Form 8-K
8-K — NexMetals Mining Corp.
Accession: 0001493152-26-043945
Filed: 2026-09-23
Period: 2026-09-23
CIK: 0000795800
SIC: 1000 (METAL MINING)
Item: Regulation FD Disclosure
Item: Financial Statements and Exhibits
Documents
8-K — form8-k.htm (Primary)
EX-99.1 (ex99-1.htm)
GRAPHIC (ex99-1_001.jpg)
GRAPHIC (ex99-1_002.jpg)
GRAPHIC (ex99-1_003.jpg)
GRAPHIC (ex99-1_004.jpg)
XML — IDEA: XBRL DOCUMENT (R1.htm)
8-K
8-K (Primary)
Filename: form8-k.htm · Sequence: 1
false
0000795800
0000795800
2026-09-23
2026-09-23
iso4217:USD
xbrli:shares
iso4217:USD
xbrli:shares
UNITED
STATES
SECURITIES
AND EXCHANGE COMMISSION
Washington,
D.C. 20549
FORM
8-K
CURRENT
REPORT
Pursuant
to Section 13 OR 15(d) of the Securities Exchange Act of 1934
Date
of Report (Date of earliest event reported): September 23, 2026
NEXMETALS
MINING CORP.
(Exact
name of registrant as specified in its charter)
British
Columbia, Canada
(State
or other jurisdiction of incorporation)
001-42750
N/A 00-0000000
(Commission
File Number)
(IRS
Employer
Identification No.)
1111
West Hastings Street,
15th
Floor,
Vancouver,
British Columbia, Canada
V6E
2J3
(Address
of principal executive offices)
(Zip
Code)
(604)
770-4334
(Registrant’s
telephone number, including area code)
N/A
(Former
name or former address, if changed since last report)
Check
the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under
any of the following provisions (see General Instruction A.2. below):
☐
Written
communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
☐
Soliciting
material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
☐
Pre-commencement
communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
☐
Pre-commencement
communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))
Securities
registered pursuant to Section 12(b) of the Act:
Title
of each class
Trading
Symbol(s)
Name
of each exchange on which registered
Common
Shares, no par value
NEXM
Nasdaq
Stock Market LLC (Nasdaq Capital Market)
Indicate
by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405
of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§240.12b-2 of this chapter).
Emerging
growth company ☐
If
an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying
with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Item
7.01 Regulation
FD Disclosure.
On
September 23, 2026, NexMetals Mining Corp. (the “Company”) issued a news release reporting assay results from drill hole
SMD-26-219 and a new visual intercept from drill hole SMD-26-217, part of its ongoing surface drilling program at the Selebi Main deposit
in Botswana. A copy of this press release is attached as Exhibit 99.1 hereto and is incorporated herein by reference. The Company undertakes
no obligation to update, supplement or amend the materials attached hereto as Exhibit 99.1.
Cautionary
Statements to Investors on Reserves and Resources
The
news release furnished herewith uses the terms “mineral resources”, “indicated mineral resources” and “inferred
mineral resources” as such terms are defined under Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects
(“NI 43-101”). NI 43-101 is a rule developed by the Canadian Securities Administrators, which establishes standards for all
public disclosure a Canadian issuer makes of scientific and technical information concerning mineral projects.
On
October 31, 2018, the SEC adopted new mining disclosure rules (“S-K 1300”) that are more closely aligned with current industry
and global regulatory practices and standards, including NI 43-101, with which we comply because we are also a “reporting issuer”
under Canadian securities laws. While S-K 1300 is more closely aligned with NI 43-101 than the prior mining disclosure rules of the Securities
and Exchange Commission, there are some differences. Accordingly, there is no assurance any mineral resources that the Company may report
as “indicated mineral resources” and “inferred mineral resources” under NI 43-101 will be the same as the reserve
or resource estimates prepared under S-K 1300. Investors should not assume that any part or all of indicated mineral resources or inferred
mineral resources will ever be converted into a higher category of mineral resources or into mineral reserves. Mineralization described
using these terms has a greater amount of uncertainty as to their existence and feasibility than mineralization that has been characterized
as reserves. Accordingly, investors are cautioned not to assume that any “indicated mineral resources”, or “inferred
mineral resources” on the Company’s projects are or will be economically or legally mineable. Further, “inferred resources”
have a greater amount of uncertainty as to their existence and as to whether they can be mined legally or economically. Therefore, investors
are also cautioned not to assume that all or any part of the inferred resources exist. In accordance with Canadian rules, estimates of
“inferred mineral resources” cannot form the basis of feasibility or other economic studies, except in limited circumstances
where permitted under NI 43-101.
The
information in this Current Report on Form 8-K (including Exhibit 99.1 attached hereto) is being furnished and shall not be deemed to
be filed for purposes of Section 18 of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), or otherwise
be subject to the liabilities of that section, nor shall it be deemed to be incorporated by reference in any filing under the Securities
Act of 1933, as amended, or the Exchange Act, whether made before or after the date hereof and regardless of any general incorporation
language in such filing.
Item
9.01 Financial
Statements and Exhibits.
(d)
Exhibits
Exhibit
No.
Description
99.1
Press Release dated September 23, 2026.
104
Cover
Page Interactive Data File (embedded within Inline XBRL document).
SIGNATURES
Pursuant
to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by
the undersigned hereunto duly authorized.
NEXMETALS
MINING CORP.
(Registrant)
By:
/s/
Brett MacKay
Brett
MacKay
Chief
Financial Officer
Date:
September 23, 2026
EX-99.1
EX-99.1
Filename: ex99-1.htm · Sequence: 2
Exhibit
99.1
NexMetals
Reports 7.55 Metres of 6.48% CuEq (2.70% Cu, 1.83% Ni) in SMD-26-219, Visual Intercept SMD-26-217 Intersects Three Mineralized Zones
and Extends High-Grade Trend to Approximately 1.5 Kilometres
Vancouver,
British Columbia, September 23, 2026 – NexMetals Mining Corp. (TSXV: NEXM) (Nasdaq: NEXM) (“NEXM”
or the “Company”) is pleased to report assay results from drill hole SMD-26-219 and a new visual intercept from drill
hole SMD-26-217, part of its ongoing surface drilling program at the Selebi Main deposit in Botswana (see Figure 1). The results continue
to support the Company’s data-driven exploration model and highlights the potential for continued growth of the Selebi Main mineralized
system.
SMD-26-219
returned 7.55 metres grading 6.48% CuEq (2.70% Cu and 1.83% Ni), confirming another thick, high-grade massive sulphide intersection along
an emerging high-grade trend that has now been defined over approximately 1.5 kilometres (the “High-Grade Trend”).
SMD-26-217
extended the High-Grade Trend by a further 100 metres toward Selebi North and intersected a combined total of 38.65 metres of disseminated
to massive sulphide mineralization across three zones. The hole represents the deepest significant intercept of mineralization along
the trend and confirmed the Main and Lower Zones, while also, for the first time, intersecting a Third Zone of massive sulphide mineralization
approximately 9 metres below the Lower Zone. Together, the three zones represent one of the thickest mineralized intervals encountered
during the program to date and provide further evidence that the High-Grade Trend continues laterally through the Flexure Zone toward
Selebi North. Assays are pending.
Why
This Matters
● Exceptional
grades continue to define the High-Grade Trend. SMD-26-219 returned 7.55 metres grading
6.48% CuEq, building on a series of thick, high-grade intersections and reinforcing the strength
and consistency of mineralization across the growing trend.
● The
Trend has been extended toward Selebi North. SMD-26-217 extended the interpreted High-Grade
Trend by approximately 100 metres to approximately 1.5 kilometres.
● Lower
Zone is demonstrating increasing continuity at depth. Results from SMD-26-213, which
returned 7.45 metres grading 5.69% CuEq (2.52% Cu, 1.54% Ni), and SMD-26-219, together with
the visual intercept in SMD-26-217, strengthen the interpretation of a laterally and vertically
extensive Lower Zone.
● The
Third Zone introduces a new dimension to the exploration model. Its discovery below the
Lower Zone indicates that the system is more complex than previously interpreted and creates
an additional target opportunity for potential expansion.
● Widely
spaced step-outs are rapidly building potential tonnage. Continued drilling success beyond
the 2024 Mineral Resource Estimate (“2024 MRE”) demonstrates the potential
for meaningful resource growth at Selebi Main, both within the upcoming 2026 Mineral Resource
Estimate (“2026 MRE”) and beyond its cut-off date.
● The
system remains open and recent BHEM indicates the High-Grade Trend continues. Borehole
electromagnetic surveying (“BHEM”) indicates that the High-Grade Trend
continues beyond SMD-26-217, supporting further potential laterally and down plunge. Ongoing
drilling and geological modelling will test the extent of all three mineralized zones and
target additional areas of thick massive sulphide mineralization.
1
Next
Steps
● The
2026 Mineral Resource Estimate (“2026 MRE”) remains on track for completion
in the third quarter of 2026. Drill holes completed after the resource cut-off date of September
21, including SMD-26-217, will not be included in the 2026 MRE but continue to support the
Company’s strategy of expanding the Selebi resource base through ongoing exploration
success.
● The
Company has engaged TECT Geological Consulting to develop an integrated three-dimensional
geological and structural model for Selebi North and Selebi Main. The model is expected to
enhance the Company’s understanding of the geological controls of mineralization across
the mining license, support future resource growth and improve drill targeting of thicker,
higher-grade zones, and identify potential regional exploration targets.
Sean
Whiteford, CEO and Director of the Company, commented: “SMD-26-219 delivered another strong result, with 7.55 metres grading
6.48% CuEq. It is the latest in a series of successful, widely spaced step-out holes that are rapidly defining additional tonnage at
Selebi Main and extending this High-Grade Trend to approximately 1.5 kilometres.
SMD-26-217
extended the trend by a further 100 metres and, for the first time in this area, intersected a third zone of massive sulphide mineralization
below the Main and Lower Zone. The presence of three distinct mineralized zones highlights both the complexity of the Selebi Main system
and the significant potential that remains within the deposit and beyond the areas tested to date. BHEM surveying in SMD-26-217 is complete
and results indicate that the lower zone continues to depth.
The
2026 MRE continues to advance, and our Qualified Persons are working diligently to complete it. The additional time has allowed us to
incorporate results from SMD-26-219 that we believe will add meaningful tonnage and provide a more complete picture of the growth achieved
at Selebi Main. We look forward to sharing the 2026 MRE with the market upon its completion.”
Figure
1: Inclined long section of Selebi Main highlighting the location of drill holes SMD-26-219 and SMD-26-217 relative to the 2024 MRE.
The 2024 Inferred Resource reference in Figure 1 is presented in accordance with NI 43-101, which may not be identical to Inferred Mineral
Resource references under SEC Regulation SK-1300.
2
Figure
2: SMD-26-217 Core photos. Complete core photographs for the hole are available on the Company’s website.
Detailed
Drilling and BHEM Information
SMD-26-219,
completed to 1956.8 metres, was planned as a step-out hole in the direction of Selebi North and tested the down-plunge extension of the
interpreted trend of thick high grade massive sulphide mineralization. The hole intercepted Main Zone mineralization between 1858.50
to 1878.00 metres. The 19.50-metre-wide zone was dominated by disseminated sulphides including a total of 2.15 metres of massive sulphide
in two narrow intervals. The drillhole intercepted the Lower Zone between 1903.25 and 1916.75 metres. Within this 13.50 metre zone, is
a 7.55 metre interval dominated by semi-massive and massive sulphides. Mineralization at SMD-26-219 is very similar to that seen in SMD-26-213
175 metres away (7.45 m of 2.52% Cu, 1.54% Ni, news release July 22, 2026) and in the recently completed SMD-26-217 step out hole
located 100 metres toward Selebi North
SMD-26-217
was planned to be another down plunge step out hole, testing along the High-Grade Trend. The hole was completed to a final depth of 2050.9
metres. SMD-26-217 drilled three distinct zones of mineralization separated by short intervals of country rock between 1920.30 metres
and 2000.90 metres.
● Main
Zone - (1920.30 metres – 1941.15 metres): Spans a total mineralized interval
of 20.85 metres. The zone is dominated by 19.90m of weakly mineralised medium to coarse
grained amphibolite shist. Two sub-metre intervals, 0.80 meters and 0.15 meters, of massive
sulphide occur in the middle of the zone.
3
● Lower
Zone - (1974.75 metres – 1981.35 metres): Intersected a combined total of 5.00
metres of massive sulphides and 1.60 metres of disseminated sulphides, containing abundant
pyrrhotite, chalcopyrite, and magnetite crystals.
● Third
Zone - (1994.30 metres – 2000.90 metres): At 8.65 metres below the Lower Zone the
drill discovered a new mineralized horizon, featuring 2.30 metres of disseminated to semi-massive
mineralized amphibolite directly underlain by 4.30 metres of massive sulphide comprised
of pyrrhotite and chalcopyrite.
SMD-26-217
has not only extended the footprint of mineralisation by 100 metres, but it has also showed the mineralization thickening down plunge.
The third zone discovery shows that the Selebi Main deposit continues to dramatically change with each new drill hole highlighting the
potential in the flexure zone between Selebi Main and Selebi North (Figure 2).
Figure
2: Inclined long section of Selebi Main and Selebi North Deposits highlighting the location of drill holes released in this news release,
and 2025-2026 drilling to the 2024 MRE and the expansion of the Flexure Zone. The 2024 Indicated and Inferred Mineral Resources referenced
in Figure 2 is presented in accordance with NI 43-101, which may not be identical to Inferred Mineral Resource references under SEC Regulation
SK-1300.
4
Table
1: 2026 Surface Drilling Results
Hole-ID
From
(m)
To
(m)
Length
(m)
Est.
True
Thickness1
Cu
(%)
Ni
(%)
Co
(%)2
Zone
CuEq
(%)3
SMD-26-219
1858.50
1878.00
19.50
18.8
0.47
0.49
0.02
Main
Zone
1.48
including
1861.20
1868.00
6.80
6.55
0.67
0.89
0.04
Main
Zone
2.51
*including
1681.20
1862.80
1.60
1.55
1.53
2.51
0.11
Main
Zone
6.70
*and
1864.20
1864.75
0.55
0.53
0.06
2.57
0.10
Main
Zone
5.36
SMD-26-219
1903.25
1916.75
13.50
13.30
1.69
1.22
0.05
Lower
Zone
4.21
including
1909.20
1916.75
7.55
7.45
2.70
1.83
0.09
Lower
Zone
6.48
*including
1910.15
1916.75
6.60
6.50
2.01
2.02
0.09
Lower
Zone
6.17
*including
1910.15
1912.75
2.60
2.55
1.81
2.10
0.10
Lower
Zone
6.14
*and
1913.25
1916.75
3.50
3.45
2.43
2.23
0.10
Lower
Zone
7.02
SMD-26-217
1920.30
1941.15
20.85
20.55
Ap4
Ap4
Ap4
Main
Zone
Ap4
including
1931.85
1932.65
0.80
0.79
Ap4
Ap4
Ap4
Main
Zone
Ap4
SMD-26-217
1974.75
1981.35
6.60
6.40
Ap4
Ap4
Ap4
Lower
Zone
Ap4
including
1974.25
1979.00
4.25
4.17
Ap4
Ap4
Ap4
Lower
Zone
Ap4
and
1980.35
1981.35
1.00
0.98
Ap4
Ap4
Ap4
Lower
Zone
Ap4
SMD-26-217
1994.30
2000.90
6.60
6.40
Ap4
Ap4
Ap4
Third
Zone
Ap4
including
1996.60
2000.90
4.30
4.17
Ap4
Ap4
Ap4
Third
Zone
Ap4
1Length
refers to drillhole length and not true width. True widths are estimated where density of drilling is sufficient for an estimation. Some
true widths cannot be estimated due to insufficient drill density.
2Co
is not included in the MRE as cobalt analyses are not consistently available throughout the deposit.
3CuEq
was calculated using the formula CuEq=Cu+2.06*Ni assuming long-term prices of US$10.50/lb Ni and US$4.75/lb Cu, and nickel and copper
recoveries of 72.0% and 92.4%, respectively, derived from metallurgical studies which consider a conceptual bulk concentrate scenario.
4Assays
pending
Table
2: Surface Drilling Collar Information
HOLE
ID
UTM
East
UTM
North
Elevation
Dip
True
North Azimuth
Hole
Length
(m)
Comment
SMD-26-219
582,670.0
7,564,013.4
916.2
-75.1
111.0
1956.8
Approximate
collar position
SMD-26-217
582,547.6
7,564,008.4
919.3
-74
93
2050.9
Surveyed
collar
Qualified
Person
All
scientific and technical information in this news release has been reviewed and approved by Sharon Taylor, V.P. Exploration of the Company,
MSc, P.Geo, and a “qualified person” for the purposes of National Instrument 43-101 and Subpart 1300 of Regulation S-K.
5
Quality
Control and Data Verification
The
program is being executed using three company-owned underground Zinex U5 drills which were converted into surface A5 drills, and two
Marcotte HTM2500 drills purchased by the Company capable of drilling to depths of 2,550 metres (NQ core).
Drill
core samples are either NQ (47.75 mm diameter) or BQ (36.40 mm diameter). All samples are ½ core samples cut by a diamond saw
on site and the remaining half of the core is retained for reference purposes. Samples are generally 1.0 to 1.5 metre intervals or less
at the discretion of the site geologists. Sample preparation and lab analysis was completed at ALS Geochemistry in Johannesburg, South
Africa. Commercially prepared Blank samples and certified Cu/Ni sulphide analytical control standards with a range of grades are inserted
in every batch of 20 samples or a minimum of one set per sample batch. Analyses for Ni, Cu and Co are completed using a peroxide fusion
preparation and ICP-AES finish (ME-ICP81). Analyses for Pt, Pd, and Au are by fire assay (30 grams nominal sample weight) with an ICP-AES
finish (PGM-ICP23).
Holes
are numbered as follows: SMD (Selebi Main Deposit) + year + hole number starting at 201.
The
Qualified Person has verified the data through contribution to the core handling and sampling procedures, visits to the drill and core
processing facilities, monitoring of core logging results and sample selection, review of core assay and QAQC results.
BHEM
Surveys
The
BHEM surveys at Selebi utilize the Crone PEM system operated by local Botswana staff. Survey data is collected using a 3-component fluxgate
probe collecting full waveform data. Surveys have been collected using timebases between 50 and 1000ms (0.25 Hz to 5 Hz). The data has
been processed to a calculated residual step response to better quantify the conductive sources. This added processing has proven to
be highly valuable because of the size of the highly conductive mineralized system.
Technical
Report
The
2024 MRE on the Selebi Mines is supported by the technical report entitled “Technical Report, Selebi Mines, Central District, Republic
of Botswana” dated September 20, 2024 (with an effective date of June 30, 2024) (the “Selebi Technical Report”),
and the technical report summary entitled “S-K 1300 Technical Report Summary Selebi Mines, Central District, Republic of Botswana,
Premium Resources Ltd.” dated December 17, 2024 (with an effective date of June 30, 2024) (the “Selebi Technical Report
Summary”), each prepared by SLR Consulting (Canada) Ltd. for NEXM. Reference should be made to the full text of the Selebi
Technical Report, which was prepared in accordance with NI 43-101 and is available on SEDAR+ (www.sedarplus.ca) and the Selebi
Technical Report Summary, which was prepared in accordance with Subpart 1300 of Regulation S-K and is available in the Company’s
Annual Report on Form 10-K for the fiscal year ended December 31, 2025 filed with the U.S. Securities and Exchange Commission on EDGAR
(www.sec.gov), in each case, under NEXM’s issuer profile.
About
NexMetals Mining Corp.
NexMetals
Mining Corp. is a TSX.V and NASDAQ listed mineral exploration and development company focused on redeveloping the past-producing Selebi
and Selkirk copper-nickel-cobalt-platinum group element mines in Botswana. NexMetals has confirmed the scale of mineralization is larger
than historical estimates, supported by NI 43-101- and Regulation S-K 1300-compliant resource estimates, with ongoing down-hole geophysics,
drilling, and metallurgical programs aimed at expanding resources and supporting future economic studies. The Company is led by an experienced
management and technical team with a proven track record in global mineral projects, emphasizing disciplined execution, transparent governance,
and long-term stakeholder value creation.
6
For
further information about NexMetals Mining Corp., please contact:
Sean
Whiteford
CEO
info@nexmetalsmining.com
1-866-794-NEXM
(6396)
Neither
the TSX Venture Exchange and its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor
the Nasdaq Stock Market LLC accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission
or other regulatory authority has approved or disapproved the information contained herein.
Follow
Us
X:
https://x.com/NexMetalsCorp
LinkedIn:
https://www.linkedin.com/company/NexMetalsMiningCorp
Facebook:
https://www.facebook.com/NexMetalsMiningCorp
Cautionary
Note Regarding Forward-Looking Statements
This
news release contains “forward-looking statements” within the meaning of the United States federal securities laws and “forward-looking
information” within the meaning of applicable Canadian securities legislation (collectively, “forward-looking information”)
based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves risks, uncertainties
and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed
or implied by such forward-looking information. For the purposes of this release, forward looking information includes, but is not limited
to, the implementation of the objectives, goals and future plans of the Company, including the expansion potential of the Selebi Main
system and the scale and continuity thereof; the expansion potential within the Flexure Zone and the Company’s interpretation that
the Flexure Zone has significant potential for resource growth beyond the 2024 MRE; the receipt of pending assay results and the timing
and results thereof; the Company’s belief that the combination of massive, semi-massive and disseminated sulphides indicates a
strong sulphide system with potential for scale, particularly when integrated with ongoing BHEM targeting; the expected timing of completion
of the 2026 MRE; the Company’s belief in the benefits of its data-driven exploration approach; the anticipated benefits of TECT
Geological Consulting’s model, including enhancement of the Company’s understanding of the geological controls of mineralization
across the mining license, support for future resource growth and improvement of drill targeting of thicker, higher-grade zones, and
the identification of potential regional exploration targets; the Company’s belief that recent step-out drilling will add meaningful
tonnage to the 2026 MRE and provide a more complete picture of the growth achieved at Selebi Main; the planned completion and use of
BHEM surveying around SMD-26-217 to further test the lateral and down-plunge extent of Selebi Main; the identification of the Third Zone
as an additional target for follow-up drilling and the potential for its lateral and down-plunge expansion; the Company’s plans
for ongoing drilling, geological modelling and BHEM to evaluate the extent of all three mineralized zones and identify further areas
of thick massive sulphide mineralization; the High-Grade Trend extending to approximately 1.5 kilometres and the Company’s plans
to test its continued extent through ongoing drilling and BHEM targeting; the expectation that the Selebi Main system has continued to
grow beyond the resource currently being modelled in the 2026 MRE; and future resource modelling and potential mine planning. These forward-looking
statements, by their nature, require the Company to make certain assumptions and necessarily involve known and unknown risks and uncertainties
that could cause actual results to differ materially from those expressed or implied in these forward-looking statements. Factors that
could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating
costs varying significantly from estimates; the preliminary nature of drilling and metallurgical test results; the ability of exploration
results to predict mineralization; the ability of the Company to implement its drilling, geoscience and metallurgical work on its properties
and work plans generally; prefeasibility or the feasibility of mine production; delays in obtaining or failures to obtain required governmental,
environmental or other project approvals; uncertainties relating to the availability and costs of financing needed in the future; changes
in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other risks involved in the
mineral exploration and development industry; and those risks set out in the Company’s filings with the SEC on EDGAR (www.sec.gov)
and public disclosure record on SEDAR+ (www.sedarplus.ca), in each case, under NEXM’s issuer profile. Although the Company
believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue
reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given
that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise
any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.
7
GRAPHIC
GRAPHIC
Filename: ex99-1_001.jpg · Sequence: 3
Binary file (16546 bytes)
Download ex99-1_001.jpg
GRAPHIC
GRAPHIC
Filename: ex99-1_002.jpg · Sequence: 4
Binary file (372281 bytes)
Download ex99-1_002.jpg
GRAPHIC
GRAPHIC
Filename: ex99-1_003.jpg · Sequence: 5
Binary file (594152 bytes)
Download ex99-1_003.jpg
GRAPHIC
GRAPHIC
Filename: ex99-1_004.jpg · Sequence: 6
Binary file (239707 bytes)
Download ex99-1_004.jpg
XML — IDEA: XBRL DOCUMENT
XML
Filename: R1.htm · Sequence: 11
v3.26.3
Cover
Sep. 23, 2026
Cover [Abstract]
Document Type
8-K
Amendment Flag
false
Document Period End Date
Sep. 23, 2026
Entity File Number
001-42750
Entity Registrant Name
NEXMETALS
MINING CORP.
Entity Central Index Key
0000795800
Entity Tax Identification Number
00-0000000
Entity Incorporation, State or Country Code
A1
Entity Address, Address Line One
1111
West Hastings Street
Entity Address, Address Line Two
15th
Floor
Entity Address, City or Town
Vancouver
Entity Address, State or Province
BC
Entity Address, Country
CA
Entity Address, Postal Zip Code
V6E
2J3
City Area Code
(604)
Local Phone Number
770-4334
Written Communications
false
Soliciting Material
false
Pre-commencement Tender Offer
false
Pre-commencement Issuer Tender Offer
false
Title of 12(b) Security
Common
Shares, no par value
Trading Symbol
NEXM
Security Exchange Name
NASDAQ
Entity Emerging Growth Company
false
X
- Definition
Boolean flag that is true when the XBRL content amends previously-filed or accepted submission.
+ References
No definition available.
+ Details
Name:
dei_AmendmentFlag
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Area code of city
+ References
No definition available.
+ Details
Name:
dei_CityAreaCode
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Cover page.
+ References
No definition available.
+ Details
Name:
dei_CoverAbstract
Namespace Prefix:
dei_
Data Type:
xbrli:stringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
For the EDGAR submission types of Form 8-K: the date of the report, the date of the earliest event reported; for the EDGAR submission types of Form N-1A: the filing date; for all other submission types: the end of the reporting or transition period. The format of the date is YYYY-MM-DD.
+ References
No definition available.
+ Details
Name:
dei_DocumentPeriodEndDate
Namespace Prefix:
dei_
Data Type:
xbrli:dateItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The type of document being provided (such as 10-K, 10-Q, 485BPOS, etc). The document type is limited to the same value as the supporting SEC submission type, or the word 'Other'.
+ References
No definition available.
+ Details
Name:
dei_DocumentType
Namespace Prefix:
dei_
Data Type:
dei:submissionTypeItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Address Line 1 such as Attn, Building Name, Street Name
+ References
No definition available.
+ Details
Name:
dei_EntityAddressAddressLine1
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Address Line 2 such as Street or Suite number
+ References
No definition available.
+ Details
Name:
dei_EntityAddressAddressLine2
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the City or Town
+ References
No definition available.
+ Details
Name:
dei_EntityAddressCityOrTown
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
ISO 3166-1 alpha-2 country code.
+ References
No definition available.
+ Details
Name:
dei_EntityAddressCountry
Namespace Prefix:
dei_
Data Type:
dei:countryCodeItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Code for the postal or zip code
+ References
No definition available.
+ Details
Name:
dei_EntityAddressPostalZipCode
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the state or province.
+ References
No definition available.
+ Details
Name:
dei_EntityAddressStateOrProvince
Namespace Prefix:
dei_
Data Type:
dei:stateOrProvinceItemType
Balance Type:
na
Period Type:
duration
X
- Definition
A unique 10-digit SEC-issued value to identify entities that have filed disclosures with the SEC. It is commonly abbreviated as CIK.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityCentralIndexKey
Namespace Prefix:
dei_
Data Type:
dei:centralIndexKeyItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Indicate if registrant meets the emerging growth company criteria.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityEmergingGrowthCompany
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Commission file number. The field allows up to 17 characters. The prefix may contain 1-3 digits, the sequence number may contain 1-8 digits, the optional suffix may contain 1-4 characters, and the fields are separated with a hyphen.
+ References
No definition available.
+ Details
Name:
dei_EntityFileNumber
Namespace Prefix:
dei_
Data Type:
dei:fileNumberItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Two-character EDGAR code representing the state or country of incorporation.
+ References
No definition available.
+ Details
Name:
dei_EntityIncorporationStateCountryCode
Namespace Prefix:
dei_
Data Type:
dei:edgarStateCountryItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The exact name of the entity filing the report as specified in its charter, which is required by forms filed with the SEC.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityRegistrantName
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The Tax Identification Number (TIN), also known as an Employer Identification Number (EIN), is a unique 9-digit value assigned by the IRS.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityTaxIdentificationNumber
Namespace Prefix:
dei_
Data Type:
dei:employerIdItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Local phone number for entity.
+ References
No definition available.
+ Details
Name:
dei_LocalPhoneNumber
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 13e
-Subsection 4c
+ Details
Name:
dei_PreCommencementIssuerTenderOffer
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 14d
-Subsection 2b
+ Details
Name:
dei_PreCommencementTenderOffer
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Title of a 12(b) registered security.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b
+ Details
Name:
dei_Security12bTitle
Namespace Prefix:
dei_
Data Type:
dei:securityTitleItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the Exchange on which a security is registered.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection d1-1
+ Details
Name:
dei_SecurityExchangeName
Namespace Prefix:
dei_
Data Type:
dei:edgarExchangeCodeItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as soliciting material pursuant to Rule 14a-12 under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 14a
-Subsection 12
+ Details
Name:
dei_SolicitingMaterial
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Trading symbol of an instrument as listed on an exchange.
+ References
No definition available.
+ Details
Name:
dei_TradingSymbol
Namespace Prefix:
dei_
Data Type:
dei:tradingSymbolItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as written communications pursuant to Rule 425 under the Securities Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Securities Act
-Number 230
-Section 425
+ Details
Name:
dei_WrittenCommunications
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration