Groowe Groowe BETA / Newsroom
⏱ News is delayed by 15 minutes. Sign in for real-time access. Sign in

Form 8-K

sec.gov

8-K — UNITED STATES ANTIMONY CORP

Accession: 0001104659-26-118600

Filed: 2026-10-26

Period: 2026-10-26

CIK: 0000101538

SIC: 3330 (PRIMARY SMELTING & REFINING OF NONFERROUS METALS)

Item: Regulation FD Disclosure

Item: Other Events

Item: Financial Statements and Exhibits

Documents

8-K — tm2628217d1_8k.htm (Primary)

EX-23.1 — EXHIBIT 23.1 (tm2628217d1_ex23-1.htm)

EX-99.1 — EXHIBIT 99.1 (tm2628217d1_ex99-1.htm)

EX-99.2 — EXHIBIT 99.2 (tm2628217d1_ex99-2.htm)

GRAPHIC (tm2628217d1_ex23-1img001.jpg)

GRAPHIC (tm2628217d1_ex99-2img001.jpg)

GRAPHIC (tm2628217d1_ex99-2img002.jpg)

GRAPHIC (tm2628217d1_ex99-2img003.jpg)

GRAPHIC (tm2628217d1_ex99-1sp1img001.jpg)

GRAPHIC (tm2628217d1_ex99-1sp2img001.jpg)

GRAPHIC (tm2628217d1_ex99-1sp2img002.jpg)

GRAPHIC (tm2628217d1_ex99-1sp2img003.jpg)

GRAPHIC (tm2628217d1_ex99-1sp2img004.jpg)

GRAPHIC (tm2628217d1_ex99-1sp2img005.jpg)

GRAPHIC (tm2628217d1_ex99-1sp2img006.jpg)

GRAPHIC (tm2628217d1_ex99-1sp2img007.jpg)

GRAPHIC (tm2628217d1_ex99-1sp2img008.jpg)

GRAPHIC (tm2628217d1_ex99-1sp2img009.jpg)

GRAPHIC (tm2628217d1_ex99-1sp2img010.jpg)

GRAPHIC (tm2628217d1_ex99-1sp2img011.jpg)

GRAPHIC (tm2628217d1_ex99-1sp2img012.jpg)

GRAPHIC (tm2628217d1_ex99-1sp3img01.jpg)

GRAPHIC (tm2628217d1_ex99-1sp3img02.jpg)

GRAPHIC (tm2628217d1_ex99-1sp3img03.jpg)

GRAPHIC (tm2628217d1_ex99-1sp3img04.jpg)

GRAPHIC (tm2628217d1_ex99-1sp3img05.jpg)

GRAPHIC (tm2628217d1_ex99-1sp3img06.jpg)

GRAPHIC (tm2628217d1_ex99-1sp3img07.jpg)

GRAPHIC (tm2628217d1_ex99-1sp3img08.jpg)

GRAPHIC (tm2628217d1_ex99-1sp3img09.jpg)

GRAPHIC (tm2628217d1_ex99-1sp3img10.jpg)

GRAPHIC (tm2628217d1_ex99-1sp3img11.jpg)

GRAPHIC (tm2628217d1_ex99-1sp3img12.jpg)

GRAPHIC (tm2628217d1_ex99-1sp3img13.jpg)

GRAPHIC (tm2628217d1_ex99-1sp3img14.jpg)

GRAPHIC (tm2628217d1_ex99-1img027.jpg)

GRAPHIC (tm2628217d1_ex99-1img028.jpg)

GRAPHIC (tm2628217d1_ex99-1img029.jpg)

GRAPHIC (tm2628217d1_ex99-1img030.jpg)

GRAPHIC (tm2628217d1_ex99-1img031.jpg)

GRAPHIC (tm2628217d1_ex99-1img063.jpg)

GRAPHIC (tm2628217d1_ex99-1img032.jpg)

GRAPHIC (tm2628217d1_ex99-1img033.jpg)

GRAPHIC (tm2628217d1_ex99-1img034.jpg)

GRAPHIC (tm2628217d1_ex99-1sp5img001.jpg)

GRAPHIC (tm2628217d1_ex99-1sp5img002.jpg)

GRAPHIC (tm2628217d1_ex99-1sp5img003.jpg)

GRAPHIC (tm2628217d1_ex99-1sp5img004.jpg)

GRAPHIC (tm2628217d1_ex99-1sp5img005.jpg)

GRAPHIC (tm2628217d1_ex99-1sp5img006.jpg)

GRAPHIC (tm2628217d1_ex99-1sp5img007.jpg)

GRAPHIC (tm2628217d1_ex99-1sp5img008.jpg)

GRAPHIC (tm2628217d1_ex99-1imgsp0601.jpg)

GRAPHIC (tm2628217d1_ex99-1imgsp0602.jpg)

GRAPHIC (tm2628217d1_ex99-1imgsp0603.jpg)

GRAPHIC (tm2628217d1_ex99-1imgsp0604.jpg)

GRAPHIC (tm2628217d1_ex99-1imgsp0605.jpg)

GRAPHIC (tm2628217d1_ex99-1imgsp0606.jpg)

GRAPHIC (tm2628217d1_ex99-1imgsp0608.jpg)

GRAPHIC (tm2628217d1_ex99-1imgsp0607.jpg)

GRAPHIC (tm2628217d1_ex99-1imgsp0609.jpg)

GRAPHIC (tm2628217d1_ex99-1imgsp0610.jpg)

GRAPHIC (tm2628217d1_ex99-1img053.jpg)

GRAPHIC (tm2628217d1_ex99-1img054.jpg)

GRAPHIC (tm2628217d1_ex99-1img055.jpg)

GRAPHIC (tm2628217d1_ex99-1img056.jpg)

GRAPHIC (tm2628217d1_ex99-1img057.jpg)

GRAPHIC (tm2628217d1_ex99-1img058.jpg)

GRAPHIC (tm2628217d1_ex99-1img059.jpg)

GRAPHIC (tm2628217d1_ex99-1img060.jpg)

GRAPHIC (tm2628217d1_ex99-1img061.jpg)

GRAPHIC (tm2628217d1_ex99-1img062.jpg)

XML — IDEA: XBRL DOCUMENT (R1.htm)

8-K — FORM 8-K

8-K (Primary)

Filename: tm2628217d1_8k.htm · Sequence: 1

false

0000101538

0000101538

2026-10-26

2026-10-26

0000101538

UAMY:CommonStockOneMember

2026-10-26

2026-10-26

0000101538

UAMY:CommonStockTwoMember

2026-10-26

2026-10-26

iso4217:USD

xbrli:shares

iso4217:USD

xbrli:shares

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 8-K

CURRENT REPORT

Pursuant to Section 13 OR 15(d) of the

Securities Exchange Act of 1934

Date of report (Date of earliest event reported)

October 26, 2026

UNITED

STATES ANTIMONY CORPORATION

(Exact

name of registrant as specified in its charter)

Texas

001-08675

81-0305822

(State or other jurisdiction

of incorporation)

(Commission

File No.)

(IRS Employer

Identification Number)

4438

W. Lovers Lane, Unit

100, Dallas,

TX

75209

(Address of principal executive offices)

(Zip Code)

Registrant’s telephone number, including

area code: (406)

606-4117

Not Applicable

(Former name or former address, if changed since

last report.)

Check the appropriate box below if the Form 8-K

filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:

¨

Written communications

pursuant to Rule 425 under the Securities Act (17 CFR 230.425)

¨

Soliciting material pursuant

to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)

¨

Pre-commencement communications

pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))

¨

Pre-commencement communications

pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c)) Securities registered pursuant to Section 12(b) of

the Act:

Title

of each class

Trading

Symbol(s)

Name

of each exchange on which

registered

Common

Stock, $0.01 par value

UAMY

NYSE

Common

Stock, $0.01 par value

UAMY

NYSE

Texas

Indicate by check mark whether the registrant

is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405 of this chapter) or Rule 12b-2 of the

Securities Exchange Act of 1934 (§240.12b-2 of this chapter).

Emerging growth company ¨

If an emerging growth company, indicate by check

mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting

standards provided pursuant to Section 13(a) of the Exchange Act. ¨

Item 7.01 Regulation FD Disclosure.

On October 26, 2026, the Company issued a press

release announcing the completion of a new technical report summary on its Nolan Creek Property located in the State of Alaska. A copy

of the press release is furnished as Exhibit 99.2 to this Current Report on Form 8-K. The information in this Item 7.01, including Exhibit

99.2, is being furnished and shall not be deemed “filed” for purposes of Section 18 of the Securities Exchange Act of 1934,

as amended (the “Exchange Act”), or otherwise subject to the liabilities of that section, nor shall it be deemed incorporated

by reference in any filing under the Securities Act of 1933, as amended, or the Exchange Act, except as expressly set forth by specific

reference in such filing.

Item 8.01 Other Events.

On October 26, 2026, United States Antimony Corporation

(the “Company”) provided an operational update on it’s Nolan Creek Project, a mining claim prospective for both

antimony and gold, located in northern Alaska, approximately 175 miles north of Fairbanks, Alaska, by making available a Technical Report

Summary (“TRS”) titled “Initial Assessment and Estimation of Placer Gold Lode Antimony-Gold Resources, Nolan

Creek Area Wiseman District Alaska” for the property, with an original effective date of July 29, 2008 and subsequently amended

as of September 15, 2026. The TRS has recently been prepared and completed in accordance with the requirements of subpart 1300 of

Regulation S-K.  Both TRS documents were completed by Mr. Thomas K. Bundtzen, President of Pacific Rim Geological Consulting, Inc.,

who is a “Qualified Person” as such term is defined in subpart 1300 of Regulation S-K. The Nolan Creek Property was acquired

by the Company at a public auction on January 30, 2026.

The Nolan Creek Project is directly owned by Great

Land Minerals (“GLM”), a wholly-owned subsidiary of the Company.

For a complete description of the Nolan Creek

Project, see the TRS, which is filed as Exhibit 99.1 to this Current Report on Form 8-K and is incorporated herein by reference.

Cautionary Note Regarding Forward-Looking Statements

This Current Report on Form 8-K contains forward-looking

statements. Forward-looking statements reflect management’s current knowledge, assumptions, judgment, and expectations regarding

future performance or events. Although management believes that the expectations reflected in such statements are reasonable, they give

no assurance that such expectations will prove to be correct, and you should be aware that actual events or results may differ materially

from those contained in the forward- looking statements. Words such as "will," "expect," "intend," "plan,"

"potential," "possible," "goals," "accelerate," "continue," and similar expressions

identify forward-looking statements.

Forward-looking statements are subject to a number

of risks and uncertainties including, but not limited to, those described in the Company’s filings on Form 10-K, Form 10-Q, and

Form 8-K with the United States Securities and Exchange Commission.

All forward-looking statements are expressly

qualified in their entirety by this cautionary notice. You should not rely upon any forward-looking statements as predictions of future

events. The Company undertakes no obligation to revise or update any forward-looking statements made in this Current Report on Form 8-K

to reflect events or circumstances after the date hereof, to reflect new information or the occurrence of unanticipated events, to update

the reasons why actual results could differ materially from those anticipated in the forward-looking statements, in each case, except

as required by law.

Item 9.01 Financial Statements and Exhibits.

(d) Exhibits.

Exhibit

No.

Description

23.1

Consent of Thomas K. Bundtzen, Pacific Rim Geological Consulting, Inc.

99.1

Technical Report Summary on the Nolan Creek Property, Alaska

99.2

Press Release of United States Antimony Corporation, dated October 21, 2026

104

Cover Page Interactive Data File (embedded with the inline XBRL document)

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf

by the undersigned hereunto duly authorized.

UNITED STATES ANTIMONY CORPORATION

Dated:

October 26, 2026

By:

/s/ Shawn Winkler

Shawn Winkler

SVP and Chief Financial Officer

EX-23.1 — EXHIBIT 23.1

EX-23.1

Filename: tm2628217d1_ex23-1.htm · Sequence: 2

Exhibit 23.1

Pacific Rim Geological Consulting, Inc.

P.O. Box 81906, Fairbanks, Alaska 99708

Phone 907 388 6607 Email: Bundtzen@pacrimgeol.com

October 22, 2026

United States Securities and Exchange Commission

100 F Street, N.E.

Washington, D.C. 20549

Re: United States Antimony Corporation (USAC) – Consent of Qualified

Person

Ladies and Gentlemen:

Pursuant to the requirements of Subpart 1300 of Regulation S-K (17

CFR § 229.1300 et seq.) under the Securities Act of 1933, as amended, and the Securities Exchange Act of 1934, as amended, I,

Thomas Bundtzen, hereby consent to:

1. The public filing and use by United States Antimony Corporation (the "Company") of the technical report summary titled "SEC

S-K 1300 Technical Report Summary, Initial Assessment and Estimation of Placer Gold and Lode Antimony-Gold Resources, Nolan Creek

Area, Wiseman Mining District Alaska" dated October 6, 2026 (the "Technical Report Summary") as an exhibit to and

in connection with the Company's Form 8-K, and any other filings made by the Company with the U.S. Securities and Exchange Commission

(the "SEC").

2. The use of my name, and any quotations from or summarization of the Technical Report Summary, in the Company’s SEC filings,

including any registration statements, annual reports, or prospectus supplements.

3. The incorporation by reference of the Technical Report Summary, and references to my name or my status as a Qualified Person, into

any subsequently filed registration statements or amendments thereto.

I hereby confirm that I have read the relevant disclosures in the Company’s

filing(s) for which this consent is provided, and that the disclosure fairly and accurately represents the information, conclusions,

and mineral resource estimates contained in the Technical Report Summary for which I am responsible as a Qualified Person.

Sincerely,

Thomas K. Bundtzen

Qualified Person (QP)

AIPG Certified Professional Geologist (CPG) #10912

Alaska Certified Professional Geologist #592

1

EX-99.1 — EXHIBIT 99.1

EX-99.1

Filename: tm2628217d1_ex99-1.htm · Sequence: 3

Exhibit 99.1

REPORT

SEC S-K 1300 Technical Report Summary

Initial Assessment and Estimation

of Placer Gold and Lode Antimony-Gold Resources, Nolan Creek Area, Wiseman Mining District Alaska

Submitted to:

U.S. Antimony Corporation (USAC)

4438 West Lovers Lane, Suite 100,

Dallas Texas 75209 USA

Submitted by:

Pacific Rim Geological Consulting, Inc.,

P.O. Box 81906, Fairbanks, Alaska

USA 99708 1 907 388 6607

E-Mail: Bundtzen@pacrimgeol.com

October 2nd, 2026

TABLE OF CONTENTS

Date

and Signature Page

9

1.0

EXECUTIVE

SUMMARY

11

1.1

Property

Description and Ownership

11

1.2

Geology

and Mineralization

11

1.3

Status

of Exploration

12

1.4

Development

and Operations

12

1.5

Mineral

Resource Estimate

13

1.6

Mineral

Reserve Estimate

14

1.7

Mining

Methods

14

1.8

Processing

and Recovery Methods

14

1.9

Capital

and Operating Costs

14

1.10

Economic

Analysis

14

1.11

Infrastructure

14

1.12

Permitting

Requirements

15

1.10

Qualified

Person’s Conclusions and Recommendations

15

2.0

INTRODUCTION

18

2.1

Registrant

Information

18

2.2

Terms

of Reference and Purpose

18

2.3

Sources

of Information

18

2.4

Personal

Inspection Summary

19

2.5

Previously

Filed Technical Report Summary Reports

20

2.6

Units

of Measure

20

3.0

PROPERTY

DESCRIPTION

21

3.1

Nolan

Creek area claims

21

4.0

ACCESSIBILITY,

CLIMATE, LOCAL INFRASTRUCTURE, AND PHYSIOGRAPHY

24

4.1

Topography

and Land Description

24

4.2

Access

to the Property

24

4.3

Climate

Description

24

4.4

Vegetation

and Land Use

26

2

4.5

Availability

of Required Infrastructure

27

5.0

HISTORY

29

5.1

Mining

History of the Area

29

5.2

Drilling

Exploration Summary

29

5.3

Historical

Production

31

6.0

GEOLOGICAL

SETTING, MINERALIZATION AND DEPOSIT

33

6.1

Regional

Geology

33

6.2

Local

and Property Geology

34

6.3

Alteration

and Mineralization

36

6.4

Deposit

Types

36

7.0

EXPLORATION

39

7.1

Exploration

of Heavy Mineral Placer deposits

39

7.2

Nolan

Antimony-Gold Lode Deposits

39

8.0

SAMPLE

PREPARATION, ANALYSIS, AND SECURITY

60

8.1

Site

Sampling, Preparation Methods and Security

60

8.2

Laboratory

Sample Preparation Methods and Analytical Procedures

65

8.3

Quality

Control and Quality Assurance Programs

66

8.4

Qualified

Person’s Opinion Regarding Sample Preparation, Security and Analytical Procedures

67

9.0

DATA

VERIFICATION

68

9.1

Exploration

and Mineral Resource Data Verification

68

9.2

Exploration

Data Limitations

70

10.0

MINERAL

PROCESSING AND METALLURGICAL TESTING

71

10.1

Placer Deposits

71

10.2

Lode Deposits

74

10.3

Trace Element Content of Nolan Mineralization

78

10.4

Recovery Estimates

81

10.5

Qualified Person’s Opinion

81

11.0

MINERAL

RESOURCE ESTIMATES

82

11.1

Disclosure

82

11.2

Key Assumptions, Parameters, and Methods

82

3

11.3

Mineral

Resource Estimate

84

11.4

Measured

Lode Antimony-Gold Resource at Nolan Creek

94

11.5

Indicated

Lode Antimony-Gold Resource Estimate at Nolan Creek

101

11.6

Inferred

Lode Antimony-Gold Resource Estimate at Nolan Creek

105

11.7

Mineral

Resource Uncertainty Discussion

115

11.8

Assumptions

for Multi-Commodity Mineral Resource Estimate

119

11.9

Qualified

Person’s Opinion on Factors that Influence Economic Extraction

120

12.0

MINERAL RESERVE

ESTIMATES

121

13.0

MINING METHODS

122

14.0

PROCESSING AND RECOVERY

Methods

123

15.0

INFRASTRUCTURE

124

15.1

Previous

Production Infrastructure on property

124

15.2

Present

State of Infrastructure on Property

124

16.0

MARKET STUDIES

125

17.0

ENVIRONMENTAL STUDIES,

PERMITTING, AND PLANS, NEGOTIATIONS OR AGREEMENTS WITH LOCAL INDIVIDUALS OR GROUPS

126

17.1

Geotechnical-Environmental

Studies

126

17.2

Hydrological

Studies

128

17.3

Environmental

Monitoring

130

17.4

Water

Management Plan

130

17.5

Mine

Closure

130

17.6

Permitting

131

17.7

Plans,

Negotiations, or Agreements with Local Individuals or Groups

134

17.8

Descriptions

of any commitments to ensure local hiring

134

17.9

Qualified

Person’s Opinion

134

18.0

CAPITAL AND OPERATING

COSTS

135

19.0

ECONOMIC ANALYSIS

136

20.0

ADJACENT PROPERTIES

137

21.0

OTHER RELEVANT DATA

AND INFORMATION

138

22.0

INTERPRETATION AND

CONCLUSIONS

139

22.1

Mineral

Resources

139

4

22.2

Environmental,

Permitting and Social

139

22.3

Mineral

Processing

139

22.4

Mineral

Reserves

140

23.0

RECOMMENDATIONS

141

23.1

Mineral

Resources

141

23.2

Environmental,

Permitting and Social

144

23.3

Geotechnical

144

23.4

Mineral

Processing

144

23.5

Tailings

Storage Facility

145

23.6

Mineral

Reserves

145

24.0

REFERENCES

146

25.0

RELIANCE

ON INFORMATION PROVIDED BY REGISTRANT

153

26.0

APPENDIX

I

154

27.0

APPENDIX

II

168

Figures

Figure 3.1

Map of the thirty-six (36)

federal claims purchased by USAC, January 2026

23

Figure 3.2

Forty-eight (48)

Alaska State Claims covering the Nolan Creek area 2026

23

Figure 4.1

Nolan Creek location map, showing

access features to claims held by USAC

25

Figure 4.2

Coldfoot Camp, 06 13 2026;

USAC vehicle in foreground; photo by QP

26

Figure 4.3

Main Street of Wiseman Village

on 06 13 2026. Photo by QP

27

Figure 4.4

Nolan Mine Camp as it appeared

during spring, 2008; From QP files

28

Figure 5.1

Prospector #3 Multi-Purpose

NQ Core Drill TM, October 22, 2007; QP files

30

Figure 5.2

Low profile truck used in underground

placer mining, circa 2006; from QP

32

Figure 5.3

Washing plant washed pay gravels

from 2005-2007, Swede Channel project

32

Figure 6.1

Geologic map of the Nolan Creek

area; from Dillon and Reifenstuhl (1990)

35

Figure 6.2

Photomicrographs, Workman’s

Bench mineralized system

38

Figure 7.1

Location Map Showing Locations

of 771 placer drill collars, Nolan Creek

40

Figure 7.2

Plan of Swede Channel Underground

Development; 2005-2006

41

Figure 7.3

Plan of Mary’s East Underground

Development and Exploration Drilling

42

Figure 7.4

Contour map from drill data

and underground workings in Nolan Creek Valley

43

5

Figure 7.5

A—gold concentrate

rich in stibnite; B—placer nuggets of gold plus stibnite

43

Figure 7.6

Map of Nolan Creek Basin with

870 Khz geophysical (resistivity) anomaly

44

Figure 7.7

Soil sample locations on Workman

Bench-Pringle Bench area

45

Figure 7.8

1994 inaugural percussion (RC)

drill hole results for Workman’s Bench

47

Figure 7.9

Selected Stibnite-bearing intervals

in 2008 and 2009 diamond drill hole

48

Figure 7.10

Schematic of Workman’s

Bench, showing locations of drill holes

54

Figure 7.11

Schematic, cross section A-A’,

southern portion of Workman’s Bench

55

Figure 7.12

Schematic, cross section B-B’

in the central portion, Workman’s Bench

56

Figure 7.13

Schematic, cross section C-C’

in northern portion Workman’s Bench

57

Figure 7.14

Schematic plane view of Pringle

Bench, showing locations of drill holes

58

Figure 7.15

Schematic, cross sectional

profile D-D’ on Pringle Bench

59

Figure 8.1

Geologists collect channel

sample underground, Workmen’s Bench

62

Figure 8.2

Location, underground channel

samples, Workman’s Bench

63

Figure10.1

Side view of 2007 Nolan washing

plant

72

Figure10.1

Plan view of 2006 Nolan wash

plant

73

Figure 10.3

Tabled Concentrate from Workman’s

Bench analyzed Hazen Research Labs

75

Figure 10.4

Hazen mineralogical separation

process flowchart for Workman’s Bench

76

Figure 10.5

Gold (bright color) in stibnite

(gray), Workman’s Bench Bulk sample

77

Figure 10.6

Stibnite-gold concentrates

from table products from Nolan Bulk Sample

78

Figure 10.7

Drill plan showing the locations

of mercury analyses, 2008 core drilling

80

Figure11.1

Location of placer-style gold

mineral resource estimates, Nolan Creek

85

Figure11.2

Polygon layout for D-Block

#1 and 3B3-Block indicated resources placer gold

88

Figure 11.3

Histogram plots of antimony

(on left) and gold (on right) distribution

91

Figure 11.4

As-Au and Sb-Au correlations

for assay results Workman’s Bench

91

Figure 11.5

Surface view of Workman’s

bench mineralized zones with drill collars

95

Figure 11.6

Measured resource polygons

for ‘A’ Zone, Workman’s Bench, Nolan Creek

96

Figure 11.7

Measured resource polygons

for ‘B’ Zone, Workman’s Bench

98

Figure 11.8

Measured resource polygons

for ‘West’ Zone, Workman’s Bench

100

Figure 11.9

Indicated Resource polygons

for ‘A’ Zone, Workman’s Bench, 2009 drilling

103

Figure 11.10

Indicated resource polygons

for B Zone, Workman’s Bench, 2009 drilling

104

Figure 11.11

Inferred Resource polygons

for ‘A’ Zone, Workman’s Bench

106

Figure 11.12

Inferred Resource polygons

for ‘B’ Zone, Workman’s Bench

107

Figure 11.13

Inferred Resource polygons

for ‘C’ Zone, Workman’s Bench

108

Figure 11.14

Surface view of Pringle Bench

mineralized zones trenches and drill locales

111

Figure 11.15

Inferred Resource polygons

for ‘A’ Zone, Pringle Bench; 2009 drilling

112

Figure 11.16

Inferred Resource polygons

for West Zone, Pringle Bench; 2009 drilling

113

Figure 11.17

Plan view image of Workman’s

bench ‘A’ Zone vein-fault. Scale 100 feet

117

Figure 11.18

Side profile of Workman’s

Bench ‘A’ Zone looking northwest; with Sb grade

118

6

Figure 15.1

A—Fuel

tank storage facility in 2009; B—Same Fuel tank storage in 2026

124

Figure 17.1

Land reclamation

conducted on previously mined Odgen-Eureka Bench

126

Figure

17.2

A—Underground

drift looking E/Se in 2008 Note near-horizontal, phyllitic schist bands in base and roof; B—portal on April 12th

, 2008. Photos from QP files

128

Figure 17.3

Core logging

summary from 2007 core drilling, showing acidity

129

Figure

17.4

A--Inside

machine shop as it appeared in 2006; note dirt floor in shop; B—inside machine shop as it appeared in 06 13 2026—both

from QP files

131

Figure 23.1

Priority

1 work program for Workman’s Bench

141

Figure

23.2

Priority

II program for Pringle Bench

142

Figure 23.3

Removal of

overburden on Pringle Bench with hydraulic technology

142

Figure 23.4

Pringle Bench

mineralized surface exposed by removal of overburden

143

Figure 23.5

USAC manger

Rodney Blakestad inspects drill core storage facility

143

Tables

Table 2. 1

Units of measure

used in this Technical Report

20

Table 3.1

Legal Description the Federal

Mining Claims acquired by USAC, January, 2026

22

Table 5.1

Summary of lode drilling programs,

Nolan Creek

30

Table 5.2

Placer gold production from

Silverado properties, 1979 to 2007, Nolan Creek

31

Table 7.1

Summary of lode exploration

activities, Nolan Creek, 1981-to-2009

46

Table 7.2

Collar location and data, Pringle

Bench, 2006-2009 Exploration

49

Table 7.3

Collar location and data, Workman’s

Bench; 2007-2009 Exploration

50

Table 8.1

Drill hole intersection summary

for 3B3-Block

61

Table 8.2

Table of selected sample composites,

Workman’s Bench drill program

64

Table 9.1

Duplicate analytical comparisons

between QP and contractor samples

68

Table 9.2

List of Duplicate Samples,

Workman’s Bench Drilling Program 2008

69

Table 10.1

Composition of the Heavy-Liquid

Sink Product

77

Table 10.2

Stibnite quality comparative

characteristics from Amalgamet-Canada

81

Table 11.1

Reconciliation of estimated

gold content for two selected placer deposits

86

Tables 11.2

D Block #1 Below Discovery

and 3B3 Block indicated resource estimates

87

Table 11.3

Placer deposit indicated mineral

resources, USAC Nolan Creek claims

89

Table 11.4

Characteristics of indicated

resources-measured resources versus inferred resources, Nolan Creek antimony-gold deposits, Alaska

89

Table 11.5

Analysis of high grade, gold

intervals, Workman’s/Pringle Bench

92

Table 11.6

Specific gravity (SG) measurements

(ASTM C 127) for Workman’s Bench

94

Table 11.7

Measured lode mineral resource,

Workman’s Bench, Nolan Creek

94

Table 11.8

Polygonal measured resource

block summary, ‘A’ Zone, Workman’s Bench

97

Table 11.9

Polygonal probable resource

for ‘West’ Zone, Workman’s Bench

99

7

Table 11.10

Data for probable

resource in ‘A’, ‘B’ and ‘West’ Zones, Workman’s Bench

101

Table 11.11

Indicated resource summary

2009 drill program, A-Zone, Workman’s Bench

102

Table 11.12

Indicated resource summary

2009 Drill Program, B-Zone, Workman’s Bench

102

Table 11.13

Measured and Indicated lode

resources, Workman’s Bench

105

Table 11.14

Total inferred lode mineral

resources, Workman’s Bench and Pringle Bench

105

Table 11.15

Polygonal Block Inferred Resource

Estimate for ‘C Zone’, Workman’s Bench

109

Table 11.16

Polygonal Inferred Resource

Estimate ‘A Zone’, Workman’s Bench

109

Table 11.17

Polygonal Inferred Resource

Estimate ‘West Zone’, Workman’s Bench

109

Table 11.18

Polygonal Block inferred resource

estimate for ‘B-Zone’, Workman’s Bench

109

Table 11.19

Summary of Inferred Antimony

and Gold Resources From Workman’s Bench

110

Table 11.20

Polygonal inferred resource

‘A’ Zone, Pringle Bench Bundtzen (2009)

114

Table 11.21

Polygonal inferred resource

Pringle bench, A-Zone, Bundtzen (2011)

114

Table 11.22

Polygonal inferred resource

calculation for ‘West’ Zone, Pringle Bench

114

Table 11.23

Polygonal inferred resource

from 2009 Drill Program, West-Zone, Pringle Bench

115

Table 11.24

Total Inferred Lode Mineral

Resource calculation, Pringle Bench

115

Table 11.25

Proven Indicated Resources

calculated by VulcanTM

118

Table 11.26

Comparative Results of Polygonal

Method versus VulcanTM block model

119

Table 17.1

Results of Field Rinses of

samples, Nolan Lode Project

133

Table 17.2

Underground sampling program

for ML/ARD Program, Nolan Camp, 2008

133

Appendices

APPENDIX I: Summary

of Relevant Sample Data Used in Calculation of all Categories of Sb and Au Resources from Workman’s Bench That are Described

in this Technical Report; Including Relevant Trace Element Data

154

APPENDIX II Summary of Relevant

Sample Data Used in Calculation of Inferred Sb and Au Resources from Pringle Bench that are described in this Technical Report

168

8

DATE AND SIGNATURE PAGE

The effective date of the Mineral Resources

Estimates is October 6th, 2026

Author and

Sections

Signature

Qualified

Person

Thomas K. Bundtzen

All Sections

/s/ Thomas K. Bundtzen

The qualifications and relevant experiences

of the QP is summarized below:

Thomas K. Bundtzen (the QP):

§

Education:

B.S.

Geology, 1973 College of Earth Science and Mineral Industries (CESMI), University of Alaska-Fairbanks.

M.S.

Economic Geology, 1981, Department of Geology and Geophysics, University of Alaska-Fairbanks.

§

Years of Experience

Twenty-five

(25) years as senior economic geologist with the Alaska Division of Geological and Geophysical Surveys (1972-1997).

Twenty-eight (28) years as

President and Principal Economic Geologist with Alaska-based firm Pacific Rim Geological Consulting, Inc. based in Fairbanks, Alaska

USA (1998-2026.

§

Relevant Experience

During 1979-1981, the QP completed

his M.S. Thesis in the Kantishna Mining district of Interior Alaska and studied four stibnite-gold deposits, including the Stampede mine,

Alaska’s largest historic producer of antimony. Since 1980, the QP has studied and sampled semi-massive stibnite vein deposits

in the Fairbanks, Tok, Iditarod, Cape Nome, Ruby and Innoko mining districts of Interior and Western Alaska.

9

While participating in an

International Minerals Exchange between the U.S. Geological Survey, Soviet (later Russian) Ministry of Natural Resource, the Alaska Division

of Geological and Geological Survey, and the Geological Survey of Canada (1989-1997), the QP examined stibnite deposits and mines throughout

the Russian Far East.

From 2004-2011, the QP conducted

field investigations in the Fairbanks and Wiseman districts and has written Technical Reports for the firm Silverado Gold Mines Ltd.,

the former owner of the claims in Nolan Creek valley now held by USAC. These include the Workman’s Bench and Pringle Bench antimony-gold

lode deposits, which are the principal subjects being reviewed in this Technical Report. A Technical Report summarizing placer resources

and initial lode resource estimates was prepared by the QP in 2008. Subsequently Canadian National Instrument NI 43-101 Technical Reports

on the Nolan Creek and antimony-gold deposits were released in June, 2009, and subsequently amended in July, 2011.

10

1.0     EXECUTIVE SUMMARY

1.1        Property

Description and Ownership

This Technical Report summarizes the

geologic framework, and mineral resources as an initial assessment placer gold resources and the Workman’s Bench and Pringle Bench

antimony-gold lode deposits owned by Great Land Minerals LLC (GLM) a wholly owned subsidiary of the United States Antimony Corporation

(USAC) in the Nolan Creek area (Nolan Creek) of the historic Koyukuk Mining District. According to government reports, historic

mineral production in the area is about 350,000 oz of placer-style gold and a small amount of stibnite (ore of antimony) since 1894.

Nolan Creek is about 175 mi (280 km) north-northwest of Fairbanks, Alaska. This analysis focuses on the lode antimony-gold deposits owned

by GLM/USAC.

Nolan Creek is part of the Koyukuk Mining

District, which covers about 12,500 sq mi (32,000 km2) of northern Alaska. The district is bounded on the east by the South

Fork of Koyukuk River, the Alatna River on the west, the continental divide of the Brooks Range on the north, and the Kanuti River Basin

on the south. Nolan Creek is at the center of the Koyukuk Mining District. Elevations in the area range from 4,635 ft (1420 m) on Vermont

Dome to about 1,220 ft (370 m) on the floodplain of the Middle Fork of the Koyukuk River.

GLM acquired thirteen (13) lode and

twenty-three (23) placer federal mining claims in Nolan Creek valley through a Trustee’s sale in a public auction on January 30th,

2026. The properties had been previously owned by Silverado Gold Mines Ltd. (Silverado) a Canadian public company based in Vancouver,

British Columbia, which conducted exploration and mining placer gold deposits and exploration of lode targets from both surface and underground

operations from 1979-to-2009. Silverado operated in Alaska vis it’s wholly owned U.S. subsidiary Silverado Gold Mines Inc. and

a private company, Tri-Con Mining Ltd.

During the fall of 2026, GLM staked

an additional forty-eight (48), 160-acre, State-of-Alaska mining claims that overlap the original Federal Mining Claims purchased at

auction in January. These new state claims were staked to cover open ground in the Nolan Creek area of interest as a result of the Pipeline

Corridor land transfer from Federal (U.S. Government) domain to State of Alaska domain. Acquisition by GLM of the Alaska state claims

depicted in Figure 3.2 will ensure that the original historic federal claims purchased by GLM from the 2026 auction are not compromised

by third parties as a result of the new federal-to state transfers being acted upon in the Pipeline Corridor. All of the mining claims

occur in the Wiseman B-1 USGS quadrangle of northern Alaska.

1.2        Geology and Mineralization

The bedrock geology of Nolan Creek is

dominated by units of the Brooks Range schist belt, a poly-deformed package of schist, greenstone, and orthogneiss. The schist belt is

part of the Coldfoot sub-terrane of the Arctic Alaska terrane, which underlies more than 75% of the south flank of the Brooks Range.

11

The Workman’s Bench and Pringle

Bench properties contain quartz-stibnite-gold veins that cut a high-angle, structurally controlled zone that is 150 ft to 300 ft wide

(45-to-91 m) and at least 1,600 ft (488 m) in length. These quartz-only and stibnite-quartz (gold) veins strike northeast and cross-cut

low angle cleavage at steep to vertical angles. Besides locally massive stibnite, the quartz-carbonate vein stock works also contain

arsenopyrite.

The gold-stibnite-quartz veins of Nolan

Creek Valley strongly resemble the gold-antimony deposit type (U.S. Geological Survey Deposit Model 36C). These deposits are characterized

by the presence of stibnite, berthierite, high fineness gold, and aurostibnite hosted in metamorphosed, quartz-carbonate-bearing, compressive

shear zones within low grade, greenschist facies metamorphic rocks. The deposit types are characterized by deformed, ductile fabrics

and tectonically re-crystallized, fine grained, granoblastic stibnite lobes and lenses.

The gold-antimony deposit type 36C

is considered to be a sub-type of the mesothermal, auriferous lodes found in mineral provinces worldwide. Mineral deposit type 36C

is not very well documented in North America but well studied in Asia, Europe, and Africa. Worldwide examples include deposits in

the Transvaal of South Africa, the Reefton District in New Zealand, and deposits in Eastern Europe and in Russia. Olympiada

in Siberia is an example of a large, productive gold-stibnite deposit of this type. The Olympiada deposit is currently one of the

worlds’ largest producers of antimony—which is produced as a byproduct of the mainly gold-mining operation there. Placer

gold deposits eroding from the Sb-Au vein deposits have formed in valleys and on benches of Nolan Creek valley and the Hammond River

areas.

1.3        Status of Exploration

Most of the exploration on the property

occurred during 1979-2009, when the previous owner explored both placer and lode (hardrock) prospects in the Nolan Creek claim area.

From 1979-to-2006, Silverado drilled 910 reverse circulation (RC) holes totaling 58,756 feet (17,913 m) in search of placer gold resources.

About 90 percent of these drill holes were conducted on claims now owned by GML/USAC.

From 1981-to-2009, the previous owner

drilled seventy-two (72) relatively shallow (454 feet TD maximum) diamond drill core holes totaling 21,144 feet (6,446 m) to explore

the Workman’s Bench and Pringle Bench antimony-gold deposits. In addition, the previous owner conducted 70.28 line miles of VLF/EM)

geophysical surveys and 4,672 feet of trenching on the Workman’s Bench and Pringle Bench antimony-gold deposits.

About 1,283 soil and stream sediment

samples have also been collected by the previous owner on the GLM property. To the QP’s knowledge, there has been no further exploration

of mineral resources on the property since 2011.

1.4        Development and Mine Operations

From 1979-to-2007, the previous owner

produced 23,150 oz placer gold from 271,771 yds3 of pay gravel from a variety of surface and underground placer mining operations. No

further development occurred after 2011.

12

1.5        Mineral Resource Estimate

Mr. Thomas K. Bundtzen, President

of Pacific Rim Geological Consulting Inc. (Pacific Rim), an independent Qualified Person (QP) for the writing of this Technical Report,

has estimated Indicated placer gold resources in Nolan Creek valley, and Measured, Indicated and Inferred lode antimony and lode

gold mineral resources on Workman’s Bench and Pringle Bench. No Mineral Reserves are included in this report. The QP reports only

Measured, Indicated, and Inferred Mineral Resources in this Initial Assessment of the subject property.

Indicated Placer gold mineral resources,

Nolan Creek

Resource

category

Cut-off grade

(oz/cu yd Au)

Quantity

(cu yd)

Grade

(oz/cu yd Au)

Metal

(oz Au)

Indicated

0.06

66,800

0.095

6,250

The effective date of these resources is July 29th, 2008; amended September 15th , 2026

Rounding may result in some discrepancies.

No processing recovery factors have been applied to these resources

The industry standard unit of quantity for Alaskan placer deposit is cubic yards. The weight of a cubic yard averages about 2.4 short tons.

Measured and Indicated lode antimony-gold

resources, Workman’s Bench

Resource

Cut-off

grade

Quantity

Grade

Metal

Grade

Metal

Category

(%

Sb)

(ton)

(%

Sb)

(ton

Sb)

(oz/ton

Au)

(oz

Au)

Measured

4.0

53,616

26.27

14,089

0.372

19,968

and

Indicated

The effective date of these indicated resources is July 12th, 2011; amended on September 16th, 2026

Cut-off grade is 4.0% Sb ‘equivalent’, which refers to the combined values of gold plus antimony expressed in terms of percent antimony.

Total Inferred lode mineral resources,

Workman’s Bench and Pringle Bench

Resource

Deposit

Cut-off grade

Quantity

Grade

Metal

Grade

Metal

Category

(% Sb)

(short tons)

(% Sb)

(ton Sb)

(oz/ton Au)

(oz Au)

Inferred

Pringle

4.0

12,817

19.61

2,513.8

0.499

6,390.4

Inferred

Workman’s Bench

4.0

19,642

11.17

2,127.0

0.273

5,362.1

Total Inferred

Workman’s Pringle Benches

4.0

32,459

14.29

4,640.8.5

0.362

11,752.5

The effective date of these resources is March 7th, 2011; amended September 18th, 2026 . Cut-off grade is 4.0% Sb ‘equivalent’, which refers to the combined values of gold plus antimony expressed in terms of percent antimony.

13

1.6        Mineral Reserve Estimate

No mineral reserve estimates have been

made by the QP on mineral properties described in this Technical Report.

1.7        Mining Methods

No mining methods have been recommended

by the QP for mineral properties described in this report.

1.8        Processing and Recovery Methods

No specific Processing and Recovery

Methods are recommended by the QP for the mineral properties described in this report; pending further acquisition of information by

GLM.

1.9        Capital and Operating Costs

No Capital of Operating Costs have been

made on the mineral properties in this Technical Report.

1.10      Economic Analysis

No economic analysis has been made on

the Nolan Creek properties for the purposes of this Technical Report.

1.11      Infrastructure

The previous owner

of the mineral property maintained a self-sufficient camp that included camp infrastructure capable of housing thirty (30) mine employees,

machine shops, and a diesel power plant (see Figure 4.4 of this Technical Report). A 2007 upgrade project included:

· The

purchase and installation of a ten room housing unit;

· The

construction of an engineering office;

· The

upgrading of laboratory facilities;

· The

installation of a new sewage treatment facility;

· The

construction of a new kitchen and cafeteria; and

· The

installation of new communications equipment.

· Installation

of 2,500 gallon plastic holding tanks for water needs.

However, all of these facilities are

in a state of disrepair and cannot be used.

The QP does not recommend any construction

of new infrastructure, pending a complete review by GLM of what current camp infrastructure is salvageable and what, if anything, must

be removed from the site.

14

1.12      Permitting Requirements

Presently a mixed property

ownership exists between the State of Alaska and the U.S. Interior Department Bureau of Land Management. This manifests itself in

both state and federal mining claims. The state of Alaska has General Selection Lands (GS 5167) Ta’d surrounding the

active GLM federal Mining claims and an ANILCA Top Filing covering the active federal mining claims owned by USAC. GLM has also

located State of Alaska mining claims over the active federal mining claims to protect its claim ownership position. This process

has been used numerous times to facilitate ownership transfer from BLM to the State of Alaska for high value mineral lands.

Currently, permit requirements include the following:

Alaska Department of Natural

Resources

Alaska

Placer Mining Application (APMA AAC Title 27, AS 38.05)

Approved Plan of Operations (AAC Title 27, AS 38.05)

Approved Reclamation Plan

(AAC Title 27, 38.05)

Approved Mine Closure Plan (AAC Title 27, 38.05)

Temporary Water Use Permit

(TWUP 11 AAC 93.035, 93.220)

Alaska Department of Environmental

Conservation

APDES (Authorized

under the federal Clean Water Act, 33 U.S.C. 1251-1387 and implemented in Alaska by 18 AAC Chapter 83)

Storm Water

Plan, SWPPP; (AS 46.03.100; 18 AAC 83.615)

Industrial Waste Water Permit (APDES Program)

Solid Wate Permit (ACC Title

17, AS Title 16)

Air Quality Permit (AS 46.14, 18 AAC 50)

Alaska Department of Fish &

Game

Title 16 Habitat Permit (AS

Title 16)

U.S. Army Corps of Engineers

404 Wetlands Permit (Clean Water

Act)

U.S. Bureau of Land Management

Plan of

Operations Approval

Environmental

Assessment (EA, National Environmental Policy Act of 1969, 43 CFR Part 46)

Reclamation Plan (30 U.S. Code

1258 Supplemented by 43CFR Part 3600, Subpart 3601 and related BLM manuals)

GLM will have to pay taxes to the Alaska

Department of Revenue; complete required maintenance of the Nolan Road from the Alaska Department of Transportation and Public Facilities;

and conform with guidelines set forth by the Alaska State Historical Preservation Office, if artifacts are encountered.

1.13      Qualified Person’s Conclusions

and Recommendations

The QP does not

make any specific recommendations to GLM for advancing their indicated placer gold resources in Nolan Creek Valley. If those resources

become a priority for development, GLM should attempt to determine whether the paystreaks occur in dry versus wet environments.

15

GLM should complete additional

infill diamond core drilling on Workman’s Bench. Workman’s Bench should be the top priority because it contains

the best chance thus far known for documenting consistent widths and grades of stibnite-quartz-gold mineralization. The exploration

focus on ‘A’ Zone previously described but also include subsidiary vein systems. Drill-testing the zone of inferred

mineralization should be given a high priority. A drill priority should also be to drill-test Pringle Bench.

The diamond

drill core should be of a larger size than the modified NQ core previously used--not necessarily due to high recovery as the older

NQ core was satisfactory in producing high recovery rates. Instead, use of larger diameter ‘P’ core and a drill rig

capable of drilling to 1,000 foot depths (or more) could greatly assist in determining the overall vertical extent of the

mineralizing system. In order to accomplish the drill-testing, Pringle Bench should be scrapped off much like it was prior to

2011.

GLM should build on environmental baseline

work initiated by the previous owner. On behalf of the previous owner, SRK Consulting initiated base line studies on the property in

2008, but none have been completed since. GLM should advance baseline studies through investigations of geochemical characterization,

meteorological precipitation, hydrological steam run-off (including storm water) prediction and mixing zone potential. An early significant

conclusion from past environmental work is that un-weathered materials have a neutral pH; hence an Acid Rock Drainage (ARD) mitigation

plan should be aimed at minimizing oxidation of waste rock and ore materials during disposal and in-capsulation of material. GLM should

advance baseline studies through investigations of geochemical characterization, meteorological precipitation, hydrological steam run-off

(including storm water) prediction and mixing zone potential. Large samples taken underground should be run using acid-base accounting

procedures. In similar fashion, selected core of both mineralized vein and wall rock material from representative drill holes along strike

and at depth should be split for the expressed purpose of acid-base accounting analyses. Large samples taken underground should be run

using acid-base accounting procedures.

To the QP’s knowledge, the previous

owner was not engaged in any partnerships or agreements with outside parties. The leading landowner in the area is Doyon Limited (Doyon),

a regional native corporation based in Fairbanks. Doyon owns lands immediately west of the Nolan Creek area, which juxtaposes the Gates

of the Arctic National Park and Preserve. Doyon is currently in partnership with Wiseman Metals, a subsidiary of MDF-Global, on a district-scale

evaluation of copper-precious metal ‘skarn’ and ‘porphyry’ style copper mineralization north-northeast of Coldfoot.

The 415 pound bulk sample collected

in 2008 by the QP and processed by Hazen Research in Colorado yielded promising results concerning the beneficiation of the

antimony-gold mineralization for the Nolan lode project (see Chapter 10 of this Technical Report). That bulk sample was collected

underground from the main ‘A zone’ on Workman’s Bench. The QP suggests that four (4) additional bulk

samples of vein-fault mineralization be collected: 1) another bulk sample from ‘A’ zone on Workman’s bench using

both underground and surface exposures and selected core where available; 2) a bulk sample from the ‘B’, West, and

‘C’ mineral zones on Workman’s Bench; 3) a bulk sample from the ‘A’ zone on Pringle Bench; and 4) a

bulk sample from other mineralized zones on Pringle Bench. Collecting more metallurgical data will allow GLM to continue to refine

their mill-plans and provide increased confidence to a potential market for their stibnite-gold concentrate products. GML/USAC may

then elect to construct a pilot plant on-site and process larger amounts of mineralized materials.

16

The QP does not recommend work on a

tailings facility until information acquired from mineral processing, geotechnical, environmental or infill drilling programs are completed

and when a Proven Reserve has been established.

Mineral reserves cannot be established

until a fundamentally upgraded, technical analysis is completed from previous studies. A positive reserve analysis was provided in Chapter

18 of previous Technical Report issued by the QP in his Technical Report for the previous owner of the Nolan Creek claims.

However, economic assumptions for the

2011 reserve study on properties currently held by GLM have significantly changed. Commodity prices have improved dramatically, but inflationary

costs for fuel, groceries, equipment, labor and many other factors have driven costs significantly upward for operating a mineral development

in Nolan Creek valley. In addition, the 2011 mine model envisioned use of the Nolan Camp facility as a base for developing underground

mining operations. That camp facility is currently in a state of fundamental disrepair and cannot be used in a reserve analysis of the

lode-antimony-gold deposits on the subject property.

17

2.0     INTRODUCTION

2.1        Registrant Information

United States Antimony Corporation;

referred to in this Technical Report as ‘USAC’ (NYSE American; UASE; NYSE Texas; UAMY) is a critical minerals company focused

on the production of antimony and zeolites. USAC owns and operates two antimony smelters in North America located in Thompson Falls,

Montana and in Madero, Mexico respectively. Besides antimony, USAC operates the Bear River zeolite mine in Idaho, producing a mineral

product for water filtration, agriculture and environmental remediation. Great Land Minerals LLC (GLM), which purchased the claims in

the Nolan Creek area in 2026, is a wholly owned subsidiary of USAC.

2.2        Terms of Reference and Purpose

This Technical Report was requested

by U.S. Antimony Corporation (USAC).

According to government reports,

historic placer gold production in the Koyukuk mining district is estimated at about 350,000 oz of placer-style gold and a small amount

of stibnite (ore of antimony) since 1894. Nearly half of the total gold production was sourced in the Nolan Creek basin, which is partially

claimed by USAC. Nolan Creek is about 175 mi (280 km) north-northwest of Fairbanks, Alaska. Rather than placer gold, this analysis focuses

on the lode antimony-gold deposits on properties in Nolan Creek basin held by USAC. The independent Qualified Person, Mr. Thomas

K. Bundtzen, President of Pacific Rim Geological Consulting Inc. (Pacific Rim), is responsible for this Technical Report. Henceforth

Mr. Bundtzen is referred to as the QP.

The primary purpose of this Technical

Report is to disclose lode antimony-gold mineral resources for USAC’s holdings in the Nolan Creek Area (Nolan Creek) of the historic

Koyukuk Mining District of Northern Alaska.

2.3        Sources of Information

The sources of information are numerous

and include U.S. Government, State of Alaska, and unpublished private company reports, which are detailed in the References section of

this report. Geological mapping and framework studies summaries of the Nolan Creek area have been published by Maddren (1910, 1913),

Brosge and Reiser (1970), Dillon (1989), Dillon and others (1986), Dillon and Reifenstuhl (1990), Moore and others (1994), Mull (1989),

and Eden (1999, 2000).

Reed (1938) provided a comprehensive

summary of all gold exploration and production activities in the Koyukuk District including detailed descriptions of activities in Nolan

Creek area, including USAC’s holdings. Kurtak et al (2002) provides an exhaustive summary of all historic mining activities in

the Koyukuk district, with an emphasis on activities in the Wiseman quadrangle where the USAC properties reside.

18

2.4        Personal Inspection Summary

During his career with the Alaska Department

of Natural Resources, Division of Geological and Geophysical Surveys, the QP completed geological mapping and mineral resource investigations

on some mineral properties described in this Technical Report. The author visited Nolan Creek in 1994, when the previous owner was producing

placer gold from Mary’s underground and Ogden-Eureka open cut placer deposits, and witnessed placer gold processing activities.

The purpose of the 1994 trip was to observe the previous owner’s gold production activities, which were subsequently described

in the State of Alaska Minerals Report series (Swainbank et al, 1995).

In 1999, the QP sampled and mapped

stibnite-gold lodes on Smith Dome and Pringle Bench, which constitutes a part of GLM/USAC’s lode claim group in the area. The

QP’s 1999 work in the Koyukuk Mining District was completed on behalf of North Star Exploration Inc., a junior mining

company based in Denver, Colorado. From November 14 to 15, 2004, the QP visited the previous owner’s operation at Nolan

Creek, where he examined current infrastructure, and discussed with geologists Brian Flanigan and Edward Armstrong the technical

databases stored on the property.

During April 22 to 24, 2008, the

QP examined stibnite mineralization in the Workman’s Bench underground workings, collected channel samples to cross-check those

collected by Silverado geologists, mapped the geological features, and acquired a large bulk sample for laboratory bench testing. During

June 13 to 14, 2008, the QP examined all mineralized intercepts from the 2007 core drilling program on Workman’s Bench and

examined and sampled surface exposures of stibnite mineralization also on Workman’s Bench.

On 2008, the QP visited Nolan Camp and

examined all significantly mineralized core intervals acquired from the 2008 exploration of the Workman’s bench property (Bundtzen,

2008a, 2008b, 2008c. A total of 124 mineralized intervals as cut in drill core were inspected by the QP.

During portions of July 23-25,

2009, the QP reviewed the previous owner’s 2009 drill program at Nolan Creek with Karl Sharp, the company geologist. During

parts of the time interval August 13-29, the QP inspected the following technical items acquired by him from Karl Sharp: 1)

certified analytical results of drill core intervals; 2) photos for surface and subsurface exploration activities; 3) EXCEL spread

sheets of the data acquired during the drill program; 4) core logs from all holes that had been completed; 5) Sharp’s

preliminary interpretations of the structural corridors drilled during the season; and 6) surveys of drill collar locations in UTM

coordinates and elevations based on the NAD27AK datum. At the QP’s request, selected sections of core were brought to his Fairbanks

office later in September for further inspection. Because the most important, mineralized structure—the A

zone—exhibits a peculiar fine-grained granoblastic texture, comparisons between underground samples collected by the QP in

2008 and the samples brought to Fairbanks by Sharp were made by the QP in his office. During December 11-17, the QP reviewed

with Karl Sharp all of the data acquired during the 2009 drill program including his (Sharp’s) structural interpretation of

the mineralization encountered and his thoughts on previous exploration work completed in 2007 and 2008. During this last effort,

the QP inspected a total of 23 new mineralized intercepts.

19

2.5        Previously Filed Technical Reports

In December, 2004, the QP produced an

Independent Technical Review of the Nolan Creek area for the previous owner (Bundtzen, 2004). That document reviewed all aspects of mineral

activities, including exploration, development, and mining activities, environmental remediation steps needed for compliance, and permitting

issues at all of their properties held in the Fairbanks and Koyukuk districts by Silverado. Comprehensive in nature, the report format

was designed to be compliant with Technical Report formatting.

In July, 2008, 2009, and in 2011, the

QP completed the Canadian National Instrument (NI) 43-101-compliant documents: 1) Estimation of Lode and Placer Mineral Resources, Nolan

Creek, Wiseman B-1 Quadrangle, Koyukuk Mining District, Northern Alaska, July 29, 2008; and 2) Update on lode mineral resources

and reserve estimates, antimony-gold lode deposits, Nolan Creek, Wiseman B-1 quadrangle, Koyukuk Mining district, Alaska, June, 2009;

amended 2011. These documents were publicly released to the Canadian server SEDAR.

2.6        Units of Measure

Because of extensive prior use in virtually

all categories of measuring, the QP has used the English system of measurements in this Technical Report. A metric conversion table is

presented below.

Table 2. 1 Units of measure used

in this Technical Report

Type

Unit

abbreviation

Description

(with metric conversion)

Area

acre

acre (4,046.86

m2)

Area

ha

hectare

(10,000 m2)

Area

km2

square

kilometer (100 ha)

Area

sq mi

square

mile (259.00 ha)

Concentration

g/t

grams per

tonne (1 part per million)

Concentration

oz/cu yd

troy ounces

per cubic yard

Concentration

oz/ton

troy ounces

per short ton (34.28552 g/t)

Length

ft

foot (0.3048

m)

Length

m

meter (SI

base unit)

Length

mi

mile (1,609.344

m)

Length

yd

yard (0.9144

m)

Mass

g

grams (SI

base unit)

Mass

kg

kilogram

(1,000 g)

Mass

oz

troy ounce

(31.10348 g)

Mass

t

tonne (1,000

kg)

Mass

ton

short ton

or US ton (0.90719 t)

Time

Ma

million

years

Volume

cu yd

cubic yard

(0.7646 m3)

Volume

gallon

U.S. liquid

gallon (3.785411784 L)

Volume

L

litre (SI

base unit)

Temperature

°C

degrees

Celsius

Temperature

°F

degrees

Fahrenheit (°F = °C × 9⁄5 + 32)

20

3.0 PROPERTY

DESCRIPTION

3.1 Nolan

Creek Area Claims

GLM/USAC acquired thirteen (13) lode

and twenty-three (23) placer federal mining claims in Nolan Creek valley through a Trustee’s sale in a public auction on January 30th,

2026 (Figure 3.1). The properties had been previously owned by a private company (Silverado) which conducted exploration and mining placer

gold deposits and exploration of lode targets from both surface and underground operations from 1979-to-2009.

On December 22nd,

2015, the previous private company executed a Deed of Trust conveying a certain property in the Nolan Creek Valley of the Southern Brooks

Range, Alaska to Yukon Title Company (Fairbanks) as Trustee with Alminco LLC as Beneficiary, which deed was recorded on February 3rd,

2016.

Because the Trustee failed to perform

the Deed of Trust as promised, the Deed of Trust was assigned to Nolan Metals LLC through recordation of an assigned Deed of Trust on

September 15th, 2025. A notice of Sale of the property was posted on October 23rd, 2025. A public auction

was held on January 30th, 2026 in the Rabinowitz Memorial Courthouse in Fairbanks, Alaska. The property was sold to Great

Land Minerals LLC (GLM) for the sum of One Million Three Hundred Thousand Dollars ($1,300,000 USD). GML is a wholly owned subsidiary

of USAC.

During the fall of 2026, USAC staked

an additional forty-eight (48), 160-acre, State-of-Alaska mining claims that overlap the original Federal Mining Claims purchased at

auction in January, 2026 (Figure 3.2). These new state claims were staked to cover open ground in the Nolan Creek area of interest as

a result of the Pipeline Corridor land transfer from Federal (U.S. Government) domain to State of Alaska domain. Acquisition by USAC

of the Alaska state claims depicted in Figure 3.2 will insure that the original historic federal claims purchased by USAC from the 2026

auction are not compromised by third parties as a result of the new federal-to state transfers being acted upon in the Pipeline Corridor.

21

Table 3.1 Legal Description the Federal

Mining Claims acquired by GLM in January, 2026

Count

Claim

Name

BLM

No.

TWP

RNG

Section

Qtr.

Section

Type

1

Mary’s

Bench

FF-42437

31N

12W

27

SW

placer

2

Hillside

Bench

FF-42438

31N

12W

27,

28

SW,

SE

placer

3

Highland

FF-42439

31

N

12W

27

SW

placer

4

No. 3

below Discovery

FF-42440

31

N

12W

28

NESE

placer

5

Ogden

FF-42442

31N

12W

27,

28, 33, 34

SW,

SE, NW, NE

placer

6

No. 5

Below Discovery

FF-58595

31N

12W

33,28

NE,

SE

placer

7

Discovery,

Nolan Creek

FF-62022

31N

12W

27

NW

placer

8

No. 4

below Discovery

FF-62026

31N

12W

28

SE

placer

9

Archibald

Association

FF-62028

31N

12W

27

SW

placer

10

Archibald

#3

FF-62029

31N

12W

27

SE

placer

11

Nolan

23

FF-73165

31N

12W

27

SW

lode

12

Bench

26

FF-90820

31N

12W

27,

33, 34

SW,

NE, NW

placer

13

Bench

27

FF-90821

31N

12W

27

SW

placer

14

Bench

34

FF-90828

31N

12W

27,34

SW,

NW

placer

15

Nolan

100

FF-90888

31N

12W

34

NW

Lode

16

Nolan

111

FF-90899

31N

12W

33,

34

SE,NE,NW

lode

17

Nolan

151

FF-90939

31N

12W

33

NE,SE

Lode

18

Nolan

152

FF-90940

31N

12W

33

NE,

SE

Lode

19

Dol

1 Fraction

FF-91165

31N

12W

33

NE

Placer

20

Nolan

176

FF-91194

31N

12W

27,

33, 34

SE,

NE, NW

lode

21

Nolan

179

FF-91197

31N

12W

33,

34

NE,

NW

lode

22

Acme

1

FF-92686

31N

12W

28

SE,

NE

placer

23

Acme

3

FF-92688

31N

12W

28

SE,

NE

placer

24

SSH

3

FF-94008

31N

12W

27

SW

1/4

lode

25

SSH

6

FF-94011

31N

12W

27

SW

1/4

lode

26

SSH

7

FF-94012

31N

12W

33

NE

1/4

lode

27

SSH

9

FF-94014

31N

12W

33

NE

1/4

lode

28

SSH

10

FF-94015

31N

12W

33

NW

¼ , NE ¼ , SW ¼, SE ¼

lode

29

SSH

11

FF-94016

31N

12W

33

SW

¼, SE ¼, NE ¼

lode

30

Top

Notch Bench

FF-94686

31N

12W

33,

28, 27, 34

NW

SE, SW, NW

placer

31

Surething

Bench

FF-94687

31N

12W

27,

33, 34

SW,

NW, NW

placer

32

Never

Sweat Bench

FF-94688

31N

12W

35,

34

NE,

NW

placer

33

Daisy

Bench

FF-94689

31N

12W

34

NW

placer

34

Calilion

Fraction

FF-94690

31N

12W

34

NW

placer

35

D&C

Fraction

FF-94691

31N

12W

34

NW

placer

36

Smith

Creek #1

FF-94692

31N

12W

33,

34

NE,

NW

placer

22

Figure 3.1 Map depiction of thirty-six

(36) federal claims (pink) purchased by GLM in January 2026

Figure 3.2 Forty-eight (48) new State

of Alaska Claims covering the Nolan Creek staked by USAC in the fall of 2026.

23

4.0 ACCESSIBILITY, CLIMATE, LOCAL INFRASTRUCTURE

AND PHYISIOGRPHY

4.1 Topography and Land Description

The Koyukuk Mining District is bounded

on the east by the South Fork of Koyukuk River, the Alatna River on the west, the continental divide of the Brooks Range on the north,

and the Kanuti River basin on the south. Elevations in the district range from 4,635 ft on Vermont Dome to about 1,220 ft on the floodplain

of the Middle Fork of the Koyukuk River. Other prominent landforms present at or near Nolan Creek include Smith Dome at 4,005 ft elevation,

Montana Mountain at 3,270 ft, and Midnight Dome at 3,860 ft (Figure 4.1).

4.2 Access to the Property

Nolan Creek is at the center of the

Koyukuk district. Regularly scheduled commuter flights from Fairbanks to the 4,500 ft long, state-maintained Coldfoot Airport are provided

by Wright Air Service Inc. Nolan Creek is road-accessible from Fairbanks via the Dalton Highway, which services the Trans-Alaska Pipeline

and the North Slope oil fields. The Trans-Alaska Pipeline System (TAPS) and Dalton Highway corridor in the valley of the Middle Fork,

Koyukuk River are east-southeast of the Nolan Creek property holdings. In 1985, the access road from Wiseman to Nolan Creek was upgraded

to secondary standards by the Alaska Department of Transportation and Public Facilities (DOTPF). Since 2012, DOTPF has paved selected

portions of the Dalton Highway. It is estimated that by 2020, about 40 percent of the highway had been paved from the Elliot Highway

to Chandler Shelf, about 80 miles north of Coldfoot. USAC’s Nolan Creek property is remote and far from Alaska’s urban areas.

The GML/USAC camp at Nolan Creek is located 175 air miles north-northwest of Fairbanks, Alaska’s second largest community, with

a population in 2026 of about 99,500, when counting adjacent military bases.

4.3 Climate Description

Nolan Creek Valley is located about

75 mi north of the Arctic Circle. Winter usually begins in late September or early October and lasts until early April. A very

brief spring is followed by summer in early June, which lasts until late August. Fall weather conditions occur for about one month in

September. Coldfoot, about 15 mi southeast of Nolan Creek Valley, recorded the unofficial all-time, State of Alaska record low of −82°F

in January,1989.

24

Figure 4.1 Nolan Creek location map,

showing access to claims held by GLM/USAC.

25

4.4 Vegetation and Land Use

Vegetation in the area is dominantly

mature white spruce forests and occasional groves of birch and alder. Although lower slopes are heavily forested, the entire area was

logged during the late 19th to early 20th Centuries to provide fuel logs for cabins, for mine timbers for early underground placer mine

activities, and wood for general construction activities. Currently, the timberline is at about 2,500 ft elevation. Alpine species consist

of various mosses, shrubs, lichen, and wild berries.

Current land use in the area is primarily

focused on tourism. Bed and Breakfast facilities in Wiseman host small select groups of international tourists seeking wildlife observation,

dog mushing and observation of the ‘Northern Lights’. A public facility describing outdoor activities are found at the Gates

of the Arctic National Park and Preserve offices in Coldfoot. Due to the currently high gold prices, there has been expansion of traditional,

small scale gold mining activities in the area. Mineral exploration in the area is currently being carried out by several mining companies

using rotor wing aircraft.

The community of Coldfoot, which is

about 13 miles south of the community of Wiseman, has Alaska’s most northern gas station, grocery, bar, and public lodging facilities.

The weather station at Coldfoot provides the Alaska State Weather Service with climatic condition on the Southern Brooks Range. DOTPF

operates a large shop facility at Coldfoot on a year-round basis and maintains a 125 mi long segment of the Dalton Highway and the Coldfoot

Airport.

The small community of Wiseman, with

a 2010 census population of 35, is at the junction of the seven (7) mile long, secondary access road that links the Dalton Highway

with Silverado’s Nolan Creek mine camp.

Figure

4.2 Coldfoot Camp, June 13th, 2026; USAC vehicle in foreground; photo by QP

26

Figure

4.3 Main Street of Wiseman Village on June 13th, 2026. Photo by QP.

4.5 Availability of Required Infrastructure

All types of fuels related to mine infrastructure

needs can be obtained from Coldfoot. Both fixed wing and rotor wing aircraft facilities can also be accessed from Coldfoot Airport.

The previous owner of the mineral property

(Silverado) maintained a self-sufficient camp that included camp infrastructure capable of housing thirty (30) mine employees, machine

shops, and a diesel power plant. A 2007 upgrade project included:

· The

purchase and installation of a ten room housing unit;

· The

construction of an engineering office;

· The

upgrading of laboratory facilities;

· The

installation of a new sewage treatment facility;

· The

construction of a new kitchen and cafeteria; and

· The

installation of new communications equipment.

· Installation

of 2,500 gallon plastic holding tanks for water needs.

However, all of these facilities are

in a state of disrepair and cannot be used. Rooms for employees involved in exploration and development activities could be housed in

Coldfoot.

27

Figure

4.4 Nolan Mine Camp as it appeared during spring, 2008; From QP files

28

5.0 HISTORY

5.1 Mining

History of Area

Placer gold was found on the bars of

the Koyukuk River between 1885 and 1890, and the first commercial discoveries on Nolan Creek and Hammond River and tributaries were made

in 1901 (Cobb, 1973). The earliest placer mines were open cuts using hand methods and sometimes mechanization. Since the ground was frozen,

steam boilers were frequently deployed to mine frozen pay gravels. Beginning in 1908 deeply buried but rich gold placers were found at

considerable depths of up to 200 feet; much of the ground has been acquired by GML. These ‘drift mines operated up until WWII.

After WWII, most gold mines in the Koyukuk district, including those in Nolan Creek Valley, closed due to the fixed price of gold in

the United States, coupled with rising inflationary challenges.

After the gold

price was decontrolled in 1971, small scale gold mines were restarted. In 2026, an estimated six (6) mechanized placer gold mines

operated in the Koyukuk district, with many using Coldfoot as a supply base.

Beginning in 1979, in the Nolan Valley,

which now includes the claims held by USAC, placer gold deposits were developed using both surface methods such as bulldozers and excavators

and underground methods using low profile mine extraction equipment and standard blasting technologies—much like what you would

see in an underground hardrock mine. Gold bearing gravels were stockpiled on the surface during winter months and processed through sluice

boxes on the surface during summer months. Two such operations on Nolan Creek and nearby Vermont Creek used underground methods to mine

placer gold in the last 30 plus years.

5.2 Drilling Exploration History

From 1979-to-2007, approximately 910

Reverse Circulation (RC) drill holes that totaled 58,756 feet have evaluated placer gold deposits in the study area and in Vermont Creek

basin to the NE. Drill holes range from 25 ft to 145 ft in depth and average 62 ft in depth. During the drill program, more than 11,750

five-ft intervals were systematically panned down the entire length of each drill hole. The drill holes were generally designed on 50

ft centers. In Nolan Creek Valley, drill hole collars are oriented along north 070° west (Bearing 290°) lines, which crosscut

the northeast trend of ancestral and modern, gold-bearing fluvial deposits. The extensive drill program led to the direct discovery and

subsequent development of commercial placer gold paystreaks, which were excavated on various bench deposits in Nolan Creek valley using

both open-cut and underground mining methods.

Table 5.1 summarizes lode drilling programs

conducted in Nolan Creek valley—all on ground currently held by GLM. Drilling commenced in 1993 on Thompson Pup using percussion

technology and then expanded to Workman’s Bench in 1994 and Pringle Bench in 2006. Diamand core drill programs occurred on Workman’s

Bench and Pringle Bench from 2007-to-2009.

29

Table 5.1 Summary of lode drilling

programs, Nolan Creek

Year

Location

Drilling

Drill

Amount

Assay

Drilling

contractor

method

hole

of

drilling

count

count

(ft)

1993

Thompson

Pup

RC

4

1,275

255

Tri-Con

Mining Company

1994

Workman’s

Bench

RC

4

780

156

Tri-Con

Mining Company

2003

Pringle

Bench and Hillside

RC

5

1,340

260

American

Arctic Drilling

2006

Pringle

Bench

RC

1

300

56

American

Arctic Drilling

Total

percussion (RC)

14

3,695

727

2007

Pringle

Bench

diamond

11

2,415

607

Independent

Contractor

2007

Workman’s

Bench

diamond

7

2,140

588

Independent

Contractor

2008

Workman’s

Bench

diamond

34

11,597

627

Independent

Contractor

2009

Workman’s

Bench

diamond

9

2,663

19

(1)

Independent

Contractor

2009

Pringle

Bench

diamond

11

2,329

23

(1)

Independent

Contractor

Total

diamond

72

21,144

1,863

Independent

Contractor

GRAND

TOTAL

NA

86

24,839

2,588

NA

Figure

5.1 Prospector #3 Multi-Purpose NQ Core Drill TM, October 22, 2007, From QP files

30

5.3 Historical Mineral Production

Through 2002, about 344,990 oz of gold

have been recovered from both open cut and underground placer mines in the Koyukuk District (Kurtak et al, 2002). The largest single

producer has been Nolan Creek and its tributaries, Smith Creek and Archibald and Fay Gulches, which produced an estimated 185,000 oz

of placer gold from 1901-to-2007, or about 54% of the Koyukuk District total. It is estimated by the QP that more than 100,000 oz of

gold was produced from 1908 to 1911 by underground drift miners on Nolan Creek.

From 1979 to 2007, the previous owner

mined pay gravel from a variety of surface and underground placer mining operations in Nolan Creek valley (Table 5.2). Production during

2003, 2006 and 2007 totaled 5,113 ounces gold. Hence the total for the Koyukuk district must be at least 350,000 ounces gold. No further

development or gold production activity on the claims occurred after 2011. Total production from 1979 to 2007 was 23,150 oz of placer

gold recovered from 271,771 cu yd of gravel at an average grade of 0.085 oz/cu yd gold (Table 5.2).

Table 5.2 Placer gold production

from Silverado properties, 1979 to 2007, Nolan Creek

Year

Location

Bank

cu yd

Placer

gold

Recovered

grade

(BCY)

(oz)

(oz/BCY)

1979

Fay Creek

NA

12

NA

1981

Archibald/Fay

Creek

12,166

730

0.060

1984

Archibald/Fay

Creek

4,343

304

0.070

1987

Archibald/Fay

Creek

20,585

1,338

0.065

1993

Thompson

Pup

33,800

1,304

0.038

1994

Mary’s

Bench Underground

16,143

2,697

0.167

1994

Ogden-Eureka

Bench Open Cut

29,300

5,733

0.196

1995

Phase 3

Open Cut

22,285

2,394

0.107

1995

3B1 Underground

12,991

1,006

0.077

1995

West Block

Open Cut

18,988

1,305

0.069

1995

Mary’s

Bench Hydraulic

600

27

0.045

1996

Dolney

Bench Open Cut

5,042

126

0.025

1998

Archibald

Creek Open Cut

5,947

128

0.022

1999

Swede Channel

Underground

4,575

623

0.136

1999

Workman’s

Bench Open Cut

5,580

112

0.020

2000

Workman’s

Bench Open Cut

14,919

201

0.013

2003

Nolan Deep

Channel; Wool Bench, Mary’s Bench

30,279

451

0.015

2006

Swede Channel

8,896

951

0.105

2007

Swede Channel

and Mary’s East

25,332

3,711

0.146

Total

271,771

23,153

0.085

In 1948, approximately

5.0 tons of high-grade selected stibnite ores were produced from an open-cut operation on Pringle Bench, which occurs on claims now held

by GLM. These hand sorted ores were shipped to a refinery in Texas.

31

Figure

5.2 Low profile truck used in underground placer mining, circa 2006; from QP files

Figure

5.3 Washing plant processing pay gravels, 2005-2007, Swede Channel project; from QP files.

32

6.0 GEOLOGICAL

SETTING, MINERALIZATION, AND DEPOSIT

6.1 Regional

Geology

The bedrock geology of the Wiseman-Nolan

Creek area has been described by several previous workers including Maddren (1910, 1913), Brosge and Reiser (1970), Turner et al (1979),

Dillon et al (1986), Mull (1989), Dillon (1989), Dillon and Reifenstuhl (1990), Moore et al (1994), and Eden (1999, 2000). The following

geologic discussions use information from all of these sources. After review of published geological mapping, the QP selected the map

provided by Dillon and Reifenstuhl (1990) for display of the most relevant and accurate information used in this Technical Report.

The bedrock geology of the general area

is dominated by units of the Brooks Range ‘Schist Belt’ or Province, a poly-deformed package of schist, greenstone, and gneiss.

The Schist Belt is part of the Coldfoot sub-terrane of the Arctic Alaska Terrane, which underlies more than 75 percent of the south flank

of the Brooks Range. The Coldfoot sub-terrane is composed of Proterozoic to Middle Devonian, poly-metamorphic meta-sedimentary rocks

which have been intruded by Devonian granitic plutons and overlain by also bimodal meta-volcanic rocks also of Devonian age (Dillon,

1989). Although no fossils have been found, chloritic metasiltstone (Dbcs), black slate and phyllite (Dbs), and chloritic carbonates

(Dcc) are correlative with the Devonian Beaucoup Formation, as summarized by Mull (1989). The Beaucoup Formation and other metamorphosed

rocks in the Wiseman-Nolan Creek area are thought to be near the stratigraphic top of the Coldfoot sub-terrane (Dillon, 1989; Dillon

and Reifenstuhl, 1990).

The Wiseman-Nolan Creek area has been

subjected to the effects of Pleistocene glaciation, which has carved U-shaped valley profiles in the valleys of Wiseman, and Jap Creeks,

and the main trunk valleys of the Hammond and Middle Fork of the Koyukuk Rivers. Glaciers from the Middle Pleistocene Sagavanirktok Glaciation

traversed at high elevations down trunk valleys along the entire flank of the southern Brooks Range, reaching lowland areas in the lower

Chandalar River on the east, the Kanuti Flats to the south, and Kobuk River to the west (Hamilton, 1979, 1986). Glacial drift of the

Sagavanirktok River Glaciation (Qd1) occupies hill slopes, low saddle areas, and high level cirques to maximum elevations of about 3,200

ft.

According to Dillon (1989), Mull (1989),

Dillon and Reifenstuhl (1990), Moore et al (1994), and Eden (1999), two and possibly three well-defined periods of regional dynamo-thermal

metamorphism have affected the layered rocks of the Coldfoot sub-terrane in the Wiseman-Nolan Creek. These layered metamorphic rocks,

which monoclinally dip to the north throughout the map area, contain a complex fold and faulting history; fold axes generally strike

northeast with fold vergence in several directions. Schistosity is defined on two discrete cleavage surfaces. The oldest (S2), parallels

bedding and the youngest (S3), is a semi-penetrative axial planar feature that probably formed during a thrust or recumbent folding event

(Dillon and Reifenstuhl, 1990; Eden, 1999). Several thrust planes have been mapped at Nolan Creek. During Late Jurassic to Early Cretaceous

time, the rock units of the Coldfoot sub-terrane including the Beaucoup Formation were thrust over thrust panels to the north and outside

the study area. Brittle deformation began to form as the last regional metamorphic gradients subsided in mid-Cretaceous time.

33

6.2 Local and Property Geology

The Coldfoot sub-terrane underlies most

of the valley of Nolan Creek (Dillon, 1989). The Beaucoup Formation and other metamorphosed rocks in the Wiseman-Nolan Creek area are

thought to be near the stratigraphic top of the Coldfoot sub-terrane (Dillon and Reifenstuhl, 1990).

Although Dillon and Reifenstuhl (1990)

do not describe non-metamorphosed or metamorphosed intrusive rocks at Nolan Creek, Eden (1999, 2000) describes metabasite dikes near

the mouth of Steep Gulch. Granite gneiss yields U/Pb ages of 360 Ma on the western slopes of the Middle Fork Koyukuk River valley, about

10 mi south of Nolan Creek. These Middle Devonian granitic intrusions, which were metamorphosed along with the host Beaucoup Formation,

could conceivably underlie Nolan Creek at depth.

Dillon and Reifenstuhl (1990) and Eden

(1999) map west-dipping, northeast-striking reverse faults in Nolan Creek valley that post-date fold deformation thrusting and are thought

to be the result of east-west compression documented in other areas of the southern Brooks Range. This brittle deformational event produced

a NE/NW, high-angle, orthogonal fault pattern that host the antimony-gold-quartz deposits that constitute a prime focus of this Technical

Report.

The more youthful V-shaped profiles

in Nolan and Vermont Creeks reflect erosional profiles that post-date the major glacial events described above, and there is no evidence

that Late Pleistocene ice ever developed in Nolan Creek Valley or tributaries. Steepened valley walls are now covered by a mixture of

colluvial-landslide, solifluction, and talus deposits (Qcl, Qcs, Qct units). Modern stream alluvium underlies the course of present Nolan,

Smith, and Wiseman Creeks and tributaries of the Hammond River (Qa unit).

34

Figure 6.1 Geologic map of the Nolan

Creek area Koyukuk District; modified from Dillon and Reifenstuhl (1990).

35

6.3 Alteration and Mineralization

Northeast-trending, steeply dipping,

auriferous stibnite-quartz veins cut phyllitic schist on Workman’s Bench on the left (south) limit of Smith Creek about 800 ft

upstream from its confluence with Nolan Creek (Eden, 1999). The mineralization on Workman’s Bench is almost certainly correlative

with the stibnite-gold-quartz veins exposed in placer cuts and trenches on the Pringle Bench north of Smith Creek, which have been known

since the early 20th Century (Killeen, 1942; Ebbley and Wright, 1948).

Mineralization

consists of quartz-sulfide veins cutting host Beaucoup Formation that mainly consist of stibnite, arsenopyrite, and minor Sb-sulfosalts.

Free gold is associated with both arsenopyrite and stibnite.

6.4 Deposit Types

Placer gold deposits in the Nolan Creek

and Hammond River areas can be classified as an ‘Incised Glacio-Fluvial’ subtype of heavy mineral placer deposits (Maddren,

1913; Laznika, 1985). The Koyukuk District examples, especially on Nolan Creek, probably formed in similar fashion to that observed in

the Valdez Creek district of south-central Alaska, Alaska’s largest placer gold mine during the 1980s and 1990s (Reger and Bundtzen,

1990); the Chandalar district east of the Koyukuk district; the Porcupine district in southeast Alaska; the Cassiar-Caribou district

of British Columbia, Canada (Knight and McTaggart, 1989); and the Bolotny-Ravkosky district in northeast Russia (Tchapko,1995).

Different explanations have been advanced

for the origin of the placer deposits in Nolan Creek. Maddren (1913) believed that the left limit, bench deposits such as the Mary’s

Bench, Swede, West Block, and Ogden-Eureka Bench placers may be remnants of narrow, crudely washed beaches formed along the mountain

sides when Nolan Creek was an arm of Glacial Lake Wiseman.

The Workman’s Bench and Pringle

Bench properties contain quartz-stibnite-arsenopyrite-gold veins. These quartz-only and stibnite-quartz (gold) veins strike northeast

and cross-cut low angle cleavage at steep to vertical angles. Besides locally massive stibnite, the quartz-carbonate vein stock works

also contain arsenopyrite.

The Workman’s Bench and Pringle

Bench properties contain quartz-stibnite-gold veins that cut a high angle, structurally controlled zone that is 150 ft to 300 ft wide

and at least 3,500 ft in length. These quartz-carbonate-sulfide and stibnite-quartz (gold) veins strike north 45° east and cross-cut

low angle cleavage at steep-to-vertical angles. Besides locally massive stibnite, the veins also contain local arsenopyrite. According

to Ebbley and Wright (1948), individual quartz-sulfide veins north of Smith Creek ranged from1 inches-to-4 inches thick and can be traced

for at least 400 ft of strike length. This area, now known as ‘Pringle Bench’, contains individual quartz-sulfide (stibnite)

veins up to 1.5 feet in thickness, based on 2009 Silverado exploration work.

36

Bedrock units on Workman’s Bench

and Pringle Bench consist of dark gray, carbonaceous phyllite and schist, light gray quartz-rich meta-sandstone, greenish gray chlorite

rich muscovite schist, and occasional lenses of calcareous chlorite schist. Isolated boudins of greenstone-gabbro have also been observed,

but not in place. The layered rock units have been deformed by both open and sub-isoclinal folds. Metamorphic foliation in the hanging

wall and footwall zones of the vein-fault zone is normally shallow, with dips of less than 45°. S1 foliation usually parallels compositional

banding, but locally, a conspicuous S2 secondary cleavage crosscuts compositional banding at a high angle. Northeast and northwest-striking,

high angle fault zones and low angle thrust faults cut the metamorphic rock basement.

Lode mineralization at Workman’s

Bench and Pringle Bench systems consists of a northeast-striking, steeply dipping zone of gold-bearing, quartz-stibnite veins and veinlets.

At Workman’s Bench, stibnite-bearing veinlets occur from 86 ft-to-234 ft from the portal or over a width of about 150 ft. Because

the drift was cut perpendicular to strike, this represents a true thickness of the vein-veinlet swarm. A more focused zone of quartz

stibnite vein concentration occurs mainly from 136 ft-to-234 ft or an estimated width of about 98 ft, where 67 individual veins were

identified. Within the ‘Crosscut A’ zone, 21 of the veins contained identifiable stibnite. In the ‘Crosscut C’

zone, the same mineralized stock work veins occur from 120 feet-to-228 feet or an estimated width of 108 ft. Within this measured width,

79 individual veins were identified, 22 of which contain stibnite.

At Pringle Bench, which is the northeasterly

extension of the Workman’s Bench system, the same stibnite-quartz vein-fault system widens to nearly 400 ft in three subsidiary

zones. In 2009, the ‘A zone’ vein fault was recognized on Pringle Bench—the same zone that contains the bulk of the

known mineralization on Workman’s Bench.

A majority of veins observed in either

trenches, core, or underground workings exhibit nearly horizontal slickensides, suggesting intrusion of hydrothermal fluids along fault

zones and lateral movement subsequent to vein emplacement.

Geologists recognized that distinct

near-vertical vein-fault structures could be recognized in drill core and in the underground workings on the basis of both spatial relationships

and physical features. All of these structures strike approximately north 45o east, and can be traced for variable lengths

along strike. The strongest mineralized vein-fault is designated ‘A’ zone, which exhibits evidence of post-mineralization

movement. Others include ‘B’ zone, ‘West’ zone, and ‘C’ zone. Detailed physical characteristics of

these structures and how they are recognized during exploration are found in Chapter 11 of this Technical Report.

Polished section analysis shows that

two basic fabrics are observed in the stibnite (aurostibnite)-quartz veins:

· Simple,

twinned stibnite blades and grains showing resorption textures with euhedral, quartz crystals

and grains.

· Extensive

shearing and local coarsening of sulfide grains (mainly stibnite), 120° triple junctions

in mono-mineralic stibnite, and recrystallization of gangue minerals (quartz) that indicate

dynamic metamorphism.

37

Mineralization in the ‘A’

zone’ at Workman’s Bench contains a shear fabric consisting of parallel lamina of recrystallized stibnite. These fabrics

are referred to in the literature as thermal metamorphic textures (i.e., Ineson, 1989). The sheared fabric results in a fine-grained

stibnite exhibiting a distinct granoblastic texture, which contrasts with the other subsidiary stibnite-bearing veins-faults that contain

coarser grained stibnite grains and blades. Microprobe analyses by Cannon Microprobe Inc. document that siderite (as gangue) and accessory

arsenopyrite occur in the stibnite-bearing zones along vein selvage zones (Figure 6.2).

More than 90% of the veins and veinlets

dip steeply southeast, with dips ranging from 50° to 85°. A few veins dip steeply northwest. A system of east-west to northwest

striking, moderately dipping vein-faults cut through the underground workings. The QP observed that these faults both offset, to a minor

degree, the northeast-striking, stibnite-bearing veins, but are also cut by other northeast-striking stibnite veins.

Figure 6.2 Photomicrographs,

Workman’s Bench mineralized system

The gold-stibnite-quartz veins of Nolan

Creek Valley strongly resemble the gold-antimony deposit type (Berger, 1986; U.S. Geological Survey Deposit Model 36C). These deposits

are characterized by the presence of stibnite, berthierite, high fineness gold, and aurostibite hosted in metamorphosed, quartz-carbonate-bearing,

compressive shear zones within low grade, greenschist facies metamorphic rocks. The deposit types are characterized by deformed, ductile

fabrics and tectonically recrystallized, fine grained, granoblastic stibnite lobes and lenses.

The gold-antimony deposit type 36C is

considered to be a sub-type of the mesothermal, auriferous lodes found in mineral provinces worldwide (Berger, 1993; Laznika, 1985; Hodgson,

1993). Radiogenic leads characterize gold-bearing vein deposits of the Brooks Range (Gacetta and Church, 1989). This data reinforces

the classification of the Nolan lode deposits as mesothermal in origin. Mineral deposit type 36C is not very well documented in North

America but well studied in Asia, Europe, and Africa. Worldwide examples include deposits in the Transvaal of South Africa, the Reefton

District in New Zealand, and deposits in Eastern Europe and in Russia. Olympiada in Siberia is an example of a large, productive gold

(stibnite) deposit of this type.

38

7.0 EXPLORATION

From 1978-to-2009, Silverado explored

for placer gold and lode gold deposits on federal claims in Nolan Creek basin, which are now owned by GLM.

7.1 Exploration of Heavy Mineral Placer

Deposits

Placer gold exploration in Nolan Creek

basin was primarily carried out using Reverse Circulation (RC) drilling technology. The RC drill program identified a system of left-limit

benches situated east of the main channel immediately east of Nolan Creek valley. Figure 7.1 illustrates the channel configurations of

771 drill collars as determined from drill campaign conducted on the property from 1979-to-2005.

Drill holes range from 25 feet-to-145

feet in depth and average 62 feet in depth. During the drill program, more than 11,750 five-ft intervals were systematically processed

and panned down the entire length of each drill hole. The drill holes were generally designed on 50 ft centers. In Nolan Creek Valley,

drill hole collars are oriented to 2900, which crosscut the northeast trend of ancestral and modern, gold-bearing fluvial deposits.

The pattern illustrates the steeply

incised nature of the Nolan Deep channel, and the much more irregular incised depressions and channel cuts on the left limit of Nolan

Creek. Figure 7.1 does not include drilling information from 2006 and 2007 campaigns, which would likely reveal more detailed information

about the bench system.

RC drilling was the principal exploration

method used by the previous owner in the identification of placer gold deposits in Nolan Creek basin. RC drilling campaigns have led

directly to the development and test mining of placer deposits at Nolan Creek. These would include successful development of the relatively

high-grade Mary’s Bench and Ogden-Eureka Bench deposits in 1994; the West Block and 3B1 Underground deposits in 1995, The Swede

Channel development in 1999 and 2005-2006; and the Mary’s East deposit during 2007.

In general, placer gold deposits were

evaluated with a line of fences that were interpreted to be perpendicular to the trend of the fluvial channels. Holes were spaced 50-75

feet apart. The drilling campaigns concentrated mainly on the main channel of Nolan Creek above the previous owners camp and along the

left limit bench deposits east of camp. Drill fences of a more reconnaissance nature explored extensions of the main Nolan Creek deposit

below Silverado’s camp, in the headward portions of Smith Creek and on high altitude benches north of Fay Creek.

Figure 7.2 illustrates the channel configurations

as determined from the drilling campaign conducted prior to 2006 at Swede Channel, a left limit fluvial deposit east of the main Nolan

Creek valley. During the drill program, the different geological units were logged along with depth to bedrock. Drilling completed in

1999 yielded a strong gold anomaly in a channel-like depression. This drill hole, MB42A, eventually led the previous owner to test this

anomaly with underground test-mining six years later in the fall of 2005 (Bundtzen, 2006 a, b, c).

39

Figure 7.1 Location Map Showing Locations

of 771 placer drill collars in Nolan Creek Valley placer field.

40

Figure 7.3 illustrates the general configuration of the left limit

bench placers at Mary’s East, the highest level bench system so far drilled and mine-tested. Unlike Swede Channel and other drill-tested

bench deposits, Mary’s East appears to be predominately a colluvial deposit composite slope debris and minor fluvial sand. It’s

irregular configuration contrasts with the more sinuous features of a fluvial channel.

Figure 7.4 illustrates the stacked nature of bench systems on the left

limit of Nolan Creek, using the mine-tested areas and the drill-indicated resources. Radio-carbon ages presented by Bundtzen and Eden

(2008) indicate that the Swede and Ogden-Eureka deposits formed from 39,000-to-42,000 B.P. whereas the Mary’s East deposits formed

at approximately 45,000 B.P.

Figure 7.2 Plan of Swede Channel Exploration and Underground Development;

2005-2006

41

Figure 7.3 Plan of Mary’s East Underground Development and

Exploration Drilling.

42

Figure 7.4 Contour map constructed from drill data and underground

workings in Nolan Creek Valley.

Figure 7.5 A—gold concentrate rich in

arsenopyrite and stibnite; B—nuggets of gold plus stibnite—indicating a clear correlation between the two metals. Both photos

from 2007 cleanup operations, Nolan Creek. Photos by the QP during 2007 cleanup activities from Mary’s Bench underground mining

activities.

43

7.2 Exploration of Antimony-Gold Lode Deposits

The combination of soil surveys, VLF/EM geophysical data, and past

trenching on Smith Creek at Pringle Bench and Workman’s Bench laid the foundation for the interpretation of the character of lode

mineralization on the GLM property. Table 7.1 summarizes the exploration activities for lode mineralization (excluding drilling, which

is summarized in Table 5.1) that took place from 1981-to-2009.

In the summer of 2003, the previous owner modeled the resistivity data

using Surfer 8.02 by Golden Software, with kriging parameters that focused on narrow target zones (Flanigan, 2003a; Flanigan et al, 2003).

The modeled geophysical data resulted in the recognition of two northeast-trending 870 Hz resistivity lows, one of which more-or-less

correlates with the trend of quartz-sulfide veins on Smith Creek and the associated gold, antimony, and arsenic-in-soil anomalies (7.7).

This geophysical anomaly, with associated quartz-sulfide lode prospects and metalliferous soil anomalies, were referred to as the ‘Solomon

Shear’ lode target (Flanigan, 2003b). Flanigan estimates that the Solomon Shear is about 1 mi long and 0.25 mi wide, with geophysical

indications of extensions, possibly offset, for an additional 2 mi to 3 mi to the northeast.

Figure 7.6 Map of Nolan Creek Basin illustrating 870 Khz geophysical

(resistivity) anomaly in gray

A stream sediment sample grid also covered the general area known by

the previous owners geological staff as the Solomon Shear (Figure 7.8). The soils geochemistry clearly showed a direct correlation of

a northeast-striking zone at least 1.5 miles long and up to 600 feet wide.

VLF/EM data was also acquired; however, the results did not assist

in defining the mineralized structures like the resistivity and soil sampling program did.

44

Figure 7.7 Summary of 2004 and 2007 soil sample grid programs, in

the Workman Bench-Pringle Bench and Hillside areas; data from previous owners.

45

An early 1993 drill campaign tested mineralization at Thompson’s

Pup. Four drill holes penetrated a brownish gray phyllite with varying degrees of silicification, pyritization, and generally weak hydrothermal

alteration. Arsenopyrite and trace stibnite were identified in two drill logs (93TPHR-03 and 04). At 50 ft to 55 ft in drill hole 93TPHR-04,

grades were 145 ppb gold, > 1.0% arsenic (the upper limit of detection for As), and 25 ppm antimony, in association with abundant quartz

veins.

Table 7.1 Summary of lode exploration activities, Nolan Creek, 1981-to-2009

Activity

Sample count

Drill hole count

Total (ft)

Soil/stream sediment samples

1,383(1)

NA

NA

Rock chip samples

275

NA

NA

Rotary drilling (lode)

739

14

3,695

Core drilling (lode)

1,842

72

21,144

Trenching

340(3)

NA

4,672(3)

Underground exploration drifts

NA

NA

470

Geophysical surveys (VLF/EM)

NA

NA

70.28 line mi(5)

Notes:

− (1) Does not include soil sampling conducted by USBLM on

Silverado claims.

− (2) 5 ft intervals were panned and gold, where encountered,

weighed or estimated.

− (3) Estimated from 2004, 2006, 2007, and 2009 Silverado

work. Does not include exploration work completed by the federal government (USBLM).

− (4) Exploration drifting only. Does not include production

or development stopes.

− (5) Does not include airborne work conducted by USBLM over

Silverado claims.

Total amount of drilling on the subject Nolan properties was previously

summarized in Table 5.1. In 1994, the previous owner completed an inaugural, short, rotary drill program to test the lode potential of

the Workman’s Bench area, where stibnite-gash veins were found in a placer mine cut. A ‘first phase’ program consisted

of about 750 ft of drilling in four drill holes that ranged from 130 ft-to-300 ft in depth. Figure 7.8 illustrates the results. Three

different horizons display vein-hosted gold-antimony mineralization over 100 ft-to-120 ft of true width. The veins range from 0.026 oz/ton

Au-to-0.086 oz/ton Au over 5.0 ft assay intervals, with up to >1.0% antimony and 4,370 ppm arsenic. One 10.0 ft assay interval averaged

about 0.036 oz/ton Au, >1.0% antimony, and 3,300 ppm arsenic. Underground exposures have shown that veins dip vertical or steeply southeast,

not northwest as shown in 1994 cross sections.

In 2006, one RC drill hole tested Pringle Bench (Table 7.2). In 2007

the previous owner purchased it’s own diamond drill rig and contracted the drilling to subcontractor Tricon, originally using BTW-sized

core on the Pringle Bench and Workman’s Bench deposits. A conversion to NQ core which is larger in diameter by about ¼ inch,

was made during July, 2008. NQ refers to the size of the core, which is approximately 1.75 inches in diameter. Core drilling

is better suited to this narrow-vein style of deposits than RC percussion drilling.

During 2007, the previous owner tested closely spaced stibnite-quartz

veins and veinlets at Pringle Bench north of Smith Creek using eleven diamond drill holes totaling 2,415 ft (Table 7.2). Also during 2007, Silverado drilled seven drill holes totaling 2,140 ft

to test the Workman’s Bench deposit (Table 7.3).

46

Figure 7.8 Section of 1994 inaugural percussion (RC) drill

hole results for Workman’s Bench; illustrating a pioneer attempt at exploring the Workman’s Bench antimony-gold deposit

47

Exploration work conducted during the latter part of 2007 and all of

2008 focused on: 1) driving 470 feet of underground drift to affirm surface and core sampling results and collection of bulk sample for

a metallurgical test; and 2) completion of 72 diamond drill holes totaling 21,144 feet to test the extent of the Workman’s Bench

and Pringle bench antimony-gold mineralized system. This confirmed that several parallel mineralized veins are intersected by diamond

drill holes for a strike length of more than 3,500 feet (including across Smith Creek) and a maximum vertical depth of 450 feet.

During 2009, diamond drill core program was designed by

contractor Karl Sharp to: 1) explore shallower level of Workman’s Bench southwest of the underground workings driven in 2008;

and 2) test deeper levels of the Pringle Bench vein-fault system and provide for vertical extensions of the shallow inferred

resource estimate reported in the 2009 NI- 43-101 Technical Report (Bundtzen, 2009). In 2009, approximately 5,000 feet were drilled

in twenty holes on Pringle and Workman’s Bench. The previous owner soon recognized the need to selectively sample the thin

mineralized quartz veins and changed their sampling protocol so that smaller samples, better representing these veins, could be

taken.

Collar location, orientation data and drill footage summaries for the

RC and diamond core programs on Pringle and Workman’s bench are provided in Tables 7.2 and 7.3. Coordinates for all collars were

determined with the GarminTM Global Positioning System (GPS) using NAD27 Alaska datum. This datum was used because the USGS

!:63,360 scale topographic maps created at that time used NAD27 Alaska datum. GPS measurements were taken 2-to-4 times to ensure that

the collar was accurately located. All collar elevations are determined from the same benchmark (BM) at survey control point CP-06-01.

The significance of using the same benchmark is that a much more accurate elevation estimate for each collar can be ascertained.

Figure 7.9 Stibnite-bearing interval in drill hole 08SH01, from

93.5 to 94.4 feet; B Massive granoblastic stibnite in DDH 09SH-05; true thickness estimated to be 1.5 feet.

48

Table 7.2 Collar location and data, Pringle Bench, 2006, 2007, and

2009 Exploration Campaigns

RC Drill Hole

DDH No.

UTM Easting

UTM Northing

Datum

Zone

Collar Elevation

Azimuth

Dip

Total Depth

Core Diameter

06SH01

618868.02

7486656.03

NAD 27 Alaska

5W

1801.50

320

-45

300

RC, 8 in

Diamond Core Drill Holes

DDH No.

UTM Easting

UTM Norhing

Datum

Zone

Collar Elev. (ft)

Azimuth

Dip

Total Depth (ft)

Core Size

07SH02

618888.00

7486745.27

NAD 27 Alaska

5W

1848.50

320

-45

212

BTW

07SH03

618867.00

7486735.00

NAD 27 Alaska

5W

1848.50

320

-45

102

BTW

07SH04

618867.00

7486735.00

NAD 27 Alaska

5W

1848.50

320

-45

284

BTW

07SH05

618889.00

7486768.00

NAD 27 Alaska

5W

1872.60

320

-45

297

BTW

07SH06

618913.00

7486776.00

NAD 27 Alaska

5W

1884.90

320

-45

139

BTW

07SH07

618931.00

7486782.00

NAD 27 Alaska

5W

1898.10

320

-45

207

BTW

07SH08

618942.00

7486790.00

NAD 27 Alaska

5W

1900.50

320

-45

182

BTW

07SH09

618942.00

7486790.00

NAD 27 Alaska

5W

1900.50

320

-45

92

BTW

07SH10

619008.00

7486676.00

NAD 27 Alaska

5W

1873.70

320

-45

301

BTW

07SH11

618985.00

7486706.00

NAD 27 Alaska

5W

1876.40

320

-45

307

BTW

07SH12

618985.00

7486704.00

NAD 27 Alaska

5W

1876.40

320

-45

292

BTW

09SH10

618918

7486843

NAD 27 Alaska

5W

1913.00

110

-45

267

NQ

09SH11

618862

7486741

NAD 27 Alaska

5W

1854.00

160

-45

142

NQ

09SH12

618862

7486741

NAD 27 Alaska

5W

1854.00

160

-60

137

NQ

09SH13

618860

7486743

NAD 27 Alaska

5W

1854.00

160

-69

267

NQ

09SH14

618927

7486755

NAD 27 Alaska

5W

1887.00

320

-45

202

NQ

09SH15

618927

7486755

NAD 27 Alaska

5W

1887.00

320

-65

222

NQ

09SH16

618967

7486802

NAD 27 Alaska

5W

1920.00

320

-45

192

NQ

09SH17

618808

7486735

NAD 27 Alaska

5W

1835.00

140

-55

139

NQ

09SH18

618879

7486722

NAD 27 Alaska

5W

1850.00

320

-60

137

NQ

09SH19

618874

7486721

NAD 27 Alaska

5W

1850.00

250

-60

282

NQ

09SH20

618874

7486721

NAD 27 Alaska

5W

1850.00

245

-65

342

NQ

Total Drill Holes, Pringle Bench—23

Total Drill Footage, Pringle Bench—5,044 Feet

Note—Five (5) percussion drill holes completed in 2003

that total 1,340 feet are not included in the above tabulation

49

Table 7.3 Collar location and data Workman’s Bench; 2007,

2008, and 2009 exploration campaigns

DDH No.

UTM Easting

UTM Norhing

Datum

Zone

Collar Elev. (ft)

Azimuth

Dip

Total Depth (ft)

Core Size

07SH01

618652.00

7486576.58

NAD 27 Alaska

5W

1749.10

140

-45

312

BTW

07SH13

618571.00

7486484.00

NAD 27 Alaska

5W

1776.80

143

-45

358

BTW

07SH14

618571.00

7486484.00

NAD 27 Alaska

5W

1776.80

100

-45

407

BTW

07SH15

618579.00

7486499.00

NAD 27 Alaska

5W

1776.80

100

-45

323

BTW

07SH16

618525.00

7486470.00

NAD 27 Alaska

5W

1766.00

140

-45

397

BTW

07SH17

618500.00

7486495.00

NAD 27 Alaska

5W

1763.30

140

-45

252

BTW

07SH18

618615.00

7486507.00

NAD 27 Alaska

5W

1811.00

90

-45

91

BTW

08SH01A

618669.37

7486571.13

NAD 27 Alaska

5W

1751.20

184

-45

216

BTW

08SH01B

618669.37

7486571.13

NAD 27 Alaska

5W

1751.20

140

-45

312

NQ

08SH02

618662.66

7486569.92

NAD 27 Alaska

5W

1752.71

110

-45

343

NQ

08SH03

618675.00

7486564.00

NAD 27 Alaska

5W

1755.00

140

-50

252

NQ

08SH04

618740.14

7486553.52

NAD 27 Alaska

5W

1751.00

320

-50

55

NQ

08SH05

618771.00

7486541.00

NAD 27 Alaska

5W

1751.00

320

-50

30

NQ

08SH06

618621.85

7486506.24

NAD 27 Alaska

5W

1788.00

100

-50

72

NQ

08SH07

618551.00

7486477.00

NAD 27 Alaska

5W

1777.00

140

-50

370

NQ

08SH08

618485.00

7486452.00

NAD 27 Alaska

5W

1772.00

140

-50

452

NQ

08SH09

618426.00

7486379.00

NAD 27 Alaska

5W

1762.00

140

-50

457

NQ

08SH10

618558.00

7486465.33

NAD 27 Alaska

5W

1777.00

140

-45

317

NQ

08SH11

618584.00

7486489.00

NAD 27 Alaska

5W

1780.00

140

-60

362

NQ

08SH12

618584.00

7486489.00

NAD 27 Alaska

5W

1780.00

100

-50

282

NQ

08SH13

618619.24

7486508.75

NAD 27 Alaska

5W

1788.00

90

-60

312

NQ

08SH14

618674.39

7486570.08

NAD 27 Alaska

5W

1752.00

140

-45

242

NQ

08SH15

618671.51

7486567.75

NAD 27 Alaska

5W

1752.00

180

-45

397

NQ

08SH16

618671.51

7486567.75

NAD 27 Alaska

5W

1752.00

190

-45

352

NQ

08SH17

618672.65

7486567.85

NAD 27 Alaska

5W

1752.00

140

-70

497

NQ

08SH18

618501.00

7486434.00

NAD 27 Alaska

5W

1803.00

140

-60

472

NQ

08SH19

618501.00

7486434.00

NAD 27 Alaska

5W

1803.00

140

-45

307

NQ

08SH20

618501.00

7486434.00

NAD 27 Alaska

5W

1803.00

110

-50

397

NQ

08SH21

618501.00

7486434.00

NAD 27 Alaska

5W

1803.00

170

-50

402

NQ

08SH22

618560.00

7486468.00

NAD 27 Alaska

5W

1777.00

140

-60

302

NQ

08SH23

618560.00

7486468.00

NAD 27 Alaska

5W

1777.00

165

-50

307

NQ

08SH24

618560.00

7486468.00

NAD 27 Alaska

5W

1777.00

120

-50

317

NQ

08SH25

618451.00

7486419.00

NAD 27 Alaska

5W

1765.00

140

-45

427

NQ

08SH26

618426.00

7486379.00

NAD 27 Alaska

5W

1762.00

120

-45

432

NQ

08SH27

618426.00

7486379.00

NAD 27 Alaska

5W

1762.00

140

-45

402

NQ

08SH28

618426.00

7486379.00

NAD 27 Alaska

5W

1762.00

160

-45

450

NQ

08SH29

618451.00

7486419.00

NAD 27 Alaska

5W

1765.00

110

-45

450

NQ

08SH30

618451.00

7486419.00

NAD 27 Alaska

5W

1765.00

155

-45

450

NQ

08SH31

618451.00

7486419.00

NAD 27 Alaska

5W

1765.00

140

-55

487

NQ

50

Table 7.3 Continued Collar location and data Workman’s Bench;

2007, 2008, and 2009 exploration campaigns

DDH No.

UTM Easting

UTM Northing

Datum

Zone

Collar Elevation

Azimuth

Dip

Depth

Core Size

08SH32

618639.00

7486563.00

NAD 27 Alaska

5W

1758.00

160

-45

307

NQ

08SH33

618639.00

7486563.00

NAD 27 Alaska

5W

1758.00

160

-45

367

NQ

09SH01

618594

7486411

NAD 27 Alaska

5W

1880.00

320

-45

257

NQ

09SH02

618594

7486411

NAD 27 Alaska

5W

1880.00

291

-50

302

NQ

09SH03

618548

7486371

NAD 27 Alaska

5W

1880.00

326

-45

302

NQ

09SH04

618564

7486387

NAD 27 Alaska

5W

1880.00

290

-55

297

NQ

09SH05

618529

7486347

NAD 27 Alaska

5W

1873.00

320

-69

342

NQ

09SH06

618530

7486350

NAD 27 Alaska

5W

1873.00

335

-66

302

NQ

09SH07

618516

7486337

NAD 27 Alaska

5W

1870.00

305

-69

322

NQ

09SH08

618547

7486365

NAD 27 Alaska

5W

1873.00

297

-68

332

NQ

09SH09

618547

7486365

NAD 27 Alaska

5W

1873.00

297

-45

207

NQ

Total Core Drill Holes Workman’s Bench--50

Total Drill Footage

Workman’s Bench—16,400 feet

Note—Four (4) percussion (RC) drill holes completed in

1994 that total 780 feet are not included in the above tabulation

51

Figures 7.10-to-7.15 depict the vein-fault system on Pringle and Workman’s

Benches that has been drilled by the previous owner since 2006, but mainly since 2007. Figure 7.10 is the plane view of the Workman’s

bench vein-fault system. Figure 7.12 is a plane view of the Pringle Bench vein-fault system. Much of the data for the cross-sectional

profiles on Workman’s Bench was compiled from a series of twelve (12) large plates that depict vertical sections constructed by

the company (see Staff, 2008, a-l). Additional vertical profiles were completed by the QP after inspection of the 2009 drill program data.

A cross-sectional profile on Pringle Bench was developed by the QP mainly from drill information provided by the previous owner. Three

cross sectional profiles, namely A-‘A’, B-‘B’, and C-‘C’, which are shown in Figures 7.11-to-7.13,

provide a generalized fence of the Workman’s Bench vein-fault system from southwest to northeast. They reveal that three, sometimes

four, mineralized zones designated ‘West’, ‘A’, ‘B’, and ’C’ zones, are more-or-less sub-parallel

to each other and dip steeply southeast in the southern part, steeply northwest in the central part, and essentially vertical in the northern

part of the drill tested system. The vertical profile designated D-‘D’ on Pringle Bench indicates that the vein-fault system

there dips steeply to the northwest. Geologists recognized that distinct near-vertical vein-fault structures could be recognized in drill

core and in the underground workings on the basis of both spatial relationships and physical features.

· ‘A’ zone is the largest and most distinctive of the mineralized structures at Nolan—appearing on both Workman’s

and Pringle Benches. It is almost always accompanied by a distinctive lateral slickenside on its footwall and a pervasive quartz-sulfide

stock work on it’s hanging wall. This post-mineral movement creates a distinctive granoblastic texture in stibnite. ‘A’

zone varies from less than 1.0 feet to 5.8 feet in true thickness and is thicker when combined with the stock work hanging wall.

· ‘B’ zone generally occurs 40-50 feet to the southeast of ‘A’ zone and sub-parallels the latter. It is also

a vein-fault but does not generally contain slickensides—indicating that movement has not taken place after mineralization. Besides

the conspicuous quartz-stibnite mineralization, ‘B’ zone also contains significant siderite gangue—up to 10 percent.

‘B’ zone is somewhat thinner than ‘A’ zone, averaging about 0.85 foot true thickness, but can attain a true thickness

of 4.8 feet.

· ‘West’ zone generally lies 20-30 feet west of ‘A’ Zone but sometimes further. It is similar to ‘B’

zone in that it does not contain slicken-sided features typical of ‘A’ Zone. However, it can contain distinctive stock work

quartz-sulfide zones in it’s hanging wall like ‘A’ Zone. ‘West’ zone averages the same thickness as ‘B’

Zone but can be up to 5.0 feet true thickness. It has been recognized on both Workman’s Bench and Pringle Bench.

· ‘C’ zone is the weakest mineralized Sb-Au vein-fault in the Nolan system and has only been positively identified on Workman’s

Bench. Like ‘B’ and ‘West’ zones, no post-mineral slickenside has been observed. It averages only about 0.75 feet

in thickness and normally found about 30-40 feet southeast of ‘B’ zone. It is also the weakest mineralization observed on

the Workman’s bench and thus far con only be traced for about 275 feet of strike length.

Other Sb-Au veinlet zones have been recognized and sampled but cannot

be correlated with a specific fault structure of the Nolan system. More work has to be completed to better understand these additional

zones.

52

Two methods were deployed to calculate the estimated true widths of

the mineralized vein-faults being evaluated for resources estimates. Firstly, the core-logging geologist estimated true widths by measuring

across the extent of the parallel footwall and hanging wall contacts of the mineralized structure being sampled with host metamorphic

phyllite. This field estimate is aided by the fact that foliation in the host phyllite, is nearly horizontal. Thus the geologist can check

his true width calculations with the angle of the drill hole. During April, June, and September of 2008, the QP looked at all core

intervals, underground stations, and selected channel sites in order to check true width intervals. In 2009, the QP examined twelve of

the twenty-two core intervals to estimate true width. When true widths were ambiguous in core, standard trigometric calculations were

used to calculate the actual dip of the vein(s) in core versus the calculated angle that the vein intersects the zone. Additional

descriptive information is described in section 12 of this report. A comparison of drill interval widths versus estimated true width are

presented in Appendices I and II.

No down-hole orientation surveys were conducted. Oriented drill holes

are important to insure that drill azimuths are not off course. The QP judges that the shortcomings of not having oriented core is minimized

by: 1) the relatively short drill holes that accessed the mineralized zones; 2) the relative competency of the host rocks; and 3) the

near horizontal foliation of the host lithology probably minimize the potential of steeply angled drill holes from bending and diverting

off trajectory for any significant amounts. As an example, down hole depths of most mineralized intercepts; i.e., ‘A’ zone,

were predicted accurately at the drill site by the geologist before the actual intersection took place. However, as more drill holes explore

deeper portions of the system, more holes should be oriented to avoid down-dip inaccuracies.

53

Figure 7.10 Schematic of Workman’s Bench, illustrating bench

configuration, locations of 2007-2009 drill holes, the ‘A’ zone’, ‘West’ zone, ‘B’ zone, and

‘C’ zone, and locations of three cross sectional profiles illustrated in Figures 7.11. 7-12, and 7-13.

54

Figure 7.11 Schematic, cross sectional profile A-A’ the southern

portion of Workman’s Bench, illustrating the intersection of the major mineralizing structures currently being assessed—note

that the ‘Zones as drawn represent a width of the mineralized structure and not the sampled assay interval, which is generally thinner.

55

Figure 7.12 Schematic, cross sectional profile B-B’ in the

central portion of Workman’s Bench, just south of the ‘South Portal’ tunnel, illustrating the intersection of the near-vertical,

major mineralizing structures currently being assessed—note that the ‘Zones’ as drawn represent a width of mineralizing

structure from inspection of core and not the sampled assay interval, which is generally thinner.

56

Figure 7.13 Schematic, cross sectional profile C-C’ in the

northern portion of Workman’s Bench, just north of the ‘North Portal’ tunnel, illustrating the intersection of the near-vertical,

major mineralizing structures currently being assessed—note that the ‘Zones’ as drawn represent a width of mineralizing

structure from inspection of core and not the sampled assay interval, which is generally thinner.

57

Figure 7.14 Schematic plane view of Pringle Bench, illustrating

bench configuration, locations of 2006, 2007 and 2009 drill holes, the ‘A Zone’, ‘West Zone, and other

non-designated vein-fault zones; location of cross-sectional profile D-D’ illustrated in Figure 7.15.

58

Figure 7.15 Schematic, cross sectional profile D-D’ (and including

RC hole 06SH01) on Pringle Bench, illustrating the intersection of the essentially vertical, major mineralizing structures currently being

assessed—namely ‘A’ Zone (red) and West Zone (blue). Note that the ‘A’ and ‘West’ zones as drawn

represent a width of mineralizing structure from inspection of core and not the sampled assay interval, which is generally much thinner.

From QP files.

59

8.0 SAMPLE PREPARATION, ANALYSES, AND SECURITY

8.1 Site Sample Preparation Methods and Security

The previous firm developing the placer deposits directly supervised

the primary collection, sample preparation, and analysis of all placer deposit samples.

Gold nuggets within the placer systems can be very large (50% greater

than number 4 mesh size) and variably distributed; hence, the requirement for collecting and analyzing large samples. The percussion samples

were analyzed in their entirety without sub-sampling to minimize potential bias caused by sub-sampling material with extreme size variation

in gold nuggets.

Sample grades for the Nolan Creek placer deposits are expressed as

oz/yd3 Au. Accurate measurement of the volume of the sample is therefore as critical as accurate recovery and weighing of the

contained gold. The volume in the analysis is the in-situ or bank volume of the sample. This is determined using swell factors that have

been determined for the deposits. These factors are subject to local variation (e.g., because of higher silt content in the sample) that

may cause inaccuracies in the analytical results.

Two methods were traditionally used by the previous owner to estimate

gold grades in a placer resource. One method is to calculate the amount of gold present in a bank cubic yard or ounces gold/cubic yard.

When all of the values are on or near the bedrock-gravel interface, an alternative method of estimating gold quantities in a placer deposit

is the amount of gold present on one square foot of surface area on bedrock—known as a bedrock square foot (brsf). Because most

of the placer gold in the Nolan Deep Channel and in left limit benches are ‘bedrock placers’, some Silverado geologists expressed

gold values in exploration drill programs in ‘brsf’. This value varied with the thickness of auriferous materials both above

and below the bedrock-gravel interface. The previous owner established conversion factors for converting ounces gold/brsf to ounces gold/cubic

yard, which systematically varied from valley floor and bench deposits. For this summary, the QP expressed all drill hole grade data in

ounces gold per cubic yard.

Sample recovery calculations have been implemented by the previous

owner’s geological staff and described by Flanigan (2003d; 2004). The QP could not verify every sample or the reported results for

authenticity, but he is reasonably confident that sampling programs were carried out in a professional manner by competent, qualified

individuals.

As an example, Table 8.1 summarizes data collected for drill hole intersections

for one of the placer target areas: D-3B3 Block.

60

Table 8.1 Drill hole intersection summary for 3B3-Block

Drill hole

From

To

True Thickness

Grade

(ft)

(ft)

(ft)

(oz/cu yd Au)

NC-3B3 10-1

30

42

12

0.012

NC 3B3 11-3

85

97

12

0.015

NC-3B3 2-1

105

110

5

0.024

NC-3B3 2-3

75

85

10

0.275

NC-3B3 2-4

70

75

5

0.176

NC 3B3 3-1

55

60

5

0.010

NC 3B3 3-3

90

95

5

0.041

NC 3B3 3-5

125

135

10

0.117

NC 3B3 4-1

105

110

5

0.011

NC 3B3 6-3

50

55

5

0.061

NC 3B3 7-3

55

60

5

0.067

NC 3B3 9-5B

90

97

7

0.134

Four types of samples were collected during previous lode exploration

campaigns. Soil samples were taken every 50 ft over established grids. Silverado used hand-held, mechanized augers to collect the samples

and sometimes spade shovels. Trench channel samples were taken each 5 ft. When mineralized veins are encountered, a narrower (to a minimum

of 6 in) segment was collected. This reflects previous owner’s interest in evaluating the stibnite-bearing veins for selective extraction

rather than looking at the deposits as a lower grade bulk tonnage play. All drill core was cut by diamond saws at the mine site. Half

of the core was split and bagged for shipment to the selected lab; the other half was kept for further logging activities and reference.

The location of trenches and diamond drill holes are described for

the lode deposits at Pringle Bench and Workman’s Bench in Chapter 7 of this report. Summaries of the number of RC and diamond core

samples are presented in Tables 5.1 and 7.1 of this Technical Report. The locations of channel samples for the Workman’s Bench underground

development work deposit are shown in Figure 8.1. Table 8.2 summarizes how sample interval and assay data are presented by the QP from

the diamond core drilling, surface-trench, and underground sampling programs.

In February 2008, the previous owner completed an underground

channel sample program of thin zones of quartz-stibnite mineralization exposed in the workings driven in late 2007. True sample widths

across mainly massive stibnite veins ranged from 3 inches-to-11 inches and averaged 6.5 inches. In April 2008, geologists re-entered

the underground workings and collected an additional 92 channel samples along 460 ft of underground development.

A portable, air-powered chipper (i.e., jackhammer) and chisel

were used to extract the samples, mostly 5 ft intervals. The sample channel was first cut with an air-powered rock saw before being

extracted with the jackhammer. Sample weight was estimated to be about 15 pounds each, for a total of approximately 600 kg for the

92 samples. The broken sample was collected on a plastic sheet lain on the floor of the drive immediately below the channel. The QP

considers that adequate care was taken in the collection of the material in the sampled intervals. In April, 2008, the QP collected

23 independent channel samples from underground workings, using sampling methods similar to those described above.

61

During September 29-30, 2008, the QP inspected the

methodology of the sampling methods and approaches during the processing of core from the 2008 Workman’s Bench exploration

program. In contrast to the 2007 exploration drill program on both Pringle and Workman’s Benches, where 5.0 foot lengths of

core were systematically assayed along with selected mineralized zones, sample intervals selected during the 2008 drill program on

Workman’s Bench were entirely focused on the relatively thin mineralized veins intervals in core. Five-foot intervals in core

were not assayed if veinlet mineralization was not recognized. This Previous owner’s decision reflects the desire to focus

exclusively on relatively small, high grade, antimony-gold veinlet zones in core. As a result, the total number of assay intervals

during the 2008 drill program (627) was only 52 percent of the 2007 drill program total (1,195) despite the fact that drill footage

in 2008 (11,597 ft) exceeded the drill footage in 2007 (4,555 ft) by about 160 percent.

Figure 8.1 Geologists collect channel sample in underground Workmen’s

Bench development using horizontal diamond saw cut across mineralized zone; circa April, 2008. From QP files.

62

Figure 8.2 Location of underground development and channel samples,

Workman’s Bench

63

Table 8.2 Table of selected sample composite, illustrating assay

information and true widths of mineralized structures from 2009 Workman’s Bench core drilling program.

Drill Hole #

(Assay

Intervals)

Underground,

Surface  or Drill

Core Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/t)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

09SH01

(09SS03)

Drill

Core

‘A’

Zone

181.1

182.0

0.90

0.75

<0.01

0.072

7,730

0.25

2.5

Dense quartz

vein swarm with trace stibnite and arsenopyrite

09SH01

(09SS04)

Drill

Core

West Zone

189.9

190.6

0.70

0.58

0.07

0.126

6,680

0.27

8.9

3.25 inch

thick vuggy quartz-stibnite vein

09SH02

(09SS019)

Drill

Core

‘A’

Zone hanging wall

160.3

162.0

1.70

1.36

5.64

0.035

2,310

0.27

0.9

Quartz

carbonate stibnite stockwork

09SH02

(09SS020)

Drill

Core

‘A’

Zone

162.0

162.9

0.90

0.72

0.18

0.035

4,560

0.37

15.6

Quartz-stibnite

breccias vein; analytical  Sb content lower than visual in core

09SH02

(09SS021)

Drill

Core

‘A’

Zone

162.9

164.6

1.70

1.36

3.05

0.042

3,790

0.40

29.1

Two vertical

quartz-stibnite veins 0.75 inches thick; 0.30 foot carbonate vein

09SH03

(09SS035

Drill

Core

‘A’

Zone hanging wall

164.1

164.6

0.50

0.40

0.35

0.012

NA

NA

NA

3/8 inch

qtz +Sb; 30% stibnite—over-drilled

09SH03

(09SS036)

Drill

Core

‘A’

Zone

168.0

168.6

0.60

0.40

0.80

0.019

NA

NA

NA

<1/2

inch qtz-Sb; 80% stibnite-over -drilled

09SH04

(09SS039-040)

Drill

Core

‘B’

Zone

145.0

148.7

3.70

2.75

1.57

0.169

5,130

0.90

2.6

Quartz-carbonate

veins and quartz-stibnite breccias—contamination from hanging wall

09SH04

(09SS047)

Drill

Core

‘A’

Zone

193.6

195.8

2.20

1.62

3.71

0.002

415

0.24

3.4

Abundant

quartz carbonate stibnite

09SH04

(09SS048)

Drill

Core

‘A’

Zone

195.8

196.3

0.50

0.37

1.65

0.190

2,170

0.37

15.7

Similar

to 09SS047 but more arsenopyrite

09SH05

(09SH022)

Drill

Core

‘A’

Zone

276.2

276.7

0.50

0.30

47.29

0.217

2.9

1.16

0.7

Hanging

wall of massive stibnite vein; arsenopyrite in hanging wall

09SH05

(09SS023)

Drill

Core

‘A’

Zone

276.7

278.3

1.60

1.30

69.21

0.251

<0.1

1.63

0.2

Massive

stibnite vein (see cover photo)

09SH05

(09SS024)

Drill

Core

‘A’

Zone

278.3

278.8

0.50

0.30

39.53

0.389

17.9

0.79

1.3

Footwall

contact zone

64

Sample security from both placer and lode sampling programs were maintained

by geological contractors. All samples were stored in a secure trailer at Nolan Camp. Individual samples were composited into larger rice

bags and sealed with plastic tape. Samples were then stored in a locked trailer at Nolan Camp prior to transport to the ALS Chemex preparation

laboratory in Fairbanks, Alaska.

8.2 Laboratory Sample Preparation Methods and Analytical Procedures

Samples from placer deposits were analyzed in their entirety

(i.e., no sub-sampling) to minimize potential bias from sub-sampling of material with such a large proportion of gold nuggets.

Samples from RC drilling were split with a splitter and surface samples were split by contracted laboratory personnel. The primary

sample was processed through a gravity separation technique at the drill rig to separate gold nuggets, finer-grained gold, and heavy

minerals from the host gangue material. A systematic procedure was developed by Tricon Mining geological staff for the collection

and preparation of percussion drill hole samples. The sample was emitted from the drill and immediately submitted to a drill-mounted

cyclone to dissipate the sample velocity, and then passed through a JonesTM splitter. The split sample was then processed

through a Denver Gold SaverTM. The oversize discharged to a revolving drum screen to a ‘picking plate’ where

+¼ inch nuggets were hand-picked. The – ¼ inch undersize reported to a Teflon lateral action sluice and the

resultant heavy mineral concentrate was hand-panned. The gold in the concentrate was then picked with tweezers. The remaining fine

heavy concentrate was treated with amalgamation and the resultant gold bead was weighed along with the hand-picked gold with a

ChampTM electronic balance.

The previous owner conducted volume measurements of samples collected

during 2003 and 2004 placer drilling programs. Results of these measurements showed that a 5 ft sample from the Nolan Deep Channel averaged

14.80 gallons, whereas a 5 ft sample from the Mary’s East Bench deposit averaged 19.20 gallons. The Nolan Deep Channel deposits

contain significant amounts of silt, sand, and clay, whereas the left limit bench deposits such as those at Mary’s East are much

coarser grained. Determination of volumetric measurements results in a more accurate estimate of gold grade in the placer deposit. Hence

each placer deposit was volume-characterized by Silverado contractors during exploration.

Sample grades for placer deposits are expressed as gold content

per bank volume of material where bank volume is the in-situ volume of material. To calculate the bank volume the sample volume must

be factored using a predefined swell factor that quantifies how much the volume of the sample increases as a result of extraction.

Swell factors for mine operations were estimated by Murton (2004) to be 130%, whereas the calculated swell factor during the

2003-to-2004 rotary drill programs was calculated by Flanigan (2004) to be 117%. The weight of the gold extracted from the sample

(the method of recovery which was described previously) is divided by the bank volume of the sample to

determine the grade of the sample expressed in oz/cu yd Au.

65

For lode exploration, diamond core samples were split in half on site

by company personnel using a core saw. Half of the core was submitted to external laboratories for analysis and half is retained on site.

ALS Chemex of Vancouver, Canada, an ISO 9001:2000 accredited laboratory,

analyzed most of the Silverado sample stream from lode-style deposits. Alaska Assay Laboratories LLC of Fairbanks, Alaska, an ANS/ISO/IEC

Standard 17035:2005 accredited laboratory were subsequently used by Silverado for analytical work. Both laboratories produced a coarse

split from which a finely ground material to 150 mesh is analyzed. The pulverized material and the coarse reject were stored by the laboratories

for possible re-analysis. Both laboratories were utilized during the 2008 exploration program. In 2009, analytical services were exclusively

provided by ALS Chemex Labs (now ALS USA Inc.).

8.3 Quality Control and Quality Assurance Programs

Quality assurance and quality control (QAQC) was routinely performed

by the previous owner’s exploration contractors. During 2008, standards have been obtained from Shea Clark Smith, (Minerals, Exploration,

and Environmental Geochemistry) in Reno, Nevada that supplies standards for mining companies. For core intervals intersecting vein zones,

two standards and one blank are randomly inserted in batches of twenty (20) sample intervals. One standard contains 0.174 oz/ton gold.

The other standard contains 0.261 oz/ton gold. For core penetrating mainly wall rock zones, one standard and one blank were randomly inserted

into batches of twenty (20) samples, with the standard used containing 0.174 oz/ton gold. The standards for gold that were inspected by

the QP during 2008; all appear to be within a narrow 1.0 percent of the values.

During 2009, standards were again obtained from Shea Clark Smith, (Minerals,

Exploration, and Environmental Geochemistry) in Reno, Nevada. One mineralized standard contained 6 ppm (0.174 oz/ton) gold while another

contained 9 ppm (0.264 oz/ton) gold. A blank consisting of pure quartz was also obtained from Shea Clark Smith. Duplicate samples were

prepared by Karl Sharp using known intervals with known assay values. In 2009, standards, blanks, and duplicate samples were inserted

into the sample stream every twenty (20) samples in a similar fashion to that developed for the 2008 sample stream.

The QP inspected ALS Chemex certified analytical results for the 2008-2009

programs. For example, in 2009, Certificates FA09127826-828; FA0917035-037; FA09091985; FA09085913; and FA09081078 contained 170 assayed

samples from all sources. Of these the QP observed the standards and blanks. The low gold standard (6 ppm Au) ranged from 5.91-6.27 and

averaged 6.04 ppm Au. The higher standard (9 ppm Au) ranged from 8.61-9.38 and averaged 8.84 ppm Au. The QP judges that the contracted

laboratory was performing in a satisfactory manner. Antimony standards were not deployed.

66

Core recovery was checked in every box coming off the drill rig. The

QP witnessed core loggers estimating core recovery during 2007 and 2008. During 2008, Silverado's geological contractors have reported

that core recovery and Rock Quality Designators values (RQD) averaged 95 percent, especially after switching from BTW size core to the

larger diameter NQ core. During his October 22-23, 2007, June 13-14, 2008, and September 29-30, 2008 site visits, the QP

noted that core recovery is consistently very high and averages >90 percent. Lower RQD values occur in mineralized intervals.

8.4 Qualified Person’s Opinion Regarding Sample Collection

and Preparation

The QP considers that contractors for the previous

owner competently prepared samples analysis and dispatch to external laboratories. The QP observed sampling procedures and QAQC issues

at Nolan Creek since about 2003.

During the

April 20th 2008 inspection of the Workman’s Bench underground workings,

the QP suggested some modifications to Silverado contactors during the collection of channel samples underground, which

included covering the floor of the drift with a tarp to collect the samples and to prevent contamination and using larger sample

bags than were being used.

For the 2009 programs, only narrow mineralized zones were selected

for assay; therefore, the bulk of the core volume was not submitted for analytical work. The QP suggests that a selected portion of the

unanalyzed core should be submitted for: 1) the same analytical methods as used in the mineralized zones in order to estimate the possibility

of bulk mineable albeit lower grade zones of mineralization; and 2) acid-base accounting (ABA), in order to better predict the acid generating

capacity (AGC) of the site during development and for future permitting requirements.

67

9.0 DATA VERIFICATION

9.1 Exploration and Mineral Resource Data Verification

The QP has verified all exploration and resource data relied upon in

this Technical Report.

Concerning placer deposits, the QP observed contractors from the previous

owner prepare placer samples for separation of placer gold, the subsequent weighing of recovered gold and calculation of gold per unit

volume of material. Concentrate splits were stored at Nolan Camp. The QP inspected these records during 2003-to-2004 and also looked at

chip trays collected during 2006-to-2007. The QP observed placer exploration conducted by the previous owner’s contractors during

underground development of Swede Channel in 2006. The QP is confident that contractors conducted a sound panning program that was directly

factored into the development of drifts and crosscuts.

Concerning lode deposits, in 2009, the QP observed mineralized sample

intervals being prepared for submittal to the ALS Chemex Laboratory in his Fairbanks office complex. All of the core boxes were nailed

shut prior to shipment to Fairbanks. According to geologist Karl Sharp (pers. commun., September, 2009), splitting occurred after the

core was photographed.

Selected field duplicates of sampled intervals, two from underground

channels, and one from a trench, were submitted by the QP to an umpire laboratory (Alaska Assay Laboratories LLC) to check analytical

results from ALS Chemex. In as much as the samples are collected by different individuals at different times and analyzed by different

labs, the QP judges that results from this limited comparison indicate acceptable levels of bias and accuracy for gold and antimony values

(Table 9.1).

Table 9.1 Duplicate analytical comparisons between QP and contractor

samples

Sampler

Sample #

Sb (%)

Au (oz/ton)

Description

QP

203808

43.64

1.190

Underground sample, Alaska Assay Laboratories

Karsten Eden

WBUG5-S2

50.04

1.040

Underground sample, ALS Chemex

QP

203810

41.00

0.696

Underground sample, Alaska Assay Laboratories

Karsten Eden

WBUG8-S3

58.02

0.696

Underground sample ALS Chemex

QP

267397

36.51

0.793

Trench Sample, Alaska Assay Laboratories

Silverado Contractor

Trench J1

29.30

0.120

Trench Sample, ALS Chemex

During 2008, Silverado submitted sixty-one (61) duplicate samples of

mineralized core to ALS Chemex, and analyzed them for the Au-GRA21 and Sb-AA65 packages (Table 9.2). The QP did not rigorously compare

the data but generally found that, by visual inspection, the assay results for both antimony and gold compared, varied, on average about

2.5 percent.

68

Table 9.2 List of Duplicate Samples, Workman’s Bench Drilling

Program 2008

Total: 61 duplicate samples

FA08083476

08SS13

08SS14

08SS18

08SS25

FA08086192

08SS33

08SS46

08SS51

FA08093001

08SS102

08SS106

08SS111

FA08093002

08SS119

08SS122

08SS123

08SS124

FA08076587

08SS02

08SS09

FA08093003

08SS52

08SS67

08SS68

08SS70

FA08095943

08SS138

08SS147

08SS149

08SS150

FA08117975

08SS235

08SS241

08SS242

FA08135958

08SS353

08SS372

FA08135959

08SS375

08SS386

FA08108707

08SS281

08SS283

08SS287

FA08108706

08SS195

08SS196

08SS212

FA08108707

08SS215

08SS218

08SS227

FA08117976

08SS254

08SS255

08SS192

FA08100110

08SS177

08SS182

08SS190

FA08100111

08SS158

08SS159

08SS170

FA08093000

08SS73

08SS80

FA08127442

08SS313

08SS326

FA08127448

08SS302

08SS305

FA08130451

08SS342

08SS351

FA08137318

08SS413

08SS426

69

In the vast majority of cases (>97%), the mineralized zones had

corresponding elevated values of antimony and frequently (but not always) gold. In four (4) examples (1.9 percent of the total 202

sample assay intervals on Workman’s Bench), where stibnite-quartz and trace visual gold was identified in core, analytical results

did not indicate correspondingly high metal values; i.e., sample intervals 08SS216 (DDH 08SH14), 08SS379 (DDH 08SH32), 08SS380 (DDH 08SH32),

and 08SS243 (DDH08SH17). In the remaining 98.1 percent of the assay intervals, analytical results seemed to correspond with estimated

amounts of mineralization; i.e. estimated content of stibnite and occasional visible gold.

9.2 Exploration Data Limitations

Although drill core intervals can be checked through re-assay activities,

placer intervals cannot be checked as the sample material is completely consumed. After interviews with the previous owner’s contractors

involved with the earlier placer exploration programs, the QP is satisfied that exploration data acquired during that time is reliable.

The QP cannot comment on the validity of sampling and analysis performed

prior to the mid-1990s, because he was not present during the exploration programs. The early RC (percussion) drill programs directed

at assessing lode mineral potential in the Nolan Creek area are not very well documented. For example, the specific locations of drill

hole collars on the Thompson Pup area could not be found.

Because of uncertain sampling procedures, and apparent inaccurate orientations

of mineralized structures, the QP did not use percussion drilling results to calculate resource estimates.

70

10.0 MINERAL

PROCESSING AND METALLURGICAL TESTING

10.1 Placer Deposits

The previous owner used a number of different plant designs for the

processing of gold from placer deposits. During the early 1980s, test pits were completed on Archibald Creek and limited amounts of pay

gravels were fed into a trommel screen, and standard sluice box equipped with Hungarian riffles. During the 1990s, recovery technologies

improved with the construction of newer washing plant facility. In 2003, a new plant was designed to wash 150 cu yd/h in two 10-hour shifts

per day. Improvements to the plant included: 1) Hydraulic riffles to promote an active riffle bed in the sluice box; 2) a one inch screen

classifier; 3) A sand screw to the dewatering system; and 4) because of coarse gold, an oversize discharge belt with a nugget alarm system.

In 2006, the washing plant was redesigned to improve plant

efficiency and improve gold recovery (Figure 10.2 and Figure 10.3). Oversize (greater than 4 in) from the plant is directed to a

TechronTM Model #5500 conveyor belt (Techron) oriented at 90° to the length of the washing plant. Any nugget that

hits this belt was automatically scanned by the metal detector which is situated at 45 ft along the conveyor belt system. If

detected, a trap door was triggered, which dropped the nugget into a wash tub. It is worth noting that the largest gold material

recovered during the 2006 washing plant cycle, a flat 9.05 oz gold nugget composed of essentially pure placer gold, escaped the main

grizzly and the elongated harp screen but was detected and ‘saved’ by the electronic detector.

Undersize material

was further sorted by size and gold was recovered using two sluice boxes. All heavy mineral concentrates accumulated in hydraulic nugget

traps within the sluice boxes and in the hydraulic riffles ere further processed through a Denver Gold SaverTM.

The washing plant had five nugget traps (numbered 1 to 5 on Figure 10.3), 16 ft of hydraulic riffles, and 16 ft of expanded riffles.

The plant layout was approximately 110 ft in length and about 65 ft in width.

During operations, the QP observed a steady, even feed of pay gravel,

efficient removal of oversize materials, and an effective water delivery system. From discussions with company officials and direct inspection

by the QP, there was practically no placer gold observed in the middle and lower riffles of both the main and sulfide sluice boxes. Panning

of concentrates from these sections failed to yield any significant placer gold (Josh Moore, pers. comm., 2006). Gold recovery was very

high and estimated to exceed 95%.

71

Figure 10.2 Side view of 2007 Nolan washing plant

72

Figure 10.3 Plan view of 2006 Nolan wash plant

73

The Silverado gold recovery plant was designed to process 35 yd/hr.

From June 27 to July 21, 2006, the plant processed 8,896 cu yd during 278 hours of operation at a rate of 32 cu yd/h. During

June 20-to-July 30, 2007, the plant operated for 705 hours and processed 19,615 cu yd, an average rate of 29 cu yd/hr. When

fully operational, two day-and-night shifts washed for 11 hours each, with 2 hours each day devoted to plant maintenance.

During his June 2026 inspection of the property, the QP searched

for but not identify any component of the 2006 washing plant and assumes that it has been dismantled/scrapped and/or moved to another

site.

10.2 Lode Deposits

The previous owner acquired a permit from USBLM

to collect and process a maximum 1,000 cu yd of material from the Workman’s Bench lode for metallurgical testing. This large bulk

sample could determine further grinding, flotation, and other processing and characteristics of stibnite; however, the bulk sample was

never collected.

In April 2008, the QP collected a 414 pound bulk sample of semi-massive

to massive stibnite, vein quartz, and wall rock gangue all from the defined mineralized ‘A’ zone in the Workman’s Bench

underground workings (see Bundtzen, 2008c). The purpose was to determine the mineralogical nature of the antimony mineralization and

the source of significant gold values. There is variation in gold content of the stibnite zones even within constrained sample collection

areas. The bulk sample was sent to Hazen Research Labs Inc. (Hazen) in Golden, Colorado, USA in to determine the most optimal grind for

potential marketing of a stibnite product and identify the mineralogical nature of gold and antimony values. The QP believes that the

bulk sample was representative of the ‘A’ mineralized zone on Workman’s Bench.

Two reports were produced by Hazen in September: 1) Report #1-Flotation

and Gravity Results, Workman’s Bench Stibnite-Gold Deposit, Wiseman District, Alaska; and 2) Report #2-Mineralogical Examination,

Workman’s Bench Stibnite-Gold Deposit, Wiseman District (Schultz, 2008 a, b). Both yielded important and relevant information. Hazen

tested both gravity and flotation separation technologies, provided for heavy mineral components of the ore, predicted recovery of both

stibnite and free gold, and suggested recovery technologies to be used in a future operation.

Importantly, in the QP’s opinion, the bulk sample demonstrated

that stibnite can be effectively separated from the other heavy mineral components such as gold and arsenopyrite, which report separately

in the rougher concentrate table testing (see Figure 10.3). Hence the two economic products of the proposed mineral development, stibnite

(antimony) and native gold, can be successfully separated. The stibnite concentrates can be upgraded to market quality and most of the

gold (90 percent according to Hazen test results) can be recovered at the mine site, using gravity separation techniques.

74

Figure 10.3 Tabled Rougher Concentrate from Workman’s Bench

Deposit analyzed by Hazen Research Labs, Inc.

75

Gravity separation using a quarter DeisterTM shaking table

produced a second, cleaner gold and arsenopyrite concentrate that assayed 9.4 oz/ton. This test work indicates that coarse gold and coarse

stibnite can likely be recovered by gravity separation; however, fine-grained components of both mineralogical products might benefit

from flotation (Figure 10.3). Given the tendency for stibnite to ‘slime’, a flotation circuit may be an important prerequisite

for a recovery system. Using gravity-only methods would result in a stibnite recovery of approximately 85 percent and gold recovery of

about 90 percent.

Report #2 (Schultz, 2008b) was designed to learn more about the mineralogical

constituents of the bulk sample. In an effort to determine the nature of the gold occurrence, gravity concentration was carried out using

heavy liquid, to enable detection and to allow examination of a statistically valid number of gold particles and also to obtain preliminary

information on response to gravity separation. A 500-g split from the minus 10-mesh head sample was dry-screened at 35-mesh, and the oversized

material was stage-crushed to minus 35-mesh for the gravity separation and the mineralogical work on the separated fractions. For the

separation, the minus 35-mesh split was wet-screened at 500 mesh. The minus 35 mesh fraction was separated with heavy liquid using acetylene

tetra-bromide at a specific gravity of 2.96 to upgrade the heavy minerals and concentrate the gold (Figure 10.4).

Figure 10.4 Hazen mineralogical separation process flowchart, Workman’s

Bench bulk sample.

76

The heavy liquid sink product contained as predicted, dominantly stibnite,

but also other minerals as summarized in Table 10.1 below.

Table 10.1. Composition of the Heavy-Liquid Sink Product

Constituent

Estimate

Area, %

Stibnite

85

Gangue

10

Pyrite (including marcasite)

3

Arsenopyrite

2

Rutile

1

Chalcopyrite

Trace

Covellite

Trace

Gold

Trace

Small gold inclusions (less than 20 µm) in stibnite were

observed in the sink product. The identification was confirmed by Electron Microprobe (EMP) analysis, which shows 100 percent Au.

Also, fine microcrystalline gold was observed associated with stibnite. The EMP analysis of these particles also showed 100 percent

Au. Figure 10.5 illustrates gold inclusions in stibnite.

Figure 10.5 Gold (bright color) in stibnite (gray grain), Workman’s

Bench Bulk sample.

77

A split portion of the concentrate from the shaking table was panned

to concentrate the gold even further. Several gold particles were observed ranging in size between 500 µm to about 2 mm. Figure

10.6 illustrates the gold in the shaking table concentrate; note the coarse nature of the gold particles in the sample.

Figure 10.6 Stibnite-gold concentrates from table products from

Nolan Bulk Sample—A and B illustrate sampled product variability. Magnification is approximately 25X.

10.3 Trace Element Content of Nolan Mineralized Zones

Trace element content of the stibnite

mineralization in the Nolan Creek area will affect potential marketability. Amalgamet-CanadaTM provides

specifications for threshold concentrations of trace elements in stibnite ores, which if exceeded, could result in penalties. The metals

of concern are mercury, lead, arsenic, selenium, tellurium, tin, and bismuth. Three of these elements, mercury, lead, and arsenic, are

addressed because they are usually the most scrutinized during metallurgical and environmental evaluation of stibnite ores. The previous

owner analyzed for all of these elements during their Workman’s bench exploration program. When the QP released his July 29,

2008 NI 43-101 Technical Report (Bundtzen, 2008c) to the previous owner, he indicated that mercury analyses did not exist for 2007 and

earlier exploration sampling programs and recommended that mercury analyses be given a priority, given the need to document mercury levels

in stibnite-gold mineralization for metallurgical and marketing issues. The previous owner responded to this recommendation and added

mercury analyses to the analytical package for the 2008 core drilling campaign on Workman’s Bench.

Table 10.2 compares a selected roster of industry standard trace

impurities with trace elements identified from the Workman’s Bench and Pringle Bench stibnite-quartz zones. Arsenic, mercury,

lead, selenium, bismuth, tellurium, and tin, all pass accepted industrial criteria (maximum quantities) for those metals. The

average levels for all of the trace metals in the assay intercepts fall below the Amalgamet-Canada metal specifications, which were

used as a standard to test the metallurgical nature of the Workman’s Bench mineralization.

78

The Silverado data set includes

mercury results from 174 mineralized assay intervals used in the resource analysis, or about 80 percent of those used in the mineral

resource estimates. For specific clarification, mercury assays exists for all holes drilled in 2008 and 2009, but does not exist for

the 2007 drill holes, nor in surface trench samples and underground channel samples collected prior to April, 2008. However, the

2008 and 2009 drill holes and respective intercepts into mineralized zones flank the 2007 drill core intercepts described in the

previously released July, 29th, 2008 Technical Report (Bundtzen, 2008 c). The 2008

drill intercepts represent approximately 80 percent of all mineralized intercept data acquired on Workman’s Bench and

Pringle Bench. Figure 10.7 illustrates where mercury data is available in mineralized intervals.

Mercury values from the 2008 drill-indicated intervals range from nil

to a maximum value of 8.12 ppm and average 0.774 ppm mercury (n=134). Twenty-one (or 16 percent) of the intervals contained greater than

1.00 ppm mercury whereas 113 (or 84 percent) of the intervals contained less than 1.00 ppm mercury. The QP inspected the 2009 drill core

analytical data from 43 intercepted mineralized zones. Mercury values from the 2009 intercepts ranged from 0.22 ppm-to-15.70 ppm and averaged

1.45 ppm. None of the mercury values exceed the threshold of concern (see Table 10.2).

Lead and arsenic values exist for all 2007, 2008 and 2009 drill core

intervals, but not trench or chip samples. For 2007-2008, about 87 percent of the mineralized intercepts have Pb and As control. All 2009

vein-fault assay intervals have arsenic and lead assay control. For 199, or 91 percent of the analyses, arsenic levels average 2,379 ppm

(0.224 percent) and lead values are very low, averaging just 17.1 ppm. The highest lead value was 275 ppm, indicating that lead only exists

in very small amounts in the mineralized rock.

However, for 15 sample intervals or 8 percent of the sample population,

arsenic values are >1.00 percent. Arsenic levels in zones of greater than 10 percent antimony average about 0.18 percent. For 2009,

arsenic values ranged from 2.9 ppm to 9,380 ppm and averaged 2,312 ppm. Lead values ranged from 0.2 ppm to 14.5 ppm and averaged 6.55

ppm. The QP is confident that the mercury, arsenic, and lead values encountered in the core drilling program provides adequate information

for the metallurgical testing summarized in this Technical Report.

The maximum arsenic value in these higher-grade Sb intervals is 0.41

percent in sample interval #203789, which contains 22.48 percent Sb (sample control #61, Appendix I). During consideration of milling

technologies, future work should focus on the most effective removal of arsenopyrite from the stibnite concentrate prior to marketing.

The metallurgical data shown by the Hazen Research on the Bulk Sample (see Figure 10.1) shows that arsenopyrite and gold report to separate

mill circuits during gravity processing.

79

Figure 10.7 Drill plan showing the locations of mercury analyses

on 2008 core drilling program on Workman’s Bench

80

Table 10.2 Selected stibnite quality comparative characteristics

from Amalgamet-Canada.

Amalgamet-Canada Threshold of

Average Content Workman’s bench Mineralized

Concern Specifications for Stibnite Ores

Zones

<0.50 % Pb+As

0.224 % arsenic for 91 percent of intervals; and 17.1 ppm lead

Trace Selenium (<30 ppm)

5.0 ppm selenium

Trace tellurium (<10 ppm)

<2.0 ppm tellurium

Trace tin (<10 ppm)

<4.0 ppm tin

Trace bismuth (<10 ppm)

<3.0 ppm bismuth

Trace mercury (<20 ppm)

0.90 ppm mercury (maximum value is 15.70 ppm)(1)

(1)  mercury data available for 177 mineralized intervals

from 2008 and 2009 core drilling programs

10.4 Recovery Estimates

In Report #1 (Schultz, 2008a), rod mill grinding followed by two rougher

stages yielded a gold recovery of 98% and an antimony recovery of nearly 100%, which indicates flotation may be a viable process for recovering

gold and antimony at Workman’s Bench. The gold and antimony grades from the sample were 0.546 oz/ton (as stated, 18.7 g/t) and 36.7

percent, respectively, which compare favorably to the average measured and indicated resource grade estimates (Chapter 11).

10.5 Qualified Person’s Opinion

Metallurgical Results of the Bulk Sample processed by Hazen Research

suggest that coarse gold and coarse stibnite can likely be recovered by gravity separation; however, fine grained components of both mineralogical

products might benefit from flotation (Figure 10.3). Given the tendency for stibnite to ‘slime’, a flotation circuit may be

an important prerequisite for a recovery system. However, using gravity-only methods could result in high stibnite and gold recoveries.

In the QP’s judgment, the Hazen bulk sample work, coupled with

his own mineralogical work derived from his underground sampling, provide enough information to initiate design and operations for recovery

of gold and stibnite.

Lead values ranged from 0.2 ppm to 14.5 ppm and averaged 6.55 ppm.

The QP is confident that the mercury, arsenic, and lead values encountered in the core drilling program provides adequate information

reducing their effect on concentrate quality. However, because arsenic is present in significant amounts because it is part of the gold-antimony

mineral system, it’s presence has to be taken into account. During design of a mill and marketing of a sulfide concentrate. The

QP reviewed tin, bismuth, selenium, and tellurium values. For the majority of the mineralized zones, values were below limits of detection

as indicated in Table 10.2.

81

11.0 MINERAL RESOURCE ESTIMATES

11.1 Disclosure

The mineral resource estimates reported in this section were prepared

by Mr. Thomas K. Bundtzen, President of Pacific Rim Geological Consulting Inc. and AIPG Certified Professional Geologist. Mr. Bundtzen

is the QP and is independent of GML/USAC. In accordance with CIM Definition Standards (Staff, 2003, 2004, 2005a, b), a mineral resource

may be sub-divided into Inferred, Indicated, and Measured categories. “Measured and Indicated Mineral Resources” are

that part of a mineral resource for which quantity and grade can be estimated with a level of confidence sufficient to allow the application

of technical and economic parameters to support mine planning and evaluation of the economic viability of the deposit. An “Inferred

mineral resource” is that part of a mineral resource for which quantity and grade can be estimated on the basis of geological evidence

and limited sampling and reasonably assumed, but not verified, geological and grade continuity (Staff, 2004). The QP judges that the mineral

resource estimates presented in this Section are representative of the mineralized zones that have been explored by the previous

owner.

The QP is unaware of any issues that materially affect the mineral

resource in a detrimental sense, and has checked agency records, company correspondence with regulatory agencies and reviewed regulatory

agency websites. In addition:

· To the best of the QP’s knowledge, there are no known material exploration, legal, marketing, socio-economic,

political, title, permitting, or taxation issues;

· To the best of the QP’s knowledge, apart from the usual environmental aspects that require consideration

as part of any mineral exploration project, there are no known material specific environmental issues; and

· To the best of the QP’s knowledge, there are no known material mining, metallurgical, or infrastructure

issues other than those discussed in this Technical Report.

11.2 Key Assumptions, Parameters and Methods

Firstly, according to CIM standards, “Mineral Resources that

are not Mineral Reserves do not have demonstrated economic viability”. The writer (QP) judges that the gold-antimony Nolan Deposits

contain Measured, Indicated and Inferred Resources of gold and antimony. The placer gold deposits contain both Indicated and Inferred

Mineral Resources of placer gold.

The QP estimated mineral resources using the following steps:

· Personal inspection of both and the Nolan Creek placer-gold and Workman’s Bench lode gold-antimony

properties during 1999-2004, and 2007-to-2009 respectively.

· Database compilation and data validation by the QP.

· Geological interpretation and modeling by the QP.

· Compositing assay intervals to a common length.

· Determination of average material density for both lode and placer properties by the QP.

82

· Analysis of grade variability by the QP.

· Polygonal estimation of grade by compositing of sample assay information taken within designated widths

and lengths of mineralized zones by the QP.

· Assignment of appropriate cut-off grades, the lowest grade that the QP judges can be mined economically.

· Classification of confidence with respect to CIM (2005) guidelines by the QP; and.

· Mineral resource tabulation and validation of the resource estimates by the QP.

Because of the well-designed drill data set available for the Nolan

Creek Placer deposits, the writer has produced an Indicated Resource estimate for placer gold, using accepted polygonal weighting methods

that have been deployed for heavy mineral placer deposits worldwide. Doheny (1941, 1942a, b) describes polygonal resource estimation methodology

while assessing large, low grade placer gold resources for both the United Stated Smelting, Refining, and Mining (USSR&M)

Company in the Nome and Fairbanks districts of Alaska and the Yukon

Consolidated Gold Corporation (YCGC) operations in the Klondike district in Yukon, Canada. Daily 1962) advocated use of polygonal weighting

methods for globally distributed large heavy mineral placers. Peters (1978) describes five geometric patterns used in polymetallic lode

mineral resource calculations, including the triangular block method used in this analysis.

A Society of Economic Geologists (SEG) publication

summarizes polygonal methods of resource estimation in Ore Reserve Estimates in the Real World (Stone and others,1998). While describing

triangular estimation techniques, these authors state:

“Polygons can be constructed with the drill holes

at the corners of the polygons. Such polygons consist of triangles; the solid lines define triangles with a drill hole at each apex…the

area is easily calculated but the thickness and grade are calculated by averaging the intercepts in the bounding drill holes”.

The triangular method works best when the majority of samples exceed

cut-off grades in large, planar-shaped deposits such those that frequently occur in placer fields, including in the Nolan Creek Deposits

or thin, linear vein-like lode deposits. This is also the methodology selected by the writer for estimating Measured, Indicated and

Inferred lode Mineral Resources at Nolan Creek.

Although this Technical Report does not estimate Mineral Reserves and

instead only reports Mineral Resources, Section 229.1302(d)(2) of SK 1300 states that an assessment of resources as presented

in a Technical Report of this nature must estimate a cut-off grade from ‘assumed’ unit costs and estimated commodity prices

disclose the prices used and reasons for choosing cut off grades. The QP uses a cutoff grade of 0.06 oz/yd gold for indicated gold resources

found in drill-tested, deeply buried placer deposits. Using a price estimate of $2,500/ounce, this cutoff grade reflects the greatly added

costs of mine extraction encountered during the mining of frozen, deeply buried mineral resources which require underground mine technologies

for extraction of the gold.

83

Consistent with past Technical Reports produced by the QP for the Nolan

Sb-Au lodes, a cut-off grade of 4.0 percent ‘equivalent’ antimony was used, reflecting the dominance of Sb in the resource

estimates. A subsidiary factor corroborated the economic cutoff grade of 4.0 percent equivalent antimony. This includes gold values. The

QP understands that commodity prices (Sb and Au) have risen since release of previous Technical Reports. He has assumed a price of $12

US/pound for refined antimony in this study and $2,500.00/oz gold Upon inspecting core and assay interval information from both Pringle

Bench and Workman’s Bench, the QP also observed that a 4 percent antimony value (6-7 percent stibnite) generally reflects sharp

metallogenic boundaries of the mineralized veins being investigated (see Figure 11.4-B). The drop-off at approximately 4.0 percent antimony

equivalent is apparent in most assay intervals (for example, see Sub-Chapter 11.7—Mineral Resource Uncertainties (page 115-119)

and Appendices I and II of this Technical Report.

11.3 Mineral Resource Estimates

Concerning placer deposits, the QP estimated mineral resources for

a number of deposits at Nolan Creek Figure (11.1). The QP considered the resource summaries of Armstrong et al 1994) and Childress (1995)

during his review of placer resources. The QP considers that the two deposits, D-Block #1 and 3B3 Block contain Indicated Resources of

gold and the remaining five deposits contain only Inferred placer gold resources (D-Block #2 Below Discovery, Wooll Bench, Treasure Chest

South, Smith Creek, and Slisco Bench).

84

Figure 11.1 Location

of placer-style gold mineral resource estimates, Nolan Creek.

Only the Indicated placer gold resources in D-Block #1 and 3B3 Block

are presented in this Technical Report. Details for the inferred resources estimates can be found in Bundtzen (2008c).

The QP estimated indicated placer gold resources in the Nolan area

using a polygonal weighting method (i.e., Triangular Diagram Method) as advocated by Doheny (1941; 1942 a, b), Daily (1962), Peters (1978),

and Cook (1983). For this method, data from three drill holes are used to estimate the volume and grade for a triangular area of influence.

By linking each triangular area, the method provides a model of the placer mineral deposit in terms of shape, grade, and depth.

The accuracy of the resource estimate is influenced by the density

of drill holes in the deposit, the regularity of the drilling pattern (i.e., whether the drilling pattern is isotropic, anisotropic, or

erratic in distribution), the volume of material estimated by each drill hole, and the inherent variability of gold distribution in the

deposit. Nugget effect is one of the main concerns when estimating resources for this type of deposit. Gold nuggets as large as 41.5 oz

have been recovered from Silverado operations at Nolan Creek, and more than 25 nuggets have exceeded 10 oz. Such coarse

85

gold concentrations are not uniformly distributed in paystreaks, which

is a source of error in placer resource estimation. Other variables that may influence the mineral resource estimation include the proposed

mining method, recovery technologies, clay and boulder content of the paystreak, and accuracy of drill station locations.

Reconciliations of estimated metal content versus actual (mined) metal

content for two selected Silverado’s placer deposits are presented in Table 11.1. These reconciliations indicate that the polygonal

approach to estimation gives favorable results over the life of mining operations. Polygonal estimations on average predict 6% less metal

than actual production while kriging methods significantly underestimate the global metal content of the resources. During the 37-year

history (1928 to 1965) of the United States Smelting Refining and Manufacturing Company (USSR&M) in the Fairbanks district, historically

Alaska’s largest corporate producer of placer gold, about 4.1 Moz of placer gold were recovered with bucketline dredging technologies

in the Fairbanks district. All deposits were defined with drilling lines spaced about 150 ft apart. Actual gold recovery exceeded the

estimates by approximately 8.5% (Boswell, 1979, p. 15).

Table 11.1 Reconciliation of actual versus estimated gold content

for two selected placer deposits, Nolan Creek

Location

Estimation

Drill hole

Drilling

Drilling

Estimated

Mined

Difference

method

count

density

pattern

metal

metal

(%)

(sq ft/hole)

description

(oz)

(oz)

Swede

polygonal

23

403

anisotropic

2,200

2,305

4.7

Underground

Ogden-Eureka

polygonal

53

5,572

isotropic

7,509

8,127

7.6

D-Block #1 Below Discovery is defined by 50 rotary drill holes, 23

of which intercept fluvial sediments with significant gold values. Included in the resource definition are 8 drill holes completed during

1994 and 15 drill holes completed in December, 2003. Drill hole distribution is anisotropic although most of the drilling was aligned

along northwest lines perpendicular to the strike of the interpreted channel. Drilling density averages 2,055 cu yd/drill hole. Depth

to bedrock is quite variable in D-Block #1 Below Discovery and ranges from 10 ft to 75 ft but generally averages about 35 ft. Geological

drill hole logs indicate that the gold concentrations are nearly always on or near the bedrock surface and average about 7.25 ft thick.

Twenty-three polygons define an indicated resource of 4,320 oz Au in 47,278 cu yd of gravel, at an average grade of 0.091 oz/cu yd Au,

(Table 11.2).

South of D-Block #1 Below Discovery, along the same buried channel

trend, twelve drill holes in four lines define the 3B3-Block deposit. This placer deposit is also on or near bedrock but is much deeper

than D-Block #1, ranging from 42 ft to 135 ft and averaging about 75 ft deep. Twelve polygons define a resource of 19,525 cu yd of gravel

averaging 0.099 oz/cu yd Au (Table 11.3). The drilling pattern defining the 3B3-block deposit is anisotropic with 1,627 cu yd/ drill hole.

86

Tables 11.2 D Block #1 Below Discovery and 3B3 Block indicated resource

estimates.

Polygon

Area

Average

Volume

Average grade

Metal

(sq ft)

thickness

(ft)

(bank cu yd)

(oz /cu yd Au)

(oz Au)

A1

6,000

8.3

1,845

0.086

159

A2

7,200

10.0

2,667

0.077

205

A3

5,700

16.6

3,504

0.072

252

A4

8,550

8.3

2,628

0.008

21

A5

5,700

16.6

3,504

0.114

400

B1

6,400

6.6

1,564

0.253

396

B2

8,500

10.0

3,148

0.203

639

B3

7,975

5.0

1,477

0.197

291

B4

7,890

8.3

2,425

0.015

36

B5

6,500

8.3

1,998

0.040

80

C1

7,400

6.6

1,809

0.315

570

C2

7,100

6.6

1,736

0.207

359

C3

7,650

5.0

1,417

0.202

286

C4

4,760

5.0

881

0.022

19

C5

6,800

5.0

1,259

0.043

54

D1

5,600

6.6

1,396

0.025

29

D2

5,350

6.6

1,307

0.023

30

D3

6,500

6.6

1,589

0.021

33

D4

5,240

5.0

970

0.016

16

E1

1,900

6.6

464

0.020

9

E2

2,900

6.6

709

0.023

16

E3

5,000

6.6

1,222

0.024

29

E4

3,900

5.0

722

0.019

14

F1

7,000

5.0

1,296

0.020

26

F2

9,900

5.0

1,833

0.067

123

F3

10,200

5.0

1,889

0.060

113

F4

10,900

5.0

2,018

0.057

115

Total

178,515

7.25

47,277

0.091

4,320

Polygon

Area

Average

Volume

Average grade

Metal

(sq ft)

thickness

(bank cu yd)

(oz /cu yd Au)

(oz Au)

A1

5,400

9.0

1,800

0.103

186

A2

8,400

9.4

2,924

0.101

295

A3

7,600

9.0

2,530

0.096

243

B1

6,900

5.0

1,275

0.050

64

B2

5,400

8.3

1,660

0.113

188

B3

5,500

8.3

1,690

0.144

243

B4

5,250

6.6

1,280

0.284

363

C1

7,900

5.0

1,464

0.027

39

C2

7,600

6.6

1,857

0.037

69

C3

4,500

5.0

833

0.056

47

C4

5,650

5.0

1,046

0.080

84

C5

6,300

5.0

1,166

0.097

113

Total

76,400

6.9

19,525

0.099

1,934

87

Figure 11.2 Polygon layout for D-Block #1 and 3B3-Block indicated

resources of placer gold; 39 polygons were used in calculating the resource estimates.

88

Table 11.3 summarizes the Indicated Mineral Resource estimates for

the D-Block #1 and 3BE Blocks placer gold deposits in Nolan Creek valley.

Table 11.3 Placer deposit Indicated Mineral Resource, USAC Nolan

Creek placer claims

Resource

Cut-off grade

Quantity

Grade

Metal

category

(oz/cu yd Au)

(cu yd)

(oz/cu yd Au)

(oz Au)

Indicated

0.06

66,800

0.095

6,250

Notes:

− The effective date of these resources was July 2, 2008; amended October, 2026

− Rounding may result in some discrepancies.

− No processing recovery factors have been applied to these resource figures.

− The industry standard unit of quantity for Alaskan placer deposit is cubic yards. The weight of a cubic

yard varies, but averages about 2.4 short tons.

The triangular block method (a.k.a. polygonal method) was

selected by the QP to calculate Measured, Indicated, and Inferred lode antimony-gold mineral resources in the Nolan Creek area.

Peters (1978) describes five (5) geometric polygonal patterns for ore reserve calculations as: 1) uniform spacing; 2)

perpendicular at midpoints between holes; 3) triangular blocks (the method used in this analysis); 4) random spacing; and 5) angular

bisectors. He suggests that geometric pattern methods are best used for tabular deposits such as massive sulfide bodies and for

veins. A sixth method known as the ‘cross sectional method’ is used when there is significant variance in deposit

thicknesses.

There are several important considerations for the comparison of indicated

versus inferred resources: 1) The assessment of the areas of influence between core drill or other control points or ‘area of influence’;

2) the comparison of tonnage present in each polygonal block; 3) drill pattern; i.e., whether it is isotropic, anisotropic, or erratic,

and 4) factoring in other features such as known vein length and depth continuity (or lack of), and assay grade variance. Table 11.4 summarizes

the resource classification criteria adapted by the QP for the Nolan lode evaluation.

Table 11.4 Characteristics of Measured/Indicated resource- versus

Inferred resource, Nolan Creek antimony-gold deposits, Alaska

Locations

Resource Category

Drill

#

Total

Tons/

Comments

Pattern

Polygons

Tons

Polygon

Workman’s Bench

Measured and

Mainly

123

53,616

442

Vein-faults exhibit

Indicated Resources

isotropic

predictable widths

and orientations

Workman’s Bench

Inferred Resources

Erratic to

62

32,459

523

Some interval

and Pringle Bench

anisotropic

variances- both

laterally and at

depth

89

Vein-fault continuity is a significant consideration in assessing the

classification of polygons. ‘A’ zone has been identified for a strike length of 3,500 feet, based on 72 core drill holes and

extended surface sampling control. The West and ‘B’ zones have less strike length but can be verified for significant strike

length, based on test drilling and surface control. The more consistent the vein-fault, the more predictable is the presence of mineralization.

Finally, drill pattern is an important criteria at Nolan Creek. Even though the relative density of polygons at Pringle Bench is more-or-less

comparable with indicated resources on Workman’s Bench, the drill pattern at Pringle bench has a generally erratic distribution.

Because of this, the QP decided that all resources on Pringle Bench could only be regarded as inferred.

For average grades of antimony and gold, each channel interval was

weighted by an interval of influence as well as a width in order to obtain an area of influence. It is important that metal grades not

be overstated in a mineral deposit—thus exaggerating the amount of resources in question. It is also important to note that the

Nolan Creek lodes that have been drill-tested drills are primarily antimony deposits. Based on past and present prices, the antimony content

of the vein-faults constitute about 70-75% of the value. Gold is a byproduct, albeit a significant credit. In order to better understand

antimony and gold distribution in the vein-faults, the QP constructed two (2) histograms that depict: 1) gold grades on Workman’s

Bench and Pringle; and 2) antimony grades on Workman’s Bench and Pringle Bench (Figure 11.3). Some 247 assay intervals are used

in the analysis. For gold, the trends start off with a quick peak between 0.01 and 0.06 oz/ton, then level off and then break away at

a steep 70 degree slope and then level off again at about 1.1 oz/ton. There are six (6) assay values on Workman’s Bench that

exceed 1.0 oz/ton and three (3) on Pringle bench that exceed 1.0 oz/ton.

The antimony histograms for Pringle and Workman’s Bench exhibit

a different pattern to the gold grade data (Figure 11.4-A). For both Pringle and Workman’s Bench antimony values peak early at about

5.0 percent, drop to a relatively flat trend beginning at about 10-15% antimony; and then continues on a horizontal trend all the way

to the maximum 65+% antimony values. Sixty-one (61) or 25 percent of the sample population exceeds 30 percent antimony. The QP assigned

a Sb cut-off grade at 4.0 percent based on assay distribution graphically shown in Figure 11.4-A as well as past-to-current price estimates

for high grade stibnite concentrates.

In order to understand why the gold and antimony histograms differ,

correlation coefficients were calculated for the 2008 Workman’s Bench data, the largest data set (Figures 11.4 a, b). The correlation

coefficient between gold and antimony is 0.58. The correlation coefficient between gold and arsenic is 0.87. It is known from inspection

of core, from the mapping of underground workings, from ore microscopy studies, and finally bench testing (Section 10 of this Report)

that gold is found in quartz-carbonate-gold-arsenopyrite veinlets that frequently form selvages around the main stibnite structures. Gold

is also found as grains in the stibnite itself. The Hazen Research bench tests show that the gold grains are liberated upon grinding of

the stibnite and the arsenopyrite and gold grains bleed off in a separate train during Wiffley table testing.

90

Figure 11.3, a, b Histogram plots of antimony

(on left) and gold (on right) distribution from 247 assay intervals, Pringle Bench and Workman’s Bench vein-faults, Nolan Creek,

Alaska. Note that the data points are derived from submitted assay intervals and are not necessarily total true width estimates for vein-faults.

Figures 11.4 a, b Correlation coefficients for assay intervals from

Workman’s Bench (n=118); a—coefficient of 0.87 for gold versus arsenic; and b—coefficient of 0.58 for gold versus antimony.

91

Table 11.5 shows that the majority of the nine

high-grade gold assay intervals from Workman’s Bench and Pringle Bench are diluted when added to other assayed samples within a

true and weighted vein-fault width.

Table 11.5 Analysis of high grade, assayed gold intervals (>1.0

oz/ton), Workman’s Bench and Pringle Bench antimony-gold deposits.

Deposit

Drill

Hole/

Intercept

True

Gold

Antimony

Comments

sample

Thickness

Grade

Grade

number

(feet)

(oz/ton

(%)

Workman’s

08SH32

205.7-

0.74

1.13

38.74

Part of

a wider zone with two composites

Bench

‘B’ Zone

(08SS393)

206.6

that

contain an average true thickness of

2.9

feet; weighted average grade of

composite

sample interval is 0.18 oz/ton

Au

Workman’s

Channel

172.0-

1.50

1.19

43.63

Measured

1.50 foot true thickness width

Bench

‘A’ Zone

203808

173.5

underground

underground

Workman’s

WBUG5

S2

199.8-

0.50

1.04

50.04

Thin,

0.4 foot wide massive stibnite, vein

Bench

‘B’ Zone

(underground)

200.2

core;

part of 3 composited samples that

taped

average

0.37 oz/ton Au

from

control

point

Workman’s

08SH018

315.0-

1.15

2.88

27.65

Part of

high-grade stibnite zone with

Bench

‘A’ Zone

(08SS255)

316.8

visible

gold when composited with sample

08SS254,

yields an average gold grade of

1.57

oz/ton.

Workman’s

07SH14

209.0-

0.20

1.61

51.42

Part of

a composited interval that has a

Bench

‘A’ Zone

(267394)

209.2

true

thickness of 0.85 feet,

Weighted

average grade of 0.64 oz/ton Au

Workman’s

08SH25

374.8-

1.41

2.86

43.20

1.70

foot intercept has true thickness of

Bench

‘A’ Zone

(08SS351)

376.5

11.0

inches; composited with two other

samples

within ‘A’ zone interval that

averages

1.07 oz/ton Au in a 2.9 foot true

vein-fault

thickness.

Pringle

Bench

09SH18

74.5-75.5

0.66

5.72

37.73

High

grade Au zone has true width of 0.66

‘A’

Zone

(09SS109)

feet.

Combined with true vein width of

2.00

ft for ‘A’ zone., which yields a

weighted

average of 1.95 oz/ton Au

Pringle

Bench

09SH20

205.5-

0.66

1.69

2.74

Quartz-carbonate

stibnite vein zone with

‘A’

Zone

(09SS148)

206.5

visible

gold

Pringle

Bench

Channel

33.0-49.2

16.2

5.56

8.74

Wide

“A’ zone channel

‘A’

Zone

Sample

in

Trench

H;

(07H03)

The QP has decided that a very high-grade gold value should be capped

at 1.9 ounces/ton gold for the grade of a true sample width interval. This relatively high level does allow for the occurrence of high-grade

zones if their spatial relationship shows a pattern. The high-grade zones in both drill holes 09SH 18, 08SH18, 09HS18, and 07H03 were

capped at 1.9 oz/ton gold. The QP believes that the histogram of gold values shown ai Figure 11.3-B supports that decision.

The data set acquired by the previous owners of the federal claims

on Nolan Project is comprehensive. Samples have been professionally collected, assayed and archived by contractors

92

and employees. The QP believes the large sample suite to be

accurate and can be relied upon. However, some selected information was scrutinized by the QP. In addition to the rejection of the

high-grade gold sample interval on Pringle Bench previously described, a few sample intervals were disregarded in the resource

calculations because their values were not believed to be representative. Examples are cited below. Sample control #84-86 samples at

Workman’s bench were reported to be true thickness estimates of 8.2 feet each of disseminated to massive stibnite-bearing

zones that assayed up to 30.30 % antimony and 0.22 oz/ton gold. But upon inspection of the zones in the field by the QP, it was

determined that samples may have been testing a northwest-bearing shear along it’s rake, and not perpendicular to the

high-angle northeast structures being evaluated. Additionally, no thicknesses reported on the surface have so far been recognized in

drill holes, or in sample control directly underneath in the underground workings. This data was not used in resource calculations.

The U.S. Bureau of Land Management (USBLM) reported results of 13 samples at surface exposures on Workman’s bench that assayed

up to 61.7% antimony and 0.476 oz/ton gold. The QP attempted to see if these data points could be used but concluded they were just

grab samples—not representative across true widths of mineralization. He did not use this data in resource calculations.

Owing to the oxidized and locally slumped nature of surface exposures,

some trench information on Pringle Bench was scrutinized. One channel in Trench I included a 6.5 foot true thickness of ‘B’

Zone that averaged 30.35% Sb. A similar high value over a thick ‘A’ zone occurs in Trench M. After the QP inspected these

zones in the field, he was unsure as to whether the assays could be used in the resource analysis. The West zone that was sampled in Trench

M was inspected by the QP and assay and width information from the fresh exposure there appeared to be valid; hence that data was used.

In order to complete the polygonal resource calculations, the QP rigorously

calculated tonnage factors for the inferred and indicated resources presented in this Technical Report. Thrush et al (1968) specifies

specific gravity estimates for pure stibnite (4.52), for quartz gangue (2.70), and for pelitic schist (2.66). A tonnage factor was calculated

using the equation provided by Peters (1978). Pure stibnite would have a tonnage factor of about 7.1 cu ft/ton. The tonnage factor was

individually calculated for each polygon using the equation of Peters (1978). The equation is: Tonnage Factor=2000/specific gravity

X 62.5=cubic feet per ton. Pure stibnite is 71.5 percent antimony. As an example for polygon # 5, which contains 29.6 percent antimony

(41.4 percent stibnite), the average calculated specific gravity of the polygonal zone is 3.89. The tonnage factor for this polygon is

2000/3.89X62.5=8.20 cubic feet/ton. For a lower grade zone; i.e., polygon 29, which assays 18.19 percent antimony (25.4 percent stibnite),

then the specific gravity of the polygon is 3.82. The tonnage factor is 2000/3.82X62.5=8.39 cubic feet/ton. The QP calculated the tonnage

factor for each polygon and arrived at an average tonnage factor of 8.21 cubic feet/ton— rounded to 8.20 cubic feet/ton for the

Technical Report analysis.

93

Two control samples of mineralized vein intervals and one sample

of wall rock from Workman’s bench underwent specific gravity (SG) and absorption measurements (ASTM C 127) at the laboratory

of Shannon and Wilson Inc. in Fairbanks. Table 11.6 summarizes the results and compares them to SG calculated using methods

described above. High grade nearly massive stibnite that assayed 56.88 percent Sb from station #203804 yielded a SG of 4.38 and a

tonnage factor of 7.31. In contrast, much lower grade material from the bulk sample that assayed 9.10 percent Sb, yielded an SG of

3.45, and a tonnage factor of 9.27. The average tonnage factor for the high-and low-grade stibnite zones, which have an average

assay of 33.04 percent Sb, is 8.29. These limited physical SG measurements are consistent with SG values calculated from assay data

and inferred SG of country rock material used in the QP’s resource calculations.

Table 11.6 Specific gravity (SG) measurements (ASTM C 127) from

selected mineralized intervals, Workman’s Bench; laboratory analyses by Shannon and Wilson, Inc., Fairbanks

Sample #

Sample Description

Measured

Absorption

Tonnage

Antimony

Calculated

Difference

Specific

(%)

Factor

(%)

tonnage

between SG

gravity

Appendix I

factor

Values (%)

(SG)

203804

Massive stibnite

4.38

0.33

7.31

56.88

7.34

0.40

interval in ‘A’ Zone

HR51856-1

Bulk sample stibnite

3.45

1.50

9.27

9.20

9.31

0.43

gravity concentrate

HR51856-2

Wall Rock Gangue

3.04

0.33

10.50

NA

NA

NA

from Hanging Wall,

A Zone

Consistent with past Technical Reports produced by the QP for the Nolan

Sb-Au lodes, a cut-off grade of 4.0 percent ‘equivalent’ antimony was used, reflecting the dominance of Sb in the resource

values.

11.4 Measured Lode Antimony-Gold Resource at Nolan

Creek

This Technical Report describes the Measured Resource Estimate as

summarized in Tables 11.7; 11.8. No new information concerning the measured resources has been generated for the Nolan Creek project

since the release of those estimates on July, 2011; which were filed on SEDAR (www.sedarplus.ca.com).

Graphic depictions of resource blocks and data tables that define the probable reserve are summarized in Figures 11.6-11.26 and Tables

11.9-to-11.28.

Table 11.7 Measured lode mineral resource, Workman’s Bench

Nolan Creek area

Resource

Cut-off

Quantity

Grade

Metal

Grade

Metal

Category

grade

(ton)

(% Sb)

(ton Sb)

(oz/ton Au)

(oz Au)

(% Sb)

Measured

4.0

42,412

28.00

11,880

0.408

17,300

Notes:

The effective date of this measured

resource is July, 2011; amended September 2026

Assumed processing recoveries for

the base case are 90% gold recovery and 85% antimony recovery. The unit ton refers to short tons.

Rounding may result in some discrepancies.

94

Figure 11.5 Surface view of Workman’s bench mineralized zones,

showing locations of underground workings, 2007-2008 drill hole control (in black), 2009 drill hole control (in blue), and interpreted

extensions and fault offsets of A, B, C and West Zones.

95

Figure 11.6 Measured resource polygons for ‘A’ Zone,

Workman’s bench, Nolan Creek Area

96

Table 11.8 Polygonal Measured Resource block summary for ‘A’

Zone, Workman’s Bench

Polygon

Tons

Antimony (%)

Antimony (tons)

Gold (oz/ton)

Gold (ounces)

1

365

4.70

17.2

0.056

20.4

2

337

4.20

14.1

0.120

40.4

3

445

22.80

101.5

1.090

485.1

4

484

22.85

110.5

1.070

517.8

5

602

29.60

178.2

1.120

674.2

6

508

23.09

116.8

0.056

28.4

7

390

50.89

198.4

1.109

432.2

8

379

31.40

119.0

1.115

422.6

9

305

28.03

85.4

0.987

301.0

10

195

13.47

26.2

0.146

28.5

11

950

22.36

212.4

0.193

183.4

12

175

27.94

48.9

1.097

191.9

13

125

10.66

13.3

0.970

121.3

14

105

16.17

33.9

0.102

10.7

15

535

19.73

105.5

0.300

160.6

16

335

31.68

106.1

0.307

102.8

17

452

34.24

154.7

0.334

150.9

18

152

24.68

37.5

0.486

73.8

19

109

21.43

23.3

0.240

26.1

20

485

24.40

118.3

0.323

156.6

21

855

24.73

211.4

0.196

167.5

22

245

19.90

48.7

0.256

62.7

23

140

17.48

24.4

0.250

35.0

24

65

16.50

10.7

0.160

10.4

25

85

18.86

16.0

0.166

14.1

26

101

18.19

18.4

0.150

15.1

27

100

15.77

15.8

0.143

14.3

28

146

14.18

20.7

0.170

24.8

29

389

36.55

141.9

0.322

125.2

30

716

35.86

256.7

0.340

243.4

31

384

23.49

90.2

0.141

54.1

32

345

23.10

79.7

0.181

62.4

33

107

24.18

25.8

0.217

23.2

34

330

32.04

106.0

0.267

88.0

35

780

39.10

304.9

0.681

531.2

36

840

36.57

307.1

0.492

413.2

37

2,050

48.74

999.0

0.416

853.0

38

2,490

48.68

1,212.0

0.453

1,128.0

39

2,300

54.59

1,255.0

0.725

1,667.0

40

459.0

21.00

96.3

0.459

210.6

41

1,180

39.43

465.0

0.201

237.0

42

550

30.66

165.0

0.130

72.0

43

185

20.50

37.9

0.106

19.6

44

820

28.02

229.6

0.114

93.4

45

353

18.14

64.0

0.107

37.8

46

697

7.93

55.2

0.123

85.7

47

998

17.53

174.9

0.101

100.7

48

157

20.93

32.8

0.106

16.6

49

140

14.49

20.3

0.056

7.8

50

450

10.80

48.6

0.098

44.1

51

135

28.76

38.8

0.140

18.9

52

100

29.58

29.6

0.130

13.0

53

85

29.60

25.1

0.120

10.2

54

454

23.74

107.8

0.171

77.6

55

423

24.02

101.6

0.516

218.2

56

228

23.02

52.5

0.463

105.6

57

235

20.02

47.0

0.413

33.6

58

338

26.46

89.4

0.463

156.4

59

564

21.44

120.9

0.526

296.6

TOTAL/AVERAGE

28,452

31.52

8,967.9

0.405

11,516.7

97

Figure 11.7 Measured Resource polygons for ‘B’ Zone,

Workman’s bench, Nolan Creek Area

98

Table 11.9 Polygonal block summary for ‘B’ Zone,

Workman’s Bench Table 2 Polygonal Measured Resource calculations for ‘B’ Zone, Workman’s bench, Nolan Creek

Area, Alaska

Polygon

Tons

Antimony (%)

Antimony (tons)

Gold (oz/ton)

Gold (ounces)

1

185

34.32

64.0

0.298

55.0

2

237

40.13

95.0

0.618

146.0

3

175

39.36

69.0

0.507

89.0

4

475

47.50

226.0

1.105

524.0

5

590

41.42

244.0

0.652

384.0

6

574

45.32

260.0

1.060

608.0

7

195

31.32

61.0

0.425

83.0

8

289

17.59

50.8

0.154

44.5

9

830

37.15

308.0

0.802

666.0

10

675

34.97

236.0

0.724

489.0

11

116

21.73

25.2

0.123

14.3

12

79

19.76

15.6

0.130

10.3

13

160

10.10

16.2

0.313

50.1

14

186

21.60

40.2

0.451

83.9

15

487

15.25

74.2

0.430

209.4

16

875

25.54

223.4

0.317

277.3

17

95

16.51

15.7

0.241

22.9

18

331

16.06

53.1

0.244

80.8

19

209

4.59

9.6

0.067

14.0

20

107

5.16

5.5

0.070

7.5

21

145

13.82

20.0

0.063

9.1

22

155

13.58

21.1

0.050

7.8

23

365

7.98

29.1

0.160

58.4

24

385

5.65

21.7

0.083

31.9

25

567

8.30

47.0

0.310

175.8

26

269

4.77

12.8

0.256

68.8

TOTAL/AVERAGE

8,756

25.63

2,244.2

0.480

4,210.8

Table 11.10 Polygonal Measured Resource Calculation for ‘West’

Zone, Workman’s Bench, Nolan Creek area, Alaska

Polygon

Tons

Antimony (%)

Antimony (tons)

Gold (oz/ton)

Gold (ounces)

1

565

2.86

16.1

0.908

513.0

2

446

2.39

10.6

0.108

48.2

3

450

3.12

14.0

0.921

414.5

4

359

2.64

9.5

0.121

43.4

5

131

3.36

4.4

0.140

18.3

6

73

9.30

6.8

0.143

10.2

7

210

9.81

20.6

0.124

26.0

8

297

18.09

53.7

0.105

31.2

9

110

19.06

20.9

0.261

28.7

10

95

12.10

11.5

0.225

21.3

11

109

14.53

15.8

0.215

23.4

12

166

13.13

21.8

0.229

38.0

13

286

18.35

52.4

0.293

83.8

14

397

11.75

46.6

0.098

38.9

15

175

21.56

37.7

0.146

25.6

16

537

19.82

106.4

0.140

75.2

17

160

23.59

37.7

0.143

22.8

18

192

35.32

67.8

0.230

44.2

19

75

31.78

23.8

0.196

14.7

20

115

21.74

25.0

0.113

13.0

21

256

25.28

64.7

0.147

37.6

TOTAL/AVERAGE

5,204

12.80

667.8

0.302

1,572

99

Figure 11.8 Measured resource polygons for ‘West’ Zone,

Workman’s bench, Nolan Creek Area

100

Table 11.10 Summary data for Measured

Resource in ‘A’, ‘B’ and ‘West’ Zones, Workman’s Bench, Nolan Creek area, Alaska

Physical

Parameters For

Resource

Calculations

‘A’ Zone

‘B’ Zone

‘West’

Zone

Total or

Average

Total Strike Length of Vein Used in Resource Calculation

980

525

900

980

Maximum Depth (Vertical) of Vein Used in Resource Calculation

355

355

225

355

Average Sample Interval Width

0.95

0.65

0.60

0.73

Number of Drill Hole Intercepts and Channel Sample Locations

Used

48

22

19

89

Number of polygons Used in Indicated Resource Calculation

59

26

21

106

Calculated Tons of Mineralization

28,452

8,756

5,204

42,412

Calculated Average Grade Sb (%)

31.52

25.63

12.80

28.00

Total Tons, Contained Antimony

8,967.9

2,244.2

667.8

11,875

Calculated Average Grade Gold (oz/ton)

0.405

0.480

0.302

0.408

Contained Gold (oz)

11,516.7

4,210.8

1,572.0

17,300

11.5 Indicated Lode Antimony-Gold Resource

Estimate at Nolan Creek

Indicated mineral resources are that

part of a mineral resource for which quantity and grade can be estimated with a level of confidence sufficient to allow the application

of technical and economic parameters to support mine planning and evaluation of the economic viability of the deposit.

101

During the 2009

Workman’s Bench evaluation, nine holes (9) totaling 2,663 feet in length were collared and oriented to test shallow extensions

of: 1) A-zone, the largest of the several high-grade vein-fault structures; and 2) B-zone, a subsidiary parallel structure southeast

of A-Zone. Sixteen (16) polygons define the indicated resources in both ‘A Zone’ and ‘B Zone’ vein fault structures,

which aggregate 11,204 tons grading 19.7 percent antimony and 0.238 ounces/ton gold (Figures 11.9 and 11.10). The 2009 drill intercepts

used to calculate the indicated resources are adjacent to the ‘A Zone’ and ‘B Zone’ vein-faults on Workman’s

Bench. Tables 11.11 and 11.12 provide the numerical calculations for the Indicated Resource estimates within ‘A Zone’ and

‘B Zone’, Workman’s Bench, Nolan Creek area.

Table 11.11 Indicated resource block

summary from 2009 Drill Program, A-zone, Workman’s Bench

Polygon

Tons

Antimony

Antimony

Gold

Gold

(%)

(tons)

(oz/ton)

(ounces)

A

(1)

806

34.45

277.7

0.479

386.1

B

(2)

198

18.47

36.6

0.192

38.0

C

(3)

820

49.45

405.5

0.557

456.7

D

(4)

215

35.80

76.9

0.349

75.0

E

(5)

450

5.64

25.4

0.035

15.7

F

(6)

915

20.71

189.5

0.294

269.0

G

(7)

750

37.20

279.0

0.398

298.5

H

(8)

614

30.96

190.1

0.285

174.9

I

(9)

675

7.17

48.4

0.098

66.2

J

(10)

850

19.21

163.3

0.177

150.5

K

(11)

1,212

3.78

45.8

0.124

150.3

L

(12)

1,225

12.00

147.0

0.150

183.8

M

(13)

1,694

10.12

171.4

0.189

320.2

TOTAL

10,424

19.72

2056.6

0.248

2,584.9

Table 11.12 Indicated resource block

summary from 2009 Drill Program, B-zone, Workman’s Bench

Polygon

Tons

Antimony

Antimony

Gold

Gold

(%)

(tons)

(oz/ton)

(ounces)

O (14)

430

24.28

104.4

0.093

40.0

P (15)

215

12.98

27.9

0.112

24.1

Q (16)

135

15.37

20.7

0.137

18.5

TOTAL/AVERAGE

780

19.61

153.0

0.105

82.6

102

Figure 11.9 Indicated Mineral Resource

polygons for ‘A’ Zone, Workman’s Bench, Nolan Creek Area, based on 2009 drilling.

103

Figure 11.10 Indicated mineral resource

polygons for B Zone, Workman’s Bench, Nolan Creek area, based in 2009 drilling

104

The combined Measured and Indicated

resource estimate for the Workman’s lode system is summarized in Table 11.13.

Table 11.13 Measured and Indicated

lode antimony-gold resources, Workman’s Bench, Nolan Creek area

Resource

Cut-off

grade

Quantity

Grade

Metal

Grade

Metal

Category

(%

Sb)

(ton)

(%

Sb)

(ton

Sb)

(oz/ton

Au)

(oz

Au)

Measured

and

4.0

53,616

26.27

14,089

0.372

19,968

Indicated

The effective date of these indicated resources is July 12th, 2011; amended on September 16th, 2026

Cut-off grade is 4.0% Sb ‘equivalent’, which refers to the combined values of gold plus antimony expressed in terms of antimony.

11.6 Inferred Lode Antimony-Gold Resource

Estimate at Nolan Creek

According to the CIM, an “Inferred

mineral resource” is that part of a mineral resource for which quantity and grade can be estimated on the basis of geological evidence

and limited sampling and reasonably assumed but not verified by geological and grade continuity (Staff, 2004).

Inferred lode resource estimates for

Workman’s Bench include zones on the A, B, C and West zones and Pringle Bench are summarized in Table 11.14.

Table 11.14 Total Inferred lode Mineral

Resources, Workman’s Bench and Pringle Bench Nolan Creek

Resource

Deposit

Cut-off

grade

Quantity

Grade

Metal

Grade

Metal

Category

(%

Sb)

(short

tons)

(%

Sb)

(ton

Sb)

(oz/ton

Au)

(oz

Au)

Inferred

Pringle

4.0

12,817

19.61

2,513.8

0.499

6,390.4

Inferred

Workman’s

Bench

4.0

19,642

10.83

2,127.0

0.273

5,362.1

Total

Inferred

Workman’s

Pringle Benches Workman’s

4.0

32,459

14.29

4,640.8

0.362

11,752.5

The

effective date of these resources is March 7th, 2011; amended September 18th, 2026 .

Mineral

Resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially

affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

105

Figure 11.11 Inferred Resource polygons

for ‘A’ Zone, Workman’s Bench, Nolan Creek Area

106

Figure 11.12 Inferred Resource polygons

for ‘B’ Zone, Workman’s Bench, Nolan Creek Area

107

Figure 11.13 Inferred Resource polygons

for ‘C’ Zone, Workman’s Bench, Nolan Creek Area

108

Table 11.15 Polygonal Block Inferred

Resource estimate for ‘C Zone’, Workman’s Bench

Polygon

Tons

Antimony

(%)

Antimony

(tons)

Gold

(oz/ton)

Gold

(ounces)

1

98

0.05

0.5

0.055

5.4

2

84

2.96

2.5

0.103

8.7

3

234

3.83

9.0

0.054

12.6

4

325

6.74

21.9

0.103

33.4

5

201

6.72

13.5

0.080

16.1

6

98

6.50

6.4

0.085

8.3

7

314

3.26

10.2

0.049

15.4

8

216

3.49

7.5

0.079

17.1

9

351

0.03

1.0

0.160

56.2

10

538

3.79

20.4

0.157

84.5

11

146

0.29

0.5

0.070

10.2

12

85

6.22

5.3

0.123

10.5

13

173

5.98

10.3

0.210

36.3

14

74

0.05

0.5

0.157

11.6

15

140

6.54

9.2

0.213

29.8

16

313

0.59

1.8

0.183

52.3

17

787

3.79

29.8

0.184

144.8

18

55

6.77

3.7

0.127

7.0

Total/Average

4,232

3.64

154.0

0.132

560.2

Table 11.16 Polygonal Block Inferred

Resource estimate for ‘A Zone’, Workman’s Bench

Polygon

Tons

Antimony

(%)

Antimony

(tons)

Gold

(oz/ton)

Gold

(ounces)

1

826

11.87

98.0

0.260

214.7

2

1,524

9.36

142.6

0.213

324.6

3

2,737

19.13

523.5

0.266

728.0

Total/Average

5,087

15.02

764.1

0.249

1,267.3

Table 11.17 Polygonal Block, Inferred

Resource estimate for ‘West Zone’, Workman’s Bench

Polygon

Tons

Antimony

(%)

Antimony

(tons)

Gold

(oz/ton)

Gold

(ounces)

1

164

14.03

23.0

0.069

11.3

2

152

7.44

11.3

0.068

10.3

3

774

12.38

95.8

0.075

58.1

4

643

19.49

125.3

0.067

43.1

5

595

14.86

88.4

0.055

32.7

6

2,536

10.94

277.4

0.928

2,353.4

7

470

3.64

17.1

0.107

50.3

Total/Average

5,334

11.96

638.3

0.507

2,704.4

Table 11.18 Polygonal Block Inferred

Resource estimate for ‘B-Zone’, Workman’s Bench

Polygon

Tons

Antimony  (%)

Antimony(tons)

Gold

(oz/ton)

Gold

(ounces)

1

2,291

9.96

228.0

0.105

240.5

2

1,733

15.20

263.4

0.147

254.8

3

965

8.28

79.2

0.347

334.9

TOTAL/AVERAGE

4,989

11.44

570.6

0.166

830.2

109

Table 11.19 Summary of Inferred Antimony

and Gold Resources From ‘A’, ‘B’, ‘C’, and West Zones, Workman’s Bench Lode, Nolan Creek Area.

Category

Cut-Off

Grade (% Sb Equivalent)

Quantity

of Mineralization

(Short Tons)

Grade

(% Sb)

Metal

(ton Sb)

Grade

(oz/ton Au)

Metal

(oz gold)

‘A’

Vein Inferred

4.0

5,087

15.02

764.1

0.249

1,267.3

‘B’

Vein Inferred

4.0

4,989

11.44

570.7

0.166

830.2

‘C’

Vein Inferred

4.0

4,232

3.64

154.0

0.132

560.2

‘West

Vein Inferred

4.0

5,334

11.96

637.9

0.507

2,704.4

Totals

4.0

19,642

10.83

2,127.0

0.273

5,362.1

During 2009, eleven (11) drill holes

totaling 2,329 feet were collared and oriented to test the ‘A zone’ and ‘West zone’ structures on Pringle Bench,

which are the same structures that have been drill-tested on Workman’s Bench. Figure 11.14 illustrates the surface plan of the

Pringle bench that the QP used in his resource calculations. The primary objective of the 2009 exploration program was to test deeper

portions of both ‘A’ and ‘West’ vein-faults, which previously had been drill-tested to depths of only about 150

feet below the surface. Figures 11.15 and 11.16 illustrate the polygonal configuration of the ‘A Zone’ and the ‘West

Zone’ mineralized structures respectively. Upon the combination of the previous (2009) and current (2011) data, twenty-three (23)

polygons define an inferred resource of 12,817 tons grading 19.61 percent antimony and 0.499 ounces/ton gold. The 2009 exploration program

on Pringle Bench: 1) confirmed gold and antimony mineralization to depths of up to 400 feet below the surface; and 2) yielded gold values

that were higher than the average content observed in the shallower portions of the vein-fault system explored in 2007. Tables 11.20-to-11.24

summarize the polygonal block data for all inferred resource estimates on Pringle Bench.

110

Figure 11.14 Surface view of Pringle

Bench mineralized zones, showing drill locations; 2007 (black) and 2009 drill holes (blue).

111

Figure 11.15 Polygonal Block Inferred

Mineral Resource polygons for ‘A’ Zone, Pringle Bench, Nolan Creek Area, based in 2009 drilling.

112

Figure 11.16 Polygonal Block Inferred

Mineral Resource polygons for West Zone, Pringle Bench, Nolan Creek Area, based in 2009 drilling.

113

Table 11.20 Polygonal Inferred Mineral

Resource calculation for ‘A’ Zone, Pringle Bench, from Bundtzen (2009b)

Polygon

Tons

Antimony

(%)

Antimony

(tons)

Gold

(oz/ton)

Gold

(ounces)

1

63

12.78

8.1

0.037

2.3

2

134

26.27

35.2

0.019

2.5

3

205

31.49

64.6

0.119

24.4

4

138

36.67

50.6

0.112

15.5

5

82

26.67

21.9

0.127

10.4

6

115

29.80

34.3

0.246

28.3

TOTAL/AVERAGE

737

29.13

214.7

0.113

83.4

Table 11.21 Polygonal Inferred Mineral

Resource calculation for Pringle Bench from 2009 Drill Program, A-Zone, (This Technical Report)

Polygon

Tons

Antimony

(%)

Antimony

(tons)

Gold

(oz/ton)

Gold

(ounces)

A

(1)

55

11.21

6.2

0.065

3.6

B

(2)

311

22.51

70.0

1.953

607.4

C

(3)

65

26.69

17.3

1.963

127.6

D

(4)

254

28.46

72.3

0.126

32.0

E

(5)

83

33.11

27.5

0.250

20.8

F

(6)

1,218

30.81

375.3

0.150

182.7

G

(7)

988

31.47

310.9

0.030

29.6

H

(8)

314

35.32

110.9

0.023

7.2

I

(9)

556

30.92

171.9

1.920

1,067.5

J

(10)

1,404

27.37

384.3

1.930

2,709.7

K

(11)

590

26.24

154.8

1.947

1,148.7

L

(12)

886

18.56

164.4

0.076

12.5

M

(13)

1,633

8.06

131.6

0.106

173.1

N

(14)

664

5.93

39.4

0.110

73.0

TOTAL/AVERAGE

9,021

22.58

2,036.8

0.687

6,195.4

Table 11.22 Polygonal

Inferred Mineral Resource calculation for ‘West’ Zone, Pringle Bench (Bundtzen, 2009b)

Polygon

Tons

Antimony

(%)

Antimony

(tons)

Gold

(oz/ton)

Gold

(ounces)

1

80

14.11

11.3

0.061

4.9

2

160

11.37

18.2

0.036

5.8

3

206

12.12

25.0

0.044

9.1

4

99

18.68

18.5

0.051

5.0

5

615

3.91

24.0

0.021

12.9

6

290

9.46

27.4

0.028

8.1

7

182

15.47

28.2

0.095

17.3

8

319

12.43

39.7

0.099

31.6

TOTAL/AVERAGE

1,951

9.86

192.3

0.049

94.7

114

Table 11.23 Polygonal Inferred Mineral

Resource calculation from 2009 Drill Program, West-Zone, Pringle Bench

Polygon

Tons

Antimony

(%)

Antimony

(tons)

Gold

(oz/ton)

Gold

(ounces)

O

(15)

297

3.97

11.8

0.010

3.0

P

(16)

505

7.15

36.1

0.014

7.1

Q

(17)

378

5.85

22.1

0.018

6.8

TOTAL/

AVERAGE

1,108

6.31

70.0

0.015

16.9

Table 11.24 Polygonal Total Inferred

Lode Mineral Resource Antimony-Gold calculation, Pringle Bench, Nolan Creek

Resource

Category

Cut-Off

Grade

(% Sb)

Vein-Fault

Zone

Quantity

(tons)

Grade

(% Sb)

Metal

(tons Sb)

Grade

(oz/ton Au)

Metal

(oz Au)

Inferred

4.0

A

(2008)

737

29.13

214.7

0.113

83.4

Inferred

4.0

A

(2009)

9,021

22.58

2,036.8

0.687

6,195.4

Inferred

4.0

West  (2008)

1,951

9.86

192.3

0.049

94.7

Inferred

4.0

West

(2009)

1,108

6.31

70.0

0.015

16.9

Inferred

Total/Average

4.0

A

and West Zones Combined

12,817

19.61

2513.8

0.499

6390.4

The 2009 Inferred Resource estimates

for Silverado’s Nolan Creek properties; i.e., Workman’s Bench and Pringle Bench, did not change from what was reported by

the QP in his previous Technical Report issued June 1, 2009; (amended July, 2011). The inferred lode mineral total tonnage increased

from 24,077 tons as inferred in the 2009 Technical Report to 32,459 tons in this Technical Report, or an increase of about 35 percent.

In terms of in-place metal content, antimony increased from 2,997.6 tons as indicated in the 2011 Technical Report to 4,640.8 tons in

this Technical Report, an increase of 63 percent. In-place gold increased from 5,894.7 ounces as Indicated Mineral Resources in the 2011

Technical Report to 11,752 ounces in this Technical Report.

11.7 Mineral Resource Uncertainty Discussion

Concerning placer resources, the QP

constructed 39 polygons to determine an Indicated Resource estimate for placer gold deposits in Nolan Creek Valley; namely the 3B3 and

D-Block #1 Below Discovery. Both placers occur below overburden ranging from 70-to-100 feet of overburden. Most of the unconsolidated

ground is frozen and is capable of being mined using mechanized equipment successfully deployed by the previous owner. However, in 2003,

live water was encountered while attempting to mine buried placer gold deposits about 400 feet upstream from D-Block #1 Below Discovery

on the right limit of Nolan Creek, causing mine operations to be curtailed. Another uncertainty is that historic underground placer mining

has occurred adjacent to 3B3 and D-Block #1 Below Discovery resource blocks. Although past drilling efforts carried out by the previous

owner did not encounter mined ground, there is a possibility that some of the indicated resource area has been depleted by historic operations.

115

For lode mineral resources, the QP constructed

123 polygons to demonstrate Measured and Indicated Resources of gold and antimony at Nolan Creek; and 62 polygons to demonstrate Inferred

Resources of antimony and gold at Nolan Creek. The QP is confident with these resource estimates. However, they occur in relatively thin

fault-controlled structures and mining methodology is not discussed in this report.

The QP used traditional polygonal methods

to determine resource potential for both placers and lodes. The QP acknowledges that many mineral resource estimates are now determined

using computer-based ‘kriging-based’ technologies.

To confirm the results of the polygonal

methods used in determining the resource calculations at Nolan Creek, the QP contacted Will Robinson, E.I.T. Senior Geologist, who has

experience with the VulcanTM computer-based, block model method for estimating mineral resources. Robinson agreed to examine

selected portions of Silverado’s data base and calculate indicated resources using a Vulcan program. The QP supervised Robinson

during the Vulcan-Polygonal test comparison and formatted the design of the test. But the latter ran the computer program independently

of the QP. Because of time considerations, the QP determined that the comparison would be confined to the ‘A’ Zone in Workman’s

bench, which contains the largest single block of resources. The QP told Robinson to: 1) set a cut-off at 4% Sb equivalent; and 2) cap

gold grades at 1.5 oz/ton. The following was given:

· All

drill, underground, and surface (trench) information that was used to calculate polygonal

resources was forwarded to Robinson by the QP. A table containing only ‘A’ zone

data was prepared for the Vulcan estimate. All of this data was derived from Appendix I.

This included drill hole depths, precise GPS collar coordinates, drill hole intercepts from

Table 11.2 of this Technical Report; estimated true widths of mineralized vein-fault intercepts

and weighted assay grades are from this Technical Report. The data used to calculate resources

within ‘A; Zone on Workman’s Bench consists of forty (40) diamond core holes

totaling 10,079 feet as well as ten (10) surface trenches and underground channel sample

data that test the ‘A’ Zone. The maximum drill hole depth is 497 feet and the

average depth is 352 feet. Spacing between drill holes and sample points varies but is more-or

less isometric, averaging about 75 feet. Files created by Robinson for the Vulcan program

include COLLAR.csv, ASSAY.csv, and SURVEY.csv.

· To

help facilitate the effort and reduce the time expended on the Vulcan program, the QP used

the specific gravity and tonnage factors previously calculated for the polygonal estimates

for the Vulcan resource estimates.

Past polygonal resource estimates were

not given to Robinson. After discussions, Robinson wanted to combine the 2007-2008 ‘A’ Zone data set with the 2009 ‘A’

Zone data set. In that the 2007-2008 data from ‘A’ Zone on Workman’s bench calculated an indicated resource prior to

116

conversion into a measured resource,

the QP judged that it was reasonable to combine the 2007-2008 and 2009 data sets. A three-dimensional geologic solid representing the

A-zone vein was created using conventional methods in Vulcan. The solid conforms to the uppermost and lower most assay interval for drill

holes and trenches contained within the A-zone vein. This solid was used to constrain the compositing, block model construction and resource

estimation for this study. The block model was constructed using the Vulcan 3D modeling software. The orientation of the A-zone block

model was selected to be 45o in order to conform to the observed trend of mineralization. The parent block size was selected

to be a uniform 10’ x 10’ x 10’. The indicated resource estimation for the block model was conducted using the Inverse

Distance Squared (ID2) method. The search ellipse for the estimation was selected to be 23’ x 5’ x 23’ in

order to conform to the planar, steeply dipping nature of the A-zone vein and reflect the average spacing between composites. The sample

constraints put on this estimate were that a minimum of one sample was required for a given block to be estimated and no more than 4

samples could be used for estimating any given block. The results of the block model estimation can be seen in Figures 11.17 and 11.18.

Figure 11.17 Plan view image of Workman’s

bench ‘A’ Zone vein-fault. Estimated blocks are shown displaying antimony grade. Scale (squares) are 100 feet across.

117

Figure 11.18 Side profile view of

Workman’s Bench ‘A’ Zone looking northwest; displaying Sb grade.

The indicated resources contained within

the A-zone vein were calculated using the above block estimations. Specific gravity and tonnage factor data was available for all assay

intervals and was included in the resource estimate. Although the QP mandated that a 4.0% antimony-equivalent cut-off grade be used,

Robinson judged that it would be useful to the study to compare the indicated resources contained in the A-Zone vein using cutoff grades

of 0.0% equivalent Sb and 4.0 % equivalent Sb (Table 11.25). Nearly the same amount of antimony is realized for the zero percent versus

4.0 percent Sb cutoff (1.4 percent difference), but more gold is indicated (6.9 percent

difference) in the zero percent cut-off.

Table 11.25 Measured and Indicated

Resources calculated by VulcanTM that are contained in Workman’s Bench ‘A’ Zone only vein-fault from 2007-2009

exploration data

Material

Cutoff

Grade (% eq

Sb)

Sb

(% eq)

Au

(oz/ton)

Total

Tons

Total

cu ft

Tons

ANTIMONY

Ounces

GOLD

MINERALIZATION

0.0

23.15

0.275

51,713

454,833

11,972

14,221

MINERALIZATION

4.0

29.17

0.327

40,458

344,776

11,802

13,230

WASTE

4.0

1.50

0.088

11,254

110,057

169

990

Table 11.26 compares the indicated resource

estimates using polygonal methods versus the indicated resource estimates produced by the Vulcan analysis. Summary data for indicated

resources of ‘A’ zone on Workman’s Bench determined from polygonal estimates are contained in

At a 4.0 percent Sb cut-off, the Vulcan

indicated resource volume (in tons) estimate is 4.0 percent larger; the antimony grade is also 2.9 percent larger, but the Vulcan gold

grade is 9.9 percent lower than the polygonal indicated resource estimate. In terms of in-place metal resource, the Vulcan antimony estimate

is 6.9 percent higher than the polygonal estimate, but the Vulcan gold estimate is 6.20 percent lower than the polygonal estimate. Stone

and others (1998) have stated that resource estimates between two completely different estimation methods can vary by 10 percent or more.

The QP concludes that the polygonal resource estimate compares favorably to the Vulcan resource estimate and that the former estimate

is an accurate indication of size and grade of mineralization in the Nolan lode system.

118

Table 11.26 Comparative Results of

Polygonal Method for resources in A-Zone Workman’s Bench, used by writer, versus computer VulcanTM block model method

Mineralized

Zone

Cut-Off

Sb

(%)

Au

(oz/ton)

Total

short

Tons ore

Total

Cubic

feet

Tons

Antimony

Ounces

Gold

Polygonal

Method, 2007-2008 Data, Workman’s Bench ‘A’ Zone

4.0

% Sb equivalent

31.52

0.405

28,452

235,867

8,967.9

11,516.7

Polygonal

method 2009 Data, Workman’s Bench ‘A’ Zone

4.0

% Sb equivalent

19.78

0.248

10,444

89,192

2,066.0

2,593.6

Total

Polygonal Method, Workman’s Bench ‘A’ zone 2007-2009 data

4.0

% Sb equivalent

28.36

0.363

38,896

325,058

11,033.9

14,110.3

Vulcan

Estimate 2007-2009 data

4.0

% Sb equivalent

29.17

0.327

40,458

344,776

11,802.0

13,230.0

Differences

between Polygonal Method and Vulcan estimate  (in %)

4.0

% Sb equivalent

2.86+

9.90-

4.02+

5.70+

6.90+

6.20-

11.8 Assumptions for Multiple Commodity

Resource Estimate

In nearly all cases, the principal mineralized

zones contain, stibnite, quartz, minor arsenopyrite. Metallurgical work, assay information, and mineralogical content all suggest that

the principal mineral products are free gold and stibnite. Both are readily marketable in today’s economic environment. Gold is

at record high prices. Antimony is currently a much sought after critical mineral/metal. Testing shows that the gold reports to both

arsenopyrite and stibnite on wiffley table tests. However, the QP does not consider arsenic as a recoverable commodity. Hence the principal

resource estimates discussed in this Technical Report are focused on antimony and gold.

119

11.9 Qualified Person’s Opinion

on Factors that are likely to influence the prospect of economic extraction.

The confirmation of drill-indicated

resource, both surface and underground engineering studies quantifying wall-rock stability and selected mining methods, environmental

mitigation where-ever needed, overall environmental assessment of the property, and market demand of a mineral product will all influence

the economic viability of developing the lode deposits of antimony and gold and placer gold resources on GLM’s claims in Nolan

valley.

Based on his experience reviewing antimony

and gold deposits in Alaska, the Russian Far East, and elsewhere, it is the QP’s opinion that the grade and known size characteristics

of lode antimony and gold and the relatively large nugget content of the placer deposits at the Nolan Creek property provide reasonable

prospects for economic extraction of the mineral resources based on this Initial Assessment and Technical Report Summary.

120

12.0 MINERAL RESERVE ESTIMATES

Mineral reserve estimates are not presented

in this Technical Report by the QP on the subject mineral properties.

121

13.0 MINING METHODS

No Mining Methods have been proposed

for the mineral properties that are the subject of this Technical Report.

122

14.0 PROCESSING AND RECOVERY METHODS

The QP described the historic processing

of placer gold by the previous owner (see Chapter 10.1; Placer Deposits). Hower, the QP does not recommend a specific processing methodology

for placer gold recovery in this Technical Report.

The QP has described results of a bulk

sample metallurgical test on lode antimony-gold mineralization in Chapter 10.2 of the Technical Report. However, the QP is not recommending

any recovery method until more research has been completed by GLM.

123

15.0 INFRASTRUCTURE

15.1 Previous

Production Infrastructure on property

The previous owner of the mineral property

(Silverado) maintained a self-sufficient camp that included camp infrastructure capable of housing thirty (30) mine employees, machine

shops, kitchen, individual ‘apartments’ for employees, a laundromat, recreational facilities, laboratories and a diesel power

plant (see Figure 4.4 of this Technical Report). The power plant was capable of supplying up to 1.5 Mw of power for all needs within

the camp and for maintenance of underground mining equipment. The sewer system was specially designed by Life Water Engineering in Fairbanks

due to the existence of permafrost. A 2007 upgrade project included:

· The

purchase and installation of a ten-room housing unit;

· The

construction of an engineering office;

· The

upgrading of laboratory facilities;

· The

installation of a new sewage treatment facility;

· The

construction of a new kitchen and cafeteria; and

· The

installation of new communications equipment.

· Installation

of 2,500 gallon plastic holding tanks for water needs.

It was previously assumed by the QP

that the camp facility was completely capable of supporting the proposed underground development on Workman’s Bench.

15.2 Present State of Infrastructure

on Property

The QP inspected the camp facility in

June, 2026. Virtually all of the facilities listed above are in a state of disrepair and cannot be used. The QP recommends that construction

of new infrastructure should take place only after a complete review of what current camp infrastructure is salvageable and what must

be removed from the site.

Figure 15.1

A—Fuel tank storage facility in 2009; B— Same Fuel tank storage facility in 2026; which features collapsed staircase to top

of tanks a failed fire extinguisher and other repair issues Both photos by the QP

124

16.0 MARKET STUDIES

Market studies have not been completed

for this Technical Report.

125

17.0       GEOTECHNICAL-HYDROLOGICAL-ENVIRONMENTAL

STUDIES, PERMITTING, AND PLANS, OR AGREEMENTS WITH LOCAL INDIVIDUALS OR GROUPS

17.1 Geotechnical-Environmental

Studies

The previous owner aggressively engaged

in land reclamation efforts during their development of both surface and underground mining activities. All of their work was completed

under guidance of both the Alaska Department of Environmental Conservation and the U.S. Bureau of land Management (USBLM).

Figure 17.1 Example of land reclamation

conducted on previously mined Odgen-Eureka Bench, left limit of Nolan Creek, circa 2006. Photo from QP files

Geotechnical studies of the Workman’s

and Pringle Bench have been mainly confined to core logging by the previous owner’s geological contractors completed during the

definition of ore zones. The QP has examined the underground workings on Workman’s bench during April 7-10, 2008, and measured

joint sets, foliation and compositional banding, and inspected fault zones. Foliation and compositional banding strikes northeast (025-045o)

and generally dips shallow to the southeast ranging from 05-to-015o. At some stations, compositional banding and foliation

is horizontal. Figure 17.2 illustrates the near-horizontal nature of compositional banding in phyllitc schist in the ‘A’

Crosscut. Northwest striking high angle faults offset the northeast veins in small amounts. The previous owner reclaimed placer mine

tailings under the advice and direction of the Alaska Department of Natural Resources.

126

Because the claims are federal, reclamation

activities follow guidelines administered by the USBLM. Overall water quality is administered by the State of Alaska Department of Environmental

Conservation (ADEC). The QP conducted an audit of the ADEC and Alaska Department of Natural Resources (ADNR) websites for any environmental

liabilities related to Silverado’s Nolan Creek properties and could not find any notice of water quality violations, public notice

violations, non-point source water pollution control issues, or wastewater violations.

Nolan Creek is classified as an ‘industrial

stream’, which recognizes placer mining as a determined use in the Koyukuk district. Under Alaska State law all disturbed lands

must be reclaimed after mining activities have ceased, regardless of land ownership. For placer mining in Nolan Creek, Silverado participates

in the statewide bond pool administered by the ADNR. Reclamation has occurred consistent with the operating plan and has been reduced

from a bonded 60 acres to about 40 acres, per discussions with USBLM field personnel.

The Nolan Creek property is on federal

lands that are adjacent to Gates of the Arctic National Park and Preserve, which is administered by the U.S. National Park Service (USNPS).

According to records researched by the QP, neither the USBLM nor USNPS had lodged a complaint about exploration or mining activities

that have occurred on Nolan Creek claims at least through 2011.

All mineralized zones at Workman’s

Bench are near-vertical ‘vein-faults’ that strike in a northeasterly direction. Most of the northeast-striking joint sets

have some silica vein selvage infilling. The northwest striking joints and fractures have both vein filling but are also frequently barren.

The main ‘A’ zone shows slickensides in a horizontal configuration, indicating mostly post mineralization, lateral low angle

slip planes. The ‘B’ and ‘West’ Zones also occur along fault planes, but do not show obvious evidence of lateral

movement. Past mine planning took into account the fault structure of ‘A’ zone and avoided driving along it’s projected

surface to prevent wall rock instability.

Wall rocks enclosing

the stibnite-quartz lodes contain significant pyrite and pyrrhotite, which could result in Acid Rock Drainage issues (ARD). PRGCI geological

contractor R.C. Swainbank estimated sulfide content in 18 core drill holes from Pringle and Workman’s bench that were completed

in 2007 (Figure 17.3). Phyllitic schist contains the highest sulfide content. The QP recommends that any plan of action for lode mineral

development incorporates the characterization of the material, a definition of waste rock, geochemical testing, review of geochemical

parameters present in drill core, and an implementation plan.

127

Figure 17.2 A—Underground drift

looking E/SE in 2008. Note near-horizontal, phyllitic schist bands in base and roof; B—portal on April 12th , 2008.

Photos from QP files.

17.2 Hydrological and Engineering Studies

The Workman’s Bench deposit occupies

a near-horizontal terrace level at an elevation of 1,800 feet near the confluence of Smith Creek, a third order tributary, with Nolan

Creek, a second order trunk stream. The Workman’s Bench mineralized system trends in a northeast direction toward Smith Creek Valley.

The underground workings driven into the Workman’s Bench lode are dry. One hole, 08BT17, which is part of the Workman’s bench

evaluation, intersected “live water”. The drill hole is situated at the northeastern edge of the drill pattern completed

in Workman’s bench and does not affect the Mineral Resources described in this Technical Report. The drill hole likely intersected

water from Smith Creek—drilling did not advance further because it was assumed that Smith Creek constituted a northeasterly limit

of Workman’s bench due to this condition

128

Figure 17.3 Core logging summary

from 2007 core drilling, illustrating rock types and sulfide-bearing zone.

129

According to the previous owner’s

operational mine manager, Ray Medina (written email communication), the hole was plugged off. The QP assumed from inspection of data

that no other holes on Workman’s Bench contained water and all drilled dry. Mr. Medina did not believe the single wet drill

hole on the northeastern margin of the defined resource is a problem and suggests that the drill hole 08SH17 could be grouted off if

necessary. Based on observations of the drill hole data and underground mine conditions, the QP agreed with this assessment. The other

hole that drilled wet was on Pringle Bench to the northeast (07SH04). There is other evidence to corroborate the general dry nature of

the bedrock subsurface. A number of large diameter well holes were drilled in the camp vicinity to find a good source of water. Three

drill holes explored the Workman’s Bench area to depths of up to 400 feet but failed to encounter water. Left limit benches on

Nolan Creek; i.e., Swede Channel and Mary’s Bench, were found to be dry during underground drift mining of frozen placer gold deposits

(see Bundtzen, 2006 a-c).

17.3 Environmental Monitoring

The QP is not aware of any current environmental

monitoring on the GLM properties in Nolan Creek valley.

17.4 Water Management Plan

The QP is not aware of the current water

management plan being implemented on the GLM properties.

17.5 Mine Closure

Alaska Statute Title 27.19 (Reclamation)

and Alaska Statute 38.05 require Reclamation and Mine Closure Plans as part of the APMA process for approval.

A potential issue for past mine closure

by the previous owner deals with the maintenance shop facility at the Nolan Creek Mine. The shop has a dirt floor and has been in use

since the early 1980s to repair heavy equipment such as various types of drills, low profile Dux mine-haul trucks, tractors and miscellaneous

vehicles. The shop may contain contaminated soils that will need to be remediated. Other issues may involve fuel storage, and removal

of other materials from contaminated sites at the original Nolan Camp.

130

Figure 17.4

—A--Inside machine shop as it appeared in 2006 with mechanic repairing low-profile mining equipment; note dirt floor in shop; B—inside

machine shop as it appeared on June 13th, 2026—both photos from QP files.

17.6 Permitting

Presently a mixed property ownership

for GLM claims exists between the State of Alaska and the U.S. Interior Department Bureau of Land Management. This manifests itself in

both state and federal mining claims. The state of Alaska has General Selection Lands (GS 5167) Ta’d surrounding the active USAC

federal Mining claims and an ANILCA Top Filing covering the active federal mining claims owned by USAC. GLM/USAC has also located State

of Alaska mining claims over the active federal mining claims to protect its claim ownership position. This process has been used numerous

times to facilitate ownership transfer from BLM to the State of Alaska for high value mineral lands. Currently, permit requirements include

the following:

Alaska Department of Natural

Resources

Alaska

Placer Mining Application (APMA AAC Title 27, AS 38.05)

Approved

Plan of Operations (AAC Title 27, AS 38.05)

Approved

Reclamation Plan (AAC Title 27, 38.05)

Approved

Mine Closure Plan (AAC Title 27, 38.05)

Temporary Water Use Permit (TWUP

11 AAC 93.035, 93.220)

Alaska Department of Environmental

Conservation

APDES (Authorized under the

federal Clean Water Act, 33 U.S.C. 1251-1387

and implemented in Alaska by

18 AAC Chapter 83)

Storm Water Plan, SWPPP; (AS

46.03.100; 18 AAC 83.615)

Industrial Waste Water Permit

(APDES Program)

Solid Wate Permit (ACC Title

17, AS Title 16)

Air Quality Permit (AS 46.14,

18 AAC 50)

Alaska Department of Fish &

Game

Title 16 Habitat Permit (AS

Title 16)

131

U.S. Army Corps of Engineers

404 Wetlands Permit (Clean Water

Act)

U.S. Bureau of Land Management

Plan of Operations Approval

Environmental Assessment (EA,

National Environmental Policy Act of 1969, 43 CFR Part 46)

Reclamation Plan (30 U.S. Code

1258 Supplemented by 43CFR Part 3600, Subpart 3601 and related BLM manuals)

Importantly, an Alaska Placer Mining

Application Permit (APMA Permit) will be required for GLM to operate on their claims at Nolan Creek. Two Nolan Creek claims were found

to be listed on active State of Alaska APMA Permits during calendar year 2011, which reflects the recent underground placer mining activities

that have taken place in Swede Channel and Mary’s East placer deposits. Other APMA Permits identified on other claims in Nolan

Creek Valley have been closed due to inactivity.

The previous owner filed active Plan

of Operations on Nolan Creek is filed with USBLM. Both surface and underground mining activities follow the rules administered by

the U.S. Mine Safety and Health Administration (MSHA). The previous owner’s mining operations on Nolan Creek had been inspected

by MSHA officials several times during 2002 to 2003. The QP observed two field inspections concerning the previous owner’s activities

by MSHA officers. One citation was issued during the spring of 2006 that requested remedial action at their portal for the ‘Swede

Channel Project’. The portal for those underground workings was shored up and subsequently approved by MSHA.

The previous owner acquired a permit

from USBLM to collect a bulk mineralized sample. This permit would have allowed the previous owner to acquire up to 1,000 cu yd of mineralized

materials for metallurgical testing and analysis from their Workman’s Bench stibnite-gold resource area. The QP identified the

need for former owner to produce a potential acid generation plan for the bulk sample collection effort.

In June, 2008, the previous owner engaged

SRK Consulting, Inc. (SRK) to complete a Sampling and Analysis Plan (SAP) as part of a Metal Leaching/Acid Rock Drainage (ML/ARD)

mitigation program for the Nolan Lode project. Field work by SRK professionals took place in July, 2008 at Nolan Camp. The purpose of

the site visit was to evaluate: 1) existing weather conditions; 2) potential of future changes in oxidation conditions; 3) mobility of

regulated contaminants; and 4) any differences between tock types. SRK reviewed site geology and examined core from 2008 drill holes.

This work confirmed that sulfides occur not only in mineralized vein-faults but also disseminated throughout the wall rock. Table 17.1

summarizes the analytical results from the initial sampling collection program. SRK examined gangue minerals and identified siderite

and ankerite (iron-rich carbonates) but calcite was judged to be uncommon. Seven samples collected by SRK from the existing adit waste

rock, rock exposed in historic trenches, and from weathered pyritic bedrock for field rinse (contact) tests to evaluate the initial acid

generating potential. Three samples of relatively un-oxidized adit waste rock (Nolan 1-3) were not acidic (pH=6.97-7.44) although the

presence of soluble weathering products was shown by elevated conductivity. Two older trench samples (Nolan 6-7) were also non-acidic

(pH=7.07-7.33) but also showed the presence of soluble weathering. One weathered phyllite sample was strongly acidic (pH=2.48). A significant

initial conclusion of these results is that because un-weathered materials are relatively neutral, the objective of an ARD mitigation

plan is to minimize oxidation of waste rock and ore materials during disposal and in-capsulation.

132

Table 17.1 Results of Field Rinses

of samples, Nolan Lode Project; from Day and Jeffress (2008)

Sample

#

Sample

Descriptions

pH

Conductivity

ORP

(uS)

Distilled

water

4.85

9

391

Nolan

1

Phyllite

near portal opening waste

7.02

1031

188

materials

Nolan

2

Phyllite

near portal opening waste

6.97

701

204

materials

Nolan

3

Phyllite

near portal opening waste

7.44

489

189

materials

Nolan

6

Phyllite

fines from trench near Smith Creek

7.07

3,930

208

Nolan

7

Black

phyllite from trench near Smith

7.33

1,751

206

Creek

Nolan

8

Salts

precipitated from black phyllite

7.71

3,360

186

Nolan

9

Weathered

bedrock, orange

2.48

4,170

596

At the request of SRK, the previous

owner’s contractors collected samples from the underground mine workings for further testing, which are summarized in Table 17.2.

The general approach of the underground sampling program as outlined by SRK was to target 13 feet (4 m) of true width in waste rock to

evaluate variations along mineralization. However, the QP has not verified the results of analytical testing of these samples.

Table 17.2 Underground sampling program

for ML/ARD Program, Nolan Camp, 2008

Sample

#

Site

Description

DLRW7140811

Waste

sample from vein rib, D crosscut

DLRW7140812

Waste

sample from vein rib, D crosscut

DLRW714081

Waste

rock samples from face, D crosscut

DLRW714082

Waste

rock samples from face, D crosscut

DLRW7140821

Waste

rock sample from rib near intersection of A and D crosscut

DLRW7140822

Waste

rock sample from rib near intersection of A and D crosscut

DO714081

Stibnite

ore samples from main vein

DO714082

Stibnite

ore samples from main vein

A regulatory issue did affect the previous

owner’s 2007-2008 core drilling program on Pringle Bench north of Smith Creek. Exploration must comply with Section 106 of

the National Historic Preservation Act (NHPA) as codified in USBLM regulation 36CFR 800. Silverado hired Northern Land Use Research (NLUR)

of Fairbanks, Alaska to complete a cultural review on a number of claims where historic mining activities had taken place. NLUR produced

a report for the previous owner detailing the extent of historical artifacts present on the mining claims. That report was then forwarded

to the USBLM (Neely, 2007).

133

17.7 Plans, Negotiations, or Agreements

with Local Individuals or Groups

The QP is unaware of any negotiations

or agreements with outside groups in the exploration and development of their mineral properties as described in this report.

17.8 Descriptions of any commitments

to ensure local procurement and hiring

The QP is unaware of any commitments

to ensure local procurement and hiring by USAC.

17.9 Qualified Person’s Opinion

The previous owner of the claims in

the Nolan Creek area conducted geotechnical, hydrological, and environmental studies needed to acquire necessary permits to conduct their

mining operations for placer gold and permits to conduct exploration of lodes.

The QP is unaware of any agreements

reached with local individuals and groups. However, the previous owner established economic relations for provisions of goods and services

necessary to operate their mining ventures. The previous owner was a regular customer for fuel, groceries, and needed equipment from

Fairbanks and beyond as needed to operate their enterprise at Nolan Creek.

However, the Nolan camp closed nearly

15 years ago, and as a result, these relationships have ended. The QP believes that, given all the circumstances discussed above, it

would be reasonable for GLM to initiate an aggressive program to rehabilitate and develop the lode antimony-gold resources described

in this Initial Assessment and Technical Summary Report.

134

18.0 CAPITAL AND OPERATING COSTS

No capital or operating costs were generated

for this Technical Report.

135

19.0 ECONOMIC ANALYSIS

No economic analysis has been completed

by the QP for this Technical Report.

136

20.0 ADJACENT PROPERTIES

The Slisco Bench placer gold deposit

occurs in the Vermont Creek drainage about two miles northeast of the subject claim group. The auriferous bench was explored extensively

by RC drilling by the previous owner of the Nolan Creek claims during 2004-to-2005 (see Bundtzen (2008c). The bench system is thought

to be very similar to that Nolan Creek valley and may have formed due to the same geological processes as at the former site.

Antimony-gold lode deposits have been

described in the Chandalar mining district about 40 miles east of the Nolan Creek area and at Sukakpak Mountain about 15 miles north

of the Nolan Creek and east of the Dalton Highway (Kurtak et al (1992). Both vein systems cut rocks of the Coldfoot terrane and may have

a similar geological origin to those exposed on the subject claims in the Nolan Creek area. No lode antimony-gold mineral resources have

been identified at either locale.

137

21.0 OTHER RELEVANT DATA AND INFORMATION

There is no additional relevant data

to be reported by the QP for this Technical Report.

138

22.0 INTERPRETATION

AND CONCLUSIONS

22.1 Mineral

Resources

High-grade lode antimony and gold resources

occur on Workman’s Bench and Pringle Bench in the Nolan Creek area, Wiseman District, Alaska, which has been previously examined

for previous owners by the QP. There has been no additional environmental base line work, surface and underground engineering investigations,

or metallurgical work at Nolan Creek since 2011. On Workman’s Bench, drill-tested, Measured and Indicated Mineral resources amount

to 53,616 tons grading 26.27 percent antimony and 0.372 oz/ton gold. Using both drill-indicated and surface trenching data, an Inferred

Mineral Resource totals 32,459 tons grading 14.50 percent antimony and 0.362 oz/ton gold occurs at Workman’s Bench and Pringle

Bench to the northeast.

Based on targeted

RC drilling programs across Federal placer claims, the previous owner identified an indicated resource in D-Block #1 and 3B3 zones amounting

to 66,800 cubic yards grading 0.095 oz/yd gold.

It is assumed by the QP that both resource

types would be developed using underground extraction technologies.

22.2 Environmental Permitting and Social

Permit requirements include an Alaska

Placer Mine Application (APMA) from both state and federal agencies, including the U.S. Bureau of Land Management; a national pollution

discharge elimination system (NPDES) permit from the U.S. Environmental Protection Agency; a 404 Wetlands permit from the U.S. Army Corps

of Engineers; approval from the Mine Safety and Health Administration (MSHA); APMA and Bonding negotiations from the Alaska Department

of Natural Resources (ADNR); a waste water treatment permit from the Alaska Department of Environmental Conservation (ADEC); and a Title

16 Permit from the Alaska Department of Fish and Game (ADF&G).

GLM will need to

negotiate a maintenance plan for the Nolan Road with the Alaska Department of Transportation and Public Facilities, which conforms with

guidelines set forth by the Alaska State Historical Preservation Office, if artifacts are encountered.

The QP is unaware of any social interactions

or obligations with other groups active in the Nolan Creek area.

22.3 Mineral Processing

On behalf of the previous owner, the

QP collected a 414 pound bulk sample of semi-massive to massive stibnite, vein quartz, and wall rock gangue all from the defined mineralized

‘A’ zone in the Workman’s Bench underground workings (see Bundtzen, 2008c). The purpose was to determine the mineralogical

nature of the antimony mineralization and the source of significant gold values. That bulk sample was collected underground from the

main ‘A Zone’ on Workman’s Bench.

139

The bulk sample was sent to Hazen Research

Labs Inc. (Hazen) in Golden, Colorado, USA in to determine the most optimal grind for potential marketing of a stibnite product and identify

the mineralogical nature of gold and antimony values. The bench test results were very successful in helping to identify a processing

path to produce gold and antimony concentrates for the market.

There is variation in gold content of

the stibnite-bearing zones, even within constrained sample collection areas. The QP suggests that four (4) additional bulk samples

of vein-fault mineralization be collected: 1) an additional sample of ‘A’ zone mineralization on Workman’s Bench ;

2) a bulk sample from ‘B’, West, and C zones on Workman’s Bench; 3) a bulk sample of the ‘A’ zone from

Prongle Bench; and 4) a bulk sample from other mineralized zones on Pringle Bench.

22.4 Mineral Reserves

No Mineral Reserves have been identified

in this Technical Report.

140

23.0 RECOMMENDATIONS

23.1 Mineral Resources

The QP does not make any specific recommendations to GLM/USAC for advancing

their Indicated placer gold resources in Nolan Creek Valley. If those resources become a priority for development, the company should

attempt to determine whether the paystreaks occur in dry versus water environments.

Going forward, GLM should complete additional infill diamond core drilling

on Workman’s Bench. Workman’s Bench should be the top priority because it contains the best chance thus far known for documenting

consistent widths and grades of stibnite-quartz-gold mineralization. The exploration focus on ‘A’ zone previously described

but also include subsidiary vein systems. Drill-testing the zone of inferred mineralization should be given a high priority. A drill priority

should also be to drill-test Pringle Bench. Figures 23.1 and 23.2 illustrate the proposed target areas.

Figure 23.1 Plan map of Priority 1 work program for Workman’s

Bench, illustrating drill pattern to be used (in blue), and past drill collars and intercepts (in black and red).

141

Figure 23.2 Priority II program recommended for Pringle Bench, illustrating

drill pattern to be used

The diamond drill core should be of a larger

size than the modified NQ core previously used--not necessarily due to high recovery as the older NQ core was satisfactory in

producing high recovery rates. Instead, use of larger diameter ‘P’ core and a drill rig capable of drilling to 1,000

foot depths (or more) could greatly assist in determining the overall vertical extent of the mineralizing system. In order to

accomplish the drill-testing, Pringle Bench should be scrapped off much like it was prior to 2011. The veins to be targeted for

exploration were clearly visible (Figure 23.3, 23.4).

Figure 23.3 Ray Medina removes Pringle Bench overburden with hydraulic/air

pressure technology, 2009. Photo from QP files.

142

Figure 23.4 Pringle Bench mineralized surface revealed after removal

of overburden. The stibnite-quartz-gold veins and associated fault structures are marked in red. Photo from QP files.

Review of previous drill programs should be a priority before new drilling

takes place. Most of the core has been stored on the property and appears to be in a useable condition (Figure 23.5)

Figure 23.5 USAC VP Rodney Blakestad inspects drill core storage

facility on Nolan Creek. Photo from QP files.

143

23.2 Environmental, Permitting and Social.

GLM/USAC should build on environmental baseline work initiated by the

previous owner. On behalf of the previous owner, SRK Consulting initiated base line studies on the property in 2008, but none have been

completed since. GLM should advance baseline studies through investigations of geochemical characterization, meteorological precipitation,

hydrological steam run-off (including storm water) prediction and mixing zone potential. An early significant conclusion from past environmental

work is that un-weathered materials have a neutral pH; hence an ARD mitigation plan should be aimed at minimizing oxidation of waste rock

and ore materials during disposal and in-capsulation of material. Large samples taken underground should be run using acid-base accounting

procedures. In similar fashion, selected core of both mineralized vein and wall rock material from representative drill holes along strike

and at depth should be split for the expressed purpose of acid-base accounting analyses.

To the QP’s knowledge, the previous owner was not engaged in

any partnerships or agreements with outside parties. The leading landowner in the area is Doyon Limited (Doyon), a regional native corporation

based in Fairbanks. Doyon owns lands immediately west of the Nolan Creek area, which juxtaposes the Gates of the Arctic National Park

and Preserve. Doyon is currently in partnership with Wiseman Metals, a subsidiary of MDF-Global, on a district-scale evaluation of copper-precious

metal ‘skarn’ and ‘porphyry style copper mineralization north northeast of Coldfoot; sometimes referred to as the ‘Chandalar

Copper Belt’.

23.3 Geotechnical

Further work should expand the bedrock joint study with core-stress

testing engineering studies initiated by the previous owner, which examined underground workings on Workman’s Bench. In addition,

ASTM tensile stress measurements could be completed at a facility at the University of Alaska-Fairbanks, which can be made available for

contracted uses. The QP has used this lab in past years during material site investigations for the Alaska Department of Transportation

and Public Facilities. Completion of this work will help confirm what is already known about rock behavior as well as add information

about modifications needed for underground extraction techniques and waste disposal planning.

23.4 Mineral Processing

Additional processing studies will be required to address specific

mineral recovery objectives for either future lode or placer mining objectives. It is recommended to consult with University of Alaska

geological engineering facilities as well as commercial facilities for additional mineral processing studies.

144

23.5 Tailings Storage

The QP does not recommend work on a tailings facility until information

acquired from mineral processing, geotechnical, environmental or infill drilling programs are completed and when a proven reserve has

been established During their initial planning for development of the lode antimony-gold assets at Workman’s Bench, the previous

owner was considering use of the abandoned frozen drifts created by underground placer mine activities for the disposal of tailings. The

QP assumes this plan was canceled after 2011, when the property became dormant.

23.6 Mineral Reserves

Mineral reserves cannot be established until a

fundamentally upgraded, technical economic analysis is completed, incorporating previous studies and future studies. A Mineral Reserve

analysis was provided in Chapter 18 of a previous Canadian National Instrument (NI) 43-101 Technical Report issued by the QP for the previous

owner of subject claims (Bundtzen, 2011).

However, economic assumptions for the 2011 NI 43-101 Mineral Reserve

study have significantly changed. Commodity prices have increased, but inflationary costs for fuel, groceries, equipment, labor and many

other factors have driven costs significantly upward for operating a mineral development in Nolan Creek valley. Geopolitical issues have

also become important considerations. A new mineral reserve study is recommended to be conducted at the discretion of GLM/USAC.

145

24.0 REFERENCES

Armstrong, Edward J., Childress, R., and Currey,

Jeff, 1994, Gold reserve, and resource estimates and calculated assumptions for Nolan Creek placer deposits: Unpublished Silverado Gold

Mines Ltd document dated October 27, 1994; 34 pages.

Berger, B.R., 1986, Descriptive model of low sulfide gold-quartz veins,

in, Cox, D.P., and Singer, D.A., eds., Mineral deposit models, U.S. Geological Survey Bulletin 1693, p. 239-243.

Berger, V.I., 1993, Descriptive and grade and tonnage model for gold-antimony

deposits: U.S. Geological Survey Open File Report 93-194, 22 pages.

Brosge, W.P., and Reiser, H.N., 1970, Geochemical reconnaissance in

the Wiseman and Chandalar mining districts and adjacent region, southern Brooks Range. U.S. Geological Survey Professional Paper 709,

21 pages.

Bundtzen, T.K., 2004, Information Review and Recommendations Gold

Properties on Ester Dome and at Eagle Creek, Fairbanks mining district, Alaska; and Nolan Area, Koyukuk mining district, Alaska: Independent

Technical Report for Silverado Gold Mines, ltd., Pacific Rim Geological Consulting, Inc., unpublished report, 258 pages

Bundtzen, T.K., 2006a, Swede Channel 2005/2006

Development Project, Nolan Creek, Koyukuk District, Northern Alaska: Project review for Silverado Gold Mines ltd., by Pacific Rim Geological

Consulting, Inc. 52 pages.

Bundtzen, T.K., 2006b, Project update: Completion of 2005-2006 Swede

Channel Phase I Underground Development Activities on Nolan Creek, Koyukuk District, Northern Alaska: Project review for Silverado Gold

Mines ltd., by Pacific Rim Geological Consulting, Inc. 68 pages.

Bundtzen, T.K., 2006c, Project Update: 1) Placer gold production from

cleanup of 2006 Swede Channel pay gravels; and 2) Exploration activities of Silverado Gold Mines Ltd. In Koyukuk district: Project review

for Silverado Gold Mines ltd., by Pacific Rim Geological Consulting, Inc. 64 pages

Bundtzen, 2008a, Review of 2007 Silverado Gold Mines, Ltd., Exploration

and Gold production Activities in Koyukuk district, Northern Alaska: Discussion of New Placer Geology Information: Project review for

Silverado Gold Mines ltd., by Pacific Rim Geological Consulting, Inc. 80 pages.

Bundtzen, T.K., 2008b, Bulk Sampling and Resource Evaluation Program,

Workman Bench Gold-Antimony Deposit, Koyukuk District, Northern Alaska: Project Review for Silverado Gold Mines ltd., by Pacific Rim Geological

Consulting, Inc. 44 pages.

Bundtzen, T.K., 2008c, Estimation of lode and

placer mineral resources, Nolan Creek, Wiseman B-1 quadrangle, Koyukuk mining district, Northern Alaska, July 29, 2008: NI 43-101

Technical Report for Silverado Gold Mines, Inc., 133 pages.

146

Bundtzen, T.K., 2009, Update of Mineral resources and reserve

estimates, and Preliminary Feasibility Study, Workman’s Bench Antimony-Gold Lode Deposit, Nolan Creek, Wiseman B-1 Quadrangle,

Koyukuk Mining District, Northern Alaska; June 1, 2009): NI 43-101 report for Silverado Gold Mines, Ltd.

Bundtzen, T.K., 2011, Update of Mineral resources and reserve

estimates, and Preliminary Feasibility Study, Workman’s Bench Antimony-Gold Lode Deposit, Nolan Creek, Wiseman B-1 Quadrangle,

Koyukuk Mining District, Northern Alaska, July 9th, 2011: NI 43-101 report for Silverado Gold Mines, Ltd.

Bundtzen, T.K., and Eden, Karsten, 2008, Power Point Presentation on

Swede Channel Developments, Wiseman B-1 Quadrangle, Alaska. Given at the Spring Alaska Miners Association Conference, March 25, 2008,

Fairbanks Alaska.

Childress, R. L., 1995, Gold Reserve and Resource estimates for the

Nolan Creek Placer Project: Unpublished Silverado Gold Mines Ltd. document dated January 14, 1995, 38 pages; which includes drill

target area plates.

Cobb, E.H., 1973, Placer deposits of Alaska: U.S. Geological Survey

Bulletin 1374, 213 pages

Cook, D.J., 1983, Placer Mining in Alaska: Mineral Industry

Research Laboratory Report No. 65, Fairbanks, Alaska, 157 pages.

Daily, Arthur, 1962, Valuation of large gold-bearing placers: Engineering

and Mining Journal Vol. 163, No. 7, pages 80-88.

Day, Stephen, and Jeffress, Bill, 2008, Sampling and Analysis Plan

(SAP), Nolan Creek: Unpublished memo report to Silverado Gold Mines, Inc. and Tricon Mining, October 9th, 2008, 5

pages.

Dillon, J.T., 1989, Structure and stratigraphy of the southern Brooks

Range and northern Koyukuk basin near the Dalton Highway, in, Mull, C.G., and Adams, K.E., eds., Dalton Highway, Yukon River to Prudhoe

Bay, Alaska: Alaska Division of Geological and Geophysical Surveys Guidebook #7, p. 157-187.

Dillon, J.T., Brosge, W.P., and Dutro, J.T., Jr., 1986, Generalized

geologic map of the Wiseman quadrangle, Alaska: U.S. Geological Survey Open File Report 86-219, one sheet @ 1:250,000 plus text.

Dillon, J.T., Lamal, K.K., and Huber, J.A., 1989, Gold deposits in

the Upper Koyukuk and Chandalar mining districts, in, Mull, C.G., and Adams, K.E., eds., Dalton Highway, Yukon River to Prudhoe Bay: Alaska

Division of Geological and Geophysical Surveys Guidebook #7, p. 195-201.

147

Dillon, J.T., and Reifenstuhl, R.R., 1990, Geologic map of the Wiseman

B-1 quadrangle, south-central Brooks Range, Alaska: Alaska Division of Geological and Geophysical Surveys Professional Report 101, one

sheet @ 1:63,360 scale plus text.

Doheny, L. C., 1941, Placer valuation in Alaska—Part I:

Engineering and Mining Journal Vol. 142, No. 12, December, 1941, pages 47-49.

Doheny, L. C., 1942a, Placer valuation in Alaska—Part II:

Engineering and Mining Journal Vol. 143, No. 1, January, 1942, pages 43-44.

Doheny, L. C., 1942b, Placer valuation in Alaska—Part III:

Engineering and Mining Journal Vol. 143, No. 3, March, 1942, pages 48-49.

Driscoll, Alan J., Jr., 1987, Geology and

economic geology of the Wiseman area, Koyukuk mining district, northern Alaska: Unpublished, confidential technical report by Alaska Mining

Company, (ALMINCO), Anchorage, Alaska, 25 pages plus appendices.

Ebbley, N. Jr., and Wright, W.S., 1948, Antimony deposits in Alaska:

U.S. Bureau of Mines Report of Investigations 4173, p. 37-38.

Eden, Karsten, 1999, Geology and gold mineralization of the Nolan area

in the Brooks Range, Alaska: Masters thesis presented to Institute of Mineral Geology and Mining Engineering, Technical University of

Clausthal, Germany, 147 pages. Several plates @ 1:21,000 scale.

Eden, Karsten, 2000, Geology and gold mineralization of the Nolan area

in the Brooks Range, Alaska: U.S. Bureau of Land Management Open File Report 78, 140 pages

Flanigan, Brian P., 2003a, Discussion of geophysical modeling and

interpretation of Solomon’s Shear: Confidential memo to Ed Armstrong, President, Tri-Con Mining Company Inc., August 10,

2003, 5 pages.

Flanigan, Brian P., 2003b, Tri-Con Mining Company

Inc. Geology Department Monthly report June 1 to June 30, 2003: Unpublished, confidential activity summary for Tri-Con Mining

dated July 2, 2003, 2 pages.

Flanigan, Brian P., 2003c, Results of Excavator sampling Program: Unpublished,

confidential activity summary for Tri-Con Mining, Inc. dated July 30, 2003, 1 page.

Flanigan, Brian P., 2003d, Tri-Con Mining Company

Inc. Geology Department Monthly report July 2 to June 30, 2003: Unpublished, confidential activity summary for Tri-Con Mining

Inc. dated July 31, 2003, 2 pages.

Flanigan, Brian P. 2004, Comparison of Nolan Creek placer mining recoveries

and drill-indicated resource estimates—an attempt to improve future placer gold resources estimates: Unpublished, confidential activity

summary for Tri-Con Mining, Inc. dated October 25, 2004, 10 pages.

148

Flanigan, Brian P., Glassburn, Fawn, Kirkham, Russell, and

Lessard, Richard, 2003, Solomon’s Shear and other potential lode targets at Nolan Creek: Unpublished, confidential activity

summary for Tri-Con Mining, Inc. dated August 3, 2003, 7 pages with plates.

Gacetta, J.D., and Church, S.E., 1989, Lead isotope data base for sulfide

occurrences in Alaska: U.S. Geological Survey Open File Report 89-688, 59 pages.

Hamilton, T.D., 1979, Surficial geologic map of the Wiseman quadrangle,

Alaska: U.S. Geological Survey Miscellaneous Investigations Map MF-1122, scale 1:250,000

Hamilton, T.D., 1986, Late Cenozoic glaciation of the central Brooks

Range, Alaska, in, Hamilton, T.D., Reed, K.M., and Thorson, R.M., eds., Glaciation in Alaska—the Geologic Record: Alaska Geological

Society Special Research Volume, pages 9-50.

Hodgson, C.J., 1993, Mesothermal lode gold deposits,

in, Kirkham, R.V., Sinclair, W.D., Thorpe, R.I., and Duke, J.M., eds., Mineral deposit modeling: Geological Association of Canada Special

Paper 40, p. 635-678.

Ineson, P.R., 1989, Introduction to Practical Microscopy: Longman

Scientific Technical, John Wiley and Sons New York, 181 pages

Joesting, H.R., 1942, Strategic Minerals in Interior Alaska: Alaska

Territorial Department of Mines pamphlet #2, 46 pages.

Killeen, P.L., 1942, Antimony deposits near Wiseman, Alaska: U.S. Geological

Survey War Pamphlet, 3 pages.

Knight, J.L., and McTaggart, K.C., 1989, Lode and Placer gold of the

Coquihalla and Wells areas, Cariboo district, British Columbia, Canada: Exploration in British Columbia-1989: British Columbia geological

Survey p. 105-117.

Kurtak, J.M., Klieforth, R.F., Clark, J.M., and Maclean, E.A., 2002,

Mineral investigations in the Koyukuk mining district, northern Alaska: Volume II—Introductory Text and Summary of mines, prospects,

and mineral occurrences in the Melozitna, Survey Pass, Tanana, and Wiseman quadrangles, Alaska: U.S. Department of Interior, Bureau of

Land Management BLM-Alaska Technical Report 50, 450 pages

Laznicka, Peter, 1985, Empirical Metallogeny—Depositional Environments,

Lithologic Associations, and Metallic Ores: Elsevier Publishers, Amsterdam, p. 1,350 pages.

Maddren, A.G., 1910, The Koyukuk-Chandalar region,: U.S. Geological

Survey Bulletin 442-G, pages 284-315.

Maddren, A.G., 1913, The Koyukuk-Chandalar region, Alaska: U.S. Geological

Survey Bulletin 532, 119 pages.

149

Moiser, E.L., and Lewis, J.S., 1986, Analytical

results, geochemical signatures, and sample locality map of lode gold, placer gold, and heavy mineral concentrates from the Koyukuk-Chandalar

mining district, Alaska: U.S. Geological Survey Open File Report 86-345, 173 pages.

Moore, T.E., Wallace, W.K., Bird, K.J., Karl, S.M., Mull, C.G., and

Dillon, J.T., 1994, Geology of northern Alaska, in, Plafker, George, and Berg, H.C., eds., The Geology of Alaska: Boulder, Colorado, Geological

Society of America, the Geology of North America, Volume G-1, p. 49-140.

Mull, C.G., 1989, Chapter 6—Summary of structural style and history

of the Brooks Range deformation, in, Mull, C.G., and Adams, K.E., eds., Dalton Highway, Yukon River to Prudhoe Bay, Alaska: Alaska Division

of Geological and Geophysical Surveys Guidebook #7, p. 47-56.

Neely, Burr, 2007, Cultural Resource Survey of proposed Exploration

Drilling and Mining Locations in the Vicinity of Nolan, Alaska: Unpublished report prepared for Silverado Gold Mines, Inc. by Northern

Land Use Research, Inc., 22 pages.

Peters, W.C., 1978, Exploration and Mining Geology: John Wiley

and Sons, New York, 695 pages.

Proffett, J.M., 1982, Preliminary report on the geology of the Hammond

River-Vermont Creek gold placer area, Wiseman district, Alaska: Unpublished Confidential Report by J.M Proffett and Associates, Inc.,

Eagle River, Alaska, 15 pages.

Reed, Irving McKinney, 1938, Upper Koyukuk Region, Alaska: Alaska

Territorial Department of Mines Miscellaneous Report 194-7, 169 pages.

Reger, R.D., and Bundtzen, T.K., 1990, Multiple glaciation and gold

placer formation, Valdez Creek valley, western Clearwater Mountains, Alaska: Alaska Division of Geological and Geophysical Surveys Professional

Report 107, 29 pages.

Schultz, C.P., 2008a, Report #1: Flotation and gravity results, Workman’s

Bench Stibnite-Gold Bulk Sample, Wiseman District, Alaska: Unpublished report by Hazen Research, Inc., for Pacific Rim Geological

Consulting, Inc. 10 pages.

Schultz, C.P., 2008b, Report #2: Mineralogical examination Workman’s

Bench Stibnite-Gold Bulk Sample, Wiseman District, Alaska: Unpublished report by Hazen Research, Inc., for Pacific Rim Geological

Consulting, Inc. 18 pages.

Staff, 2003, Standards and Guidelines for Valuation of Mineral properties:

Special Committee of the CIM Metallurgy and Petroleum Valuation of Mineral properties: 33 pages.

Staff, 2004, Estimation of Mineral Resources and Mineral Reserves Best

Practice Guidelines: CIM Council, 35 pages.

Staff, 2005a, National Instrument 43-101 Standards of Disclosure for

Mineral projects, Form 43-101 and Companion Policy 43-101 CP: 29 pages.

150

Staff, 2005b, Form 43-101F1-Contents of the Technical report:

9 pages.

Silverado Staff (Eden), 2008a, Workman’s bench Drilling and

Underground Exploration Program 2007-2008, Horizontal Plan View Map, October 21, 2008; one sheet at scale 1:1,000

Silverado Staff (Eden), 2008b, Workman’s bench Drilling and Underground

Exploration Program 2007-2008, Vertical Section 1, S1-S1’, October 21, 2008 scale: one inch=50 feet

Silverado Staff (Eden), 2008c, Workman’s bench Drilling and

Underground Exploration Program 2007-2008, Vertical Section 2, S2-S2’, scale: October 21, 2008, scale one inch=50

feet

Silverado Staff (Eden), 2008d, Workman’s bench Drilling and Underground

Exploration Program 2007-2008, Vertical section 3, S3-S3’, October 21, 2008, scale: one inch=50 feet

Silverado Staff (Eden), 2008e, Workman’s bench Drilling and Underground

Exploration Program 2007-2008, Vertical section 4, S4-S4’, October 21, 2008, scale: one inch=50 feet

Silverado Staff (Eden), 2008e, Workman’s bench Drilling and

Underground Exploration Program 2007-2008, Vertical section 5, S5-S5’, scale: one inch=50 feet

Silverado Staff (Eden), 2008f, Workman’s bench Drilling and Underground

Exploration Program 2007-2008, Vertical section 1, A-A’, May 2, 2008 scale: one inch=50 feet

Silverado Staff (Eden), 2008g, Workman’s bench Drilling and Underground

Exploration Program 2007-2008, Vertical section 2, B-B’, June 6, 2008 scale: one inch=50 feet

Silverado Staff (Eden), 2008h, Workman’s bench Drilling and Underground

Exploration Program 2007-2008, Vertical section 3, C-C’, May 2, 2008, scale: one inch=50 feet

Silverado Staff (Eden), 2008i, Workman’s bench Drilling and Underground

Exploration Program 2007-2008, Vertical section 4, D-D’, May 2, 2008, scale: one inch=50 feet

Silverado Staff (Eden), 2008j, Workman’s bench Drilling and Underground

Exploration Program 2007-2008, Vertical section 5, E-E’, May 2, 2008, scale: one inch=50 feet

Silverado Staff (Eden), 2008k, Workman’s bench Drilling and Underground

Exploration Program 2007-2008, Vertical section 6, F-F’, May 2, 2008, scale: one inch=50 feet

Silverado Staff (Eden), 2008l, Workman’s bench Drilling and Underground

Exploration Program 2007-2008, Vertical section 7, H-H’, June 6, 2008, scale: one inch=50 feet

Silverado Staff (Eden), 2008m, Pringle bench Drilling and Underground

Exploration Program 2007, Vertical section 7, H-H’, February 8, 2008, scale: one inch=100 feet

Stone, J.G., Dunn, P.G., and Sheahan, P., 1998, Ore Reserve Estimates

in the Real World: Society of Economic Geologists Special Publication Number 3, Second Edition, Citizens Printing Company, Littleton,

Colorado, 160 pages

151

Swainbank, R.C., Bundtzen, T.K., Clough, A.H.,

Henning, M.W., and Hansen, E.W., 1995, Alaska’s Mineral Industry-1994, Alaska Division of Geological and Geophysical Surveys Special

Report 49, 77 pages.

Tchapko, Vitali, 1995, Placer and hardrock gold deposits in the Central

Kolyma area, Magadan region, Northeast Russia, in, Bundtzen, T.K., Fonseca, A.L., and Mann, Roberta, eds., Geology and Mineral Deposits

of the Russian Far east: Alaska Miners Association Special Symposium Volume 1, p. 29-35.

Turner, D.L., Forbes, R.B., and Dillon, J.T., 1979, K-Ar geochronology

of the southern Brooks Range, Alaska: Canadian Journal of Earth Sciences, vol. 16, no. 9, p. 1789-1804.

152

25.0 RELIANCE ON INFORMATION PROVIDED BY REGISTRANT

The Registrant (GLM/USAC) provided detailed information concerning

their ownership of the thirty-six (36) federal lode and placer claims in the Nolan Creek Valley that were acquired through a Trustee’s

public auction on January, 30, 2026. The Registrant also provided details of the forty-eight (48) Alaska State Mining Claims acquired

during the fall of 2026.

In June, 2026, the QP accompanied USCA’s Vice President of the

company’s Mining Division, Rodney Blakestad, on a two-day examination of the company’s properties in Nolan Creek valley.

Remaining information disclosed in this Technical Report is the responsibility

of the QC.

153

APPENDIX I: Summary of Relevant Sample Data Used in Calculation

of all Categories of Sb and Au Resources from Workman’s Bench That are Described in this Technical Report; Including Relevant Trace

Element Data

Sample

Control #

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/t)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

1

08SH02

(08SS47)

West

of ‘A’ Zone

160.0

160.6

0.6

0.50

23.30

0.031

2520

0.30

24.0

Quartz-Stibnite

vein about  2.0 inches wide (visual by QP)

2

08SH02

(08SS51)

‘A’  Zone

186.5

187.5

1.0

0.70

37.92

0.091

15.0

0.72

<0.2

5.5

inch (true thickness) quartz-stibnite vein with semi-massive stibnite also in remaining zone

3

08SH02

(08SS52)

‘B’

Zone

193.0

193.8

0.8

0.58

7.11

0.190

3260

0.59

10.3

2

parallel quartz stibnite veins about 4.5 inches  true width with sch

4

08SH03

(08SS67-68)

West

of ‘A’ Zone

41.4

42.5

1.1

1.00

37.91

0.301

0.8

0.45

1.4

Sheared

stibnite-quartz zone; about 1.0 foot true thickness; textures

5

Including

(08SS67)

West

of ‘A’ Zone

41.4

42.0

0.6

0.45

42.05

0.420

<0.01

1.38

<0.2

Sheared

nearly massive stibnite; about 0.45 foot true

6

08SH03

(08SS80)

‘A’

Zone

115.9

117.0

1.1

0.91

26.73

0.410

139

0.40

5.1

Several

closely spaced, quartz-stibnite veins

7

08SH03

(08SS81)

Hanging

wall ‘A’ zone

117.0

117.5

0.5

0.41

0.07

0.360

8560

1.26

20.6

Hanging

wall trace stibnite in quartz

8

08SH03

(08SS82)

‘B’

Zone

130.3

130.9

0.6

0.49

13.65

0.130

188

0.41

17.6

Stibnite-quartz

vein zone with siderite

9

08SH03

(08SS88)

Zone

not designated

161.5

162.0

0.5

0.41

0.01

0.140

>10000

0.37

9.8

Arsenopyrite-rich

quartz vein with trace of stibnite

10

08SH03

(08SS93)

‘C’

Zone

195.5

196.1

0.6

0.41

0.70

0.130

9930

0.15

56.1

Quartz-stibnite

zone; 10 % Sb2S3 (QP inspection)

11

08SH01B

(08SS13)

‘West’

Zone

33.8

35.2

1.4

0.92

53.44

0.280

<0.1

0.30

5.0

Massive

stibnite with only minor quartz

12

08SH01B

(08SS14)

‘A’

Zone’ Footwall

95.7

96.4

0.7

0.42

28.69

0.230

110

0.36

1.2

5

inch thick, vertical quartz-stibnite 3 inches of massive stibnite

13

08SH01B

(08SS15)

Main

‘A’ Zone

98.2

101.3

3.0

2.49

18.43

0.130

248

0.28

1.3

quartz-stibnite

veins; with locally massive stibnite over 3.0 feet

Sample

Control #

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/t)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

14

08SH01B

(08SS18)

Hanging

Wall ‘A’ Zone

108.0

108.5

0.5

0.41

26.05

0.020

5.9

0.21

1.1

2.0

inch massive stibnite with quartz

15

08SH01B

(08SS23, 08SR52,

08SS24)

‘B’

Zone

139.0

142.2

3.2

2.65

12.22

0.015

300

535

100

3.67

0.37

0.30

1.2

19.2

0.7

Massive

stibnite veins with quartz;  Sb grade over 3.2 feet

16

Including

(08SS24)

‘B’

zone

141.6

142.2

0.6

0.49

19.87

0.010

100.5

0.3

0.7

Thickest

stibnite-quartz vein (4 inches)

17

08SH01B

(08SS33)

‘C’

Zone

198.7

199.2

0.5

0.41

17.86

0.210

610

0.16

0.9

2.0

inch semi-massive stibnite vein in quartz gangue.

18

08SH15

(08SS192)

‘West

Zone

84.0

85.7

1.7

1.10

10.55

0.141

1,220

0.57

0.7

Stibnite-quartz

zone with slickensides

19

08SH15

(08SS196-197)

‘A’

Zone

113.0

117.0

4.0

2.58

23.06

0.028

527

0.87

<0.02

Semi-massive

stibnite over wide zone

20

08SH15

(08SS206-208

‘B’

Zone

182.5

190.7

8.2

4.80

6.25

0.092

2836

0.31

<0.02

Diffuse

zone of stibnite-bearing stockwork

21

08SH15

(08SS209)

‘C’

Zone ?

194.6

196.2

1.6

0.94

0.89

0.050

7620

0.29

18.3

Weak

zone with thin stibnite veins

22

08SH14

(08SS211)

‘West’  Zone

56.5

57.0

0.5

0.41

4.02

0.008

742

0.18

2.0

1.0

inch quartz-stibnite-carbonate vein

23

08SH14

(08SS212)

Zone

not Designated

88.3

92.0

3.7

3.07

0.27

0.180

>10000

0.23

6.9

Arsenopyrite-rich

quartz vein zone

24

08SH14

(08SS216)

‘A’

Zone

108.5

109.2

0.7

0.60

0.06

0.010

3000

0.31

9.0

Notes

from 09/27/08 visual by QP indicate 40% stibnite in a zone 0.6 feet wide true thickness

25

08SH14

(08SS218)

‘B’

Zone

121.0

122.0

1.0

0.83

0.25

0.260

4270

0.27

24.6

Disseminated

stibnite ion quartz vein vertical orientation (QP estimate)

26

08SH14

(08SS226)

‘C’

Zone

179.2

179.9

0.7

0.58

1.75

0.040

4320

0.44

81.2

Vuggy

Quartz vein with stibnite (30%) of total.

27

08SH14

(08SS227)

Possible

‘C’ Zone Extension

183.8

184.3

0.6

0.50

0.02

0.190

>10000

0.29

41.5

Arsenopyrite-rich

quartz vein about 3 inches thick

28

08SH17

(08SS240-241)

‘A’

Zone

285.0

288.3

3.3

1.91

0.00

0.160

8080

0.30

4.6

Wide

zone of stibnite=bearing quartz veins (3); stockwork type zone

Sample

Control #

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/t)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

29

Including

(08SS241)

‘A’

Zone

287.6

288.3

0.9

0.52

4.63

0.230

>10000

0.24

5.6

4

inch zone of stibnite-quartz vein; 25 percent Sb2S3 (QP estimate)

30

08SH17

(08SS242)

‘B’

Zone

299.3

299.9

0.6

0.35

13.63

0.200

28.5

1.02

<0.2

0.75

inch of massive stibnite on quartz vein

31

08SH17

(08SS243)

‘C’

Zone

311.8

312.9

1.1

0.64

0.01

0.120

>10000

0.30

8.9

Visual

by QP: contains 10% Sb2S3—not in assay results

32

08SH16

(08SS228)

West

of ‘west’ Zone

156.0

157.0

1.0

0.83

0.93

0.092

9340

0.37

12.8

Quartz-stibnite

vein about 4 inches thick

33

08SH16

(08SS229)

‘West’

Zone

197.0

198.0

1.0

0.83

1.11

0.020

2370

0.28

13.7

Quartz-stibnite

vein  4 inches thick

34

08SH16

(08SS231)

‘A’

Zone

233.7

234.7

1.0

0.83

1.64

0.053

7910

0.17

21.2

Quartz

vein with 5-8% stibnite as disseminations; vein is 6 inches thick

35

08SH16

(08SS235)

‘B’

Zone

309.5

310.5

1.0

0.83

0.00

0.390

1000

0.28

9.6

Quartz

vein with abundant arsenopyrite in vein selvages

36

07SH01

07SS06)

‘A’

Zone Main Vein

201.00

202.00

1.0

0.83

9.37

0.211

2250

NA

NA

Semi-Massive

stibnite with quartz stockwork

37

07SH01

(07SS08-12)

‘B’

Zone

223.50

242.50

19.00

15.77

3.24

0.091

3020

NA

NA

Quartz

–stibnite vein stockwork zone in four distinct zones.

38

Including

(07SS10)

‘B’

Zone

237.40

242.50

6.00

4.81

8.81

0.191

1250

NA

NA

Two

main stibnite-quartz stockwork; each 18 inches thick

39

Including

(267392)

‘B’

Zone

238.40

238.90

0.50

0.41

28.69

0.023

NA

NA

NA

Massive

stibnite in core

40

Trench

(W399)

‘A’

Zone Main Vein

NA

NA

1.20

1.20

50.63

0.240

NA

NA

NA

Furthest

trench sample on surface

41

07SH18

(07SS194-97;

SR378-79)

‘West’

Zone

46.5

53.5

7.0

3.26

1.24

0.029

325

NA

NA

Stibnite

bearing stockwork zone; core contains stibnite lenses

42

Including

(07SR379)

‘West’

Zone

52.7

53.5

0.8

0.67

7.94

0.058

160

NA

NA

Stibnite

bearing stockwork zone; core

43

08SH16

(08SS228)

‘West’

Zone

156.0

157.0

1.0

0.83

0.93

0.090

9340

0.37

12.8

Quartz

carbonate vein with stibnite grains and arsenopyrite

44

08SH16

(08SS229)

‘A’

Zone

197.0

198.0

1.0

0.83

1.11

0.020

2370

0.28

13.7

Disseminated

stibnite in 6 inch quartz vein

Sample

Control #

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Sb

(%)

Au

(oz/t)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

45

08SH32

(08SS375-379)

‘West’

Zone

171.5

177.5

6.0

6.23

0.085

See

below

See

below

See

below

Wide

zone (true width=3.2 feet) of quartz-stibnite-carbonate veinlet zone.

46

Including

(08SS375-376)

West

Zone

171.5

172.8

1.6

14.63

0.110

See

below

See

below

See

below

Wide

zone of quartz-stibnite veins

47

Including

(08SS375)

‘West

Zone

172.8

173.3

0.5

21.24

0.180

578

1.57

5.1

Semi-massive

stibnite vein zone

48

Including

(08SS379)

West

Zone

176.0

177.5

1.5

12.62

0.060

337

0.46

5.1

Three

flecks of gold noted during logging not reflected in assays

49

08SH32

(08SS380)

‘A’

Zone hanging wall

177.5

179.5

2.0

0.04

0.010

320

0.26

46.7

Visual

by QP: 20% stibnite and 80% quartz;  Sb2S3 not reflected in assays

50

08SH32

(08SS385)

‘A’

Zone Hanging Wall

186.5

188.0

1.5

1.22

0.275

1490

0.21

10.3

Quartz

carbonate vein with stibnite grains and trace arsenopyrite

51

08SH32

(08SS292-394

‘A’

Zone

203.7

209.5

5.8

8.20

0.180

>10000

18.2

7600

0.28

7.22

0.26

3.9

0.2

5.6

Wide

zone (true thickness=2.9 feet) of stibnite-bearing quartz vein mineralization

52

Including

(08SS393)

‘A’

Zone

205.7

206.6

0.9

38.74

1.130

18.2

7.22

0.2

Strong zone of stibnite-quartz mineralization

53

08SH32

(08SS396)

‘B’

Zone

212.0

213.5

1.5

0.09

0.030

5250

0.23

13.5

5%

percent Sb2S3 in large quartz zone

54

08SH33

(08SS411)

‘West

’ Zone

162.0

167.0

5.0

2.70

0.040

2140

0.59

23.9

Wide

stockwork vein zone contains disseminated Sb2S3

55

08SH33

(08SS426-427)

‘A’

Zone

242.0

243.2

1.2

14.74

0.030

68.5

0.29

1.2

Wide

zone (true thickness=1.00 feet) of stibnite-quartz mineralization

56

Including

(08SS426)

‘A’

Zone

242.0

242.6

0.6

19.68

0.040

68.5

0.29

1.2

Disseminated

to locally massive stibnite in quartz vein

57

203797

‘A’

Zone

166.20

167.70

1.50

0.36

0.036

67

ND

275

NW

fracture adjacent to ‘A’ Zone

58

08SH13

(08SS177)

Zone

not designated

17.8

18.3

0.5

13.16

0.025

20.4

2.1

<0.2

Quartz-stibnite

zone with locally 50% Sb2S3

Sample

Control #

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/t)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

59

08SH13

(08SS179)

‘West’

Zone?

121.3

126.7

5.4

3.40

1.99

0.138

>10000

0.31

11.8

Significant

wide zone (true thickness=3.4 feet)  with Sb+Au

60

08SH13

(08SS182)

‘A’

Zone

187.5

188.8

1.3

1.00

22.15

0.061

308

0.17

1.3

Thick

quartz-stibnite zone stibnite Lense

61

08SH13

(08SS184-85)

‘B’

Zone

208.4

212.2

3.8

2.43

6.21

0.061

2050

4410

0.53

0.19

14.0

18.4

Wide

zone of stockwork stibnite-quartz vein

62

Including

(08SS184)

‘B’

Zone

208.4

209.9

1.5

0.96

6.97

0.26

2050

0.53

14.0

Stibnite

lobes in wide

63

08SH13

(08SS188)

‘C’

Zone

250.6

252.6

2.0

1.28

0.07

0.050

5760

0.12

24.5

Quartz

carbonate veins (3) with isolated stibnite

64

203405

‘West’

Zone

138.0

139.5

1.5

1.50

41.20

0.110

NA

NA

NA

Semi-massive

stibnite in quartz gangue

65

203789

‘West’

Zone

40.5

42.0

1.5

1.50

22.48

0.556

4152

NA

141

In

wall of connecting drift; true thickness

66

203808

A

Zone

172.0

173.50

1.50

1.50

43.64

1.19

52

NA

<0.2

Nearly

massive stibnite with quartz

67

WBUG3

S1

‘A’

Zone

172.9

173.32

0.42

0.42

52.10

0.676

0.5

NA

1.1

Massive

stibnite core

68

WBUG3

S2

‘A’

Zone

172.9

173.32

0.42

0.42

58.89

0.329

<0.1

NA

0.5

Massive

stibnite core

69

WBUGG3

S3

‘A’

Zone

172.9

173.32

0.42

0.42

60.90

0.031

3010

NA

18.2

Massive

stibnite core

70

WBUGG3

S4

‘A’

Zone

172.9

173.32

0.42

0.42

55.71

0.451

1.3

NA

0.4

Massive

stibnite core

71

WBUGG3

S5

‘A’

Zone

172.9

173.32

0.42

0.42

11.10

0.444

2520

NA

4.5

Massive

stibnite core

72

WBUG8-

S2

‘A’

Zone

182.9

183.32

0.42

0.42

58.76

0.145

0.7

NA

0.2

Massive

stibnite core

73

203802

‘A’

Zone

114.0

116.50

2.50

2.50

37.78

0.076

68

NA

<0.2

‘A’

Zone in south drift

74

203810

‘B’

Zone

183.0

183.5

0.5

0.50

41.00

0.696

66

NA

<0.2

Nearly

massive stibnite with quartz gangue; south drift

75

203791

‘B’

Zone

199.1

200.35

0.50

0.50

39.73

0.362

1163

NA

<0.2

Nearly

massive stibnite with hanging wall; north drift

76

WBUGG8

S1

‘A’

Zone

NA

NA

0.42

0.42

57.52

0.359

1

NA

<0.2

Massive

stibnite

77

WBUG5

S2

‘B’

Zone

199.8

200.22

0.42

0.42

50.04

1.040

0.7

NA

<0.2

Massive

stibnite in vein core

78

WBUG8

S3

‘B’

Zone

NA

NA

0.42

0.42

58.02

0.696

2.5

NA

<0.2

Massive

stibnite core

79

203795

‘A’

Zone

40.00

41.50

1.50

1.50

40.35

0.357

52

NA

<0.2

Semi-Massive

stibnite-quartz vein

80

203488

‘B’

Zone

122.00

123.2.0

0.65

0.65

18.05

0.039

NA

NA

NA

Semi-Massive

stibnite-quartz vein

81

WBUG9

S1

‘B’

Zone

124.00

124.42

0.42

0.42

33.92

0.084

18.8

NA

<0.2

Semi-Massive

stibnite-quartz vein

Sample

Control #

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/t)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

82

WBUGG9

S2

‘B’

Zone

NA

NA

0.42

0.42

17.34

0.130

459

NA

0.4

Semi-Massive

stibnite

83

WBUGG5

S3

‘C’

Zone

NA

NA

0.42

0.42

13.38

0.031

2530

NA

3.8

Semi-Massive

stibnite

84

WBUGG9

S4

‘B’

Zone

NA

NA

0.50

0.50

7.34

0.513

5590

NA

2.3

Semi-massive

stibnite

85

203804

B

Zone Vein

218.0

218.45

0.45

0.45

56.88

0.033

NA

NA

NA

Massive

stibnite vein

86

203450

A

Zone

68.00

69.50

1.50

1.50

57.02

0.012

NA

NA

NA

Massive

Stibnite vein

87

203409

B

Zone  Vein

172.00

172.45

0.45

0.40

51.41

0.372

NA

NA

NA

Massive

Stibnite

88

Trench

J (52)

A

Zone Main Vein on Surface

151.0

159.2

8.2

8.20

30.30

0.140

NA

NA

NA

Semi-massive

stibnite

89

Trench

J

A

Zone Main Vein  on Surface

159.2

167.4

8.2

8.20

1.72

0.220

NA

NA

NA

Disseminated

stibnite

90

Trench

J

Surface

B Zone

167.4

175.6

8.2

8.20

11.70

0.037

NA

NA

NA

Semi-massive

stibnite

91

267397

Main

‘A’ Vein; surface

171.4

172.25

0.85

0.85

36.51

0.793

67

NA

275

Massive

Stibnite

92

Trench

J

Surface

B Zone

175.6

183.8

8.2

8.20

29.30

0.120

NA

NA

NA

Semi-massive

stibnite

93

Trench

J

Zone

between A and B Veins

183.80

192.00

8.2

8.20

2.56

0.016

NA

NA

NA

Disseminated

stibnite

94

Trench

J

‘B’

Zone

192.00

201.80

9.8

9.80

14.05

0.016

NA

NA

NA

Semi-massive

stibnite

95

Trench

J

West

Vein on Surface

35.0

43.2

8.2

8.20

1.70

0.040

NA

NA

NA

West

Vein as seen in 2008 drill hole

96

08SH18

(08SS250)

Interpreted

‘West’ Vein

276.0

277.0

1.0

0.64

0.01

0.037

NA

NA

NA

Arsenopyrite-rich

quartz vein

97

08SH18

(08SS254)

‘A’

Zone

313.0

315.0

2.0

1.27

0.15

0.102

3,420

0.23

6.5

Footwall

zone with arsenopyrite

98

08SH18

(08SS255

‘A’

Zone

315.0

316.8

1.8

1.15

27.65

2.88

27.1

3.21

0.5

High

grade quartz-stibnite vein

99

WBUG1-S2

‘A’

Zone

138.80

139.22

0.42

0.42

64.34

0.030

NA

NA

NA

Massive stibnite near hanging

wall

South drift

100

07SH15

(07SR193

‘West’

Zone’

127.0

130.5

3.5

2.59

0.25

0.035

1,000

268

11.2

Disseminated

stibnite in quartz

101

07SH15

(07SS173-175;

‘A’

Zone

192.0

197.8

5.80

4.29

4.07

0.104

912

NA

3.6

Disseminated

stibnite

102

07SH15

(07SR217-220)

‘B’

Zone

242.00

247.80

5.80

3.95

3.45

0.060

982

NA

5.5

Quartz

stibnite stockwork vein zone

Sample

Control #

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/t)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

103

Including

(07SS179)

‘B’

Zone

245.3

245.8

0.60

0.49

34.51

0.554

138

NA

3.1

Semi-Massive

stibnite with  quartz gangue

104

07SH15

(07SS180)

‘C’

Zone

253.3

253.8

0.5

0.41

9.69

0.056

922

NA

2.0

Disseminated

stibnite in quartz

105

08SH12B

(08SS166)

‘West’

Zone

180.4

180.9

0.5

0.41

6.94

0.050

1,060

0.36

0.3

Quartz

vein 8 inches thick with stibnite

106

08SH12B

(08SS168-170)

‘A’

Zone

204.1

209.0

4.9

3.62

6.99

0.107

1,936

0.36

1.0

Stibnite-bearing

quartz vein and hanging wall

107

Including

(08SS168)

‘A’

Zone

204.1

205.0

0.90

0.72

7.05

0.05

1,345

0.35

1.5

Base

of hanging wall

108

Including

(08SS170)

‘A’

Zone

208.1

209.0

0.9

0.72

20.97

0.220

10.8

0.47

<0.2

Semi-massive

stibnite vein with euhedral quartz gangue

109

08SH12B

(08SS173)

‘B’

Zone

236.3

236.8

0.5

0.40

0.40

0.030

2930

0.19

69.1

Thin,

3 inch thick quartz vein with stibnite grains

110

08SH12B

(08SS175)

‘C’

Zone

250.0

251.7

1.7

1.36

0.01

0.040

2720

0.31

10.4

Quartz

veon zone (true thickness=1.2 feet) trace stibnite.

111

08SH12B

(08SS176)

‘West

Zone’

179.8

180.4

0.6

0.41

0.01

0.029

4130

0.13

2.3

Veinlet

zone in footwall of ‘West Zone’ contains arsenopyrite and trace stibnite

112

07SH14

(07SS157-159;SR117)

‘West’

Zone

161.6

172.0

10.4

7.80

4.99

0.056

2470

NA

NA

Stibnite

stockwork vein zone

113

Including

(07SS159)

‘West’

Zone

166.2

167.6

1.4

1.05

29.23

0.224

201

NA

NA

Semi-Massive

stibnite lense

114

07SH14

(07SS166)

‘A’

Zone

208.6

209.6

1.0

0.80

6.42

0.242

7000

NA

NA

Stibnite

stockwork vein zone

115

Including

(267394)

‘A’  Zone

209.0

209.15

0.15

0.10

51.42

1.610

1100

NA

NA

Thin

massive stibnite lense

116

07SH14

(07SS168)

‘B’

Zone

240.0

240.5

0.5

0.40

8.81

0.160

621

NA

NA

Thin

stibnite stockwork vein zone

117

07SH14

(07SS169)

‘C’

Zone

257.7

258.7

1.0

0.8

0.152

0.071

5,580

NA

ND

Disseminated

Sb and As

118

08SH11

(08SS155)

‘West’

Zone

184.7

185.4

0.9

0.58

3.55

0.073

2670

0.17

2.4

Stibnite

bearing quartz vein about 5 inches

119

08SH11

(08SS156-158)

‘A’

Zone

193.0

197.0

4.0

2.56

8.12

0.184

6700

1710

0.22

0.21

7.5

3.7

Stibnite

bearing quartz vein about 2.5 feet

Sample

Control #

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/t)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

120

Including

(08SS157)

Footwall

of ‘A’ Zone

193.6

194.5

0.9

0.58

10.02

0.120

1710

0.21

3.7

Footwall

zone of ‘A’ Vein is part of system below, separated by 1.0 feet of wall rock. Abundant AsPy

121

Including

(08SS158)

‘A’

Zone

196.2

197.0

0.8

0.51

10.36

0.330

389

0.13

0.7

Main

‘A’ zone characterized by sheared fine-grained stibnite (QP)

122

08SH11

(08SS159)

‘B’

Zone

225.3

226.1

0.8

0.51

11.20

0.700

984

2.01

1.6

Quartz-stibnite

zone with 2.0 inch massive stibnite vein; As sulfides abundant in margins

123

08SH11

(08SS160)

‘C’

Zone?

275.8

276.8

1.0

0.65

11.36

0.040

7790

0.11

6.5

Quartz-stibnite

vein with 25% stibnite.

124

07SH13

(07SS140)

‘West’

Vein

38.5

39.3

0.8

0.66

2.34

0.074

>10000

NA

7.8

Thin

quartz stibnite vein 3 inches thick

125

07SH13

(07SS144)

‘A’

Zone

133.0

134.5

1.5

1.24

0.05

0.230

3740

NA

4.2

True

thickness of quartz vein is 1.2 feet stibnite vein (log notes)

126

07SH13

(07SS146-48)

‘B’

Zone

196.0

200.0

4.0

2.80

3.37

0.040

1315

7170

172

NA

5.0

Stibnite

bearing stockwork zone; core contains stibnite

127

Including

(07SS146)

‘B’

Zone

196.0

196.5

0.5

0.40

7.79

0.031

1315

NA

19.6

Stibnite

bearing stockwork zone; core contains stibnite

128

Including

(07SS148)

‘B’

Zone

199.5

200.0

0.5

0.40

19.09

0.100

172

NA

<0.2

Stibnite

bearing stockwork

129

08SH22

(08SS308)

West

of ‘West’ Zone

204.5

205.5

1.0

0.64

0.72

0.016

2100

0.07

14.6

Stockwork

vein with stibnite xtals

130

08SH22

(08SS309)

‘West’

Zone

215.0

222.0

7.0

4.00

0.46

0.017

636

0.09

10.0

Thick

zone of quartz vein stockwork with six vein zones

131

08SH22

(08SS312-313)

‘A’

Zone

226.0

227.5

1.5

1.20

13.10

0.080

1705

0.12

1.4

Quartz-stibnite

mineralization true thickness=1.2 feet

132

Including

(08SS313)

‘A’

Zone

227.5

228.0

0.5

0.35

18.97

0.120

1110

0.14

0.6

Semi-massive

stibnite core of vein

133

08SH22

(08SS318)

‘B’

Zone

252.8

253.3

0.5

0.35

0.02

0.140

>10000

0.18

20.8

Quartz-carbonate

vein zone with tr stibnite.

Sample

Control #

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/t)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

134

08SH24

(08SS333)

‘West’

Zone

99.0

100.0

1.0

0.80

19.58

0.090

703

1.73

5.7

75

degrees steep SE

135

08SH24

(08SS335)

‘A’

Zone

118.7

119.4

0.7

0.56

11.05

0.060

1285

0.85

11.8

Quartz-stibnite

zone with massive stibnite lenses 2.5 inches thick

136

08SH24

(08SS341-342)

‘B’

Zone

204.1

205.5

1.4

1.12

15.13

0.250

>10000

0.32

8.9

Thick

zone of quartz-stibnite mineralization; vertical true thickness=1.1  feet

137

Including

(08SS342)

‘B’

Zone

204.9

205.5

0.6

0.48

28.72

0.340

37.3

0.68

0.3

Semi-massive

stibnite vein about 4 inches thick

138

08SH24

(08SS343)

‘C’

Zone

265.0

267.0

2.0

1.10

0.064

0.110

>10000

0.15

57.1

Thick

quartz vein zone (true thickness=1.1 feet) with stibnite grains.

139

08SH07

(08SS100)

‘West’

Zone

171.5

172.0

0.5

0.40

3.95

0.060

4340

0.2

2.1

Quartz-stibnite

mineralized vein (3 inches)

140

08SH07

(08SS101)

Zone

not designated

175.0

175.5

0.5

0.40

3.43

0.011

773

0.2

2.1

Thin

quartz vein with stibnite

141

08SH07

(08SS102)

Zone

not designated

181.5

182.0

0.5

0.40

17.54

0.020

33.8

0.95

2.8

2.0

inch massive stibnite in two veins;

142

08SH07

(08SS104)

‘A’

Zone

185.2

185.7

0.5

0.40

11.28

0.020

102

0.9

3.1

2.0

inch massive stibnite in two veins;

143

08SH07

(08SS106)

‘A’

Zone Hanging Wall

201.0

202.0

1.0

0.80

0.03

0.300

>10000

0.29

9.9

Steep

quartz-carbonate veins with minor stibnite and arsenopyrite

144

08SH07

(08SS111)

‘B’

Zone

221.0

222.0

0.8

0.64

21.10

0.149

378

1.14

0.9

Contains

4.0 inch thick massive stibnite in quartz-stibnite zone 1.0 feet thick (visual estimate by QP)

145

08SH07

(08SS115)

‘C’

Zone?

250.0

250.5

0.5

0.40

0.01

0.040

6090

0.2

5.5

Vug-rich

quartz vein with AsPy in selvage zones

146

08SH10

(08SS147)

‘West’

Zone

90.2

91.6

1.4

1.16

4.39

0.280

5370

0.26

18.8

Thick

gold-bearing vein with isolated lenses of stibnite

147

08SH10

(08SS148)

Footwall

‘A’ Zone

104.4

105.1

0.7

0.58

4.41

0.050

6200

0.23

21.2

Quartz-carbonate

vein with minor stibnite \

Sample

Control #

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/t)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

148

08SH10

(08SS149)

‘A’

Zone

106.3

107.0

0.7

0.58

20.36

0.100

512

1.48

4.0

8

inch thick stibnite quartz vein (visual estimate by QP)

149

08SH10

(08SS150)

‘B’

Zone

188.4

189.2

0.8

0.64

25.00

0.120

112.5

1.56

3.6

8

inch thick stibnite-quartz vein with 55% Sb2S3 (visual estimate by QP)

150

08SH10

(08SS151)

‘C’

Zone

290.8

291.5

0.7

0.58

0.08

0.014

1620

0.16

5.4

Quartz

vein 3 inches thick with stibnite grains

151

08SH23

(08SS326)

‘A’

Zone

194.5

195.5

1.0

0.80

18.24

0.520

798

0.48

2.9

Quartz-stibnite

vein with 8 inches of true vein thickness

152

07SH16

(07SS183-186)

‘A’

Zone

238.1

243.1

5.0

4.15

1.79

0.045

1090

NA

3.1

Stibnite

bearing stockwork zone; core of massive stibnite zones

153

Including

(267396)

A

Zone Vein Wall

242.8

243.3

0.5

0.41

42.72

0.170

NA

NA

4.2

Massive

stibnite in core

154

07SH16

(07SS186)

‘

B’ Zone

245.3

245.8

0.5

0.41

23.24

0.030

42.7

NA

19.9

Semi-massive

stibnite  zone in larger

155

07SH16

(07SS192)

‘C’

Zone?

366.0

366.5

0.5

0.41

0.12

0.035

1510

NA

2.1

Thin

quartz vein with stibnite grains

156

08SH20

(08SS285

West

of ‘A’ Vein

212.0

217.0

5.0

4.0

0.10

0.000

41.2

0.41

18.2

Zone

of quartz veinlets with trace stibnite

157

08SH20

(08SS287)

‘A’

Vein

242.6

243.3

0.7

0.56

3.32

0.030

3250

0.11

1.0

Quartz=stibnite

vein with 10% Sb2S3

158

08SH20

(08SS291)

‘B’

Vein?

278.8

279.8

1.0

0.80

0.01

0.044

4340

0.28

46.3

Quartz-aspy

vein zone; no stibnite recognized

159

08SH20

(08SS294)

‘C’

Vein?

329.5

330.0

0.5

0.40

0.02

0.062

>10000

0.16

93.3

Quartz

aspy vein zone; no stibnite recognized

160

08SH08

(08SS119)

‘West’

Zone

347.9

348.6

0.7

0.56

5.77

2.68

>10000

0.54

8.7

4.0

inch wide massive stibnite in phyllitic schist with only minor quartz gangue

161

08SH08

(08SS122)

Footwall

of ‘A’ Zone

375.0

375.5

0.5

0.40

34.77

0.610

73.2

8.12

1.1

Massive

stibnite lense 7 inches wide (true thickness=5 inches); with 50% quartz

Sample

Control #

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/t)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

162

08SH08

(08SS123-124)

‘A’

Zone

378.4

381.2

2.8

2.25

18.29

0.183

2,919

0.41

1.1

Massive

stibnite lense 6 inches thick with 50% quartz gangue (visual estimate by QP)

163

Including

(08SS123)

Hanging

Wall ‘A’ Zone

380.0

381.2

1.2

0.96

46.02

0.050

39.8

0.42

1.1

Hanging

Wall of ‘A’ Zone contains quartz-stibnite stockwork

164

08SH08

(08SS126)

‘B’

Zone

405.2

405.7

0.5

0.40

0.03

0.014

3490

0.27

5.8

Weal

quartz vein mineralization

165

08SH19

(08SS275)

‘West’

Zone?

148.5

149.0

0.5

0.40

1.76

0.005

84.9

0.48

4.3

Weak

quartz stibnite vertical  vein

166

08SH19

(08SS281-283)

‘A’

Zone

217.0

219.5

2.5

2.07

19.13

0.138

2750

13.1

0.28

4.28

2.3

0.3

Wide

zone of stibnite-Quartz stockwork mineralization

167

Including

(08SS281)

‘A’

Zone  Footwall

217.0

217.5

0.5

0.41

22.75

0.030

26.7

0.92

0.3

Two

1.0 inch thick massive stibnite-quartz  veins

168

Including

(08SS283)

Main

‘A’ Zone

218.5

219.5

1.0

0.83

34.61

0.350

13.1

4.28

0.3

Two

stibnite + quartz veins with 3 flecks of visible gold (visual estimate by QP)

169

08SH29

(08SS355)

‘A’

Zone

347.0

348.0

1.0

0.83

0.02

0.000

146

0.01

32

Quartz-carbonate

vein with trace stibnite—Sb not reflected in assay results

170

08SH21

(08SS301)

Footwall

to ‘A’ Zone

305.0

305.5

0.5

0.40

16.96

0.040

263

0.24

0.5

Stibnite

plus quartz euhedral vein; cuts schist vertically

171

08SH21

(08SS302)

Main  ’A’

Zone

305.5

307.0

1.5

1.20

63.47

0.080

3.1

3.65

<0.2

Massive

stibnite 13 inches true thickness—no gangue; most impressive zone observed

172

08SH21

(08SS305)

Hanging

Wall to ‘A’ Zone

312.7

313.5

0.7

0.56

30.20

0.410

101

8.46

0.2

Quartz-stibnite

vein; same pattern  as 08SH08

173

08SH21

(08SS306)

‘B’

Zone

317.0

317.7

0.7

0.56

27.10

0.190

72.7

0.54

0.4

Vertical

quartz-stibnite vein

174

08SH21

(08SS307)

‘B’

Zone

317.7

318.7

1.0

0.80

4.85

0.020

2150

0.17

13.8

Disseminated

zone in hanging wall.

Sample

Control #

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/t)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

175

08SH25

(08SS346)

‘West’

Zone?

40.8

41.3

0.5

0.41

1.07

0.040

>10000

0.3

120

Quartz

vein with disseminated stibnite and >3% arsenopyrite

176

08SH25

(08SS351)

‘A’

Zone

374.8

376.5

1.7

1.41

43.20

2.860

367

1.81

0.5

Massive

stibnite with no gangue—additional quartz in selvages;   70 % Sb2S3 and the rest quartz (visual estimate by QP)

177

08SH25

(08SS352-353)

Hanging

Wall of ‘A’ Zone

376.5

378.5

2.0

1.66

4.46

0.140

3080

0.41

7.4

A

total of four (4) stibnite-quartz veins each about 1.5 inches thick; with arsenopyrite

178

Including

08SS352

Hanging

Wall of ‘A’ Zone

376.5

377.0

0.5

0.41

4.45

0.214

5630

0.35

15.6

Gold

enriched portion of wider intersection

179

08SH31

(08SS369)

‘West’

Zone

272.0

273.5

1.5

1.09

0.010

0.090

>10000

0.09

3.3

Weak

quartz vein mineralization with trace stibnite.

180

08SH26

(08SS398)

Footwall

of ‘A’ Zone

334.5

335.0

0.5

0.37

1.04

0.260

>10000

0.09

3.6

Several

quartz-sulfide veins with stibnite veins

181

08SH26

(08SS399)

Interpreted

‘A’ Zone

337.0

337.5

0.5

0.37

3.59

0.070

6700

0.14

7.2

Quartz-stibnite

vein with about 10% stibnite

182

08SH26

(08SS400)

Hanging

Wall ‘A’ Zone

340.5

341.0

0.5

0.37

4.91

0.030

3250

0.13

52.7

Quartz-stibnite

vein zone with 12-14% Sb2S3

183

08SH26

(08SS403)

‘B’

Zone?

352.0

359.0

7.0

5.11

0.01

Trace

82.4

0.04

5.6

Swarm

of quartz veins with isolated grains of stibnite.

184

08SH09

(08SS138)

‘A’

Zone

346.4

347.4

1.0

0.80

5.85

0.090

3020

0.51

3.1

Quartz-stibnite

vein with about 10% Sb2S3; (visual estimate by QP)

185

08SH09

(08SS139)

‘A’

Zone Hanging Wall

350.5

351.2

0.7

0.56

0.01

0.084

5890

0.33

2.4

Quartz

vein with trace stibnite

Sample

Control #

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/t)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

187

08SH27

(08SS407)

‘A’

Zone

346.0

347.0

1.0

0.80

0.01

0.010

3860

0.07

36.6

Quartz

vein with isolated grains of stibnite and 0.35% arsenic

188

09SH01

(09SS01)

‘B’

Zone

114.2

114.8

0.6

0.50

13.90

0.071

475

0.79

0.50

One

inch wide massive quartz-stibnite vein with 80% stibnite

189

09SH01

(09SS02)

‘A’

Zone Hanging Wall

178.2

181,1

2.9

2.40

0.03

0.058

6,310

0.22

4.1

Vuggy

coarse quartz veins with trace disseminated sulfides

190

09SH01

(09SS03)

‘A’

Zone

181.1

182.0

0.9

0.75

<0.01

0.072

7,730

0.25

2.5

Dense

quartz vein swarm with trace stibnite and arsenopyrite

191

09SH01

(09SS04)

West

Zone

189.9

190.6

0.7

0.58

0.07

0.126

6,680

0.27

8.9

3.25

inch thick vuggy quartz-stibnite vein

192

09SH02

(09SS019)

‘A’

Zone

160.3

162.0

1.7

1.36

5.64

0.035

2,310

0.27

0.9

Quartz

carbonate stibnite stockwork

193

09SH02

(09SS020)

‘A’

Zone Hanging Wall

162.0

162.9

0.9

0.72

0.18

0.035

4,560

0.37

15.6

Quartz-stibnite

breccias vein; analytical  Sb content lower than visual in core

194

09SH02

(09SS021)

‘A’

Zone Hanging Wall

162.9

164.6

1.7

1.36

3.05

0.042

3,790

0.40

29.1

Two

vertical quartz-stibnite veins 0.75 inches thick; 0.30 foot carbonate vein

195

09SH03

(09SS035

‘A’

Zone hanging wall

164.1

164.6

0.5

0.40

0.35

0.012

NA

NA

NA

3/8

inch qtz +Sb; 30% stibnite—over-drilled

196

09SH03

(09SS036)

‘A’

Zone

168.0

168.6

0.6

0.40

0.80

0.019

NA

NA

NA

<1/2

inch qtz-Sb; 80% stibnite-over -drilled

197

09SH04

(09SS039-040)

‘B’

Zone

145.0

148.7

3.7

2.75

1.57

0.169

5,130

0.90

2.6

Quartz-carbonate

veins and quartz-stibnite breccias—contamination from hanging wall

198

09SH04

(09SS047)

‘A’

Zone

193.6

195.8

2.2

1.62

3.71

0.002

415

0.24

3.4

Abundant

quartz carbonate stibnite veins

199

09SH04

(09SS048)

‘A’

Zone

195.8

196.3

0.5

0.37

1.65

0.190

2,170

0.37

15.7

Similar

to 09SS047 but more disseminated arsenopyrite

Sample

Control #

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/t)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

200

09SH05

(09SH022)

‘A’

Zone

276.2

276.7

0.5

0.30

47.29

0.217

2.9

1.16

0.7

Hanging

wall of massive stibnite vein; arsenopyrite in hanging wall (see cover photo)

201

09SH05

(09SS023)

‘A’

Zone

276.7

278.3

1.6

1.30

69.21

0.251

<0.1

1.63

0.2

Massive

stibnite vein (see cover photo)

202

09SH05

(09SS024)

‘A’

Zone

278.3

278.8

0.5

0.30

39.53

0.389

17.9

0.79

1.3

Footwall

contact zone containing massive stibnite arsenopyrite

203

09SH06

(09SS054)

‘A’

Zone

214.3

215.3

1.0

0.75

36.24

0.061

12.3

15.70

0.4

Massive

stibnite  up to 3 inches thick within sheared carbonate-stibnite vein swarms

204

09SH07

(09SS058)

‘A’

Zone Hanging wall

216.2

217.0

0.9

0.62

34.00

0.648

45.7

3.74

0.2

Quartz-stibnite

veins, locally massive

205

09SH07

(09SS059)

‘A’

Zone

218.0

219.6

1.6

0.93

47.97

0.780

3.6

7.02

2.9

One

foot wide massive stibnite-quartz vein with fine grained sheared stibnite

206

09SH08

(09SS060)

‘A’

Zone

278.6

279.7

1.1

0.64

55.38

0.566

<0.1

12.15

0.7

0.64

feet wide (true width) massive stibnite vein with 85% massive stibnite

207

09SH09

(09SS063)

Hanging

wall of ‘A’ Zone

165.5

166.5

1.0

0.83

0.09

0.060

5,800

0.27

3.4

Quartz-stibnite

stockwork veins; more visual stibnite than analytical Sb (discrepancy?)

208

09SH09

(09SS064-065)

‘A’

Zone

169.0

172.3

3.3

2.00

2.20

0.090

8,380

0.26

14.5

Broken,

chaotic quartz-stibnite vein zone with Sb veins 0.5-1.5 inches.  True width is 2.0 ft; part of larger chaotic zone 6.8

feet wide (from 165.5-172.3

APPENDIX II Summary of Relevant Sample Data Used in Calculation

of Inferred Sb and Au Resources from Pringle Bench that are described in this Technical Report.

Sample

Control

#

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/ton)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

1

Trench

I

(07112-07113)

West

of ‘West’ Zone

90.2

95.1

4.9

4.9

14.64

0.030

NA

NA

NA

Multiple

thin stibnite quartz veins vertical

2

Trench

I

(0715)

‘West’

Zone

100.6

102.7

2.1

2.1

26.23

0.230

NA

NA

NA

Semi-massive

stibnite-quartz vein; vertical

3

Trench

I

(07120)

‘A’

Zone

132.2

133.4

1.2

1.2

30.03

0.044

NA

NA

NA

Trench

exposure shows vertical vein

4

Trench

I

(0714)

‘B’

Zone

157.4

163.3

5.9

5.9

30.35

0.035

NA

NA

NA

Semi-massive

stibnite in quartz vein about 1.5 feet

5

Trench

I

(07129)

‘C’

Zone

189.6

190.2

0.6

0.6

22.92

0.040

NA

NA

NA

Thin,

semi-massive stibnite quartz vein

6

Trench

I

(07159)

East

of ‘C’ Zone

428.0

428.2

0.2

0.2

48.07

0.020

NA

NA

NA

Massive

stibnite near vertical gash vein with <5.0% quartz

7

Trench

I

(07166)

East

of ‘C’ Zone

472.3

472.6

0.3

0.3

59.52

0.010

NA

NA

NA

Massive

stibnite near vertical gash vein with <5.0% quartz

8

Trench

I

(07176)

East

of ‘C’ Zone

540.2

540.4

0.2

0.2

64.76

0.010

NA

NA

NA

Massive

stibnite near vertical gash vein with <5.0% quartz

9

07SH08

(07SS71-73)

‘B’

Zone

45.0

46.5

1.5

1.25

5.62

0.069

NA

NA

NA

Vertical

stibnite-quartz vein

10

Including

(07SS71)

‘B’

Zone

45.0

45.5

0.5

0.42

12.60

0.140

NA

NA

NA

Vertical

stibnite-quartz vein

11

07SH08

West

Zone?

147.0

148.0

1.0

0.83

0.31

0.052

NA

NA

NA

Disseminated

stibnite with arsenopyrite

12

07SH08

(07SS75)

‘A’

Zone

78.25

79.25

1.0

0.80

40.80

0.212

NA

NA

NA

Nearly

massive stibnite in quartz gangue

13

07SH09

(07SS90)

‘B’

Zone

46.75

47.75

1.0

0.83

8.78

0.020

NA

NA

NA

Vertical

stibnite-quartz vein; twinned from 07SH08

14

07SH09

(07SS93)

‘A’

Zone

80.0

80.5

0.5

0.42

33.51

0.391

NA

NA

NA

Nearly

massive stibnite in quartz gangue twinned

15

07SH09

‘West’

86.0

86.5

0.5

0.42

10.78

0.044

NA

NA

NA

Disseminated

stibnite

Sample

Control

#

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/ton)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

16

Trench

M

(07M08-07M10)

‘West’

Zone

114.8

116.9

2.1

2.10

19.90

0.035

NA

NA

NA

‘West’

Zone of semi-massive stibnite plus quartz; true thickness=0.7 feet

17

Trench

M

(07M13)

‘A’  Zone

121.4

127.9

6.5

6.50

35.11

0.000

NA

NA

NA

Semi-massive

stibnite in phyllite gangue zone

18

Trench

M

(07M17)

‘B’

Zone

127.9

141.0

13.1

13.1

1.45

0.020

NA

NA

NA

Continuous

chip through Sb-bearing veinlet zone.

19

07SH07

(07SS49)

‘B’

Zone

30.0

31.0

1.0

0.83

7.11

0.023

NA

NA

NA

About

12% stibnite in euhedral quartz gangue

20

07SH07

(07SS52)

‘A’

Zone

65.0

66.0

1.0

0.83

14.88

0.338

NA

NA

NA

Interpreted

‘A’ Zone of semi-massive stibnite plus quartz mineralization; true thickness=0.7 feet

21

07SH07

(07SS61)

‘West’

Zone

132.5

133.0

0.5

0.42

0.29

0.022

NA

NA

NA

Stibnite

in quartz vein

22

07SH06

‘A’

Zone

18.3

19.3

1.0

0.83

60.03

<0.005

NA

NA

NA

Massive

stibnite lense  6 inches thick

23

07SH06

(07SS44)

‘West

Zone’

36.8

37.3

0.5

0.42

8.28

0.028

NA

NA

NA

Disseminated

stibnite in quartz carbonate vein

24

07SH06

(07SS46)

‘West

Zone”

42.0

42.5

0.5

0.42

6.88

<0.005

NA

NA

NA

Disseminated

stibnite in quartz carbonate vein

25

07SH05

(07R548)

West

Zone

112.0

115.0

3.0

2.22

2.97

<0.005

NA

NA

NA

Silicified

zone with disseminated stibnite

26

07SH02

(07SS15)

‘A’

Zone

39.5

40.5

1.0

0.83

19.56

0.020

NA

NA

NA

Quartz-stibnite

vein with thermal metamorphic textures (6 inches thick; QP examination)

27

07SH02

(07SS18)

‘West’

Zone

51.5

52.5

1.0

0.83

0.21

0.015

NA

NA

NA

Disseminated

stibnite in quartz vein; with arsenopyrite

28

Trench

‘D’

(06ST001-002)

‘West’

Zone

67.0

67.5

0.5

0.50

27.86

0.090

NA

NA

NA

High

angle, semi-massive stibnite veins (3) in schist

Sample

Control

#

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/ton)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

29

Trench ‘D’

(06ST030-032)

‘A’

Zone

85.0

86.5

1.5

1.50

14.95

0.037

NA

NA

NA

Disseminated

stibnite in quartz vein; with arsenopyrite

30

07SH02

(07SS24-25)

West

Sb-Au vein

183.5

187.5

4.0

2.5

1.05

0.019

NA

NA

NA

Wide

zone with vein zone about 2.5 feet in true thickness; stibnite disseminations in quartz

31

Including

(07SS24)

West

Sb-Au vein

183.5

186.5

3.0

2.0

1.70

0.017

NA

NA

NA

Vein

zone about 2.0 feet in true thickness; stibnite disseminations in quartz

32

07SH04

(07SS30)

West

Zone

108.5

109.0

0.5

0.42

6.05

0.004

NA

NA

NA

Disseminated

stibnite in thin quartz zone quartz

33

07SH03

(07SS219)

‘A’

Zone

17.5

18.4

0.9

0.75

3.83

0.054

NA

NA

NA

Quartz-stibnite

vein with thermal metamorphic textures (6 inches thick; QP examination)

34

07SH03

(07SS220)

West

Zone

34.6

35.1

0.5

0.50

0.84

0.005

NA

NA

NA

Disseminated

stibnite in thin quartz zone quartz

35

Trench F

(06ST061)

West

of ‘West’ Zone

200.0

200.3

0.3

0.30

20.18

0.748

NA

NA

NA

Steep,

stibnite-quartz vein

36

Trench F

(06ST063)

‘West’

Zone

315.0

315.3

0.3

0.30

8.43

0.090

NA

NA

NA

Steep,

stibnite-quartz vein

37

Trench F

(06ST066)

‘A’

Zone

350.0

350.3

0.3

0.30

17.42

0.120

NA

NA

NA

Quartz-stibnite

vein with thermal metamorphic textures (6 inches thick; QP examination);

Definitive observation

for ‘A’ Zone

38

Trench F

(06ST071)

‘C’

Zone

435.0

435.3

0.3

0.30

46.33

0.040

NA

NA

NA

Thin

stibnite vein in schist

39

06SH01

(06SH153)

‘A’

Zone

275.0

280.0

5.0

4.15

2.50

0.050

NA

NA

NA

RC

Program with stibnite-quartz zone identified.

40

06SH01

(06SH150)

‘B’

Zone

250.0

255.0

5.0

4.15

0.93

0.030

NA

NA

NA

Disseminated

stibnite in thin quartz zone

41

09SH11

(09SS077)

West

Zone

10.7

11.4

0.7

0.58

38.51

0.807

36.2

1.51

1.7

Massive

stibnite 0.5 feet thick

42

06STO30-032)

Trench

H

West

Zone

85.0

86.5

1.50

1.50

14.90

0.050

NA

NA

NA

Continuous

Chip

Sample

Control

#

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/ton)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

43

09SH11

(09SS078)

‘A’

Zone

29.0

30.0

1.0

0.83

10.25

0.122

1,120

0.12

2.2

Quartz-stibnite

vein 0.6 feet of a 1.5 foot vein of massive stibnite recovered

44

09SH12

(09SS080)

Footwall

‘A’ Zone

17.0

17.5

0.5

0.42

7.20

0.041

3,370

0.23

0.4

Broken

quartz-stibnite vein

45

09SH12

(09SS081)

‘A’

Zone

20.0

21.5

1.5

1.25

32.10

0.052

39.9

0.34

0.2

One

foot of massive stibnite and 0.5 feet of stibnite-quartz stockwork

46

09SH13

(09SS085)

‘A’

Zone

233.0

237.8

4.8

2.78

8.91

0.045

1,260

0.33

2.1

Two

foot wide (true width) zone of braided quartz-stibnite veins

47

09SH14

(09SS086)

‘B’

Zone

43.2

44.7

1.5

1.25

36.60

0.008

0.7

0.18

4.3

0.3

foot wide quartz-stibnite vein with 50% fine grained sheared stibnite—like ‘A’ Zone

48

09SH14

(09SS088)

‘A’

Zone

112.5

113.5

1.0

0.83

50.94

0.019

1.2

2.44

1.2

Massive

stibnite with oxidation--kermesite

49

09SH14

(09SS089)

West

Zone

129.5

130.0

0.5

0.30

6.94

0.011

1,430

0.21

3.6

Braided

quartz-stibnite vein swarm

50

09SH15

(09SS092)

‘B’

Zone

13.0

13.7

0.7

0.41

15.25

0.156

2,170

0.22

1.6

Sheared

quartz-stibnite zone possible caught in fault zone

51

09SH15

(09SS095)

‘A’

Zone hanging wall

156.0

157.0

1.0

0.58

3.32

0.057

7,880

0.30

61.1

Two

parallel quartz-stibnite veins with semi-massive stibnite

52

09SH15

(09SS096)

‘A’

Zone

162.5

163.5

1.0

0.58

35.48

0.030

75.3

0.46

1.3

One

foot wide zone of quartz-stibnite mineralization; 4 inches massive stibnite--sheared

53

09SH16

(09SS098)

‘A’

Zone branch

152.0

153.0

1.0

0.74

8.20

0.015

1,110

0.24

3.5

Over-drilled

quartz-stibnite vein

54

09SH16

(09SS099)

‘A’

Zone

156.0

157.0

1.0

0.74

10.16

0.039

2,210

0.49

7.9

Broken

quartz-stibnite vein

55

09SH16

(09SS100)

West

Zone

160.5

161.5

1.0

0.74

5.77

0.071

8,290

1.04

18.2

0.3

feet quartz-stibnite vein

56

09SH18

(09SS116-117)

‘A’

Zone hanging wall

72.5

74.5

2.0

1.33

3.30

0.009

990

0.15

14.1

Quartz-carbonate

stibnite veins in hanging wall of ‘A’ zone

Sample

Control

#

Drill

Hole #

(Assay

Intervals)

Underground

or Surface

Channels

Stibnite

Target

Vein Zone

From

(feet)

To

(feet)

Width

(feet)

Estimated

True

Width

Sb

(%)

Au

(oz/ton)

As

(ppm)

Hg

(ppm)

Pb

(ppm)

Brief

Description

57

09SH18

(09SS109)

‘A’

Zone

74.5

75.5

1.0

0.66

37.73

5.72

6.9

0.32

<0.2

Quartz-stibnite

vein with coarse visible gold, 0.8 feet true thickness

58

09SH18

(09SS122-123)

West

Zone

109.5

111.5

2.0

1.33

4.11

0.016

NA

NA

NA

Braided

quartz stibnite veinlets

59

09SH19

(09SS132)

‘A’

Zone

173.8

174.7

0.9

0.50

32.50

0.330

34.2

0.85

0.6

Semi-massive

stibnite with granoblastic textures

60

09SH19

(09SS137)

West

Zone

215.5

216.5

1.0

0.52

7.95

0.033

1,635

0.27

10.7

Braised

quartz-antimony vein stockwork

61

09SH20

(09SS148)

‘A’

Zone

205.5

206.5

1.0

0.50

2.74

1.690

8.560

0.30

11.2

Quartz-carbonate-stibnite

vein with visible gold

62

09SH20

(09SS150)

‘A’

Zone footwall

223.0

224.0

1.0

0.50

11.48

0.044

NA

NA

NA

Massive

stibnite-quartz zones to 6 inches; with carbonate

63

09SH20

(09SS152)

Offset?

‘A’ Zone footwall

272.0

273.0

1.0

0.50

11.08

0.055

NA

NA

NA

Massive

stibnite-quartz zones to 6 inches; with carbonate

64

09SH20

(09SS155)

West

Zone

324.5

325.5

1.0

0.50

27.29

0.010

42

0.34

1.0

Massive

stibnite-quartz zones to 6 inches; with carbonate

65

09SH20

(09SS156)

West

Zone extension

335.0

338.0

3.0

1.74

9.75

0.135

1,675

039

8.1

Numerous

braided quartz-stibnite veinlets within 2.5 foot true thickness zone; interpreted  offset

66

Channel

Sample in Trench H; (07H03)

‘A’

Zone

33.0

49.2

16.2

16.2

8.74

5.56

NA

NA

NA

Wide

“A’ zone channel sampled—suspect analysis rejected

EX-99.2 — EXHIBIT 99.2

EX-99.2

Filename: tm2628217d1_ex99-2.htm · Sequence: 4

Exhibit 99.2

United States Antimony Announces Completion

of New

Technical Report on Nolan Creek, Alaska Gold/Antimony

Deposit

Measured and Indicated Resource Value Exceeds

$314 Million

Inferred Resource Value Exceeds $125 Million

Mining Operations Commenced Earlier this

Month

“The Critical

Minerals and ZEO Company”

~ Antimony, Gold,

Tungsten, and Zeolite ~

DALLAS,

TX / ACCESS Newswire / October 21, 2026 / United States Antimony Corporation (“USAC,” “US Antimony,”

or the “Company”), (NYSE: UAMY) (NYSE Texas: UAMY), a leading producer and processor of antimony, zeolite, and other critical

minerals, and the only fully integrated antimony company in the free world outside of China and Russia, announced today the completion

of a new Technical Report defining the gold-antimony resources on its 100% owned Nolan Creek Property located in northern Alaska. The

Technical Report, compliant with SEC S-K 1300 Regulations will be filed with the SEC under a Form 8-K today. This Technical Report

was authored by Mr. Thomas K. Bundtzen, President of Pacific Rim Geological Consulting, Inc recognized as a Qualified Person

in accordance with the S-K 1300 Regulations.

Nolan Creek (Antimony & Gold)

The company acquired the Nolan Creek BLM Claims

through a Trustee's Sale at the Courthouse steps in a public auction on January 30, 2026, after identifying the property and region

as having high potential for hosting antimony as well as gold deposits. The Nolan Creek deposit is located approximately 175 miles north

of Fairbanks, Alaska. The property was previously owned by a private company who conducted exploration and mining of both placer and lode

targets from both surface and from an underground operation more than twenty years ago. Management of US Antimony chose to further expand

the claim package by purchasing Alaskan State Claims (shown in green below) over the wider area to capture the region’s full potential.

The dark grey areas represent individual placer claim holders in the area. The region was predominately open since the last commercial

miner in the area abandoned the Nolan Creek region when gold prices were significantly depressed.

Resource Tables

Considering the economic potential of Nolan Creek,

USAC is using $4,000/oz gold price and $8.30/lb antimony price. Currently all planned operations are within the lode claims. The existing

exploration drift intersects the highest confidence material: measured and indicated. Phase 2 of the operation, after the bulk sample,

will continue to target this M&I material which has a current insitu value of $233.9M from contained antimony and $79.9M from contained

gold (before mining, transporting and processing costs and before recovery).

Resource Value

Sb - $8.30/lb

Au - $4000/oz

Classification

Measured & Indicated Lode ($k)

$ 233,877.4

$ 79,872.0

$ 313,749 MM

Inferred Lode ($k)

$ 78,161.1

$ 47,010.0

$ 125,171 MM

Grand Total

$ 438,920 MM

*Before mining, transporting and processing costs

**Before process recovery

In 2006, the previous owner collared an exploration

adit and excavated 570 linear feet of 12 foot x12 foot exploration drifts and crosscuts. These headings intercepted three parallel veins

of high-grade antimony containing gold as a secondary metal

The adit, collared near the bottom of a hillside,

connects to the antimony/gold vein structures via horizontal headings sufficiently large to provide access for modern mobile underground

equipment. We anticipate that the exploration drifts and crosscuts can be extended to provide immediate access to multiple ore faces.

In the first half of 2027, we plan to demonstrate that the site has the capability to fully meet our Radersburg, Montana name plate mill

feed capacity using long hole open stope mining methods. Our contractor’s personnel have previous experience in utilizing mechanized

longhole mining methods for production from narrow vein deposits.

Earlier this year, the company hosted pre-bid

underground site inspection tours by two internationally recognized mining contractors in preparation for their submission of tenders

in mid-August, for underground development and mining of this high-grade material. One third party contractor was selected, and mining

operations began this month with an excavation of an exploration bulk sample of approximately 1,000 tons. Our third-party contractor has

mobilized equipment and personnel to the site and with the goal of having their crews operating two shifts daily by the end of October.

Additionally, USAC has engaged an experienced

underground mining geologist to work on site to map the geology and assist in minimizing dilution of this high-grade antimony/gold resource.

USAC has recently contracted a local Alaskan transportation

company to deliver the bulk sample to our floatation mill facility located in Radersburg, Montana. The intention is to verify the overall

economics and practicality of producing antimony trisulphide meeting military specifications and to satisfy other existing antimony market

demands in 2027.

Commenting on this

announcement today, Mr. Gary C. Evans, Chairman and CEO of USAC, stated, “This is another example of USAC’s “fast

track” approach to mining methods. Having only acquired this property earlier this year, and operating in a weather environment

that is difficult at best, we will be moving approximately 1,000 tons of lode ore (antimony and gold) from the underground mine for processing

to our in-house flotation mill located in Radersburg, Montana, in preparation for sales during the months of November and December this

year. This shipment will represent our first antimony delivered from our exploration efforts in Alaska to Montana for processing.”

Commenting further on the Nolan Creek activities,

Mr. Joseph Bardswich, P.E., Executive Vice President and Chief Mining Engineer, stated “We were very fortunate to have acquired

this quality of a property earlier this year at such a nominal price. We were successful at solving prior existing environmental issues,

acquiring additional leases around the prospect, making repairs on a 7 mile road owned by the state in an effort to make it usable, acquiring

and moving to the site a “man camp, contracting an experienced mining contracting firm who are already underground performing mining

operations today, negotiating the transport of material to Montana during the middle of winter, with all of this done in less than 12

months! These actions are representative of the quality and perseverance of the personnel that US Antimony has attracted within our organization.”

About USAC:

United States Antimony Corporation and its subsidiaries

in the U.S., Mexico, and Canada ("USAC," “U.S. Antimony,” the "Company," "Our," "Us,"

or "We") sell antimony, zeolite, and precious metals primarily in the U.S., Mexico, and Canada. The Company mines, purchases,

and processes ore primarily into antimony oxide, antimony metal, antimony trisulfide, and precious metals at its facilities located in

Montana and Mexico. Antimony oxide is used to form a flame-retardant system for plastics, rubber, fiberglass, textile goods, paints, coatings,

and paper, as a color fastener in paint, and as a phosphorescent agent in fluorescent light bulbs. Antimony metal is used in bearings,

storage batteries, and ordnance. Antimony trisulfide is used as a primer in ammunition. The Company also recovers precious metals, primarily

gold and silver, at its Montana facility from third party ore. At its Bear River Zeolite (“BRZ”) facility located in Idaho,

the Company mines and processes zeolite, a group of industrial minerals used in water filtration, sewage treatment, nuclear waste and

other environmental cleanup, odor control, gas separation, animal nutrition, soil amendment and fertilizer, and other miscellaneous applications.

Beginning in 2024 and continuing in 2025, the Company acquired mining claims, real properties (patented claims) and leases located in

Alaska, Montana, and Ontario, Canada in an effort to reduce the cost of third-party antimony ore purchases and to expand its product offerings.

Learn more about

United States Antimony Corporation at www.usantimony.com.

Forward-Looking Statements:

This press release contains forward-looking statements

within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, statements regarding the Company’s

future operations, production levels, financial performance, business strategy, market conditions, demand for antimony, zeolite, other

critical minerals, and precious metals, expected costs, and other statements that are not historical facts. These statements are based

on current expectations, estimates, forecasts, and projections about the industries in which the Company operates, as well as management’s

beliefs and assumptions. Words such as “anticipates,” “expects,” “intends,” “plans,” “believes,”

“seeks,” “estimates,” “may,” “will,” “should,” “could,” and variations

of these words or similar expressions are intended to identify such forward-looking statements.

Forward-looking statements are subject to certain

risks and uncertainties that could cause actual results to differ materially from those indicated in such statements, including, but not

limited to: fluctuations in the market prices and demand for antimony and zeolite; changes in domestic and global economic conditions;

operational risks inherent in mining and mineral processing; geological or metallurgical conditions; availability and cost of energy,

equipment, transportation, and labor; the Company’s ability to maintain or obtain permits, licenses, and regulatory approvals; changes

in environmental and mining laws or regulations; competitive factors; the impact of geopolitical developments; and the effects of weather,

natural disasters, or health pandemics on operations and supply chains. Additional information regarding risk factors that could cause

actual results to differ materially is included in the Company’s filings with the U.S. Securities and Exchange Commission, including

its Annual Report on Form 10-K and Quarterly Reports on Form 10-Q.

The Company undertakes no obligation to publicly

update or revise any forward-looking statements, whether as a result of new information, future events, or otherwise, except as required

by law. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date hereof.

Investor Relations Contact:

Media Relations Contact:

Jonathan Miller, VP, Investor Relations

Anthony D. Andora

4438 W. Lovers Lane, Unit 100

Edge Consulting, Inc.

Dallas, Texas 75209

1560 Market Street, Ste. 701

E-Mail: Jmiller@usantimony.com

Denver, Colorado 80202

Phone: 406-606-4117

E-Mail: Anthony@EdgeConsultingSolutions.com

Phone: 720-317-8927

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex23-1img001.jpg · Sequence: 5

Binary file (3820 bytes)

Download tm2628217d1_ex23-1img001.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-2img001.jpg · Sequence: 6

Binary file (8198 bytes)

Download tm2628217d1_ex99-2img001.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-2img002.jpg · Sequence: 7

Binary file (68165 bytes)

Download tm2628217d1_ex99-2img002.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-2img003.jpg · Sequence: 8

Binary file (55165 bytes)

Download tm2628217d1_ex99-2img003.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp1img001.jpg · Sequence: 13

Binary file (30643 bytes)

Download tm2628217d1_ex99-1sp1img001.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp2img001.jpg · Sequence: 14

Binary file (93728 bytes)

Download tm2628217d1_ex99-1sp2img001.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp2img002.jpg · Sequence: 15

Binary file (20514 bytes)

Download tm2628217d1_ex99-1sp2img002.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp2img003.jpg · Sequence: 16

Binary file (105871 bytes)

Download tm2628217d1_ex99-1sp2img003.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp2img004.jpg · Sequence: 17

Binary file (25991 bytes)

Download tm2628217d1_ex99-1sp2img004.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp2img005.jpg · Sequence: 18

Binary file (35336 bytes)

Download tm2628217d1_ex99-1sp2img005.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp2img006.jpg · Sequence: 19

Binary file (71584 bytes)

Download tm2628217d1_ex99-1sp2img006.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp2img007.jpg · Sequence: 20

Binary file (33791 bytes)

Download tm2628217d1_ex99-1sp2img007.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp2img008.jpg · Sequence: 21

Binary file (30466 bytes)

Download tm2628217d1_ex99-1sp2img008.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp2img009.jpg · Sequence: 22

Binary file (33344 bytes)

Download tm2628217d1_ex99-1sp2img009.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp2img010.jpg · Sequence: 23

Binary file (143739 bytes)

Download tm2628217d1_ex99-1sp2img010.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp2img011.jpg · Sequence: 24

Binary file (54824 bytes)

Download tm2628217d1_ex99-1sp2img011.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp2img012.jpg · Sequence: 25

Binary file (124223 bytes)

Download tm2628217d1_ex99-1sp2img012.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp3img01.jpg · Sequence: 26

Binary file (99079 bytes)

Download tm2628217d1_ex99-1sp3img01.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp3img02.jpg · Sequence: 27

Binary file (40306 bytes)

Download tm2628217d1_ex99-1sp3img02.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp3img03.jpg · Sequence: 28

Binary file (30612 bytes)

Download tm2628217d1_ex99-1sp3img03.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp3img04.jpg · Sequence: 29

Binary file (27552 bytes)

Download tm2628217d1_ex99-1sp3img04.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp3img05.jpg · Sequence: 30

Binary file (26566 bytes)

Download tm2628217d1_ex99-1sp3img05.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp3img06.jpg · Sequence: 31

Binary file (101256 bytes)

Download tm2628217d1_ex99-1sp3img06.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp3img07.jpg · Sequence: 32

Binary file (50404 bytes)

Download tm2628217d1_ex99-1sp3img07.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp3img08.jpg · Sequence: 33

Binary file (24617 bytes)

Download tm2628217d1_ex99-1sp3img08.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp3img09.jpg · Sequence: 34

Binary file (81974 bytes)

Download tm2628217d1_ex99-1sp3img09.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp3img10.jpg · Sequence: 35

Binary file (31626 bytes)

Download tm2628217d1_ex99-1sp3img10.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp3img11.jpg · Sequence: 36

Binary file (39611 bytes)

Download tm2628217d1_ex99-1sp3img11.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp3img12.jpg · Sequence: 37

Binary file (30000 bytes)

Download tm2628217d1_ex99-1sp3img12.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp3img13.jpg · Sequence: 38

Binary file (32290 bytes)

Download tm2628217d1_ex99-1sp3img13.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp3img14.jpg · Sequence: 39

Binary file (27301 bytes)

Download tm2628217d1_ex99-1sp3img14.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img027.jpg · Sequence: 40

Binary file (24346 bytes)

Download tm2628217d1_ex99-1img027.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img028.jpg · Sequence: 41

Binary file (298048 bytes)

Download tm2628217d1_ex99-1img028.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img029.jpg · Sequence: 42

Binary file (107394 bytes)

Download tm2628217d1_ex99-1img029.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img030.jpg · Sequence: 43

Binary file (41579 bytes)

Download tm2628217d1_ex99-1img030.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img031.jpg · Sequence: 44

Binary file (382841 bytes)

Download tm2628217d1_ex99-1img031.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img063.jpg · Sequence: 45

Binary file (97215 bytes)

Download tm2628217d1_ex99-1img063.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img032.jpg · Sequence: 46

Binary file (22723 bytes)

Download tm2628217d1_ex99-1img032.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img033.jpg · Sequence: 47

Binary file (84582 bytes)

Download tm2628217d1_ex99-1img033.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img034.jpg · Sequence: 48

Binary file (207654 bytes)

Download tm2628217d1_ex99-1img034.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp5img001.jpg · Sequence: 49

Binary file (45900 bytes)

Download tm2628217d1_ex99-1sp5img001.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp5img002.jpg · Sequence: 50

Binary file (36722 bytes)

Download tm2628217d1_ex99-1sp5img002.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp5img003.jpg · Sequence: 51

Binary file (22091 bytes)

Download tm2628217d1_ex99-1sp5img003.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp5img004.jpg · Sequence: 52

Binary file (15563 bytes)

Download tm2628217d1_ex99-1sp5img004.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp5img005.jpg · Sequence: 53

Binary file (251328 bytes)

Download tm2628217d1_ex99-1sp5img005.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp5img006.jpg · Sequence: 54

Binary file (189637 bytes)

Download tm2628217d1_ex99-1sp5img006.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp5img007.jpg · Sequence: 55

Binary file (116681 bytes)

Download tm2628217d1_ex99-1sp5img007.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1sp5img008.jpg · Sequence: 56

Binary file (98744 bytes)

Download tm2628217d1_ex99-1sp5img008.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1imgsp0601.jpg · Sequence: 57

Binary file (188100 bytes)

Download tm2628217d1_ex99-1imgsp0601.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1imgsp0602.jpg · Sequence: 58

Binary file (111768 bytes)

Download tm2628217d1_ex99-1imgsp0602.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1imgsp0603.jpg · Sequence: 59

Binary file (125179 bytes)

Download tm2628217d1_ex99-1imgsp0603.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1imgsp0604.jpg · Sequence: 60

Binary file (127762 bytes)

Download tm2628217d1_ex99-1imgsp0604.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1imgsp0605.jpg · Sequence: 61

Binary file (91640 bytes)

Download tm2628217d1_ex99-1imgsp0605.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1imgsp0606.jpg · Sequence: 62

Binary file (120914 bytes)

Download tm2628217d1_ex99-1imgsp0606.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1imgsp0608.jpg · Sequence: 63

Binary file (148503 bytes)

Download tm2628217d1_ex99-1imgsp0608.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1imgsp0607.jpg · Sequence: 64

Binary file (50185 bytes)

Download tm2628217d1_ex99-1imgsp0607.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1imgsp0609.jpg · Sequence: 65

Binary file (18507 bytes)

Download tm2628217d1_ex99-1imgsp0609.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1imgsp0610.jpg · Sequence: 66

Binary file (30398 bytes)

Download tm2628217d1_ex99-1imgsp0610.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img053.jpg · Sequence: 67

Binary file (226341 bytes)

Download tm2628217d1_ex99-1img053.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img054.jpg · Sequence: 68

Binary file (33126 bytes)

Download tm2628217d1_ex99-1img054.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img055.jpg · Sequence: 69

Binary file (194129 bytes)

Download tm2628217d1_ex99-1img055.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img056.jpg · Sequence: 70

Binary file (298357 bytes)

Download tm2628217d1_ex99-1img056.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img057.jpg · Sequence: 71

Binary file (190115 bytes)

Download tm2628217d1_ex99-1img057.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img058.jpg · Sequence: 72

Binary file (141408 bytes)

Download tm2628217d1_ex99-1img058.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img059.jpg · Sequence: 73

Binary file (183855 bytes)

Download tm2628217d1_ex99-1img059.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img060.jpg · Sequence: 74

Binary file (20730 bytes)

Download tm2628217d1_ex99-1img060.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img061.jpg · Sequence: 75

Binary file (81720 bytes)

Download tm2628217d1_ex99-1img061.jpg

GRAPHIC

GRAPHIC

Filename: tm2628217d1_ex99-1img062.jpg · Sequence: 76

Binary file (27890 bytes)

Download tm2628217d1_ex99-1img062.jpg

XML — IDEA: XBRL DOCUMENT

XML

Filename: R1.htm · Sequence: 78

v3.26.3

Cover

Oct. 26, 2026

Document Type

8-K

Amendment Flag

false

Document Period End Date

Oct. 26, 2026

Entity File Number

001-08675

Entity Registrant Name

UNITED

STATES ANTIMONY CORPORATION

Entity Central Index Key

0000101538

Entity Tax Identification Number

81-0305822

Entity Incorporation, State or Country Code

TX

Entity Address, Address Line One

4438

W. Lovers Lane

Entity Address, Address Line Two

Unit

100

Entity Address, City or Town

Dallas

Entity Address, State or Province

TX

Entity Address, Postal Zip Code

75209

City Area Code

406

Local Phone Number

606-4117

Written Communications

false

Soliciting Material

false

Pre-commencement Tender Offer

false

Pre-commencement Issuer Tender Offer

false

Entity Emerging Growth Company

false

Common Stock One [Member]

Title of 12(b) Security

Common

Stock, $0.01 par value

Trading Symbol

UAMY

Security Exchange Name

NYSE

Common Stock Two [Member]

Title of 12(b) Security

Common

Stock, $0.01 par value

Trading Symbol

UAMY

Security Exchange Name

NYSE

X

- Definition

Boolean flag that is true when the XBRL content amends previously-filed or accepted submission.

+ References

No definition available.

+ Details

Name:

dei_AmendmentFlag

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Area code of city

+ References

No definition available.

+ Details

Name:

dei_CityAreaCode

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

For the EDGAR submission types of Form 8-K: the date of the report, the date of the earliest event reported; for the EDGAR submission types of Form N-1A: the filing date; for all other submission types: the end of the reporting or transition period. The format of the date is YYYY-MM-DD.

+ References

No definition available.

+ Details

Name:

dei_DocumentPeriodEndDate

Namespace Prefix:

dei_

Data Type:

xbrli:dateItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The type of document being provided (such as 10-K, 10-Q, 485BPOS, etc). The document type is limited to the same value as the supporting SEC submission type, or the word 'Other'.

+ References

No definition available.

+ Details

Name:

dei_DocumentType

Namespace Prefix:

dei_

Data Type:

dei:submissionTypeItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Address Line 1 such as Attn, Building Name, Street Name

+ References

No definition available.

+ Details

Name:

dei_EntityAddressAddressLine1

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Address Line 2 such as Street or Suite number

+ References

No definition available.

+ Details

Name:

dei_EntityAddressAddressLine2

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the City or Town

+ References

No definition available.

+ Details

Name:

dei_EntityAddressCityOrTown

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Code for the postal or zip code

+ References

No definition available.

+ Details

Name:

dei_EntityAddressPostalZipCode

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the state or province.

+ References

No definition available.

+ Details

Name:

dei_EntityAddressStateOrProvince

Namespace Prefix:

dei_

Data Type:

dei:stateOrProvinceItemType

Balance Type:

na

Period Type:

duration

X

- Definition

A unique 10-digit SEC-issued value to identify entities that have filed disclosures with the SEC. It is commonly abbreviated as CIK.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityCentralIndexKey

Namespace Prefix:

dei_

Data Type:

dei:centralIndexKeyItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Indicate if registrant meets the emerging growth company criteria.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityEmergingGrowthCompany

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Commission file number. The field allows up to 17 characters. The prefix may contain 1-3 digits, the sequence number may contain 1-8 digits, the optional suffix may contain 1-4 characters, and the fields are separated with a hyphen.

+ References

No definition available.

+ Details

Name:

dei_EntityFileNumber

Namespace Prefix:

dei_

Data Type:

dei:fileNumberItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Two-character EDGAR code representing the state or country of incorporation.

+ References

No definition available.

+ Details

Name:

dei_EntityIncorporationStateCountryCode

Namespace Prefix:

dei_

Data Type:

dei:edgarStateCountryItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The exact name of the entity filing the report as specified in its charter, which is required by forms filed with the SEC.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityRegistrantName

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The Tax Identification Number (TIN), also known as an Employer Identification Number (EIN), is a unique 9-digit value assigned by the IRS.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityTaxIdentificationNumber

Namespace Prefix:

dei_

Data Type:

dei:employerIdItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Local phone number for entity.

+ References

No definition available.

+ Details

Name:

dei_LocalPhoneNumber

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 13e

-Subsection 4c

+ Details

Name:

dei_PreCommencementIssuerTenderOffer

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 14d

-Subsection 2b

+ Details

Name:

dei_PreCommencementTenderOffer

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Title of a 12(b) registered security.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b

+ Details

Name:

dei_Security12bTitle

Namespace Prefix:

dei_

Data Type:

dei:securityTitleItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the Exchange on which a security is registered.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection d1-1

+ Details

Name:

dei_SecurityExchangeName

Namespace Prefix:

dei_

Data Type:

dei:edgarExchangeCodeItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as soliciting material pursuant to Rule 14a-12 under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 14a

-Subsection 12

+ Details

Name:

dei_SolicitingMaterial

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Trading symbol of an instrument as listed on an exchange.

+ References

No definition available.

+ Details

Name:

dei_TradingSymbol

Namespace Prefix:

dei_

Data Type:

dei:tradingSymbolItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as written communications pursuant to Rule 425 under the Securities Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Securities Act

-Number 230

-Section 425

+ Details

Name:

dei_WrittenCommunications

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Details

Name:

us-gaap_StatementClassOfStockAxis=UAMY_CommonStockOneMember

Namespace Prefix:

Data Type:

na

Balance Type:

Period Type:

X

- Details

Name:

us-gaap_StatementClassOfStockAxis=UAMY_CommonStockTwoMember

Namespace Prefix:

Data Type:

na

Balance Type:

Period Type: