Groowe Groowe BETA / Newsroom
⏱ News is delayed by 15 minutes. Sign in for real-time access. Sign in

Form 8-K

sec.gov

8-K — Contango Silver & Gold Inc.

Accession: 0001104659-26-109483

Filed: 2026-09-22

Period: 2026-09-22

CIK: 0001502377

SIC: 1040 (GOLD & SILVER ORES)

Item: Regulation FD Disclosure

Item: Other Events

Item: Financial Statements and Exhibits

Documents

8-K — tm2625571d1_8k.htm (Primary)

EX-23.1 — EXHIBIT 23.1 (tm2625571d1_ex23-1.htm)

EX-99.3 — EXHIBIT 96.1 (tm2625571d1_ex96-1.htm)

EX-99.1 — EXHIBIT 99.1 (tm2625571d1_ex99-1.htm)

EX-99.2 — EXHIBIT 99.2 (tm2625571d1_ex99-2.htm)

GRAPHIC (tm2625571d1_ex23-1img001.jpg)

GRAPHIC (tm2625571d1_ex23-1img002.jpg)

GRAPHIC (tm2625571d1_ex96-1img001.jpg)

GRAPHIC (tm2625571d1_ex96-1img002.jpg)

GRAPHIC (tm2625571d1_ex96-1img003.jpg)

GRAPHIC (tm2625571d1_ex96-1img004.jpg)

GRAPHIC (tm2625571d1_ex96-1img005.jpg)

GRAPHIC (tm2625571d1_ex96-1img006.jpg)

GRAPHIC (tm2625571d1_ex96-1img007.jpg)

GRAPHIC (tm2625571d1_ex96-1sp03img001.jpg)

GRAPHIC (tm2625571d1_ex96-1sp03img002.jpg)

GRAPHIC (tm2625571d1_ex96-1sp03img003.jpg)

GRAPHIC (tm2625571d1_ex96-1sp03img004.jpg)

GRAPHIC (tm2625571d1_ex96-1sp03img005.jpg)

GRAPHIC (tm2625571d1_ex96-1sp03img006.jpg)

GRAPHIC (tm2625571d1_ex96-1sp03img007.jpg)

GRAPHIC (tm2625571d1_ex96-1sp03img008.jpg)

GRAPHIC (tm2625571d1_ex96-1sp03img009.jpg)

GRAPHIC (tm2625571d1_ex96-1sp03img010.jpg)

GRAPHIC (tm2625571d1_ex96-1sp03img011.jpg)

GRAPHIC (tm2625571d1_ex96-1sp03img012.jpg)

GRAPHIC (tm2625571d1_ex96-1sp2img01.jpg)

GRAPHIC (tm2625571d1_ex96-1sp2img02.jpg)

GRAPHIC (tm2625571d1_ex96-1sp2img03.jpg)

GRAPHIC (tm2625571d1_ex96-1sp2img04.jpg)

GRAPHIC (tm2625571d1_ex96-1sp2img05.jpg)

GRAPHIC (tm2625571d1_ex96-1sp2img06.jpg)

GRAPHIC (tm2625571d1_ex96-1sp5img001.jpg)

GRAPHIC (tm2625571d1_ex96-1sp5img002.jpg)

GRAPHIC (tm2625571d1_ex96-1sp5img003.jpg)

GRAPHIC (tm2625571d1_ex96-1sp5img004.jpg)

GRAPHIC (tm2625571d1_ex96-1sp5img005.jpg)

GRAPHIC (tm2625571d1_ex96-1sp5img006.jpg)

GRAPHIC (tm2625571d1_ex96-1sp5img007.jpg)

GRAPHIC (tm2625571d1_ex96-1sp5img008.jpg)

GRAPHIC (tm2625571d1_ex96-1sp5img009.jpg)

GRAPHIC (tm2625571d1_ex96-1sp5img010.jpg)

GRAPHIC (tm2625571d1_ex96-1sp5img011.jpg)

GRAPHIC (tm2625571d1_ex96-1sp5img012.jpg)

GRAPHIC (tm2625571d1_ex96-1sp5img013.jpg)

GRAPHIC (tm2625571d1_ex96-1sp5img014.jpg)

GRAPHIC (tm2625571d1_ex99-1img001.jpg)

GRAPHIC (tm2625571d1_ex99-1img002.jpg)

GRAPHIC (tm2625571d1_ex99-1img003.jpg)

GRAPHIC (tm2625571d1_ex99-1sp04img001.jpg)

GRAPHIC (tm2625571d1_ex99-1sp04img002.jpg)

GRAPHIC (tm2625571d1_ex99-1sp04img003.jpg)

GRAPHIC (tm2625571d1_ex99-1sp04img004.jpg)

GRAPHIC (tm2625571d1_ex99-1sp04img005.jpg)

GRAPHIC (tm2625571d1_ex99-1sp04img006.jpg)

GRAPHIC (tm2625571d1_ex99-1sp04img007.jpg)

GRAPHIC (tm2625571d1_ex99-1sp04img008.jpg)

GRAPHIC (tm2625571d1_ex99-1sp04img009.jpg)

GRAPHIC (tm2625571d1_ex99-1sp04img010.jpg)

GRAPHIC (tm2625571d1_ex99-1sp04img011.jpg)

GRAPHIC (tm2625571d1_ex99-1sp04img012.jpg)

GRAPHIC (tm2625571d1_ex99-1sp6img01.jpg)

GRAPHIC (tm2625571d1_ex99-1sp6img02.jpg)

GRAPHIC (tm2625571d1_ex99-1sp6img03.jpg)

GRAPHIC (tm2625571d1_ex99-1sp6img04.jpg)

GRAPHIC (tm2625571d1_ex99-1sp6img05.jpg)

GRAPHIC (tm2625571d1_ex99-1sp6img06.jpg)

GRAPHIC (tm2625571d1_ex99-1sp6img07.jpg)

GRAPHIC (tm2625571d1_ex99-1sp6img08.jpg)

GRAPHIC (tm2625571d1_ex99-1sp6img09.jpg)

GRAPHIC (tm2625571d1_ex99-2img001.jpg)

GRAPHIC (tm2625571d1_ex99-2img002.jpg)

GRAPHIC (tm2625571d1_ex99-2img003.jpg)

GRAPHIC (tm2625571d1_ex99-2img004.jpg)

GRAPHIC (tm2625571d1_ex99-2img005.jpg)

GRAPHIC (tm2625571d1_ex99-2img006.jpg)

GRAPHIC (tm2625571d1_ex99-2img007.jpg)

GRAPHIC (tm2625571d1_ex99-2img008.jpg)

GRAPHIC (tm2625571d1_ex99-2img009.jpg)

GRAPHIC (tm2625571d1_ex99-2img010.jpg)

GRAPHIC (tm2625571d1_ex99-2img011.jpg)

GRAPHIC (tm2625571d1_ex99-2img012.jpg)

GRAPHIC (tm2625571d1_ex99-2img013.jpg)

GRAPHIC (tm2625571d1_ex99-2img014.jpg)

GRAPHIC (tm2625571d1_ex99-2img015.jpg)

GRAPHIC (tm2625571d1_ex99-2img016.jpg)

GRAPHIC (tm2625571d1_ex99-2img017.jpg)

GRAPHIC (tm2625571d1_ex99-2img018.jpg)

GRAPHIC (tm2625571d1_ex99-2img019.jpg)

GRAPHIC (tm2625571d1_ex99-2img020.jpg)

GRAPHIC (tm2625571d1_ex99-2img021.jpg)

GRAPHIC (tm2625571d1_ex99-2img022.jpg)

GRAPHIC (tm2625571d1_ex99-2img023.jpg)

GRAPHIC (tm2625571d1_ex99-2img024.jpg)

GRAPHIC (tm2625571d1_ex99-2img025.jpg)

GRAPHIC (tm2625571d1_ex99-2img026.jpg)

GRAPHIC (tm2625571d1_ex99-2img027.jpg)

GRAPHIC (tm2625571d1_ex99-2img028.jpg)

GRAPHIC (tm2625571d1_ex99-2img029.jpg)

GRAPHIC (tm2625571d1_ex99-2img030.jpg)

GRAPHIC (tm2625571d1_ex99-2img031.jpg)

XML — IDEA: XBRL DOCUMENT (R1.htm)

8-K — FORM 8-K

8-K (Primary)

Filename: tm2625571d1_8k.htm · Sequence: 1

false

0001502377

0001502377

2026-09-22

2026-09-22

iso4217:USD

xbrli:shares

iso4217:USD

xbrli:shares

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

WASHINGTON, D.C. 20549

FORM 8-K

CURRENT REPORT

PURSUANT TO SECTION 13 OR 15(d) OF THE

SECURITIES EXCHANGE ACT OF 1934

Date of Report (Date of earliest event reported):

September 22, 2026

CONTANGO

SILVER & GOLD INC.

(Exact name of Registrant as specified in its charter)

Delaware

(State or other jurisdiction of

incorporation or organization)

001-35770

(Commission

File Number)

27-3431051

(I.R.S. Employer

Identification No.)

516 2nd Avenue, Suite 401

Fairbanks, Alaska

(Address of principal executive offices)

99701

(Zip Code)

Registrant’s Telephone Number, including

area code: (907) 888-4273

Not Applicable

(Former name, former address

and former fiscal year, if changed since last report)

Check the appropriate box below if the Form 8-K

filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions (see General

Instruction A.2.):

¨ Written communications pursuant to Rule 425

under the Securities Act (17 CFR 230.425)

¨ Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)

¨ Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))

¨ Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))

Securities registered pursuant to Section 12(b) of the Act:

Title of each class

Trading Symbol(s)

Name of each exchange on which registered

Common Stock, Par Value $0.01 per share

CTGO

NYSE American LLC

Indicate by check mark

whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§ 230.405 of

this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§ 240.12b-2 of this chapter).

Emerging growth company  ¨

If an emerging growth

company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or

revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.  ¨

Item 7.01 Regulation FD Disclosure.

On September 22, 2026, Contango Silver &

Gold Inc. (the “Company” or “Contango”) made available a new corporate presentation. A copy of this

presentation is furnished as Exhibit 99.2 to this Current Report on Form 8-K and is available on the Company’s website

at www.contangoore.com.

The Company’s presentation furnished as Exhibit 99.2

to this Current Report contains non-GAAP financial measures. Generally, a non-GAAP financial measure is a numerical measure of a company’s

performance, financial position, or cash flows that either excludes or includes amounts that are not normally excluded or included in

the most directly comparable measure calculated and presented in accordance with United States generally accepted accounting principles

(“GAAP”). Reconciliations of these non-GAAP financial measures are not included in the furnished presentation due to

the inherent difficulty and impracticality of quantifying certain amounts that would be required to calculate the most directly comparable

GAAP financial measures. In addition, certain of the non-GAAP financial measures have been prepared by Kinross Gold Corporation, the Company’s

partner in, and the manager of, Peak Gold, LLC, a joint venture company in which the Company currently holds a 30% interest, and are based

on International Financial Reporting Standards (“IFRS”) accounting standards and detailed information to which the

Company has not had access to at this time. As a result, the Company is unable to quantify certain amounts that would be required to be

included in the most directly comparable GAAP financial measure without unreasonable efforts.

The information included herein and in Exhibit 99.2

shall not be deemed “filed” for purposes of Section 18 of the Exchange Act, as amended (the “Exchange Act”)

or otherwise subject to the liabilities of that section, nor shall it be deemed incorporated by reference in any filing under the Securities

Act of 1933, as amended, or the Exchange Act.

Item 8.01 Other Events.

On September 22, 2026,

Contango announced that it had completed its Technical Report Summary, with an effective date of September 11, 2026 (the “TRS”),

on the Kitsault Valley Project (the “Project”) in accordance with the mining property disclosure rules specified

in subpart 1300 of Regulation S-K. A copy of the TRS is filed as Exhibit 96.1 to this Current Report on Form 8-K and is incorporated

herein by reference. A copy of the related press release is filed as Exhibit 99.1 to this Current Report on Form 8-K. The foregoing

description of the TRS does not purport to be complete and is subject to, and qualified in its entirety by, the full text of the TRS attached

hereto as Exhibit 96.1.

Cautionary Note Regarding Mineral Resources

Mineral resources are not

mineral reserves and do not have demonstrated economic viability. No measured mineral resources or mineral reserves are reported for the

Project. The estimate is intended to support continued evaluation of potential underground extraction and does not establish a mine development

decision. Indicated mineral resources have a lower level of confidence than measured mineral resources, and inferred mineral resources

have a lower level of confidence than indicated mineral resources; inferred mineral resources cannot be assumed to be converted to indicated

or measured mineral resources or to mineral reserves, and actual upgrading depends on future drilling, sampling, metallurgical, engineering,

environmental, permitting and economic results and is not assured.

The mineral resource estimate

is subject to material uncertainties including local geological and grade continuity, high-grade sample influence, historical data and

mined-out geometry, density variability, metallurgical response and product quality, mining dimensions and ground conditions, access and

infrastructure requirements, water and waste management, permitting, and commodity-price and operating-cost assumptions.

Cautionary Note Regarding Forward-Looking Statements

Many of the statements included or incorporated

in this Current Report on Form 8-K and the furnished exhibit constitute “forward-looking statements.” In particular,

they include statements relating to future actions, strategies, future operating and financial performance, ability to realize the anticipated

benefits of various transactions and the Company’s future financial results. These forward-looking statements are based on current

expectations and projections about future events. Readers are cautioned that forward-looking statements are not guarantees of future operating

and financial performance or results and involve substantial risks and uncertainties that cannot be predicted or quantified, and, consequently,

the actual performance of the Company may differ materially from that expressed or implied by such forward-looking statements. Such risks

and uncertainties include, but are not limited to, factors described from time to time in the Company’s Annual Report on Form 10-K

and Quarterly Reports on Form 10-Q filed with the Securities and Exchange Commission (including the sections entitled “Risk

Factors” and “Management’s Discussion and Analysis of Financial Condition and Results of Operations” contained

therein).

This Current Report on Form 8-K and the exhibits

thereto contain forward-looking information and forward-looking statements within the meaning of applicable U.S. and Canadian securities

laws (“Forward-looking Statements”). These include statements regarding Contango’s plans and expectations for

its properties and operations, the content within future annual filings, operations in respect of Contango mineral properties and any

benefits of investment in Contango, including the timing and scope of exploration, drilling, development and permitting activities; the

timing and anticipated results of mineral resource estimates, technical studies and related filings; and anticipated production, costs,

capital expenditures and cash flows.

The Forward-looking Statements regarding Contango

are intended to be covered by the safe harbor for “forward-looking statements” provided by the Private Securities Litigation

Reform Act of 1995 and applicable safe harbor provisions under Canadian securities laws, in each case to the extent available. The Forward-looking

Statements are based on Contango’s current expectations and includes statements regarding future results of operations, quality

and nature of the asset base, the assumptions upon which estimates are based and other expectations, beliefs, plans, objectives, assumptions,

strategies or statements about future events or performance (often, but not always, using words such as “expects”, “projects”,

“anticipates”, “plans”, “estimates”, “intends”, “believes”, “forecasts”,

“predicts”, “proposes”, “contemplates”, “aims”, “seeks”, “continues”,

“potential”, “positioned”, “strategy”, “outlook”, “future”, “going forward”,

“designed to”, and similar expressions or other words of similar meaning, and the negatives thereof, or stating that certain

actions, events or results “may”, “might”, “will”, “should”, “would”, or “could”

be taken, or that they are “possible”, “probable”, or “likely” to occur or be achieved). However,

the absence of these words does not mean that the statements are not forward-looking.

Material assumptions underlying the Forward-looking

Statements include the reliability of current mineral resource and mineral reserve estimates; the timely receipt and maintenance of required

permits and approvals; the availability of financing, personnel, contractors and equipment as needed; continued access to transportation

and third-party processing facilities; and the performance of joint venture partners and contractors in accordance with their obligations.

Management considers these assumptions reasonable as of the date of this Current Report on Form 8-K, but they may prove to be incorrect.

Forward-looking Statements are based on current

expectations, estimates and projections that involve a number of risks and uncertainties, which could cause actual results to differ materially

from those expressed or implied by the statements. These risks include, but are not limited to: the risks of the exploration and the mining

industry (for example, operational risks in exploring for and developing mineral reserves and mining, transporting and processing ore);

risks and uncertainties involving geology; the speculative nature of the mining industry; the uncertainty of estimates and projections

relating to future production, costs and expenses; the volatility of natural resources prices, including prices of gold and associated

minerals; the existence and extent of commercially exploitable minerals in properties acquired by Contango or the Peak Gold JV; ability

to realize the anticipated benefits of the Peak Gold JV; Contango’s limited control over the Peak Gold JV and its reliance on Kinross

and its subsidiaries, including the availability and performance of the Fort Knox processing facilities; potential delays or changes in

plans with respect to exploration or development projects or capital expenditures; the interpretation of exploration results and the estimation

of mineral resources and mineral reserves; the loss of key employees or consultants; health, safety and environmental risks; risks related

to weather and other natural disasters; uncertainties as to the availability and cost of financing; Contango’s ability to service

its indebtedness and comply with financing covenants; Contango’s inability to retain or maintain its relative ownership interest

in the Peak Gold JV; inability to realize expected value from acquisitions and integration risks associated with the acquisition of Dolly

Varden Silver Corporation; inability of Contango’s management team to execute its plans to meet its goals; the extent of disruptions

caused by public health emergencies; and the possibility that government policies may change, political developments may occur or governmental

approvals may be delayed or withheld, including as a result of political or regulatory changes in the United States or Canada or the inability

to obtain or maintain mining permits.

Additional information on these and other factors

which could affect Contango’s operations or financial results is included under “Risk Factors” and elsewhere in Contango’s

most recent Annual Report on Form 10-K, subsequent Quarterly Reports on Form 10-Q and other filings with the U.S. Securities

and Exchange Commission and applicable Canadian securities regulatory authorities, available on EDGAR and SEDAR+, respectively. Readers

are cautioned not to place undue reliance on Forward-looking Statements, which are not guarantees of future performance and actual results

or developments may differ materially from the projections in the Forward-looking Statements. Forward-looking Statements are based on

the estimates and opinions of management at the time the statements are made and speak only as of the date of this press release, unless

otherwise indicated. Contango does not assume any obligation to publicly update or revise Forward-looking Statements whether as a result

of new information, future events or otherwise, except as required by applicable law.

Item 9.01. Financial Statements and Exhibits.

(d) Exhibits.

Exhibit No.

Description of Exhibit

23.1

Consent of Dave Larimer, CPG.

96.1

Technical Report Summary, dated September 21, 2026, with an effective date of September 11, 2026.

99.1

Press Release of the Company, dated September 22, 2026.

99.2

Corporate Presentation, dated September 22, 2026.

104

Cover Page Interactive Data File (embedded within the Inline XBRL document).

SIGNATURES

Pursuant to the requirements of the Securities

Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

CONTANGO SILVER & GOLD INC.

Date:

September 22, 2026

By:

/s/ Mike Clark

Name: Mike Clark

Title: Chief Financial Officer and

Secretary

EX-23.1 — EXHIBIT 23.1

EX-23.1

Filename: tm2625571d1_ex23-1.htm · Sequence: 2

Exhibit 23.1

CONSENT OF QUALIFIED PERSON

September 18, 2026

Contango Silver & Gold Inc.

516 2nd

ave., Suite 401

Fairbanks, AK 99701

Re: Kitsault Valley Project Technical Report Summary

and Updated Mineral Resource Estimate 2026, dated 21 September 2026

I, Dave Larimer, CPG, hereby consent to:

1. the use of and reference to my name, qualifications, professional designation, and status as a "qualified person" as defined

in Subpart 1300 of Regulation S-K and National Instrument 43-101;

2. the filing, incorporation by reference, and use of the technical report summary titled "Kitsault Valley Project Technical Report

Summary and Updated Mineral Resource Estimate 2026," dated 21 September 2026, including any amendments or supplements thereto,

in any registration statement, annual report, current report, technical disclosure, press release, investor presentation, or other filing

or disclosure document of Contango Silver & Gold Inc. relating to the Kitsault Valley Project;

3. the use of, reference to, and summarization of the scientific and technical information, conclusions, mineral resource estimates,

interpretations, and recommendations for which I am responsible, including the sections of the technical report summary prepared by me

or under my supervision; and

4. the filing of this consent as an exhibit to any applicable filing made by Contango Silver & Gold Inc. with the United States

Securities and Exchange Commission or applicable Canadian securities regulators.

I confirm that I have reviewed the portions of the technical

report summary and related disclosure for which I am responsible, and that I consent to the disclosure of such information in the form

and context in which it appears.

Respectfully submitted,

18SEP26

Dave Larimer, CPG

Vice President, Exploration

Contango Silver & Gold Inc.

Qualified Person under Subpart 1300 of Regulation S-K and

National Instrument 43-101

516 2nd Ave Suite 401

Fairbanks, AK 99701

907-888-4273

EX-99.3 — EXHIBIT 96.1

EX-99.3

Filename: tm2625571d1_ex96-1.htm · Sequence: 3

Exhibit 96.1

Kitsault Valley Project Technical

Report Summary and updated Mineral Resource Estimate 2026

S-K 1300 Report

Prepared by:

Contango Silver and Gold

516 2nd Ave, Suite 401

Fairbanks, AK 99701

Qualified Person:

Dave Larimer, CPG

21 September 2026

Qualified

Person Statement and Signature

Kitsault Valley Project

Report title: Kitsault Valley Project

Technical Report Summary, and Updated Mineral Resource Estimate 2026

TRS issue date: September 21,

2026

Mineral resource effective date:

September 11, 2026

I, Dave Larimer,

CPG, am Vice President Exploration of Contango Silver & Gold Inc. (the Company). I am an employee of the Company and am not

independent of the registrant.

I am a Certified

Professional Geologist with the American Institute of Professional Geologists, certificate number CPG-11862, and a Certified Professional

Geologist in the State of Alaska, certificate number 115316. Both certifications were awarded in 2016, and currently in good standing

with both. I hold a bachelor’s degree in geology from the University of Colorado Boulder, awarded in 2000. My relevant professional

experience comprises 20 years of geological work, including exploration, advanced exploration, and development-stage project evaluation

for underground and surface mining; metallurgical, geometallurgical, and infrastructure risk integration; and mineral resource and reserve

governance. My areas of specialization include geological modeling, geostatistics, variography, geochemistry, ore control, resource drilling,

exploration targeting, structural interpretation, and database management. On this basis, I meet the definition of a Qualified Person

under 17 CFR 229.1300 for the responsibilities undertaken in this report.

I am the sole Qualified

Person responsible for all sections of this Technical Report Summary (TRS). I prepared or supervised its preparation, reviewed the technical

information and conclusions adopted in it, and accept responsibility for the report, subject to the specific reliance on information

provided by the registrant identified in Chapter 25 pursuant to 17 CFR 229.1302(f).

I personally inspected

the Project on September 14, 2025, and July 21–24, 2026. The nature and scope of those inspections, my data-verification

procedures and any limitations are described in Chapter 9.

The Company supplied

the project database and supporting records. Technical contributions, including Sims Resources’ modeling assistance, metallurgical

specialist review by Jeff Austin of International Metallurgy and Environmental, and market study input for Chapter 16 from Jim Cowley,

are described in Chapter 25 and identified in the report. I retain responsibility for the technical work and conclusions I adopted from

these contributions.

Based on my review

and knowledge, the TRS fairly presents the technical information and conclusions for which I am responsible, together with the material

assumptions, limitations and uncertainties described in the report. My signature below applies to the final TRS identified above.

Signature:

/s/

DAVE LARIMER

(18SEP26) Dave Larimer,

CPG

Vice President Exploration, Contango

Silver & Gold Inc.

Date signed: September 18, 2026

Table

of Contents

Qualified

Person Statement and Signature

2

Table

of Contents

3

List

of Figures

9

List

of Tables

13

1

EXECUTIVE SUMMARY

18

1.1

Purpose

and Principal Conclusions

18

1.2

Property

Description and Ownership

18

1.3

Geological

Setting and Mineralization

19

1.4

Exploration

and Data Verification

21

1.5

Mineral

Resource Estimate

21

1.6

Estimation

and Classification

25

1.7

Mineral

Processing and Metallurgical Testing

26

1.8

Mining

Concept and Resource Reporting Basis

26

1.9

Access

Infrastructure Environmental Matters and Permitting

27

1.10

Qualified

Person Conclusions and Recommendations

27

2

INTRODUCTION

30

2.1

Purpose

and Terms of Reference

30

2.2

Project

and Deposit Scope

30

2.3

Qualified

Person and Technical Contributions

30

2.4

Sources

of Information

31

2.5

Relationship

to Previous Reporting

32

2.6

Personal

Inspection

32

2.7

Effective

Date and Information Cut-offs

32

2.8

Units,

Currencies and Reporting conventions

33

3

PROPERTY DESCRIPTION

34

3.1

Description

and Location

34

3.2

Fee

Simple Service Lots

47

3.3

Royalties

and Agreements

49

3.4

Environmental

Liabilities, Permitting and Significant Factors

49

Contango Silver and Gold – Kitsault Valley Project Page 3 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

4

ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY

51

4.1

Accessibility

51

4.2

Physiography,

Elevation and Vegetation

53

4.3

Climate

and Operating Season

53

4.4

Local

Resources

54

4.5

Infrastructure

54

5

HISTORY

56

5.1

Overview

and Sources

56

5.2

Dolly

Varden Area

56

5.3

Homestake

Ridge Area

59

5.4

Consolidation

of the Kitsault Valley Project

61

5.5

Historical

Mineral Resource and Mineral Reserve Estimates

62

6

GEOLOGICAL SETTING, MINERALIZATION, AND DEPOSIT models

65

6.1

Regional

Geology

65

6.2

Property

and Local Geology

68

6.3

Mineralization

and Material Deposits

73

6.4

Deposit

Models

78

7

EXPLORATION

80

7.1

Scope,

Attribution, and Source Basis

80

7.2

Exploration

Other Than Drilling

80

7.3

Drilling

Methods and Factors Affecting Reliability

86

7.4

Drilling

— Dolly Varden, 2011–2018

87

7.5

Drilling

— 2019–2022

89

7.6

Drilling

— 2023–2025

91

7.7

Hydrogeological

and Geotechnical Data

103

7.8

QP

Interpretation and Limitations

103

8

SAMPLE PREPARATION, ANALYSES, AND SECURITY

104

8.1

Scope

and Qualified Person Review

104

8.2

Sample

Populations and QA/QC Compilations

104

8.3

Drill

Core Handling and Sampling

104

8.4

Sample

Security and Chain of Custody

105

8.5

Laboratories,

Preparation and Analytical Methods

106

8.6

Surface,

Lithogeochemical and Density Samples

107

Contango Silver and Gold – Kitsault Valley Project Page 4 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

8.7

Quality

Assurance and Quality Control

107

8.8

Completion

of the 2023 and 2023–2025 Programs

113

8.9

Data

Acceptance and Exceptions

113

8.10

Qualified

Person Opinion

114

9

DATA VERIFICATION

115

9.1

Introduction

and Scope

115

9.2

Data

Sources and Database Environment

115

9.3

Summary

of QP Verification Procedures

116

9.4

Qualified

Person Site Visits

117

9.5

Drillhole

Database and Geological Record Verification

117

9.6

Collar,

Downhole Survey and Spatial Verification

118

9.7

Assay

Database and Analytical QA/QC Verification

118

9.8

Sample

Custody, Laboratory Status and Record Reconciliation

119

9.9

Historical

Data Verification and MRE Inclusion

119

9.10

Limitations

on Data Verification

119

9.11

Data-Governance

and Continuing Verification Measures

120

9.12

Qualified

Person Opinion on Data Adequacy

120

10

MINERAL PROCESSING AND METALLURGICAL TESTING

121

10.1

Introduction

and Scope

121

10.2

Summary

of Metallurgical Test Work Programs

121

10.3

Homestake

Area Prior to Metallurgical Test Work

124

10.4

Dolly

Varden and Torbrit 2019 Metallurgical Test Work

126

10.5

Wolf

and Kitsol 2025/2026 Metallurgical Test Work

131

10.6

Processing

Implications by Mineralized Area

136

10.7

Material

Processing Risks, Deleterious Elements, and Recovery Assumptions

137

10.8

Adequacy

of the Metallurgical Data

138

10.9

Recommended

Follow-up Work

138

11

MINERAL RESOURCE ESTIMATES

140

11.1

Introduction

and Basis of Estimate

140

11.2

Resource

Database and Data Preparation

142

11.3

Project-wide

Estimation and Reporting Conventions

145

11.4

Economic

Basis and Resource Reporting Assumptions

148

Contango Silver and Gold – Kitsault Valley Project Page 5 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.5

Homestake

Region Mineral Resource Estimates

150

11.6

Dolly

Varden Area Mineral Resource Estimates

165

11.7

Consolidated

Kitsault Valley Mineral Resource Statement

194

11.8

Comparison

with Previously Reported Estimates

196

11.9

Resource

Sensitivity

198

11.10

Uncertainty,

Limitations and Material Risks

201

11.11

QP

Conclusions on the Mineral Resource Estimate

203

12

MINERAL RESERVE ESTIMATES

204

13

MINING METHODS

205

14

PROCESSING AND RECOVERY METHODS

206

15

INFRASTRUCTURE

207

15.1

Scope

and Reporting Basis

207

15.2

Infrastructure

Setting and Status

207

15.3

Transportation

and Access

209

15.4

Current

Exploration-Support Facilities

211

15.5

Water,

Waste, Tailings, Dams, and Pipelines

212

15.6

Future

Project Infrastructures Requirements

212

15.7

QP

Interpretation and Limitations

214

16

MARKET STUDIES

215

16.1

Lead

Concentrate

215

16.2

Copper

Concentrate

215

16.3

Zinc

Concentrate

216

16.4

Summary

216

17

ENVIRONMENTAL STUDIES, PERMITTING, AND COMMUNITY

217

17.1

Scope,

Reporting Basis, and Project Stage

217

17.2

Environmental

and Social Setting

217

17.3

Current

Exploration Permitting

217

17.4

Environmental

Studies and Baseline Information

222

17.5

Wildlife,

Vegetation, and Aquatic Protection

224

17.6

Archaeology

and Cultural Heritage

225

17.7

Indigenous

Nations, Communities, and Agreements

225

17.8

Waste,

Tailings, Monitoring, and Water Management

226

Contango Silver and Gold – Kitsault Valley Project Page 6 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

17.9

Future

Project Permitting Framework

226

17.10

Closure

and Reclamation

228

17.11

QP

Interpretation, Risks, and Finalization

228

18

CAPITAL AND OPERATING COSTS

229

19

ECONOMIC ANALYSIS

230

20

ADJACENT PROPERTIES

231

20.1

Scope

and Reporting Basis

231

20.2

Regional

Setting and Property Reconciliation

231

20.3

Red

Mountain Gold Project

233

20.4

Golddigger

Property and Surebet Discovery

233

20.5

Kisault

Molybdenum Project

233

20.6

Other

Surrounding Tenure

234

20.7

Qualified

Person Interpretation

234

21

OTHER RELEVANT DATA AND INFORMATION

235

22

INTERPRETATION AND CONCLUSIONS

236

22.1

Basis

and Principal Conclusions

236

22.2

Exploration

Data and Verification

236

22.3

Geological

Interpretation by Area

237

22.4

Estimation

and Classification

237

22.5

Mineral

Resource Outcome

238

22.6

Metal

Prices and Metallurgical Assumptions

239

22.7

Mining

Concept and Reasonable Prospects of Economic Extraction

239

22.8

Infrastructure,

Environment and Permitting

240

22.9

Significant

Risks and Uncertainties

240

22.10

Overall

QP Conclusion

241

23

RECOMMENDATIONS

242

23.1

Recommended

Program

242

23.2

Stage

1 – 2026 Drill Close-out, 2027 MRE Update and Initial Assessement

242

23.3

Stage

2 – Three Program Toward Pre-Feasibility Study (PFS)

242

23.4

Proposed

Budget and Sequence

243

24

REFERENCES

245

Contango Silver and Gold – Kitsault Valley Project Page 7 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

25

RELIANCE ON REGISTRANT

251

25.1

Registrant

and Scope

251

25.2

Land

Status Permitting and Environmental Information

251

25.3

Historical

Reports and Public Disclosures

252

25.4

Company

Technical Data and QP Review

252

25.5

Metallurgical

Information Market Studies and Specialist Review

252

25.6

Extent

of Reliance

253

Contango Silver and Gold – Kitsault Valley Project Page 8 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

List of

Figures

Figure 1-1 Location

of the Kitsault Valley resource deposits. Red outlines show the resource deposits. Coordinates are NAD83 / UTM Zone 9N, in meters

20

Figure 1-2. Drilling coverage

supporting the mineral resource estimate. A: Homestake area. B: Dolly Varden area. Gray traces show historical drilling; red traces

identify drilling incorporated in the estimate. South Reef is labeled “Silver Reef” in the source image

23

Figure 3-1. Dolly Varden Property

mineral leases and Crown-granted mineral claims

45

Figure 3-2. Dolly Varden Property

mineral tenures

46

Figure 3-3. Dolly Varden fee

simple surface lots in Alice Arm

48

Figure 4-1. Kitsault Valley

Project regional location and access

52

Figure 6-1. Terrane setting

of the Kitsault Valley Project in the Canadian Cordillera

66

Figure 6-2. Regional geology

and location of the Kitsault Valley Project

67

Figure 6-3. Property level geology

and location of the Kitsault Valley Project

69

Figure 6-4. Simplified time-stratigraphic

and mineralization column for the Dolly Varden area (modified from Higgs and Giroux [2015] and Sebert [2013])

70

Figure 6-5. Property geology

of the Dolly Varden claim block

71

Figure 6-6. Property geology

of the Homestake claim block

73

Figure 6-7. Locations of the

principal Kitsault Valley Project deposits

77

Figure 6-8. Longitudinal section

along the Kitsault Valley trend showing the relative positions of the principal ore bodies

78

Figure 6-9. Conceptual hybrid

bimodal-felsic/siliciclastic mineralization model (after Galley et al., 2007)

79

Figure 7-1. LiDAR coverage over

the Dolly Varden claim block, 2017

82

Figure 7-2. LiDAR coverage over

the Homestake claim block and southern Kitsault Valley, 2022

85

Figure 7-3. Kitsault Valley

Project drilling locations, 2019–2025 (source: current Chapter 7 working record)

100

Figure 7-4. Homestake area drilling

locations, 2022–2025 (source: current Chapter 7 working record)

101

Figure 7-5. Dolly Varden area

drilling locations, 2019–2025 (source: current Chapter 7 working record)

102

Figure 8-1. Routine certified

reference material (CRM), blank, and field duplicate counts for the 2023–2025 programs at the Dolly Varden (DV) and Homestake

Ridge (HR) properties. Counts are from the summary tabs of the January and February 2026 QA/QC compilations

108

Figure 8-2. Representative silver

CRM control charts for (A) CDN-ME-2314 at Dolly Varden and (B) CDN-ME-2203 at Homestake Ridge. The plots show certified

values and ±3 standard-deviation limits; isolated excursions were evaluated at the batch level as described in the text

110

Contango Silver and Gold – Kitsault Valley Project Page 9 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 8-3. Gold

results for compiled 2023-2025 mafic-intrusive coarse blanks at (A) Dolly Varden and (B) Homestake Ridge. The plots include

repeat or resubmitted determinations and therefore contain more points than the routine insertion counts in Table 8-4. The dashed

line is the 0.015 ppm review limit used in the QA/QC compilation

111

Figure 8-4. Original versus

one-third-core field-duplicate silver results for 2023-2025. Axes are logarithmic and the dashed line is the 1:1 relationship

112

Figure 8-5. Comparison of original

ALS assay versus Bureau Veritas check-assay silver results. Axes are logarithmic and the dashed red line is the 1:1 relationship

113

Figure 10-1. Comparison of the

2016 Homestake Main and Homestake Silver metallurgical process concepts

125

Figure 10-2. Historical development

of the Torbrit processing flowsheet, illustrating the transition from cyanidation of native silver to flotation recovery of galena

and ruby silver minerals (Turner and McConchie, 1960)

126

Figure 10-3. Historical polished-section

images from Torbrit showing: (A) crustiform barite–galena–sphalerite mineralization; (B) galena with inclusions

of sphalerite, pyrite, and pyrargyrite; (C) pyrargyrite (ruby silver) replacing galena in calcite–barite gangue; and (D) chalcopyrite

with galena and sphalerite in barite gangue. Mineral abbreviations: Ba = barite; Gn = galena; Sp = sphalerite; Py = pyrite; Prg =

pyrargyrite (ruby silver); Ccp = chalcopyrite; and Cal = calcite. Images are qualitative and are not representative of quantitative

mineralogy. Source: adapted from Mortensen (1960)

128

Figure 10-4. Simplified flowsheet

evaluated during the 2019 Torbrit differential lead-zinc flotation program. The flowsheet represents preliminary batch testing and

is not a selected process design

129

Figure 10-5. Silver cyanidation

kinetics for selected Dolly Varden and Torbrit composites. A – Dolly Varden whole-ore cyanidation kinetics; B – Torbrit

whole-ore Cyanidation Kinetics; C – Flotation-tail cyanidation kinetics (Dolly Varden and Torbrit). Summarized results of the

2019 Blue Coast Research Ltd. metallurgical test work

130

Figure 10-6. Comparative recovery

of silver, lead, and zinc by process route and deposit. Recoveries are based on selected composite test work and represent the maximum

recoveries achieved under the conditions shown. Whole-ore cyanidation recoveries for Ag, Pb, and Zn were calculated from head assays

and leach residues. Flotation-tail cyanidation reports Ag recovery only. Source: Blue Coast Research Ltd. (2019)

131

Figure 11-1. Regional location

of the Kitsault Valley resource deposits

141

Figure 11-2. Drilling and sample

coverage supporting the Mineral Resource estimates. A – Homestake northern region. B – Dolly Varden southern region.

Historical drilling in gray with red drill traces representing holes included in this MRE

145

Figure 11-3. Homestake Main

geological domains and representative sections. Deposit views of Homestake Main showing the four modeled domains used in this MRE.

A – Plan view, B – Longitudinal view (looking SW), C – Cross-sectional view (looking NW)

151

Figure 11-4. Homestake Main

Resource Classification geometry: A – Plan view, B – Longitudinal view (looking SW), C – Cross-sectional view looking

NW. Red solid represents Indicated classification and blue Inferred classification

155

Contango Silver and Gold – Kitsault Valley Project Page 10 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 11-5. Homestake

Silver domain geometry and representative sections showing the 13 modeled domains. A – Plan view, B – Longitudinal view

(looking southwest), C – Cross-sectional view looking west

157

Figure 11-6. Homestake Silver

Mineral Resource Classification: A – Plan view, B – Longitudinal view (looking southwest), C – Cross-sectional

view looking west. Red solid represents Indicated classification and blue Inferred classification

163

Figure 11-7. Wolf domain geometry

and representative sections showing the two modeled domains: A – Plan view, B – Longitudinal view (looking northwest),

C – Cross-sectional view of the shallower Wolf Vein systems looking northeast, D – Cross-sectional view of the Wolf Deep

system looking northeast

167

Figure 11-8. Wollf Mineral Resource

classification geometry A – Plan view, B – Longitudinal view (looking northwest), C – Cross-sectional view of the

shallower Wolf Vein systems looking northeast, D – Cross sectional view of the Wolf Deep system looking northeast. Red solid

represents Indicated classification and blue Inferred classification

170

Figure 11-9. Kitsol domain geometry

and representative sections showing the modeled domains. A – Plan view, B – Longitudinal view (looking west), C –

Cross- sectional view looking northeast

172

Figure 11-10. Kitsol Mineral

Resource Classification geometry: A – Plan view, B – Longitudinal view (looking west), C – Cross- sectional view

looking northeast. Red solid represents Indicated classification and blue Inferred classification

175

Figure 11-11. Torbrit domain

geometry and representative sections showing the 11 modeled domains: A – Plan view, B – Longitudinal view (looking northeast),

C – Cross-sectional view looking northwest

177

Figure 11-12. Torbrit Mineral

Resource Classification geometry: A – Plan view, B – Longitudinal view (looking northeast), C – Cross- sectional

view looking northwest. Red solid represents Indicated classification and blue Inferred classification

182

Figure 11-13. Final mineralized

unmined model (purple) and historical underground workings and mined out (depleted) areas (black)

183

Figure 11-14. Dolly Varden geometry

and representative sections showing the modeled domain. A – Plan View, B – Longitudinal view (looking northeast), C –

Cross-sectional view (looking northwest)

185

Figure 11-15. Dolly Varden Mineral

Resource Estimate geometry: A – Plan view, B – Longitudinal view (looking northeast), C – Cross-sectional view

looking northwest. Red solid represents Indicated classification and blue Inferred classification

188

Figure 11-16. Final mineralized

unmined model (purple) and historical underground workings and mined out (depleted) areas (black)

189

Figure 11-17. Northstar geometry

and representative sections showing the modeled domain. A – Plan View, B – Longitudinal view (looking northeast), C –

Cross-sectional view (looking northwest)

190

Figure 11-18. Northstar Mineral

Resource classification geometry. A – Plan view, B – Longitudinal view (looking northeast), C – Cross-sectional

view (looking northwest). Red solid represents Indicated classification and blue Inferred classification

193

Figure 11-19. Northstar final

mineralized unmined model (purple) and historical underground workings and mined out (depleted) areas (black)

194

Contango Silver and Gold – Kitsault Valley Project Page 11 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 11-20. Change

in reported AgEq by deposit and resource category. Values are on their respective reporting bases, including different cut-offs,

metal prices and recoveries. This is not a constant-assumption revaluation. Torbrit and Kitsol are combined to match the preceding

reporting unit. South Reef has no Indicated resource

198

Figure 15-1. Regional access

and transportation setting, Kitsault Valley Project (source: initial Chapter 15 infrastructure working draft, June 2026)

210

Figure 15-2. Project-scale infrastructure

setting, showing regional roads, transmission lines, Alice Arm and Kitsault logistics nodes, historic hydroelectric works, and Stewart

port (source: initial Chapter 15 infrastructure working draft, June 2026)

214

Figure 17-1. Principal exploration

permit areas and historical infrastructure in the core Kitsault Valley corridor

219

Figure 17-2. Broader exploration

permit setting. Boundaries and permit identifiers are informational and require reconciliation with the final Chapter 4 property

boundary and executed permits

221

Figure 20-1. Kitsault Valley

Project and selected adjacent mineral tenure. Tenure ownership and boundaries are based on the June 2026 Company compilation

232

Contango Silver and Gold – Kitsault Valley Project Page 12 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

List of

Tables

Table 1-1. Mineral

resource summary by area and classification

22

Table 1-2. Indicated mineral

resource grades and contained metals

24

Table 1-3. Inferred mineral

resource grades and contained metals

24

Table 1-4. Adopted recovery

assumptions for the seven updated deposits. South Reef retains its historical reporting basis and is not included in this recovery

matrix

26

Table 1-5. Proposed program

budget in U.S. dollars

29

Table 2-1. Deposits included

in the mineral resource statement for the Kitsault Project, northwestern British Columbia

30

Table 2-2. Sources of information

used in this report

31

Table 2-3. Reporting milestones

32

Table 3-1. Kitsault Valley Project

mineral leases

34

Table 3-2. Kitsault Valley Project

mineral claims

34

Table 3-3. Kitsault Valley Project

Crown-granted mineral claims

43

Table 3-4. Kitsault Valley Project

2026 Mineral Tax fee simple lots

47

Table 4-1. Principal access

and logistics routes

51

Table 4-2. Regional climate

statistics reported in the 2023 Technical Report

54

Table 4-3. Existing and required

infrastructure

55

Table 5-1. Summary of historical

exploration of regional prospects in the Dolly Varden area

58

Table 5-2. Summary of principal

previous operators and work programs – Dolly Varden area

59

Table 5-3. Summary of principal

previous operators and work programs – Homestake Ridge area

61

Table 5-4. Historical mineral

estimates reported for the Dolly Varden area

62

Table 5-5. Homestake Ridge area

historical estimates – reported tonnage and gold-equivalent cutoff grade

63

Table 5-6. Homestake Ridge area

historical estimates – reported metal grades and sources

64

Table 6-1. Summary of host setting,

mineralization style, and principal geological controls by deposit, Kitsault Valley Project

74

Table 7-1. Summary of Dolly

Varden drilling, 2011–2018

88

Table 7-2. Selected representative

drilling results, Dolly Varden, 2011–2018

89

Table 7-3. Summary of Kitsault

Valley Project drilling, 2019–2022

89

Table 7-4. Selected representative

drilling results, 2019–2022

91

Table 7-5. Reported drilling

totals and target areas, 2023–2025

92

Table 7-6. Selected representative

exploration drill intercepts disclosed during 2023–2025

95

Contango Silver and Gold – Kitsault Valley Project Page 13 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 7-7. Target-level

drilling allocations, 2023–2025

99

Table 8-1. QA/QC compilation

totals

104

Table 8-2. Sample security controls

and QP verification

106

Table 8-3. Summary of drill

sample preparation and analytical procedures

107

Table 8-4. Current program drill

and routine control statistics

108

Table 8-5. QP review and disposition

framework

114

Table 9-1. Principal verification

evidence reviewed by the QP

115

Table 9-2. QP verification procedures

and determinations

116

Table 9-3. Site inspections

relevant to data verification

117

Table 9-4. Continuing verification

and data-governance measures

120

Table 10-1. Summary of principal

metallurgical test work programs. Summarized from Shouldice and Coombs (2016), Middleditch (2019), Hough et al. (2022), Turner and

Hough (2023), Fuse Advisors (2026), and Hall (2026a)

122

Table 10-2. Metallurgical laboratory

and specialist disclosure summary. Prepared from Shouldice and Coombs (2016), Middleditch (2019), Hough et al. (2022), Turner and

Hough (2023), Fuse Advisors (2026), and Hall (2026a)

123

Table 10-3. Homestake 2016 composite

head grades reported from duplicate head cuts. Summarized from Hough et al. (2022) and Turner and Hough (2023)

124

Table 10-4. Dolly Varden and

Torbrit composite head assays

127

Table 10-5. Preliminary silver

recovery estimates from 2019 Dolly Varden and Torbrit test work

130

Table 10-6. Wolf and Kitsol

sample selection summary

132

Table 10-7. Wolf and Kitsol

2026 composite head assays

132

Table 10-8. Selected final open-circuit

cleaner concentrate grades from 2026 Wolf and Kitsol tests

134

Table 10-9. Selected final open-circuit

cleaner flotation recoveries from 2026 Wolf and Kitsol tests

134

Table 10-10. Wolf and Kitsol

2026 cyanidation test results

135

Table 10-11. Selected deleterious

elements in 2026 final cleaner concentrates

136

Table 11-1. Deposit scope and

reporting basis

140

Table 11-2. Drill hole header

inventory by deposit

142

Table 11-3. Merged interval

inventory and analytical coverage by deposit

143

Table 11-4. Merged interval

analytical coverage by deposit and domain

144

Table 11-5. Density measurement

support and resource assignments

146

Table 11-6. Selected classification

thresholds and raw AvgD equivalents

147

Table 11-7. Commodity prices

for the 2026 updated estimates

148

Table 11-8. Recovery factors

used in the updated metal-equivalent calculations

149

Contango Silver and Gold – Kitsault Valley Project Page 14 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-9. Homestake

Main estimation domains

151

Table 11-10. Homestake Main

caps and capped input statistics

153

Table 11-11. Homestake Main

global block-model bounds

154

Table 11-12. Homestake Main

search and sample parameters

154

Table 11-13. Homestake Main

Mineral Resource grades

156

Table 11-14. Homestake Main

contained metals

156

Table 11-15. Homestake Silver

estimation domains

157

Table 11-16. Homestake Silver

caps and capped input statistics

159

Table 11-17. Homestake Silver

global block-model bounds

161

Table 11-18. Homestake Silver

search and sample parameters

162

Table 11-19. Homestake Silver

Mineral Resource grades

164

Table 11-20. Homestake Silver

contained metals

164

Table 11-21. South Reef Mineral

Resource grades

165

Table 11-22. South Reef contained

metals

165

Table 11-23. Wolf estimation

domains

166

Table 11-24. Wolf caps and capped

input statistics

168

Table 11-25. Wolf global block-model

bounds

169

Table 11-26. Wolf search and

sample parameters

169

Table 11-27. Wolf Mineral Resource

grades

171

Table 11-28. Wolf contained

metals

171

Table 11-29. Kitsol estimation

domains

171

Table 11-30. Kitsol caps and

capped input statistics

173

Table 11-31. Kitsol global block-model

bounds

173

Table 11-32. Kitsol search and

sample parameters

174

Table 11-33. Kitsol Mineral

Resource grades

176

Table 11-34. Kitsol contained

metals

176

Table 11-35. Torbrit estimation

domains

177

Table 11-36. Torbrit caps and

capped input statistics

178

Table 11-37. Torbrit global

block-model bounds

180

Table 11-38. Torbrit search

and sample parameters

181

Table 11-39. Torbrit Mineral

Resource grades

183

Table 11-40. Torbrit contained

metals

183

Contango Silver and Gold – Kitsault Valley Project Page 15 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-41. Dolly

Varden estimation domains

184

Table 11-42. Dolly Varden caps

and capped input statistics

186

Table 11-43. Dolly Varden global

block-model bounds

186

Table 11-44. Dolly Varden search

and sample parameters

187

Table 11-45. Dolly Varden Mineral

Resource grades

189

Table 11-46. Dolly Varden contained

metals

189

Table 11-47. North Star estimation

domains

190

Table 11-48. North Star caps

and capped input statistics

191

Table 11-49. North Star global

block-model bounds

192

Table 11-50. North Star search

and sample parameters

192

Table 11-51. North Star Mineral

Resource grades

194

Table 11-52. North Star contained

metals

194

Table 11-53. Indicated Mineral

Resource tonnes and grades

195

Table 11-54. Indicated Mineral

Resource contained metals

195

Table 11-55. Inferred Mineral

Resource tonnes and grades

195

Table 11-56. Inferred Mineral

Resource contained metals

196

Table 11-57. Regional and project

totals by resource category

196

Table 11-58. Indicated comparison

with the preceding resource statement

197

Table 11-59. Inferred comparison

with the preceding resource statement

197

Table 11-60. Homestake Main

classification-distance sensitivity

199

Table 11-61. Homestake Silver

classification-distance sensitivity

199

Table 11-62. Wolf classification-distance

sensitivity

199

Table 11-63. Kitsol classification-distance

sensitivity

199

Table 11-64. Torbrit classification-distance

sensitivity

200

Table 11-65. Dolly Varden classification-distance

sensitivity

200

Table 11-66. North Star classification-distance

sensitivity

200

Table 11-67. Principal sources

of resource uncertainty and their treatment

202

Table 15-1. Existing infrastructure

and future-project requirement or status

208

Table 15-2. Infrastructure definition

required for a future project study

213

Table 16-1. Commercial terms

used in economic analysis for Pb concentrate

215

Table 16-2. Commercial terms

used in economic analysis for Cu concentrate

216

Table 16-3. Commercial terms

used in economic analysis for Zn concentrate

216

Contango Silver and Gold – Kitsault Valley Project Page 16 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 17-1. Principal

exploration permits for the core Kitsault Valley area (2026 management register; verify against executed permits)

218

Table 17-2. Other exploration

permits shown in the working record

220

Table 17-3. Management-reported

operating authorizations and arrangements

222

Table 17-4. Reported 2012 reconnaissance

water-sample locations

223

Table 17-5. Environmental baseline

status and principal gaps for future development

224

Table 17-6. Engagement context

reported in the working record

225

Table 17-7. Indicative future

permitting framework

227

Table 20-1. Adjacent properties

selected for regional context

231

Table 22-1. Mineral resource

summary by area and classification

238

Table 22-2. Principal uncertainties

affecting resource confidence and further evaluation

241

Table 23-1. Proposed staged

work-program budget in U.S. dollars

244

Table 25-1. Company information

relied upon for land status, permitting and environmental matters

251

Contango Silver and Gold – Kitsault Valley Project Page 17 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

1 EXECUTIVE

SUMMARY

1.1 Purpose and Principal Conclusions

This Technical

Report Summary (TRS), dated September 21, 2026, presents the updated mineral resource estimate and supporting technical information

for the Kitsault Valley Project located in northwestern British Columbia, Canada. The report has been prepared for Contango Silver &

Gold Inc. (the Company) under Subpart 1300 of Regulation S-K. The mineral resource effective date is September 11, 2026[RV1.1][DL1.2].

Dave Larimer, CPG, Vice President Exploration, is the sole Qualified Person (QP) responsible for all sections of the report. He is an

employee of the Company and is not independent.

Mr. Larimer

holds American Institute of Professional Geologists certification CPG-11862 and State of Alaska Certified Professional Geologist certification

115316, both in good standing. His 20 years of relevant professional experience and qualifications are described on the QP statement

and signature page.

The Project contains

Indicated mineral resources of 7.660 million metric tons (Mt), containing 58.698 million ounces (Moz) of silver, 394.700 thousand ounces

(koz) of gold or 89.545 Moz of silver equivalent (AgEq), and Inferred mineral resources of 6.305 Mt, containing 22.804 Moz of silver,

620.817 koz of gold or 64.920 Moz AgEq. Indicated and Inferred resources are reported separately. No Measured mineral resources or mineral

reserves are reported. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

The update establishes

a larger Indicated inventory and incorporates a substantially revised geological interpretation at Homestake Main and Homestake Silver.

Additional drilling has improved the definition of mineralized domains and the understanding of geometry and continuity relative to the

framework underlying the preceding resource statement reported in 2023. The larger Indicated inventory provides a stronger basis for

subsequent technical evaluation; it does not imply that all additional Indicated material represents conversion from the previous Inferred

estimate.

1.2 Property Description and Ownership

The Kitsault Valley

Project lies approximately 39 km southeast of Stewart and 27 km northeast of Alice Arm, in the Skeena Mining District of British Columbia.

The resource estimate covers two areas: the Homestake area, comprising Homestake Main, Homestake Silver and South Reef; and the Dolly

Varden area, comprising Wolf, Kitsol, Torbrit, Dolly Varden and North Star. Figure 1-1 shows the relative locations of the eight deposits

for which resources have been estimated.

The Company holds

its interest through its subsidiaries following completion of the merger with Dolly Varden Silver Corporation on March 26, 2026.

Project mineral rights are held through mineral claims, mineral leases and Crown-granted mineral claims. Company-owned surface parcels

at Alice Arm support exploration facilities, offices and core storage. Mineral tenure and surface rights are distinct, and maintaining

rights requires the applicable rents, taxes, assessment work or payments. Certain property portions are subject to net smelter return

royalties and other contractual obligations, as detailed in Chapter 3. The scope of the resource estimate is the eight deposits identified

above; broader regional exploration holdings are not additional mineral resources.

Contango Silver and Gold – Kitsault Valley Project Page 18 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

1.3 Geological Setting and Mineralization

The Project lies

within the Stikine Terrane and Stewart Complex of the Canadian Cordillera. The principal host rocks are Jurassic Hazelton Group volcanic,

volcaniclastic, sedimentary and subvolcanic units. Mineralization reflects both stratigraphic and structural controls, including synvolcanic

faults, hydrothermal brecciation, veining, replacement and later deformation. A single deposit model does not adequately describe all

of the different styles of mineralization.

The Dolly Varden

area is predominantly silver-rich, with variable lead, zinc, gold and copper. Torbrit and North Star include stratabound silica–barite–sulfide

mineralization and locally reworked or structurally overprinted material. Wolf and Kitsol are principally structurally controlled epithermal-style

vein and breccia systems. Homestake Main contains gold–silver–copper mineralization in silicified lenses and hydrothermal

breccias; Homestake Silver comprises silver–gold-bearing breccia and vein zones with lead and zinc; and South Reef consists of

relatively narrow gold-bearing zones associated with quartz–chlorite alteration and sulfides.

Contango Silver and Gold – Kitsault Valley Project Page 19 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 1-1 Location

of the Kitsault Valley resource deposits. Red outlines show the resource

deposits. Coordinates are NAD83 / UTM Zone 9N, in meters.

Contango Silver and Gold – Kitsault Valley Project Page 20 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

1.4 Exploration and Data Verification

Exploration has

included geological and structural mapping, surface geochemistry, airborne and ground geophysics, terrain surveys, historical-core review

and diamond drilling. Modern drilling has tested extensions of known mineralization, improved geological interpretation and increased

local drill support. Historical workings at Dolly Varden, Torbrit and North Star provide additional geological context and require appropriate

treatment of mined-out volumes.

The estimate uses

the accepted historical and modern drilling and assay database, incorporating all drilling through the completed 2025 program. The assay

dataset was locked at the start of January 2026. Geological-solid updates and database review continued through March 2026,

and the QP finalized, checked and certified the databases and supporting information on April 13, 2026. The final resource statement,

classifications and supporting assumptions were accepted as complete and current on September 11, 2026, the mineral resource effective

date.

All drilling completed

in 2026 falls outside the accepted estimation dataset is to be incorporated in the next resource update described in Section 1.10

The eight-deposit

header inventory contains 1,454 holes totaling 328,638.18 meters. The seven updated deposits have merged Leapfrog exports covering 34

geological domains, with 24,120 intervals totaling 29,842.13 meters. Of these, 23,264 intervals totaling 27,176.00 meters from 947 distinct

hole identifiers contain at least one populated metal result. These merged intervals are distinct from original assay samples and final

composites. South Reef is excluded from the seven-export inventory and retains its preceding estimation basis. Chapter 11, Section 11.2

documents these data populations; Figure 1-2 shows the drilling coverage.

The QP’s

verification included review of drilling, logging, sampling, survey and analytical procedures; selected comparisons of original drill

logs and assay certificates against digital records; review of analytical quality control; and checks for overlapping intervals, records

extending beyond hole depth, missing fields, inconsistent codes and unit-conversion errors. The QP personally inspected the Project on

September 14, 2025, and July 21–24, 2026, including review of core handling, logging, sampling and geological observations.

The inspection scope and verification work are described in Chapter 9. Some historical assay certificates remain unavailable; those records

were assessed using prior verification, internal consistency and comparison with surrounding drilling. The QP considers the accepted

data adequate for the geological interpretation and mineral resource estimation purposes described in this TRS.

1.5 Mineral Resource Estimate

Table 1-1 summarizes

the mineral resources by area and category. Tables 1-2 and 1-3 present the deposit grades and contained silver, gold, copper, lead and

zinc, together with silver-equivalent totals. The complete resource statement, classification criteria and reporting assumptions are

presented in Chapter 11.

Contango Silver and Gold – Kitsault Valley Project Page 21 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 1-1. Mineral

resource summary by area and classification.

Area

Category

Tonnage

(Mt)

Ag

(Moz)

Au

(koz)

Cu

(Mlb)

Pb

(Mlb)

Zn

(Mlb)

AgEq

(Moz)

Homestake

Indicated

2.140

6.133

387.416

6.32

5.96

7.02

33.275

Dolly

Varden

Indicated

5.520

52.565

7.285

3.06

72.20

81.83

56.270

Project

total

Indicated

7.660

58.698

394.700

9.38

78.16

88.85

89.545

Homestake

Inferred

4.595

7.965

615.824

4.24

16.86

14.69¹

48.501

Dolly

Varden

Inferred

1.710

14.839

4.993

1.80

23.38

33.92

16.419

Project

total

Inferred

6.305

22.804

620.817

6.04

40.24

48.61¹

64.920

The resources are

reported in situ within the accepted resource domains, after exclusion of modeled historical mined-out material where applicable, and

before mining dilution or mining recovery. Contained metals are not recovered or payable metal. Totals may differ due to rounding. South

Reef is carried forward from the previous estimate and retains its separate reporting basis. All reported quantities in this summary

follow the final statement in Chapter 11, Section 11.7. Mlb = million pounds. ¹ Zinc totals exclude South Reef, where zinc

is not reported.

Contango Silver and Gold – Kitsault Valley Project Page 22 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 1-2. Drilling

coverage supporting the mineral resource estimate. A: Homestake area. B: Dolly Varden area. Gray traces show historical drilling; red

traces identify drilling incorporated in the estimate. South Reef is labeled “Silver Reef” in the source image.

Contango Silver and Gold – Kitsault Valley Project Page 23 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Indicated mineral

resources

Table 1-2. Indicated

mineral resource grades and contained metals.

Deposit

Tonnage

(Mt)

Ag

(g/t)

Au

(g/t)

Cu

(%)

Pb

(%)

Zn

(%)

Ag

(Moz)

Au

(koz)

Cu

(Mlb)

Pb

(Mlb)

Zn

(Mlb)

AgEq

(Moz)

Homestake

Main

1.430

49.55

6.350

0.181

0.058

0.112

2.277

292.009

5.71

1.83

3.53

23.308

Homestake

Silver

0.710

168.26

4.160

0.039

0.263

0.222

3.856

95.407

0.61

4.13

3.49

9.968

Torbrit

3.250

295.43

0.014

0.018

0.546

0.440

30.847

1.428

1.29

39.06

31.52

32.394

Kitsol

0.290

301.13

0.030

0.029

0.368

0.300

2.766

0.231

0.18

2.32

1.89

2.876

Dolly

Varden

0.090

426.44

0.020

0.025

0.432

1.459

1.235

0.056

0.05

0.86

2.90

1.321

Wolf

1.530

301.90

0.050

0.027

0.714

0.864

14.850

2.246

0.92

24.09

29.15

16.108

North

Star

0.360

249.18

0.290

0.079

0.744

2.076

2.866

3.322

0.62

5.87

16.37

3.571

Inferred mineral

resources

Table 1-3. Inferred

mineral resource grades and contained metals.

Deposit

Tonnage

(Mt)

Ag

(g/t)

Au

(g/t)

Cu

(%)

Pb

(%)

Zn

(%)

Ag

(Moz)

Au

(koz)

Cu

(Mlb)

Pb

(Mlb)

Zn

(Mlb)

AgEq

(Moz)

Homestake

Main

0.520

11.09

4.610

0.143

0.056

0.127

0.186

77.211

1.64

0.64

1.46

5.770

Homestake

Silver

3.630

65.88

3.550

0.028

0.203

0.165

7.680

414.413

2.24

16.22

13.23

34.132

South

Reef

0.445

4.90

8.680

0.040

0.001

NR

0.100

124.200

0.36

0.00

NR

8.600

Torbrit

0.760

235.77

0.013

0.034

0.545

0.250

5.747

0.329

0.57

9.10

4.18

6.057

Kitsol

0.140

303.04

0.020

0.033

0.434

0.316

1.323

0.101

0.10

1.30

0.94

1.380

Dolly

Varden

0.140

328.78

0.030

0.048

0.506

1.519

1.456

0.149

0.15

1.54

4.61

1.604

Wolf

0.440

381.40

0.030

0.030

0.707

1.100

5.390

0.411

0.30

6.85

10.66

5.790

North

Star

0.230

123.99

0.540

0.134

0.898

2.650

0.923

4.002

0.68

4.59

13.53

1.587

The seven updated

deposits are reported at a cut-off grade of 132 g/t AgEq. South Reef retains a cut-off of 2.0 g/t AuEq. The underground extraction concept

considers mechanized mining, including longhole stoping where deposit geometry and ground conditions permit. The reporting constraints

and reasonable-prospects assessment are summarized in Section 1.8 and described in Chapter 11, Section 11.4. Mlb = million

pounds; NR = not reported.

Contango Silver and Gold – Kitsault Valley Project Page 24 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Comparison with the previous estimate

Relative to the preceding statement presented

in the 2023 combined report, Indicated tonnage increases from 4.153 to 7.660 Mt, an increase of 84.4%, and Indicated AgEq increases

from 46.368 to 89.545 Moz, an increase of 93.1%. Inferred tonnage decreases from 6.831 to 6.305 Mt, a decrease of 7.7%, and Inferred

AgEq decreases from 86.725 to 64.920 Moz, a decrease of 25.1%. These are net comparisons on their respective reporting bases and do not

measure block-by-block category conversion. The changes combine drilling, geological domains, capping, interpolation, density, classification,

depletion and reporting assumptions. Kitsol is combined with Torbrit for comparison with the earlier reporting unit, and gold was not

reported for the southern deposits in the earlier baseline.

AgEq values retain the adopted reporting

basis of each deposit. Tables 1-2 and 1-3 include copper, lead and zinc grades and contained metals; Table 1-4 summarizes the base-metal

grades by category. These metals contribute to equivalent grades for the seven updated deposits. NR = not reported. South Reef retains

0.445 Mt at 8.68 g/t Au and 4.90 g/t Ag, containing 124.200 koz Au and 0.100 Moz Ag. Its 8.600 Moz AgEq is a retained comparative metric;

the historical resource has not been re-estimated using the 2026 Homestake Silver equation or a 132 g/t AgEq filter. Displayed tonnages,

grades and contents are rounded independently.

1.6 Estimation

and Classification

The seven updated estimates were prepared

in Leapfrog Geo version 2026.1.2 with the Edge extension, using hard geological domains, prepared assay datasets, compositing and grade

capping by domain and element. Each metal was estimated independently using inverse-distance-cubed weighting. Leapfrog declustering was

applied by domain and element in every estimator. Grade-search orientations, ranges and sample-selection controls were configured by

domain, with variable orientation where appropriate. The models use 5 × 5 × 5 meter parent blocks and minimum sub-blocks

of 0.5 × 0.5 × 0.5 meters in NAD83 / UTM Zone 9N coordinates.

Target composite lengths are 2.0 meters

for Homestake Main, Homestake Silver, Wolf and Torbrit; 1.25 meters for Dolly Varden Main; and 1.5 meters for Kitsol and North Star.

Compositing used the within-boundary setting and hard domain boundaries, with residual end lengths below 1.0 meter distributed equally

and no additional compositing weight. Density assignments are 2.77 t/m³ for Homestake Main and Homestake Silver, 2.90 t/m³

for Wolf, 3.10 t/m³ for Torbrit, and 3.00 t/m³ for Dolly Varden, North Star and Kitsol. South Reef retains its historical estimation

and density basis (Table 1-4).

Classification reflects the QP’s assessment

of geological and grade continuity, data reliability and independent drill-hole support. Grade-estimation searches and classification

searches serve separate purposes. The selected nominal Indicated/Inferred limits include 38/100 meters for Homestake Main and Homestake

Silver, 45/100 meters for Wolf, 35/100 meters for Torbrit, 35/70 meters for Kitsol and 30/70 meters for Dolly Varden and North Star.

These limits use classification AvgD divided by 0.707, an approximate nominal-spacing indicator rather than measured drill-hole spacing.

Dolly Varden has a separate remnant-resource classification review. Detailed criteria and sensitivity results are presented in Chapter

11.

The 2026 equivalent-metal assumptions use

prices of US$53/oz Ag, US$3,500/oz Au, US$5.00/lb Cu, US$1.25/lb Zn and US$0.90/lb Pb. These prices were selected for resource evaluation,

with management concurrence in May 2026. The selection rationale and applicable time frame are described in Chapter 11.

Contango Silver and Gold – Kitsault Valley Project Page 25 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 1-4. Adopted recovery assumptions

for the seven updated deposits. South Reef retains its historical reporting basis and is not included in this recovery matrix.

Recovery

group

Ag

%

Au

%

Cu

%

Zn

%

Pb

%

Dolly

Varden area

85

75

70

80

85

Homestake

Main

80

85

65

70

75

Homestake

Silver

85

80

65

75

80

Dolly Varden area: AgEq = Ag + 58.27Au

+ 53.27Cu + 15.22Zn + 11.64Pb.

Homestake Main: AgEq = Ag + 70.17Au +

52.56Cu + 14.15Zn + 10.92Pb.

Homestake Silver: AgEq = Ag + 62.15Au

+ 49.47Cu + 14.27Zn + 10.96Pb.

In these equations, Ag and Au grades are

in g/t and Cu, Zn and Pb grades are in percent. AgEq is expressed in g/t. The coefficients reflect relative prices and assumed metallurgical

recoveries and do not represent net payable revenue after commercial deductions.

1.7 Mineral

Processing and Metallurgical Testing

The metallurgical database includes the

2016 Base Metallurgical Laboratories work on Homestake composites, the 2019 Blue Coast Research program on Dolly Varden and Torbrit,

and the 2025 sample-selection and testwork program extending modern coverage to Wolf and Kitsol. The work evaluated mineralogy, flotation,

gravity concentration where applicable, whole-ore cyanidation and cyanidation of selected flotation products or tails. The tested material

responds to conventional processing methods, but the results do not establish a single finalized flowsheet for all deposits.

The adopted recovery assumptions reflect

differing mineralogy and allowance for downstream processing losses. Some values are preliminary proxies rather than measured integrated

whole-feed recoveries. Arsenic, antimony and mercury in some tested concentrates may affect product specifications, penalties or treatment

requirements. These factors remain material to subsequent economic evaluation. The planned 2026–2027 program will evaluate five

representative composites using characterization, comminution, sequential lead–zinc flotation, locked-cycle testing, leaching and

detailed product analysis. Chapter 24 defines the recommended program and budget. This future work has not been used to claim completed

testing or improved recoveries in the current estimate.

1.8 Mining

Concept and Resource Reporting Basis

The estimate is intended to support continued

evaluation of potential underground extraction. Longhole stoping is a conceptual option for appropriately shaped and sufficiently continuous

portions of the mineralization; it is not a demonstrated mining solution for every domain. Mining widths, dilution, recovery, geotechnical

conditions, access development and the treatment of isolated mineralized volumes must be considered together with grade.

The updated resources are constrained within

underground mineralized shapes developed in Leapfrog and reported at 132 g/t AgEq. These shapes delineate spatially continuous mineralization

considered potentially amenable to future mechanized underground mining. Historical workings at Torbrit, Dolly Varden and North Star

and unclassified material are excluded. The grade threshold and spatial constraints form part of the QP’s assessment of reasonable

prospects for economic extraction. That assessment also considers access, processing and marketability, infrastructure, environmental

and permitting requirements. The QP considers the identified technical issues capable of resolution through further work, as discussed

in Chapter 11, Sections 11.4 and 11.11.

Contango Silver and Gold – Kitsault Valley Project Page 26 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

The resource-stage work summarized in this

TRS does not establish a project-level construction capital estimate, a definitive operating-cost estimate or a development cash-flow

valuation. No mineral reserves, mine production schedule, project net present value or internal rate of return are declared in this summary.

1.9 Access

Infrastructure Environmental Matters and Permitting

Alice Arm provides the current exploration

base, with seasonal camp, geology and core-handling facilities. Regional supplies and personnel are mobilized through northwestern British

Columbia service centers. Roads reach Kitsault, while marine transport and helicopter support provide access to Alice Arm and field locations.

A historical road or trail corridor extends northward into the lower Kitsault Valley; the upper valley and Homestake deposits are accessed

principally by helicopter. Rugged terrain, glaciers, heavy precipitation, snow and avalanche exposure affect field operations and future

infrastructure design.

Existing facilities support exploration.

Future mining would require evaluation of road upgrades, bridges, power supply, water management, processing and waste facilities, accommodation

and product transport. Regional grid infrastructure and third-party ports provide options for study, but project capacity, access rights

and commercial arrangements are not established by their proximity.

The core exploration areas are administered

under the Dolly Varden and Homestake exploration permits, MX-1-860 and MX-1-603, respectively. Exploration activities remain subject

to permit-specific disturbance limits, reporting, reclamation, security and operating conditions. Exploration authorizations do not constitute

approval to construct or operate a mine. A future development proposal would require a project-specific permitting and assessment process,

including applicable provincial and federal requirements and engagement with affected Indigenous Nations and communities.

Environmental work includes historical and

renewed water-quality observations, meteorological monitoring, wildlife-management planning and archaeological screening. The Kitsault

River watershed, fish habitat, steep terrain and seasonal runoff are important considerations. Historical workings, the former plant

site and waste-rock accumulations require continued management and characterization. Existing baseline work is not a complete development-stage

environmental assessment. Further hydrology, hydrogeology, geochemistry, aquatic and terrestrial studies are required to support facility

selection, effects assessment and closure planning.

Engagement with Nisga’a Lisims Government

and other Indigenous Nations and regional communities is an integral part of exploration planning and future project evaluation. Consultation

associated with exploration permits should not be interpreted as consent to a future mine. Engagement commitments and the effective-date

status of permits and agreements are described in Chapter 17.

1.10 Qualified

Person Conclusions and Recommendations

The QP considers the accepted geological,

drilling, sampling, analytical and density information adequate to support the estimates at the confidence levels assigned. The geological

domains, high-grade controls, estimation parameters and classification framework described in Chapter 11 appropriately reflect the mineralized

systems and available data. The revised Homestake framework and larger Indicated inventory support continued technical evaluation. Based

on the geological setting and available drilling, the QP reasonably expects that the majority of Inferred resources should be upgraded

through continued exploration; actual upgrading depends on the results and is not assured.

Contango Silver and Gold – Kitsault Valley Project Page 27 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Material uncertainties include local geological

and grade continuity, high-grade sample influence, historical data and mined-out geometry, density variability, metallurgical response

and product quality, mining dimensions and ground conditions, access and infrastructure requirements, water and waste management, permitting,

and commodity-price and operating-cost assumptions. The magnitude of the resource does not remove these uncertainties. Inferred material

remains less certain than Indicated material and cannot be assumed to convert to a higher resource category or mineral reserves.

The QP recommends the staged program summarized

in Chapter 23. Stage 1 should complete the current 2026 drilling program, receive and validate the remaining assays, update the current

MRE in 2027 with accepted 2026 drilling, and complete the planned 2026-2027 metallurgical program described technically in Chapter 10.

After the 2027 MRE update is complete, the Company should proceed to an S-K 1300 Initial Assessment with preliminary capital and operating

costs, cash-flow analysis and sensitivities. If assay receipt, MRE updating and metallurgical inputs progress as expected, the Initial

Assessment could target completion near the end of Q2 2027; that target remains conditional on the timing and quality of the required

inputs.

Stage 2 should advance the Project toward

a pre-feasibility study over approximately the next three years. The work should focus on the PFS rollout rather than duplicating the

current drilling program, and should include staged geotechnical and hydrogeological drilling, geotechnical testing and instrumentation,

hydrology, hydrogeology, environmental baseline, geochemistry, permitting, access, infrastructure and closure-related field and engineering

studies. These activities should be released through decision points tied to the Initial Assessment results, the updated geological model,

metallurgical results, permitting priorities and field-season access.

Table 1-5 summarizes the staged planning

allowances. Stage 1 includes metallurgy, the 2027 MRE update and the Initial Assessment; it excludes the cost of the already-authorized

2026 drilling program. Stage 2 includes the additional technical, environmental, permitting and engineering work required to support

the PFS path.

Contango Silver and Gold – Kitsault Valley Project Page 28 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 1-5. Proposed program budget in

U.S. dollars.

Stage

Work

item and timing

US$

Estimate

Budget

basis

Stage

1

Complete

2026 drilling, assay receipt and QA/QC close-out. 2026 to early 2027.

0

No

new incremental allowance in this table; complete under the approved current program.

Stage

1

Metallurgical

program. Fall 2026 through 2027.

200,000–300,000

Representative

composites, comminution, flotation, leaching, locked-cycle/product-quality testing and coordination.

Stage

1

2027

MRE update and QP reporting. After receipt and validation of 2026 assays.

160,000–240,000

Update

the current MRE with accepted 2026 drilling and preserve the September 11, 2026 estimate as the baseline.

Stage

1

Initial

Assessment with economic analysis. After the 2027 MRE; target end of Q2 2027 if timing allows.

800,000–1,200,000

S-K

1300 Initial Assessment with preliminary mining, processing, infrastructure, environmental, permitting, capital, operating cost and

sensitivity work.

Stage

2

Geotechnical

and hydrogeological drilling - up to 5,000 meters. Staged as engineering needs are confirmed.

2,800,000–4,200,000

Support

access, underground design, water inflow, ground conditions and PFS-level engineering.

Stage

2

Geotechnical

testing and instrumentation. With staged geotechnical drilling.

350,000–500,000

Laboratory

testing, instrumentation, monitoring and specialist interpretation.

Stage

2

PFS

engineering, environmental, hydrology, permitting and field studies. Approximately three years after the Initial Assessment.

2,800,000–4,200,000

Engineering

trade-off studies, baseline expansion, hydrology/hydrogeology, geochemistry, access/infrastructure field work, permitting strategy

and reporting.

Stage

1 subtotal

1,160,000–1,750,000

Planning

sensitivity only; not a formal estimate-class accuracy range.

Stage

2 subtotal

6,000,000–9,000,000

Planning

sensitivity only; not a formal estimate-class accuracy range.

Total

proposed staged allowance

7,160,000–10,750,000

Planning

sensitivity only; not a formal estimate-class accuracy range.

Budget basis. Amounts are conceptual planning

allowances in U.S. dollars and remain subject to Company approval, final scopes, contractor pricing, laboratory schedules and exchange-rate

assumptions. The estimates reflect +/-20% planning sensitivity and are not presented as a formal estimate-class accuracy range. The retained

Stage 2 drilling allowance is limited to geotechnical and hydrogeological drilling at US$712.50 per meter, including normal field logistics;

specialist testing and instrumentation are separate.

The QP recommends staged expenditure against

confirmed scopes and results. This work supports further evaluation; it does not establish additional mineral resources, mineral reserves

or economic returns, or commit the Project to development.

Contango Silver and Gold – Kitsault Valley Project Page 29 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

2 INTRODUCTION

2.1 Purpose

and Terms of Reference

This Technical Report Summary (TRS) has

been prepared for Contango Silver & Gold Inc. (Contango or the Company) to support disclosure of the updated mineral resource

estimate for the Kitsault Valley Project (the Project), British Columbia, Canada, under Subpart 1300 of Regulation S-K. The report summarizes

the scientific and technical information, interpretations and conclusions supporting the estimate and the associated resource-stage assessment.

The mineral resource effective date is September 11, 2026. The TRS issue date is identified on the report title page.

The purpose of the work is to estimate and

classify mineral resources, document the geological and estimation basis, assess the technical and economic assumptions relevant to reasonable

prospects of economic extraction, and identify further work required to advance the Project. The scope includes review of exploration

and drilling data, sampling and analytical quality, data verification, geological modeling, metallurgical information, resource estimation

and classification, and relevant property, infrastructure and environmental information. This TRS does not declare mineral reserves or

present a preliminary or final feasibility study.

2.2 Project

and Deposit Scope

The Project is situated in northwestern

British Columbia, approximately 39 km southeast of Stewart and 27 km northeast of Alice Arm. The Company holds its interests through

subsidiaries following completion of the merger with Dolly Varden Silver Corporation on March 26, 2026 (Contango, 2026a). The mineral

resource estimate covers eight deposits grouped into two areas (Table 2-1). Property boundaries, tenure, royalties and access rights

are described in the Property Description chapter.

Table 2-1. Deposits included in the mineral

resource statement for the Kitsault Project, northwestern British Columbia.

Area

Deposits

included in the mineral resource statement

Homestake

Homestake

Main; Homestake Silver; South Reef

Dolly

Varden

Wolf;

Kitsol; Torbrit; Dolly Varden; North Star

The current work updates seven deposit models.

South Reef is carried forward as an Inferred resource at its preceding 2.0 g/t AuEq cut-off; no additional drilling is incorporated into

that retained estimate. The seven updated deposits use a 132 g/t AgEq cut-off and the underground reporting constraints described in

Chapter 11. Regional targets outside these eight deposits are excluded from reported resources.

The final statement in Chapter 11 reports

7.660 Mt Indicated containing 58.698 Moz Ag, 394.700 koz Au and 89.545 Moz AgEq, and 6.305 Mt Inferred containing 22.804 Moz Ag, 620.817

koz Au and 64.920 Moz AgEq. The categories are reported separately. South Reef is included in the Inferred totals on its retained reporting

basis.

2.3 Qualified

Person and Technical Contributions

Dave Larimer, CPG, Vice President Exploration

of Contango, is the Qualified Person (QP) responsible for the mineral resource estimate and the technical conclusions presented in this

TRS. Mr. Larimer is an employee of the Company and is not independent. The Company identifies him as a QP under Regulation S-K 1300

(Contango, 2026b). His qualifications and responsibilities are set out in the report’s QP identification and signature information.

Contango Silver and Gold – Kitsault Valley Project Page 30 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Company geological personnel supplied the

exploration database, geological records and supporting project information. Sims Resources assisted with geological modeling, statistical

evaluation and implementation in Leapfrog Geo version 2026.1.2 with Edge under the QP’s supervision. The QP reviewed and accepted

the model inputs, estimation parameters, validation and classification and takes responsibility for the adopted estimates. Technical

assistance does not replace that responsibility.

2.4 Sources

of Information

This TRS is based on Company records, prior

technical reports, laboratory and specialist reports, geological and block models, and the QP’s review and personal observations.

The principal source groups are summarized in Table 2-2 below. Detailed references and source-specific limitations are provided in the

relevant technical chapters and the References chapter.

Table 2-2. Sources of information used

in this report.

Source

group

Information

used and principal records

Previous

project reporting

Technical

Report on the Combined Kitsault Valley Project, British Columbia, Canada, dated March 23, 2023, effective September 28,

2022; earlier reports and assessment records cited in that report and in the current technical chapters.

Exploration

and analytical data

Accepted

historical and modern collars, downhole surveys, geological logs, merged intervals, assays, analytical certificates and density records.

Chapter 11 distinguishes the 1,454-hole, 328,638.18-meter deposit header inventory from the seven merged exports: 24,120 intervals

across 34 domains, including 23,264 intervals with metal results from 947 distinct hole identifiers.

Quality

control and verification

Company

sampling and analytical procedures, laboratory quality-control records, and the Dolly Varden and Homestake quality-control compilations

dated January 30 and February 2, 2026, respectively; QP verification records.

Geological

and resource models

Chapter

11 Mineral Resource Estimates and its final resource statement; Leapfrog Geo 2026.1.2 / Edge models and September 11, 2026 exports;

domain, compositing, capping and declustering records; density assignments; grade and classification estimators; validation, sensitivity

and historical-depletion evaluations.

Metallurgical

information

Base

Metallurgical Laboratories work on Homestake composites (2016); Blue Coast Research work on Dolly Varden and Torbrit (2019); and

the 2025–2026 Wolf and Kitsol testwork, including Blue Coast project PJ-5599, dated April 29, 2026, and associated interpretations

cited in the Metallurgy chapter.

Property

and project context

Company

tenure and ownership records, historical operating information, exploration infrastructure descriptions, environmental and permitting

records, and information on Indigenous and community engagement, as identified in the relevant chapters.

The QP’s data review included selected

comparisons with original records and checks of the digital data and model inputs. Some historical assay certificates were unavailable.

The treatment of those records, the verification performed and the resulting limitations are discussed in the Data Verification chapter.

The QP considers the accepted database adequate for the geological interpretation and mineral resource estimation purposes described

in this TRS.

Contango Silver and Gold – Kitsault Valley Project Page 31 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

2.5 Relationship

to Previous Reporting

The previous combined-project report is

titled Technical Report on the Combined Kitsault Valley Project, British Columbia, Canada, dated March 23, 2023, with an effective

date of September 28, 2022. Those dates are confirmed in Andrew Turner’s consent filed by Contango on June 22, 2026 (Turner,

2026). References in this TRS to the “2023 baseline” mean the resource disclosure presented in that report; the publication

year should not be interpreted as the effective date of all underlying estimates.

2.6 Personal

Inspection

Mr. Larimer personally inspected the

Project on September 14th 2025, and July 21–24, 2026. The inspections included review of core handling, geological

logging and sampling practices, and geological observations relevant to the interpretation of the mineralized systems. These observations

informed his assessment of the exploration procedures and the suitability of the information used in the resource estimate. The scope

of the inspection and the supporting verification work are described in the Data Verification chapter.

The QP’s conclusions on data adequacy

consider these field observations together with the verification procedures and limitations documented in this TRS.

2.7 Effective

Date and Information Cut-offs

The effective date of the resource estimate

is distinct from the dates on which the database, geological models and reporting files were prepared or approved. The following dates

define the preparation sequence used for this update (Table 2-3).

Table 2-3. Reporting milestones.

Milestone

Date

or reporting basis

Resource

effective date

September 11,

2026; QP acceptance of the completed resource statement, classifications and supporting assumptions.

TRS

issue date

As

stated on the report title page; distinct from the resource effective date.

Estimation

database coverage

Accepted

historical and modern data, including the completed 2025 program; assay dataset locked at the start of January 2026.

Database

certification

April 13,

2026; databases and supporting information finalized, checked and certified by the QP.

Geological-solid

updates and database review

Continued

through March 2026 before database certification.

Metal-price

assumptions

Management

concurrence in May 2026; QP-accepted prices and recovery assumptions are disclosed in Chapter 11, Section 11.4.

Final

model exports and resource statement

Final

exports locked and generated September 11, 2026; resource quantities are reported in Chapter 11, Section 11.7.

Exploration information obtained after the

estimation database cut-off is excluded from the estimate unless specifically identified as incorporated into the accepted model inputs.

Material information relevant to the report’s conclusions is addressed through the effective-date review. The dates of the data

lock, model preparation and personal inspection therefore serve different purposes.

Contango Silver and Gold – Kitsault Valley Project Page 32 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

2.8 Units,

Currencies and Reporting conventions

Unless otherwise stated, distances are reported

in meters, areas in metric units and tonnages in metric tons (t), with one metric ton equal to 1,000 kilograms. Precious-metal grades

are expressed in grams per metric ton (g/t), and base-metal grades in percent (%), except where source fields are explicitly in parts

per million (ppm). For gold and silver, 1 ppm is numerically equal to 1 g/t; base-metal ppm values are divided by 10,000 to obtain percent.

Precious-metal contents use 31.1034768 grams per troy ounce, and base-metal conversions use 2,204.62262 pounds per metric ton. Mt denotes

million metric tons, koz thousand troy ounces and Moz million troy ounces.

US$ denotes United States dollars and C$

denotes Canadian dollars. Commodity-price and cost assumptions identify their currency, and any exchange rate used is disclosed with

the relevant assumptions. The resource database and models use NAD83 / UTM Zone 9N coordinates, with eastings, northings and elevations

expressed in meters. The QP verified the coordinate-reference information used for the estimate.

AgEq and AuEq denote silver-equivalent and

gold-equivalent grades or contents. For the seven updated deposits, AgEq is calculated for each block using the adopted metal prices

and relative metallurgical recoveries before applying the reporting cut-off. South Reef retains its historical AuEq cut-off and its separately

disclosed comparative AgEq content. Equivalent values are not additional metal to be added to individual commodity contents. Resources

are reported in situ within accepted domains, after modeled historical depletion where applicable and before mining dilution and mining

recovery. Contained metal is not recovered or payable metal. No Measured resources or mineral reserves are reported; Indicated and Inferred

resources remain separate and totals may differ due to rounding. Mineral resources do not have demonstrated economic viability.

Contango Silver and Gold – Kitsault Valley Project Page 33 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

3 PROPERTY

DESCRIPTION

3.1 Description

and Location

The Kitsault Valley Project is located near

the central west coast of British Columbia (BC), approximately 39 km southeast of Stewart and 27 km northeast of Alice Arm, BC. The Project

sits within National Topographic System Sheets 103P05, 103P06, 103P11, 103P12, 103P13, and 103P14 in the Skeena Mining District and Cassiar

Land District. The Property encompasses 7 mineral leases, 253 mineral claims and 57 Crown granted mineral claims (Crown grants) listed

in Tables 3-1, 3-2 and 3-3, respectively. The Property area totals 163 square km, with non-owned land removed. The Dolly Varden mineral

leases, Crown grants and mineral claims are shown in Figures 3-1 and 3-2.

Table 3-1. Kitsault Valley Project mineral

leases.

Tenure

Number

Registered

Owner (100%)

Valid

Until

Area

(ha)

254534

Dolly

Varden

2027/JUL/06

53.397

254535

Dolly

Varden

2027/FEB/04

8.681

254536

Dolly

Varden

2027/APR/05

37.213

254537

Dolly

Varden

2027/APR/05

11.892

254538

Dolly

Varden

2027/APR/05

17.301

254542

Dolly

Varden

2027/JUL/08

41.010

254579

Dolly

Varden

2026/OCT/15

14.452

Mineral Leases have a 30-year term and are

maintained through yearly rent payments. The seven mineral leases on the project were renewed with the Chief Gold Commissioner in 2024

for another 30-year term.

Table 3-2. Kitsault Valley Project mineral

claims.

Project

Name

Title

Number

Claim

Name

Good

To

Date

Area

(ha)

Big

Bulk

250684

BIG

BULK

2035/DEC/03

400

Big

Bulk

254242

SKUCH

12

2035/DEC/03

225

Big

Bulk

254243

SKUCH

13

2035/DEC/03

300

Big

Bulk

523826

DOLLY

3

2035/DEC/03

237.364

Big

Bulk

523830

DOLLY

7

2035/DEC/03

18.23

Big

Bulk

526114

BIG

BULK 1

2035/DEC/03

456.161

Big

Bulk

570084

DOLLY

VARDEN BIG BULK 1

2035/DEC/03

1003.362

Big

Bulk

385586

KL

2

2032/JUL/14

400

Big

Bulk

385587

KL

3

2032/JUL/14

500

Contango Silver and Gold – Kitsault Valley Project Page 34 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Project

Name

Title

Number

Claim

Name

Good

To

Date

Area

(ha)

Big

Bulk

385591

LAVENDER

3

2032/JUL/14

300

Big

Bulk

385592

LAVENDER

4

2032/JUL/14

450

Big

Bulk

385602

LAVENDER

5

2032/JUL/14

500

Big

Bulk

385603

LAVENDER

6

2032/JUL/14

500

Big

Bulk

385604

LAVENDER

7

2032/JUL/14

375

Dolly

Varden

383279

TIGER

2

2035/DEC/03

500

Dolly

Varden

383281

TIGER

4

2035/DEC/03

500

Dolly

Varden

384022

EVINDSON

2

2035/DEC/03

500

Dolly

Varden

523825

DOLLY

2

2035/DEC/03

218.884

Dolly

Varden

538780

DOLLY

CROWN 3

2035/DEC/03

127.574

Dolly

Varden

538781

DOLLY

CROWN 4

2035/DEC/03

163.998

Dolly

Varden

538782

DOLLY

CROWN 5

2035/DEC/03

18.223

Dolly

Varden

538783

DOLLY

CROWN 6

2035/DEC/03

91.161

Dolly

Varden

538784

DOLLY

CROWN 7

2035/DEC/03

182.283

Dolly

Varden

538785

DOLLY

CROWN 8

2035/DEC/03

437.658

Dolly

Varden

538786

DOLLY

CROWN 9

2035/DEC/03

72.971

Dolly

Varden

538787

DOLLY

CROWN 10

2035/DEC/03

127.709

Dolly

Varden

538788

DOLLY

CROWN 11

2035/DEC/03

109.477

Dolly

Varden

538804

DOLLY

CROWN 15

2035/DEC/03

36.442

Dolly

Varden

538805

DOLLY

CROWN 16

2035/DEC/03

18.232

Dolly

Varden

538806

DOLLY

CROWN 17

2035/DEC/03

164.25

Dolly

Varden

538899

DOLLY

CROWN 19

2035/DEC/03

18.2268

Dolly

Varden

538900

DOLLY

CROWN 20

2035/DEC/03

18.2248

Dolly

Varden

538901

DOLLY

CROWN 21

2035/DEC/03

18.2249

Dolly

Varden

538902

DOLLY

CROWN 22

2035/DEC/03

18.2229

Dolly

Varden

538904

DOLLY

CROWN 24

2035/DEC/03

18.2307

Dolly

Varden

538906

DOLLY

CROWN 26

2035/DEC/03

18.2403

Dolly

Varden

564163

DOLLY

CROWN 27

2035/DEC/03

18.2384

Dolly

Varden

564240

DOLLY

CROWN 28

2035/DEC/03

18.2402

Dolly

Varden

569857

DOLLY

VARDEN EAST 1

2035/DEC/03

637.293

Dolly

Varden

569859

DOLLY

VARDEN EAST 2

2035/DEC/03

655.9154

Contango Silver and Gold – Kitsault Valley Project Page 35 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Project

Name

Title

Number

Claim

Name

Good

To

Date

Area

(ha)

Dolly

Varden

569871

DOLLY

VARDEN EAST 3

2035/DEC/03

473.5278

Dolly

Varden

569872

DOLLY

VARDEN NORTH 1

2035/DEC/03

436.943

Dolly

Varden

569873

DOLLY

VARDEN NORTH 2

2035/DEC/03

364.2831

Dolly

Varden

569874

DOLLY

VARDEN NORTH 3

2036/APR/21

273.2914

Dolly

Varden

570074

DOLL

A

2035/DEC/03

18.2229

Dolly

Varden

570075

DOLL

B

2035/DEC/03

18.2268

Dolly

Varden

570076

DOLL

C

2035/DEC/03

36.4632

Dolly

Varden

570080

DOLLY

VARDEN WEST 1

2035/OCT/21

419.2429

Dolly

Varden

570081

DOLLY

VARDEN WEST 2

2035/DEC/03

109.3779

Dolly

Varden

570082

DOLLY

VARDEN WEST 3

2036/APR/21

510.6939

Dolly

Varden

570083

DOLLY

VARDEN WEST 4

2035/DEC/03

237.1939

Dolly

Varden

589602

DOLLY

VARDEN - NORTH STAR

2035/DEC/03

18.2384

Homestake

251427

CAMBRIA

1

2036/APR/21

100

Homestake

251428

CAMBRIA

2

2036/APR/21

75

Homestake

377241

WK

1

2036/APR/21

250

Homestake

377242

WK

2

2036/APR/21

500

Homestake

377243

WK

3

2036/APR/21

400

Homestake

380949

WK

4

2036/APR/21

450

Homestake

380950

WK

5

2036/APR/21

450

Homestake

380951

KW

1

2036/APR/21

25

Homestake

380952

KW

2

2036/APR/21

25

Homestake

380953

KW

3

2036/APR/21

25

Homestake

383016

KW

5

2036/APR/21

25

Homestake

383017

KW4

2036/APR/21

25

Homestake

383037

WK

6

2036/APR/21

150

Homestake

383038

WK

7

2036/APR/21

400

Homestake

537435

HR

2036/APR/21

127.45

Homestake

537436

HRMARGIN

1

2036/APR/21

109.25

Homestake

537437

HRMARGIN2

2036/APR/21

54.599

Homestake

538791

HOMESTAKE

RIDGE 1

2036/APR/21

18.209

Homestake

540533

HOMESTAKE

RIDGE 2

2036/APR/21

18.2035

Contango Silver and Gold – Kitsault Valley Project Page 36 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Project

Name

Title

Number

Claim

Name

Good

To

Date

Area

(ha)

Homestake

540540

HOMESTAKE

RIDGE 3

2036/APR/21

18.2074

Homestake

545945

HOMESTAKE

RIDGE 4

2036/APR/21

18.2036

Homestake

565708

HOMESTAKE

RIDGE 5

2036/APR/21

36.4169

Homestake

565709

HOMESTAKE

RIDGE 6

2036/APR/21

18.2055

Homestake

565710

HOME

STAKE 7

2036/APR/21

18.2036

Homestake

598667

VANGUARD

GOLD

2036/APR/21

18.2133

Homestake

598668

VANGUARD

EXTENSION

2036/APR/21

54.663

Homestake

950714

BRAVO

N1

2036/APR/21

327.4891

Homestake

950719

BRAVO

N2

2036/APR/21

436.5113

Homestake

950722

BRAVO

N3

2036/APR/21

436.5046

Homestake

950724

BRAVO

N4

2036/APR/21

272.8082

Homestake

950725

BRAVO

N5

2036/APR/21

381.8186

Homestake

950726

BRAVO

N6

2036/APR/21

418.0394

Homestake

950727

BRAVO

N7

2036/APR/21

417.955

Homestake

1011645

KN

HSR 1

2036/APR/21

273.8619

Homestake

1015450

KINSKUCH

NW2

2036/APR/21

1039.181

Homestake

1015588

HS

SOUTH 1

2036/APR/21

36.442

Homestake

1061421

NR

2036/APR/21

18.1958

Kinskuch

1105020

GLEB01

2035/DEC/03

454.992

Kinskuch

1105023

GLEB02

2035/DEC/03

454.8574

Kinskuch

1105026

GLEB03

2035/DEC/03

454.9309

Kinskuch

1105029

GLEB04

2035/DEC/03

454.8791

Kinskuch

1105032

GLEB05

2035/DEC/03

454.8242

Kinskuch

1105035

GLEB06

2035/DEC/03

454.8324

Kinskuch

1105038

GLEB07

2035/DEC/03

454.7061

Kinskuch

1105041

GLEB08

2035/DEC/03

454.9873

Kinskuch

1105044

GLEB09

2035/DEC/03

455.1056

Kinskuch

1105047

GLEB10

2035/DEC/03

455.0987

Kinskuch

1105050

GLEB11

2035/DEC/03

455.1276

Kinskuch

1105054

GLEB12

2035/DEC/03

455.3719

Kinskuch

1105057

GLEB13

2035/DEC/03

455.3618

Contango Silver and Gold – Kitsault Valley Project Page 37 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Project

Name

Title

Number

Claim

Name

Good

To

Date

Area

(ha)

Kinskuch

1105060

JADE

1

2035/DEC/03

91.0605

Kinskuch

1105065

GLEB14

2035/DEC/03

455.2397

Kinskuch

1105066

JADE

2

2035/DEC/03

18.2101

Kinskuch

1105092

GLEB15

2035/DEC/03

455.389

Kinskuch

1105095

GLEB16

2035/DEC/03

437.3459

Kinskuch

1105098

GLEB17

2035/DEC/03

455.6003

Kinskuch

1105101

GLEB18

2035/DEC/03

455.6016

Kinskuch

1105104

GLEB19

2035/DEC/03

455.3952

Kinskuch

1105107

GLEB20

2035/DEC/03

437.456

Kinskuch

1105110

GLEB20A

2035/DEC/03

455.8045

Kinskuch

1105113

GLEBX

1

2035/DEC/03

437.6296

Kinskuch

1105116

GLEB21

2035/DEC/03

455.8357

Kinskuch

1105119

GLEB23

2035/DEC/03

455.7809

Kinskuch

1105122

GLEB24

2035/DEC/03

455.8772

Kinskuch

1105125

GLEB25

2035/DEC/03

455.9786

Kinskuch

1105128

GLEB26

2035/DEC/03

456.1687

Kinskuch

1105131

GLEB27

2035/DEC/03

456.4401

Kinskuch

1105134

GLEB28

2035/DEC/03

456.647

Kinskuch

1105137

GLEB29

2035/DEC/03

456.635

Kinskuch

1105141

GLEB30

2035/DEC/03

456.8963

Kinskuch

1105144

GLEB31

2035/DEC/03

456.8556

Kinskuch

1105147

GLEB32

2035/DEC/03

457.1528

Kinskuch

1105150

GLEB33

2035/DEC/03

457.3952

Kinskuch

1105153

GLEB34

2035/DEC/03

457.6379

Kinskuch

1105156

GLEB36

2035/DEC/03

457.88

Kinskuch

1105159

ILLY

7

2035/DEC/03

402.3718

Kinskuch

1105162

GLEB34A

2035/DEC/03

420.5602

Kinskuch

1105165

ILLY

10

2035/DEC/03

274.4895

Kinskuch

1105171

GLEB35

2035/DEC/03

457.5257

Kinskuch

1105174

GLEB39

2035/DEC/03

458.2964

Kinskuch

1105177

GLEB38

2035/DEC/03

458.1243

Contango Silver and Gold – Kitsault Valley Project Page 38 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Project

Name

Title

Number

Claim

Name

Good

To

Date

Area

(ha)

Kinskuch

1105180

GLEB40

2035/DEC/03

458.0259

Kinskuch

1105183

GLEB41

2035/DEC/03

458.1559

Kinskuch

1105186

GLEB41

2035/DEC/03

458.2662

Kinskuch

1105189

KITSAULT

SOUTH 3

2035/DEC/03

458.2899

Kinskuch

1105192

GLEB23A

2035/DEC/03

458.0882

Kinskuch

1105195

GLEB44

2035/DEC/03

457.8863

Kinskuch

1105198

GLEB45

2035/DEC/03

457.6578

Kinskuch

1105201

GLEB46

2035/DEC/03

439.2692

Kinskuch

1105204

GLEB47

2035/DEC/03

457.5816

Kinskuch

1105207

ILLY16

2035/DEC/03

164.7841

Kinskuch

1105210

GLEB48

2035/DEC/03

439.4265

Kinskuch

1105213

GLEB49

2035/DEC/03

457.7444

Kinskuch

1105216

RED

BLUFF 3

2035/DEC/03

201.3713

Kinskuch

1105219

GLEB50

2035/DEC/03

457.7931

Kinskuch

1105221

GLEB51

2035/DEC/03

457.5793

Kinskuch

1105222

SILVER

CORD

2035/DEC/03

18.306

Kinskuch

1105224

GLEB52

2035/DEC/03

420.8514

Kinskuch

1105225

IXL

2035/DEC/03

18.3002

Kinskuch

1105228

GLEB53

2035/DEC/03

457.2427

Kinskuch

1105231

ILLY

8

2035/DEC/03

219.5074

Kinskuch

1105234

GLEB55

2035/DEC/03

457.0572

Kinskuch

1105237

ILLY

4

2035/DEC/03

73.1315

Kinskuch

1105240

ILLY

5

2035/DEC/03

456.9824

Kinskuch

1105243

GLEB56

2035/DEC/03

274.1288

Kinskuch

1105246

GLEB56A

2035/DEC/03

456.1801

Kinskuch

1105249

GLEB62

2035/DEC/03

456.427

Kinskuch

1105252

EAST

DOLLY 1

2035/DEC/03

456.5502

Kinskuch

1105255

GLEB57

2035/DEC/03

456.2774

Kinskuch

1105258

GLEB60

2035/DEC/03

456.5191

Kinskuch

1105261

GLEB59

2036/APR/21

456.3689

Kinskuch

1105264

KITGOLD

1

2035/DEC/03

401.9519

Contango Silver and Gold – Kitsault Valley Project Page 39 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Project

Name

Title

Number

Claim

Name

Good

To

Date

Area

(ha)

Kinskuch

1105267

GLEB61

2035/DEC/03

456.6629

Kinskuch

1105273

GLEB63

2035/DEC/03

456.5369

Kinskuch

1105274

ZORKA

2035/DEC/03

18.2616

Kinskuch

1105277

GLEB64

2035/DEC/03

456.7166

Kinskuch

1105280

2035/DEC/03

402.028

Kinskuch

1105283

GLEB65

2035/DEC/03

456.6985

Kinskuch

1105286

GLEB66

2035/DEC/03

438.4397

Kinskuch

1105288

GLEB67

2035/DEC/03

456.9251

Kinskuch

1105289

HENDERSONS

2035/DEC/03

18.2751

Kinskuch

1105292

GLEB69

2035/DEC/03

457.6007

Kinskuch

1105295

GLEB68

2035/DEC/03

457.3609

Kinskuch

1105298

GLEB83

2035/DEC/03

54.889

Kinskuch

1105300

GLEB70

2035/DEC/03

457.4573

Kinskuch

1105301

EAGLE

2035/DEC/03

18.2905

Kinskuch

1105304

GLEB72

2035/DEC/03

456.8227

Kinskuch

1105307

GLEB71

2035/DEC/03

456.744

Kinskuch

1105310

GLEB72A

2035/DEC/03

457.2692

Kinskuch

1105313

GLEB73

2035/DEC/03

457.4402

Kinskuch

1105325

GLEB76

2035/DEC/03

457.164

Kinskuch

1105328

GLEB74

2035/DEC/03

456.9179

Kinskuch

1105331

GLEB75

2035/DEC/03

438.7854

Kinskuch

1105334

GLEB78

2035/DEC/03

329.0577

Kinskuch

1105337

GLEB76A

2035/DEC/03

457.1176

Kinskuch

1105339

GLEB77

2035/DEC/03

292.5717

Kinskuch

1105340

RIVERSIDE

2035/DEC/03

18.2887

Kinskuch

1105344

GLEB80

2035/DEC/03

457.7967

Kinskuch

1105347

COPPER

CREST

2035/DEC/03

36.623

Kinskuch

1105350

GLEB81

2035/DEC/03

384.6607

Kinskuch

1105353

GLEB81A

2035/DEC/03

457.8399

Kinskuch

1105356

KITSAULT

SOUTH 9

2035/DEC/03

458.2146

Kinskuch

1105359

GLEB82

2035/DEC/03

348.1087

Contango Silver and Gold – Kitsault Valley Project Page 40 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Project

Name

Title

Number

Claim

Name

Good

To

Date

Area

(ha)

Kinskuch

1105362

GLEB

X2

2035/DEC/03

437.5087

Kinskuch

1105365

GLEB

X3

2035/DEC/03

437.3884

Kinskuch

1105368

GLEB

X4

2035/DEC/03

437.268

Kinskuch

1105371

GLEB

X5

2035/DEC/03

437.1475

Kinskuch

1105374

GLEB

X6

2035/DEC/03

437.027

Kinskuch

1105377

GLEB

X7

2035/DEC/03

436.9064

Kinskuch

1105380

2035/DEC/03

511.7981

Kinskuch

1105383

DOLLY

CAMP 1

2035/DEC/03

73.135

Kinskuch

1105386

RIFT

01

2035/DEC/03

437.7241

Kinskuch

1105389

RIFT

02

2035/DEC/03

437.8516

Kinskuch

1105392

RIFT

03

2035/DEC/03

437.919

Kinskuch

1105395

RIFT

04

2035/DEC/03

437.998

Kinskuch

1105398

RIFT

5

2035/DEC/03

456.3232

Kinskuch

1105401

RIFT

6

2035/DEC/03

438.1567

Kinskuch

1105404

RIFT

07

2035/DEC/03

438.2376

Kinskuch

1105412

RIFT

08

2035/DEC/03

438.3481

Kinskuch

1105414

RIFT

09

2035/DEC/03

438.4587

Kinskuch

1105415

VMS

2035/DEC/03

18.273

Kinskuch

1105419

RIFT

10

2035/DEC/03

420.2961

Kinskuch

1105422

RIFT

11

2035/DEC/03

438.6798

Kinskuch

1105425

RIFT

12

2035/DEC/03

438.7902

Kinskuch

1105428

RIFT

13

2035/DEC/03

438.8785

Kinskuch

1105431

KINSAULT

SOUTH 1

2035/DEC/03

219.9121

Kinskuch

1105434

CARL

2035/DEC/03

36.6425

Kinskuch

1105437

KINSAULT

SOUTH 2

2035/DEC/03

458.3685

Kinskuch

1105440

KINSAULT

SOUTH 4

2035/DEC/03

439.7818

Kinskuch

1105443

KINSAULT

SOUTH 5

2035/DEC/03

403.1737

Kinskuch

1105446

KINSAULT

SOUTH 8

2035/DEC/03

146.6097

Kinskuch

1105450

KINSAULT

SOUTH 6

2035/DEC/03

458.0821

Kinskuch

1105453

KINSAULT

SOUTH 7

2035/DEC/03

403.0214

Kinskuch

1105570

KITSAULT

SOUTH 10

2035/DEC/03

439.8487

Contango Silver and Gold – Kitsault Valley Project Page 41 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Project

Name

Title

Number

Claim

Name

Good

To

Date

Area

(ha)

Kinskuch

1105573

KITSAULT

SOUTH 12

2035/DEC/03

440.0493

Kinskuch

1105576

2035/DEC/03

896.3284

Kinskuch

1105579

RED

BLUFF 1

2035/DEC/03

109.7725

Kinskuch

1105581

RED

BLUFF 5

2035/DEC/03

36.5927

Kinskuch

1105582

RED

BLUFF 2

2035/DEC/03

18.2983

Kinskuch

1105585

RED

BLUFF 4

2035/DEC/03

164.7709

Kinskuch

1105590

RED

BUFF A

2035/DEC/03

128.2222

Kinskuch

1105593

ILLY2

2035/DEC/03

420.242

Kinskuch

1105595

ILLY1

2035/DEC/03

219.2534

Kinskuch

1105596

ILLY1A

2035/DEC/03

18.2691

Kinskuch

1105599

ILLY5

2035/DEC/03

457.209

Kinskuch

1105602

ILLY6

2035/DEC/03

347.4506

Kinskuch

1105605

ILLY11

2035/DEC/03

457.8309

Kinskuch

1105608

ILLY9

2035/DEC/03

457.5587

Kinskuch

1105611

ILLY12

2035/DEC/03

439.5922

Kinskuch

1105614

ILLY13

2035/DEC/03

109.9069

Kinskuch

1105617

RIFT

XX1

2035/DEC/03

54.87

Kinskuch

1105620

ILLY15

2035/DEC/03

457.5044

Kinskuch

1105623

ILLY14

2035/DEC/03

457.3259

Theia

1102912

THEIA2

2036/APR/21

1635.443

Theia

1102913

THEIA

1

2036/APR/21

1814.93

Theia

1102914

2036/APR/21

1708.085

Theia

1102916

THEIA#

2036/APR/21

471.9937

Theia

1102918

THEIA

2

2036/APR/21

1816.439

Theia

1102921

FLAT

GOLD

2036/APR/21

54.5337

Theia

1102922

FLAT

GOLD 2

2036/APR/21

54.528

Theia

1102950

2036/APR/21

617.927

Contango Silver and Gold – Kitsault Valley Project Page 42 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 3-3. Kitsault Valley Project Crown-granted

mineral claims.

Project

Name

Lot

Number

Claim

Name

Ownership

Area

(ha)

Dolly

Varden

934

ANGLO

Dolly

Varden 100%

5.7744

Dolly

Varden

4068

ARMES

Dolly

Varden 100% *

18.25

Dolly

Varden

4066

ATHOS

Dolly

Varden 100% *

13.06022

Dolly

Varden

4217

BLUEBERRY

Dolly

Varden 100%

16.01978

Dolly

Varden

4070

BONANZA

FRACTION

Dolly

Varden 100% *

17.26693

Dolly

Varden

3806

COPPER

CLIFF

Dolly

Varden 100%

18.52409

Dolly

Varden

3807

COPPER

CLIFF NO. 1

Dolly

Varden 100%

17.16805

Dolly

Varden

3808

COPPER

CLIFF NO. 2

Dolly

Varden 100%

15.59502

Dolly

Varden

3798

COPPER

CLIFF NO. 3

Dolly

Varden 100%

16.30057

Dolly

Varden

3825

DAN

PATCH

Dolly

Varden 100%

17.69157

Dolly

Varden

4071

D’ARTAGNON

Dolly

Varden 100% *

11.78304

Dolly

Varden

4069

D’ARTAGNON

NO. 1

Dolly

Varden 100% *

9.429956

Dolly

Varden

3194

DOLLY

VARDEN M.C.

Dolly

Varden 100%

17.01527

Dolly

Varden

3192

DOLLY

VARDEN NO. 1

Dolly

Varden 100%

11.92451

Dolly

Varden

3193

DOLLY

VARDEN NO. 2

Dolly

Varden 100%

12.93685

Dolly

Varden

3195

DOLLY

VARDEN NO. 4

Dolly

Varden 100%

11.34692

Dolly

Varden

3196

DOLLY

VARDEN NO. 5 M.C.

Dolly

Varden 100%

14.75147

Dolly

Varden

3197

DOLLY

VARDEN NO. 6

Dolly

Varden 100%

14.69214

Dolly

Varden

3198

DOLLY

VARDEN NO. 7

Dolly

Varden 100%

4.773376

Dolly

Varden

3815

KITSOL

NO. 1

Dolly

Varden 100%

16.12156

Dolly

Varden

3814

KITSOL

NO. 2

Dolly

Varden 100%

14.3449

Dolly

Varden

937

LAMB

Dolly

Varden 100%

7.36939

Dolly

Varden

3613

LION

Dolly

Varden 100%

15.57007

Dolly

Varden

3827

LUE

DILLON

Dolly

Varden 100%

10.66612

Dolly

Varden

3817

MAUD

MCPHEE

Dolly

Varden 100%

19.10728

Dolly

Varden

936

MOOSE

Dolly

Varden 100%

14.58834

Dolly

Varden

1241

MOOSE

NO. 1

Dolly

Varden 100%

17.17196

Dolly

Varden

1242

MOOSE

NO. 2

Dolly

Varden 100%

18.28269

Dolly

Varden

1243

MOOSE

NO. 6

Dolly

Varden 100%

16.39161

Dolly

Varden

4265

MUTT

AND JEFF FRACTION

Dolly

Varden 100%

20.54905

Dolly

Varden

3826

NANCY

HANKS

Dolly

Varden 100%

17.85157

Contango Silver and Gold – Kitsault Valley Project Page 43 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Project

Name

Lot

Number

Claim

Name

Ownership

Area

(ha)

Dolly

Varden

3634

NORTH

STAR

Dolly

Varden 100%

8.52548

Dolly

Varden

4211

NORTH

STAR FRACTION

Dolly

Varden 100%

6.916129

Dolly

Varden

3615

PLUTUS

FRACTION

Dolly

Varden 100%

0.047709

Dolly

Varden

4067

PORTHES

Dolly

Varden 100%

10.32379

Dolly

Varden

3810

RED

POINT EXTENSION

Dolly

Varden 100%

18.60226

Dolly

Varden

3809

RED

POINT NO. 1

Dolly

Varden 100%

14.09369

Dolly

Varden

4210

RUBY

Dolly

Varden 100%

11.31651

Dolly

Varden

3816

SPORTSMAN

Dolly

Varden 100%

19.57567

Dolly

Varden

3818

SUNSET

NO. 1

Dolly

Varden 100%

4.640988

Dolly

Varden

3819

SUNSET

NO. 2

Dolly

Varden 100%

18.34724

Dolly

Varden

4335

SURPRISE

Dolly

Varden 100%

11.20392

Dolly

Varden

4336

SWIFTWATER

Dolly

Varden 100%

14.53467

Dolly

Varden

3614

TIGER

Dolly

Varden 100%

16.76311

Dolly

Varden

935

TORIC

Dolly

Varden 100%

11.78887

Dolly

Varden

4337

UIST

Dolly

Varden 100%

20.45016

Dolly

Varden

3795

WOLF

Dolly

Varden 100%

20.21308

Dolly

Varden

3794

WOLF

NO. 2

Dolly

Varden 100%

19.02368

Dolly

Varden

3796

WOLF

NO. 3

Dolly

Varden 100%

18.02279

Dolly

Varden

3797

WOLVERINE

Dolly

Varden 100%

14.86634

Homestake

Ridge

3979

HOMESTAKE

FRACTION

Homestake

100%

0.918

Homestake

Ridge

6322

MILLSITE

Homestake

100%

20.915

Homestake

Ridge

3978

HOMESTAKE

NO. 3

Homestake

100%

13.922

Homestake

Ridge

3977

HOMESTAKE

NO. 2

Homestake

100%

15.053

Homestake

Ridge

3980

HOMESTAKE

NO. 1 FRACTION

Homestake

100%

4.740

Homestake

Ridge

3976

HOMESTAKE

NO. 1

Homestake

100%

20.300

Homestake

Ridge

3975

HOMESTAKE

Homestake

100%

20.921

* from Musketeer option

Contango Silver and Gold – Kitsault Valley Project Page 44 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 3-1. Dolly Varden Property mineral

leases and Crown-granted mineral claims.

Contango Silver and Gold – Kitsault Valley Project Page 45 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 3-2. Dolly Varden Property mineral

tenures.

Contango Silver and Gold – Kitsault Valley Project Page 46 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Within the Crown grant list, 11 fee simple

Mining Lands exist with Mineral Land Tax notices paid annually (Table 3-4).

Table 3-4. Kitsault Valley Project 2026

Mineral Tax fee simple lots.

Dolly

Varden Silver

Mineral Land Tax

NOA for Tax Year 2026

Folio

Tax

/ utility account

Letter

ID

Amount

067105

MLT-1059-3149

L0111970976

129.11

067237

MLT-1056-6308

L0396053152

87.78

069337

MLT-1052-3957

L0690784928

132.31

069680

MLT-1057-2533

L1895697056

40.38

069892

MLT-1054-0829

L0672238240

95.58

069930

MLT-1056-8693

L1160284832

84.20

070041

MLT-1053-9338

L2062191264

134.11

070114

MLT-1053-2754

L1861487264

117.03

070866

MLT-1055-9707

L10559707

100.11

920.61

Homestake

Resource Corporation

Mineral Land Tax

NOA for Tax Year 2026

Folio

Tax

/ utility account

Letter

ID

Amount

070483

MLT-1052-5598

L1313147552

94.75

074845

MLT-1059-3186

L0383290016

–

94.75

Total

1015.36

3.2 Fee

Simple Service Lots

Dolly Varden Silver Corporation is the registered

owner of several fee simple surface lots in the village of Alice Arm (Figure 3-3). The exploration camp, geology offices and core storage

are located on the owned lots. Include in the Alice Arm lots is a water access frontage on the road to the Alice Arm dock facilities.

Annual municipal property taxes are due on these lots.

Contango Silver and Gold – Kitsault Valley Project Page 47 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 3-3. Dolly Varden fee simple surface

lots in Alice Arm.

Contango Silver and Gold – Kitsault Valley Project Page 48 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

3.3 Royalties

and Agreements

The Kitsault Valley Project is encumbered

with several royalty agreements covering separate yet contiguous portions of the property in the form of standard Net Smelter Return

(NSR) royalty agreements.

The Company entered into an NSR royalty

agreement on March 18, 2011 with 0897287 B.C. Ltd. in consideration of title transfer for the majority of the Property, except for

the “Musketeer Option” area as described below. By an agreement dated April 1, 2011, 0897287 B.C. Ltd. sold and assigned

the Royalty Rights to 0907105 B.C. Ltd. The Musketeer Option area is subject to a 2% NSR owed to 0907105 B.C. Ltd. of which one half

can be repurchased by the Company for CDN$1,000,000 at any time (Dolly Varden Silver Corp., 2019b; Higgs and Giroux, 2015).

The second NSR agreement is with Musketeer

Holdings et al. (“Musketeer”). The initial agreement was for the Company to acquire 100% interest in the Musketeer Crown

Grants (Figure 3-1) for a purchase price of CDN$1,050,000 payable over four years, subject to a 2% NSR to Musketeer. The Option Agreement

with Musketeer has been completed through aggregate option payments by the Company of CDN$350,000, CDN$233,333 in 2013 and 2014, respectively.

In 2015, the final two payments were renegotiated to defer CDN$100,000 until February 2018 plus a renegotiation fee of CDN$10,000

to be included with the 2015 payment (Dolly Varden Silver Corporation, 2015). The agreement was renegotiated again in February 2016

with CDN$81,000 plus a renegotiation fee of CDN$10,000 paid on February 12, 2016 (Dolly Varden Silver Corporation, 2016). The final

two payments of CDN$102,334 and CDN$100,000 were made in 2017 and 2018, respectively.

Upon completion of the Option Agreement

the Company entered into an NSR royalty agreement with Musketeer on May 16, 2018, for the 2% NSR royalty. On or before May 16,

2021, Dolly Varden can deliver notice to the NSR holders with the intent to re-purchase 50% of the 2% royalty for CDN $1,750,000. After

May 16, 2021, the NSR holders have no obligation to accept an offer to buy back 1% of the NSR.

The Coombes Claims, part of the original

Homestake claim block (including Cambria 1, Cambria 2, KW1, KW2, KW3, KW4, KW5, WK1, WK3, WK4, WK6 and WK7), are subject to a 2 percent

NSR royalty by virtue of an option agreement dated July 5, 2000. The royalty includes a purchase right in favour of the Company

for C$1,000,000.

The Homestake crown grants (including DL

3975, DL 3976, DL 3977, DL 3978, DL 3979, DL 3980, and DL 6322) are subject to a 2 percent NSR royalty which includes an annual advanced

minimum royalty of C$50,000 in favour of Alice Sullivan and Mildred Keller.

3.4 Environmental

Liabilities, Permitting and Significant Factors

Exploration Permits MX-1-860, MX-1-603,

MX-1-990, MX-1-784, MX-1868 and MX-1-189 are a 5-year Multi Year, Area Based (MYAB) application that is submitted either every 5 years

or if the allotted disturbance and activities have been reached. At the end of each year an Annual Summary of Exploration Activities

(AESA) is filed which states the area disturbed, the area reclaimed and other activities completed that year. These are subtracted from

the MYAB allowance, and the remaining allowances are calculated.

Contango Silver and Gold – Kitsault Valley Project Page 49 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

A Wildlife Management Plan and Archaeological

Overview Assessment (AOA) were amended in 2025 by ERM Consultants Canada Ltd. (ERM) over the Dolly Varden project and the Homestake Project.

The Wildlife Management Plan comprises protocols to address possible goat, bear and marbled murrelet encounters and outlines protected

areas in the region. No protected areas are located within the Dolly Varden Property, although there are protected areas along the fly

route to access the Property. The AOA includes a desktop study outlining high probability chance discovery areas and culturally modified

tree (CMT) high probability areas. The Company must take pre-cautions when planning drill programs near or within these areas. Both the

Wildlife Management Plan and AOA included a consultation with the Nisga’a Lisims Government. Earlier Dolly Varden versions of these

documents were prepared by ERM Consultants Canada Ltd. (2018a, 2018b).

Regarding environmental liabilities associated

with the Dolly Varden Property, a historic plant site and numerous historic workings and waste rock dump piles are located within the

permit area. The Ministry of Energy, Mines and Petroleum Resources is aware of these historic sites, and the Company has closed off access

to these sites as a safety pre-caution. No compounded tailings have been identified to exist from the 1949 to 1959 plant site. Furthermore,

acid rock drainage (ARD) testing has been conducted on water outflow locations within the Property and all results returned are within

acceptable levels.

Contango Silver and Gold – Kitsault Valley Project Page 50 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

4 ACCESSIBILITY,

CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY

This chapter describes access to the Kitsault

Valley Project (the Property), the physical setting and climate, and the regional availability of personnel and supplies. Historical

facilities are described as such; their current condition, capacity, ownership and suitability for future development have not been established

by engineering studies.

4.1 Accessibility

The Property is located near the central

west coast of British Columbia, approximately 27 km north of Alice Arm and 39 km southeast of Stewart. Primary access to the Property

is by helicopter from Alice Arm, Kitsault or Stewart. Dolly Varden personnel typically access the Property by helicopter from the Company’s

exploration camp at Alice Arm or from a staging point at kilometre 19 on the Kitsault River Road (Table 4-1, Figure 4-1).

Road access from Terrace to Kitsault is

via the Nisga’a Highway (Highway 113) and the Kitsault Mine Road, a reported total distance of approximately 167 km. Kitsault is located

on Alice Arm of Observatory Inlet. Marine transport by boat or barge is used to cross the inlet between Kitsault and Alice Arm. Alice

Arm and Kitsault may also be reached from Prince Rupert by privately contracted seaplane, boat or barge.

From Alice Arm, the Kitsault Valley Road

follows the Kitsault River along the alignment of the former railway constructed to service the Dolly Varden mine. The source reports

identify an old rail bed but do not identify an operating railway serving the Property. The current condition, ownership, maintenance

responsibility, bridge capacity and suitability of the historical road system for heavy or all-season traffic have not been established

in the source reports.

Table 4-1. Principal access and logistics

routes.

Mode

or Route

Source-Reported

Access

Current

Limitation or Qualification

Road

to Kitsault

Terrace

to Kitsault via Highway 113 and the Kitsault Mine Road; approximately 167 km.

Provides

regional road access to Kitsault, not direct all-season road access to the deposits.

Marine

Boat

or barge between Kitsault and Alice Arm; contracted marine access is also available from Prince Rupert.

Service

is privately contracted and is subject to marine and weather conditions.

Helicopter

Primary

Property access from Alice Arm, Kitsault or Stewart; routine staging from Alice Arm camp or kilometre 19.

Surface

exploration is helicopter supported and dependent on ceiling, visibility and weather.

Seaplane

Privately

contracted access to Alice Arm or Kitsault from Prince Rupert.

Seasonal

and weather dependent; no scheduled service is identified in the source reports.

Internal

road

Kitsault

Valley Road follows the Kitsault River and the former Dolly Varden railway alignment.

Road

and bridge condition and heavy-haul suitability require confirmation.

Surface exploration is generally conducted

from May through October, with the start and end of the field season adjusted for snow and weather. Snow cover, steep terrain and

variable flying conditions can restrict access to drill sites and other work areas.

Contango Silver and Gold – Kitsault Valley Project Page 51 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 4-1. Kitsault Valley Project regional

location and access.

Contango Silver and Gold – Kitsault Valley Project Page 52 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

4.2 Physiography,

Elevation and Vegetation

The Property is situated in the Coast Mountains

and is characterized by rugged, glaciated terrain. Elevations within the Property range from approximately 300 m to 1,300 m above sea

level. The Kitsault River flows south through the Property within a glacially formed U-shaped valley. The Homestake area deposits are

near the headwaters of the Kitsault River below the Homestake and Kitsault glaciers. Southward past the Wolf deposit and the Dolly Varden

area deposits, including Dolly Varden, Torbrit and North Star, the valley is deeply incised with steep forested slopes before opening

into a broader valley south of the Property.

The landscape includes steep slopes, narrow

valleys, ridgelines, cirques, hanging valleys, glacial till and moraines. Drainage is well developed and generally follows steep gradients

toward Alice Arm and the coastal fjord system. The Kitsault River is the principal drainage through the Property.

The Property lies within the Coastal Western

Hemlock biogeoclimatic zone and the wet submaritime subzone (Pojar et al., 1991). Lower and middle elevations are generally forested.

Reported tree species include western hemlock, Douglas-fir, spruce, western red cedar, mountain ash and cottonwood, with devil’s club,

huckleberry and blueberry common in the understorey. Vegetation grades to subalpine communities and then to alpine tundra, exposed rock,

permanent snow and ice at higher elevations.

Dense vegetation and glacial overburden

limit bedrock exposure at lower elevations. Outcrop is generally more abundant at higher elevations, where access may instead be constrained

by steep slopes, snow and ice. These conditions affect the seasonal timing and logistics of geological mapping, geophysical surveys and

drilling.

4.3 Climate

and Operating Season

The Property has a Coast Mountains climate

characterized by cool to mild, wet summers and cold, snowy winters. Turner and Hough (2023) cite Canadian Climate Normals 1981-2010 station

data published in 2018 and report the regional statistics summarized in Table 4-2. The source chapter does not identify the station name

or station elevation in the chapter text; the representativeness of these values across the Property’s approximately 1,000 m elevation

range should therefore be considered when using the data for design purposes.

Contango Silver and Gold – Kitsault Valley Project Page 53 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 4-2. Regional climate statistics

reported in the 2023 Technical Report.

Parameter

Reported

Value

Source

Context

Mean

annual temperature

5.6

degrees C

Canadian

Climate Normals 1981-2010 dataset cited by Turner and Hough (2023).

Reported

January average high

–8.7

degrees C

Value

reproduced from the 2023 technical report and should be checked against the underlying station record.

Reported

July average high

21.3

degrees C

Value

reproduced from the 2023 technical report.

September precipitation

117

mm

Reported

monthly average.

October precipitation

150

mm

Reported

monthly average and highest reported rainfall month.

January maximum

snow accumulation

Up

to 85 cm

Terminology

reproduced from the 2023 technical report.

Mean

annual precipitation

1,091.9

mm

Reported

annual average.

Precipitation increases during the autumn

and early winter, and persistent snow commonly restricts surface work outside the May-to-October field season. Helicopter-supported

work is also affected by cloud ceiling, visibility and rapidly changing mountain weather. The source reports do not establish that surface

exploration can be conducted year-round.

4.4 Local

Resources

The Company’s exploration camp is located

at Alice Arm on privately owned land leased by the Company. Food, fuel, equipment and general exploration supplies are mobilized through

the regional service centres of Prince Rupert, Terrace and Smithers and transported onward by road, marine vessel, aircraft or the historical

access road, depending on the destination and seasonal conditions. The source reports do not establish direct road delivery from Terrace

or Smithers to the Alice Arm camp without a marine transfer.

Prince Rupert, Terrace and Smithers are

full-service communities with established resource-sector businesses and access to food, fuel, equipment, contractors and general supplies.

Terrace and Smithers have regional airports with scheduled connections to Vancouver and Prince George, and the three communities are

connected to the provincial highway network. Helicopter, seaplane and marine services are available on a contract basis in northwestern

British Columbia.

The regional mining and exploration industry

provides an experienced labour and contractor base for exploration programs. The source reports consider field personnel and exploration

support services to be available from the regional centres. Project-specific requirements for construction and operations personnel,

accommodation, emergency response and long-term service capacity have not yet been defined.

4.5 Infrastructure

Existing infrastructure is principally exploration-related

or historical (Table 4-3). The Property contains historical surface and underground mine workings, access alignments and waste rock dumps

associated with the former Dolly Varden and Torbrit operations. Turner and Hough (2023) also identify a historical plant site. These

facilities should not be assumed to be operational or suitable for future development without condition assessments and engineering review.

Contango Silver and Gold – Kitsault Valley Project Page 54 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 4-3. Existing and required infrastructure.

Infrastructure

Source-Reported

Status

Qualification

or Future Requirement

Alice

Arm exploration camp

Company

exploration camp on privately owned land leased by the Company.

Supports

exploration activities; capacity and suitability for construction or operations are not established in the source reports.

Kitsault

Valley Road and former rail alignment

Historical

access follows the Kitsault River toward the Property.

Condition,

ownership, maintenance, bridge capacity and all-season heavy-haul suitability require confirmation.

Electrical

power

Connection

to the BC provincial grid is reported at Kitsault.

No

source evidence establishes an operating grid connection to the deposits; routing, voltage, capacity and required upgrades remain

to be determined.

Historical

hydroelectric facilities

A

historical dam and access road are reported near Kitsault Lake, with historical interconnections to BC Hydro.

Ownership,

operating status, water rights, capacity, condition and interconnection availability have not been established.

Water

The

Upper Kitsault River and Kitsault Lake have supplied or are available for exploration activities.

Exploration

use does not establish permitted supply, seasonal yield, water quality or suitability for future processing and domestic demand.

Historical

mine and plant areas

Historical

workings, a plant site and waste rock dumps are present; the 2023 report states that no impounded tailings were identified at the

1949-1959 plant site.

Safety,

geotechnical, geochemical and environmental conditions are addressed elsewhere in the TRS and require current verification.

Production

infrastructure

No

current mine, processing plant or production-scale site infrastructure is identified.

Potential

development would require engineered access, power distribution, water systems, camp and maintenance facilities, waste rock and tailings

management, communications and product transport systems.

Infrastructure concepts and requirements

for any future project will need to be developed and evaluated in appropriate engineering and economic studies.

Environmental liabilities, waste and tailings

management, water management, permitting and closure requirements are discussed in the applicable environmental section of the TRS.

Contango Silver and Gold – Kitsault Valley Project Page 55 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

5 HISTORY

5.1 Overview

and Sources

This chapter summarizes previous operations

and the type, amount, quantity, and general results of exploration and development work completed by previous owners and operators within

the area now comprising the Kitsault Valley Project. The Project consolidates the Dolly Varden and Homestake Ridge areas. For historical

continuity, those areas are discussed separately below; they are not treated as separate current projects.

The history has been compiled

principally from Garrow (2011), Higgs and Giroux (2015), Turner and Nicholls (2019), Macdonald and Rennie (2016), Ross and Chamois

(2017), Chamois et al. (2020) Hough et al. (2022), and Turner and Hough (2023), together with government and assessment-report

sources cited in those reports. Much of the early information is derived from secondary historical summaries and has not been

independently verified by the Qualified Persons.

Exploration completed by or on behalf of

Dolly Varden Silver Corporation and subsequent registrant entities is described in Chapter 7.

5.2 Dolly

Varden Area

5.2.1 Early Claim Staking,

Development, and Production (1910–1959)

The first recorded claim staking in the

Dolly Varden area occurred in 1910 with the location of the Red Point No. 1 copper-gold prospect. Claims covering silver occurrences

in the Dolly Varden mine area were staked in 1911. The Sportsman and North Star claims were staked in 1912 and 1914, respectively.

Prospecting, test pitting, and underground

drifting were completed during the following years. The Dolly Varden silver deposit entered production in 1919. Between 1919 and 1921,

the Dolly Varden and North Star mines reportedly produced approximately 1.305 Moz of silver from 36,000 short tons at an average historical

grade of 35.66 oz/short ton Ag (approximately 1,109 g/t Ag). The material was direct-shipped without beneficiation, principally to the

Granby Mines smelter at Anyox (Leigh and Thompson, 1981).

Torbrit Silver Mines Ltd. subsequently developed

and operated the Torbrit Mine. From 1949 to 1959, historical records report production of 18,706,847 oz of silver (approximately 18.7

Moz) and 10.8 million lb of lead. The same historical summaries report approximately 1,377,632 tonnes processed at an average grade of

466.3 g/t Ag and 0.38% Pb. Production was reported as a silver-lead concentrate and silver bullion.

Note: The historically

reported Torbrit tonnes and average silver grade imply approximately 20.65 Moz of contained silver and therefore do not arithmetically

reconcile with the reported 18.7 Moz of silver production. This may reflect recovery, concentrate accounting, rounding, conversion, or

inconsistent historical records. The figures are presented as separate historical production metrics and should be confirmed against

primary production records before final filing.

During Torbrit production, exploration and

development continued at North Star and Wolf, with lesser work at Moose-Lamb, Tiger, and Surprise. Three holes drilled at North Star

in 1957–1958 intersected a mineralized horizon; hole NS-17 reportedly returned 3.50 m grading 72.3 g/t Ag, 3.38% Pb, and 16.48%

Zn.

Contango Silver and Gold – Kitsault Valley Project Page 56 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

5.2.2 Exploration and Development

(1960–1990)

Sunshine Mining Company, while holding an

option on Dolly Varden Mines Ltd. interests, completed 310.9 m of drifting and crosscutting and 3,137.9 m of surface and underground

diamond drilling at Wolf in 1964. Dolly Varden Mines Ltd. completed an additional 97.5 m of percussion drilling at Wolf in 1968.

From 1969 to 1973, Dolly Varden Mines Ltd.

completed soil geochemistry over the Copper Belt on the west side of the Kitsault Valley and diamond drilling in several prospect areas.

Consultants working for Dolly Varden Minerals Inc. subsequently completed drilling and historical estimate work from 1979 to 1981. Geological

interpretations developed during the mid-1980s emphasized a possible volcanogenic origin for the Dolly Varden–North Star–Torbrit

mineralization and the importance of silver with associated zinc, lead, and copper.

Tecucomp Geological Inc., the predecessor

of Cambria Geosciences Inc., conducted mapping, geochemical sampling, and drilling on behalf of Dolly Varden Minerals Inc. in 1989 and

1990. The 1989 North Star program comprised six holes totalling 2,397 m; all six holes intersected the targeted mineralized horizon.

The 1990 program comprised 18 holes totalling 7,095.9 m across North Star, Dolly Varden, Torbrit, and the V Vein. Additional work at

Red Point during the 1989–1990 period included approximately 2,256 m of drilling. These programs tested a volcanogenic massive-sulphide

exploration model and improved understanding of stratigraphic and structural controls.

5.2.3 Exploration (1991–2010)

Available Mines Branch Notice of Work records

indicate that no material exploration was completed at the principal Dolly Varden, North Star, Red Point, and Torbrit areas from 1991

through 2009.

In 2010, Dolly Silver Corporation and Dolly

Varden Silver Ltd., a predecessor of Dolly Varden Silver Corporation, commissioned Geotech Ltd. to complete a helicopter-borne geophysical

survey using versatile time-domain electromagnetic (VTEM), gamma-ray spectrometry, and aeromagnetic methods. The survey comprised 941.7

line-km flown at 100 m line spacing and covered approximately 90% of the then-current claim block (Garrow, 2011). The survey provided

regional geophysical coverage for target identification and subsequent exploration planning.

Contango Silver and Gold – Kitsault Valley Project Page 57 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

5.2.4 Regional Prospects

Historical exploration completed at selected

regional prospects in the Dolly Varden area is summarized in Table 5-1.

Table 5-1. Summary of historical exploration

of regional prospects in the Dolly Varden area.

Prospect

Principal

period

Type

and amount of work

General

result

Ace-Galena

1951

and 1968

Historical

drilling reported as approximately 1,845 m.

Selected

historical results included 0.5 m at 12.8 oz/short ton Ag and 8.8 m at 6.0 oz/short ton Ag.

Kitsol

1918;

1969–1973

Early

trenching and underground work; three holes totalling approximately 505 m in 1972–1973.

Reported

drilling included up to 4.88 m at 380.57 g/t Ag; trench sampling included up to 4.11 m at 626.4 g/t Ag.

Chance

/ Victory

1918–1975

Trenching,

underground work, and approximately 1,893.4 m of historical drilling.

Work

outlined silver-bearing veins and several historical estimates; selected drill results included 15.2 m at 607.2 g/t Ag.

Moose-Climax

1916–1967

Trenching

and underground work; 22 holes totalling approximately 1,654 m in 1964 and 1967.

Selected

drilling included 2.44 m at 360.0 g/t Ag and 12.5 m at 257.14 g/t Ag.

Sault

1966–1990

Geological,

geochemical, and geophysical surveys; eight holes totalling 1,269.2 m, followed by approximately 992 m of additional drilling.

Work

tested a stratiform barite-realgar-celestite occurrence and associated Ag-Pb-Zn mineralization.

Contango Silver and Gold – Kitsault Valley Project Page 58 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

5.2.5 Summary of Principal

Previous Operators – Dolly Varden Area

The principal previous operators, work completed,

and general results for the Dolly Varden area are summarized in Table 5-2.

Table 5-2. Summary of principal previous

operators and work programs – Dolly Varden area.

Period

Owner

/ operator

Work

completed

General

result

1910–1921

Early

prospectors and Dolly Varden/North Star operators

Claim

staking, prospecting, pits, underground development, and production.

Dolly

Varden and North Star reportedly produced approximately 1.305 Moz Ag.

1949–1959

Torbrit

Silver Mines Ltd.

Underground

mine development, production, and exploration at Torbrit, North Star, Wolf, and nearby prospects.

Approximately

18.7 Moz Ag and 10.8 million lb Pb historically reported as produced.

1964–1968

Sunshine

Mining Company; Dolly Varden Mines Ltd.; Silver Butte Mines Ltd.

Underground

development and surface/underground drilling at Wolf and regional prospects.

Extended

and tested Wolf, Moose-Climax, and other mineralized occurrences.

1969–1981

Dolly

Varden Mines Ltd.; Dolly Varden Minerals Inc. and consultants

Geochemistry,

mapping, drilling, and historical estimate work.

Tested

principal deposits and regional prospects and reassessed historical mineralization.

1989–1990

Dolly

Varden Minerals Inc.; Tecucomp Geological Inc./Cambria Geosciences

Mapping,

geochemistry, and more than 9,000 m of reported drilling across major programs.

Intersected

mineralized horizons and advanced stratigraphic, structural, and volcanogenic massive-sulphide interpretations.

2010

Dolly

Silver Corporation and Dolly Varden Silver Ltd.

941.7

line-km helicopter-borne VTEM, radiometric, and magnetic survey.

Established

regional geophysical coverage for later exploration.

5.3 Homestake

Ridge Area

5.3.1 Early Exploration (1914–2000)

Claims in the Homestake group were first

staked between 1914 and 1917 and were bonded to the Mineral Claims Development Company (MCDC) in 1918. The company was reorganized as

Homestake Development in 1921. Limited surface and underground work followed, and portions of the claim group were granted Crown Grant

status in 1925. Subsequent early work included surface trenching, limited underground development, and seven short drill holes totalling

approximately 58.2 m on the Lucky Strike and Cascade claims.

Canex Aerial Exploration Ltd. completed

prospecting, geochemical sampling, electromagnetic surveying, and chip sampling in the Vanguard area in 1966. Amax Exploration examined

and extended the Vanguard work in 1967 but did not continue. Newmont Exploration of Canada Ltd. optioned the Wilberforce group in 1979

and completed magnetic and Max-Min geophysical surveys, mapping, trenching, 595 soil samples, and 82 rock samples before terminating

the option in 1980.

Contango Silver and Gold – Kitsault Valley Project Page 59 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Caulfield Resources Ltd. collected 102 soil

samples and completed 5.25 line-km of ground magnetic surveying in 1981. Cambria Resources Ltd. later completed mapping, lithogeochemical

sampling, trenching, and 4.3 line-km of induced-polarization and resistivity surveying. From 1989 to 1991, Noranda Exploration Company

Limited consolidated several claim groups, established a 44.3 km grid, completed magnetic and induced-polarization surveys and geological

mapping, collected 1,930 rock samples and 1,943 soil and silt samples, and drilled 12 holes totalling 1,450.05 m.

5.3.2 Teck, Bravo/Homestake

Resource, and Agnico Eagle (2000–2016)

Teck acquired interests in the Homestake

claim block in 2000 through option agreements and staking. From 2000 to 2002, Teck completed geological and geochemical surveys, trenching,

and 21 NQ diamond drill holes totalling 4,374.6 m. The program produced 618 core samples, 778 rock samples analyzed for multi-element

geochemistry and gold, and 31 whole-rock samples. The work tested a volcanogenic massive-sulphide exploration model.

Bravo Ventures Group optioned the Teck and

Crown Grant claims in 2003. Bravo was subsequently reorganized and renamed Homestake Resource Corporation on April 12, 2012. Eleven

confirmatory holes totalling 1,002.39 m were completed in 2003. The 2004 program included 313 soil samples, 39 rock samples, approximately

25 line-km of magnetic surveying, and mapping. Bravo completed 11 holes totalling 1,646.09 m in 2005 and 28 holes totalling approximately

6,488 m in 2006.

Homestake Resource continued systematic

drilling with 28 holes totalling 9,323 m in 2007; 42 holes totalling 8,724 m in 2008; 48 holes totalling 13,548 m in 2009; 48 holes totalling

18,083 m in 2010; and 23 holes totalling 7,366 m in 2011. Surface exploration from 2010 to 2012 included mapping, soil and rock sampling,

and 13.54 line-km of induced-polarization surveying. Three holes drilled in 2011 tested the South Reef target and all three reportedly

intersected intervals exceeding 30 g/t Au. Two phases of 2012 drilling further delineated the target over an interpreted area approximately

250 m by 250 m before the mineralized trend met or was offset by a major fault.

Agnico Eagle Mines Limited optioned the

claims in 2012. In 2013, Agnico Eagle completed mapping, 785 soil samples, approximately 21 line-km of induced-polarization/resistivity

and magnetic surveying, and ten holes totalling 3,947.24 m outside the Homestake Main and Homestake Silver deposits. In 2014, Agnico

Eagle completed reconnaissance work, 57 rock samples, and six holes totalling 2,578 m at the Slide Zone. The drilling supported an interpretation

that the Slide Zone is broadly concordant with the Homestake Main and Homestake Silver zones.

5.3.3 Auryn Resources and

Fury Gold Mines (2016–2021)

Auryn Resources Inc. acquired the Homestake

claims through its acquisition of Homestake Resource Corporation on September 7, 2016. Auryn completed mapping, rock and soil-talus

sampling, portable X-ray fluorescence and short-wave infrared surveys, induced-polarization surveying, relogging of historical core,

geochronological studies, airborne VTEM and magnetic surveying, and reprocessing of historical geophysical data.

The 2017 ground geophysical program comprised

17.5 line-km of pole-dipole induced-polarization surveying at 50 m dipole spacing. Data were integrated with the 2013 survey and used

to produce three-dimensional resistivity and chargeability models. The 2017 and 2019 surface programs collected 274 rock samples and

4,029 soil-talus samples. Five geochronology samples were also collected. These programs refined structural and geological interpretations

and identified geochemical anomalies around Homestake Main, Homestake Silver, South Reef, and regional targets.

Auryn completed 43 drill holes totalling

approximately 17,300 m in 2017, principally as step-outs along the Homestake Main and Homestake Silver structures. Selected gold-bearing

intervals were reported; however, the Homestake Main extension drilling was described as not returning significant results. No subsequent

drilling was reported from 2018 through 2021, although surface sampling and interpretive work continued, including the 2019 sampling

program summarized above.

Contango Silver and Gold – Kitsault Valley Project Page 60 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

On October 9, 2020, the Auryn reorganization

and acquisition of Eastmain Resources were completed, resulting in the formation of Fury Gold Mines Limited. Fury thereby became the

owner of the Homestake Ridge Project before its later sale to Dolly Varden.

5.3.4 Summary of Principal

Previous Operators — Homestake Ridge Area

The principal previous operators, work completed,

and general results for the Homestake Ridge area are summarized in Table 5-3.

Table 5-3. Summary of principal previous

operators and work programs – Homestake Ridge area.

Period

Owner

/ operator

Work

completed

General

result

1914–1967

Early

claimholders; MCDC/Homestake Development; Canex; Amax

Claim

staking, limited underground work, trenching, short drilling, prospecting, geochemistry, and electromagnetic surveying.

Established

early mineral occurrences and claim-group history.

1979–1991

Newmont;

Caulfield; Cambria; Noranda

Mapping,

trenching, geochemistry, magnetic/IP surveys, grid establishment, and 12 Noranda holes totalling 1,450.05 m.

Advanced

regional targeting and drill-tested the consolidated claim groups.

2000–2002

Teck

Geology,

geochemistry, trenching, and 21 holes totalling 4,374.6 m.

Tested

VMS-style targets and generated modern drill and geochemical data.

2003–2012

Bravo

Ventures / Homestake Resource

Systematic

surface work and more than 230 reported holes from 2003 through 2012.

Defined

and expanded Homestake Main, Homestake Silver, and South Reef mineralization.

2013–2014

Agnico

Eagle Mines Limited

Mapping,

soil and rock sampling, approximately 21 line-km geophysics, and 16 holes totalling 6,525.24 m.

Tested

regional and Slide Zone targets.

2016–2021

Auryn

Resources / Fury Gold Mines

Geophysics,

surface sampling, core relogging, geochronology, and 43 holes totalling approximately 17,300 m in 2017.

Refined

geological models and tested deposit extensions and regional targets.

5.4 Consolidation

of the Kitsault Valley Project

Dolly Varden announced the acquisition of

the Homestake Ridge Project from Fury Gold Mines in December 2021 and completed the transaction in February 2022. The transaction

consolidated the Dolly Varden and Homestake Ridge areas as the Kitsault Valley Project. Exploration completed by or on behalf of Dolly

Varden following consolidation, and other registrant exploration relevant to the current technical assessment, is presented in Chapter

7.

Current mineral tenure, ownership, agreements,

and encumbrances are described in Chapter 3. The historical claim-block names used in this chapter are retained only to identify the

location and operator associated with prior work.

Contango Silver and Gold – Kitsault Valley Project Page 61 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

5.5 Historical

Mineral Resource and Mineral Reserve Estimates

Note: The estimates

summarized in this section are historical estimates prepared before the effective date of this TRS. They have not been prepared or verified

as mineral resources or mineral reserves under Regulation S-K 1300, are not current estimates, and are not relied upon for the current

mineral resource estimate. Historical classifications are shown only as originally reported and must not be interpreted as S-K mineral-resource

or mineral-reserve classifications. The current mineral-resource estimate is presented in Chapter 11.

The historical estimates are included solely

to document the progression of previous technical work. They were prepared using different databases, cutoff grades, metal prices, estimation

methods, assumptions, and classification systems. The estimates should not be added together or directly compared with the current mineral-resource

estimate. Selected historical mineral estimates reported for deposits and prospects in the Dolly Varden area are summarized in the following

sections. The estimates retain the classifications and terminology used in the original sources and are not current S-K 1300 mineral-resource

estimates.

5.5.1 Dolly Varden Area Historical

Estimates

Table 5-4 presents the reported historical

mineral estimates for the Dolly Varden area.

Table 5-4. Historical mineral estimates

reported for the Dolly Varden area.

Deposit

Year

Historical

classification as

originally reported

Ag

cutoff

(g/t)

Tonnes

Ag

grade

(g/t)

Contained

Ag (oz)

Source

Dolly

Varden

1964

/ 1974

Proven &

Probable

171

42,638

754.3

1,034,000

Skerl

(1964); Mann (1974)

North

Star

1981

Proven &

Probable

137

128,437

401.5

1,657,867

Thompson &

Pearson (1981)

Torbrit

1983

Possible

171

786,531

312.0

7,889,700

Leigh &

Thompson (1983)

Wolf

No. 1

1981

Proven &

Probable

171

77,932

395.0

989,626

Thompson &

Pearson (1981)

Wolf

No. 2

1981

Proven &

Probable

171

218,512

285.9

2,008,839

Thompson &

Pearson (1981)

Wolf

No. 2

1981

Possible

171

100,295

279.4

901,031

Thompson &

Pearson (1981)

Last

Chance

1967

Possible

Not

reported

42,160

373.9

459,581

Mitchell

(1976)

Moose-Climax

1964

Possible

Not

reported

30,000

308.7

270,000

Mitchell

(1976)

Contango Silver and Gold – Kitsault Valley Project Page 62 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

5.5.2 Homestake Ridge Area

Historical Estimates

Historical estimates were prepared for Homestake

Main (HSM), Homestake Silver (HSS), and South Reef (SR) between 2006 and 2017 using reported gold-equivalent (AuEq) cutoffs. Because

the original source tables combine multiple classifications within some rows, Table 5-5 presents the reported tonnage and gold-equivalent

cutoff grade as separate entries by year, deposit, and historical classification.

Table 5-5. Homestake Ridge area historical

estimates – reported tonnage and gold-equivalent cutoff grade.

Year

Deposit

Historical

classification as originally reported

AuEq

cutoff (g/t)

Tonnes

(million)

2006

HSM

Inferred

0.5

11.90

2006

HSM

Inferred

5.0

1.30

2010

HSM

Indicated

3.0

0.89

2010

HSM

Inferred

3.0

1.14

2010

HSS

Inferred

3.0

1.20

2011

HSS

Inferred

3.0

2.90

2012

HSM

Indicated

2.0

0.60

2012

HSM

Inferred

2.0

2.03

2012

HSS

Inferred

2.0

4.40

2012

SR

Inferred

2.0

0.33

2017

HSM

Indicated

2.0

0.60

2017

HSM

Inferred

2.0

2.098

2017

HSS

Inferred

2.0

4.81

2017

SR

Inferred

2.0

0.337

The corresponding reported gold, silver,

and copper grades, together with source of each historical estimate are presented in Table 5-6.

Contango Silver and Gold – Kitsault Valley Project Page 63 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 5-6. Homestake Ridge area historical

estimates – reported metal grades and sources.

Year

Deposit

Au

grade (g/t)

Ag

grade (g/t)

Cu

grade (%)

Source

2006

HSM

2.36

15.0

0.11

Folk &

Makepeace (2007)

2006

HSM

10.61

38.3

0.37

Folk &

Makepeace (2007)

2010

HSM

6.69

47.2

0.15

Rennie

et al. (2010)

2010

HSM

5.02

50.9

0.25

Rennie

et al. (2010)

2010

HSS

4.25

158.0

0.02

Rennie

et al. (2010)

2011

HSS

3.69

123.4

Not

available

Rennie

(2011)

2012

HSM

6.40

48.3

0.31

Macdonald &

Rennie (2016)

2012

HSM

5.65

28.6

0.18

Macdonald &

Rennie (2016)

2012

HSS

2.85

130.4

0.03

Macdonald &

Rennie (2016)

2012

SR

13.04

3.6

0.04

Macdonald &

Rennie (2016)

2017

HSM

6.25

47.9

0.18

Ross &

Chamois (2017)

2017

HSM

5.53

28.0

0.30

Ross &

Chamois (2017)

2017

HSS

2.71

124.4

0.02

Ross &

Chamois (2017)

2017

SR

12.88

3.6

0.04

Ross &

Chamois (2017)

Contango Silver and Gold – Kitsault Valley Project Page 64 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

6 GEOLOGICAL

SETTING, MINERALIZATION, AND DEPOSIT models

This chapter describes the regional- and

property-scale geological setting of the Kitsault Valley Project, the material styles and zones of mineralization, and the deposit models

used to guide geological interpretation. The discussion is based on previous project reports and geological studies, including Garrow

(2011), Higgs and Giroux (2015), McCuaig and Sebert (2017), Ross and Chamois (2017), Atkinson and Gunson (2018), Turner and Nicholls

(2019), Hough et al. (2022), Turner and Hough (2023), and the regional work of Monger et al. (1982), Alldrick (1993), Lewis et al. (2001),

and Gagnon et al. (2012). Historical interpretations are identified where they require reconciliation with the current geological model.

6.1 Regional

Geology

The Kitsault Valley Project is located within

the Stikine Terrane (Stikinia) of the Intermontane Belt of the Canadian Cordillera (Figure. 6-1). Stikinia is an accreted island-arc

terrane that extends from southern Yukon to south-central British Columbia and is bounded by the Cache Creek Terrane to the east and

the Alexander Terrane to the west (Figure. 6-2). The project lies within the Stewart Complex, a northwest-trending metallogenic belt

that hosts precious-metal veins, porphyry, skarn, and volcanogenic massive sulphide occurrences and deposits (Monger et al., 1982; Alldrick,

1993; Gagnon et al., 2012).

The principal regional rock packages are

Upper Triassic volcanic and marine sedimentary rocks of the Stuhini Group; Lower to Middle Jurassic volcanic, volcaniclastic, sedimentary,

and intrusive rocks of the Hazelton Group; Middle to Upper Jurassic sedimentary rocks of the Bowser Lake Group; and Mesozoic to Cenozoic

intrusive rocks. The Hazelton Group records the transition from Early Jurassic arc volcanism to waning volcanism, subsidence, local rifting,

and basin development during the Early to Middle Jurassic. This transition created favourable volcanic, sedimentary, structural, and

hydrothermal environments for the mineralization recognized on the project.

Contango Silver and Gold – Kitsault Valley Project Page 65 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 6-1. Terrane setting of the Kitsault

Valley Project in the Canadian Cordillera.

Contango Silver and Gold – Kitsault Valley Project Page 66 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 6-2. Regional geology and location

of the Kitsault Valley Project.

Contango Silver and Gold – Kitsault Valley Project Page 67 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

6.1.1 Hazelton Group

The Hazelton Group is a compositionally

and environmentally diverse succession deposited in subaerial to subaqueous volcanic-arc and basin settings. Abrupt lateral facies changes,

interfingering volcanic and sedimentary units, growth faults, and later deformation complicate formation-level correlation. The Lower

Hazelton Group broadly comprises Early Jurassic intermediate to felsic arc volcanic and volcaniclastic rocks, including Betty Creek Formation-equivalent

units. The Upper Hazelton Group contains a greater proportion of sedimentary and tuffaceous strata deposited during regional subsidence

and extension, locally with continued intermediate, felsic, and mafic volcanism.

In the Kitsault area, hydrothermal activity

was focused by synvolcanic basin-bounding faults and cross-faults. These structures provided fluid pathways and localized volcanic centres,

brecciation, alteration, and mineralization. This setting is important to the interpretation of both stratiform/exhalative and structurally

controlled epithermal-style mineralization on the project.

6.1.2 Intrusive and Stuctural

Activity

Regional Mesozoic magmatism includes Late

Triassic Stikine plutonic-suite intrusions (approximately 228–221 Ma), Early Jurassic Texas Creek-suite intrusions (approximately

195–190 Ma), and Early to Middle Jurassic intrusions associated spatially and temporally with Hazelton Group volcanism and basin

development (Macdonald et al., 1996).

Two broad deformation periods are material

to the project interpretation. Early to Middle Jurassic synvolcanic extension and growth faulting influenced volcanic facies, basin architecture,

and hydrothermal fluid flow. Cretaceous contraction produced broad folds, thrust faults, cleavage, and structural repetition. Later faults

and dykes locally offset or overprint earlier stratigraphy, alteration, and mineralization.

6.2 Property

and Local Geology

The Kitsault Valley Project is underlain

principally by Stuhini, Hazelton, and Bowser Lake group rocks and associated intrusive rocks (Figure. 6-3). The known mineral deposits

occur mainly within Hazelton Group volcanic, volcaniclastic, sedimentary, and subvolcanic units. The Dolly Varden and Homestake claim

blocks occupy different parts of the regional stratigraphic and structural framework and are described separately below (Figure. 6-4).

Contango Silver and Gold – Kitsault Valley Project Page 68 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure

6-3. Property level geology and location of the Kitsault Valley Project.

Contango Silver and Gold – Kitsault Valley Project Page 69 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure

6-4. Simplified time-stratigraphic and mineralization column for the Dolly Varden area (modified from Higgs and Giroux [2015] and

Sebert [2013]).

6.2.1

Dolly Varden Claim Block

The oldest mapped

units are Upper Triassic Stuhini Group mafic volcanic rocks and marine sedimentary rocks. Mafic units include dark green pyroxene-bearing

basalt flows and breccias. Sedimentary rocks include thinly bedded silty argillite, fine-grained sandstone, siliceous siltstone, and

local silty limestone. Hazelton Group rocks unconformably overlie or are faulted against the Stuhini Group and host the principal silver-rich

deposits and prospects in the southern part of the project (Figure. 6-5).

Hazelton Group

volcanic and volcaniclastic rocks are dominated by subaqueously deposited and commonly reworked andesitic to dacitic tuffs, lapilli tuffs,

tuff breccias, volcanic sandstones, and conglomerates. Local felsic units occur in the footwall of the Wolf deposit and in the Sault

stratigraphy. Sedimentary intervals include black siltstone and argillite, argillaceous sandstone, conglomerate, fossiliferous calcareous

sandstone, and graphitic argillite. Lower Jurassic hornblende–feldspar-phyric subvolcanic intrusions occur locally and may be affected

by quartz–sericite–pyrite alteration.

The Dolly Varden

area is characterized by broad north- to northwest-trending folds and large north- to northwest-trending, generally west-dipping faults.

The Mitchell Creek fault lies west of the Dolly Varden deposit and Kitsol prospect and dips approximately 60° west. The Moose Lamb

fault lies east of Torbrit, strikes northwest, and dips west. Available geological evidence indicates that some structures were active

during Hazelton deposition and were reactivated or offset during later deformation. Northeast-trending faults, fractures, and dykes are

also important locally and are associated with mineralization at Wolf, Kitsol, and other prospects.

Contango Silver and Gold – Kitsault Valley Project Page 70 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 6-5. Property

geology of the Dolly Varden claim block.

6.2.2

Homestake Claim Block

The Homestake area

covers the transition from Upper Triassic to Lower Jurassic Stuhini Group sedimentary and volcanic rocks, through Lower to Middle Jurassic

Hazelton Group volcanic, volcaniclastic, sedimentary, and intrusive rocks, into Middle to Upper Jurassic Salmon River and Bowser Lake

sedimentary rocks (Figure. 6-6). The Hazelton succession records a transition from a volcanic-dominated lower stratigraphy through a

depositional hiatus into tuffs and sediments with bimodal volcanic components, followed by fine-grained basin sedimentation. Sulphide

occurrences and extensive alteration are concentrated in the Lower to Middle Jurassic stratigraphy.

Contango Silver and Gold – Kitsault Valley Project Page 71 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Geological mapping

and geophysical interpretation in the 2023 combined report defined four northwest-trending domains from southwest to northeast:

1. Domain

1 comprises Stuhini Group sedimentary and volcaniclastic rocks and fault panels of pervasively

altered Early Jurassic andesitic volcanic and volcaniclastic rocks. These rocks are intruded

and locally silicified by rhyolitic and porphyritic monzonite sills, dykes, and plugs.

2. Domain

2 comprises Early Jurassic Betty Creek andesite and dacite and Brucejack Lake-member rhyolitic

to monzonitic rocks. The western margin is structurally juxtaposed against Domain 1 and the

domain is unconformably overlain to the northwest by younger sedimentary rocks.

3. Domain

3 comprises varied Lower to Middle Jurassic Hazelton Group volcanic and volcaniclastic rocks.

Fine-grained to feldspar–hornblende-phyric andesitic to latitic/trachytic units, with

local hypabyssal monzonite, form the host and footwall sequences to Homestake Main, Homestake

Silver, and South Reef. The lower succession is capped locally by volcanic breccia, debris-flow,

tuffaceous, mudstone, and sandstone units and by maroon to green andesitic and dacitic volcaniclastic

rocks.

4. Domain

4 comprises Salmon River/Quock Formation and overlying Bowser Lake Group sedimentary rocks.

Fine-grained carbonaceous and sulphidic horizons can produce strong chargeability responses

and are locally affected by slip and shear zones. North-northwest- and northeast-trending

dykes crosscut the sedimentary succession.

Structure in the

Homestake area reflects multiple deformation events. Northwest-trending stratigraphic and fold fabrics are crosscut by north- and northeast-striking

faults and dykes. The Vanguard fault is a northwest-trending, approximately 60° southwest-dipping, northeast-verging structure characterized

locally by up to approximately 50 m of variably sheared quartz–sericite–pyrite-altered rock. Northwest-southeast normal faults

along the northeastern slopes of Homestake Ridge have been interpreted as basin-bounding structures active during Early to Middle Jurassic

volcanism. These structures are interpreted to have channelled mineralizing fluids, although their timing and displacement require confirmation

in the current model.

Contango Silver and Gold – Kitsault Valley Project Page 72 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 6-6. Property

geology of the Homestake claim block.

6.3 Mineralization

and Material Deposits

Mineralization

on the Kitsault Valley Project includes stratiform and stratabound exhalative silver–lead–zinc mineralization, reworked or

debris-flow mineralization, structurally controlled epithermal silver and gold mineralization, quartz–sericite–pyrite-associated

stockwork and breccia mineralization, and porphyry-style copper–gold mineralization at Big Bulk if that occurrence remains within

scope. Individual deposits may contain more than one style or record structural and hydrothermal overprinting.

6.3.1

Principal Mineralization Styles

· Exhalative

stratiform silica–sulphide mineralization containing variable quartz, chalcedony, barite,

carbonate, jasper, galena, sphalerite, pyrargyrite, and other silver-bearing minerals in

the Dolly Varden–Torbrit horizon at North Star and Torbrit.

· Exhalative

pyrite–sphalerite–galena–chert–carbonate mineralization at Sault

and in the upper Trout Horizon.

· Stratabound

infill and replacement silver-sulphosalt mineralization in the lower Trout Horizon.

Contango Silver and Gold – Kitsault Valley Project Page 73 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

· Quartz–silica–carbonate

± barite epithermal mineralization containing galena, sphalerite, pyrite, and lesser

tetrahedrite, pyrargyrite, argentite/acanthite, and native silver. Colloform to crustiform

banding, bladed carbonate or barite, hydrothermal brecciation, and late veining occur locally

at Wolf, Kitsol, and Dolly Varden.

· Quartz–sericite–pyrite-altered

zones with Cu–Ag ± Au in quartz-sulphide stockworks, veins, and hydrothermal

breccias, including local chalcopyrite, sphalerite, galena, and sulphosalts.

· Homestake

mineralization with both epithermal and volcanogenic characteristics, including stratabound,

replacement, vein, and hydrothermal-breccia styles associated with sericite–pyrite,

silica, carbonate, and chlorite alteration.

6.3.2

Deposit Summary

The mineral deposits

of the Kitsault Valley Project occur within Hazelton Group volcanic and volcaniclastic rocks and exhibit a range of stratabound, replacement,

vein, breccia, and epithermal mineralization styles. Deposit geometry and continuity are principally controlled by favourable stratigraphic

horizons, hydrothermal brecciation, veining, and northwest- to northeast-trending structures. The host setting, mineralization style,

and principal geological controls for each deposit are summarized in Table 6-1.

Table 6-1. Summary

of host setting, mineralization style, and principal geological controls by deposit, Kitsault Valley Project.

Deposit/zone

Host

setting

Style

Principal

controls

Dolly

Varden

Hazelton

volcanic/ volcaniclastic rocks; DVT horizon

Exhalative

silica–sulphide and structurally overprinted epithermal Ag

Stratigraphy,

brecciation, veins, faults

North

Star

Hazelton

rocks; DVT horizon

Silica–carbonate–sulphate–sulphide

Ag–Pb–Zn

Favourable

horizon; NE to NNE structures

Torbrit

Hazelton

rocks; DVT horizon

Barite-rich

stratabound infill, exhalative/debris-flow and vein Ag–Pb–Zn

Stratigraphy,

reworking, faults and veining

Wolf

Hazelton

volcanic/ volcaniclastic rocks

Structurally

hosted epithermal Ag

NE-trending

structure; veins and breccias

Homestake

Main

Lower

Hazelton feldspar–hornblende-phyric volcanic rocks

Silica

to silica–carbonate–chlorite lenses and hydrothermal breccias; Au–Ag–Cu

NW

strike; moderate NE dip; lenses/feeders

Homestake

Silver

Lower

Hazelton volcanic rocks

Steep

hydrothermal breccias and veins; Ag–Au–Pb–Zn

Parallel

NW-striking structural zones

South

Reef

Lower

Hazelton volcanic rocks

Quartz–chlorite–pyrite-associated

Au zones

Two

NW-striking, steep NE-dipping tabular zones

Contango Silver and Gold – Kitsault Valley Project Page 74 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

6.3.3

Dolly Varden-Area Deposits

Dolly Varden

Mineralization

at Dolly Varden includes silica–sulphide exhalative material and structurally controlled quartz–silica–carbonate mineralization

within Hazelton Group volcanic and volcaniclastic rocks. Reported minerals include pyrite, sphalerite, galena, pyrargyrite and other

silver minerals, with variable quartz, carbonate, and barite. Brecciation, open-space filling textures, and later veins record multiple

hydrothermal and structural events. (see Figure. 6-7 and Figure. 6-8).

North Star

North Star is associated

with the prospective Dolly Varden–Torbrit horizon and includes silica–carbonate–sulphate–sulphide mineralization

containing silver, sphalerite, galena, pyrite, and minor chalcopyrite in quartz–calcite–barite gangue. Sericite–pyrite

alteration is reported around the deposit, and northeast to north-northeast structures may influence geometry. The final description

should distinguish stratigraphic continuity from fault repetition and add verified current-model dimensions and depth extent.

Torbrit

Torbrit comprises

a combination of barite-rich semi-conformable pod-like stratabound infill, sheet-like veining, reworked debris-style mineralization,

and local stratiform lenses of thin-bedded barite and silica-rich exhalite. Mineralization includes silver minerals with sphalerite,

galena, pyrite, quartz, carbonate, barite, hematite, and jasper. The deposit is affected by large northwest-trending faults and local

structural repetition. The final TRS should provide current upper- and lower-zone geometry, true-thickness ranges, depth extent, and

continuity supported by the effective-date model.

Wolf and Kitsol

Wolf and Kitsol

are principally structurally hosted epithermal-style silver zones developed in northeast-trending structures. Mineralization occurs in

quartz–silica–carbonate ± barite veins, fissure fills, and breccias with galena, sphalerite, pyrite, and silver minerals.

Colloform to crustiform banding, bladed carbonate or barite, repeated hydrothermal brecciation, and later veining occur locally. Wolf

is a material deposit and requires verified current-model dimensions, depth extent, and continuity. Kitsol should be described at comparable

detail only if material to the updated TRS.

6.3.4

Homestake Deposits

The principal Homestake

deposits are Homestake Main, Homestake Silver, and South Reef. Mineralization displays both epithermal and volcanogenic characteristics

and includes Au, Ag, Cu, Pb, Zn, As, Sb, and locally Hg. Mineralization is spatially associated with Early Jurassic feldspar–hornblende-phyric

volcanic and subvolcanic rocks and commonly occurs within sericite–pyrite alteration. The deposits have been interpreted to show

vertical metal zonation from an upper Au–Ag-rich, relatively base-metal-poor association to an Ag-rich, base-metal-bearing association

over an approximate vertical interval of 250–350 m.

Homestake Main

Homestake Main

comprises northwest-striking, moderately northeast-dipping silica to silica–carbonate–chlorite-altered lenses and hydrothermal

breccias. Gold and silver mineralization occurs with pyrite, chalcopyrite, and lesser galena and sphalerite, principally within strongly

silicified or brecciated zones developed in sericite–pyrite-altered feldspar–hornblende-phyric volcanic rocks. Native gold,

pyrargyrite, and acanthite have been observed in quartz veins and quartz-carbonate hydrothermal breccias. The 2023 report described the

zone as approximately 700 m long, traced approximately 500 m down dip, and up to approximately 60 m in true width. Mineralization is

diffuse in places and the deposit may comprise faulted lenses with related steep feeders. These dimensions and the interpreted southeast

extension require update and QP confirmation.

Contango Silver and Gold – Kitsault Valley Project Page 75 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Homestake Silver

Homestake Silver

lies southeast of Homestake Main and comprises a cluster of parallel, northwest-trending, steeply dipping hydrothermal-breccia and structurally

controlled zones (see Figure 6-7 and Figure. 6-8). Mineralization is characterized by silver with galena and sphalerite and is generally

less copper-rich than Homestake Main. The 2023 model described an overall strike extent of approximately 700 m and down-dip extent of

approximately 550 m. Individual subzones strike approximately 140°, have near-vertical dips, and rarely exceed approximately 3 m

true thickness. The broader zone had been traced by drilling for approximately 600 m vertically and just under 800 m along strike. These

overlapping extent descriptions should be reconciled to the current model before finalization.

South Reef

South Reef is located

approximately 800 m south-southwest of Homestake Silver. Gold mineralization is associated with quartz–chlorite alteration, pyrite,

minor base-metal sulphides, and intervals of sericite–pyrite alteration. The 2023 report described two narrow, subparallel, tabular

zones striking approximately 120–130° and dipping approximately 70°–80° northeast. Reported thicknesses are approximately

1–3 m, with approximately 300 m of vertical and 400 m of strike extent. Characterization was considered preliminary because relatively

few holes intersected significant mineralization. The current model should update the geometry, continuity, and degree of uncertainty.

Contango Silver and Gold – Kitsault Valley Project Page 76 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 6-7. Locations

of the principal Kitsault Valley Project deposits.

Contango Silver and Gold – Kitsault Valley Project Page 77 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 6-8. Longitudinal

section along the Kitsault Valley trend showing the relative positions of the principal ore bodies.

6.4 Deposit

Models

The project is

not represented by a single deposit model. The current interpretation should integrate the observed stratigraphic, structural, mineralogical,

textural, alteration, and metal-zonation evidence and recognize that some zones may be transitional or overprinted. The models below

are exploration and interpretation frameworks and do not establish continuity or economic significance.

6.4.1

Exhalative and VMS-Related Model

Volcanogenic massive

sulphide (VMS) deposits form at or near the seafloor through focused hydrothermal-fluid discharge in submarine volcanic environments.

Typical deposits are stratabound, locally mound- or lens-shaped, and may overlie discordant stockwork or feeder zones with alteration

halos. The Dolly Varden–Torbrit horizon contains stratiform silica, sulphide, barite, carbonate, jasper, and related debris-flow

facies that support an exhalative or VMS-related component. Local reworking, replacement, faulting, and later veining complicate a simple

syngenetic interpretation (Figure 6-9).

Dolly Varden-area

deposits have been compared with precious-metal-rich hybrid bimodal-felsic/siliciclastic systems, including Eskay Creek-type models,

because they formed in Hazelton arc stratigraphy during waning volcanism, local basin development, and shallow subaqueous hydrothermal

activity. The comparison is useful where supported by stratiform mineralization, exhalative textures, epithermal-suite elements, synvolcanic

structures, and volcanic-sedimentary facies; it should not be presented as evidence that the project deposits are direct analogues of

Eskay Creek.

Contango Silver and Gold – Kitsault Valley Project Page 78 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 6-9. Conceptual

hybrid bimodal-felsic/siliciclastic mineralization model (after Galley et al., 2007).

6.4.2

Epithermal Model

Epithermal deposits

form at shallow crustal levels in volcanic and subvolcanic environments and occur as veins, fissure fills, stockworks, breccias, and

replacements. Wolf, Kitsol, and parts of Dolly Varden and Torbrit display features consistent with epithermal mineralization, including

open-space filling, colloform and crustiform banding, bladed gangue textures, hydrothermal brecciation, repeated sealing and veining,

and Ag–Pb–Zn–Sb–As mineral associations. The occurrence of both stratiform/exhalative and epithermal features

supports a transitional or overprinted hydrothermal system in parts of the project.

6.4.3

Homestake Hybrid Model

Homestake Main,

Homestake Silver, and South Reef contain stratabound, replacement, vein, and hydrothermal-breccia mineralization associated with Lower

Hazelton volcanic and subvolcanic rocks, sericite–pyrite alteration, synvolcanic basin structures, and later faults. The combination

of volcanic-hosted, structurally focused, and vertically zoned Au–Ag–base-metal mineralization supports a hybrid volcanogenic–epithermal

interpretation. The relative timing of intrusive activity, volcanism, alteration, mineralization, and fault reactivation remains an important

control and uncertainty.

Contango Silver and Gold – Kitsault Valley Project Page 79 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

7 EXPLORATION

7.1 Scope,

Attribution, and Source Basis

7.2 Exploration

Other Than Drilling

7.2.1

Dolly Varden Claim Block, 2010–2014

In 2010, Dolly

Silver Corporation and Dolly Varden Silver Ltd., predecessors of Dolly Varden Silver Corporation, commissioned Geotech Ltd. to complete

a helicopter-borne survey using versatile time-domain electromagnetic (VTEM), gamma-ray spectrometric, and aeromagnetic methods. Approximately

941.7 line-km were flown at 100 m line spacing, covering about 90% of the then property. A 694 line-km Z-axis tipper electromagnetic

(ZTEM) and magnetometer survey followed in 2012. Ground electromagnetic and induced-polarization (IP) surveys were completed over three

grids in 2014, together with downhole electromagnetic and IP surveys at the Dolly Varden deposit.

Geological mapping

in 2011 included surface and underground work at Wolf. The 2012 program included regional mapping at Moose Lamb, Red Point, Kitsol, and

Surprise and underground mapping at the Torbrit Mine. That work identified prospective growth faults at Moose Lamb and in the Tiger–Evindsen

area and documented intense hydrothermal alteration at Red Point. Surface and underground mapping continued at Torbrit in 2013, and property-scale

structural and lithological mapping in 2014 supported regional drill targeting.

Between 2011 and

2014, 804 rock samples, 2,412 soil samples, and 36 silt samples were collected. These datasets provided geochemical context for deposit-area

and regional targets. Because individual grab, chip, and soil samples are selective and may not be representative of average grades,

they are used as targeting information rather than as estimates of mineralized width or grade.

7.2.2

Dolly Varden Claim Block, 2010–2014

In 2010, Dolly

Silver Corporation and Dolly Varden Silver Ltd., predecessors of Dolly Varden Silver Corporation, commissioned Geotech Ltd. to complete

a helicopter-borne survey using versatile time-domain electromagnetic (VTEM), gamma-ray spectrometric, and aeromagnetic methods. Approximately

941.7 line-km were flown at 100 m line spacing, covering about 90% of the then property. A 694 line-km Z-axis tipper electromagnetic

(ZTEM) and magnetometer survey followed in 2012. Ground electromagnetic and induced-polarization (IP) surveys were completed over three

grids in 2014, together with downhole electromagnetic and IP surveys at the Dolly Varden deposit.

Geological mapping

in 2011 included surface and underground work at Wolf. The 2012 program included regional mapping at Moose Lamb, Red Point, Kitsol, and

Surprise and underground mapping at the Torbrit Mine. That work identified prospective growth faults at Moose Lamb and in the Tiger–Evindsen

area and documented intense hydrothermal alteration at Red Point. Surface and underground mapping continued at Torbrit in 2013, and property-scale

structural and lithological mapping in 2014 supported regional drill targeting.

Between 2011 and

2014, 804 rock samples, 2,412 soil samples, and 36 silt samples were collected. These datasets provided geochemical context for deposit-area

and regional targets. Because individual grab, chip, and soil samples are selective and may not be representative of average grades,

they are used as targeting information rather than as estimates of mineralized width or grade.

Contango Silver and Gold – Kitsault Valley Project Page 80 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

7.2.3

Dolly Varden Claim Block, 2015–2018

In 2015, structural

and lithological examinations were completed underground at the Torbrit and North Star mines and on surface at Musketeer, Ace–Galena,

and Kitsol. In 2016, mapping focused on Summit Ridge, Ace–Galena–Trout, Chance Creek, the Trout hanging-wall, the northeast

sediment–volcanic contact, and Medallion. Lithogeochemical sampling accompanied the mapping: 254 rock samples were collected in

2015 and 242 in 2016. More reconnaissance-oriented mapping and sampling in 2017 and 2018 produced 235 and 229 rock samples, respectively.

Geological observations without analytical samples were recorded at 370 geostations in 2015, 121 in 2016, 233 in 2017, and 216 in 2018.

The 2015 soil program

collected 1,810 samples over Wolf, Silver Horde, Chance, and Ace–Galena–Trout. Most samples were collected at 25 m spacing

on lines 100 m apart. Silver, lead, zinc, antimony, and barium anomalies outlined the Wolf–Silver Horde corridor and an anomaly

extending northeast toward Ace–Galena–Trout; copper responses generally coincided with a lithological change along the eastern

grid margin. Gold responses were less coherent. A ten-sample portable-XRF orientation line at Ace–Galena in 2016 returned weak

to moderate relative copper and zinc responses. Portable-XRF results are semi-quantitative and were used only for relative pattern recognition.

In early 2017,

Geotech Ltd., CW Geophysics Inc., and Dolly Varden re-evaluated the 2010 VTEM and 2011/2012-era ZTEM datasets. The study concluded that

the principal lead–zinc-rich, copper-poor VMS-style mineralization was not readily distinguishable in the VTEM response, while

ZTEM resistivity patterns more clearly outlined broad high-resistivity regions around known deposits. Rugged topography and variable

flight height were identified as limitations on the controlled-source survey response. The data remain useful for regional geological

and alteration interpretation but are not treated as direct ore detectors.

McElhanney Consulting

Services Ltd. completed a LiDAR survey over the Dolly Varden claim block on August 7, 2017 using an Optech Galaxy system mounted

on a Piper Navajo fixed-wing aircraft (Figure 7-1). The reported ground resolution was approximately 25 cm. The resulting terrain model

supports topographic control, geological mapping, collar planning, and surface interpretation.

Contango Silver and Gold – Kitsault Valley Project Page 81 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 7-1. LiDAR

coverage over the Dolly Varden claim block, 2017.

Contango Silver and Gold – Kitsault Valley Project Page 82 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

7.2.4

Dolly Varden Claim Block, 2019–2022

Rock sampling was

completed in 2019, 2020, and 2022; no rock sampling was reported in 2021. Three samples were collected in 2019 at Goldbelt and Fisher/Silver

Tip. Seventeen samples were collected in 2020 at Red Point, Goldbelt/Starlight–Racehorse, and Surprise. Twenty-nine samples were

collected in 2022 at Kitsol, Red Point, Starlight, Surprise, V-Vein, and the 44 Zone. The 2022 program also recorded 96 geostations.

Results confirmed localized precious- and base-metal-bearing veins and alteration at several targets, but selective rock samples are

not necessarily representative of target-scale grade.

Lithogeochemical

sampling was used to characterize lithology and alteration. The programs collected 184 samples in 2019, five in 2020, none in 2021, and

seven in 2022. The 2023 technical report stated that integration and interpretation of the combined dataset remained in progress. These

data should therefore be used as supporting vectors together with mapped geology and drilling rather than as a stand-alone target ranking.

7.2.5

Homestake Claim Block, 2017–2019

Auryn Resources

completed integrated mapping, geochemical sampling, portable-XRF and shortwave-infrared (SWIR) surveys, IP, historical-core relogging,

geochronology, and airborne geophysics across the Homestake claim block. These legacy datasets are material because they informed the

geological models and targets subsequently inherited by Dolly Varden.

A total of 274

channel, chip, and grab rock samples were collected during the 2017 and 2019 programs. Sampling tested gossanous ridges north of Homestake

Main, historical occurrences around Homestake Main and South Reef, and newly exposed areas at Kombi. The programs returned anomalous

precious- and base-metal values at Kombi, Bria, and KNHSR. Sample selection was based on favourable lithology or visible mineralization;

therefore, the results indicate prospectivity but are not representative of average grade.

The 2017 and 2019

soil programs collected 1,032 Ah-horizon samples and 2,997 B-, C-, and talus-fines samples. Ah-horizon sampling was used to test for

responses through younger cover southeast of Homestake. Talus-fines samples were composited along 10 m sections, field screened, and

supported by inserted standards and duplicates. B-horizon samples were collected from test pits, screened to remove coarse material,

documented digitally, and also supported by standards and duplicates. The results outlined anomalies interpreted as possible extensions

of Homestake Silver and South Reef and identified regional precious- and base-metal anomalies at Bria, Kombi, and KNHSR.

In 2017, 17.5 line-km

of pole–dipole IP surveying were completed at 50 m dipole spacing. The new data were combined with the 2013 IP survey, and resistivity

and chargeability depth slices were incorporated into three-dimensional inversion models. The inversions, together with drill logging,

supported interpretation of an extensional structural setting and graben geometry.

A historical-core

relogging program captured alteration, brecciation, faulting, sulphide, and SWIR mineral data not consistently recorded in the original

logs. Features associated with mineralization included strong texturally destructive silicification, elevated sulphide content, hematite,

hydrothermal chlorite, multi-phase brecciation, high-crystallinity kaolinite and sericite, higher-wavelength white mica, and Mg-rich

chlorite. The relogging supported a model in which faults bound down-dropped blocks and acted as mineralizing conduits.

Five geochronology

samples were analyzed using U–Pb zircon, Ar–Ar step-heating, and galena Pb-isotope methods to constrain intrusive, volcanic,

cooling, and mineralization ages. Geotech Ltd. also completed a 574 line-km VTEM and magnetic survey over two Homestake blocks, using

50 m traverse lines and 500 m tie lines. Computational Geosciences Inc. produced individual and joint inversions integrating AeroTEM

2009, VTEM 2010, ZTEM 2012, and VTEM 2019 datasets. The inversions helped define NNE- and NNW-trending regional structures and refine

intrusive-body geometry, particularly at Kombi.

Contango Silver and Gold – Kitsault Valley Project Page 83 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

7.2.6

Consolidated 2022 Mapping, Sampling, and Terrain Data

On the Homestake

claim block, the 2022 program collected 119 rock samples from historical workings, trenches, waste piles, and outcrop at Vanguard, Homestake

Camp, Old Homestake Camp, Rambler, and other target areas, and recorded 502 geostations. Forty-four additional samples were submitted

for whole-rock geochemical analysis to characterize lithologies and alteration at the main Homestake area and East Valley. As reported

in the 2023 technical report, final lithogeochemical interpretation remained pending.

McElhanney Ltd.

acquired LiDAR and aerial photography over the Homestake area and southern Kitsault Valley on July 27–28, 2022 using a Leica

TerrainMapper-2 mounted on a Piper Navajo fixed-wing aircraft (Figure 7-2). Integration with the 2017 Dolly Varden dataset provided near-continuous

high-resolution terrain coverage across the consolidated project and supports survey control, geomorphological interpretation, access

planning, and drill-site design.

Contango Silver and Gold – Kitsault Valley Project Page 84 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 7-2. LiDAR

coverage over the Homestake claim block and southern Kitsault Valley, 2022.

Contango Silver and Gold – Kitsault Valley Project Page 85 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

7.3 Drilling

Methods and Factors Affecting Reliability

7.3.1

Dolly Varden Drilling

Diamond drilling

is the principal subsurface exploration method. For the 2014 program, NQ core was processed at TerraLogic Exploration’s Alice Arm

facility. Logging included magnetic susceptibility, portable XRF, gamma-ray spectrometry, and HALO optical spectroscopy. Potassium responses,

checked intermittently by whole-rock analysis, were used to outline broad alteration envelopes around epithermal systems.

For the 2015–2018

programs, drill-site inspections were completed under the supervision of Dolly Varden or TerraLogic geologists. Core placement and depth

blocks were checked before boxes were transported by helicopter to the secure logging facility. Whole-core procedures included conversion

to metric depth, metre marking, recovery measurement, box identification, and digital capture. Geological logs recorded lithology, alteration,

brecciation, mineralization, structure, shearing, and veining. Core was photographed before sampling. Sample intervals were selected

by a project geologist; a technician visually selected the cutting line to provide comparable halves, and half core was cut with a diamond

saw. Detailed preparation, analytical, and QA/QC procedures are addressed in Chapter 8.

The 2019 technical

report states that post-2015 collars were surveyed by differential GPS, downhole surveys were collected in all drillholes, and geological

and geotechnical logs were subject to repeated validation and consistency checks. Oriented core was used in all 2020 drillholes and informed

later structural and true-width interpretations. The source reports do not provide a single consolidated table of contractor, rig, core

diameter, orientation tool, downhole instrument, and survey frequency for every Dolly Varden program; those fields should be confirmed

from annual drill logs for the current TRS.

7.3.2

Homestake Drilling

Historical Homestake

logging protocols were generally consistent after 2003. Quick logs recorded lithology, alteration, mineralogy, and significant structures.

Detailed logs recorded lithology, mineralization, alteration intensity, vein mineralogy and abundance, brecciation, fracture intensity,

faults, contacts, bedding, cleavage, and veins relative to the core axis. Geotechnical logging included recovery, rock-quality designation

(RQD), and occasional specific gravity. The 2022 Homestake technical report characterized core recovery as generally very good and concluded

that no drilling, sampling, or recovery factors materially affected accuracy or reliability.

Early collars were

positioned with handheld GPS and chain-and-compass ties from known control. Early downhole control relied on acid dip tests. Beginning

in 2006, RANGER Single Shot surveys were collected at approximately 30–60 m intervals; a RANGER Explorer Multi-shot tool was used

in 2010–2012. Collar elevations were checked against surface topography; isolated elevation discrepancies identified in three holes

were considered immaterial to the then-current resource estimate.

Auryn’s 2017

and 2018 drilling was contracted to Cyr Drilling International Ltd. using helicopter-portable Zinex A-5 hydraulic drills producing NQ2

core. Drill-pad positions were marked by handheld GPS; an Azimuth Aligner and inclinometer established initial azimuth and dip. DeviShot

single-shot readings were taken initially approximately 6 m beyond casing and nominally every 50 m thereafter. Completed collars were

surveyed by differential GPS. Core was sealed in wooden boxes, transported by helicopter to camp, checked and reconstructed in a secure

facility, geotechnically logged in 3 m runs for recovery, RQD, and magnetic susceptibility, descriptively logged for geology and mineralization,

measured by TerraSpec Halo at 3 m intervals, digitally captured, and photographed wet and dry before sampling.

Contango Silver and Gold – Kitsault Valley Project Page 86 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

7.3.3

Hole Closure, Core Transport, and Storage

The 2018–2025

working draft states that casing is pulled following completion and the hole is marked. Where a completed hole produces water, the draft

specifies cementing the hole. The final TRS should confirm that hole closure complied with the applicable authorization and that any

exceptions are documented in the drill record.

The working draft

reports that Dolly Varden core from 2017–2025 and Homestake core from 2022–2025 is cross-stacked on private lots in Alice

Arm. Dolly Varden core from 2011–2016 is reported to be stored in a warehouse on Bornite Road outside Terrace. Historical Homestake

and Auryn-era core is reported to be stored in a warehouse in Smithers. The draft contains an apparent year inconsistency in its description

of the Auryn core; the inventory and storage locations should be verified before filing.

7.3.4

Interval Widths, Recovery, and Other Limitations

Reported drill

intervals are not interchangeable. The source reports variously provide core length, downhole length, true width calculated from sections,

or estimated true width based on interpreted geometry and oriented-core data. At Torbrit, reported true-width factors commonly range

from about 80% to 95% of core length, although individual 2022 Kitsol and Torbrit intervals range more widely depending on intersection

angle. Homestake Main and Homestake Silver true widths were reported as generally 80% to 90% of core length. True width cannot be assigned

reliably where mineralized geometry is insufficiently constrained.

Known factors requiring

explicit treatment include intersections of historical underground workings, holes lost before reaching target, variable historical survey

methods, isolated collar-elevation discrepancies, and changing geological models. These conditions do not automatically invalidate the

affected data; they require hole-specific treatment in the database and resource workflow. Detailed database validation is addressed

in Chapter 9.

7.4 Drilling

— Dolly Varden, 2011–2018

Dolly Varden and

its predecessor entities completed 205 diamond drillholes totalling approximately 63,883.57 m from 2011 through 2018 (Table 7-1). Program

objectives progressed from verification and extension of known deposits to property-scale targeting, discovery drilling, and resource

delineation.

Contango Silver and Gold – Kitsault Valley Project Page 87 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 7-1. Summary

of Dolly Varden drilling, 2011–2018.

Year

Area/target

Holes

Metres

Program

emphasis

2011

Wolf

21

4,607.36

Verified

grades and widths; tested down-dip and northern extensions.

2012

Dolly

Varden–Torbrit horizon

6

1,728.21

Tested

down-dip and strike extensions.

2013

Torbrit

14

3,069

Infill,

verification, and step-out drilling.

2014

Six

property-scale targets

12

5,280

Tested

Ag–Au targets, prospective contacts, and alteration systems.

2015

Ace–Galena,

Kitsol, sediment target

10

2,037

Tested

geochemical, vein, structural, and stratigraphic targets.

2016

Torbrit,

Ace–Galena, Chance

13

2,312

Tested

deposit extensions and Pb–Zn–Ag mineralization.

2017

Dolly

Varden claim block

45

15,715.8

Deposit

verification plus regional reconnaissance; four new targets identified.

2018

Dolly

Varden claim block

84

29,134.20

Deposit

delineation/verification plus regional alteration targets.

Total

Dolly

Varden, 2011–2018

205

63,883.57

Subtotal

reconciled to the 2023 technical report and current working chapter.

The 2011 program

at Wolf verified down-dip continuity of the central mineralized zone and identified additional mineralization along the northern extension.

The 2012 drilling tested the Dolly Varden–Torbrit mineralized horizon; the source cautions that composites may exclude internal

weakly mineralized intervals and that true widths were interpreted from sections. In 2013, all fourteen holes intersected the Torbrit

horizon, with mineralization expressed as veins, banded zones and breccias, and carbonate–quartz–barite replacement. True

widths were not estimated for the reported 2013 intervals.

The 2014 program

tested Torbrit, Torbrit Northwest, Red Point, Musketeer North, Kitsol, and Wolf. Moderately anomalous to high-grade silver was intersected

at all target areas, including a high-grade Kitsol intersection in DV14010. The 2015 and 2016 programs tested Ace–Galena, Kitsol,

Chance, and Torbrit; the Chance holes in 2016 did not return significant mineralization, an outcome relevant to target ranking. The 2017

program identified Moose–Lamb, Torbrit North, Torbrit East, and Beginner’s Luck as new or materially advanced targets. The

2018 program emphasized resource delineation and confirmed high-grade mineralization at Torbrit, Torbrit East, Moose–Lamb, Kitsol,

and Dolly Varden.

Representative

drilling results are presented in Table 7-2. The complete program tables in the source technical reports include additional mineralized

and non-mineralized holes. The omission of those holes from this chapter does not imply that they were excluded from geological interpretation

or resource estimation.

Contango Silver and Gold – Kitsault Valley Project Page 88 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 7-2. Selected

representative drilling results, Dolly Varden, 2011–2018.

Year

Hole

Target

Reported

interval

Grade

Selection

rationale

2011

WS11-107

Wolf

No. 2 vein

15.20

m core / 10.05 m true

595

g/t Ag

Verified

a broad high-grade vein interval.

2012

DV12-4

DV–Torbrit

horizon

5.55

m core / 5.30 m true

536

g/t Ag

Confirmed

mineralization in the tested horizon.

2013

TB13-03

Torbrit

17.10

m core; true width not estimated

509

g/t Ag

Representative

broad Torbrit intersection.

2014

DV14010

Kitsol

23.14

m reported true width

712.19

g/t Ag

Demonstrated

high-grade Kitsol vein mineralization.

2015

DV15019

Ace–Galena

3.15

m core; low angle to core axis

591

g/t Ag

High-grade

result with geometry caution.

2016

DV16035

Torbrit

19.40

m core; true width not stated

485.04

g/t Ag

Extended

multi-zone Torbrit mineralization.

2017

DV17063

Torbrit

North

22.74

m core / 21.37 m true

433.3

g/t Ag

Advanced

a new Torbrit North target.

2018

DV18163

Torbrit

75.45

m core / 65.34 m true

418.9

g/t Ag

Representative

resource-delineation intersection.

7.5 Drilling

— 2019–2022

Table 7-3 presents

a summary of all drilling at the Kitsault Valle Project between 2019 and 2022.

Table 7-3. Summary

of Kitsault Valley Project drilling, 2019–2022.

Year

Claim

block

Holes

Metres

Program

emphasis

2019

Dolly

Varden

44

11,863.5

Twelve

targets; reconnaissance, confirmation, strike and depth continuity.

2020

Dolly

Varden

40

11,396.6

19

Torbrit infill/step-out holes and 21 regional holes; oriented core.

2021

Dolly

Varden

31

10,506.7

21

Torbrit/Kitsol-area holes and 10 regional reconnaissance holes.

2022

Dolly

Varden

52

18,614.15

Torbrit/Kitsol

infill and step-out; Wolf and Red Point exploration.

2022

Homestake

56

18,448.1

Homestake

Main and Homestake Silver infill and extension drilling.

7.5.1

2019 Program

The 2019 program

completed 44 holes totalling 11,863.5 m at twelve Dolly Varden targets. Most holes were reconnaissance tests within the potassic-alteration

belt north of the resource areas and were designed to confirm historical results and test lateral and depth continuity. Chance, Silver

Horde, McKay, Beginner’s Luck, and Kitsol South returned results considered to warrant follow-up. At Chance, DV19-165 intersected

26.5 m core length averaging 385.4 g/t Ag, including 9.0 m averaging 968.2 g/t Ag; estimated true widths were 24.9 m and 8.46 m, respectively.

Contango Silver and Gold – Kitsault Valley Project Page 89 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

7.5.2

2020 Program

The 2020 program

completed 40 holes totalling 11,396.6 m. Nineteen holes tested Torbrit by infill and step-out drilling, and 21 tested regional targets.

Oriented core was used in all holes. Representative Torbrit results include DV20-222, with 6.00 m core length averaging 310 g/t Ag; DV20-244,

with 45.82 m averaging 304 g/t Ag; and DV20-246, with 5.10 m averaging 306 g/t Ag. The source estimated true widths at Torbrit as approximately

80%–95% of reported core length. The drilling refined the interpreted vertical extent and internal high-grade lenses, but individual

intersections are not substitutes for the three-dimensional model.

7.5.3

2021 Program

The 2021 program

completed 31 holes totalling 10,506.7 m. Twenty-one holes tested Torbrit, Kitsol, and related extensions; ten reconnaissance holes tested

Medallion, Red Point, Syndicate, Silver Horde, and Wolf. At Kitsol, DV21-274 returned 15.28 m core length averaging 354 g/t Ag, including

3.70 m averaging 705 g/t Ag; reported true widths were 12.28 m and 2.97 m. DV21-275 returned 23.88 m core length averaging 220 g/t Ag,

with a reported true width of 18.27 m, and a separate 0.70 m core interval averaging 1,220 g/t Ag in the Torbrit extension. No significant

results were reported from Medallion; including this outcome avoids selection bias in the program narrative.

7.5.4

2022 Program — Dolly Varden

Fifty-two holes

totalling 18,614.15 m tested Torbrit/Kitsol, Wolf, and Red Point. At Kitsol, DV22-283 intersected 50.18 m core length averaging 414 g/t

Ag (30.11 m reported true width), including multiple higher-grade zones. At Wolf, wide-spaced drilling tested the southwest extension

beneath younger sedimentary cover; most holes intersected the interpreted vein system. At Red Point, three holes tested an IP chargeability

anomaly and the depth extent of gold-bearing veins. All three intersected strong quartz–pyrite–sericite alteration and stockwork

veining, with higher gold and copper grades where veining and brecciation intensified.

7.5.5

2022 Program — Homestake

Fifty-six holes

totalling 18,448.1 m tested Homestake Main and Homestake Silver through infill and extension drilling. The 2023 report interpreted the

Homestake Main results as supporting more continuous higher-grade lenses than indicated by earlier drilling and identified additional

down-dip targets. At Homestake Silver, infill and step-out drilling returned mineralization consistent with the established interpretation.

Representative reported results include HR22-328, with 9.16 m core length averaging 27.44 g/t Au and 463 g/t Ag, and HR22-362, with 2.50 m

core length averaging 0.81 g/t Au and 1,252 g/t Ag (Table 7-4). Estimated true widths were generally reported as 80–90% of core

length.

Contango Silver and Gold – Kitsault Valley Project Page 90 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 7-4. Selected

representative drilling results, 2019–2022.

Year

Hole

Target

Reported

interval

Grade

Selection

rationale

2019

DV19-165

Chance

26.50

m core / 24.90 m est. true

385.4

g/t Ag

Material

reconnaissance discovery/follow-up target.

2020

DV20-244

Torbrit

45.82

m core; 80–95% est. true

304

g/t Ag

Broad

infill/step-out result used to refine geometry.

2021

DV21-274

Kitsol

15.28

m core / 12.28 m true

354

g/t Ag

Representative

Kitsol infill and extension result.

2022

DV22-283

Kitsol

50.18

m core / 30.11 m true

414

g/t Ag

Broad

multi-zone Kitsol intersection.

2022

DV22-300

Wolf

19.85

m core / 13.90 m approx. true

584

g/t Ag

Material

southwest extension below cover.

2022

DV22-321

Red

Point

49.0

m core; 75–90% est. true

0.59

g/t Au,

13 g/t Ag

Broad

altered interval testing IP target.

2022

HR22-328

Homestake

Main

9.16

m core; 80–90% est. true

27.44

g/t Au, 463 g/t Ag

Representative

high-grade Main-zone result.

2022

HR22-362

Homestake

Silver

2.50

m core; 80–90% est. true

0.81

g/t Au, 1,252 g/t Ag

Representative

Silver-zone step-out result.

7.6 Drilling

— 2023–2025

The 2023–2025

programs continued deposit expansion, infill, metallurgical, and regional exploration drilling across the consolidated Kitsault Valley

Project (Table 7-5). The 2023 Homestake annual assessment report materially improves the program record and supports 59 NQ holes totalling

27,603.40 m based on its detailed target allocation (26 Homestake Main, 27 Homestake Silver, and six regional holes). This replaces the

83-hole working-draft value used previously. The assessment-report title page states 56 holes, but the detailed program narrative

and target allocations sum to 59; the locked collar table should be used for final QP confirmation.

Using the detailed

2023 Homestake program allocation together with the current working record for 2024 and 2025, the 2023–2025 total is 266 holes

and approximately 130,177.87 m. The supplied 2024 Dolly Varden assessment report is claim-specific: it documents the Silver Horde hole

DV24-422 and does not represent the complete 41-hole Dolly Varden program. The 2025 program totals and target allocations remain based

on the current corporate working record.

Contango Silver and Gold – Kitsault Valley Project Page 91 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 7-5. Reported

drilling totals and target areas, 2023–2025.

Year

Area

Holes

Metres

Targets

/ qualification

2023

Dolly

Varden

56

23,934.40

Includes

2 metallurgical holes (310 m); exploration/resource subtotal 23,624.40 m.

2023

Homestake

59

27,603.40

26

Main, 27 Silver, and 6 regional holes; detailed annual-report allocation.

2024

Dolly

Varden

41

19,429.41

Wolf,

Red Point, Silver Horde, North Star, Chance, Moose–Climax, Ace–Galena.

2024

Homestake

28

16,147.66

Homestake

Silver, Vanguard, and Blue Ribbon.

2025

Dolly

Varden

49

23,006

Wolf,

Musketeer, North Star, Chance, Moose–Climax, and Red Point.

2025

Homestake

31

18,011

Homestake

Silver and Homestake Main.

2025

Big

Bulk

2

2,046

Big

Bulk drilling; purpose classification to be confirmed.

7.6.1

Contractors, Equipment, and Operating Procedures

The 2023 Homestake

program was drilled by Omineca Diamond Drilling of Burns Lake, British Columbia, using NQ core and was supported by three Bell 407 helicopters

operated by Summit Helicopters of Terrace. The program operated from April 30 to October 19, 2023 from the Alice Arm camp.

The supplied 2024 Dolly Varden assessment report also identifies Omineca Diamond Drilling and Summit Helicopters. At the QP’s direction,

this draft assumes that these drill and helicopter contractors remained the same for the 2024 and 2025 programs unless the final annual

records show otherwise.

Drill sites were

inspected at cross-shift, generally near 07:00 and 19:00 when weather permitted, to confirm safety and permit compliance, correct placement

of core and depth markers, and the absence of grease or other drill additives on the core. Core boxes were lidded and secured in metal

baskets and transported by helicopter to the Alice Arm processing facility, where the box sequence and depth blocks were checked before

logging.

Geotechnical processing

included metric depth conversion, one-metre marking, run-by-run recovery measurement, RQD, and core orientation using the ACTIII system.

Bottom-of-hole marks were extended through connected core, assigned quality rankings, and used with beta corrections for alpha, beta,

and gamma structural measurements. The 2023 equipment record identifies a Reflex downhole survey tool, a Reflex core-orientation tool,

and differential GPS; the DV24-422 survey record specifically lists Reflex Multi-shot readings. Collar and downhole survey files should

be reconciled to the locked database.

Project geologists

selected sample intervals based on lithology, alteration, veining, and mineralization. The standard interval was modified as required

within a reported range of 0.50–2.00 m. Logging captured alteration, brecciation, lithology, mineralization, structure, shearing,

veins, and vein intervals in the project database. Whole core was photographed, and half-core samples were cut with a diamond saw to

provide comparable mineralized halves. The recorded drillhole dataset included recovery, sample, oriented-core, RQD, geology, magnetic-susceptibility,

photograph, and specific-gravity records. Detailed analytical methods, laboratory QA/QC, and security remain in Chapter 8.

Core from the 2023

Homestake program was stored at the Dolly Varden property in Alice Arm. Consistent with the working draft, this chapter assumes the same

Alice Arm processing and storage workflow for the 2024–2025 programs, subject to confirmation against the final core inventory

and storage register.

Contango Silver and Gold – Kitsault Valley Project Page 92 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

7.6.2

2023 Dolly Varden Program

The 2023 Dolly

Varden program completed 56 NQ holes totalling 23,934.40 m between April 30 and October 25. Approximately two-thirds of the

program focused on resource expansion and metallurgical drilling at Wolf, Torbrit, and Kitsol, and approximately one-third tested Moose–Climax,

Red Point, North Star, Surprise, and southwest Wolf exploration targets. Two metallurgical holes totalled 310 m. The annual report cited

total program expenditures of approximately $10.47 million.

At Moose–Climax,

four holes totalling 705 m tested down-dip extensions of the Moose Vein. DV23-371 intersected 7.65 m core length averaging 269 g/t Ag

from 140.75–148.40 m, including 1.00 m averaging 712 g/t Ag. Three Red Point holes totalling 1,680 m followed the 2022 IP anomaly

and DV22-321 mineralization. DV23-360 intersected 120.62 m of quartz–sericite–pyrite alteration and stockwork veining averaging

0.05 g/t Au and 3 g/t Ag, including 2.30 m averaging 7.25 g/t Au and 15 g/t Ag. Higher gold values were associated with increased veining

and brecciation.

Two North Star

holes totalling 844 m tested the northwestern extension of the vein and intersected stratabound and vein/breccia mineralization. DV23-358

returned 7.43 m core length averaging 345 g/t Ag, 5.92 g/t Au, 2.75% Pb, and 1.60% Zn. Two Surprise holes totalling 918 m did not intersect

significant silver, lead, or zinc mineralization at the targeted contact; localized anomalous copper occurred in brecciated quartz–carbonate

veining. This negative result is retained because it affects target ranking.

At Wolf, exploration

and expansion drilling tested the steeply dipping multi-phase vein and breccia system. DV23-379 returned 18.21 m core length averaging

247 g/t Ag from 719.89–738.10 m. Expansion hole DV23-368 returned 29.34 m averaging 381 g/t Ag from 711.84–741.18 m, including

16.97 m averaging 583 g/t Ag. The program extended high-grade silver mineralization to a reported dip extent of more than 857 m and more

than 500 m from the historic Wolf Mine.

Kitsol drilling

included exploration and six expansion holes. DV23-336 returned 18.00 m core length averaging 342 g/t Ag from 70.00–88.00 m, including

0.50 m averaging 2,270 g/t Ag. At Torbrit, two expansion holes totalled 300 m; DV23-348 returned 3.50 m averaging 334 g/t Ag from the

interpreted lower Torbrit horizon, while DV23-350 intersected mafic dykes at the expected target depth and returned no anomalous precious-

or base-metal grades.

7.6.3

2023 Homestake Program

The detailed annual

report describes 59 NQ holes totalling 27,603.40 m. At Homestake Main, 26 holes totalled 11,281.40 m: 17 infill holes (6,535.90 m) targeted

definition and potential upgrading of Inferred material, and nine exploration holes (4,745.50 m) tested the northern and southern extents

of the mineralized lenses. HR23-390 returned 50.30 m core length averaging 1.92 g/t Au and 4 g/t Ag from 167.70–218.00 m, including

0.50 m averaging 129 g/t Au and 218 g/t Ag. The high-grade shoot remained open down dip in the annual interpretation.

At Homestake Silver,

27 holes totalled 14,630 m. Thirteen infill holes (5,823 m) tested the central lens cluster and fourteen step-out/exploration holes (8,807

m) tested northern and southern extensions. HR23-416 returned 1.02 m core length averaging 55.40 g/t Au and 4,830 g/t Ag. Southern step-out

HR23-411 returned 10.55 m averaging 369 g/t Ag and 0.91 g/t Au, including 0.55 m averaging 1,925 g/t Ag and 1.73 g/t Au. The northern

drilling identified additional high-grade gold in irregular quartz–carbonate veins.

Six regional holes

totalling 1,692 m tested Tip Top, Fox Reef, Slide Zone, South Reef, Dilly, and Rambler. The holes intersected faulting and generally

low-density quartz–carbonate veining. HR23-424 at Fox Reef returned 0.50 m averaging 5.72 g/t Au and 21.5 g/t Ag; HR23-423 at Rambler

returned 1.10 m averaging 1.37 g/t Au and 0.60 g/t Ag. Regional results were weaker than those from Homestake Main and Silver but improved

the structural and alteration framework.

Contango Silver and Gold – Kitsault Valley Project Page 93 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

7.6.4

2023 Magnetotelluric Surveys

Simcoe Geoscience

Ltd. completed three-dimensional ultra-wideband magnetotelluric surveys on both claim blocks. At Homestake, 97 sites covered a centralized

17 line-km grid between August 2 and September 21, 2023. The survey was designed to identify resistivity and conductivity responses

at depth, refine northwest-trending structural and lithological interpretations, and generate drill targets. At Dolly Varden, eight MT

sites over 1.5 lines covered approximately 4.6 line-km. The Dolly Varden inversion outlined northwest–southeast conductive features

interpreted as possible intrusions and helped map subparallel faults and lineaments associated with alteration and anomalous metal responses.

7.6.5

2024 Program

The current corporate

working record reports 69 holes and 35,577.07 m in 2024: 41 holes and 19,429.41 m at Dolly Varden and 28 holes and 16,147.66 m at Homestake.

The Dolly Varden program was distributed among Wolf, Red Point, Silver Horde, North Star, Chance, Moose–Climax, and Ace–Galena;

the Homestake program focused on Homestake Silver, Vanguard, and Blue Ribbon.

The supplied 2024

Dolly Varden assessment report documents only the Silver Horde component credited to claim 538781 and is not a complete annual-program

report. It records DV24-422 as an NQ hole at Silver Horde, with 100 m reported for assessment-credit purposes; the narrative also describes

the hole as reaching 468 m, an internal inconsistency that should be checked against the collar table. The hole tested extensions of

silver-bearing veins identified in 2019 and 2021. The reported analytical highlight was 1.00 m averaging 36 g/t Ag from 177.00–178.00

m. The report concluded that the hole did not reach the intended target depth and returned no material result for the planned target,

supporting additional three-dimensional modelling before further drilling.

7.6.6

2025 Program

The current working

record reports 82 holes and 43,063 m in 2025. Dolly Varden drilling comprised 49 holes and 23,006 m: 32 holes (16,482 m) at Wolf, eight

holes (2,739 m) distributed among Musketeer, North Star, and Chance, and nine holes (3,785 m) at Moose–Climax and Red Point. Homestake

drilling comprised 31 holes and 18,011 m, dominated by 29 holes (16,813 m) at Homestake Silver and two holes (1,198 m) at Homestake Main.

Two Big Bulk holes totalled 2,046 m.

Under the QP-directed

assumption that contractors and controlled procedures were unchanged, the 2025 drilling is described using the Omineca/Summit helicopter-supported

NQ workflow and the TerraLogic/Dolly Varden logging, ACTIII orientation, Reflex survey, recovery/RQD, photography, specific-gravity,

and half-core sampling procedures summarized in Section 7.6.1. The supplied report package does not contain a complete 2025 analytical-results

report. Accordingly, Table 7-6 includes selected 2025 intercepts only from approved corporate disclosures; those results remain subject

to reconciliation to the locked 2025 assay database and are presented as representative rather than exhaustive results.

Table 7-6 provides

a QP-selected compilation of representative exploration drill intercepts from results disclosed during 2023 through 2025. The selection

spans the Homestake Ridge area, principal Dolly Varden deposits and prospects, and other exploration targets, and is intended to illustrate

the range of mineralization, interval widths, target styles, and exploration outcomes encountered during the campaigns.

Contango Silver and Gold – Kitsault Valley Project Page 94 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 7-6. Selected

representative exploration drill intercepts disclosed during 2023–2025.

Drill

Year

Property

Area

Location

/

Deposit

Hole

ID

Interval

Class

Length

(m)

Ag

(g/t)

Au

(g/t)

AgEq

(g/t)

AuEq

(g/t)

Pb

(g/t)

Zn

(g/t)

Cu

(g/t)

Context

/ Significance

2022

Homestake

Ridge

Homestake

Main

HR22-333

Main

composite

25

70

46.31

—

—

—

—

0.19

Highlighted

main interval

2022

Homestake

Ridge

Homestake

Main

HR22-336

Separate

interval

3.9

1,844

6.19

—

—

—

—

—

Highlighted

separate interval

2022

Homestake

Ridge

Homestake

Main

HR22-345

Main

composite

29.54

12

8.73

—

—

—

—

—

Highlighted

main interval

2022

Homestake

Ridge

Homestake

Silver

HR22-361

Main

composite

1.2

2,500

15.04

—

—

—

—

0.17

Highlighted

interval

2023

Homestake

Ridge

Homestake

Silver

HR23-416

Main

composite

93.95

213

1.74

357

—

—

—

—

Mineralized

envelope

2023

Homestake

Ridge

Homestake

Silver

HR23-416

Included

interval

1.02

4,830

55.4

9,422

—

—

—

—

Highest-grade

emphasized subinterval

2023

Homestake

Ridge

Homestake

Silver

HR23-389

Main

composite

12.45

60

79.49

—

80.21

—

—

—

New

gold-rich zone

2023

Homestake

Ridge

Homestake

Silver

HR23-399

Separate

interval

1.75

418

40.33

—

45.37

—

—

—

Highlighted

high-grade vein

2024

Homestake

Ridge

Homestake

Silver

HR24-432

Broad

envelope

48.23

5

8.85

—

—

—

—

—

Mineralized

envelope

2024

Homestake

Ridge

Homestake

Silver

HR24-435

Included

interval

34.93

84

12.23

—

—

—

—

—

Stronger

breccia-vein interval

2024

Homestake

Ridge

Homestake

Silver

HR24-431

Main

composite

8.72

27

21.55

—

—

—

—

—

North

step-out

2024

Homestake

Ridge

Homestake

Silver

HR24-433

Broad

envelope

29.5

13

3.48

—

—

—

—

—

Eastern

lens

2024

Homestake

Ridge

Homestake

Silver

HR24-437

Main

composite

10.2

97

5.54

—

—

—

—

—

South

infill

Contango Silver and Gold – Kitsault Valley Project Page 95 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Drill

Year

Property

Area

Location

/

Deposit

Hole

ID

Interval

Class

Length

(m)

Ag

(g/t)

Au

(g/t)

AgEq

(g/t)

AuEq

(g/t)

Pb

(g/t)

Zn

(g/t)

Cu

(g/t)

Context

/ Significance

2025

Homestake

Ridge

Homestake

Silver

HR25-456

Broad

envelope

120

3

3.34

—

—

—

—

—

45

m step-out along strike

2025

Homestake

Ridge

Homestake

Silver

HR25-469

Main

composite

14.76

34

26.74

—

—

0.77

0.9

—

Large

open area

2025

Homestake

Ridge

Homestake

Silver

HR25-464

Main

composite

6.65

2

9.22

—

—

—

—

—

Newly

recognized stockwork zone

2025

Homestake

Ridge

Homestake

Silver

HR25-475

Main

composite

21.18

75

14.5

—

—

0.76

1.1

—

Assay-table

and introductory length used; highlight bullet states 21.60 m

2022

Dolly

Varden

Wolf

DV22-329

Main

composite

15.94

1,499

—

—

—

1.89

0.46

—

50

m step-out; east offset

2022

Dolly

Varden

Wolf

DV22-320

Main

composite

12.85

321

—

—

—

0.84

0.84

—

63

m down-plunge step-out

2022

Dolly

Varden

Kitsol

DV22-323

Main

composite

15

301

—

—

—

0.23

0.56

—

85

m down-plunge step-out

2023

Dolly

Varden

Kitsol

DV23-334

Main

composite

8.32

297

—

—

—

0.28

0.22

—

Near-surface

extension

2023

Dolly

Varden

Kitsol

DV23-336

Main

composite

18

342

—

—

—

0.58

0.57

—

Near-surface

extension

2023

Dolly

Varden

Kitsol

DV23-337

Main

composite

9.57

496

—

—

—

0.78

0.38

—

41

m up-plunge step-out

2023

Dolly

Varden

Torbrit

DV23-348

Main

composite

3.5

334

0.13

—

—

0.03

0.05

—

South

extension

2023

Dolly

Varden

Wolf

DV23-368

Main

composite

29.34

381

0.09

418

—

0.46

0.39

—

75

m down-plunge step-out

2023

Dolly

Varden

Wolf

DV23-375

Main

composite

26.99

296

—

461

—

1.68

3.01

—

81

m step-out; AgEq includes Ag, Au, Pb and Zn

2024

Dolly

Varden

Wolf

DV24-404

Main

composite

9.38

1,091

0.06

—

—

1.35

1.4

—

40

m southwest step-out

Contango Silver and Gold – Kitsault Valley Project Page 96 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Drill

Year

Property

Area

Location

/

Deposit

Hole

ID

Interval

Class

Length

(m)

Ag

(g/t)

Au

(g/t)

AgEq

(g/t)

AuEq

(g/t)

Pb

(g/t)

Zn

(g/t)

Cu

(g/t)

Context

/ Significance

2024

Dolly

Varden

Wolf

DV24-412

Main

composite

16.2

606

—

—

—

0.61

1.43

—

Body/table

length used; release title states 16.38 m

2024

Dolly

Varden

Wolf

DV24-414

Broad

envelope

15.02

254

—

—

—

0.86

1.34

—

Wide

vein-breccia zone

2024

Dolly

Varden

Wolf

DV24-416

Main

composite

21.48

654

—

—

—

0.47

0.57

—

Upper

vertical extension

2024

Dolly

Varden

Wolf

DV24-408

Main

composite

27.19

513

—

—

—

2.95

1.82

—

Lower

vertical extension

2024

Dolly

Varden

Wolf

DV24-421

Main

composite

21.69

379

—

—

—

0.64

0.66

—

120

m step-out

2025

Dolly

Varden

Wolf

DV25-446

Main

composite

21.7

1,422

0.51

—

—

3.05

1.42

—

105

m up-plunge from DV24-421

2025

Dolly

Varden

Wolf

DV25-446

Included

interval

1

10,700

2.54

—

—

4.33

1.68

—

Highest-grade

included interval

2022

Dolly

Varden

Red

Point

DV22-321

Broad

interval

49

13

0.59

—

—

—

—

—

Broad

altered interval

2022

Dolly

Varden

Red

Point

DV22-321

Included

interval

5

83

2.94

—

—

—

—

1.65

Included

in broader system

2022

Dolly

Varden

Red

Point

DV22-321

Included

interval

1

244

8.1

—

—

—

—

5.16

Highest-grade

included interval

2022

Dolly

Varden

Red

Point

DV22-322

Separate

interval

1.15

23

17.2

—

—

0.07

0.13

1.93

Assay

table value used; highlight text lists 1.65% Cu

2023

Dolly

Varden

Moose

DV23-371

Main

composite

7.55

269

—

285

—

0.38

0.13

—

Initial

Moose drilling

2023

Dolly

Varden

Moose

DV23-371

Included

interval

1

712

—

728

—

0.29

0.19

—

Highest-grade

included interval

2024

Dolly

Varden

Moose

DV24-387

Main

composite

5

977

—

—

—

—

—

—

Headline

rounds to 978 g/t Ag; table/highlight states 977 g/t Ag

Contango Silver and Gold – Kitsault Valley Project Page 97 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Drill

Year

Property

Area

Location

/

Deposit

Hole

ID

Interval

Class

Length

(m)

Ag

(g/t)

Au

(g/t)

AgEq

(g/t)

AuEq

(g/t)

Pb

(g/t)

Zn

(g/t)

Cu

(g/t)

Context

/ Significance

2024

Dolly

Varden

Moose

DV24-387

Included

interval

0.79

3,670

—

—

—

—

—

—

Highest-grade

included interval

2024

Dolly

Varden

Chance

DV24-388

Main

composite

23.03

206

—

—

—

—

—

—

First

2024 Chance result

2024

Dolly

Varden

Chance

DV24-388

Included

interval

0.5

749

—

—

—

—

—

—

Highest-grade

emphasized subinterval

2024

Dolly

Varden

North

Star

DV24-423

Broad

envelope

22.78

124

0.13

—

—

0.5

2.83

—

Newly

reported exploration result

2024

Dolly

Varden

North

Star

DV24-423

Included

interval

3.04

432

—

—

—

1.39

5.28

—

Silver-rich

layer

2024

Dolly

Varden

Red

Point

DV24-400

Broad

envelope

20.15

—

0.79

—

—

—

—

—

Newly

reported broad stockwork zone

2024

Dolly

Varden

Red

Point

DV24-400

Included

interval

0.5

—

21.1

—

—

—

—

—

Highest-grade

included interval

2024

Dolly

Varden

Red

Point

DV24-395

Broad

envelope

59.09

—

0.5

—

—

—

—

—

Newly

reported broad stockwork zone

2024

Dolly

Varden

Red

Point

DV24-395

Included

interval

3.11

—

2.99

—

—

—

—

—

Highest-grade

included interval

Notes: This is a selected and representative

compilation and is not a complete assay or drill-hole database. Drill year is shown in the first column; certain 2022 drilling results

were disclosed in 2023. Reported lengths are drill-core or downhole lengths unless the applicable source expressly reports an estimated

true width. Included intervals are contained within broader reported intervals and must not be summed with their parent intervals. AgEq

and AuEq values are reproduced only where reported and depend on the metal-price, recovery, and formula assumptions stated in the applicable

disclosure. The selected results do not, by themselves, demonstrate continuity or support mineral-resource classification.

Contango Silver and Gold – Kitsault Valley Project Page 98 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

7.6.7

Target Allocations and Reconciliation

The following target

allocations combine the detailed 2023 Homestake annual report with the current 2023–2025 corporate working record (Table 7-7, Figures

7-3 to 7-5). The 2024 and 2025 allocations are retained pending final reconciliation to the locked collar and purpose-classification

tables.

Table 7-7. Target-level

drilling allocations, 2023–2025.

Year

Area

Target

allocation

Holes

Metres

2023

Dolly

Varden

Wolf

32

16,712.40

2023

Dolly

Varden

Red

Point / Surprise / Moose

9

3,303

2023

Dolly

Varden

North

Star / Kitsol / Torbrit

13

3,609

2023

Dolly

Varden

Metallurgical

2

310

2023

Homestake

Homestake

Main

26

11,281.40

2023

Homestake

Homestake

Silver

27

14,630

2023

Homestake

Tip

Top / Slide / South Reef / Dilly / Rambler / Fox Reef

6

1,692

2024

Dolly

Varden

Wolf

22

13,614.06

2024

Dolly

Varden

Red

Point / Silver Horde / North Star / Chance

11

3,898.35

2024

Dolly

Varden

Moose–Climax

/ Ace–Galena

8

1,917

2024

Homestake

Homestake

Silver

25

15,403.7

2024

Homestake

Vanguard

/ Blue Ribbon

2

744

2025

Dolly

Varden

Wolf

32

16,482

2025

Dolly

Varden

Musketeer

/ North Star / Chance

8

2,739

2025

Dolly

Varden

Moose–Climax

/ Red Point

9

3,785

2025

Homestake

Homestake

Silver / Homestake Main

31

18,011

2025

Big

Bulk

Big

Bulk

2

2,046

The detailed 2023

Homestake allocation reconciles to 59 holes and 27,603.40 m. The assessment-report title page lists 56 holes, while its body, individual

target allocations, and results sections consistently support 59. For 2024 Homestake, the working-draft target rows account for 27 holes,

one fewer than the stated 28, while metres reconcile within rounding. The 2024 Dolly Varden and 2025 allocations reconcile to the stated

headline counts and metres.

The working record

further reports 25,420 core samples and 682 mapping rock samples for 2023; 16,314 core samples and 291 mapping rock samples for 2024;

and 23,289 core samples and 329 mapping rock samples for 2025. The 2023 Homestake count includes 682 re-samples from 2022 drilling. These

counts should be retained only after “core sample” is defined and original samples, re-samples, QA/QC insertions, and metallurgical

samples are separated consistently.

Contango Silver and Gold – Kitsault Valley Project Page 99 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 7-3. Kitsault

Valley Project drilling locations, 2019–2025 (source: current Chapter 7 working record).

Contango Silver and Gold – Kitsault Valley Project Page 100 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 7-4. Homestake

area drilling locations, 2022–2025 (source: current Chapter 7 working record).

Contango Silver and Gold – Kitsault Valley Project Page 101 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 7-5. Dolly

Varden area drilling locations, 2019–2025 (source: current Chapter 7 working record).

Contango Silver and Gold – Kitsault Valley Project Page 102 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

7.7 Hydrogeological

and Geotechnical Data

Geotechnical information

collected during routine drilling includes core recovery, RQD, fracture and structural observations, and, in some programs, specific

gravity and magnetic susceptibility. The historical Homestake programs and Auryn’s 2017–2018 drilling explicitly recorded

recovery and RQD; Dolly Varden’s post-2015 procedures explicitly recorded recovery and detailed structural information. These data

support geological interpretation and identify intervals affected by poor recovery or structural complexity.

The source reports

reviewed for this chapter do not describe a standalone project-scale hydrogeological drilling, packer-testing, pumping-testing, or groundwater-monitoring

program, nor do they present a feasibility-level geotechnical domain model. At the current exploration/resource stage, the absence of

such a program does not affect the reporting of exploration results, but dedicated hydrogeological and geotechnical investigations will

be required if the project advances to mine design and economic assessment.

7.8 QP

Interpretation and Limitations

The combined exploration

record demonstrates progressive testing of known deposits, favourable stratigraphic horizons, structural corridors, alteration systems,

geochemical anomalies, and geophysical targets. At Dolly Varden, the programs refined the Torbrit–Kitsol system, extended Wolf

beneath cover, advanced North Star and related connectors, and tested regional alteration corridors. At Homestake, integrated surface

geochemistry, geophysics, relogging, and drilling refined the structural and alteration framework around Homestake Main, Homestake Silver,

South Reef, and regional targets.

The principal limitations

are: selective surface samples are not representative of average target grade; some historical procedure records are incomplete; interval

reporting alternates between core length and true width; true-width confidence depends on local geometry and oriented-core control; historical

collar and downhole survey methods changed through time; certain holes encountered workings or were lost; and geological interpretations

evolved as drilling density increased. These limitations are manageable when they are carried through the validated database and geological

model and disclosed consistently.

No conclusion regarding

continuity or resource classification is based on a single high-grade intersection. Representative results in this chapter were selected

to demonstrate material program outcomes and include at least one negative or cautionary result where relevant. Complete hole populations,

including non-significant intersections, remain part of the project database and resource workflow.

Contango Silver and Gold – Kitsault Valley Project Page 103 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

8 SAMPLE

PREPARATION, ANALYSES, AND SECURITY

8.1 Scope

and Qualified Person Review

The QP reviewed

the procedures and results for the former Dolly Varden and Homestake Ridge properties, now components of the Kitsault Valley Project

(the Project). The QP's review included the prior technical and assessment reports cited in Section 8.11, analytical certificates

and dispatch records available for the modern programs, the Dolly Varden QAQC Compilation dated January 30, 2026, and the Homestake

Ridge QAQC Compilation dated February 2, 2026. The two workbooks contain annual drill and sample statistics, CRM control charts,

blank results, field-duplicate pairs, and interlaboratory check-assay results.

The QP also reviewed

the completion status of previously outstanding assays, laboratory independence and accreditation, sample custody and receipt reconciliation,

and the inclusion or exclusion of historical data in the mineral-resource database. Based on that review, the QP has replaced the provisional

action items in the earlier draft with the determinations and conclusions set out below.

Note:

This chapter addresses preparation, analysis, QA/QC and custody of geological samples. Drill methods and sample representativeness

are addressed in Chapter 7; database verification is addressed in Chapter 9; metallurgical samples are addressed in Chapter 10; and Appendix

A will identify the drill intercepts and analytical records used in the current mineral-resource estimate (MRE). Final cross-references

should follow the filed TRS numbering.

8.2 Sample

Populations and QA/QC Compilations

The analytical

database includes diamond-drill core, surface rock and soil samples, lithogeochemical samples, density specimens and historical samples

collected by several operators. The MRE relies principally on validated drill-core assays. Surface geochemical and portable-XRF results

support exploration targeting and geological interpretation and are not treated as substitutes for resource-supporting drill assays.

The QA/QC compilations

summarize 519 Dolly Varden holes and 507 Homestake Ridge holes (Table 8-1). Together, they cover approximately 352,010 m of drilling

and 150,763 reported samples, with 6,135 CRM insertions, 5,248 blanks, 2,758 field duplicates and 3,513 check-assay determinations. These

are workbook compilation totals and include historical programs with different operators, procedures and check-assay objectives.

Table 8-1. QA/QC

compilation totals.

Area

Compiled

period

Holes

Metres

Reported

samples

CRMs

Blanks

Field

duplicates

Checks

Dolly

Varden

2011-2025

519

172,126.4

67,706

2,664

2,134

918

552

Homestake

Ridge

2002-2025

507

179,883.9

83,057

3,471

3,114

1,840

2,961

Combined

2002-2025

1,026

352,010.3

150,763

6,135

5,248

2,758

3,513

8.3 Drill

Core Handling and Sampling

Drill core is placed

in labelled boxes at the drill, inspected under Company or geological-contractor supervision and transported to the Alice Arm camp. For

recent remote programs, core was transported by helicopter in metal baskets. At the secured logging facility, personnel inspect the core;

record summary, geological and geotechnical logs; measure recovery and rock-quality designation; mark metre intervals and sample boundaries;

attach box and sample tags; collect digital photographs; and enter the information into the project database.

Contango Silver and Gold – Kitsault Valley Project Page 104 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

A project geologist

selects sample intervals with reference to lithology, alteration, structure, veining and mineralization. Recent procedures generally

use nominal one-metre intervals modified at geological contacts, commonly within reported limits of approximately 0.5 m to 2.0 m. Historical

Homestake intervals extended to 3 m, while the 2016-2020 Auryn programs generally used continuous two-metre intervals. The QP considered

these differences when determining whether each population was suitable for its intended use.

Core is cut longitudinally

with a diamond saw. The technician orients the cut so that submitted and retained halves comparably represent visible mineralization.

One half is placed in a pre-labelled plastic bag and the other half is returned to the core box as a permanent record. The saw is cleaned

between sample intervals. Individual bags are sealed, ordered and checked against the sample log and manifest before being packed into

labelled woven rice bags. Remaining core is stored at Alice Arm or, for portions of the historical Homestake collection, in secure storage

in Prince Rupert.

8.3.1

Historical Sampling Limitations

Written procedures

for some pre-2003 Homestake work are incomplete. Previous reviews dismissed samples whose locations could not be verified and did not

use historical trench or underground samples in the MRE. The QP confirmed that historical data not used in the current MRE have been

excluded from the resource database. Appendix A will identify the drill intercepts used in the MRE and provide the auditable boundary

between accepted and excluded records.

8.4 Sample Security and Chain of

Custody

Modern samples

remain under Company or contractor control through drill-site handling, logging, cutting, bagging and dispatch. Individual sample bags

and outer rice bags are sealed. Sample identifiers, dates and bag numbers are recorded, and dispatch manifests accompany shipments. Surface

samples are returned to camp daily, organized, dried where applicable, catalogued and shipped separately from drill-core samples.

Samples have been

transported by helicopter, Company personnel, expeditors and commercial freight carriers to the applicable preparation facility. On receipt,

the laboratory logs the shipment into its tracking system and identifies discrepancies or condition issues. The QP reviewed and spot-checked

modern custody records for each year from 2011 onward. The QP's checks reconciled dispatch logs to laboratory receipts, including sample

counts, bag counts, missing or damaged bags, relabelling, rejects and resubmissions. The spot-checked records reconciled correctly, and

the QP identified no unresolved custody exception that would materially affect the validity of the analytical database.

Sample security

controls and QP verification procedures are summarized in Table 8-2).

Contango Silver and Gold – Kitsault Valley Project Page 105 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 8-2. Sample

security controls and QP verification.

Custody

stage

Control

QP

determination

Drill

site to camp

Labelled

boxes, supervised transfer and recorded core intervals

Spot

checks of modern records completed; no unresolved exception

Logging

and cutting

Restricted

work area, sample tags, digital/sample logs and retained half core

Sample

identities and interval sequences reconciled

Dispatch

Sealed

sample and rice bags, manifests and bag-sequence checks

Dispatch

logs reconciled to laboratory receipts

Transport

Helicopter/staging,

expeditor and commercial freight

Bag

counts, missing/damaged bags and relabelling reviewed

Laboratory

receipt

Computerized

receipt, preparation tracking and pulp transfer

Rejects,

resubmissions and receipt exceptions reviewed and resolved

8.5 Laboratories, Preparation and

Analytical Methods

8.5.1

Laboratory Independence and Certification

ALS Canada Ltd.

(ALS) is the principal recent laboratory. Preparation facilities reported for the modern database include Terrace, Kamloops, Vancouver

and Yellowknife, Canada, with some 2019 preparation in Elko, Nevada. Analytical work was performed principally in Vancouver, British

Columbia, with some work in Reno, Nevada. Bureau Veritas Mineral Laboratories (Bureau Veritas) was used for earlier primary assays, lithogeochemistry,

check assays and umpire work. Historical work also used Acme Analytical Laboratories Ltd., Eco-Tech Laboratories Ltd., International

Plasma Labs Ltd., AGAT Laboratories and Activation Laboratories Ltd.

The QP confirmed

the locations and independence from the registrant of the assay laboratories materially supporting the current database. The QP also

confirmed that the current laboratories are ISO-certified commercial facilities and that the applicable certifications are current. Historical

accreditation was not documented for every early facility; the QP considered that limitation together with the available check assays,

control results and database verification when assessing the relevant historical data.

8.5.2

Current 2023–2025 Procedures

The QP confirmed

that the sample counts, custody controls, laboratory preparation, analytical suite, over-limit treatment and QA/QC procedures were materially

the same for the 2023, 2024 and 2025 programs (Table 8-3). Samples were prepared at ALS, principally at Terrace, by logging and drying

the samples, crushing the entire sample to the specified passing size, splitting and pulverizing the analytical portion to the specified

fine fraction. Pulps were submitted to ALS analytical facilities for the methods described below.

The primary suite

comprised a four-acid digestion followed by multi-element ICP-MS (reported as ME-MS61) and a 30 g gold fire assay with atomic-absorption

finish (Au-AA23). Ore-grade silver, copper, lead and zinc were rerun using four-acid digestion with ICP-AES finish (ME-OG62). High-silver

samples were rerun by gravimetric fire assay. The QP reconciled the earlier 1,000 ppm versus 1,500 ppm narrative discrepancy and the

Ag-GRA21/Ag-GRAV21 notation against the applicable dispatches, certificates and program procedures; the final database reflects the correct

program-specific over-limit result and method. These procedures are conventional mineral-industry methods for the commodities and grade

ranges reported.

Contango Silver and Gold – Kitsault Valley Project Page 106 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 8-3. Summary

of drill sample preparation and analytical procedures.

Program

Laboratory

Reported

preparation

Principal

analytical procedures

2003-2006

Homestake

Acme;

Eco-Tech in 2003

~80%

passing 10 mesh; ~250 g split; ~85% passing 150 mesh

Au/Ag

fire assay with ICP-AES; gravimetric and base-metal over limits; ICP-MS

2007-2008

Homestake

Acme

and IPL

~80%

passing 10 mesh; 250 g split; ~90% passing 150 mesh

One-assay-ton

fire assay/AA; gravimetric Au over limit; aqua-regia ICP

2009-2012

Homestake

Acme

1

kg crushed; 500 g split; ~85% passing 150/200 mesh

Au/Ag

fire assay/ICP-ES; gravimetric over limits; ICP-MS and base metals

2013

Homestake

ALS

Commercial

preparation at Terrace/Vancouver

Au-AA23

and ME-MS61; CRM, blank, field and preparation duplicates

2016-2020

Homestake

ALS

>90%

passing 2 mm; 250 g split to >85% passing 75 micrometres

Au

fire assay/AAS; Au and Ag over limits; four-acid 48-element ICP-MS

2015-2022

Dolly Varden

Bureau

Veritas, then principally ALS

Generally

>70% passing 2 mm; split to >85% passing 75 micrometres

Au

fire assay/AAS; four-acid ICP-MS; ore-grade and gravimetric over limits

2023-2025

Project

ALS;

Bureau Veritas checks

Common

current preparation procedure confirmed for all three years

ME-MS61,

Au-AA23, ME-OG62 and certificate-specific gravimetric Ag reruns

8.6 Surface, Lithogeochemical and

Density Samples

Rock samples are

generally 1 kg to 2 kg of material placed in heavy plastic bags. Field coordinates, geology, alteration and other observations are recorded,

and the sample site is marked. Soil samples are generally collected from the B horizon where available, with depth, slope, sample quality

and site observations recorded. Soil samples are dried before shipment. Rock and soil samples are packed and shipped separately.

Recent rock samples

were prepared by crushing, splitting and pulverizing under ALS or Bureau Veritas procedures and analyzed using fire-assay, multi-element

and ore-grade methods as required. Lithogeochemical samples were prepared for whole-rock major-oxide XRF and trace-element ICP-MS. Portable-XRF

work is semi-quantitative exploration information and is not treated as accredited laboratory assay data.

Density specimens

were selected at wider spacing in unaltered or unmineralized rock and at closer spacing through altered and mineralized intervals. Intact

core pieces were photographed, dried and measured by water immersion using weights in air and water. The QP addresses the use and verification

of density data in the resource-estimation and data-verification chapters.

8.7 Quality Assurance and Quality

Control

8.7.1

2023–2025 Control Counts

The current programs

inserted CRMs and blanks at approximately one in every 20 routine samples, staggered in the sample stream, and field duplicates at approximately

one in every 50 samples. Additional blanks were inserted around high-grade intervals or at the geologist's discretion. The 2023–2025

workbooks summarize 58,881 reported samples and 6,221 routine external controls, comprising 2,554 CRMs, 2,428 blanks and 1,239 field

duplicates (Table 8-4, Figure 8-1). Routine controls therefore represent approximately 10.6% of the reported sample count.

Contango Silver and Gold – Kitsault Valley Project Page 107 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 8-4. Current

program drill and routine control statistics.

Area

Year

Holes

Metres

Reported

samples

CRMs

Blanks

Field

dups

Routine

controls

Controls

/

samples

Dolly

Varden

2023

56

26,396.81

7,595

339

342

157

838

11.0%

Dolly

Varden

2024

41

15,549.50

5,145

246

111

114

471

9.2%

Dolly

Varden

2025

50

22,889.00

12,030

482

491

237

1,210

10.1%

Homestake

Ridge

2023

59

27,593.40

14,654

652

658

326

1,636

11.2%

Homestake

Ridge

2024

28

16,180.65

9,514

431

426

209

1,066

11.2%

Homestake

Ridge

2025

32

18,011.00

9,943

404

400

196

1,000

10.1%

Combined

2023–2025

266

126,620.36

58,881

2,554

2,428

1,239

6,221

10.6%

Figure 8-1. Routine

certified reference material (CRM), blank and field duplicate counts for the 2023–2025 programs at the Dolly Varden (DV) and Homestake

Ridge (HR) properties. Counts are from the summary tabs of the January and February 2026 QA/QC compilations.

Contango Silver and Gold – Kitsault Valley Project Page 108 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

8.7.2

Certified Reference Materials

The CRM suite spans

silver, gold and base-metal grades relevant to the Project. The QP reviewed the control charts by CRM, analyte, laboratory batch and

program year. The charts contain isolated results outside the workbook's ±3 standard-deviation limits and, for some CRMs, method-

or analyte-specific patterns (Figure. 8-2). The QP did not treat every isolated excursion as evidence that all results in a batch were

invalid. The QP reviewed the applicable certificate, adjacent CRMs and blanks, laboratory internal controls, method suitability and re-assay

results.

Where a control

failure affected a resource-relevant analyte, the affected batch was investigated and rerun or otherwise resolved before acceptance.

The QP accepted data when repeat analysis resolved the failure, surrounding controls and laboratory controls supported the batch, or

the excursion concerned an analyte or method for which that CRM was not the acceptance control. Rejected or superseded determinations

were not used as final MRE assays. The QP identified no unresolved CRM failure that causes a material systematic bias in the accepted

database.

Contango Silver and Gold – Kitsault Valley Project Page 109 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 8-2. Representative

silver CRM control charts for (A) CDN-ME-2314 at Dolly Varden and (B) CDN-ME-2203 at Homestake Ridge. The plots show certified

values and ±3 standard-deviation limits; isolated excursions were evaluated at the batch level as described in the text.

Contango Silver and Gold – Kitsault Valley Project Page 110 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

8.7.3

Blanks and Contamination

The current coarse

blank is mafic intrusive material. The QP reviewed blank results in sequence and relative to preceding mineralized samples. The compiled

2023-2025 determination sheets contain 1,074 Dolly Varden and 1,509 Homestake gold determinations, including repeat or resubmitted determinations;

routine inserted blank counts are those in Table 8-4. Eleven compiled gold determinations exceeded the 0.015 ppm review line—one

in the Dolly Varden compilation and ten in the Homestake compilation (Figure. 8-3). The QP reviewed these isolated exceptions and their

associated batches. Corrective work and surrounding controls did not indicate persistent preparation contamination, and no unresolved

blank issue materially affects the accepted assay database.

Figure 8-3. Gold

results for compiled 2023-2025 mafic-intrusive coarse blanks at (A) Dolly Varden and (B) Homestake Ridge. The plots include

repeat or resubmitted determinations and therefore contain more points than the routine insertion counts in Table 8-4. The dashed line

is the 0.015 ppm review limit used in the QA/QC compilation.

Contango Silver and Gold – Kitsault Valley Project Page 111 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

8.7.4

Field Duplicates

Current field duplicates

are one-third-core pairs generated by retaining approximately one third of the core and dividing the remaining material between the original

and duplicate samples. The 2023-2025 compilations contain 508 usable Dolly Varden and 731 usable Homestake Ridge silver pairs. Pearson

correlations for silver are 0.954 and 0.948, respectively (Figure 8-4). Copper, lead and zinc duplicate correlations are also strong

overall; gold precision varies more in low-grade Dolly Varden samples because many results are near detection and because coarse precious-metal

mineralization introduces sampling variance.

The QP reviewed

the duplicate plots by grade range and did not identify a systematic high or low bias between original and duplicate samples. Scatter

increases at low grades and in locally coarse or nuggety mineralization, as expected for field duplicates. The duplicate performance

is adequate for the intended geological and resource-estimation uses when considered with CRM, blank, check-assay and geological controls.

Figure 8-4. Original

versus one-third-core field-duplicate silver results for 2023-2025. Axes are logarithmic and the dashed line is the 1:1 relationship.

8.7.5

Check Assays and Re-assays

The workbooks compile

interlaboratory and historical check programs. The modern ALS-Bureau Veritas datasets contain 140 paired Dolly Varden samples and 202

paired Homestake Ridge samples. Silver results show very strong agreement, with Pearson correlations of 0.998 and approximately 1.000,

respectively (Figure 8-5). The paired copper, lead and zinc results also show strong agreement. The QP evaluated gold checks using method-,

unit- and detection-limit-appropriate comparisons because the pooled historical and modern gold fields include different reporting conventions.

The QP reviewed

re-assays, over-limit results, rejected determinations and corrective actions in conjunction with the control charts. The final database

uses the accepted result after completion of the applicable rerun, over-limit or corrective-action sequence. Superseded results are retained

for auditability but are not used as the final MRE assay. The QP found no material between-laboratory bias in the accepted silver or

base-metal data.

Contango Silver and Gold – Kitsault Valley Project Page 112 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 8-5. Comparison

of original ALS assay versus Bureau Veritas check-assay silver results. Axes are logarithmic and the dashed red line is the 1:1 relationship.

8.8 Completion of the 2023 and 2023–2025

Programs

The February 2023

technical report identified some 2022 assays as outstanding at the time of writing. The QP confirmed that all of those assays were subsequently

received, passed the applicable QA/QC review and were loaded correctly into the database. There is no remaining 2022 analytical-completion

limitation.

The QP confirmed

that the 2023, 2024 and 2025 programs used materially the same sample-handling, custody, preparation, analytical, over-limit and QA/QC

procedures described in this chapter. The QP compiled and reviewed the actual control counts, control charts, duplicate and check-assay

figures, re-assays, corrective actions, accepted exceptions and final assay status by program. The QP found no unresolved exception that

requires exclusion of an otherwise accepted 2023-2025 program from the current database.

8.9 Data Acceptance and Exceptions

The QP's acceptance

review was conducted at the laboratory-batch and program level. A plotted point outside a control line was treated as a review trigger,

not automatically as proof that every result in the batch was invalid. The QP considered the CRM's certified analytes and grade range,

analytical method, adjacent control samples, blank response, laboratory internal standards, duplicate behavior, preceding sample grade,

re-assay or over-limit result and the materiality of the affected analyte to the MRE (Table 8-5).

Contango Silver and Gold – Kitsault Valley Project Page 113 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 8-5. QP

review and disposition framework.

Review

trigger

QP

action

Disposition

CRM

outside control limits

Review

certificate, adjacent controls and method fitness; request rerun where resource-relevant

Accepted

only after resolution or supported batch-level justification

Elevated

blank

Review

preceding samples and preparation sequence; reassay affected interval/batch as appropriate

No

unresolved systematic contamination identified

Duplicate

variance

Assess

grade, detection limit, mineral texture and pair identity

Accepted

where variance is consistent with sampling heterogeneity and no directional bias

Check-assay

variance

Confirm

sample pairing, units, method and detection limits; repeat or exclude mismatched pair

Final

accepted result retained; superseded result remains auditable

Custody

discrepancy

Reconcile

dispatch, bag count, receipt, relabelling, reject and resubmission records

No

unresolved material custody exception

Historical

unsupported data

Exclude

from current resource database unless specifically validated

Excluded

data identified through Appendix A boundary

8.10 Qualified Person Opinion

In the QP's opinion,

the sample preparation, analytical methods, sample-security measures and QA/QC programs used for the material drill data supporting this

TRS are appropriate for the styles of mineralization and commodities at the Project. The current commercial laboratories are independent

of the registrant and operate under current ISO-certified quality systems. The analytical procedures relied upon are conventional mineral-industry

methods.

The QP has confirmed

receipt, QA/QC acceptance and correct database loading of the assays that were outstanding when the February 2023 report was issued.

The QP has also confirmed the common 2023-2025 procedures, reviewed annual custody reconciliation from 2011 onward, evaluated the 2023-2025

control results and corrective actions, and confirmed exclusion of unsupported historical data from the MRE database. Isolated control

excursions and expected duplicate scatter do not indicate a material systematic analytical bias or unresolved sample-security issue.

Accordingly, the

QP considers the accepted sample preparation, security and analytical data adequate for the exploration interpretations and MRE purposes

for which they are used in this TRS. This opinion should be read together with the drill-sampling discussion in Chapter 7, the data-verification

work in Chapter 9, the resource-estimation discussion, and the accepted drill-intercept population in Appendix A.

Contango Silver and Gold – Kitsault Valley Project Page 114 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

9 DATA

VERIFICATION

9.1 Introduction and Scope

The QP's review

was directed to information material to the geological interpretation and MRE, including drillhole collars and downhole surveys; geological,

geotechnical and density logging; sample intervals and assay results; analytical quality-control records; laboratory and sample-custody

documentation; and the transfer, validation and use of those data in the resource database and geological models. Verification was performed

on a representative and risk-based basis and was supplemented by prior QP verification work where the source records and procedures remained

relevant.

9.2 Data Sources and Database Environment

The Project database

contains historical and current collar, downhole survey, geological logging, geotechnical, sample interval, assay, density and analytical

quality-control information for the former Dolly Varden and Homestake Ridge project areas. Geovia GEMS has served as the principal drilling

and assay database through the effective date of this working draft. Controlled comma-separated-value exports are imported into Leapfrog

Geo for geological interpretation, project tracking and model review. The QP reviewed the relationship between the source records, the

controlled database and the modelling exports to determine whether the data lineage was sufficiently auditable for MRE use (Table 9-1).

The January 30,

2026 Dolly Varden and February 2, 2026 Homestake Ridge QA/QC compilations summarize 1,026 drillholes, approximately 352,010 m of

drilling and 150,763 reported samples. Those workbook totals provide the broad verification population; they are not, by themselves,

the final MRE assay population. The accepted MRE population is the validated subset identified through the resource database and Appendix

A.

Table 9-1. Principal

verification evidence reviewed by the QP.

Evidence

category

Information

reviewed

Verification

purpose

Primary

database

GEMS

collar, survey, interval, geology, assay, density and QA/QC tables

Internal

consistency, completeness, relational integrity and export control

Original

records

Drill

logs, survey files, analytical certificates, dispatches and laboratory receipts

Selected

comparison to corresponding digital records

Physical

evidence

Selected

drill core, drill sites/collars and core-processing facilities

Comparison

of observed location, geology, alteration and mineralization with recorded information

QA/QC

compilations

Dolly

Varden and Homestake Ridge workbooks through 2025

Control

counts, control charts, duplicates, blanks, checks, re-assays and final disposition

Prior

technical reports

2015,

2019, 2022 and 2023 technical reports

Historical

verification procedures, certificate comparisons and prior QP check sampling

Recent

operating reports

2023

Homestake Ridge and 2024 Dolly Varden assessment reports

Current

logging, sampling, analytical and database procedures

Contango Silver and Gold – Kitsault Valley Project Page 115 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

9.3 Summary of QP Verification Procedures

The QP completed

or reviewed the procedures summarized in Table 9-2. The source-document selections were intended to test material data pathways and representative

drilling populations rather than to duplicate every record in the database. The QP considered both the result of each test and whether

exceptions indicated an isolated transcription issue or a systematic condition capable of affecting the MRE.

Table 9-2. QP

verification procedures and determinations.

Verification

area

Procedure

QP

determination

Site

inspection

Inspected

Project facilities, field procedures, selected drill core and geological records; discussed workflows with Project personnel

Observed

procedures and selected records were consistent; no material issue identified

Drill

logs

Compared

original logs for an approximately 10% representative selection of Project drillholes with digital records

No

material discrepancy identified in the reviewed population

Assay

certificates

Compared

certificates for an approximately 10% representative selection of drillholes where source certificates were available

No

material data-entry error identified in the reviewed population

Database

validation

Tested

interval overlaps, end-of-hole exceedances, missing or inconsistent fields, missing assays and invalid codes

Material

validation exceptions were resolved or excluded before MRE use

Survey

review

Reviewed

collar and downhole survey procedures, coordinate reasonableness and anomalous survey records

No

material unresolved collar or downhole survey issue identified

Custody

reconciliation

Spot-checked

each modern program year from 2011 onward against dispatch and laboratory receipt records

No

unresolved material custody exception identified

Analytical

QA/QC

Reviewed

CRMs, blanks, field duplicates, check assays, re-assays, over-limits and corrective actions

No

unresolved systematic bias or contamination issue identified in accepted data

Database

acceptance

Confirmed

final accepted results, superseded-result treatment and exclusion of unsupported historical records

Accepted

database considered suitable for the current MRE

Earlier verification

provides additional support. For the Dolly Varden database, prior QPs compared 60 analytical certificates representing approximately

18% of available certificates and approximately 15% of assay intervals reviewed for the 2019 MRE. For Homestake Ridge, prior verification

compared approximately 5,000 certificate values, reported as approximately 12% of the then-current database. Prior QP site inspections

in 2018, 2022, 2025, and 2026 included collar checks, observation of logging and sampling, and independent check sampling. The current

QP reviewed those programs as supporting evidence and did not rely on them as a substitute for the current verification described in

this chapter.

Contango Silver and Gold – Kitsault Valley Project Page 116 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

9.4 Qualified Person Site Visits

Table 9-3 outlines

in person site visits from prior and current QPs and to what degree the data collection visit was used for.

Table 9-3. Site

inspections relevant to data verification.

Date

QP

status

Principal

scope

Use

in this TRS draft

October 1–2,

2018

Prior

QP

Dolly

Varden area; field procedures, collars, core and six independent check samples

Completed;

supporting historical verification

January 20,

2022

Prior

QP

Homestake

Ridge area; physiography, historical core and six half-core check samples

Completed;

supporting historical verification

September 28–29,

2022

Prior

QP

Combined

Project; Alice Arm logging/sampling, collars and six check samples

Completed;

supporting historical verification

September 14,

2025

Current

QP

Active

Project operations, procedures, selected core and database discussions

Completed;

relied upon in this chapter

August 21–24,

2026

Current

QP

Planned

follow-up inspection and confirmation of current operations

Completed;

relied upon in this chapter

9.4.1

September 14, 2025, QP Site Visit

The QP visited

the Project on September 14, 2025, during active operations. The visit included discussions with Project personnel; observation

of core receipt, handling, logging, marking, cutting and sampling activities; review of sample dispatch and database-management procedures;

inspection of selected drill core; and comparison of observed lithology, alteration, mineralization and structural characteristics with

the corresponding geological records. The QP also reviewed the physical setting of the Project and the relationship of the operating

areas to the principal deposits and exploration targets.

The selected geological

records reasonably reflected the core inspected by the QP. The observed core-handling, logging, sampling and data-capture procedures

were consistent with the written procedures reviewed for the modern programs. The QP identified no material condition during the September 14,

2025, visit that would preclude use of the accepted data for geological interpretation or the current MRE.

9.4.2

July 21–24, 2026, QP Site Visit

A further QP site

visit was conducted on July 21–24, 2026. In this visit follow-up inspection of active drilling and core-processing operations,

review of any material workflow changes, examination of selected 2026 core and records, and confirmation that the procedures described

in Chapters 7 through 9 remain current. The QP identified no material condition during the July 2026 visit that would preclude use

of the accepted data for geological interpretation or the current MRE.

9.5 Drillhole Database and Geological

Record Verification

The QP reviewed

the controls applied to the principal database tables and modelling exports. Validation tests included intervals extending beyond end-of-hole

depth, overlapping intervals, gaps or missing mandatory fields, inconsistent sample intervals, absent or duplicate sample identifiers,

missing assays, invalid or non-standard lithology and alteration codes, unreasonable collar coordinates or elevations, and anomalous

downhole survey entries. Exceptions were evaluated against source records and were corrected, documented or excluded as appropriate before

the data were used for the MRE.

Contango Silver and Gold – Kitsault Valley Project Page 117 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Original drill

logs for an approximately 10% representative selection of Project drillholes were compared with corresponding database records, including

lithology codes and interval boundaries. The QP also compared selected physical core with recorded lithology, alteration, mineralization

and structure. No material transcription issue or systematic coding problem was identified in the reviewed population. Minor interpretive

differences typical of geological logging do not materially affect the geological model.

The centralized

database, defined data formats and validation queries provide an appropriate framework for the Project. To preserve auditability, the

database version used for the MRE, its extraction date, the export files provided to the resource modeller and material post-export changes

should be retained together in the MRE archive.

9.6 Collar, Downhole Survey and Spatial

Verification

The QP reviewed

collar survey procedures and available collar records. Modern and selected historical collars have been surveyed or resurveyed using

differential GPS equipment where applicable, and prior QP site inspections compared selected field positions with database coordinates.

The current verification included reasonableness checks for coordinate system, easting, northing, elevation, azimuth, dip and total depth,

together with spatial review against topography, drilling patterns and known workings.

The QP reviewed

downhole survey procedures and the storage of survey data in the Project database. Validation included checks for missing surveys, duplicate

depths, survey stations beyond end-of-hole, implausible azimuth or inclination changes and inconsistent survey sequences. Where a questionable

record was identified, the survey was compared with the available source file and adjacent stations before acceptance or correction.

The QP identified no unresolved material collar or downhole survey issue affecting the accepted MRE database.

9.7 Assay Database and Analytical

QA/QC Verification

The QP compared

selected digital assays with original laboratory certificates where certificates were available and reviewed interval continuity, unit

conventions, detection limits, over-limit replacement, resubmissions and the treatment of null, below-detection, rejected and superseded

determinations. The QP confirmed that the assays reported as outstanding in the February 2023 technical report were subsequently

received, passed the applicable QA/QC review and were loaded correctly into the database. No 2022 analytical-completion limitation remains.

For the 2023, 2024

and 2025 programs, the QP confirmed materially consistent custody, sample preparation, analytical, over-limit and QA/QC procedures. The

program workbooks summarize 58,881 reported samples and 6,221 routine external controls, comprising 2,554 CRMs, 2,428 blanks and 1,239

field duplicates. The QP reviewed control charts and batch-level exceptions, including re-assays and corrective actions, and confirmed

that the final database contains the accepted result after the applicable resolution sequence.

The 2023-2025 compilations

contain 508 usable Dolly Varden and 731 usable Homestake Ridge silver field-duplicate pairs, with Pearson correlations of 0.954 and 0.948,

respectively. The modern ALS-Bureau Veritas check datasets contain 140 paired Dolly Varden and 202 paired Homestake Ridge samples; silver

correlations are 0.998 and approximately 1.000, respectively. Eleven compiled 2023-2025 gold blank determinations exceeded the 0.015

ppm review line, but review of the associated batches, adjacent controls and corrective work did not indicate persistent preparation

contamination. The QP identified no unresolved systematic analytical bias or contamination issue in the accepted data. Detailed QA/QC

results and figures are presented in Chapter 8.

Contango Silver and Gold – Kitsault Valley Project Page 118 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

9.8 Sample Custody, Laboratory Status

and Record Reconciliation

The QP reviewed

and spot-checked custody records for each modern program year from 2011 onward. The checks reconciled dispatch logs to laboratory receipts

and included sample counts, bag counts, missing or damaged bags, relabelling, rejects, resubmissions and final receipt status. The spot-checked

documentation reconciled correctly, and the QP identified no unresolved custody exception that would materially affect the analytical

database.

The QP confirmed

the locations and independence from the registrant of the assay laboratories materially supporting the current database and confirmed

that the current laboratories operate under current ISO-certified quality systems. Historical accreditation is not documented for every

early facility; the QP considered that limitation together with historical check assays, prior verification, database consistency and

the current MRE inclusion criteria.

9.9 Historical Data Verification

and MRE Inclusion

Historical records

vary in completeness. Some original certificates, drill logs or survey records are unavailable for portions of the early drilling, and

certain early data were reconstructed from mine plans, sections or surviving records. Previous technical reports document substantial

historical compilation and verification, including source-record comparisons, coordinate checks and independent check assays. The QP

reviewed that prior work and considered it together with the current database checks, spatial and grade continuity, retained core where

available, and the use or exclusion of each data population in the current MRE.

The QP confirmed

that historical data not accepted for the current MRE have been excluded from the resource database used for estimation. Historical trench,

underground or drill records that lack adequate support may be retained for exploration context, but they are not treated as MRE assays

unless specifically validated and accepted. Appendix A will identify the drill intercepts used in the MRE and provide the auditable boundary

between accepted and excluded records.

9.10 Limitations on Data Verification

The principal limitation

is the incomplete availability of original certificates and other primary source records for some historical drilling. This limits direct

record-by-record verification of those specific records. The QP mitigated the limitation by reviewing prior verification, comparing available

certificates and logs, testing database consistency, examining spatial and grade continuity, reviewing historical check assays and retained

core where available, and excluding unsupported records from the MRE database.

The QP's program

was representative and risk-based rather than a complete audit of every Project record. The verification therefore provides reasonable

assurance regarding material reliability but is not a guarantee that the database contains no immaterial transcription or coding errors.

The QP identified no failure to conduct verification and no unresolved limitation that materially impairs use of the accepted database

for the current MRE.

Contango Silver and Gold – Kitsault Valley Project Page 119 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

9.11 Data-Governance and Continuing

Verification Measures

Table 9-4 summarizes

the continuing verification and data-governance measures recommended to maintain database integrity, traceability and auditability for

future mineral resource updates.

Table 9-4. Continuing

verification and data-governance measures.

Control

area

Measure

Purpose

Historical

source records

Continue

locating, cataloguing and reconciling recovered certificates, logs and survey files

Preserves

source-document auditability and may permit validation of additional historical records

MRE

database freeze

Archive

the final GEMS database, extraction date, validation report, export files and checksum/version identifiers

Establishes

the exact data population used by the resource modeller

Change

control

Maintain

an auditable change log for material edits, including reason, source, approver and affected records

Supports

traceability between verification and estimation

Pre-estimation

validation

Repeat

database, collar, survey, interval, assay and QA/QC validation before each MRE update

Confirms

that later drilling and edits have not introduced material exceptions

9.12 Qualified Person Opinion on

Data Adequacy

In the QP's opinion,

the drilling, collar, downhole survey, geological logging, sampling, assay, density and analytical quality-control data accepted for

the Kitsault Valley Project MRE were collected, recorded, validated and managed using procedures appropriate for the current stage of

Project evaluation. The QP considers the completed verification procedures appropriate for the purposes of this TRS.

The QP identified

no material data-entry, survey, logging, sampling, analytical, custody or database-integrity issue that would invalidate use of the accepted

Project database for geological interpretation or the 2026 MRE. The incomplete availability of some historical primary records is a recognized

limitation, but it does not materially impair the current MRE because the QP considered corroborating verification evidence and confirmed

that unsupported historical data were excluded from the estimation database.

Accordingly, the

QP considers the accepted data sufficiently reliable for the geological modelling and mineral resource estimation purposes for which

they are used in this TRS. This opinion should be read together with the sampling and QA/QC conclusions in Chapters 7 and 8, the resource-estimation

validation, and the final accepted drill-intercept population.

Contango Silver and Gold – Kitsault Valley Project Page 120 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

10 MINERAL

PROCESSING AND METALLURGICAL TESTING

10.1 Introduction and Scope

This chapter summarizes

mineral processing and metallurgical testing information reviewed for the Kitsault Valley Project and identifies how the available work

informs preliminary process concepts, recovery assumptions, processing risks, and additional work requirements. The discussion incorporates

prior NI 43-101 technical report summaries, historical metallurgical programs, the 2019 Blue Coast Research Ltd. work on Dolly Varden

and Torbrit, the 2026 Fuse Advisors metallurgical sample selection and results presentation, and the 2026 Blue Coast Research Ltd. Wolf

and Kitsol metallurgical testwork report.

The available test

work is sufficient to demonstrate that the principal mineralized areas tested to date respond to conventional mineral processing methods,

principally selective flotation, whole-ore cyanidation, and cyanidation of flotation tails. However, the database remains insufficient

by itself for final flowsheet selection, detailed plant design, mineral reserve conversion, or reserve-level recovery estimates. The

principal gaps are locked-cycle flotation, comminution variability, geometallurgical variability, leach optimization, environmental characterization,

and concentrate marketing.

The most material

new work since the prior chapter draft is the 2025/2026 metallurgical program on Wolf and Kitsol composites. This new work materially

reduces a prior data gap because the earlier technical reports noted that no recent metallurgical test work had been completed on Wolf

or North Star and that the Dolly Varden/Torbrit work did not cover all resource areas. The 2026 program specifically extends the modern

test-work basis to Wolf and Kitsol using a scope similar to the 2019 Dolly Varden/Torbrit program.

10.2 Summary of Metallurgical Test

Work Programs

Table 10-1 summarizes

the principal metallurgical programs reviewed for this chapter. Additional older work may exist in historical project files; however,

the programs below are the principal datasets described in the source technical reports and recent metallurgical work reviewed for this

draft.

Contango Silver and Gold – Kitsault Valley Project Page 121 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 10-1.

Summary of principal metallurgical test work programs. Summarized from Shouldice and Coombs (2016), Middleditch (2019), Hough et al.

(2022), Turner and Hough (2023), Fuse Advisors (2026), and Hall (2026a).

Area

/ deposits

Laboratory

/ consultant

and timing

Program

scope

Disclosure

use and key limitations

Homestake

Main and Homestake Silver domains

Base

Metallurgical Laboratories Ltd. (Base Met Labs), Kamloops, British Columbia; 2016 program completed for a prior owner

Gravity

concentration, selective sulphide flotation, cleaner flotation, cyanide leaching of selected flotation products, and limited concentrate-quality

assays

Prior-owner

test work. Useful for preliminary flowsheet definition and risk identification. Not a complete variability program and not sufficient

by itself for final flowsheet selection or reserve-level recovery assumptions.

Dolly

Varden and Torbrit deposits

Blue

Coast Research Ltd., Parksville, British Columbia; 2019 program completed for Dolly Varden Silver Corporation

Head

assays, QEMSCAN mineralogy, Bond Ball Work Index testing for Torbrit, flotation, whole-ore cyanidation, cyanidation of flotation

tails, and gravity-recoverable silver testing

Preliminary

modern test work on selected composites. Useful for scoping-level process-response assessment. Additional variability, locked-cycle

flotation, leach optimization, environmental, and concentrate-marketing work required.

Wolf

and Kitsol deposits

Fuse

Advisors sample selection work in 2025/2026 and Blue Coast Research Ltd. project PJ-5599, final report dated April 29, 2026

Composite

selection from assay rejects, sample preparation and characterization, TESCAN TIMA mineralogy, bulk and sequential rougher flotation,

cleaner flotation, whole-ore cyanidation, and flotation tails cyanidation

New

modern test work that materially expands metallurgical coverage to Wolf and Kitsol. Results are positive and support sequential Pb-Zn

flotation and cyanidation as process options. The work remains open-circuit and preliminary; locked-cycle, comminution, variability,

and concentrate marketing work are required.

10.2.1

Laboratory Relationship, Quality-System, and Certification Disclosure

The metallurgical

laboratories and consultants identified in the source reports are summarized in Table 10-2 below. For an exploration/initial assessment-level

TRS, the laboratory identity and general work scope are sufficient to support a preliminary discussion of metallurgical response. For

final filing, the QP should confirm and document each laboratory or specialist relationship to the registrant, any relevant certification

or accreditation, and any limitations on QA/QC, chain-of-custody, or sample representativeness.

Contango Silver and Gold – Kitsault Valley Project Page 122 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 10-2.

Metallurgical laboratory and specialist disclosure summary. Prepared from Shouldice and Coombs (2016), Middleditch (2019), Hough et al.

(2022), Turner and Hough (2023), Fuse Advisors (2026), and Hall (2026a).

Laboratory

/

specialist

Work

summarized

Location

stated in

source

Relationship

/

independence status

for draft

Certification

/ quality-system

status for draft

Blue

Coast Research Ltd.

2019

Dolly Varden/Torbrit and 2025/2026 Wolf/Kitsol metallurgical test work, including sample preparation, characterization, flotation,

cyanidation, and selected concentrate analyses.

Parksville,

British Columbia

Third-party

metallurgical testwork laboratory retained for project test work; no ownership interest or affiliation is identified in the source

reports reviewed for this draft.

Certification/accreditation

status is not stated in the source summaries reviewed. QP/lab confirmation is required before final filing.

Base

Metallurgical Laboratories Ltd. / Base Met Labs

2016

Homestake Main and Homestake Silver process development work including flotation, gravity, cyanidation of flotation products, and

limited concentrate-quality assays.

Kamloops,

British Columbia

Third-party

metallurgical testwork laboratory retained for prior-owner test work; no ownership interest or affiliation is identified in the source

summaries reviewed for this draft.

Certification/accreditation

status is not stated in the source summaries reviewed. QP/lab confirmation is required before final filing.

Fuse

Advisors

2026

metallurgical sample selection review, program planning, and summary presentation for Wolf and Kitsol work.

Not

applicable / consulting presentation

Technical

advisor/consultant role based on the presentation reviewed; relationship, independence, and reliance basis should be confirmed by

the issuer and QP.

Not

a testing laboratory in the materials reviewed. Certification status is not applicable unless the QP relies on specialist opinions

beyond sample selection and program coordination.

TESCAN

TIMA mineralogical analysis as reported by Blue Coast Research

Mineralogical

characterization, modal mineralogy, deportment, grain size, and liberation work for Wolf and Kitsol composites.

Reported

within Blue Coast Research work program

Performed

as part of the Blue Coast Research testwork package; specific subcontractor or internal laboratory status should be confirmed if

material to disclosure.

Quality-system

and instrument calibration documentation should be confirmed by the QP if relied upon for final filing.

Contango Silver and Gold – Kitsault Valley Project Page 123 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

10.3 Homestake Area Prior to Metallurgical

Test Work

10.3.1

Program Status and Source

The Homestake metallurgical

information summarized in the 2023 Kitsault Valley technical report was extracted from prior technical reports, including Ross and Chamois

(2017) and Chamois et al. (2020)and is supported by the 2016 Base Met Labs program. Because the work was completed for previous owners,

it should be described as prior test work and used with appropriate qualification regarding data verification, laboratory records, and

sample representativeness.

The 2016 program

evaluated a hybrid process concept consisting of sulphide flotation followed by cyanide leaching of selected flotation products. The

primary objective was to maximize precious metal recovery while producing potentially saleable base-metal concentrates where mineralogy

and grade supported that approach.

10.3.2

Composite Samples and Representativeness

The composites

appear appropriate for initial process-response testing of the specific mineralization types selected (Table 10-3). The available summaries

do not demonstrate that the composites cover all material grade ranges, lithologies, mineralized domains, alteration intensity, oxidation

state, or sulphide assemblage variability. Additional variability testing is therefore required before recovery assumptions are applied

broadly across the Homestake resource domains.

Table 10-3.

Homestake 2016 composite head grades reported from duplicate head cuts. Summarized from Hough et al. (2022) and Turner and Hough (2023).

Composite

Reported

mineralization

represented

Au

(g/t)

Ag

(g/t)

Representativeness

note

Main

composite

Copper-dominant

portion of the Homestake Main deposit

4.62

6

Represents

a specific copper-dominant metallurgical domain; available summaries do not demonstrate full project-scale variability coverage.

Silver

composite

Higher

silver-lead-zinc mineralization

7.76

198

Materially

higher in Ag, Pb, and Zn than the Main composite; represents a distinct metallurgical response that should not be generalized to

all Homestake mineralization without additional testing.

10.3.3

Flowsheet Concepts and Results

For the Main composite,

the 2016 test work evaluated sequential recovery of a gravity concentrate, copper concentrate by flotation, gold-bearing pyrite concentrate

by flotation, and cyanide leaching of combined copper cleaner tailings and pyrite concentrate. For the Silver composite, the copper stage

was replaced with sequential lead, zinc, and gold-bearing pyrite flotation. Tests were completed both with and without gravity concentration.

The contrasting process concepts evaluated for the Homestake Main and Homestake Silver composites are compared in Figure 10-1.

Contango Silver and Gold – Kitsault Valley Project Page 124 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 10-1.

Comparison of the 2016 Homestake Main and Homestake Silver metallurgical process concepts.

· Gravity

concentration recovered approximately 21% of feed gold from the Main composite into a concentrate

grading about 83 g/t Au and approximately 28% of feed gold from the Silver composite into

a concentrate grading about 249 g/t Au. Gravity was not consistently beneficial to total

downstream performance and should be re-evaluated in future integrated testing.

· Main

composite rougher flotation achieved approximately 85% to 90% copper recovery at rougher

mass recoveries of approximately 6% to 10%. Combined recovery of gold to gravity, copper

rougher, and pyrite concentrate was approximately 95% at about 30% mass recovery. Silver

recovery to concentrates was approximately 90% at about 30% mass recovery.

· Main

composite cleaner flotation recovered approximately 70% of copper to final cleaner concentrate,

with concentrate grades up to approximately 28% Cu. Without gravity in the circuit, approximately

50% to 55% of feed gold and 40% to 45% of feed silver were expected to report to final copper

concentrate.

· Silver

composite rougher flotation recovered up to approximately 80% of lead to the lead rougher

concentrate. Gold recovery to all concentrates was approximately 95% at about 20% mass recovery,

and silver recovery to all concentrates ranged from approximately 90% to 95% at about 20%

mass recovery.

· Silver

composite cleaner flotation, without gravity concentration, recovered approximately 65% of

lead to a concentrate grading approximately 30% Pb. Gold recovery to final lead concentrate

ranged from approximately 66% to 68%, with silver recovery ranging from approximately 23%

to 50%.

Contango Silver and Gold – Kitsault Valley Project Page 125 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

· Cyanide

leaching of pyrite concentrate and cleaner-tailings streams recovered additional precious

metals, but the leach tests were limited to 24 hours and kinetics were incomplete, particularly

for silver. For the Main composite, leaching without gravity achieved approximately 73% gold

extraction and 57% silver extraction. For the Silver composite, average concentrate leach

extractions without gravity were approximately 80% gold and 65% silver.

· Limited

concentrate assays indicated arsenic, antimony, and mercury at levels that may attract smelter

penalties. Additional concentrate generation, multi-element assaying, and marketing review

are required.

10.4 Dolly Varden and Torbrit 2019

Metallurgical Test Work

10.4.1

Program Status and Source

In January 2019,

selected samples from the Torbrit and Dolly Varden deposits were submitted to Blue Coast Research Ltd. in Parksville, British Columbia,

for preliminary metallurgical assessment. The program included feed characterization by head assay, QEMSCAN mineralogy, Bond Ball Work

Index testing, froth flotation, whole-ore cyanidation, cyanidation of flotation tails, and gravity-recoverable silver testing. Historical

development of the Torbrit processing approach, including the transition from cyanidation to flotation, is summarized in Figure 10-2.

Figure 10-2.

Historical development of the Torbrit processing flowsheet, illustrating the transition from cyanidation of native silver to flotation

recovery of galena and ruby silver minerals (Turner and McConchie, 1960).

Contango Silver and Gold – Kitsault Valley Project Page 126 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

The program was

appropriate for evaluating whether the selected mineralization responded to conventional silver-lead-zinc flotation and cyanidation process

options. It was not designed as a full variability program and should not be treated as sufficient by itself for final flowsheet selection,

detailed plant design, or reserve-level recovery assumptions. The preliminary program proposal and final testwork report are documented

by Middleditch (2018, 2019)

10.4.2

Composite Samples, Head Grades, and Mineralogy

The 2019 metallurgical

program evaluated separate composites representing the Dolly Varden and Torbrit deposits. Table 10-4 summarizes the head assays for these

composites, including their silver, base-metal, iron and total sulfur contents.

Table 10-4.

Dolly Varden and Torbrit composite head assays.

Composite

Cu

(%)

Pb

(%)

Zn

(%)

Fe

(%)

Ag

(g/t)

Total

S (%)

Dolly

Varden

0.03

0.35

1.11

8.29

347

7.67

Torbrit

0.02

0.55

0.39

4.44

290

8.23

QEMSCAN analysis

indicated that lead and zinc were primarily hosted in galena and sphalerite, respectively, while silver occurred as native silver, acanthite,

and polybasite. These minerals are generally amenable to conventional froth flotation. At a nominal primary grind size of approximately

120 μm, galena and sphalerite liberation were poor, indicating that finer primary grinding and/or regrinding would likely be required

for improved metal recovery and concentrate quality. Historical polished-section images illustrating intergrowths among barite, galena,

pyrargyrite, sphalerite, and associated sulphides are presented in Figure 10-3.

Contango Silver and Gold – Kitsault Valley Project Page 127 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 10-3.

Historical polished-section images from Torbrit showing: (A) crustiform barite–galena–sphalerite mineralization; (B) galena

with inclusions of sphalerite, pyrite, and pyrargyrite; (C) pyrargyrite (ruby silver) replacing galena in calcite–barite gangue;

and (D) chalcopyrite with galena and sphalerite in barite gangue. Mineral abbreviations: Ba = barite; Gn = galena; Sp = sphalerite;

Py = pyrite; Prg = pyrargyrite (ruby silver);

Ccp = chalcopyrite; and Cal = calcite. Images are qualitative and are not representative of quantitative mineralogy. Source: adapted

from Mortensen (1960).

10.4.3

Key Results

· Torbrit

material was relatively soft based on a single Bond Ball Work Index test, which returned

9.5 kWh/t at a closing size of 106 μm and measured product P80 of 78 μm.

· Torbrit

differential flotation was successful in the best test, producing a high-grade lead-silver

concentrate grading approximately 58% Pb, 25,000 g/t Ag, and 3% Zn at approximately 76% Pb

recovery and 64% Ag recovery. A zinc concentrate grading approximately 36% Zn and 2,700 g/t

Ag was produced at approximately 64% zinc recovery and 7% silver recovery, for total silver

recovery by flotation of approximately 71%. The simplified differential lead-zinc flotation

flowsheet evaluated for Torbrit is shown in Figure 10-4.

Contango Silver and Gold – Kitsault Valley Project Page 128 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 10-4.

Simplified flowsheet modified from the 2019 Torbrit differential lead-zinc flotation program. The flowsheet represents preliminary batch

testing and is not a selected process design.

· Dolly

Varden differential lead-zinc flotation was more challenging due to the higher zinc-to-lead

ratio in the feed. The best test produced a bulk concentrate grading approximately 21% Pb,

23% Zn, and 22,000 g/t Ag at recoveries of approximately 59% Pb, 21% Zn, and 65% Ag. The

concentrate was high grade in silver but may not attract favorable smelter payment terms

without further separation or marketing support.

· Whole-ore

cyanidation produced silver extractions ranging from approximately 63% to 86% for the Dolly

Varden composite and approximately 54% to 87% for the Torbrit composite. The highest extractions

required fine grind sizes, longer retention times, and cyanide consumptions of approximately

7.5 kg/t to 8.0 kg/t.

· Cyanidation

of flotation tails recovered approximately 54% of silver from Dolly Varden tails and approximately

59% of silver from Torbrit tails (Table 10-5). Calculated combined silver recoveries were

approximately 84% for Dolly Varden and 88% for Torbrit. The whole-ore and flotation-tail

silver cyanidation kinetics for the Dolly Varden and Torbrit composites are shown in Figure

10-5.

Contango Silver and Gold – Kitsault Valley Project Page 129 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 10-5.

Silver cyanidation kinetics for selected Dolly Varden and Torbrit composites. A – Dolly Varden whole-ore cyanidation kinetics;

B – Torbrit whole-ore Cyanidation Kinetics; C – Flotation-tail cyanidation kinetics (Dolly Varden and Torbrit). Summarized

results of the 2019 Blue Coast Research Ltd. metallurgical test work.

Table 10-5.

Preliminary silver recovery estimates from 2019 Dolly Varden and Torbrit test work.

Zone

Flotation

only -

lead concentrate

(%)

Flotation

only -

zinc concentrate

(%)

Cyanidation

of

flotation tails (%)

Flotation

+

cyanidation (%)

Whole-ore

cyanidation (%)

Dolly

Varden

65

Not

tested

54

84

86

Torbrit

64

7

59

88

87

Source: Summarized

from Turner and Hough (2023) and Middleditch (2019).

Contango Silver and Gold – Kitsault Valley Project Page 130 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 10-6 compares

selected silver, lead, and zinc recoveries achieved by process route for the Dolly Varden and Torbrit composites.

Figure 10-6.

Comparative recovery of silver, lead, and zinc by process route and deposit. Recoveries are based on selected composite test work and

represent the maximum recoveries achieved under the conditions shown. Whole-ore cyanidation recoveries for Ag, Pb, and Zn were calculated

from head assays and leach residues. Flotation-tail cyanidation reports Ag recovery only. Source: Blue Coast Research Ltd. (2019).

10.5 Wolf and Kitsol 2025/2026 Metallurgical

Test Work

10.5.1

Program Objective and Status

Fuse Advisors prepared

a metallurgical sample selection presentation for the Kitsault Valley Project dated April 30, 2026. The stated objective was to

complete a metallurgical test-work program to better define processing requirements for the Dolly Varden resource, particularly the Wolf

and Kitsol deposits, and to ensure that each major Dolly Varden and Homestake Ridge deposit has metallurgical test work sufficient to

support a future preliminary economic assessment. The stated test-work focus included mineralogy, comminution, cyanidation, flotation,

preliminary flowsheet development, and investigation of antimony as a potential saleable product where warranted.

Blue Coast Research

Ltd. was contracted by Dolly Varden Silver, c/o Fuse Advisors, to complete metallurgical test work on two composites from the Kitsault

Valley Project. The final Blue Coast Research report, project PJ-5599, is dated April 29, 2026. The program incorporated sample

characterization, mineralogy, flotation, whole-ore cyanidation, and flotation tails cyanidation. It was designed at a similar level of

scope to the prior Blue Coast Research program completed on Dolly Varden and Torbrit.

Contango Silver and Gold – Kitsault Valley Project Page 131 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

10.5.2

Sample Selection and Representativeness

The 2026 sample

selection work targeted composite grades broadly aligned with estimated mineral resource grades, with silver as the primary metal and

lead and zinc as secondary metals. The sample selection considered Dolly Varden-recommended drill intervals, MRE grade targets, grade

trimming to align with target grades, lithology, grain size, and available sample mass. Sample selection was from a combination of 2022-2024

drill holes for Wolf and 2021-2023 drill holes for Kitsol (Table 10-6). Fuse Advisors noted that no suitable drilling had been completed

at North Star for metallurgical testing.

Table 10-6.

Wolf and Kitsol sample selection summary.

Composite

Selected

drill intervals /

sources

Approximate

mass

selected

Selection

comments

Kitsol

DV21274

134.85-146.8 m;

DV22291 121.72-132.7 m;

DV22298 25.45-40.0 m;

DV23336 74-88 m

Approximately

80 kg selected; Blue Coast sample preparation inventory reports 88.9 kg in the final Kitsol composite

Composite

grade was mass-weighted and trimmed to align with a 425 g/t Ag target. Spatial representation was described as acceptable, with a

good range of lithology and grain size. Large internal grade swings may indicate potential for ore sorting or pre-concentration.

Wolf

DV22300

325.5-354.7 m;

DV22320 647.9-661.25 m;

DV23375 746.15-777 m;

DV24416 662.52-685.66 m;

DV24421 757.37-779.06 m

Approximately

161 kg selected; Blue Coast sample preparation inventory reports 147.7 kg in the final Wolf composite

Composite

grade was mass-weighted and trimmed to align with a 400 g/t Ag target. Spatial representation was described as good, with a good

range of lithology and grain size. The larger composite mass was retained to preserve grade and lithology variability.

Source: Summarized

from Fuse Advisors (2026) and Hall (2026a).

The selected composites

are appropriate for preliminary process-response testing of Wolf and Kitsol material. However, Blue Coast Research stated that its interpretations

are based on samples made available by the client and that no assurance can be made on representativeness. Therefore, the composites

should not be treated as fully representative of all spatial, mineralogical, lithological, oxidation, and grade variability within the

deposits.

10.5.3

Sample Preparation and Head Assays

A total of approximately

230 kg of assay reject material was submitted to Blue Coast Research in Parksville, British Columbia, in October 2025. The samples

were inventoried, weighed, stage crushed to 100% passing 6 mesh (3.35 mm), homogenized through a rotary splitter, and split into head

assay subsamples and replicate charges for metallurgical testing. Gold was analyzed by fire assay with ICP finish; silver, lead, zinc,

and iron by four-acid digest with ICP finish; and total sulphur by combustion IR using an ELTRA carbon-sulphur analyzer. The resulting

head assays for the Wolf and Kitsol composites are summarized in Table 10-7.

Table 10-7.

Wolf and Kitsol 2026 composite head assays.

Sample

ID

Au

(g/t)

Ag

(g/t)

Pb

(%)

Zn

(%)

Fe

(%)

Total

S (%)

Wolf

0.08

397

0.60

0.78

7.35

4.46

Kitsol

0.10

387

0.38

0.32

9.65

6.04

Source: Hall (2026a).

Contango Silver and Gold – Kitsault Valley Project Page 132 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

The Wolf composite

silver grade was close to the target grade of 400 g/t Ag. The Kitsol composite silver grade was lower than the 425 g/t Ag target but

close to the grade predicted during sample selection. Zinc and lead grades for both composites were close to the predicted sample-selection

values.

10.5.4

Mineralogy and Liberation

Mineralogical analysis

was completed using TESCAN TIMA. Each composite was ground to a target of 75 μm and screened into +75 μm, –75/+38 μm,

and –38 μm size fractions. Polished sections were prepared from each fraction. The predominant sulphide minerals were pyrite,

sphalerite, and galena. Quartz, feldspar, chlorite, and carbonates were the predominant non-sulphide minerals.

· Both

sphalerite and galena are fine grained and have low liberation in the +75 μm fraction.

This indicates that a coarse primary grind would constrain flotation recovery and concentrate

quality.

· Sphalerite

and galena grain-size statistics showed P80 values ranging from approximately 28 to 35 μm.

· Zinc

deportment was entirely to sphalerite and lead deportment was entirely to galena in the TIMA

data.

· Sulphur

was overwhelmingly hosted in pyrite. Kitsol was more pyrite-dominant than Wolf, while Wolf

showed relatively higher sphalerite content.

The new mineralogical

data support a primary grind near or finer than 75 μm for flotation testing, with regrinding used to improve cleaner concentrate quality.

10.5.5

Floatation Test Work

The flotation program

targeted silver, lead, and zinc recovery using both bulk and sequential lead-zinc flowsheet concepts. A total of eight rougher tests

and ten cleaner tests were completed. Silver was reported to be strongly associated with lead; therefore, in the sequential flowsheet,

silver recovery to the lead concentrate is preferred, although silver may reach payable levels in zinc concentrate.

· Bulk

rougher flotation at approximately 75 μm P80 produced lower lead, silver, and zinc recoveries

than sequential flotation, especially for Kitsol. The bulk flowsheet was not pursued further

and is not expected to provide strong concentrate payabilities.

· Sequential

rougher flotation achieved better results than the bulk flowsheet. Initial sequential rougher

tests showed promising recoveries, generally higher for Wolf than Kitsol.

· A

coarser primary grind of approximately 125 μm on Wolf reduced recovery and increased zinc

misplacement to the lead rougher concentrate. The coarser grind was not pursued further.

· Testing

of a stainless-steel mill on Kitsol was intended to address negative oxidation-reduction

potential but adversely affected lead-zinc selectivity and did not improve Pb/Zn/Ag recoveries.

The program reverted to mild steel grinding.

· Increasing

zinc depressants in the lead circuit reduced zinc misplacement to the lead concentrate. The

increased depressant regime was carried forward into cleaner tests.

· Cleaner

flotation optimization included increased regrind time, circulation of lead cleaner 1 tails

to the zinc cleaner circuit, increased zinc regrind time, and copper sulphate addition in

the zinc cleaner circuit.

Contango Silver and Gold – Kitsault Valley Project Page 133 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Selected final

concentrate grades from the optimized open-circuit cleaner tests are summarized in Table 10-8.

Table 10-8.

Selected final open-circuit cleaner concentrate grades from 2026 Wolf and Kitsol tests.

Test

ID

Sample

ID

Product

Ag

(g/t)

Pb

(%)

Zn

(%)

S

(%)

F-17

Wolf

Pb

Cln 3 Conc

29,230

51.5

5.8

22.53

F-17

Wolf

Zn

Cln 3 Conc

2,912

1.7

56.0

33.48

F-18

Kitsol

Pb

Cln 3 Conc

42,053

56.9

2.8

18.93

F-18

Kitsol

Zn

Cln 3 Conc

7,504

2.9

53.1

32.89

Source: Hall (2026a).

The corresponding

silver, lead and zinc recoveries from these tests are summarized in Table 10-9.

Table 10-9.

Selected final open-circuit cleaner flotation recoveries from 2026 Wolf and Kitsol tests.

Test

ID

Sample

ID

Product

Ag

recovery (%)

Pb

recovery (%)

Zn

recovery (%)

F-17

Wolf

Pb

Cln 3 Conc

70.5

77.7

6.6

F-17

Wolf

Zn

Cln 3 Conc

8.4

3.0

76.4

F-18

Kitsol

Pb

Cln 3 Conc

43.2

65.5

3.5

F-18

Kitsol

Zn

Cln 3 Conc

4.6

2.0

39.5

Source: Hall (2026a).

The optimized open-circuit

cleaner tests achieved final lead and zinc concentrate grades above the target grades used by Blue Coast Research. The Wolf composite

showed stronger flotation recovery than Kitsol, especially in zinc recovery. Kitsol may require blending or further optimization if production

of a separate zinc concentrate is considered material, because its lower zinc head grade limits zinc units available to the circuit.

Locked-cycle tests

were not included in the 2026 test-work program. Accordingly, the cleaner test results should be treated as open-circuit performance

indicators and not final metallurgical projections. Locked-cycle testing is required to evaluate circulating-load effects, final concentrate

quality, and steady-state recoveries.

10.5.6

Cyanidation Test Work

Eight cyanidation

tests were completed on whole ore and flotation tails. Each cyanidation test maintained sodium cyanide concentration at 3.0 g/L, 40%

solids, and pH 10.5 to 11 using lime. Kinetic samples were taken at 2, 6, 24, and 48 hours, with 72-hour duration for two extended tests.

Table 10-10 summarizes the cyanidation test purposes, reagent consumptions, grind sizes and resulting silver recoveries for the Wolf

and Kitsol composites

Contango Silver and Gold – Kitsault Valley Project Page 134 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 10-10.

Wolf and Kitsol 2026 cyanidation test results.

Test

ID

Composite

Purpose

NaCN

consumption

(kg/t)

CaO

consumption

(kg/t)

P80

(um)

Ag

recovery (%)

CN-1

Wolf

Baseline

whole-ore bottle roll

10.70

0.42

49

81.8

CN-2

Kitsol

Baseline

whole-ore bottle roll

12.29

0.44

51

83.0

CN-3

Wolf

Flotation

tails cyanidation

3.89

0.21

74

57.9

CN-4

Kitsol

Flotation

tails cyanidation

4.96

0.27

76

50.9

CN-5

Wolf

Pre-aeration,

72-hour leach

6.81

0.85

49

85.1

CN-6

Kitsol

Pre-aeration,

72-hour leach

6.19

1.21

53

79.1

CN-7

Wolf

Fine

grind and pre-aeration

6.18

0.52

42

82.6

CN-8

Kitsol

Fine

grind and pre-aeration

6.72

0.58

44

76.1

Source: Hall (2026a).

· Baseline

whole-ore cyanidation at approximately 50 μm P80 recovered approximately 82% Ag from Wolf

and 83% Ag from Kitsol. Cyanide consumption was high at approximately 10.7 kg/t for Wolf

and 12.3 kg/t for Kitsol.

· Pre-aeration

reduced cyanide consumption materially. For Wolf, pre-aeration plus extended leach time increased

silver recovery to approximately 85.1% while reducing cyanide consumption to approximately

6.8 kg/t. For Kitsol, pre-aeration reduced cyanide consumption to approximately 6.2 kg/t

but silver recovery was approximately 79.1%.

· A

finer primary grind near 40 μm did not improve silver recovery for either composite, unlike

the behavior previously observed for Dolly Varden and Torbrit.

· Flotation

tails cyanidation recovered a moderate amount of residual silver, approximately 57.9% from

Wolf flotation tails and 50.9% from Kitsol flotation tails.

· Kitsol

and Torbrit appear to have slower silver leach kinetics than Wolf and Dolly Varden, based

on the 2026 presentation comparison of leach residence-time curves.

10.5.7

Concentrate Quality and Deleterious Elements

The final lead

and zinc concentrates from tests F-17 and F-18 were submitted for selected assays for deleterious elements (Table 10-11). Sample mass

was limited, and not all analyses were performed. The results indicate that future concentrate marketing and penalty-element assessment

are material work items.

Contango Silver and Gold – Kitsault Valley Project Page 135 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 10-11.

Selected deleterious elements in 2026 final cleaner concentrates.

Test

ID

Sample

ID

Product

Hg

(ppm)

Cd

(ppm)

Se

(ppm)

Sb

(ppm)

W

(ppm)

Cl

(%)

F

(%)

F-17

Wolf

Pb

Cln 3 Conc

51

1,017

414

8,996

533

0.02

<0.01

F-17

Wolf

Zn

Cln 3 Conc

23

8,522

11

533

5,263

0.01

<0.01

F-18

Kitsol

Pb

Cln 3 Conc

86

659

78

18,399

252

0.03

<0.01

F-18

Kitsol

Zn

Cln 3 Conc

38

8,064

<10

4,827

4,872

–

<0.01

Source: Hall (2026a).

The antimony, mercury,

cadmium, selenium, tungsten, chlorine, and fluorine results should be considered preliminary because they were generated from limited

open-circuit concentrate mass. However, the reported antimony, mercury, cadmium, and tungsten values are sufficiently material that locked-cycle

concentrate generation and formal concentrate marketing review should be considered mandatory before any economic assumptions are adopted.

10.5.8

Principal Conclusions from the New Wolf and Kitsol Work

· The

2026 program demonstrates that Wolf and Kitsol mineralization responds to conventional sequential

Pb-Zn flotation and cyanidation process options.

· Sequential

flotation is clearly preferred over bulk flotation for both composites based on rougher recovery

and likely concentrate payability.

· A

primary grind near 75 μm performed better than a coarser grind of approximately 125 μm.

Mineralogy indicates that sphalerite and galena liberation improves at finer sizes, supporting

grind-size optimization around the 75 μm range and regrinding of cleaner feeds.

· Open-circuit

cleaner testing produced above-target Pb and Zn concentrate grades for both composites. Wolf

showed better overall flotation response than Kitsol, especially for zinc recovery.

· Whole-ore

cyanidation can achieve approximately 80% silver recovery for both composites, but cyanide

consumption is high. Pre-aeration reduces cyanide consumption and should be included in further

optimization.

· Flotation

tails cyanidation recovers residual silver and may support a combined flotation-plus-leach

flowsheet, but integrated locked-cycle flotation and tails leach testing is required.

· Deleterious

elements in final concentrates require further evaluation. The new work identifies a clear

concentrate-quality and marketing workstream, particularly for Sb, Hg, Cd and W.

10.6 Processing Implications by Mineralized

Area

10.6.1

Homestake

The Homestake test

work indicates that the tested material responds to selective sulphide flotation and cyanide leaching. Homestake Main behaves principally

as a copper-gold-silver system, while Homestake Silver behaves more as a lead-zinc-silver-gold system. Potentially high-value precious-metal-bearing

copper and lead concentrates were produced in batch tests, but additional work is required to confirm locked-cycle performance, concentrate

quality, smelter penalties, and marketability.

Contango Silver and Gold – Kitsault Valley Project Page 136 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

10.6.2

Dolly Varden and Torbrit

The 2019 Blue Coast

Research program indicates that Dolly Varden and Torbrit respond to conventional metallurgical processes, but their flotation behavior

differs materially. Torbrit appears more favorable for differential lead-zinc flotation. Dolly Varden requires additional lead-zinc separation

development due to zinc misplacement to the lead or bulk concentrate. Whole-ore cyanidation and flotation plus tailings cyanidation produced

encouraging preliminary silver recoveries, but cyanide consumption and environmental management remain important trade-offs.

10.6.3

Wolf and Kitsol

The 2026 Wolf and

Kitsol program is the most important new addition to the metallurgical database. Wolf appears to respond well to sequential Pb-Zn flotation,

with strong silver deportment to lead concentrate and improved zinc recovery in optimized cleaner testing. Kitsol can produce high-grade

lead and zinc concentrates in open-circuit tests, but its lower zinc head grade and lower zinc recovery make zinc concentrate economics

more sensitive to blending strategy, payability, penalty terms, and circuit configuration.

For both Wolf and

Kitsol, whole-ore cyanidation provides an alternative or complementary recovery path, but high cyanide consumption means that cyanidation

should be assessed in an integrated economic and environmental framework rather than as a recovery metric alone. Pre-aeration is a meaningful

optimization lever and should be incorporated into future leach testing.

10.7 Material Processing Risks, Deleterious

Elements, and Recovery Assumptions

The following risk

discussion is framed for exploration/initial assessment-level use. The recovery values in this chapter are not proposed as final recovery

assumptions. They are laboratory-scale indications of metallurgical response and are appropriate for identifying processing opportunities,

constraints, and follow-up work. Any economic model that uses these values should clearly identify them as preliminary and subject to

change after locked-cycle, variability, comminution, environmental, and marketing work.

The prior and recent

metallurgical programs demonstrate that mineralization tested to date can respond to conventional flotation and cyanidation process options.

However, the test work also identifies processing risks that should be reflected in recovery assumptions and project risk evaluation.

· Sample

representativeness: The tested composites represent selected mineralization types and

target grades but do not constitute a complete variability database across all relevant deposits

and domains.

· Flowsheet

maturity: Most flotation results are based on batch and open-circuit tests. Locked-cycle

flotation and integrated flotation-leach tests are required to confirm recirculating-load

effects, final concentrate quality, and metal deportment.

· Lead-zinc

separation: Dolly Varden, Homestake Silver, Wolf, and Kitsol each require additional

separation optimization to determine whether separate zinc concentrate production is economically

justified under realistic smelter terms.

Contango Silver and Gold – Kitsault Valley Project Page 137 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

· Comminution:

Only limited Bond Ball Work Index data are available from prior Torbrit testing, and the

2026 Wolf/Kitsol program did not include full grindability test work. JK Drop Weight/SMC,

Bond Ball Work Index, and Abrasion Index testing are required for process design.

· Cyanide

consumption and leach kinetics: Whole-ore and concentrate cyanidation can achieve encouraging

precious-metal extraction, but cyanide consumption and incomplete or variable kinetics are

material issues for operating costs, detoxification, permitting, and tailings management.

· Concentrate

quality: Arsenic, antimony, mercury, cadmium, selenium, tungsten, chlorine, and fluorine

require confirmation using sufficient locked-cycle concentrate mass and appropriate analytical

methods.

· Environmental

characterization: Cyanidation residues, flotation tailings, sulphide-bearing tailings,

WAD cyanide formation, acid rock drainage potential, and metal leaching potential require

environmental and geochemical characterization before final process selection.

· Recovery

assumptions: Recovery values from batch and open-circuit tests should not be applied

as reserve-level assumptions without locked-cycle confirmation, variability testing, and

geometallurgical domain support.

10.8 Adequacy of the Metallurgical

Data

In the opinion

of the QP, the metallurgical database is adequate for an exploration/initial assessment-level TRS to describe preliminary processing

response and material process risks. It is not adequate for mineral reserve conversion, final plant design, or final project-level recovery

projections.

Based on the source

summaries and recent reports reviewed for this chapter, the available metallurgical data are adequate to demonstrate preliminary metallurgical

response for selected Homestake, Dolly Varden, Torbrit, Wolf, and Kitsol mineralization. The new Wolf and Kitsol test work materially

improves the project metallurgical coverage because it adds modern data for deposits that were not covered by the 2019 Blue Coast Research

program.

The available metallurgical

database is not yet considered sufficient, by itself, to support final flowsheet selection, detailed plant design, mineral reserve conversion,

final concentrate marketing assumptions, or reserve-level recovery estimates. Before the metallurgical assumptions are used for reserve-level

disclosure or detailed economic analysis, additional confirmatory and variability test work should be completed under an approved metallurgical

test plan.

10.9 Recommended Follow-up Work

The following follow-up

work is recommended to advance the metallurgical basis for the Kitsault Valley Project. The work should be organized into phases with

budgets and decision points consistent with the overall level of study. The recommended scope should be finalized against the applicable

laboratory quotations and proposals (ALS Canada Ltd., 2026; Hall, 2026b)

Phase 1 - Confirmatory

and Design-Basis Testing

· Develop

a geometallurgical composite selection plan covering Homestake Main, Homestake Silver, South

Reef, Dolly Varden, Torbrit, Wolf, Kitsol, North Star, and other relevant domains where applicable.

· Complete

grindability testing to support comminution design, including JK Drop Weight/SMC, Bond Ball

Work Index, and Abrasion Index testing.

Contango Silver and Gold – Kitsault Valley Project Page 138 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

· Complete

locked-cycle flotation tests on representative composites to validate sequential flotation

performance and generate metallurgical projections.

· Generate

sufficient final concentrate mass for detailed multi-element concentrate characterization,

deleterious-element deportment, and concentrate marketing review.

· Optimize

primary grind and regrind sizes for flotation recovery, concentrate grade, liberation, leach

response, and energy consumption.

Phase 2 - Variability

and Flowsheet Optimization

· Complete

variability testing by deposit, lithology, grade range, mineralized domain, alteration intensity,

sulphide assemblage, oxidation state, and spatial location.

· Optimize

lead-zinc separation, especially for Dolly Varden, Homestake Silver, Wolf, and Kitsol, and

determine whether zinc concentrate production has economic value in each domain or requires

blending.

· Optimize

cyanidation parameters, including grind size, residence time, cyanide concentration, oxygenation,

pre-aeration, pH control, lead nitrate or other additives, and detoxification requirements.

· Evaluate

combined flotation plus tailings cyanidation under integrated conditions rather than as isolated

batch tests.

· Investigate

pre-concentration or ore sorting potential where large grade swings exist within mineralized

intervals, particularly where indicated by the Kitsol sample selection review.

Phase 3 - Environmental,

Marketing, and Model Integration

· Complete

environmental characterization of flotation tailings, cyanidation residues, sulphide-bearing

materials, WAD cyanide potential, acid rock drainage potential, and metal leaching potential.

· Complete

independent concentrate marketing review using locked-cycle concentrate products and realistic

payable, penalty, treatment, refining, and freight terms.

· Investigate

antimony deportment and the potential for antimony to represent either a saleable product

opportunity or a penalty/liability.

· Prepare

metallurgical recovery models supported by test work and geometallurgical domains for use

in resource optimization, process design, and future economic evaluation.

· Confirm

laboratory QA/QC, chain-of-custody, sample storage, and laboratory quality-system information

for all test-work programs used to support disclosure.

Contango Silver and Gold – Kitsault Valley Project Page 139 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11 MINERAL

RESOURCE ESTIMATES

11.1 Introduction and Basis of Estimate

This chapter presents

the 2026 Mineral Resource estimates for the Kitsault Valley Project. The Homestake region comprises Homestake Main, Homestake Silver

and South Reef. The Dolly Varden area comprises Wolf, Kitsol, Torbrit, Dolly Varden and North Star. Seven deposits have updated geological

and resource models. South Reef is retained as an Inferred Mineral Resource on its preceding estimation and reporting basis.

The Project contains

7.66 Mt of Indicated Mineral Resources with 58.698 Moz Ag and 394.700 koz Au, reported as 89.545 Moz AgEq, and 6.305 Mt of Inferred Mineral

Resources with 22.804 Moz Ag and 620.817 koz Au, reported as 64.920 Moz AgEq. Copper, lead and zinc grades and contained quantities are

disclosed with individual deposits. The Inferred totals include the carried-forward South Reef estimate. Indicated and Inferred resources

are reported separately because their levels of confidence differ.

Dave Larimer is

the Qualified Person responsible for the Mineral Resource estimates and this chapter. Mr. Larimer is employed by the Company and

is not independent. Sims Resources assisted with geological modeling, statistical evaluation and implementation of the Leapfrog resource

models under the QP’s supervision. The QP reviewed and accepted the model inputs, estimation parameters, validation and classification

and takes responsibility for the estimates. Qualifications and responsibilities are described in Chapter 2.

The reporting reference

point is in-situ mineralized material within the accepted resource domains, above the applicable reporting cut-off and after removal

of modeled historical depletion, before mining dilution and mining recovery. Estimated metallurgical recoveries enter the metal-equivalent

calculation but are not deductions from the individually reported in-situ contained metals. No Measured Mineral Resources or Mineral

Reserves are reported. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

The effective date

of the Mineral Resource estimate is September 11th, 2026. The resource databases and supporting information were locked, checked

and certified by the QP as of that date. Subsequent model-archive and parameter-export dates are documentation dates and do not change

the effective date.

Table 11-1 summarizes

the estimation scope. The resource table in Section 11.7 retains the final approved quantities and reporting cut-offs, including

South Reef’s separate basis. See Figure 11-1 for deposit location map.

Table 11-1.

Deposit scope and reporting basis.

Region

Deposit

Estimation

status

Reporting

cut-off

Homestake

Homestake

Main

Updated

2026 model

132

g/t AgEq

Homestake

Homestake

Silver

Updated

2026 model

132

g/t AgEq

Homestake

South

Reef

Carried-forward

Inferred estimate

2.0

g/t AuEq

Dolly

Varden

Wolf

Updated

2026 model

132

g/t AgEq

Dolly

Varden

Kitsol

Updated

2026 model

132

g/t AgEq

Dolly

Varden

Torbrit

Updated

2026 model

132

g/t AgEq

Dolly

Varden

Dolly

Varden

Updated

2026 model

132

g/t AgEq

Dolly

Varden

North

Star

Updated

2026 model

132

g/t AgEq

Contango Silver and Gold – Kitsault Valley Project Page 140 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 11-1.

Regional location of the Kitsault Valley resource deposits. Red outlines show the resource deposits. Coordinates are NAD83 / UTM

Zone 9N, in meters.

Contango Silver and Gold – Kitsault Valley Project Page 141 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.2 Resource Database and Data Preparation

The Mineral Resource

database comprises drill-hole collar locations, downhole surveys, geological logging, analytical results and bulk-density measurements

assembled for the Kitsault Valley Project. The Qualified Person (QP) reviewed and accepted the database for resource estimation, including

the consistency of collar and survey information, interval definitions, analytical units, missing or invalid values, and the relationship

of samples to the interpreted geological domains. Drilling and sampling procedures are described in Chapter 7, analytical methods and

quality control in Chapter 8, and data verification in Chapter 9.

The assay dataset

was locked at the start of January 2026 following receipt and incorporation of the results accepted for the estimate. Geological-solid

updates and database review continued through March 2026. The resource databases and supporting information were finalized, checked

and certified by the QP on April 13th, 2026 and is the database certification date. The final resource statement, classifications

and supporting technical and economic assumptions were accepted by the QP as complete and current on September 11, 2026, the Mineral

Resource effective date.

The database and

resource models use NAD83 / UTM Zone 9N coordinates, with eastings, northings and elevations expressed in meters. The QP verified the

coordinate-reference information used for the estimate. Gold and silver in the merged exports are reported in parts per million (ppm),

numerically equivalent to grams per tonne (g/t). Gold fields labelled AU_PPM or Au_ppm are already in these units. Copper, lead and zinc

are stored in ppm and are divided by 10,000 when expressed as percentages.

The project header

inventory contains 1,873 holes totaling 433,933.73 m. Of these, 1,454 holes totaling 328,638.18 m are assigned to the eight resource-reporting

deposits; the remaining 419 holes, totaling 105,295.55 m, are assigned to other or unmapped prospects. Table 11-2 summarizes the

deposit header inventory and the drilling recorded from each prior resource effective-date year onward. Drilled meters are the full lengths

recorded in the header database. The interval populations selected within the geological models are summarized separately in Tables 11-3

and 11-4.

Table 11-2.

Drill hole header inventory by deposit.

Deposit

All

holes

All

drilled

meters

Underlying

prior

MRE date

Post-effective-

date holes

Post-effective-

date meters

Homestake

Main

228

57,945.18

2019-12-31

72

25,410.34

Homestake

Silver

151

77,712.01

2019-12-31

90

53,530.43

South

Reef

47

16,128.51

2019-12-31

1

222.00

Wolf

231

84,465.75

2019-05-08

117

71,308.92

Kitsol

35

10,965.46

2019-05-08

22

7,532.00

Torbrit

540

51,289.11

2019-05-08

58

13,257.68

Dolly

Varden

78

12,351.50

2019-05-08

1

390.00

North

Star

144

17,780.66

2015-05-18

10

3,834.35

Total

1,454

328,638.18

Deposit-specific

371

175,485.72

Contango Silver and Gold – Kitsault Valley Project Page 142 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

The estimation-input

inventory was compiled from merged interval tables exported directly from Leapfrog for Homestake Main, Homestake Silver, Wolf, Kitsol,

Torbrit, Dolly Varden and North Star. The seven exports contain 24,120 intervals totaling 29,842.13 m from 1,023 distinct hole identifiers.

Of these, 23,264 intervals totaling 27,176.00 m, from 947 distinct hole identifiers, contain at least one populated result for Ag, Au,

Cu, Pb or Zn. The remaining 856 intervals, totaling 2,666.13 m, have no populated result for these metals. All exported hole identifiers

were matched to the project header inventory.

Table 11-3 summarizes

analytical coverage by deposit. Each metal has its own input population because analytical coverage varies, particularly in historical

southern-deposit data. Interval meterage is calculated from the exported start and end depths.

Table 11-3.

Merged interval inventory and analytical coverage by deposit.

Deposit

Export

holes

Holes

with

results

Ag

results

Au

results

Cu

results

Pb

results

Zn

results

Assayed

meters

Homestake

Main

176

174

6,552

6,552

6,552

6,552

6,552

8,535.30

Homestake

Silver

114

114

7,429

7,429

7,429

7,429

7,429

7,950.11

Wolf

145

139

2,040

1,428

1,428

1,475

1,470

1,576.43

Kitsol

17

16

377

377

377

377

377

289.20

Torbrit

417

354

5,630

1,713

1,713

1,910

1,969

7,291.51

Dolly

Varden

54

51

453

358

358

378

378

618.10

North

Star

100

99

783

110

281

401

416

915.34

Total

1,023

947

23,264

17,967

18,138

18,522

18,591

27,176.00

Table 11-4 summarizes

analytical coverage within 34 exported geological domains. Domain-level hole counts are not additive because a hole may intersect several

domains. Merged tables can split original assay intervals at geological or other table boundaries, so row counts differ from original

sample and final composite counts. Geological-model fields define the grouping; secondary vein fields were retained for traceability

and were not used as an additional exclusion filter.

Contango Silver and Gold – Kitsault Valley Project Page 143 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-4.

Merged interval analytical coverage by deposit and domain.

Deposit

Domain

Holes

with

results

Ag

results

Au

results

Cu

results

Pb

results

Zn

results

Assayed

meters

Homestake

Main

FW

72

541

541

541

541

541

592.54

Homestake

Main

HW

103

677

677

677

677

677

715.73

Homestake

Main

LOWGRADE

174

5,173

5,173

5,173

5,173

5,173

7,093.45

Homestake

Main

MIDLENS

37

161

161

161

161

161

133.58

Homestake

Silver

HS1

62

671

671

671

671

671

560.34

Homestake

Silver

HS2

28

264

264

264

264

264

223.43

Homestake

Silver

HS3

9

48

48

48

48

48

34.15

Homestake

Silver

HS4

4

45

45

45

45

45

44.14

Homestake

Silver

HS5

37

277

277

277

277

277

238.45

Homestake

Silver

HS6

7

35

35

35

35

35

30.78

Homestake

Silver

HS7

10

65

65

65

65

65

55.86

Homestake

Silver

HS8

4

21

21

21

21

21

14.61

Homestake

Silver

HS9

9

44

44

44

44

44

40.31

Homestake

Silver

HS10

5

12

12

12

12

12

8.73

Homestake

Silver

HS11

4

22

22

22

22

22

14.63

Homestake

Silver

HS12

9

49

49

49

49

49

38.81

Homestake

Silver

LG_HALO

114

5,876

5,876

5,876

5,876

5,876

6,645.90

Wolf

Upper

veins

76

850

238

238

285

280

761.14

Wolf

Deep

63

1,190

1,190

1,190

1,190

1,190

815.29

Kitsol

Kitsol

vein

16

377

377

377

377

377

289.20

Torbrit

TB_A

265

3,761

847

847

969

1,030

5,082.39

Torbrit

TB_B

clip A

54

561

106

106

109

109

745.84

Torbrit

TB_C

clip A

35

286

105

105

126

121

354.25

Torbrit

TB_D

clip A

30

183

23

23

23

23

245.12

Torbrit

TB_E

clip A

18

235

85

85

136

139

304.08

Torbrit

TB_F

15

192

192

192

192

192

190.85

Torbrit

TB_G

14

90

90

90

90

90

69.42

Torbrit

TB_H

12

76

76

76

76

76

64.19

Torbrit

TB_I

10

115

115

115

115

115

105.27

Torbrit

TB_J

6

31

31

31

31

31

23.01

Torbrit

TB_K

22

100

43

43

43

43

107.10

Dolly

Varden

DV_Main

48

384

305

305

318

318

534.89

Dolly

Varden

DV_HW

12

69

53

53

60

60

83.21

North

Star

North

Star vein

99

783

110

281

401

416

915.34

Contango Silver and Gold – Kitsault Valley Project Page 144 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

The export reconciliation

identified no duplicate hole–from–to records, non-positive interval lengths or internal interval overlaps. All exported intervals

were retained for the inventory, with missing analytical coverage identified. These checks complement the QP verification in Chapter

9.

South Reef remains

a carried-forward Inferred Mineral Resource. Its header inventory appears in Table 11-2. The seven merged exports do not include South

Reef; its retained estimation basis is described in Section 11.5.4.

The QP considers

the verified database and preparation procedures adequate for resource estimation. Drilling and sample coverage are to be illustrated

in Figure 11-2.

Figure 11-2.

Drilling and sample coverage supporting the Mineral Resource estimates. A – Homestake northern region. B – Dolly Varden southern

region. Historical drilling in gray with red drill traces representing holes included in this MRE.

11.3   Project-wide

Estimation and Reporting Conventions

The seven block

models were created in Leapfrog Geo version 2026.1.2, with the resource-estimation functionality provided by the Edge extension. Final

Exports are locked and generated on September 11, 2026.

The common workflow

comprises geological interpretation, selection of samples within mineralized domains, compositing and high-grade treatment, declustering

by domain and element, independent estimation of each metal, evaluation onto sub-blocked models, density assignment, resource classification,

depletion where relevant and application of the reporting cut-off. Geological boundaries determine the populations available to an estimator.

Search ellipsoids control which eligible samples can inform an estimate. Classification then describes the confidence in that estimate.

A block passing a grade cut-off is not a Mineral Resource unless it also meets the geological, spatial and classification requirements.

Contango Silver and Gold – Kitsault Valley Project Page 145 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Block model.

The updated models

use 5 × 5 × 5 m parent blocks and minimum sub-blocks of 0.5 × 0.5 × 0.5 m. Sub-blocking represents domain and

depletion boundaries more closely; it does not create additional sample support or justify a higher resource category. Block tonnage

is the accepted mineralized volume multiplied by the assigned density. Contained precious metal is calculated from tonnes and g/t using

31.1034768 grams per troy ounce. Base-metal reporting uses 2,204.62262 pounds per metric tonne and the stated grade units.

Density Assignment

Bulk-density measurements

were obtained from intact drill-core specimens using the Archimedes water-immersion method. Core was weighed in air and submerged in

water; density was calculated from the mass in air divided by the difference between the air and submerged masses. The reported BULK_DENS

and SG_FIELD values were used in the statistical review, with recalculated densities retained as a quality-control check where both mass

measurements were available. Numerically, g/cm³ and t/m³ are equivalent.

The reviewed populations

support validation but do not automatically represent the volume-weighted density of the final mineralized domains. Historical and current

counts overlap and are not additive. Changes in count are not identified as new measurements without reconciliation of sample identifiers,

dates and domain membership. Table 11-5 summarizes the screened density measurements, supporting drill holes, screened mean densities

and resource density assignments for each deposit.

Table 11-5.

Density measurement support and resource assignments

Deposit

Screened

measurements

Supporting

holes

Screened

mean

(t/m³)

Resource

density

(t/m³)

Homestake

Main

926

48

2.759

2.77

Homestake

Silver

2612

51

2.751

2.77

South

Reef

77

14

2.970

3.01

Wolf

31

15

2.898

2.90

Kitsol

33

11

2.890

3.00

Torbrit

389

72

3.337

3.10

Dolly

Varden

156

22

2.977

3.00

North

Star

0

–

–

3.00²

Grade Capping

Capping is selected

by element within each domain using the distribution of grades, the influence of extreme values and their geological and spatial context.

The current grade-capping worksheet reports the capped input count, cap, number affected, input-metal reduction and resulting statistics.

The percentage of records capped is calculated as the number affected divided by the domain count. Its Metal Loss % column is an input-data

statistic; it is not the percentage of resource ounces removed by capping. Resource-metal effects require paired evaluations with the

same sample selection, interpolation settings, block population, cut-off and depletion constraints. Each deposit capping by domain is

described below in their respective section.

Contango Silver and Gold – Kitsault Valley Project Page 146 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Sample Compositing

Target composite

lengths of 2.0 m for Homestake Main, Homestake Silver, South Reef, Wolf and Torbrit; 1.25 m for Dolly Varden Main (DV_Main); and 1.5

m for Kitsol and North Star. All deposits used the within boundary (hard boundary) compositing setting with hard domain boundaries. Residual

end lengths of less than 1.0 m were distributed equally within the boundary interval. No additional weighting was applied during compositing.

These compositing settings are distinct from the deposit-specific interpolation and declustering settings described below.

Interpolation

IDW with power

3 is used in the updated parameter sets. Search directions are either fixed dip/dip-azimuth/pitch values or variable-orientation fields

that follow local mineralized geometry. Search limits are not interchangeable with classification thresholds.

Declustering

Declustering was

evaluated and applied in every estimator for all deposits used in Leapfrog’s declustering program. Declustering was performed separately

within each estimation domain for each element, and the resulting declustering weights were applied in the respective estimators. Declustering

during estimation is separate from the compositing procedure, for which no additional weighting was applied. The capping tables report

capped arithmetic input statistics, not declustered means.

Classification

Distances

The classification

calculations for Homestake Main, Homestake Silver, Wolf, Torbrit, Kitsol and North Star use the average distance (AvgD) to samples from

dedicated classification estimators, divided by 0.707 (Table 11-6). This is an approximate nominal-spacing indicator derived from idealized

sampling geometry, not a direct measurement of actual hole spacing. It is also not an anisotropic distance. The raw AvgD field remains

the mean sample-to-block distance in meters. Geological continuity and independent drill-hole support are assessed in addition to the

numerical thresholds.

Table 11-6.

Selected classification thresholds and raw AvgD equivalents.

Deposit

Nominal

Indicated

limit (m)

Nominal

Inferred

limit (m)

Raw

AvgD Indicated

limit (m)

Raw

AvgD Inferred

limit (m)

Homestake

Main

38

100

26.866

70.700

Homestake

Silver

38

100

26.866

70.700

Wolf

45

100

31.815

70.700

Kitsol

35

70

24.745

49.490

Torbrit

35

100

24.745

70.700

North

Star

30

70

21.210

49.490

Dolly

Varden

30

70

21.210

49.490

Contango Silver and Gold – Kitsault Valley Project Page 147 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.4 Economic

Basis and Resource Reporting Assumptions

11.4.1

Conceptual Mining and Processing Scenario

The reporting scenario

is potential underground extraction of the mineralized lenses and veins. Mechanized long-hole stoping is a conceptual method where thickness,

dip, continuity and rock conditions support it. Narrow or geometrically complex portions may require more selective methods or may not

form reportable mining volumes. The resource model is intended to support further engineering evaluation; it is not a mine design or

a production schedule.

The processing

concept builds on the flotation and leaching test work discussed in Chapter 10. Recovery assumptions distinguish the silver-dominant

southern deposits from Homestake Main and Homestake Silver. The inclusion of multiple metals assumes compatible recovery routes and marketable

products. Regional recovery factors do not establish that every metal recovery has been demonstrated simultaneously in an integrated

circuit or that a common plant has been designed for all deposits.

11.4.2

Commodity Prices and Selection Basis

The QP reviewed

and accepted the long-term commodity-price assumptions used in the 2026 resource models. Senior management concurred with the price basis

in May 2026. The selected gold and silver prices imply a gross gold-to-silver price ratio of approximately 66:1. The QP considers

these prices reasonable for resource evaluation and intended to moderate the elevated spot-price environment at the time the assumptions

were established (Table 11-7).

Table 11-7.

Commodity prices for the 2026 updated estimates

Commodity

Assumed

price

Price

unit

Silver

53.00

US$/troy

oz

Gold

3,500.00

US$/troy

oz

Copper

5.00

US$/lb

Zinc

1.25

US$/lb

Lead

0.90

US$/lb

11.4.3

Metallurgical Recovery Assumptions

The recovery matrix

reflects available metallurgical and geometallurgical information through 2025 and the differing metal associations in the three regional

metallurgical groups (Table 11-8). The QP accepted the factors for this resource evaluation. Some non-silver recoveries in the southern

area, and Pb and Zn recoveries at Homestake Main, are judgmental proxy assumptions. The Homestake Silver factors are rounded interpretations

of available rougher, cleaner and leach results, rather than a single measured whole-feed integrated recovery.

Contango Silver and Gold – Kitsault Valley Project Page 148 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-8.

Recovery factors used in the updated metal-equivalent calculations

Deposit group

Ag

(%)

Au

(%)

Cu

(%)

Pb

(%)

Zn

(%)

Dolly

Varden area

85

75

70

85

80

Homestake

Main

80

85

65

75

70

Homestake

Silver

85

80

65

80

75

The southern Ag

assumption of 85% is lower than the 90% used previously. Homestake Main assumptions of 85% Au, 80% Ag and 65% Cu are lower than the earlier

92%, 88% and 87.5% assumptions. The reductions allow for the difference between individual test-stage recoveries and overall recovery

through a potential operating circuit. Recovery, payability and marketability are distinct. Further variability testing, concentrate

characterization and assessment of treatment charges, refining charges and penalties are required as the Project advances.

11.4.4

Metal Equivalent Formulae

AgEq expresses

the estimated metals on a common silver-value basis using their prices and relative metallurgical recoveries. Silver and gold grades

are in g/t; copper, lead and zinc grades in the equations below are percentages. Because the equations are normalized to recovered silver

value, the Ag coefficient is one. The recoveries are therefore already embedded in the relative coefficients and must not be applied

again to those contributions when interpreting the AgEq grade.

For a precious-metal

term, the conversion coefficient is the metal price multiplied by its recovery, divided by the silver price multiplied by silver recovery.

For a base-metal grade expressed as percent, the conversion also includes 22.0462262 lb per tonne for each 1% grade and 31.1034768 g

per troy ounce. If base-metal model fields remain in ppm, they must be divided by 10,000 before applying the coefficients shown above.

AgEq is calculated from individual block grades before selection at the reporting cut-off.

The approved South

Reef row reports 8.60 Moz AgEq as a retained comparative metric. Its physical tonnage and grades are carried forward at 2.0 g/t AuEq.

That 8.60 Moz value has not been presented as the result of applying the 2026 Homestake Silver equation or a 132 g/t AgEq filter to the

South Reef block model.

11.4.5

Unit Costs and Cut-off Grade Derivation

The seven updated

deposits are reported at 132 g/t AgEq. This reporting threshold is separate from the equivalent-grade conversion. At the adopted prices,

2.0 g/t Au has a gross metal value equivalent to approximately 132.08 g/t Ag. Mineral resources for the updated deposits are reported

from three-dimensional block models constrained within underground shapes developed in Leapfrog, using an adopted reporting cut-off of

132 grams per metric ton silver equivalent (g/t AgEq). These shapes delineate spatially continuous mineralization, considered potentially

amenable to future mechanized underground mining. Silver-equivalent grades incorporate the adopted metal prices and assume metallurgical

recoveries. The grade threshold and underground constraints form part of the assessment of reasonable prospects for economic extraction

at the project’s current exploration stage.

Contango Silver and Gold – Kitsault Valley Project Page 149 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.4.6

Spatial and Technical Constraints on Resource Reporting

The updated resource

calculations use mineralized domains, accepted classifications, the AgEq cut-off and mined/unmined coding where applicable.

Historical mine

workings are excluded from Torbrit, Dolly Varden and North Star. Cat4 or otherwise unclassified material is excluded from all reported

resources, even where its estimated grade exceeds the cut-off. Small, disconnected blocks and narrow unsupported projections are considered

in the QP’s spatial review. Mineralized model volumes outside the supported classified resource are not included in the resource

statement.

11.4.7

Reasonable Prospects for Economic Extraction

The QP’s

assessment of reasonable prospects considers underground access, geometry and continuity, processing options, recovery and marketability,

infrastructure, environmental and permitting requirements, and the economic assumptions used to select the reporting cut-off. The established

mining district, available regional access and services, historical underground operations in the southern area and metallurgical response

provide a basis for continued evaluation. Historical production and prior conceptual studies support the assessment but do not demonstrate

the economic viability of the current resources.

In the QP’s

opinion, the identified technical issues can be addressed through further drilling, metallurgical testing and engineering evaluation.

Permitting, environmental management, access and community-related factors are addressed in the relevant TRS chapters. No mine development

decision or Mineral Reserve is established by this Mineral Resource estimate.

11.5 Homestake

Region Mineral Resource Estimates

11.5.1

Regional Overview and Shared Methodology

The Homestake region

contains structurally controlled gold-silver mineralization at Homestake Main, Homestake Silver and South Reef. Updated grade-shell and

lens interpretations are used for Homestake Main and Homestake Silver. Both employ hard boundaries, capped five-metal inputs, IDW

with power 3, 2.77 t/m³ density and 38/100 nominal classification thresholds. Their recovery matrices differ. South Reef is carried

forward and retains its original domain densities, classification and AuEq cut-off.

The two updated

models require separate consideration of high-grade lenses and broader lower-grade envelopes. Changes in the proportions of those domains

can alter tonnage and average grade even where the total drilled mineralized footprint is similar. The geological basis and estimation

procedures are described for each deposit below.

11.5.2

Homestake Main

11.5.2.1

Estimation Basis and Input Data

The Homestake Main

estimate uses the SRs HS Main Grade Shell GM interpretation and the HS Capped_DGL estimation dataset. The current interpretation incorporates

the drilling and geological review completed for the 2026 update. The preceding estimate was accepted with an underlying effective date

of January 20, 2022 and was subsequently reviewed in the 2023 combined Kitsault Valley report. The 2026 estimate replaces that estimate

for Homestake Main.

Contango Silver and Gold – Kitsault Valley Project Page 150 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

The deposit header

inventory contains 228 holes totaling 57,945.18 m. Of these, 29 holes totaling 14,024.76 m fall in years after the preceding effective-date

year; a further 43 holes totaling 11,385.58 m are in the boundary year. These are inventory counts, with the estimation-input population

defined by domain and assay acceptance as described in Section 11.2.

11.5.2.2

Geological Interpretation and Estimation Domains

Mineralization

is organized into hanging-wall, footwall and middle lenses within a broader lower-grade envelope (Table 11-9). The modeled system follows

a northwest-trending structural corridor and has a sigmoidal geometry with a northwest plunge. Higher-grade lenses are associated with

stronger silicification, quartz veining and brecciation, and sulphide development. Broader sericite-pyrite alteration and stockwork veining

support the lower-grade envelope. The domains separate populations with different grade distributions and geological continuity. They

also prevent the broad low-grade population from diluting the higher-grade lenses during interpolation. The spatial relationships and

geometry of the four modeled Homestake Main domains are illustrated in plan, longitudinal and cross-sectional views in Figure 11-3.

Table 11-9.

Homestake Main estimation domains.

Model

domain

Geological

role

HM_2026_FW

Footwall

mineralized lens

HM_2026_HW

Hanging-wall

mineralized lens

HM_2026_LOWGRADE

Lower-grade

envelope around and between the principal lenses

HM_2026_MIDLENS

Middle

mineralized lens

Figure 11-3.

Homestake Main geological domains and representative sections. Deposit views of Homestake Main showing the four modeled domains used

in this MRE. A – Plan view, B – Longitudinal view (looking SW), C – Cross-sectional view (looking NW).

Contango Silver and Gold – Kitsault Valley Project Page 151 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.5.2.3

Sample Statistics and Compositing

The domain capping

populations comprise 305 records in FW, 361 in HW, 3,569 in LOWGRADE and 73 in MIDLENS for each of the five estimated elements. The 17,610-record

parent population includes material outside these four domain populations and is not the count of informing composites within the reported

resource domains. Capped mean gold grades are approximately 5.34 g/t in FW, 5.57 g/t in HW, 0.42 g/t in LOWGRADE and 2.89 g/t in MIDLENS.

The much larger low-grade population illustrates why a project-wide arithmetic mean is not an appropriate validation target for the higher-grade

lenses.

Homestake Main

samples were composited to a target length of 2.0 m using the within boundary setting and hard domain boundaries. Residual end lengths

of less than 1.0 m were distributed equally within the boundary interval. No additional weighting was applied during compositing. The

following capping table reports capped input means and coefficients of variation. The capped arithmetic input statistics are distinct

from declustered statistics and volume-weighted block grades.

11.5.2.4

Grade Capping

Gold caps are 70

g/t in FW, 80 g/t in HW, 7 g/t in LOWGRADE and 22 g/t in MIDLENS. Silver caps are 100, 1,750, 70 and 60 g/t, respectively. The caps reflect

the different grade distributions within each domain. The MIDLENS silver cap is 60 g/t in the current capping schedule, superseding the

61 g/t example in the initial chapter draft. Gold input-metal reductions range from 9.61% to 22.89%. Base-metal distributions are more

sensitive in some domains, particularly MIDLENS, where Pb and Zn input-metal reductions are 77.37% and 89.38%. These large percentages

concern small, highly skewed input populations and are not equivalent to percentage reductions in the deposit resource. Table 11-10 reports

the caps and capped input statistics for Homestake Main.

Contango Silver and Gold – Kitsault Valley Project Page 152 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-10.

Homestake Main caps and capped input statistics.

Domain

Metal

Input

N

Cap

Capped

N

Capped

(%)

Input

metal

loss (%)

Capped

mean

CV

FW

Ag

305

100

5

1.64

16.36

9.96

1.64

HW

Ag

361

1,750

6

1.66

9.01

80.09

3.25

LOWGRADE

Ag

3,569

70

8

0.22

20.03

3.58

2.01

MIDLENS

Ag

73

60

2

2.74

1.54

6.92

1.64

FW

Au

305

70

4

1.31

22.89

5.338

2.04

HW

Au

361

80

3

0.83

11.12

5.573

2.13

LOWGRADE

Au

3,569

7

7

0.20

10.18

0.416

1.61

MIDLENS

Au

73

22

2

2.74

9.61

2.888

1.39

FW

Cu

305

4,200

38

12.46

29.06

955.05

1.49

HW

Cu

361

14,000

12

3.32

19.10

1,454.69

2.27

LOWGRADE

Cu

3,569

7,700

20

0.56

15.73

230.57

3.68

MIDLENS

Cu

73

5,200

7

9.59

41.68

826.07

1.94

FW

Pb

305

2,200

8

2.62

28.36

284.74

1.80

HW

Pb

361

4,900

17

4.71

29.69

601.95

2.16

LOWGRADE

Pb

3,569

3,200

25

0.70

27.29

108.80

3.44

MIDLENS

Pb

73

1,000

6

8.22

77.37

136.93

2.01

FW

Zn

305

3,500

19

6.23

40.32

553.54

1.74

HW

Zn

361

11,500

12

3.32

20.13

1,149.20

2.22

LOWGRADE

Zn

3,569

12,000

14

0.39

14.26

310.77

3.60

MIDLENS

Zn

73

400

8

10.96

89.38

141.20

0.81

11.5.2.5

Bulk Density Assignment

A constant bulk

density of 2.77 t/m³ is applied to the four domains. The mineralized-sample review contains 926 measurements from 48 drill holes

with an arithmetic mean of 2.759 t/m³. The assignment is approximately 0.4% above that screened mean and is consistent with the

earlier mineralized-zone mean of approximately 2.75 t/m³. The QP considers 2.77 t/m³ appropriate for the current estimate.

Density should continue to be assessed by final domain because the screened average does not quantify the relative volumes of individual

lenses.

11.5.2.6

Block Model Definition

The model is fully

sub-blocked, with 116 × 117 × 150 = 2,035,800 nominal parent cells, 5 × 5 × 5 m parent dimensions and minimum

0.5 × 0.5 × 0.5 m sub-blocks. The Leapfrog base point is 462663.5543706773, 6179100.853788124, 1140 m. Its local boundary

dimensions are 580, 585, 750 m and its rotation is azimuth 0°, dip 0° and pitch 0°. The reported base-point elevation is

the upper Z boundary; the model extends downward from that elevation (Table 11-11).

Contango Silver and Gold – Kitsault Valley Project Page 153 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-11.

Homestake Main global block-model bounds.

Axis

Minimum

(m)

Maximum

(m)

X

/ Easting

462,663.554

463,243.554

Y

/ Northing

6,179,100.854

6,179,685.854

Z

/ Elevation

390.000

1,140.000

11.5.2.7

Grade Interpolation and Estimation Parameters

Ag, Au, Cu, Pb

and Zn are estimated independently using inverse-distance cubed weighting within hard boundaries. Variable-orientation fields follow

the local geometry of each domain. The grade estimators require 4 to 20 composites and limit contributions to two samples per drill hole.

Dedicated classification estimators use three samples with a one-sample-per-hole limit. The classification searches are intentionally

broader than the grade searches and provide distance-support information rather than the reported grades. Leapfrog declustering was applied

separately by domain and element in every Homestake Main estimator. The variogram sheet contains no fitted variogram parameters; the

estimate uses IDW with power 3. Table 11-12 summarizes the search geometries, orientation controls, sample-selection limits and per-hole

restrictions applied to the Homestake Main grade and classification estimators.

Table 11-12.

Homestake Main search and sample parameters.

Domain

Metal

Estimator

purpose

Ranges

(m)

major × inter. × minor

Orientation

Samples

min–max

Max

per

hole

FW

Ag

Classification

150

× 75 × 50

VO

3–3

1

HW

Ag

Classification

200

× 100 × 75

VO

3–3

1

LOWGRADE

Ag

Classification

150

× 75 × 50

VO

3–3

1

MIDLENS

Ag

Classification

150

× 75 × 50

VO

3–3

1

FW

Ag/Au/Cu/Pb/Zn

Grade

72

× 43.2 × 14.4

VO

4–20

2

HW

Ag/Au/Cu/Pb/Zn

Grade

80

× 48 × 16

VO

4–20

2

LOWGRADE

Ag/Au/Cu/Pb/Zn

Grade

80

× 48 × 16

VO

4–20

2

MIDLENS

Ag/Au/Cu/Pb/Zn

Grade

72

× 43.2 × 14.4

VO

4–20

2

Source: parameters

Homestake Main.xlsx, Search and Interpolant. All listed current estimators are IDW, power 3. VO = variable orientation; fixed values

are dip / dip azimuth / pitch in degrees. Per-sector drill-hole-limit option is enabled.

11.5.2.8

Model Validation

Validation focused

on separation of the higher-grade lenses from the lower-grade envelope, the influence of high-grade gold and silver observations, and

continuity through the sigmoidal structure. The QP reviewed the geological coding, capped input distributions, block grades and classification

volumes and considered the model suitable for resource reporting at the assigned confidence levels. The different silver response of

the hanging-wall lens and the lower silver grades in FW and MIDLENS require domain-based validation. In particular, the high base-metal

capping losses in MIDLENS should be interpreted alongside its small contribution to reported tonnage and metal.

Contango Silver and Gold – Kitsault Valley Project Page 154 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.5.2.9

Mineral Resource Classification

The QP selected

nominal spacing thresholds of 38 m for Indicated and 100 m for Inferred, applied to the dedicated classification AvgD divided by 0.707.

These correspond to raw AvgD limits of 26.866 m and 70.700 m. Classification also considers the continuity of each lens, the spatial

distribution of the informing holes and the coherence of classified volumes. Inferred material is principally the continuation of established

domains into areas with less direct drilling support. The QP expects that the majority of this material could be upgraded through appropriately

located infill drilling, subject to confirmation of the interpreted lens geometry and grade continuity.

In the classification

review model, reducing the Indicated threshold from 38 to 35 m transferred approximately 173,061 t and 2.566 Moz AgEq from Indicated

to Inferred. Increasing it from 38 to 42 m transferred approximately 180,274 t and 2.562 Moz AgEq in the opposite direction. Reducing

the Inferred threshold from 100 to 75 m left the Indicated inventory unchanged and removed approximately 14,081 t and 0.086 Moz AgEq

from the classified inventory. These tests support the selected confidence boundary when read with the spatial review. The resulting

Indicated and Inferred classification geometry for Homestake Main is shown in plan, longitudinal and cross-sectional views in Figure

11-4.

Figure 11-4.

Homestake Main Resource Classification geometry: A – Plan view, B – Longitudinal view (looking SW), C – Cross-sectional

view looking NW. Red solid represents Indicated classification and blue Inferred classification.

11.5.2.10

Depletion, Exclusions and Reporting Constraints

No historical production

depletion is applied to the Homestake Main resource. Reporting is limited to classified mineralization within the accepted domain model

and above the 132 g/t AgEq cut-off. The lower-grade envelope contributes resources only where the estimated block grades satisfy the

reporting cut-off and the QP accepts their spatial continuity. Geological inclusion within LOWGRADE alone is insufficient for resource

reporting.

Contango Silver and Gold – Kitsault Valley Project Page 155 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.5.2.11

Deposit Mineral Resource Statement

The final estimate

contains more Indicated material and less Inferred material than the preceding estimate (Table 11-13 and 11-14). Indicated gold grade

decreases from 7.02 to 6.35 g/t, while Indicated gold content increases from 166,000 to 292,009 oz. Inferred gold content decreases from

355,600 to 77,211 oz. These changes reflect the combined effects of the new geological interpretation, additional data, capping, interpolation,

classification and reporting assumptions. They cannot be represented as a measured one-for-one conversion of the previous Inferred blocks

to Indicated.

Table 11-13.

Homestake Main Mineral Resource grades.

Category

Tonnes

(Mt)

Ag

(g/t)

Au

(g/t)

Cu

(%)

Pb

(%)

Zn

(%)

Indicated

1.43

49.55

6.350

0.181

0.058

0.112

Inferred

0.52

11.09

4.610

0.143

0.056

0.127

Table 11-14.

Homestake Main contained metals.

Category

Ag

(Moz)

Au

(koz)

Cu

(Mlb)

Pb

(Mlb)

Zn

(Mlb)

AgEq

(Moz)

Indicated

2.277

292.009

5.71

1.83

3.53

23.308

Inferred

0.186

77.211

1.64

0.64

1.46

5.770

11.5.3

Homestake Silver

11.5.3.1

Estimation Bias and Input Data

The Homestake Silver

estimate uses the SRs HS Silver GM 2026 geological model and the HS Silver Capped DGL estimation dataset. It replaces the estimate with

an underlying effective date of January 20, 2022 that was reviewed in the 2023 combined report. The current model reports an Indicated

population in addition to Inferred resources, whereas the preceding Homestake Silver resource was entirely Inferred.

The deposit header

inventory contains 151 holes totaling 77,712.01 m. Of these, 78 holes totaling 47,061.43 m fall in years after the preceding effective-date

year; a further 12 holes totaling 6,469.00 m are in the boundary year. These are inventory counts, with the estimation-input population

defined by domain and assay acceptance as described in Section 11.2.

11.5.3.2

Geological Interpretation and Estimation Domains

The deposit consists

of a steep, structurally controlled mineralized corridor containing twelve numbered lenses and a surrounding lower-grade halo (Table

11-15, Figure 11-5). The higher-grade lenses and halo are modeled separately to respect their different geological controls and grade

distributions. The 2026 lens arrangement is more detailed than the nine high-grade lenses described for the preceding model. Fixed and

variable search orientations are used according to local lens geometry. The modeling thresholds that define the lenses and halo are geological

guides and are distinct from the 132 g/t AgEq reporting cut-off.

Contango Silver and Gold – Kitsault Valley Project Page 156 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-15.

Homestake Silver estimation domains.

Model

domain

Geological

role

HS1

Mineralized

lens 1

HS2

Mineralized

lens 2

HS3

Mineralized

lens 3

HS4

Mineralized

lens 4

HS5

Mineralized

lens 5

HS6

Mineralized

lens 6

HS7

Mineralized

lens 7

HS8

Mineralized

lens 8

HS9

Mineralized

lens 9

HS10

Mineralized

lens 10

HS11

Mineralized

lens 11

HS12

Mineralized

lens 12

LG_HALO

Lower-grade

envelope associated with the lens system

Source: current

parameter and model rollup files; descriptive geological context from the initial Chapter 11 draft and the accepted interpretation.

Figure 11-5.

Homestake Silver domain geometry and representative sections showing the 13 modeled domains. A – Plan view, B – Longitudinal

view (looking southwest), C – Cross-sectional view looking west.

Contango Silver and Gold – Kitsault Valley Project Page 157 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.5.3.3

Sample Statistics and Compositing

The thirteen domain

populations contain 4,118 capping-input records for each of the five elements. LG_HALO accounts for 3,330 records, while individual lens

populations range from six records in HS10 to 283 in HS1. Small populations in several lenses limit the stability of distribution statistics

and are an important source of uncertainty. Capped mean grades and coefficients of variation are reported with the capping schedule.

They characterize the prepared input populations and are not tonnage-weighted resource grades.

Homestake Silver

samples were composited to a target length of 2.0 m using the Within boundary setting and hard domain boundaries. Residual end lengths

of less than 1.0 m were distributed equally within the boundary interval. No additional weighting was applied during compositing. The

following capping table reports capped input means and coefficients of variation. The capped arithmetic input statistics are distinct

from declustered statistics and volume-weighted block grades.

11.5.3.4

Grade Capping

Grade caps are

assigned separately by element and lens (Table 11-16). Silver caps range from 7 g/t in HS4 to 2,270 g/t in HS2, with 405 g/t applied

to LG_HALO. Gold caps range from 0.463 g/t in HS3 to 37 g/t in HS1, with 12.7 g/t in LG_HALO. Several small lens populations have substantial

input-metal reductions: Au decreases by 84.04% in HS3 and 82.96% in HS12, and Ag by 51.46% in HS9. These results reflect the influence

of a small number of extreme observations. The QP has retained the domain-specific caps to control extrapolation of those values, with

the geological and spatial evidence considered alongside the statistics.

Contango Silver and Gold – Kitsault Valley Project Page 158 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-16.

Homestake Silver caps and capped input statistics.

Domain

Metal

Input

N

Cap

Capped

N

Capped

(%)

Input

metal

loss (%)

Capped

mean

CV

HS1

Ag

283

350

5

1.77

9.82

23.17

2.53

HS2

Ag

116

2,270

4

3.45

9.86

239.22

1.99

HS3

Ag

19

350

4

21.05

9.59

178.79

0.73

HS4

Ag

22

7

3

13.64

10.78

3.17

0.69

HS5

Ag

121

300

3

2.48

5.18

40.48

1.68

HS6

Ag

17

266

3

17.65

44.35

69.04

1.37

HS7

Ag

29

183

4

13.79

36.87

79.14

0.79

HS8

Ag

7

174

3

42.86

5.60

104.46

0.67

HS9

Ag

20

269

7

35.00

51.46

155.34

0.66

HS10

Ag

6

108

2

33.33

22.97

68.31

0.57

HS11

Ag

7

20.2

2

28.57

16.15

15.60

0.35

HS12

Ag

21

250

3

14.29

8.86

62.71

1.38

LG_HALO

Ag

3,330

405

12

0.36

10.99

14.80

2.59

HS1

Au

283

37

6

2.12

24.96

3.907

1.61

HS2

Au

116

18

7

6.03

15.32

3.770

1.28

HS3

Au

19

0.463

5

26.32

84.04

0.221

0.84

HS4

Au

22

3.74

4

18.18

13.17

2.315

0.46

HS5

Au

121

22.6

5

4.13

14.06

4.293

1.30

HS6

Au

17

2.29

4

23.53

53.01

1.291

0.50

HS7

Au

29

8.37

3

10.34

48.34

1.819

1.32

HS8

Au

7

1.66

2

28.57

1.74

1.078

0.44

HS9

Au

20

4.39

2

10.00

9.54

1.081

1.21

HS10

Au

6

12.1

2

33.33

18.64

6.994

0.59

HS11

Au

7

1.85

1

14.29

0.62

1.404

0.16

HS12

Au

21

27.3

2

9.52

82.96

5.174

1.56

LG_HALO

Au

3,330

12.7

9

0.27

11.51

0.359

2.55

HS1

Cu

283

2,390

6

2.12

2.48

347.92

1.53

HS2

Cu

116

2,430

3

2.59

3.14

366.76

1.45

HS3

Cu

19

210

4

21.05

26.55

109.61

0.64

HS4

Cu

22

297

4

18.18

5.81

141.45

0.71

HS5

Cu

121

1,600

5

4.13

5.41

271.19

1.50

HS6

Cu

17

389

2

11.76

13.97

88.34

1.37

HS7

Cu

29

1,310

5

17.24

19.75

376.95

1.24

Contango Silver and Gold – Kitsault Valley Project Page 159 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Domain

Metal

Input

N

Cap

Capped

N

Capped

(%)

Input

metal

loss (%)

Capped

mean

CV

HS8

Cu

7

148

2

28.57

2.74

87.44

0.55

HS9

Cu

20

380

2

10.00

33.45

147.15

0.79

HS10

Cu

6

195

2

33.33

9.13

116.53

0.56

HS11

Cu

7

1,540

2

28.57

22.44

674.38

0.90

HS12

Cu

21

742

2

9.52

5.96

164.61

1.28

LG_HALO

Cu

3,330

1,280

10

0.30

1.95

61.51

2.06

HS1

Pb

283

18,800

5

1.77

14.50

1,462.09

2.24

HS2

Pb

116

61,900

3

2.59

5.60

4,952.39

2.31

HS3

Pb

19

3,150

3

15.79

11.78

1,259.96

0.87

HS4

Pb

22

2,870

4

18.18

35.22

668.11

1.64

HS5

Pb

121

27,500

3

2.48

13.61

2,239.68

2.42

HS6

Pb

17

3,120

2

11.76

3.50

733.27

1.28

HS7

Pb

29

30,000

2

6.90

10.03

3,353.82

2.35

HS8

Pb

7

895

2

28.57

1.57

603.94

0.49

HS9

Pb

20

11,300

2

10.00

19.61

2,408.26

1.44

HS10

Pb

6

2,210

2

33.33

15.21

1,267.52

0.83

HS11

Pb

7

295

2

28.57

12.20

172.39

0.55

HS12

Pb

21

16,100

2

9.52

44.05

3,361.26

1.49

LG_HALO

Pb

3,330

7,300

13

0.39

11.90

276.09

2.85

HS1

Zn

283

33,100

3

1.06

5.09

1,534.12

2.96

HS2

Zn

116

20,800

6

5.17

15.08

2,795.83

1.86

HS3

Zn

19

4,520

3

15.79

3.23

1,563.09

1.01

HS4

Zn

22

5,150

2

9.09

12.64

755.11

2.03

HS5

Zn

121

21,300

4

3.31

22.49

1,958.09

2.40

HS6

Zn

17

6,900

2

11.76

16.90

1,234.19

1.78

HS7

Zn

29

12,200

2

6.90

33.84

1,906.87

1.75

HS8

Zn

7

1,550

2

28.57

9.68

798.40

0.68

HS9

Zn

20

7,610

2

10.00

46.32

1,722.37

1.41

HS10

Zn

6

1,260

2

33.33

12.31

635.12

0.85

HS11

Zn

7

251

2

28.57

1.56

161.41

0.47

HS12

Zn

21

3,780

3

14.29

47.51

835.89

1.59

LG_HALO

Zn

3,330

4,250

20

0.60

15.77

240.51

2.08

Contango Silver and Gold – Kitsault Valley Project Page 160 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.5.3.5

Bulk Density Assignment

A bulk density

of 2.77 t/m³ is applied throughout the estimated Homestake Silver domains. The screened mineralized population contains 2,612 measurements

from 51 drill holes and has an arithmetic mean of 2.751 t/m³. The selected assignment is approximately 0.7% higher than this

mean and is consistent with the earlier mineralized-zone mean of approximately 2.76 t/m³. The QP considers the assignment appropriate

for the current estimate, while recognizing that density variation among individual lenses remains a subject for continuing domain-based

review.

11.5.3.6

Block Model Definition

The model is fully

sub-blocked, with 200 × 200 × 200 = 8,000,000 nominal parent cells, 5 × 5 × 5 m parent dimensions and minimum

0.5 × 0.5 × 0.5 m sub-blocks. The Leapfrog base point is 463180, 6178390, 1030 m. Its local boundary dimensions are 1000,

1000, 1000 m and its rotation is azimuth 0°, dip 0° and pitch 0°. The reported base-point elevation is the upper Z boundary;

the model extends downward from that elevation (Table 11-17).

Table 11-17.

Homestake Silver global block-model bounds.

Axis

Minimum

(m)

Maximum

(m)

X

/ Easting

463,180.000

464,180.000

Y

/ Northing

6,178,390.000

6,179,390.000

Z

/ Elevation

30.000

1,030.000

Source: model rollup,

block model data. For rotated models, global axis-aligned bounds differ from local boundary dimensions. Nominal parent-cell count is

not mineralized-block count. Horizontal coordinates: NAD83 / UTM Zone 9N (meters).

11.5.3.7

Grade Interpolation and Estimation Parameters

All five metals

are estimated using inverse-distance cubed weighting and hard boundaries. Grade searches use 4 to 10 composites with a maximum of two

samples per drill hole. Classification searches use three samples and a maximum of one sample per hole. The parameter export contains

material element-specific orientation differences: HS1 silver uses a 200 × 150 × 40 m grade search, while its Au, Cu, Pb

and Zn searches are 140 × 100 × 35 m. HS9 Ag, Cu, Pb and Zn use a fixed orientation, while Au uses a variable-orientation

field. These distinctions are preserved in the parameter table. Leapfrog declustering was applied separately by domain and element in

every Homestake Silver estimator. Search and sample parameters are presented in Table 11-18.

Contango Silver and Gold – Kitsault Valley Project Page 161 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-18.

Homestake Silver search and sample parameters.

Domain

Metal

Estimator

purpose

Ranges

(m)

major × inter. × minor

Orientation

Samples

min–max

Max

per

hole

HS10

Ag

Classification

70

× 68 × 20

85/39.4/110.11

3–3

1

HS11

Ag

Classification

65

× 56 × 20

85/44/90

3–3

1

HS12

Ag

Classification

140

× 84 × 28

35/30/63

3–3

1

HS1

Ag

Classification

140

× 100 × 35

VO

3–3

1

HS2

Ag

Classification

200

× 200 × 50

VO

3–3

1

HS3

Ag

Classification

120

× 80 × 35

43/40/65

3–3

1

HS4

Ag

Classification

120

× 70 × 35

87.78/19/90

3–3

1

HS5

Ag

Classification

140

× 85 × 30

VO

3–3

1

HS6

Ag

Classification

100

× 60 × 20

85/41/70

3–3

1

HS7

Ag

Classification

140

× 85 × 30

85/48/90

3–3

1

HS8

Ag

Classification

70

× 50 × 30

80/45/90

3–3

1

HS9

Ag

Classification

180

× 105 × 35

85/51/100

3–3

1

LG_HALO

Ag

Classification

150

× 100 × 80

90/44/90

3–3

1

HS10

Ag/Au/Cu/Pb/Zn

Grade

70

× 68 × 20

85/39.4/110.11

4–10

2

HS11

Ag/Au/Cu/Pb/Zn

Grade

65

× 56 × 20

85/44/90

4–10

2

HS12

Ag/Au/Cu/Pb/Zn

Grade

140

× 84 × 28

35/30/63

4–10

2

HS1

Ag

Grade

200

× 150 × 40

VO

4–10

2

HS2

Ag/Au/Cu/Pb/Zn

Grade

140

× 100 × 35

VO

4–10

2

HS3

Ag/Au/Cu/Pb/Zn

Grade

120

× 80 × 35

43/40/65

4–10

2

HS4

Ag/Au/Cu/Pb/Zn

Grade

120

× 70 × 35

87.78/19/90

4–10

2

HS5

Ag/Au/Cu/Pb/Zn

Grade

140

× 85 × 30

VO

4–10

2

HS6

Ag/Au/Cu/Pb/Zn

Grade

100

× 60 × 20

85/41/70

4–10

2

HS7

Ag/Au/Cu/Pb/Zn

Grade

140

× 85 × 30

85/48/90

4–10

2

HS8

Ag/Au/Cu/Pb/Zn

Grade

70

× 50 × 30

80/45/90

4–10

2

HS9

Ag/Cu/Pb/Zn

Grade

180

× 105 × 35

85/51/100

4–10

2

LG_HALO

Ag/Au/Cu/Pb/Zn

Grade

150

× 100 × 80

90/44/90

4–10

2

HS1

Au/Cu/Pb/Zn

Grade

140

× 100 × 35

VO

4–10

2

HS9

Au

Grade

180

× 105 × 35

VO

4–10

2

Contango Silver and Gold – Kitsault Valley Project Page 162 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.5.3.8

Model Validation

Validation considered

the continuity and mutual separation of the lenses, the behavior of the broad halo and the influence of extreme observations in the smallest

populations. The QP reviewed the resource model against geological interpretation and sample support and considers the overall estimation

approach appropriate. The Indicated inventory is concentrated in the better-supported portions of the lens system. Low sample counts

and substantial local cap effects remain relevant to uncertainty even where aggregate deposit statistics appear stable.

11.5.3.9

Mineral Resource Classification

The selected classification

thresholds are 38 m nominal spacing for Indicated and 100 m for Inferred, equivalent to raw AvgD limits of 26.866 m and 70.700 m. The

distance measure is calculated using the dedicated classification estimators, then reviewed within the accepted geological model. Numerical

thresholds do not override poor lens continuity or inadequate spatial support. Most of the deposit remains Inferred. The QP considers

that the majority of the Inferred resources have a reasonable prospect of upgrading through continued infill drilling, particularly where

the drilling can resolve lens thickness, structural offsets and the relationship between the lenses and halo.

The review-model

35/100 case contains approximately 0.564 Mt Indicated, compared with 0.891 Mt in the selected 38/100 case and 1.352 Mt in the 42/100

case. Reducing the Inferred threshold from 100 to 75 m removes approximately 465,056 t and 3.544 Moz AgEq from the classified inventory.

This is a materially larger peripheral response than at Homestake Main. The QP retained the 100 m nominal threshold only where the mineralized

domains remain geologically coherent and supported by estimation. The resulting Indicated and Inferred classification geometry for Homestake

Silver is shown in plan, longitudinal and cross-sectional views in

Figure 11-6.

Figure 11-6.

Homestake Silver Mineral Resource Classification: A – Plan view, B – Longitudinal view (looking southwest), C – Cross-sectional

view looking west. Red solid represents Indicated classification and blue Inferred classification.

Contango Silver and Gold – Kitsault Valley Project Page 163 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.5.3.10

Depletion, Exclusions and Reporting Constraints

No historical production

depletion is applied. Resources are reported within accepted mineralized domains at or above 132 g/t AgEq and with Indicated or Inferred

classification. HS4, HS8 and HS11 do not contribute Indicated resources in the final domain report. A very small Inferred contribution

from HS11 rounds to 0.00 Mt in the domain export; rounding does not make it a separate material resource population.

11.5.3.11

Deposit Mineral Resource Statement

The final estimate

establishes 0.71 Mt of Indicated resources at 168.26 g/t Ag and 4.16 g/t Au (Table 11-19 and 11-20). The Inferred estimate contains 3.63

Mt at 65.88 g/t Ag and 3.55 g/t Au. Relative to the preceding entirely Inferred estimate, the Inferred silver grade decreases from 146.0

to 65.88 g/t, while Inferred gold grade increases from 3.13 to 3.55 g/t. The different response of the two metals is consistent with

changes to the modeled lens and halo populations and their allocation between categories. A controlled model reconciliation would be

required to isolate each contributing effect.

Table 11-19.

Homestake Silver Mineral Resource grades.

Category

Tonnes

(Mt)

Ag

(g/t)

Au

(g/t)

Cu

(%)

Pb

(%)

Zn

(%)

Indicated

0.71

168.26

4.160

0.039

0.263

0.222

Inferred

3.63

65.88

3.550

0.028

0.203

0.165

Source: approved

Roll Up_USE worksheet. Cut-off: 132 g/t AgEq. In-situ, unmined resource before mining dilution and recovery. Mineral Resource effective

date: September 11, 2026.

Table 11-20.

Homestake Silver contained metals.

Category

Ag

(Moz)

Au

(koz)

Cu

(Mlb)

Pb

(Mlb)

Zn

(Mlb)

AgEq

(Moz)

Indicated

3.856

95.407

0.61

4.13

3.49

9.968

Inferred

7.680

414.413

2.24

16.22

13.23

34.132

Contained metals

are in situ. NR means not reported, not zero. Rounding may cause apparent differences.

11.5.4 South Reef

11.5.4.1

Estimation Bias and Input Data

The South Reef

Inferred Mineral Resource is carried forward at 0.445 Mt grading 8.68 g/t Au and 4.90 g/t Ag, with 124,200 oz Au and 100,000 oz Ag as

reported in the approved rollup. The underlying estimate was accepted with an effective date of January 20, 2022 and was reviewed

in the combined technical report dated February 23, 2023, effective September 28, 2022. The historical estimation model derives

from the Homestake work described by Chamois et al. (2020). No 2026 re-estimation or re-filtering at 132 g/t AgEq is claimed.

Contango Silver and Gold – Kitsault Valley Project Page 164 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.5.4.2

Mineral Resource Classification

South Reef remains

entirely Inferred. No Indicated category has been created by applying the 2026 Homestake distance rules. The classification reflects

the lower level of drilling support and the confidence in the retained geological model. Additional drilling is expected to permit upgrading

of the majority of the resource where it confirms the interpreted vein geometry and grade continuity. The expectation of upgrading is

not a guarantee of conversion to Indicated resources or Mineral Reserves.

11.5.4.3

Depletion, Exclusions and Reporting Constraints

The retained resource

uses 2.0 g/t AuEq cut-off. The 2023 report identifies the original commodity assumptions as US$1,300/oz Au, US$20/oz Ag and US$2.50/lb

Cu, with recoveries of 92% Au, 88% Ag and 87.5% Cu. No current historical-production depletion deduction is identified for South Reef.

The original cut-off and reporting constraints are preserved; the estimate is not represented as recalculated under the current Homestake

Silver recovery matrix.

No historical stope

tonnage is reported here as a reserve or production inventory.

11.5.4.4

Deposit Mineral Resource Statement

South Reef quantities

and grades are unchanged from the preceding physical-resource statement. Zinc is not reported. The change from 8.585 Moz AgEq in the

comparison column to 8.60 Moz in the approved 2026 column is a presentation/conversion matter and is not mineral-resource growth or evidence

of new drilling in the estimate.

Table 11-21.

South Reef Mineral Resource grades.

Category

Tonnes

(Mt)

Ag

(g/t)

Au

(g/t)

Cu

(%)

Pb

(%)

Zn

(%)

Inferred

0.445

4.90

8.680

0.040

0.001

NR

Source: approved

Roll Up_USE worksheet. Cut-off: 2.0 g/t AuEq; carried forward. Mineral Resource effective date: September 11, 2026.

Table 11-22.

South Reef contained metals.

Category

Ag

(Moz)

Au

(koz)

Cu

(Mlb)

Pb

(Mlb)

Zn

(Mlb)

AgEq

(Moz)

Inferred

0.100

124.200

0.36

0.00

NR

8.600

Contained metals

are in situ. NR means not reported, not zero. Rounding may cause apparent differences. The approved South Reef AgEq value is retained

pending insertion of its conversion basis.

11.6 Dolly

Varden Area Mineral Resource Estimates

11.6.1

Regional Overview and Shared Methodology

The southern area

contains five separately reported deposits. Their principal resource commodity is silver, with Au, Cu, Pb and Zn estimated where supported

by the accepted data. Each uses the southern recovery matrix and a 132 g/t AgEq cut-off. The models share 5 m parent blocks, 0.5 m minimum

sub-blocks and IDW with power 3, but their domain geometries, cap values, density assignments, search orientations, sample coverage and

classification distances differ.

Contango Silver and Gold – Kitsault Valley Project Page 165 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Historical underground

mining affects Torbrit, Dolly Varden and North Star. The current resource statement uses the unmined populations for those deposits.

Kitsol is separately reported in 2026, requiring its recombination with Torbrit for comparison with the preceding reporting unit. Historic

assays in parts of the region emphasize silver, so confidence in non-silver credits is assessed independently of silver sampling density.

11.6.2 Wolf

11.6.2.1

Estimation Bias and Input Data

The Wolf estimate

uses the Wolf GMs 2026 geological model and DGL_Wolf Grade Capped 2026 input dataset. Two estimation domains, the combined upper veins

and Wolf Deep, provide the current resource. The estimate replaces Wolf resource with an underlying effective date of May 8, 2019.

The large amount of subsequent drilling provides a substantially expanded geological and grade-estimation basis.

The deposit header

inventory contains 231 holes totaling 84,465.75 m. Of these, 111 holes totaling 69,194.82 m fall in years after the preceding effective-date

year; a further 3 holes totaling 878.20 m are in the boundary year. These are inventory counts, with the estimation-input population

defined by domain and assay acceptance as described in Section 11.2.

11.6.2.2

Geological Interpretation and Estimation Domains

The model separates

WOLF_1_2_3_VEINS_CLIPPED from WOLF_DEEP (Table 11-23, Figure 11-7). The upper domain combines the interpreted vein system after clipping

overlaps, while the deep domain represents the deeper continuation defined by later drilling. This separation respects differences in

geometry, metal distribution and available sample support. In particular, the deep domain has appreciably higher Pb and Zn grades than

the combined upper veins. Hard boundaries restrict interpolation to the applicable domain.

Table 11-23.

Wolf estimation domains.

Model

domain

Geological

role

WOLF_1_2_3_VEINS_CLIPPED

Combined

and clipped upper vein domains

WOLF_DEEP

Deeper

mineralized domain

Contango Silver and Gold – Kitsault Valley Project Page 166 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 11-7.

Wolf domain geometry and representative sections showing the two modeled domains: A – Plan view, B – Longitudinal view (looking

northwest), C – Cross-sectional view of the shallower Wolf Vein systems looking northeast, D – Cross-sectional view of the

Wolf Deep system looking northeast.

11.6.2.3

Sample Statistics and Compositing

The capping statistics

include 406 Ag records in the combined upper veins and 415 in Wolf Deep. The upper-vein Au and Cu populations contain only 98 records

each, compared with 121 Pb and 117 Zn records. Wolf Deep has 415 records for every estimated element. This imbalance demonstrates the

more limited historical coverage of gold and base metals in the upper veins. It is carried into the assessment of equivalent-grade uncertainty

and is not treated as evidence that missing assays have zero metal content.

Wolf samples were

composited to a target length of 2.0 m using the Within boundary setting and hard domain boundaries. Residual end lengths of less than

1.0 m were distributed equally within the boundary interval. No additional weighting was applied during compositing. The following capping

table reports capped input means and coefficients of variation. The capped arithmetic input statistics are distinct from declustered

statistics and volume-weighted block grades.

11.6.2.4

Grade Capping

Silver caps are

2,260 g/t for the combined upper veins and 2,060 g/t for Wolf Deep (Table 11-24). They affect four records in each domain, or approximately

0.99% and 0.96%, respectively, and reduce input silver metal by 6.71% and 6.95%. A gold cap of 0.20 g/t applies to both domains. Base-metal

caps are lower in the upper-vein population than in Wolf Deep, consistent with their differing distributions. The Pb caps are 20,000

and 56,000 ppm, and Zn caps are 5,900 and 72,000 ppm, respectively.

Contango Silver and Gold – Kitsault Valley Project Page 167 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-24.

Wolf caps and capped input statistics.

Domain

Metal

Input

N

Cap

Capped

N

Capped

(%)

Input

metal

loss (%)

Capped

mean¹

CV

Upper

veins

Ag

406

2,260

4

0.99

6.71

280.67

1.52

Wolf

Deep

Ag

415

2,060

4

0.96

6.95

246.91

1.35

Upper

veins

Au

98

0.2

4

4.08

22.87

0.022

1.91

Wolf

Deep

Au

415

0.2

20

4.82

20.05

0.049

1.02

Upper

veins

Cu

98

500

4

4.08

3.09

133.70

0.95

Wolf

Deep

Cu

415

2,000

8

1.93

6.93

315.51

1.37

Upper

veins

Pb

121

20,000

5

4.13

16.80

2,911.95

1.55

Wolf

Deep

Pb

415

56,000

10

2.41

11.02

7,882.58

1.50

Upper

veins

Zn

117

5,900

5

4.27

7.88

1,676.92

0.92

Wolf

Deep

Zn

415

72,000

9

2.17

6.69

10,687.03

1.45

11.6.2.5

Bulk Density Assignment

A constant density

of 2.90 t/m³ applies to both Wolf domains. The screened density population contains 31 measurements from 15 drill holes, with an

arithmetic mean of 2.898 t/m³. The close agreement supports the selected value, although the small population should be expanded

as drilling continues into the deep domain. The current screened population and historical density datasets overlap and should not be

added together as independent population measurement.

11.6.2.6

Block Model Definition

The model is fully

sub-blocked, with 177 × 200 × 211 = 7,469,400 nominal parent cells, 5 × 5 × 5 m parent dimensions and minimum

0.5 × 0.5 × 0.5 m sub-blocks. The Leapfrog base point is 466740, 6172931, 612 m. Its local boundary dimensions are 885, 1000,

1055 m and its rotation is azimuth 0°, dip 0° and pitch 0°. The reported base-point elevation is the upper Z boundary; the

model extends downward from that elevation (Table 11-25).

Contango Silver and Gold – Kitsault Valley Project Page 168 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-25.

Wolf global block-model bounds.

Axis

Minimum

(m)

Maximum

(m)

X

/ Easting

466,740.000

467,625.000

Y

/ Northing

6,172,931.000

6,173,931.000

Z

/ Elevation

-443.000

612.000

Source: model rollup,

block model data. For rotated models, global axis-aligned bounds differ from local boundary dimensions. Nominal parent-cell count is

not mineralized-block count. Horizontal coordinates: NAD83 / UTM Zone 9N (meters).

11.6.2.7

Grade Interpolation and Estimation Parameters

Grades use IDW

with power 3. Upper-vein Ag uses a fixed 150 × 100 × 40 m search at dip 87°, dip azimuth 294° and pitch 90°,

with 3 to 15 samples. Upper-vein Au and base metals use the same ranges, 4 to 20 samples and a fixed 87.76° / 294.03° / 90°

orientation. Wolf Deep uses a variable-orientation 100 × 60 × 20 m search with 4 to 15 samples. Grade estimators allow two

samples per hole. Classification uses three samples, one per hole, with fixed 150 × 100 × 40 m searches. Leapfrog declustering

was applied separately by domain and element in every Wolf estimator. Search and sample parameters are presented in Table 11-26.

Table 11-26.

Wolf search and sample parameters.

Domain

Metal

Estimator

purpose

Ranges

(m)

major × inter. × minor

Orientation

Samples

min–max

Max

per

hole

Upper

veins

Ag

Classification

150

× 100 × 40

87/294/90

3–3

1

Wolf

Deep

Ag

Classification

150

× 100 × 40

89/136/76

3–3

1

Upper

veins

Ag

Grade

150

× 100 × 40

87/294/90

3–15

2

Wolf

Deep

Ag/Au/Cu/Pb/Zn

Grade

100

× 60 × 20

VO

4–15

2

Upper

veins

Au/Cu/Pb/Zn

Grade

150

× 100 × 40

87.76/294.03/90

4–20

2

11.6.2.8

Model Validation

The QP reviewed

the connection between the upper veins and Wolf Deep, the consistency of block grades with their respective input populations and the

influence of isolated high-grade silver observations. Validation considers the differing metal associations and sample coverage in the

two domains. The final domain report attributes approximately 12.233 Moz of the Indicated AgEq inventory to Wolf Deep and 3.875 Moz to

the combined upper veins. This concentration makes validation of deep-domain continuity and orientation

11.6.2.9

Mineral Resource Classification

Wolf uses selected

nominal spacing thresholds of 45 m for Indicated and 100 m for Inferred, equivalent to raw AvgD thresholds of 31.815 m and 70.700 m.

The QP considered the coherent geometry of the mineralized system, the distribution of the informing holes and the spatial continuity

of the classified volumes. The Inferred category covers lower-confidence extensions within the interpreted domains. Targeted infill drilling

is expected to increase the majority of the Inferred resource where the interpreted continuity is confirmed.

Contango Silver and Gold – Kitsault Valley Project Page 169 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

In the classification

review model, reducing the Indicated threshold from 45 to 40 m transfers approximately 214,611 t and 2.341 Moz AgEq to Inferred. Increasing

it from 45 to 50 m transfers approximately 160,308 t and 1.758 Moz AgEq to Indicated. Reducing the Inferred threshold from 100 to 75

m removes approximately 10,549 t and 0.100 Moz AgEq without changing Indicated resources. The QP selected 45/100 based on geological

confidence and spatial support, with sensitivity tests illustrating the effect of neighboring choices. The resulting Indicated and Inferred

classification geometry for the Wolf deposit, including the shallower vein systems and Wolf Deep domain, is shown in Figure 11-8.

Figure 11-8.

Wollf Mineral Resource classification geometry A – Plan view, B – Longitudinal view (looking northwest), C – Cross-sectional

view of the shallower Wolf Vein systems looking northeast, D – Cross sectional view of the Wolf Deep system looking northeast.

Red solid represents Indicated classification and blue Inferred classification.

11.6.2.10

Depletion, Exclusions and Reporting Constraints

No mined-out deduction

is identified in the final Wolf resource report. The reported resource includes only Indicated and Inferred material above 132 g/t AgEq

in the two accepted domains. Unclassified material is excluded. Geological extensions beyond the supported estimation and classification

limits remain exploration potential and are not included as Mineral Resources.

11.6.2.11

Deposit Mineral Resource Statement

Wolf shows the

largest increase in Indicated AgEq among the separately reported deposits, from 3.834 Moz to 16.108 Moz (Table 11-27 and 11-28). Indicated

tonnage increases from 0.402 Mt to 1.53 Mt, with silver grade changing from 296.6 to 301.90 g/t. Inferred tonnage increases from 0.010

Mt to 0.44 Mt. The increase is consistent with the expanded drilled footprint and development of the deep domain, but the net change

also includes updated density, capping, classification and reporting assumptions.

Contango Silver and Gold – Kitsault Valley Project Page 170 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-27.

Wolf Mineral Resource grades.

Category

Tonnes

(Mt)

Ag

(g/t)

Au

(g/t)

Cu

(%)

Pb

(%)

Zn

(%)

Indicated

1.53

301.90

0.050

0.027

0.714

0.864

Inferred

0.44

381.40

0.030

0.030

0.707

1.100

Table 11-28.

Wolf contained metals.

Category

Ag

(Moz)

Au

(koz)

Cu

(Mlb)

Pb

(Mlb)

Zn

(Mlb)

AgEq

(Moz)

Indicated

14.850

2.246

0.92

24.09

29.15

16.108

Inferred

5.390

0.411

0.30

6.85

10.66

5.790

Contained metals

are in situ. NR means not reported, not zero. Rounding may cause apparent differences.

11.6.3 Kitsol

11.6.3.1

Estimation Bias and Input Data

Kitsol is estimated

and reported as a separate deposit in the current update. It was included in the Torbrit reporting unit in the preceding estimate, so

comparisons use the May 8, 2019 Torbrit effective date and combine Torbrit and Kitsol when assessing like-for-like reporting totals.

The current model is Kitsol GM 2026 and the input is SRs Kitsol Estimation Dataset Capped, retaining the source object spelling for traceability.

The deposit header

inventory contains 35 holes totaling 10,965.46 m. Of these, 20 holes totaling 6,639.00 m fall in years after the preceding effective-date

year; a further 2 holes totaling 893.00 m are in the boundary year. These are inventory counts, with the estimation-input population

defined by domain and assay acceptance as described in Section 11.2.

11.6.3.2

Geological Interpretation and Estimation Domains

The resource is

constrained to the Kitsol_VN mineralized vein domain (Table 11-29, Figure 11-9). It is evaluated independently of Torbrit for grade estimation,

density assignment and classification. The domain boundary is hard. This treatment recognizes the local geological geometry and avoids

assigning resource confidence solely by association with the adjacent Torbrit system.

Table 11-29.

Kitsol estimation domains.

Model

domain

Geological

role

Kitsol_VN

Kitsol

mineralized vein domain

Contango Silver and Gold – Kitsault Valley Project Page 171 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 11-9.

Kitsol domain geometry and representative sections showing the modeled domains. A – Plan view, B – Longitudinal view (looking

west), C – Cross- sectional view looking northeast.

11.6.3.3

Sample Statistics and Compositing

The capping schedule

contains 194 records for each of Ag, Au, Cu, Pb and Zn. The current estimator reads a prepared capped dataset using the QP-confirmed

compositing settings below. The capped mean silver grade is 290.18 g/t with a coefficient of variation of 0.83. Capped mean gold grade

is 0.0364 g/t.

Kitsol samples

were composited to a target length of 1.5 m using the Within boundary setting and hard domain boundaries. Residual end lengths of less

than 1.0 m were distributed equally within the boundary interval. No additional weighting was applied during compositing. The following

capping table reports capped input means and coefficients of variation. The capped arithmetic input statistics are distinct from declustered

statistics and volume-weighted block grades.

11.6.3.4

Grade Capping

The current caps

are 800 g/t Ag, 0.30 g/t Au, 1,000 ppm Cu, 17,500 ppm Pb and 10,500 ppm Zn (Table 11-30). These supersede the earlier draft values where

they differ. The silver cap affects 18 of 194 records, or 9.28%, and removes 12.86% of input silver metal. The gold cap affects five

records and removes 53.57% of input gold metal. This large relative gold change has limited influence on a resource dominated by silver,

but the gold credit still requires consistent treatment and disclosure.

Contango Silver and Gold – Kitsault Valley Project Page 172 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-30.

Kitsol caps and capped input statistics.

Domain

Metal

Input

N

Cap

Capped

N

Capped

(%)

Input

metal

loss (%)

Capped

mean¹

CV

Kitsol_VN

Ag

194

800

18

9.28

12.86

290.18

0.83

Kitsol_VN

Au

194

0.3

5

2.58

53.57

0.036

1.63

Kitsol_VN

Cu

194

1,000

11

5.67

21.32

268.70

1.06

Kitsol_VN

Pb

194

17,500

7

3.61

7.25

3,534.48

1.20

Kitsol_VN

Zn

194

10,500

6

3.09

5.52

2,937.12

0.83

Source: Model rollups

for all in progress.xlsx, grade capping. ¹Ag and Au in g/t; Cu, Pb and Zn in ppm. Means and CV describe capped inputs. Input metal

loss is the exported data statistic, not loss of classified resource metal. Domain names abbreviated in this table are defined above.

None means no numerical cap is specified.

11.6.3.5

Bulk Density Assignment

The QP assigned

3.00 t/m³ to Kitsol, consistent with the Dolly Varden assignment. The mineralized density screen contains 33 measurements from 11

drill holes and has a mean of 2.890 t/m³. The assignment is approximately 3.8% higher than that mean. Its basis includes the geological

setting and the representativeness of samples within the resource domain. The assignment is not inherited automatically from the 3.10

t/m³ Torbrit value, and the limited Kitsol measurement population remains a source of tonnage uncertainty.

11.6.3.6

Block Model Definition

The model is fully

sub-blocked, with 24 × 30 × 61 = 43,920 nominal parent cells, 5 × 5 × 5 m parent dimensions and minimum 0.5 ×

0.5 × 0.5 m sub-blocks. The Leapfrog base point is 467580, 6172060, 390 m. Its local boundary dimensions are 120, 150, 305 m and

its rotation is azimuth 0°, dip 0° and pitch 0°. The reported base-point elevation is the upper Z boundary; the model extends

downward from that elevation (Table 11-31).

Table 11-31.

Kitsol global block-model bounds.

Axis

Minimum

(m)

Maximum

(m)

X

/ Easting

467,580.000

467,700.000

Y

/ Northing

6,172,060.000

6,172,210.000

Z

/ Elevation

85.000

390.000

Source: model rollup,

block model data. For rotated models, global axis-aligned bounds differ from local boundary dimensions. Nominal parent-cell count is

not mineralized-block count. Horizontal coordinates: NAD83 / UTM Zone 9N (meters).

11.6.3.7

Grade Interpolation and Estimation Parameters

The five metals

use IDW with power 3 and a variable-orientation 100 × 60 × 20 m grade search, selecting 4 to 15 composites with a maximum

of two samples per drill hole. Leapfrog declustering was applied separately by domain and element in every Kitsol estimator. The grade-estimator

export identifies the SRs_Kitsol_Grade Capped_2026 declustering object. The dedicated Class_ID 2 estimator uses a fixed 150 × 100

× 40 m search, with dip 75.62°, dip azimuth 268.48° and pitch 90°, and selects three samples with a one-sample-per-hole

limit. A nearest-neighbour Ag estimator is also present for comparison; its 100 × 60 × 35 m fixed search differs from the

grade estimator and should be considered when interpreting local differences. Search and sample parameters are presented in Table 11-32.

Contango Silver and Gold – Kitsault Valley Project Page 173 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-32.

Kitsol search and sample parameters.

Domain

Metal

Estimator

purpose

Ranges

(m)

major × inter. × minor

Orientation

Samples

min–max

Max

per

hole

Kitsol_VN

Ag

Classification

150

× 100 × 40

75.62/268.48/90

3–3

1

Kitsol_VN

Ag/Au/Cu/Pb/Zn

Grade

100

× 60 × 20

VO

4–15

2

11.6.3.8

Model Validation

The QP reviewed

sections through the Kitsol vein, the distribution of informing samples, capped and uncapped silver estimates and classification volumes.

The selected 35/70 export in the distance-classification workbook reports Indicated silver of 2.766 Moz in the capped estimate and 3.237

Moz in the uncapped estimate. For Inferred, the corresponding values are 1.323 and 1.382 Moz. These differences are approximately 14.55%

and 4.25% relative to the uncapped inventories.

11.6.3.9

Mineral Resource Classification

The selected nominal

spacing thresholds are 35 m for Indicated and 70 m for Inferred, equivalent to raw AvgD limits of 24.745 m and 49.490 m. The QP selected

these limits after reviewing the 30/60, 35/70, 40/75 and 35/50 cases with the geological model and drill support. The selected classification

remains coherent, adequately supported portions of the vein as Indicated and its less directly supported continuation as Inferred. The

majority of Inferred material is considered capable of upgrading with infill drilling that confirms the interpreted vein geometry and

grade continuity.

The selected 35/70

case contains 285,743.63 t Indicated and 135,796.50 t Inferred, leaving 1,330.50 t unclassified in the tested above-cut-off population.

Increasing the Indicated threshold to 40 m adds approximately 47,199 t to Indicated. Reducing the Inferred threshold from 70 to 50 m

removes approximately 33,368 t and 0.284 Moz AgEq from Inferred. The detailed exports provide the AgEq values used here; several overview

cells in the sensitivity workbook contain Ag or uncapped Ag under AgEq headings and have not been used for this comparison. The resulting

Indicated and Inferred classification geometry for the Kitsol deposit is shown in plan, longitudinal and cross-sectional views in Figure

11-10.

Contango Silver and Gold – Kitsault Valley Project Page 174 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 11-10.

Kitsol Mineral Resource Classification geometry: A – Plan view, B – Longitudinal view (looking west), C – Cross- sectional

view looking northeast. Red solid represents Indicated classification and blue Inferred classification.

11.6.3.10

Depletion, Exclusions and Reporting Constraints

No mined-out deduction

is identified in the final Kitsol resource report. The report contains a small Cat4 population that is excluded from the approved resource

statement. The final reported quantities are the Indicated and Inferred rows only, rather than the worksheet Total row, which includes

Cat4.

11.6.3.11

Deposit Mineral Resource Statement

The standalone

resource contains 0.29 Mt Indicated at 301.13 g/t Ag and 0.14 Mt Inferred at 303.04 g/t Ag (Table 11-33). The corresponding AgEq inventories

are 2.876 Moz and 1.380 Moz (Table 11-34). A separate historical Kitsol resource was not reported, so a numerical change from a zero

historical resource would be misleading. Section 11.8 compares the combined Torbrit–Kitsol reporting unit.

Contango Silver and Gold – Kitsault Valley Project Page 175 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-33.

Kitsol Mineral Resource grades.

Category

Tonnes

(Mt)

Ag

(g/t)

Au

(g/t)

Cu

(%)

Pb

(%)

Zn

(%)

Indicated

0.29

301.13

0.030

0.029

0.368

0.300

Inferred

0.14

303.04

0.020

0.033

0.434

0.316

Source: approved

Roll Up_USE worksheet. Cut-off: 132 g/t AgEq. In-situ, unmined resource before mining dilution and recovery. Mineral Resource effective

date: September 11, 2026.

Table 11-34.

Kitsol contained metals.

Category

Ag

(Moz)

Au

(koz)

Cu

(Mlb)

Pb

(Mlb)

Zn

(Mlb)

AgEq

(Moz)

Indicated

2.766

0.231

0.18

2.32

1.89

2.876

Inferred

1.323

0.101

0.10

1.30

0.94

1.380

Contained metals

are in situ. NR means not reported, not zero. Rounding may cause apparent differences.

11.6.4 Torbrit

11.6.4.1

Estimation Bias and Input Data

The Torbrit estimate

uses SRs Torbrit GM 2026 and the sub-blocked model compiled for the 2026 update. The current capping and estimator files replace earlier

working settings in the initial chapter draft. The preceding reporting unit included Kitsol and had an underlying effective date of May 8,

2019. Current Torbrit resources are reported after excluding modeled historical mining.

The deposit header

inventory contains 540 holes totaling 51,289.11 m. Of these, 57 holes totaling 13,099.68 m fall in years after the preceding effective-date

year; a further 1 hole totaling 158.00 m are in the boundary year. These are inventory counts, with the estimation-input population defined

by domain and assay acceptance as described in Section 11.2.

11.6.4.2

Geological Interpretation and Estimation Domains

Eleven mineralized

domains define the Torbrit estimate (Table 11-35, Figure 11-11). The interpretation uses the established mineralized wireframes, including

clipped domains that avoid overlapping with the principal TB_A domain. Broader control surfaces provide local orientation fields for

the curving and folded mineralized geometry. Hard boundaries prevent samples in one domain from informing another. Historical workings

are modeled separately from the mineralized domains so that geological volume, estimated grade and mining depletion remain distinct components

of the calculation.

Contango Silver and Gold – Kitsault Valley Project Page 176 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-35.

Torbrit estimation domains.

Model

domain

Geological

role

TB_A

Principal

mineralized domain

TB_B_Clip_A

Clipped

mineralized domain

TB_C_Clip_A

Clipped

mineralized domain

TB_D_Clip_A

Clipped

mineralized domain

TB_E_Clip_A

Clipped

mineralized domain

TB_F

Subsidiary

mineralized domain

TB_G

Subsidiary

mineralized domain

TB_H

Subsidiary

mineralized domain

TB_I

Subsidiary

mineralized domain

TB_J

Subsidiary

mineralized domain

TB_K

Subsidiary

mineralized domain

Figure 11-11.

Torbrit domain geometry and representative sections showing the 11 modeled domains: A – Plan view, B – Longitudinal view

(looking northeast), C – Cross-sectional view looking northwest.

Contango Silver and Gold – Kitsault Valley Project Page 177 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.6.4.3

Sample Statistics and Compositing

The estimator export

identifies SRs_Torbrit_2m_numeric_composite_2026 as its input, establishing a nominal 2.0 m composite basis. Silver coverage is

substantially more extensive than Au and base-metal coverage in parts of the historical dataset. TB_A contains 2,711 Ag records but 375

Au and Cu records, 479 Pb records and 528 Zn records in the capping schedule. The Unknown population is outside the named estimation

domains and is excluded from the deposit capping tables. Population-wide statistics that include Unknown are not representative of the

resource-domain inputs.

Torbrit samples

were composited to a target length of 2.0 m using the Within boundary setting and hard domain boundaries. Residual end lengths of less

than 1.0 m were distributed equally within the boundary interval. No additional weighting was applied during compositing. The following

capping table reports capped input means and coefficients of variation. The capped arithmetic input statistics are distinct from declustered

statistics and volume-weighted block grades.

11.6.4.4

Grade Capping

The current silver

cap for TB_A is 3,100 g/t, replacing the 2,020 g/t value in the earlier draft (Table 11-36). The TB_B_Clip_A silver cap is 1,400 g/t.

The remaining domain caps range from 175 to 1,600 g/t. Silver input-metal reductions are approximately 8.00% in TB_A, 0.24% in TB_B_Clip_A,

20.78% in TB_F and 16.44% in TB_H. Base-metal caps are also domain-specific, including 130,000 ppm Pb in TB_C_Clip_A. No numerical Au

top cut is specified for TB_D_Clip_A, where the schedule records no capped samples. The QP considers the variable cap treatment appropriate

to the different domain distributions.

Table 11-36.

Torbrit caps and capped input statistics.

Domain

Metal

Input

N

Cap

Capped

N

Capped

(%)

Input

metal

loss (%)

Capped

mean

CV

TB_A

Ag

2,711

3,100

10

0.37

8.00

315.65

1.27

TB_B

(clipped)

Ag

407

1,400

4

0.98

0.24

281.40

0.86

TB_C

(clipped)

Ag

187

1,200

3

1.60

1.29

211.54

1.10

TB_D

(clipped)

Ag

138

1,600

2

1.45

1.16

262.48

1.03

TB_E

(clipped)

Ag

157

500

6

3.82

2.80

145.97

0.93

TB_F

Ag

99

600

4

4.04

20.78

104.76

1.35

TB_G

Ag

35

400

2

5.71

1.98

103.09

1.09

TB_H

Ag

32

175

4

12.50

16.44

73.64

0.75

TB_I

Ag

52

800

2

3.85

3.19

137.73

1.53

TB_J

Ag

12

350

1

8.33

1.77

118.06

0.83

TB_K

Ag

59

1,100

2

3.39

2.07

217.64

1.22

TB_A

Au

375

0.2

4

1.07

11.02

0.013

1.79

TB_B

(clipped)

Au

53

0.2

2

3.77

17.21

0.016

2.38

TB_C

(clipped)

Au

51

0.05

0

0.00

0.00

0.010

0.78

TB_D

(clipped)

Au

10

None

0

0.00

0.00

0.006

0.40

TB_E

(clipped)

Au

44

0.05

1

2.27

0.92

0.010

0.94

Contango Silver and Gold – Kitsault Valley Project Page 178 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Domain

Metal

Input

N

Cap

Capped

N

Capped

(%)

Input

metal

loss (%)

Capped

mean

CV

TB_F

Au

99

0.1

2

2.02

5.78

0.012

1.48

TB_G

Au

35

0.05

1

2.86

1.50

0.014

0.96

TB_H

Au

32

0.2

1

3.12

16.34

0.024

1.63

TB_I

Au

52

0.1

8

15.38

6.86

0.035

1.01

TB_J

Au

12

0.3

1

8.33

1.08

0.041

2.05

TB_K

Au

17

0.02

1

5.88

0.60

0.008

0.65

TB_A

Cu

375

1,200

6

1.60

8.88

196.52

1.33

TB_B

(clipped)

Cu

53

1,000

3

5.66

19.86

259.58

1.03

TB_C

(clipped)

Cu

51

1,800

3

5.88

24.25

494.61

1.02

TB_D

(clipped)

Cu

10

800

1

10.00

9.85

239.93

1.27

TB_E

(clipped)

Cu

44

1,600

3

6.82

19.78

384.83

1.17

TB_F

Cu

99

700

8

8.08

8.33

198.55

1.03

TB_G

Cu

35

600

1

2.86

15.91

140.26

1.18

TB_H

Cu

32

800

2

6.25

10.04

257.85

0.90

TB_I

Cu

52

3,300

3

5.77

15.57

514.56

1.63

TB_J

Cu

12

250

1

8.33

1.64

87.66

0.83

TB_K

Cu

17

500

2

11.76

3.04

156.16

1.15

TB_A

Pb

479

49,000

5

1.04

3.77

5,465.83

1.58

TB_B

(clipped)

Pb

56

13,500

7

12.50

8.59

4,281.65

0.96

TB_C

(clipped)

Pb

69

130,000

3

4.35

6.12

14,115.18

2.14

TB_D

(clipped)

Pb

10

11,000

1

10.00

4.50

3,199.86

1.14

TB_E

(clipped)

Pb

87

30,000

2

2.30

3.85

5,974.26

1.27

TB_F

Pb

99

13,000

2

2.02

17.25

1,998.20

1.49

TB_G

Pb

35

15,500

1

2.86

35.13

2,402.35

1.75

TB_H

Pb

32

6,220

9

28.12

34.78

3,018.11

0.87

TB_I

Pb

52

38,000

2

3.85

18.05

2,784.31

2.71

TB_J

Pb

12

3,600

2

16.67

9.61

1,554.32

0.84

TB_K

Pb

17

5,000

1

5.88

5.23

1,159.13

1.07

TB_A

Zn

528

42,000

6

1.14

6.03

5,456.64

1.44

TB_B

(clipped)

Zn

56

16,500

4

7.14

7.80

4,192.40

1.20

TB_C

(clipped)

Zn

65

13,000

8

12.31

40.92

5,025.57

0.89

Contango Silver and Gold – Kitsault Valley Project Page 179 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Domain

Metal

Input

N

Cap

Capped

N

Capped

(%)

Input

metal

loss (%)

Capped

mean

CV

TB_D

(clipped)

Zn

10

4,700

1

10.00

1.78

1,623.64

0.91

TB_E

(clipped)

Zn

91

41,100

5

5.49

2.37

10,503.79

1.15

TB_F

Zn

99

5,278

2

2.02

9.84

1,471.20

0.83

TB_G

Zn

35

15,800

3

8.57

5.70

2,208.91

1.95

TB_H

Zn

32

6,300

4

12.50

12.61

1,958.70

1.11

TB_I

Zn

52

37,500

2

3.85

3.91

6,222.47

1.47

TB_J

Zn

12

2,940

2

16.67

5.42

1,328.03

0.74

TB_K

Zn

17

3,000

2

11.76

2.56

1,550.60

0.54

11.6.4.5

Bulk Density Assignment

Torbrit resources

use 3.10 t/m³. The grade-screened density population contains 389 measurements from 72 drill holes and has a mean of 3.337 t/m³.

The screened mean is about 7.6% higher than the assignment. It gives greater representation to mineralized samples and is not automatically

a volume-representative density for every domain. The QP retained 3.10 t/m³ in the approved resource estimate. Domain membership,

sulfide abundance and spatial support remain relevant to future refinement of this assignment.

11.6.4.6

Block Model Definition

The model is fully

sub-blocked, with 98 × 225 × 148 = 3,263,400 nominal parent cells, 5 × 5 × 5 m parent dimensions and minimum

0.5 × 0.5 × 0.5 m sub-blocks. The Leapfrog base point is 468076, 6170973, 565 m. Its local boundary dimensions are 490, 1125,

740 m and its rotation is azimuth 330°, dip 0° and pitch 0°. The reported base-point elevation is the upper Z boundary; the

model extends downward from that elevation (Table 11-37).

Table 11-37.

Torbrit global block-model bounds.

Axis

Minimum

(m)

Maximum

(m)

X

/ Easting

467,513.500

468,500.352

Y

/ Northing

6,170,973.000

6,172,192.279

Z

/ Elevation

-175.000

565.000

Source: model rollup,

block model data. For rotated models, global axis-aligned bounds differ from local boundary dimensions. Nominal parent-cell count is

not mineralized-block count. Horizontal coordinates: NAD83 / UTM Zone 9N (meters).

11.6.4.7

Grade Interpolation and Estimation Parameters

The exported estimators

use inverse-distance cubed weighting and variable orientation. Grade searches differ among domains, with minimum sample requirements

of two to four and maxima of 15 or 20 for the exported silver estimators. A two-sample-per-hole limit applies. Dedicated classification

estimators use three samples and a one-sample-per-hole limit. The parameter export is incomplete for the TB_A silver estimator and for

TB_B_Clip_A, so the earlier reviewed values for those two searches are identified separately instead of being represented as newly exported

settings. Leapfrog declustering was applied separately by domain and element in every Torbrit estimator. Search and sample parameters

are presented in Table 11-38.

Contango Silver and Gold – Kitsault Valley Project Page 180 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-38.

Torbrit search and sample parameters.

Domain

Metal

Estimator

purpose

Ranges

(m)

major × inter. × minor

Orientation

Samples

min–max

Max

per

hole

TB_C

(clipped)

Ag

Classification

150

× 75 × 50

VO

3–3

1

TB_D

(clipped)

Ag

Classification

150

× 75 × 50

VO

3–3

1

TB_E

(clipped)

Ag

Classification

150

× 75 × 50

VO

3–3

1

TB_F

Ag

Classification

150

× 75 × 50

VO

3–3

1

TB_G

Ag

Classification

150

× 75 × 50

VO

3–3

1

TB_H

Ag

Classification

150

× 75 × 50

VO

3–3

1

TB_I

Ag

Classification

150

× 75 × 50

VO

3–3

1

TB_J

Ag

Classification

200

× 200 × 100

VO

3–3

1

TB_K

Ag

Classification

150

× 75 × 50

VO

3–3

1

TB_C

(clipped)

Ag/Au/Cu/Pb/Zn

Grade

75

× 50 × 20

VO

3–20

2

TB_D

(clipped)

Ag/Au/Cu/Pb/Zn

Grade

45

× 30 × 20

VO

3–20

2

TB_E

(clipped)

Ag/Au/Cu/Pb/Zn

Grade

50

× 50 × 20

VO

3–20

2

TB_F

Ag/Au/Cu/Pb/Zn

Grade

120

× 72 × 24

VO

3–15

2

TB_G

Ag/Au/Cu/Pb/Zn

Grade

100

× 75 × 30

VO

2–20

2

TB_H

Ag/Au/Cu/Pb/Zn

Grade

100

× 60 × 25

VO

3–15

2

TB_I

Ag/Au/Cu/Pb/Zn

Grade

100

× 75 × 24

VO

4–15

2

TB_J

Ag/Au/Cu/Pb/Zn

Grade

175

× 150 × 35

VO

2–20

2

TB_K

Ag/Au/Cu/Pb/Zn

Grade

80

× 55 × 25

VO

4–15

2

TB_A

Au/Cu/Pb/Zn

Grade

150

× 75 × 50

VO

4–20

2

TB_A

Ag

Earlier

review¹

150

× 75 × 50

VO

4–20

2

TB_B

(clipped)

All

Earlier

review¹

65

× 50 × 35

VO

3–10

2

11.6.4.8

Model Validation

Validation includes

the comparison of block grades with domain composites, review of local orientation controls, capped and uncapped evaluations and reconciliation

of modeled depletion to historical production. The initial technical review reports expected smoothing in the Torbrit swath comparisons

without pervasive global bias. The final unmined export gives Ag grades of 295.43 g/t capped versus 305.28 g/t uncapped for Indicated,

and 235.77 versus 259.23 g/t for Inferred. These are reductions of approximately 3.23% and 9.05% relative to the uncapped grades on the

reported evaluation.

Contango Silver and Gold – Kitsault Valley Project Page 181 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.6.4.9

Mineral Resource Classification

The selected Torbrit

criteria use 35 m nominal spacing for Indicated and 100 m for Inferred, equivalent to raw AvgD limits of 24.745 m and 70.700 m. The distance

estimate is evaluated within mineralized domains and reviewed against drilling and geological continuity. The QP applies greater confidence

to coherent, well-supported volumes than to isolated numerical passes of the threshold. The inferred extensions lie within the accepted

mineralized framework, and the majority are expected to be capable of upgrading with infill drilling and, where relevant, improved control

on historical workings.

The 35/75 and 35/100

cases in the review model produce identical classified tonnes and AgEq ounces. Extending the Inferred threshold from 75 to 100 m therefore

adds no resources in that test population. Increasing the Indicated threshold from 35 to 40 m transfers approximately 221,361 t and 2.111

Moz AgEq from Inferred to Indicated. The QP retained 35 m for Indicated based on the geological and spatial review. The test population

is smaller than the final Torbrit export, so its absolute inventories are not used as final resources. The resulting Indicated and Inferred

classification geometry for the Torbrit deposit is shown in plan, longitudinal and cross-sectional views in Figure 11-12.

Figure 11-12.

Torbrit Mineral Resource Classification geometry: A – Plan view, B – Longitudinal view (looking northeast), C – Cross-

sectional view looking northwest. Red solid represents Indicated classification and blue Inferred classification.

11.6.4.10

Depletion, Exclusions and Reporting Constraints

The final resource

statement uses the Unmined rows from the Torbrit export. The same report identifies approximately 1.25 Mt of mined material in the Indicated-classified

portion of the model and approximately 0.01 Mt in the Inferred-classified portion. Those mined populations contain approximately 20.701

Moz and 0.145 Moz Ag, respectively, and are excluded. Historical recovered production of approximately 18.6–18.7 Moz Ag is not

directly comparable with modeled in-situ contained metal. Applying the historical 84.5% recovery to production implies about 22.0 Moz

Ag in mill feed. The final modeled depleted silver inventory of about 20.846 Moz is approximately 5.2% below that indicative contained-metal

benchmark. This is a deposit-scale reasonableness check, not a survey reconciliation of individual stopes. Figure 11-13 illustrates the

Torbrit mineralization model, distinguishing interpreted historically mined material from the remaining unmined mineralized material.

Contango Silver and Gold – Kitsault Valley Project Page 182 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 11-13.

Final Torbrit mineralized unmined model (purple) and historical underground workings and mined out (depleted) areas (black).

11.6.4.11

Deposit Mineral Resource Statement

The approved unmined

resource contains 3.25 Mt Indicated at 295.43 g/t Ag and 0.76 Mt Inferred at 235.77 g/t Ag (Tables 11-39 and 11-40). The historical-depletion

reconciliation tab contains an earlier evaluation of 1,236,649 t and 20.386 Moz Ag. Those earlier values do not replace the mined and

unmined values in the final Torbrit tab. The uncertainty in the location and extent of individual historical workings remains material

to local resource interpretation.

Table 11-39.

Torbrit Mineral Resource grades.

Category

Tonnes

(Mt)

Ag

(g/t)

Au

(g/t)

Cu

(%)

Pb

(%)

Zn

(%)

Indicated

3.25

295.43

0.014

0.018

0.546

0.440

Inferred

0.76

235.77

0.013

0.034

0.545

0.250

Table 11-40.

Torbrit contained metals.

Category

Ag

(Moz)

Au

(koz)

Cu

(Mlb)

Pb

(Mlb)

Zn

(Mlb)

AgEq

(Moz)

Indicated

30.847

1.428

1.29

39.06

31.52

32.394

Inferred

5.747

0.329

0.57

9.10

4.18

6.057

Contained metals

are in situ. NR means not reported, not zero. Rounding may cause apparent differences.

Contango Silver and Gold – Kitsault Valley Project Page 183 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.6.5 Dolly Varden

11.6.5.1

Estimation Bias and Input Data

The Dolly Varden

deposit estimate is complete and included in the approved 2026 resource statement. It uses DV Main GM 2026 and SRs DV_Main Estimation

Dataset Capped.

The deposit header

inventory contains 78 holes totaling 12,351.50 m. Of these, 0 holes totaling 0.00 m fall in years after the preceding effective-date

year; a further 1 hole totaling 390.00 m are in the boundary year. These are inventory counts, with the estimation-input population defined

by domain and assay acceptance as described in Section 11.2.

11.6.5.2

Geological Interpretation and Estimation Domains

The reported estimate

is restricted to the DV_Main mineralized domain (Table 11-41, Figure 11-14). Historical mining is represented by a separate mined/unmined

geological evaluation. The earlier classification review discusses hanging-wall and footwall meshes, but those meshes are not separate

reporting domains in the final DV_Main-filtered resource export. The final chapter therefore does not assign resources to DVHW or DVFW

independently of the approved reporting domain.

Table 11-41.

Dolly Varden estimation domains

Model

domain

Geological

role

DV_Main

Principal

Dolly Varden mineralized domain used for reporting

Contango Silver and Gold – Kitsault Valley Project Page 184 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 11-14.

Dolly Varden geometry and representative sections showing the modeled domain. A – Plan View, B – Longitudinal view (looking

northeast), C – Cross-sectional view (looking northwest).

11.6.5.3

Sample Statistics and Compositing

The prepared capping

population contains 445 Ag records, 224 Au and Cu records, and 235 Pb and Zn records. The differing populations reflect the less complete

historical coverage of metals other than silver. The capped mean silver grade is 246.82 g/t with a coefficient of variation of 1.99.

The capped Au mean is 0.0224 g/t. The resource average is calculated from qualifying blocks and is not expected to equal the arithmetic

mean of these broader input populations.

Dolly Varden Main

samples were composited to a target length of 1.25 m using the Within boundary setting and hard domain boundaries. Residual end lengths

of less than 1.0 m were distributed equally within the boundary interval. No additional weighting was applied during compositing. The

following capping table reports capped input means and coefficients of variation. The capped arithmetic input statistics are distinct

from declustered statistics and volume-weighted block grades.

11.6.5.4

Grade Capping

Caps of 3,000 g/t

Ag, 0.20 g/t Au, 2,200 ppm Cu, 25,500 ppm Pb and 46,000 ppm Zn are applied in DV_Main (Table 11-42). The silver cap affects six of 445

records, or 1.35%, with an input-metal reduction of 6.30%. The Pb and Zn input-metal reductions are 38.29% and 25.37%, reflecting more

pronounced upper-tail influence in those populations. The QP considers this treatment necessary to limit extrapolation of local high

values through the remaining mineralized volume.

Contango Silver and Gold – Kitsault Valley Project Page 185 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-42.

Dolly Varden caps and capped input statistics.

Domain

Metal

Input

N

Cap

Capped

N

Capped

(%)

Input

metal

loss (%)

Capped

mean

CV

DV_Main

Ag

445

3,000

6

1.35

6.30

246.82

1.99

DV_Main

Au

224

0.2

3

1.34

6.13

0.022

1.72

DV_Main

Cu

224

2,200

7

3.12

20.04

224.93

1.94

DV_Main

Pb

235

25,500

8

3.40

38.29

2,547.65

2.17

DV_Main

Zn

235

46,000

12

5.11

25.37

10,622.15

1.15

11.6.5.5

Bulk Density Assignment

The model uses

3.00 t/m³. The grade-screened density review contains 156 measurements from 22 drill holes and has a mean of 2.977 t/m³, approximately

0.8% below the selected assignment. The QP considers the density appropriate for the current resource. Interpretation of remnant mineralization

near historical workings requires the density assignment and depletion model to be considered together.

11.6.5.6

Block Model Definition

The model is fully

sub-blocked, with 80 × 39 × 72 = 224,640 nominal parent cells, 5 × 5 × 5 m parent dimensions and minimum 0.5

× 0.5 × 0.5 m sub-blocks. The Leapfrog base point is 467620, 6170686, 689 m. Its local boundary dimensions are 400, 195,

360 m and its rotation is azimuth 0°, dip 0° and pitch 0°. The reported base-point elevation is the upper Z boundary; the

model extends downward from that elevation (Table 11-43).

Table 11-43.

Dolly Varden global block-model bounds.

Axis

Minimum

(m)

Maximum

(m)

X

/ Easting

467,620.000

468,020.000

Y

/ Northing

6,170,686.000

6,170,881.000

Z

/ Elevation

329.000

689.000

Source: model rollup,

block model data. For rotated models, global axis-aligned bounds differ from local boundary dimensions. Nominal parent-cell count is

not mineralized-block count. Horizontal coordinates: NAD83 / UTM Zone 9N (meters).

11.6.5.7

Grade Interpolation and Estimation Parameters

Ag, Au, Cu, Pb

and Zn are estimated using IDW with power 3, a variable-orientation 150 × 100 × 50 m search and hard domain boundaries. Each

estimator requires 4 to 15 composites and limits contributions to two samples per hole. Leapfrog declustering was applied separately

by domain and element in every Dolly Varden Main estimator. The grade-estimator export identifies the SRs DV_Main Grade Capped 2026 declustering

object. The export contains the grade estimators but no separately named classification estimator, so it does not by itself establish

which AvgD field was used for classification. Search and sample parameters are presented in Table 11-44.

Contango Silver and Gold – Kitsault Valley Project Page 186 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-44.

Dolly Varden search and sample parameters.

Domain

Metal

Estimator

purpose

Ranges

(m)

major × inter. × minor

Orientation

Samples

min–max

Max

per

hole

DV_Main

Ag/Au/Cu/Pb/Zn

Grade

150

× 100 × 50

VO

4–15

2

Source: parameters

- DollyVarden.xlsx, Search and Interpolant. All listed current estimators are IDW, power 3. ²VO = variable orientation; fixed values

are dip / dip azimuth / pitch in degrees. Per-sector drill-hole-limit option is enabled.

11.6.5.8

Model Validation

Validation emphasizes

the distribution of remnant mineralization relative to historical workings, the representation of high-grade silver samples and the influence

of sparse Au and base-metal data. The QP reviewed the accepted DV_Main domain and the unmined reporting population. Capped base-metal

distributions are retained in the equivalent calculation, with their more limited sample support recognized as a source of uncertainty.

11.6.5.9

Mineral Resource Classification

The classification

review selects 30/70 for Dolly Varden. The 30/70 selection reflects the QP’s assessment of continuity and support in the remnant

mineralized domain.

The valid historical

test cases compare 25/50, 30/50, 35/50 and 30/40. Their results demonstrate the sensitivity of the remnant inventory to classification

boundaries, but their tonnes and ounces differ from the final DV_Main export. They are therefore reported as supporting review-model

results only. The QP’s classification decision is based on geological and sample support rather than maximizing classified tonnes.

Continued infill work is expected to upgrade the majority of Inferred material where the continuity and position of the remaining mineralized

lenses can be confirmed. The resulting Indicated and Inferred classification geometry for the Dolly Varden deposit is shown in plan,

longitudinal and cross-sectional views in Figure 11-15.

Contango Silver and Gold – Kitsault Valley Project Page 187 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 11-15.

Dolly Varden Mineral Resource Estimate geometry: A – Plan view, B – Longitudinal view (looking northeast), C – Cross-sectional

view looking northwest. Red solid represents Indicated classification and blue Inferred classification.

11.6.5.10

Depletion, Exclusions and Reporting Constraints

The final resource

statement includes only the unmined Indicated and unmined Inferred rows under the DV_Main filter. Mined material and Cat4 are excluded.

The export identifies approximately 0.1886 Moz AgEq and 0.1761 Moz Ag in the mined Indicated and Inferred populations. Those quantities

are not added to the remaining resource. Additional mined Cat4 material is present in the model but has no resource classification. Figure

11-16 illustrates the Dolly Varden mineralization model, distinguishing interpreted historically mined material from the remaining unmined

mineralized material.

Contango Silver and Gold – Kitsault Valley Project Page 188 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 11-16.

Final Dolly Varden mineralized unmined model (purple) and historical underground workings and mined out (depleted) areas (black).

11.6.5.11

Deposit Mineral Resource Statement

The approved estimate

contains 0.09 Mt Indicated at 426.44 g/t Ag and 0.14 Mt Inferred at 328.78 g/t Ag (Table 11-45). Indicated AgEq decreases from 2.078

to 1.321 Moz relative to the preceding statement, while Inferred AgEq increases from 0.754 to 1.604 Moz (Table 11-46). The change reflects

the revised model, remnant-volume interpretation, estimation and classification, rather than substantial newly drilled deposit expansion.

Table 11-45.

Dolly Varden Mineral Resource grades.

Category

Tonnes

(Mt)

Ag

(g/t)

Au

(g/t)

Cu

(%)

Pb

(%)

Zn

(%)

Indicated

0.09

426.44

0.020

0.025

0.432

1.459

Inferred

0.14

328.78

0.030

0.048

0.506

1.519

Source: approved

Roll Up_USE worksheet. Cut-off: 132 g/t AgEq. In-situ, unmined resource before mining dilution and recovery. Mineral Resource effective

date: September 11, 2026.

Table 11-46.

Dolly Varden contained metals.

Category

Ag

(Moz)

Au

(koz)

Cu

(Mlb)

Pb

(Mlb)

Zn

(Mlb)

AgEq

(Moz)

Indicated

1.235

0.056

0.05

0.86

2.90

1.321

Inferred

1.456

0.149

0.15

1.54

4.61

1.604

Contained metals

are in situ. NR means not reported, not zero. Rounding may cause apparent differences.

Contango Silver and Gold – Kitsault Valley Project Page 189 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.6.6 North

Star

11.6.6.1

Estimation Bias and Input Data

The North Star

estimate uses Northstar GM 2026 and the prepared SRs Northstar Estimation Dataset Capped. The approved resource export identifies the

DIST 30_70 classification evaluation. It replaces the deposit estimate with an underlying effective date of May 8, 2019.

The deposit header

inventory contains 144 holes totaling 17,780.66 m. Of these, 10 holes totaling 3,834.35 m fall in years after the preceding effective-date

year. These are inventory counts, with the estimation-input population defined by domain and assay acceptance as described in Section 11.2.

11.6.6.2

Geological Interpretation and Estimation Domains

The mineralized

volume is represented by the DV_Northstar_VN domain and a separate mined/unmined evaluation (Table 11-47, Figure 11-17). The geometry

is interpreted from drilling and historical information within the silver-bearing mineralized system. The hard domain boundary limits

grade interpolation to the accepted vein volume. The final model does not treat all material near the vein or within the broader bounding

box as resource.

Table 11-47.

North Star estimation domains.

Model

domain

Geological

role

DV_Northstar_VN

Principal

North Star mineralized vein domain

Figure 11-17. Northstar geometry

and representative sections showing the modeled domain. A – Plan View, B – Longitudinal view (looking northeast), C –

Cross-sectional view (looking northwest).

Contango Silver and Gold – Kitsault Valley Project Page 190 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.6.6.3

Sample Statistics and Compositing

The prepared population

contains 638 Ag records but only 61 Au records, 191 Cu records, 299 Pb records and 316 Zn records. The capped mean silver grade is 197.43

g/t with a coefficient of variation of 1.31. The much smaller gold population and incomplete base-metal coverage are material considerations

because those metals contribute to AgEq, particularly in the lower-silver-grade Inferred population.

North Star samples

were composited to a target length of 1.5 m using the Within boundary setting and hard domain boundaries. Residual end lengths of less

than 1.0 m were distributed equally within the boundary interval. No additional weighting was applied during compositing. The following

capping table reports capped input means and coefficients of variation. The capped arithmetic input statistics are distinct from declustered

statistics and volume-weighted block grades.

11.6.6.4

Grade Capping

The current caps

are 1,700 g/t Ag, 1.70 g/t Au, 5,400 ppm Cu, 32,000 ppm Pb and 100,000 ppm Zn (Table 11-48). The silver cap affects five of 638 records,

or 0.78%, and reduces input silver metal by 1.03%. Lead has a greater input-metal reduction of 28.94%, while Au, Cu and Zn reductions

are 11.31%, 12.85% and 6.10%.

Table 11-48.

North Star caps and capped input statistics.

Domain

Metal

Input

N

Cap

Capped

N

Capped

(%)

Input

metal

loss (%)

Capped

mean

CV

North

Star vein

Ag

638

1,700

5

0.78

1.03

197.43

1.31

North

Star vein

Au

61

1.7

3

4.92

11.31

0.204

1.81

North

Star vein

Cu

191

5,400

9

4.71

12.85

936.82

1.37

North

Star vein

Pb

299

32,000

13

4.35

28.94

6,420.62

1.30

North

Star vein

Zn

316

100,000

9

2.85

6.10

16,189.24

1.49

11.6.6.5

Bulk Density Assignment

The QP assigned

3.00 t/m³ by analogy with Dolly Varden and the comparable mineralized setting. The North Star source contains 42 density records,

but none qualifies under the silver-greater-than-10-g/t screen used in the density review. The screen therefore provides no direct North

Star mean for comparison. The assignment does not imply that no density information exists; it identifies the limited support within

the selected mineralized population. Additional measurements backflagged to the resource domain are recommended.

11.6.6.6

Block Model Definition

The model is fully

sub-blocked, with 99 × 88 × 87 = 757,944 nominal parent cells, 5 × 5 × 5 m parent dimensions and minimum 0.5

× 0.5 × 0.5 m sub-blocks. The Leapfrog base point is 467381.385, 6171225.407, 540 m. Its local boundary dimensions are 495,

440, 435 m and its rotation is azimuth 45°, dip 0° and pitch 0°. The reported base-point elevation is the upper Z boundary;

the model extends downward from that elevation (Table 11-49).

Contango Silver and Gold – Kitsault Valley Project Page 191 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-49.

North Star global block-model bounds.

Axis

Minimum

(m)

Maximum

(m)

X

/ Easting

467,381.385

468,042.530

Y

/ Northing

6,170,875.389

6,171,536.534

Z

/ Elevation

105.000

540.000

Source: model rollup,

block model data. For rotated models, global axis-aligned bounds differ from local boundary dimensions. Nominal parent-cell count is

not mineralized-block count. Horizontal coordinates: NAD83 / UTM Zone 9N (meters).

11.6.6.7

Grade Interpolation and Estimation Parameters

The Ag estimator

uses a variable-orientation 200 × 100 × 35 m search. Au, Cu, Pb and Zn use 150 × 100 × 35 m variable-orientation

searches. All grade estimators use IDW with power 3, select 4 to 15 composites and impose a two-sample-per-hole limit. Leapfrog declustering

was applied separately by domain and element in every North Star estimator; the grade-estimator export identifies the North Star declustering

object. The Class_ID 3 estimator uses a variable-orientation 200 × 150 × 35 m search and selects three samples with a one-sample-per-hole

limit. A fixed-orientation nearest-neighbour Ag estimator is retained as a comparison. Search and sample parameters are presented in

Table 11-50).

Table 11-50.

North Star search and sample parameters.

Domain

Metal

Estimator

purpose

Ranges

(m)

major × inter. × minor

Orientation

Samples

min–max

Max

per

hole

North

Star vein

Ag

Classification

200

× 150 × 35

VO

3–3

1

North

Star vein

Ag

Grade

200

× 100 × 35

VO

4–15

2

North

Star vein

Au/Cu/Pb/Zn

Grade

150

× 100 × 35

VO

4–15

2

Source: parameters

North Star.xlsx, Search and Interpolant. All listed current estimators are IDW, power 3. ²VO = variable orientation; fixed values

are dip / dip azimuth / pitch in degrees. Per-sector drill-hole-limit option is enabled.

11.6.6.8

Model Validation

The QP reviewed

block grades and domain boundaries in section, the distribution of historical and recent samples, and the change in the Inferred envelope

under the 30/70 classification. Validation of Au and base-metal credits requires particular attention because their sample populations

are smaller than the silver population. The final Inferred resource has an Ag grade of 123.99 g/t and an AgEq grade of 213.24 g/t. Its

qualification at 132 g/t AgEq therefore depends materially on the other estimated metals and their assumed recoveries.

11.6.6.9

Mineral Resource Classification

The selected criteria

are 30 m nominal spacing for Indicated and 70 m for Inferred, equivalent to raw AvgD limits of 21.210 m and 49.490 m. The calculation

uses dedicated classification AvgD divided by 0.707. The QP retained the 30 m Indicated boundary and extended the Inferred boundary from

50 to 70 m where the vein remains geologically coherent and supported by the estimation. Isolated or unsupported projections remain unclassified.

Infill drilling and improved density support are expected to permit upgrading of the majority of the Inferred resource, subject to confirming

the interpreted continuity.

Contango Silver and Gold – Kitsault Valley Project Page 192 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

The selected 30/70

case contains 357,735.38 t Indicated and 231,552.00 t Inferred. Compared with 30/50, the selected case adds approximately 54,627 t and

0.319 Moz AgEq to Inferred without changing Indicated. The unclassified above-cut-off inventory decreases from 77,849.25 t to 23,221.88

t. Reducing the Indicated boundary from 30 to 25 m transfers approximately 65,081 t and 0.562 Moz AgEq to Inferred; raising it to 35

m transfers approximately 66,335 t and 0.494 Moz AgEq to Indicated. These results quantify the neighboring choices but do not independently

establish geological confidence. The resulting Indicated and Inferred classification geometry for the North Star deposit is shown in

plan, longitudinal and cross-sectional views in Figure 11-18.

Figure 11-18.

Northstar Mineral Resource classification geometry. A – Plan view, B – Longitudinal view (looking northeast), C – Cross-sectional

view (looking northwest). Red solid represents Indicated classification and blue Inferred classification.

11.6.6.10

Depletion, Exclusions and Reporting Constraints

Only unmined Indicated

and Inferred material is reported. The detailed selected classification export identifies 483.75 t of modeled mined material, containing

approximately 3,275 oz AgEq and 2,504 oz Ag. The small modeled depletion is excluded even though its tonnage rounds to 0.00 Mt in the

resource report. The Cat4 population is also excluded. Figure 11-19 illustrates the North Star mineralization model, showing the remaining

unmined mineralized material in relation to the interpreted historical underground workings and depleted areas.

Contango Silver and Gold – Kitsault Valley Project Page 193 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 11-19.

Northstar final mineralized unmined model (purple) and historical underground workings and mined out (depleted) areas (black).

11.6.6.11

Deposit Mineral Resource Statement

The final North

Star estimate contains 0.36 Mt Indicated and 0.23 Mt Inferred, with AgEq inventories of 3.571 Moz and 1.587 Moz (Tables 11-51 and 11-52).

Confidence in density and non-silver credits remains a specific limitation, especially for the expanded Inferred population.

Table 11-51.

North Star Mineral Resource grades.

Category

Tonnes

(Mt)

Ag

(g/t)

Au

(g/t)

Cu

(%)

Pb

(%)

Zn

(%)

Indicated

0.36

249.18

0.290

0.079

0.744

2.076

Inferred

0.23

123.99

0.540

0.134

0.898

2.650

Table 11-52.

North Star contained metals.

Category

Ag

(Moz)

Au

(koz)

Cu

(Mlb)

Pb

(Mlb)

Zn

(Mlb)

AgEq

(Moz)

Indicated

2.866

3.322

0.62

5.87

16.37

3.571

Inferred

0.923

4.002

0.68

4.59

13.53

1.587

11.7 Consolidated Kitsault

Valley Mineral Resource Statement

The consolidated

statement presents the final approved Mineral Resource quantities as of September 11, 2026 by region, deposit and confidence category.

The consolidated Indicated and Inferred Mineral Resource tonnes, grades and contained metals are presented by deposit in Tables 11-53

through 11-56, with regional and project totals by resource category summarized in Table 11-57. The seven updated deposits use 132 g/t

AgEq. South Reef retains its 2.0 g/t AuEq cut-off and original physical-resource estimate. Regional contained-metal totals are sums of

the approved deposit values, with appropriate rounding.

Contango Silver and Gold – Kitsault Valley Project Page 194 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-53.

Indicated Mineral Resource tonnes and grades.

Deposit

Tonnes

(Mt)

Ag

(g/t)

Au

(g/t)

Cu

(%)

Pb

(%)

Zn

(%)

Homestake

Main

1.43

49.55

6.350

0.181

0.058

0.112

Homestake

Silver

0.71

168.26

4.160

0.039

0.263

0.222

Wolf

1.53

301.90

0.050

0.027

0.714

0.864

Kitsol

0.29

301.13

0.030

0.029

0.368

0.300

Torbrit

3.25

295.43

0.014

0.018

0.546

0.440

Dolly

Varden

0.09

426.44

0.020

0.025

0.432

1.459

North

Star

0.36

249.18

0.290

0.079

0.744

2.076

Table 11-54.

Indicated Mineral Resource contained metals.

Deposit

Ag

(Moz)

Au

(koz)

Cu

(Mlb)

Pb

(Mlb)

Zn

(Mlb)

AgEq

(Moz)

Homestake

Main

2.277

292.009

5.71

1.83

3.53

23.308

Homestake

Silver

3.856

95.407

0.61

4.13

3.49

9.968

Wolf

14.850

2.246

0.92

24.09

29.15

16.108

Kitsol

2.766

0.231

0.18

2.32

1.89

2.876

Torbrit

30.847

1.428

1.29

39.06

31.52

32.394

Dolly

Varden

1.235

0.056

0.05

0.86

2.90

1.321

North

Star

2.866

3.322

0.62

5.87

16.37

3.571

Table 11-55.

Inferred Mineral Resource tonnes and grades

Deposit

Tonnes

(Mt)

Ag

(g/t)

Au

(g/t)

Cu

(%)

Pb

(%)

Zn

(%)

Homestake

Main

0.52

11.09

4.610

0.143

0.056

0.127

Homestake

Silver

3.63

65.88

3.550

0.028

0.203

0.165

South

Reef

0.445

4.90

8.680

0.040

0.001

NR

Wolf

0.44

381.40

0.030

0.030

0.707

1.100

Kitsol

0.14

303.04

0.020

0.033

0.434

0.316

Torbrit

0.76

235.77

0.013

0.034

0.545

0.250

Dolly

Varden

0.14

328.78

0.030

0.048

0.506

1.519

North

Star

0.23

123.99

0.540

0.134

0.898

2.650

Source: approved

Roll Up_USE. Cut-off 132 g/t AgEq except South Reef at 2.0 g/t AuEq. NR = not reported. The reference point is in-situ, unmined material

before mining dilution and mining recovery. Mineral Resource effective date: September 11, 2026.

Contango Silver and Gold – Kitsault Valley Project Page 195 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-56.

Inferred Mineral Resource contained metals.

Deposit

Ag

(Moz)

Au

(koz)

Cu

(Mlb)

Pb

(Mlb)

Zn

(Mlb)

AgEq

(Moz)

Homestake

Main

0.186

77.211

1.64

0.64

1.46

5.770

Homestake

Silver

7.680

414.413

2.24

16.22

13.23

34.132

South

Reef

0.100

124.200

0.36

0.00

NR

8.600

Wolf

5.390

0.411

0.30

6.85

10.66

5.790

Kitsol

1.323

0.101

0.10

1.30

0.94

1.380

Torbrit

5.747

0.329

0.57

9.10

4.18

6.057

Dolly

Varden

1.456

0.149

0.15

1.54

4.61

1.604

North

Star

0.923

4.002

0.68

4.59

13.53

1.587

Table 11-57.

Regional and project totals by resource category.

Category

and region

Tonnes

(Mt)

Ag

(Moz)

Au

(koz)

Cu

(Mlb)

Pb

(Mlb)

Zn

(Mlb)

AgEq

(Moz)

Indicated

Homestake

2.140

6.133

387.416

6.32

5.96

7.02

33.275

Indicated

Dolly Varden

5.520

52.565

7.285

3.06

72.20

81.83

56.270

Indicated

Project total

7.660

58.698

394.700

9.38

78.16

88.85

89.545

Inferred

Homestake

4.595

7.965

615.824

4.24

16.86

14.69¹

48.501

Inferred

Dolly Varden

1.710

14.839

4.993

1.80

23.38

33.92

16.419

Inferred

Project total

6.305

22.804

620.817

6.04

40.24

48.61¹

64.920

The resource statement

is subject to the following reporting notes: the effective date is September 11, 2026; Dave Larimer is the responsible QP and an

employee of the Company; no Measured resources or Mineral Reserves are reported; historical mined material and unclassified blocks are

excluded; quantities and grades are rounded to reflect the precision of the estimate; mineral-equivalent grades are calculated using

the disclosed prices, recoveries and units; and Mineral Resources do not have demonstrated economic viability. The Inferred category

has lower confidence than Indicated and cannot be converted directly to Mineral Reserves.

11.8 Comparison

with Previously Reported Estimates

The comparison

is against the resources presented in the 2023 combined Kitsault Valley technical report. The underlying resource effective dates are

January 20, 2022, for the Homestake deposits and May 8, 2019, for the Dolly Varden-area deposits. These are different from

the effective date of September 28, 2022, effective date of the combined report. Kitsol was included in Torbrit previously, so the

principal numerical comparison combines the current Torbrit and Kitsol values.

Contango Silver and Gold – Kitsault Valley Project Page 196 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

The AgEq comparison

columns are reproduced from the approved rollup. The earlier southern resources were reported principally as silver resources at 150

g/t Ag, while the updated models include additional metals at 132 g/t AgEq. The earlier Homestake estimates used a different AuEq

price and recovery basis. Differences in equivalent ounces therefore combine physical-resource changes with changes in reporting basis.

Tables 11-58 and 11-59 compare the Indicated and Inferred tonnage and contained AgEq, respectively, in the 2026 estimate with the preceding

resource statement by deposit or reporting unit.

Table 11-58.

Indicated comparison with the preceding resource statement.

Deposit

/ reporting unit

Prior

Mt

2026

Mt

Change

Mt

Prior

AgEq

Moz

2026

AgEq

Moz

Change

Moz

Homestake

Main

0.736

1.430

0.694

13.437

23.308

9.871

Homestake

Silver

–

0.710

0.710

–

9.968

9.968

Torbrit

+ Kitsol

2.623

3.540

0.917

25.025

35.269

10.244

Wolf

0.402

1.530

1.128

3.834

16.108

12.274

Dolly

Varden

0.156

0.090

–0.066

2.078

1.321

–0.757

North

Star

0.236

0.360

0.124

1.994

3.571

1.577

Project

total

4.153

7.660

3.507

46.368

89.545

43.177

Table 11-59.

Inferred comparison with the preceding resource statement.

Deposit

/ reporting unit

Prior

Mt

2026

Mt

Change

Mt

Prior

AgEq

Moz

2026

AgEq

Moz

Change

Moz

Homestake

Main

1.747

0.520

–1.227

27.820

5.770

–22.050

Homestake

Silver

3.354

3.630

0.276

38.873

34.132

–4.741

South

Reef

0.445

0.445

0.000

8.585

8.600

0.015

Torbrit

+ Kitsol

1.185

0.900

–0.285

10.588

7.437

–3.151

Wolf

0.010

0.440

0.430

0.070

5.790

5.720

Dolly

Varden

0.086

0.140

0.054

0.754

1.604

0.850

North

Star

0.005

0.230

0.225

0.035

1.587

1.552

Project

total

6.831

6.305

–0.526

86.725

64.920

–21.805

Indicated tonnage

increases by 3.507 Mt, or approximately 84.4%, and the approved Indicated AgEq inventory increases by 43.177 Moz, or approximately 93.1%.

Inferred tonnage decreases by 0.526 Mt, or approximately 7.7%, and Inferred AgEq decreases by 21.805 Moz, or approximately 25.1%. These

category changes are net comparisons of separately estimated inventories. They are not a block-by-block transition matrix.

Contango Silver and Gold – Kitsault Valley Project Page 197 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Additional drilling

materially expands the database at Wolf and the Homestake deposits. At Homestake, revised lenses and low-grade envelopes, changes in

high-grade treatment and a different allocation between Indicated and Inferred contribute to the reported grade changes. At Torbrit,

separate Kitsol reporting and updated depletion must be considered. At Dolly Varden, the revised remnant model and classification are

more important explanations than new drilling. North Star’s Inferred quantity also reflects the selected 30/70 classification and

non-silver contributions to AgEq. South Reef’s physical resources remain unchanged.

The effects of

geology and drilling, capping and interpolation, density, classification, depletion, metal prices, recoveries and spatial constraints

are not additive unless each effect is isolated through controlled model reruns. The supplied files do not contain a common-block reconciliation

that isolates all of those drivers. Consequently, no percentage of the net resource change is assigned uniquely to one driver. Figure

11-20 summarizes the change in reported AgEq by deposit and resource category between the preceding and 2026 estimates; the comparison

reflects their respective reporting bases and is not a constant-assumption revaluation.

Figure 11-20.

Change in reported AgEq by deposit and resource category. Values are on their respective reporting bases, including different cut-offs,

metal prices and recoveries. This is not a constant-assumption revaluation. Torbrit and Kitsol are combined to match the preceding reporting

unit. South Reef has no Indicated resource.

11.9 Resource

Sensitivity

Sensitivity work

distinguishes a change in the classification of an existing estimate from a change in the estimate itself or in the set of blocks qualifying

for reporting. The supplied distance workbook contains controlled classification alternatives. North Star and Kitsol provide detailed

selected scenario exports that reconcile to the final resource values. Homestake, Wolf, Torbrit and Dolly Varden review populations differ

from their final exports and are retained as historical test populations supporting the QP’s decisions. Tables 11-60 through 11-66

summarize the classification-distance sensitivity analyses for Homestake Main, Homestake Silver, Wolf, Kitsol, Torbrit, Dolly Varden

and North Star, respectively, showing how alternative spacing scenarios affect Indicated, Inferred and unclassified tonnage and

AgEq inventories.

Contango Silver and Gold – Kitsault Valley Project Page 198 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-60.

Homestake Main classification-distance sensitivity.

Scenario¹

Indicated

Mt

Inferred

Mt

Unclassified

kt

Indicated

AgEq

Moz

Inferred

AgEq

Moz

38/100

1.446

0.504

0.01

22.706

6.372

35/100

1.273

0.677

0.01

20.140

8.937

42/100

1.627

0.324

0.01

25.268

3.809

38/75

1.446

0.490

14.09

22.706

6.286

1. Scenario values

represent the nominal average-distance thresholds, in meters, used to evaluate Indicated and Inferred classification, respectively. For

example, 38/75 represents a 38 m threshold for Indicated and a 75 m threshold for Inferred..

Table 11-61.

Homestake Silver classification-distance sensitivity.

Scenario¹

Indicated

Mt

Inferred

Mt

Unclassified

kt

Indicated

AgEq

Moz

Inferred

AgEq

Moz

38/100

0.891

3.367

70.34

11.240

32.346

35/100

0.564

3.694

70.34

7.170

36.417

42/100

1.352

2.906

70.34

16.203

27.383

38/75

0.891

2.902

535.40

11.240

28.802

1. Scenario values

represent the nominal average-distance thresholds, in meters, used to evaluate Indicated and Inferred classification, respectively. For

example, 38/75 represents a 38 m threshold for Indicated and a 75 m threshold for Inferred..

Table 11-62.

Wolf classification-distance sensitivity.

Scenario¹

Indicated

Mt

Inferred

Mt

Unclassified

kt

Indicated

AgEq

Moz

Inferred

AgEq

Moz

45/100

1.337

0.452

0.34

16.044

4.315

40/100

1.122

0.666

0.34

13.702

6.656

50/100

1.497

0.291

0.34

17.801

2.557

45/75

1.337

0.441

10.88

16.044

4.215

1. Scenario values

represent the nominal average-distance thresholds, in meters, used to evaluate Indicated and Inferred classification, respectively. For

example, 38/75 represents a 38 m threshold for Indicated and a 75 m threshold for Inferred..

Table 11-63.

Kitsol classification-distance sensitivity.

Scenario¹

Indicated

Mt

Inferred

Mt

Unclassified

kt

Indicated

AgEq

Moz

Inferred

AgEq

Moz

30/60

0.179

0.230

13.83

1.776

2.385

35/70

0.286

0.136

1.33

2.876

1.380

40/75

0.333

0.089

1.33

3.375

0.880

35/50

0.286

0.102

34.70

2.876

1.096

1. Scenario values

represent the nominal average-distance thresholds, in meters, used to evaluate Indicated and Inferred classification, respectively. For

example, 38/75 represents a 38 m threshold for Indicated and a 75 m threshold for Inferred..

Contango Silver and Gold – Kitsault Valley Project Page 199 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-64.

Torbrit classification-distance sensitivity.

Scenario¹

Indicated

Mt

Inferred

Mt

Unclassified

kt

Indicated

AgEq

Moz

Inferred

AgEq

Moz

30/50

2.497

0.730

284.43

25.025

6.922

35/75

2.765

0.746

0.30

27.655

6.296

35/100

2.765

0.746

0.30

27.655

6.296

40/100

2.987

0.525

0.30

29.765

4.186

1. Scenario values

represent the nominal average-distance thresholds, in meters, used to evaluate Indicated and Inferred classification, respectively. For

example, 38/75 represents a 38 m threshold for Indicated and a 75 m threshold for Inferred..

Table 11-65.

Dolly Varden classification-distance sensitivity.

Scenario¹

Indicated

Mt

Inferred

Mt

Unclassified

kt

Indicated

AgEq

Moz

Inferred

AgEq

Moz

30/50

0.091

0.144

76.38

1.340

1.714

25/50

0.032

0.203

76.38

0.478

2.577

35/50

0.134

0.101

76.38

1.992

1.062

30/40

0.091

0.081

138.60

1.340

1.082

1. Scenario values

represent the nominal average-distance thresholds, in meters, used to evaluate Indicated and Inferred classification, respectively. For

example, 38/75 represents a 38 m threshold for Indicated and a 75 m threshold for Inferred..

Table 11-66.

North Star classification-distance sensitivity.

Scenario¹

Indicated

Mt

Inferred

Mt

Unclassified

kt

Indicated

AgEq

Moz

Inferred

AgEq

Moz

30/50

0.358

0.177

77.85

3.571

1.268

25/50

0.293

0.242

77.85

3.009

1.830

35/50

0.424

0.111

77.85

4.065

0.774

30/70

0.358

0.232

23.22

3.571

1.587

1. Scenario values

represent the nominal average-distance thresholds, in meters, used to evaluate Indicated and Inferred classification, respectively. For

example, 38/75 represents a 38 m threshold for Indicated and a 75 m threshold for Inferred..

The Dolly Varden

30/75 result is excluded from the sensitivity table because it changes the Indicated population relative to 30/50 while purporting to

change only the Inferred threshold. The selected 30/70 conclusion is retained

Changing metal

prices or recoveries has two different effects. With a fixed block population, it changes only the equivalent-value calculation and the

equivalent ounces; individual metal grades, contained metals and tonnes remain unchanged. When the new AgEq values are used to reapply

a reporting cut-off, blocks can enter or leave the resource and all reported averages and quantities can change. A simple revaluation

of the final table therefore cannot establish the change in reportable resource tonnes.

Contango Silver and Gold – Kitsault Valley Project Page 200 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

A final cut-off

and economic sensitivity suite should re-evaluate the approved models at common reporting constraints and retain Indicated and Inferred

separately. Useful cut-off cases bracket 132 g/t AgEq and show tonnes, individual metal grades, individual contained metals and AgEq.

Recovery and price cases should distinguish their effect on equivalency from the effect of reselecting blocks. South Reef requires a

separately labeled retained-basis case unless its original model is formally rerun.

11.10 Uncertainty,

Limitations and Material Risks

The resource categories

express the QP’s assessment of uncertainty in geological continuity, grade and quantity at the scale relevant to resource reporting.

Indicated material has sufficient confidence in the interpretation and estimate to support further mine planning and economic evaluation.

Inferred material has lower confidence and requires additional drilling and evaluation before it can be considered for conversion to

Mineral Reserves. No numerical confidence interval or probability of conversion has been calculated from the supplied models. Table 11-67

summarizes the principal sources of uncertainty affecting the Mineral Resource estimate, their influence on estimation and classification,

and the deposits for which each factor is particularly relevant.

Contango Silver and Gold – Kitsault Valley Project Page 201 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 11-67.

Principal sources of resource uncertainty and their treatment

Factor

Influence

on estimate and classification

Deposits

of particular relevance

Sampling

and data coverage

Historical

assays emphasize silver in parts of the southern area. Sparse Au/base-metal data increase uncertainty in equivalent credits.

North

Star, Dolly Varden, upper Wolf, historical Torbrit

Geological

interpretation

Lens

connections, thickness and extrapolation control volume and local grade continuity. Hard domains and spatial classification review

limit unsupported continuity.

Homestake

Main and Silver; narrow southern veins

High-grade

influence

Small

populations and skewed distributions make some caps influential. Domain caps limit extrapolation; paired model tests are needed to

quantify resource-metal effects.

Homestake

Silver small lenses; Homestake Main MIDLENS; selected Torbrit domains

Density

Screened

sample means may differ from volume-representative domain densities. Analogy or small populations add uncertainty to tonnes.

North

Star and Kitsol; Torbrit domain distribution

Interpolation

and support

IDW

smoothing, orientation and clustering affect local estimates. Separate grade and classification estimators must retain their intended

roles.

All

updated models

Historical

depletion

Uncertain

stope position or unrecorded workings can change remnant volumes. Production reconciliation does not resolve local spatial uncertainty.

Torbrit,

Dolly Varden and North Star

Metallurgy

and payable products

Proxy

recoveries, incomplete integrated testing and uncertain payable terms can change AgEq and reporting thresholds.

All

deposits; non-silver credits particularly relevant

Economic

and spatial assumptions

Unit

costs, minimum mining dimensions, dilution, access and processing configuration affect reasonable extraction prospects.

All

deposits

Retained

estimate

Original

model, cut-off and density must remain distinguishable from new-model assumptions.

South

Reef

Sensitivity

version control

Earlier

test quantities cannot be mixed with final reporting quantities or used as a final cut-off sensitivity.

Homestake,

Wolf, Torbrit and Dolly Varden

The QP considered

these factors together when assigning classification. A threshold passing the nominal-spacing test is not sufficient where geological

continuity, independent sample support, density or depletion confidence is inadequate. Conversely, a coherent mineralized continuation

with lower confidence can remain Inferred where it is supported by the geological and estimation evidence. Increasing a distance threshold

to increase tonnes is not a classification justification.

The principal measures

to reduce uncertainty are targeted infill and structural drilling, improved density coverage within the final domains, complete documentation

of historical workings and selective verification of remnant areas, metallurgical variability and product testing, and engineering work

that links the reporting cut-off to an accepted underground extraction scenario. These measures are carried into the TRS recommendations.

Contango Silver and Gold – Kitsault Valley Project Page 202 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

11.11 QP

Conclusions on the Mineral Resource Estimate

In the opinion

of the Qualified Person, the accepted geological, drilling, assay and density information provides an adequate basis for the Mineral

Resource estimates at the confidence levels assigned. The deposit-specific domains, high-grade controls and estimation settings appropriately

reflect the mineralized systems and the available data. The updated models support Indicated and Inferred resources at the seven re-estimated

deposits. South Reef is retained as an Inferred resource on its preceding physical-resource and reporting basis.

The QP considers

the selected classification framework appropriate when applied with geological continuity, independent sample support and spatial review.

Inferred resources represent lower-confidence parts of the accepted mineralized systems. Based on that geological setting and the nature

of the available drilling, the QP reasonably expects that the majority of the Inferred resources could be upgraded through continued

exploration. Actual upgrading will depend on the results of that work and is not assured.

The QP considers

the identified geological, density, metallurgical and engineering issues capable of resolution through further work. The estimates do

not establish Mineral Reserves or demonstrate economic viability. The material risks and recommended follow-up work should be read with

the overall conclusions and recommendations in Chapters 22–23.

Contango Silver and Gold – Kitsault Valley Project Page 203 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

12 MINERAL

RESERVE ESTIMATES

The Kitsault Valley

Project does not have any Mineral Reserves.

Contango Silver and Gold – Kitsault Valley Project Page 204 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

13 MINING

METHODS

This section is

not applicable.

Contango Silver and Gold – Kitsault Valley Project Page 205 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

14 PROCESSING

AND RECOVERY METHODS

This section is

not applicable.

Contango Silver and Gold – Kitsault Valley Project Page 206 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

15 INFRASTRUCTURE

15.1 Scope and Reporting

Basis

The Kitsault Valley

Project is an exploration- and mineral-resource-stage property. No mine plan, process plant, production schedule, tailings-management

facility, waste-rock management plan, or project execution plan has been selected. Accordingly, the infrastructure described as existing

or currently used is adequate only for seasonal exploration support. References to possible future facilities identify categories requiring

study; they do not constitute a project design, capacity commitment, construction decision, or demonstration of economic viability.

Note:

Existing roads, marine landings, grid infrastructure, hydroelectric works, and third-party ports are not represented as being

controlled by, reserved for, or available to the Company at any particular capacity unless expressly stated. Commercial arrangements,

access rights, engineering suitability, permitting, and capacity remain to be established for any future development scenario.

15.2 Infrastructure Setting

and Status

The Project extends

northward from the historic Dolly Varden-Torbrit mining district in the lower and central Kitsault River valley to the Homestake deposits

near the headwaters of the Kitsault River. The terrain is rugged, locally glaciated, and incised by steep streams and gullies. The lower

valley contains remnants of historic mining and hydroelectric infrastructure and a historical road or tractor-trail corridor. The upper

valley and Homestake areas do not have developed road access and are reached primarily by helicopter.

Alice Arm is the

current exploration logistics base. Regional supplies, equipment, contractors, and personnel are mobilized through Terrace, Prince Rupert,

Smithers, Stewart, and other northwestern British Columbia service centres. Kitsault and Alice Arm have few permanent residents and should

not be assumed to provide municipal-scale services, labour, accommodation, or emergency-response capacity for a future mine.

Existing infrastructure

and future needs are outlined in Table 15-1.

Contango Silver and Gold – Kitsault Valley Project Page 207 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 15-1.

Existing infrastructure and future-project requirement or status.

Element

Existing

or current exploration use

Future-project

requirement or status

Road

access

Highway

113 and connecting roads reach Kitsault; a historical road/trail extends north from Alice Arm into the lower Kitsault Valley.

Road

condition and continuity are insufficient for mine haulage. Upgrading, bridges, geotechnical design, avalanche and drainage controls,

and access rights would require study.

Rail

No

railway serves the Property. The Canadian National Railway main line passes through Kitwanga, about 180 km by road from Kitsault

as reported in the 2022 Homestake report.

No

rail connection or rail-loading concept has been selected.

Aviation

Scheduled

air service is available at Terrace and other regional airports; helicopters support field access from Alice Arm and regional bases.

A

permanent aerodrome has not been proposed. Future helicopter or emergency-aviation facilities would require design and permitting.

Marine

and ports

Alice

Arm and Kitsault have barge landing areas. Prince Rupert supports current marine supply; Stewart has a third-party deep-sea port

used by regional mines.

No

dedicated project port, concentrate-handling system, capacity reservation, or shipping agreement has been established.

Camp

and buildings

Temporary

seasonal camp, geology, core-logging, core-cutting, storage, and helicopter-support facilities are maintained at Alice Arm.

Permanent

accommodation, administration, maintenance, warehouse, emergency, and operational buildings have not been designed.

Power

Current

exploration facilities use portable diesel generation. Grid power is present at Kitsault, and historical hydroelectric works occur

in the upper Kitsault valley.

No

project load study, connection study, service agreement, transmission alignment, or generation plan has been completed.

Water

Surface-water

sources are abundant and support permitted exploration activities.

Production

demand, water rights, source reliability, treatment, storage, site-wide balance, discharge, and contact-water management have not

been defined.

Waste

and tailings

Historical

Dolly Varden and Torbrit mining left limited surface waste-rock dumps; the 2023 report states that no on-site tailings were produced.

No current process waste is generated.

Waste-rock,

tailings, overburden, leach-pad, and water-management facilities have not been selected or designed.

Dams

and pipelines

The

historic Kitsault River hydroelectric dam and associated works are not used for current project power. No project pipelines are in

service.

No

new project dam or pipeline system has been designed.

Contango Silver and Gold – Kitsault Valley Project Page 208 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

15.3 Transportation and

Access

15.3.1

Regional Roads and Property Access

Overland access

from Terrace to Kitsault is by the Nisga'a Highway (Highway 113) and connecting forest-service and mine roads. The 2023 combined technical

report reports a total road distance of approximately 167 km from Terrace to Kitsault. Older reports and annual assessment filings describe

different route lengths; these values reflect different route definitions and should not be combined. Kitsault lies on the eastern side

of Alice Arm, across tidewater from the Alice Arm exploration base.

From Alice Arm,

the historical Kitsault Valley Road follows the former Dolly Varden railway grade north along the Kitsault River. The corridor historically

served the Dolly Varden, North Star, Torbrit, and Wolf areas and was later used for exploration and hydroelectric work. Filed reports

describe road or tractor-trail access into the lower valley and identify washouts, bridge loss, overgrowth, and maintenance needs. Access

beyond the lower and central valley, particularly to the Homestake deposits, is primarily by helicopter. The historical grade is not

a modern all-season mine road and should not be treated as such in engineering or economic studies.

Ongoing planning

to repair washouts and redesign bridge crossings under a forestry-road Special Use Permit is in progress.

15.3.2

Aviation Facilities

There is no developed

land-based runway at the Project. Regional scheduled air service is available at Terrace, with additional airports at Prince Rupert and

Smithers. Helicopters are available from Terrace, Stewart, Prince Rupert, and other regional bases and are the primary means of moving

personnel, drill crews, core, and light supplies between Alice Arm and field sites. Floatplane access to Alice Arm is possible at the

marked water-access ramp when weather and water conditions permit.

The current exploration

program uses a temporary helicopter staging area near the Alice Arm waterfront. The infrastructure includes two double-walled, monitored

25,000 L tanks for aviation fuel, replenished seasonally through marine and road-supported logistics, and secondary helicopter-fuelling

capability at Kitsault. These facilities support exploration only.

15.3.3

Marine Logistics, Ports, and Rail

Heavy equipment,

bulk fuel, and camp supplies are moved to Alice Arm by contracted tug and ramp-equipped barge, principally from Prince Rupert according

to the filed Dolly Varden reports and annual assessment records. Alice Arm has a wet landing and laydown area used for current exploration

logistics. A historical dry landing exists on the Kitsault side of Alice Arm; barge selection and tidal planning are material because

a vessel may ground at low tide during unloading.

Stewart, at the

head of Portland Canal, hosts a third-party deep-sea port that has historically handled ore and concentrate from regional mines. Prince

Rupert also provides deep-water marine and intermodal services. The Project has no dedicated port, concentrate storage, shiploader, marine

terminal, or contracted capacity. Port selection, shipping route, product form, handling method, environmental requirements, and commercial

terms cannot be established until a mine and processing concept has been defined.

Contango Silver and Gold – Kitsault Valley Project Page 209 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

No railway reaches

Alice Arm or the Project. The Canadian National Railway main line and Highway 16 pass through Kitwanga, approximately 180 km by road

from Kitsault as reported in the 2022 Homestake technical report. No transload location, haulage route, capacity allocation, or railway

agreement has been selected. The regional access and transportation setting for the Kitsault Valley Project, including road, marine,

aviation, port and rail connections, is shown in Figure 15-1.

Figure 15-1.

Regional access and transportation setting, Kitsault Valley Project (source: initial Chapter 15 infrastructure working draft, June 2026).

Contango Silver and Gold – Kitsault Valley Project Page 210 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

15.4 Current Exploration-Support

Facilities

15.4.1

Alice Arm Camp and Work Areas

Seasonal exploration

is supported from private lots in Alice Arm used by the Company. The camp comprises temporary kitchen, dining, dry, washroom, sleeping,

office, geology, core-logging, and core-cutting structures. The current infrastructure consists of wood-frame tent and plywood sleeping

units, two approximately 20 ft by 40 ft logging buildings, an office, and a core-cutting building. Heating and electrical service are

provided by diesel-fired equipment and portable generators. No permanent mine-site buildings or municipal utility services are present

on the mineral property.

Currently all drill

core is transported by helicopter to the Alice Arm base, received and checked by geological personnel, logged and photographed, and prepared

for sampling at the logging facility. The camp and work areas are suited to seasonal exploration but have not been assessed for mine

construction or production staffing.

15.4.2

Fuel, Supplies, and Storage

Camp fuel and bulk

supplies are mobilized seasonally by barge and, where practicable, by road to Kitsault and then by small boat or helicopter. Fuel storage

at Alice Arm supports helicopters, generators, heating, and light equipment. A rented warehouse near Terrace is used for samples and

minor supplies.

The current exploration

drill core is cross-stacked and covered on private lots in Alice Arm. Earlier Dolly Varden core is stored near Terrace, and historical

Homestake/Auryn core is reported stored near Smithers.

15.4.3

Power Supply

Portable diesel

generator sets provide current electrical power for the Alice Arm camp, office, logging, and core-cutting facilities. Current generation

is temporary and sized for exploration support, not for mine or process loads.

The British Columbia

electrical grid extends to Kitsault. Historical grid interconnections and a hydroelectric dam, generating station, and access road occur

in the Kitsault River valley. The historical hydroelectric facilities are not in service as a Project power source, and private proposals

to rehabilitate regional hydroelectric assets do not establish available Project supply. Likewise, regional transmission planning by

BC Hydro does not constitute an interconnection approval or capacity commitment at this time. A future project would require a load forecast,

connection and system-impact studies, route and land-access studies, reliability assessment, commercial agreement, and comparison with

on-site or hybrid generation alternatives.

15.4.4

Personnel and Supply Centres

Terrace is the

principal regional service centre and provides scheduled air service, accommodation, medical and commercial services, contractors, equipment,

fuel, and a pool of personnel experienced in mineral exploration and construction. Prince Rupert, Smithers, and Stewart also provide

specialized supplies, contractors, marine services, aviation support, and mining-experienced labour. Kitwanga provides highway and rail

access. Alice Arm and Kitsault should be treated as logistics nodes rather than full-service communities.

Currently there

is availability of regional exploration labour and services to support the proposed exploration work, however It does not include a production

workforce plan, commuting strategy, accommodation plan, training assessment, emergency-response plan, or commitments for local procurement

and hiring. Those matters would be developed with the mining and processing concepts.

Contango Silver and Gold – Kitsault Valley Project Page 211 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

15.5 Water, Waste, Tailings,

Dams, and Pipelines

15.5.1

Water Supply and Current Water Management

The Upper Kitsault

River, Kitsault Lake, tributaries, snowmelt, and local groundwater indicate substantial regional water availability. Current exploration

water use is limited to drilling and camp support and is subject to applicable authorizations. Drill-return water is managed at the drill

sites using settling sumps and other permit-specific controls. The Alice Arm camp uses a septic system and local wastewater controls;

solids are removed by contracted service as required by the operating plan.

No site-wide water

balance, production-water demand, intake, treatment plant, raw-water reservoir, contact-water collection system, discharge system, or

water pipeline has been designed. The apparent abundance of water does not establish legal availability, seasonal reliability, water

quality, or acceptable environmental effects. Future studies would require hydrometric and climate data, hydrogeology, water-quality

baseline data, water rights and permitting review, source and demand modelling, treatment criteria, extreme-event design, and closure

considerations.

15.5.2

Waste Rock, Tailings, Leach Pads, and Dumps

Historical mining

at Dolly Varden and Torbrit left limited surface waste-rock dumps and underground openings. The 2023 combined technical report states

that no on-site tailings were produced because historical ore was primarily shipped from the site. No current mineral processing occurs,

and the exploration program does not operate a tailings facility, leach pad, production waste-rock dump, or overburden stockpile.

No future mining

method or processing route has been selected; consequently, the quantity and geochemical character of waste rock, tailings, overburden,

and process residues are not defined. Facility siting, storage technology, dam consequence classification, geotechnical and seismic design,

geochemical controls, water management, progressive reclamation, and closure requirements must be established in later studies.

15.5.3

Dams and Pipelines

The historic Kitsault

River hydroelectric dam and associated power works are legacy infrastructure and are not represented as operating Project facilities.

No new water-retaining dam, tailings dam, process-water pipeline, concentrate pipeline, fuel pipeline, or natural-gas pipeline is proposed

in the current exploration plan. If a later project concept includes any such facility, its alignment, ownership, capacity, integrity

management, environmental setting, permitting, and closure obligations would require project-specific engineering.

15.6 Future Project Infrastructures

Requirements

A future development

concept would require infrastructure sized and located to match the selected mining, processing, waste-management, and product-transport

strategies. The following work packages represent the minimum infrastructure definition needed before costs, schedules, or economic conclusions

could be supported (Table 15-2).

Contango Silver and Gold – Kitsault Valley Project Page 212 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 15-2.

Infrastructure definition required for a future project study.

Work

package

Required

definition

Access

and logistics

Select

the construction and operating access strategy; survey the corridor; assess terrain, avalanche, hydrology and geotechnical hazards;

design roads, bridges and drainage; establish access rights and maintenance basis.

Marine,

port, and product transport

Define

product form and annual tonnage; compare Alice Arm, Stewart, Prince Rupert, road and rail interfaces; complete marine, terminal,

storage, transload, capacity, and commercial studies.

Site

layout and buildings

Define

mine and plant locations, construction laydown, camp, administration, warehouse, maintenance, laboratory, explosives, fuel, emergency,

and communications facilities with constructability and winterization criteria.

Power

and fuel

Develop

load lists and demand profiles; compare grid, hydroelectric, thermal, renewable and hybrid options; complete interconnection, transmission,

reliability, fuel-logistics, storage, and emissions studies.

Water

systems

Complete

baseline monitoring and a site-wide water balance; define sources, rights, intakes, storage, treatment, pipelines, contact-water

collection, discharge, flood and climate-change criteria.

Waste,

tailings, and earthworks

Characterize

waste and tailings; prepare siting and alternatives studies; define storage technology, dams, foundations, seepage and water

controls, borrow sources, closure, and monitoring requirements.

Workforce

and services

Prepare

construction and operations workforce plans, accommodation and transport strategies, regional service and emergency-response assessments,

and local procurement and training plans.

The sequence and

scope of these studies should be coordinated with the effective-date mineral resource, mine and process alternatives, environmental baseline

program, Indigenous and community engagement, permitting strategy, and project risk register. Existing exploration infrastructure

may provide logistical value but should not be credited as production-ready without condition assessment and fit-for-purpose engineering.

Figure 15-2 provides a project-scale overview of the regional roads, transmission lines, Alice Arm and Kitsault logistics nodes, historical

hydroelectric works and Stewart port relevant to future infrastructure planning.

Contango Silver and Gold – Kitsault Valley Project Page 213 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 15-2.

Project-scale infrastructure setting, showing regional roads, transmission lines, Alice Arm and Kitsault logistics nodes, historic hydroelectric

works, and Stewart port (source: initial Chapter 15 infrastructure working draft, June 2026).

15.7 QP Interpretation

and Limitations

The consolidated

source record demonstrates that the Project can be supported for seasonal exploration using the Alice Arm camp, regional service centres,

contracted marine transport, road access to Kitsault, and helicopter access to field sites. These arrangements have supported substantial

multi-year drilling programs and are considered appropriate for the current exploration stage.

The available information

is not sufficient to conclude that infrastructure required for mining and processing is technically or economically feasible. Material

uncertainties include all-season access, road and bridge condition, port and rail capacity, electrical supply and interconnection, site-wide

water management, waste and tailings facility selection, terrain and avalanche hazards, permanent accommodation and services, ownership

and access rights, permitting, capital and operating costs, and construction schedule. No infrastructure capacities or cost credits should

be carried into an economic analysis without project-specific engineering and verification.

The maps identify

the regional infrastructure setting and known historical or current logistics nodes. They are not engineering layouts and do not show

a selected mine, process plant, tailings facility, waste-rock facility, water-management system, transmission line, or pipeline corridor.

Any such facilities shown elsewhere in the TRS should be reconciled to a single effective-date project basis.

Contango Silver and Gold – Kitsault Valley Project Page 214 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

16 MARKET

STUDIES

The marketability

of the concentrates from this project will be determined by mineral composition and payable metal contents. Market research and pricing

information confirm that the concentrates will be attractive to custom copper, lead and zinc smelters for the current and foreseeable

future, though specific characteristics must be factored into commercial negotiations.

16.1 Lead

Concentrate

Lead smelting profitability

is driven by recovery of byproduct metals, primarily silver and gold, as well as minor elements such as antimony. China and Korea are

the largest importers of seaborne lead concentrates, primarily because they operate smelting technologies capable of efficiently recovering

byproduct precious metals. The high-silver lead concentrate market is currently under-supplied and is expected to continue to be in deficit

for the long term. Table 16-1 defines the commercial terms used for this analysis.

Table 16-1.

Commercial terms used in economic analysis for Pb concentrate.

Pb

Concentrate

Pb

95%

Deduct

3 units

Gold

97.5%

Min

1.0g/t

Silver

97.5%

Min

50g/t

Pb

TC

$50

/dmt

Ag

RC

$0.50

/oz

Export

CIF

Main Asian Port

16.2 Copper

Concentrate

The International

Copper Study Group estimates global mine supply of copper concentrate reached approximately 25 million mt in 2025, whereas global copper

concentrate smelting capacity was 28 million mt. The deficit, primarily due to expansion of China’s copper smelting industry, has

caused treatment and refining charges to collapse, yielding below-zero treatment and refining charges (TC/RC’s). This condition

is expected to persist and result in very low TC/RC’s for the medium to long term (International Copper Study Group, n.d.). Table

16-2 defines the commercial terms used for this analysis.

Contango Silver and Gold – Kitsault Valley Project Page 215 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 16-2.

Commercial terms used in economic analysis for Cu concentrate.

Cu

Concentrate

Gold

97.5%

Silver

90%

Copper

96.5%

Deduct

1 unit

Cu

TC

$50

/dmt

Cu

RC

$0.05

/lb

Au

RC

$5

/oz

Ag

RC

$0.50

/oz

Export

CIF

Main Asian Port

16.3 Zinc

Concentrate

The zinc concentrates

produced in the Kitsault Valley ores may be more challenging to market, as the most recent test-work has only produced concentrate grades

of 36% zinc with as high as 21% lead, as well as high antimony and cadmium content. Standard zinc concentrates typically contain at least

45% zinc, although some smelters process zinc concentrates with as little as 25% zinc. While the global zinc concentrate market is also

in deficit, (global zinc mine production of 13 million mt in 2025 vs. global zinc smelting capacity of 14 million mt), this quality may

only be attractive to lead/zinc smelters with high silver recovery rates. If silver grades can be maintained at >2.7kg/mt, the concentrates

are marketable in China as “silver” concentrates. Table 16-3 defines the commercial terms used for this analysis.

Table 16-3.

Commercial terms used in economic analysis for Zn concentrate.

Zn

Concentrate

Silver

95%

Minimum

deduct 50g/dmt

Zn

40%

If

over 15% zinc

Pb

95%

Minimum

deduct 3 units

TC

$50

/dmt

Ag

RC

$0.10

/troy

oz.

Export

CIF

Main Chinese Port

16.4 Summary

The Project’s

three concentrates (Pb, Cu and Zn) show no significant issues with their overall marketability. Major suppliers and smelters worldwide

form a competitive landscape where entry barriers include high capital investment, regulatory compliance, and access to infrastructure.

Given the concentrates’ specifications, strategic partnerships may be necessary to optimize offtake agreements and mitigate market

risks. Partnerships should be evaluated during future Pre-Feasibility and Feasibility studies.

Contango Silver and Gold – Kitsault Valley Project Page 216 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

17 ENVIRONMENTAL

STUDIES, PERMITTING, AND COMMUNITY

17.1 Scope,

Reporting Basis, and Project Stage

The Kitsault Valley

Project is an exploration- and mineral-resource-stage property. Current authorizations support exploration; no mine plan, process plant,

production schedule, tailings-management facility, waste-rock management facility, site-wide water-management system, or mine closure

plan has been selected. No provincial environmental assessment certificate, major-mine permit, federal impact assessment decision, or

production-related discharge authorization are obtained. Consequently, future mine-permitting requirements are described as a framework

and data need, not as an approved permitting pathway or schedule.

Note:

This chapter is not a legal opinion and does not determine Aboriginal rights or title, treaty rights, regulatory jurisdiction,

environmental-assessment reviewability, or the complete set of approvals for a future mine. Those matters depend on the project ultimately

proposed and require legal, regulatory, environmental, engineering, and Indigenous-engagement review.

17.2 Environmental

and Social Setting

The core Project

area occupies the Kitsault River watershed from tidewater at Alice Arm northward to glaciated headwaters near the Homestake deposits.

The upper watershed receives substantial snow and glacial runoff. The river passes through a confined central canyon and opens into a

lower-gradient braided reach before entering Alice Arm. Tributaries below the canyon provide fish habitat, including habitat used by

Pacific salmon species. The Project's other exploration holdings and permit areas extend outside the core Kitsault River corridor and

require separate watershed and land-use screening.

Vegetation ranges

from coastal forest in the lower valley to subalpine and alpine environments. The combined technical report identifies rugged terrain,

glaciers, steep streams, heavy precipitation, and weather-dependent access as material environmental and operating conditions. These

conditions affect baseline design, seasonal sampling, erosion and sediment control, water balance, road and bridge design, wildlife timing

windows, reclamation, and emergency response.

The Project is

within an area of longstanding Indigenous use and asserted or recognized interests. The source reports identify the Nisga'a Nation as

the principal Indigenous government engaged for the core Kitsault Valley permits and also identify areas of interest or consultation

involving Metlakatla, Skii km Lax Ha, and Gitanyow hereditary governance.

17.3 Current

Exploration Permitting

17.3.1

Mines Act and Multi-Year Area-Based Authorizations

Mechanized exploration

in British Columbia generally requires a permit under section 10 of the Mines Act. A Notice of Work application or amendment describes

proposed activities and includes a program for protection and reclamation of affected land and watercourses. Multi-Year Area-Based permitting

typically authorizes specified exploration activities within defined activity areas for up to five years, subject to permit conditions,

disturbance limits, annual reporting, and reclamation obligations.

Contango Silver and Gold – Kitsault Valley Project Page 217 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Permit holders

submit an Annual Summary of Exploration Activities (ASEA) describing work, disturbance, reclamation, and remaining authorized capacity.

Financial reclamation security may be required as a permit condition and can be adjusted as liability changes. Permit closeout and return

of security require completion and regulatory acceptance of reclamation; the existence of security does not cap the Company's reclamation

obligation.

The core deposits

are covered by two principal exploration permits: MX-1-860 over the legacy Dolly Varden area and MX-1-603 over the legacy Homestake area

(Table 17-1; Figure 17-1).

Table 17-1.

Principal exploration permits for the core Kitsault Valley area (2026 management register; verify against executed permits).

Area

Permit

Authorized

disturbance

(ha)

Principal

authorized activities

Security

Reported

expiry

Dolly

Varden

MX-1-860

24.03

112

helicopter-supported drill sites; 140 line-km geophysics; 30 helicopter pads; work structures; 12 trenches; 5 km trails; 800 m Torbrit

rehabilitation; 20 underground drill stations and 10 geotechnical sites.

C$99,000

March 31,

2031

Homestake

MX-1-603

20.06

200

helicopter-supported diamond drill sites; 300 helicopter-supported RC sites; 50 line-km geophysics; 6 helicopter pads; 2 km trails;

camp allowance of 1.0 ha.

C$76,000

March 31,

2030

The MX-1-860 amendment

has been approved in early 2026. An Occupant Licence to Cut associated with the permit is renewed in 2026 for Crown timber clearing beyond

the volume otherwise authorized. The Homestake area is predominantly alpine, but timber and vegetation-clearing requirements remain site-specific.

Contango Silver and Gold – Kitsault Valley Project Page 218 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 17-1.

Principal exploration permit areas and historical infrastructure in the core Kitsault Valley corridor.

Contango Silver and Gold – Kitsault Valley Project Page 219 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

17.3.2

Other Exploration Permits and Boundary Reconciliation

The broader permit

map supplied with the draft shows additional Contango exploration permits over Big Bulk, Kinskuch, Theia, Porter, Red Cliff, and BA areas

(Table 17-2; Figure 17-2).

Table 17-2.

Other exploration permits shown in the working record.

Area

Permit

identifier

Disturbance

(ha)

Security

Reported

expiry

Status

note

Kinskuch

MX-1-838

on map; draft register listed MX-1-868

0.83

C$51,000

March 31,

2030

Identifier

and TRS inclusion to verify

Big

Bulk - DV

MX-1-784

3.74

C$27,000

March 31,

2030

Current

draft register

Big

Bulk option

MX-1-990

3.92

C$36,000

March 31,

2030

Current

draft register

Theia

portion

MX-1-186

on map; draft register listed MX-1-189

0.35

C$25,878

March 10,

2027

Identifier

and TRS inclusion to verify

Porter

/ Red Cliff / BA

MX-1-977

/ MX-1-736 / MX-1-776 on map

Not

supplied

Not

supplied

Not

supplied

Outside

core corridor; scope to verify

Contango Silver and Gold – Kitsault Valley Project Page 220 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 17-2.

Broader exploration permit setting. Boundaries and permit identifiers are informational and require reconciliation with the final Chapter

4 property boundary and executed permits.

Contango Silver and Gold – Kitsault Valley Project Page 221 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

17.3.3

Operating Authorizations and Commercial Arrangements

The Alice Arm exploration

base occupies fee-simple or other private surface parcels used by the Company. Private ownership does not remove facilities from otherwise

applicable mine, occupational health and safety, public health, water, waste, fire, building, or environmental requirements. Table 17-3

summarizes the management-reported operating authorizations and commercial arrangements supporting the Project’s current exploration

activities and facilities.

Table 17-3.

Management-reported operating authorizations and arrangements.

Subject

Authorization

or arrangement

Reported

status

Effective-date

verification

Camp

water

Water

Licence Authorization C035609

Reported

active with annual provincial fees

Confirm

licence holder, authorized source, quantity, term, reporting, and compliance.

Food

service and potable water

Northern

Health food-service operating permit, reportedly effective from August 18, 2011

Reported

renewed annually

Confirm

permit number, inspection status, monthly potable-water testing, and current results.

Road

access

Commercial

road-use agreement for the Terrace-Kitsault route

Reported

active with monthly fees

Confirm

parties, route, term, load and seasonal restrictions, insurance, and termination rights.

Alice

Arm dock and landing

Arrangement

administered by Alice Arm Harbour Society

Reported

active with annual maintenance fee

Confirm

tenure, operating authority, environmental conditions, capacity, and good standing.

17.4 Environmental

Studies and Baseline Information

17.4.1

Historical Water-Quality Programs

IEC Consultants

Ltd. completed water-quality monitoring in 1981 at four Kitsault River stations: upstream of Wolf; downstream of the historical Torbrit

mill and townsite; upstream of the Two Mile Creek historical site; and downstream of that site. Samples collected during high-flow autumn

conditions were analyzed for physical parameters, dissolved anions and metals, solids, sewage indicators, and selected mine-drainage

constituents. (IEC Consultants Ltd., 1981)

The 2015 technical

report states that river samples were turbid and exceeded then-applicable objectives for total suspended solids and certain dissolved

constituents during high flow. Elevated aluminum was considered potentially affected by laboratory contamination. Torbrit portal drainage

was reported as mildly alkaline and chemically similar to natural surface water, with higher calcium and magnesium. The historical report

concluded that mine-water discharge did not have a detectable effect on surface-water chemistry. These results are screening-level historical

observations using older criteria and methods; they do not establish current compliance, absence of effects, or suitability as a future

water source.

In October 2012,

five reconnaissance samples were collected from Kitsault River sites upstream and downstream of the Torbrit 1025 Level portal and from

Torbrit and North Star mine waters (Table 17-4). The standing and circulating mine waters as mildly alkaline and without the dissolved

heavy-metal or particulate contamination of concern identified by that program.

Contango Silver and Gold – Kitsault Valley Project Page 222 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 17-4.

Reported 2012 reconnaissance water-sample locations.

Sample

Location

SW-5

Kitsault

River upstream of Torbrit 1025 Level south portal

SW-6

Kitsault

River downstream of Torbrit 1025 Level south portal

TFS

Flooded

lower raise reaching the Torbrit 1025 Level

SW-P3

Natural

outflow at southern entrance to Torbrit 1025 Level portal

SWP-2

Entrance

to northeast portal of North Star Mine

17.4.2

Homestake Environmental and Engineering Studies

The Homestake project

in the 2022 technical report includes a 2011 SGS Minerals Services characterization of Homestake Ridge tailings; a 2012 Triton Environmental

Consultants surface-water-quality initial site visit (Triton Environmental Consultants Ltd., 2012a); a 2012 Triton proposed-road stream

assessment (Triton Environmental Consultants Ltd., 2012b); a 2012 pHase Geochemistry waste-rock field-barrel characterization (pHase

Geochemistry Inc., 2012); a 2018 wildlife management and monitoring plan; preliminary geotechnical assessments; access-road studies;

conceptual mine-site and hydroelectric layouts; and 2011 tailings-storage alternatives and conceptual tailings-cost work by Knight Piésold

Consulting (2011a–d).

These studies demonstrate

that prior operators began environmental and infrastructure screening, including preliminary acid-generation testing of waste rock and

tailings. The 2022 report recommended broader testing across all major rock types, baseline monitoring of surface water, groundwater,

air and climate, and a site-wide water balance. The conceptual facility studies pre-date the consolidated Project and do not represent

a current mine plan, selected tailings site, approved facility, or current cost basis.

17.4.3

Current Environmental Work

ERM Consultants

Canada Ltd. collected surface-water samples at four locations across the Homestake and Dolly Varden areas during 2024 and 2025 as due

diligence on historical results, these were generally consistent with the historical record. A meteorological station with precipitation

and wind instruments was installed near Red Point in 2024 and data are downloaded to a monitoring database (ERM Consultants Canada Ltd.

[n.d.]).

This work is the

start of renewed baseline collection, not as a complete baseline or a demonstration of no material effect. Table 17-5 summarizes the

status of the available environmental baseline information and identifies the principal data gaps that should be addressed before future

project development.

Contango Silver and Gold – Kitsault Valley Project Page 223 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 17-5.

Environmental baseline status and principal gaps for future development.

Discipline

Available

information

Additional

definition required

Surface

hydrology

Historical

spot samples and 2024-2025 reconnaissance sampling

Install

representative long-term stations; measure flow, stage, sediment, seasonality, extreme events, glacier contribution, and climate-change

sensitivity.

Surface-water

quality

1981,

2012, and reported 2024-2025 observations

Develop

multi-season, multi-year program with current analytes, QA/QC, guideline comparison, load estimates, and reference/control sites.

Groundwater

and mine water

Limited

portal-water observations

Define

hydrostratigraphy, groundwater levels, flow, chemistry, mine inflows, groundwater-surface-water interaction, and monitoring network.

Climate

and air

Red

Point meteorological station from 2024; historical regional climate

Complete

validated meteorological record and evaluate air quality, dust, greenhouse gas, snow, icing, avalanche, and dispersion inputs.

Aquatic

resources

Watershed

and fish-habitat context; prior road-stream reconnaissance

Complete

fish, fish habitat, benthic, aquatic-health, stream-crossing, and sediment baseline at project-specific locations.

Terrestrial

ecology

Wildlife

plans and species tracking

Update

vegetation, wetlands, wildlife, species-at-risk, habitat-use, migratory-bird, and cumulative-effects studies.

Geochemistry

Preliminary

waste-rock and tailings screening

Characterize

all material types for acid generation, metal leaching, source terms, volumes, segregation, treatment, and closure performance.

Cultural

heritage and land use

AOA,

chance-find procedure, targeted field review

Maintain

current archaeological and Indigenous land-use information and complete field studies aligned with the selected footprint.

17.5 Wildlife,

Vegetation, and Aquatic Protection

Wildlife Management

Plans have accompanied exploration permit amendments. The current consolidated plan has been prepared by ERM using prior plans, desktop

information, and species tracking. It contains encounter and mitigation protocols for grizzly bear, mountain goat, moose, coastal northern

goshawk, marbled murrelet, and other species and identifies timing or spatial restrictions for sensitive habitat and helicopter routes.

There are no identified

designated protected area lies within the legacy Dolly Varden claim block, while sensitive wildlife areas occur along access routes and

elsewhere in the broader region. That statement does not replace current spatial screening for parks, conservancies, wildlife habitat

areas, ungulate winter ranges, species-at-risk habitat, old-growth or ecosystem designations, or Indigenous land-use values

Exploration planning

should continue to incorporate flight paths, minimum-altitude and setback requirements, nesting and breeding windows, bear attractant

and waste controls, spill prevention, erosion and sediment control, stream-crossing constraints, invasive-species prevention, and progressive

reclamation.

Contango Silver and Gold – Kitsault Valley Project Page 224 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

17.6 Archaeology

and Cultural Heritage

Archaeological

Overview Assessments (AOAs) have been prepared for exploration permit amendments. An AOA is a desktop screening tool that uses known

archaeological information, landform and terrain context, and other indicators to identify areas of archaeological potential. Proposed

disturbances that overlap higher-potential areas may require Preliminary Field Reconnaissance or an Archaeological Impact Assessment

by qualified specialists, in coordination with the relevant Indigenous Nations and the Province.

There is an archaeological

chance-find procedure and an active Heritage Conservation Act inspection permit inplace. Work is to stop and the applicable notification

and protection procedures are to be followed if suspected cultural material is encountered. No new archaeological sites encountered during

Project exploration to date. Absence of a reported discovery is not evidence that cultural heritage resources or Indigenous cultural

values are absent.

17.7 Indigenous

Nations, Communities, and Agreements

17.7.1

Engagement and Consultation Record

The Crown conducts

consultation in connection with Mines Act permit decisions, and the Company provides project information and responds to questions through

the application and engagement process. Current engagement associated with the 2025 Wildlife Management Plan, AOA, and permit amendments

involving Nisga'a Lisims Government, Metlakatla, Skii km Lax Ha, and Gitanyow hereditary governance, including the Luuxhon and Bii Yoxw

wilps for areas east and north of the core watershed (Table 17-6).

Table 17-6.

Engagement context reported in the working record.

Nation

or

community

Reported

context

Reported

engagement

Effective-date

verification or future work

Nisga'a

Lisims Government

Core

Kitsault Valley permits and regional interests identified in the working record

2018

and 2025 wildlife/AOA and permit-amendment engagement reported

Confirm

Crown record, Company correspondence, permit conditions, and any continuing commitments.

Metlakatla

Coastal

and Great Bear Rainforest interests identified by the draft

2025

wildlife/AOA engagement reported

Confirm

geographic basis, issues record, and whether future marine or access components change engagement scope.

Skii

km Lax Ha

Traditional-territory

interests north of the core Project identified by the draft

Consultation

during permit amendments reported

Confirm

current governance contacts, Crown record, and applicable permit areas.

Gitanyow

hereditary governance

Areas

east and north, including Luuxhon and Bii Yoxw wilps, identified by the draft

Engagement

on Kinskuch/Big Bulk and related permit amendments reported

Reconcile

permit boundaries, wilp territories, correspondence, conditions, and future engagement.

Alice

Arm, Kitsault, Terrace, Stewart and regional communities

Logistics,

labour, services, transport, and potential environmental or socioeconomic interests

Operational

relationships and procurement occur during exploration

Develop

stakeholder register, grievance mechanism, emergency coordination, and socioeconomic baseline for any development proposal.

Contango Silver and Gold – Kitsault Valley Project Page 225 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

The permit consultations

concluded without unresolved comments that prevented the reported permit approvals. That outcome is specific to the activities and decisions

consulted on and should not be described as consent to a future mine, acceptance of future effects, or a waiver of rights. Engagement

records, commitments, conditions, correspondence, and issues tracking should be maintained and verified for the effective date.

17.7.2

Agreements, Local Procurement, and Hiring

There are no project-wide

impact-benefit agreement, exploration agreement, cooperation agreement, procurement agreement, employment agreement, or community-benefits

agreement for the consolidated Project. No material negotiation or executed agreement of this type has been provided for disclosure

The Company does

have a policy preference for local hiring and estimates that approximately 10% to 15% of the field workforce has been drawn from regional

communities. This is historical practice rather than a quantified binding commitment unless supported by an adopted policy or agreement.

17.8 Waste,

Tailings, Monitoring, and Water Management

Current exploration

does not operate a process plant, leach pad, production waste-rock dump, tailings facility, or mine-water treatment plant. Drill water,

cuttings, fuels, domestic wastewater, solid waste, and disturbed sites are managed under applicable exploration permits and operating

procedures. Chapter 15 describes current camp and exploration-support systems; permit-specific environmental controls and annual performance

should be confirmed from operating records.

Historical Dolly

Varden and Torbrit mining left a plant site, underground workings, and limited waste-rock dumps. The 2023 combined technical report states

that no on-site tailings were produced because historical ore was primarily shipped from site, and it reported historical acid-rock-drainage

testing results within acceptable levels

No waste-rock or

tailings management plan, operational monitoring plan, site-wide water balance, discharge strategy, treatment design, or post-closure

monitoring plan exists for a future mine because mining and processing methods have not been selected. These systems must be developed

together from representative geochemical, hydrological, hydrogeological, geotechnical, climatic, ecological, and process data in the

future.

17.9 Future

Project Permitting Framework

A future development

proposal would require a coordinated provincial, federal, Indigenous, and local permitting strategy based on the selected project

description. The following matrix identifies principal regulatory subjects, but it is not exhaustive and does not determine applicability

(Table 17-7).

Contango Silver and Gold – Kitsault Valley Project Page 226 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 17-7.

Indicative future permitting framework.

Regulatory

subject

Principal

authority

Potential

requirement

Current

status

Provincial

environmental assessment

Environmental

Assessment Act and Reviewable Projects Regulation

Environmental

assessment certificate or exemption/order if the selected project is reviewable; project notification may also apply.

No

application identified; reviewability cannot be determined without a project description.

Mine

construction, operation, reclamation and closure

Mines

Act and Health, Safety and Reclamation Code

Major-mine

permit and approved mine, reclamation and closure plans; security based on liability.

Exploration

permits only.

Effluent,

air emissions and waste

Environmental

Management Act

Authorizations

for discharges, emissions, waste handling and treatment, as applicable.

No

production authorization identified.

Water

diversion, use and works

Water

Sustainability Act

Water

licences, use approvals and approvals for changes in and about streams, as applicable.

Camp

authorization reported; development needs undefined.

Land,

roads, timber and foreshore

Land

Act, Forest Act and related tenure authorities

Crown

land tenure, road and access authorities, timber authorizations, and foreshore or marine tenure, as applicable.

Exploration

arrangements reported; future footprint undefined.

Archaeology

and heritage

Heritage

Conservation Act

Heritage

inspection/investigation permits and impact-management measures, as applicable.

Exploration

AOA and chance-find process reported.

Fish,

fish habitat and aquatic species

Federal

Fisheries Act and Species at Risk Act

Authorizations

or permits if activities affect fish, fish habitat, listed aquatic species or critical habitat.

Applicability

to development unknown.

Federal

impact assessment and other federal approvals

Impact

Assessment Act, Species at Risk Act, Migratory Birds Convention Act, Canadian Navigable Waters Act and other federal laws

Assessment

decision and project-specific approvals where triggered.

No

federal development assessment identified.

Public

health, buildings, fire and emergency services

Provincial

and local authorities

Camp,

potable water, food, sewage, building, fire, fuel and emergency approvals, as applicable.

Exploration

authorizations partly reported; future needs undefined.

Sources: British

Columbia (1996a, 1996b, 1996c, 1996d, 1996e, 2003, 2004, 2014, 2018, 2019); British Columbia, Mineral Titles Branch (n.d.); British Columbia,

Ministry of Mining and Critical Minerals (2026a, 2026b, n.d.); Canada (1985a, 1985b, 1994, 2002, 2019).

The permitting

strategy should identify lead and participating agencies, assessment reviewability, Crown and Company engagement roles, information requirements,

seasonal survey windows, Indigenous and public participation, application sequencing, decision points, permit dependencies, security,

compliance systems, and realistic schedule ranges. No permitting schedule should be represented as established until the project description

and regulator engagement support it.

Contango Silver and Gold – Kitsault Valley Project Page 227 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

17.10 Closure

and Reclamation

17.10.1

Current Exploration Remediation

Current reclamation

obligations are governed by the applicable exploration permits and the Mines Act. They include stabilization and reclamation of drill

sites, pads, trails, trenches, camp disturbances and other authorized work; removal or management of materials and equipment; erosion

control; revegetation where applicable; annual reporting; and regulator acceptance. Progressive reclamation reduces outstanding liability

but does not eliminate obligations until accepted by the Province.

The Company reports

reclamation securities of C$99,000 for MX-1-860 and C$76,000 for MX-1-603. Additional securities are listed for other exploration permits

in Table 17-2. These amounts are permit security, not mine-closure cost estimates and not limits on liability. Executed permit conditions,

security instruments, outstanding disturbance, reclamation cost estimates, and inspection status should be verified at the effective

date.

17.10.2

Historical Features and Future Mine Closure

Historical plant

foundations, underground openings and waste-rock piles occur within the Project. Access to certain historical workings has been restricted

for safety.

No mine closure

plan or mine closure cost estimate has been prepared for the consolidated Project because no mineral reserve, mine plan, process plant,

waste or tailings facility, or site-wide water-management design has been defined. A future closure plan would need to address progressive

reclamation, physical and chemical stability, water treatment, infrastructure disposition, underground and surface openings, tailings

and waste facilities, revegetation, habitat and land-use objectives, post-closure monitoring, adaptive management, care and maintenance,

financial security, and engagement with Indigenous Nations and communities.

17.11 QP

Interpretation, Risks, and Finalization

Based on the consolidated

source record, exploration permitting, wildlife and archaeological planning, progressive reclamation, and regional engagement processes

are established for the current stage.The current framework appears adequate to support the authorized exploration activities described

in Chapter 7.

Contango Silver and Gold – Kitsault Valley Project Page 228 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

18 CAPITAL

AND OPERATING COSTS

This section is

not applicable.

Contango Silver and Gold – Kitsault Valley Project Page 229 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

19 ECONOMIC

ANALYSIS

This section is

not applicable.

Contango Silver and Gold – Kitsault Valley Project Page 230 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

20 ADJACENT

PROPERTIES

20.1 Scope

and Reporting Basis

This chapter summarizes

selected properties near the Kitsault Valley Project (the Project) to provide regional geologic context. The adjacent-property information

is not used to estimate the Project's exploration results, mineral resources, mineral reserves, modifying factors, or economic outcomes.

It does not establish continuity of geology, structure, alteration, grade, thickness, metallurgy, or economic viability across property

boundaries.

Note:

The QP has not visited the adjacent properties for purposes of this TRS and has been unable to independently verify the adjacent-property

information summarized below. The information is not necessarily indicative of mineralization on the Kitsault Valley Project. Any third-party

exploration results, historical production, mineral-resource statements, development concepts, or permit status remain statements of

the adjacent-property owner or operator and are not estimates or conclusions of the Project QP.

20.2 Regional

Setting and Property Reconciliation

The Project lies

within the Stewart Complex of northwestern British Columbia, commonly included in the region known as the Golden Triangle. Triassic to

Jurassic island-arc volcanic and sedimentary successions, younger intrusive rocks, and long-lived structures host numerous precious-metal

vein, volcanogenic massive sulphide, skarn, and porphyry occurrences. This shared regional setting supports district-scale exploration

concepts but does not, by itself, demonstrate that mineralization on an adjacent property continues onto the Project (Table 20-1,

Figure 20-1).

Table 20-1.

Adjacent properties selected for regional context.

Property

Relative

location

Reported

owner/operator

Reported

stage

Regional

relevance

Red

Mountain Gold Project

Northwest;

approximately 15 km northeast of Stewart

Cambria

Gold Mines Inc. (formerly Ascot Resources)

Advanced

gold-silver project with historical underground development

Intrusion-related

gold-silver system in Triassic-Jurassic host rocks

Golddigger

/ Surebet

West

to southwest; tenure locally contiguous with the Project

Goliath

Resources Limited

Exploration-stage

polymetallic gold-silver discovery

Structurally

controlled sulphide-rich veins and alteration zones

Kitsault

Molybdenum Project

South

of Alice Arm and adjacent to the southern Project area

Avanti

Kitsault Mine Ltd. / New Moly LLC

Past-producing

brownfield molybdenum project

Porphyry

molybdenum stockwork system

Contango Silver and Gold – Kitsault Valley Project Page 231 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Figure 20-1.

Kitsault Valley Project and selected adjacent mineral tenure. Tenure ownership and boundaries are based on the June 2026 Company

compilation.

Contango Silver and Gold – Kitsault Valley Project Page 232 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

20.3 Red

Mountain Gold Project

The Red Mountain

Gold Project is northwest of the Project and approximately 15 km northeast of Stewart, near the headwaters of Bitter Creek. The property

was advanced by IDM Mining Ltd. between 2014 and 2019 and was acquired by Ascot Resources Ltd. in March 2019. The current owner

identifies itself as Cambria Gold Mines. The filing QP should confirm the legal owner and corporate name as of the TRS effective date.

Owner disclosures

describe Red Mountain as a gold-silver deposit hosted by multiphase Jurassic dioritic intrusive rocks that cut Triassic sedimentary rocks

of the Stuhini Group. Mineralized zones are described as tabular, northwest-trending, moderately to steeply southwest-dipping pyrite-rich

stockworks with local pyrrhotite, quartz-carbonate fracture filling, and strong sericite alteration. Gold is reported in native gold,

electrum, telluride, and sulphosalt minerals. These characteristics differ in detail from the principal silver-rich vein and stratabound

mineralization described on the Project, although both occur within the broader Stewart metallogenic setting.

Public disclosures

report approximately 2,000 m of production-scale underground workings and a 2019 Canadian NI 43-101 mineral-resource update. The QP has

not verified those workings, the supporting drill database, estimation assumptions, classification, or the current status of the third-party

estimate. No Red Mountain mineral-resource quantity or grade is adopted in this TRS, and the Canadian estimate has not been reconciled

to the definitions and disclosure requirements of S-K 1300 for purposes of this chapter.

20.4 Golddigger

Property and Surebet Discovery

The Golddigger

property lies west and southwest of the Project, approximately 35 km south of Stewart. Goliath Resources Limited's public disclosures

describe five claim groups covering approximately 91,500 ha. Goliath announced in March 2026 that it had acquired the remaining

optioned interest and held a 100% interest in the property, subject to a reported 2% net smelter return royalty. Because this ownership

update post-dates some of the source reports, the filing QP should apply the status current at the TRS effective date.

Exploration since

2021 has focused on the Surebet discovery, located near the Project's western side. Operator disclosures describe a stacked, structurally

controlled polymetallic vein system containing galena, sphalerite, pyrrhotite, and pyrite within silica-altered host rocks. The operator

reports multiple mineralization styles elsewhere on the property, including intrusion-related and epithermal systems and targets interpreted

as volcanogenic massive sulphide occurrences.

Operator disclosures

report extensive drilling through 2025, but no S-K 1300 mineral resource for Golddigger or Surebet is relied upon in this TRS. The presence

of mineralization on Golddigger does not demonstrate extension across the intervening tenure or onto the Project.

20.5 Kisault

Molybdenum Project

The Kitsault molybdenum

project is a brownfield property south of Alice Arm and immediately south of the Project area shown on Figure 20-1. Public information

identifies Avanti Kitsault Mine Ltd. as the project company and New Moly LLC as its owner.

The property hosts

porphyry molybdenum mineralization associated with the Alice Arm intrusive suite. Mineralization is described as molybdenite-bearing

stockwork and sheeted veins in intrusive and adjacent hornfelsed rocks. Historical open-pit operations reportedly produced approximately

30 million pounds of molybdenum intermittently between the late 1960s and 1982. New Moly describes the site as having historical infrastructure

and advanced development permits.

Contango Silver and Gold – Kitsault Valley Project Page 233 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

A 2013 Canadian

NI 43-101 technical report described mineral resources and a redevelopment concept that included an expanded open pit, process plant,

access-road work, powerline upgrades, stockpiles, a waste-rock management facility, a tailings management facility, and associated water-management

ponds. The QP has not verified the historical production, title, permit status, engineering assumptions, or mineral-resource estimate,

and no quantity, grade, production rate, mine life, or permit conclusion from that report is adopted in this TRS. The Kitsault porphyry

system provides regional geologic context but is not directly analogous to the Project's principal precious-metal deposits.

20.6 Other

Surrounding Tenure

Figure 20-1 also

shows mineral tenure held by other operators and regional property holdings that are not discussed individually. Their inclusion on the

map indicates spatial context only. No technical inference is made from the ownership, size, shape, or proximity of those tenure blocks.

20.7 Qualified

Person Interpretation

The adjacent properties

demonstrate that the Stewart Complex hosts several mineralizing systems and has supported sustained regional exploration and development.

They provide useful context for selecting regional geologic models and interpreting district-scale stratigraphy and structures. They

do not provide direct evidence of grade, continuity, thickness, metallurgy, resource classification, modifying factors, or economic extraction

on the Kitsault Valley Project.

Contango Silver and Gold – Kitsault Valley Project Page 234 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

21 OTHER

RELEVANT DATA AND INFORMATION

This section is

not applicable.

Contango Silver and Gold – Kitsault Valley Project Page 235 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

22 INTERPRETATION

AND CONCLUSIONS

22.1 Basis

and Principal Conclusions

The updated mineral

resource estimate provides a more developed geological framework and a larger Indicated resource inventory for the Kitsault Valley Project.

The principal advance at Homestake Main and Homestake Silver is the incorporation of drilling and revised mineralized domains that were

not represented in the geological framework underlying the previous resource disclosure. The QP considers this improved definition of

mineralized geometry and continuity to be a substantive increase in geological confidence. Changes in resource grade and contained metal

also reflect the material included in the revised models and the estimation and reporting assumptions adopted for this update.

These interpretations

and conclusions are based on the information and analyses presented in this TRS for the mineral resource estimate effective September 11,

2026. The conclusions address the eight deposits in the Homestake and Dolly Varden areas and the technical uncertainties relevant to

their continued evaluation. No mineral reserves are declared.

22.2 Exploration

Data and Verification

The accepted historical

and modern drilling, sampling, analytical and geological information provides an adequate basis for the interpretation and estimation

work described in this TRS. The database includes accepted results from the completed 2025 program. The assay dataset was locked at the

start of January 2026, geological-solid updates and database review continued through March, and the databases and supporting information

were certified by the QP on April 13, 2026. The final resource statement and supporting assumptions were accepted as complete and

current on September 11, 2026.

The eight-deposit

header inventory contains 1,454 holes totaling 328,638.18 meters. Separate merged exports for the seven updated deposits contain 24,120

intervals across 34 domains; 23,264 intervals totaling 27,176.00 meters from 947 distinct hole identifiers have at least one populated

metal result. Exported intervals, original assays and final composites are different populations. All exported hole identifiers matched

the project header inventory, and the export reconciliation identified no duplicate hole–from–to records, non-positive lengths

or internal overlaps. South Reef is outside this seven-export inventory.

The QP’s

assessment considers the sampling and analytical procedures, quality-control results, selected comparisons of digital records with original

documentation, database integrity checks and site observations described in Chapters 8 and 9. Some original historical assay certificates

remain unavailable. Confidence in accepted historical records therefore also depends on prior verification, internal consistency, location

reliability and agreement with surrounding drilling. This limitation remains relevant where historical information provides a substantial

portion of the local estimation support.

Additional drilling

has improved local geological and spatial support, but the amount of drilling alone does not establish resource confidence. The orientation,

distribution and representativeness of the intersections, together with geological and grade continuity, determine the confidence that

can be assigned to individual modeled volumes.

Contango Silver and Gold – Kitsault Valley Project Page 236 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

22.3 Geological

Interpretation by Area

22.3.1

Homestake Area

Homestake Main

comprises footwall, hanging-wall and middle mineralized lenses within a broader lower-grade envelope. Homestake Silver comprises twelve

numbered lenses and a surrounding lower-grade halo. Hard domain boundaries separate the contrasting grade populations. The QP considers

the revised framework more representative of the interpreted systems than retaining the earlier domain geometry without revision. Local

uncertainty remains at domain margins, structural intersections, thin or irregular zones and sparsely drilled extensions.

South Reef retains

the previous Inferred estimate of 0.445 Mt at 8.68 g/t Au and 4.90 g/t Ag, containing 124.200 koz Au and 0.100 Moz Ag, at a 2.0 g/t AuEq

cut-off. No additional drilling is incorporated into this retained estimate. Its 8.600 Moz AgEq is a comparative metric and is not the

result of applying the current Homestake Silver recovery matrix or the 132 g/t AgEq filter. Improvements elsewhere in the Homestake area

do not themselves establish an upgrade at South Reef.

22.3.2

Dolly Varden Area

Torbrit, Wolf,

Kitsol, Dolly Varden and North Star comprise distinct mineralized bodies with differing geometry, grade distribution and drill support.

The stratigraphic and structural controls represented by these deposits support the use of separate estimation domains and local search

controls. Torbrit and Wolf account for most of the area’s reported silver inventory. Historical mining at Torbrit, Dolly Varden

and North Star makes the interpretation of mined-out volumes an additional control on the remaining resource.

Wolf’s upper

veins and deep domain are estimated separately, reflecting their geometry, metal associations and analytical coverage. The final Kitsol

35/70 case reports 0.29 Mt Indicated and 0.14 Mt Inferred, containing 2.876 and 1.380 Moz AgEq, respectively. North Star’s selected

30/70 case reports 0.36 Mt Indicated and 0.23 Mt Inferred, containing 3.571 and 1.587 Moz AgEq. North Star’s Inferred silver grade

is 123.99 g/t, so its equivalent-grade qualification depends materially on the other estimated metals and their assumed recoveries. Sparse

non-silver data and density support therefore remain specific priorities.

22.4 Estimation

and Classification

The seven updated

estimates were prepared in Leapfrog Geo version 2026.1.2 with Edge, using hard geological domains, compositing, capping by domain and

element, density assignments and domain-specific parameters. Metals were estimated independently using inverse-distance-cubed weighting,

with Leapfrog declustering applied separately by domain and element in every estimator. Variable orientation follows mineralized geometry

where appropriate. The sub-blocked models use 5 × 5 × 5 meter parent cells and minimum 0.5 × 0.5 × 0.5 meter

sub-blocks in NAD83 / UTM Zone 9N coordinates. Final exports were locked on September 11, 2026.

The confirmed target

composite lengths are 2.0 meters for Homestake Main, Homestake Silver, Wolf and Torbrit; 1.25 meters for Dolly Varden Main; and 1.5 meters

for Kitsol and North Star. Within-boundary compositing used hard boundaries, equal distribution of residual end lengths below 1.0 meter

and no additional compositing weight. The separate estimation declustering weights should not be confused with compositing weights. Capping

input-metal losses likewise describe the input population, rather than an equivalent percentage loss of reported resource metal.

Contango Silver and Gold – Kitsault Valley Project Page 237 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

The suitability

of inverse-distance-cubed estimation depends on the geological controls, sample selection and model validation described in Chapter 11.

The method gives greater influence to nearby samples, which can be useful in locally variable mineralization but can also make estimates

sensitive to isolated high grades and uneven drilling. Grade capping, sample limits, limits on contributions from individual holes and

the treatment of domain boundaries are therefore important controls. The change from historical kriging does not, by itself, demonstrate

improved accuracy; the model must reproduce the supported geological and grade patterns without material unsupported extrapolation.

Resource classification

reflects geological and grade continuity, data quality and independent drill-hole support. Dedicated classification estimators are distinct

from grade-estimation searches. For Homestake Main, Homestake Silver, Wolf, Kitsol, Torbrit and North Star, AvgD divided by 0.707 is

an approximate nominal-spacing indicator rather than measured drill-hole spacing or a numerical confidence interval. The selected limits

are evaluated with domain geometry and spatial continuity.

Indicated classification

expresses greater confidence in quantity, grade and continuity. A larger Indicated inventory does not demonstrate one-for-one conversion

of the preceding Inferred blocks. Based on the geological setting and nature of the available drilling, the QP reasonably expects that

the majority of Inferred resources could be upgraded through continued exploration. Actual upgrading requires confirmation of the interpreted

continuity and other supporting assumptions and is not assured. No numerical conversion percentage or schedule is established, and Inferred

resources cannot be converted directly to mineral reserves.

22.5 Mineral

Resource Outcome

Table 22-1 summarizes

the finalized resource statement by area and category. The complete deposit tables, individual metal grades, equivalent-metal assumptions

and reporting constraints are presented in Chapter 11.

Table 22-1.

Mineral resource summary by area and classification.

Area

Category

Tonnage

(Mt)

Ag

Moz

Au

koz

AgEq

Moz

Homestake

Indicated

2.140

6.133

387.416

33.275

Dolly

Varden

Indicated

5.520

52.565

7.285

56.270

Project

total

Indicated

7.660

58.698

394.700

89.545

Homestake

Inferred

4.595

7.965

615.824

48.501

Dolly

Varden

Inferred

1.710

14.839

4.993

16.419

Project

total

Inferred

6.305

22.804

620.817

64.920

Chapter 11, Table

11-60; effective September 11, 2026. Mt = million metric tons; Moz = million troy ounces; koz = thousand troy ounces. Totals may

differ due to rounding. Categories are reported separately. South Reef retains its separate reporting basis. AgEq is not additional metal

to be added to silver and gold contents. Contained metal is not recovered or payable metal. No Measured resources or mineral reserves

are reported, and mineral resources do not have demonstrated economic viability.

Relative to the

preceding statement presented in the 2023 combined report, Indicated tonnage increases from 4.153 to 7.660 Mt, an increase of 84.4%,

and Indicated AgEq increases from 46.368 to 89.545 Moz, an increase of 93.1%. Inferred tonnage decreases from 6.831 to 6.305 Mt, a decrease

of 7.7%, and Inferred AgEq decreases from 86.725 to 64.920 Moz, a decrease of 25.1%. These are net comparisons on their respective reporting

bases and do not measure block-by-block category conversion. The changes combine drilling, geological domains, capping, interpolation,

density, classification, depletion and reporting assumptions. Kitsol is combined with Torbrit for comparison with the earlier reporting

unit, and gold was not reported for the southern deposits in the earlier baseline.

Contango Silver and Gold – Kitsault Valley Project Page 238 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

At Homestake Main, Indicated

grade decreases from 7.02 to 6.35 g/t Au and from 74.8 to 49.55 g/t Ag. The increased geological confidence and lower grades are compatible

outcomes: the revised resource represents a different modeled and classified population of material. Domain revision, the distribution

of newly supported material, high-grade treatment, interpolation and reporting selection can all affect the mean. Their individual contributions

cannot be quantified from the aggregate resource tables alone.

22.6 Metal

Prices and Metallurgical Assumptions

The updated equivalent-metal

calculations use QP-accepted prices of US$53/oz Ag, US$3,500/oz Au, US$5.00/lb Cu, US$1.25/lb Zn and US$0.90/lb Pb, with management concurrence

in May 2026. Chapter 11, Section 11.4 describes the price basis and three recovery groups: the Dolly Varden area, Homestake

Main and Homestake Silver. South Reef retains its historical basis. The relative recovery factors are embedded in each updated AgEq formula

and should not be applied a second time to the individual equivalent-metal contributions.

Changes in relative

metal prices and assumed recoveries alter the equivalent grade assigned to a block. They can also change which blocks meet a fixed equivalent-grade

threshold, even when the underlying individual metal grades and geometry remain unchanged. The effect on metric tons and contained metal

depends on the distribution and combination of metals within the blocks. A single conversion factor applied to the project total cannot

reproduce that selection effect. Separating the effect of price or recovery changes from geological and estimation changes requires controlled

block-level comparisons with other inputs held constant.

The metallurgical

evidence includes the 2016 Homestake testing, the 2019 Dolly Varden and Torbrit program, and the 2025–2026 work extending coverage

to Wolf and Kitsol. The results support continued evaluation of conventional flotation and cyanidation routes. The different mineralogy

and metal associations across the deposits support differentiated recovery assumptions rather than treating all mineralization as metallurgically

uniform.

The testwork does

not establish a final integrated flowsheet or a demonstrated plant recovery for every domain. Some adopted recoveries remain estimates

or proxies based on the available testing and interpretation. Their application is subject to sample representativeness, variability

in mineralogy, downstream losses and the treatment of deleterious elements. Arsenic, antimony and mercury in some tested concentrates

may affect product quality, treatment requirements or commercial terms. These matters could change the equivalent grades, reporting thresholds

and potentially economic portions of the resource.

22.7 Mining

Concept and Reasonable Prospects of Economic Extraction

Potential underground

extraction is the basis of the reporting concept for the updated deposits. Mechanized mining, including longhole stoping where geometry

and ground conditions permit, warrants further evaluation. The viability of that concept depends on mining width, continuity, dilution,

mining recovery, access development, geotechnical conditions, processing performance and site costs. It cannot be established from grade

or classification distance alone.

Contango Silver and Gold – Kitsault Valley Project Page 239 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

The seven updated

deposits are reported at 132 g/t AgEq within accepted underground mineralized shapes developed in Leapfrog. The shapes delineate spatially

continuous mineralization considered potentially amenable to future mechanized underground extraction. Unclassified material and historical

mined-out volumes at Torbrit, Dolly Varden and North Star are excluded. South Reef retains its separate 2.0 g/t AuEq cut-off and preceding

physical-resource basis.

The grade threshold

and spatial constraints form part of the QP’s assessment of reasonable prospects for economic extraction at the current exploration

stage. The assessment also considers underground access, geometry and continuity, processing options, recovery and marketability, infrastructure,

environmental management and permitting. The QP considers the identified geological, density, metallurgical and engineering issues capable

of resolution through further drilling, testing and engineering work. Historical mining and earlier conceptual studies provide context

for this assessment without demonstrating the economic viability of the current resources.

The reporting point

of reference is in situ mineralized material above the applicable cut-off, after exclusion of modeled historical mined-out material where

relevant, and before mining dilution or mining recovery. The resource-stage work does not establish a mine production schedule, project

capital requirement, development cash flow, net present value or internal rate of return. No economic viability or conversion to mineral

reserves is demonstrated by the resource statement.

22.8 Infrastructure,

Environment and Permitting

Existing facilities

and access arrangements support continued exploration. Rugged terrain, precipitation, snow, avalanche exposure and the separation of

deposit areas affect future facility planning. Development would require evaluation of roads, power, water, processing, waste management

and product transport. Nearby regional infrastructure does not establish available capacity, secured access or acceptable cost.

Exploration authorizations

do not constitute approval to construct or operate a mine. Development requires additional baseline studies, engineering, assessment

and permitting. Historical workings and waste, watershed conditions, water quality and closure obligations remain relevant. Tenure, royalties,

permit conditions and engagement with affected Indigenous Nations and communities must be addressed with the development concept.

22.9 Significant

Risks and Uncertainties

Table 22-2 summarizes

the principal uncertainties identified in Chapter 11. The current estimate incorporates the QP-accepted validation and classification

review. The additional work below addresses continuing uncertainty and subsequent model updates.

Contango Silver and Gold – Kitsault Valley Project Page 240 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 22-2.

Principal uncertainties affecting resource confidence and further evaluation.

Uncertainty

Potential

effect

Work

that would reduce uncertainty

Geological

and grade continuity

Changes

to domain geometry, local grades and classification, particularly near boundaries and sparsely drilled extensions.

Targeted

infill drilling, structural review and domain validation.

Historical

data and depletion

Uncertainty

in locally supported grades and in the volume remaining around historical workings.

Targeted

record verification and reconciliation of surveyed workings with depletion models.

High

grades and interpolation

Sensitivity

to isolated high grades, cap selection, uneven drilling and local extrapolation.

Preserve

accepted capped inputs and declustering weights; use matched capped/uncapped and alternative-estimator tests where needed. Input-metal

loss is not resource-metal loss.

Density

variability

Tonnage

sensitivity where sparse or grade-screened measurements do not represent domain volumes, particularly North Star, Kitsol and Torbrit.

Collect

representative domain-coded measurements; expand Wolf Deep coverage and evaluate Torbrit’s domain distribution.

Classification

support

Category

changes where nominal spacing does not reflect independent hole support, continuity or remnant geometry.

Maintain

final criteria and spatial checks; keep historical test populations separate from final outputs and design infill to resolve specific

gaps.

Recovery

and product quality

Changes

in equivalent grades and recoverable value, especially where non-silver assay coverage or recovery evidence is limited.

Target

North Star and other historical southern populations; complete variability and integrated testing, product characterization and commercial

assessment.

Mining

and reporting economics

Changes

in cut-off, dilution, mineable dimensions and accessible resource volumes.

Conceptual

layouts, geotechnical work, physical reporting constraints and documented cost sensitivity.

Infrastructure

and authorizations

Changes

in access, development cost, timing and the ability to advance a mining concept.

Access

and facility studies, environmental baselines, permit review and continued Indigenous engagement.

22.10 Overall

QP Conclusion

The QP considers

the accepted geological, drilling, assay and density information adequate for the resource estimates at the assigned confidence levels.

The adopted domains, high-grade controls, estimation settings and spatial classification review appropriately reflect the mineralized

systems and available data. The seven updated deposits support Indicated and Inferred resources, and South Reef remains Inferred on its

retained basis. The QP reasonably expects that the majority of Inferred resources could be upgraded through continued exploration, subject

to the results, and considers the identified technical issues capable of resolution through further work. The priorities in Chapter 24

address continuity, density, historical depletion, metallurgy, mining and infrastructure. The estimate supports continued evaluation

and does not establish mineral reserves or demonstrated economic viability.

Contango Silver and Gold – Kitsault Valley Project Page 241 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

23 RECOMMENDATIONS

23.1 Recommended

Program

The QP recommends

that the Kitsault Valley Project advance through a staged program from the mineral resource estimate effective September 11, 2026.

The first stage should complete the 2026 drilling program, receive and validate the remaining assays, update the current mineral resource

estimate in H1 2027, complete the planned 2026-2027 metallurgical program, and then proceed to an S-K 1300 Initial Assessment if the

resource update .

The second stage

should advance the Project toward a pre-feasibility study (PFS) over the next three years. That work should focus on staged geotechnical,

hydrogeological, hydrological, environmental, permitting, access and other field investigations sufficient to support PFS-level Technical

Report.

23.2 Stage

1 – 2026 Drill Close-out, 2027 MRE Update and Initial Assessement

Complete the 2026

drilling program and incorporate the 2026 drilling in a 2027 update to the current mineral resource estimate after the relevant assays

have been received, validated and passed the Company's QA/QC requirements. The September 11, 2026 estimate would be the comparison

baseline. The timing of the 2027 MRE update depends principally on assay receipt, validation, geological interpretation and QP review

but is expected in H1 2027.

Proceed with the

planned 2026-2027 metallurgical program described in Chapter 10. The program should evaluate representative composites through characterization,

comminution, flotation, locked-cycle testing, leaching and detailed product-quality analysis. Results should be integrated with market,

processing and environmental inputs before they are used in any economic assumptions.

Once the 2027 MRE

update is complete, commission an integrated Initial Assessment under S-K 1300 that includes preliminary capital and operating cost estimates,

economic analysis and sensitivity work. The study should evaluate underground mining methods, access, production scheduling, dilution

and recovery together with processing or off-site treatment options, product transport and market terms. Assuming assay receipt, MRE

updating and metallurgical inputs progress as expected, the Initial Assessment could target completion near the end of 2027; that target

should remain conditional on the timing and quality of the required inputs.

The Initial Assessment

should include environmental, infrastructure, hydrology, hydrogeology, geotechnical, permitting, water, waste and closure assessments

at the level appropriate for the study. Its principal deliverables should be a development concept, a documented cost basis, a cash-flow

assessment and sensitivities identifying the main drivers and outstanding risks. Resource-category treatment and any use of Inferred

resources must meet S-K 1300 requirements. This work will guide the next investment decision and does not establish mineral reserves.

23.3 Stage

2 – Three Program Toward Pre-Feasibility Study (PFS)

After the Initial

Assessment, advance a staged work program directed toward completion of a pre-feasibility study over approximately the next three years.

The program should be released in decision points tied to the Initial Assessment results, updated geological model, metallurgical results,

permitting priorities and field-season access. Stage 2 covers the additional engineering, baseline and permitting work required for the

PFS path.

Retain a staged

allowance for up to 5,000 meters of geotechnical and hydrogeological drilling. Its locations, timing and extent should follow engineering

priorities identified in the Initial Assessment and should support underground access, stope design, groundwater inflow, water management,

infrastructure siting and PFS-level risk reduction. This work is conditional on specialist design and should be scoped separately from

the current drilling program.

Contango Silver and Gold – Kitsault Valley Project Page 242 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

The Stage 2 field

program should also expand hydrology, hydrogeology, environmental baseline, geochemistry, permitting, access, infrastructure and closure-related

studies. These studies should be scheduled early enough to support PFS engineering and realistic permitting strategy, including seasonal

data requirements and engagement with affected Indigenous Nations and communities.

23.4 Proposed

Budget and Sequence

Table 23-1 summarizes

the staged budget. The base allowances are conceptual planning amounts. The low and high columns show a ±20% planning sensitivity

around the base allowances, not a formal estimate-class accuracy range. Stage 1 includes the metallurgy, 2027 MRE update and Initial

Assessment allowances; it does not include the already-authorized cost of completing the 2026 drilling program. Stage 2 includes additional

geotechnical, hydrogeological, engineering, environmental, hydrology, permitting, access/infrastructure and other investigations required

to support a PFS over approximately three years. Note that Stage 2 may also include additional in-fill drilling if deemed necessary to

upgrade resources after incorporating results of the 2026 drill program. As this amount is not currently known, there is no allocation

made at this time. It will no doubt be part of the recommendations after completion of the Stage 1 Initial Assessment.

The Stage 1 base

allowance is US$1,450,000, with a planning range of approximately US$1,160,000 to US$1,740,000. The Stage 2 base allowance is US$7,512,500,

with a planning range of approximately US$6,010,000 to US$9,015,000. The combined staged planning allowance is US$8,962,500, with a +/-20%

planning range of approximately US$7,170,000 to US$10,755,000.

The QP recommends

staged expenditure against confirmed scopes and results. This work supports further evaluation; it does not establish additional mineral

resources, mineral reserves or economic returns, and it does not commit the Project to development.

Contango Silver and Gold – Kitsault Valley Project Page 243 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Table 23-1.

Proposed staged work-program budget in U.S. dollars.

Stage

Work

item and timing

Base

US$

Low

-20% US$

High

+20% US$

Budget

basis

Stage

1

Complete

2026 drilling, assay receipt and QA/QC close-out. 2026 to early 2027.

0

0

0

No

new incremental allowance in this chapter; complete under the approved 2026 exploration program.

Stage

1

Metallurgical

program. Fall 2026 through 2027.

250,000

200,000

300,000

Five

representative composites, comminution, flotation, leaching, product-quality analysis and external metallurgical coordination.

Stage

1

2027

MRE update and QP reporting. After receipt and validation of 2026 assays.

200,000

160,000

240,000

Update

the current MRE with accepted 2026 drilling; preserve the September 11, 2026 estimate as the comparison baseline.

Stage

1

Initial

Assessment with economic analysis. After the 2027 MRE; target end of Q2 2027 if assays and MRE timing allow.

1,000,000

800,000

1,200,000

Integrated

S-K 1300 Initial Assessment with mining, processing, infrastructure, environmental, hydrology, permitting, capital, operating cost

and sensitivity work.

Stage

2

Geotechnical

and hydrogeological drilling - up to 5,000 meters. Staged as engineering needs are confirmed.

3,562,500

2,850,000

4,275,000

Initial

and follow-up drilling to support mine access, underground design, water inflow, ground conditions and PFS-level engineering.

Stage

2

Geotechnical

testing and instrumentation. With staged geotechnical drilling.

450,000

360,000

540,000

Laboratory

testing, instrumentation, monitoring and specialist interpretation.

Stage

2

PFS

engineering, environmental, hydrology, permitting and field studies. Over approximately three years following the Initial Assessment.

3,500,000

2,800,000

4,200,000

Conceptual

planning allowance for engineering trade-off studies, baseline expansion, hydrology/

hydrogeology, geochemistry, access/infrastructure field work, permitting strategy and reporting.

Stage

1 subtotal

1,450,000

1,160,000

1,740,000

Planning

sensitivity only; not a formal cost-estimate accuracy range.

Stage

2 subtotal

7,512,500

6,010,000

9,015,000

Planning

sensitivity only; not a formal cost-estimate accuracy range.

Total

staged planning allowance

8,962,500

7,170,000

10,755,000

Planning

sensitivity only; not a formal cost-estimate accuracy range.

Budget basis. Amounts

are conceptual planning allowances in U.S. dollars and remain subject to Company approval, final scopes, contractor pricing, laboratory

schedules and exchange-rate assumptions. The low and high columns are a requested ±20% planning sensitivity and are not presented

as a formal estimate-class accuracy range. Stage 1 excludes the cost of the already-authorized 2026 drilling program to avoid double

counting. The retained Stage 2 drilling allowance is limited to geotechnical and hydrogeological drilling at US$712.50 per meter, including

normal field logistics; specialist testing and instrumentation are separate.

Contango Silver and Gold – Kitsault Valley Project Page 244 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

24 REFERENCES

References are

listed alphabetically by author or organization. Bracketed titles describe sources whose formal titles were not available; “n.d.”

means no confirmed publication date. Where a source was consulted through a predecessor report, that report is identified.

Alldrick,

D.J. (1993). Geology and metallogeny of the Stewart mining camp, northwestern British Columbia. British Columbia Ministry of Energy,

Mines and Petroleum Resources, Bulletin 85, 105 p.

Allnorth

Consultants Ltd. (2009). [Road design package for the Homestake Ridge access road]. March 20, 2009. As described in Hough

et al. (2022), Section 2.3.

Allnorth

Consultants Ltd. (2010). [Kitsault River Road review inspection report]. August 26, 2010. As described in Hough et al. (2022),

Section 2.3.

Allnorth

Consultants Ltd. (2012). [Homestake Ridge mainline access road feasibility study]. March 3, 2012. As described in Hough et

al. (2022), Section 2.3.

ALS

Canada Ltd. (2026). Kitsault Valley metallurgical testwork. Quotation KM8127, Revision 1, August 27, 2026. ALS Metallurgy,

Kamloops, British Columbia.

Arseneau,

G. (2019). 2019 mineral resource update for the Red Mountain Gold Project, northwestern British Columbia, Canada. NI 43-101 technical

report prepared for Ascot Resources Ltd. Effective August 30, 2019; dated November 22, 2019.

Atkinson,

B., and Gunson, T. (2018). Assessment report for the Homestake Ridge Property, northwestern British Columbia. British Columbia

assessment report, August 24, 2018. As cited in Hough et al. (2022) and Turner and Hough (2023).

Austin,

J. (2026). RFQ and scope of work for 2026/7 metallurgy test program – Contango Au/Ag Project. International Metallurgical

and Environmental Inc., memorandum, August 18, 2026.

British

Columbia (1996a). Forest Act. R.S.B.C. 1996, c. 157. As amended; BC Laws consolidated text. Online source.

British

Columbia (1996b). Heritage Conservation Act. R.S.B.C. 1996, c. 187. As amended; BC Laws consolidated text. Online source.

British

Columbia (1996c). Land Act. R.S.B.C. 1996, c. 245. As amended; BC Laws consolidated text. Online source.

British

Columbia (1996d). Mineral Tenure Act. R.S.B.C. 1996, c. 292. As amended; BC Laws consolidated text. Online source.

British

Columbia (1996e). Mines Act. R.S.B.C. 1996, c. 293. As amended; BC Laws consolidated text. Online source.

British

Columbia (2003). Environmental Management Act. S.B.C. 2003, c. 53. As amended; BC Laws consolidated text. Online source.

British

Columbia (2004). Mineral Tenure Act Regulation. B.C. Reg. 529/2004. As amended; BC Laws consolidated text. Online source.

British

Columbia (2014). Water Sustainability Act. S.B.C. 2014, c. 15. As amended; BC Laws consolidated text. Online source.

Contango Silver and Gold – Kitsault Valley Project Page 245 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

British Columbia (2018). Environmental

Assessment Act. S.B.C. 2018, c. 51. As amended; BC Laws consolidated text. Online source.

British

Columbia (2019). Reviewable Projects Regulation. B.C. Reg. 243/2019. As amended; BC Laws consolidated text. Online source.

British

Columbia, Mineral Titles Branch (n.d.). Mineral titles information and guidance. Provincial guidance concerning mineral claims,

leases, tenure maintenance and surface rights. Online source.

British

Columbia, Ministry of Mining and Critical Minerals (2026a). Annual reporting for mines in B.C. Provincial guidance, including

annual summaries of exploration activities and multi-year area-based work program updates. Updated April 23, 2026. Online source.

British

Columbia, Ministry of Mining and Critical Minerals (2026b). Health, Safety and Reclamation Code for Mines in British Columbia.

2026 edition. Online source.

British

Columbia, Ministry of Mining and Critical Minerals (n.d.). Mineral and coal exploration permit applications. Provincial Notice

of Work and exploration-permitting guidance. Online source.

Cambria

Gold Mines Inc. (n.d.). Red Mountain Gold Project. Public project webpage. Online source.

Canada

(1985a). Canadian Navigable Waters Act. R.S.C. 1985, c. N-22. As amended; Justice Laws consolidated text. Online source.

Canada

(1985b). Fisheries Act. R.S.C. 1985, c. F-14. As amended; Justice Laws consolidated text. Online source.

Canada

(1994). Migratory Birds Convention Act, 1994. S.C. 1994, c. 22. As amended; Justice Laws consolidated text. Online source.

Canada

(2002). Species at Risk Act. S.C. 2002, c. 29. As amended; Justice Laws consolidated text. Online source.

Canada

(2019). Impact Assessment Act. S.C. 2019, c. 28, s. 1. As amended; Justice Laws consolidated text. Online source.

Chamois,

P., Geusebroek, P., Mioska, M., and Stone, D.M.R. (2020). Technical report, updated mineral resource estimate and preliminary economic

assessment on the Homestake Ridge Gold Project, Skeena Mining Division, British Columbia. MineFill Services, Inc., prepared for

Auryn Resources Inc. Effective May 29, 2020. Amended and restated version dated June 24, 2020 is identified in the Project

reference record. Online source.

Christie,

G., Thomas, D.G., Mendoza Reyes, R., and Lipiec, I. (2013). Kitsault Molybdenum Project, British Columbia, Canada – NI

43-101 technical report on updated feasibility study. AMEC Americas Limited, prepared for Avanti Mining Inc., Project 171424. Effective

February 4, 2013; dated March 22, 2013. Online source.

Contango

Silver & Gold Inc. (2026a). Contango ORE completes merger with Dolly Varden Silver. News release, March 26, 2026.

Online source.

Contango

Silver & Gold Inc. (2026b). Contango Silver & Gold provides project updates. News release, June 23, 2026.

Online source.

Contango

Silver & Gold Inc. (2026c). Current report on Form 8-K. Dated March 27, 2026; earliest event March 25,

2026. Item 2.01 reports completion of the Dolly Varden acquisition on March 26, 2026. SEC accession 0001193125-26-129496. Online

source.

Cowley,

J. (2026). [Market-study advice on concentrate marketability and indicative commercial terms for the Kitsault Valley Project]. Unpublished

technical consultation provided to Contango Silver & Gold Inc.

Contango Silver and Gold – Kitsault Valley Project Page 246 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Cui,

Y., Miller, D., Schiarizza, P., and Diakow, L.J. (2017). British Columbia digital geology. British Columbia Geological Survey,

Open File 2017-08. Data version 2018-04-05. Online source.

Dolly

Varden Silver Corporation (2025). [Kinskuch acquisition closing disclosure]. Public corporate disclosure, May 26, 2025.

Dolly

Varden Silver Corporation (2026). Audited consolidated financial statements for the years ended December 31, 2025 and 2024.

Approved for issue March 12, 2026. Note 8, exploration and evaluation assets. Included as Exhibit 99.2 to Contango Silver &

Gold Inc.’s March 27, 2026 Form 8-K. Online source.

Ebert,

L. (2025). 2024 technical report for exploration drilling on the Dolly Varden Property. Volumes I and II. Prepared for Dolly Varden

Silver Corporation, December 15, 2025. Assessment event 6079322.

Environment

and Climate Change Canada (2018). Canadian climate normals 1981–2010 station data. Station record 482, Nass Camp, British

Columbia. Dataset cited in Turner and Hough (2023). Online source.

ERM

Consultants Canada Ltd. (2018a). [Wildlife management plan supporting the Exploration Permit MX-1-860 amendment application].

Prepared for the Dolly Varden project. As described in Turner and Hough (2023).

ERM

Consultants Canada Ltd. (2018b). [Archaeological overview assessment supporting the Exploration Permit MX-1-860 amendment application].

Prepared for the Dolly Varden project. As described in Turner and Hough (2023).

ERM

Consultants Canada Ltd. (n.d.). [Surface-water monitoring, wildlife management and archaeological assessment records for the Kitsault

Valley Project, 2024–2025 programs]. Unpublished external consultant work identified in the Project environmental and permitting

record.

Folk,

P., and Makepeace, D. (2007). Report on the Homestake Ridge Project, Skeena Mining Division, British Columbia. Prepared for Bravo

Venture Group Inc., April 11, 2007; amended June 3, 2008. As cited in Hough et al. (2022).

Fuse

Advisors (2026). Dolly Varden Kitsault Valley Project, Golden Triangle, British Columbia – Metallurgical sample selection. Presentation,

April 30, 2026.

Gagnon,

J.-F., Barresi, T., Waldron, J.W.F., Nelson, J.L., Poulton, T.P., and Cordey, F. (2012). Stratigraphy of the upper Hazelton Group

and the Jurassic evolution of the Stikine terrane, British Columbia. Canadian Journal of Earth Sciences, 49(9), 1027–1052.

doi:10.1139/e2012-042. Online source.

Galley,

A.G., Hannington, M.D., and Jonasson, I.R. (2007). Volcanogenic massive sulphide deposits. In Mineral Deposits of Canada:

A Synthesis of Major Deposit-Types, District Metallogeny, the Evolution of Geological Provinces, and Exploration Methods. Geological

Association of Canada, Mineral Deposits Division, Special Publication 5, pp. 141–161.

Garrow,

T. (2011). Technical report, geology and mineral exploration of the Dolly Varden Property, British Columbia, Canada. NI 43-101

technical report prepared for Dolly Varden Silver Corporation, September 5, 2011, 108 p. As cited in Turner and Nicholls (2019)

and Turner and Hough (2023).

Golder

Associates Ltd. (2012a). [Geotechnical assessment of the proposed new road extension for the Homestake Ridge access road]. January 24,

2012. As described in Hough et al. (2022), Section 2.3.

Golder

Associates Ltd. (2012b). [Preliminary geotechnical assessment of proposed mine infrastructure sites for the Homestake Ridge Project].

February 27, 2012. As described in Hough et al. (2022), Section 2.3.

Goliath

Resources Limited (2026). Goliath Resources acquires 100% ownership of the Golddigger Property hosting the high-grade Surebet gold discovery

and buys down 1% of the NSR, Golden Triangle, B.C. News release, March 10, 2026. Online source.

Contango Silver and Gold – Kitsault Valley Project Page 247 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Goliath

Resources Limited (n.d.). Golddigger. Public project webpage. Online source.

Government

of Yukon (n.d.). GeoYukon. Online geospatial mapping application. Source of terrane mapping reproduced in the geological-setting

chapter.

Hall,

A. (2026a). PJ-5599 – Dolly Varden – Wolf & Kitsol metallurgical testwork. Blue Coast Research Ltd., Project

PJ-5599, Version 1.0, final report, April 29, 2026.

Hall,

A. (2026b). Kitsault Au/Ag Project. Blue Coast Research Ltd., project proposal PR-2026-092-R1, August 27, 2026.

Higgs,

A.A. (2015). Amended 2015 technical report for the Dolly Varden Property, Skeena Mining Division, British Columbia. NI 43-101

technical report prepared for Dolly Varden Silver Corporation. Effective May 1, 2015.

Higgs,

A.A., and Giroux, G. (2015). 2015 technical report for the Dolly Varden Property, Skeena Mining Division, British Columbia. NI

43-101 technical report prepared for Dolly Varden Silver Corporation. Effective September 30, 2015.

Hough,

R., Stone, D.M.R., and Turner, A.J. (2022). Technical report and updated mineral resource estimate for the Homestake Ridge Gold Project,

Skeena Mining Division, British Columbia. MineFill Services, Inc., and APEX Geoscience Ltd., prepared for Dolly Varden Silver Corp.

Effective January 20, 2022; amended December 13, 2022.

IEC

Consultants Ltd. (1981). [Water-quality monitoring of the Kitsault River and Torbrit mine drainage]. As described in Higgs and Giroux

(2015).

International

Copper Study Group (n.d.). [Global copper mine-production and concentrate-smelting-capacity statistics]. Statistical source identified

in the Market Studies chapter.

Knight

Piésold Consulting (2011a). [Preliminary power supply assessment for the Homestake Ridge Project]. April 23, 2011.

As described in Hough et al. (2022), Section 2.3.

Knight

Piésold Consulting (2011b). [Conceptual cost estimate for tailings disposal, Homestake Ridge Project]. May 13, 2011.

As described in Hough et al. (2022), Section 2.3.

Knight

Piésold Consulting (2011c). [Plant site and tailings storage facility alternatives assessment, Homestake Ridge Project].

May 19, 2011. As described in Hough et al. (2022), Section 2.3.

Knight

Piésold Consulting (2011d). Homestake Ridge Project – Integration of a hydroelectric facility within the mine development

concept #1. June 1, 2011. As cited in Hough et al. (2022).

Lavigne,

B. (2025). 2023 technical report for the Homestake Ridge Property. Volumes I and II. TerraLogic Exploration Inc., prepared for

Dolly Varden Silver Corporation, January 13, 2025. Assessment event 6041345.

Leigh,

O.E., and Thompson, I.S. (1981). Report on the property of Torbrit Silver Resources Ltd., Kitsault River area, B.C. Derry,

Michener & Booth and Wahl, Toronto. As cited in Higgs and Giroux (2015) and Turner and Hough (2023).

Leigh,

O.E., and Thompson, I.S. (1983). Report on the property of Dolly Varden Minerals Inc., Kitsault River area, B.C. Derry, Michener &

Booth and Wahl, Toronto. As cited in Higgs and Giroux (2015).

Lewis,

P.D., Toma, A., and Tosdal, R.M. (compilers) (2001). Metallogenesis of the Iskut River area, northwestern British Columbia. Mineral

Deposit Research Unit, University of British Columbia, Special Publication 1, June 2001. Includes P.D. Lewis, Geological maps, Chapter

6, p. 77 ff. Online source.

Contango Silver and Gold – Kitsault Valley Project Page 248 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Macdonald,

A.J., Lewis, P.D., Thompson, J.F.H., Nadaraju, G., Bartsch, R., Bridge, D.J., Rhys, D.A., Roth, T., Kaip, A., Godwin, C.I., and Sinclair,

A.J. (1996). Metallogeny of an Early to Middle Jurassic arc, Iskut River area, northwestern British Columbia. Economic Geology,

91(6), 1098–1114. doi:10.2113/gsecongeo.91.6.1098. Online source.

Macdonald,

R.W.J., and Rennie, D.W. (2016). Technical report on the Homestake Ridge Project, an updated mineral resource, Kitsault, British Columbia.

NI 43-101 technical report readdressed to Auryn Resources Inc., November 15, 2016. As cited in Hough et al. (2022) and Turner and

Hough (2023).

Mann

(1974). [Historical mineral inventory and assay verification for the Dolly Varden property]. As cited in Higgs and Giroux (2015).

McCuaig,

M., and Sebert, C. (2017). 2016 technical report for the Dolly Varden Property, Skeena Mining Division. Prepared for Dolly Varden

Silver Corporation. British Columbia Geological Survey, Assessment Report 36934, 1,123 p.

Middleditch,

D.J. (2019). Metallurgical testwork report. Blue Coast Research Ltd., prepared for Dolly Varden Silver Corporation, 78 p. Dolly

Varden and Torbrit test program; as cited in Turner and Hough (2023).

Miller,

E.A., Kennedy, L.A., and van Straaten, B.I. (2020). Geology of the Kinskuch Lake area and Big Bulk porphyry prospect, northwestern British

Columbia: Syndepositional faulting and basin formation during the Rhaetian (latest Triassic) transition from the Stuhini to the Hazelton

Group. In Geological Fieldwork 2019. British Columbia Ministry of Energy, Mines and Petroleum Resources, British Columbia Geological

Survey Paper 2020-01, pp. 77–99. Online source.

Miller

(2023). Emplacement environment and structural modification of the Big Bulk Cu-Au porphyry system, northwestern British Columbia.

Thesis, University of British Columbia, Open Collections item 1.0438619. Online source.

Mitchell,

M.A. (1976). Consolidated Silver Butte Mines Ltd., Moose–Robin–Victory Group (MRV Group), Skeena Mining Division.

British Columbia Assessment Report 6112A, 25 p. Online source.

Monger,

J.W.H., Price, R.A., and Tempelman-Kluit, D.J. (1982). Tectonic accretion and the origin of the two major metamorphic and plutonic

welts in the Canadian Cordillera. Geology, 10(2), 70–75. Online source.

Mortensen,

E. (1960). Torbrit Mine, Alice Arm, B.C. Geology 409, Report 4. British Columbia Property File 600401. Online source.

New

Moly LLC (n.d.). Kitsault Project. Public project webpage, as identified in the adjacent-properties source record. Online source.

One-eighty

Consulting Group (2018). Homestake Ridge Mineral Exploration Project management and monitoring plan for grizzly bear, mountain goat,

moose, coastal northern goshawk, and marbled murrelet. Prepared for Auryn Resources Inc., June 27, 2018. As cited in Hough et al.

(2022).

pHase

Geochemistry Inc. (2012). Geochemical characterization of split samples from the waste rock field barrel program, Homestake Ridge Project.

Final report, October 4, 2012. As cited in Hough et al. (2022).

Pojar,

J., Klinka, K., and Demarchi, D.A. (1991). Coastal western hemlock zone. In Ecosystems of British Columbia. British Columbia Ministry

of Forests, Special Report Series 6, pp. 95–111. Online source.

Rennie,

D. (2011). Technical report on the Homestake Ridge Project, Kitsault, British Columbia, Canada. NI 43-101 technical report prepared

for Bravo Gold Corp., May 20, 2011, 145 p. As cited in Hough et al. (2022).

Rennie,

D., Scott, K., and McDonough, B. (2010). Technical report on the Homestake Ridge Project, Stewart, British Columbia, Canada. NI

43-101 technical report, June 28, 2010. As cited in Hough et al. (2022).

Contango Silver and Gold – Kitsault Valley Project Page 249 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

Ross,

D., and Chamois, P. (2017). Technical report on the Homestake Ridge Project, Skeena Mining Division, northwestern British Columbia.

Roscoe Postle Associates Inc., prepared for Auryn Resources Inc. Effective September 1, 2017; dated September 29, 2017; amended

October 23, 2017.

Sangra,

H., and Lucy, E. (2026). Metallurgical test program in support of Kitsault Project. Base Metallurgical Laboratories Ltd., revised

quotation BL2424 (R1), August 30, 2026.

Sebert,

C. (2013). 2012 geological mapping, geophysical surveying, and geological interpretation work, Dolly Varden Silver Property, northwest

British Columbia. Cambria Geosciences Inc. As cited in Turner and Hough (2023).

SGS

Minerals Services (2011). An investigation into environmental characterisation of Homestake Ridge tailings. Prepared for Bravo

Venture Group Inc., Project 12198-001, final report, March 8, 2011. As cited in Hough et al. (2022).

Shouldice,

T.W., and Coombs, H. (2016). Process development studies, Homestake Ridge gold-silver deposit. Base Metallurgical Laboratories

Ltd., prepared for Auryn Resources Inc., 19 p. As cited in Hough et al. (2022).

Skerl,

A.C. (1964). Dolly Varden report. May 25, 1964. British Columbia Property File 825696, Rimfire collection. Online source.

Thompson, I.,

and Pearson, W. (1981). Ore reserves of the North Star and Wolf deposits held by Dolly Varden Minerals Inc., Kitsault Valley, British

Columbia. Volume 1. British Columbia Assessment Report 10042A. Online source.

Triton

Environmental Consultants Ltd. (2012a). Homestake Ridge Project surface water quality initial site visit report. Prepared for

Allnorth Consultants Ltd., February 10, 2012. As cited in Hough et al. (2022).

Triton

Environmental Consultants Ltd. (2012b). Homestake Ridge Project proposed road stream assessment report. Prepared for Allnorth

Consultants Ltd., January 20, 2012. As cited in Hough et al. (2022).

Turner,

A.J. (2026). Consent of Andrew Turner. Exhibit 23.11 to the Contango Silver & Gold Inc. registration statement,

filed June 22, 2026. Online source.

Turner,

A.J., and Hough, R. (2023). Technical report on the combined Kitsault Valley Project, British Columbia, Canada. APEX Geoscience

Ltd., prepared for Dolly Varden Silver Corporation. Effective September 28, 2022; report text dated February 23, 2023; signing

date March 23, 2023.

Turner,

A.J., and Nicholls, S.J. (2019). Technical report and mineral resource update for the Dolly Varden Property, British Columbia, Canada.

APEX Geoscience Ltd., prepared for Dolly Varden Silver Corp. Effective May 8, 2019; revised December 12, 2022.

U.S.

Securities and Exchange Commission (2026a). Regulation S-K, Subpart 1300 – Disclosure by registrants engaged in mining operations.

17 C.F.R. §§ 229.1300–229.1305. Electronic Code of Federal Regulations. Online source.

U.S.

Securities and Exchange Commission (2026b). Regulation S-K, Item 601(b)(96) – Technical report summary. 17 C.F.R. §

229.601(b)(96). Electronic Code of Federal Regulations. Online source.

Contango Silver and Gold – Kitsault Valley Project Page 250 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

25 RELIANCE

ON REGISTRANT

25.1 Registrant

and Scope

Contango Silver &

Gold Inc. (Contango or the Company) is the registrant for which this Technical Report Summary (TRS) has been prepared for the Kitsault

Valley Project, British Columbia, Canada. Dave Larimer, CPG, Vice President Exploration of Contango, is the Qualified Person (QP) responsible

for this report and is an employee of the Company.

The Company provided

the drill hole database, geological and exploration records, historical reports and public disclosures, and internal files concerning

land status, permitting and environmental matters. These sources support information throughout the TRS. This chapter identifies the

specific Company information relied upon under 17 CFR 229.1302(f), and documents the use of historical and technical sources for which

the QP retains responsibility for the conclusions adopted in this report.

25.2 Land

Status Permitting and Environmental Information

The QP relied on

the Company’s internal records for the matters summarized in Table 25-1. The reliance applies to the identified portions of Chapters

3 and 17 and to their corresponding summaries in the Executive Summary and Interpretations and Conclusions. It also informs the consideration

of property rights, environmental obligations and permitting in the assessment of reasonable prospects for economic extraction in Chapter

11.

Table 25-1.

Company information relied upon for land status, permitting and environmental matters.

Information

and report location

Company

source

Extent

and reason for reliance

Land

status and mineral tenure

Chapter 3

Internal

land-status and tenure files.

Relied

upon for the descriptions of ownership and legal tenure status, and associated rights and obligations identified in Chapter 3. Reliance

is reasonable because the Company administers its Project interests through its subsidiaries and maintains the records supporting

those interests.

Permitting

and governmental requirements

Chapters 3 and 17

Internal

permitting files and status information.

Relied

upon reported permit status, conditions and applicable governmental requirements outside the QP’s expertise. The Company manages

Project permitting and maintains the relevant records, providing a direct basis for the status information used in the report.

Environmental

matters

Chapter 17

Internal

environmental files and supporting reports.

Relied

upon the descriptions of environmental conditions, obligations and management requirements outside the QP’s expertise. The

Company maintains the Project environmental information and is responsible for managing the associated obligations, providing the

basis for this reliance.

Contango Silver and Gold – Kitsault Valley Project Page 251 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

25.3 Historical

Reports and Public Disclosures

The TRS draws on

previously published technical reports and press releases, together with historical records provided through the Company, including information

originating with Dolly Varden Silver Corporation and other former owners, operators and technical consultants. The originating issuer,

report author and responsible QP are identified in source citations where applicable. This information supports the property and access

descriptions, history, geological setting, exploration, sampling and verification discussions, resource comparisons and other chapters

in which it is cited.

A principal historical

source is the Technical Report on the Combined Kitsault Valley Project, British Columbia, Canada, prepared for Dolly Varden Silver Corporation

by APEX Geoscience Ltd., authored by Andrew J. Turner and Rachelle Hough, signed March 23, 2023, with an effective date of September 28,

2022. That report and its cited predecessor reports provide historical context and the previously reported resource information discussed

in Chapters 5 and 11. The underlying dates and methods of individual prior estimates are identified in the applicable resource discussion.

Historical sources

are used within the scope of the information they document. Previously reported production, exploration results and resource estimates

are distinguished from the current mineral resource statement. The QP’s assessment of historical data incorporated into the current

estimate is described in Chapters 9 and 11. South Reef is carried forward on the basis expressly described in Chapter 11. Attribution

to a prior author or QP identifies the source of the work and does not assign that person responsibility for this TRS. Possession of

a historical report in Company files does not, by itself, bring its technical conclusions within the registrant-reliance provision.

25.4 Company

Technical Data and QP Review

The Company supplied

the drilling and assay database and supporting geological records used for the mineral resource estimate. The QP reviewed and verified

the accepted data and considers them suitable for the geological interpretation and estimation purposes described in Chapters 9 and 11.

The nature and extent of verification, together with source-specific limitations, are described in those chapters. Company custody and

provision of the database do not replace the QP’s responsibility for its suitability and use in the estimate.

Sims Resources

assisted with geological modeling and implementation of the Leapfrog resource models under the QP’s supervision. The QP reviewed

and accepted the model inputs, estimation parameters, validation and classification and takes responsibility for the estimates presented

in Chapter 11. This modeling assistance is separate from the registrant reliance in Table 25-1.

25.5 Metallurgical

Information Market Studies and Specialist Review

The Company supplied

the metallurgical reports and supporting information used by the QP to compile and review Chapter 10. Jeff Austin of International Metallurgical

and Environmental has been asked to review the metallurgical chapter and provide specialist input on its technical content and recommendations

for further work. His requested role is that of a consulting metallurgical specialist and technical reviewer.

The QP retains

responsibility for the metallurgical interpretations adopted in Chapter 10, their application to the resource assumptions in Chapter

11, and the related recommendations in Chapter 24. Specialist assistance does not transfer those technical responsibilities through the

registrant-reliance provision. Original testwork reports remain identified by their laboratory or author, irrespective of their provision

through Company files.

Contango Silver and Gold – Kitsault Valley Project Page 252 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

The Company retained

Jim Cowley as a consulting specialist to provide advice on market studies for this report. The QP reviewed and adopted his input in Chapter

16 and retains responsibility for the market-study information, interpretations and conclusions adopted in that chapter, together with

any related assumptions and recommendations adopted in Chapter 24. Mr. Cowley’s consulting contribution does not transfer

the QP’s responsibility for the technical work and conclusions adopted in the TRS.

25.6 Extent

of Reliance

The reliance described

in this chapter is confined to the identified Company information and its use in the report. The QP remains responsible for the technical

interpretations, estimation decisions and resource conclusions adopted in the TRS, subject to the specific reliance permitted by 17 CFR

229.1302(f). The Project’s mineral resource effective date is September 11, 2026. Source-specific conditions, limitations

and uncertainties are addressed in the relevant chapters; reliance on Company permitting or environmental information does not establish

that future mine-development approvals have been obtained.

Contango Silver and Gold – Kitsault Valley Project Page 253 of 253

Technical Report Summary and updated Mineral Resource Estimate 2026

EX-99.1 — EXHIBIT 99.1

EX-99.1

Filename: tm2625571d1_ex99-1.htm · Sequence: 4

Exhibit 99.1

NEWS

RELEASE

CONTANGO SILVER &

GOLD

Contango

Announces Updated Mineral Resource Estimate for Kitsault Valley Project; Indicated Resources Increase 93% to 89.5 Million Silver Equivalent

Ounces

FAIRBANKS, AK

- (September 22, 2026) - Contango Silver and Gold Inc. (“Contango” or the “Company”) (NYSE American

/ TSX: CTGO) is pleased to announce an updated mineral resource estimate (“MRE”) for its 100% owned Kitsault Valley Project

located in Northwest British Columbia’s Golden Triangle. The updated MRE, prepared under Subpart 1300 of U.S. Securities and Exchange

Commission Regulation S-K, has an effective date of September 11, 2026, and reflects a substantially revised geological interpretation

supported by ~434,000 meters of drilling completed through the end of the 2025 program.

Highlights

· 93%

Increase in Indicated AgEq Resources: Indicated Mineral Resources expand to 89.55

million (“M”) oz silver equivalent (“AgEq”) - 7.66 million tonnes

“(Mt”) at 363 grams per tonne (“g/t”) AgEq and Inferred Mineral Resources

of 64.92 Moz AgEq - 6.31 Mt at 320 g/t AgEq.

· Remodeled

Geological Framework: Integrates the addition of 370 new drill holes totaling

175,264 meters drilled since the previous MRE update across seven deposits into advanced

3D geological models developed in Leapfrog, providing a consistent and repeatable framework

for future resource updates.

· Substantial

Resource Base: Supported by a total project database of 1,873 drill holes totaling

over 433,934 meters across eight resource-reporting deposits.

· Expanded

High-Grade Primary Silver Inventory: Indicated silver ounces grew by 93.1% to 58.7

Moz Ag alongside 394.70 koz Au, 9.38 Mlb Cu, 78.16 Mlb Pb, and 88.85 Mlb Zn; and

· Project

Roadmap: The Company plans to update the MRE again in H1 2027 which will incorporate

the 2026 drill program, which should wrap up by October. The Company then plans to complete

an S-K 1300 Initial Assessment targeted for later in 2027.

Rick Van Nieuwenhuyse,

the Company’s Chief Executive Officer, said, “This updated mineral resource estimate confirms what our drilling has been

telling us all year – Kitsault Valley continues to grow, both in scale and in confidence. Our Indicated resource has increased

93% to just shy of 90 million ounces silver-equivalent, driven not just by more drilling but by a fundamentally improved geological understanding

of both the Dolly Varden and Homestake systems. That's a materially stronger foundation as we head toward an Initial Assessment. It's

also worth noting that none of our 2026 drilling – now well over 50,000 meters – is reflected in these numbers, meaning this

update represents where the project stood before this year's 50,000-meter drill program even began. We look forward to incorporating

this new data into our 2027 resource update and then working on an initial mining plan for the district with completion of an Initial

Assessment later in 2027. We are committed to continuing to deliver shareholder value by building the Kitsault Valley project into one

of the premier primary silver mines in the Golden Triangle.”

Figure 1.

Location of the eight Kitsault Valley resource deposits (Homestake and Dolly Varden areas). Coordinates NAD83 / UTM Zone 9N.

Updated Mineral Resource Estimate

Table 1 and Table

2 summarize the updated mineral resources by area, classification and grade. These figures represent total in-situ mineralization within

defined geological domains, adjusted for historical underground workings but prior to applying mining dilution or metallurgical recovery

factors. Contained metal figures reflect raw estimated inventory rather than final recoverable or payable metal. The seven updated deposits

are reported at a cut-off grade of 132 g/t AgEq, while South Reef retains its historical baseline cut-off of 2.0 g/t AuEq. Totals may

differ slightly due to rounding.

Table 1. Mineral resource summary

by area and classification (effective September 11, 2026).

Area

Category

Tonnage

(Mt)

Ag

(Moz)

Au

(koz)

Cu

(Mlb)

Pb

(Mlb)

Zn

(Mlb)

AgEq

(Moz)

Homestake

Indicated

2.14

6.13

387.42

6.32

5.96

7.02

33.28

Dolly

Varden

Indicated

5.52

52.57

7.29

3.06

72.20

81.83

56.27

Project

Total

Indicated

7.66

58.70

394.70

9.38

78.16

88.85

89.55

Homestake

Inferred

4.60

7.97

615.82

4.24

16.86

14.69¹

48.50

Dolly

Varden

Inferred

1.71

14.84

4.99

1.80

23.38

33.92

16.42

Project

Total

Inferred

6.31

22.80

620.82

6.04

40.24

48.61¹

64.92

Table 2. Mineral resource summary

by grade (effective September 11, 2026).

Category

Area

Tonnes

(Mt)

Ag

(g/t)

Au

(g/t)

Cu

(%)

Zn

(%)

Pb

(%)

AgEq

(g/t)

AgEq

(Moz)

Indicated

Homestake

2.14

89.14

5.63

0.13

0.15

0.13

483.7

33.28

Dolly

Varden

5.52

296.1

0.04

0.03

0.67

0.59

317.06

56.27

Total

7.66

238.34

1.60

0.06

0.53

0.46

363.0

89.55

Inferred

Homestake

4.60

53.91

4.17

0.04

0.15

0.17

328.30

48.50

Dolly

Varden

1.71

269.91

0.10

0.05

0.90

0.62

289.65

16.42

Total

6.31

112.50

3.06

0.04

0.35

0.29

320.26

64.92

Comparison with the Prior Estimate

Relative to the

preceding 2023 combined statement, Indicated tonnage and contained silver-equivalent ounces increased substantially, while Inferred

tonnage and contained AgEq declined on a net basis (Table 3). Indicated resources increased as additional drilling, particularly at Wolf

and Homestake, improved geological confidence and supported revised geological domains and classification. The net decrease in Inferred

resources reflects the combined effects of resource conversion of Inferred to Indicated category as well as a revised geological interpretation,

estimation parameters and historical depletion. The net decrease does not reflect a one-for-one conversion of Inferred resources to Indicated.

These net comparisons reflect overall changes across their respective reporting bases rather than block-by-block category conversion.

The updates combine the effects of new drilling, revised geological domains, updated grade capping and interpolation, revised density

assignments, updated classification criteria, and historical depletion.

Table 3. Comparison of key resource

metrics, 2023 vs. 2026 estimates.

Metric

2023

Estimate

2026

Estimate

Change

Indicated

tonnage (Mt)

4.15

7.66

+84.4%

Indicated

AgEq (Moz)

46.37

89.55

+93.1%

Inferred

tonnage (Mt)

6.83

6.31

-7.7%

Inferred

AgEq (Moz)

86.73

64.92

-25.1%

Geology and Mineralization

The Kitsault Valley

Project is located within the Stikine Terrane and Stewart Complex of the Canadian Cordillera, hosted principally within Jurassic Hazelton

Group volcanic, volcaniclastic, sedimentary, and subvolcanic rocks. Mineralization reflects both stratigraphic and structural controls,

displaying distinct styles across the property:

· Dolly

Varden Area: Predominantly silver-rich with variable lead, zinc, gold, and copper. Mineralization

includes strataform silica–barite–sulfide deposits at Torbrit and North Star,

alongside structurally controlled epithermal-style vein and breccia systems at Wolf and Kitsol.

· Homestake

Area: Homestake Main hosts gold–silver–copper mineralization within silicified

lenses and hydrothermal breccias, whereas Homestake Silver comprises silver–gold-bearing

breccia and vein zones with associated lead and zinc.

Database and Technical Framework

The updated estimate

is supported by a comprehensive project drill-hole database totaling 1,873 holes and 433,934 meters, with 1,454 holes and 328,638 meters

directly assigned to the eight resource-reporting deposits. Since the effective dates of the prior resource statements, 370 holes (175,264

meters) across the seven updated deposits have been added to the overall resource database.

For the seven re-modeled

deposits, updated geological solids encompass 34 distinct domains containing 23,264 assay intervals (27,176 meters) from 947 drill holes

with populated metal assays. The underlying assay dataset was locked in early January 2026, with 3D geological modeling and database

validation continuing through March 2026. All data was formally audited, verified, and certified by the Qualified Person on April 13,

2026. Drilling completed during the 2026 field season is excluded from this statement and will be incorporated into a future MRE update

planned for H1 2027.

Dave Larimer, CPG,

the Company’s Vice President, Exploration, added, “This resource update reflects a total modernization of our geological

framework across Kitsault Valley, rather than simply dropping new drill holes into old wireframes. A major driver of our timeline was

migrating historical datasets out of legacy software and into Leapfrog Geo to re-interpret all 34 mineralized domains directly from core

logging, and structural data. While re-domaining deposit by deposit required more time upfront, it established a single, internally consistent,

integrated and highly robust model across the entire project. We now have a geological foundation we can rely on with absolute confidence—one

designed for rapid, seamless updates as new drilling comes in, providing for a much faster path toward our next resource iteration.”

Figure 2.

Drilling coverage supporting the mineral resource estimate. A: Homestake area. B: Dolly Varden area. Red traces identify drilling incorporated

into the estimate.

Estimation Basis and Methodology

The seven updated

deposits were modeled in Leapfrog Geo (version 2026.1.2 with the Edge extension) using hard geological boundaries with domain- and element-specific

compositing and grade capping. Grade interpolation was executed using inverse-distance-cubed (ID3) weighting with Leapfrog

declustering applied by domain and element. The block model utilizes 5 m × 5 m × 5 m parent blocks with minimum sub-blocks

of 0.5 m × 0.5 m × 0.5 m in NAD83 / UTM Zone 9N coordinates. Resource classification reflects the Qualified Person’s

assessment of geological and grade continuity, data reliability, and drill-hole support, applying nominal Indicated and Inferred spacing

limits tailored to each deposit. South Reef retains its historical estimation basis and is reported separately.

Price Inputs and Technical Assumptions

Silver-equivalent

calculations incorporate variable metallurgical recovery assumptions across deposit groups and use commodity prices of US$53/oz Ag, US$3,500/oz

Au, US$5.00/lb Cu, US$1.25/lb Zn and US$0.90/lb Pb. Metallurgical recovery factors are integrated directly into the silver-equivalent

formulas, with AgEq coefficients reflecting relative metal value rather than net payable revenue after commercial deductions.

The conceptual

mining framework considers mechanized underground extraction, including longhole stoping where deposit geometry and ground conditions

permit. Reporting constraints and the assessment of reasonable prospects for economic extraction account for site access, processing,

marketability, infrastructure, environmental considerations, and permitting requirements. This resource-stage estimate does not establish

project-level capital expenditures, definitive operating costs, a mine production schedule, net present value (“NPV”), or

internal rate of return (“IRR”). Mineral resources are not mineral reserves and do not demonstrate economic viability. There

are no mineral reserves for the Kitsault Valley Project.

Next Steps

The Company’s Qualified Person

has recommended a structured, two-stage work program to advance Kitsault Valley:

· Stage

1 (2027 Target): Complete the 2026 drilling program, validate pending assay results,

and perform the planned 2026–2027 metallurgical test work program. These inputs will

support a project-wide resource update in 2027 and advance the project toward an S-K 1300

Initial Assessment—incorporating preliminary capital and operating costs, cash-flow

modeling, and economic sensitivities—targeted for later in 2027.

· Stage

2 (Multi-Year Advancement): Progress the project toward a Pre-Feasibility Study (“PFS”)

over the following three years. Work will include staged geotechnical and hydrogeological

drilling, expanded environmental baseline studies, ongoing permitting, and site infrastructure

evaluation.

Cautionary Note Regarding Mineral

Resources

Mineral Resources

are not Mineral Reserves and do not have demonstrated economic viability. No Measured Mineral Resources or Mineral Reserves are reported

for the Kitsault Valley Project. The estimate is intended to support continued evaluation of potential underground extraction and does

not establish a mine development decision. Indicated Mineral Resources have a lower level of confidence than Measured Mineral Resources,

and Inferred Mineral Resources have a lower level of confidence than Indicated Mineral Resources; Inferred Mineral Resources cannot be

assumed to be converted to Indicated or Measured Mineral Resources or to Mineral Reserves, and actual upgrading depends on future drilling,

sampling, metallurgical, engineering, environmental, permitting and economic results and is not assured.

The mineral resource

estimate is subject to material uncertainties including local geological and grade continuity, high-grade sample influence, historical

data and mined-out geometry, density variability, metallurgical response and product quality, mining dimensions and ground conditions,

access and infrastructure requirements, water and waste management, permitting, and commodity-price and operating-cost assumptions. This

news release uses the term “silver-equivalent” (AgEq); silver-equivalent figures are calculated using the metal price and

recovery assumptions described in the Company's technical report and do not represent recovered or payable metal or net smelter revenue

after commercial deductions.

Data Verification and Qualified Person

Conclusions

The estimate uses

the accepted historical and modern drilling and assay database, incorporating all drilling through the completed 2025 program. The QP

finalized, checked and certified the databases and supporting information on April 13, 2026, and accepted the final resource statement,

classifications and supporting assumptions as complete and current on September 11, 2026. Historic drilling (pre-2011) was not used

for resource estimation but was used to support geological modelling. Drilling completed in 2026 falls outside the accepted estimation

dataset and is expected to be incorporated in the next MRE update.

Quality Assurance and Quality Control

Contango's drilling,

sampling and database verification programs are conducted under the supervision of the Company's Qualified Person and in accordance with

procedures intended to support disclosure under SEC Regulation S-K 1300. The QP's verification included review of drilling, logging,

sampling, survey and analytical procedures; selected comparisons of original drill logs and assay certificates against digital records;

review of analytical quality control; and checks for overlapping intervals, records extending beyond hole depth, missing fields, inconsistent

codes and unit-conversion errors.

The QP personally

inspected the Project on September 14, 2025, and July 21–24, 2026, including review of core handling, logging, sampling

and geological observations. Some historical assay certificates remain unavailable; those records were assessed using prior verification,

internal consistency and comparison with surrounding drilling. The QP considers the accepted data adequate for the geological interpretation

and mineral resource estimation purposes described in the technical report summary.

Conference Call and Webcast

Contango will host

a conference call and webcast to discuss the Kitsault Valley Project MRE update with the Company’s CEO - Rick Van Nieuwenhuyse,

President - Shawn Khunkhun, and Vice President, Exploration - Dave Larimer on Wednesday, September 23, 2026, at 1:00pm EST / 10:00am

PST. Participants may join the webcast using the following call-in details: https://6ix.com/event/kitsault-mre-update

Qualified Person

The scientific

and technical information contained in this news release has been reviewed and approved by Dave Larimer, CPG, Vice President, Exploration

of Contango. Mr. Larimer is a “qualified person” as defined in Subpart 1300 of Regulation S-K and National Instrument

43-101. Mr. Larimer is an employee of, and is not independent of, the Company. Mr. Larimer holds American Institute of Professional

Geologists certification CPG-11862 and State of Alaska Certified Professional Geologist certification 115316, both in good standing.

ABOUT CONTANGO

Contango is an

NYSE American and the Toronto Stock Exchange (“TSX”) listed company, with gold and associated mineral production in Alaska

and gold, silver and associated mineral exploration and development projects in Alaska and the Golden Triangle in British Columbia. Contango

holds a 30% interest in the Peak Gold JV, which leases approximately 675,000 acres of land in Alaska, including the production of Manh

Choh mine, with the remaining 70% owned by KG Mining (Alaska), Inc., an indirect subsidiary of Kinross Gold Corporation, operator

of the Peak Gold JV. KG Mining (Alaska), Inc. serves as the manager of the Peak Gold JV.

The Company and

its subsidiaries also have (i) a lease on the Johnson Tract project, which consists of mineral rights to approximately 21,000 acres

located near tidewater, 125 miles southwest of Anchorage, Alaska, from the underlying owner, CIRI, (ii) a lease on the Lucky Shot

project, which consists of mineral rights to approximately 8,600 acres of State of Alaska and patented mining claims located in the Willow

Mining District about 75 miles north of Anchorage, Alaska, from the underlying owner, Alaska Hardrock Inc., (iii) mineral rights

to approximately 145,000 acres of State of Alaska mining claims, (iv) mineral rights to approximately 11,700 acres of State of Alaska

mining claims and upland mining leases, and (v) mineral tenures of approximately 247,000 acres (100,000 ha) located in and around

the Kitsault Valley in the Golden Triangle of northwest British Columbia. These interests confer exploration and development rights,

subject to applicable agreements, laws, permits and approvals.

Additional information

can be found on the Company’s website at www.contangoore.com

FORWARD-LOOKING STATEMENTS

This press release

contains forward-looking information and forward-looking statements within the meaning of applicable U.S. and Canadian securities laws

(“Forward-looking Statements”). These include statements regarding Contango's plans and expectations for its properties and

operations, the content within future annual filings, operations in respect of Contango mineral properties and any benefits of investment

in Contango, including the timing and scope of exploration, drilling, development and permitting activities; the timing and anticipated

results of mineral resource estimates, technical studies and related filings; and anticipated production, costs, capital expenditures

and cash flows.

The Forward-looking

Statements regarding Contango are intended to be covered by the safe harbor for “forward-looking statements” provided by

the Private Securities Litigation Reform Act of 1995 and applicable safe harbor provisions under Canadian securities laws, in each case

to the extent available. The Forward-looking Statements are based on Contango's current expectations and includes statements regarding

future results of operations, quality and nature of the asset base, the assumptions upon which estimates are based and other expectations,

beliefs, plans, objectives, assumptions, strategies or statements about future events or performance (often, but not always, using words

such as “expects”, “projects”, “anticipates”, “plans”, “estimates”, “intends”,

“believes”, “forecasts”, “predicts”, “proposes”, “contemplates”, “aims”,

“seeks”, “continues”, “potential”, “positioned”, “strategy”, “outlook”,

“future”, “going forward”, “designed to”, and similar expressions or other words of similar meaning,

and the negatives thereof, or stating that certain actions, events or results “may”, “might”, “will”,

“should”, “would”, or “could” be taken, or that they are “possible”, “probable”,

or “likely” to occur or be achieved). However, the absence of these words does not mean that the statements are not forward-looking.

Material assumptions

underlying the Forward-looking Statements include the reliability of current mineral resource and mineral reserve estimates; the timely

receipt and maintenance of required permits and approvals; the availability of financing, personnel, contractors and equipment as needed;

continued access to transportation and third-party processing facilities; and the performance of joint venture partners and contractors

in accordance with their obligations. Management considers these assumptions reasonable as of the date of this press release, but they

may prove to be incorrect.

Forward-looking

Statements are based on current expectations, estimates and projections that involve a number of risks and uncertainties, which could

cause actual results to differ materially from those expressed or implied by the statements. These risks include, but are not limited

to: the risks of the exploration and the mining industry (for example, operational risks in exploring for and developing mineral reserves

and mining, transporting and processing ore); risks and uncertainties involving geology; the speculative nature of the mining industry;

the uncertainty of estimates and projections relating to future production, costs and expenses; the volatility of natural resources prices,

including prices of gold and associated minerals; the existence and extent of commercially exploitable minerals in properties acquired

by Contango or the Peak Gold JV; ability to realize the anticipated benefits of the Peak Gold JV; Contango’s limited control over

the Peak Gold JV and its reliance on Kinross and its subsidiaries, including the availability and performance of the Fort Knox processing

facilities; potential delays or changes in plans with respect to exploration or development projects or capital expenditures; the interpretation

of exploration results and the estimation of mineral resources and mineral reserves; the loss of key employees or consultants; health,

safety and environmental risks; risks related to weather and other natural disasters; uncertainties as to the availability and cost of

financing; Contango’s ability to service its indebtedness and comply with financing covenants; Contango's inability to retain or

maintain its relative ownership interest in the Peak Gold JV; inability to realize expected value from acquisitions and integration risks

associated with the acquisition of Dolly Varden Silver Corporation; inability of Contango’s management team to execute its plans

to meet its goals; the extent of disruptions caused by public health emergencies; and the possibility that government policies may change,

political developments may occur or governmental approvals may be delayed or withheld, including as a result of political or regulatory

changes in the United States or Canada or the inability to obtain or maintain mining permits.

Additional information

on these and other factors which could affect Contango’s operations or financial results is included under “Risk Factors”

and elsewhere in Contango’s most recent Annual Report on Form 10-K, subsequent Quarterly Reports on Form 10-Q and other

filings with the U.S. Securities and Exchange Commission and applicable Canadian securities regulatory authorities, available on EDGAR

and SEDAR+, respectively. Investors are cautioned not to place undue reliance on Forward-looking Statements, which are not guarantees

of future performance and actual results or developments may differ materially from the projections in the Forward-looking Statements.

Forward-looking Statements are based on the estimates and opinions of management at the time the statements are made and speak only as

of the date of this press release, unless otherwise indicated. Contango does not assume any obligation to publicly update or revise Forward-looking

Statements whether as a result of new information, future events or otherwise, except as required by applicable law.

CONTACTS:

Contango Silver & Gold Inc.

Rick Van Nieuwenhuyse

(907) 388-7770

www.contangoore.com

EX-99.2 — EXHIBIT 99.2

EX-99.2

Filename: tm2625571d1_ex99-2.htm · Sequence: 5

Exhibit 99.2

SEPTEMBER 2026 WWW.CONTANGOORE.COM NYSE AMERICAN / TSX: CTGO AN EMERGING NORTH AMERICAN HIGH - GRADE MID - TIER SILVER & GOLD PRODUCER AND DEVELOPER

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 1 DISCLAIMER FORWARD - LOOKING STATEMENTS AND INFORMATION This presentation contains “forward - looking statements” and “forward - looking information” within the meaning of applicable United States and Canadian securities laws (collectively, “FLI”) . Contango Silver & Gold Inc . (the “Company” or “Contango”) intends that FLI be covered by applicable safe harbor provisions, including those of the Private Securities Litigation Reform Act of 1995 , to the extent available . Readers should consider the cautionary statements below and any additional FLI disclosure accompanying the relevant statements in this presentation . FLI includes statements regarding expected production, grades, recoveries, mine life, costs, capital expenditures, cash flows, financing and distributions from Peak Gold, LLC (“Peak Gold”) ; exploration potential and anticipated exploration results ; estimates of mineral resources and mineral reserves and the potential to expand or upgrade them ; the results, assumptions and projected economics of technical studies ; the timing and results of future studies ; permitting, construction and development plans ; and the integration of Dolly Varden Silver Corporation (“Dolly Varden”) and the anticipated benefits of that acquisition . FLI may be identified by words such as “expects”, “anticipates”, “plans”, “estimates”, “intends”, “believes”, “projects”, “may”, “will”, “could” and similar expressions, although the absence of these words does not mean that a statement is not FLI . FLI is based on management’s expectations, estimates and assumptions at the time the statements are made, including assumptions regarding metal prices and exchange rates ; mineral resources, mineral reserves, grades and recoveries ; production rates and schedules ; operating and capital costs ; availability of financing, personnel, equipment and infrastructure ; continued access to ore transportation and processing capacity ; timely receipt and maintenance of permits and approvals ; performance by joint venture partners and contractors ; and the successful integration of acquired businesses . The material assumptions underlying particular forecasts and study results are described with the relevant disclosure in this presentation . FLI involves risks and uncertainties that could cause actual results to differ materially from those expressed or implied, including variability in production, grades and recoveries ; uncertainty in mineral resource and mineral reserve estimates and technical study results ; exploration, development, construction and operating risks ; dependence on Kinross Gold Corporation (“Kinross”) and its affiliates as manager and operator of Peak Gold and Contango’s limited control over joint venture decisions ; changes in metal prices, exchange rates, costs and capital requirements ; availability of financing and compliance with debt obligations ; joint venture capital calls and the timing and amount of distributions ; title, permitting, environmental, health and safety risks ; indigenous rights and community relations ; changes in laws, taxes and government policies ; severe weather and other natural events ; loss of key personnel ; and the inability to realize expected value from acquisitions, including integration risks associated with the acquisition of Dolly Varden Silver Corporation . Additional risks are described in the Company’s most recent annual report on Form 10 - K, subsequent quarterly reports on Form 10 - Q and other filings with the SEC and Canadian securities regulators, available on EDGAR and SEDAR+, respectively . FLI is not a guarantee of future performance . Readers should not place undue reliance on it . Unless otherwise indicated, FLI speaks as of the date of this presentation . Except as required by applicable law, Contango undertakes no obligation to update or revise FLI to reflect subsequent events, circumstances or changes in expectations . MINERAL DISCLOSURE AND TECHNICAL REPORTS In the United States, mining disclosure is governed by Item 1300 of SEC Regulation S - K (“S - K 1300 ”) and under S - K 1300 , the U . S . Securities and Exchange Commission (“SEC”) recognizes estimates of measured, indicated and inferred mineral resources and proven and probable mineral reserves . An SEC registrant with material mining operations must disclose specified information in its SEC filings concerning mineral resources and mineral reserves . Disclosure of mineral resources or mineral reserves on a material property must be supported by a technical report summary prepared by a qualified person or persons, and that summary must be filed when required by S - K 1300 . References below to an “S - K 1300 Report” mean a technical report summary prepared under S - K 1300 . For a description of the key assumptions, parameters and methods used to estimate mineral reserves and mineral resources included in this presentation that relate to Contango’s mineral projects, as well as data verification procedures and a general discussion of the extent to which the estimates may be affected by any known environmental, permitting, legal, title, taxation, sociopolitical, marketing or other relevant factors, please review the technical report summaries for each of Contango’s material properties which are available at www . sec . gov . The following reports are available on Contango’s EDGAR profile at www . sec . gov : ( i ) the S - K 1300 technical report summary for the Manh Choh Project, dated May 12 , 2023 , with an effective date of December 31 , 2022 , filed as Exhibit 96 . 1 to Contango’s Form 8 - K filed June 2 , 2023 ; (ii) the S - K 1300 technical report summary for the Lucky Shot Project, dated and effective May 26 , 2023 , filed as Exhibit 96 . 1 to Contango’s Form 8 - K filed June 16 , 2023 ; and (iii) the S - K 1300 technical report summary and initial assessment for the Johnson Tract Polymetallic Project, effective May 12 , 2025 , as amended January 12 , 2026 , filed as Exhibit 96 . 1 to Contango’s Form 8 - K/A filed January 13 , 2026 . These reports were prepared for Contango by the qualified persons identified in the respective reports . Estimates are stated as of their specified effective dates an may be affected by subsequent exploration, mining depletion and changes in technical and economic assumptions . Preparation or filing of a technical report does not constitute regulatory approval or endorsement of the report or the estimates it contains . The Feasibility Study (“FS”) referenced herein that relates to Peak Gold was prepared by Kinross in accordance with Canadian National Instrument 43 - 101 – Standards of Disclosure for Mineral Projects (“NI 43 - 101 ”) . KG Mining (Alaska), Inc . , an indirect subsidiary of Kinross, holds 70 % of the outstanding membership interests in Peak Gold and serves as its manager . Contango indirectly owns the remaining 30 % membership interest in Peak Gold and relies on Kinross and its affiliates for the FS and related information . Contango remains responsible for its own disclosure . Contango is subject to applicable United States and Canadian securities laws . Investors are cautioned that, although the mineral resource and mineral reserve definitions under S - K 1300 and NI 43 - 101 are substantially similar, the standards and disclosure requirements are not identical . Accordingly, estimates prepared under NI 43 - 101 may differ from estimates prepared under S - K 1300 . The applicable reporting standard and effective date should be considered when reviewing each estimate identified in this presentation . Further, investors are cautioned that while the SEC recognizes “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under S - K 1300 , investors should not assume that any part or all of the mineralization in these categories will ever be converted into a higher category of mineral resources or into mineral reserves . Mineralization that has been characterized as resources has a greater degree of uncertainty as to its existence and feasibility than mineralization that has been characterized as reserves . Accordingly, investors are cautioned not to assume that any measured mineral resources, indicated mineral resources or inferred mineral resources that Contango reports are or will be economically or legally mineable . Mineral resource estimates are subject to technical and economic assumptions ; conversion of measured or indicated mineral resources to mineral reserves requires appropriate studies and consideration of mining losses, dilution and other modifying factors . Inferred mineral resources have a lower level of geological confidence than measured or indicated mineral resources and cannot be converted directly into mineral reserves . There is no certainty that further exploration will upgrade inferred mineral resources to measured or indicated mineral resources, or that measured or indicated mineral resources will be converted to mineral reserves . The securities of Contango have not been approved or disapproved by the United States Securities and Exchange Commission, any Canadian securities regulatory authority or any other securities commission or regulatory authority in the United States or any other jurisdiction, nor have any of the foregoing authorities passed upon or endorsed the merits of this presentation or confirmed the accuracy or adequacy of the information contained in this presentation . Any representation to the contrary is a criminal offense . This presentation does not constitute an offer to sell or the solicitation of an offer to buy the securities of Contango . This presentation does not contain all of the information that would normally appear in a prospectus under applicable United States or Canadian securities laws . Prospective investors should carefully read Contango’s disclosure documents filed with the SEC on EDGAR and with Canadian securities regulators on SEDAR+, , especially the risk factors contained in such filings, before making an investment decision with respect to investing in the securities of Contango . Unless otherwise indicated, all dollar amounts in this presentation are expressed in United States dollars . Hyperlinks included in this presentation are provided for convenience only . Information contained in, or otherwise accessible through, those hyperlinks does not form part of, and is not incorporated by reference into, this presentation . NON - GAAP RECONCILIATION DISCLAIMER This presentation contains forward looking estimates of all - in sustaining cost (“AISC”), resources, free cash flow and EBITDA, which are financial measures not determined in accordance with United States generally accepted accounting principles (“GAAP”) . We cannot provide a reconciliation of estimated AISC, resources and EBITDA to estimated costs of goods sold, assets and net income, which are the GAAP financial measures most directly comparable to such non - GAAP measures, without unreasonable efforts due to the inherent difficulty and impracticality of quantifying certain amounts that would be required to calculate projected AISC, resources and EBITDA . In addition, the estimates of AISC, resources and EBITDA have been prepared by Kinross and are based on IFRS accounting standards and detailed information that the Company does not have access to at this time . These amounts that would require unreasonable effort to quantify could be significant, such that the amount of projected GAAP cost of goods sold, assets and net income would vary substantially from the amount of projected AISC, resources and EBITDA .

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 2 WWW.CONTANGOORE.COM

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 3 33.5 M SHARES O/S NYSE / TSX CTGO DUAL LISTED Fairbanks AK HEADQUARTERS NORTH AMERICAN SILVER & GOLD PRODUCER ~2 Moz Au Gold ~83 Moz Ag Silver TOTAL RESOURCES $89M CASH ON HAND $100M+ 2025 FREE CASH FLOW

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 4 STRONG CAPITAL MARKETS PROFILE 1. Approximate amounts reported as of August 12, 2026 2. Cash reported as of June 30, 2026 3. CTGO convertible debt (convertible into 655,738 shares at $30.50) 4. Reported as of June 30, 2026 which includes settlement of remaining hedges 5. Capital IQ, SEDI and Bloomberg publicly disclosed data Ownership 2,3 Shareholder Summary 5 Analyst Coverage Current ETF Inclusion GDXJ x Dual Listing Russell 2000 x CAPITAL STRUCTURE TRADING - NYSE AMERICAN (US Dollars): CTGO 1 90 - Day Avg. Daily Volume ~530,000 shares per day 52 - week range $14.50 - $34.38 Market Cap $657 M CAPITAL STRUCTURE 2 Issued & Outstanding 33.5 M Warrants 0.4 M Options 0.5 M Fully Diluted 34.4 M FINANCIAL POSITION (US Dollars) Cash 2 $89 M Convertible Debenture 3 $20.0 M Debt (ING & Macquarie) 4 $43.6 M Hedge Contracts 4 nil Alyeska Investment ~45% ~45% ~10% Institutional / HNW Retail Management / Insiders 4

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM HIGHLY LEVERAGED TO SILVER & GOLD Source : Company Materials, brokers’ estimates as of April 2026 ; Calculated at spot Au & Ag prices, excludes base metal credits Grade vs Valuation: Precious Metals Producer Peers Consensus P/NAV by AgEq Resource Grade (g/t) Consensus P/NAV AgEq Resource Grade (g/t) CTGO's grade is ~2.4x the peer average, yet it trades at 0.45x the peer average valuation Wesdome Orla G Mining Endeavour Silver Avino Silvercorp Fortuna Aya Americas Gold & Silver Discovery Andean Precious Metals GoGold Orezone Minera Alamos McEwen CTGO 5

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 6 CONTANGO’S FIVE YEAR DEVELOPMENT PIPELINE TARGET 200k oz Au + 5M oz Ag 2 Yrs 100,000 GEO 2 – 3 Yrs 1. See news release dated March 16, 2026 “ Contango Announces 2025 Year End Financials and Provides 2026 and 2027 Production Guidance” 2. See new released dated May 5, 2025 “ Contango Announces S - K 1300 Technical Report Summary with Robust Economics and One Year Payback for its Johnson Tract Project ” Fully Funded to Execute Fastest Gold Producing Growth Profile in the Industry ~60,000 GEO 1 KITSAULT VALLEY NEW MRE – September 2026: Ind: 89.5 Moz AgEq (7.66 Mt at 364 g/t AgEq ) Inf: 64.92 Moz AgEq (6.31 Mt at 322 g/t AgEq ) x ~50,000 m 2026 drill program x 247,000 acres (100,000 ha) of prospective land x MRE update scheduled for H1 2027 x IA scheduled for later in 2027 MANH CHOH LUCKY SHOT JOHNSON TRACT x Fully permitted and producing gold x Permits received in less than 2 years x Built on time and on budget x First gold pour on July 8, 2024 x 2025 ~60,000 oz annual production 1 x LOM ~60,000 oz annual production x LOM $1,700 AISC x Fully permitted for mining x 110,000 oz at 14.5 g/t Au x 2 years to develop 400,000 - 500,000 oz Au resource x Target 40,000 - 50,000 oz Au production x Identify potential processing facilities x Established 1.1M oz resource at 9.4 g/t GEO x Federal permitting under FAST 41 x Initial Assessment released May 2025 2 x Post Tax NPV 5 = $615.4M and +60% IRR at $4,000 gold x Building road to portal site in 2026 x Target for FS with mine construction decision by 2028/2029 GEO = Gold Equivalent Ounces 200,000 oz Au 5.0 Moz Ag

WWW.CONTANGOORE.COM NYSE - A/TSX: CTGO COMPANY PORTFOLIO OVERVIEW

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 8 PRECIOUS METALS FOCUSED PORTFOLIO EXECUTING ON OUR DIRECT SHIP ORE MODEL (DSO) FORT KNOX MILL (Kinross) 1. Reserve and Resource Table can be found in the Appendix 2. See news release dated March 16, 2026 “ Contango Announces 2025 Year End Financials and Provides 2026 and 2027 Production Guidance” 3. LOM = Life of Mine, MRE = Mineral Resource Estimate; MANH CHOH MINE (30%) 1 1M oz at 8 g/t Au reserve (on 100% basis) Private land owned by Tetlin Native Tribe ~25 km from Alaska Highway 1 year for Federal Permitting Production started Q3 2024 Avg LOM ~60,000 oz Au 2,3 ~ $550M LOM 3 free cash flow (at $4,000/oz) JOHNSON TRACT PROJECT (100%) 1 KITSAULT VALLEY PROJECT (100%) 1 LUCKY SHOT MINE (100%) 1 DSO Routes

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 9 DSO CRITERIA High - grade resources Gold, Silver, Copper focus Near Infrastructure Road Rail Water Simple permitting from a mining perspective Private and State lands Minimal water and wetlands impact Simple mining/processing 2020/2021 2022 2023 2024 JV with Kinross, Community Outreach, PFS/FS, permit applications submitted Construction decision & road construction, mill modifications, campus renovation; 404 Wetlands Permit received Operating permits received; construction completed with groundbreaking ceremony in August; ore transport started in November Ore stockpiled at Manh Choh and Fort Knox; first gold pour in July 2024! FEDERAL PERMITS 1 YR CONSTRUCTION AND RAMP UP 2 YRS Manh Choh deposit before mining MANH CHOH MINE CTGO SUCCESS OF DSO APPROACH

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM Contango Production Guidance (30% basis) Units 2026 Gold Production 40,000 - 45,000 oz 2027 Gold Production 75,000 - 80,000 oz 2026 Cash Costs $1,900 - $2,000 per oz sold 2027 Cash Costs $1,200 - $1,300 per oz sold LOM Cumulative Cash (approximate) 550,000,000$ at $4,000 gold Remaining Hedge Balance nil oz 10 YEAR END 2025 RESULTS & LOM GUIDANCE 60,200 oz of gold produced 57,315 oz of silver produced $102 million cash distribution to Contango AISC = $1,616 per oz sold Manh Choh to Fort Knox 240 mi Kinross is operator (70% owner) On schedule and on budget State and Federal permits received within 18 months Construction and Ramp Up completed in 2 years First gold pour in July 2024 Contract mining & trucking MANH CHOH MINE – DEMONSTRATED DSO SUCCESS IN PRODUCTION – Hedge - Free , as of July 1, 2026

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 11 WHAT IS THE DIRECT SHIPPING ORE (DSO) APPROACH? Drill & Muck at Mine Site Load & Weigh at Mine Site Transport via Rail/Road/Barge Ore mined underground Loaded into covered/sealed containers at the mine site Small environmental footprint Containers loaded and weighed at mine site Ore containers loaded onto trucks Covered/sealed containers prevent “fugitive dust” DSO approach eliminates the need for onsite processing and tailings storage. This drastically reduces the onsite environmental footprint, reduces permitting risk and lowers upfront capital cost. NO TAILINGS FACILITY NO MILL Ore containers are transferred to Rail/Barge Transported to off - site milling facility

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 12 FORT KNOX MILL (Kinross) 1. Reserve and Resource Table can be found in the Appendix MANH CHOH MINE (30%) 1 LUCKY SHOT MINE (100%) 1 Current r esource : 110 , 000 oz Au at 14 . 5 g/t Private land on road/rail system Fully permitted for mining Currently drilling to develop 400 , 000 - 500 , 000 oz Au resource Targeting DSO Feasibility Study in 2027 Target 40 , 000 – 50 , 000 oz Au annual production in 2028 Identified multiple potential processing facilities JOHNSON TRACT PROJECT (100%) 1 KITSAULT VALLEY PROJECT (100%) 1 PRECIOUS METALS FOCUSED PORTFOLIO EXECUTING ON OUR DIRECT SHIP ORE MODEL (DSO) DSO Routes

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 13 FEASIBILITY UNDERWAY Current 18,000m in - fill and expansion drill program for resource definition OBJECTIVES: Define high - grade “ore shoots” Delineate 400,000 to 500,000 oz Au measured and indicated resource Collect data for detailed feasibility - level mine and transportation plan Anticipate $50 - $60 million spend over 2026 - 27 to reach production decision Targeting 40,000 to 50,000 oz Au annual production in 2028 TARGETING INITIAL RESOURCE OF 400,000 to 500,000 oz Au LUCKY SHOT – OUR NEXT DSO PROJECT Coleman and Lucky Shot Resources Tables 1 Please see S - K 1300 Technical Report Summary on the Lucky Shot Project Alaska, USA https : //www . contangoore . com/investors/overview Combined Segments of Lucky Shot Vein Resources Au Ounces Au Grade Tonnes Classification (g/t) - - - Measured 105,620 14.5 226,963 Indicated 105,620 14.5 226,963 TOTAL 25,110 9.5 82,058 Inferred Note 1: Measured, Indicated and Inferred mineral resource classification are assigned according to CIM Definition Standards. Mi neral resources, which are not mineral reserves, do not demonstrate economic viability and there is no guarantee that mineral re sources will be converted to mineral reserves. This mineral resource estimate was prepared by Sims Resources LLC based on data and information available and has an effective date of May 26, 2023. The Measured, Indicated and Inferred mineral resources are reported using the followi ng parameters: undiluted gold grades; long term gold price of $US1,600 per ounce; reported as contained within a 3.0 g/t Gold underground shapes and apply ing a 3.0 meter minimum width at a 4.3 g/t gold cutoff grade (“COG”). 2026 / 2027 PROGRAM

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 14 High Grade KM Vein 5.92m @ 60.24 g/t Au 0.31m @ 99.75 g/t Au 1.5m @ 59 g/t Au Close - in opportunity to define ~50,000 Oz Au in a 100m x 100m area directly below the West Drift extension. VG and Gal KW Vn projection 100m W. Drift Extension (Current Exploration) Lucky Shot Fault ? NEW DISCOVERY – KEITH MILES VEIN (KM)

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 15 FORT KNOX MILL (Kinross) 1. Reserve and Resource Table can be found in the Appendix 2. See new released dated May 5, 2025 “ Contango Announces S - K 1300 Technical Report Summary with Robust Economics and One Year Payback for its Johnson Tract Project ” MANH CHOH MINE (30%) 1 LUCKY SHOT MINE (100%) 1 JOHNSON TRACT PROJECT (100%) 1 Current Resource: 1.1 Moz @ 9.4 g/t Au Eq Critical Metals Project: Gold - Silver - Copper - Zinc - Lead Private land owned by Cook Inlet Regional Inc. (CIRI) Federal permitting currently in FAST 41; targeting mid - 2028 construction decision 100,000 oz Au Eq annual production annual production in 2030 Initial Assessment released May 2025 2 Post Tax NPV 5 = $615.4M and +60% IRR at $4,000 gold 1 year payback KITSAULT VALLEY PROJECT (100%) 1 PRECIOUS METALS FOCUSED PORTFOLIO EXECUTING ON OUR DIRECT SHIP ORE MODEL (DSO) DSO Routes

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 16 EXPLORATION / PERMITTING 2026 WORK PROGRAM COMPLETED JOHNSON TRACT – FAST 41 PERMITTING JOHNSON TRACT INITIAL ASSESSMENT 1 Post - Tax NPV 5 of USD $ 615 . 4 million with a post - tax IRR of + 60 % at $ 4 , 000 LOM annual average production of 102 , 258 oz Au Eq at 7 . 58 g/t Au Eq Initial Capital costs of $ 213 . 6 million, including $ 36 million in contingency Sustaining Capital costs of USD $ 61 . 3 million, including $ 12 . 3 million in contingency AISC estimated at $ 860 per Au Eq sold Payback period ~ 1 year 7 - year LOM $4,000 Au $3,000 Au $2,200 Au $2,000 Au Sensitivity $615.4 $398.2 $224.0 $181.0 Post - Tax NPV 5 (USD M) POST TAX NPV 5 GOLD PRICE SENSITIVITY x Build road from camp to Portal Site x Mobilize equipment and build laydown x Start preparation for camp winterization x Environmental studies, geotechnical drilling for barge landing, and community outreach x Continue Federal permitting on FAST - 41 dashboard 1 See Contango’s SK 1300 Johnson Tract Technical Report Press Release dated May 6 , 2025 ; Initial capex reflects the Initial Assessment study reported in “ Contango Announces S - K 1300 Technical Report Summary with Robust Economics and One Year Payback for its Johnson Tract Project ” Press Release and Initial Assessment dated May 6 , 2025 and filed on May 12 , 2025 ; “ GEO” refers to Gold Equivalent Ounces . Road work completed

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 17 FORT KNOX MILL (Kinross) 1. Reserve and Resource Table can be found in the Appendix 2.MRE = Mineral Resource Estimate; 3 . See new released dated September 22, 2026 “ Contango Announces Updated Mineral Resource Estimate for Kitsault Valley Project; Indicated Resources Increase 93% to 89.5 Million Silver Equivalent Ounces ” MANH CHOH MINE (30%) 1 LUCKY SHOT MINE (100%) 1 JOHNSON TRACT PROJECT (100%) 1 KITSAULT VALLEY PROJECT (100%) 1 Current M&I Resource: 166k oz Gold and 34.7 M oz Silver ; Inferred Resource: 817k oz Gold and 29.3 M oz Silver Silver - Gold polymetallic district NEW MRE – September 2026 2,3 : Ind: 89.5 Moz AgEq (7.66 Mt at 364 g/t AgEq ) Inf: 64.92 Moz AgEq (6.31 Mt at 322 g/t AgEq ) +50,000 m 2026 drilling program Environmental baseline, Metallurgical, Permitting planned for 2026 PEA and IBA in 2027 PRECIOUS METALS FOCUSED PORTFOLIO EXECUTING ON OUR DIRECT SHIP ORE MODEL (DSO) DSO Routes

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 18 Kitsault Valley MRE 1 1 See Contango’s SK 1300 Kitsault Valley Technical Report Press Release dated September 22 , 2026 ; See Contango’s SK 1300 Kitsault Valley Technical Report Effective Date September 11 , 2026 ; AgEq (Moz) AgEq (g/t) Pb (%) Zn (%) Cu (%) Au (g/t) Ag (g/t) Tonnes (Mt) Area Category 33.28 483.7 0.13 0.15 0.13 5.63 89.14 2.14 Homestake Indicated 56.27 317.06 0.59 0.67 0.03 0.04 296.1 5.52 Dolly Varden 89.55 363.0 0.46 0.53 0.06 1.60 238.34 7.66 Total 48.50 328.30 0.17 0.15 0.04 4.17 53.91 4.60 Homestake Inferred 16.42 289.65 0.62 0.90 0.05 0.10 269.91 1.71 Dolly Varden 64.92 320.26 0.29 0.35 0.04 3.06 112.50 6.31 Total Change 2026 Estimate 2023 Estimate Metric +84.4% 7.66 4.15 Indicated tonnage (Mt) +93.1% 89.55 46.37 Indicated AgEq (Moz) - 7.7% 6.31 6.83 Inferred tonnage (Mt) - 25.1% 64.92 86.73 Inferred AgEq (Moz) Torbrit Mineral Resource Classification geometry: A – Plan view, B – Longitudinal view (looking northeast), C – Cross - sectional view looking northwest. Red solid represents Indicated classification and blue Inferred classification. Comparison of key resource metrics, 2023 vs. 2026 estimates +84% increase Indicated Tonnage & +93% increase Indicated AgEq Oz Ind. 89M oz AgEq at 363 g/t AgEq Inf. 65M oz AgEq at 320 g/t AgEq KITSAULT VALLEY – THE SILVER LINING OF GOLDEN TRIANGLE

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 19 SEPT 15, 2026 NEWS Step - out drilling confirms Torbrit and North Star form one connected silver system. HIGHLIGHTS: DV26 - 480: incl. 881 g/t AgEq over 2.30m DV26 - 488: incl. 2,878 g/t AgEq over 0.98m DV26 - 494: incl. 2,254 g/t AgEq over 1.00m DV26 - 515: also 165 g/t AgEq over 66.35m 2026 drilling not incorporated into the 2026 MRE update TORBRIT & NORTH STAR: ONE CONNECTED SILVER SYSTEM KITSAULT VALLEY – RECENT DRILL RESULTS Note: See Contango’s news release dated September 15, 2026 “ Contango Announces Updated Mineral Resource Estimate for Kitsault Valley Project; Indicated Resources Increase 93% to 89.5 Million Silver Equivalent Ounces ” . Intervals shown are downhole core lengths (approx. 80% - 95% of true width). AgEq = Ag + 11.64Pb + 15.22Zn + 58.27Au, using metal prices of US$53/oz Ag, US$0.90/lb Pb, US$1.25/lb Zn and US$3,500/oz Au, and metallurgical recoveries of 85% Ag, 85% Pb, 80% Zn and 7 5% Au. None of this 2026 drilling is incorporated into the Mineral Resource Estimate update expected later this quarter. The Kit sau lt Valley Project is an exploration - stage property with no mineral reserves; these exploration results do not demonstrate economic viability. See the full news release for the complete assay table and QA/QC disclosure. 2026 PROGRAM New Mineral Resource Estimate released September 22, 2026 ~50,000 meters drilling planned for 2026 Environmental Baseline Studies Community Engagement First Nations Engagement Working towards formal IBA

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM The Contango Value Proposition: High Margin, High Torque, Proven Results An Emerging Mid - Tier Silver - Gold Producer 20 North America – Ag - Focused Developers North America – Producers North America – Au - Focused Developers

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 21 info@contangoore.com +1 - 907 - 388 - 7770 www.contangoore.com Twitter: @orecontango LinkedIn: Contango ORE Instagram: ContangoORE Facebook: Contango ORE CORPORATE INQUIRIES NYSE - A / TSX: CTGO

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 22 LEADERSHIP TEAM Rick Van Nieuwenhuyse CEO & Director 40+ years of experience in the mining industry. He previously served as President and CEO of Trilogy Metals and founded NOVAGOLD where he served as President and CEO. Shawn Khunkhun President & Director 20+ years of experience in capital markets and mineral exploration, development and production. Founder and Director of Gold X2 and Gladiator Metals. Partner at the Fiore Group. Clynt Nauman Chairman of Board & Director 45+ years of experience in mining industry. Served as Chairman and CEO of Alexco Resource, President and Director of Viceroy Gold, Director of NOVAGOLD and Director of Spectrum Gold. Board of Directors Michael Clark CFO 20+ years of experience in corporate finance and financial reporting. He is currently a Director of Avino and has served as CFO of Alexco Resources, Goldgroup Mining and Grosso Group. Darren Devine Director Principal of CDM Capital Partners, a corporate advisory firm and acts as a director to junior companies in the natural resource sector. Completed transactions including Centric Energy’s sale of Eastern African assets to Africa Oil. Tim Clark Director 23+ years of experience in capital markets, corporate strategy and financial analysis for corporations within the commodities and mining sectors. Currently serves as the CEO and Director of Fury Gold Mines. Brad Juneau Director Co - founder of Contango and previously served as President, CEO and Director from August 2012 to January 2020. He has served as Chairman of the Board for Contango since April 2013. Mike Cinnamond Director 25+ years of experience in the mining sector, bringing significant industry and financial knowledge. He has served as the Senior Vice President and CFO of B2Gold since April 2014. Proven Leadership Team with a Demonstrated Track Record of Value Creation in the North American Mining Sector

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 23 BUILDING OUR ESG FRAMEWORK DEVELOPING OUR STRATEGY AROUND OUR BUSINESS MODEL AND CORE VALUES BUILT ON OUR FUNDAMENTAL DSO CRITERIA High - grade resources Gold, Silver, Copper focus Near Infrastructure Road Rail Water Simple permitting from a mining perspective Minimal water and wetlands impact Simple mining/processing Private and State lands ▪ Defining the pillars » Social - safety of our people and our communities, valued partnerships with Alaskan Natives » Environment – responsible practices, minimize our footprint » Governance - business conduct, social responsibility and reporting » Growth – resulting in a strong, reputable company ▪ Working through materiality assessment ▪ Evaluating sustainability risk and opportunities ▪ ESG data quality and completeness forms reliable basis for the future ▪ Consolidating our understanding of risks, opportunities and policies for all our sites

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 24 CONTANGO’S RESERVES AND RESOURCES CONTINUED ON NEXT PAGE Notes: Manh Choh Reserves 1 - Published from Contango 10K. Reserves Current as of 31DEC25 2 - The definitions for mineral reserves in S - K 1300 were followed for mineral reserves. 3 - Mineral reserves were estimated at long term prices of $2,000/oz Au and $23.50/oz Ag. 4 - Mineral reserves are reported at an economic cut - off that varies by process cost and metallurgical recovery, approximately equivalent to 2.50 g/t Au. 5 - Mineral reserve estimates incorporate dilution built in during the re - blocking process and assume 100% mining recovery 6 - Mineral reserves are reported in dry metric tonnes . 7 - Numbers may not total due to rounding. 8 - Mineral reserves are reconciled and incorporate depletion from 2024 and 2025 production 9. Mineral Reserves reported on 30% Contango Ore ownership basis. Notes: Manh Choh Resources 1 - Published from Contango 10K. Reserves Current as of 31DEC25 2 - Mineral Resources are reported on a 30% Contango Ore ownership. 3 - The definitions for mineral resources in S - K 1300 were followed for mineral resources. 4 - Mineral resources are reported exclusive of mineral reserves. 5 - Mineral resources are estimated using long term prices of US$2,000/oz Au price and US$23.53/oz Ag price. 6 - Mineral resources are reported using un - diluted Au and Ag grades. 7 - Mineral resources are reported within constraining pit shells. 8 - Mineral resources that are not mineral reserves do not have demonstrated economic viability. 9 - Mineral resources are reported in dry metric tonnes . 10 - Numbers may not total due to rounding. 11 - Mineral resources are reconciled and incorporate depletion from 2024 and 2025 production. PROJECT CLASSIFICATION TONNES (000) Au Grade (g/t) Au Ounces (000) Ag Grade (g/t) Ag Ounces (000) Cu (%) Cu (M Lb) Pb (%) Pb (M Lb) Zn (%) Zn (M Lb) AuEq (g/t) AuEq Ounces (000) AgEq (g/t) AgEq Ounces (000) Manh Choh Proven 158 4.0 20 11.8 60 4.1 21 352.2 1,586 Proven 714 7.4 170 11.3 259 7.5 173 641.1 13,254 Sub-Total 871 6.8 190 11.4 318 6.9 194 590.1 14,839 TOTAL 871 6.8 190 11.4 318 6.9 194 590.1 14,839 Contango Owned Reserves PROJECT CLASSIFICATION TONNES (000) Au Grade (g/t) Au Ounces (000) Ag Grade (g/t) Ag Ounces (000) Cu (%) Cu (M Lb) Pb (%) Pb (M Lb) Zn (%) Zn (M Lb) AuEq (g/t) AuEq Ounces (000) AgEq (g/t) AgEq Ounces (000) Manh Choh Measured 186 2.0 12.0 11.9 71 2.1 13 182.1 983 Indicated 115 2.1 8.0 6.6 24 2.5 9 185.3 634 Sub-total 301 2.0 20 9.8 95 2.3 22 180.1 1,617 Lucky Shot Measured - - - - - - - - - - - - - - - Indicated 227 14.5 106 14.5 106 987.2 6495 Sub-total 227 14.5 106 14.5 106 987.2 6,495 Johnson Tract Measured - - - - - - - - - - - - - - - Indicated 3,489 5.3 598 6.0 673 0.56 43.1 0.67 51.5 5.21 400.8 9.4 1,053 884.5 84347 Sub-total 3,489 5.3 598 6.0 673 0.56 43.1 0.67 51.5 5.21 400.8 9.4 1,053 884.5 84,347 Homestake Measured - Indicated 2,140 5.6 387 89.1 6,133 0.134 6.3 0.126 6.0 0.149 7.0 7.3 504 483.6 33,275 Sub-total 2,140 5.6 387 89.1 6,133 0.134 6.3 0.126 6.0 0.149 7.0 7.3 504 483.6 33,275 Dolly Varden Measured - - - - - - - - - - - - - - - Indicated 5,520 0.0 7 296.2 52,565 0.025 3.1 0.593 72.2 0.672 81.8 4.8 852 317.1 56,270 Sub-total 5,520 0.0 7 296.2 52,565 0.025 3.1 0.593 72.2 0.672 81.8 4.8 852 317.1 56,270 TOTAL METAL 1,119 59,466 52.5 129.7 489.7 Total EQ 2,537 182,004 Contango Owned Resources

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 25 CONTANGO’S RESERVES AND RESOURCES Notes: Lucky Shot Resources 1. Mineral Resources were estimated as of 26 MAY 23 under definitions for Mineral Resources in S - K1300. See TRS Lucky shot Proj ect Alaska, USA. 2. Mineral resources are estimated using long term prices of US$1,600/oz Au price. 3. Mineral resources are reported using un - diluted Au grades. 4. Mineral resources are reported as contained within 3.0 g/t Au underground shapes applying a 3.0m min. width at a 4.3 g/t C OG. 5. Mineral resources that are not mineral reserves do not have demonstrated economic viability. There are no mineral reserves fo r the Lucky Shot Project. 6. Mineral resources are reported in dry metric tonnes . 7. Numbers may not add due to rounding. 8. Mineral resources are reported on a 100% ownership basis Notes: Johnson Tract Resources 1. Mineral Resources were estimates as of 25 AUG 22 under definitions for Mineral Resources in NI 43 - 101. See Updated Mineral Re source estimate and 43 - 101 Report for Johnson Tract project, Alaska. 2. Assumed metal prices are US$1650/oz for gold (Au), US$20/oz for silver (Ag), US$3.50/lb. copper (Cu), US$1/lb. lead (Pb), and US$1.50/lb. for zinc (Zn) 3. Gold Equivalent (“ AuEq ”) is based on assumed metal prices and payable metal recoveries of 97% for Au, 85% for Ag, 85% Cu, 72% Pb and 92% Zn from me tal lurgical test work completed in 2022. 4. AuEq equals = Au g/t + Ag g/t × 0.01 + Cu% × 1.27 + Pb% × 0.31 + Zn% × 0.59 5. An average bulk density value of 2.84 used as determined by conventional analytical methods for assay samples 6. Capping applied to assays to restrict the impact of high - grade outliers 7. Preliminary underground constrains were applied, including the elimination of isolated or scattered blocks above cut - off grad e to define the “reasonable prospects of eventual economic extraction” for the Mineral Resource Estimate 8. Mineral resources as reported are undiluted 9. Mineral resource tonnages have been rounded to reflect the precision of the estimate 10. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability Notes: Kitsault Valley Resources 1. Mineral Resources were estimated as of 21 SEP 26 23 under definitions for Mineral Resources in S - K1300. See Kitsault MRE TRS 21SEP26 2. Mineral resources are estimated using long term prices Ag $53/oz, Au $3,500/oz, Zn $1.25/ lb , Pb $0.90/ lb , Cu $5.00/ lb 3. Mineral resources are reported using un - diluted grades. 4. Mineral resources are reported as contained within underground shapes at a 132 AgEq COG. 5. AqEq are calculated by deposit based on assumed metal recovery, metal prices, and deposit density. 6. By region the AgEq calculations are: Dolly Varden Region: AgEq = Ag + 58.27Au + 15.22Zn + 11.64Pb +53.27Cu, Homestake Main: AgEq = Ag + 70.17Au + 14.15Zn + 10.92Pb + 52.56Cu, Homestake Silver: AgEq = Ag + 62.15Au + 14.27Zn + 10.96Pb + 49.47Cu 7. Mineral resources that are not mineral reserves do not have demonstrated economic viability. There are no mineral reserves fo r the Kitsault Valley Project. 8. Mineral resources are reported in dry metric tonnes . 9. Numbers may not add due to rounding. 10. Mineral resources are reported on a 100% ownership basis. PROJECT CLASSIFICATION TONNES (000) Au Grade (g/t) Au Ounces (000) Ag Grade (g/t) Ag Ounces (000) Cu (%) Cu (M Lb) Pb (%) Pb (M Lb) Zn (%) Zn (M Lb) AuEq (g/t) AuEq Ounces (000) AgEq (g/t) AgEq Ounces (000) Manh Choh Inferred - 3.2 - 9.2 - 0.0 0 Lucky Shot Inferred 82 9.5 25 9.5 25 646.8 1,532 Johnson Tract Inferred 706 1.4 31 9.1 207 0.59 9.2 0.30 4.7 4.18 65.1 4.8 108 449.3 8,686 Homestake Inferred 4,595 4.2 616 53.9 7,965 0.042 4.2 0.17 16.9 0.15 14.7 5.0 734 328.3 48,501 Dolly Varden Inferred 1,710 0.1 5 269.9 14,839 0.048 1.8 0.62 23.4 0.90 33.9 4.5 249 298.7 16,419 TOTAL METAL 677 23,011 15.2 44.9 113.7 Total EQ 1,116 75,138

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM DEVELOPMENT Historic High - Grade Gold Mining District Initial Discoveries 1890’s 20+ Historic Mines and Prospects Relatively “unmined” since 1942 Mesothermal, shear hosted quartz +Au veins LUCKY SHOT Lucky Shot ore with visible gold Coleman LUCKY SHOT – WILLOW CREEK DISTRICT SCALE OPPORTUNITY 26

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 27 PLAN VIEW LOOKING NORTHWEST JT BLOCK MODEL JOHNSON TRACT DEPOSIT NORTH (G/T) JOHNSON TRACT 27 ATTRACTIVE ATTRIBUTES FOR UNDERGROUND MINING ROBUST GRADES AND 40m TRUE WIDTHS

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 28 Ellis Zone discovery 4km NE of JT Deposit 578 g/t Au and 2,023 g/t Ag over 6.4 m JOHNSON TRACT EXPLORATION UPSIDE – NEW GEOPHYSICAL TARGETS 2023 geophysical survey defines 12km (7.5 mi) mineral trend Geophysics, geochemistry and geology define 1. Distinct +10km long epithermal/VMS trend 2. Two potential intrusive related Cu - Au targets (porphyry) Large, shallowly buried, untested alteration systems detected at DC, between DC and JT, and South of J ohnson Tract Multiple new drill targets 2023 Airborne MobileMT Survey (3D inversion)

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM KITSAULT VALLEY – PREMIER MINING DISTRICT 2 centers of gravity at Kitsault Valley: 1. Gold - focused on northern tract 2. Silver focused on silver tract District scale exploration opportunities Porter Idaho – Historic Mine Mountain Boy – Historic Mine PREMIERE MINING DISTRICT Richest 20km on the planet for gold and silver, from Seabridge's KSM to Newmont's Brucejack 150M ounces of Gold 1.2B ounces of Silver Discovered in just the past 3 decades CORNERSTONE IN THE GOLDEN TRIANGLE, BC

NYSE - A: CTGO | TSX: CTGO | WWW.CONTANGOORE.COM 30 2026 2027 2028 2029+ CASH FLOW FUNDED GROWTH ENGINE Catalyst Rich Portfolio of Advanced Exploration - Stage Assets Supported by Cash Flows from Manh Choh Production Accelerating Growth: Catalysts & Project Pipeline 4 0,000m drill program + baseline env. Advance PEA / IA + initiate permitting Target PEA / IA Study Camp upgrades + initial construction Surface infrastructure permit (FAST 41) Johnson Tract Lucky Shot Manh Choh Kitsault Valley UG tunnel construction + infill drilling Complete road from Camp to Barge Target Fully Permitted / Construction Mine decision; final permits issued Target Feasibility / FID Continued gold production ~2,500m drill program Targeting 60koz p.a. average GEO production Continued exploration initiatives Infill drilling + technical studies UG in - fill drilling program, consisting of 18,000m of total drilling Target Feasibility Study / FID Q2 - 2026: Updated Resource UG tunnel construction+ infill drilling Construct site infrastructure + infill drilling Target Production Utilizing Manh Choh Cash Flow to Drive Near - Term Execution

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex23-1img001.jpg · Sequence: 9

Binary file (3157 bytes)

Download tm2625571d1_ex23-1img001.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex23-1img002.jpg · Sequence: 10

Binary file (2248 bytes)

Download tm2625571d1_ex23-1img002.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1img001.jpg · Sequence: 11

Binary file (3025 bytes)

Download tm2625571d1_ex96-1img001.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1img002.jpg · Sequence: 12

Binary file (52386 bytes)

Download tm2625571d1_ex96-1img002.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1img003.jpg · Sequence: 13

Binary file (425232 bytes)

Download tm2625571d1_ex96-1img003.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1img004.jpg · Sequence: 14

Binary file (401623 bytes)

Download tm2625571d1_ex96-1img004.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1img005.jpg · Sequence: 15

Binary file (436456 bytes)

Download tm2625571d1_ex96-1img005.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1img006.jpg · Sequence: 16

Binary file (576327 bytes)

Download tm2625571d1_ex96-1img006.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1img007.jpg · Sequence: 17

Binary file (528359 bytes)

Download tm2625571d1_ex96-1img007.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp03img001.jpg · Sequence: 18

Binary file (479529 bytes)

Download tm2625571d1_ex96-1sp03img001.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp03img002.jpg · Sequence: 19

Binary file (271651 bytes)

Download tm2625571d1_ex96-1sp03img002.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp03img003.jpg · Sequence: 20

Binary file (446395 bytes)

Download tm2625571d1_ex96-1sp03img003.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp03img004.jpg · Sequence: 21

Binary file (481918 bytes)

Download tm2625571d1_ex96-1sp03img004.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp03img005.jpg · Sequence: 22

Binary file (418168 bytes)

Download tm2625571d1_ex96-1sp03img005.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp03img006.jpg · Sequence: 23

Binary file (81579 bytes)

Download tm2625571d1_ex96-1sp03img006.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp03img007.jpg · Sequence: 24

Binary file (245322 bytes)

Download tm2625571d1_ex96-1sp03img007.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp03img008.jpg · Sequence: 25

Binary file (323815 bytes)

Download tm2625571d1_ex96-1sp03img008.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp03img009.jpg · Sequence: 26

Binary file (295030 bytes)

Download tm2625571d1_ex96-1sp03img009.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp03img010.jpg · Sequence: 27

Binary file (474729 bytes)

Download tm2625571d1_ex96-1sp03img010.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp03img011.jpg · Sequence: 28

Binary file (412886 bytes)

Download tm2625571d1_ex96-1sp03img011.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp03img012.jpg · Sequence: 29

Binary file (406101 bytes)

Download tm2625571d1_ex96-1sp03img012.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp2img01.jpg · Sequence: 30

Binary file (67959 bytes)

Download tm2625571d1_ex96-1sp2img01.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp2img02.jpg · Sequence: 31

Binary file (82139 bytes)

Download tm2625571d1_ex96-1sp2img02.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp2img03.jpg · Sequence: 32

Binary file (58798 bytes)

Download tm2625571d1_ex96-1sp2img03.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp2img04.jpg · Sequence: 33

Binary file (108262 bytes)

Download tm2625571d1_ex96-1sp2img04.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp2img05.jpg · Sequence: 34

Binary file (70665 bytes)

Download tm2625571d1_ex96-1sp2img05.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp2img06.jpg · Sequence: 35

Binary file (88141 bytes)

Download tm2625571d1_ex96-1sp2img06.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp5img001.jpg · Sequence: 36

Binary file (85047 bytes)

Download tm2625571d1_ex96-1sp5img001.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp5img002.jpg · Sequence: 37

Binary file (9945 bytes)

Download tm2625571d1_ex96-1sp5img002.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp5img003.jpg · Sequence: 38

Binary file (16826 bytes)

Download tm2625571d1_ex96-1sp5img003.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp5img004.jpg · Sequence: 39

Binary file (43707 bytes)

Download tm2625571d1_ex96-1sp5img004.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp5img005.jpg · Sequence: 40

Binary file (43508 bytes)

Download tm2625571d1_ex96-1sp5img005.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp5img006.jpg · Sequence: 41

Binary file (42336 bytes)

Download tm2625571d1_ex96-1sp5img006.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp5img007.jpg · Sequence: 42

Binary file (48271 bytes)

Download tm2625571d1_ex96-1sp5img007.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp5img008.jpg · Sequence: 43

Binary file (39211 bytes)

Download tm2625571d1_ex96-1sp5img008.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp5img009.jpg · Sequence: 44

Binary file (42224 bytes)

Download tm2625571d1_ex96-1sp5img009.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp5img010.jpg · Sequence: 45

Binary file (44315 bytes)

Download tm2625571d1_ex96-1sp5img010.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp5img011.jpg · Sequence: 46

Binary file (52806 bytes)

Download tm2625571d1_ex96-1sp5img011.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp5img012.jpg · Sequence: 47

Binary file (46907 bytes)

Download tm2625571d1_ex96-1sp5img012.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp5img013.jpg · Sequence: 48

Binary file (40174 bytes)

Download tm2625571d1_ex96-1sp5img013.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex96-1sp5img014.jpg · Sequence: 49

Binary file (35018 bytes)

Download tm2625571d1_ex96-1sp5img014.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1img001.jpg · Sequence: 50

Binary file (2830 bytes)

Download tm2625571d1_ex99-1img001.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1img002.jpg · Sequence: 51

Binary file (72734 bytes)

Download tm2625571d1_ex99-1img002.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1img003.jpg · Sequence: 52

Binary file (73716 bytes)

Download tm2625571d1_ex99-1img003.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp04img001.jpg · Sequence: 53

Binary file (27996 bytes)

Download tm2625571d1_ex99-1sp04img001.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp04img002.jpg · Sequence: 54

Binary file (54238 bytes)

Download tm2625571d1_ex99-1sp04img002.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp04img003.jpg · Sequence: 55

Binary file (55558 bytes)

Download tm2625571d1_ex99-1sp04img003.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp04img004.jpg · Sequence: 56

Binary file (36489 bytes)

Download tm2625571d1_ex99-1sp04img004.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp04img005.jpg · Sequence: 57

Binary file (32991 bytes)

Download tm2625571d1_ex99-1sp04img005.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp04img006.jpg · Sequence: 58

Binary file (48137 bytes)

Download tm2625571d1_ex99-1sp04img006.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp04img007.jpg · Sequence: 59

Binary file (54309 bytes)

Download tm2625571d1_ex99-1sp04img007.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp04img008.jpg · Sequence: 60

Binary file (84434 bytes)

Download tm2625571d1_ex99-1sp04img008.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp04img009.jpg · Sequence: 61

Binary file (117699 bytes)

Download tm2625571d1_ex99-1sp04img009.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp04img010.jpg · Sequence: 62

Binary file (33257 bytes)

Download tm2625571d1_ex99-1sp04img010.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp04img011.jpg · Sequence: 63

Binary file (43821 bytes)

Download tm2625571d1_ex99-1sp04img011.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp04img012.jpg · Sequence: 64

Binary file (96360 bytes)

Download tm2625571d1_ex99-1sp04img012.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp6img01.jpg · Sequence: 65

Binary file (34296 bytes)

Download tm2625571d1_ex99-1sp6img01.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp6img02.jpg · Sequence: 66

Binary file (43340 bytes)

Download tm2625571d1_ex99-1sp6img02.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp6img03.jpg · Sequence: 67

Binary file (35343 bytes)

Download tm2625571d1_ex99-1sp6img03.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp6img04.jpg · Sequence: 68

Binary file (36189 bytes)

Download tm2625571d1_ex99-1sp6img04.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp6img05.jpg · Sequence: 69

Binary file (39473 bytes)

Download tm2625571d1_ex99-1sp6img05.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp6img06.jpg · Sequence: 70

Binary file (27043 bytes)

Download tm2625571d1_ex99-1sp6img06.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp6img07.jpg · Sequence: 71

Binary file (26869 bytes)

Download tm2625571d1_ex99-1sp6img07.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp6img08.jpg · Sequence: 72

Binary file (107531 bytes)

Download tm2625571d1_ex99-1sp6img08.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-1sp6img09.jpg · Sequence: 73

Binary file (74623 bytes)

Download tm2625571d1_ex99-1sp6img09.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img001.jpg · Sequence: 74

Binary file (121985 bytes)

Download tm2625571d1_ex99-2img001.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img002.jpg · Sequence: 75

Binary file (435763 bytes)

Download tm2625571d1_ex99-2img002.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img003.jpg · Sequence: 76

Binary file (164202 bytes)

Download tm2625571d1_ex99-2img003.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img004.jpg · Sequence: 77

Binary file (173474 bytes)

Download tm2625571d1_ex99-2img004.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img005.jpg · Sequence: 78

Binary file (170367 bytes)

Download tm2625571d1_ex99-2img005.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img006.jpg · Sequence: 79

Binary file (106096 bytes)

Download tm2625571d1_ex99-2img006.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img007.jpg · Sequence: 80

Binary file (274048 bytes)

Download tm2625571d1_ex99-2img007.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img008.jpg · Sequence: 81

Binary file (89855 bytes)

Download tm2625571d1_ex99-2img008.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img009.jpg · Sequence: 82

Binary file (175714 bytes)

Download tm2625571d1_ex99-2img009.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img010.jpg · Sequence: 83

Binary file (260919 bytes)

Download tm2625571d1_ex99-2img010.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img011.jpg · Sequence: 84

Binary file (276428 bytes)

Download tm2625571d1_ex99-2img011.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img012.jpg · Sequence: 85

Binary file (261565 bytes)

Download tm2625571d1_ex99-2img012.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img013.jpg · Sequence: 86

Binary file (178809 bytes)

Download tm2625571d1_ex99-2img013.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img014.jpg · Sequence: 87

Binary file (215032 bytes)

Download tm2625571d1_ex99-2img014.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img015.jpg · Sequence: 88

Binary file (271751 bytes)

Download tm2625571d1_ex99-2img015.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img016.jpg · Sequence: 89

Binary file (192619 bytes)

Download tm2625571d1_ex99-2img016.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img017.jpg · Sequence: 90

Binary file (261981 bytes)

Download tm2625571d1_ex99-2img017.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img018.jpg · Sequence: 91

Binary file (194624 bytes)

Download tm2625571d1_ex99-2img018.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img019.jpg · Sequence: 92

Binary file (251302 bytes)

Download tm2625571d1_ex99-2img019.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img020.jpg · Sequence: 93

Binary file (248835 bytes)

Download tm2625571d1_ex99-2img020.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img021.jpg · Sequence: 94

Binary file (205214 bytes)

Download tm2625571d1_ex99-2img021.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img022.jpg · Sequence: 95

Binary file (258831 bytes)

Download tm2625571d1_ex99-2img022.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img023.jpg · Sequence: 96

Binary file (226237 bytes)

Download tm2625571d1_ex99-2img023.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img024.jpg · Sequence: 97

Binary file (185029 bytes)

Download tm2625571d1_ex99-2img024.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img025.jpg · Sequence: 98

Binary file (258092 bytes)

Download tm2625571d1_ex99-2img025.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img026.jpg · Sequence: 99

Binary file (200302 bytes)

Download tm2625571d1_ex99-2img026.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img027.jpg · Sequence: 100

Binary file (206737 bytes)

Download tm2625571d1_ex99-2img027.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img028.jpg · Sequence: 101

Binary file (225911 bytes)

Download tm2625571d1_ex99-2img028.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img029.jpg · Sequence: 102

Binary file (206704 bytes)

Download tm2625571d1_ex99-2img029.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img030.jpg · Sequence: 103

Binary file (227432 bytes)

Download tm2625571d1_ex99-2img030.jpg

GRAPHIC

GRAPHIC

Filename: tm2625571d1_ex99-2img031.jpg · Sequence: 104

Binary file (183552 bytes)

Download tm2625571d1_ex99-2img031.jpg

XML — IDEA: XBRL DOCUMENT

XML

Filename: R1.htm · Sequence: 106

v3.26.3

Cover

Sep. 22, 2026

Cover [Abstract]

Document Type

8-K

Amendment Flag

false

Document Period End Date

Sep. 22, 2026

Entity File Number

001-35770

Entity Registrant Name

CONTANGO

SILVER & GOLD INC.

Entity Central Index Key

0001502377

Entity Tax Identification Number

27-3431051

Entity Incorporation, State or Country Code

DE

Entity Address, Address Line One

516 2nd Avenue

Entity Address, Address Line Two

Suite 401

Entity Address, City or Town

Fairbanks

Entity Address, State or Province

AK

Entity Address, Postal Zip Code

99701

City Area Code

907

Local Phone Number

888-4273

Written Communications

false

Soliciting Material

false

Pre-commencement Tender Offer

false

Pre-commencement Issuer Tender Offer

false

Title of 12(b) Security

Common Stock, Par Value $0.01 per share

Trading Symbol

CTGO

Security Exchange Name

NYSEAMER

Entity Emerging Growth Company

false

X

- Definition

Boolean flag that is true when the XBRL content amends previously-filed or accepted submission.

+ References

No definition available.

+ Details

Name:

dei_AmendmentFlag

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Area code of city

+ References

No definition available.

+ Details

Name:

dei_CityAreaCode

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Cover page.

+ References

No definition available.

+ Details

Name:

dei_CoverAbstract

Namespace Prefix:

dei_

Data Type:

xbrli:stringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

For the EDGAR submission types of Form 8-K: the date of the report, the date of the earliest event reported; for the EDGAR submission types of Form N-1A: the filing date; for all other submission types: the end of the reporting or transition period. The format of the date is YYYY-MM-DD.

+ References

No definition available.

+ Details

Name:

dei_DocumentPeriodEndDate

Namespace Prefix:

dei_

Data Type:

xbrli:dateItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The type of document being provided (such as 10-K, 10-Q, 485BPOS, etc). The document type is limited to the same value as the supporting SEC submission type, or the word 'Other'.

+ References

No definition available.

+ Details

Name:

dei_DocumentType

Namespace Prefix:

dei_

Data Type:

dei:submissionTypeItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Address Line 1 such as Attn, Building Name, Street Name

+ References

No definition available.

+ Details

Name:

dei_EntityAddressAddressLine1

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Address Line 2 such as Street or Suite number

+ References

No definition available.

+ Details

Name:

dei_EntityAddressAddressLine2

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the City or Town

+ References

No definition available.

+ Details

Name:

dei_EntityAddressCityOrTown

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Code for the postal or zip code

+ References

No definition available.

+ Details

Name:

dei_EntityAddressPostalZipCode

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the state or province.

+ References

No definition available.

+ Details

Name:

dei_EntityAddressStateOrProvince

Namespace Prefix:

dei_

Data Type:

dei:stateOrProvinceItemType

Balance Type:

na

Period Type:

duration

X

- Definition

A unique 10-digit SEC-issued value to identify entities that have filed disclosures with the SEC. It is commonly abbreviated as CIK.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityCentralIndexKey

Namespace Prefix:

dei_

Data Type:

dei:centralIndexKeyItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Indicate if registrant meets the emerging growth company criteria.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityEmergingGrowthCompany

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Commission file number. The field allows up to 17 characters. The prefix may contain 1-3 digits, the sequence number may contain 1-8 digits, the optional suffix may contain 1-4 characters, and the fields are separated with a hyphen.

+ References

No definition available.

+ Details

Name:

dei_EntityFileNumber

Namespace Prefix:

dei_

Data Type:

dei:fileNumberItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Two-character EDGAR code representing the state or country of incorporation.

+ References

No definition available.

+ Details

Name:

dei_EntityIncorporationStateCountryCode

Namespace Prefix:

dei_

Data Type:

dei:edgarStateCountryItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The exact name of the entity filing the report as specified in its charter, which is required by forms filed with the SEC.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityRegistrantName

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The Tax Identification Number (TIN), also known as an Employer Identification Number (EIN), is a unique 9-digit value assigned by the IRS.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityTaxIdentificationNumber

Namespace Prefix:

dei_

Data Type:

dei:employerIdItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Local phone number for entity.

+ References

No definition available.

+ Details

Name:

dei_LocalPhoneNumber

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 13e

-Subsection 4c

+ Details

Name:

dei_PreCommencementIssuerTenderOffer

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 14d

-Subsection 2b

+ Details

Name:

dei_PreCommencementTenderOffer

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Title of a 12(b) registered security.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b

+ Details

Name:

dei_Security12bTitle

Namespace Prefix:

dei_

Data Type:

dei:securityTitleItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the Exchange on which a security is registered.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection d1-1

+ Details

Name:

dei_SecurityExchangeName

Namespace Prefix:

dei_

Data Type:

dei:edgarExchangeCodeItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as soliciting material pursuant to Rule 14a-12 under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 14a

-Subsection 12

+ Details

Name:

dei_SolicitingMaterial

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Trading symbol of an instrument as listed on an exchange.

+ References

No definition available.

+ Details

Name:

dei_TradingSymbol

Namespace Prefix:

dei_

Data Type:

dei:tradingSymbolItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as written communications pursuant to Rule 425 under the Securities Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Securities Act

-Number 230

-Section 425

+ Details

Name:

dei_WrittenCommunications

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration