited to, reasonable attorneys’

fees, costs, and expenses incurred in connection with any dispute resolution process, in each case arising out of or relating to the

delivery, handling, application, storage, removal, and disposal of all materials and substances.

Mojave Groundwater Bank

NPL – Pump Stations 16

2.11 Differing

Site Conditions

2.11.1

If the CMAR encounters Differing Site Conditions, the CMAR shall stop Work and shall provide the Owner and the Engineer with written

notice of its claim for Differing Site Conditions within the time period set forth in Paragraph 11.1. Any change in the Phase 2 Construction

Price, estimated Cost of the Work and/or CMAR’s Fee (where applicable), Date of Substantial Completion, or Date of Final Completion

and, if appropriate, the Compensation for Construction Phase Services because of the Differing Site Conditions shall be determined as

provided in Article 11. The CMAR shall only be entitled to pursue a claim for Differing Site Conditions if the Parties have not agreed,

in writing, that Differing Site Conditions have occurred after the CMAR’s submission of appropriate backup documentation.

2.12 Permits

And Taxes

2.12.1

The CMAR shall give public authorities all notices required by law and, except for permits and fees which are the responsibility

of the Owner pursuant to Paragraph 3.6 hereof, shall obtain and pay for all necessary permits, licenses, and renewals pertaining to the

Work. The CMAR shall provide to the Owner copies of all notices, permits, licenses, and renewals required under this Agreement.

2.12.2

The CMAR shall pay all applicable taxes legally enacted when bids are received or negotiations concluded for the Work provided by

the CMAR.

2.12.3

The Phase 2 Construction Price shall be adjusted for additional costs, subject to approval by the Owner, resulting from Applicable

Laws enacted after the date of this Agreement, including but not limited to: increased taxes, tariffs, or other costs arising from any

Executive Orders or other governmental action.

2.12.4

If, in accordance with the Owner’s direction, the CMAR claims an exemption for taxes, the Owner shall indemnify, defend, and

hold the CMAR harmless from any liability, penalty, interest, fine, tax assessment, attorneys’ fees, or other expense or cost incurred

by the CMAR because of any such action.

2.13 Confidentiality

2.13.1

The CMAR shall treat as confidential and shall not use for its own benefit nor disclose to third persons, except as is necessary

for the performance of the Work, any of the Owner’s confidential information, know-how, discoveries, production methods, and the

like that may be disclosed to the CMAR or which the CMAR may acquire in connection with the Work. The Owner shall treat as confidential

information all of the CMAR’s estimating systems and historical and parameter cost data and identified related proprietary information

that may be disclosed to the Owner in connection with the performance of this Agreement. The Owner and the CMAR shall each specify those

items to be treated as confidential and shall mark them as “Confidential.” The provisions of this Subparagraph 2.13.1 shall

survive the termination or completion of this Agreement and the transactions contemplated hereby.

Mojave Groundwater Bank

NPL – Pump Stations 17

ARTICLE

3 — Owner’s Responsibilities

3.1 Adequate

Funding for Project

At

the CMAR’s request following execution of the Phase 2 Construction Price Amendment and prior to the Owner’s issuance of a

Notice to Proceed with the Construction Phase Services, the Owner shall promptly furnish reasonable evidence satisfactory to the CMAR

that the Owner has adequate funds available and committed to fulfill all of the Owner’s payment obligations under the Contract

Documents. If the Owner fails to furnish such financial information in a timely manner, the CMAR may stop Work under Section 10.4 of

the General Conditions or exercise any other right permitted under the Contract Documents. Following the Owner’s issuance of the

Phase 2 Notice to Proceed, so long as the Owner satisfies its payment obligations under the Agreement and other Contract Documents, the

Owner shall not be required to furnish any further financial evidence of its ability to satisfy its payment obligations under the Contract

Documents.

3.2 Owner’s

Representative

The

Owner will identify the Owner’s Representative, or any other authorized person or entity as defined in Subparagraph 1.1.38 of the

Agreement, to act on behalf of the Owner. The Owner may change the Owner’s Representative upon written notice to the CMAR.

The

Owner’s authorized representative shall be fully acquainted with the Project and shall have the authority to bind the Owner in

all matters requiring the Owner’s approval, authorization, or written notice. If the Owner changes its representative or the representative’s

authority as listed above, the Owner shall immediately notify the CMAR in writing.

3.3 Information

and Services

Any

information or services to be provided by the Owner shall be provided in a timely manner so as not to delay the Work. The Owner shall

establish and update an overall budget for the Project in accordance with Paragraph 2.1 of the Agreement hereof, based on consultation

with the CMAR and Engineer, which shall include Contingencies for changes in the Work and other costs which are the responsibility of

the Owner.

3.4 Worksite

Information

Except

to the extent that the CMAR knows of any inaccuracy, the CMAR is entitled to rely on the following Project information furnished by the

Owner pursuant to this Paragraph 3.4. To the extent the Owner has obtained, or is required elsewhere in the Contract Documents to obtain,

the following Project information, the Owner shall provide such information to the CMAR at the Owner’s expense and with reasonable

promptness so as not to delay the Schedule:

3.4.1

Information describing the physical characteristics of the Worksite, including surveys, Worksite evaluations, legal descriptions,

data or Drawings depicting existing conditions, subsurface conditions and environmental studies, reports, and investigations.

3.4.2

Tests, inspections, and other reports dealing with environmental matters, Hazardous Material, and other existing conditions, including

structural, mechanical, and chemical tests required by the Contract Documents or by law.

Mojave Groundwater Bank

NPL – Pump Stations 18

3.4.3

Any other information or services requested in writing by the CMAR which are relevant to the CMAR’s performance of the Work

and under the Owner’s control. The information required by this Subparagraph 3.4.3 shall be provided in reasonable detail. Legal

descriptions shall include easements, title restrictions, boundaries, and zoning restrictions. Worksite descriptions shall include existing

buildings and other construction and all other pertinent site conditions. Adjacent property descriptions shall include structures, streets,

sidewalks, alleys, and other features relevant to the Work. Utility details shall include available services, lines at the Worksite and

adjacent thereto, and connection points. The information shall include public and private information, subsurface information, grades,

contours, and elevations, drainage data, exact locations and dimensions, and benchmarks that can be used by the CMAR in laying out the

Work.

3.4.4

All licenses and other rights to use of the Drawings, Specifications, and any other intellectual property necessary or required for

the CMAR’s performance of the Work as well as any other rights to use of any other documents, materials, and/or information generated

or produced by the Engineer or its consultants at any level in connection with the design, engineering, or programing for the Project.

3.5 Engineer

Unless

otherwise expressly provided to the contrary in this Agreement, the Owner shall be responsible for retaining and paying the Engineer

and all other professional design and engineering consultants required for construction of the Project or portions thereof.

3.6 Building

Permit, Fees, And Approvals

Except

for those permits and fees related to the Work which are the responsibility of the CMAR pursuant to Paragraph 2.12, the Owner shall secure

and pay for all other permits, approvals, easements, assessments, and fees required for the development, construction, use, or occupancy

of permanent structures or for permanent changes in existing facilities, including the building permit. Assuming the CMAR has performed

all necessary and reasonable actions to obtain permits, the CMAR shall not be liable for any delays related to obtaining permits and

shall be entitled to any cost or Schedule impacts related thereto so long as not caused by any acts, errors, or omissions of the CMAR.

3.7 Mechanics

and Construction Lien Information

Where

allowed by law, within five (5) days after receiving the CMAR’s written request, the Owner shall provide the CMAR with the information

necessary to give notice of or enforce mechanics lien rights and, where applicable, stop notices. This information shall include the

Owner’s interest in the real property on which the Project is located and the record legal title.

3.8 Contract

Documents

Unless

otherwise specified, Owner shall provide electronic or hard copies of the Contract Documents to the CMAR as may be agreed to by the Owner

and CMAR and without cost to the CMAR.

3.8.1

Electronic Documents. If the Owner requires that the Owner, Engineer, and CMAR exchange documents and data in electronic or digital

form, prior to any such exchange the Owner, Engineer, and CMAR shall agree on a written protocol governing all exchanges which, at a

minimum, shall specify: (1) the definition of documents and data to be accepted in electronic or digital form or to be transmitted electronically

or digitally; (2) management and coordination responsibilities; (3) necessary equipment, software, and services; (4) acceptable formats,

transmission methods, and verification procedures; (5) methods for maintaining version control; (6) privacy and security requirements;

and (7) storage and retrieval requirements. Except as otherwise agreed to by the Parties in writing, the Parties shall bear their own

costs as identified in the protocol. In the absence of a written protocol, use of documents and data in electronic or digital form shall

be at the sole risk of the recipient.

Mojave Groundwater Bank

NPL – Pump Stations 19

3.9 Submittals

The

Owner shall be responsible for review and approval of submittals with reasonable promptness to avoid causing delay and shall cause the

Engineer to respond to such submittals and to either approve or reject the same no later than fifteen (15) days following Engineer’s

receipt of same, unless an earlier or later response deadline is provided elsewhere in the Contract Documents or through written agreement

between the CMAR and the Engineer.

3.10 Access

The

Owner shall provide the CMAR and its Subcontractors and Materials Suppliers at all tiers with appropriate physical and legal access to

the Project Site and other areas necessary for the proper and timely performance and completion of the Work.

ARTICLE

4 — Subcontracts

4.1 Subcontractors

The

Work not performed by the CMAR with its own forces shall be performed by Subcontractors. All subcontracts shall be issued on a lump sum

cost basis unless the Owner has given prior written approval of a different method of payment to the Subcontractor.

4.2 Award

of Subcontracts and Other Contracts for Portions of the Work

4.2.1

As soon after the execution of this Agreement as possible, the CMAR shall provide the Owner and, if directed, the Engineer with a

written list of the proposed Subcontractors and significant Material Suppliers. If the Owner has a reasonable objection to any proposed

Subcontractor or Material Supplier, the Owner shall notify the CMAR in writing. Failure to object within 20 days shall constitute acceptance.

Subcontractors shall be secured by the CMAR in accordance with the Subcontractor Procurement Plan.

4.2.2

If the Owner has reasonably and promptly objected as provided in Subparagraph 4.2.1, the CMAR shall not contract with the proposed

Subcontractor or Material Supplier, and the CMAR shall propose another acceptable to the Owner. If the substituted Subcontractor or Material

Supplier is more or less expensive or use of such Party will result in a change in the Contract Time, the Owner shall execute an appropriate

Change Order that shall reflect any increase or decrease in the Phase 2 Construction Price or Dates of Substantial or Final Completion

because of the substitution.

Mojave Groundwater Bank

NPL – Pump Stations 20

The

CMAR agrees to bind every Subcontractor and Material Supplier (and require every Subcontractor to so bind its Subcontractors and Material

Suppliers) to all the provisions of this Agreement and the Contract Documents as they apply to the Subcontractors’ and Material

Suppliers’ portions of the Work.

4.2.3

The CMAR shall be responsible for ensuring Subcontractor compliance with Applicable Law, including applicable registration and reporting

requirements.

4.3 Contingent

Assignment of Subcontracts

4.3.1

If this Agreement is terminated for cause in accordance with Paragraph 10.1 hereof, each subcontract agreement shall be assigned

by the CMAR to the Owner, subject to the prior rights of any surety, provided that the Owner accepts such assignment after termination

by notifying the Subcontractor or Material Supplier and CMAR in writing, and assumes all rights and obligations of the CMAR pursuant

to each subcontract agreement.

4.3.2

If the Owner accepts such an assignment, and the Work has been suspended for more than thirty (30) consecutive days following termination,

the Subcontractor’s compensation shall be equitably adjusted because of the suspension.

ARTICLE

5 — Time

5.1 Performance

of the Work

5.1.1

Date of Commencement. Unless otherwise provided to the contrary in the Agreement or other Contract Documents, the Date of Commencement

of the Preconstruction Phase Services is the date of issuance of a Phase 1 Notice to Proceed for the same in accordance with Paragraph

2.1 of the Agreement. Unless otherwise provided to the contrary in the Agreement, the Date of Commencement of the Construction Phase

Services is the date construction of those services commence following issuance of a Phase 2 Notice to Proceed by the Owner for some

or all the Work covered by such Construction Phase Services as described in the Amended Agreement executed by the Owner and the CMAR

for the same. The Work shall proceed in general accordance with the Schedule of Work as such Schedule may be amended from time to time,

subject to other provisions of this Agreement. The Schedule is subject to allowable adjustments in the Contract Time as permitted herein

or in the other Contract Documents.

5.1.2

Substantial/Final Completion. Unless the Parties agree or otherwise, the Date of Substantial Completion or the Date of Final Completion

shall be established pursuant to the Amended Agreement, subject to adjustments as provided for in the Contract Documents. If a Phase

2 Construction Price is not established and the Parties desire to establish a Date of Substantial Completion or Date of Final Completion,

it shall be set forth via Amendment.

5.1.3

Time limits stated above are of critical importance to this Agreement.

5.1.4

The CMAR shall not knowingly commence the Work before the effective date of the insurance to be provided by the CMAR and Owner as

required by the Contract Documents.

Mojave Groundwater Bank

NPL – Pump Stations 21

5.2 Schedule

of the Work

5.2.1

The CMAR shall submit an initial and updated Project Construction Schedule to the Owner in the form and within the time limits acceptable

to the Owner in accordance with Exhibit F. The Owner will determine the acceptability of the initial and updated Project Construction

Schedule within a reasonable period of time. If the Owner deems the Project Construction Schedule unacceptable, it shall specify in writing

to the CMAR the basis for its objection.

5.2.2

The initial and updated Project Construction Schedule shall represent a practical plan to complete the Work within the Contract Time.

Schedules showing the Work completed in less than the Contract Time may be acceptable if judged by the Owner to be practical.

5.2.3

The Project Construction Schedule shall be prepared in accordance with Exhibit G.

5.3 Delays

and Extensions of Time

5.3.1

If the CMAR is delayed at any time in the commencement or progress of the Work by Excusable Delay (as hereinafter defined), then,

upon agreement of the Parties:

5.3.1.1

The Contract Time shall be extended by Change Order for a reasonable time based on the impact of such delay or concurrent delays

to the Critical Path of the Project Schedule.

5.3.1.2

Provided the CMAR has made reasonable attempts to mitigate the effects of such delay (such as, by way of example and not of limitation,

through rescheduling, resequencing, or other measures), the Phase 2 Construction Price shall be adjusted to the extent reasonably necessary

to compensate the CMAR for any increases in the Cost of the Work due to additional time to which the CMAR is entitled under this Paragraph

5.3.

Any

adjustments made pursuant to Sections 5.3.1.1 or 5.3.1.2 shall be subject to limitations set forth in Article 7 hereof of these General

Conditions and the provisions of Paragraphs 5.6 and 5.7 of these General Conditions.

The

CMAR shall not be entitled to an adjustment in the Phase 2 Construction Price or the Contract Time for CMAR Delays.

5.4 Other

Terms Defined

5.4.1

For purposes of the Contract Documents, the following terms shall have the meanings indicated for each:

5.4.1.1

“CMAR Delay” means each day of delay to the completion of the Work to the extent such delay was caused by and/or within

the control of the CMAR, and (a) actually causes a delay in the Critical Path of such Work, and (b) is not caused by an Excusable Delay,

Force Majeure, or Owner Delay. Delays attributable to and within the control of the CMAR, its Subcontractors of all tiers, its Material

Suppliers, Consultants, or other Party for whom the CMAR is responsible shall be deemed to be CMAR Delay.

Mojave Groundwater Bank

NPL – Pump Stations 22

5.4.1.2

“Excusable Delay” means any act, omission, condition, event, or circumstance beyond the CMAR’s reasonable control

and due to no fault of the CMAR including, but not limited to, the Owner’s suspension of the Work without cause or the CMAR’s

suspension of the Work due to nonpayment, Owner Delay, delays or impacts caused by or attributable to a third party, delay caused by

or resulting from Differing Site Conditions, or a Force Majeure Delay.

5.4.1.3

“Force Majeure” means any conditions, occurrences, or acts of God, and not within the reasonable control of the CMAR,

not constituting Owner Delay, delay caused by Differing Site Conditions, or CMAR Delay, which impacts the Work or prevents or delays

the CMAR from performing its obligations under the Contract Documents, including without limitation any one or more of the following:

5.4.1.3.1

Damage or destruction by fire or casualty.

5.4.1.3.2

Unusually severe weather including lightning, tornado, earthquake, flood, windstorm, named weather event, named storm, wind, natural

disasters.

5.4.1.3.3

Pandemic, epidemic, quarantine, declaration of public health emergency, and/or governmental orders issued in connection with such

public health emergencies.

5.4.1.3.4

Weather related delays beyond the number provided for in Paragraph 5.3.3 of the Agreement or as otherwise allowed or permitted, if

applicable, in the Phase 2 Construction Price Amendment.

5.4.1.3.5

Strike or other labor dispute not specifically directed at the CMAR or any person or entity for whom the CMAR is responsible under

the Contract Documents.

5.4.1.3.6

Regional, nationwide, or global unavailability or shortage of materials or equipment resulting in Critical Path delay. To the extent

that any alleged delay relates to regional, nationwide, or global unavailability or shortage of materials or equipment, the CMAR shall

be required to provide documented proof to the Owner that the CMAR did not reasonably anticipate such unavailability as of the Effective

Date of the Phase 2 Construction Price Amendment and made diligent and timely efforts to obtain (buy out) such materials or equipment

as a condition precedent to any extension of the Contract Time or increase of the Phase 2 Construction Price under this paragraph.

5.4.1.3.7

Unavailability of utilities (not caused in whole or in part as a result of fault on the part of the Owner or the CMAR).

5.4.1.3.8

Riots, insurrections, acts of a public enemy, acts of domestic and/or foreign terrorism, or vandalism.

5.4.1.3.9

Bomb scares or similar third-party threats or disruptions.

5.4.1.3.10

Moratoriums or other unusual or unforeseeable delays in the issuance of any required approvals from any Governmental Authorities

or utilities.

Mojave Groundwater Bank

NPL – Pump Stations 23

5.4.1.3.11

Delays caused directly or indirectly by the actions or inactions of Governmental Authorities (not caused in whole or in part as a

result of fault on the part of the Owner or the CMAR) including, but not limited to, enactment or revision of Applicable Laws or official

interpretations subsequent to the execution of the Agreement.

For

the avoidance of doubt, the Owner’s financial insolvency or inability to perform its financial obligations under the Agreement

and the other Contract Documents shall not constitute an event of Force Majeure.

5.4.1.4

“Owner Delay” means a cost impact or each day of delay that actually impacts the completion of the Work and is caused

by any one or more of the following actions or omissions of the Owner (or any tenant of the Owner) at the Project related to:

5.4.1.4.1

Any Change in the Work initiated by the Owner.

5.4.1.4.2

The Owner’s failure to timely approve or disapprove any item for which Owner approval is required under the Contract Documents

except to the extent that the Owner’s failure is deemed to mean approval pursuant to the terms of the Agreement and except to the

extent that the Owner cures such failure within seven (7) Business Days after receipt of written notice from the CMAR of such failure.

5.4.1.4.3

Any failure of the Owner to (a) comply with the CMAR’s reasonable requirements relative to access to areas of the Work reasonably

necessary for the performance of Work, including, without limitation, the hoist, freight elevators, and/or defined path of travel established

with respect to the Work; (b) utilize labor which can work in harmony with labor employed by the CMAR and its Subcontractors; (c) comply

with the CMAR’s safety rules; or (d) comply with all requirements applicable to the Owner’s separate work for the Project

undertaken by the Owner or its separate Contractors and Subcontractors at any tier in each case to the extent any such failure is not

cured within five (5) Business Days after written notice is given by the CMAR to the Owner and only to the extent any such failure actually

impacts the CMAR’s already scheduled Work.

5.4.1.4.4

Failure by the Owner to comply with its obligations under this Agreement.

5.4.1.4.5

Any defects, delay, or impacts from the Owner’s separate work for the Project undertaken or failed to be undertaken by the

Owner or its separate Contractors and Subcontractors at any tier, or which delays the Work or the issuance of a certificate of occupancy

or another applicable certificate of completion for the Work by any governmental entity having jurisdiction over the Project or the Work,

in each case to the extent not cured within five (5) Business Days after written notice is given by the CMAR to the Owner.

5.4.1.4.6

Any other event or circumstance caused by or attributable to the Owner.

Mojave Groundwater Bank

NPL – Pump Stations 24

5.5 Claims

/ Modifications for Excusable Delays

If

any delay to the Work is caused by Excusable Delay, any adjustments to time or Phase 2 Construction Price shall be made in accordance

with Section 5.3.

5.6 Construction

General Conditions Costs

In

the event of an Excusable Delay pursuant to which the CMAR, subject to consultation with and approval of the Owner, is entitled to an

adjustment in the Contract Time in accordance with Paragraph 5.3.1 hereof but not otherwise, the CMAR shall, subject to consultation

with and approval of the Owner, be entitled to an equitable adjustment of the Phase 2 Construction General Conditions Costs, as negotiated

between the Parties. The CMAR shall, in the event of an occurrence likely to cause Excusable Delay, cooperate in good faith with the

Owner to minimize and mitigate the impact of any such occurrence and do all things reasonable under the circumstances to achieve this

goal.

5.7 Monitoring

Progress and Costs

Following

acceptance by the Owner of the Phase 2 Construction Price, the CMAR and the Owner shall establish a process for monitoring costs against

the Phase 2 Construction Price and actual progress against the Schedule of Work. The CMAR shall provide written reports to the Owner

at monthly intervals on the status of the Work, showing variances between costs and the Phase 2 Construction Price and actual progress

as compared to the Project Construction Schedule, including estimates of future costs and recovery programs if actual progress indicates

that the Dates of Substantial Completion or Final Completion may not be met.

5.8 Owner

Approval

Notwithstanding

anything contained herein or in the other Contract Documents to the contrary, any decision by the Owner to approve (or disapprove) any

requested adjustments in the Contract Time and/or the Phase 2 Construction Price (including any increase in the Construction General

Conditions Costs) resulting from an Excusable Delay shall be made by the Owner in its sole but good faith discretion. Any failure by

the Parties to reach an agreement hereunder shall not prejudice the CMAR’s entitlement to price and Schedule relief otherwise provided

and may constitute a Claim for purposes of the dispute-related provisions in this Agreement.

ARTICLE

6 — Compensation

6.1 CMAR’s

Compensation for Preconstruction Phase Services

The

Owner shall compensate the CMAR for the performance of the CMAR’s Preconstruction Phase Services in accordance with Paragraph 6.1.1

of the Agreement.

Mojave Groundwater Bank

NPL – Pump Stations 25

6.2 CMAR’s

Compensation for Early Work(s) Package(s) – NOT USED

6.3 CMAR’s

Compensation for Construction Phase Services

The

Owner shall compensate the CMAR for Work performed and described in the Phase 2 Construction Price (Exhibit E) on the basis of

a Guaranteed Maximum Price, as set forth in the Amended Agreement.

6.4 Contingency

and Allowances

Contingency

and/or Allowances, if any, and the use thereof, shall be as set forth in, and subject to the terms, covenants, and conditions of the

Phase 2 Construction Price executed in connection therewith.

ARTICLE

7 — Changes

Changes

in the Work that are within the general scope of this Agreement shall be accomplished, without invalidating this Agreement, by Change

Order, Owner Change Directive, and/or Field Order.

7.1 Change

Order

7.1.1

The CMAR may request, or the Owner may order, changes in the Work or the timing or sequencing of the Work that impacts the Phase

2 Construction Price, where applicable the estimated Cost of the Work and CMAR’s Fee, the Date of Substantial Completion, and/or

the Date of Final Completion. All such changes in the Work shall be formalized in a Change Order. Any such requests for changes in the

Work shall be processed in accordance with this Article 7.

7.1.2

The Phase 2 Construction Price will be adjusted only for Excusable Delay in accordance with and subject to the terms, conditions,

and limitations set forth in Article 5.3 hereof.

7.2 Owner

Change Directives and Field Orders

7.2.1

The Owner may issue a written Owner Change Directive directing a change in the Work prior to reaching agreement with the CMAR on

the adjustment, if any, in the Phase 2 Construction Price or the Date of Substantial Completion or Date of Final Completion.

7.2.2

The Owner and the CMAR shall negotiate expeditiously and in good faith for appropriate adjustments, as applicable, to the Phase 2

Construction Price or the Contract Time arising out of Owner Change Directives. If the Owner and the CMAR are unable to reach agreement

within 30 Days, the issue shall be elevated to the CMAR’s management and the Owner’s Representative for a determination.

As the Work associated with the Owner Change Directive is performed, the CMAR shall submit its costs for such Work with its Application

for Payment and the CMAR shall be paid for the Work performed in accordance with the Phase 2 Contract Price Amendment. The Owner shall

prepare an Owner Change Directive, utilizing the Owner’s available funds, for any undisputed portion of the costs. Contingency

funds may only be used for Owner Change Directives upon written agreement of the Parties.

7.2.3

When the Owner and the CMAR agree upon the adjustments in the Phase 2 Construction Price, the Date of Substantial Completion, and/or

Date of Final Completion for a change in the Work directed by an Owner Change Directive, such agreement shall be the subject of an appropriate

Change Order.

Mojave Groundwater Bank

NPL – Pump Stations 26

7.2.4

The Owner may authorize Field Orders. Such Field Orders will be binding on the Owner and on the CMAR, which shall perform the Work

involved promptly. If the CMAR believes that a Field Order justifies an adjustment in the Phase 2 Construction Price or Contract Times

or both, then the CMAR shall submit a Change Order Proposal.

7.3 Determination

of Cost

7.3.1

An increase or decrease in the Phase 2 Construction Price established in the Amended Agreement or changes to the Project Construction

Schedule or the Schedule/Contract Time resulting from a change in the Work that affect the Phase 2 Construction Price shall, in each

case, be determined by one or more of the following methods:

7.3.1.1

A mutually accepted, itemized Lump Sum, based on the Cost of the Work definition appearing in the Phase 2 Construction Price.

7.3.1.2

Cost of Work (as defined in the Phase 2 Construction Price) calculated on a basis agreed upon by the Owner and the CMAR, plus CMAR’s

Fee.

7.3.1.3

If an increase or decrease cannot be agreed to as set forth in Clauses .1 through .2 above, and the Owner issues an Owner Change

Directive, the cost of the change in the Work shall be determined by the reasonable actual expense and savings of the performance of

the Work resulting from the change. Where applicable, if there is a net increase or decrease in the GMP, the CMAR’s Fee shall be

adjusted accordingly. The CMAR shall maintain a documented, itemized, accounting evidencing the expenses and savings.

7.3.2

If the Owner and the CMAR disagree as to whether work required by the Owner is within the Scope of the Work, the CMAR shall furnish

the Owner with an estimate of the costs to perform the disputed work in accordance with the Owner’s interpretations. Any such disagreement

shall be resolved in accordance with Article 11.

ARTICLE

8 — Payment

8.1 Schedule

of Values

Concurrently

with the CMAR’s preparation and delivery to the Owner of any cost model or progressive cost model as required for the Phase 1 Preconstruction

Services Scope of Work through and including the date on which a Phase 2 Construction Price Amendment for any portion of the Work is

executed by the CMAR, the CMAR shall prepare and submit to the Owner and, if directed, the Engineer, a Schedule of Values apportioned

to the various divisions or phases of the Work in increasing level of detail. At the time a Phase 2 Construction Price Amendment is executed

for the Work or any portion thereof, each line item contained in the Schedule of Values shall be assigned a value such that the total

of all items shall equal the Phase 2 Construction Price for such Work or portion thereof.

Mojave Groundwater Bank

NPL – Pump Stations 27

8.2 Progress

Payments for Preconstruction Phase Services

Progress

Payment for Preconstruction Phase Services shall be made in accordance with Paragraph 6.1 of the Agreement.

8.3 Progress

Payments for Construction Phase Services

Applications

for Payment for Construction Phase Services shall be submitted by the CMAR to the Owner and the same paid, in each case in accordance

with and subject to the terms and provisions of this Article 8, the Phase 2 Construction Price Amendment, and other applicable provisions

of the Agreement and other Contract Documents.

8.3.1

Applications. The CMAR shall submit to the Owner and, if directed, its Engineer a monthly application for payment for Construction

Phase Services no later than the 7th day of the calendar month for the preceding thirty (30) days; the CMAR’s applications

for payment shall be itemized and supported by the CMAR’s Schedule of Values and any other substantiating data as required by these

General Conditions and the other Contract Documents. Payment applications shall include payment requests on account of properly authorized

Change Orders or Owner Change Directives. The Owner shall pay amounts not in dispute and otherwise due no later than thirty (30) days

after the CMAR has submitted a complete and accurate payment application. The Owner may deduct from any progress payment amounts as may

be retained pursuant to Subparagraph 8.3.3 below, as well as amounts in dispute.

8.3.2

Lien Waivers and Liens.

8.3.2.1

Partial Lien Waivers and Affidavits. If requested by the Owner, as a prerequisite for payment, but subject to the CMAR’s receipt

of payment, the CMAR shall provide partial conditional payment lien waivers in the amount of the application for payment and affidavits

from its Subcontractors and Material Suppliers for the Work completed during the period covered by the current application for payment

and partial unconditional payment lien waivers from the CMAR and all Subcontractors and Material Suppliers paid from the previous month’s

application payment. In no event shall the CMAR be required to sign an unconditional waiver of lien or claim, either partial or final,

prior to receiving payment nor shall the CMAR be required to execute or deliver any lien waiver for the Work not covered by such lien

waiver or in an amount more than what it has been paid.

8.3.2.2

Responsibility for Liens. If the Owner has made payments in the time required by this Article 8 and is otherwise not in breach of

its obligations, the CMAR shall, within thirty (30) days after written notice of filing, cause the removal or bonding over of any liens

filed against the premises or public improvement fund by any Party or Parties performing labor or services or supplying materials in

connection with the Work by, among other things, securing a bond around the lien. If the CMAR fails to take such action on a lien, the

Owner may cause the lien, after thirty (30) days written notice, to be removed at the CMAR’s expense, including bond costs and

reasonable attorneys’ fees. This Clause shall not apply if there is a dispute pursuant to Article 11 relating to the subject matter

of the lien.

8.3.3

Retainage. Retainage shall be withheld and disbursed in accordance with the terms and provisions of the Phase 2 Construction Price

Amendment.

Mojave Groundwater Bank

NPL – Pump Stations 28

8.3.4

Stored Materials and Equipment. Unless otherwise provided in the Contract Documents, applications for payment may include materials

and equipment not yet incorporated into the Work but delivered to and suitably stored on-site or off-site, including applicable insurance,

storage, and costs incurred transporting the materials to an off-site storage facility. Approval of payment applications for stored materials

and equipment stored off-site shall be conditioned on submission by the CMAR of bills of sale and proof of required insurance, or such

other procedures satisfactory to the Owner to establish the proper valuation of the stored materials and equipment, the Owner’s

title to such materials and equipment, and to otherwise protect the Owner’s interests therein, including transportation to the

Worksite.

8.3.5

Mobilization. The Schedule of Values shall include a line item for Mobilization equal to five percent (5%) of the Contract Price

which shall include all costs associated with bonds, insurance, the establishment of field offices and utilities, and other general project

commencement activities. These line items shall be included in the CMAR’s first Application for Payment and paid by Owner in accordance

with Subparagraph 8.3.1.

8.4 Adjustment

of CMAR’s Payment Application

The

Owner may adjust or reject a payment application or nullify a previously approved payment application, in whole or in part, as may reasonably

be necessary to protect the Owner from loss or damage based upon the following, to the extent that the CMAR is responsible therefor under

the Agreement:

8.4.1

The CMAR’s failure to perform the Work as required by the Contract Documents.

8.4.2

Loss or damage arising out of or relating to this Agreement and caused by the CMAR to the Owner or Others to whom the Owner may be

liable.

8.4.3

The CMAR’s failure to properly pay Subcontractors and Material Suppliers following receipt of such payment from the Owner.

8.4.4

Defective Work not corrected in a timely fashion.

8.4.5

Reasonable evidence of delay in performance of the Work such that the Work will not be completed by the Dates of Substantial or Final

Completion.

8.4.6

Reasonable evidence demonstrating that the unpaid balance of the Phase 2 Construction Price is insufficient to fund the cost to complete

the Work.

8.4.7

Third-party claims involving the CMAR until the CMAR furnishes the Owner with adequate security in the form of a surety bond, letter

of credit or other collateral or commitment sufficient to discharge such claims if established.

No

later than seven (7) days after receipt of an application for payment, the Owner shall give written notice to the CMAR, at the time of

disapproving or nullifying all or part of an application for payment, stating its specific reasons for such disapproval or nullification,

and the remedial actions to be taken by the CMAR in order to receive payment. When the above reasons for disapproving or nullifying an

application for payment are removed, payment will be promptly made for the amount previously withheld.

Undisputed

portions of any Application for Payment shall be promptly paid by the Owner in accordance with the terms of the Agreement, these General

Conditions, and other applicable Contract Documents.

Mojave Groundwater Bank

NPL – Pump Stations 29

8.5 Acceptance

of Work

Neither

the Owner’s payment of progress payments nor its partial or full use or occupancy of the Project constitutes acceptance of Work

not complying with the Contract Documents.

8.6 Payment

Delay

If

for any reason, not the fault of the CMAR, the CMAR does not receive a progress payment from the Owner in accordance with the Agreement,

the CMAR, upon giving the Owner such written notice, if any, as specified in the Agreement, and without prejudice to and in addition

to any other legal remedies, may stop Work until payment of the full amount owing to the CMAR has been received, including interest from

the date payment was due in accordance with the Agreement. The Phase 2 Construction Price and Dates of Substantial or Final Completion

shall be equitably adjusted by a Change Order for reasonable cost and delay resulting from shutdown, delay, and startup.

8.7 Substantial

Completion

8.71

The CMAR shall notify the Owner and, if directed, its Engineer when it considers Substantial Completion of the Work or a designated portion

to have been achieved. The Owner, with the assistance of its Engineer, shall promptly conduct an inspection to determine whether the

Work or designated portion can be occupied or utilized for its intended use by the Owner without excessive interference in completing

any remaining unfinished Work by the CMAR. If the Owner determines that the Work or designated portion has not reached Substantial Completion,

the Owner, with the assistance of its Engineer, shall promptly compile a list of items to be completed or corrected so the Owner may

occupy or utilize the Work or designated portion for its intended use. The CMAR shall promptly complete all items on the list.

8.7.2

When Substantial Completion of the Work or a designated portion is achieved, the CMAR shall prepare a Certificate of Substantial

Completion that shall establish the date of Substantial Completion, and the respective responsibilities of the Owner and the CMAR for

interim items such as security, maintenance, utilities, insurance, and damage to the Work, and fixing the time for completion of all

items on the list accompanying the Certificate. The Certificate of Substantial Completion shall be submitted by the CMAR to the Owner

and, if directed, to its Engineer for the Owner’s written acceptance of responsibilities assigned in the Certificate.

8.7.3

Unless otherwise provided in the Certificate of Substantial Completion, warranties required by the Contract Documents shall commence

on the earlier of (a) the date of Substantial Completion of the Work or a designated portion, and (b) the date the Owner takes beneficial

use of the Work or a designated portion of the Work.

8.8 Partial

Occupancy or Beneficial Use

8.8.1

The Owner may occupy, or use completed or partially completed portions of the Work, beneficially when (a) the portion of the Work

is designated in a Certificate of Substantial Completion, (b) appropriate insurer(s) consent to the occupancy or use, and (c) public

authorities authorize the occupancy or use. The CMAR shall not unreasonably withhold consent to partial occupancy or use. The Owner shall

not unreasonably refuse to accept partial occupancy. The CMAR shall be entitled to a Change Order if the Owner’s partial use or

occupancy of completed or partially completed portions of the Work adversely impacts completion of other portions of the Work through

no fault of the CMAR.

Mojave Groundwater Bank

NPL – Pump Stations 30

8.9 Final

Completion and Final Payment

8.9.1

Upon notification from the CMAR that the Work has reached Final Completion and is ready for final inspection and acceptance, the

Owner, with the assistance of its Engineer, shall promptly conduct an inspection to determine if the Work has reached Final Completion

and is acceptable under the Contract Documents.

8.9.2

When the Work has reached Final Completion, the CMAR shall prepare for the Owner’s acceptance a final application for payment

stating that to the best of the CMAR’s knowledge, and based on the Owner’s inspections, the Work has reached Final Completion

in accordance with the Contract Documents.

8.9.3

Final Payment shall be due on the CMAR’s submission of the following to the Owner:

8.9.3.1

An affidavit declaring any indebtedness connected with the Work, e.g., payrolls or invoices for materials or equipment, to have been

paid, satisfied, or to be paid with the proceeds of Final Payment, so as not to encumber the Owner’s property.

8.9.3.2

As-built Drawings, manuals, copies of warranties, and all other close-out documents required by the Contract Documents.

8.9.3.3

Release of any liens, conditioned on Final Payment being received.

8.9.3.4

Consent of any surety, if applicable.

8.9.3.5

Any outstanding known and unreported accidents or injuries experienced by the CMAR or its Subcontractors at the Worksite.

8.9.4

If, after Substantial Completion of the Work, the Final Completion of a portion of the Work is materially delayed through no fault

of the CMAR, the Owner shall pay the balance due for portion(s) of the Work fully completed and accepted. If the remaining contract balance

for Work not fully completed and accepted is less than the retained amount prior to payment, the CMAR shall submit to the Owner the written

consent of any surety to payment of the balance due for portions of the Work that are fully completed and accepted. Such payment shall

not constitute a waiver of claims, but otherwise shall be governed by this Paragraph 8.9.

8.9.5

Claims not reserved in writing with the making of Final Payment shall be waived except for claims relating to liens or similar encumbrances,

warranties, and Defective Work.

8.9.6

Acceptance of Final Payment. Unless the CMAR provides written identification of unsettled claims with an application for Final Payment,

its acceptance of Final Payment constitutes a waiver of such payment claims.

Mojave Groundwater Bank

NPL – Pump Stations 31

8.10 Late

Payment

Payments

due but unpaid shall bear interest until paid at the rate set forth in Article 8 of the Agreement.

8.11 Change

of Payment

Upon

execution of the Agreement, the CMAR shall provide the Owner with written payment instructions and all necessary forms required by the

Owner to effectuate payments to the CMAR by wire transfer (the “Payment Information”). The CMAR shall submit the initial

Payment Information to the Owner by certified mail or hand delivery only. If the Owner receives a request to change such Payment Information,

the Owner agrees that it will not modify or make a change to this Payment Information without oral confirmation, followed by written

confirmation, from the CMAR’s Chief Financial Officer, Vice President, or President. The Owner shall make no changes to the Payment

Information if it does not receive the oral and written confirmations as stated herein.

ARTICLE

9 — Indemnity, Insurance, Waivers, and Bonds

9.1 Indemnity

The

CMAR shall indemnify, defend, and hold harmless the Owner and its directors, officers, employees, successors, and assigns from and against

any and all third-party claims, legal actions, causes of action, proceedings, suits, judgments, liens, and levies, including reasonable

attorneys’ fees and disbursements but only to the extent for bodily injury or death of any person(s) and damages to tangible property

(other than the Work itself), to the extent caused by the CMAR (or by its Subcontractor or Sub-subcontractors, regardless of tier) and

arising from the intentional, willful or negligent acts or omissions of the CMAR, any Subcontractor at any tier, or any person or entity

for whom such Parties are legally responsible in the performance of the Work.

9.1.1

The CMAR’s indemnity obligations under Paragraph 9.1 shall not apply (a) to the extent of the negligence or willful or intentional

misconduct of the Owner, its officers, agents, employees, successors, or assigns, or (b) to any loss, cost, claim, suit, damage, liability,

or expense (including attorneys’ fees and costs) for which the Owner is required to indemnify the CMAR Indemnitees in accordance

with the Contract Documents.

9.1.2

In all claims against the Owner Indemnitees by any employee of the CMAR, anyone directly or indirectly employed by the CMAR or anyone

for whose acts the CMAR may be liable, the indemnification obligation set forth in Paragraph 9.1 shall not be limited in any way by any

limitation on the amount or type of damages, compensation, or benefits payable by or for the CMAR under workers’ compensation acts,

disability benefit acts, or other employee benefit acts.

9.1.3

Notwithstanding any provision or term to the contrary herein, under no circumstances shall either Party be liable to the other for

any consequential, incidental, special, or punitive damages and as provided in Article 9 of the Agreement.

Mojave Groundwater Bank

NPL – Pump Stations 32

9.2 CMAR’s

Insurance

9.2.1

Phase 1 Insurance. The CMAR shall obtain and maintain primary insurance on all of its operations and list the Owner as

additional insureds on all forms including the required “additional insured” endorsements in the following minimum

coverages: (a.) Worker’s Compensation Insurance as required by applicable law; (b.) General Liability Insurance covering all

operations: $2,000,000 (occ) and $4,000,000 (agg); (c.) Automobile Liability Insurance: $2,000,000 including coverage for all owned,

hired and non-owned automobiles. A waiver of subrogation endorsement in favor of Owner must be provided for all coverages stated

herein

9.2.2

Phase 2 Insurance and Bond requirements are provided in Exhibit A.1.

9.3 Property

Insurance

Builder’s

Risk Insurance shall be obtained and maintained for the Project upon and subject to the terms and conditions provided in Exhibit A.1.

9.4 Risk

Of Loss

Owner

has established a project-specific insurance program for the Project, including an Owner-Controlled Insurance Program (“OCIP”)

providing Commercial General Liability and Excess Liability coverage, and Owner-procured Builder’s Risk insurance covering the

Work on an all-risk basis. Contractor and its Subcontractors shall enroll in and comply with the OCIP as a condition of performing Work

on the Project.

Risk

of loss of, or damage to, the Work shall be upon the Contractor until the Date of Substantial Completion. Contractor shall take all reasonable

precautions to protect the Work, materials, equipment, and temporary structures whether located onsite, offsite, in transit, or in storage

against loss or damage.

In

the event of loss or damage to the Work before Substantial Completion, Contractor shall promptly repair, restore, or replace the affected

Work so that it conforms to the Contract Documents. Such repair shall be funded first from proceeds of Owner’s Builder’s

Risk policy. To the extent any loss or damage is not covered or paid by Owner’s Builder’s Risk policy Contractor shall bear

such costs at its sole expense, without entitlement to additional compensation. Contractor may request an equitable extension of time

for delays caused by a covered casualty loss beyond Contractor’s reasonable control, subject to Owner’s written approval.

Risk

of loss shall transfer to Owner upon the Date of Substantial Completion, provided that Contractor shall remain responsible for loss or

damage caused by Contractor’s acts, errors, omissions, or failure to complete punch list items through Substantial Completion and

written acceptance by Owner.

9.5 Adjustment

of Loss

A

loss insured under the Builder’s Risk Insurance Policy required pursuant to Exhibit A.1 shall be adjusted by the Party obtaining

such Builder’s Risk Insurance and made payable to such Party for the insureds, as their interests may appear, subject to requirements

of any applicable mortgagee clause and Paragraph 9.6 hereof. The CMAR shall pay Subcontractors their just shares of insurance proceeds

received by the CMAR, and by appropriate agreements, written where legally required for validity, shall require Subcontractors to make

payments to their Sub-subcontractors in similar manner.

Mojave Groundwater Bank

NPL – Pump Stations 33

9.6 Insurance

Payouts

If

required in writing by a Party in interest, the Party obtaining such Builder’s Risk Insurance shall, upon occurrence of an insured

loss, give bond for proper performance of such Party’s duties. The cost of required bonds shall be charged against proceeds received

by each Party. Such Party shall deposit in a separate account proceeds so received, which such Party shall distribute in accordance with

such agreement as the Parties in interest may reach, or in accordance with Article 11 of these General Conditions. The CMAR shall not

be required to repair or replace lost or damaged Work until a mutually acceptable Change Order, in accordance with Article 7, is executed

and funds are available to pay for such loss or damage.

9.7 Bonds

Payment

and performance bonds or other forms of substitute security, if any, shall be required as set forth in the Phase 2 Construction Price

Amendment. The requirements for each of the bonds are included in Appendix A.2.

9.8 Royalties,

Patents, and Copyrights

The

CMAR shall pay all royalties and license fees which may be due on the inclusion of any patented or copyrighted materials, methods, or

systems selected by the CMAR and incorporated in the Work. The CMAR shall indemnify and hold the Owner harmless from all suits or claims

for infringement of any patent rights or copyrights arising out of such selection. The Owner agrees to indemnify and hold the CMAR harmless

from any suits or claims of infringement of any patent rights or copyrights arising out of any patented or copyrighted materials, methods,

or systems specified by the Owner or Engineer or otherwise included in the Drawings, Specifications, and other documents, materials,

or information provided by the Owner or the Engineer for construction of the Work, whether pursuant to this Agreement or otherwise.

ARTICLE

10 — Suspension, Notice to Cure, and Termination of the Agreement

10.1

The Owner may suspend Work at any time and, without cause, suspend the Work or any portion thereof for a period of not more than

thirty (30) days for a single occurrence or sixty (60) days in the aggregate by notice in writing to the CMAR and the Engineer, which

shall fix the date on which Work shall resume. The CMAR shall resume the Work on the date so fixed.

The

CMAR will be allowed an increase in the Phase 2 Construction Price or an extension of the Contract Time, or both, for delayed or added

costs, directly attributable to any suspension (but not lost profits) if the CMAR makes a claim therefor as provided in Articles 5 and

7.

If

the CMAR fails to correct Defective Work as required by Paragraphs 2.5 and 2.6 herein or fails to perform the Work in accordance with

the Contract Documents, the Owner or Owner’s Representative may direct the CMAR to stop the Work, or any portion thereof, until

the cause for such order has been eliminated by the CMAR. The CMAR shall not be entitled to any adjustment of Contract Time or Phase

2 Construction Price because of any such order. The Owner and Owner’s Representative have no duty or responsibility to the CMAR

or any other Party to exercise the right to stop the Work.

Mojave Groundwater Bank

NPL – Pump Stations 34

10.2 Owner

Termination

10.2.1

The Owner May Terminate Agreement upon the occurrence of any one or more of the following events:

10.2.1.1

If the CMAR is adjudged as bankrupt or insolvent.

10.2.1.2

If the CMAR makes a general assignment for the benefit of creditors.

10.2.1.3

If a trustee or receiver is appointed for the CMAR or for any of the CMAR’s property.

10.2.1.4

If the CMAR files a petition to take advantage of any debtor’s act, or to reorganize under bankruptcy or similar laws.

10.2.1.5

If the CMAR fails to perform the Work in accordance with the Contract Documents, including, but not limited to, failure to supply sufficient

skilled workmen or suitable materials or equipment or failure to adhere to the progress Schedule established and adjusted in accordance

with pursuant to Article 5 of the Agreement and Article 5 hereof.

10.2.1.6

If the CMAR, without justification, repeatedly fails to make timely payments to Subcontractors or Material Suppliers for labor, materials,

or equipment.

10.2.2

The Owner may, without prejudice to any other right or remedy, serve written notice upon the CMAR and the CMAR’s surety of

the Owner’s intention to terminate the Agreement for any breach set forth in this Paragraph 10.2. Said notice to contain the reasons

for such intention to terminate the Agreement, and provided that unless within thirty (30) days after the service of such notice all

such violations have been corrected and remedied, the Contract Documents shall cease and terminate, and the CMAR shall be excluded from

the site. In such case, the CMAR shall not be entitled to receive any further payment until the Work is finished by Others.

10.2.2.1

The foregoing notwithstanding, if the nature of the alleged reason for termination is not capable of being corrected or remedied

within thirty (30) days, such correction or remedy shall commence and be completed with reasonable diligence and in no event later than

ninety (90) days following the occurrence of such default.

10.2.3

In the event of any such termination, the Owner shall immediately serve written notice thereof upon the surety and the CMAR, and

the surety shall have the right to take over and perform the Contract Documents, provided, however, that if the surety, within 30 days

after the serving upon it of a notice of termination, does not give the Owner written notice of their intention to take over and perform

the Contract Documents, or does not commence performance thereof within 90 days from the date of serving said notice, Owner may take

possession of the Work and incorporate in the Work all materials and equipment stored at the site or for which Owner has paid the CMAR

but which are stored elsewhere that were intended to be incorporated into the Work, and finish the Work as Owner may deem expedient for

the account and at the expense of the CMAR. The CMAR’s surety shall be liable to the Owner for any excess costs or other damage

occasioned the Owner thereby. If the unpaid Balance of the Phase 2 Construction Price exceeds the direct and indirect costs of completing

the Work, including but not limited to, compensation for additional professional services and all costs generated to insure or bond the

Work of substituted Contractors or Subcontractors utilized to complete the Work, such excess shall be paid to the CMAR. If such costs

exceed the unpaid balance, the CMAR shall pay the difference to the Owner promptly upon demand; on failure of the CMAR to pay, the surety

shall pay on demand by Owner. Any portion of such difference not paid by the CMAR or surety within thirty (30) days following the mailing

of a demand for such costs by the Owner shall earn interest rate authorized by state law. Such costs incurred by the Owner shall be verified

by the Owner’s Representative and incorporated in a Change Order, but in finishing the Work, the Owner shall have the obligation

to mitigate its damages, but not be required to obtain the lowest figure for the Work performed. Any dispute under this section shall

be addressed in accordance with Article 11 in this Agreement.

Mojave Groundwater Bank

NPL – Pump Stations 35

10.2.4

Where the CMAR’s services have been so terminated by the Owner, the termination shall not affect any rights of the Owner against

the CMAR then existing or which may thereafter accrue. Any retention or payment of monies due the CMAR by the Owner will not release

the CMAR from liability.

10.2.5

The Owner may terminate the Agreement for convenience in accordance with Paragraph 10.3 hereof. In the event of such termination

for convenience, the CMAR shall be compensated for the portion of the CMAR’s Preconstruction or Construction Phase Services, if

any, performed to the date of such termination, but the CMAR shall not be entitled to compensation for Work not performed.

10.3

Owner Termination. Upon ten (10) days written notice to the CMAR, the Owner may, without cause and without prejudice to any other

right or remedy of the Owner, terminate the Agreement for convenience. In such case, the CMAR shall be paid for (without duplication

of any items):

10.3.1

Work executed in accordance with the Contract Documents prior to the effective date of termination, including CMAR Fee for Construction

General Conditions Costs on such Work, as applicable.

10.3.2

Expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment

as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for Construction General Conditions

Costs and CMAR Fee thereon.

10.3.3

Other reasonable expenses directly attributable to termination, including demobilization costs, cancellation charges and fees, and

costs incurred to prepare a termination for convenience cost proposal and cancellation costs related to material and equipment subcontracts.

10.3.4

The amount of profit, if any, on such uncompleted Work agreed to by the Owner and the CMAR as set forth in the Amended Agreement.

Unless mutually agreed to by the Owner and the CMAR in a written amendment to the Agreement, no profit on uncompleted Work for Preconstruction

Phase Services shall be due or payable for any termination for convenience exercised by the Owner or the CMAR during the Preconstruction

Phase Services in accordance with the Contract Documents.

Mojave Groundwater Bank

NPL – Pump Stations 36

10.4 CMAR

Termination

If,

through no act or fault of the CMAR, the Work is suspended for a period of more than thirty (30) days for a single occurrence

or sixty (60) days in the aggregate by the Owner or under an order of court or other public authority, or the Owner fails to pay

within sixty (60) days to the CMAR any undisputed amounts due, or the Owner breaches any other material provision of the Agreement

and the same is not cured within ten (10) days following the Owner’s receipt of written notice thereof from the CMAR, then the

CMAR may, upon ten (10) days written notice to the Owner, terminate the Agreement and recover from the Owner payment for all Work

executed and any expense sustained plus reasonable termination expenses, provided the Owner does not remedy such suspension or

failure within that time. In addition, and in lieu of terminating the Contract Documents, if the Owner has failed to make any

payment as aforesaid of undisputed amounts, the CMAR may, upon ten (10) days written notice to the Owner, stop the Work until

payment of all amounts then due.

10.4.1 In

addition to, and without limiting the generality of the CMAR’s suspension and termination rights under Paragraph 10.4, if the

Owner directs the CMAR or its Subcontractors or Material Suppliers at any tier to perform Work that the CMAR informs the Owner is

illegal or involves an imminent danger to human health, the environment, or the Owner’s property or other nearby or adjoining

properties, the CMAR shall have the right to notify the Owner, in writing, of such illegality or danger and the Owner shall meet

with the CMAR within three (3) days following the Owner’s receipt of such notice to review and discuss such concerns and work

cooperatively and in good faith with the CMAR to resolve them. Any resolution shall include an appropriate adjustment in the Phase 2

Construction Price and Project Construction Schedule to account for the added cost and time to the CMAR in objecting to and

attempting to resolve such concerns. If the Owner fails to respond to the CMAR within ten (10) days following the CMAR’s

notification of such concerns, or the Parties, after meeting to discuss the same are unable, within an additional thirty (30) days

to resolve the concerns to the CMAR’s reasonable, good faith satisfaction, the CMAR shall thereafter have the right to

terminate this Agreement for convenience and without cause upon an additional ten (10) days’ written notice to the Owner. In

such event, the Owner shall pay the CMAR the same amounts owing to the CMAR for an Owner’s termination for convenience

pursuant to Paragraph 10.3.

ARTICLE

11— Claims, Claims Procedures, Dispute Mitigation, and Resolution

11.1 Claims

for Additional Cost or Time

Except

as provided in any applicable section of the Amended Agreement, for any claim for an increase in the Phase 2 Construction Price or the

change in or extension to the Date of Substantial Completion or Date of Final Completion (each a “Claim”), the CMAR shall

give the Owner written notice of the Claim within fifteen (15) days after the CMAR has become aware of the occurrence giving rise to

the Claim. Except in an emergency, notice shall be given before proceeding with the Work. Any change in the Phase 2 Construction Price

or the Date of Substantial Completion or Date of Final Completion resulting from such Claim shall be authorized by Change Order.

Mojave Groundwater Bank

NPL – Pump Stations 37

11.1.1

Claims Procedures

Submission

of a Claim, in full conformance with all requirements of this Article, and rejection of all or part of said Claim by the Owner, is a

condition precedent to any action by the CMAR against the Owner, including, but not limited to, the filing of a lawsuit, request for

mediation, or demand for arbitration.

11.1.2

Notice of Claim

11.1.2.1

If the CMAR disagrees with the decision in, or in any case where the CMAR deems additional compensation or a time extension to the

Contract Time is due the CMAR for work or materials not covered in the Contract Documents or which the Owner has not recognized as extra

work, the CMAR shall notify the Owner, in writing, of its intention to make a Claim.

11.1.2.2

Written notice shall use the words “Notice of Potential Claim.”

11.1.2.2.1

Such Notice of Potential Claim shall state the circumstances and the reasons for the Claim but need not state the amount.

11.1.2.2.2

A Notice of Potential Claim and all notices and other communications required or permitted under this Agreement or the other Contract

Documents shall be in writing and delivered by hand delivery, certified first class mail return receipt requested, reputable overnight

courier, or electronic methods otherwise agreed to by the parties, to:

If to: Owner

Fenner Gap Mutual Water Company

550 South Hope

St, Suite 2850

Los Angeles, CA 90071

If to: CMAR:

W. M. Lyles Co.

525 W. Alluvial Ave.

Fresno, CA 93711

and shall be deemed given and received.

11.1.2.3

Claims pertaining to decisions or such other determinations by the Owner relating to any Claim from the CMAR shall be communicated by

the CMAR with the Owner in writing within fifteen (15) days following receipt of such decision.

11.1.2.4

All other Claims by the CMAR shall be filed in writing within fifteen (15) days after the event or occurrence giving rise to the Claim.

11.1.2.5

Additionally, no Claim for additional compensation or extension of time for a delay will be considered unless the provisions for Delays

and Time Extensions are complied with.

11.1.2.6

Unless expressly permitted in the Phase 2 Construction Price Amendment or other Contract Documents, no Claim for additional compensation

for Work performed filed by the CMAR after the date of Final Payment will be considered.

Mojave Groundwater Bank

NPL – Pump Stations 38

11.1.3 Records

of Extra Work

11.1.3.1

In proceeding under a Claim for extra Work, the CMAR shall keep accurate records in such a manner as to provide a clear distinction

between the direct costs of extra Work paid and the costs of other operations.

11.1.3.2

Daily extra work reports shall:

11.1.3.2.1

Be signed by the CMAR or the CMAR Representative.

11.1.3.2.2

Itemize the materials used and state the direct cost of labor and the charges for equipment rental, whether furnished by the CMAR,

Subcontractor, or any specialized forces.

11.1.3.2.3

Provide names or identifications and classifications of workers, the hourly rate of pay and hours worked, and also the size, type,

and identification number of equipment and hours operated.

11.1.3.2.4

Substantiate material charges with attached valid copies of vendor’s invoices and, if not available, the invoices shall be

submitted within forty-five (45) days after the date of delivery of the material.

11.1.3.3

Such information shall be submitted to the Owner weekly. The Owner shall review, disapprove, and request adjustments, or agree upon and

sign daily extra work reports upon receipt from the CMAR. The CMAR and the Owner shall agree on the contents of the extra work reports

daily.

11.1.3.3.1

The Owner will compare the Owner’s records with the completed daily extra work reports furnished by the CMAR and make any necessary

adjustments.

11.1.3.3.2

When these daily extra work reports are agreed upon and signed by both Parties, the reports shall become the basis of payment for

the Work performed but shall not preclude subsequent adjustment based on a later audit by the Owner.

11.1.3.4

The CMAR’s and Subcontractor’s records pertaining to the Project shall be open to inspection or audit by representatives

of the Owner, during the life of the Agreement, and for a period of three (3) years after the date of acceptance thereof, and the CMAR

and all Subcontractors shall retain those records for that period. Such audit shall not include the CMAR’s proprietary information,

including, but not limited to, the CMAR’s formula or other data or communications used in calculating pricing.

11.1.3.4.1

Where payment for materials or labor is based on Work performed by Subcontractors and other forces not employees of the CMAR, the

CMAR shall make every reasonable effort to ensure that the cost records of those other forces will be open to inspection and audit by

representatives of the Owner on the same terms and conditions as the cost records of the CMAR.

11.1.3.4.2

If an audit is to be commenced more than thirty (30) days after the acceptance date of the Agreement, the CMAR will be given a reasonable

notice of the time when the audit is to begin.

Mojave Groundwater Bank

NPL – Pump Stations 39

11.1.3.5

The CMAR and Subcontractors shall keep full and complete records of the costs and additional time incurred for any Work for which

a Claim for additional compensation is made.

11.1.3.5.1

The Owner Representative or any designated Claim investigator or auditor shall have access to those records and any other records

as may be required by the Owner Representative to determine the facts or contentions involved in the Claims.

11.1.3.6

The Owner, or its authorized representatives, shall have access, upon reasonable notice, during normal business hours, to the CMAR

and Subcontractors’ books, documents, and accounting records, including, but not limited to, bid worksheets, bids, Subcontractor

bids and proposals, estimates, cost accounting data, accounting records, payroll records, time sheets, canceled checks, profit and loss

statements, balance sheets, project correspondence including, but not limited to, correspondence between the CMAR and its sureties and

Subcontractors/Vendors, project files, scheduling information, and other records of the CMAR and Subcontractors directly or indirectly

pertinent to the Work, original as well as change and Claimed extra Work, to verify and evaluate the accuracy of cost and pricing data

submitted with any Change Order, prospective or completed, or any Claim for which additional compensation has been requested or Claim

has been tendered.

11.1.3.6.1

Such access shall include the right to examine and audit such records, and make excerpts, transcriptions, and photocopies at the

Owner’s cost.

11.1.3.7

In case the Claim is found to be just, it shall be allowed and paid for as provided by the Contract Documents.

11.2 Dispute

Resolution

11.2.1

Direct Discussions. If the Parties cannot reach resolution on a matter relating to or arising out of the Agreement or the

Project, the Parties shall endeavor to reach resolution through good faith direct discussions between the Parties’

representatives, who shall possess the necessary authority to resolve such matter and who shall record the date of first

discussions. If the Parties’ representatives are not able to resolve such matter within five (5) Business Days from the date

of first discussion, the Parties’ representatives shall immediately inform senior executives of the Parties in writing that

resolution was not affected. Upon receipt of such notice, the senior executives of the Parties shall meet within five (5) Business

Days to endeavor to reach resolution. If the dispute remains unresolved after fifteen (15) days from the date of first discussion,

the Parties shall submit such matter to the dispute resolution procedures selected herein.

11.2.2

Mediation. Unless otherwise provided to the contrary in the Phase 2 Construction Price Amendment, Claims and other disputes or matters

in controversy arising out of or related to the Agreement or Project that are not resolved pursuant to other provisions of this Article

11 shall be mediated prior to recourse to litigation or other binding dispute resolution proceeding. Such mediation shall, unless the

Parties mutually agree otherwise, be conducted by a mediator mutually agreeable to the Parties in the city or town nearest where the

Project is located in accordance with the American Arbitration Association Construction Industry Mediation Procedures in effect on the

date of this Agreement. A request for mediation shall be made in writing, delivered to the other Party to the Agreement, and filed with

the person or entity administering the mediation. The request may be made concurrently with the filing of litigation or other binding

dispute resolution proceedings, and, in such event, mediation shall proceed at an appropriate time mutually agreed upon by the Parties

or as directed by the court. The mediator shall be agreed to by the mediating Parties; in the absence of an agreement, the Parties shall

each submit one name from the mediators listed by the American Arbitration Association in the locality in which the Project is located

or other agreed-upon services. Such mediation shall be held for a period not to exceed one (1) day unless otherwise agreed in writing

by the Parties. Agreements reached in mediation shall be enforceable as settlement agreements in any court having jurisdiction thereof.

Neither Party shall be deemed the prevailing Party and each Party shall pay its own attorneys’ fees and costs and one-half of the

mediator’s fees and costs. Disputes that are not resolved through mediation in accordance with this Paragraph 11.2.2 shall be resolved

in the manner selected by the Parties in Paragraph 11.2.3 below.

Mojave Groundwater Bank

NPL – Pump Stations 40

11.2.3

Dispute Resolution. If the matter remains unresolved after submission of the matter to direct management discussions or mediation,

the Parties shall submit the matter to the binding dispute resolution procedure described below:

11.2.3.1

By litigation. Litigation shall commence in any court having jurisdiction over the Project site. Notwithstanding any contrary provision

herein, nothing in the Contract Documents shall be construed as a waiver of a defending Party’s right to remove a suit to any US

District Court having jurisdiction, provided that the threshold requirements for removal and diversity are satisfied. The matter shall

proceed as a bench trial tried to a single judge. THEREFORE, THE PARTIES TO THIS AGREEMENT, INCLUDING ANY ASSIGNEES, HEREBY KNOWINGLY,

VOLUNTARILY, AND IRREVOCABLY WAIVE ANY AND ALL RIGHT TO TRIAL BY JURY.

11.2.4

Survival. The dispute resolution provisions of the Agreement shall survive the completion of the Work and/or the expiration or termination

of the Contract Documents.

11.3 Venue

The

venue of any binding dispute resolution procedure shall be the location of the Project unless the Parties agree on a mutually convenient

location. The Parties waive any objection to such venue on the basis of inconvenient form.

11.4 Multiparty

Proceeding

The

Parties agree that all Parties necessary to resolve a claim shall be Parties to the same dispute resolution proceeding. Appropriate provisions

shall be included in all other contracts relating to the Work to provide for the joinder or consolidation of such dispute resolution

procedures.

11.5 Lien

Rights

Nothing

in this Article 11 or other applicable provisions of the Contract Documents shall limit any rights or remedies not expressly waived by

the CMAR which the CMAR may have under Applicable Law.

ARTICLE

12 — Miscellaneous Provisions

12.1 Assignment

Neither

the Owner nor the CMAR shall assign its interest in the Agreement or the other Contract Documents without the written consent of the

other except as to the assignment of proceeds. The terms and conditions of the Agreement and the other Contract Documents shall be binding

upon both Parties, their partners, successors, assigns, and legal representatives. Neither Party to the Agreement or the other Contract

Documents shall assign the Agreement without written consent of the other except that the Owner may assign the Agreement to a wholly

owned subsidiary of the Owner when the Owner has fully indemnified the CMAR or to an institutional lender providing construction financing

for the Project as long as the assignment is no less favorable to the CMAR than the Agreement. In the event of such assignment, the CMAR

shall execute any consent reasonably required. In such event, the wholly owned subsidiary or lender shall assume the Owner’s rights

and obligations under the Contract Documents and the CMAR shall not be obligated to perform for such wholly owned subsidiary or lender

unless the CMAR is fully paid for its Work under the Agreement in accordance with the terms and provision thereof. If either Party attempts

to make such an assignment, that Party shall nevertheless remain legally responsible for all obligations under the Agreement, unless

otherwise agreed by the other Party.

Mojave Groundwater Bank

NPL – Pump Stations 41

Exhibit

A.1 — Insurance Requirements

[***]

Mojave Groundwater Bank

NPL – Pump Stations 42

Exhibit

A.2 – Performance Bond and Payment Bond

[***]

Mojave Groundwater Bank

NPL – Pump Stations 43

Exhibit

B—CMAR Phase I Preconstruction Scope of Services

[***]

Mojave Groundwater Bank

NPL – Pump Stations 44

Exhibit

C—Phase I Notice to Proceed

[***]

Mojave Groundwater Bank

NPL – Pump Stations 45

Exhibit

D—Phase I Early Work(s) Package(s) (if applicable)

Not

Used

Mojave Groundwater Bank

NPL – Pump Stations 46

Exhibit

D.1—Phase I Early Work(s) Package(s) Amendment Form (if applicable)

Not

Used

Mojave Groundwater Bank

NPL – Pump Stations 47

Exhibit

E—Phase 2 Construction Price

Southern Division - Murrieta

26501 Madison Avenue

Murrieta, CA 92562

Telephone (951) 973-7393

Fax (951) 698-3031

Contractor’s License No. 422390

DIR No. 1000001448

June 30, 2026

Fenner Gap Mutual Water Company

550

South Hope Street – Suite 2850

Los Angeles, CA 90071

Attn: Don Bunts

Project: Mojave Water Bank Northern Pipeline

Facilities Construction

Subject: 30% Price & Schedule – R2

Please find the enclosed price & schedule proposal

based on the revised drawings received May 26, 2026 for Pump Stations 1, 3, 5 & 6 only.

The total price is $218,977,066 and substantial completion

is anticipated to be achieved within 24 months from Notice to Proceed.

The pricing and information are organized as follows:

Section

1 – Total Price Summary

Section 2 – Estimate Clarifications

Section 3 –

Estimate Breakdown

Section 4 – General Conditions

Section 5 – Subcontractor Quotes

Section 6 – Schedule - Forthcoming

Please reach out with any questions, comments or concerns.

Sincerely,

Stephen Henning

Senior Project Manager – Collaborative Delivery

W.M. Lyles Co.

Corporate Office: 525 W. Alluvial

Avenue, Suite C, Fresno, CA 93711 Telephone: (559) 441-1900

An Equal Opportunity Employer

Mojave Groundwater Bank

Bank NPL – Pump Stations

48

[***]

Mojave Groundwater Bank

Bank NPL – Pump Stations

49

Exhibit

G—Project Technical Scheduling Requirements

[***]

Mojave Groundwater Bank

NPL – Pump Stations 50

Exhibit

H—Preconstruction Phase Services Hourly Rate Schedule

[***]

Mojave Groundwater Bank

NPL – Pump Stations 51

Exhibit

I—Project Technical Performance Requirements

Not

Used

Mojave Groundwater Bank

NPL – Pump Stations 52

Exhibit

J—Project Labor and Vendor Requirements

[***]

Mojave Groundwater Bank

NPL – Pump Stations 53

EX-10.2 — CONSTRUCTION MANAGEMENT AT-RISK AGREEMENT, DATED JULY 27, 2026, BY AND BETWEEN FENNER GAP MUTUAL WATER COMPANY AND MIKE BUBALO CONSTRUCTION CO., INC

EX-10.2

Filename: ea029942401ex10-2.htm · Sequence: 3

Exhibit

10.2

Note:

Certain portions of this exhibit (marked with [***]) have been omitted in accordance with Item 601(b)(10)(iv) of Regulation S-K because

they are both (i) not material and (ii) the type of information that the Company customarily and actually treats as private or confidential.

Mojave

Water Bank Project

Northern

Pipeline Facilities

Construction

- Pipeline

CONSTRUCTION

MANAGEMENT

AT-RISK

(CMAR)

Agreement

Mojave Groundwater Bank

Northern Pipeline Project

CONTENTS

ARTICLE 1 — Definitions

2

ARTICLE 2 — CMAR Responsibilities

7

ARTICLE 3 — Owner Responsibilities

9

ARTICLE 4 — Subcontracts and Labor

Relations

9

ARTICLE 5 — Time

10

ARTICLE 6 — Compensation

12

ARTICLE 7 — Changes

13

ARTICLE 8 — Payment

13

ARTICLE 9 — Liability

14

ARTICLE 10 — Dispute Mitigation and

Resolution

15

ARTICLE 11 — Miscellaneous Provisions

15

Exhibit A—General Conditions to

Agreement

19

Exhibit A.1—Insurance Requirements

43

Exhibit A.2—Performance Bond and

Payment Bond

44

Exhibit B—CMAR Phase I Preconstruction

Scope of Services

45

Exhibit C—Phase I Notice to Proceed

46

Exhibit D—Phase I Early Work(s)

Package(s) (if applicable)

47

Exhibit D.1—Phase I Early Work(s)

Package(s) Amendment Form (if applicable)

48

Exhibit E—Phase 2 Construction Price

Amendment

49

Exhibit F—Initial Schedule of Work

50

Exhibit G—Project Technical Scheduling

Requirements

51

Exhibit H—Preconstruction Phase

Services Hourly Rate Schedule

52

Exhibit I—Project Technical Performance

Requirements

53

Exhibit J—Project Labor and Vendor

Requirements

54

Mojave Groundwater Bank

Northern Pipeline Project i

Mojave

Water Bank

Agreement

Between Owner and Construction Manager at-Risk

(CMAR)

Basis

of Payment is Cost of the Work Plus CMAR’s Fee Not to Exceed a

Guaranteed

Maximum Price

Agreement

This

Agreement is made effective as of the 27th day of July in the year 2026 (the “Contract Date”), for good and valuable consideration,

the receipt and sufficiency of which are hereby acknowledged, by and between the

OWNER

Owner:

Fenner Gap Mutual Water Company

Address:

[***]

and

the

CONSTRUCTION

MANAGER AT-RISK (CMAR):

Company:

Mike Bubalo Construction Co. Inc.

Address:

[***]

for

services in connection with the following Project:

PROJECT

NO.: 20-002

PROJECT NAME:

MOJAVE WATER BANK PROJECT

NORTHERN PIPELINE FACILITIES CONSTRUCTION - PIPELINE

PROJECT

LOCATION: CADIZ, CALIFORNIA

PROJECT

SUMMARY AND PHASING:

The

total project site is located near Cadiz, California, through an existing pipeline Right of Way (ROW) towards the City of Barstow and

potentially extending beyond to the northern boundary of Edwards Air Force Base. The activities for the initial portion of the Northern

Pipeline (NPL) project in the larger context of the Mojave Groundwater Bank Program and overall NPL will be focused on conveyance from

Reaches 1 and 2-Point A to Point B to Point C, as shown on the location map below and represents approximately 90 miles of an existing

30” diameter Natural Gas pipeline that is being repurposed and/or replaced to convey water.

Mojave Groundwater Bank

Northern Pipeline Project 1

FIGURE

1

The

full scope of the NPL includes removal and replacement of up [***] an existing 30” oil and gas pipeline and necessary appurtenances

(wash crossings and connections to the existing pipeline at either end of the identified sections to be replaced as well as reducers

to connect to the existing 30” railroad crossing) with the 36” steel pipe supplied by the Owner, to repurpose for water conveyance,

the installation of [***] air release valves and blow-off valves, the installation of [***] cathodic protection test stations, the replacement

of [***] cathodic protection rectifiers and those other items included in Exhibit E.

Notice

to the Owner and/or CMAR (each individually a “Party” and collectively, the “Parties”) shall be given at the

above addresses.

Accordingly,

the Parties hereto hereby agree as follows.

ARTICLE

1 — Definitions

1.1 Definitions

1.1.1

“Agreement” means this Agreement between Owner and CMAR where the Basis of Payment is the Cost of the Work plus CMAR’s

Fee with a Guaranteed Maximum Price, and the exhibits and attachments made part of this Agreement upon its execution including but not

limited to CMAR’s Exclusions and Assumptions attached as Exhibit K.

1.1.2

“Allowance” is an estimated sum to be used as Owner directs for categories of Work that cannot be established at the

time the GMP are agreed upon. Owner can direct Work under Allowances only up to the established amount as identified in the Bid Schedule

included in Exhibit E. Any work directed over the established Allowance amount is to be processed by Change Order to CMAR.

Mojave Groundwater Bank

Northern Pipeline Project 2

1.1.3

“Applicable Law” or “Applicable Laws” means, collectively, all applicable federal, state, and local laws,

statutes, rules, regulations, tariffs, levies, embargoes, ordinances, codes, and binding administrative or judicial precedents or authorities,

including the binding interpretation or administration thereof by any Governmental Authority charged with the enforcement, interpretation,

or administration thereof, and all applicable administrative orders, directed binding duties, licenses, authorizations, and permits of,

and binding agreements with, any Governmental Authority, in each case applicable to or affecting the Project or the Work of CMAR under

this Agreement or the other Contract Documents.

1.1.4

“Assumptions” and “Clarifications” are material terms associated with CMAR’s Guaranteed Maximum Price

upon which the Owner and CMAR agree and are more particularly described in Exhibit E.

1.1.5

“Bid Package” or “Bid Packages” means one or more design bid packages for specific scopes of the Work that

are developed and generated by the Engineer for bidding and award pursuant to this Agreement.

1.1.6

The term “Business Day” means any day other than a Saturday, Sunday, or legal holiday on which national banks located

in California are not required or permitted to be open for business to the public.

1.1.7

A “Change Order” is a written order signed by the Owner and the CMAR after execution of this Agreement indicating any

change to the Agreement including, among other things, changes in the Scope of the Work, the CMAR’s Fee for Preconstruction Phase

Services, the Phase 2 Construction Price and Date of Substantial Completion, or Date of Final Completion.

1.1.8

A “Change Order Proposal” is a proposal submitted by the CMAR or the Owner for a change in the Work as evidenced by a

Change Order.

1.1.9

The “CMAR” is Mike Bubalo Construction Co., Inc.

1.1.10

The “CMAR Representative” is Dave Sorem.

1.1.11

“Construction Phase” or “Construction Phase Services” means the Work of the CMAR undertaken during Phase

2 pursuant to the Drawings and Specifications in accordance with Paragraph 2.2 of this Agreement and other applicable terms and provisions

of this Agreement and the other Contract Documents.

1.1.12

“Construction General Conditions Costs” are an element of the Cost of Work that is included in the Construction Price

as agreed to by the CMAR and the Owner and has the meaning set forth in Article 5 of the Exhibit A – General Conditions.

1.1.13

“Contingencies,” where applicable, has the meaning set forth in Paragraph 6.4 of Exhibit A – General Conditions.

Mojave Groundwater Bank

Northern Pipeline Project 3

1.1.14

The “Contract Documents” represents the entire and integrated agreement between the Parties hereto and supersedes prior

negotiations, representations, or agreements, either written or oral. It consists of this Agreement, the General Conditions, the Phase

2 Construction Price, the Drawings, Specifications, addenda issued prior to execution of this Agreement, information furnished by the

Owner under Paragraph 3.8 of the General Conditions, any supplemental or other conditions attached as an exhibit to this Agreement, performance

Specifications attached as an exhibit to this Agreement, the CMAR’s qualifications, Assumptions, and Clarifications mutually agreed

upon by Owner and CMAR and identified in Exhibit K and attached to this Agreement and/or the Phase 2 Construction Price, the other

documents listed in this Agreement, and any modifications issued after its execution, including, without limitation, Change Orders and

Owner Change Directives. The Contract Documents do not include bidding instructions or sample forms not attached as exhibits to this

Agreement.

1.1.15

The “Contract Time” is the overall time period allowed for performance of the Work.

1.1.16

“Cost of the Work,” has the meaning of the sum of all allowed direct and indirect costs necessarily and reasonably incurred

and paid by CMAR in the performance of the Work including those set forth in the Phase 2 Construction Price.

1.1.17

The term “Day” or “day” shall mean calendar day unless otherwise specifically defined.

1.1.18

“Defective Work” is any portion of the Work that does not conform to the Contract Documents, as more fully described

in Paragraphs 2.4 and 2.5 of the General Conditions.

1.1.19

“Differing Site Conditions” means conditions at the Project site that are: (a) subsurface or other physical conditions

materially different from those indicated in the documents provided to CMAR prior to bid, or (b) unusual or unknown physical conditions

materially different from conditions ordinarily encountered.

1.1.20

“Drawings” means the documents prepared by Engineer or other consultants of Owner showing the design, location, and dimensions

of the Work, generally including plans, elevations, sections, details, schedules, and diagrams.

1.1.21

“Early Work(s) Package(s)” is procurement or construction work that may be performed during Phase I or Phase 2 for the

benefit the Project.

1.1.22

“Engineer” means the licensed Engineer and its consultants, retained by Owner to perform design services for the Project.

1.1.23

“Engineer Contract” means the engineering contract dated February 18, 2025, and any subsequent contracts between Owner

and Engineer for the design and/or engineering of the Project or portions thereof.

1.1.24

“Fee” or “CMAR Fee” means the amount due to CMAR for all services provided and expenses incurred by CMAR

for Preconstruction Phase Services. The Fee to be charged by the CMAR for PreConstruction Phase Services, shall be (i) (ii) a fixed dollar

amount based on the Cost of the Work, in each case agreed upon by the Owner and the CMAR at the time of execution of this Agreement.

1.1.25

“Field Order” means minor changes in the Work if the changes do not involve an adjustment in the Phase 2 Construction

Price or the Contract Times and are compatible with the design of the completed Project as a functioning whole as indicated by the Contract

Documents.

Mojave Groundwater Bank

Northern Pipeline Project 4

1.1.26

“Final Completion” occurs on the date when the CMAR’s obligations under this Agreement are complete and final payment

becomes due and payable in accordance with Paragraph 8.9 of the General Conditions. This date shall be confirmed by a Certificate of

Final Completion signed by the Owner and the CMAR.

1.1.27

“Final Payment” has the meaning set forth in Article 8.9 of the General Conditions.

1.1.28

“Force Majeure,” as defined in Article 5.4.1.1 of the General Conditions.

1.1.29

The “General Conditions” to the Agreement is included as Exhibit A.

1.1.30

“GMP” or “Guaranteed Maximum Price” means, with regard to the Project as a whole or any Bid Package for construction

of any portion of the Work where a GMP is selected by the Parties as the basis for the Phase 2 Construction Price, as may be further

defined in the Phase 2 Construction Price Amendment for the Project, as applicable. The Guaranteed Maximum Price for the Work covered

thereby, as established by a Phase 2 Construction Price Amendment executed by and between Owner and CMAR, is further defined as the Cost

of Work plus Allowances and fee for such Work. Subject to Change Orders and other allowable adjustments made pursuant to this Agreement

or the other Contract Documents, where the Phase 2 Construction Price for any Work is based on a GMP, the Phase 2 Construction Price

for such Work shall not exceed the GMP for such Work plus any approved additions or deductions to the GMP.

1.1.31

“Governmental Authorities” means any federal, state, local, or other political subdivision thereof, any agency, authority,

instrumentality, regulatory body, court, administrative tribunal, central bank, public office, court, arbitration or mediation panel,

or other entity exercising executive, legislative, judicial, taxing, regulatory, or administrative powers or functions of government.

1.1.32

A “Material Supplier” is a person or entity retained by the CMAR or a Subcontractor to provide material or equipment

for the Work.

1.1.33

“Others” means other contractors, Material Suppliers, and persons at the Worksite who are not employed by the CMAR or

Subcontractors.

1.1.34

“Owner” is Fenner Gap Mutual Water Company and includes the Owner’s representative and any other Owner authorized

person or entity.

1.1.35

“Owner’s Approved Budget” means the sum of $80,000,000.

1.1.36

“Owner Change Directive” means a directive issued by Owner to CMAR to undertake and perform a change in the Work prior

to the time such Parties have reached agreement on the adjustment, if any, of the Phase 2 Construction Price or the Contract Time.

1.1.37

The Owner’s authorized representative is Don Bunts (the “Owner’s Representative”).

Mojave Groundwater Bank

Northern Pipeline Project 5

1.1.38

“Phase 1” means the Preconstruction Phase and will include close collaboration with the Engineer and the Owner, to define

details appropriate to design milestones, establish logical work packages to the target schedules and develop early procurement packages

to equipment and materials determine to be long-lead elements and critical to project activities.

1.1.39

“Phase 2” means the Construction Phase Services performed by CMAR pursuant to this Agreement and the other Contract Documents.

1.1.40

“Phase 2 Construction Price” means the contract price established by the Parties for CMAR’s performance of the

Work during the Construction Phase in accordance with this Agreement and the other Contract Documents, as the same may be modified by

any Change Orders increasing or reducing such contract price.

1.1.41

“Phase 2 Construction Price” has the meaning given to it in Exhibit E.

1.1.42

“Phase 2 Construction Price Proposal” has the meaning given to it in Exhibit E.

1.1.43

“Preconstruction Phase” or “Preconstruction Phase Services” means the Phase 1 Preconstruction Services performed

by CMAR in connection with the Project and described in Paragraph 2.1 of this Agreement The scope of Preconstruction Phase Services related

to the Pipeline shall be limited as further described in Exhibit B.

1.1.44

“Project” is the building, facility, or other improvements for which the CMAR is to perform Work under this Agreement.

It may also include construction by the Owner or Others which is not part of the Work of this agreement.

1.1.45

“Project Component” refers to one of the three components of the Project, the pipeline portion of the Northern Pipeline,

as further described in Exhibit B (Preconstruction Phase Services) and Exhibit F.

1.1.46

“Risk Register” is the result of an assessment led by either the Owner or the CMAR, and agreed to by both parties, that

identifies potential project risks and the likelihood of occurrence and allocates the responsibility for mitigation of each risk element.

1.1.47

“Schedule” is the critical path method (CPM) schedule prepared by the CMAR, and based on the current conceptual schedule

to be refined during Phase 1 preconstruction services, that specifies the dates on which the CMAR plans to begin and complete various

parts of the Work, including all activities during Phase 1 Preconstruction and Phase 2 Construction.

1.1.48

“Schedule Update” means any update to the Schedule prepared and submitted by CMAR to Owner concurrently with CMAR’s

submission to Owner of a Phase 2 Construction Price Proposal, , or as otherwise required or permitted hereunder.

1.1.49

“Specifications” means the documents prepared by Owner, Engineer, or other consultant of Owner consisting of the written

requirements for materials, equipment, construction systems, standards, and workmanship for the Work and performance of related services.

Mojave Groundwater Bank

Northern Pipeline Project 6

1.1.50

A “Subcontractor” is a person or entity retained by the CMAR as an independent contractor to provide the labor, materials,

equipment, or services necessary to complete a specific portion of the Work. The Subcontractor obligations within this Agreement shall

also apply to the CMAR for all self-perform trade work.

1.1.51

“Substantial Completion of the Work,” or “Substantially Complete” or a designated portion, occurs on the

date when the Work is sufficiently complete in accordance with the Contract Documents so that the Owner may occupy or utilize the Work,

or a designated portion, for the beneficial use for which it is intended. This date shall be confirmed by a certificate of Substantial

Completion signed by the Engineer and CMAR with Owner’s consent. The issuance of a certificate of occupancy is not a prerequisite

for Substantial Completion if the certificate of occupancy cannot be obtained due to factors beyond the CMAR’s control. In addition

to and without limiting the generality of the foregoing requirements of this Paragraph 1.1.51, “Substantial Completion” of

the Work or a portion of the Work shall not be deemed to have occurred unless and until the Project or a portion thereof is available

for beneficial use and satisfies any other requirements set forth in the Phase 2 Construction Price.

1.1.52

A “Sub-subcontractor” is a person or entity who has an agreement with a Subcontractor to perform any portion of the Work.

1.1.53

“Work” means the construction and services necessary or incidental to fulfill the CMAR’s obligations for the Project

in conformance with this Agreement and the other Contract Documents, including the Preconstruction Phase Services and the Construction

Phase Services as set forth in the Scope of Work.

1.1.54

“Worksite” means the location of the Project as identified in Article 1 where the Work is to be performed.

1.1.55

Capitalized terms used herein but not defined herein shall have the meanings given them in the Phase 2 Construction Price Amendment,

General Conditions, and other Contract Documents.

ARTICLE

2 — CMAR Responsibilities

2.1 Phase

1 Preconstruction Phase Services

2.1.1

Commencement. Preconstruction Phase Services, as described in Exhibit B attached hereto shall commence no later than five

(5) Days following the Owner’s issuance of a Phase 1 Notice to Proceed in substantially the form of Exhibit C attached hereto

and incorporated herein by this reference with the appropriate box checked. For the performance of the Preconstruction Phase Services

CMAR shall be paid the Preconstruction Phase Services fees in the amount and in the manner set forth in Paragraph 6.1.

2.1.2

Early Work(s) Package(s). If applicable, Early Work(s) Package(s) commenced prior to mutual execution of a Phase 2 Construction Price

shall be performed and paid for pursuant to Exhibit D and Exhibit D.1 to this Agreement but otherwise subject to the terms,

covenants, and conditions of this Agreement and the other Contract Documents.

Mojave Groundwater Bank

Northern Pipeline Project 7

2.1.3

Completion.

CMAR’s

Preconstruction Phase Services shall be deemed to have been completed upon receipt of Notice to Proceed on Phase 2 Construction, provided,

however, that the Preconstruction Phase Services may extend into and run concurrently with the Phase 2 Construction Phase as the Parties

transition from Preconstruction to Construction under a GMP arrangement. If the Owner and CMAR are unable to reach a written agreement

on a Phase 2 Construction Price, the Owner may terminate this Agreement for convenience on five (5) Days’ written notice to the

CMAR in accordance with Paragraph 10.3 of the General Conditions. In the event of such termination for convenience, the CMAR shall be

compensated as set forth in Section 10.3 of the General Conditions for (1) the portion of the CMAR’s Preconstruction or Construction

Phase Services, if any, performed to the date of such termination, but the CMAR shall not be entitled to compensation for Work not performed,

plus (2) reasonable demobilization costs, if any, which shall include, but not be limited to, reasonable cost(s) incurred by CMAR to

break contractual obligations with Subcontractors, Subconsultants, Suppliers, Vendors, and Materialmen entered prior to Subcontractor’s

receipt of the notice of termination. In such event, the CMAR shall have no obligation to perform the Scope of Work covered by the unexecuted

Phase 2 Construction contract. The CMAR shall not be entitled to compensation for Work not performed.

2.2 Phase

2 Construction Phase Services

2.2.1

Commencement. Unless otherwise provided to the contrary elsewhere in this Agreement or the other Contract Documents, CMAR’s

Construction Phase Services shall commence within ten (10) days of the Phase 2 Notice to Proceed.

2.2.2

Self-Perform Work. As part of the CMAR’s Construction Phase Services, the CMAR may be entitled to self-perform work with Owner

approval. Any self-perform Work, whether negotiated or competitively bid, that is approved by the Owner is subject to the terms and conditions

of and as identified in Exhibit B and the following provisions of this Paragraph 2.2.2.

2.2.2.1

The CMAR may seek to perform portions of the Work itself in addition to minor work that may be included in the CMAR’s Construction

General Conditions Costs. As part of CMAR’s Preconstruction Phase Services, CMAR shall communicate to Owner, in writing, which

portions of the Work that it intends to self-perform and the pricing for such portions shall be clearly identified within CMAR’s

Phase 2 Construction Price Proposal.

2.2.2.2

If a selected Subcontractor defaults in the performance of its Work or fails to execute a subcontract after being selected in accordance

with this paragraph, the CMAR may, without advertising, fulfill the contract requirements through selection of an alternate Subcontractor

or self-performance, in each case with the Owner’s prior written approval. Owner shall be notified in the event of a Subcontractor

default or failure to execute the subcontract.

2.2.2.3

The pricing for any Work that will be performed by the CMAR shall be submitted to and reviewed by the Owner’s Representative,

or any other neutral party as determined by the Owner, for confirmation that the pricing is competitive and representative of the market

value of the Work.

Mojave Groundwater Bank

Northern Pipeline Project 8

ARTICLE

3 — Owner Responsibilities

3.1 Owner

Responsibilities

Owner

shall be responsible for providing the information and delivering the materials set forth in Article 3 of the General Conditions.

ARTICLE

4 — Subcontracts and Labor Relations

4.1 Subcontractors

The

work not performed by the CMAR with its own forces shall be performed by approved Subcontractors. All subcontracts shall be issued on

a Lump-Sum basis unless the Owner has given prior written approval of a different method of payment to the Subcontractor. Owner may require

CMAR to competitively bid subcontracts for services or supplies that are over $200,000. CMAR may subcontract any services or supplies

that are under $200,000 without the approval or competitive requirement to Subcontractors.

4.2 Labor

Relations

4.2.1

Prevailing Wages.

4.2.1.1

Applicable laws. The current prevailing wage rate determinations for public works contracts by the Owner, the Director of the California

Department of INDUSTRIAL RELATIONS, and, if federal funding is used for the Project, the current General Wage Determination Decisions,

as determined by the US Secretary of Labor, may change during the term of this Agreement. CMAR will pay the applicable prevailing wage

in effect at the time services are rendered.

4.2.1.1.1

Davis-Bacon. Should Owner obtain federal funding for the Project, CMAR shall be responsible for ensuring that all subcontracts and

Subcontractors fully comply with all applicable requirements of the Davis-Bacon Act, including but not limited to applicable prevailing

wage, contractual provisions, and recordkeeping.

4.2.1.1.2

CMAR shall pay any person performing labor necessary to complete any portion of Work on the Project not less than the highest general

prevailing rate of wages. If federal funds are used for the Project, where the minimum rate of pay for any classification differs among

city, state, and federal wage rate determinations, the highest rate of pay shall prevail.

4.2.1.1.3

CMAR shall include, in any contract or subcontract relating to Work on the Project, a requirement that all persons performing labor

under such contract or subcontract shall be paid not less than the highest prevailing rate of wages for the labor so performed.

Mojave Groundwater Bank

Northern Pipeline Project 9

4.2.2

Compliance Monitoring. CMAR shall require every subcontractor to provide certified payroll reports with respect to all persons performing

labor necessary to complete any portion of Work on the Project. This input will be required as part of the CMAR monthly project/program

summaries and exceptional issues will be included in weekly project updates and reports. Failure to provide this information may result

in the withholding of progress payments until such information is provided to the Owner.

4.2.3

Nondiscrimination / Nonharassment. CMAR shall not engage in any form of discrimination or harassment because of race, color, creed,

national origin, ancestry, age, sex, sexual orientation, disability, or any other protected classification against any employee or applicant

for employment on the Project.

4.2.4

Additional Requirements. During performance of the Construction Services, CMAR shall comply, and shall require every subcontractor

to comply, with any local hire, labor relations, or local procurement requirements required by any Project Labor Agreement hereunder,

funding source or contractual obligation of the Owner. A current list of such obligations is set forth in Exhibit J. For the avoidance

of doubt, the obligations of any Project Labor Agreement shall not apply during performance of the Preconstruction Phase Services.

ARTICLE

5 — Time

5.1 Performance

of the Work

5.1.1

Date of Commencement. The Date of Commencement of the Preconstruction Phase Services, shall be July 15, 2026. The Work shall proceed

in general accordance with the Schedule of Work as such Schedule may be amended from time to time, subject to other provisions of this

Agreement. The Schedule is subject to allowable adjustments in the Contract Time as permitted herein or in the other Contract Documents.

5.1.2

Substantial / Final Completion. Unless the Parties agree otherwise, the Date of Substantial Completion and the Date of Final Completion

shall be established pursuant to the Phase 2 Construction Price Amendment, subject to adjustments as provided for in the Contract Documents.

If a Phase 2 Construction Price is not established and the Parties desire to establish a Date of Substantial Completion or Date of Final

Completion, it shall be set forth via Amendment.

5.1.3

The CMAR shall not knowingly commence the Work on Phase 2 Construction before the effective date of insurance to be provided by the

CMAR and Owner as required by the Contract Documents.

5.2 Schedule

of the Work

5.2.1

The initial Schedule is attached hereto as Exhibit F.

5.2.2

Owner will timely review the baseline Schedule submitted by CMAR. If the Owner determines that additional supporting data are necessary

to fully evaluate the Schedule, the Owner will request additional supporting data in writing. Such data shall be furnished no later than

five (5) Days after the date of such request. Owner will render a decision promptly and in any case within ten (10) Days after the latter

of the receipt of the Schedule update or the deadline for furnishing such additional supporting data. Owner shall review, approve, and/or

provide comments in a reasonable time.

Mojave Groundwater Bank

Northern Pipeline Project 10

5.2.3

Contemporaneously with CMAR’s submission of its Phase 2 Construction Price Proposal in accordance with Phase 2 Construction

Price Amendment, the CMAR shall submit to the Owner and, if directed, the Engineer, a Schedule Update, in compliance with the technical

scheduling requirements attached hereto as Exhibit G and the requirements of this Paragraph 5.2, that shall show the dates on

which the CMAR plans to commence and complete various parts of the Work, including dates on which information and approvals are required

from the Owner.

5.3 Contract

Time, Delays, and Extensions of Time

5.3.1

The Contract Time for the Project shall be 610 Days.

5.3.2

The Contract Time, as it may be modified from time to time in accordance with this Agreement and any other applicable Contract Documents,

shall control the determination of liquidated damages payable by the CMAR under Paragraph 5.4 and in the determination of any delay under

Paragraph 5.3.

5.3.3

The CMAR will include 20 Days of weather-related delays per year within the Project Construction Schedule. If the number of weather-related

delays exceeds 20 Days in any given year, the CMAR may be entitled to a commensurate extension of time and reimbursement of costs associated

with the delay, including Construction General Conditions Costs, in each case as may be agreed upon by the Owner and CMAR but subject

to the requirements of Article 5 of the General Conditions.

5.3.4

In the event delays to the Work are encountered for any reason, the CMAR shall provide prompt written notice to the Owner of the

cause of such delays, in any event within three (3) Days after the delay occurs. Excusable delays shall be adjusted upon and subject

to the terms and conditions of Article 5 of the General Conditions.

5.3.5

A waiver of or failure by the Owner or Owner’s Representative to enforce any requirement in this Article 5 hereof or the requirements

of Article 5 of the General Conditions, including, without limitation, the requirements in Paragraph 5.3 thereof, in connection with

any or all past delays shall not constitute a waiver of, and shall not preclude the Owner or Owner’s Representative from enforcing

such requirements in connection with any present or future delays.

5.4 Liquidated

Damages

5.4.1

Substantial Completion. The Owner and the CMAR agree that this Agreement shall provide for the imposition of liquidated damages for

any CMAR delay not excused by Paragraph 5.3 hereof or elsewhere in this Agreement.

5.4.1.1

The CMAR agrees that if the Work of the Project is not Substantially Completed on or before the Substantial Completion Date applicable

to the Project the CMAR shall pay the Owner as liquidated damages and not as a penalty the sum of [***] per Day for each Day of unexcused

delay past the Substantial Completion Date. The liquidated damages provided herein shall be the sole and exclusive remedy for any unexcused

delay in the performance of CMAR’s obligations hereunder and shall be in lieu of any and all other liability to the Owner for extra

costs, losses, expenses, claims, penalties and any other damages of whatever nature (whether actual, compensatory, direct, indirect,

special, consequential, punitive, or otherwise) incurred by the Owner and which are caused by any unexcused CMAR delay in timely achieving

Substantial Completion on or before the Substantial Completion Date. The Parties acknowledge and agree that it would be extremely difficult,

if not impossible, to quantify the economic loss incurred by the Owner as a result of such unexcused delay, that the liquidated damages

contemplated herein are reasonable and represent a fair approximation of the economic loss to be incurred by Owner as a result of such

unexcused delay, and that such liquidated damages shall be enforceable to the maximum extent permitted under Applicable Law.

Mojave Groundwater Bank

Northern Pipeline Project 11

ARTICLE

6 — Compensation

6.1 CMAR’s

Compensation for Preconstruction Phase Services

6.1.1

The Owner shall compensate CMAR for performance of the CMAR’s Preconstruction Phase Services outlined in Paragraph 2.1 hereof

on a time and materials basis, subject to a not-to-exceed amount to be established by the Parties prior to commencement of Preconstruction

Phase Services. Such compensation shall be based on the direct personnel costs incurred by CMAR and includes the direct salaries of the

CMAR’s personnel providing Preconstruction Phase Services on the Project and CMAR’s customary and mandatory contributions

and benefits related thereto, such as employment taxes and other statutory employee benefits, insurance, sick leave, holidays, vacations,

employee retirement plans and similar contributions and, unless otherwise provided, includes all sales, use, consumer, and other taxes

mandated by applicable law, plus a fee of fifteen percent (15%) applied to the Cost of the Work for such Preconstruction Phase Services.

6.2 CMAR

Compensation for Early Work(s) Package(s)

6.2.1

Not Used

6.3 CMAR’s

Compensation for Construction Phase Services

6.3.1

The Owner shall compensate the CMAR for Work performed and described in a Phase 2 Construction Price Amendment on the basis of a

Phase 2 Guaranteed Maximum Price, in each case as set forth in such Phase 2 Construction Price and General Conditions.

6.3.2

The Owner shall have the right to directly procure equipment and materials and assign any such purchase orders or contracts to the

CMAR, for the CMAR to administer. Any such equipment or materials to be directly procured by the Owner shall be listed on the Phase 2

Construction Price Amendment. In the case of Owner procured purchase orders and contracts, CMAR’s obligations to Owner shall be

limited to the terms negotiated and included in said contract by Owner.

Mojave Groundwater Bank

Northern Pipeline Project 12

6.3.3

Recognizing that there will be both contingencies and allowances applied throughout the GMP, Owner and CMAR agree to split any monies

remaining in the contingencies with 50% going to Owner and 50% going to CMAR. Any remaining monies in allowances will be returned, in

full, to Owner.

6.4 Hourly

Rates

6.4.1

Where Work or portions thereof performed by the CMAR for Preconstruction Phase Services is charged on an hourly rate basis, such

Work shall be performed on a time and materials basis subject to a not-to-exceed amount established by the Parties, in accordance with

the CMAR’s hourly rate schedule attached hereto as Exhibit H and incorporated herein by this reference, plus a fee of fifteen

percent (15%) applied to such costs. A separate hourly rate schedule for Construction Phase Services shall be attached to the Phase 2

Construction Price upon Owner’s and CMAR’s mutual execution of the same.

6.5 Early

Completion Incentive

6.5.1

The Owner and CMAR agree that this Agreement shall provide for the payment of an early completion incentive for achieving substantially

complete facilities that are fully functional earlier than the Contract Completion Date.

6.5.1.1

The Owner agrees that if the Work of the Project is Substantially Completed and fully functional before the Substantial Completion

Date applicable to the Project, the Owner shall pay the CMAR as an early completion incentive the sum of [***] per Day for each day

prior to the Substantial Completion Date.

ARTICLE

7 — Changes

Changes

in the Work that are within the general scope of this Agreement shall be accomplished, without invalidating this Agreement, by Change

Order, Owner Change Directive, and Field Order, in each case in accordance with and subject to the terms and provisions of Article 7

of the General Conditions and any Phase 2 Construction Price Amendment executed in connection herewith for the Project.

ARTICLE

8 — Payment

Payment

based on time and materials and accompanied by supporting documentation unless otherwise agreed, in writing, by Owner and CMAR. Payments

are due and payable within thirty (30) Days of the CMAR’s request for payment for those amounts that are not contested by the Owner.

Uncontested amounts unpaid more than sixty (60) Days after the invoice date shall bear interest at the rate of 1.5% per month or the

maximum allowed by California law, whichever is greater.

8.1 Payments

for Construction Phase Services performed following the NTP of the Phase 2 Construction shall

be made in accordance with such Amendment and the General Conditions.

Mojave Groundwater Bank

Northern Pipeline Project 13

ARTICLE

9 — Liability

9.1 Waiver

of Consequential Damages

Except

for (a) damages mutually agreed upon by the Parties as liquidated damages in Paragraph 5.4 hereof, and (b) subject to the following provisions

set forth in this Paragraph 9.1, notwithstanding anything else herein to the contrary, the Owner and the CMAR agree to waive all claims

against each other for any consequential or other special damages that may arise out of or relate to this agreement. The Owner agrees

to waive consequential or other special damages including, but not limited to, the Owner’s loss of use of the Project, any rental

expenses incurred, loss of tax abatements or credits, cost of substitute facilities or services, cost of purchased or replacement product

or claims from customers or suppliers of Owner, loss of income, profit, or revenue related to the Project, as well as the loss of business,

opportunity, loss of financing, principal office overhead and expenses, loss of profits not related to this Project, loss of reputation

or goodwill and/or insolvency regardless of whether any of the foregoing are found to be direct or indirect. The CMAR agrees to waive

consequential damages including, but not limited to, loss of business, loss of financing, loss of profits not related to this Project,

loss of bonding capacity, loss of reputation and / or insolvency. The provisions of this paragraph shall also apply to the termination

of this Agreement and shall survive such termination.

9.2 CMAR’s

Limitation of Liability

Notwithstanding

anything to the contrary contained herein or in the other Contract Documents, the maximum liability, in the aggregate, of the CMAR, its

Subcontractors, sureties (if any) and their respective officers, directors, shareholders, employees, agents, successors and assigns to

Owner and anyone claiming by, through, or under Owner for any loss, damage, suit, action, liability, claim, or expense caused by, resulting

from, or arising out of or relating in any way to this Agreement or the Project from any cause whatsoever, including, without limitation,

the negligence, breach of contract, strict liability, express or implied warranty, indemnity, professional errors or omissions, or any

other cause arising at law or in equity, shall in all events be limited to and not exceed 50% of the Phase 2 Construction Price. This

limitation has been freely bargained for by the Parties for valuable consideration and shall be enforceable to the maximum extent permitted

by applicable law.

9.3 Releases,

Waivers and Remedies

Releases,

waivers, and limitations on liability and remedies expressed in the Contract Documents shall apply even in the event of the fault, tort

(including negligence), strict liability, breach of contract or warranty, or other basis of liability of the benefited Party, except

to the extent caused by intentional, reckless, or grossly negligent conduct, and shall extend to and benefit the Subcontractors, agents,

employees, officers, directors, assignees, affiliates, and vendors and each of their respective Subcontractors, agents, employees, officers,

directors, assignees, affiliates, and vendors of each Party.

Mojave Groundwater Bank

Northern Pipeline Project 14

ARTICLE

10— Dispute Mitigation and Resolution

10.1 Claims

Procedures

Claims

procedures are governed by Article 11 of the General Conditions.

10.2 Preconstruction

Phase Services

If,

during the Preconstruction Phase Services the Parties cannot reach resolution on a matter relating to or arising out of the Agreement,

the Parties shall endeavor to reach resolution through good faith direct discussions between the Parties’ representatives, who

shall possess the necessary authority to resolve such matter and who shall record the date of first discussions. If the Parties’

representatives are not able to resolve such matter within five (5) Business Days from the date of first discussion, the Parties’

representatives shall immediately inform senior executives of the Parties in writing that resolution was not affected. Upon receipt of

such notice, the senior executives of the Parties shall meet within five (5) Business Days to endeavor to reach resolution. If the dispute

remains unresolved after fifteen (15) Days from the date of first discussion, the Parties shall submit such matter to the mediation procedures

identified in Paragraph 11.2.2 of the General Conditions as a condition precedent to any judicial forum or voluntary binding alternative

dispute resolution proceeding subsequently agreed to by the Parties.

10.3 Construction

Phase Services

During

the Construction Phase Services, the Parties shall resolve any disputes between them in accordance with the dispute mitigation and resolution

procedures selected by them in Article 11 of the General Conditions.

ARTICLE

11 — Miscellaneous Provisions

11.1 Governing

Law

This

Agreement shall be governed by the laws of the State of California.

11.2 Severability

The

partial or complete invalidity of any one or more provisions of this Agreement shall not affect the validity or continuing force and

effect of any other provision.

11.3 No

Waiver of Performance

The

failure of either Party to insist, in any one or more instances, on the performance of any of the terms, covenants, or conditions of

this Agreement, or to exercise any of its rights, shall not be construed as a waiver or relinquishment of such term, covenant, condition,

or right with respect to further performance or any other term, covenant, condition, or right.

Mojave Groundwater Bank

Northern Pipeline Project 15

11.4 Titles

and Groupings

The

titles given to the articles of this Agreement are for ease of reference only and shall not be relied upon or cited for any other purpose.

The grouping of the articles in this Agreement and of the Owner’s Specifications under the various headings is solely for the purpose

of convenient organization and in no event shall the grouping of provisions, the use of paragraphs, or the use of headings be construed

to limit or alter the meaning of any provisions.

11.5 Joint

Drafting

The

Parties expressly agree that this Agreement was jointly drafted, and that both had opportunity to negotiate its terms and to obtain the

assistance of counsel in reviewing its terms prior to execution. Therefore, this Agreement shall be construed neither against nor in

favor of either Party but shall be construed in a neutral manner.

11.6 Federal

Financial Assistance.

There

are currently no Federal Financial Assistance provisions in place relative to the Project. If these funds, or those of a similar nature,

become available to the Project, the CMAR shall work with the Owner to make such modifications to the Agreement such the Project remains

qualified to receive the funds.

11.7 Counterparts;

Electronic Signatures

This

Agreement, the General Conditions, and other Contract Documents may be executed in counterparts, each of which shall be deemed an original

and all of which taken together shall constitute one and the same instrument. Facsimile or electronic signatures on this Agreement and/or

the other Contract Documents, as applicable, shall be deemed originals for all purposes.

11.8 Attorneys’

Fees

In

the event of any claim, controversy, or dispute involving this Agreement, the Parties’ performance hereunder or interpretation

hereof, the substantially prevailing Party in such claim, controversy, or dispute shall be awarded its reasonable attorneys’ fees

and costs, including attorneys’ fees and costs of any associated appeal.

11.9 Exhibits,

Schedules, and Addenda

Exhibits,

schedules, and addenda bearing on the payment and performance of the Construction Phase Services will be attached to the Phase 2 Construction

Price Amendment for such Construction Phase Services. The following exhibits pertaining to the Preconstruction Phase Services are attached

hereto and incorporated herein by this reference:

Exhibit A

General Conditions to Agreement

Mojave Groundwater Bank

Northern Pipeline Project 16

Exhibit A.1

Insurance Requirements

Exhibit A.2

Performance Bond and Payment Bond

Exhibit B

CMAR Phase I Preconstruction Scope of Services

Exhibit C

Phase I Notice to Proceed

Exhibit D

Phase I Early Work(S) Package(S) Not Used

Exhibit D.1

Phase I Early Work(S) Package(S) Amendment Form Not Used

Exhibit E

Phase 2 Construction Price

Exhibit F

Initial Schedule of Work

Exhibit G

Project Technical Scheduling Requirements

Exhibit H

Preconstruction Phase Services Hourly Rate Schedule

Exhibit I

Project Technical Performance Requirements Not Used

Exhibit J

Project Labor and Vendor Requirements

11.10 Other

Provisions

Mojave Groundwater Bank

Northern Pipeline Project 17

This

Agreement is entered into as of the date entered in Article 1.

OWNER:

Fenner

Gap Mutual Water Company

BY:

/s/

Susan Kennedy

PRINT NAME

Susan Kennedy

PRINT TITLE

President

CONSTRUCTION

MANAGER AT-RISK (CMAR)

Mike Bubalo Construction Co.

BY:

/s/ Dave Sorem

PRINT NAME

Dave Sorem

PRINT TITLE

PRESIDENT

Mojave Groundwater Bank

Northern Pipeline Project 18

Exhibit

A—General Conditions to Agreement

Mojave Groundwater Bank

Northern Pipeline Project 19

Mojave

Water Bank

Northern

Pipeline Facilities

Construction

- Pipeline

CONSTRUCTION

MANAGEMENT

AT-RISK

(CMAR)

Exhibit

A – General Conditions

to

Agreement

Mojave Groundwater Bank

Northern Pipeline Project

CONTENTS

ARTICLE

1 — General Provisions

4

ARTICLE

2 — CMAR Preconstruction Phase and Construction Phase Responsibilities

6

ARTICLE

3 — Owner’s Responsibilities

18

ARTICLE

4 — Subcontracts

20

ARTICLE

5 — Time

21

ARTICLE

6 — Compensation

26

ARTICLE

7 — Changes

26

ARTICLE

8 — Payment

28

ARTICLE

9 — Indemnity, Insurance, Waivers, and Bonds

32

ARTICLE

10 — Suspension, Notice to Cure, and Termination of the Agreement

34

ARTICLE

11 — Claims, Claims Procedures, Dispute Mitigation, and Resolution

37

ARTICLE

12 — Miscellaneous Provisions

42

Mojave Groundwater Bank

Northern Pipeline Project ii

Mojave

Water Bank

Northern

Pipeline Facilities Construction - Pipeline

General

Conditions to Agreement Effective as of

July

27, 2026

Between

OWNER

Owner:

Fenner Gap Mutual Water Company

Address:

[***]

and

the

CONSTRUCTION

MANAGER AT-RISK (CMAR):

Company:

Mike Bubalo Construction Co.

Address:

[***]

for

services in connection with the following Project:

PROJECT

NO.: 20-002

PROJECT NAME:

MOJAVE WATER BANK PROJECT

NORTHERN PIPELINE FACILITIES CONSTRUCTION

PROJECT

LOCATION: CADIZ, CALIFORNIA

In

which Stantec is the Engineer (“Engineer”).

Capitalized

terms used herein but not defined herein shall have the meanings given them in the Agreement, and other Contract Documents.

Mojave Groundwater Bank

Northern Pipeline Project 3

ARTICLE

1— General Provisions

1.1 Contract;

Order of Precedence

The

Contract Documents are enumerated in Paragraph 1.1.14 of the Agreement and consist of the Agreement, Conditions of the Contract (General,

Supplementary, and other Conditions), Drawings, Specifications, addenda issued prior to execution of the Agreement, the CMAR’s

proposal, other documents or exhibits listed in or attached to the Agreement, and Modifications issued after execution of the Agreement.

A “Modification” is (a) a written amendment to the Agreement signed by both the Owner and the CMAR (each a “Party”

and collectively, the “Parties”), (b) a Change Order, (c) an Owner Change Directive, or (d) a written order for a minor change

in the Work issued by the Engineer. Unless specifically enumerated in the Agreement, the Contract Documents do not include the advertisement

or invitation to bid, instructions to bidders, sample forms, other information furnished by the Owner in anticipation of receiving bids

or proposals, or portions of addenda relating to bidding or proposal requirements. Conflicts, ambiguities, or inconsistencies between

or amongst the Contract Documents are governed by and subject to the order of precedence set forth in Paragraph 1.1.5 hereof.

1.1.1

The Drawings and Specifications are complementary. If Work is shown only on one but not on the other, the CMAR shall perform the

Work as though fully described on both, in all cases consistent with the Contract Documents.

1.1.2

In case of conflicts or inconsistencies between the Drawings and Specifications, the Owner and the CMAR shall attempt to resolve

the conflict or inconsistency through mutual and good faith discussions and if the Parties are unable to resolve the matter in a mutually

satisfactory manner, the CMAR shall be entitled to submit a Claim in accordance with Article 11 hereof for the increased cost and time

caused by or resulting from such conflict or inconsistency.

1.1.3

Where figures are given, they shall be preferred to scaled dimensions.

1.1.4

Any terms that have well-known technical or trade meanings, unless otherwise specifically defined in the Agreement or these General

Conditions, shall be interpreted in accordance with their well-known meanings.

1.1.5

In the event of a conflict between provisions of any of the Contract Documents which cannot be resolved by giving effect to both

provisions, the order of precedence of the Contract Documents in descending order, shall be as follows:

1.1.5.1

Amendments and Change Orders, with precedence of amendments and Change Orders in reverse order of execution;

1.1.5.2

The Agreement, including all exhibits thereto; in event of a conflict between the body of the Agreement and (or between) Agreement

exhibits which cannot be resolved by giving effect to both provisions, the order of precedence shall be the body of the Agreement followed

by the exhibits in the order they are attached to the body of the Agreement, with precedence of such exhibits given in the order in which

they are attached to the Agreement;

1.1.5.3

These General Conditions;

Mojave Groundwater Bank

Northern Pipeline Project 4

1.1.5.4

Drawings and Specifications; and

1.1.5.5

Notice to Proceed.

If

any provision of the Agreement conflicts with or is inconsistent with any other provision of other Contract Documents, the provisions

of the Agreement govern, unless the other provision specifically refers to the provision it supersedes and replaces it in the Agreement

or unless otherwise superseded by the order of precedence set forth above in this Paragraph 1.1.5.

1.1.6

The Agreement and other Contract Documents are solely for the benefit of the Owner and the CMAR except to the extent expressly provided

in the Agreement, represents the entire and integrated agreement between such Parties, and supersedes all prior negotiations, representations,

or agreements, either written or oral.

1.2 Relationship

of Parties

The

Owner and the CMAR agree to proceed with the Project based on mutual trust, good faith, and fair dealing.

1.2.1

The CMAR shall furnish preconstruction, construction, administration, and management services and use the CMAR’s reasonable

efforts to perform the Work in an expeditious manner consistent with the Contract Documents. The Owner and CMAR shall endeavor to promote

harmony and cooperation among all Project participants.

1.2.2

The CMAR represents that it is an independent contractor and that in its performance of the Work it shall act as an independent contractor.

1.2.3

Neither the CMAR nor any of its agents or employees shall act on behalf of or in the name of the Owner except as provided in the

Agreement unless authorized in writing by the Owner’s Representative.

1.2.4

The Owner’s Representative shall possess full authority to give instructions from the Owner and shall be able to issue directions

and Change Orders to the CMAR.

1.2.5

The CMAR Representative shall possess full authority to receive instructions from the Owner and to act on those instructions. The

CMAR shall notify the Owner in writing of a change in the designation of the CMAR Representative. Upon such notice, the Owner will have

five (5) Business Days to approve or reject the change in designation. Should the Owner reject the CMAR Representative, the CMAR and

Owner shall meet within five (5) Business Days to decide on who will serve as the CMAR Representative.

1.2.6

The Owner and the CMAR shall perform their obligations with integrity, ensuring, at a minimum, that:

1.2.6.1

Conflicts of interest shall be avoided or disclosed promptly to the other Party; and

1.2.6.2

The Owner and the CMAR warrant that they have not and shall not pay nor receive any contingent fees or gratuities to or from the

other Party, including their agents, officers, and employees, Subconsultants, or Others from whom they may be liable, to secure preferential

treatment.

Mojave Groundwater Bank

Northern Pipeline Project 5

1.3 Engineer

The

Owner, through its Engineer, shall provide all engineering and other design services necessary for the completion of the Work. The Owner

shall obtain from the Engineer either a license for the CMAR and Subcontractors to use the design documents prepared by the Engineer

or ownership of the copyrights for such design documents, and shall indemnify, defend, and hold harmless the CMAR against any suits or

claims of infringement of any copyrights or licenses arising out of the use of the design documents except if used by the CMAR or any

other entity on work not contemplated by this Agreement or work outside the Project.

ARTICLE

2 — CMAR Preconstruction Phase and Construction Phase Responsibilities

2.1 General

Responsibilities

2.1.1

The CMAR shall provide all labor, materials, equipment, and services necessary to complete the Work, except for the Owner will provide

all the 36” replacement straight lengths of pipe, all of which shall be provided in full accord and consistent with the Contract

Documents.

2.1.2

The CMAR shall be responsible for the supervision and coordination of the Work, including the construction means, methods, techniques,

sequences, and procedures used, unless the Contract Documents give other specific instructions. In such case, the CMAR shall not be liable

to the Owner for damages resulting from compliance with such instructions unless the CMAR recognized and failed to timely report to the

Owner any error, inconsistency, omission, or unsafe practice that it discovered in the specified construction means, methods, techniques,

sequences, or procedures. The CMAR shall not be required to provide professional services which constitute the practice of architecture

or engineering except as otherwise provided in Subparagraph 2.1.6 nor shall the CMAR be liable for professional services rendered by

or design documents prepared by the Engineer or any of its consultants or subconsultants at any tier. The CMAR shall be entitled to rely

upon the adequacy, accuracy, and completeness of all design, engineering, and other consulting services provided by the Engineer and

its consultants and subconsultants at all tiers and/or other consultants retained directly or indirectly by the Owner. The CMAR shall

have no liability to the Owner or any other Party for the failure of any Drawings, Specifications, or other design or engineering produced

by Others to be adequate, correct, complete, and free from defect for any purpose or to comply with Applicable Law, all of which shall

remain the responsibility of the Engineer.

2.1.3

The CMAR shall perform Work only within locations allowed by the Contract Documents, applicable permits, and Applicable Law.

2.1.4

The CMAR and its Subcontractors shall review and compare each of the Contract Documents with the others and with information furnished

or made available by Owner and shall, subject to limitations set forth in Subparagraph 2.1.2 hereof, promptly report in writing to Owner’s

Representative any errors, inconsistencies, or omissions it discovers in the Contract Documents or inconsistencies it discovers with

Applicable Law observed by the CMAR or its Subcontractors. The CMAR and its Subcontractors shall take field measurements, verify field

conditions, and compare with the Contract Documents with such field measurements and conditions before commencing any of the Work. The

observations and measurements are for the purpose of facilitating coordination and construction by the CMAR and are not for the purpose

of discovering errors, omissions, or inconsistencies in the Contract Documents; however, they are opportunities for the CMAR to identify

any readily observable or potential errors, omissions, or inconsistencies in the Contract Documents. Readily observable errors, inconsistencies,

or omissions discovered by the CMAR shall be promptly reported in writing to Owner’s Representative. The CMAR maintains responsibility

for losses, including the costs of correcting Defective Work involving an error, inconsistency, or omission by the CMAR and/or its Subcontractors

which are caused by or are attributable to the CMAR, but the CMAR does not have responsibility for losses arising from design or engineering

errors or omissions and it is recognized that the CMAR’s review, observations, and measurements are made in the CMAR’s capacity

as a construction manager and not as a licensed design or engineering professional.

Mojave Groundwater Bank

Northern Pipeline Project 6

2.1.5

Worksite Visit. The CMAR acknowledges that it has visited, or has had the opportunity to visit, the Worksite to visually inspect

the general and local conditions which could affect the Work and, during the Preconstruction Phase, has participated in Owner/Engineer

work sessions and provided input and feedback to the Owner and Engineer on the design and engineering of the Project, both from a constructability

and a budgeting and cost-trending analysis standpoint. The CMAR will advise the Owner if it requires additional visits to increase its

familiarity with the general and local conditions of the Worksite which may impact the Work.

2.1.6

Professional Services. The CMAR may be required to procure professional services to carry out its responsibilities for construction

means, methods, techniques, sequences, and procedures or as such services are specifically called for by the Contract Documents. The

CMAR shall obtain these professional services and any design certifications required from licensed design professionals. All Drawings,

Specifications, calculations, certifications, and submittals prepared by such design professionals shall bear the signature and seal

of such design professionals and the Owner and the Engineer shall be entitled to rely upon the adequacy, accuracy, and completeness of

such design services. If professional services are specifically required by the Contract Documents, the Owner, through the Engineer,

shall indicate all required performance and design criteria. The CMAR shall not be responsible for the adequacy of such performance and

design criteria. The CMAR shall not be required to provide such services in violation of Applicable Law in the jurisdiction where the

Project is located. Should the CMAR refuse to provide services based on the inadequacy of design criteria or because of a violation of

existing Applicable Law, the CMAR shall provide notice and an explanation to Owner within five (5) Business Days of the CMAR becoming

aware of the issue. The CMAR shall work with Owner to mitigate the issue.

2.2 Preconstruction

Phase Services

The

CMAR’s Scope of Work responsibilities include the Preconstruction Phase Services defined and described in the Agreement. The CMAR

shall perform such Preconstruction Phase Services at the time, in the manner, and for the Fee set forth in Article 2 of the Agreement.

Unless otherwise mutually agreed in writing by the Owner and the CMAR, such Preconstruction Phase Services do not require or obligate

the CMAR to generate or produce any design or engineering for the Project but will require the CMAR to participate in Owner/Engineer

work sessions and provide input and feedback to the Owner and Engineer on the design and engineering of the Project from a constructability,

budgeting, schedule, and cost- trending analysis standpoint. The CMAR, when providing input and feedback, shall not be responsible or

liable for any design or engineering related work or services. However, the CMAR shall be responsible for any temporary works or related

construction engineering necessary to implement the construction of the Project.

Mojave Groundwater Bank

Northern Pipeline Project 7

2.3 Construction

Phase Services

2.3.1

Commencement. Unless otherwise provided to the contrary elsewhere in this Agreement or the other Contract Documents, the CMAR’s

Construction Phase Services shall commence upon delivery of the Phase 2 Construction Notice to Proceed for the Project or specific Bid

Package or other portion of the Work.

2.3.2

Coordination. The CMAR shall supervise, coordinate, and direct the Work using the CMAR’s ordinary skill and attention. Subject

to Subparagraph 2.1.2, the CMAR shall be solely responsible for and have control over construction means, methods, techniques, sequences,

procedures, and the coordination of all portions of the Work. The CMAR shall manage and administer all phases of construction activities

to achieve the completion of all Work within the requirements of the Contract Documents. The CMAR shall coordinate the Work of its Subcontractors

and Material Suppliers to optimize efficiency and minimize conflict and interference between the various Subcontractors on-site or with

any other contractors who may be working at the site concurrently. It is recognized, however, that the CMAR is not acting in the capacity

of a licensed design professional, and that the CMAR’s examination is to facilitate construction and does not create an affirmative

responsibility to detect errors, omissions, or inconsistencies in the design Drawings or plans created by the Engineer or to ascertain

from the design Drawings or plans created by the Engineer compliance with Applicable Laws. The CMAR does not have an affirmative responsibility

to detect errors or omissions by the Engineer.

2.3.3

Cost Reporting. The CMAR shall keep such full and detailed accounts as are necessary for proper financial management under this Agreement.

The CMAR shall maintain a complete set of all books and records prepared or used by the CMAR with respect to the Project. The CMAR’s

records supporting its performance and billings under this Agreement shall be current, complete, and accurately maintained. The Owner

shall be afforded access to all the CMAR’s records, books, correspondence, instructions, Drawings, receipts, vouchers, memoranda,

and similar data relating to this Agreement. The CMAR shall preserve all such records for a period of three years after the Final Payment

in accordance with Paragraph 8.9 hereof or longer where required by law.

2.3.4

Construction Personnel and Supervision

2.3.4.1

The CMAR shall provide competent supervision for the performance of the Work. Before commencing the Work, the CMAR shall notify the

Owner in writing of the name and qualifications of its proposed superintendent(s) and project manager so the Owner may review the individual’s

qualifications. If, for reasonable cause, the Owner refuses to approve the individual, or withdraws its approval after once giving it,

the CMAR shall name a different superintendent for the Owner’s review. Any disapproved superintendent shall not perform in that

capacity thereafter at the Worksite.

2.3.4.2

The CMAR shall be responsible to the Owner for acts or omissions of Parties or entities performing portions of the Work for or on

behalf of the CMAR or any of its Subcontractors and Material Suppliers.

Mojave Groundwater Bank

Northern Pipeline Project 8

2.3.4.3

The CMAR shall permit only fit and ordinarily skilled persons to perform the Work. The CMAR shall enforce safety procedures, discipline,

and good order among persons performing the Work. If the Owner reasonably determines that a particular person does not follow safety

procedures, or is unfit or unskilled for the assigned Work, the CMAR shall immediately reassign the person on receipt of the Owner’s

written notice to do so.

2.3.5

Submittals

2.3.5.1

The CMAR shall be responsible to the Owner for the accuracy and conformity of its submittals to the Contract Documents. The CMAR

shall prepare and deliver its submittals to the Owner and Engineer in such time and sequence so as not to delay the performance of the

Work or the work of the Owner and Others. When the CMAR delivers its submittals to the Owner, the CMAR shall identify in writing for

each submittal all changes, deviations, or substitutions from the requirements of the Contract Documents. The review and approval of

any CMAR submittal shall not be deemed to authorize changes, deviations, or substitutions from the requirements of the Contract Documents

unless express written approval is obtained from the Owner specifically authorizing such deviation, substitution, or change. To the extent

a change, deviation or substitution causes an impact to the Phase 2 Construction Price or Contract Time, such approval shall be promptly

memorialized in a Change Order. Further, the Owner shall not make any change, deviation, or substitution through the submittal process

without specifically identifying and authorizing such deviation to the CMAR. If the Contract Documents do not contain submittal requirements

pertaining to the Work, the CMAR agrees upon request to submit in a timely fashion to the Owner for review and approval any submittals,

samples, product data, manufacturers’ literature, or similar submittals as may reasonably be required by the Owner.

2.3.5.2

The CMAR shall perform all Work strictly in accordance with approved submittals. Approval does not relieve the CMAR from responsibility

for Defective Work resulting from errors or omissions of any kind on the approved submittals.

2.3.5.3

Record copies of the following, incorporating field changes and selections made during construction, shall be maintained at the Worksite

and available to the Owner upon request: Drawings, Specifications, addenda, and other Modifications, and required submittals including

product data, samples, and shop drawings.

2.3.5.4

No substitutions shall be made in the Work unless permitted in the Contract Documents and then only after the CMAR obtains all approvals

required under the Contract Documents for substitutions. All such substitutions shall be memorialized promptly by written approval by

the Owner no later than seven (7) days following the Owner’s receipt of a written request for approval thereof. If required, the

CMAR will prepare a Change Order request within seven (7) days following approval by the Owner and, if applicable, provide for an adjustment

in the Phase 2 Construction Price or Contract Time.

2.3.5.5

The CMAR shall prepare and submit to the Owner updated electronic data, in accordance with Subparagraph 3.8.1.

Mojave Groundwater Bank

Northern Pipeline Project 9

2.3.6

Cooperation with Work of Owners and Others

2.3.6.1

The Owner may perform work at the Worksite directly or by Others. Any agreements with Others to perform construction or operations

related to the Project shall include provisions pertaining to insurance, indemnification, waiver of subrogation, coordination, interference,

cleanup, and safety which are substantively the same as the corresponding provisions of this Agreement.

2.3.6.2

If the Owner elects to perform work at the Worksite directly or by Others, the CMAR and Owner shall coordinate the activities of

all forces at the Worksite and agree upon fair and reasonable schedules and operational procedures for Worksite activities. The Owner

shall require each separate contractor to cooperate with the CMAR and assist with the coordination of activities and the review of construction

schedules and operations. The Phase 2 Construction Price or the Date of Substantial Completion or the Date of Final Completion may be

equitably adjusted, as mutually agreed by the Parties, for changes made necessary by the coordination of construction activities, and

the Schedule of the Work shall be revised accordingly. The CMAR, Owner, and Others shall adhere to the revised Schedule of the Work until

it may subsequently be revised.

2.3.6.3

With regard to the work of the Owner and Others, the CMAR shall (a) proceed with the Work in a manner which does not hinder, delay,

or interfere with the work of the Owner or Others or cause the work of the Owner or Others to become defective, (b) afford the Owner

or Others reasonable access for introduction and storage of their materials and equipment and performance of their activities, and (c)

coordinate the CMAR’s construction and operations with theirs as required by Subparagraph 2.3.6.2. With regard to the work of the

Owner and Others, the Owner and Others shall (a) proceed with their work in a manner which does not hinder, delay, or interfere with

the Work of the CMAR or cause the Work of the CMAR to become defective, (b) afford CMAR reasonable access for introduction and storage

of their materials and equipment and performance of their activities, and (c) coordinate the construction and operations with the CMAR.

2.3.6.4

Before proceeding with any portion of the Work affected by the construction or operations of the Owner or Others, the CMAR shall

visually examine such work performed by the Owner or Others and give the Owner prompt, written notification of any defects the CMAR discovers

therein of their work which will prevent the proper execution of the Work. The CMAR’s obligations in this Subparagraph 2.3.6.4

do not create a responsibility for the work of Others but are for the purpose of facilitating the Work. If the CMAR does not notify the

Owner of patent defects interfering with the performance of the Work, the CMAR acknowledges that to the CMAR’s reasonable knowledge

at the time, the work of the Owner or Others is not defective and is acceptable for the proper execution of the Work. Following receipt

of written notice from the CMAR of defects, the Owner shall promptly inform the CMAR what action, if any, the CMAR shall take regarding

the defects.

2.3.7

Cutting, Fitting, and Patching

2.3.7.1

The CMAR shall perform cutting, fitting, and patching necessary to coordinate the various parts of the Work and to prepare its Work

for the work of the Owner or Others, if within the CMAR’s Scope of Services.

Mojave Groundwater Bank

Northern Pipeline Project 10

2.3.7.2

Cutting, patching, or altering the work of the Owner or Others shall be done with the prior written approval of the Owner. Such approval

shall not be unreasonably withheld.

2.3.8

Cleaning Up

2.3.8.1

The CMAR shall regularly remove debris and waste materials at the Worksite resulting from the Work. Prior to discontinuing Work in

an area, the CMAR shall clean the area and remove all rubbish and its construction equipment, tools, machinery, waste, and surplus materials.

The CMAR shall minimize and confine dust and debris resulting from construction activities. At the completion of the Work, the CMAR shall

remove from the Worksite all construction equipment, tools, surplus materials, waste materials, and debris created by the CMAR and its

Subcontractors.

2.3.8.2

If the CMAR fails to commence compliance with cleanup duties within two (2) Business Days after written notification from the Owner of

noncompliance, the Owner may implement appropriate cleanup measures without further notice and the cost shall be deducted from any amounts

due or to become due the CMAR in the next payment period.

2.3.9

Access to Work. The CMAR shall facilitate the access of the Owner, its Engineer, and Others to Work in progress. The Owner, Engineer,

and Others shall follow safety protocols in effect and in compliance with OSHA.

2.3.10

Materials Furnished by the Owner or Others

2.3.10.1

In the event the Work includes installation of materials or equipment furnished by the Owner or Others, it shall be the responsibility

of the CMAR to visually examine the items so provided and thereupon handle, store, and install the items, unless otherwise provided in

the Contract Documents, with such skill and care as to provide a satisfactory and proper installation. Loss or damage due to acts or

omissions of the CMAR shall be the responsibility of the CMAR and may be deducted from any amounts due or to become due the CMAR. Any

defects discovered in such materials or equipment shall be reported at once to the Owner. Following receipt of written notice from the

CMAR of defects, the Owner shall promptly inform the CMAR what action, if any, the CMAR shall take regarding the defects.

2.3.11

Tests and Inspections

2.3.11.1

The CMAR shall schedule all required tests, approvals, and inspections of the Work or portions thereof at appropriate times so as

not to delay the progress of the Work or other Work related to the Project. The CMAR shall give proper notice to all required Parties

of such tests, approvals, and inspections. If feasible, the Owner and Others may timely observe the tests at the normal place of testing.

Except as provided in Subparagraph 2.3.11.3 below or unless otherwise required by the Contract Documents, the Owner shall bear all expenses

associated with tests, inspections, and approvals required by the Contract Documents which, unless otherwise agreed to, shall be conducted

by an independent testing laboratory or entity retained by the Owner. Unless otherwise required by the Contract Documents, required certificates

of testing, approval, or inspection shall be secured by the CMAR and promptly delivered to the Owner.

Mojave Groundwater Bank

Northern Pipeline Project 11

2.3.11.2

If the Owner or appropriate authorities determine that tests, inspections, or approvals in addition to those required by the Contract

Documents will be necessary, the CMAR shall arrange for the procedures and give timely notice to the Owner and Others who may observe

the procedures. Costs of the additional tests, inspections, or approvals are at the Owner’s expense except as provided in Subparagraph

2.3.11.3.

2.3.11.3

If the procedures described in Subparagraph 2.3.11.1 and 2.3.11.2 indicate that portions of the Work fail to comply with the Contract

Documents due to the negligence of the CMAR, the CMAR shall be responsible for costs of correction and retesting.

2.4 Warranty

2.4.1

The CMAR warrants that all materials and equipment furnished by the CMAR under the Construction Phase of this Agreement will be new

unless otherwise specified, of good quality, and in conformance with the Specifications set forth in the Contract Documents. The CMAR

further warrants that the Work shall be free from defects in materials and workmanship not intrinsic in the design or materials required

in the Contract Documents. The CMAR’s warranty does not include remedies for defects or damages caused by normal wear and tear

during normal usage, use, or operation for a purpose for which the Project was not intended, improper or insufficient maintenance, inadequate,

incomplete, or defective design, modifications performed by the Owner or Others, or abuse. The CMAR’s warranty pursuant to this

Subparagraph 2.4.1 shall commence on the earlier of (a) the Date of Substantial Completion of the Work or the designated portion as agreed

to by the Owner and the CMAR, and (b) the date the Owner takes beneficial use of the Work or designated portion of the Work as agreed

to by the Owner and the CMAR.

2.4.2

The CMAR shall use commercially reasonable efforts to obtain from its Subcontractors and Material Suppliers any special or extended

warranties expressly required by the Contract Documents, and if any such special or extended warranty cannot be obtained, the CMAR shall

provide notice to the Owner and must obtain the Owner’s consent prior to contracting with any Subcontractor or Material Supplier

who cannot provide a special or extended warranty provided by the Contract Documents. The CMAR’s liability for such warranties

shall be limited to the one-year correction period referred to in Subparagraph 2.5. After that period, the CMAR shall assign them to

the Owner and provide reasonable assistance to the Owner in enforcing the obligations of Subcontractors and Material Suppliers.

2.5 Correction

of Defective Work

2.5.1

If prior to Substantial Completion and within one year after the date of Substantial Completion of the Work any Defective Work is

found, the Owner shall promptly notify the CMAR in writing. Unless the Owner provides written acceptance of the condition, the CMAR shall

promptly correct the Defective Work. If the Owner discovers a defect, the Owner shall notify the CMAR within five (5) Business Days of

the date of discovery. Work that is found not to conform to the requirements of the Agreement prior to Substantial Completion but does

not prevent achievement of Substantial Completion may be corrected prior to Final Completion.

2.5.2

If the CMAR fails to correct Defective Work within a mutually agreed time after receipt of written notice from the Owner prior to

Final Payment, the Owner may correct it in accordance with the Owner’s right to carry out the Work in Subparagraph 10.2.3. In such

case, an appropriate Change Order shall be issued deducting the cost of correcting such deficiencies from payments then or thereafter

due the CMAR. If payments then or thereafter due the CMAR are not sufficient to cover such amounts, the CMAR shall pay the difference

to the Owner.

Mojave Groundwater Bank

Northern Pipeline Project 12

2.5.3

If after the one-year correction period but before the periods of limitations and repose applicable to the Work in the jurisdiction

in which the Project is located have run the Owner discovers any Defective Work, the Owner shall, unless the Defective Work requires

emergency correction, promptly notify the CMAR. If the CMAR elects to correct the Work, it shall provide written notice of such intent

within fourteen (14) days of its receipt of notice from the Owner. The CMAR shall complete the correction of Work within a mutually agreed

time frame. If the CMAR does not elect to correct the Work, the Owner may have the Work corrected by itself or Others and charge the

CMAR for the reasonable cost of the correction. The Owner shall provide the CMAR with an accounting of correction costs it incurs.

2.5.4

If the CMAR’s correction or removal of Defective Work causes damage to or destroys other completed or partially completed Work

or existing building, the CMAR shall be responsible for the cost of correcting the destroyed or damaged property.

2.5.5

The one-year period for correction of Defective Work does not constitute a limitation period with respect to the enforcement of the

CMAR’s other obligations under the Contract Documents.

2.5.6

Prior to Final Payment, at the Owner’s option and with the CMAR’s agreement, the Owner may elect to accept Defective

Work rather than require its removal and correction. In such cases, the Phase 2 Construction Price may be equitably adjusted for any

diminution in the value of the Project, if any, caused by such Defective Work.

2.6 Correction

of Covered Work

2.6.1

On request of the Owner, Work that has been covered without a requirement that it be inspected prior to being covered may be uncovered

for the Owner’s inspection. The Owner shall pay for the costs of uncovering and replacement if the Work proves to be in conformance

with the Contract Documents, or if the defective condition was caused by the Owner or Others and the CMAR shall be entitled to a Change

Order adjusting the Contract Time and/or the Phase 2 Construction Price for any resulting delay or added cost. If the uncovered Work

proves to be defective, the CMAR shall pay the costs of uncovering and replacement and will not receive an adjustment to the contract

time.

2.6.2

If a portion of the Work is covered, contrary to specific requirements in the Contract Documents or contrary to a specific request

from the Owner, the Owner, by written request, may require the CMAR to uncover the Work, at a mutually convenient time, for the Owner’s

observation. In this circumstance, the Work shall be replaced at the CMAR’s expense and with no adjustment to the Contract Time.

2.6.3

The CMAR is required to correct in a timely fashion any Work rejected by the Owner which fails to comply with the Contract Documents

prior to the commencement of the warranty period(s) or during the correction period(s) established under Paragraph 2.5. The CMAR shall

correct at its own cost and time and bear the expense of additional services required for correction of any Defective Work for which

it is responsible.

Mojave Groundwater Bank

Northern Pipeline Project 13

2.7 Safety

of Persons and Property

2.7.1

Safety Precautions and Programs. The CMAR shall have overall responsibility for safety precautions and programs in the performance

of the Work. While this Paragraph 2.7 establishes the responsibility for safety between the Owner and CMAR, it does not relieve the Engineer

or Subcontractors of their responsibility for the safety of persons or property in the performance of their Work, nor for compliance

with the provisions of Applicable Laws.

2.7.2

The CMAR shall seek to avoid injury, loss, or damage to persons or property by taking reasonable steps to protect:

2.7.2.1

Its employees and other persons at the Worksite;

2.7.2.2

Materials and equipment stored at on-site or off-site locations for use in the Work; and

2.7.2.3

Property located at the Worksite and adjacent to Work areas, whether the property is part of the Work.

2.7.3

CMAR’s Safety Representative. The CMAR shall designate an individual at the Worksite in the employ of the CMAR who shall act

as the CMAR’s authorized safety representative with a duty to prevent accidents in accordance with Subparagraph 2.7.2. The CMAR

shall report within three (3) Business Days in writing all accidents and injuries occurring at the Worksite. When the CMAR is required

to file an accident report with a public authority, the CMAR shall furnish a copy of the report to the Owner concurrent with the report’s

distribution with the public authority.

2.7.4

The CMAR shall provide the Owner with copies of all notices required of the CMAR by Applicable Law. The CMAR’s safety program

shall comply with the requirements of Governmental Authorities having jurisdiction.

2.7.5

Damage or loss not insured under property insurance which may arise from the Work to the extent caused by negligent acts or omissions

of the CMAR, or anyone for whose acts the CMAR may be liable, shall be promptly remedied by the CMAR. If the Owner deems any part of

the Work or Worksite unsafe, and such safety concerns are due to the fault or neglect of the CMAR, its Subcontractors, or anyone else

for whom such Parties are responsible, the Owner, without assuming responsibility for the CMAR’s safety program, may require the

CMAR to stop performance of the Work or take corrective measures satisfactory to the Owner, or both. If the CMAR does not adopt corrective

measures, the Owner may perform them and deduct their cost from the Phase 2 Construction Price. The CMAR agrees to make no claim for

damages, or an increase in the Phase 2 Construction Price, or for a change in the Dates of Substantial or Final Completion based on the

CMAR’s compliance with the Owner’s reasonable request.

2.8 Emergencies

2.8.1

In an emergency, the CMAR shall act in a reasonable manner to prevent personal injury or property damage. If appropriate, an equitable

adjustment in the Phase 2 Construction Price or Date of Substantial Completion or Date of Final Completion shall be determined in a Change

Order.

Mojave Groundwater Bank

Northern Pipeline Project 14

2.9 Hazardous

Materials

2.9.1

A Hazardous Material is any substance or material identified now or in the future as hazardous under any federal, state, or local

law or regulation, or any other substance or material that may be considered hazardous or otherwise subject to statutory or regulatory

requirement governing handling, disposal, or cleanup. The CMAR shall not be obligated to commence or continue Work until any unknown

Hazardous Material discovered or encountered at the Worksite has been removed, rendered, or determined to be harmless by the Owner as

certified by an independent testing laboratory and approved by the appropriate government agency. The Owner shall retain generator status

of any preexisting hazardous materials contained on-site and shall sign manifests for removal of preexisting hazardous materials.

2.9.2

If after the commencement of the Work, unknown Hazardous Material is discovered or encountered at the Worksite, the CMAR shall be

entitled to immediately stop Work in the affected area. The CMAR shall report the condition to the Owner, the Engineer, and, if required,

the Governmental Authority with jurisdiction.

2.9.3

The CMAR shall not be required to perform any Work relating to or around Hazardous Material without written mutual agreement between

Owner and CMAR.

2.9.4

The Owner shall be responsible for retaining an independent testing laboratory to determine the nature of the material encountered

and whether the material requires corrective measures or remedial action. Such measures shall be the sole responsibility of the Owner

and shall be performed in a manner minimizing any adverse effects upon the Work. The CMAR shall resume Work in the area affected by any

Hazardous Material only upon written agreement between the Parties after the Hazardous Material has been removed or rendered harmless

and only after approval, if necessary, of the Governmental Authority with jurisdiction.

2.9.5

If the CMAR incurs additional costs or is delayed due to the presence or remediation of Hazardous Material, the CMAR shall be entitled

to an equitable adjustment in the Phase 2 Construction Price and in the Dates of Substantial and Final Completion.

2.9.6

To the extent not caused by the negligent acts or omissions of the CMAR, its Subcontractors and Sub-subcontractors, and the agents,

officers, directors, and employees of each of them (collectively, the “CMAR Indemnitees”), the Owner shall defend, indemnify,

and hold harmless the CMAR Indemnitees from and against any and all direct or indirect claims, suits, damages, losses, costs, and expenses

(including, but not limited to, attorneys’ fees and costs) incurred by any such CMAR Indemnitees in connection with or arising

out of or relating to the performance of the Work in any area contaminated or affected by Hazardous Material or any bodily injury or

property damage suffered or incurred by any CMAR Indemnitee, in each case arising out of, relating to, resulting from, or incurred in

connection with the generation, location, transportation, or the existence, remediation, or removal of any Hazardous Materials located

on, under, in, or adjacent to the Project Site or transported to or from such Project Site, in each case where such generation, location,

transportation, or the existence, remediation, or removal resulted from events or circumstances either (a) occurred prior to the CMAR’s

execution of any Phase 2 Construction Price Amendment and entry onto the Project site at commencement of the Construction Phase Services

covered by such Phase 2 Construction Price Amendment, and/or (b) did not result from or arise out of any errors or omissions of the CMAR

or its Subcontractors at any tier. To the fullest extent permitted by law, such indemnification shall apply regardless of the fault,

negligence, breach of warranty or contract, or strict liability of the Owner and such indemnity obligations shall survive the termination

of this Agreement and/or the completion of the Work and the transactions contemplated herein.

Mojave Groundwater Bank

Northern Pipeline Project 15

2.9.7

To the extent not caused by the acts or omissions of the Owner, its Engineer or other consultants, the agents, officers, directors,

and employees of any of them, or any person or entity in the chain of title to the real property comprising the Project or any portion

thereof, whether as owner, tenant, guest, licensee, invitee, or otherwise (collectively, the “Owner Indemnitees”), the CMAR

shall defend, indemnify and hold harmless the Owner Indemnitees from and against any and all direct or indirect claims, suits, damages,

losses, costs, and expenses (including, but not limited to, attorneys’ fees and costs) incurred by any such Owner Indemnitees in

connection with or arising out of or relating to any Hazardous Materials first introduced onto the Project site by the CMAR or its Subcontractors

on or after the date of the Agreement; provided however, that in no event shall such indemnity and defense obligations apply to (a) any

Hazardous Materials specified for the Work by the Owner, the Engineer, any consultants of such Parties or any other person or entity

for whom the Owner is legally responsible, or (b) common cleaning solvents used by the CMAR in the performance of the Work, provided

that any such common cleaning solvents are used in compliance with best practices and applicable permitting and legal requirements. To

the fullest extent permitted by law, such indemnification shall survive the termination of this Agreement and/or the completion of the

Work and the transactions contemplated herein.

2.9.8

Removal of Hazardous Materials

2.9.8.1

To the extent the Hazardous Materials not the subject of Subparagraph 2.9.7 above are identified in other applicable provisions above

of this Paragraph 2.9, the CMAR shall proceed with remediation and removal of such Hazardous Materials as agent for the Owner in accordance

with this Subparagraph 2.9.8.

2.9.8.2

The Owner hereby appoints the CMAR as its agent to act in the Owner’s name and on the Owner’s behalf to negotiate, enter,

and execute contracts with third parties to remove, transport, and/or dispose of Hazardous Materials. The CMAR’s scope of authority

as agent does not include the execution of any manifests or governmental documents related to the Hazardous Materials. All documents

executed by the CMAR acting within the CMAR’s scope of authority shall provide that the CMAR is acting solely as agent for the

Owner. The CMAR shall maintain appropriate records of all acts undertaken as agent for the Owner and all such documents shall be available

for audit by the Owner.

2.9.8.3

The authority of the CMAR to act as agent on behalf of the Owner shall terminate upon termination or assignment of the Construction

Agreement.

2.10 Materials

Brought to the Worksite

2.10.1

Material Safety Data (MSD) sheets as required by law and pertaining to materials or substances used or consumed in the performance

of the Work, whether obtained by the CMAR or its Subcontractors, shall be maintained at the Worksite by the CMAR and made available to

the Owner, Subcontractors, and Others.

2.10.2

The CMAR shall be responsible for the proper delivery, handling, application, storage, removal, and disposal of all materials and

substances brought to the Worksite by the CMAR in accordance with the Contract Documents and used or consumed in the performance of the

Work.

Mojave Groundwater Bank

Northern Pipeline Project 16

2.10.3

To the extent caused by the negligent acts or omissions of the CMAR, its agents, officers, directors, and employees, the CMAR shall

defend, indemnify, and hold harmless the Owner and the Engineer, its agents, officers, directors, and employees, in accordance with Paragraph

2.9.7 hereof, from and against claims, damages, losses, costs, and expenses, including, but not limited to, reasonable attorneys’

fees, costs, and expenses incurred in connection with any dispute resolution process, in each case arising out of or relating to the

delivery, handling, application, storage, removal, and disposal of all materials and substances.

2.11 Differing

Site Conditions

2.11.1

If the CMAR encounters Differing Site Conditions, the CMAR shall stop Work and shall provide the Owner and the Engineer with written

notice of its claim for Differing Site Conditions within the time period set forth in Paragraph 11.1. Any change in the Phase 2 Construction

Price, estimated Cost of the Work and/or CMAR’s Fee (where applicable), Date of Substantial Completion, or Date of Final Completion

and, if appropriate, the Compensation for Construction Phase Services because of the Differing Site Conditions shall be determined as

provided in Article 11. The CMAR shall only be entitled to pursue a claim for Differing Site Conditions if the Parties have not agreed,

in writing, that Differing Site Conditions have occurred after the CMAR’s submission of appropriate backup documentation.

2.12 Permits

and Taxes

2.12.1

The CMAR shall give public authorities all notices required by law and, except for permits and fees which are the responsibility

of the Owner pursuant to Paragraph 3.6 hereof, shall obtain and pay for all necessary permits, licenses, and renewals pertaining to the

Work. The CMAR shall provide to the Owner copies of all notices, permits, licenses, and renewals required under this Agreement.

2.12.2

The CMAR shall pay all applicable taxes legally enacted when bids are received or negotiations concluded for the Work provided by

the CMAR.

2.12.3

The Phase 2 Construction Price shall be adjusted for additional costs, subject to approval by the Owner, resulting from Applicable

Laws enacted after the date of this Agreement, including but not limited to: increased taxes, tariffs, or other costs arising from any

Executive Orders or other governmental action.

2.12.4

If, in accordance with the Owner’s direction, the CMAR claims an exemption for taxes, the Owner shall indemnify, defend, and

hold the CMAR harmless from any liability, penalty, interest, fine, tax assessment, attorneys’ fees, or other expense or cost incurred

by the CMAR because of any such action.

2.13 Confidentiality

2.13.1

The CMAR shall treat as confidential and shall not use for its own benefit nor disclose to third persons, except as is necessary

for the performance of the Work, any of the Owner’s confidential information, know-how, discoveries, production methods, and the

like that may be disclosed to the CMAR or which the CMAR may acquire in connection with the Work. The Owner shall treat as confidential

information all of the CMAR’s estimating systems and historical and parameter cost data and identified related proprietary information

that may be disclosed to the Owner in connection with the performance of this Agreement. The Owner and the CMAR shall each specify those

items to be treated as confidential and shall mark them as “Confidential.” The provisions of this Subparagraph 2.13.1 shall

survive the termination or completion of this Agreement and the transactions contemplated hereby.

Mojave Groundwater Bank

Northern Pipeline Project 17

ARTICLE

3 — Owner’s Responsibilities

3.1 Adequate

Funding for Project

At

the CMAR’s request, prior to the Owner’s issuance of a Notice to Proceed with the Construction Phase Services, the Owner

shall promptly furnish reasonable evidence satisfactory to the CMAR that the Owner has adequate funds available and committed to fulfill

all of the Owner’s payment obligations under the Contract Documents. If the Owner fails to furnish such financial information in

a timely manner, the CMAR may stop Work under Paragraph 10.4 of the General Conditions or exercise any other right permitted under the

Contract Documents. Following the Owner’s issuance of the Phase 2 Notice to Proceed, so long as the Owner satisfies its payment

obligations under the Agreement and other Contract Documents, the Owner shall not be required to furnish any further financial evidence

of its ability to satisfy its payment obligations under the Contract Documents.

3.2 Owner’s

Representative

The

Owner will identify the Owner’s Representative, or any other authorized person or entity as defined in Subparagraph 1.1.38 of the

Agreement, to act on behalf of the Owner. The Owner may change the Owner’s Representative upon written notice to the CMAR.

The

Owner’s authorized representative shall be fully acquainted with the Project and shall have the authority to bind the Owner in

all matters requiring the Owner’s approval, authorization, or written notice. If the Owner changes its representative or the representative’s

authority as listed above, the Owner shall immediately notify the CMAR in writing.

3.3 Information

and Services

Any

information or services to be provided by the Owner shall be provided in a timely manner so as not to delay the Work. The Owner shall

establish and update an overall budget for the Project in accordance with the Agreement hereof, based on consultation with the CMAR and

Engineer, which shall include Contingencies for changes in the Work and other costs which are the responsibility of the Owner.

3.4 Worksite

Information

Except

to the extent that the CMAR knows of any inaccuracy, the CMAR is entitled to rely on the following Project information furnished by the

Owner pursuant to this Paragraph 3.4. To the extent the Owner has obtained, or is required elsewhere in the Contract Documents to obtain,

the following Project information, the Owner shall provide such information to the CMAR at the Owner’s expense prior to CMAR commencing

its Phase 2 Construction Services Work:

3.4.1

Information describing the physical characteristics of the Worksite, including surveys, Worksite evaluations, legal descriptions,

data or Drawings depicting existing conditions, subsurface conditions and environmental studies, reports, and investigations.

Mojave Groundwater Bank

Northern Pipeline Project 18

3.4.2

Tests, inspections, and other reports dealing with environmental matters, Hazardous Material, and other existing conditions, including

structural, mechanical, and chemical tests required by the Contract Documents or by law.

3.4.3

Any other information or services requested in writing by the CMAR which are relevant to the CMAR’s performance of the Work

and under the Owner’s control. The information required by this Subparagraph 3.4.3 shall be provided in reasonable detail. Legal

descriptions shall include easements, title restrictions, boundaries, and zoning restrictions. Worksite descriptions shall include existing

buildings and other construction and all other pertinent site conditions. Adjacent property descriptions shall include structures, streets,

sidewalks, alleys, and other features relevant to the Work. Utility details shall include available services, lines at the Worksite and

adjacent thereto, and connection points. The information shall include public and private information, subsurface information, grades,

contours, and elevations, drainage data, exact locations and dimensions, and benchmarks that can be used by the CMAR in laying out the

Work.

3.4.4

All licenses and other rights to use of the Drawings, Specifications, and any other intellectual property necessary or required for

the CMAR’s performance of the Work as well as any other rights to use of any other documents, materials, and/or information generated

or produced by the Engineer or its consultants at any level in connection with the design, engineering, or programing for the Project.

3.5 Engineer

Unless

otherwise expressly provided to the contrary in this Agreement, the Owner shall be responsible for retaining and paying the Engineer

and all other professional design and engineering consultants required for construction of the Project or portions thereof.

3.6 Building

Permit, Fees, And Approvals

Except

for those permits and fees related to the Work which are the responsibility of the CMAR pursuant to Paragraph 2.12, the Owner shall secure

and pay for all other permits, approvals, easements, assessments, and fees required for the development, construction, use, or occupancy

of permanent structures or for permanent changes in existing facilities, including the building permit. Assuming the CMAR has performed

all necessary and reasonable actions to obtain permits, the CMAR shall not be liable for any delays related to obtaining permits and

shall be entitled to any cost or Schedule impacts related thereto so long as not caused by any acts, errors, or omissions of the CMAR.

3.7 Mechanics

and Construction Lien Information

Where

allowed by law, within five (5) days after receiving the CMAR’s written request, the Owner shall provide the CMAR with the information

necessary to give notice of or enforce mechanics lien rights and, where applicable, stop notices. This information shall include the

Owner’s interest in the real property on which the Project is located and the record legal title.

Mojave Groundwater Bank

Northern Pipeline Project 19

3.8 Contract

Documents

Unless

otherwise specified, Owner shall provide electronic or hard copies of the Contract Documents to the CMAR as may be agreed to by the Owner

and CMAR and without cost to the CMAR.

3.8.1

Electronic Documents. If the Owner requires that the Owner, Engineer, and CMAR exchange documents and data in electronic or digital

form, prior to any such exchange the Owner, Engineer, and CMAR shall agree on a written protocol governing all exchanges which, at a

minimum, shall specify: (1) the definition of documents and data to be accepted in electronic or digital form or to be transmitted electronically

or digitally; (2) management and coordination responsibilities; (3) necessary equipment, software, and services; (4) acceptable formats,

transmission methods, and verification procedures; (5) methods for maintaining version control; (6) privacy and security requirements;

and (7) storage and retrieval requirements. Except as otherwise agreed to by the Parties in writing, the Parties shall bear their own

costs as identified in the protocol. In the absence of a written protocol, use of documents and data in electronic or digital form shall

be at the sole risk of the recipient.

3.9 Submittals

The

Owner shall be responsible for review and approval of submittals with reasonable promptness to avoid causing delay and shall cause the

Engineer to respond to such submittals and to either approve or reject the same no later than fifteen (15) days following Engineer’s

receipt of same, unless an earlier or later response deadline is provided elsewhere in the Contract Documents or through written agreement

between the CMAR and the Engineer.

3.10 Access

The

Owner shall provide the CMAR and its Subcontractors and Materials Suppliers at all tiers with appropriate physical and legal access to

the Project Site and other areas necessary for the proper and timely performance and completion of the Work.

ARTICLE

4 — Subcontracts

4.1 Subcontractors

The

Work not performed by the CMAR with its own forces shall be performed by Subcontractors. All subcontracts shall be issued on a lump sum

cost basis unless the Owner has given prior written approval of a different method of payment to the Subcontractor.

4.2 Award

of Subcontracts and Other Contracts for Portions of the Work

4.2.1

As soon after the execution of this Agreement as possible, the CMAR shall provide the Owner and, if directed, the Engineer with a

written list of the proposed Subcontractors and significant Material Suppliers. If the Owner has a reasonable objection to any proposed

Subcontractor or Material Supplier, the Owner shall notify the CMAR in writing. Failure to object within 20 Days shall constitute acceptance.

Subcontractors shall be secured by the CMAR in accordance with the Subcontractor Procurement Plan.

Mojave Groundwater Bank

Northern Pipeline Project 20

4.2.2

If the Owner has reasonably and promptly objected as provided in Subparagraph 4.2.1, the CMAR shall not contract with the proposed Subcontractor

or Material Supplier, and the CMAR shall propose another acceptable to the Owner. If the substituted Subcontractor or Material Supplier

is more or less expensive or use of such Party will result in a change in the Contract Time, the Owner shall execute an appropriate Change

Order that shall reflect any increase or decrease in the Phase 2 Construction Price or Dates of Substantial or Final Completion because

of the substitution.

The

CMAR agrees to bind every Subcontractor and Material Supplier (and require every Subcontractor to so bind its Subcontractors and Material

Suppliers) to all the provisions of this Agreement and the Contract Documents as they apply to the Subcontractors’ and Material

Suppliers’ portions of the Work.

4.2.3

The CMAR shall be responsible for ensuring Subcontractor compliance with Applicable Law, including applicable registration and reporting

requirements.

4.3 Contingent

Assignment of Subcontracts

4.3.1

If this Agreement is terminated for cause in accordance with Paragraph 10.1 hereof, each subcontract agreement shall be assigned

by the CMAR to the Owner, subject to the prior rights of any surety, provided that the Owner accepts such assignment after termination

by notifying the Subcontractor or Material Supplier and CMAR in writing, and assumes all rights and obligations of the CMAR pursuant

to each subcontract agreement.

4.3.2

If the Owner accepts such an assignment, and the Work has been suspended for more than thirty (30) consecutive Days following termination,

the Subcontractor’s compensation shall be equitably adjusted because of the suspension.

ARTICLE

5 — Time

5.1 Performance

of the Work

5.1.1

Date of Commencement. Unless otherwise provided to the contrary in the Agreement or other Contract Documents, the Date of Commencement

of the Preconstruction Phase Services is the date of issuance of a Phase 1 Notice to Proceed for the same in accordance with Paragraph

2.1 of the Agreement. Unless otherwise provided to the contrary in the Agreement, the Date of Commencement of the Construction Phase

Services is the date construction of those services commence following issuance of a Phase 2 Notice to Proceed by the Owner for some

or all the Work covered by such Construction Phase Services as described in the Agreement executed by the Owner and the CMAR for the

same. The Work shall proceed in general accordance with the Schedule of Work as such Schedule may be amended from time to time, subject

to other provisions of this Agreement. The Schedule is subject to allowable adjustments in the Contract Time as permitted herein or in

the other Contract Documents.

5.1.2

Substantial/Final Completion. Unless the Parties agree or otherwise, the Date of Substantial Completion or the Date of Final Completion

shall be established pursuant to the Agreement, subject to adjustments as provided for in the Contract Documents. If a Phase 2 Construction

Price is not established and the Parties desire to establish a Date of Substantial Completion or Date of Final Completion, it shall be

set forth via Amendment.

5.1.3

Time limits stated above are of critical importance to this Agreement.

Mojave Groundwater Bank

Northern Pipeline Project 21

5.1.4

The CMAR shall not knowingly commence the Work before the effective date of the insurance to be provided by the CMAR and Owner as

required by the Contract Documents.

5.2 Schedule

of the Work

5.2.1

The CMAR shall submit an initial and updated Project Construction Schedule to the Owner in the form and within the time limits acceptable

to the Owner in accordance with Exhibit F. The Owner will determine the acceptability of the initial and updated Project Construction

Schedule within a reasonable period of time. If the Owner deems the Project Construction Schedule unacceptable, it shall specify in writing

to the CMAR the basis for its objection.

5.2.2

The initial and updated Project Construction Schedule shall represent a practical plan to complete the Work within the Contract Time.

Schedules showing the Work completed in less than the Contract Time may be acceptable if judged by the Owner to be practical.

5.2.3

The Project Construction Schedule shall be prepared in accordance with Exhibit G.

5.3 Delays

and Extensions of Time

5.3.1

If the CMAR is delayed at any time in the commencement or progress of the Work by Excusable Delay (as hereinafter defined), then,

upon agreement of the Parties:

5.3.1.1

The Contract Time shall be extended by Change Order for a reasonable time based on the impact of such delay or concurrent delays

to the Critical Path of the Project Schedule.

5.3.1.2

Provided the CMAR has made reasonable attempts to mitigate the effects of such delay (such as, by way of example and not of limitation,

through rescheduling, resequencing, or other measures), the Phase 2 Construction Price shall be adjusted to the extent reasonably necessary

to compensate the CMAR for any increases in the Cost of the Work due to additional time to which the CMAR is entitled under this Paragraph

5.3.

Any

adjustments made pursuant to Paragraphs 5.3.1.1 or 5.3.1.2 shall be subject to limitations set forth in Article 7 hereof of these General

Conditions and the provisions of Paragraphs 5.6 and 5.7 of these General Conditions.

The

CMAR shall not be entitled to an adjustment in the Phase 2 Construction Price or the Contract Time for CMAR Delays.

5.4 Other

Terms Defined

5.4.1

For purposes of the Contract Documents, the following terms shall have the meanings indicated for each:

5.4.1.1

“CMAR Delay” means each Day of delay to the completion of the Work to the extent such delay was caused by and/or within

the control of the CMAR, and (a) actually causes a delay in the Critical Path of such Work, and (b) is not caused by an Excusable Delay,

Force Majeure, or Owner Delay. Delays attributable to and within the control of the CMAR, its Subcontractors of all tiers, its Material

Suppliers, Consultants, or other Party for whom the CMAR is responsible shall be deemed to be CMAR Delay.

Mojave Groundwater Bank

Northern Pipeline Project 22

5.4.1.2

“Excusable Delay” means any act, omission, condition, event, or circumstance beyond the CMAR’s reasonable control

and due to no fault of the CMAR including, but not limited to, the Owner’s suspension of the Work without cause or the CMAR’s

suspension of the Work due to nonpayment, Owner Delay, delays or impacts caused by or attributable to a third party, delay caused by

or resulting from Differing Site Conditions, or a Force Majeure Delay.

5.4.1.3

“Force Majeure” means any conditions, occurrences, or acts of God, and not within the reasonable control of the CMAR,

not constituting Owner Delay, delay caused by Differing Site Conditions, or CMAR Delay, which impacts the Work or prevents or delays

the CMAR from performing its obligations under the Contract Documents, including without limitation any one or more of the following:

5.4.1.3.1

Damage or destruction by fire or casualty.

5.4.1.3.2

Unusually severe weather including lightning, tornado, earthquake, flood, windstorm, named weather event, named storm, wind, natural

disasters.

5.4.1.3.3

Pandemic, epidemic, quarantine, declaration of public health emergency, and/or governmental orders issued in connection with such

public health emergencies.

5.4.1.3.4

Weather related delays beyond the number provided for in Paragraph 5.3.3 of the Agreement or as otherwise allowed or permitted, if

applicable, in the Phase 2 Construction Price Amendment.

5.4.1.3.5

Strike or other labor dispute not specifically directed at the CMAR or any person or entity for whom the CMAR is responsible under

the Contract Documents.

5.4.1.3.6

Regional, nationwide, or global unavailability or shortage of materials or equipment resulting in Critical Path delay. To the extent

that any alleged delay relates to regional, nationwide, or global unavailability or shortage of materials or equipment, the CMAR shall

be required to provide documented proof to the Owner that the CMAR did not reasonably anticipate such unavailability as of the Effective

Date of the Phase 2 Construction Price Amendment and made diligent and timely efforts to obtain (buy out) such materials or equipment

as a condition precedent to any extension of the Contract Time or increase of the Phase 2 Construction Price under this paragraph.

5.4.1.3.7

Unavailability of utilities (not caused in whole or in part as a result of fault on the part of the Owner or the CMAR).

5.4.1.3.8

Riots, insurrections, acts of a public enemy, acts of domestic and/or foreign terrorism, war, or vandalism.

5.4.1.3.9

Bomb scares or similar third-party threats or disruptions.

Mojave Groundwater Bank

Northern Pipeline Project 23

5.4.1.3.10

Moratoriums or other unusual or unforeseeable delays in the issuance of any required approvals from any Governmental Authorities

or utilities.

5.4.1.3.11

Delays caused directly or indirectly by the actions or inactions of Governmental Authorities (not caused in whole or in part as a

result of fault on the part of the Owner or the CMAR) including, but not limited to, enactment or revision of Applicable Laws or official

interpretations subsequent to the execution of the Agreement.

5.4.1.3.12

Earthquakes with an epicenter in the county where the project site is located in excess magnitude 6.5;

5.4.1.3.13

Software hacking or malware, including loss of access to the internet cloud. To the extent that any alleged delay relates to software

hacking, malware or loss of access to the internet cloud, the CMAR has made diligent and timely efforts to mitigate the situation as

a condition precedent to any extension of the Contract Time or increase of the Phase 2 Construction Price under this paragraph.

For

the avoidance of doubt, the Owner’s financial insolvency or inability to perform its financial obligations under the Agreement

and the other Contract Documents shall not constitute an event of Force Majeure.

5.4.1.4

“Owner Delay” means a cost impact or each day of delay that actually impacts the completion of the Work and is caused

by any one or more of the following actions or omissions of the Owner (or any tenant of the Owner) at the Project related to:

5.4.1.4.1

Any Change in the Work initiated by the Owner.

5.4.1.4.2

The Owner’s failure to timely approve or disapprove any item for which Owner approval is required under the Contract Documents

except to the extent that the Owner’s failure is deemed to mean approval pursuant to the terms of the Agreement and except to the

extent that the Owner cures such failure within seven (7) Business Days after receipt of written notice from the CMAR of such failure.

5.4.1.4.3

Any failure of the Owner to (a) comply with the CMAR’s reasonable requirements relative to access to areas of the Work reasonably

necessary for the performance of Work, including, without limitation, the hoist, freight elevators, and/or defined path of travel established

with respect to the Work; (b) utilize labor which can work in harmony with labor employed by the CMAR and its Subcontractors; (c) comply

with the CMAR’s safety rules; or (d) comply with all requirements applicable to the Owner’s separate work for the Project

undertaken by the Owner or its separate Contractors and Subcontractors at any tier in each case to the extent any such failure is not

cured within five (5) Business Days after written notice is given by the CMAR to the Owner and only to the extent any such failure actually

impacts the CMAR’s already scheduled Work.

Mojave Groundwater Bank

Northern Pipeline Project 24

5.4.1.4.4

Failure by the Owner to comply with its obligations under this Agreement.

5.4.1.4.5

Any defects, delay, or impacts from the Owner’s separate work for the Project undertaken or failed to be undertaken by the

Owner or its separate Contractors and Subcontractors at any tier, or which delays the Work or the issuance of a certificate of occupancy

or another applicable certificate of completion for the Work by any governmental entity having jurisdiction over the Project or the Work,

in each case to the extent not cured within five (5) Business Days after written notice is given by the CMAR to the Owner.

5.4.1.4.6

Any other event or circumstance caused by or attributable to the Owner.

5.5 Claims

/ Modifications for Excusable Delays

If

any delay to the Work is caused by Excusable Delay, any adjustments to time or Phase 2 Construction Price shall be made in accordance

with Paragraph 5.3.

5.6 Construction

General Conditions Costs

In

the event of an Excusable Delay pursuant to which the CMAR, subject to consultation with and approval of the Owner, is entitled to an

adjustment in the Contract Time in accordance with Paragraph 5.3.1 hereof but not otherwise, the CMAR shall, subject to consultation

with and approval of the Owner, be entitled to an equitable adjustment of the Phase 2 Construction General Conditions Costs, as negotiated

between the Parties. The CMAR shall, in the event of an occurrence likely to cause Excusable Delay, cooperate in good faith with the

Owner to minimize and mitigate the impact of any such occurrence and do all things reasonable under the circumstances to achieve this

goal.

5.7 Monitoring

Progress and Costs

Following

acceptance by the Owner of the Phase 2 Construction Price, the CMAR and the Owner shall establish a process for monitoring costs against

the Phase 2 Construction Price and actual progress against the Schedule of Work. The CMAR shall provide written reports to the Owner

at monthly intervals on the status of the Work, showing variances between costs and the Phase 2 Construction Price and actual progress

as compared to the Project Construction Schedule, including estimates of future costs and recovery programs if actual progress indicates

that the Dates of Substantial Completion or Final Completion may not be met.

5.8 Owner

Approval

Notwithstanding

anything contained herein or in the other Contract Documents to the contrary, any decision by the Owner to approve (or disapprove) any

requested adjustments in the Contract Time and/or the Phase 2 Construction Price (including any increase in the Construction General

Conditions Costs) resulting from an Excusable Delay shall be made by the Owner in its good faith discretion. Any failure by the Parties

to reach an agreement hereunder shall not prejudice the CMAR’s entitlement to price and Schedule relief otherwise provided and

may constitute a Claim for purposes of the dispute-related provisions in this Agreement.

Mojave Groundwater Bank

Northern Pipeline Project 25

ARTICLE

6 — Compensation

6.1 CMAR’s

Compensation for Preconstruction Phase Services

The

Owner shall compensate the CMAR for the performance of the CMAR’s Preconstruction Phase Services in accordance with Paragraph 6.1.1

of the Agreement.

6.2 CMAR’s

Compensation for Early Work(s) Package(s) – NOT USED

6.3 CMAR’s

Compensation for Construction Phase Services

The

Owner shall compensate the CMAR for Work performed and described in the Phase 2 Construction Price (Exhibit E) on the basis of

a Guaranteed Maximum Price, as set forth in the Agreement.

6.4 Contingency

and Allowances

Contingency

and/or Allowances, if any, and the use thereof, shall be as set forth in, and subject to the terms, covenants, and conditions of the

Phase 2 Construction Price executed in connection therewith.

ARTICLE

7 — Changes

Changes

in the Work that are within the general scope of this Agreement shall be accomplished, without invalidating this Agreement, by Change

Order, Owner Change Directive, and/or Field Order.

7.1 Change

Order

7.1.1

The CMAR may request, or the Owner may order, changes in the Work or the timing or sequencing of the Work that impacts the Phase

2 Construction Price, where applicable the estimated Cost of the Work and CMAR’s Fee, the Date of Substantial Completion, and/or

the Date of Final Completion. All such changes in the Work shall be formalized in a Change Order. Any such requests for changes in the

Work shall be processed in accordance with this Article 7.

7.1.2

The Phase 2 Construction Price will be adjusted only for Excusable Delay in accordance with and subject to the terms, conditions,

and limitations set forth in Article 5.3 hereof.

7.2 Owner

Change Directives and Field Orders

7.2.1

The Owner may issue a written Owner Change Directive directing a change in the Work prior to reaching agreement with the CMAR on

the adjustment, if any, in the Phase 2 Construction Price or the Date of Substantial Completion or Date of Final Completion.

Mojave Groundwater Bank

Northern Pipeline Project 26

7.2.2

The Owner and the CMAR shall negotiate expeditiously and in good faith for appropriate adjustments, as applicable, to the Phase 2

Construction Price or the Contract Time arising out of Owner Change Directives. If the Owner and the CMAR are unable to reach agreement

within 30 Days, the issue shall be elevated to the CMAR’s management and the Owner’s Representative for a determination.

As the Work associated with the Owner Change Directive is performed, the CMAR shall submit its costs for such Work with its Application

for Payment and the CMAR shall be paid for the Work performed in accordance with the Phase 2 Contract Price. The Owner shall prepare

an Owner Change Directive, utilizing the Owner’s available funds, for any undisputed portion of the costs. Contingency funds may

only be used for Owner Change Directives upon written agreement of the Parties.

7.2.3

When the Owner and the CMAR agree upon the adjustments in the Phase 2 Construction Price, the Date of Substantial Completion, and/or

Date of Final Completion for a change in the Work directed by an Owner Change Directive, such agreement shall be the subject of an appropriate

Change Order.

7.2.4

The Owner may authorize Field Orders. Such Field Orders will be binding on the Owner and on the CMAR, which shall perform the Work

involved promptly. If the CMAR believes that a Field Order justifies an adjustment in the Phase 2 Construction Price or Contract Times

or both, then the CMAR shall submit a Change Order Proposal.

7.3 Determination

of Cost

7.3.1

An increase or decrease in the Phase 2 Construction Price established in the Agreement or changes to the Project Construction Schedule

or the Schedule/Contract Time resulting from a change in the Work that affect the Phase 2 Construction Price shall, in each case, be

determined by one or more of the following methods:

7.3.1.1

A mutually accepted, itemized Lump Sum, based on the Cost of the Work definition appearing in the Phase 2 Construction Price.

7.3.1.2

Cost of Work (as defined in the Phase 2 Construction Price) calculated on a basis agreed upon by the Owner and the CMAR, plus CMAR’s

Fee.

7.3.1.3

If an increase or decrease cannot be agreed to as set forth in Clauses .1 through .2 above, and the Owner issues an Owner Change

Directive, the cost of the change in the Work shall be determined by the reasonable actual expense and savings of the performance of

the Work resulting from the change. Where applicable, if there is a net increase or decrease in the GMP, the CMAR’s Fee shall be

adjusted accordingly. The CMAR shall maintain a documented, itemized, accounting evidencing the expenses and savings.

7.3.2

If the Owner and the CMAR disagree as to whether work required by the Owner is within the Scope of the Work, the CMAR shall furnish

the Owner with an estimate of the costs to perform the disputed work in accordance with the Owner’s interpretations. Any such disagreement

shall be resolved in accordance with Article 11.

Mojave Groundwater Bank

Northern Pipeline Project 27

ARTICLE

8 — Payment

8.1 Schedule

of Values

Concurrently

with the CMAR’s preparation and delivery to the Owner of any cost model or progressive cost model as required for the Phase 1 Preconstruction

Services Scope of Work through and including the date on which a Phase 2 Construction Price Amendment for any portion of the Work is

executed by the CMAR, the CMAR shall prepare and submit to the Owner and, if directed, the Engineer, a Schedule of Values apportioned

to the various divisions or phases of the Work in increasing level of detail. At the time a Phase 2 Construction Price Amendment is executed

for the Work or any portion thereof, each line item contained in the Schedule of Values shall be assigned a value such that the total

of all items shall equal the Phase 2 Construction Price for such Work or portion thereof.

8.2 Progress

Payments for Preconstruction Phase Services

Progress

Payment for Preconstruction Phase Services shall be made in accordance with Paragraph 6.1 of the Agreement.

8.3 Progress

Payments for Construction Phase Services

Applications

for Payment for Construction Phase Services shall be submitted by the CMAR to the Owner and the same paid, in each case in accordance

with and subject to the terms and provisions of this Article 8, the Phase 2 Construction Price, and other applicable provisions of the

Agreement and other Contract Documents.

8.3.1

Applications. The CMAR shall submit to the Owner and, if directed, its Engineer a monthly application for payment for Construction

Phase Services no later than the 7th day of the calendar month for the preceding thirty (30) days; the CMAR’s applications

for payment shall be itemized and supported by the CMAR’s Schedule of Values and any other substantiating data as required by these

General Conditions and the other Contract Documents. Payment applications shall include payment requests on account of properly authorized

Change Orders or Owner Change Directives. The Owner shall pay amounts not in dispute and otherwise due no later than thirty (30) days

after the CMAR has submitted a complete and accurate payment application. The Owner may deduct from any progress payment amounts as may

be retained pursuant to Subparagraph 8.3.3 below, as well as amounts in dispute.

8.3.2

Lien Waivers and Liens.

8.3.2.1

Partial Lien Waivers and Affidavits. If requested by the Owner, as a prerequisite for payment, but subject to the CMAR’s receipt

of payment, the CMAR shall provide partial conditional payment lien waivers in the amount of the application for payment and affidavits

from its Subcontractors and Material Suppliers for the Work completed during the period covered by the current application for payment

and partial unconditional payment lien waivers from the CMAR and all Subcontractors and Material Suppliers paid from the previous month’s

application payment. In no event shall the CMAR be required to sign an unconditional waiver of lien or claim, either partial or final,

prior to receiving payment nor shall the CMAR be required to execute or deliver any lien waiver for the Work not covered by such lien

waiver or in an amount more than what it has been paid.

8.3.2.2

Responsibility for Liens. If the Owner has made payments in the time required by this Article 8 and is otherwise not in breach of

its obligations, the CMAR shall, within thirty (30) days after written notice of filing, cause the removal or bonding over of any liens

filed against the premises or public improvement fund by any Party or Parties performing labor or services or supplying materials in

connection with the Work by, among other things, securing a bond around the lien. If the CMAR fails to take such action on a lien, the

Owner may cause the lien, after thirty (30) days written notice, to be removed at the CMAR’s expense, including bond costs and

reasonable attorneys’ fees. This Clause shall not apply if there is a dispute pursuant to Article 11 relating to the subject matter

of the lien.

Mojave Groundwater Bank

Northern Pipeline Project 28

8.3.3

Retainage. Retainage shall be withheld and disbursed in accordance with the terms and provisions of the Phase 2 Construction Price

Amendment.

8.3.4

Stored Materials and Equipment. Unless otherwise provided in the Contract Documents, applications for payment may include materials

and equipment not yet incorporated into the Work but delivered to and suitably stored on-site or off-site, including applicable insurance,

storage, and costs incurred transporting the materials to an off-site storage facility. Approval of payment applications for stored materials

and equipment stored off-site shall be conditioned on submission by the CMAR of bills of sale and proof of required insurance, or such

other procedures satisfactory to the Owner to establish the proper valuation of the stored materials and equipment, the Owner’s

title to such materials and equipment, and to otherwise protect the Owner’s interests therein, including transportation to the

Worksite.

8.3.5

Mobilization. The Schedule of Values shall include a line item for Mobilization equal to five percent (5%) of the Contract Price

which shall include all costs associated with bonds, insurance, the establishment of field offices and utilities, and other general project

commencement activities. These line items shall be included in the CMAR’s first Application for Payment and paid by Owner in accordance

with Subparagraph 8.3.1.

8.4 Adjustment

of CMAR’s Payment Application

The

Owner may adjust or reject a payment application or nullify a previously approved payment application, in whole or in part, as may reasonably

be necessary to protect the Owner from loss or damage based upon the following, to the extent that the CMAR is responsible therefor under

the Agreement:

8.4.1

The CMAR’s failure to perform the Work as required by the Contract Documents.

8.4.2

Loss or damage arising out of or relating to this Agreement and caused by the CMAR to the Owner or Others to whom the Owner may be

liable.

8.4.3

The CMAR’s failure to properly pay Subcontractors and Material Suppliers following receipt of such payment from the Owner.

8.4.4

Defective Work not corrected in a timely fashion.

8.4.5

Reasonable evidence of delay in performance of the Work such that the Work will not be completed by the Dates of Substantial or Final

Completion.

8.4.6

Reasonable evidence demonstrating that the unpaid balance of the Phase 2 Construction Price is insufficient to fund the cost to complete

the Work.

8.4.7

Third-party claims involving the CMAR until the CMAR furnishes the Owner with adequate security in the form of a surety bond, letter

of credit or other collateral or commitment sufficient to discharge such claims if established.

Mojave Groundwater Bank

Northern Pipeline Project 29

No

later than seven (7) days after receipt of an application for payment, the Owner shall give written notice to the CMAR, at the time of

disapproving or nullifying all or part of an application for payment, stating its specific reasons for such disapproval or nullification,

and the remedial actions to be taken by the CMAR in order to receive payment. When the above reasons for disapproving or nullifying an

application for payment are removed, payment will be made within 14 Days, or other mutually agreed upon time period, for the amount previously

withheld.

Undisputed

portions of any Application for Payment shall be promptly paid by the Owner in accordance with the terms of the Agreement, these General

Conditions, and other applicable Contract Documents.

8.5 Acceptance

of Work

Neither

the Owner’s payment of progress payments nor its partial or full use or occupancy of the Project constitutes acceptance of Work

not complying with the Contract Documents.

8.6 Payment

Delay

If

for any reason, not the fault of the CMAR, the CMAR does not receive a progress payment from the Owner in accordance with the Agreement,

the CMAR, upon giving the Owner such written notice, if any, as specified in the Agreement, and without prejudice to and in addition

to any other legal remedies, may stop Work until payment of the full amount owing to the CMAR has been received, including interest from

the date payment was due in accordance with the Agreement. The Phase 2 Construction Price and Dates of Substantial or Final Completion

shall be equitably adjusted by a Change Order for reasonable cost and delay resulting from shutdown, delay, and startup.

8.7 Substantial

Completion

8.71

The CMAR shall notify the Owner and, if directed, its Engineer when it considers Substantial Completion of the Work or a designated portion

to have been achieved. The Owner, with the assistance of its Engineer, shall promptly conduct an inspection to determine whether the

Work or designated portion can be occupied or utilized for its intended use by the Owner without excessive interference in completing

any remaining unfinished Work by the CMAR. If the Owner determines that the Work or designated portion has not reached Substantial Completion,

the Owner, with the assistance of its Engineer, shall promptly compile a list of items to be completed or corrected so the Owner may

occupy or utilize the Work or designated portion for its intended use. The CMAR shall promptly complete all items on the list.

8.7.2

When Substantial Completion of the Work or a designated portion is achieved, the CMAR shall prepare a Certificate of Substantial

Completion that shall establish the date of Substantial Completion, and the respective responsibilities of the Owner and the CMAR for

interim items such as security, maintenance, utilities, insurance, and damage to the Work, and fixing the time for completion of all

items on the list accompanying the Certificate. The Certificate of Substantial Completion shall be submitted by the CMAR to the Owner

and, if directed, to its Engineer for the Owner’s written acceptance of responsibilities assigned in the Certificate.

8.7.3

Unless otherwise provided in the Certificate of Substantial Completion, warranties required by the Contract Documents shall commence

on the earlier of (a) the date of Substantial Completion of the Work or a designated portion, and (b) the date the Owner takes beneficial

use of the Work or a designated portion of the Work.

Mojave Groundwater Bank

Northern Pipeline Project 30

8.8 Partial

Occupancy or Beneficial Use

8.8.1

The Owner may occupy, or use completed or partially completed portions of the Work, beneficially when (a) the portion of the Work

is designated in a Certificate of Substantial Completion, (b) appropriate insurer(s) consent to the occupancy or use, and (c) public

authorities authorize the occupancy or use. The CMAR shall not unreasonably withhold consent to partial occupancy or use. The Owner shall

not unreasonably refuse to accept partial occupancy. The CMAR shall be entitled to a Change Order if the Owner’s partial use or

occupancy of completed or partially completed portions of the Work adversely impacts completion of other portions of the Work through

no fault of the CMAR.

8.9 Final

Completion and Final Payment

8.9.1

Upon notification from the CMAR that the Work has reached Final Completion and is ready for final inspection and acceptance, the

Owner, with the assistance of its Engineer, shall promptly conduct an inspection to determine if the Work has reached Final Completion

and is acceptable under the Contract Documents.

8.9.2

When the Work has reached Final Completion, the CMAR shall prepare for the Owner’s acceptance a final application for payment

stating that to the best of the CMAR’s knowledge, and based on the Owner’s inspections, the Work has reached Final Completion

in accordance with the Contract Documents.

8.9.3

Final Payment shall be due on the CMAR’s submission of the following to the Owner:

8.9.3.1

An affidavit declaring any indebtedness connected with the Work, e.g., payrolls or invoices for materials or equipment, to have been

paid, satisfied, or to be paid with the proceeds of Final Payment, so as not to encumber the Owner’s property.

8.9.3.2

As-built Drawings, manuals, copies of warranties, and all other close-out documents required by the Contract Documents.

8.9.3.3

Release of any liens, conditioned on Final Payment being received.

8.9.3.4

Consent of any surety, if applicable.

8.9.3.5

Any outstanding known and unreported accidents or injuries experienced by the CMAR or its Subcontractors at the Worksite.

8.9.4

If, after Substantial Completion of the Work, the Final Completion of a portion of the Work is materially delayed through no fault

of the CMAR, the Owner shall pay the balance due for portion(s) of the Work fully completed and accepted. If the remaining contract balance

for Work not fully completed and accepted is less than the retained amount prior to payment, the CMAR shall submit to the Owner the written

consent of any surety to payment of the balance due for portions of the Work that are fully completed and accepted. Such payment shall

not constitute a waiver of claims, but otherwise shall be governed by this Paragraph 8.9.

Mojave Groundwater Bank

Northern Pipeline Project 31

8.9.5

Claims not reserved in writing with the making of Final Payment shall be waived except for claims relating to liens or similar encumbrances,

warranties, and Defective Work.

8.9.6

Acceptance of Final Payment. Unless the CMAR provides written identification of unsettled claims with an application for Final Payment,

its acceptance of Final Payment constitutes a waiver of such payment claims.

8.10 Late

Payment

Payments

due but unpaid shall bear interest until paid at the rate set forth in Article 8 of the Agreement.

8.11 Change

of Payment

Upon

execution of the Agreement, the CMAR shall provide the Owner with written payment instructions and all necessary forms required by the

Owner to effectuate payments to the CMAR by wire transfer (the “Payment Information”). The CMAR shall submit the initial

Payment Information to the Owner by certified mail or hand delivery only. If the Owner receives a request to change such Payment Information,

the Owner agrees that it will not modify or make a change to this Payment Information without oral confirmation, followed by written

confirmation, from the CMAR’s Chief Financial Officer, Vice President, or President. The Owner shall make no changes to the Payment

Information if it does not receive the oral and written confirmations as stated herein.

ARTICLE

9 — Indemnity, Insurance, Waivers, and Bonds

9.1 Indemnity

The

CMAR shall indemnify, defend, and hold harmless the Owner and its directors, officers, employees, successors, and assigns from and against

any and all third-party claims, legal actions, causes of action, proceedings, suits, judgments, liens, and levies, including reasonable

attorneys’ fees and disbursements but only to the extent for bodily injury or death of any person(s) and damages to tangible property

(other than the Work itself), to the extent caused by the CMAR (or by its Subcontractor or Sub-subcontractors, regardless of tier) and

arising from the intentional, willful or negligent acts or omissions of the CMAR, any Subcontractor at any tier, or any person or entity

for whom such Parties are legally responsible in the performance of the Work.

9.1.1

The CMAR’s indemnity obligations under Paragraph 9.1 shall not apply (a) to the extent of the negligence or willful or intentional

misconduct of the Owner, its officers, agents, employees, successors, or assigns, or (b) to any loss, cost, claim, suit, damage, liability,

or expense (including attorneys’ fees and costs) for which the Owner is required to indemnify the CMAR Indemnitees in accordance

with the Contract Documents.

9.1.2

In all claims against the Owner Indemnitees by any employee of the CMAR, anyone directly or indirectly employed by the CMAR or anyone

for whose acts the CMAR may be liable, the indemnification obligation set forth in Paragraph 9.1 shall not be limited in any way by any

limitation on the amount or type of damages, compensation, or benefits payable by or for the CMAR under workers’ compensation acts,

disability benefit acts, or other employee benefit acts.

Mojave Groundwater Bank

Northern Pipeline Project 32

9.1.3

Notwithstanding any provision or term to the contrary herein, under no circumstances shall either Party be liable to the other for

any consequential, incidental, special, or punitive damages and as provided in Article 9 of the Agreement.

9.2 CMAR’s

Insurance

9.2.1

Phase 1 Insurance. The CMAR shall obtain and maintain primary insurance on all of its operations and list the Owner as additional

insureds on all forms including the required “additional insured” endorsements in the following minimum coverages: (a.) Worker’s

Compensation Insurance as required by applicable law; (b.) General Liability Insurance covering all operations: $2,000,000 (occ) and

$4,000,000 (agg); (c.) Automobile Liability Insurance: $2,000,000 including coverage for all owned, hired and non-owned automobiles.

A waiver of subrogation endorsement in favor of Owner must be provided for all coverages stated herein

9.2.2

Phase 2 Insurance and Bond requirements are provided in Exhibit A.1.

9.3 Property

Insurance

Builder’s

Risk Insurance shall be obtained and maintained for the Project upon and subject to the terms and conditions provided in Exhibit A.1.

9.4 Risk

Of Loss

Owner

has established a project-specific insurance program for the Project, including an Owner-Controlled Insurance Program (“OCIP”)

providing Commercial General Liability and Excess Liability coverage, and Owner-procured Builder’s Risk insurance covering the

Work on an all-risk basis. Contractor and its Subcontractors shall enroll in and comply with the OCIP as a condition of performing Work

on the Project.

Risk

of loss of, or damage to, the Work shall be upon the Contractor until the Date of Substantial Completion. Contractor shall take all reasonable

precautions to protect the Work, materials, equipment, and temporary structures whether located onsite, offsite, in transit, or in storage

against loss or damage.

In

the event of loss or damage to the Work before Substantial Completion, Contractor shall promptly repair, restore, or replace the affected

Work so that it conforms to the Contract Documents. Such repair shall be funded first from proceeds of Owner’s Builder’s

Risk policy. To the extent any loss or damage is not covered or paid by Owner’s Builder’s Risk policy Contractor shall bear

such costs at its sole expense, without entitlement to additional compensation. Contractor may request an equitable extension of time

for delays caused by a covered casualty loss beyond Contractor’s reasonable control, subject to Owner’s written approval.

Risk

of loss shall transfer to Owner upon the Date of Substantial Completion, provided that Contractor shall remain responsible for loss or

damage caused by Contractor’s acts, errors, omissions, or failure to complete punch list items through Substantial Completion and

written acceptance by Owner.

Mojave Groundwater Bank

Northern Pipeline Project 33

9.5 Adjustment

of Loss

A

loss insured under the Builder’s Risk Insurance Policy required pursuant to Exhibit A.1 shall be adjusted by the Party obtaining

such Builder’s Risk Insurance and made payable to such Party for the insureds, as their interests may appear, subject to requirements

of any applicable mortgagee clause and Paragraph 9.6 hereof. The CMAR shall pay Subcontractors their just shares of insurance proceeds

received by the CMAR, and by appropriate agreements, written where legally required for validity, shall require Subcontractors to make

payments to their Sub-subcontractors in similar manner.

9.6 Insurance

Payouts

If

required in writing by a Party in interest, the Party obtaining such Builder’s Risk Insurance shall, upon occurrence of an insured

loss, give bond for proper performance of such Party’s duties. The cost of required bonds shall be charged against proceeds received

by each Party. Such Party shall deposit in a separate account proceeds so received, which such Party shall distribute in accordance with

such agreement as the Parties in interest may reach, or in accordance with Article 11 of these General Conditions. The CMAR shall not

be required to repair or replace lost or damaged Work until a mutually acceptable Change Order, in accordance with Article 7, is executed

and funds are available to pay for such loss or damage.

9.7 Bonds

Payment

and performance bonds or other forms of substitute security, if any, shall be required as set forth in the Phase 2 Construction Price.

The requirements for each of the bonds are included in Exhibit A.2.

9.8 Royalties,

Patents, and Copyrights

The

CMAR shall pay all royalties and license fees which may be due on the inclusion of any patented or copyrighted materials, methods, or

systems selected by the CMAR and incorporated in the Work. The CMAR shall indemnify and hold the Owner harmless from all suits or claims

for infringement of any patent rights or copyrights arising out of such selection. The Owner agrees to indemnify and hold the CMAR harmless

from any suits or claims of infringement of any patent rights or copyrights arising out of any patented or copyrighted materials, methods,

or systems specified by the Owner or Engineer or otherwise included in the Drawings, Specifications, and other documents, materials,

or information provided by the Owner or the Engineer for construction of the Work, whether pursuant to this Agreement or otherwise.

ARTICLE

10 — Suspension, Notice to Cure, and Termination of the Agreement

10.1

The Owner may suspend Work at any time and, without cause, suspend the Work or any portion thereof for a period of not more than

thirty (30) days for a single occurrence or sixty (60) days in the aggregate by notice in writing to the CMAR and the Engineer, which

shall fix the date on which Work shall resume. The CMAR shall resume the Work on the date so fixed.

The

CMAR will be allowed an increase in the Phase 2 Construction Price or an extension of the Contract Time, or both, for delayed or added

costs, directly attributable to any suspension (but not lost profits) if the CMAR makes a claim therefor as provided in Articles 5 and

7.

Mojave Groundwater Bank

Northern Pipeline Project 34

If

the CMAR fails to correct Defective Work as required by Paragraphs 2.5 and 2.6 herein or fails to perform the Work in accordance with

the Contract Documents, the Owner or Owner’s Representative may direct the CMAR to stop the Work, or any portion thereof, until

the cause for such order has been eliminated by the CMAR. The CMAR shall not be entitled to any adjustment of Contract Time or Phase

2 Construction Price because of any such order. The Owner and Owner’s Representative have no duty or responsibility to the CMAR

or any other Party to exercise the right to stop the Work.

10.2 Owner

Termination

10.2.1

The Owner May Terminate Agreement upon the occurrence of any one or more of the following events:

10.2.1.1

If the CMAR is adjudged as bankrupt or insolvent.

10.2.1.2

If the CMAR makes a general assignment for the benefit of creditors.

10.2.1.3

If a trustee or receiver is appointed for the CMAR or for any of the CMAR’s property.

10.2.1.4

If the CMAR files a petition to take advantage of any debtor’s act, or to reorganize under bankruptcy or similar laws.

10.2.1.5

If the CMAR fails to perform the Work in accordance with the Contract Documents, including, but not limited to, failure to supply sufficient

skilled workmen or suitable materials or equipment or failure to adhere to the progress Schedule established and adjusted in accordance

with pursuant to Article 5 of the Agreement and Article 5 hereof.

10.2.1.6

If the CMAR, without justification, repeatedly fails to make timely payments to Subcontractors or Material Suppliers for labor, materials,

or equipment.

10.2.2

The Owner may, without prejudice to any other right or remedy, serve written notice upon the CMAR and the CMAR’s surety of

the Owner’s intention to terminate the Agreement for any breach set forth in this Paragraph 10.2. Said notice to contain the reasons

for such intention to terminate the Agreement, and provided that unless within thirty (30) days after the service of such notice all

such violations have been corrected and remedied, the Contract Documents shall cease and terminate, and the CMAR shall be excluded from

the site. In such case, the CMAR shall not be entitled to receive any further payment until the Work is finished by Others.

10.2.2.1

The foregoing notwithstanding, if the nature of the alleged reason for termination is not capable of being corrected or remedied

within thirty (30) days, such correction or remedy shall commence and be completed with reasonable diligence and in no event later than

ninety (90) Days following the occurrence of such default.

Mojave Groundwater Bank

Northern Pipeline Project 35

10.2.3

In the event of any such termination, the Owner shall immediately serve written notice thereof upon the surety and the CMAR, and the

surety shall have the right to take over and perform the Contract Documents, provided, however, that if the surety, within 30 Days after

the serving upon it of a notice of termination, does not give the Owner written notice of their intention to take over and perform the

Contract Documents, or does not commence performance thereof within 90 days from the date of serving said notice, Owner may take possession

of the Work and incorporate in the Work all materials and equipment stored at the site or for which Owner has paid the CMAR but which

are stored elsewhere that were intended to be incorporated into the Work, and finish the Work as Owner may deem expedient for the account

and at the expense of the CMAR. The CMAR’s surety shall be liable to the Owner for any excess costs or other damage occasioned

the Owner thereby. If the unpaid Balance of the Phase 2 Construction Price exceeds the direct and indirect costs of completing the Work,

including but not limited to, compensation for additional professional services and all costs generated to insure or bond the Work of

substituted Contractors or Subcontractors utilized to complete the Work, such excess shall be paid to the CMAR. If such costs exceed

the unpaid balance, the CMAR shall pay the difference to the Owner promptly upon demand; on failure of the CMAR to pay, the surety shall

pay on demand by Owner. Any portion of such difference not paid by the CMAR or surety within thirty (30) Days following the mailing of

a demand for such costs by the Owner shall earn interest rate authorized by state law. Such costs incurred by the Owner shall be verified

by the Owner’s Representative and incorporated in a Change Order, but in finishing the Work, the Owner shall have the obligation

to mitigate its damages, but not be required to obtain the lowest figure for the Work performed. Any dispute under this section shall

be addressed in accordance with Paragraph 11 in this Agreement.

10.2.4

Where the CMAR’s services have been so terminated by the Owner, the termination shall not affect any rights of the Owner against

the CMAR then existing or which may thereafter accrue. Any retention or payment of monies due the CMAR by the Owner will not release

the CMAR from liability.

10.2.5

The Owner may terminate the Agreement for convenience in accordance with Paragraph 10.3 hereof. In the event of such termination

for convenience, the CMAR shall be compensated for the portion of the CMAR’s Preconstruction or Construction Phase Services, if

any, performed to the date of such termination, but the CMAR shall not be entitled to compensation for Work not performed.

10.3 Owner

Termination. Upon ten (10) Days written notice to the CMAR, the Owner may, without cause

and without prejudice to any other right or remedy of the Owner, terminate the Agreement

for convenience. In such case, the CMAR shall be paid for (without duplication of any items):

10.3.1

Work executed in accordance with the Contract Documents prior to the effective date of termination, including CMAR Fee for Construction

General Conditions Costs on such Work, as applicable.

10.3.2

Expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment

as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for Construction General Conditions

Costs and CMAR Fee thereon.

10.3.3

Other reasonable expenses directly attributable to termination, including demobilization costs, cancellation charges and fees, and

costs incurred to prepare a termination for convenience cost proposal and cancellation costs related to material and equipment subcontracts.

Mojave Groundwater Bank

Northern Pipeline Project 36

10.3.4

The amount of profit, if any, on such uncompleted Work agreed to by the Owner and the CMAR as set forth in the Agreement. Unless

mutually agreed to by the Owner and the CMAR in a written amendment to the Agreement, no profit on uncompleted Work for Preconstruction

Phase Services shall be due or payable for any termination for convenience exercised by the Owner or the CMAR during the Preconstruction

Phase Services in accordance with the Contract Documents.

10.4 CMAR

Termination

If,

through no act or fault of the CMAR, the Work is suspended for a period of more than thirty (30) Days for a single occurrence or sixty

(60) Days in the aggregate by the Owner or under an order of court or other public authority, or the Owner fails to pay within sixty

(60) Days to the CMAR any undisputed amounts due, or the Owner breaches any other material provision of the Agreement and the same is

not cured within ten (10) Business Days following the Owner’s receipt of written notice thereof from the CMAR, then the CMAR may,

upon ten (10) Days written notice to the Owner, terminate the Agreement and recover from the Owner payment for all Work executed and

any expense sustained plus reasonable termination expenses, provided the Owner does not remedy such suspension or failure within that

time. In addition, and in lieu of terminating the Contract Documents, if the Owner has failed to make any payment as aforesaid of undisputed

amounts, the CMAR may, upon ten (10) Days written notice to the Owner, stop the Work until payment of all amounts then due.

10.4.1

In addition to, and without limiting the generality of the CMAR’s suspension and termination rights under Paragraph 10.4, if

the Owner directs the CMAR or its Subcontractors or Material Suppliers at any tier to perform Work that the CMAR informs the Owner is

illegal or involves an imminent danger to human health, the environment, or the Owner’s property or other nearby or adjoining properties,

the CMAR shall have the right to notify the Owner, in writing, of such illegality or danger and the Owner shall meet with the CMAR within

three (3) Business Days following the Owner’s receipt of such notice to review and discuss such concerns and work cooperatively

and in good faith with the CMAR to resolve them. Any resolution shall include an appropriate adjustment in the Phase 2 Construction Price

and Project Construction Schedule to account for the added cost and time to the CMAR in objecting to and attempting to resolve such concerns.

If the Owner fails to respond to the CMAR within ten (10) days following the CMAR’s notification of such concerns, or the Parties,

after meeting to discuss the same are unable, within an additional thirty (30) Days to resolve the concerns to the CMAR’s reasonable,

good faith satisfaction, the CMAR shall thereafter have the right to terminate this Agreement for convenience and without cause upon

an additional ten (10) Days written notice to the Owner. In such event, the Owner shall pay the CMAR the same amounts owing to the CMAR

for an Owner’s termination for convenience pursuant to Paragraph 10.3.

ARTICLE

11— Claims, Claims Procedures, Dispute Mitigation, and Resolution

11.1 Claims

for Additional Cost or Time

Except

as provided in any applicable section of the Agreement, for any claim for an increase in the Phase 2 Construction Price or the change

in or extension to the Date of Substantial Completion or Date of Final Completion (each a “Claim”), the CMAR shall give the

Owner written notice of the Claim within fifteen (15) Days after the CMAR has become aware of the occurrence giving rise to the Claim.

Except in an emergency, notice shall be given before proceeding with the Work. Any change in the Phase 2 Construction Price or the Date

of Substantial Completion or Date of Final Completion resulting from such Claim shall be authorized by Change Order.

Mojave Groundwater Bank

Northern Pipeline Project 37

11.1.1

Claims Procedures

Submission

of a Claim, in full conformance with all requirements of this Article, and rejection of all or part of said Claim by the Owner, is a

condition precedent to any action by the CMAR against the Owner, including, but not limited to, the filing of a lawsuit, request for

mediation, or demand for arbitration.

11.1.2

Notice of Claim

11.1.2.1

If the CMAR disagrees with the decision in, or in any case where the CMAR deems additional compensation or a time extension to the

Contract Time is due the CMAR for work or materials not covered in the Contract Documents or which the Owner has not recognized as extra

work, the CMAR shall notify the Owner, in writing, of its intention to make a Claim.

11.1.2.2

Written notice shall use the words “Notice of Potential Claim.”

11.1.2.2.1

Such Notice of Potential Claim shall state the circumstances and the reasons for the Claim but need not state the amount.

11.1.2.2.2

A Notice of Potential Claim and all notices and other communications required or permitted under this Agreement or the other Contract

Documents shall be in writing and delivered by hand delivery, certified first class mail return receipt requested, reputable overnight

courier, or electronic methods otherwise agreed to by the parties, to:

If

to: Owner Fenner

Gap Mutual Water Company

550 South Hope St, Suite 2850

Los Angeles, CA 90071

If

to: CMAR: Mike

Bubalo Construction Company

5102

Gayhurst

Baldwin

Park, CA 91706

and

shall be deemed given and received.

11.1.2.3

Claims pertaining to decisions or such other determinations by the Owner relating to any Claim from the CMAR shall be communicated by

the CMAR with the Owner in writing within fifteen (15) Days following receipt of such decision.

11.1.2.4

All other Claims by the CMAR shall be filed in writing within fifteen (15) Days after the event or occurrence giving rise to the Claim.

11.1.2.5

Additionally, no Claim for additional compensation or extension of time for a delay will be considered unless the provisions for Delays

and Time Extensions are complied with.

Mojave Groundwater Bank

Northern Pipeline Project 38

11.1.2.6

Unless expressly permitted in the Phase 2 Construction Price or other Contract Documents, no Claim for additional compensation for Work

performed filed by the CMAR after the date of Final Payment will be considered.

11.1.3

Records of Extra Work

11.1.3.1

In proceeding under a Claim for extra Work, the CMAR shall keep accurate records in such a manner as to provide a clear distinction

between the direct costs of extra Work paid and the costs of other operations.

11.1.3.2

Daily extra work reports shall:

11.1.3.2.1

Be signed by the CMAR or the CMAR Representative.

11.1.3.2.2

Itemize the materials used and state the direct cost of labor and the charges for equipment rental, whether furnished by the CMAR,

Subcontractor, or any specialized forces.

11.1.3.2.3

Provide names or identifications and classifications of workers, the hourly rate of pay and hours worked, and also the size, type,

and identification number of equipment and hours operated.

11.1.3.2.4

Substantiate material charges with attached valid copies of vendor’s invoices and, if not available, the invoices shall be

submitted within forty-five (45) Days after the date of delivery of the material.

11.1.3.3

When a Claim for extra Work is submitted, such information shall be submitted to the Owner weekly. The Owner shall review, disapprove,

and request adjustments, or agree upon and sign daily extra work reports upon receipt from the CMAR. The CMAR and the Owner shall agree

on the contents of the extra work reports daily.

11.1.3.3.1

The Owner will compare the Owner’s records with the completed daily extra work reports furnished by the CMAR and make any necessary

adjustments.

11.1.3.3.2

When these daily extra work reports are agreed upon and signed by both Parties, the reports shall become the basis of payment for

the Work performed but shall not preclude subsequent adjustment based on a later audit by the Owner.

11.1.3.4

The CMAR’s and Subcontractor’s records pertaining to the Project shall be open to inspection or audit by representatives

of the Owner, during the life of the Agreement, and for a period of three (3) years after the date of acceptance thereof, and the CMAR

and all Subcontractors shall retain those records for that period. Such audit shall not include the CMAR’s proprietary information,

including, but not limited to, the CMAR’s formula or other data or communications used in calculating pricing.

11.1.3.4.1

Where payment for materials or labor is based on Work performed by Subcontractors and other forces not employees of the CMAR, the

CMAR shall make every reasonable effort to ensure that the cost records of those other forces will be open to inspection and audit by

representatives of the Owner on the same terms and conditions as the cost records of the CMAR.

Mojave Groundwater Bank

Northern Pipeline Project 39

11.1.3.4.2

If an audit is to be commenced more than thirty (30) days after the acceptance date of the Agreement, the CMAR will be given a reasonable

notice of the time when the audit is to begin.

11.1.3.5

The CMAR and Subcontractors shall keep full and complete records of the costs and additional time incurred for any Work for which

a Claim for additional compensation is made.

11.1.3.5.1

The Owner Representative or any designated Claim investigator or auditor shall have access to those records and any other records

as may be required by the Owner Representative to determine the facts or contentions involved in the Claims.

11.1.3.6

The Owner, or its authorized representatives, shall have access, upon reasonable notice, during normal business hours, to the CMAR

and Subcontractors’ books, documents, and accounting records, including, but not limited to, bid worksheets, bids, Subcontractor

bids and proposals, estimates, cost accounting data, accounting records, payroll records, time sheets, canceled checks, profit and loss

statements, balance sheets, project correspondence including, but not limited to, correspondence between the CMAR and its sureties and

Subcontractors/Vendors, project files, scheduling information, and other records of the CMAR and Subcontractors directly or indirectly

pertinent to the Work, original as well as change and Claimed extra Work, to verify and evaluate the accuracy of cost and pricing data

submitted with any Change Order, prospective or completed, or any Claim for which additional compensation has been requested or Claim

has been tendered.

11.1.3.6.1

Such access shall include the right to examine and audit such records, and make excerpts, transcriptions, and photocopies at the

Owner’s cost.

11.1.3.7

In case the Claim is found to be just, it shall be allowed and paid for as provided by the Contract Documents.

11.2 Dispute

Resolution

11.2.1

Direct Discussions. If the Parties cannot reach resolution on a matter relating to or arising out of the Agreement or the Project,

the Parties shall endeavor to reach resolution through good faith direct discussions between the Parties’ representatives, who

shall possess the necessary authority to resolve such matter and who shall record the date of first discussions. If the Parties’

representatives are not able to resolve such matter within five (5) Business Days from the date of first discussion, the Parties’

representatives shall immediately inform senior executives of the Parties in writing that resolution was not affected. Upon receipt of

such notice, the senior executives of the Parties shall meet within five (5) Business Days to endeavor to reach resolution. If the dispute

remains unresolved after fifteen (15) Business Days from the date of first discussion, the Parties shall submit such matter to the dispute

resolution procedures selected herein.

Mojave Groundwater Bank

Northern Pipeline Project 40

11.2.2

Mediation. Unless otherwise provided to the contrary in the Phase 2 Construction Price Amendment, Claims and other disputes or matters

in controversy arising out of or related to the Agreement or Project that are not resolved pursuant to other provisions of this Article

11 shall be mediated prior to recourse to litigation or other binding dispute resolution proceeding. Such mediation shall, unless the

Parties mutually agree otherwise, be conducted by a mediator mutually agreeable to the Parties in the city or town nearest where the

Project is located in accordance with the American Arbitration Association Construction Industry Mediation Procedures in effect on the

date of this Agreement. A request for mediation shall be made in writing, delivered to the other Party to the Agreement, and filed with

the person or entity administering the mediation. The request may be made concurrently with the filing of litigation or other binding

dispute resolution proceedings, and, in such event, mediation shall proceed at an appropriate time mutually agreed upon by the Parties

or as directed by the court. The mediator shall be agreed to by the mediating Parties; in the absence of an agreement, the Parties shall

each submit one name from the mediators listed by the American Arbitration Association in the locality in which the Project is located

or other agreed-upon services. Such mediation shall be held for a period not to exceed one (1) day unless otherwise agreed in writing

by the Parties. Agreements reached in mediation shall be enforceable as settlement agreements in any court having jurisdiction thereof.

Neither Party shall be deemed the prevailing Party and each Party shall pay its own attorneys’ fees and costs and one-half of the

mediator’s fees and costs. Disputes that are not resolved through mediation in accordance with this Paragraph 11.2.2 shall be resolved

in the manner selected by the Parties in Paragraph 11.2.3 below.

11.2.3

Dispute Resolution. If the matter remains unresolved after submission of the matter to direct management discussions or mediation,

the Parties shall submit the matter to the binding dispute resolution procedure described below:

11.2.3.1

By litigation. Litigation shall commence in any court having jurisdiction over the Project site. Notwithstanding any contrary provision

herein, nothing in the Contract Documents shall be construed as a waiver of a defending Party’s right to remove a suit to any US

District Court having jurisdiction, provided that the threshold requirements for removal and diversity are satisfied. The matter shall

proceed as a bench trial tried to a single judge. THEREFORE, THE PARTIES TO THIS AGREEMENT, INCLUDING ANY ASSIGNEES, HEREBY KNOWINGLY,

VOLUNTARILY, AND IRREVOCABLY WAIVE ANY AND ALL RIGHT TO TRIAL BY JURY.

11.2.4

Survival. The dispute resolution provisions of the Agreement shall survive the completion of the Work and/or the expiration or termination

of the Contract Documents.

11.3 Venue

The

venue of any binding dispute resolution procedure shall be the location of the Project unless the Parties agree on a mutually convenient

location. The Parties waive any objection to such venue on the basis of inconvenient form.

11.4 Multiparty

Proceeding

The

Parties agree that all Parties necessary to resolve a claim shall be Parties to the same dispute resolution proceeding. Appropriate provisions

shall be included in all other contracts relating to the Work to provide for the joinder or consolidation of such dispute resolution

procedures.

Mojave Groundwater Bank

Northern Pipeline Project 41

11.5 Lien

Rights

Nothing

in this Article 11 or other applicable provisions of the Contract Documents shall limit any rights or remedies not expressly waived by

the CMAR which the CMAR may have under Applicable Law.

ARTICLE

12 — Miscellaneous Provisions

12.1 Assignment

Neither

the Owner nor the CMAR shall assign its interest in the Agreement or the other Contract Documents without the written consent of the

other except as to the assignment of proceeds. The terms and conditions of the Agreement and the other Contract Documents shall be binding

upon both Parties, their partners, successors, assigns, and legal representatives. Neither Party to the Agreement or the other Contract

Documents shall assign the Agreement without written consent of the other except that the Owner may assign the Agreement to a wholly

owned subsidiary of the Owner when the Owner has fully indemnified the CMAR or to an institutional lender providing construction financing

for the Project as long as the assignment is no less favorable to the CMAR than the Agreement. In the event of such assignment, the CMAR

shall execute any consent reasonably required. In such event, the wholly owned subsidiary or lender shall assume the Owner’s rights

and obligations under the Contract Documents and the CMAR shall not be obligated to perform for such wholly owned subsidiary or lender

unless the CMAR is fully paid for its Work under the Agreement in accordance with the terms and provision thereof. If either Party attempts

to make such an assignment, that Party shall nevertheless remain legally responsible for all obligations under the Agreement, unless

otherwise agreed by the other Party.

Mojave Groundwater Bank

Northern Pipeline Project 42

Exhibit

A.1 - Insurance Requirements

[***]

Mojave Groundwater Bank

Northern Pipeline Project 43

Exhibit

A.2 – Performance Bond and Payment Bond Requirements

[***]

Mojave Groundwater Bank

Northern Pipeline Project 44

Exhibit

B—CMAR Phase I Scope of Services

[***]

Mojave Groundwater Bank

Northern Pipeline Project 45

Exhibit

C - Phase I Notice to Proceed

[***]

Mojave Groundwater Bank

Northern Pipeline Project 46

Exhibit

D—Phase I Early Work(s) Package(s) (if applicable)

Not

Used

Mojave Groundwater Bank

Northern Pipeline Project 47

Exhibit

D.1—Phase I Early Work(s) Package(s) Amendment Form (if applicable)

Not

Used

Mojave Groundwater Bank

Northern Pipeline Project 48

Exhibit

E—Phase 2 Construction Price

MIKE BUBALO CONSTRUCTION CO., INC.

BID SCHEDULE

36-inch Replacement Pipe and Ancilliary Valves

Northern Pipeline for Fenner Gap Mutual Water Company

Preconstruction Services

$ 150,000

Mobilization/Demobilization

$ 2,150,000

Clear & Grub/Fencing

$ 3,500,000

Replace Pipeline

$ 35,310,960

Install Air Relase & Blow Off Valves

$ 7,380,000

Cathodic Protection

$ 1,110,000

Restoration & SWPPP

$ 430,000

$ 50,030,960

Contingency @ 10%

$ 5,003,096

Total

$ 55,034,056

Mojave Groundwater Bank

Bank NPL – Pump Stations

49

Exhibit

F—Initial Schedule of Work

[***]

Mojave Groundwater Bank

Bank NPL – Pump Stations

50

Exhibit

G—Project Technical Scheduling Requirements

[***]

Mojave Groundwater Bank

Bank NPL – Pump Stations

51

Exhibit

H—Preconstruction Phase Services Hourly Rate Schedule

[***]

Mojave Groundwater Bank

Bank NPL – Pump Stations

52

Exhibit

I—Project Technical Performance Requirements

Not

Used

Mojave Groundwater Bank

Bank NPL – Pump Stations

53

Exhibit

J—Project Labor and Vendor Requirements

[***]

Mojave Groundwater Bank

Bank NPL – Pump Stations

54

GRAPHIC

GRAPHIC

Filename: ea029942401_ex10-1img1.jpg · Sequence: 4

Binary file (149260 bytes)

Download ea029942401_ex10-1img1.jpg

GRAPHIC

GRAPHIC

Filename: ea029942401_ex10-1img2.jpg · Sequence: 5

Binary file (8017 bytes)

Download ea029942401_ex10-1img2.jpg

GRAPHIC

GRAPHIC

Filename: ea029942401_ex10-1img3.jpg · Sequence: 6

Binary file (3350 bytes)

Download ea029942401_ex10-1img3.jpg

GRAPHIC

GRAPHIC

Filename: ea029942401_ex10-2img1.jpg · Sequence: 7

Binary file (507110 bytes)

Download ea029942401_ex10-2img1.jpg

XML — IDEA: XBRL DOCUMENT

XML

Filename: R1.htm · Sequence: 13

v3.26.1

Cover

Jul. 27, 2026

Document Type

8-K

Amendment Flag

false

Document Period End Date

Jul. 27, 2026

Entity File Number

001-40579

Entity Registrant Name

Cadiz Inc.

Entity Central Index Key

0000727273

Entity Tax Identification Number

77-0313235

Entity Incorporation, State or Country Code

DE

Entity Address, Address Line One

550 S. Hope Street

Entity Address, Address Line Two

Suite 2850

Entity Address, City or Town

Los Angeles

Entity Address, State or Province

CA

Entity Address, Postal Zip Code

90071

City Area Code

213

Local Phone Number

271-1600

Written Communications

false

Soliciting Material

false

Pre-commencement Tender Offer

false

Pre-commencement Issuer Tender Offer

false

Entity Emerging Growth Company

false

Common Stock, par value $0.01 per share

Title of 12(b) Security

Common Stock, par value $0.01 per share

Trading Symbol

CDZI

Security Exchange Name

NASDAQ

Depositary Shares (each representing a 1/1000th fractional interest in share of 8.875% Series A Cumulative Perpetual Preferred Stock, par value $0.01 per share)

Title of 12(b) Security

Depositary Shares

Trading Symbol

CDZIP

Security Exchange Name

NASDAQ

X

- Definition

Boolean flag that is true when the XBRL content amends previously-filed or accepted submission.

+ References

No definition available.

+ Details

Name:

dei_AmendmentFlag

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Area code of city

+ References

No definition available.

+ Details

Name:

dei_CityAreaCode

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

For the EDGAR submission types of Form 8-K: the date of the report, the date of the earliest event reported; for the EDGAR submission types of Form N-1A: the filing date; for all other submission types: the end of the reporting or transition period. The format of the date is YYYY-MM-DD.

+ References

No definition available.

+ Details

Name:

dei_DocumentPeriodEndDate

Namespace Prefix:

dei_

Data Type:

xbrli:dateItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The type of document being provided (such as 10-K, 10-Q, 485BPOS, etc). The document type is limited to the same value as the supporting SEC submission type, or the word 'Other'.

+ References

No definition available.

+ Details

Name:

dei_DocumentType

Namespace Prefix:

dei_

Data Type:

dei:submissionTypeItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Address Line 1 such as Attn, Building Name, Street Name

+ References

No definition available.

+ Details

Name:

dei_EntityAddressAddressLine1

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Address Line 2 such as Street or Suite number

+ References

No definition available.

+ Details

Name:

dei_EntityAddressAddressLine2

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the City or Town

+ References

No definition available.

+ Details

Name:

dei_EntityAddressCityOrTown

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Code for the postal or zip code

+ References

No definition available.

+ Details

Name:

dei_EntityAddressPostalZipCode

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the state or province.

+ References

No definition available.

+ Details

Name:

dei_EntityAddressStateOrProvince

Namespace Prefix:

dei_

Data Type:

dei:stateOrProvinceItemType

Balance Type:

na

Period Type:

duration

X

- Definition

A unique 10-digit SEC-issued value to identify entities that have filed disclosures with the SEC. It is commonly abbreviated as CIK.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityCentralIndexKey

Namespace Prefix:

dei_

Data Type:

dei:centralIndexKeyItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Indicate if registrant meets the emerging growth company criteria.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityEmergingGrowthCompany

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Commission file number. The field allows up to 17 characters. The prefix may contain 1-3 digits, the sequence number may contain 1-8 digits, the optional suffix may contain 1-4 characters, and the fields are separated with a hyphen.

+ References

No definition available.

+ Details

Name:

dei_EntityFileNumber

Namespace Prefix:

dei_

Data Type:

dei:fileNumberItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Two-character EDGAR code representing the state or country of incorporation.

+ References

No definition available.

+ Details

Name:

dei_EntityIncorporationStateCountryCode

Namespace Prefix:

dei_

Data Type:

dei:edgarStateCountryItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The exact name of the entity filing the report as specified in its charter, which is required by forms filed with the SEC.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityRegistrantName

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The Tax Identification Number (TIN), also known as an Employer Identification Number (EIN), is a unique 9-digit value assigned by the IRS.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityTaxIdentificationNumber

Namespace Prefix:

dei_

Data Type:

dei:employerIdItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Local phone number for entity.

+ References

No definition available.

+ Details

Name:

dei_LocalPhoneNumber

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 13e

-Subsection 4c

+ Details

Name:

dei_PreCommencementIssuerTenderOffer

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 14d

-Subsection 2b

+ Details

Name:

dei_PreCommencementTenderOffer

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Title of a 12(b) registered security.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b

+ Details

Name:

dei_Security12bTitle

Namespace Prefix:

dei_

Data Type:

dei:securityTitleItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the Exchange on which a security is registered.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection d1-1

+ Details

Name:

dei_SecurityExchangeName

Namespace Prefix:

dei_

Data Type:

dei:edgarExchangeCodeItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as soliciting material pursuant to Rule 14a-12 under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 14a

-Subsection 12

+ Details

Name:

dei_SolicitingMaterial

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Trading symbol of an instrument as listed on an exchange.

+ References

No definition available.

+ Details

Name:

dei_TradingSymbol

Namespace Prefix:

dei_

Data Type:

dei:tradingSymbolItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as written communications pursuant to Rule 425 under the Securities Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Securities Act

-Number 230

-Section 425

+ Details

Name:

dei_WrittenCommunications

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Details

Name:

us-gaap_StatementClassOfStockAxis=CDZI_CommonStockParValue0.01PerShareMember

Namespace Prefix:

Data Type:

na

Balance Type:

Period Type:

X

- Details

Name:

us-gaap_StatementClassOfStockAxis=CDZI_DepositarySharesEachRepresenting11000thFractionalInterestInShareOf8.875SeriesCumulativePerpetualPreferredStockParValue0.01PerShareMember

Namespace Prefix:

Data Type:

na

Balance Type:

Period Type: