Form 8-K
8-K — HYCROFT MINING HOLDING CORP
Accession: 0001493152-26-026891
Filed: 2026-06-02
Period: 2026-06-02
CIK: 0001718405
SIC: 1040 (GOLD & SILVER ORES)
Item: Regulation FD Disclosure
Item: Other Events
Item: Financial Statements and Exhibits
Documents
8-K — form8-k.htm (Primary)
EX-23.1 (ex23-1.htm)
EX-23.2 (ex23-2.htm)
EX-23.3 (ex23-3.htm)
EX-99 — EX-96.1 (ex96-1.htm)
EX-99.1 (ex99-1.htm)
EX-99.2 (ex99-2.htm)
GRAPHIC (ex1_001.jpg)
GRAPHIC (ex1_002.jpg)
GRAPHIC (ex1_003.jpg)
GRAPHIC (ex1_004.jpg)
GRAPHIC (ex1_005.jpg)
GRAPHIC (ex1_006.jpg)
GRAPHIC (ex1_007.jpg)
GRAPHIC (ex1_008.jpg)
GRAPHIC (ex1_009.jpg)
GRAPHIC (ex1_010.jpg)
GRAPHIC (ex1_011.jpg)
GRAPHIC (ex1_012.jpg)
GRAPHIC (ex1_013.jpg)
GRAPHIC (ex1_014.jpg)
GRAPHIC (ex1_015.jpg)
GRAPHIC (ex1_016.jpg)
GRAPHIC (ex1_017.jpg)
GRAPHIC (ex1_018.jpg)
GRAPHIC (ex1_019.jpg)
GRAPHIC (ex1_020.jpg)
GRAPHIC (ex1_021.jpg)
GRAPHIC (ex1_022.jpg)
GRAPHIC (ex1_023.jpg)
GRAPHIC (ex1_024.jpg)
GRAPHIC (ex1_025.jpg)
GRAPHIC (ex1_026.jpg)
GRAPHIC (ex1_027.jpg)
GRAPHIC (ex1_028.jpg)
GRAPHIC (ex1_029.jpg)
GRAPHIC (ex1_030.jpg)
GRAPHIC (ex1_031.jpg)
GRAPHIC (ex1_032.jpg)
GRAPHIC (ex1_033.jpg)
GRAPHIC (ex1_034.jpg)
GRAPHIC (ex1_035.jpg)
GRAPHIC (ex1_036.jpg)
GRAPHIC (ex1_037.jpg)
GRAPHIC (ex1_038.jpg)
GRAPHIC (ex1_039.jpg)
GRAPHIC (ex1_040.jpg)
GRAPHIC (ex1_041.jpg)
GRAPHIC (ex1_042.jpg)
GRAPHIC (ex1_043.jpg)
GRAPHIC (ex1_044.jpg)
GRAPHIC (ex1_045.jpg)
GRAPHIC (ex1_046.jpg)
GRAPHIC (ex1_047.jpg)
GRAPHIC (ex1_048.jpg)
GRAPHIC (ex1_049.jpg)
GRAPHIC (ex1_050.jpg)
GRAPHIC (ex1_051.jpg)
GRAPHIC (ex1_052.jpg)
GRAPHIC (ex1_053.jpg)
GRAPHIC (ex1_057.jpg)
GRAPHIC (ex1_058.jpg)
GRAPHIC (ex1_059.jpg)
GRAPHIC (ex1_060.jpg)
GRAPHIC (ex1_061.jpg)
GRAPHIC (ex1_062.jpg)
GRAPHIC (ex1_063.jpg)
GRAPHIC (ex1_064.jpg)
GRAPHIC (ex1_065.jpg)
GRAPHIC (ex1_066.jpg)
GRAPHIC (ex1_067.jpg)
GRAPHIC (ex1_068.jpg)
GRAPHIC (ex1_069.jpg)
GRAPHIC (ex1_070.jpg)
GRAPHIC (ex1_071.jpg)
GRAPHIC (ex1_072.jpg)
GRAPHIC (ex1_073.jpg)
GRAPHIC (ex1_074.jpg)
GRAPHIC (ex1_075.jpg)
GRAPHIC (ex1_076.jpg)
GRAPHIC (ex1_077.jpg)
GRAPHIC (ex1_078.jpg)
GRAPHIC (ex1_079.jpg)
GRAPHIC (ex1_080.jpg)
GRAPHIC (ex1_081.jpg)
GRAPHIC (ex1_082.jpg)
GRAPHIC (ex1_083.jpg)
GRAPHIC (ex1_084.jpg)
GRAPHIC (ex1_085.jpg)
GRAPHIC (ex1_086.jpg)
GRAPHIC (ex1_087.jpg)
GRAPHIC (ex1_088.jpg)
GRAPHIC (ex1_089.jpg)
GRAPHIC (ex1_090.jpg)
GRAPHIC (ex1_091.jpg)
GRAPHIC (ex1_092.jpg)
GRAPHIC (ex1_093.jpg)
GRAPHIC (ex1_094.jpg)
GRAPHIC (ex1_095.jpg)
GRAPHIC (ex1_096.jpg)
GRAPHIC (ex1_097.jpg)
GRAPHIC (ex1_098.jpg)
GRAPHIC (logo_001.jpg)
GRAPHIC (logo_002.jpg)
GRAPHIC (slide_002.jpg)
GRAPHIC (ex99-1_001.jpg)
GRAPHIC (ex99-1_008.jpg)
GRAPHIC (ex99-1_002.jpg)
GRAPHIC (ex99-1_003.jpg)
GRAPHIC (ex99-1_004.jpg)
GRAPHIC (ex99-1_005.jpg)
GRAPHIC (ex99-1_006.jpg)
GRAPHIC (ex99-1_007.jpg)
GRAPHIC (ex99-2_001.jpg)
GRAPHIC (ex99-2_002.jpg)
GRAPHIC (ex99-2_003.jpg)
GRAPHIC (ex99-2_004.jpg)
GRAPHIC (ex99-2_005.jpg)
GRAPHIC (ex99-2_006.jpg)
GRAPHIC (ex99-2_007.jpg)
GRAPHIC (ex99-2_008.jpg)
GRAPHIC (ex99-2_009.jpg)
GRAPHIC (ex99-2_010.jpg)
GRAPHIC (ex99-2_011.jpg)
GRAPHIC (ex99-2_012.jpg)
GRAPHIC (ex99-2_013.jpg)
GRAPHIC (ex99-2_014.jpg)
GRAPHIC (ex99-2_015.jpg)
GRAPHIC (ex99-2_016.jpg)
GRAPHIC (ex99-2_017.jpg)
GRAPHIC (ex99-2_018.jpg)
GRAPHIC (ex99-2_019.jpg)
GRAPHIC (ex99-2_020.jpg)
GRAPHIC (ex99-2_021.jpg)
GRAPHIC (ex99-2_022.jpg)
GRAPHIC (ex99-2_023.jpg)
GRAPHIC (ex99-2_024.jpg)
GRAPHIC (ex99-2_025.jpg)
GRAPHIC (ex99-2_026.jpg)
GRAPHIC (ex99-2_027.jpg)
GRAPHIC (ex99-2_028.jpg)
GRAPHIC (ex99-2_029.jpg)
GRAPHIC (ex99-2_030.jpg)
GRAPHIC (ex99-2_031.jpg)
GRAPHIC (ex99-2_032.jpg)
GRAPHIC (ex99-2_033.jpg)
GRAPHIC (ex99-2_034.jpg)
GRAPHIC (ex99-2_035.jpg)
GRAPHIC (ex99-2_036.jpg)
GRAPHIC (ex99-2_037.jpg)
GRAPHIC (ex99-2_038.jpg)
GRAPHIC (ex99-2_039.jpg)
GRAPHIC (ex99-2_040.jpg)
GRAPHIC (ex99-2_041.jpg)
GRAPHIC (ex99-2_042.jpg)
GRAPHIC (ex99-2_043.jpg)
GRAPHIC (ex99-2_044.jpg)
GRAPHIC (ex99-2_045.jpg)
GRAPHIC (ex99-2_046.jpg)
GRAPHIC (ex99-2_047.jpg)
GRAPHIC (ex99-2_048.jpg)
GRAPHIC (ex99-2_049.jpg)
GRAPHIC (ex99-2_050.jpg)
XML — IDEA: XBRL DOCUMENT (R1.htm)
8-K
8-K (Primary)
Filename: form8-k.htm · Sequence: 1
false
0001718405
0001718405
2026-06-02
2026-06-02
iso4217:USD
xbrli:shares
iso4217:USD
xbrli:shares
UNITED
STATES
SECURITIES
AND EXCHANGE COMMISSION
Washington,
D.C. 20549
FORM
8-K
CURRENT
REPORT
Pursuant
to Section 13 OR 15(d) of The Securities Exchange Act of 1934
Date
of Report (Date of earliest event reported): June 2, 2026
HYCROFT
MINING HOLDING CORPORATION
(Exact
name of registrant as specified in its charter)
Delaware
001-38387
82-2657796
(State
or other jurisdiction
of
incorporation)
(Commission
File
Number)
(IRS
Employer
Identification
No.)
P.O.
Box 3030 Winnemucca, Nevada
89446
(Address
of principal executive offices)
(Zip
Code)
Registrant’s
telephone number, including area code: (775) 304-0260
(Former
name or former address, if changed since last report.)
Check
the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under
any of the following provisions (see General Instruction A.2. below):
☐
Written
communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
☐
Soliciting
material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
☐
Pre-commencement
communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
☐
Pre-commencement
communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))
Securities
registered pursuant to Section 12(b) of the Act:
Title
of each class
Trading
Symbol(s)
Name
of each exchange on which registered
Class A common stock, par value $0.0001 per share
HYMC
The Nasdaq Stock Market LLC
Indicate
by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405
of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§240.12b-2 of this chapter).
Emerging
growth company ☐
If
an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying
with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Item
7.01. Regulation FD Disclosure.
News Release Announcing S-K 1300 Technical
Report Summary and Initial Assessment with Economic Analysis
On June 2, 2026, Hycroft Mining Holding Corporation
(the “Company”) issued a press release announcing the results of the S-K 1300 Technical Report Summary and Initial Assessment
with Economic Analysis (“TRS”) for the Company’s Hycroft Mine in Nevada. A copy
of the press release is attached as Exhibit 99.1 to this Current Report on Form 8-K and is incorporated by reference herein.
Corporate
Presentation
On
June 2, 2026, the Company furnished its updated corporate presentation to its website at www.hycroftmining.com. A copy of the updated
corporate presentation is attached hereto as Exhibit 99.2 to this Current Report on Form 8-K.
In
accordance with General Instruction B.2 of Form 8-K, the information set forth in (i) this Item 7.01, (ii) the news release and (iii)
the updated corporate presentation is being furnished and shall not be deemed to be “filed” for purposes of Section 18 of
the Securities Exchange Act of 1934, as amended (the “Exchange Act”), and shall not be incorporated by reference into any
registration statement or other document filed under the Securities Act of 1933, as amended, or the Exchange Act, except as shall be
expressly set forth by specific reference in such filing.
Item 8.01 Other Events.
On June 2, 2026, the Company announced that it
had completed the TRS, effective May 14, 2026, which has been prepared in accordance with the requirements of subpart 1300 of Regulation
S-K. The TRS was completed by Ausenco Engineering USA South Inc., Independent Mining Consultants, Inc. and WestLand Engineering &
Environmental Services, Inc., each a “Qualified Person” as such term is defined in subpart 1300 of Regulation S-K. A copy
of the TRS is attached hereto as Exhibit 96.1 to this Current Report on Form 8-K and is incorporated herein by reference.
Item
9.01 Financial Statements and Exhibits.
(d)
Exhibits
Exhibit
Number
Description
23.1
Consent of Ausenco Engineering USA South Inc.
23.2
Consent of Independent Mining Consultants, Inc.
23.3
Consent of WestLand Engineering & Environmental Services, Inc.
96.1
S-K 1300 Technical Report
Summary and Initial Assessment with Economic Analysis
99.1
Press Release dated June 2, 2026
99.2
Corporate Presentation posted June 2, 2026
104
Cover Page Interactive Data File (embedded
within the Inline XBRL document).
SIGNATURES
Pursuant
to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by
the undersigned thereunto duly authorized.
Date:
June 2, 2026
Hycroft Mining Holding Corporation
By:
/s/
Rebecca A. Jennings
Rebecca
A. Jennings
Senior
Vice President and General Counsel
EX-23.1
EX-23.1
Filename: ex23-1.htm · Sequence: 2
Exhibit
23.1
Ausenco
Engineering USA South Inc.
595 S. Meyer Ave.
Tucson,
AZ 85701
CONSENT
OF THIRD-PARTY QUALIFIED PERSON
Ausenco
Engineering USA South Inc. (“Ausenco”), in connection with the filing of the Report on Form 8-K of Hycroft Mining Holding
Corporation (the “Form 8-K”), consents to:
●
the
filing of the technical report summary titled “Hycroft Technical Report Summary and
Initial Assessment with Economics on the Hycroft Mine, Nevada, United States of America”
(the “TRS”), with an effective date of May 14, 2026, as an exhibit to and referenced
in the Form 8-K;
●
the
incorporation by reference of the TRS in the Company’s Registration Statements on Form S-1 (Registration No. 333-264293), Form
S-3 (Registration Nos. 333-257567, 333-279292, 333-290760 and 333-292470) and Form S-8 (Registration Nos. 333-249620, 333-265434,
333-292803 and 333-280193) (collectively, the “Registration Statements”);
●
the
use of and references to our name in connection with the Form 8-K, the Registration Statements and the TRS; and
●
the
information derived, summarized, quoted or referenced from the TRS, or portions thereof, that was prepared by us, that we supervised
the preparation of and/or that was reviewed and approved by us, that is included or incorporated by reference in the Form 8-K and
the Registration Statements.
Ausenco
is responsible for authoring, and this consent pertains to the following Sections of the TRS: 1.1, 1.2, 1.8, 1.11, 1.12, 1.13, 1.15,
1.16, 1.17, 1.18, 2.1-2.4.1, 2.5-2.7, 10, 14 – 16, 18.1-18.2.3, 18.2.4-18.2.7,18.2.8.2-18.3.2, 18.3.4, 18.3.5, 19, 22.1, 22.5,
22.7-22.12, 22.13.1.3, 22.13.1.5-22.13.1.7, 22.13.2.2, 22.13.2.4, 22.13.2.5, 23.1, 23.4, 23.6, 24 and 25.
May
28, 2026
/s/
David Thomas
Signature
of Authorized Person for
Ausenco
Engineering USA South Inc.
David
Thomas
name of Authorized Person for
Ausenco
Engineering USA South Inc.
EX-23.2
EX-23.2
Filename: ex23-2.htm · Sequence: 3
Exhibit
23.2
Independent
Mining Consultants, Inc.
3560 E. Gas Road
Tucson,
AZ 85714
CONSENT
OF THIRD-PARTY QUALIFIED PERSON
Independent
Mining Consultants, Inc. (“IMC”) in connection with the filing of the Report on Form 8-K of Hycroft Mining Holding Corporation
(the “Form 8-K”) consents to:
●
the
filing of the technical report summary titled “Hycroft Technical Report Summary and Initial Assessment with Economics on the
Hycroft Mine, Nevada, United States of America” (the “TRS”), with an effective date of May 14, 2026, as an exhibit
to and referenced in the Form 8-K;
●
the
incorporation by reference of the TRS in the Company’s Registration Statements on Form S-1 (Registration No. 333-264293), Form
S-3 (Registration Nos. 333-257567, 333-279292, 333-290760 and 333-292470) and Form S-8 (Registration Nos. 333-249620, 333-265434,
333-292803 and 333-280193) (collectively, the “Registration Statements”);
●
the
use of and references to our name in connection with the Form 8-K, the Registration Statements and the TRS; and
●
the
information derived, summarized, quoted or referenced from the TRS, or portions thereof, that was prepared by us, that we supervised
the preparation of and/or that was reviewed and approved by us, that is included or incorporated by reference in the Form 8-K and
the Registration Statements.
IMC
is responsible for authoring, and this consent pertains to the following Sections of the TRS: 1.9, 1.10, 1.15, 1.18, 2.4.2, 11, 13, 18.2.3,
18.2.8.1, 18.3.1, 18.3.3, 22.6, 22.13.1.4, 22.13.2.3, 23.1, 23.5, and 24.
May
28, 2026
/s/ John M. Marek
Signature
of Authorized Person for
Independent
Mining Consultants, Inc.
John
M. Marek
name of Authorized Person for
Independent
Mining Consultants, Inc.
EX-23.3
EX-23.3
Filename: ex23-3.htm · Sequence: 4
Exhibit 23.3
WestLand Engineering & Environmental Services,
Inc.
1650 Meadow Wood Lane
Reno, NV 89502
CONSENT OF THIRD-PARTY QUALIFIED PERSON
WestLand Engineering & Environmental Services,
Inc. (“WestLand”), in connection with the filing of the Report on Form 8-K of Hycroft Mining Holding Corporation (the “Form
8-K”), consents to:
●
the filing of the technical report summary titled “Hycroft Technical Report Summary and Initial Assessment with Economics on the Hycroft Mine, Nevada, United States of America” (the “TRS”), with an effective date of May 14, 2026, as an exhibit to and referenced in the Form 8-K;
●
the incorporation by reference of the TRS in the Company’s Registration Statements on Form S-1 (Registration No. 333-264293), Form S-3 (Registration Nos. 333-257567, 333-279292, 333-290760 and 333-292470) and Form S-8 (Registration Nos. 333-249620, 333-265434, 333-292803 and 333-280193) (collectively, the “Registration Statements”);
●
the use of and references to our name in connection with the Form 8-K, the Registration Statements and the TRS; and
●
the information derived, summarized, quoted or referenced from the TRS, or portions thereof, that was prepared by us, that we supervised the preparation of and/or that was reviewed and approved by us, that is included or incorporated by reference in the Form 8-K and the Registration Statements.
WestLand is responsible for authoring, and this consent
pertains to the following Sections of the TRS: 1.14, 17, 22.1, and 24.
May 28, 2026
/s/
Richard DeLong
Signature
of Authorized Person for
Westland
Engineering & Environmental Services, Inc.
Richard
DeLong
name of Authorized Person for
Westland
Engineering & Environmental Services, Inc.
EX-99 — EX-96.1
EX-99
Filename: ex96-1.htm · Sequence: 5
Exhibit 96.1
Hycroft
Mine Project
S-K
1300 Technical Report Summary and Initial Assessment with Economic Analysis
Nevada,
USA
Effective
Date: May 14, 2026
Report
Date: May 29, 2026
Prepared
for:
Hycroft
Mining Holding Corporation
PO
Box 3030
Winnemucca,
Nevada, United States, 89446
Prepared
by:
Ausenco
Engineering USA South Inc.
595
S Meyer Ave, Tucson, Arizona, United States, 85701
Contributing
Authors:
Ausenco
Engineering USA South Inc.
Independent
Mining Consultants Inc.
WestLand
Engineering & Environmental Services, Inc.
Date
and Signature Page
This technical report summary (“TRS”), entitled “Hycroft
Mine Project, S-K 1300 Technical Report Summary and Initial Assessment with Economics Analysis, Nevada, USA” is current as of May
14, 2026, and has been prepared by:
Consulting
Firm
Responsible
for the following sections
Signature
Date
Ausenco
Engineering USA South Inc.
1.1,
1.2, 1.8, 1.11, 1.12, 1.13, 1.15, 1.16, 1.17, 1.18, 2.1-2.4.1, 2.5-2.7, 10, 14-16, 18.1-18.2.3, 18.2.4- 18.2.7, 18.2.8.2-18.3.2, 18.3.4,
18.3.5, 19, 22.1, 22.5, 22.7-22.12, 22.13.1.3, 22.13.1.5-22.13.1.7, 22.13.2.2, 22.13.2.4, 22.13.2.5, 23.1, 23.4, 23.6, 24 and 25
“signed”
May
29, 2026
Hycroft
Mining Holding Corporation
1.3-1.7,
1.15,3-9, 12, 20, 22.2-22.4, 22.13.1.1, 22.13.1.2, 22.13.2.1, 23.1-23.3 and 24
“signed”
May
29, 2026
Independent
Mining Consultants, Inc.
1.9,
1.10, 1.15, 1.18, 2.4.2, 11, 13, 18.2.3, 18.2.8.1, 18.3.1,
18.3.3,
22.6, 22.13.1.4, 22.13.2.3, 23.1, 23.5 and 24
“signed”
May
29, 2026
WestLand
Engineering &
Environmental
Services, Inc.
1.14,
17, 22.1, and 24
“signed”
May
29, 2026
Hycroft Mine Project
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
of Contents
1
Executive Summary
1
1.1
Introduction
1
1.2
Terms
of Reference
1
1.3
Mineral
Tenure, Surface Rights, Water Rights, and Agreements
2
1.4
History
2
1.5
Geology
and Mineralization
3
1.6
Exploration
4
1.7
Sampling
4
1.8
Metallurgical
Testwork
4
1.9
Mineral
Resource Estimate
5
1.10
Mining
Methods
9
1.11
Processing
and Recovery Methods
9
1.12
Infrastructure
10
1.12.4
Tailings
Management Facility
11
1.12.5
Waste
Rock Storage Facility (WRSF)
11
1.12.6
Power,
Communications, and Fuel
11
1.12.7
Water
Supply and Management
12
1.12.8
Hazard
Considerations
12
1.13
Market
Studies and Contracts
12
1.14
Environmental,
Permitting and Social Considerations
12
1.14.1
Environmental
Considerations
12
1.14.2
Permitting
Considerations
13
1.14.3
Social
Considerations
14
1.14.4
Closure
and Reclamation Considerations
14
1.15
Capital
and Operating Cost
14
1.15.1
Capital
Cost Estimate
14
1.15.2
Operating
Cost Estimate
15
1.16
Economic
Analysis
15
1.16.1
Economic
Summary
15
1.16.2
Sensitivity
Analysis
18
1.17
Conclusions
19
1.18
Recommendations
19
Hycroft Mine Project
Page i
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
2
Introduction
20
2.1
Introduction
20
2.2
Terms
of Reference
20
2.3
Qualified
Persons
21
2.4
Site
Visits and Scope of Personal Inspection
21
2.4.1
Site
inspection for Jonathan Cooper
21
2.4.2
Site
inspection for John Marek
21
2.5
Effective
Dates
21
2.6
Information
Sources and References
21
2.6.1
General
21
2.6.2
Previous
Technical Reports
22
2.7
Currency,
Units, Abbreviations and Definitions
22
3
Property
Description
26
3.1
Introduction
26
3.2
Property
and Title in Jurisdiction
26
3.3
Project
Ownership
27
3.4
Property
Agreements
29
3.5
Surface
Rights
32
3.6
Water
Rights
32
3.7
Liabilities
and Encumbrances
32
3.8
Environmental
Considerations
32
3.9
Safety
Considerations
33
3.10
Permitting
Considerations
33
3.10.1
Hycroft
Expansion Permitting and Timelines
35
3.10.2
Crofoot
Heap Leach Facility Closure
37
3.11
Social
License Considerations
37
3.12
Project
Risks and Uncertainties
37
4
Accessibility,
Climate, Local Resources, Infrastructure and Physiography
38
4.1
Physiography
38
4.2
Accessibility
38
4.3
Climate
38
4.4
Local
Resources and Infrastructure
38
4.5
Seismicity
41
5
History
42
5.1
Regional
History
42
5.2
Property
Exploration History
42
5.3
Production
42
Hycroft Mine Project
Page ii
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
6
Geological
Setting, Mineralization, and Deposit
44
6.1
Geological
Setting
44
6.1.1
Regional
Geology
44
6.1.2
Local
Geology
44
6.2
Mineralization
and Alteration
45
6.2.1
Brimstone
46
6.2.2
Vortex
47
6.2.3
Bay
48
6.2.4
Central
50
6.2.5
Camel
50
6.3
Deposit
Types
51
7
Exploration
52
7.1
Exploration
52
7.2
Geological
Mapping
52
7.3
Geophysics
52
7.4
Soil
Sampling
53
7.5
Rock-Chip
Sampling
53
7.6
Drilling
53
7.6.1
Introduction
53
7.6.2
Exploration
Drilling
54
7.7
Hydrogeology
58
7.8
Geotechnical
58
7.9
Exploration
Targets
59
8
Sample
Preparation, Analyses, and Security
66
8.1
Introduction
66
8.2
Sample
Preparation
66
8.3
Assay
Methods
66
8.3.1
Sample
Security
70
8.4
Sample
Storage
70
8.5
Analytical
Results
70
8.6
QP
Comment
70
9
Data
Verification
71
9.1
Verification
Procedure
71
9.2
Certificate
of Assay Checks
71
9.3
QA/QC
2005 – 2024
71
9.3.1
Standards
2005-2013
72
9.3.2
Blanks
2008 - 2014
74
Hycroft Mine Project
Page iii
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
9.3.3
Check
Assays 2011-2012
75
9.3.4
Standards
2021 – 2022
77
9.3.5
Blank
Analysis Results 2021-2022
78
9.3.6
Duplicate
Assays, 2021-2022
79
9.3.7
Standards
2023 – 2024
80
9.3.8
Blanks
2023-2024
81
9.3.9
Duplicate
Assays 2023-2024
81
9.3.10
Check
Assays 2023-2024
84
9.3.11
DDH
vs. RC for Post 2000 Samples
85
9.3.12
Old
vs. New Drilling
86
9.3.13
Downhole
Surveys
87
9.4
QP
Comment
87
10
Mineral
Processing and Metallurgical Testing
88
10.1
Introduction
88
10.2
Metallurgical
Testwork
89
10.2.1
Summary
of Metallurgical Testwork Programs
89
10.2.2
Mineralized
Materials and Sampling
89
10.2.3
Hycroft
Mineralization Domains
89
10.3
Legacy
Testwork
91
10.3.1
Comminution
Tests
91
10.3.2
Flotation
91
10.3.3
Direct
Cyanidation
102
10.3.4
Concentrate
Oxidation Tests
102
10.3.5
Solid-Liquid
Separation Tests
109
10.3.6
Deleterious
Elements
109
10.3.7
Metallurgical
Parameters for Process Design Criteria and Financial Analysis
109
11
Mineral
Resource Estimates
111
11.1
Summary
111
11.2
Model
Location
111
11.3
Database
111
11.4
Basic
Statistics
113
11.5
Geology
113
11.6
Lithology
113
11.7
Alteration
114
11.8
Structure
115
11.9
Domains
117
11.10
Assay
Caps
120
Hycroft Mine Project
Page iv
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
11.11
Bench
Height Confirmation
121
11.12
Composites
122
11.13
Variography
125
11.14
Block
Grade Estimation
126
11.14.1
Gold
126
11.14.2
Silver
126
11.14.3
Cyanide
Ratio
129
11.14.4
Sulfide
Sulfur
130
11.14.5
Density
132
11.14.6
Stockpile
Grade Estimation
132
11.14.7
Treatment
of 1982 – 1987 Data
133
11.15
Classification
134
11.16
Model
Verification
135
11.16.1
Swath
Plots
137
11.16.2
Smear
Check
141
11.17
Mineral
Resource Estimate
142
12
Mineral Reserve
149
13
Mining Methods
149
13.1
Overview
149
13.2
Geotechnical
and Hydrologic Information
153
13.3
Phase
Design
153
13.4
Production
Schedule
157
13.5
Mining
Equipment
171
13.6
Mine
Manpower Requirements
172
14
Processing
and Recovery Methods
175
14.1
Overview
175
14.2
Process
Flowsheet
176
14.3
Plant
Design
178
14.4
Process
Description
180
14.4.1
Crushing
Area
180
14.4.2
Grinding
Circuit
181
14.4.3
Rougher
Flotation
181
14.4.4
Concentrate
Thickening
182
14.4.5
POX
and Neutralization
182
14.4.6
Gold
and Silver Recovery from Flotation Concentrate
185
14.4.7
CCD
Circuit
185
14.4.8
Merrill-Crowe
Precipitation and Refinery (Existing)
186
Hycroft Mine Project
Page v
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
14.4.9
Cyanide
Destruction
187
14.4.10
Final
Tailings and Reclaim Water Transport
187
14.5
Energy,
Water, and Process Materials Requirements
187
14.5.1
Reagent
Handling and Storage
187
14.5.2
Fresh
Water, Fire Water and Potable Water
189
14.5.3
Process
Water, and Barren Solution
189
14.5.4
Oxygen
Plant
190
14.5.5
Electrical
Power
190
14.5.6
High-Pressure
and Low-Pressure Air
190
15
Infrastructure
191
15.1
Introduction
191
15.2
Site
Access
192
15.2.1
Offsite
Access and Security
192
15.2.2
Onsite
Access
193
15.2.3
Rail
Spur
193
15.3
New
Infrastructure
195
15.3.1
New
and Existing Facilities Layout
195
15.3.2
Upgrades
to Existing Facilities
203
15.3.3
Accommodation
203
15.4
Stockpiles
204
15.4.1
Mineralized
Stockpiles
204
15.4.2
Growth
Media Stockpile
204
15.4.3
Limestone
Stockpile
204
15.5
Tailings
Management Facilities
204
15.5.1
Facility
Design Basis
205
15.5.2
TMF
Design
208
15.6
Waste
Rock Storage Facility
212
15.7
Power
and Electrical
213
15.8
Communication
215
15.9
Fuel
215
15.10
Water
Supply and Management
215
15.10.1
Fresh
Water, Fire Water and Potable Water
216
15.10.2
Tailings
Water Management
217
15.10.3
WRSF
Water Management
218
15.10.4
Plant
Site Stormwater Runoff and Drainage
219
15.10.5
Site
Water Balance
219
15.10.6
Pit
Dewatering
222
Hycroft Mine Project
Page vi
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
15.11
Hazard
Considerations
222
15.12
Comments
on Project Infrastructure
222
16
Market
Studies and Contracts
224
16.1
Market
Studies
224
16.2
Commodity
Price Projections
224
16.3
Contracts
224
17
Environmental
Studies, Permitting, and Plan, Negotiations, or Agreements with Local Individuals or Groups
225
17.1
Overview
225
17.2
Environmental
Considerations
225
17.2.1
Baseline
and Supporting Studies
225
17.2.2
Environmental
Monitoring
228
17.2.3
Water
Management
229
17.3
Permitting
Considerations
229
17.3.1
Federal
Permits
230
17.3.2
State
of Nevada Permits
233
17.3.3
Additional
Permits and Authorizations
234
17.4
Social
Considerations
235
17.4.1
National
Register of Historic Places
236
17.5
Closure
and Reclamation Planning
237
17.5.1
Closure
and Reclamation Plans
237
17.5.2
Closure
Cost Estimates
237
17.6
Comments
on Environmental Studies, Permitting and Social or Community Impact
237
18
Capital
and Operating Costs
238
18.1
Introduction
238
18.2
Capital
Costs
238
18.2.1
Overview
238
18.2.2
Basis
of Estimate
239
18.2.3
Mine
Capital Costs
239
18.2.4
Process
Capital Costs
241
18.2.5
Infrastructure
Capital Costs
242
18.2.6
Indirect
Capital Costs
242
18.2.7
Owner
(Corporate) Capital Costs
243
18.2.8
Sustaining
Capital
243
18.2.9
Contingency
Costs
245
18.2.10
Closure
and Reclamation Planning
245
18.3
Operating
Costs
245
18.3.1
Overview
245
Hycroft Mine Project
Page vii
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
18.3.2
Basis
of Estimate
246
18.3.3
Mine
Operating Costs
247
18.3.4
Process
Operating Costs
248
18.3.5
General
and Administrative Operating Costs
252
19
Economic Analysis
253
19.1
Overview
253
19.2
Methodologies
Used
254
19.3
Financial
Model Parameters
254
19.3.1
Assumptions
254
19.3.2
Taxes
254
19.3.3
Royalties
255
19.4
Economic
Analysis
255
19.5
Sensitivity
Analysis
260
20
Adjacent Properties
264
21
Other
Relevant Data and Information
264
22
Interpretation
and Conclusions
265
22.1
Introduction
265
22.2
Mineral
Tenure, Surface Rights, Water Rights, Royalties and Agreements
265
22.3
Geology
and Mineralization
265
22.4
Exploration
265
22.5
Metallurgical
Testwork
266
22.6
Mineral
Resource Estimate
266
22.7
Recovery
Plan
267
22.8
Infrastructure
268
22.8.1
Tailings
Management Facility
269
22.9
Markets
and Contracts
269
22.10
Capital
Cost Estimate
269
22.11
Operating
Cost Estimate
269
22.12
Economic
Analysis
270
22.13
Risks
and Opportunities
270
22.13.1
Risks
270
22.13.2
Opportunities
272
23
Recommendations
273
23.1
Estimated
Program Costs
273
23.2
Exploration
273
23.3
Sample
Preparation, Analysis and Security
274
Hycroft Mine Project
Page viii
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
23.4
Metallurgical
Testing
274
23.5
Mineral
Resource Estimate
275
23.6
Infrastructure
275
23.6.1
TMF
275
24
References
277
25
Reliance
on Information Provided by the Registrant
281
Appendix A – Patented Claims
282
Appendix
B – Unpatented Claims
283
List
of Tables
Table
1-1:
Hycroft
MRE as of January 21, 2026, US customary Units
6
Table
1-2:
Hycroft
MRE as of 21 January 2026, Metric Units
7
Table
1-3:
High-grade
Silver Bearing Domains, Contained Within the MRE at 2 oz/ton Cutoff Grade, US customary Units
8
Table
1-4:
High-grade
Silver Bearing Domains, Contained Within the MRE at 68.57 g/tonne (2 oz/tonne) Cutoff Grade, Metric Units
8
Table
1-5:
Principal
Environmental Permits
13
Table
1-6:
Other
Notifications or Ministerial Permits
13
Table
1-7:
Capital
Cost Summary
14
Table
1-8:
Operating
Cost Summary
15
Table
1-9:
Economic
Analysis Summary
17
Table
2-1:
Abbreviations
and Acronyms
22
Table
2-2:
Units
of Measurement
24
Table
3-1:
Hycroft
Annual Land Holding Costs
29
Table
3-2:
Hycroft
Operating Permits
33
Table
3-3:
Hycroft
Miscellaneous Permits
34
Table
3-4:
Hycroft
Miscellaneous Permits
34
Table
3-5:
Right-of-Way
Payment and Renewal Schedule
34
Table
4-1:
Hycroft
Water Wells and Permitted Yearly Consumption
41
Table
7-1:
Drilling
from 2023 and 2024 Supporting the Updated MRE
56
Table
7-2:
Significant
Intercepts (2023)
60
Table
7-3:
Significant
Intercepts (2024)
62
Table
9-1:
Nearest
Neighbor Sample Comparison of RC vs Diamond Core Gold and Silver Assays
86
Table
9-2:
Nearest
Neighbor Sample Comparison of 1982-1987 Gold Assays Versus 2005 – 2024 Gold Assays
87
Hycroft Mine Project
Page ix
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
10-1:
Metallurgical
Testwork Summary
89
Table
10-2:
Average
Sulfur Contents of Oxide, Transition and Sulfide Mineralized Materials
90
Table
10-3:
Summary
of Test Samples
90
Table
10-4:
Grindability
Test Summary
91
Table
10-5:
G&T
Composites 1 through 24 Flotation Test Results
93
Table
10-6:
G&T
Composites M-1 through M-17 Flotation Test Results
94
Table
10-7:
Flotation
Reagent Schemes Studied
95
Table
10-8:
Estimated
Metallurgical Recoveries from 2016 Feasibility Study – Gold and Silver
103
Table
10-9:
Hycroft
Alkaline POX Testwork Summary
106
Table
10-10:
Hycroft
Acid POX Testwork Summary
106
Table
10-11:
Summary
Comparison Table – POX 3 to POX-7
108
Table
10-12:
Settling
Test Results
109
Table
10-13:
Deleterious
Element Assay
109
Table
10-14:
Process
Plant Overall Recovery Prediction
109
Table
11-1:
Block
Size and Model Size
110
Table
11-2:
Data
Available for the Assembly of the Resource Model for Au, Ag, AuCn, Sulfide Sulfur
111
Table
11-3:
Assay
Database (No Stockpile Assays, Inside the Model, and No Drilling from 1982 through 1987)
112
Table
11-4:
Population
Domains for Grade Estimation
117
Table
11-5:
High-grade
Silver Vein Domains
118
Table
11-6:
Sulfide
Domains
118
Table
11-7:
Assay
Cap Values
120
Table
11-8:
Sulfide
Cap Values Prior to Compositing
121
Table
11-9:
Basic
Statistics of Composites, In-Situ Rock, Eliminating Years 1982 to 1987
123
Table
11-10:
Basic
Statistics of 25 ft Sulfide Composites by Sulfide Domain
125
Table
11-11:
Grade
Estimation Parameters for Au, Ag
127
Table
11-12:
Estimation
Parameters for Cyanide Ratio, All Three Domains utilized 1/D3
130
Table
11-13:
Sulfide
Sulfur Estimation Parameters, All Three Domains Utilized 1/D3
131
Table
11-14:
Sulfide
Sulfur Default Values if Not Estimated
131
Table
11-15:
Density
Assigned to the Block Model
132
Table
11-16:
Stockpiles
Assigned Grades by Inverse Distance Estimation
133
Table
11-17:
IMC
Smear Check
141
Table
11-18:
Economic
and Technical Parameters for Hycroft MRE
144
Table
11-19:
Hycroft
MRE as of January 21, 2026, US customary Units
145
Table
11-20:
Hycroft
MRE as of 21 January 2026, Metric Units
146
Table
11-21:
High-grade
Silver Bearing Domains, Contained within the MRE at 2 oz/ton Cutoff Grade, US customary Units
147
Table
11-22:
High-grade
Silver Bearing Domains, Contained within the MRE at 3 oz/ton Cutoff Grade, US customary Units
147
Hycroft Mine Project
Page x
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
11-23:
High-grade
Silver Bearing Domains, Contained within the MRE at 4 oz/ton Cutoff Grade, US customary Units
148
Table
11-24:
High-grade
Silver Bearing Domains, Contained within the MRE at 68.57 g/ton (2 oz/ton) Cutoff Grade, Metric Units
148
Table
11-25:
High-grade
Silver Bearing Domains, Contained within the MRE at 102.86 g/ton (3 oz/ton) Cutoff Grade, Metric Units
148
Table
11-26:
High-grade
Silver Bearing Domains, Contained within the MRE at 137.14 g/t (4 oz/ton) Cutoff Grade, Metric Units
148
Table
13-1:
Hycroft
Initial Assessment Mine Production Schedule, Measured and Indicated Mineralization
151
Table
13-2:
Summary
of Lerch-Grossman Computer Pit Generation
154
Table
13-3:
Contained
Tonnage by Internal Cutoff Grade
155
Table
13-4:
Major
Mine Equipment
172
Table
13-5:
Mine
Hourly Personnel
173
Table
13-6:
Mine
Salaried Staff
174
Table
14-1:
Process
Design Criteria
178
Table
14-2:
Major
Process Equipment
179
Table
14-3:
Summary
of Reagent Used in the Process Plant
188
Table
14-4:
Annual
Consumption for Major Reagents
189
Table
15-1:
Existing
Hycroft Buildings
196
Table
15-2:
New
Ancillary Facilities Planned over the LOM
203
Table
15-3:
Proposed
Upgrades for Existing Facilities
203
Table
15-4:
Minimum
Pre-feasibility Seismic Design Criteria for Stability for Very High Dam Classification
206
Table
15-5:
Minimum
Pre-feasibility Hydrologic Design Criteria for Very High Dam Classification
206
Table
15-6:
Selected
Ground Motions and Associated Seismic Coefficients
211
Table
15-7:
Weather
Station Summary
216
Table
15-8:
Summary
of Storm Event with Associated Rainfall Intensity
216
Table
15-9:
Monthly
Maximum Flows Demand
221
Table
17-1:
Current
Major Environmental Permits and Permits Necessary to Operate the Mine
230
Table
17-2:
Ministerial
Permits, Plans and Notifications
234
Table
18-1:
Capital
Cost Summary
238
Table
18-2:
Baseline
Mine Capital Cost (without Accuracy or Contingency adjustment)
240
Table
18-3:
Process
Plant Capital Cost Breakdown
241
Table
18-4:
On-Site
Infrastructure Capital Cost Breakdown
242
Table
18-5:
Off-Site
Infrastructure Capital Cost Breakdown
242
Table
18-6:
Indirect
Capital Cost Breakdown
243
Table
18-7:
Mining
Sustaining Capital Costs
244
Table
18-8:
Operating
Cost Summary
246
Table
18-9:
Mine
Operating Cost per Ton of Total Material Moved, US$/ton (Mine Costs)
248
Table
18-10:
Process
Plant Operating Cost Summary
248
Table
18-11:
Process
Plant Labor Cost Summary
249
Hycroft Mine Project
Page xi
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
18-12:
Reagent
Consumption Summary
250
Table
18-13:
Process
Plant Consumable Consumption Summary
251
Table
19-1:
Economic
Analysis Summary Table
256
Table
19-2:
Life
of Mine Economics
257
Table
19-3:
Pre-Tax
NPV (US$M) and IRR (%) Sensitivity Analysis
260
Table
19-4:
Post-Tax
NPV (US$M) and IRR (%) Sensitivity Analysis
261
Table
22-1:
Hycroft
Mineral Resources as of 21 January 2026, US customary Units
267
Table
22-2:
High-grade
Silver Bearing Domains, Contained within the Mineral Resource at 2 oz/ton Cutoff Grade, US customary Units
267
Table
23-1:
Estimated
Program Costs
273
Table
25-1:
Information
Provided by Hycroft
281
List
of Figures
Figure
1-1:
Post-Tax
Sensitivity Analysis Results
18
Figure
3-1:
Hycroft
Mine Location Map
27
Figure
3-2:
Claim
Map
30
Figure
3-3:
Current
Property and Facilities Layout (2025)
31
Figure
4-1:
Onsite
Lab, Admin, Maintenance, Truck Shop, and Warehouse
39
Figure
4-2:
Crusher
and Conveyor Belt Circuit
39
Figure
4-3:
North
Merrill-Crowe Facility
40
Figure
4-4:
Stage
1 Heap Leach Pad and Ponds Along Jungo Road
40
Figure
6-1:
Stratigraphic
Column for Hycroft Deposit Area
45
Figure
6-2:
Simplified
East–West Cross Section Through the Hycroft Mine – Section 40600 N
45
Figure
6-3:
Vortex
Alteration Cross-Section – 40600 N
48
Figure
6-4:
Bay
Geologic Cross-Section at 50300-N
49
Figure
6-5:
Generalized
Epithermal Diagram
51
Figure
7-1:
Drill
Collar Location Plan
55
Figure
9-1:
Results
of Submitted Gold Standards 2005 - 2013
73
Figure
9-2:
Results
of Submitted Silver Standards 2005-2013
74
Figure
9-3:
Results
of Blank Submissions
75
Figure
9-4:
Check
Assay Results, Fire Assay Gold 2011 - 2012
76
Figure
9-5:
Check
Assay Results, Fire Assay Silver 2011 – 2011
77
Figure
9-6:
Standards
Results, 2021 – 2022
78
Figure
9-7:
Blank
Results, 2021 – 2022
79
Figure
9-8:
Duplicate
Assay Results, 2021 – 2022
79
Hycroft Mine Project
Page xii
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
9-9:
Gold
Standards 2023 – 2024
80
Figure
9-10:
Blank
Insertions 2004
81
Figure
9-11:
Gold
Duplicates, 2023-2024
82
Figure
9-12:
Silver
Duplicates, 2023-2024
83
Figure
9-13:
Gold
Check Assays 2023 – 2024
84
Figure
9-14:
Silver
Check Assays, 2023-2024
85
Figure
10-1:
Recovery
Vs. Time Plot, G&T Kamloops Tests, M Composites
96
Figure
10-2:
Gold
Grade Distribution Chart
97
Figure
10-3:
Silver
Grade Distribution Chart
97
Figure
10-4:
Total
Sulfur Grade Distribution
98
Figure
10-5:
Sulfide
Sulfur Grade Distribution
98
Figure
10-6:
FLS
Variability Flotation Recoveries under Optimal Conditions (137 Test Samples)
100
Figure
10-7:
FLS
Variability Flotation Gold Recoveries Based on Gold Head Grade Groups
101
Figure
10-8:
FLS
Variability Flotation Silver Recoveries Based on Head Grade Groups
101
Figure
10-9:
Oxidation
of Central Flotation Concentrate: Sulfate Spike Test
104
Figure
10-10:
Demonstration
Plant Cyanide Leach Recovery of Au and Ag
104
Figure
11-1:
East–West
Cross-Section 44000-N Looking North, Showing Lithology Types
114
Figure
11-2:
East–West
Cross-Section 44000-N Looking North, Showing Alterations
115
Figure
11-3:
Structure
and Domain Interpretation (Plan View)
116
Figure
11-4:
Structure
and Domain Interpretation with Silver Wireframes (plan view)
119
Figure
11-5:
Bench
Height Analysis
122
Figure
11-6:
Gold
Variograms for Silicic Material Between the Central Fault and East Fault
125
Figure
11-7:
Gold
Variograms for Silicic Material Between the Range Fault and Central Fault
125
Figure
11-8:
E-W
Cross-section at 41000-N, Showing Confidence Codes
135
Figure
11-9:
E-W
Cross-section at 41000-N, Visual Check of Gold Grades in Drillholes and Block Model
136
Figure
11-10:
E-W
Cross-section at 41000-N, Visual Check of Silver Grades in Drillholes and Block Model
137
Figure
11-11:
Swath
Plots for Gold, X = East and Y = North Slices, 160 ft Wide Slices
138
Figure
11-12:
Swath
Plots for Silver, X = East and Y = North Slices, 160 ft Slices
139
Figure
11-13:
Swath
Plots for Sulfide Sulfur, X = East and Y = North Slices, 160 ft Slices
140
Figure
13-1:
Hycroft
Initial Assessment Mine Plan Schedule
150
Figure
13-2:
Summary
of Lerch-Grossman Computer Pit Generation
155
Figure
13-3:
Phase
Schematic and Extraction Sequence
156
Figure
13-4:
Approximate
Recovered Gold by Year
158
Figure
13-5:
Approximate
Recovered Silver by Year
158
Figure
13-6:
Approximate
Recovered Equivalent Gold Ounces by Year Based on $3,100/oz Au and $36/oz Ag
159
Figure
13-7:
Mine
and Waste Storage Plan – Pre-production
160
Figure
13-8:
Mine
and Waste Storage Plan - End of Year 1
161
Figure
13-9:
Mine
and Waste Storage Plan – End of Year 2
162
Figure
13-10:
Mine
and Waste Storage Plan - End of Year 3
163
Hycroft Mine Project
Page xiii
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
13-11:
Mine
and Waste Storage Plan - End of Year 4
164
Figure
13-12:
Mine
and Waste Storage Plan – End of Year 5
165
Figure
13-13:
Mine
and Waste Storage Plan – End of Year 10
166
Figure
13-14:
Mine
and Waste Storage Plan – End of Year 20
167
Figure
13-15:
Mine
and Waste Storage Plan – End of Year 30
168
Figure
13-16:
Mine
and Waste Storage Plan – End of Year 40
169
Figure
13-17:
Mine
and Waste Storage Plan – End of Year 51
170
Figure
14-1:
Sulfide
Sulfur Process Plant Flowsheet
176
Figure
15-1:
Site
Layout
191
Figure
15-2:
Site
Access and Major Towns Near Hycroft Mine
192
Figure
15-3:
Rail
Spur Design
194
Figure
15-4:
Overall
Site Layout
197
Figure
15-5:
Existing
Crushing Facility and Surrounding Infrastructure
198
Figure
15-6:
The
Proposed Process Plant Generic Site Plan
199
Figure
15-7:
Proposed
Limestone Plant and Rail Spur
200
Figure
15-8:
North
Merrill-Crowe Plant
201
Figure
15-9:
Existing
Mine Ancillary Buildings
202
Figure
15-10:
TMF
Facility Layout
207
Figure
15-11:
TMF
Main Dam Section
208
Figure
15-12:
TMF
North Dam Section
209
Figure
15-13:
TMF
Closure Plan
212
Figure
15-14
Waste
Rock Storage Facilities
213
Figure
15-15:
Proposed
Power Line from Imlay Relay Station (Nevada Historical Marker 49) to Jungo Road (49 Road) - NTS
214
Figure
15-16:
Proposed
Power Line along Jungo Road (Road 49) to Hycroft Mine Site (in total approximately 57 miles) - NTS
215
Figure
15-17:
Hycroft
Water Balance Schematic
220
Figure
15-18:
Total
Fresh Water Demand
221
Figure
19-1:
Project
Post-Tax Unlevered Cashflow
255
Figure
19-2:
Pre-Tax
Sensitivity Analysis Results
262
Figure
19-3:
Post-Tax
Sensitivity Analysis Results
263
Figure
20-1:
Location
of Rosebud Property
264
Hycroft Mine Project
Page xiv
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
1 Executive
Summary
1.1 Introduction
This technical report summary (TRS) has been prepared by Ausenco
Engineering USA South Inc. (Ausenco), Independent Mining Consultants, Inc. (IMC), and WestLand Engineering & Environmental Services,
Inc. (WestLand) for Hycroft Mining Holding Corporation (Hycroft), following the reporting requirements of the United States (US) Securities
and Exchange Commission’s (SEC) Modernization of Property Disclosures of Mining Registrants under subpart 1300 and item 601 (96)(B)(iii)
of Regulation S-K for an initial assessment (IA).
This TRS is an initial assessment with an economic analysis (IA-EA)
and, filed on Electronic Data Gathering, Analysis, and Retrieval (EDGAR). The IA-EA is based on heap leaching the oxide material, while
sulfide material is milled and processed using the pressure oxidation (POX) process. Transition material will be controlled by Hycroft
grade control and may be processed with the sulfide material or heap leached with the oxide material. This TRS includes drill results
received through March 17, 2025, which formed the basis of the Mineral Resource Estimate (MRE) model.
The
Hycroft mine (the Mine) is situated on the western flank of the Kamma Mountains on the eastern edge of the Black Rock Desert
approximately 54 miles west of Winnemucca in Humboldt and Pershing Counties, Nevada. The Mine property straddles Townships 34, 35, 35½
and 36 north and Ranges 28, 29 and 30 east (MDB&M) with its central coordinates at approximately latitude 40°52’ north
and longitude 118°41’ west.
The
Mine is accessible via Nevada State Route 49 (Jungo Road), an unpaved road maintained by Humboldt County and Pershing County and Hycroft.
The Union Pacific railway, a major east–west railway, runs immediately adjacent to the property.
Hycroft, a past producer, has existing facilities on site including
two administration buildings, a mobile maintenance shop, a light vehicle maintenance shop, a warehouse, multiple leach pads, primary,
secondary and tertiary crushing systems, an assay lab, one Merrill-Crowe process plant, and a refinery.
1.2 Terms
of Reference
The firms and consultants who are providing Qualified Persons (QPs)
responsible for the content of the TRS are, in alphabetical order, Ausenco, Hycroft, IMC and WestLand.
The TRS presents the IA-EA for the mine based on the POX and Heap
Leach processes.
All
units of measurement in the TRS are US customary, unless otherwise stated.
The
monetary units are in US dollars, unless otherwise stated.
Mineral resources are reported in accordance with the US Securities
and Exchange Commission Code of Federal Regulations, Subpart 229.1300 – Disclosure by Registrants Engaged in Mining operations (S-K
1300).
Hycroft Mine Project
Page 1
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
1.3 Mineral
Tenure, Surface Rights, Water Rights, and Agreements
The
Mine property consists of 25 private parcels with patented claims totaling approximately 1,855 acres, along with 3,249 unpatented mining
claims covering approximately 62,298 acres, for a combined total of approximately 64,000 acres. On May 15, 2023, Hycroft expanded its
holdings by acquiring a 50% undivided interest in three additional patented mining claims, adding approximately 61 acres at one location
in Northern Nevada. Some mining claims overlap other Hycroft Mining claims to ensure there are no fractional gaps in mining claim coverage.
These
claims are contiguous or proximate to the original Crofoot and Lewis claims.
Payment of annual claim maintenance and holding fees to the Bureau
of Land Management (BLM) and Humboldt and Pershing Counties and payment of annual real property taxes for patented claims in Humboldt
and Pershing Counties are made every third quarter (Q3). Payments are current through the 2025–2026 claim years, with US$724,095
paid for 2025–2026. Payment of annual claim maintenance and holding fees and real property taxes are required to hold the Hycroft
property in good standing. BLM annual maintenance fees for claims are due not later than September 1 of each year. Humboldt and Pershing
County State annual holding fees beginning September 1 of each year are due no later than November 1 of each year. Annual real property
taxes for patented claims in Humboldt and Pershing Counties are due August 31 of the following year.
Hycroft
controls all surface and mineral rights within the Hycroft MRE area. No further land acquisition is required for the operation
of the mine and contemplated processing facilities.
1.4 History
The
Mine location is in the Nevada Sulfur District, where mining for native sulfur began in the late 1800’s. In the early part of the
20th century high-grade Ag was mined as were veins of nearly pure alunite (hydroxylated aluminum potassium sulfate mineral)
in the southern part of the district. From 1941 to 1943, cinnabar (a mercury sulfide mineral) was also mined. Exploration for native
sulfur commenced again in 1966 with the Duval Corporation (Duval) reporting elevated Au and Ag values but finding no significant evidence
of a sulfur deposit at depth (Wallace, 1980).
In
1977, the Cordex Syndicate mapped and rock-chip sampled the Hycroft property, recognizing the potential for a bulk tonnage, low-grade
precious metal deposit. Homestake then took interest in the property and completed surface sampling and exploration drilling during 1981-1982.
Mining officially began as a small heap leach operation in 1983 at what was then known as the Lewis Mine. In 1985, Vista gained control
of the original Hycroft property. They also acquired the Lewis Mine in early 1987 from F. W. Lewis, Inc., and the Crofoot Mine in April
1988. From 1985 to 1999, they drilled 3,212 exploration holes, totaling 965,552 feet (ft) with the bulk of this drilling
focused on oxide gold mineralization at Central, Bay and Brimstone. Production from the Brimstone pit commenced in 1985 and continued
until December 1998.
From
1983 to 1998, the Mine produced approximately 1.2 million ounces (Moz) of Au and 2.5 Moz of Ag. An additional 58,700 ounce (oz) of Au
was produced from the leaching operations from 1999 through 2004. The remaining leasehold interest in the Lewis property was purchased
by Vista in December 2005. Production followed at the former Crofoot property in the Bay, South Central, Boneyard, Gap, and Historic
Cut-4 pits along the Central Zone. The Mine was placed on a care and maintenance program through 2007. In May 2007, the Nevada-based
holdings of Vista were spun out into Allied Nevada Gold Corp. (Allied Nevada). The Mine was included as part of the transfer of ownership
allowing Allied Nevada to explore, expand, and develop the resources. The Mine was reactivated in September 2007 and achieved planned
ore production by the end of 2009. With the construction of the North leach pad in 2013, the total leach pad space was increased to more
than 20 million square ft (ft2). In 2010, the Mine began an expansion program that included construction of a 21,000 gallon
per minute (gal/min.) Merrill-Crowe processing plant and a three-stage crushing facility as well as solution pumping capacity upgrades.
Active mining was stopped again at the Mine in June 2015 due to low metal prices, but active leaching of previously mined ore continued
through 2018. During this time, Allied Nevada emerged from its financial restructuring to become Hycroft Mining Corporation.
Hycroft Mine Project
Page 2
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
In
late 2018, Hycroft began construction of new leach pads. In April 2019, active mining began with a focus on transition and sulfide minerals
but were set aside for future processing. Active mining ceased in 2021, but gold and silver production continued through 2022.
From
September 2007 through July 2019 metal sales totaled approximately 900,000 oz of Au and 5.0 Moz of Ag. Active mining ceased and production
at the Mine was terminated on November 11, 2021. Annual sales in ounces of Au and Ag produced from the Mine’s heap leach operations
over years 2019 through 2022 total approximately 107,258 ounces of Au and 615,000 ounces of Ag.
1.5 Geology
and Mineralization
The
Hycroft deposit is a low-sulfidation, epithermal, hot springs system that contains gold and silver mineralization. Radiometric
dating indicates that the main phase of gold and silver mineralization was formed four million years ago, when hydrothermal fluids
were fed upward along high angle, normal faults.
Low-grade
gold and silver mineralization were co-deposited with silica and potassium feldspar throughout porous rock types.
A
subsequent drop in permeability, due to sealing of the system, led to over pressuring and subsequent repeated hydrothermal brecciation.
Additional precious metal mineralization was deposited during this event as breccia zones, veins, and sulfide flooding.
Gold
and silver mineralization was followed by an intense event of high sulfidation acid leaching of the mineralized volcanic rocks coincident
with a regional water table drop. This allowed steam heated sulfur gases to condense into sulfuric acid and leach the upper portion of
the mineralized rocks.
Oxidation
of sulfide mineralization occurs to variable depths over the deposit, depending upon proximity to faults, extent of acid leaching, and
depth to water table. Sulfide content through the deposit is variable from 0% to 20%.
A total of six
major north-northeast trending, west dipping, normal fault zones appear to broadly control the distribution of alteration. From west
to east, these fault zones are referred to as the Range, West Splay, Central, Break, Albert, and East Faults. These major structures
down-drop stratigraphy and affect the distribution of alteration and mineralization.
A
post-mineral basin bounding fault appears to border the Camel Conglomerate and the adjacent Pleistocene Lahontan Lake sediments in the
Black Rock Desert. Based on geophysics, this structure is approximately one to two miles west of the Mine site. There are several east–west
trending structures that appear to provide post-mineral offset to the deposit. These form a series of horst and grabens within the deposit
footprint.
Hycroft Mine Project
Page 3
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
1.6 Exploration
The
Hycroft property drill history covers the period from 1982 through 2024. Within the block model there are 5,813 drillholes, with
516,901 drill intervals amounting to 2,668,616 ft of drilling.
During 2021 through 2024, Hycroft drilled 260 holes, 105 in 2021,
85 in 2022, 49 in 2023 and 21 in 2024. Most of the 2021 drilling was diamond core that was used for metallurgical testing and assay. The
2022 and 2023 drilling focused on extending mineralization and upgrading areas from inferred to measured and indicated classification.
Since 2024, drilling has focused on high-grade mineralization in Brimstone and Vortex.
1.7 Sampling
Hycroft
provided IMC with the database which contained drilling information from 1982 through 2024. Assay data was received through March 2025.
The
current sample preparation analysis and security follow best practices and are acceptable for application to mineral resource reporting.
The
historic data collection is unknown. Components of the historic data have been found to be reliable. Some components are not reliable
and have been removed or modified prior to incorporation into the MRE.
After the noted adjustments, John Marek, the QP, finds the data applicable
to the determination of the MRE.
1.8 Metallurgical
Testwork
Metallurgical testwork supporting the Hycroft process flowsheet has been conducted by several laboratories, including
G&T Metallurgical Services Ltd. (G&T), SGS Mineral Services (SGS), Hazen Research Inc. (Hazen), FLSmidth Minerals Testing &
Research Center (FLSmidth MTRC), and Kappes, Cassiday & Associates (KCA). The process design and metallurgical assumptions used in
this study are primarily based on the most recent testwork completed by FLSmidth - MTRC and Hazen Research, with historical testwork from
the other laboratories reviewed to support the interpretation of metallurgical performance and flowsheet development.
Comminution testwork indicates that Hycroft mineralization is very
high and requires relatively high grinding energy in ball mill grinding.
Hycroft Mine Project
Page 4
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
In 2021, Hycroft initiated a new metallurgical variability study
to evaluate mineralized material characteristics within the current mine plan, validate the metallurgical performance across the deposit;
and identify potential variations in processing conditions required to recover gold and silver. The objective of the study was to support
development of a Hycroft process flowsheet, including definition of key process control points in crushing, grinding, capable of consistently
achieving gold and silver recoveries across anticipated metallurgical variability.
Key
outcomes of this study included the development of the flotation process with significantly improved recoveries. The following key process
controls parameters were identified during the flotation process development program:
● Optimal
grind size is a P80 of less than 85 micrometers (µm).
● Flotation
time is 24 minutes.
● Adjusted
pH level is 4.7.
● Flotation
mass pull is 20 to 25% with 22% being the target.
A total of 137 samples were tested under these selected conditions
to achieve higher gold and silver recoveries to flotation concentrate. The results show that gold recovery exhibits a broader distribution,
with values ranging from approximately 72 to 98% and a statistical median near 88%, indicating greater sensitivity across the tested samples.
In contrast, silver recovery is generally higher, with recoveries spanning approximately 76 to 100% and a statistical median exceeding
92%. This is a significant improvement from the gold flotation recovery and silver flotation recovery values reported in a TRS prepared
for Hycroft and filed in 2023 (the 2023 TRS).
In
2025, Hycroft completed a series of POX tests demonstrating that POX at 225°C with oxygen overpressure, followed by hot cure, lime
boil, and cyanide leaching, is a technically viable and repeatable processing route for the pyrite concentrate. Gold and silver recoveries
of approximately 93% and 86%, respectively, were consistent with past performance. Overall, considering the full flowsheet involving
flotation, POX, and leaching, gold recovery has improved to approximately 83% and silver recovery has improved to approximately 78%.
Overall recovery for both gold and silver are exceeding the values assumed in the 2023 TRS.
Hycroft
existing heap leaching was discontinued in 2022. Heap leach operations are expected to restart once new oxide and transition material
becomes available.
1.9 Mineral
Resource Estimate
The MRE on the Hycroft property is currently envisioned to be mined
by way of a conventional hard rock open pit mine feeding two process facilities:
1. Run-of-mine
(ROM) oxide material will be directed to cyanide heap leaching, producing a
gold and silver doré.
2. Sulfide
material will be directed to a crushing, flotation milling followed by POX of the concentrate
to make a gold and silver doré.
Transitional material will be directed to either (ROM) cyanide heap
leaching or flotation milling followed by POX depending on the sulfide sulfur levels of the individual blocks, total sulfur content, and
gold grade.
The terms of reference for this MRE are mineralization in-place.
The procedures described in the following paragraphs establish that the stated MRE has reasonable prospects for economic extraction of
mineral resources.
Mineral resources were developed using a computer-based block model
for mineralization and pit optimization software to determine mineralization with reasonable prospectus for economic extraction.
Hycroft Mine Project
Page 5
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The cutoff grade that is reported for this statement of mineral resources
is based on mining and processing costs estimated by IMC and Ausenco combined with reasonable metal prices. The internal or marginal cutoff
is applied and reported where the benefits of selling the recovered metal will pay for the processing and fixed general and administrative
(G&A) costs. The cutoff is presented in terms of net of refining (NSR).
Metal prices for the MRE were US$3,100/oz Au and US$36.00/oz Ag.
Spot prices for gold and silver in 2025 ranged from US$2,798 to US$4,323/oz Au and US$31.34 to US$71.63/oz Ag. The spot prices for gold
and silver on January 21, 2026, were US$4,726/oz Au and US$93.50/oz Ag. The prices selected for determination of the MRE are 35% below
the spot gold price and 62% below the spot silver price on January 21, 2026.
The risks to the MRE are project costs and project recoveries as
well as metal prices that can have a substantial impact on the mineral resource both positively and negatively. The Hycroft MRE is sensitive
to estimated parameters of operating costs, recoveries, and metal prices. That sensitivity may result in future variation in the mineral
resource as costs and recoveries are refined.
Mineral
resources are not mineral reserves, and detailed economic considerations have not been applied.
Table
1-1: Hycroft MRE as of January 21, 2026, US customary Units
Classification
Cutoff
Grade
$
Net
of
Refining
Approximate
Cutoff,
AuEq oz/ton
Ktons
Gold
oz/ton
Silver
oz/ton
Sulfide
Sulfur
%
Contained
Ounces
Gold
Oz
x 1000
Silver
Oz
x 1000
Heap
Leach Resource
Measured
$1.88
- $3.63
0.001
- 0.002
92,994
0.005
0.11
1.83
446
10,322
Indicated
$1.88
- $3.63
0.001
- 0.002
110,374
0.004
0.09
1.54
475
9,492
Meas
+ Ind
$1.88
- $3.63
0.001
- 0.002
203,368
0.005
0.10
1.67
921
19,814
Inferred
$1.88
- $3.63
0.001
- 0.002
110,018
0.005
0.09
1.41
528
10,122
Flotation
Mill + Concentrate Treatment by Pressure Oxidation and Cyanide Leach
Measured
$16.73
0.007
734,571
0.011
0.43
2.03
8,154
316,600
Indicated
$16.73
0.007
748,876
0.010
0.30
1.84
7,339
226,161
Meas
+ Ind
$16.73
0.007
1,483,447
0.010
0.37
1.93
15,493
542,761
Inferred
$16.73
0.007
459,646
0.010
0.27
1.76
4,505
122,725
Combined
Mineral Resources Leach Plus Mill
Measured
$1.88
- $16.73
0.001
- 0.007
827,565
0.010
0.40
2.01
8,600
326,922
Indicated
$1.88
- $16.73
0.001
- 0.007
859,250
0.009
0.27
1.80
7,814
235,653
Meas
+ Ind
$1.88
- $16.73
0.001
- 0.007
1,686,815
0.010
0.33
1.90
16,414
562,575
Inferred
$1.88
- $16.73
0.001
- 0.007
569,664
0.009
0.23
1.69
5,033
132,847
Notes:
1. Mineral
resources based on metal prices of $3,100/troy oz Au and $36.00/troy oz Ag.
2. Cutoffs
are Income – Refining Cost = NSR.
3. Gold
Equivalent (AuEq) for Heap Leach = Cyanide Gold + 0.0019 x Total Silver Assay, or at average
gold leach recovery AuEq = Fire Gold + 0.0035 Total Silver Assay.
4. Gold
Equivalent for Mill + Pressure Oxidation = Fire Gold + 0.0107 x Total Silver Assay.
5. Numbers
may not match exactly due to rounding.
6. Mineral
resources are contained within a computer-generated optimized pit.
7. Total
material in that pit is 5.42 billion tons.
Hycroft Mine Project
Page 6
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
8. Mineral
resources are not mineral reserves, and detailed economic considerations have not been applied.
9. Modifying
factors for mine and process design have not been applied.
10. All
units are US customary. Ktons means 1,000 short tons. Au and Ag grades are in troy
ounces per short ton (oz/ton).
Table
1-2: Hycroft MRE as of 21 January 2026, Metric Units
Classification
Cutoff
Grade
$
Net
of
Refining
Approximate
Cutoff,
AuEq g/tonne
Ktonnes
Gold
Silver
Sulfide Sulfur
Contained
Ounces
Gold
Silver
g/tonne
g/tonne
%
Oz
x 1000
Oz
x 1000
Heap
Leach Resource
Measured
$2.07
- $4.00
0.027
- 0.055
84,364
0.164
3.80
1.83
446
10,322
Indicated
$2.07
- $4.00
0.027
- 0.055
100,131
0.147
2.95
1.54
475
9,492
Meas
+ Ind
$2.07
- $4.00
0.027
- 0.055
184,495
0.155
3.34
1.67
921
19,814
Inferred
$2.07
- $4.00
0.027
- 0.055
99,808
0.164
3.15
1.41
528
10,122
Flotation
Mill + Concentrate Treatment by Pressure Oxidation and Cyanide Leach
Measured
$18.44
0.206
666,403
0.380
14.76
2.03
8,154
316,600
Indicated
$18.44
0.206
679,380
0.336
10.34
1.84
7,339
226,161
Meas
+ Ind
$18.44
0.206
1,345,783
0.358
12.53
1.93
15,493
542,761
Inferred
$18.44
0.206
416,991
0.336
9.14
1.76
4,505
122,725
Combined
Mineral Resources, Leach Plus Mill
Measured
$2.07
- $18.44
0.027
- 0.206
750,767
0.356
13.53
2.01
8,600
326,922
Indicated
$2.07
- $18.44
0.027
- 0.206
779,512
0.311
9.39
1.80
7,814
235,653
Meas
+ Ind
$2.07
- $18.44
0.027
- 0.206
1,530,279
0.333
11.42
1.90
16,414
562,575
Inferred
$2.07
- $18.44
0.027
- 0.206
516,799
0.303
7.99
1.69
5,033
132,847
Notes:
1. Mineral
resources based on metal prices of $3,100/ oz Au and $36.00/ oz Ag.
2. Cutoffs
are Income – Refining Cost = NSR.
3. Gold
Equivalent for Heap Leach = Cyanide Gold + 0.0019 x Total Silver Assay.
4. Gold
Equivalent for Mill + Pressure Oxidation = Fire Gold + 0.0107 x Total Silver Assay.
5. Numbers
may not match exactly due to rounding.
6. Mineral
resources are contained within a computer-generated optimized pit.
7. Total
material in that pit is 4.92 billion tonnes.
8. All
units on this table are metric: Ktonnes means 1,000 tonnes. Au and Ag grades are in grams
per tonne (g/tonne).
9. Mineral
resources are not mineral reserves, and detailed economic considerations have not been applied.
10. Modifying
factors for mine and process design have not been applied.
Contained
within the MRE at Hycroft are a series of high-grade silver veins at Brimstone and zones of higher silver concentrations in Vortex that
are associated with a low angle breccia body. Table 1-3 and Table 1-4 are the tabulation of gold and silver within the domain volumes
that are contained within the MRE at 2 oz/tonne cutoff grade in US customary and 68.57 g/tonne cutoff grade in metric.
Hycroft Mine Project
Page 7
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
1-3: High-grade Silver Bearing Domains, Contained Within the MRE at 2 oz/ton Cutoff Grade, US customary Units
Classification
Cutoff
Grade Silver (oz/ton)
Ktons
Gold
(oz/ton)
Silver
(oz/ton)
Sulfide
Sulfur (%)
Gold
Contained
oz x 1000
Silver
Contained
oz x 1000
Brimstone
Measured
2.00
3,195
0.011
8.35
1.33
35
26,686
Indicated
2.00
330
0.010
3.11
1.87
3
1,025
Meas
+ Ind
2.00
3,525
0.011
7.86
1.38
38
27,711
Inferred
2.00
15
0.008
3.52
1.13
0
52
Vortex
Measured
2.00
9,126
0.018
3.81
1.49
160
34,781
Indicated
2.00
7,342
0.014
3.78
1.24
100
27,726
Meas
+ Ind
2.00
16,468
0.016
3.80
1.38
261
62,507
Inferred
2.00
3,644
0.014
3.65
1.27
50
13,307
Brimstone
+ Vortex
Measured
2.00
12,322
0.016
4.99
1.45
195
61,467
Indicated
2.00
7,671
0.013
3.75
1.26
104
28,750
Meas
+ Ind
2.00
19,993
0.015
4.51
1.38
299
90,218
Inferred
2.00
3,659
0.014
3.65
1.27
51
13,359
Table
1-4: High-grade Silver Bearing Domains, Contained Within the MRE at 68.57
g/tonne (2 oz/tonne) Cutoff Grade, Metric Units
Classification
Cutoff
Grade Silver (g/tonne)
Ktonnes
Gold
(g/tonne)
Silver
(g/tonne)
Sulfide
Sulfur (%)
Contained
Ounces
Gold
Oz x 1000
Silver
Oz x 1000
Brimstone
Measured
68.57
2,899
0.372
286.35
1.33
35
26,686
Indicated
68.57
299
0.332
106.62
1.87
3
1,025
Meas
+ Ind
68.57
3,198
0.368
269.54
1.38
38
27,711
Inferred
68.57
13
0.289
120.74
1.13
0
52
Vortex
Measured
68.57
8,279
0.603
130.67
1.49
160
34,781
Indicated
68.57
6,660
0.469
129.48
1.24
100
27,726
Meas
+ Ind
68.57
14,940
0.543
130.14
1.38
261
62,507
Inferred
68.57
3,306
0.475
125.20
1.27
50
13,307
Brimstone
+ Vortex
Measured
68.57
11,178
0.543
171.04
1.45
195
61,467
Indicated
68.57
6,959
0.463
128.49
1.26
104
28,750
Meas
+ Ind
68.57
18,137
0.512
154.71
1.38
299
90,218
Inferred
68.57
3,319
0.474
125.18
1.27
51
13,359
Hycroft Mine Project
Page 8
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
1.10 Mining
Methods
Hycroft
is planned as a conventional hard rock open pit operation. IMC developed a mine plan that produces the required process feed and moves
sufficient mine waste to assure continued release of the mineralization. The mine plan is based on measured and indicated mineralization
that was estimated in the mineral resource block model described in Section 11.
Inferred
mineralization was not included within this initial assessment for two reasons: (1) there is sufficient measured and indicated mineralization
to feed the process plant for over 50 years, and (2) to reduce the changes in the mine schedule and potentially minable material as the
project moves toward a pre-feasibility study in the future.
The
mine will feed two processing facilities:
1. A
flotation mill followed by pressure oxidation and leaching of the concentrate.
2. A
ROM heap leach for mineralization that is amenable to direct cyanide leaching.
The
mine production schedule is summarized in Figure 13-1 with tabular detail in Table 13-1.
1.11 Processing
and Recovery Methods
Hycroft
property is currently envisioned to be mined by way of a conventional hard rock open pit mine feeding two process facilities:
1. Oxide
Material – ROM oxide material will be directed to cyanide heap leaching, producing
gold and silver doré.
2. Sulfide
Material – Sulfide material will be directed to a crushing and flotation milling circuit,
followed by pressure oxidation (POX) of the concentrate to produce a gold and silver doré.
Transitional
material will be routed to either ROM cyanide heap leaching or flotation milling followed by POX, depending on the sulfide sulfur levels
of the individual blocks, total sulfide sulfur content, and gold grade. The process route will be determined based on grade control
The
existing Heap Leach facilities (Brimstone Heap Leach Pad and North Heap Leach Pad) will be expanded to accommodate additional capacity.
These facilities have existing collection ponds and pumping systems. The leach solution distribution network will be expanded as required
to support increased throughput.
Hycroft Mine Project
Page 9
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
For
sulfide processing, the plant will utilize the existing crushing plant. Consisting of three stages of crushing, reducing the mineralized
material from a nominal top size of approximately 35 inches (“) to about ⅜”. The crushed material is fed to a two-stage
ball milling circuit operating in closed circuit with hydrocyclones, producing a grind suitable for downstream processing. Cyclone overflow
will be directed to rougher flotation for recovery of gold and silver into a flotation concentrate.
Rougher
flotation tailings will be thickened prior to transfer to the final tailings pumping system. The flotation concentrate will be processed
through POX to oxidize sulfide minerals and liberate gold and silver for downstream recovery.
Following
oxidation, the oxidized slurry will undergo counter-current decantation (CCD) washing to recover dissolved metal values and remove acidic
process solutions. The washed solids are then conditioned through lime boil and hot curing prior to cyanide leaching.
The
conditioned solids will be leached in cyanide leach tanks to dissolve gold and silver. Precious metals will be recovered from the leach
solution using the existing Merrill-Crowe zinc precipitation circuit, producing gold-silver doré.
Residual
cyanide in the leach tailings will be destroyed using a sulfur dioxide–oxygen detoxification process, after which the detoxified
tailings will be combined with flotation tailings and pumped to the tailings management facility (TMF) for disposal.
1.12 Infrastructure
The
Hycroft Mine infrastructure scope represents a brownfield development within an established mining complex. The proposed sulfide ore
processing plant will be integrated into existing site infrastructure via tie-ins to current crushing facilities, utilities, and site
services. Most existing access roads, haul roads, and ancillary structures will remain in service or be selectively upgraded.
1.12.1 Site
Access and Haulage
New
road infrastructure includes 0.6 miles of plant access roads, a 5.6-mile TMF access road parallel to the tailings delivery pipeline corridor,
and a 3.4-mile TMF construction haul road connecting the North WRSF to the TMF embankment. All roads are designed as dirt roads with
a maximum 10% grade and 25 miles per hour (mph) speed limit. A rail spur extension from the adjacent Union Pacific line will receive
reagents, consumables, and fuel, and facilitate export of salable metals. The spur design by Mountain States Contracting Inc. includes
turnouts, derails, signals, ballast, bridges, civil works, and a bottom-dump hopper car loadout facility.
1.12.2 New
Infrastructure
New
process plant facilities will tie into the existing crushing circuit and North Merrill-Crowe facility. New onsite infrastructure includes
utility tie-ins, power distribution upgrades, substations, a process control system and control room, and reagent handling facilities
including an oxygen plant and limestone offloading and slaking system. Six new ancillary facilities are planned over the LOM including
a covered crushed ore stockpile dome (313 ft diameter × 104 ft height), new assay lab, fuel station, technical services building,
maintenance shop, and crusher maintenance building. Ten existing structures will be upgraded, relocated, or repurposed. Workforce accommodation
will be drawn primarily from Winnemucca (~54 miles east), with personnel transported via contracted bus service.
Hycroft Mine Project
Page 10
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
1.12.3 Stockpiles
Coarse
ore stockpile capacity is 56,000 tons live and 175,400 tons total; crushed ore stockpile capacity is 34,000 tons live and 113,000 tons
total, covered by a round dome structure. These stockpiles support crushing circuit availability of 31.3% for primary and 65.1% for combined
secondary and tertiary crushing. Growth medium stripped during TMF construction will be stockpiled for reclamation use. Limestone will
be delivered by rail to a dedicated onsite stockpile.
1.12.4 Tailings
Management Facility
The
TMF uses conventional designs and will be constructed in a total of eight stages and zero discharge of process solutions. The TMF will
fill the broad valley immediately northeast of the mill site and require the main and the north embankments to impound an ultimate tailings
storage capacity of 1.05 billion tons (Btons) at an average settled dry density for the ultimate facility of 92 pounds per cubic ft (pcf).
The main embankment will cross the natural drainage on the west side of the TMF, and the secondary embankment will be constructed along
the northern ridge. The facility will provide continuous containment of process solutions through the installation of a vertical chimney
drain and engineered geomembrane liner systems, extending across the impoundment basin and below a portion of the main embankment and
the upstream slope of the north embankment. The design is capable of storing runoff from the basin and direct precipitation on the facility,
resulting from the 5,000-year, 24-hour storm event during operation and the 10,000-year, 24-hour storm event for post-closure.
1.12.5 Waste
Rock Storage Facility
Two
initial waste rock storage facility (WRSF) locations — west and south of the pit — will merge into a single facility
on the southwest perimeter by Mine Year 10. The dump is designed with an overall slope of 2.7H:1V and inter-bench geometry of 1.5H:1V
slopes with 50 ft high and 60 ft wide benches, constructed over previously disturbed ground. Water management consists of upstream diversion
channels for non-contact water and a seepage collection system for contact water, comprising double-walled HDPE pipes (300 mm main, 100
mm secondary) sized for the 100-year, 24-hour event. Seepage is conveyed to double-lined GCL and HDPE collection ponds for reuse at the
process plant. Surface water diversion channels are sized for the 100-year, 24-hour event with a minimum 2% slope and riprap lining.
Physical stability will be monitored via survey markers, vibrating wire piezometers, hydraulic piezometers, and inclinometers throughout
the LOM. Topsoil and growth media will be harvested from areas adjacent to the WRSF during closure to support reclamation.
1.12.6 Power,
Communications, and Fuel
Two
120 kV powerlines will supply the site via the Nevada Power Imlay Substation. Installed load is 160 MW with an operating load of 124
MW; total load including the oxygen plant is 170 MW, requiring additional transmission capacity. Site communications are currently served
by microwave, fiber optic, and cellular systems and will be upgraded as required during execution. Diesel fuel is priced at $3.76/gallon;
supply contracts are in place on an annual or bi-annual basis. Fuel will be delivered by rail once the spur is operational. The existing
fuel island will be replaced with a high-efficiency system in mine years 3 and 4.
Hycroft Mine Project
Page 11
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
1.12.7 Water
Supply and Management
Hycroft
holds 16 water-right permits sufficient to support all planned facilities and process demands. Plant freshwater demand is estimated at
7,260 gal/min, supplied via four existing wells with four additional production wells to be drilled. Tailings will be transported as
slurry at 48% solids through an HDPE-lined pipeline, distributed via a 36” manifold system. Return water will initially
be managed via the Underdrain Collection Pond, transitioning to barge-mounted pumps in the TMF supernatant pool in later years. GoldSim
Monte Carlo water balance modeling over 250 simulations indicates average make-up water demand starting at 6,500 gal/min in year 1, declining
to 3,200 gal/min by years 14–15. Pit dewatering will be managed by four depressurization wells with groundwater at approximately
700 ft below ground surface (bgs), with water conveyed to the process plant. Plant site stormwater is managed via perimeter ditches and
a 9,850 yd³ HDPE-lined sedimentation pond sized for the 100-year, 24-hour event.
1.12.8 Hazard
Considerations
The
site climate is arid at 7.7 in/a average precipitation with winter temperatures between 20 °F and 40 °F, introducing freeze-thaw
cycling risk in near-surface soils. Seismicity is assessed as low to moderate with no active or capable faults identified. Principal
pit slope stability controls are the argillically altered Camel Conglomerate, Auld Lang Syne Formation siltstones, and the East Fault.
1.13 Market
Studies and Contracts
No
formal marketing studies have been completed. Gold and silver doré will be sold on the spot market under terms typical of comparable
doré contracts. Both metals are globally liquid commodities supporting reliable price discovery throughout the LOM. The economic
analysis assumes base case prices of US$3,600/oz gold and US$48.00/oz silver, based on long-term consensus forecasts from numerous financial
institutions as of April 2026. No refining, transportation, or hedging contracts are currently in place, though these are considered
readily obtainable. Refining and transportation costs are estimated at US$5.00/oz gold and US$0.50/oz silver based on comparable project
terms.
1.14 Environmental,
Permitting and Social Considerations
1.14.1 Environmental
Considerations
The
Mine has conducted numerous environmental baseline studies as part of their previous permitting efforts and continues to collect certain
environmental baseline data. The Mine area has been surveyed for surface water resources, including Waters of the United States (WOTUS),
biological resources, cultural resources, and groundwater resources. In addition, the Mine has developed a series of environmental management
and monitoring plans which are required to guide the development and operation of the Project to limit environmental impacts. These plans
are developed to address legal requirements and committed Environmental Protection Measures (EPMs) made by the Mine during Project permitting
and recent Plan of Operations amendments.
Hycroft Mine Project
Page 12
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
1.14.2 Permitting
Considerations
The
Mine operates under a series of permits, which are issued by both federal and state regulators. The following table lists the principal
environmental permits necessary to operate the Mine and the applicable issuing agency.
Table
1-5: Principal Environmental Permits
Operating
Permits
Issuing
Agency
Plan
of Operations
BLM
Mercury
Operating Permit to Construct
NDEP
Bureau of Air Pollution Control
Class
I Air Quality Operating Permit to Construct
NDEP
Bureau of Air Pollution Control
Class
II Air Quality Permit
NDEP
Bureau of Air Pollution Control
Permit
to Operate a Public Water System
NDEP
Bureau of Safe Drinking Water
Water
Pollution Control Permit-Crofoot Project
NDEP
Bureau of Mining Regulation & Reclamation
Water
Pollution Control Permit-Hycroft Mine
NDEP
Bureau of Mining Regulation & Reclamation
Reclamation
Permit
NDEP
Bureau of Mining Regulation & Reclamation
Mining
General Stormwater Pollution Prevention Permit
NDEP
Bureau of Water Pollution Control
Class
III Landfill Waiver
NDEP
Bureau of Waste Management
Artificial
Pond Permit (Brimstone Process Ponds)
NV
Department of Wildlife
Artificial
Pond Permit (Crofoot Process Ponds)
NV
Department of Wildlife
Artificial
Pond Permit (North Process Ponds)
NV
Department of Wildlife
Septic
Onsite Disposal
NDEP
Bureau of Water Pollution Control
Dam
Safety Permits
NV
Division of Water Resources
Hazardous
Materials Storage Permit
NV
State Fire Marshal
Special
Use Permit
Pershing
County
Special
Use Permit
Humboldt
County
Golden
Eagle Take Permit
US
Fish & Wildlife Service
In
addition to the principal environmental permits outlined above, the following table lists other notifications or ministerial permits
that may likely be necessary to operate the Project, as well as the applicable agency.
Table
1-6: Other Notifications or Ministerial Permits
Notification/Permit
Agency
Above
Ground Storage Tank Permit
Nevada
Bureau of Corrective Actions
Agreement
for Road Maintenance
Humboldt
and Pershing Counties
Explosives
Permit
Bureau
of Alcohol, Tobacco, Firearms, and Explosives
Explosives
User’s License (User’s Clearance)
Bureau
of Alcohol, Tobacco, Firearms, and Explosives
Fire
and Life Safety
Nevada
State Fire Marshal
Hazardous
Materials Permit
Nevada
State Fire Marshal
Industrial
Artificial Pond Permit
Nevada
Department of Wildlife
Leach
Pad Commencement
Nevada
Bureau of Mining Regulation and Reclamation
Leach
Pad As-Built Report
Nevada
Bureau of Mining Regulation and Reclamation
Process
Plant As-Built Report
Nevada
Bureau of Mining Regulation and Reclamation
Dam
Safety Permit
Nevada
Division of Water Resources
Mine
ID Number
Mine
Safety & Health Administration
Mine
Opening Notification
Nevada
Division of Minerals
Mine
Registry
Nevada
Division of Minerals
Notification
of Commencement of Operations
Mine
Safety & Health Administration
Production/Dewatering
Wells - Proof of Completion
Nevada
Division of Water Resources
Radio
License
Federal
Communications Commission
RCRA
Waste Mgt. ID - Mine
Nevada
Bureau of Sustainable Materials Management/U.S. Environmental Protection Agency
Well
Drilling Permit (Notice of Intent to Drill)
Nevada
Division of Water Resources
Potable
Water System
Nevada
Bureau of Safe Drinking Water
Septic
System
Nevada
Bureau of Water Pollution Control
Hycroft Mine Project
Page 13
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
1.14.3 Social
Considerations
Social
and community impacts are considered and evaluated for the revision to the Plan Application and would be used in the NEPA process. Potentially
affected Native American tribes, tribal organizations, and/or individuals are consulted during the preparation of all plan amendments
to advise on the proposed projects that may affect cultural sites, resources, and traditional activities.
1.14.4 Closure
and Reclamation Considerations
A
Tentative Plan for Permanent Closure (TPPC) for the Mine is in place and is currently being updated for future submission to the BMRR
with the application to modify the WPCP (NEV0094114). In the TPPC, the proposed TMF closure approach would consist of fluid management
through evaporation, covering the TMF with a geosynthetic cover and growth media, and then revegetation. The design of the process components
is not sufficiently advanced to determine the closure costs. Any residual TMF drainage will be managed with evaporation cells. Surface
management surety bonds currently total US$58.7 million with US$58.3 million securing financial assurance requirements for the Mine and
US$0.4 million securing financial assurance requirements for the water supply well field and exploration within the Project boundary.
Future increases in reclamation bonding will either be through surety bonds supported by restricted cash balances or by letters of credit
issued by banks.
1.15 Capital
and Operating Cost
The
capital cost (CAPEX) and operating cost (OPEX) estimates were developed in Q1 2026 in U.S. dollars (US$). The estimates are based on
budgetary quotations, supplemented with Ausenco’s in-house database, and informed by Ausenco’s experience from similar operations
in North America.
1.15.1
Capital
Cost Estimate
The
capital cost estimate was developed in Q1 2026 to target a level of accuracy of -30% to +50%, which aligns with an Association for the
Advancement of Cost Engineering International (AACE International) Class 5 level estimate. The CAPEX estimate includes the following:
● Initial
capital cost to design, construct, and commission the mine, process plants, and supporting
facilities and infrastructure.
● Sustaining
capital to construct and commission equipment replacement and other major capital expenses
expected after commercial production commences.
● Closure
costs associated with reclaimation of the project site after operations have ceased.
The
initial, sustaining, and total costs of the project are summarized by major areas in Table 1-7.
Table
1-7: Capital Cost Summary
WBS
Description
Capital
Cost (US$M)
Sustaining
Cost (US$M)
Total
Cost1 (US$M)
1000
Mining
194
1,171
1,365
2000
Crushing
48
60
109
3000
Sulfide
Process
915
776
1,692
4000
Oxide
Process
16
46
63
5000
Waste
Rock Storage & TMF
208
515
723
6000
Onsite
Infrastructure
139
9
148
7000
Offsite
Infrastructure
43
366
409
Total
Direct Costs
1,563
2,944
4,507
8000
Indirects
382
27
409
9000
Provisions
448
136
584
10000
Owner’s
Costs
41
-
41
Total
Capital Cost
2,434
3,107
5,541
Note:
1. Totals
may not match due to rounding
Hycroft Mine Project
Page 14
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
1.15.2 Operating
Cost Estimate
The
operating cost estimate was developed in Q1 2026 to target a level of accuracy of -30% to +50%, which aligns with an Association for
the Advancement of Cost Engineering International (AACE International) Class 5 level estimate. The OPEX estimate for the project includes
expenses incurred by the mine, process plant, and administration of the operation (G&A costs). A summary of the mining, processing,
and G&A operational costs by LOM total cost and unit cost (US$/ton) is in Table 1-8.
Table
1-8: Operating Cost Summary
Cost
Area
LOM
Total (US$M)1
US$/ton
milled
%
of Total
Mining
8,6832
6.91
31.5
Process
18,245
14.52
66.1
G&A
664
0.53
2.4
Total
27,592
21.96
100
Note:
1. Totals
may not match due to rounding
2. Includes
10% contingency
1.16 Economic
Analysis
1.16.1 Economic
Summary
The
results of the economic analysis discussed in this section represent forward-looking information as defined under U.S. securities law.
The results depend on inputs that are subject to a number of known and unknown risks, uncertainties and other factors that may cause
actual results to differ materially from those presented here.
Information
that is forward-looking includes:
● mineral
resource estimates
● assumed
commodity prices and exchange rates
● proposed
mine production plan
● projected
mining and process recovery rates
● assumptions
as to mining dilution
● capital
and operating cost estimates and working capital requirements
● assumptions
as to closure costs and closure requirements
● assumptions
as to environmental, permitting and social consideration and risks.
Hycroft Mine Project
Page 15
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Additional
risks to the forward-looking information includes:
● changes
to costs of production from what is assumed
● unrecognized
environmental risks
● unanticipated
reclamation expenses
● unexpected
variations in quantity of mineralized material, grade or recovery rates
● geotechnical
or hydrogeological considerations differing from what was assumed
● failure
of mining methods to operate as anticipated
● failure
of plant, equipment or processes to operate as anticipated
● changes
to assumptions as to the availability of electrical power, and the power rates used in the
operating cost estimates and financial analysis
● ability
to maintain the social license to operate
● accidents,
labor disputes and other risks of the mining industry
● changes
to interest rates
● changes
to tax rates and availability of allowances for depreciation and amortization.
The
economic analysis was completed assuming a 5% discount rate. The pre-tax NPV discounted at 5% is US$5,437 million; the IRR is 18.9%,
and payback period is 4.3 years. On a post-tax basis, the NPV discounted at 5% is US$4,344 million, the IRR is 16.9%, and the payback
period is 4.7 years. A summary of project economics is listed in Table 1-9.
Readers
are cautioned that the assessment is preliminary in nature and there is no certainty that the economic assessment will be realized. However,
it does not include any inferred mineral resources.
Hycroft Mine Project
Page 16
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
1-9: Economic Analysis Summary
Unit
Value
General
Inputs
Gold
Price
US$/oz
3,600
Silver
Price
US$/oz
48.00
Discount
Rate
%
5.0
LOM
Production
Total
Mineralized Material Mined
kst
1,496,134
Total
Waste Mined
kst
2,320,719
Average
Strip Ratio
w:o
1.55
Life
of Mine
years
50.5
Total
Mill Feed Processed
kst
1,046,284
Average
Mill Feed Grade (Au)
oz/st
0.012
Average
Mill Feed Grade (Ag)
oz/st
0.43
Total
Leach Material Processed
kst
210,010
Average
Leach Feed Grade (Au)
oz/st
0.005
Average
Leach Feed Grade (Ag)
oz/st
0.12
Total
Recovered Gold
koz
10,476
Total
Recovered Silver
koz
349,208
Average
Mill Feed Gold Recovery
%
82.8
Average
Mill Feed Silver Recovery
%
77.5
Average
Leach Gold Recovery
%
40.0
Average
Leach Silver Recovery
%
12.0
Life
of Mine Payable Gold Production
koz
10,424
Life
of Mine Payable Silver Production
koz
347,462
Life
of Mine Payable Gold Equivalent Production
koz
15,057
Refining,
Royalties
Gold
Payable
%
99.5
Silver
Payable
%
99.5
NSR
Royalty
%
NSR
2.14
Refining
Costs - Au
US$/oz
5.00
Refining
Costs - Ag
US$/oz
0.50
LOM
Operating Costs
Mining
Cost
US$/st
mined
2.28
Mining
Cost
US$/st
processed
6.91
Processing
Cost
US$/st
processed
14.52
G&A
Cost
US$/st
processed
0.53
Total
Operating Cost
US$/st
processed
21.96
Cash
Costs1
US$/oz
AuEq
1,924
All-In
Sustaining Cost2
US$/oz
AuEq
2,147
Capital
Costs
Initial
Capital
US$M
2,434
Sustaining
Capital
US$M
3,107
Closure
Costs
US$M
243
Financials
Pre-Tax
NPV (5%)
US$M
5,437
Pre-Tax
IRR
%
18.9
Pre-Tax
Payback
years
4.3
Post-Tax
NPV (5%)
US$M
4,344
Post-Tax
IRR
%
16.9
Post-Tax
Payback
years
4.7
Notes:
1. Cash
costs consist of mining costs, processing costs, mine-level G&A and refining charges
and royalties
2. AISC
includes cash costs plus sustaining capital and closure costs
Hycroft Mine Project
Page 17
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
1.16.2 Sensitivity
Analysis
A
sensitivity analysis was conducted on the base case NPV and IRR of the project using the following variables: discount rate, head grade,
recovery, total operating cost, initial capital cost, as well as silver and gold prices, which were encompassed in a single variable,
metal price.
As
shown in Figure 1-1, the sensitivity analysis revealed that the project is most sensitive to changes in metal price, head grade, and
recovery.
Figure
1-1: Post-Tax Sensitivity Analysis Results
Note:
Metal price, head grade, and recovery series overlap on the above figure. Source: Ausenco, 2026
Hycroft Mine Project
Page 18
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
1.17 Conclusions
Hycroft,
in conjunction with IMC, developed the Hycroft deposit block model based on 5,813 drillholes with 516,901 drill intervals amounting to
2,668,616 ft of drilling. The model was assembled by Ryan Rodney, C.P.G. of Hycroft. IMC worked with Hycroft and reviewed the final model.
IMC is the qualified firm for the statement of mineral resources with John Marek, P.E., acting as the Engineer of Record.
Previous
metallurgical testwork programs conducted on the Hycroft sulfide deposit consisted of a series of comminution, flotation, concentrate
oxidation, and cyanide leaching tests on mineralized materials, flotation tailings, and oxidized sulfide concentrates.
Comminution
testwork indicates that the Hycroft mineralization exhibits very high rock competency. Flotation testwork, conducted at a grind sizes
of P80 of 85 µm, under acidic conditions (pH of 4.7) using strong non-selective sulfide collectors, demonstrated improved
flotation performance. Flotation residence time was identified as a key parameter, and optimized test conditions targeted a mass pull
of approximately 22% to 25%, resulting in favorable Au and Ag recoveries.
Metallurgical
testwork conducted between 2021 and 2025 indicates that the Hycroft sulfide mineralization can be processed using a flotation and POX
flowsheet. Flotation optimization resulted in improved gold and silver recoveries, and POX test results support the application of POX
followed by hot cure, lime boil, and cyanide leaching for treatment of the pyrite concentrate.
The
MRE statement was developed using a conventional computer-based block model. Each block was evaluated to determine the net return from
the following two processes:
● ROM
cyanide heap leaching and Merrill-Crowe of oxide and some transition materials.
● Milling,
Flotation, POX, Hot Cure, and Lime Boil followed by Cyanide Leach and Merrill-Crowe of sulfide
and some transition materials.
The
Initial Assessment indicates that the selected development has the potential to support economic extraction of the Hycroft mineral resources
based on the study adopted for mining, processing, infrastructure, capital and operating costs, and commodity prices. The economic analysis
demonstrates positive project economics. However, project value remains sensitive to key factors including metal prices, metallurgical
performance, capital cost estimates, and operating assumptions. Additional metallurgical testwork, engineering refinement, and economic
optimization are recommended in the next study phase to reduce uncertainty and improve confidence in project outcomes.
1.18 Recommendations
Recommendations
cover the discipline areas of exploration and resource model refinement, mineral processing and metallurgical testing, and overall project
configuration to support the evaluation at the PFS level. The total recommended budget estimate to complete the programs is $22,050,000.
Hycroft Mine Project
Page 19
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
2 Introduction
2.1 Introduction
This
technical report summary (TRS) summarizes the results of an initial assessment with an economic analysis (IA-EA) for the Mine located
in northwestern Nevada. The work has been prepared at the request of Hycroft Mining Holding Corporation (Hycroft). The TRS follows the
requirements and outline as described in the. US Securities and Exchange Commission Code of Federal Regulations, Subpart 229.1300 –
Disclosure by Registrants Engaged in Mining operations (S-K 1300). This TRS has been completed by Ausenco Engineering South USA (Ausenco),
Hycroft, Independent Mining Consultants, Inc. (IMC) and WestLand Engineering & Environmental Services (WestLand) (collectively, the
Report Authors).
The
updated statement of mineral resources reflects information developed through 2025.
This
TRS supersedes all previous technical studies, including the TRS filed on EDGAR under Form 8-K on January 21, 2026.
The
MRE is based on information provided by Hycroft which has been checked and validated wherever possible by IMC. The MRE is based on information
provided by Hycroft. IMC, an independent third party with necessary relevant experience, has checked and validated the MRE wherever possible,
and is assuming responsibility for the published MRE.
2.2 Terms
of Reference
Some
sections of this report were published previously as part of a previous technical report summary filed in January 2026 (the 2026 TRS)
and are listed below in Section 2.6.2. The sections of these reports which were utilized have been reviewed by both IMC and Ausenco in
sufficient detail so that the Qualified Persons (QPs) at IMC and Ausenco have assumed responsibility for this work.
Hycroft
staff have provided all requested information and have worked with Ausenco, IMC and Westland Engineering in an open and transparent manner
throughout the Project period.
All
units of measurement in this report are in US customary units and currencies are expressed in United States dollars (symbol: US$
or currency: USD), unless otherwise stated. Precious metal grades are presented in units of troy ounces per short ton (oz/ton). The occasional
use of non-US customary units will be clearly noted and explained in text when they occur. Tons mean short tons of 2,000 lbs,
Ktons means 1,000 short tons.
This
TRS presents the MRE for the Hycroft Mine (the Mine), and an economic analysis based on pressure oxidation (POX) for sulfide material
and Heap Leaching for oxide material. Transitional material may be processed by either process.
Hycroft Mine Project
Page 20
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Mineral
resources are reported in accordance with SK-1300.
2.3 Qualified
Persons
Below
is a list of the firms that acted as QPs in the preparation of this TRS:
● Ausenco
Engineering USA South Inc. is responsible for sections 1.1, 1.2, 1.8, 1.11, 1.12, 1.13, 1.15,
1.16, 1.17, 1.18, 2.1-2.4.1, 2.5-2.7, 10, 14-16, 18.1-18.2.3, 18.2.4- 18.2.7, 18.2.8.2-18.3.2,
18.3.4, 18.3.5, 19, 22.1, 22.5, 22.7-22.12, 22.13.1.3, 22.13.1.5-22.13.1.7, 22.13.2.2, 22.13.2.4,
22.13.2.5, 23.1, 23.4, 23.6, 24 and 25.
● Hycroft
is responsible for sections 1.3-1.7, 1.15,3-9, 12, 20, 22.2-22.4, 22.13.1.1, 22.13.1.2,
22.13.2.1, 23.1-23.3, and 24.
● Independent
Mining Consultants, Inc. is responsible for sections 1.9, 1.10, 1.15, 1.18, 2.4.2, 11,
13, 18.2.3, 18.2.8.1, 18.3.1, 18.3.3, 22.6, 22.13.1.4, 22.13.2.3, 23.1, 23.5 and 24.
● WestLand
Engineering & Environmental Services, Inc., is responsible for Section 1.14, 17 and 24.
2.4 Site
Visits and Scope of Personal Inspection
2.4.1 Site
inspection for Jonathan Cooper
Ausenco’s
QP, Jonathan Cooper, P.Eng., completed a site visit of the Hycroft property from April 8 to 11, 2024 to inspect the existing infrastructure.
2.4.2 Site
inspection for John Marek
IMC’s
QP, John Marek, P.E., completed a site visit on August 5, 2021, to review the existing core and logs.
2.5 Effective
Dates
The
overall effective date of this report is May 14, 2026.
2.6 Information
Sources and References
2.6.1 General
The
authors sourced information from documents listed in the References section of this report (Section 24).
The
reports and documents listed in Section 2.6.2 and Section 25 of this Report were also used to support preparation of the TRS.
Hycroft Mine Project
Page 21
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
2.6.2 Previous
Technical Reports
Hycroft
previously filed the following technical reports:
● Hycroft
Technical Report Summary and Initial Assessment, Nevada, USA. Prepared by Ausenco Engineering
South USA Inc for Hycroft Mining Holding Corporation. Effective date: January 21, 2026.
● Initial
Assessment Technical Report Summary; Humboldt and Pershing Counties. Prepared by Ausenco
Engineering USA South Inc for Hycroft Mining Holding Corporation. Effective date: March 27,
2023.
● Technical
Report Summary of Initial Assessment on the Hycroft Mine, Nevada, United States of America.
Prepared by Ausenco Engineering USA South Inc for Hycroft Mining Holding Corporation, Effective
date: February 18, 2022.
● Hycroft
Project Technical Report Summary: Heap Leaching Feasibility Study, Winnemucca, Nevada, USA.
Prepared by M3 Engineering & Technology Corp for Hycroft Mining Corporation. Effective
date: July 31, 2019.
Hycroft
completed the following technical report in accordance Canada’s National Instrument 43-101 Standards of Disclosure for Mineral
Projects and which are available on the SEDAR website (www.SEDARplus.ca)
● Hycroft
Project NI 43-101 Technical Report: Mill Expansion Feasibility Study, Winnemucca, Nevada,
USA. Prepared by M3 Engineering & Technology Corp. for Allied Nevada Gold Corp. Effective
date: November 03, 2014.
2.7 Currency,
Units, Abbreviations and Definitions
All
units of measurement in this report are US customary, and all currencies are expressed in US dollars (symbol: US$; currency: USD)
unless otherwise stated. Contained gold metal is expressed as troy ounces (oz), where 1 oz = 31.1035 g. All material tons are expressed
as dry tons unless stated otherwise. A list of abbreviations and acronyms is provided in Table 2-1, and units of measurement are listed
in Table 2-2.
Table 2-1: Abbreviations and Acronyms
Abbreviation
Description
AAL
American
Assay Laboratories
AAO
atmospheric
alkaline oxidation
AAS
atomic
absorption spectroscopy
AES
atomic
emission spectrometry
Allied
Nevada
Allied
Nevada Gold Corp.
AR
aqua
regia
Ag
Silver
ALS
Auld
Lang Syne formation
Au
Gold
Ausenco
Ausenco
Engineering USA South Inc.
Az
Azimuth
BLM
Bureau
of Land Management
BWi
bond
ball mill work index
CCD
counter-current
decantation
Hycroft Mine Project
Page 22
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Abbreviation
Description
CNI
Call
& Nicholas, Inc.
CWi
bond
crusher work index
DDH
diamond
drill hole
DSHA
deterministic
seismic hazard assessment
EA
Environmental
Assessment
EDGAR
Electronic
Data Gathering, Analysis, and Retrieval
FA
fire
assay
FPCP
Final
Permanent Closure Plan
G&A
general
and administration
HLF
Heap
leach facility
Hycroft
Hycroft
Mining Holding Corporation
IA
initial
assessment
ICP
inductively
coupled plasma
ID2
inverse
distance squared
ID3
inverse
distance cubed
IMC
Independent
Mining Consultants, Inc.
IA-EA
Initial
assessment with economic analysis
IP
induced
polarization
ISO
International
Organization for Standardization
LECO
Laboratory
Equipment Corporation
LOM
life
of mine
LWIR
Longwave
Infrared
LTI
lost
time incident
M3
M3
Engineering and Technology Corp
MRE
mineral
resource estimate
MS
mass
spectrometry
MWWAI
Michael
W. West and Associates Inc.
NDEP
Nevada
Division of Environmental Protection
NDOW
Nevada
Department of Wildlife
NDWR
Nevada
Division of Water Resources
NEPA
National
Environmental Policy Act
NN
nearest
neighbor
NSR
net
smelter return
OES
optical
emission spectrometry
POX
pressure
oxidation
QA/QC
quality
assurance/quality control
QP
qualified
person (as defined in National Instrument 43-101)
RC
reverse
circulation drilling
Hycroft Mine Project
Page 23
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Abbreviation
Description
ROM
run-of-mine
RPEE
reasonable
prospects for economic extraction
RQD
rock
quality designation
SD
standard
deviation
SEC
Securities
and Exchange Commission
SHLF
South
Heap Leach Facility
S-K
1300
US
Securities and Exchange Commission Ruling S-K Subpart 1300
SRK
SRK
Consulting (US) Inc.
SS
sulfide
sulfur
SWIR
Shortwave
Infrared
the
Mine
Hycroft
Mine
TMF
tailings
management facility
TRIFR
Total
Recordable Incident Frequency Rate
TRS
technical
report summary
TSG
Tertiary
Sulfur Group
USGS
United
States Geological Survey
USFWS
US
Fish and Wildlife Service
Westland
WestLand
Engineering & Environmental Services, Inc.
WSP
WSP
Global Inc.
Table 2-2: Units of Measurement
Unit
Description
µm
micrometer
Ac
acre
Asl
above
sea level
Axb
hardness
of ore in term of impact breakage, unitless
B
billion
Bgs
below
ground surface
Bton
billion
short tons
°C
Celsius
Cfs
cubic
feet per second
D
day
°F
fahrenheit
ft
feet
ft/a
feet
per year
GWh/a
gigawatt-hours
per year
Hycroft Mine Project
Page 24
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unit
Description
g
gram
(unit of weight)
gal
gallon
gal/a
gallons
per year
gal/min
gallons
per minute
g/ton,
gm/ton
grams
per short ton
Hp
horsepower
hr
hour
in
inch
in/a
inches
per year
kg
kilogram
km
kilometer
Km2
Square
kilometer
kt
kilotonne
(1,000 metric tonnes)
ktons
kilo
short tons
kV
kilovolt
kWh/ton
kilowatt-hours
per ton
lb
pound
M
million
masl
Meters
above sea level
mi
mile
mi2
square
mile
mm
millimeters
mph
miles
per hour
Mt
million
tonnes
Mtons
million
short tons
Mtons/a
million
short tons per year
min.
minute
Moz
million
troy ounces
MW
megawatt
oz
troy
ounce
oz/ton
troy
ounces per short ton
pcf
pounds
per cubic foot
ppm
parts
per million
ppt
parts
per trillion
psig
pressure
per square inch
shifts/a
shifts
per year
t
metric
tonne (1,000 kg)
t/d
tonnes
per day
ton
short
ton (2,000 pounds)
ton/a
short
tons per year
ton/d
short
tons per day
tn
short
ton
TSS
total
suspended solids
units/a
units
per year
US$,
USD
United
States dollars (symbol; currency)
US$/a
United
States dollars per year
US$/ton
United
States dollars per short ton
wt/wt
weight
percent
%
percent
Hycroft Mine Project
Page 25
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
3 Property
Description
3.1 Introduction
The
Mine is an existing gold and silver operation located 54 miles west of Winnemucca in Humboldt County and Pershing County, Nevada, as
shown in Figure 3-1. The Site is accessible via Nevada State Route 49 (Jungo Road), an all-weather, unpaved road that is maintained by
Humboldt County and Hycroft. A major east–west railway runs immediately adjacent to the property.
The
Mine property straddles Townships 34, 35, 35½ and 36 north and Ranges 28, 29 and 30 east (MDB&M) with an approximate latitude
40°52’ north and longitude 118°41’ west. The mine is situated on the western flank of the Kamma Mountains on the
eastern edge of the Black Rock Desert.
The
Mine property was consolidated through multiple transactions over several years and is described below. Some unpatented mining claims
overlap other Hycroft patented and unpatented mining claims to ensure there are no fractional claim gaps. Existing facilities on site
include two administration buildings, a mobile maintenance shop, a light vehicle maintenance shop, a warehouse, an assay laboratory,
three heap leach pads – Crofoot, North, and Brimstone, primary, secondary and tertiary crushing systems, two Merrill-Crowe process
plants and a refinery. It is considered that existing components of the mine property would be utilized for future development. The Mine
operates under permit authorization from the Bureau of Land Management (BLM), Nevada Division of Environmental Protection (NDEP), Nevada
Department of Wildlife (NDOW), Nevada Division of Water Resources (NDWR) and County agencies. As of the effective date of this report,
Hycroft has approximately 52 employees.
3.2 Property
and Title in Jurisdiction
The
Mine is owned and managed by Hycroft Resources and Development, LLC, a wholly owned subsidiary of Hycroft Mining Holding Corporation.
Hycroft Mine Project
Page 26
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure 3-1: Hycroft Mine Location Map
Source:
Nevada Bureau of Mines, 2023
3.3 Project
Ownership
The
property containing the Mine property consists of 25 private parcels with patented claims totaling approximately 1,855 acres, along with
3,249 unpatented mining claims covering approximately 62,298 acres, for a combined total of approximately 64,000 acres. Some mining claims
overlap other Hycroft Mining claims to ensure there are no fractional gaps in mining claim coverage.
Hycroft Mine Project
Page 27
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
There
are 30 unpatented placer claims, and 3,219 unpatented lode claims are in Humboldt County and Pershing County, Nevada as follows:
● T36N,
R29E, Sections: 28, 32, 33
● T36N,
R30E, Sections: 19, 28-34
● T35
1/2N, R29E, Sections: 25, 26, 35, 36
● T35N,
R29E, Sections: 1-3, 10-15, 21-28, 31-36
● T35N,
R30E, Sections: 2-10, 15-23, 25-36
● T34N,
R28E, Sections: 1, 2, 11, 12, 13
● T34N,
R29E, Sections: 1-28, 33
● T34N,
R30E, Sections: 2-11, 17-20, 29, 30
The
25 private patented claims are located in Humboldt County and Pershing County, Nevada as follows:
● T35N,
R29E, Sections: 24, 25, 35, 36
● T35N,
R30E, Sections: 19, 30, 31
● T34N,
R29E, Sections: 1, 2
The
mining claim package is depicted in Figure 3-2. Individual mining claims for each township range and section are presented in Appendix
A – Patented Claims and Appendix B – Unpatented Claims. The project centroid is defined in the following mine grid coordinates:
51500 N and 20500 E.
This
point is located central to all mine facilities. The project centroid shall be used to reference all other locations within one mile.
Much
of the project area is located on un-surveyed public and private land for which the sections, ranges, and townships listed above have
been interpolated. Patented claims have been surveyed (Wilson, 2008; Prenn, 2006). The following is a list of land acquisitions/transactions
made over the years which constitute the entire Hycroft land claim package and has been assembled through a series of transactions.
The
Crofoot property and approximately 3,500 acres of claims were acquired by Vista in 1985. The Crofoot property, originally held under
lease, is owned by Hycroft. The Crofoot royalty was terminated January 7, 2026. The Lewis property and approximately 8,700 acres of claims
were acquired by Vista in early 1987. In 2006, approximately 13,100 acres of additional claims were staked by Vista. These claims are
contiguous or proximate to the original Crofoot and Lewis claims.
From
2007 through 2015, Hycroft staked additional lode mining claims contiguous to existing Hycroft claims that cover approximately 37,373
acres. Some of these lode claims overlap existing placer claims.
Hycroft Mine Project
Page 28
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Payment
of annual claim maintenance and holding fees to the BLM and Humboldt and Pershing Counties and payment of annual real property taxes
for patented claims in Humboldt and Pershing Counties are made every third quarter (Q3). Payments are current through the 2025–2026
claim years, with US$724,095 paid for 2025–2026. Payment of annual claim maintenance and holding fees and real property taxes are
required to continue to hold the Hycroft property in good standing from. BLM annual maintenance fees for claims are due not later than
September 1 of each year. Humboldt and Pershing County State annual holding fees beginning September 1 of each year are due no later
than November 1 of each year. Annual real property taxes for patented claims in Humboldt and Pershing Counties are due August 31 of the
following year.
Hycroft
controls all surface and mineral rights within the Hycroft MRE area. No further land acquisition is required for the operation of the
mine and contemplated processing facilities.
Figure
3-3 shows the property layout including site facilities, mine workings, leach pads and waste dumps.
3.4 Property
Agreements
Table
3-1 shows the royalty amount and other annual land holding costs.
Table
3-1: Hycroft Annual Land Holding Costs
Month
Due
Lessor
Type
Amount
Monthly
Sprott
Royalty1
Net
Smelter Return Royalty
1.5%
NSR
August-October
US
BLM, Humboldt & Pershing Counties
Claim
Fees
US$724,095
Note:
1. The
Sprott royalty is equal to 1.5% of Net Smelter Returns (NSR) free and clear of withholding
taxes or similar taxes.
Hycroft Mine Project
Page 29
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
3-2: Claim Map
Source:
Hycroft, 2026
Hycroft Mine Project
Page 30
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
3-3: Current Property and Facilities Layout (2025)
Source:
Hycroft, 2026
Hycroft Mine Project
Page 31
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
3.5 Surface
Rights
Hycroft
controls all surface and mineral rights within the Hycroft MRE area. No further land acquisition is required for the operation of the
mine and contemplated processing facilities.
3.6 Water
Rights
Hycroft
controls 16 separate water-right permits administered by the NDWR. These permits are held in ownership either by Hycroft, or by other
private parties and leased to Hycroft. Water resources to support the Mine are controlled under 14 permits in the Black Rock Desert Basin
totaling 20,414.9 acre-ft/a (6.65 billion gal/a). Two of these water permits are outside the Black Rock Desert Hydrographic Basin
and used to support construction maintenance of Jungo Road with Humboldt County.
3.7 Liabilities
and Encumbrances
The
consolidated financial statements of Hycroft Mining Holding Corporation set forth its material liabilities as of the date of such financial
statements. The assets of Hycroft Mining Holding Corporation and its subsidiaries (collectively, the Company) are subject to encumbrances
and obligations, including encumbrances and obligations under and associated with the Sprott Royalty Agreement dated May 29, 2020, by
and between the Company and Sprott Private Resource Lending II (Co) Inc.
3.8 Environmental
Considerations
Gold
production began on the property in 1983 and continued through 1985 when Standard Slag opened the Lewis Mine. There was a brief gap in
mining until Hycroft acquired the Lewis Mine and the Crofoot claims and recommenced mining in 1988. Mining operations continued until
1998 when mining was placed on standby due to low metal prices. Process operations continued until 2004 when the property was placed
on care and maintenance.
Efforts
began in 2003 to update the Reclamation Plan, associated cost estimate, and related amount of surety bond posted with the BLM. During
the years 2011 and 2012, Hycroft increased collateral account balances to support additional surety bonds for the benefit of the BLM.
These additional surety bonds allowed Hycroft to continue operations at the Mine and to expand exploration activities outside of the
Mine. In 2011, Hycroft received a reimbursement of US$0.5 million related to reclamation costs that had been paid out.
In
January 2014, the BLM approved an updated reclamation cost estimate allowing for the phased bonding of the expansion activities. The
required bond amount was lowered from US$63 million to US$58.3 million. Hycroft has Surface Management Surety Bonds with insurance companies
that meet the financial requirements of the BLM to comply with the total requirement of US$58.3 million as detailed in the September
2013 reclamation cost estimate that requested the phasing of the mill expansion activities. Additionally, Hycroft has posted a bond with
the BLM in the amount of US$0.6 million for the adjacent water supply well field, well field monitoring and exploration within the project
boundary. Hycroft has US$14.4 million in restricted cash for collateral for these bonds.
Hycroft Mine Project
Page 32
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
Hycroft area has been surveyed for surface water resources, including Waters of the United States, biological resources, cultural resources,
and groundwater resources. The Golden Eagle (Aquila chrysaetos) is known to occur adjacent to the Hycroft Project. Hycroft is working
with the BLM and the US Fish and Wildlife Service (USFWS) in the management of this species.
3.9 Safety
Considerations
The
operation of the Mine is subject to regulation by the Federal Mine Safety and Health Administration (MSHA) under the Federal Mine Safety
and Health Act of 1977 (the Mine Act). MSHA inspects the Mine on a regular basis and issues various citations and orders when it believes
a violation has occurred under the Mine Act. In years ending 2024 and 2025, after multiple inspections, MSHA has issued no (0) citations
and no (0) “Significant and Substantial” Violations under section 104(a) of the Mine Act. There have been no fines
including citations and orders issued to contractors for the year ending May 1, 2026.
Hycroft
mandated mine safety and health programs include employee and contractor training, risk management, workplace inspection, emergency response,
accident investigation, and program auditing with a goal to have zero workplace injuries and occupational illness. In 2023, Hycroft implemented
multifunctional workplace inspections and monthly employee engagement sessions. As a result, Hycroft has now operated for three consecutive
years at a 0.0 Total Recordable Incident Frequency Rate (TRIFR) and achieved over 1.4 million hours without a Lost Time Incident (LTI).
The Mine’s TRIFR per 200,000 man-hours worked including contractors was 0.0 on May 1, 2026.
3.10 Permitting
Considerations
The
Mine operates under permit authorizations from the BLM, NDEP, NDOW, and NDWR. All operating and environmental permits, approved by the
BLM, NDEP, NDOW and NDWR, are in good standing for mining operations. Table 3-2 summarizes the operating permits while Table 3-3 shows
the miscellaneous permits for the property.
Table
3-2: Hycroft Operating Permits
Operating
Permits
Issuing
Agency
Number
Status
Plan
of Operations
BLM
NVN-064641
Current
Eagle
Take Permit
USFWS
MB90099B-0
Current
Mercury
Operating Permit to Construct
NDEP
- BAPC
AP1041-2255
Current
Class
I Air Quality Operating Permit to Construct
NDEP
- BAPC
AP1041-2974
Incorporated
into the Class II AQOP
Class
I Air Quality Operating Permit to Construct
NDEP
- BAPC
AP1041-3344
Incorporated
into the Class II AQOP
Class
I Air Quality Operating Permit
NDEP
- BAPC
AP1041-2964
Current
Permit
to Operate a Public Water System
NDEP
- BSDW
HU-0864-12NTNC
Current
Class
II Air Quality Permit
NDEP
- BAPC
AP1041-0334.05
Current
Water
Pollution Control Permit-Crofoot Project
NDEP
- BMRR
NEV60013
Current
Water
Pollution Control Permit-Brimstone Project
NDEP
- BMRR
NEV94114
Current
(Application Shield)
Bioremediation
Facility Permit
NDEP
- BMRR
GNV041995-HGP15
Superseded
by Water Pollution Control Permit
Reclamation
Permit
NDEP
- BMRR
134
In
Renewal
Mining
General Stormwater Pollution Prevention Permit
NDEP
- BWPC
R300000:
MSW-177
Current
Class
III Landfill Waiver
NDEP
- BSMM
SWW-346
Current
Artificial
Pond Permit (Brimstone Process Ponds)
NDOW
HU019
– S503626
Current
Artificial
Pond Permit (Crofoot Process Ponds)
NDOW
HU009
– 39469
Current
Artificial
Pond Permit (North Process Ponds)
NDOW
HU022-39468
Current
Artificial
Pond Permit (Stage 1 Ponds)
NDOW
HU022-40377
Current
General
Onsite Sewage Disposal System
NDEP
- BWPC
GNEVOSDS09
Current
Dam
Safety Permit (Crofoot Process Ponds)
NDWR
J-273
Current
Dam
Safety Permit (Brimstone Leach Event Pond)
NDWR
J-683
Current
Dam
Safety Permit (North Leach Event Ponds)
NDWR
J-687
Current
Dam
Safety Permit (Stage 1 Event Ponds)
NDWR
Pending
Hazardous
Materials Storage Permit
NV
State Fire Marshal
8250
Current
Special
Use Permit
Pershing
County
SUP
12-04
Current
Special
Use Permit
Humboldt
County
UH-12-04
Current
Hycroft Mine Project
Page 33
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
3-3: Hycroft Miscellaneous Permits
Operating
Permits
Issuing
Agency
Number
Status
Microwave
Repeater; Sec. 29, 30
BLM
NVN46292
Current
ROW
Wells/Pipeline/Power Line; Sec. 3
BLM
NVN46564
Current
ROW
2 Wells/Pipeline/Power Line
BLM
NVN46959
Current
ROW
Road and Waterline (Old Man camp to Lewis)
BLM
NVN39119
Current
ROW
Crofoot pipeline
BLM
NVN44999
Current
ROW
24 kV Aerial Powerline, Lewis/Floka
BLM
NVN54893
Current
Kamma
Peak Station
FCC
WNER344
Current
Sulfur
Mine Station
FCC
WNER345
Current
Winnemucca
Mountain Station
FCC
WNER346
Current
Base
Station and 45 Mobile Units
FCC
WNKK336
Current
Operating
and miscellaneous permits that require annual maintenance fees are shown in Table 3-4. Fixed annual fees are required for storm water
and public drinking water system permits based upon the current Nevada regulatory structure. The other annual fees are based on annual
mining production, quantities and types of chemicals stored on site, existing and permitted surface disturbance, and the level of actual
and permitted air emissions. The variable fees shown are based upon the 2025 operational conditions.
Table
3-4: Hycroft Miscellaneous Permits
Permit
and Fee Description
Annual
Amount (US$)
Air
Quality Operating Permit AP1041-0334.05
Fees
are incorporated into title V permit.
Air
Quality Operating Permit AP1041-2255
$16,958
Air
Quality Operating Permit AP1041-2964
$47,448
Reclamation
Permit
$37,811
Nevada
Radioactive Material License
$2,000
Stormwater
Permit
$1,000
Artificial
Pond Permit
$31,625
Water
Pollution Control Permit NEV94114
$66,000
Water
Pollution Control Permit NEV60013
$60,000
State
Fire Marshal
$210
Public
Drinking Water System
$391
Septic
System Permits
$750
Toxic
Release Inventory Annual Fee
$5,500
Nevada
LP-Gas License
$795
Total
$270,488
Hycroft
currently holds six Right-of-Way (ROW) leases with two exploration notices with the BLM, as described in Table 3-5 along with fees and
renewals.
Table
3-5: Right-of-Way Payment and Renewal Schedule
ROW
Number
Annual
Payment Amount (estimated)
Payment
Date
Expiration
Date
NVN46292
$125
01/01/2025
12/31/2048
NVN46564
$100
01/01/2025
12/31/2046
NVN46959
$610
01/01/2025
In
Renewal
NVN39119
$427
01/01/2025
In
Renewal
NVN44999
$279
01/01/2025
In
Renewal
NVN54893
$200
01/01/2025
In
Renewal
Hycroft Mine Project
Page 34
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
3.10.1 Hycroft
Expansion Permitting and Timelines
Hycroft
submitted a Plan of Operations for an expansion of its heap leach facilities, open pits and waste rock facilities to the BLM in April
2010. A major modification to the State Water Pollution Control Permit was submitted in 2011 for the process components that included
engineering design reports from Golder Associates Inc. (Golder). The permit modification was issued in August 2012. An amended Plan of
Operations that included a rail spur, open pit expansion and processing complex was submitted to the BLM in August 2012. The BLM determined
that an Environmental Assessment (EA) was required, deemed the Plan of Operations complete, and initiated public scoping in December
2012. In March 2013, NV Energy submitted a ROW application for the power line associated with the Hycroft Mill. The BLM determined that
this action should be analyzed with the Hycroft EA. Approval was received in December 2014. The permits required to construct and operate
the crushing system and to begin mill construction were received in 2012. The air quality permit for operation of a mill was submitted
in December 2012, and issuance was received in late 2013.
The
Plan of Operations for a rail spur, open pit expansion and processing complex, that included a tailings management facility (TMF) and
expanded Heap Leach Facility (HLF), was completed in December 2014, with the BLM issuance of the Record of Decision authorizing the proposed
action received in January 2015. A major modification to the State Water Pollution Control Permit was submitted in 2011 for the process
components that included engineering design reports from Golder. The permit modification was issued in August 2012. All other permits
required for the heap leach expansion have been received.
A
Plan of Operations for an alternate TMF, mining below the water table and expanded facilities was submitted to the BLM in April 2014.
The BLM determined that a Supplemental Environmental Impact Statement (SEIS) was required. In October 2019, the BLM issued a record of
decision on the SEIS permitting the new TMF location, expanded facilities and deeper pit depths.
In
December 2010, Hycroft submitted a minor modification to the NDEP which proposed increasing the permitted processing rate from 10 to
12 Mtons/a. This modification was approved in February 2011. In May 2011, Hycroft proposed a major modification to build a new heap leach
pad on the site of the closed Lewis pad and to increase the processing rate to 30 Mtons/a. This modification was approved by the NDEP
in December 2011. In January of 2012, Hycroft submitted another major modification to construct a heap leach facility on the south extent
of the property. The facility was referred to as the South Heap Leach Facility (SHLF). Around the same time, Hycroft submitted a modification
proposing to add both a north and south processing area, increasing the Brimstone and Lewis heap leach pads permitted height to 400 ft,
and increasing the permitted processing rate to 36 Mtons/a of ore. Both modifications were approved by the NDEP in September 2012. Later,
in December 2012, Hycroft submitted a minor modification proposing to add a Merrill-Crowe facility at the North Process Area. NDEP approved
this modification in May 2013. In March of 2013, Hycroft submitted another modification to construct a combined heap leach and tailings
storage facility (TMF), referred to as the South Processing Complex (SPC), in the same location as the previously permitted SHLF. The
SPC uses the new SHLF, constructed in a horseshoe shape, to provide the embankment for the Southwest TMF located in the central portion
of the new SHLF. Also, as part of this modification, Hycroft proposed the construction of a mill and related facilities for processing
high-grade ore at an approximate throughput of 65,000 tons per day (ton/d) during Phase 1 to a final phase capacity of 132,000 ton/d.
Tailings were proposed to be pumped to the TMF at the SPC. These 2013 major modifications were approved by NDEP in August 2017.
Hycroft Mine Project
Page 35
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
In
September 2014, Hycroft submitted a minor modification to expand the Brimstone-North HLF to the southeast by approximately 80 acres including
an additional Event Pond at the existing North Area Merrill-Crowe facility. NDEP approved these minor modifications in March 2015.
In
April 2019, Hycroft submitted a major modification to construct a new heap leach facility named Hycroft Heap Leach Facility Stage 1 (Stage
1 HLF) north of the North Processing Facility. The Stage 1 HLF will have a storage volume of 29 Mtons and is the first stage of the larger
facility (Hycroft HLF) with a storage capacity of 550 Mtons. The ultimate footprint of the Hycroft HLF will cover approximately 925 acres,
with the Stage 1 footprint covering approximately 390 acres that includes ponds, channels, and roads. Of this area, 234 acres will be
lined with geomembrane along with the HLF pad comprising 204 of these acres. Pregnant solution collected from the pad will be pumped
to the existing North Merrill-Crowe process facility for precious metals recovery. The barren solution from the North Merrill-Crowe facility
will then be returned to the top of each lift and applied over a designated cell area using a drip and sprinkler system. The major modification
was approved by NDEP in July 2020.
Currently,
Hycroft has all permits required to restart the Mine and recently received the Federal Record of Decision for the Phase II Environmental
Impact Statement supporting the life of mine (LOM) pit development.
Received
Record of Decision from BLM for Environmental Impact Statement (EIS) (10-22-19):
● Current
operating plan is fully permitted
● Existing
operating permits will be amended as new facilities/infrastructure are required
● EIS
allows flexibility:
○ Expanded
pits
○ Construction
of a TMF to the south of the property, if needed
● Phase
1 of the new leach pad is permitted
● Phase
1A of the new leach pad has completed earthwork and high-density polyethylene (HDPE) liner
installation. A media cover has been added to protect the porous multimedia protective layer.
Collection ponds are in place. Electrical switch gear, instrumentation, and pumps are in
storage and will be added during construction restart. No mineralized ore has been added
to the pad. Phase 1B of the new leach pad and future phases will be planned for construction
from cash flows when needed.
Any
future expansion activities recommended in this TRS will require multiple federal, state and local permits. The USFWS will require modification
to the Golden Eagle Take Permit for the NE TMF and extensions of the South (Vortex) Dump.
Hycroft Mine Project
Page 36
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
3.10.2 Crofoot
Heap Leach Facility Closure
In
2023, NDEP asked Hycroft to update the 2017 Final Permanent Closure Plan (FPPC). Hycroft complied with this request and a new FPPC was
submitted. The updated plan includes schedule of compliance (SOC) items and incorporates current regulations. There are six items in
this plan. SOC Items 1 (Stormwater Controls), 2 (Heap Leach Drain-Down Channel), 3 (Update Monitoring Plan), 4 (Water Quality Evaluation
Report), SOC Item 5 (updating FPCP), and 6 (Investigation of trend for Wells SP-23, SP-24, and SP-25). NDEP has accepted and approved
SOC Items 2 (Heap Leach Drain-Down Channel) and Item 3 (Update Monitoring Plan). The other items are still under review.
Construction
of a drain-down collection system was completed in 2012. In 2024 and 2025, Hycroft completed steps to regrade the pad in preparation
for closure. Hycroft will continue to re-contour the pad, as necessary for surface water management; apply medium, where required; and
reseed the pad to complete the closure process. Hycroft is working in conjunction with NDEP, who will issue the final closure approval
letter once these activities are reviewed and accepted.
3.11 Social
License Considerations
Social
and community impacts have been considered and evaluated in the National Environmental Policy Act (NEPA) process. Potentially affected
Native American tribes, tribal organizations, and/or individuals are consulted during the preparation of all plan amendments to advise
on proposed projects that may influence cultural sites, resources, and traditional activities. Potential community impacts on the existing
population and demographics, income, employment, economy, public finance, housing, community facilities, and community services are also
evaluated during NEPA review processes. There are currently no social or community issues that materially impact Hycroft’s ability
to extract mineral resources.
3.12 Project
Risks and Uncertainties
Timely
filings and payments are required to maintain title and rights to claims, water rights and permits. Hycroft maintains processes and controls
to ensure timely filings and payments. Changing regulations or failure to make timely filings and payments are significant risks to maintaining
environmental access or ability to perform the permitted and authorized work on the property.
Hycroft Mine Project
Page 37
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
4 Accessibility,
Climate, Local Resources, Infrastructure and Physiography
4.1 Physiography
Hycroft
is situated on the eastern edge of the Black Rock Desert and on the western flank of the Kamma Mountains between Winnemucca and Gerlach,
Nevada. The site is characterized by flat, prehistoric lakebed and well-dissected topography with moderately steep slopes. Topographic
relief within the project area is 1,900 feet (ft). The elevation ranges from 4,100 ft above sea level on the western side to 6,000 ft
above sea level on the eastern side. The climate in the mine area is arid. Vegetation consists mostly of sagebrush, rabbit brush, and
surface grass. Scattered pinon and juniper trees occur along slopes in the higher parts of the property.
4.2 Accessibility
Hycroft
and its related facilities are located 54 miles west of Winnemucca, Nevada along State Road No. 49 (Jungo Road), a good quality, unpaved
road. Access is also possible from Gerlach via Jungo Road, Imlay or Lovelock by dirt roads intersecting Interstate 80. Winnemucca is
a commercial community on Interstate 80 where most of the Mine’s employees are likely to reside. Winnemucca is 164 miles northeast
of Reno, Nevada. The town is served by a transcontinental railroad and has a small public airport and there are adequate boarding rooms
and dining facilities.
4.3 Climate
The
climate at the Mine is classified as arid, with an average precipitation of 7.7 inches per year (in/a), which occurs during the winter
and spring months. Winds are generally light with occasional dust or sandstorms, particularly in the spring.
Temperatures
are moderate during the summer, ranging from 50 °F at night to above 90 °F, and averaging 85 °F to 95 °F during
the day. Winter temperatures average 20 °F at night and 40 °F during the day. The average range between the highest and lowest
daily temperatures is 30 to 35 °F with strong surface heating during the day and rapid nighttime cooling due to the dry air. Winter
nights can drop well below freezing, but daytime highs are usually above freezing. Winter snowpack is light, and snow does not normally
present logistical problems. Hycroft has not reported experiencing major delays in production due to inclement weather and is accessible
year-round.
4.4 Local
Resources and Infrastructure
Existing
infrastructure at the Mine consists of the following: a truck shop, a maintenance building, a laboratory, ore crushing facilities, an
administration building, and other service-related structures. Power is supplied to the site from nearby power lines that are fed directly
from the main power grid and there is a modern communications system including cellular connections. Potable water is sourced from a
well located approximately one mile south of the Crofoot Heap. A major east–west railway passes adjacent to the Hycroft property.
Hycroft Mine Project
Page 38
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
4-1: Onsite Lab, Admin, Maintenance, Truck Shop, and Warehouse
Source:
Hycroft, 2025
Figure
4-2: Crusher and Conveyor Belt Circuit
Source:
Hycroft, 2025
Hycroft Mine Project
Page 39
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
4-3: North Merrill-Crowe Facility
Source:
Hycroft, 2025
Figure
4-4: Stage 1 Heap Leach Pad and Ponds Along Jungo Road
Source:
Hycroft, 2025
Hycroft Mine Project
Page 40
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
Mine is in a well-known mining jurisdiction near several towns including Winnemucca, Gerlach and Lovelock. The Mine’s workforce
primarily lives in Winnemucca (Humboldt County) and Lovelock (Pershing County).
Initial
surveys indicated that the town of Winnemucca has the required infrastructure (short- and long-term rooming and boarding facilities,
dining establishments, shopping, emergency services, schools, etc.) to support the maximum workforce and dependents. The Mine has always
been successful in filling positions with qualified mining personnel from all over the country.
Currently,
the Mine operates three water wells that are located four to five miles west of the mine, and a single potable well. These four production
wells are the main sources of water for the mine site. All water rights are within the Black Rock Desert Hydrographic Basin, a recently
designated basin. Water rights are shown in Table 4-1.
Hycroft
controls sufficient land position and water rights to support its planned facilities and process water demands.
Table
4-1: Hycroft Water Wells and Permitted Yearly Consumption
Application
No.
Permit
Diversion Limit (cfs)
Annual
Appropriation Limit (acre-ft)
Point
of Division
81228
0.4
14.83
T34N
R29E S3
81226
3.2
724.79
T35N
R29E S31
81225
3.2
303.43
T35N
R29E S31
81227
2.0
1,448
T35N
R29E S31
81224
2.0
1,448
T34N
R28E S1
81408
5.4
3,890
T35N
R29E S31
81409
5.4
3,890
T35N
R29E S31
84477
0.3
177.9
T35N
R29E S31
82274
10
4,096
T35N
R29E S31
82355
3.3
2,050
T35N
R29E S31
82356
5.6
3,415
T34N
R28E S1
Total
40.8
21,457.95
-
A
fully developed project will include plans to develop access and haul roads to new processing facilities, a TMF, and additional waste
rock storage dumps. Furthermore, the development of a rail spur is recommended off the existing rail line for the receipt of grinding
media, fuel, reagents, and other supplies.
A
power study needs to be conducted to upgrade the existing power at the site to support a fully developed processing plant.
4.5 Seismicity
In
2012, Michael W. West and Associates Inc. (MWWAI) completed a review of the Hycroft deterministic seismic hazard assessment (DSHA). MWWAI
concluded that historical seismicity in the vicinity of the site is low to moderate with no relation to mapped faults. No faults in the
project area are classified as “active/capable” based on an unequivocal association of instrumentally recorded earthquakes
in the last approximately 50 years. MWWAI stated that a comparison of the United States Geological Survey (USGS) national probabilistic
seismic hazard model to deterministic and probabilistic floating earthquake peak ground accelerations (PGAs) show reasonable agreement.
MWWAI recommends the use of the deterministic and probabilistic PGAs presented in the DSHA.
Hycroft Mine Project
Page 41
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
5 History
5.1 Regional
History
The
earliest recorded mining in the Sulfur District, where the Mine is located, began in the late 1800s following the discovery of significant
native sulfur deposits (Couch and Carpenter, 1943; Wilden, 1964). Mining of native sulfur was sporadic from 1900 to 1950 with over 181,488
tons of sulfur ore, grading approximately 20-35% sulfur, mined and milled (McLean, 1991).
In
addition to sulfur, high-grade Ag mineralization, consisting of nearly pure seams of cerargyrite (AgCl), was discovered in 1908 at Camel
Hill (Vandenburg, 1938). Assays up to 3,439 oz/ton Ag and 0.362 oz/ton Au were reported (Jones, 1921). Ag mining ceased in 1912 with
an estimated 165,375 Ag ounces produced. Minor Ag mining also occurred along the East Fault at the Snyder Adit, and Ag samples as high
as 66 oz/ton (Friberg, 1980) and 29 oz/ton (Bates, 2001) were reported.
During
the First World War (1914 to 1918), three 6 to 8 ft wide veins of nearly pure alunite were mined in the southern part of the Sulfur District
(Clark, 1918). In 1931, several hundred tons of alunite were mined as a soil additive (Fulton & Smith, 1932). Vandenburg estimated
that 454 tons of alunite was shipped to the west coast to be used as fertilizer (Vandenburg, 1938). From 1941 to 1943, cinnabar was mined
from small pits in the exposed acid leach zone (Bailey, 1944). Total mercury production during this period is estimated at 1,900 lbs.
(McLean, 1991).
5.2 Property
Exploration History
In
1966, the Great American Minerals Company began extensive exploration for native sulfur in the regional area of the Mine. Approximately
200 shallow holes were drilled, and numerous trenches were dug (Friberg, 1980). In 1974, Duval drilled 20 holes on the property in search
of a Frasch-type sulfur deposit (Wallace, 1980). Duval found no evidence of a sulfur deposit at depth but did report elevated Au and
Ag values. Duval drilled two core holes (DC-1 and DC-2) and 18 rotary holes (DR-3 through 20) (Ware, 1989).
In
1977, the Cordex Syndicate mapped and rock-chip sampled the property. They concluded that there was potential for bulk tonnage as a low-grade
precious metal deposit. In 1978, Homestake became interested in the property, recognizing similarities with the McLaughlin hot springs
deposit in California. Homestake completed surface sampling and exploration drilling during 1981-1982, and although successful in defining
an oxide gold/silver mineral deposit, they forfeited the property in 1982.
5.3 Production
Mining
at the Mine began in 1983 with a small heap leach operation known as the Lewis Mine. In 1987, Vista acquired the Lewis Mine and in 1988,
they acquired the Crofoot Mine. The Mine was comprised of various open pits on the property (e.g., the Bay, South Central, Boneyard,
Gap and Historic Cut-4 pits along the Central Zone and Brimstone) and produced approximately 1.2 million ounces (Moz) of Au and 2.5 Moz
of Ag from 1983 to December 1998 when the operations were suspended due to low Au prices at the time (<$300/oz). An additional 58,700
ounces of Au were produced from the leaching and rinsing of the heap leach pads from 1999 through 2004, after the mine had been placed
on a care and maintenance program. The remaining leasehold interest in the Lewis property was purchased by Vista in December 2005, in
consideration of the US$5.1 M payment, resulting in the elimination of the 5% NSR royalty on Au and 7.5% NSR royalty on Ag.
Hycroft Mine Project
Page 42
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Further
information on the production history of the Mine comes from Hycroft’s internal documents. Ore from the Lewis Mine was crushed
and stacked on the Lewis leach pads in the north-central part of the Sulfur District. Approximately 259.2 Mtons of ore with a gold grade
averaging 0.014 oz/ton was mined from 1983 to 2019, beginning with ore mined from the Lewis Mine, followed by ore mined from the Bay,
South Central, Boneyard, Gap and Historic Cut-4 pits, and finally the north end of the Brimstone pit, producing over 2.082 Moz of Au.
The
Crofoot leach pad (Pads 1 and 2) were constructed in 1987, and Pad 3 in 1992. Ore was placed on Pad 1 from 1988 to 1997, on Pad 2 from
1989 to 1997, and on Pad 3 from 1993 to 1997. Solutions from these pads were treated in the Crofoot Merrill-Crowe plant located on the
northeast side of Pad 1.
Production
from the Brimstone pit was placed on the Brimstone pad (Pads 4 and 5) as run-of-mine (ROM). Pad 4, constructed just south of the old
Lewis pad, was completed in 1996. Loading of Pads 4 and 5 commenced in October 1996 and July 1997, respectively. A 2,800 gallon per minute
(gal/min) Merrill-Crowe leach solution plant (the Brimstone Plant) was completed and put into operation in February 1997. The plant treated
solutions from Pad 4. Pad 5 solutions were treated in the older Crofoot plant.
In
May 2007, the Nevada-based holdings of Vista were spun out into Allied Nevada Gold Corp. The Mine was included as part of the transfer
of ownership allowing Allied Nevada to explore, expand, and develop the resources at Hycroft.
In
September 2007, Allied Nevada’s Board of Directors approved the reactivation of the Mine, and a year later in December 2008, the
Mine had produced its first doré which was shipped to an offsite refinery for final processing, yielding Au and Ag bullion. Allied
Nevada received a construction permit for the Brimstone Refinery in 2008, and construction was completed in June of 2009. By the end
of 2009, the Mine was achieving the forecasted ore production capacity. In 2010, the mine began an expansion program which included the
construction of a 21,000 gal/min Merrill-Crowe processing plant, a three-stage crushing facility and upgrades to their solution pumping
capacity. With the construction of the North leach pad complete in 2013, the total leach pad surface area at the Mine site had increased
to over 20 million ft2 including the Brimstone and Lewis leach pads. Allied Nevada filed for bankruptcy on March 10, 2015,
and active mining ceased in June 2015 due to low metal prices. Leaching of the mined ore continuing through 2018.
On
October 22, 2015, Allied Nevada emerged from its financial restructuring and changed its name to Hycroft Mining Corporation. On May 29,
2020, Hycroft Mining Corporation completed a business combination with a publicly trade special purpose acquisition company (SPAC). Following
the closing of the transaction, the SPAC changed its name to Hycroft Mining Holding Corporation.
In
late 2018, Hycroft began construction of Phase 1 of the Jungo Leach Pad to expand process capacity for anticipated heap leach material.
Additionally, Hycroft began preparing the mine for a restart. Active mining began again in April 2019 to November 10, 2021, transition
ore was placed on the existing leach pads. Sulfide materials, when encountered during active mining, were set aside for future processing.
In
November 2021, Hycroft suspended mining operations to refocus resources on metallurgical test work and exploration. Final construction
of Phase 1 of the Jungo Leach Pad was suspended, and protective media cover material was placed on the multimedia liner. Electrical,
instrumentation, and pumping equipment were placed in covered storage for a future restart.
The
annual sales produced from the Mine’s heap leach operations over years 2019 through 2022 were 107,258 oz Au and 629,904 oz Ag.
There have been no gold or silver commodity sales since 2022.
Hycroft Mine Project
Page 43
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
6 Geological
Setting, Mineralization, and Deposit
6.1 Geological
Setting
Section
6 has been written and updated by Alex Davidson, Vice-President of Exploration of Hycroft Resources and Development LLC and approved
by IMC (Independent Mining Consultants). IMC is a third-party consulting firm with people who can act as a qualified person for this
section.
The
Hycroft deposit is a low-sulfidation, epithermal, hot springs system that contains Au and Ag mineralization. Radiometric dating of adularia
(potassium feldspar) indicate that the main phase of Au and Ag mineralization formed approximately four million years ago (Ebert, S.W.,
& Rye, R.O. (1997)) when hydrothermal fluids were fed upward along high angle, normal faults. Low-grade Au and Ag mineralization
was co-deposited with silica and potassium feldspar throughout porous rock types.
A
subsequent drop in permeability, due to sealing of the system, led to over pressuring and subsequent repeated hydrothermal brecciation.
Additional precious metal mineralization was deposited during this event as breccia zones, veins, and sulfide flooding.
Au
and Ag mineralization was followed (0.7 to 4.0 million years ago, (Ebert, S.W., & Rye, R.O. (1997)) by an intense event of high sulfidation
acid leaching of the mineralized volcanic rocks coincident with a regional water table drop. This allowed steam heated sulfur gases to
condense into sulfuric acid and leach the upper portion of the mineralized rocks.
Oxidation
of sulfide mineralization occurs to variable depths over the deposit, depending upon proximity to faults, extent of acid leaching, and
depth to water table. Sulfide content through the deposit is variable from 0 to 20%.
6.1.1 Regional
Geology
The
Mine is located on the western flank of the Kamma Mountains in the Basin and Range physiographic province of northwestern Nevada. The
Kamma Mountains were formed during Miocene to Quaternary Epoch from the uplift of Jurassic basement rock and emplacement of Tertiary
volcanic and sedimentary rocks. The stratigraphy along the western flank of the range is down dropped to the west, along a series of
north to northeast striking normal faults. These faults served as conduits of hydrothermal fluids that deposited the Hycroft mineralization.
6.1.2 Local
Geology
The
Hycroft property consists of Tertiary to recent age, fault-controlled, low-sulfidation Au zones that occur over an area measuring approximately
three miles in a north–south direction by two miles in an east–west direction. The zones are hosted in volcanic rock eruptive
breccias, flows and conglomerates associated with the Tertiary Kamma Volcanics and sand to conglomeratic debris flows associated with
the Tertiary Sulfur Group (TSG).
Hycroft Mine Project
Page 44
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Younger
rocks at the mine are Tertiary conglomerate, siltstone and fanglomerate of the Sulfur Group (locally termed Camel Conglomerate). These
rocks are comprised of sediment eroded from the underlying Kamma Volcanics and Jurassic Auld Lang Syne (ALS) Formation. The Sulfur Group
is divided into three main units: a clast-supported coarse conglomerate, a matrix-supported conglomerate, and an underlying tuffaceous
lake sediment. This unit outcrops throughout the mine site with increasing thickness to the west.
The
older Kamma Group is exposed throughout the Kamma Mountains east of the Central Fault. It underlies the Camel Conglomerate (TCM). The
volcanic package is comprised of siliceous to intermediate tuffs, coarse grained volcanic clastics, fanglomerates, eruption breccias
and massive to flow banded rhyolites.
The
Jurassic ALS Formation underlies the Kamma volcanic package. This formation consists of a thin bedded to laminated siltstone, with calcite
cementing. ALS is exposed approximately three miles east of the deposit and is encountered only at depth in drilling at Hycroft. A generalized
stratigraphic column for the Hycroft deposit area is presented in Figure 6-1. This stratigraphic column illustrates the formations of
volcanic origin that host the deposit with notations for lithologies in each formation. The TCM of the TSG has been broken out as a separate
rock, in addition to those shown in Figure 6-1. The sub-group of the TSG references lakebed sediments that are distinct from the TCM.
Figure
6-1: Stratigraphic Column for Hycroft Deposit Area
Source:
SRK, 2019
Six
major north-northeast trending, west dipping, normal fault zones appear to broadly control the distribution of alteration as shown in
Figure 6-2. From west to east, these fault zones are referred to as the Range, West Splay, Central, Break, Albert, and East Faults. These
major structures down-drop stratigraphy and affect the distribution of alteration and mineralization. A post-mineral basin bounding fault
(not pictured) appears to border TCM and the adjacent Pleistocene Lahontan Lake sediments in the Black Rock Desert. Based on geophysics,
this structure is approximately one to two miles west of the mine site. There are several east–west trending structures that appear
to provide post-mineral offset to the deposit. These form a series of horst and grabens within the deposit footprint.
Figure
6-2 is a mine grid north-looking section through the Mine showing structures and volcanic rock stratigraphy. There are also several other
parallel fault zones that may have a significant impact on the localization of mineralization. The depth of oxide and mixed sulfide/oxide
Au and Ag mineralization vary considerably throughout the area. Alteration at the deposit is dominated by acid leaching, silicification,
argilization, and propylitization.
Figure
6-2: Simplified East–West Cross Section Through the Hycroft Mine – Section 40600 N
Source:
Hycroft, 2025
6.2 Mineralization
and Alteration
The
Hycroft deposit is broken into five major zones based on geology, mineralization, and alteration. These include Brimstone, Vortex, Central,
Bay, and Camel. The boundaries are typically major faults, namely Break, East, and Ramp Faults. Continuity is structurally controlled
and disseminated in each of these areas.
Hycroft Mine Project
Page 45
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Detailed
geologic work by previous owners at Hycroft identified several hydrothermal alteration events. However, for resource estimation purposes,
the following four alteration types have been interpreted and assigned to the block model:
● Acid
Leach – Associated with the upper portion of the epithermal vent. Native Sulfur is
common in this area and the original protolith has been obliterated with a white clay alteration.
● Propylitic
– Propylitic altered material is generally found in the volcanic rocks of the Kamma
Mountains. Although it is occasionally interpreted within the mineralized zone of the deposit.
● Argillic
– A pervasive alteration of both TCMs and the Kamma Volcanics clay minerals have replaced
the original potassium feldspars and other minerals.
● Silicic
– Silica flooding is associated with the mineralization processes at Hycroft.
Propylitic
is generally barren or nearly so. It has been lumped with the argillic alteration units for grade estimation and assignment.
Silicic
alteration generally has better grade than the surrounding argillic and is mechanically more robust.
Oxidation
has occurred across the deposit to variable depth depending on the structural preparation and available acidic ground water. The oxidized
material has been the historical ore for heap leaching at Hycroft. This study includes ROM leaching of low-grade mineralization and flotation
of mineralization with sufficient pyrite and other sulfides to generate a gold and silver rich concentrate for further processing.
6.2.1 Brimstone
Brimstone
is approximately ¾ mile wide (E-W) and approximately 1 mile long (N-S) and sits between the East Fault and Albert Fault. The stratigraphy
(depth) at Brimstone includes up to 100 ft of alluvium, underlain by Camel Conglomerate rocks (0 ft to 400 ft), and Kamma volcanic rocks.
ALS has been drilled at depth and is in fault contact (East Fault) as well as unconformably with the overlying Kamma Volcanics. The Brimstone
deposit is hosted primarily by Kamma volcanic rocks in the hanging wall of the East Fault. The volcanic rocks are principally eruption
breccias, tuffs, rhyolites, and volcanic rocks proximal to vents, and overlie deformed and metamorphosed shale, sandstone, and siltstone
of the ALS group.
At
Brimstone, the East Fault is a north-northeast striking, west dipping, normal fault with repeated episodes of movement, including approximately
150 to 200 ft of alluvial offset. Where exposed in the Brimstone pit, the fault clearly shows steep normal movement, with slickensides
that plunge 80° to 85°. At depth the fault shallows to 45° to 60° and may merge with the Central and Break Faults. The
fault may have originally served as a conduit to hydrothermal fluids.
North
of the Brimstone deposit, the east–west trending Ramp Fault appears to down-drop favorable stratigraphy. Condemnation drilling
of the leach pad to the north has shown only local zones of weak Au and Ag mineralization. To the south, the Brimstone Zone transitions
to the Vortex Zone, with no apparent change in stratigraphy, but changes to alteration zonation.
Hycroft Mine Project
Page 46
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Host
rocks were highly altered by at least four phases of alteration. The relatively porous conglomerate and breccias were preferentially
acid leached by late stage steaming hydrothermal acid vapors. Acid leach alteration extends to depths of 700 ft in some areas of the
Brimstone deposit indicating that the water table was present below the base of the acid leached zone. A siliceous layer (basal acid
leach), up to tens of feet thick, occurs at the base of the acid leach material. Underlying the acid leaching is a layer of hydrothermal
clay alteration, followed by silica potassium feldspar alteration. Pervasive silicification, veining and hydrothermal brecciation are
generally found in the rhyolites and breccias.
Zones
of silicification of varying thickness, oriented parallel to the East Fault, are present in the footwall zone. Alteration extends approximately
1,000 ft from the fault into the footwall, with pervasive silicification and quartz veining dominant.
Au
and Ag are spatially associated with fracture and breccia-controlled chalcedony sulfide mineralization. A subsequent acid alteration
event produced the current distribution of oxidized and transition sulfide/oxide ore. The lower acid leach material hosts Au and Ag mineralization,
as does the underlying silicified and veined volcanics.
Drilling
through 2024 has shown that high-grade silver mineralization hosted in quartz/clay veins extends to a depth of over 1,800 ft in the Brimstone
Zone. The high-grade silver veins have little to no association with gold, indicating gold and silver were deposited at different times.
Petrography with support from geochemistry indicates some of the high-grade silver mineralization is potentially related to an intermediate
sulfidation system and proximal to a magmatic fluid source. Mineralization thickness of the high-grade is highly variable but generally
less than 100 ft thick (true width) and the broader overall Brimstone mineralization is 200 to 1,500 ft thick, and both mineralization
styles remain open to the west toward the Break Fault. The main phase of mineralization in the high-grade silver is naumannite and argentotetrahedrite
with inclusions of chalcopyrite, clausthite, and galena.
6.2.2 Vortex
Vortex
area is approximately ¾ mile wide (E-W) and approximately 1 mile long (N-S) and sits east of the Albert Fault. The stratigraphy
(depth) in the Vortex Zone is correlative with those at the Brimstone Zone immediately to the north. Camel Conglomerate is underlain
by tuffs, volcanic clastics, fanglomerates, and rhyolites of the Kamma Volcanics. The ALS is present in the footwall of the East Fault
and appears to be in stratigraphic contact with the Kamma Volcanics.
The
upper elevation at Vortex is hydrothermally clay (kaolinite) altered. Acid leaching is less prominent than in Brimstone and is focused
primarily along the East Fault. Strong silicification has been observed to depths greater than 1,500 ft. At least four hydrothermal mineralizing
events are present, as evidenced by crosscutting vein and breccia relationships. Propylitic and/or clay alteration extends outboard of
the silicification. The alteration within the Brimstone pit is depicted in Figure 6-3.
The
mineralization at Vortex is of both vein and disseminated types, with brecciated and altered rhyolite rocks and volcanic clastics acting
as favorable hosts. In addition to Au mineralization, high-grade Ag has been encountered at Vortex; with values ranging from 10 to 647
oz/ton. The predominant Ag minerals are miargyrite, and selenostephanite with inclusions of argentotetrahedrite, naumannite occurring
both in veins, disseminated and coarse grains along fractures. Petrography and geochemistry support the low-sulfidation epithermal style
of mineralization.
Hycroft Mine Project
Page 47
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Oxide
mineralization is present at a depth of approximately 500 ft bgs, with sulfide mineralization extending to 2,500 ft bgs. Mineralization
thickness (true width) is 1,000 to 1,800 ft thick. Banded quartz veins with both high- grade Ag and Au have been noted in core. Drilling
to date indicates that the high-grade zones are both high angle banded quartz veins and a more extensive flat lying, massive quartz zone
containing visible pyrargyrite and miargyrite.
Figure
6-3: Vortex Alteration Cross-Section – 40600 N
Source:
Hycroft, 2025
6.2.3 Bay
Bay
area is approximately ¾ mile wide (E-W) and approximately 1.5 miles long (N-S) and sits north of the Camel Pit. Mineralization
in Bay is hosted by gentle, west dipping Camel Conglomerate. Both clast-supported and matrix-supported conglomerate rocks host mineralization.
The basal rock type is tuffaceous lake sediments, composed of fine-grained clay with minor layers of gravel and conglomerate extending
to a depth greater than 1,100 ft. Mineralization is primarily bedding controlled, with the Range and Central Faults as the main feeders.
The Break Fault may also have zoning controls but is poorly drilled in this zone. Mineralized siliceous hot spring sinters have been
historically mined indicating that this deposit represents the upper-most levels of a hot spring hydrothermal system.
Hycroft Mine Project
Page 48
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
predominant alteration type at Bay is silicification. Acid leach alteration in the area is relatively minor and occurs along high angle
structures as seen in Figure 6-4. Clay alteration of the underlying lacustrine sediments is also noted in limited drillholes and is Illite-smectite
dominated. Strong oxidation is present in the upper portion of the silicified zone.
Au
and Ag mineralization is associated with flat lying Camel Conglomerate, above the lacustrine lake sediments. Mineralization thickness
(true width) is 20 to 250 ft thick at Bay and 50 to 300 ft thick at Boneyard. This zone transitions into the upper zone of mineralization
at Central. Bay and Boneyard remain open to the north and east.
Figure
6-4: Bay Geologic Cross-Section at 50300-N
Source:
Hycroft, 2025
Hycroft Mine Project
Page 49
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
6.2.4 Central
Central
area is approximately ½ mile wide (E-W) and approximately 1 mile long (N-S) and sits between Central Fault and West Splay Fault.
Central geology is similar in nature to that of Bay, with mineralization and alteration fed by high angle faults and fractures, with
dominant lateral fluid flow through the porous conglomerate rocks of the Sulfur Group. Camel Conglomerate units are underlain by lacustrine
sediments. However, the lacustrine units thin dramatically to the south, with less than 50 ft of the material noted south of Historic
Cut-4 Pit.
The
Central fault movement is unknown, but extends at least 2,000 ft, with recent reactivation in the quaternary (50 to 150 ft), as demonstrated
by offset in the alluvium. The Range Fault to the west may provide an additional boundary, although drill data is limited at this time.
Alteration along the Central Zone is consistent with the alteration found at Bay. Acid leach alteration is stronger and more widespread
than at Bay and is extensive in the southern portion of the zone. The acid leaching overlies silicified conglomerate rocks, except along
the immediate trace of the Central Fault where silicification dominates as the alteration type as seen in Figure 6-4. Acid leach material
has mostly been mined through and very little still exists in this area. Oxidation extends downward approximately 400 ft. Underlying
the silicification and acid leaching are illite-smectite clay altered and clay dominant lacustrine sediments. Hot spring sinter deposits
have not been observed.
Au
and Ag mineralization is associated with favorable stratigraphic horizons in the Camel Conglomerate, with an upper and lower zone noted
in drilling, separated by a north–south striking, east dipping clay layer. Mineralization remains open to the west, past the Range
Fault, and at depth (>1,400 ft). Mineralization thickness (true width) in the upper zone is 50 to 300 ft thick, while the lower zone
ranges from 300 to 1,200 ft thick and remains open at depth. The mineralization zone is contiguous to the Vortex and Brimstone Zones
to the east, and the Camel Hill/ Historic Cut-5 Pit zones to the south.
6.2.5 Camel
Camel
area is approximately ¾ mile wide (E-W) and approximately ½ mile long (N-S). Conglomerate is the dominant lithology at
Camel. The conglomerates appear to extend to depth in this zone, with only thin lake sediments drilled to date. The lack of lake sediments
can be attributed to either the Camel Fault or facies changes along a shoreline. The Camel Fault is an east–west trending fault,
with down-drop to the south, which is presently poorly defined by drilling.
Alteration
in the Camel area is predominantly comprised of silicification and clay alteration. Hydrothermal clays, overlying silicified conglomerate
rocks, and basal illite-smectite clay altered rocks are present. Acid leaching in the area is relatively minor, especially with respect
to the intensity and amount in the Central Zone area immediately to the northeast.
Mineralization
in Camel is hosted by conglomerate rocks and occurs as both disseminated Au and Ag associated with pyrite and marcasite, and higher-grade
veins, including Ag bearing pyrargyrite veins. Mineralization thickness (true width) is 200–1,100 ft thick, extends to depths greater
than 1,400 ft, and remains open at depth. Oxidation extends to depths greater than 200 ft and an area of intense oxidized mordenite alteration
is present between the Historic Cut-5 Pit and Camel. Mineralization remains open to the south, west and at depth. Mineralization is also
open to the west of Camel and to the south towards Hades Fault.
Hycroft Mine Project
Page 50
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
6.3 Deposit
Types
The
Hycroft deposit is generally an epithermal, low-sulfidation hot springs deposit (Figure 6-5). Au and Ag mineralization are noted as both
disseminated and vein controlled.
Figure
6-5: Generalized Epithermal Diagram
Source:
Buchanan, 1981 and modified by Corbett Greg and Leach, Terry, 1998
Hycroft Mine Project
Page 51
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
7 Exploration
7.1 Exploration
Section
7 has been written and updated by Alex Davidson, Vice President of Exploration of Hycroft and approved by IMC. IMC is a third-party consulting
firm with people who can act as a qualified person for this section. Hycroft has conducted geophysical surveys, soil and rock-chip sampling
programs, field mapping, historical data compilation, and regional reconnaissance at the site. These efforts are designed to improve
the understanding of known mineralization, as well as provide data for further exploration of the greater property position.
7.2 Geological
Mapping
Field
mapping was historically and is currently carried out in all active mine areas. Mapping focuses on structure, bedding, joints, lithology,
and alteration. The near mine data is incorporated into the three-dimensional geology model, while the regional work is focused on defining
exploration targets for future drilling. A regional geology map covering the land position was compiled in 2012. Regional exploration
data from Homestake, LAC Minerals, USX, HRDI, and others has been compiled from both in-house and public data sources. Approximately
250 drillholes, various soil and rock chip locations and results, and various field maps have been identified at present.
7.3 Geophysics
The
land position has been surveyed with both gravity and induced polarity (IP) geophysical techniques by Hycroft. The current ground-based
gravity survey covers approximately 130 square miles, centered on the mine site. Gravity indicates several structural features and density
changes that offer potential exploration targets.
Ground
induced polarization (IP) surveys were run over the mine site and Vortex in 2007 and extended outward in 2011 to cover approximately
24 square miles. The survey results focus on chargeability anomalies, that potentially identify sulfide material (> approximately
1.5%) at depth, and resistivity anomalies, that potentially identify silicification at depth. Results have identified and confirm additional
exploration targets suggested by the other geophysical methods.
An
additional 56-line kilometers of IP were collected in four phases during the 2023 and 2024 exploration seasons which extended several
of the lines from the previous surveys. The data from the new IP lines were incorporated into Voxel models which included historical
IP data. The results from the survey focused on both chargeability and resistivity anomalies.
In
2022 a hyperspectral imaging flyover of the Hycroft was conducted by SpecTIR Advanced Hyperspectral Solutions. Both longwave infrared
(LWIR) and shortwave infrared (SWIR) imaging were collected with the intent of helping identify key minerals on the surface to focus
reconnaissance mapping and soils programs. Total flyover grid was 1,200 km2.
Hycroft Mine Project
Page 52
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
7.4 Soil
Sampling
A
soil sampling grid was conducted over the Vortex and Brimstone areas historically (1,797 samples) and was extended approximately 5,200
ft north and 29,600 ft south of the mine in 2011–2012 (1,834 samples). The soil sampling program was conducted primarily along
the East Fault exposure, which is a primary ore-controlling feature at Vortex and Brimstone. Results, using Au, Ag, arsenic, and antimony,
indicate potential exploration targets to the south of the Vortex area. At present this work has identified several target areas. Au
values range from 0 to 0.027 oz/ton, while Ag values range from 0 to 3.7 oz/ton. Soil samples are taken on an evenly spaced grid (approximate
100-meter grid spacing), and screened for coarse material and wind-blown material, resulting in a fraction between 2 mm and 180 µm
being prepped for analysis. These samples are considered representative of local soil geochemistry and are used to guide the regional
exploration effort.
7.5 Rock-Chip
Sampling
Rock-chip
sampling has been conducted both historically in the active mine area, and on a regional basis (2007–present). A database of 2,416
samples has been compiled, covering the greater land position. Using Au, Ag, arsenic, and other elements, exploration targets have been
developed both north and south of the current mine. Rock-chip samples have been taken on most outcrops, with a focus on alteration and
potential mineralization. These samples are used as a guide to exploration and are point samples only.
An
additional 206 rock-chip samples were collected in the 2023 and 2024 exploration season within the mine area and immediately east of
the mine area. The gold values include 22 samples greater than 0.03 oz/ton Au, and two samples greater than 0.23 oz/ton Au. These samples
were collected in mineralized structures in the Bay Pit highwall. Silver values include 16 samples greater than 0.58 oz/ton Ag and two
samples greater than 5.9 oz/ton Ag (maximum 15.2 oz/ton Ag). These samples were collected in mineralized structures in the Brimstone
pit highwall and were not collected on a grid.
7.6 Drilling
7.6.1 Introduction
The
Hycroft drill history covers the period from 1982 through 2024 and includes 6,024 holes, representing 2,814,546 ft of drilling. Some
of those holes are water wells or are outside the resource model area and were not applied to MRE. The drillhole collar locations are
shown in Figure 7-1. At this time, there are 5,813 drillholes in the resource model area of which 188 have been drilled to define stockpiles
or the Crofoot leach pad. Section 11 provides a more detailed breakdown of the amount of drilling and assaying used in the mineral resource
modeling.
Hycroft Mine Project
Page 53
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
7.6.2 Exploration
Drilling
Exploration
drilling was started in 1974 by Duval Corporation, which was evaluating the property for a Frasch-type sulfur deposit and the copper
potential. Although native sulfur appeared to be limited to the acid leach zone, Au and Ag mineralization was discovered at depth, with
the deepest hole completed to 2,000 ft. Duval concluded that the property did not have large scale sulfur potential. Twenty drillholes
(9,726 ft) were completed on the project. Hycroft does not have access to the Duval Corporation drilling data and therefore is not a
part of the Hycroft database.
Homestake
(1982), using their McLaughlin deposit as a model, completed 96 RC drillholes totaling 16,537 ft, primarily in the Bay and Boneyard areas.
Shallow oxide Au mineralization was discovered, but Homestake declined the opportunity. Crofoot and American Slag then proceeded to acquire
the property rights and initiated small-scale oxide heap leach mining at Central and Bay in 1983. Homestake also completed 8 core holes
during this timeframe, but collar location data has not been located.
Hycroft
gained control of the district in 1985 and drilled 3,212 exploration holes, totaling 965,552 ft, between 1985 and 1999. The bulk of this
drilling was shallow and focused on oxide Au mineralization at Central, Bay and Brimstone.
In
2005, Canyon Resources completed 33 drillholes totaling 13,275 ft of RC drilling. These were completed primarily in the Brimstone pit
area.
Hycroft
commenced systematic exploration and resource development drilling starting in 2006. Drilling was focused on oxide resource delineation,
sulfide resource definition, sulfide exploration, condemnation drilling for facilities, Ag data and both geotechnical and metallurgical
core samples. Between late-2006 and August 31, 2016, Hycroft completed 1,970 exploration holes, totaling approximately 1.45 million ft.
A
combination of rotary, RC and core drilling techniques has been utilized to verify the nature and extent of mineralization. Most samples
have been collected using RC drilling methods on 5 ft sample intervals. RC drilling utilizes 4.5- to 5.5” tooling.
Deeper drilling is conducted with diamond drilling, using PQ, HQ and NQ tooling. This practice continued through 2013. Since 2013, an
RC drilling program was completed in 2014, and a metallurgical core program with six drillholes was completed in 2017. Various protocols
applied to drilling by Hycroft are consistent with industry standards and the resulting data is of good quality for use in the Hycroft
model. Shallow drillholes to sample heap material were completed with sonic coring. The 2018 sonic drilling program was limited to 56
vertical holes in sulfide stockpiles and did not include in-situ alluvium or bedrock material. While these were not used for interpolation
of in-situ rock, they were applied to estimate grades in fill material.
During
2021 through 2024, Hycroft drilled 260 holes, 105 in 2021, 85 in 2022, 49 in 2023 and 21 in 2024. Most of the 2021 drilling was diamond
core that was used for metallurgical testing and assay. The 2022 and 2023 drilling focused on extending mineralization and upgrading
areas from inferred to measured and indicated classification. The 2024 drilling focused on high-grade mineralization in Brimstone and
Vortex.
Hycroft Mine Project
Page 54
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
7-1: Drill Collar Location Plan
Source:
Hycroft, 2025
Hycroft Mine Project
Page 55
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
7-1: Drilling from 2023 and 2024 Supporting the Updated MRE
Hole
ID
Northing
Easting
Elevation
(masl)
Hole
length (ft)
Inclination
(deg)
Azimuth
(deg)
H23C-5767
23022.532
39788.972
5050.094
1000
-57.98
243
H23C-5768
23097.466
39986.601
5048.798
1020
-57.98
243
H23C-5769
19563.12
40199.23
4458.06
1750
-57.98
243
H23C-5770
19024.77
40418.99
4239.71
1887
-57.98
243
H23C-5776
18426.95
40800.25
4361.54
1629.5
-57.98
243
H23C-5778
25545.11
36956.82
5616.41
1000
-57.98
243
H23C-5780
25984.36
36976.45
5575.68
605
-57.98
243
H23C-5781
25980.93
36976.25
5575.86
753
-57.98
243
H23R-5747
22189.79
39295.821
5001.41
1300
-70
90
H23R-5748
17122
38400.01
4606.39
1300
-70
90
H23R-5749
17178.57
38589.8
4598.47
1300
-70
90
H23R-5750
17078.89
38776.26
4598.543
1400
-70
90
H23R-5751
17039.71
38669.56
4599.205
1760
-70
90
H23R-5752
17039.97
38669.7
4599.259
1400
-70
90
H23R-5753
22119.91
42749.64
4479.94
1200
-70
90
H23R-5754
21510.24
41418.17
4501.49
1250
-70
90
H23R-5755
16516.25
37642.36
4406.38
800
-70
90
H23R-5756
16369.51
38282.53
4302.76
1100
-70
90
H23R-5757
16902.9
38592.574
4597.643
1200
-70
90
H23R-5758
16916.07
38779.44
4599.196
1400
-70
90
H23R-5759
17064.069
38765.321
4599.206
1300
-70
90
H23R-5760
22545.27
42526.38
4617.74
1500
-70
90
H23R-5761
22540.37
42621.83
4619.23
1500
-70
90
H23R-5762
16878.68
40805.17
4439.201
1510
-70
90
H23R-5763
17117.9
40800.38
4448.28
1700
-70
90
H23R-5764
17366.39
40800.14
4433.93
1720
-70
90
H23R-5765
21362.57
41350.61
4508.29
1250
-70
90
H23R-5766
21642.38
40908.35
4653.27
1500
-70
90
H23R-5771
22375.51
42362.41
4619.92
1210.4
-70
90
H23R-5773
22579.05
44400.47
4834.02
1380
-70
90
H23R-5774
22577.06
44400.39
4834.09
1500
-70
90
H23R-5784
16389.27
37693.98
4375.49
950
-70
90
H23R-5785
16130.29
37479.09
4343.28
750
-70
90
H23R-5786
16212.63
37860.99
4357.13
800
-70
90
H23C-5787
25261.92
36571.14
5560.73
800
-57.98
243
H23C-5777
26047.99
37510.26
5710.02
659
-57.98
243
Hycroft Mine Project
Page 56
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Hole
ID
Northing
Easting
Elevation
(masl)
Hole
length (ft)
Inclination
(deg)
Azimuth
(deg)
H23C-5779
25048.82
36226.86
5511.94
610
-57.98
243
H23C-5790
22137.378
42732.949
4481.43
1222
-57.98
243
H23C-5794
26978.764
38048.934
5725.895
1625.5
-70
90
H23C-5795
22368.307
42211.245
4615.752
1205
-70
90
H23R-5775
22107.49
41546.68
4597.67
1378
-70
90
H23R-5782
22417.57
41989.33
4611.14
1200
-70
90
H23R-5792
19737.808
47981.098
4592.636
450
-70
90
H23C-5788
22124
42755
4480
785
-57.98
243
H23C-5789
21501.12
41405.63
4501.13
1260
-57.98
243
H23C-5796
14219.804
30051.704
5258.447
564
-70
90
H23C-5797
14216.243
30054.634
5258.395
421
-70
90
H23C-5791
19202.43
50349.998
4466.932
556
-62.53
91.39
H23C-5798
21842.82
42721.378
4480.006
1306
-70
90
H24D-6000
18456.79
41109.25
4358.82
1288.1
-51.55
139.51
H24D-6001
20279.43
40613.29
4845.23
1897
-81.79
225.4
H24D-6002
19532.83
39871.49
4497.08
1936.6
-72.19
28.04
H24D-6003
21617.07
42344.04
4522.26
1603
-57.96
74.93
H24D-6004
21632.9
42668.16
4480.78
1491
-53.29
85.89
H24D-6005
20430.43
39723.11
4874.35
1978
-80.04
37.12
H24D-6007
18467.86
39384.38
4603.13
1764.3
-65.42
19.17
H24D-6009
21596.98
42343.93
4522.13
1439
-60.25
96.83
H24D-6010
22075.19
42771.26
4480.41
1270
-58.27
121.77
H24D-6008
21414.42
42576.31
4525.28
1589.3
-65.42
19.17
H24D-6011
22083.7
42463.77
4520
1128.9
-58.27
118.96
H24D-6012
21577.37
42129.56
4563.03
1480
-77.5
16.35
H24E-6013
19581.635
52769.501
4459.163
662
-49.93
81.98
H24E-6014
19438.89
51895.48
4426.114
600
-49.93
81.98
H24E-6015
23464.19
39901.24
5307.52
785
-49.93
81.98
H24D-6006
18702.71
40106.39
4419.27
1319.8
-80.04
37.12
H24D-6016
18394.08
39005.45
4671.78
2107
-63.53
20.92
H24D-6017
22075.42
42769.46
4479
1235.4
-63.53
20.92
H24D-6018
22084.57
42462.56
4520.41
1186
-63.53
20.92
H24D-6019
21733.69
42244
4521.2
1701
-63.53
20.92
H24D-6020
21876.02
42083.76
4559.42
1254.7
-49.93
81.98
Hycroft Mine Project
Page 57
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
7.6.2.1 Drilling
Methods
Drilling
at Hycroft has been a mix of diamond core holes, reverse circulation (RC), and sonic drilling. A total of 6,024 drill holes representing
2,814,546 ft of drilling has been performed throughout the history of the project. A total of 35,647 down-hole surveys exist in the database.
7.6.2.2 Logging
Procedures
Core
is loaded into cardboard boxes in approximately ten-foot intervals and are transported to the core processing facility. Geology data
is logged directly into acQuire by the staff geologists where they log formation, lithology, structure, vein, mineralization, and alteration,
and geotechnical data. RC chips are collected from the RC rejects and the rig and stored in chip trays for logging by similar methods
as applied to core.
7.6.2.3 Recovery
The
average sample recovery within the ore at Hycroft is 82% and the average sample recovery within the waste is 75%.
7.6.2.4 Sample
Length/True Thickness
Sample
length is generally 5 ft intervals sampled down the drill hole but broken in smaller intervals based on local geologic variation. The
true thickness of mineralization is several feet to more than, 2,000 ft.
7.7 Hydrogeology
An
extensive program of hydrologic data collection was implemented by SRK Consulting (US) Inc. (SRK) for a previous owner of the property.
That work is summarized in a report titled “Summary of Field Investigations and Conceptual Hydrogeology – Hycroft Mine Expansion
Project, Nevada”, August 2013. SRK collected data from 43 drill holes including monitor wells, piezometers, slug tests, packer
tests, long-term pumping tests, and ground water level monitoring. Eighty-one ground water samples were collected and analyzed over a
period of a year and a quarter. The SRK work was utilized during the preliminary geotechnical analysis of the Hycroft pit slopes.
IMC
holds the opinion that hydrologic data collection and analysis are appropriate to determine mineral resources and an initial assessment
with an economic analysis.
7.8 Geotechnical
Call
& Nicholas, Inc. (CNI) has completed geotechnical data collection and analysis. CNI has prepared two reports titled: “Hycroft
Geotechnical Slope Stability Study,” February 2022, and “2023 Camel Pit Geotechnical Logging and Laboratory Testing Report,”
October 2023. Geotechnical laboratory testing was completed by CNI during 2010, 2011, 2021, and 2023.
Hycroft Mine Project
Page 58
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Two
geotechnical holes were drilled in 2022 using diamond core methods (H22D-5726 and H22D-5729). These holes were sampled and logged for
rock quality designation (RQD) and other geotechnical parameters by CNI engineers on site at Hycroft. Hole H22D-5729 was also televiewer
logged.
CNI
has provided slope angle recommendations that have been utilized to establish the MRE presented in this document.
IMC
holds the opinion that geotechnical work is appropriate for development of mineral resources and initial assessment with economic analysis.
Additional work will be required as the project progresses, and more detail is required.
7.9 Exploration
Targets
In
mid-2022 Hycroft restarted exploration drilling with the primary goal of converting waste material and inferred resources into measured
and indicated resources. The drilling was dominantly RC, and RC with core tails occurring on the deeper (<1,800 ft) holes (See Table
7-2). In the second half of 2023 the program was re-aligned due to the recognition of significant silver grades both within subvertical
thin veining in Brimstone and within a low angle breccia body at Vortex. Subsequently, the drilling method was switched to core to better
understand and define structural complexities at Brimstone and Vortex.
The
drilling in Brimstone indicates the zone of veining is related to a structural dilation zone between East Fault related structures. The
geometry of the high-grade Brimstone deposit has not been fully defined and remains open at depth and along strike.
The
drilling in Vortex along with additional mapping east on the trend of the Vortex mineralization, indicates the Vortex deposit is related
to a pre-mineral detachment fault.
Exploration
targets were also identified outside the resource area to the east (Manganese and Wildrose) and south (Oscar), with work on these areas
including detailed field mapping, soil and rock-chip geochemistry, IP geophysics, and core drilling. Additional exploration work was
completed at Bay to start defining vein geometry extending below the current resource. These targets are still conceptual and may require
significant work before a resource can be determined. Hycroft will continue to develop these high value targets in future exploration
programs. The exploration program continued through 2024 with one core drill program completing 21 holes totaling approximately 30,000
ft, which was exclusively focused on high-grade silver zones within Brimstone and Vortex.
Hycroft Mine Project
Page 59
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
7-2: Significant Intercepts (2023)
Hole
ID
Area
From
(m)
To
(m)
Interval
(m)
Grade
Au
(g/t)
Ag
(g/t)
H23R-5748
Camel
105.16
134.11
28.96
0.41
8.82
204.22
251.46
47.24
0.53
5.71
Including
205.74
219.46
13.72
0.61
10.84
H23R-5749
Camel
195.07
240.79
45.72
0.53
4.86
Including
204.22
222.50
18.29
0.64
3.75
288.04
304.80
16.76
0.39
5.39
368.81
377.95
9.14
0.39
3.42
H23R-5750
Camel
156.97
184.40
27.43
0.45
4.08
210.31
245.36
35.05
0.50
4.18
278.89
297.18
18.29
0.33
3.59
377.95
387.10
9.14
0.44
4.17
H23R-5751
Camel
112.78
211.84
99.06
0.46
6.88
Including
192.02
204.22
12.19
0.63
13.91
393.19
429.77
36.58
0.41
3.24
H23R-5752
Camel
152.40
219.46
67.06
0.41
4.91
333.76
371.86
38.10
0.37
29.32
Including
338.33
345.95
7.62
0.33
85.36
H23R-5757
Camel
45.72
111.25
65.53
0.51
10.38
Including
45.72
56.39
10.67
0.50
36.37
126.49
259.08
132.59
0.54
1.37
Including
138.68
184.40
45.72
0.69
8.78
350.52
365.76
15.24
0.47
7.67
H23R-5758
Camel
129.54
234.70
105.16
0.44
4.97
298.70
329.18
30.48
0.41
2.31
H23R-5759
Camel
27.43
231.65
204.22
0.53
20.70
Including
27.43
68.58
41.15
0.49
75.81
Including
80.77
128.02
47.24
0.78
8.19
281.94
359.66
77.72
0.35
3.48
H23R-5784
Camel
105.16
158.50
53.34
0.47
11.86
237.74
289.56
51.82
0.42
12.26
H23R-5786
Camel
60.96
135.64
74.68
0.36
41.20
Including
60.96
86.87
25.91
0.29
106.01
173.74
225.55
51.82
0.43
44.99
Including
173.74
181.36
7.62
0.49
266.72
H23R-5756
Camel
12.19
68.58
56.39
0.40
4.58
141.73
204.22
62.48
0.36
4.76
224.03
240.79
16.76
0.43
2.31
Hycroft Mine Project
Page 60
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Hole
ID
Area
From
(m)
To
(m)
Interval
(m)
Grade
Au
(g/t)
Ag
(g/t)
H23R-5785
Camel
164.59
213.36
48.77
0.50
43.60
Including
172.21
184.40
12.19
0.59
161.16
H23R-5762
Camel
4.57
13.72
9.14
0.41
6.42
48.77
455.68
406.91
0.39
4.90
Including
137.16
202.69
65.53
0.59
6.14
H23R-5763
Camel
190.50
236.22
45.72
0.51
5.36
254.51
445.01
190.50
0.42
4.99
Including
367.28
445.01
77.72
0.53
3.76
H23R-5764
Camel
275.84
300.23
24.38
0.57
4.32
396.24
519.68
123.44
0.47
7.00
H23C-5769
Vortex
357.62
417.15
59.53
0.36
75.91
Including
399.32
417.15
17.83
0.55
211.89
H23C-5770
Vortex
0.00
29.57
29.57
0.45
7.42
224.27
328.00
103.72
0.37
6.62
347.38
398.07
50.69
0.50
139.87
Including
350.58
368.72
18.14
0.31
288.82
Including
387.16
398.07
10.91
1.29
138.48
H23R-5773
Brimstone
88.39
141.73
53.34
0.24
24.41
Including
121.92
134.11
12.19
0.32
56.84
310.90
342.90
32.00
0.51
4.87
359.66
411.48
51.82
0.38
3.98
H23R-5774
Brimstone
108.20
111.25
3.05
0.36
57.00
129.54
132.59
3.05
0.59
30.85
275.84
278.89
3.05
0.69
34.45
315.47
326.14
10.67
0.44
26.83
393.19
396.24
3.05
0.54
5.00
H23C-5768
Brimstone
61.87
67.97
6.10
0.39
210.50
Hycroft Mine Project
Page 61
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
7-3: Significant Intercepts (2024)
Hole
ID
Area
From
(m)
To
(m)
Interval
(m)
Grade
Au
(g/t)
Ag
(g/t)
H24D-6000
Vortex
71.7
102.3
30.5
0.64
13.80
272.0
318.8
46.8
0.69
18.12
H24D-6001
Vortex
189.3
224.6
35.3
0.66
6.32
Including
220.0
223.5
3.5
1.07
16.76
383.2
507.5
124.4
0.95
102.59
Including
385.4
388.2
2.8
7.38
40.85
Including
385.4
386.3
0.9
19.65
80.60
Including
410.7
424.8
14.2
2.13
77.34
Including
449.4
488.0
38.6
0.71
134.25
Including
451.7
452.0
0.3
0.03
4,170.00
Including
458.5
462.1
3.6
2.99
40.94
Including
470.2
478.9
8.7
0.32
207.33
498.2
507.0
8.9
0.31
475.56
Including
498.2
498.8
0.7
0.42
1,700.00
Including
504.6
506.0
1.4
0.34
1,538.78
H24D-6002
Vortex
357.3
458.2
100.9
0.38
100.65
Including
357.3
359.3
2.1
2.86
4.53
428.4
448.8
20.4
0.83
357.01
Including
428.4
429.4
1.0
1.38
300.12
Including
435.9
439.5
3.6
0.66
397.04
Including
440.4
445.0
4.6
1.59
1,066.47
Including
441.9
442.4
0.5
5.90
3,310.00
452.2
454.2
2.0
0.32
225.49
H24D-6005
Vortex
111.2
119.1
8.0
0.79
176.54
207.4
234.5
27.1
0.40
6.33
254.4
476.9
222.4
0.45
32.38
Including
385.2
395.2
10.0
0.34
328.25
Including
385.2
386.9
1.7
0.94
1,155.27
Including
408.2
419.0
10.8
0.24
107.02
537.1
556.1
19.0
0.37
142.14
Including
537.4
537.6
0.3
0.06
6,260.00
H24D-6006
Vortex
20.9
25.6
4.7
2.81
56.97
19.6
31.3
11.7
1.38
31.50
74.5
96.1
21.6
1.11
10.99
Including
74.5
79.2
4.8
0.91
8.60
Including
82.2
86.1
3.9
0.56
6.19
279.7
280.1
0.4
0.15
581.00
346.2
400.9
54.7
0.68
12.86
Including
351.8
355.1
3.3
2.19
9.29
Including
365.0
367.4
2.5
4.23
16.71
Including
373.3
375.3
2.0
1.05
16.13
Hycroft Mine Project
Page 62
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Hole
ID
Area
From
(m)
To
(m)
Interval
(m)
Grade
Au
(g/t)
Ag
(g/t)
H24D-6007
Vortex
46.1
93.6
47.4
0.35
22.51
Including
47.7
50.2
2.6
0.12
307.40
Including
64.0
64.6
0.5
3.10
54.40
113.4
125.0
11.6
0.98
16.56
371.3
399.5
28.2
0.44
11.98
468.4
537.8
69.4
0.57
108.38
Including
468.4
474.7
6.4
0.63
213.71
Including
497.1
537.8
40.7
0.73
144.25
Including
497.1
500.9
3.8
0.23
193.57
Including
512.4
514.9
2.5
0.72
645.25
Including
513.2
513.7
0.5
1.19
1,430.00
Including
536.3
537.8
1.5
4.78
960.00
H24D-6016
Vortex
405.4
456.3
50.9
0.42
19.38
472.3
518.0
45.7
0.49
15.57
535.3
557.2
21.9
0.40
53.80
H24D-6003
Brimstone
0.0
23.8
23.8
0.29
10.80
42.4
47.8
5.5
0.20
119.54
250.7
278.3
27.6
0.38
4.13
351.4
440.0
88.5
0.23
34.70
Including
386.7
386.8
0.2
0.12
1,835.00
Including
397.7
397.9
0.2
0.62
8,410.00
Including
418.8
421.1
2.3
0.08
130.87
H24D-6004
Brimstone
0.0
18.6
18.6
0.63
24.59
341.4
361.6
20.2
0.34
5.48
413.8
442.1
28.3
0.31
14.19
Including
429.3
441.4
12.0
0.52
11.73
H24D-6008
Brimstone
458.6
474.0
15.4
0.45
12.81
Including
464.5
467.9
3.5
0.82
20.54
Including
470.2
474.0
3.8
0.46
19.83
H24D-6009
Brimstone
0.0
16.2
16.2
0.38
54.89
Including
4.8
6.4
1.5
1.05
353.24
333.2
358.7
25.5
0.35
5.46
417.9
423.5
5.6
0.10
150.80
Including
417.9
421.1
3.3
0.10
199.20
Also
Including
420.3
420.6
0.2
0.10
652.00
Hycroft Mine Project
Page 63
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Hole
ID
Area
From
(m)
To
(m)
Interval
(m)
Grade
Au
(g/t)
Ag
(g/t)
H24D-6010
Brimstone
328.4
346.6
18.2
0.35
1,987.35
Including
331.0
332.8
1.8
0.11
2,612.33
Including
333.4
335.8
2.5
0.33
4,683.70
Also
Including
333.4
333.7
0.3
0.41
20,280.00
Including
340.2
342.7
2.5
0.50
5,513.43
Also
Including
340.2
341.1
0.9
0.72
10,289.00
Also
Including
341.1
341.4
0.3
0.64
15,211.00
H24D-6011
Brimstone
109.3
119.0
9.8
0.81
8.14
168.2
174.7
6.4
0.56
29.76
246.3
260.2
13.9
0.31
311.41
Including
249.9
252.8
2.9
0.27
1,211.32
273.2
326.5
53.3
0.26
218.92
Including
289.0
314.4
25.3
0.28
401.50
Also
Including
298.5
300.7
2.3
0.29
2,210.81
Also
Including
306.5
311.4
4.9
0.33
610.65
H24D-6012
Brimstone
37.3
37.8
0.4
0.49
4,540.00
65.8
66.8
0.9
0.52
4,040.00
284.0
325.2
41.2
0.39
7.28
Including
297.4
307.5
10.1
0.84
4.67
354.6
405.4
50.7
0.28
101.82
Including
354.6
357.7
3.1
0.58
36.37
Including
366.3
372.6
6.2
0.23
282.25
Also
Including
370.1
370.8
0.7
0.12
1,185.00
Including
385.0
386.6
1.6
0.09
1,156.86
Including
400.8
405.4
4.6
0.12
202.67
419.1
421.5
2.4
0.24
103.52
Including
420.7
421.5
0.8
0.13
176.30
H24D-6017
Brimstone
312.6
332.5
20.0
0.45
70.02
Including
314.7
321.6
6.9
0.14
151.39
H24D-6018
Brimstone
306.6
327.9
21.2
0.38
2359.68
Including
317.4
324.7
7.3
0.59
6,278.23
Also
Including
317.4
317.6
0.2
1.62
80,017.00
Hycroft Mine Project
Page 64
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Hole
ID
Area
From
(m)
To
(m)
Interval
(m)
Grade
Au
(g/t)
Ag
(g/t)
H24D-6019
Brimstone
148.0
155.0
6.9
0.98
9.76
379.1
392.4
13.3
0.16
314.05
Including
379.1
385.1
6.0
0.15
591.73
H24D-6020
Brimstone
262.8
274.7
11.9
0.34
25.86
320.4
349.2
28.8
0.32
320.7
Including
328.7
332.0
3.3
0.36
775.1
Including
335.6
341.3
5.7
0.48
642.40
Including
343.6
346.2
2.6
0.24
465.16
H24E-6013
Bay
0.0
55.5
55.5
0.45
3.00
Including
13.6
15.0
1.4
3.84
40.00
H24E-6014
Bay
9.0
14.7
5.7
2.68
4.10
Including
12.5
14.7
2.2
4.91
4.74
H24E-6015
Manganese
33.6
41.2
7.6
0.81
293.51
Including
33.6
37.9
4.3
1.18
454.21
55.4
55.9
0.6
7.91
117.00
115.5
125.8
10.3
0.61
86.08
Including
117.1
123.6
6.5
0.72
131.15
168.0
173.9
5.9
0.46
6.03
Hycroft Mine Project
Page 65
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
8 Sample
Preparation, Analyses, and Security
8.1 Introduction
This
section describes the sample collection, preparation, analysis, and security that has been used by Hycroft or their predecessors. Drilling
and sampling at the Mine have been ongoing from 1982 through 2024. Hycroft provided IMC with the database which contained assay information
for drilling from 1982 through 2024. IMC is the qualified organization for the section.
Most
of the current staff at Hycroft have been at site for less than five years. As a result, much of the information that is reported here
regarding historical sample preparation, analysis, and security was previously reported in the 2023 TRS.
Discussion
of quality assurance and quality control (QA/QC) regarding the database is presented in Section 9.
8.2 Sample
Preparation
The
sample preparation procedures prior to 1999 were not documented. Starting in 2005, preparation procedures were well documented with standard
methods. The comparison of the pre-2005 data with post-2005 drilling will be presented in Section 9 to provide some confidence in the
application of some of the pre-2005 data.
Post-2005
sample collection consisted of both diamond core and RC drilling. Core samples are currently split at the mine site, tagged, and the
split core is sent to commercial laboratories for further preparation. RC samples are currently collected at the rig with a rotary splitter.
Bags of RC cutting splits are tagged and sent to commercial laboratories for further preparation and assaying.
Once
at the commercial labs, the samples are crushed to 10 mesh and a 0.55-lb (0.25 kg) split is taken and pulverized to 85% passing 200 mesh
prior to assay analysis.
8.3 Assay
Methods
Prior
to 1992, most samples were sent to Barringer Laboratories, Inc., in Golden, Colorado. Fire assays (FA) were routinely performed on cyanide
soluble assays for selected intervals.
From
1992 to 1999, samples were processed at the Hycroft laboratory at the mine site.
The
Hycroft laboratory assays consisted of Au FA followed by cyanide soluble Au and cyanide soluble Ag on all intervals. The Mine cyanide
soluble assay methods are reported to have been non-standard and were developed to provide a prediction of recoverable Au and Ag from
heap leaching.
There
are no samples in the database from 2000 through 2004. Starting in 2005, all samples were sent out to commercial labs for analysis that
are independent of Hycroft. During 2012, there were 10 drillholes that were an exception to this rule and were assayed by the Hycroft
lab. Those holes have reportedly been compared with assays from commercial labs and are still maintained in the database.
Hycroft Mine Project
Page 66
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
external labs that have been used by Hycroft prior to 2021 are all in the Reno/Sparks, Nevada area and are listed below with their accreditations:
● ALS
Minerals
ISO9001:2000 and ISO17025
● American
Assay Laboratories
ISO/IEC17025, PTP-MAL Canada
● Inspectorate
ISO9001:2008
● McClelland
ISO/IEC17025
During
2021 and 2022, Hycroft utilized the following laboratories in the Reno/Sparks area:
● Bureau
Veritas Mineral Laboratories USA
ISO-9001 ISO-14001 ISO-45001 OHSAS-18001
● Paragon
Geochemical
ISO/IEC 17025:2017
During
2023, Hycroft utilized the following laboratories in the Reno/Sparks area:
●
Paragon Geochemical
ISO/IEC 17025:2017
●
ALS Minerals
ISO/IEC 17025:2017 and ISO 9001:2015
During
2024, Hycroft utilized the following laboratories in the Reno/Sparks area:
●
ALS Minerals
ISO/IEC 17025:2017 and ISO 9001:2015
●
American Assay Laboratories
ISO/IEC 17025:2017
All
intervals were assayed using conventional FA with Atomic Absorption (AA) or gravimetric finish for Au. Fire silver assays were not regularly
completed by previous project operators. After 2013, aqua regia (AR) digestion was used for total silver assays and replaced the previous
gravimetric treatment of silver. The lower detection limit on the AR method was the reason for the change.
The
FA method for gold with an AA finish was the primary assay method at all the labs. Cyanide soluble methods were alternatively hot or
cold depending on the lab.
As
noted previously, cyanide silver was much more consistently assayed than fire silver. Starting in 2014, total silver was consistently
assayed along with fire gold.
Hycroft Mine Project
Page 67
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Cyanide
soluble assays for gold and silver were highly prevalent in the pre-2000 drilling. As drilling began to target the deeper sulfide mineralization
after 2005, the cyanide soluble assays were selectively run on the upper, oxidized portion of the deposit and not applied to the deeper
sulfide mineralization.
During
2007 and 2008, Hycroft also applied the 35-element inductively coupled plasma (ICP) analysis to 90% of the assay intervals. That data
results in 53,624 sample intervals that can be used to track trace elements.
During
2011, 127 drillholes were selected for ICP and Laboratory Equipment Corporation (LECO) analysis at American Assay. These holes were generally
500 x 200-foot centers across the estimated sulfide pit target at the time. Most were assayed on 25-foot intervals from top to bottom
for total sulfur, sulfide sulfur and carbon. During 2014, additional sample intervals were selected from the 2012 to 2014 drilling for
LECO and ICP.
During
2022, analysis for LECO was conducted on site by Hycroft on some drillholes.
During
2023, some drillholes were selected for ICP (4-acid digestion) and LECO analysis at ALS Minerals. ICP was analyzed on a sample-by-sample
basis while LECO was analyzed on 25-foot composites. Some drillholes were analyzed for LECO on site by Hycroft.
During
2024, all drillholes were sent out for ICP (4-acid digestion) and LECO analysis at ALS Minerals. In addition, a portion of the 2022 and
2023 drillholes were also sent out for ICP and LECO analysis to ALS. ICP was analyzed on a sample-by-sample basis while LECO was analyzed
on 25-foot composites.
The
sulfide sulfur results from this work have been used to assign sulfide sulfur values to the block model for process metallurgical input.
It should be noted that the sulfide sulfur procedures also report elemental sulfur along with the sulfide component.
Assay
submittals have included blanks and standards since 2007. Check assays and duplicate assays were submitted in 2012 and 2014. The results
of the analysis of those samples will be reported in Section 9.
Assay
procedures requested of ALS laboratories Reno and ALS Laboratories in Vancouver include:
● ALS
Au-AA23 testing:
◌ FA
gold with an atomic absorption spectroscopy (AAS) finish
◌ FA
Fusion with AAS finish for Au
◌ 30
g nominal sample weight
◌ 0.005/10
g/t lower/upper limit
◌ >10
g/t over limit testing by gravimetric by Au-GRA21
◌ ALS
Au-AA13 testing: cyanide leach capacity
◌ Cyanide
leach; AAS finish for Au
Hycroft Mine Project
Page 68
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
◌ 30
g nominal sample weight
◌ 0.03/50
g/t lower/upper limit
◌ ALS
ME-ICP41 testing
◌ AR
digestion with an atomic emission spectrometry (AES) or AAS
◌ AR
digestion with AES or AAS finish
◌ 0.5
g nominal sample weight
◌ 0.2/100
g/t lower/upper limit.
● 100
g/t over limit testing by AR digestion and AES or AAS finish by Ag-OG46
● 1,500
g/t over limit gravimetric testing by Ag-GRA21
● 10,000
g/t overlimit gravimetric testing by Ag-CON01
● ALS
Ag-AA13 testing: cyanide leach capacity:
◌ Cyanide
leach with AAS finish
◌ 30
g nominal sample weight 0.03/350 g/t lower/upper limit
◌ ALS
ME-MS61m testing: multi-element trace elements:
◌ Four
acid digestion with ICP atomic emission mass spectrometry (MS)
◌ 0.75
g nominal sample weight
◌ 49-element
suite with automatic ore-grade testing on over-limits
◌ Over-limits
were set-up specific to each element
◌ ALS
S-GRA06a testing: sulfur speciation for autoclave blending:
◌ Total
sulfur by LECO furnace analysis
◌ HCI
(15%) leach of sulfates with LECO furnace analysis for sulfide sulfur (SS). Sulfide values
are reported as calculated values
◌ 1
g nominal sample weight
◌ 0.01/50%
lower/upper limit by weight
◌ Assay
procedures requested of American Assay Laboratories (AAL) Reno:
◌ AAL
IO-FAAu30 testing: fire assay (FA) with an optical emission spectrometry (OES) finish:
Hycroft Mine Project
Page 69
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
◌ FA
with an OES finish for Au
◌ 30
g nominal sample weight
◌ 0.003/10
g/t lower/upper limit
◌ >10
g/t over limit gravimetric testing by G-FA Au
◌ AAL
IO-2AAg testing: AR with an optical emission spectrometry (OES) finish:
◌ AR
digestion with an OES finish
◌ 30
g nominal sample weight
◌ 0.3/100
g/t lower/upper limit
◌ >100
g/t over limit AR digestion testing by IO-2AOR-AG1000
◌ >1,000
g/t over limit gravimetric testing by G-FAAg
8.3.1 Sample
Security
Samples
were delivered to the analytical laboratories in numbered bags along with transmittal sheets that list the sample numbers, the total
sample count, and codes for sample type (RC or Core). The lab confirmed the receipt of shipment against the transmittal sheets to account
for all samples issued.
It
is reported that no officers, directors, or associates of Hycroft or their predecessors were operationally involved in the sample collection,
preparation, or assay transmittal.
Sample
security relies on the samples being in custody of Hycroft personnel or stored in a secure area prior to shipment to ALS. Chain-of-custody
procedures consist of unique and independent sample numbers used for each sample with dispatch-submittal sheets and database entries
used to track the progress of samples and to ensure that all samples are received by the laboratory.
Unique
and independent sample numbers and sample tags are used in all cases. Sample Dispatch and Submittal sheets are used to check and track
samples through the system. Sample information is entered into the computer database to track the samples and record results.
8.4 Sample
Storage
Split
core and chip trays are stored on site in an enclosed warehouse, Conex containers, or wrapped outside, located near the core shed. Generally,
since 2021, the remaining half of split core is retained. However, core from 2021 was mostly consumed for metallurgical purposes, and
core prior to 2021 no longer exists.
Sample
rejections are retained but stored outside where they degrade after three to four years.
All
core boxes, chip trays, and pulps are coded to facilitate easy retrieval when required.
8.5 Analytical
Results
Following
analysis, results are posted to a digital laboratory database for which Hycroft has secure permission privileges. Managers download data
where the sample results are cross-referenced to sample numbers. Each drillhole carries a unique self-identifying sample number, simplifying
cross-referencing. The completed digital file for each drillhole is emailed to Hycroft by the lab, and a follow-up, hard copy certificate
is mailed to Company offices.
Data
is checked by geologists visually and loaded into the secure acQuire database. The acQuire database is further checked using electronic
methods and then calculated into ounce per ton values and loaded to the modeling database for display and further visual QA/QC checking.
Database
security and integrity are accomplished by restricting access and user level permissions that are set by the Database Administrator.
Once data entry and validation are completed for a drill hole, access is locked. There are procedures for version control on any updates
that may happen over time, so that the database will retain all original information and prioritize use of any updates.
8.6 QP
Comment
The
sample preparation, analysis and security practices are typical for the US mining industry and are acceptable for application to mineral
resource determination.
The
QP considers that current sampling, sample preparation, analytical methods and security are acceptable, are in line with industry-standard
practices, and are adequate for mineral resource estimation.
Hycroft Mine Project
Page 70
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
9 Data
Verification
9.1 Verification
Procedure
This
section will address the QA/QC and data verification procedures that were used to confirm that the Hycroft database was acceptable for
estimation of mineral resources. Multiple tasks have been completed to verify the data since the completion of previous TRS’s in
Feb 2022 and Feb 2023.
The
data verification steps were as follows:
1. Detailed
comparison of certificates of assay versus the assay database which resulted in substantial
update and correction to the database.
2. Analysis
of the QA/QC data used by Hycroft and previous owners from 2005 to 2024. This work was done
in three stages representing different time periods.
3. Analysis
of diamond drilling hole (DDH) versus RC Drilling with the 2005-2024 drilling to confirm
that the two methods can be comingled and utilized for the estimation of mineral resources.
4. Comparison
of pre-2005 drilling versus 2005-2024 drilling to verify the application of the older data.
The pre-2005 data has no QA/QC information that can be used to verify its reliability.
The
IMC approach to data verification was to establish the reliability of the post-2005 drilling based on the available QA/QC data and the
comparison between DDH and RC. Once the 2005-2024 data was established as reliable, it was used to check the historic pre-2000 drilling
by a nearest neighbor sample comparison.
9.2 Certificate
of Assay Checks
The
team at the Mine site completed an extensive check and verification of the data base with interval-by-interval checks against the available
certificates of assay. After completion of that work, IMC completed a spot check of 95 of the drill hole certificates of assay to confirm
the edits and corrections completed by Hycroft.
9.3 QA/QC
2005 – 2024
The
2005 to 2024 drilling data had the following QA/QC information collected:
● Standards
● Blanks
● Duplicate
Assays
● Check
Assays from 2011 through 2013 and again in 2024.
Hycroft Mine Project
Page 71
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
That
information will be analyzed in three parts to understand the relative reliability of the post-2005 drilling: (1) the data collected
from 2005 to 2014, (2) the data collected from 2021 through 2022, and finally (3) the 2023 to 2024 data.
9.3.1 Standards
2005-2013
Blind
standards are inserted into the assay sample submissions for analysis at the assay lab. The lab obviously knows the sample is a standard,
but they do not know which standard.
The
early standards database provided to IMC did not include dates of insertion. It is presumed that the insertion of standards started in
2005 with the modern drilling program. However, the earliest example of standard acquisition that IMC could find was mid-2007. There
are indications of sample insertion though the 2013-time frame.
In
most exploration environments, standards results are reviewed as they arrive from the lab to confirm that the measured result is within
the error tolerance reported for the standard. IMC takes a different approach and compares the accepted value of the standard against
the multiple assays of the standard on an XY plot to identify any potential bias in the assay process.
Figure
9-1 illustrates the results of the standards submissions for gold for 2005-2013.
The
comparison of the accepted value of the standard and the tested standards results does not indicate consistent bias. The points that
are scattered off-line reflect swapped samples meaning that the wrong standard was recorded or submitted to the lab compared to the tabular
results. There are 22 apparent sample swaps out of 7,154 tested standards or about 0.3% of the original samples.
Figure
9-2 summarizes the results of the total silver standards submissions. There is substantially more variation in the silver standards results
as one would expect in this grade range. In addition, most of the original assays are gravimetric finish which have a detection limit
of 5 ppm or 0.15 oz/ton. There are only five standards below 0.15 oz/ton out of 6,498 Ag standards analyzed. With some standards values
as low as 0.20 oz/ton it would not be out of line to see an indication of subtle bias if the lowest value that can be reported is 0.15
oz/ton.
Hycroft Mine Project
Page 72
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
9-1: Results of Submitted Gold Standards 2005 - 2013
Source:
IMC, 2021
Hycroft Mine Project
Page 73
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
9-2: Results of Submitted Silver Standards 2005-2013
Source:
IMC, 2021
9.3.2 Blanks
2008 - 2014
Blank
samples are inserted periodically to confirm that metal is not carried over from one sample to the subsequent sample in the sample stream.
Figure 9-3 summarizes the results of the blank submissions for gold from 2008 to 2014. The figure indicates that most samples reported
back as trace or small values.
Hycroft Mine Project
Page 74
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
However
occasional samples have been reported near or above heap leach feed grade. Of the 2,260 standards in Figure 9-3, 5.9% reported higher
than 0.005 oz/ton and 5.6% reported higher than 0.010 oz/ton. Although these represent small percentages, there is room for improvement.
One
expects that some of the samples were not blanks but were mistakenly inserted standards. The statistical average above 0.005 oz/ton is
about 0.019 oz/ton, which is quite close to the standard value of the Cove 2 standard.
Figure
9-3: Results of Blank Submissions
Source:
IMC, 2021
9.3.3 Check
Assays 2011-2012
Assay
pulps were submitted to a second lab as check assays during 2011–2012. The primary lab was ALS, and the check lab was AAL. The
results are summarized in Figure 9-4 and Figure 9-5 as XY plots.
The
variability in the results is more than one would expect from pulp submissions, but there does not appear to be an observable bias in
the laboratory comparisons. The line on the graphs illustrates a 1:1 relationship as a comparison.
Hycroft Mine Project
Page 75
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
9-4: Check Assay Results, Fire Assay Gold 2011 - 2012
Source:
IMC, 2021
Hycroft Mine Project
Page 76
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
9-5: Check Assay Results, Fire Assay Silver 2011 – 2011
Source:
IMC, 2021
9.3.4 Standards
2021 – 2022
All
recent drilling completed by Hycroft utilizes standards, blanks, and duplicate assays for QA/QC confirmation of the database. Hycroft
analyzes the data as it is received to confirm that the results are within appropriate acceptance ranges.
Diamond
drilling was the primary method used during 2021, and RC drilling was the primary method during 2022. An analysis of RC to DDH during
2021 and 2022 indicates that both can be used for mineral resource estimation. In addition, two assay laboratories were used in 2021
and 2022. Bureau Veritas, Mineral Laboratories, USA (Sparks, Nevada) and Paragon Geochemical Laboratories, (Sparks, Nevada) were both
used to assay Hycroft samples during this period.
Paragon
and Bureau Veritas’ results have been analyzed separately and both provide similar results. The figures presented for the 2021
through 2022 QA/QC show both laboratories combined as a summary of the overall results. Most of the silver QA/QC was applied to cyanide
silver assays. Since those are not used in this estimate, the gold QA/QC information is shown.
Hycroft Mine Project
Page 77
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
standards that do not check well amount to about 2.4% of the submitted standards. Those out-of-range results tend to line up with other
standards or blank values. This implies swaps in standards submissions or in data recording rather than outright errors in the assay.
Figure
9-6 illustrates the standards results for the 495 submitted gold standards during 2021 and 2022.
Figure
9-6: Standards Results, 2021 – 2022
Source:
IMC, 2023
9.3.5 Blank
Analysis Results 2021-2022
Blanks
are inserted and analyzed to confirm that there is no sample-to-sample contamination. Figure 9-7 illustrates the results of blank submissions
during 2021 – 2022. The results indicate only one value reported with a potentially economic gold grade out of 495 blank submissions.
Hycroft Mine Project
Page 78
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
9-7: Blank Results, 2021 – 2022
Source:
IMC, 2022
9.3.6 Duplicate
Assays, 2021-2022
Duplicate
pulps were assayed to confirm the repeatability of results from the assay lab. During 2021-2022, 314 duplicates were re-assayed. Figure
9-8 summarizes the results of the duplicate checks. There are two results that are higher than expected. Those reflect an error rate
of about 0.64%.
Figure
9-8: Duplicate Assay Results, 2021 – 2022
Source:
IMC, 2023
Hycroft Mine Project
Page 79
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
9.3.7 Standards
2023 – 2024
During
2023 and 2024, 70 drill holes were completed. Of that total, 44 were diamond drilling, the rest were RC drilling. The next few sections
address the QA/QC completed by Hycroft during the period of 2023 through 2024.
During
this period, 1,501 gold standards were inserted out of 18,893 gold assays, amounting to almost 8% of the assay count. However, only 36
silver standards were inserted during this period and all of those were during 2024. The explanation is that silver standards were inserted
if there was observable high-grade silver mineralization. This procedure is inappropriate and should be corrected going forward so that
the silver standards insertion rate is 5% of the total assay number.
The
average grade of all silver assays during 2024 was 1.46 oz/ton. In the future, as silver values and volumes increase at Hycroft, silver
bearing material will receive the same QA/QC diligence as gold.
Figure
9-9 illustrates the comparison of assayed gold values versus the standard value inserted into the assay stream.
Figure
9-9: Gold Standards 2023 – 2024
Source:
IMC, 2025
Hycroft Mine Project
Page 80
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
results of this overview are consistent with previous work where the incorrect standard was inserted, or the wrong standard was recorded.
The number of these occurrences is extremely small, and the gold standard results are acceptable for 2023-2024.
The
36 silver standards did not illustrate any bias, but the graph is not shown due to the insignificant number of silver standards.
9.3.8 Blanks
2023-2024
Figure
9-10 summarizes the results of 1,013 blank insertions during 2023 and 2024 (6%). The results are positive with only one value at 0.045
g/t.
Figure
9-10: Blank Insertions 2004
Source:
IMC, 2025
9.3.9 Duplicate
Assays 2023-2024
Three
different types of duplicates samples were applied in 2023. The naming convention and the source of the duplicates is summarized below:
● FDUP:
Field duplicate, these were ¼ core for DDH holes and a second split from the rotary
splitter for RC samples. IMC check procedure is to combine field duplicates with the core
and RC field duplicates.
● PDUP:
Pulp duplicate, a second aliquot from the pulp is inserted into the sample stream to check
the repeatability of the assay process.
● CDUP:
Coarse duplicate, a second split from the coarse rejects is taken during the sample preparation
process. The coarse duplicate is meant to check on the repeatability of the pulp preparation
and assaying combined.
The
above duplicates were assayed for both gold and silver and compared to the original values of gold and silver to confirm the overall
process repeatability (precision). The results of all three duplicate types for both gold and silver produced similar statistical mean
and standard deviation results for all tests. All tests comfortably passed the Student’s T test illustrating that they represent
the same population with a high degree of confidence.
Figure
9-11 and Figure 9-12 illustrate the results for the gold and silver duplicate checks during 2023-2024 respectively.
Hycroft Mine Project
Page 81
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
9-11: Gold Duplicates, 2023-2024
Source:
IMC, 2025
Hycroft Mine Project
Page 82
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
9-12: Silver Duplicates, 2023-2024
Source:
IMC, 2025
Hycroft Mine Project
Page 83
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
9.3.10 Check
Assays 2023-2024
During
2023 – 2024, 668 sample pulps were sent to an outside laboratory for independent checks on the primary assay lab. The primary lab
changed from Paragon to ALS Chemex between 2023 and 2024. However, the check assays were all completed at AAL. The check assay rate is
about 3.5% out of the total number of over 18,800 assays during 2023 through 2024.
Basic
statistical analysis of the original versus check assays indicate that the check data report the same population as the primary lab with
better than 95% confidence. Figure 9-13 and Figure 9-14 illustrate X-Y plots of the original assays versus check assays for 2023-2024.
Figure
9-13: Gold Check Assays 2023 – 2024
Source:
IMC, 2025
Hycroft Mine Project
Page 84
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
9-14: Silver Check Assays, 2023-2024
Source:
IMC, 2025
9.3.11 DDH
vs. RC for Post 2000 Samples
The
drillhole database at Hycroft is predominately based on RC drilling with some DDH. Prior to 2000, the database does not provide a record
regarding the type of drilling applied, although it was reported to be largely RC.
Since
2000, the database records whether the drilling was RC, DDH, or sonic. All the DDH drilling was completed after 2006. The sonic drilling
was applied in stockpiles which are a minor component of the MRE.
The
RC data was compared to DDH drilling using the nearest neighbor method that was described in the previous sub-section. Table 9-1 summarizes
the results of that comparison.
Hycroft Mine Project
Page 85
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
9-1: Nearest Neighbor Sample Comparison of RC vs Diamond Core Gold and Silver Assays
Maximum
Separation Distance (ft)
Number
of Sample Pairs
RC
Mean
(oz/ton)
DDH
Mean
(oz/ton)
Ratio
of the Means
T-Statistic1
Gold
10
1114
0.006
0.005
0.903
0.976
20
3207
0.006
0.006
0.965
0.681
Silver
10
1042
0.197
0.281
1.428
0.971
20
3005
0.296
0.224
0.757
1.512
Note:
1. T-Statistics
is the Smith-Satterthwaite T for large populations
The
results indicate that the RC and DDH drilling information provide similar results for the post-2006 drilling and that they can be combined
for estimation of mineral resources.
9.3.12 Old
vs. New Drilling
Early
technical reports regarding Hycroft mineral resources had reported that all gold assays prior to 2000 were factored upward. Those in
acid leach alteration were factored upward by 1.32 and all others upward by 1.19 (Hycroft Project Mill Expansion Feasibility Study Technical
Report, October 31, 2016, and Technical Report, Allied Nevada Gold Corp, Hycroft Mine, October 2011).
Detailed
checks on the certificates of assay indicate that the gold assay information used by Hycroft and provided to IMC for use in this MRE
has not been factored in any way and the database matches the original certificate of assay.
A
comparison of pre-2000 drilling and gold assay results versus the 2005-2024 gold assay results indicates that the old data averages higher
grade than the new data when compared on a nearest neighbor basis. To identify the source of this bias, the pre-2000 data was analyzed
on a year-by-year basis against the 2005-2024 drilling assay data. The 2005-2024 data set has been illustrated to be reliable based on
the QA/QC analysis reported on previous pages and on the DDH-RC comparisons reported in the previous sub-section.
A
nearest neighbor analysis was completed comparing 1999 drilling versus 2005-2024. That was followed by analysis of 1998 versus 2006-2024.
This process was completed annually for all years prior to 2000. The results for years 1988 through 1999 were stable and compare acceptably
with the 2005-2024 data. However, once 1987 and earlier years were compared against the 2005-2024 data, an obvious high bias was identified
in the 1982 to 1987 data.
To
summarize the results, the 1982-1987 data is compared to the 2005-2024 data on a nearest sample basis. These results were completed for
sample distances as close as 5 ft for assay data.
Hycroft Mine Project
Page 86
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
9-2: Nearest Neighbor Sample Comparison of 1982-1987 Gold Assays Versus 2005 – 2024 Gold Assays
Maximum
Separation Distance (ft)
Number
of Sample
Pairs
1982-1987
Mean
(oz/ton)
2006-2024
Mean
(oz/ton)
Ratio
of the Means
T-Statistic1
5
164
0.020
0.012
1.67
3.98
10
300
0.025
0.017
1.47
4.24
20
803
0.020
0.011
1.82
8.41
30
1,635
0.018
0.010
1.80
10.43
40
2,746
0.017
0.010
1.70
12.47
Note:
1. T-Statistics
is the Smith-Satterthwaite T for large populations
The
above data excludes the stockpile drilling and includes all hard rock data that is located within the block model area.
The
results of Table 9-2 indicate that the 1982-1987 gold assays are between 1.47 and 1.80 times higher than the 2005-2024 gold assays. The
T-Statistic reported on the right side of the table is comfortably above the value of 2.0 for the sample separation distances. If the
T-Statistic is greater than 2.0 one should reject that the two data sets are similar.
The
above analysis indicates that the 1982-1987 data is biased high and unreliable relative to the more modern 2005-2024 drilling and assaying.
The 1982-1987 drilling is reported to be RC drilling completed by an early predecessor of the current Hycroft management. Hycroft and
IMC have not found any record regarding the RC sampling methods that were applied during that time that would shed light on the cause
or source of this bias.
Half
of the 1982 to 1987 database has been mined out. Discussion with retired Hycroft staff has indicated that production reconciliation was
difficult during that period. However, the 1982-1987 data set does indicate the presence of mineralization. To capture that mineralization
in the potential resource, IMC and Hycroft have completed the following steps:
1. The
1982-1987 gold data (composites) were multiplied by 0.56 to remove the observed high bias.
There are no fire silver assays recorded during that period.
2. Block
gold grades were estimated without the 1982-1987 data and were frozen so that they could
not be changed.
3. Block
grade estimation for gold was repeated including the bias corrected 1982-1987 data.
4. If
a block received a gold grade in this process that was not previously assigned, it was added
to the model and coded as “Inferred” class mineralization.
5. The
resource floating cone was regenerated with the additional 1982-1987 inferred resource blocks.
In
summary, a bias corrected version of the 1982-1987 data was incorporated so that any component of the resource based on that data is
coded as “Inferred.”
9.3.13 Downhole
Surveys
The
Mine operates on a local mine survey grid that is rotated 15.85 degrees from the Nevada state plane coordinate system. Down-hole survey
data from the drill rigs reports directly in true north coordinates, requiring all holes to be rotated into the Hycroft grid.
Hycroft
personnel have spent substantial amount of time checking the downhole survey bearings against the original downhole survey logs. The
data is stored in both state planes, and the Hycroft grid in the Hycroft system. Hycroft and IMC have confirmed that the down-hole surveys
used for the MRE are in the mine grid, consistent with the resource model and historic and potentially future mine planning.
9.4 QP
Comment
The
work outlined in this section is a summary of over a year’s worth of data verification and checking by Hycroft and IMC personnel.
As a result, the Hycroft and IMC teams have gained significant confidence in this data set. IMC holds the opinion that the database as
utilized in this statement of mineral resources inclusive of the edits and corrections outlined is appropriate for the estimation of
mineral resources. The 1982-1987 data set has been incorporated so that it only contributes to inferred category mineral resource after
correction for the high bias of that data.
In
the future, IMC recommends that complete QA/QC procedures be applied to silver and sulfide sulfur assaying and sampling. Regular sampling
for QA/QC should be applied to those values in the same way as they have been recently applied to gold.
Hycroft Mine Project
Page 87
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
10 Mineral
Processing and Metallurgical Testing
10.1 Introduction
Hycroft
has been operating the Mine as an open pit mine with a ROM heap leach facility (HLF) treating oxide ores to produce gold and silver since
2008. Prior to that, Vista Gold operated the Mine in a similar manner. As a result, the cumulative performance statistics and metallurgical
test data gathered for the direct cyanidation of high-grade ROM oxide ore via heap leach are extensive and are not the focus of this
report.
No
metallurgical testwork has been completed on transition material for heap leach processing. As a result, heap leach recovery, leach kinetics,
reagent consumption, and permeability characteristics remain uncertain. To reduce this technical uncertainty and improve confidence in
the process design and economic evaluation, a dedicated transition material heap leach metallurgical testwork program is recommended
during the next study phase.
The
following subsections focus on metallurgical testwork conducted by Hycroft on extraction of Au and Ag from refractory sulfide mineralization.
The
metallurgical test programs conducted on the Hycroft sulfide mineral deposits over the years have consisted of comminution, flotation,
concentrate oxidation, and cyanide leaching tests on mineralized materials, flotation tailings, and oxidized sulfide concentrate samples.
The samples were mostly derived from drill cores. Most of the flotation testwork were conducted at G&T Metallurgical Services (G&T)
and SGS Canada Mineral Lakefield (SGS), both located in Canada, as well as by Hazen Research Inc. (Hazen) in Colorado. Oxidation
testing was primarily conducted by Hazen, SGS and Kappes, Cassiday & Associates (KCA). G&T (ISO – 9001:2008) and SGS (ISO
– 17025:2017) both have ISO accreditation. All laboratories are independent of Hycroft.
In
general, core samples for metallurgical testing were selected to be representative of the mineralized materials, drawing from five mineralization
domains, as they were classified at the time. The primary sources included the Brimstone and Vortex domains.
The
metallurgical testwork programs were carried out by independent, third-party, ISO accredited laboratories using established and widely
accepted industry standard analytical and metallurgical procedures. These include conventional methods for comminution, flotation, oxidation,
and cyanide leaching applicable to the mineralization types under evaluation.
In
the opinion of the Qualified Person, the analytical procedures and resulting data are appropriate for the level of study and are sufficient
to support the conclusions and technical disclosures presented in this report. No non-conventional or experimental procedures requiring
additional justification have been identified.
Hycroft Mine Project
Page 88
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
10.2 Metallurgical
Testwork
10.2.1 Summary
of Metallurgical Testwork Programs
Table
10-1 summarizes the metallurgical testwork programs completed to date for the Hycroft sulfide mineralization, including the testing laboratory/location
and the primary testwork performed. These third party, industry recognized laboratories are independent of Hycroft. All data and information
have been generated in accordance with their respective quality assurance and quality control (QA/QC) policies and procedures and were
reviewed and approved by qualified laboratory personnel prior to being used in this Technical Report.
Table
10-1: Metallurgical Testwork Summary
Year
Laboratory/Location
Testwork
performed
2009-2014
SGS
Minerals Services (Lakefield, Canada)
Flotation
testwork
2011
Kappes,
Cassiday & Associates (Reno, USA)
Flotation,
batch and locked-cycle testing
2011
G&T
Metallurgical Services Ltd. (Kamloops, Canada)
Flotation
testing
2011-2016
Hazen
Research, Inc. (USA)
Flotation
variability testing; concentrate oxidation tests
2013
SGS
Minerals Services (Lakefield Canada and South Africa)
BIOX
testing
2014
Hazen
Research, Inc (USA)
Pilot
plant flotation testing
2021-2025
FLSmidth
Minerals Testing (Salt Lake City, USA)
Flotation
variability testing
2024-2025
Hazen
Research, Inc (USA)
Concentrate
oxidation testing
10.2.2 Mineralized
Materials and Sampling
Hycroft
mineralized materials are classified as oxide, transition, or sulfide based on the cyanide solubility of its gold, which is used as an
indicator of refractoriness. Materials with cyanide soluble gold of 70% or greater are classified as oxide, while material with cyanide
soluble gold of less than 30% is classified as sulfide. Material with a cyanide soluble ratio between 30% and 70% is classified as transition.
The classification has been shown to have no strong correlation with sulfide sulfur content.
10.2.3 Hycroft
Mineralization Domains
The
Hycroft mineral deposit consists of five process domains, namely Bay, Boneyard, Brimstone, Central, and Vortex.
Table
10-2 is a summary of the data for average total sulfur, sulfide sulfur, and the ratio of sulfide sulfur to total sulfur from 95 oxide,
158 transition, and 417 sulfide samples collected from the Brimstone, Central, and Vortex domains. It shows that the classification of
mineralized material as oxide, transition, or sulfide is essentially a measure of refractoriness and shows little correlation with sulfide-sulfur
content of the minerals. The sulfide-sulfur to total sulfur ratio averages slightly over 80% across the entire dataset, indicating that
degree of sulfur oxidation is similar among oxide, transition, and sulfide classifications.
Hycroft Mine Project
Page 89
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
10-2: Average Sulfur Contents of Oxide, Transition and Sulfide Mineralized Materials
Total
S (ST), %
Oxide
(%)
Transition
(%)
Sulfide
(%)
Brimstone
2.55
2.41
2.25
Central
2.94
2.82
2.48
Vortex
2.47
2.66
2.33
Unclassified
4.28
2.92
2.61
All
3.00
2.74
2.43
Sulfide
S (S=), %
Oxide
(%)
Transition
(%)
Sulfide
(%)
Brimstone
2.19
2.06
1.87
Central
2.36
2.26
1.80
Vortex
2.09
2.23
1.91
Unclassified
3.29
2.23
2.09
All
2.45
2.23
1.93
S=:ST
Ratio
Oxide
(%)
Transition
(%)
Sulfide
(%)
Brimstone
0.839
0.839
0.820
Central
0.810
0.806
0.797
Vortex
0.880
0.827
0.833
Unclassified
0.840
0.823
0.843
All
0.849
0.819
0.824
10.3 Legacy
Testwork
Table
10-3 below lists the number of samples selected
to span three historically defined main domains and their distribution within the Hycroft mineral deposit.
Information
on the individual core samples selected for testing can be found in the metallurgical test reports referenced in this study.
Table
10- 3: Summary of Test Samples
Tests
Number
of Samples per Domain
Central
Brimstone
Vortex
Composite
Crushing
(CWi)
1
1
5
7
Axb
(Drop Wt & SMC)
13
6
9
32
Bond
BWi
24
6
16
58
Bond
RWi
2
1
0
5
Bond
Abrasion
3
1
5
12
Flotation
11
13
24
48
Hycroft Mine Project
Page 90
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
10.3.1 Comminution
Tests
The
Hycroft mineralized material has been extensively characterized for its comminution properties in previous studies. Comminution tests
were conducted at the laboratories of SGS, G&T, Hazen, and Phillips, and included crushing and grinding work indices, JKSimMet parameters,
and abrasion indices.
A
summary of the 80th-percentile comminution test results is presented in Table 10-4 below. For the Axb parameter, material
competence increases as Axb decreases, therefore, the 80th-percentile in material competence corresponds to the 20th-percentile
of Axb value. The results indicate that the Hycroft mineralized material is very competent.
Table
10-4: Grindability Test Summary
Parameter
Unit
Value
CWi
kWh/ton
18.6
RWi
kWh/ton
21.2
BWi
kWh/ton
20.1
Axb
Unitless
34.2
SPI
min
102.4
Ai
g
0.623
10.3.2 Flotation
Refractory
gold in Hycroft’s sulfide mineralized materials is believed to be associated with iron sulfides, primarily pyrite and marcasite.
The objectives of the flotation testwork were to evaluate the floatability of the sulfide minerals and the recovery of gold and silver
into a sulfide concentrate. Recovering gold and silver into a sulfide concentrate reduces the volume of material requiring downstream
processing.
Initial
flotation testwork was performed by SGS in March 2009 and continued at several laboratories through April 2014. Over this period, the
testing program progressed from bench-scale flotation tests to pilot plant flotation testing conducted at G&T and Hazen.
Hycroft Mine Project
Page 91
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
10.3.2.1 SGS
Minerals Services (Lakefield) – March 2009
Six
drums containing samples representative of the Hycroft Project were shipped to SGS Minerals Services (Lakefield) on September 5, 2008.
The
initial flotation test development program consisted of three bench-scale rougher kinetics tests to evaluate the effect of primary grind
size on flotation response. A standard bulk sulfide collectors suite, comprising potassium amyl xanthate (PAX) and dithiophosphate (Cytec
AF 208), was used in conjunction with Dowfroth 250 as the frother. An additional five bench-scale tests were conducted to investigate
alternative reagent schemes and grind sizes.
Flotation
testwork was conducted on the Master Composite sample. The flotation investigation consisted of the following:
● Two-stage
cleaner flotation applying the flowsheet developed during phase 1 testing (program 12012-001).
● Cyanide
leaching of the second cleaner flotation concentrate.
● Cyanide
leaching of the recombined rougher and first cleaner scavenger tailings.
SGS
stated “In terms of sulfide flotation, it appears that beyond about 10% mass pull, recoveries were on the same grade vs. recovery
curve regardless of grind fineness.”
10.3.2.2 SGS
Minerals Services (Lakefield) – Nov 2010
Batch
tests were completed on 33 sulfide zone composites representing the Vortex (18), Cut 5 (four), Bay Area (10), and Bone Yard (one) deposits
of the Mine sulfide resource. Multiple rock types were represented in the composites. The testwork evaluated metallurgical variability
in response to the flotation (and cyanidation) flowsheet previously developed for the Master Composite under program 12012-001.
Metallurgical
variability testing consisted of rougher flotation followed by concentrate regrinding and two-stage cleaning. In the initial set of tests,
the second cleaner concentrate was cyanide leached. Based on review of those results, cyanide leaching was subsequently refocused on
the combined rougher and first cleaner scavenger tailings.
From
these tests, gold recovery in rougher flotation ranged from ~62% at a mass pull of ~15% (Test F-2, P80 of ~103 μm) to ~69% at a mass
pull of ~17% (Test F-1, P80 of ~128 μm). At comparable mass pulls, silver recovery ranged from 74% (Test F-2) to 85% (Test F-1). The
addition of a dithiophosphate collector (Cytec A208) in Test F-5 further improved Au recoveries to 80.1% at a mass pull of 14.6%.
10.3.2.3 KCA
Batch Tests – Jan 2011
In
December 2010, KCA received material from the Hycroft project at its laboratory facility in Reno, Nevada. Portions of the received material
were composited, as directed, to generate six composite samples for metallurgical testing. Initial testwork was conducted by KCA and
reported in the study titled “PAX, pH, and Grind Flotation Kinetics Study” (January 2011). Additional flotation testing was
subsequently completed, including cyanide leach testing of flotation products.
10.3.2.4 KCA
Locked-Cycle Tests – May 2011
Portions
of the six composites were combined to generate two master composites, a Sulfide Master Composite and a Mixed Master Composite. Additional
flotation testing was conducted using material from these composites, including cyanide leach testing of the flotation tailings.
10.3.2.5 G&T
Metallurgical Services Ltd. – Feb 2011
Five
separate shipments of samples were received at G&T between August 31 and December 3, 2010. The samples consisted of half HQ drill
core, with a total estimated mass of approximately 2.9 tons. These samples were used to construct 39 composite samples for flotation
and cyanidation testing.
For
the first set of 24 composites, a single stage batch cleaner flotation test was performed. For the second set of samples (M1 to M17),
a simplified flotation flowsheet was applied, using a reduced reagent scheme consisting of PAX and MIBC only. Under this simplified flowsheet,
the flotation froth was more stable and more representative of a typical sulfide flotation froth compared to the original flowsheet.
Overall, the samples responded well to flotation. Across all 39 composite samples, average flotation recoveries to the rougher concentrate
were about 78% for Au and 67% for Ag.
Using
this revised flowsheet applied to samples M1 to M17, average rougher recoveries were 78% for Au and 83% for Ag. These recoveries generally
correlated with sulfide sulfur recovery to the rougher concentrate. Table 10-5 and Table 10-6 show the results of this testwork.
Hycroft Mine Project
Page 92
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
10-5: G&T Composites 1 through 24 Flotation Test Results
Sample
ID
ST
(%)
S=
(%)
Au
(oz/ton)
Ag
(oz/ton)
Rougher
Conc
Mass Pull, (%)
Au
Recovery
to conc, (%)
Ag
Recovery
to conc, (%)
Type
G&T
Composite 1
0.70
0.62
0.009
3.968
13.3
80.1
77.3
Sulfide
G&T
Composite 2
2.48
2.49
0.145
11.136
13.2
79.6
63.2
Transition
G&T
Composite 3
2.29
2.28
0.076
11.872
12.2
82.7
61.9
Transition
G&T
Composite 4
1.25
1.22
0.008
18.016
9.1
60.4
27.7
Sulfide
G&T
Composite 5
1.50
1.40
0.045
0.496
12.9
83.1
83.6
Sulfide
G&T
Composite 6
1.64
1.51
0.027
23.136
15.0
88.3
72.6
Sulfide
G&T
Composite 7
1.36
1.29
0.010
9.504
15.7
94.5
37.8
Sulfide
G&T
Composite 8
1.33
1.26
0.027
4.000
13.1
89.4
50.5
Sulfide
G&T
Composite 9
4.30
3.81
0.021
0.602
16.5
86.5
88.5
Sulfide
G&T
Composite 10
2.23
2.04
0.014
1.946
11.6
80.5
60.1
Sulfide
G&T
Composite 11
2.80
2.72
0.027
8.064
17.8
88.1
53.9
Transition
G&T
Composite 12
1.57
1.25
0.113
1.680
8.3
73.6
44.8
Oxide
G&T
Composite 13
2.32
2.02
0.065
1.472
11.6
56.1
68.2
Transition
G&T
Composite 14
2.08
1.34
0.004
1.818
7.8
89.5
30.2
Sulfide
G&T
Composite 15
1.78
1.71
0.043
5.376
10.8
94.0
63.2
Transition
G&T
Composite 16
2.64
2.27
0.022
0.627
14.9
77.2
76.9
Sulfide
G&T
Composite 17
0.45
0.34
0.093
0.198
5.2
28.1
27.5
Oxide
G&T
Composite 18
1.33
1.08
0.014
0.074
11.8
58.7
61.2
Sulfide
G&T
Composite 19
2.00
1.76
0.012
0.266
15.7
69.9
50.3
Sulfide
G&T
Composite 20
13.70
11.80
0.045
0.992
31.2
93.7
87.1
Sulfide
G&T
Composite 21
2.06
1.97
0.019
0.598
13.1
85.6
74.9
Sulfide
G&T
Composite 22
1.73
1.70
0.025
0.464
13.1
61.2
60.7
Sulfide
G&T
Composite 23
1.72
1.31
0.016
2.099
11.1
87.5
53.7
Sulfide
G&T
Composite 24
2.00
1.92
0.024
3.584
15.5
85.4
38.9
Sulfide
Average
Sulfides
2.56
2.25
0.020
4.246
14.2
80.7
60.7
Average
All
2.39
2.13
0.037
4.666
13.4
78.1
58.9
Hycroft Mine Project
Page 93
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
10-6: G&T Composites M-1 through M-17 Flotation Test Results
Sample
ID
ST
(%)
S=
(%)
Au
(oz/ton)
Ag
(oz/ton)
Rougher
Conc
Mass Pull, (%)
Au
Recovery
to conc, (%)
Ag
Recovery
to conc, (%)
Type
G&T
Composite M-1
1.98
1.81
0.038
0.378
13.4
86.4
82.4
Sulfide
G&T
Composite M-2
2.62
1.75
0.013
1.082
14.2
82.1
85.9
Sulfide
G&T
Composite M-3
1.20
1.12
0.014
0.272
12.7
73.6
83.2
Sulfide
G&T
Composite M-4
1.62
1.55
0.020
0.150
18.1
79.7
76.8
Sulfide
G&T
Composite M-5
1.81
1.70
0.013
0.128
18.8
76.9
72.7
Sulfide
G&T
Composite M-6
1.92
1.79
0.016
0.253
20.8
79.1
76.4
Sulfide
G&T
Composite M-7
No
Data
-
-
-
-
-
-
-
G&T
Composite M-8
No
Data
-
-
-
-
-
-
-
G&T
Composite M-9
2.25
2.06
0.011
0.586
10.9
89.7
92.7
Sulfide
G&T
Composite M-10
2.50
2.00
0.012
2.454
11.6
76.7
96.0
Sulfide
G&T
Composite M-11
1.55
1.49
0.016
1.475
8.3
80.4
96.4
Sulfide
G&T
Composite M-12
1.86
1.30
0.016
3.840
10.4
80.4
97.3
Sulfide
G&T
Composite M-13
6.34
2.99
0.046
1.043
13.0
85.7
86.8
Sulfide
G&T
Composite M-14
5.53
2.32
0.020
0.288
16.0
88.2
84.1
Transition
G&T
Composite M-15
2.32
1.15
0.024
1.584
7.0
44.9
61.3
Oxide
G&T
Composite M-16
2.51
2.43
0.017
0.486
14.3
74.6
87.8
Transition
G&T
Composite M-17
1.52
1.39
0.017
0.259
16.1
65.1
62.8
Sulfide
Average
Sulfides
2.26
1.75
0.019
0.993
14.0
79.7
84.1
Average
All
2.50
1.79
0.020
0.943
13.7
77.6
82.8
10.3.2.6 Hazen
Research, Inc. – August 2011
For
this investigation, 38 drillhole composite samples representing five mineralized material types were evaluated. Initial flotation testing
was conducted using sodium hydrosulfide (NaHS) and copper sulfate (CuSO4). In subsequent tests, the NaHS and CuSO4
were eliminated, and lead nitrate (Pb(NO3)2) was introduced as a modifying agent. Following the addition of modifying
agents, flotation pH ranged from neutral to 10.5, and redox potential was monitored throughout the testing program.
A
series of 91 small-scale flotation tests were performed on 4.4-lbs splits from the 38 composite samples. The objective of this testwork
was to evaluate variability in flotation response among the composite samples.
An
additional 41 small-scale flotation tests were subsequently performed on Composites 1 through 38, excluding Composites 6, 8, 9, and 10,
using rougher flotations conditions based on G&T Metallurgical conditions and conditions recommended by Hazen. Rougher concentrate
mass pulls ranged from 4.9% to 30.7%, with corresponding Au recoveries ranging from 26.9% to 97.6% and Ag recoveries ranging from 17.1%
to 98.7%.
The
rougher concentrate assays ranged from 0.032 oz/ton Au (Test 3346-82) to 1.536 oz/ton Au (Test 3346-40), and from 0.224 oz/ton Ag (Test
3346-82) to 73.601 oz/ton Ag (Test 3346-68). The recoveries of Au and Ag to the rougher concentrates ranged from 27% (Test 3346-52) to
91% (Test 3346-68) and from 17% (Test 3346-52) to 99% (Test 3346-68), respectively.
Hycroft Mine Project
Page 94
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
10.3.2.7 Effect
of Grind Size on Flotation Performance
Most
flotation tests on Hycroft samples were performed on materials ground to 80% passing 100 µm. Additional tests were conducted at
both finer and coarser grind sizes. Overall, the results indicate that flotation achieves favorable recoveries at grinds ranging from
100 to 150 µm. Gold and silver recoveries generally decreased with grind sizes finer than 100 µm or coarser than 150 µm.
10.3.2.8 Reagent
Suite
Both
G&T and Hazen concluded that flotation tests using NaHS as a sulfurizing agent, as well as tests conducted at alkaline pH, generally
resulted in poor flotation performance.
The
exploratory and variability flotation test results discussed above demonstrate that sulfide mineralized materials can be floated to recover
gold and silver. The reagents schemes employed relied on strong, non-selective sulfide collectors, with frothing achieved using methyl
isobutyl carbinol (MIBC), Dowfroth 250 (DF250), or a combination of both. Table 10-7 summarizes the reagent schemes applied by G&T,
SGS, and Hazen. In all laboratory test programs, the reagent dosages were relatively high.
Table
10-7: Flotation Reagent Schemes Studied
Reagent
(lb/ton)
G&T
Laboratory
Hazen
SGS
NaHS
-
0,
2.56
2.1
PAX
0.552
0.546,
0.416
0.21
3418A
-
0,
0.064 - 0.124
0.055
MIBC
0.05
- 0.128, 0.192
0.02
- 0.064
-
DF250
-
0.02
- 0.064
0.095
Based
on the test results from the three laboratories, particularly G&T, the simplified reagent scheme can be further developed. Several
tests indicate that Cytec’s AEROPHINE® 3418A Promoter (sodium diisobutyldithiophosphinate) may improve Au and Ag recoveries.
10.3.2.9 Flotation
Time
Flotation
kinetics were not systematically evaluated during the flotation test programs. However, flotation data generated from the G&T testwork
on the M Composites included recoveries from froth collected at 4, 8, 12, and 16 minutes. A total of 15 rougher flotation tests were
performed. Kinetics plots for Au and Ag derived from this work are shown in Figure 10-1. To avoid visual clutter, only selected data
points are shown, along with asymptotic recovery curves fitted to the data.
Hycroft Mine Project
Page 95
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
For
each of the 15 datasets, the maximum recovery, Rmax and the kinetics constant, K were derived from the fitted asymptotic curves.
The
results indicate that the average laboratory flotation time required to achieve 95% of the maximum recovery is 19 minutes for gold and
17 minutes for silver.
Figure
10-1: Recovery Vs. Time Plot, G&T Kamloops Tests, M Composites
Source:
M3, 2016
10.3.2.10 FLSmidth
2021
In
2021, Hycroft initiated a new metallurgical variability study to evaluate mineralized material characteristics within the current mine
plan validate the metallurgical behavior of material across the mine site; and identify potential variations in processing conditions
required to recover gold and silver. The objective of the study was to support development of a robust Hycroft process flowsheet, including
definition of key process control points in crushing, grinding, capable of consistently achieving gold and silver recovery across anticipated
metallurgical variability. Hycroft selected 243 Samples from 65 different drill holes, all within the current resource, representing
the three primary metallurgical domains – Brimstone, Vortex, and Camel. The drill holes encompassed material ranging from near
surface elevations to approximately 1,235 ft below current elevations (3,040 ft above mean sea level). Two primary lithologies were represented,
corresponding to material located east and west of the Central Fault. The sample suite covered a broad range of alteration and mineralization
characteristics, including four silicification intensities - Strong quartz-K-feldspar, strong quartz, moderate, and weak; two alunite
styles based on vein width and frequency (used to estimate volume percent and validated by sulfide sulfur content; and gold grades ranging
from slightly below the cutoff grade of 0.2 g/t to values exceeding above 2.0 g/t. oxide and transition ore types were not included in
this study; it is envisioned that in the future, these materials will be processed in the heap leach pads.
Figure
10-2 to Figure 10-5 present the head grade distribution plots for gold, silver, total sulfur, and sulfide sulfur, based on the full set
of 243 variability study samples.
Hycroft Mine Project
Page 96
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
10-2: Gold Grade Distribution Chart
Source:
Hycroft, 2025
Figure
10-3: Silver Grade Distribution Chart
Source:
Hycroft, 2025
Hycroft Mine Project
Page 97
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
10-4: Total Sulfur Grade Distribution
Source:
Hycroft, 2025
Figure
10-5: Sulfide Sulfur Grade Distribution
Source:
Hycroft, 2025
Hycroft Mine Project
Page 98
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
head grade distributions for gold, silver, total sulfur, and sulfide sulfur across the 243 variability study samples indicate a broad
but well-represented range of metallurgical conditions within the current resource. Gold head grades exhibit a right-skewed distribution
with an average of approximately 0.56 g/t and a standard deviation of 0.64 g/t, reflecting the inclusion of material spanning from near
cutoff grades to higher-grade mineralization. Silver grades show a wider distribution, with an average of approximately 12.4 g/t and
a higher standard deviation (14.3 g/t), indicating greater variability in silver tenor relative to gold.
Total
sulfur and sulfide sulfur distributions demonstrate moderate variability, with average grades of approximately 2.60% total sulfur and
2.17% sulfide sulfur, and standard deviations of 2.00% and 1.64%, respectively. The close correspondence between total sulfur and sulfide
sulfur indicates that sulfur is predominantly present as sulfide minerals, consistent with the refractory nature of the ore. Collectively,
these distributions confirm that the variability study sample set adequately captures the range of grade and mineralogical conditions
expected within the mine plan, providing a sound basis for evaluating metallurgical response and defining robust process design criteria.
Important
results of this study included the development of the flotation process with significantly improved recoveries. There were four key process
controls parameters identified during the flotation process development program.
1. Optimal
grind size is a P80 of less than 85 µm.
2. Flotation
time is 24 minutes.
3. Adjusted
pH level is 4.7.
4. Mass
Pull is 20 to 25% with 22% being the target.
A
total of 137 samples were tested under these selected conditions to achieve higher gold and silver recoveries. Figure 10-6 summarizes
the distribution of gold and silver flotation recoveries achieved under the selected key process control conditions, based on 137 variability
test samples. The results show that gold recovery exhibits a broader distribution, with values ranging from approximately 72% to 98%
and a statistical median near 88%, indicating greater sensitivity to operating conditions. In contrast, silver recovery is generally
higher and more consistent, with recoveries spanning approximately 76 to 100% and a statistical median exceeding 92%. Overall, the figures
highlight the comparatively more robust flotation response of silver relative to gold under the selected operating conditions.
Hycroft Mine Project
Page 99
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
10- 6: FLS Variability Flotation Recoveries under Optimal Conditions (137 Test Samples)
Source:
Hycroft, 2025
Figure
10-7 and Figure 10-8 show that flotation recovery is only weakly correlated with head grade for both metals. Gold recoveries display
greater variability within grade groups, particularly at lower head grades, indicating sensitivity to mineralogical and metallurgical
factors beyond grade alone. In contrast, silver recoveries are consistently higher and more uniform across head grade groups, demonstrating
a more robust and less grade-dependent flotation response.
Hycroft Mine Project
Page 100
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
10- 7: FLS Variability Flotation Gold Recoveries Based on Gold Head Grade Groups
Source:
Hycroft, 2025
Figure
10- 8: FLS Variability Flotation Silver Recoveries Based on Head Grade Groups
Source:
Hycroft, 2025
Hycroft Mine Project
Page 101
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
10.3.3 Direct
Cyanidation
Direct
cyanidation testwork on bulk concentrate samples (P80 = 325 mesh, or 44 µm) collected from all zones of the deposit was conducted
in early 2010. The results indicated generally poor metallurgical performance. Gold recoveries for the Brimstone and Vortex samples were
in the mid-20% range, with silver recoveries of approximately 80%. The remaining samples yielded gold recoveries ranging from 45% to
50% and silver recoveries ranging from 55% to 83%.
A
useful indicator of direct cyanidation amenability is the ratio of cyanide soluble metal to total metal assay, expressed as AuCN/AuFA
for gold and AgCN/AgFA for silver. These ratios have been determined for many exploration samples and have been included in the resource
database. The cyanide soluble gold ratio has been applied during resource estimation to assist in mineral classification and routing,
with mineralized domains exhibiting higher cyanide soluble gold preferentially directed to heap leach processing.
10.3.4 Concentrate
Oxidation Tests
Oxidation
testwork on Hycroft flotation concentrates evaluated POX, roasting, atmospheric oxidation, and other oxidation methods, all of which
demonstrated technical viability with varying recoveries. The results of these tests are summarized below.
Beginning
in 2007, Hycroft investigated milling and flotation of refractory sulfide mineralized material followed by oxide treatment, focusing
primarily on POX, and roasting technologies commonly applied in the gold industry.
In
2012, additional testwork assessed alternative, low capital oxidation methods, including chlorination, atmospheric alkaline oxidation,
and fine grinding with intensive cyanidation. These tests showed that the Hycroft rougher concentrates were amenable to oxidation under
atmospheric conditions, leading to pilot scale testing on three main metallurgical domains at Hazen.
In
2016, Hycroft developed an oxidation demonstration plant at the mine site to process flotation concentrates and produce doré
onsite. Based on historical and current oxide heap leach performance, combined with oxide heap leach metallurgical testwork and
bench-, pilot-, and demonstration-scale metallurgical test results, individual gold and silver recoveries for each processing stream
were calculated and are presented in Table 10-8. This recovery assumption formed the basis of the 2016 NI 43-101 Feasibility Study
Technical Report published in 2016 (Ibrado, A. et al, 2016).
Table
10- 8: Estimated Metallurgical Recoveries from 2016 Feasibility Study – Gold and Silver
Gold
Silver
Contained
(koz)
Recovered
(koz)
Recovery
(%)
Contained
(koz)
Recovered
(koz)
Recovery
(%)
Heap
Leach
3,875
1,933
49.9
21,242
21,242
15.5
Mill-AAO
Sulfide
7,797
5,696
73.0
287,693
287,693
81.6
Total
11,672
7,629
65.4
489,447
308,935
63.1
Hycroft Mine Project
Page 102
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
10.3.4.1 Atmospheric
Oxidation – Batch Tests
From
2013 through 2016, metallurgical testing focused on developing a process to oxidize sulfide flotation concentrates under atmospheric
conditions. The process concept involved oxidation in an agitated slurry at elevated temperatures, using oxygen as the oxidant. Batch
oxidation tests were conducted at Hazen under various conditions on concentrates derived from Central, Brimstone, and Vortex composites.
The
results demonstrated that complete oxidation is not required to achieve high precious metal recoveries during subsequent cyanide leaching,
consistent with earlier oxidation studies. Cyanidation recoveries of approximately 85% for gold and 92% for silver were achieved when
about 60% of the sulfide-sulfur content in the concentrate was oxidized.
Oxidation
reaction kinetics improved with increasing temperatures up to 75 °C. Tests conducted at higher temperatures (around 90 °C) resulted
in slower oxidation rates, due to reduced oxygen solubility under bench-scale laboratory conditions.
10.3.4.2 Pilot
Plant Oxidation Tests
Continuous
pilot testing was conducted at Hazen using 10-liter reactors on concentrates from three metallurgical domains. The pilot results confirmed
the batch test findings. Testing was performed at 75°C a grind size of 25 µm, 20% solids, and a total residence time of 48
hours. Oxidation rates varied by material type, with Vortex oxidizing most rapidly, followed by Central and then Brimstone. The Master
Composite exhibited oxidation behavior comparable to Brimstone.
Key
outcomes from the pilot testing include:
● gold
recovery versus sulfide oxidation was higher than indicated by bench-scale testing
● approximately
80% gold recovery was achieved at 50% sulfide oxidation for all material types
● approximately
87% gold recovery was achieved at 60% sulfide oxidation for all material types.
10.3.4.3 Hycroft
Mill Demonstration Plant
Hycroft
Mining constructed and operated a demonstration plant with a nominal capacity of 10 tons/d at the Mine site. The integrated flowsheet
comprised of a ball mill, rougher flotation bank, concentrate and tailings thickeners, a regrind mill, oxidation and neutralization tanks,
an oxidized concentrate thickener, cyanide leach tanks, CCD thickeners, and a Merrill-Crowe precipitation circuit. The plant was operated
continuously, with concentrate surge capacity upstream of oxidation and pregnant solution storage upstream of Merrill-Crowe.
The
demonstration plant processed Central and Brimstone materials mined from exposed mineralization at the surface of the current open pit.
Key
demonstration plant results for Central material are presented in Figure 10-9. For clarity, only data from Tank 1 (TK1) and Tank 5 (TK5)
are shown. Sulfide oxidation levels of 60% or greater were consistently achieved when steady-state operating conditions were maintained.
Hycroft Mine Project
Page 103
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure 10-9: Oxidation of Central Flotation Concentrate: Sulfate Spike Test
Source:
M3, 2019
Oxidation
of the flotation concentrates resulted in a significant improvement in gold and silver recoveries compared to direct cyanidation. Cyanide
leach recoveries of oxidized concentrates during demonstration plant operation are presented in Figure 10-10. The graph initially reflected
Central concentrate processing and transition to Brimstone concentrates on June 11, 2016. Gold and silver recoveries for Central concentrate
peaked at approximately 85%. For Brimstone concentrate, gold recovery reached approximately 80%, while silver recovery peaked at 90%.
Overall recovery trends closely tracked the degree of concentrate oxidation.
Figure
10-10: Demonstration Plant Cyanide Leach Recovery of Au and Ag
Source:
M3, 2019
Hycroft Mine Project
Page 104
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
10.3.4.4 Pressure
Oxidation
Previous
POX testwork was conducted primarily by Hazen and SGS on various flotation concentrates derived from Hycroft sulfide mineralized material,
including individual samples, composites samples, and two transition material samples. POX testwork was performed under both alkaline
and acidic conditions.
The
following is a list of all POX testwork reports provided to Ausenco:
● Hazen
Project 11232 Report and Appendices A-F, POX-CIL Evaluation of Hycroft Flotation Concentrates.
● Hazen
Project 11243-01 Report and Appendix, Evaluation of Hycroft Blend Flotation Concentrate.
● Hazen
Project 11307 Report and Appendix, Evaluation of Kappes, Cassiday & Associates Flotation
Concentrate.
● SGS
Project 13224-001/003 Final Report, An Investigation into Oxidative Pre-treatment of Hycroft
Flotation Concentrates.
● SGS
Hycroft Project – 12012-001 Report 3, The Recovery of Au and Ag from Hycroft Project
Sulfide Samples, Allied Nevada Gold Corporation.
● Kappes,
Cassidy & Associates Project No. 189 C, Hycroft Pressure Oxidation and Leach Testwork.
Previous
acid POX testwork was conducted on flotation concentrates to establish suitable operating criteria. Table 10-9 summarizes the alkaline
POX testwork result, indicating that longer AC retention times still resulted in lower gold recovery, suggesting limited benefit from
extended durations.
Table
10-10 summarizes the acid POX test results completed by Hazen, SGS and KCA.
The
results indicate that the highest gold and silver cyanide amenability was achieved under conditions of an operating temperature between
374 °F to 437 °F, an oxygen overpressure of approximately 100 psi, and a residence time of 60 minutes. The POX test results also
suggest that the concentrates may be prone to jarosites formation, which can inhibit silver recovery. Evidence for potential jarosite
formation includes:
● the
acidic autoclave discharge pulp exhibited a yellow coloration, transitioning to reddish brown
following lime boil conditioning
● silver
recovery was higher when the pulp was subjected to a lime boil, which exposed the hot pulp
to alkaline conditions for several hours.
Hycroft Mine Project
Page 105
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
10-9: Hycroft Alkaline POX Testwork Summary
Flotation
Concentrates Samples
Sulfide
(Stotal) (wt%)
Gold
(ppm)
Silver
(ppm)
AC
Temp
(°F)
Solids
(wt%)
AC
Retention Time
(min)
Oxygen
Over-pressure
(Psig)
Caustic
Consumption
(lbs/ton)
Cyanide
Conc. (wt%)
Gold
recovery
(%)
Silver
recovery
(%)
Brimstone
40.1
11.6
418
437
20
256
40
5.41
2
98.5
72.9
40.1
11.6
418
212
40
360
40
6.05
2
54.3
71.2
Hycroft
Blend Float Concentrate
38.5
18.1
2,103
437
26
240
40
0.15
1
64.3
35.8
38.5
18.1
2,103
437
26
240
40
1.45
2
63.8
52.0
38.5
18.1
2,103
4,37
26
240
40
2.95
5
63.8
82.1
The
gold and silver recoveries from rougher flotation concentrate subjected to acid POX, followed by lime boil conditioning and cyanide leaching
were in the mid-90% range for gold and approximately the mid-80% range for silver (Table 10-10).
Acid
POX followed by lime boil was evaluated during development of the MRE primarily due to its ability to consistently achieve high sulfide
oxidation. Sulfide oxidation exceeding 95% is expected with POX, whereas AAO did not consistently achieve the target of 60%. As a result,
gold and silver recoveries from POX residue are expected to be higher and more stable than those achieved using AAO. Additional factors
for supporting the evaluation of POX included the following:
● Limestone
is a more cost-effective reagent for acid neutralization.
● Cyanide
consumption following pressure oxidation is lower than for AAO.
Soda
ash was considered as an alternative to trona but was found to be less cost effective than limestone.
Table
10-10: Hycroft Acid POX Testwork Summary
Sulfide
Concentrate
Samples Tested
Sulfide
(S=)
(wt%)
Au
(ppm)
Ag1
(ppm)
Temp
(°F)
Cyan.
Conc.6
(ppt)
Sulfide
Oxidation (%)
Au
recovery (%)
Ag
recovery (%)
Test
Lab
Brimstone
40.1
11.60
418
374
1
-
97.5
89.0
Hazen
Cut
4
36.9
11.40
168
374
1
-
94.0
94.1
Hazen
Camel
37.7
9.33
152
374
1
-
97.7
89.9
Hazen
Bay
22.1
6.03
52.3
374
1
-
97.5
75.3
Hazen
Bone
Yard
31.9
5.97
95.3
374
1
-
96.0
86.0
Hazen
Hycroft
Blend
38.5
18.10
2103
401
1
-
100.0
77.1
Hazen
Sulfide
Master Ro
18.9
4.90
432
401
1
-
87.0
65.8
Hazen
Mixed
Master Ro
9.3
8.50
193
401
1
-
82.8
86.4
Hazen
Central
Blk Sul Ro
8.4
2.47
26
374
1
98.8
93.6
90.5
SGS
Central
Blk Sul Cl
35.6
10.10
131
374
1
99.8
94.0
94.2
SGS
Vortex
Blk Sul Ro
9.1
2.93
276
374
1
98.6
97.7
73.5
SGS
Vortex
Blk Sul Cl
32.3
10.80
976
374
1
99.8
96.0
72.2
SGS
Hycroft Mine Project
Page 106
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Sulfide
Concentrate
Samples Tested
Sulfide
(S=)
(wt%)
Au
(ppm)
Ag1
(ppm)
Temp
(°F)
Cyan.
Conc.6
(ppt)
Sulfide
Oxidation (%)
Au
recovery (%)
Ag
recovery (%)
Test
Lab
Central
Sul Cl
30.7
10.30
750
374
1
98.1
93.5
81.9
SGS
Brimstone
Sul Cl
34.7
7.93
392
374
1
83.6
53.6
49.5
SGS
Vortex
Sul Cl
35.4
8.03
350
374
1
94.2
94.5
89.2
SGS
POX
1 Cl con F-162
31.1
5.93
158
437
1
98.8
71.8
5.5
SGS
POX
2 Cl con F-253
33.9
9.38
155
437
1
98.6
64.3
19.1
SGS
POX
3 Cl con F-264
24.2
4.95
165
435
1
97.6
72.7
72.7
SGS
Brimstone
Sul Cl5
33.9
7.13
383
428
2
99.9
94.0
97.0
KCA
Note:
1. Fire
Assay
2. No
lime boil, no NaCl
3. No
lime boil, 1.34 oz/g NaCl
4. No
lime boil, 2.67 oz/g NaCl
5. H2SO4
added to autoclave feed
6. ppt
= parts per trillion
10.3.4.5 Concentrate
Oxidation Tests – Hazen 2025
During
2022 to 2025, Hycroft repeated flotation testing in preparation of concentrate for the POX Process Development program and achieved higher
recovery rates with tighter controls on particle size, pH adjustment to 4.7, 24-minute flotation time and 20% to 25% Mass Pull with a
target of 22%.
A
series of POX tests (POX-3 through POX-7) were conducted at Hazen Research, Inc. on pyrite flotation concentrate to evaluate oxidation
performance and downstream precious metal recovery following hot cure, lime boil, and cyanide leaching. The objective of this test program
was to establish repeatability, assess sensitivity to operating conditions, and confirm the effectiveness of the integrated POX–hot
cure–lime boil–cyanidation flowsheet.
All
POX tests were conducted in a 2-L titanium autoclave at a nominal temperature of 225 °C, with oxygen overpressure of approximately
100 psig, and a total residence time of 90 minutes. The starting solution contained approximately 10 g/L H₂SO₄. Agitation
speeds ranged from 1,000 to 1,020 rpm, and off-gas bleed rates were maintained at approximately 100 cm³/min.
Across
POX-3 through POX-7, oxidation conditions were consistent and reproducible. No evidence of excessive passivation or runaway reactions
was observed. The POX discharge slurries were subsequently subjected to hot cure to decompose basic iron sulfate phases prior to lime
boiling and cyanide leaching.
10.3.4.6 Hot
Cure – Hazen 2025
Hot
cure tests were conducted on pressure-oxidized slurry at 90 to 95 °C for 12 hours with agitation. The purpose of this step was to
decompose basic iron sulfate species formed during pressure oxidation and to condition the solids for effective jarosite breakdown during
lime boiling.
Hycroft Mine Project
Page 107
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Across
POX-3 to POX-7, hot cure performance was stable, with temperature control maintained within ±1 °C of target. Filtration following
hot cure produced well-behaved filter cakes suitable for downstream processing. No washing was conducted after hot cure, consistent with
the intended flowsheet configuration.
10.3.4.7 Lime
Boil – Hazen 2025
Lime
boil tests were performed on hot-cured residues at 90 to 95 °C under alkaline conditions (target pH approximately 11 to 11.5) to
promote decomposition of jarosite and related basic iron sulfate phases. Residence times ranged from four hours to overnight, depending
on the specific test objective.
Calcium
hydroxide consumption varied across tests, reflecting differences in sulfate loading and the extent of iron sulfate formation during
POX. Later tests (POX-6 and POX-7) incorporated extended lime boil durations and tighter pH control to ensure complete jarosite decomposition
prior to cyanidation.
10.3.4.8 Cyanide
Leaching – Hazen 2025
Cyanide
bottle roll leach tests were conducted on lime-boiled residues at ambient temperature using sodium cyanide concentrations ranging from
2.5 to 5.0 g/L, with activated carbon addition where indicated. Leach durations were typically 48 hours.
In
several cases, a second lime boil and/or second cyanide leach was performed where the initial cyanidation indicated incomplete precious
metal extraction, particularly for silver. This staged approach demonstrated that additional gold and silver recovery could be achieved
when jarosite decomposition was completed prior to cyanidation.
Overall,
the combined results confirm that the integrated POX–hot cure–lime boil–cyanidation flowsheet is effective for
achieving high gold and silver recoveries from the pyrite concentrate. Table 10-11 summarizes the POX 3 through POX 7 test
results.
Table
10-11: Summary Comparison Table – POX 3 to POX-7
Test
POX
Temp
(°C)
O₂
Overpressure (psig)
Hot
Cure
(°C/h)
Lime
Boil
(°C/h)
NaCN
(g/L)
Au
Extraction (%)
Ag
Extraction (%)
POX-3
225
100
90–93
/ 12
90–95
/ 4
5.0
~91
~95
POX-4
225
100
90–95
/ 12
90–95
/ overnight
5.0
>92
~95
POX-5
225
100
90–95
/ 12
90–95
/ overnight
5.0
~92
~93
POX-6
225
100
90–93
/ 12
90–95
/ 4
5.0
~93
~88–90
POX-7
225
100
95
/ 12
95
/ 24+
2.5–5.0
~93
~92
Note:
Gold and silver extractions shown are combined values based on feed and final residues. Minor balance deviations are attributed to analytical
uncertainty and low residual grades
Hycroft Mine Project
Page 108
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
POX-3 through POX-7 test series demonstrates that pressure oxidation at 225 °C with oxygen overpressure, followed by hot cure, lime
boil, and cyanide leaching, is a robust and repeatable processing route for the pyrite concentrate. Variability in silver recovery was
primarily associated with the completeness of jarosite decomposition, which was successfully addressed through extended lime boiling
and staged cyanidation.
These
results provide a defensible metallurgical basis for flowsheet development and recovery assumptions.
10.3.5 Solid-Liquid
Separation Tests
Several
thickeners are included in the Hycroft flowsheet. Updated settling tests for these thickeners were conducted by Pocock Industrial, Inc.
using samples generated during hydrometallurgical process development studies performed by Hazen Research, Inc.
Tested
sample streams included:
● rougher
flotation concentrate
● neutralized
AAO circuit product (pre-leach)
● cyanide-leached
slurry (CCD feed)
● rougher
flotation tailings.
A
summary of the settling test results is presented in Table 10-12
below.
Table
10-12: Settling Test Results
Sample
Tested
Feed Solids
(%)
Design
Basis Net Feed Loading (ft2/gal/min.)
Flocculant
Dosage (lb/ton)
Predicted
U’flow Density
(%
solids)
Overflow
Clarity, (ppm) TSS
Rougher
Concentrate
7.47
– 14.79
0.87
– 1.37
0.12
– 0.13
40.6
– 49.1
150
– 318
Pre-Leach
Oxidized Concentrate
7.52
– 7.75
0.68
– 0.92
0.11
– 0.17
35.0
– 41.0
150
– 329
CCD
Feed
7.41
– 8.00
0.92
– 1.11
0.15
– 0.17
33.0
– 37.0
150
– 349
Rough
Tailings
14.10
– 15.80
0.84
– 0.88
0.07
– 0.13
59.5
– 65.0
150
– 250
10.3.6 Deleterious
Elements
The
deleterious element assay results for five bulk samples analyzed by Hazen are presented in Table 10-13 below.
Table
10-13: Deleterious Element Assay
Sample
ID
Hg
(ppm)
Cut
4 Bin-03, -08, and -18
4.19
Brimstone
Bin-14 and -20
2.68
Camel
Conglomerate Bin -26, -27, and -28
2.35
Boneyard
Bin-9, -16, and -23
15.70
Bay
Bulk Bin-7, -11, and -24
9.96
Mercury
is present in the mineralized material at moderate to high levels and is a deleterious element that can negatively impact gold recovery.
Mercury is managed through zinc precipitation, followed by retorting to capture and remove the mercury.
10.3.7 Metallurgical
Parameters for Process Design Criteria and Financial Analysis
Overall
plant recovery is calculated by multiplying the flotation recoveries by the recoveries achieved in POX, cyanide leaching, and counter
current decantation (CCD), by the refining recovery in Merrill-Crowe precipitation. The proposed process plant overall recoveries are
presented in Table10-14.
For
oxide and transition materials processed by heap leaching, the estimated gold and silver recoveries are 40% and 12%, respectively.
Table
10-14: Process Plant Overall Recovery Prediction
Element
Flotation
Recovery
(%)
Cyanide
Extraction
(%)
Refining
Recovery
(%)
Overall
Recovery
(%)
2023
Tech Report Overall Recovery (%)
Au
89.5
93.5
99.0
82.8
76.0
Ag
92.9
86.0
97.0
77.5
76.0
Note:
Overall Recovery = (Flotation Recovery) x (POX and Cyanide Leach Recovery) x (Refining Recovery)
Hycroft Mine Project
Page 109
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
11 Mineral
Resource Estimates
11.1 Summary
Mineral
resources for the Hycroft deposit were developed using conventional block modeling methods and open pit optimization software to estimate
the component of mineralization that has reasonable prospects for economic extraction (RPEE) for the mineral resource. The mineral resource
estimation (MRE) was developed in accordance with the US Securities and Exchange Commission Rule SK-1300 for Mineral Projects. The estimate
of the MRE reflects in-place mineralization as the point of reference. The effective date of the MRE is January 1, 2026. The MRE presented
here supersedes any previously stated mineral resources for the Hycroft property.
The
model was assembled by Ryan Rodney, C.P.G. of Hycroft. IMC worked with Hycroft and reviewed the final model. IMC is an independent third
party with people who meet the definition of a QP under S-K 1300, and who have checked and validated the mineral resource wherever
possible, and are assuming responsibility for the published MRE, with John Marek, P.E., acting as the QP.
11.2 Model
Location
The
block model is assembled in the existing local mine grid. That grid is rotated 15.85 degrees (left rotation looking down) compared to
true north. Table 11-1 summarizes the block size and block limits.
Table
11-1: Block Size and Model Size
Model
Location
From
Coordinates
To
Coordinates
Number
of Blocks
Easting
Limit
13000
26000
325
Northing
Limit
35440
54800
484
Elevation
Limits
2200
6600
110
Block
Size Parent, subblock
40
x 40 x 40 ft
The
drillhole database and the block model are all in the mine grid. To the user, there does not appear to be a rotation because the mine
grid is treated as if there were no rotation. The block size selection will be discussed in a later sub-section.
11.3 Database
The
drillhole database has been assembled over many years by multiple companies using at least four different drill methods. That history
and the verification of the historical information have been discussed in previous sections. Additional drilling has been completed since
the MRE published March 2023, with additional checking and corrections completed on the historic database. The cutoff date for the drilling
database is March 17, 2025, which represents the last data received from the 2024 drilling campaign.
Hycroft Mine Project
Page 110
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
There
are stockpiles and historical leach pads at the Mine that are within the block model area. Many of those have been drilled after the
original excavation by sonic or rotary methods. The stockpile holes have been used to estimate the stockpile and leach pad areas, only;
they have not been used to estimate in-situ rock. In total, the Hycroft database contains 6,023 drillholes with 534,881 sample intervals
amounting to 2,814,546 ft of drilling. Within the area of the block model, there are 5,813 drillholes with 516,901 drill intervals amounting
to 2,668,616 ft of drilling. There has been 87,383 ft of drilling in 70 drill holes that have been added due to drilling or database
correction since the previous MRE in March 2023. Table 11-2 summarizes the amount of drilling and assay information that was used to
assemble the block model.
Table
11-2: Data Available for the Assembly of the Resource Model for Au, Ag, AuCn, Sulfide Sulfur
Number
of
Total
in Model
Stockpile
Drilling
Assays
for Estimation After Removal of 1982-1987 Drilling
Holes
5,813
188
4,221
Assay
Intervals
516,901
3,268
460,131
Au
Fire Assays
488,222
2,354
433,422
Au
Cn Assays
380,400
1,952
325,962
Ag
Fire Assays
330,110
2,336
327,774
Ag
Cn Assays
327,125
1,972
309,137
Sulfide
Assays
39,058
2,450
39,058
The
“Assays for Estimation After Removal of 1982-1987 Drilling” column indicates how much of the information was used to estimate
measured and indicated class mineralization.
Sulfide
sulfur levels have been estimated from a combination of three data sources. A set of sample composites were established by weighing pulp
material from the drillholes to represent 25 ft composites from selected holes during 2011 and 2014. Specific holes were selected to
provide coverage over the zone of the deposit being considered for flotation mill treatment. Those 25 ft samples were analyzed by LECO
methods to determine sulfide sulfur percent by weight. In addition, all recent drilling in 2021 through mid-way through 2023 were assayed
for sulfide sulfur using the LECO method on each 5 ft interval. Starting in the 2023 drilling campaign, LECO analyses were reverted to
the 25 ft samples created from pulp samples. The three data sets were combined and then numerically distributed to 25 ft down-hole intervals.
The combined sulfide sulfur LECO database inside the model contains 13,523 composites that are 25 ft long, averaging 1.66% sulfide sulfur.
There
is additional multi-element ICP data available that was not used in the development of this resource model.
Hycroft Mine Project
Page 111
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
11.4 Basic
Statistics
The
assay values of economic interest are gold, silver, and sulfide sulfur. This PFS is based on sulfide material being processed as a flotation
concentrate and then utilizing pressure oxidation (POX) to generate a cyanide leachable slurry. The POX process is planned for flotation
concentrate treatment. Sulfide sulfur content is a key measurable indicator in the POX process with potential operating cost impacts.
There is a direct correlation of sulfide sulfur content to lime and limestone consumption during the Hot Cure and Lime Boil steps after
POX and prior to cyanide leaching.
In
addition, the cyanide soluble assays of gold are of interest because they provide a basis to establish the best metallurgical process
based on the ability of the gold to dissolve into cyanide solution.
Table
11-3 presents the basic statistics of the assay database used to assemble the model. The stockpile assays are not included in the table
and the assay data from 1982 through 1987 have been removed. The entire database listed in Table 11-3 was used for block grade estimation
even though some of the assay values are located above current post mining topography. Drilling data from 1982 through 1987 was bias
corrected and used to contribute to inferred class mineralization only. The cyanide data is represented as the ratio of cyanide gold
divided by fire gold where the cyanide gold value exists and when fire gold is greater than or equal to 0.001 oz/ton.
Table
11-3: Assay Database (No Stockpile Assays, Inside the Model, and No Drilling from 1982 through 1987)
Commodity
Number
of Assays
Mean
Grade
Standard
Deviation
Minimum
Value
Maximum
Value
Fire
Au
433,422
0.0063
oz/t
0.0145
0
oz/t
3.15
oz/t
CnAu/FaAu
(ratio)
251,475
0.3431
ratio
0.3156
0
ratio
1.00
ratio
Ag
327,774
0.25
oz/t
5.20
0
oz/t
2,334
oz/t
Sulfide
Sulfur in %, 25 ft Composites
13,486
1.65%
1.39%
0%
42.86%
Table
11-3 also illustrates that Au cyanide soluble ratio (CnAu/FaAu) data exists on 58% of the database. Total silver assays exist on 76%
of the database. During later historic leach operations, cyanide Ag assays were generally completed; however, fire Ag assays were not
common. Estimation of total or fire Ag will consequently be limited by the smaller number of available assays. Cyanide Ag assays were
not used for block grade estimation due to uncertainty in that data identified during checks of the certificates of assay.
Cyanide
soluble gold assays were completed on approximately 75% of the intervals where there are gold fire assays. The ratio of cyanide soluble
Au to fire assay Au (CnAu/FaAu) ratio has been used to estimate the intensity of oxidation within the deposit. Although not statistically
optimum, the process is necessary and common in the industry. The ratio of cyanide soluble Au to fire assay Au is used in mine planning
to allocate material to the proper treatment process. When the CnAu/FaAu is calculated, values over 1.0 are set back to 1.0. The basic
statistics of CnAu/FaAu are also summarized on Table 11-3. In simple terms, the cyanide to fire ratio reflects the degree of oxidation
in the rock mass.
The
apparent loss of cyanide ratio data (75% assay to 58% ratio) is because a gold fire value of 0.001 oz/ton or greater was required to
calculate a meaningful ratio. In many cases, cyanide and/or fire assays are reported as trace values. In those cases, the resulting cyanide
ratio was either 0.0, 0.5, or 1.0. Those values are meaningless when determining the level of oxidation and the relative cyanide amenability
of the fire gold assay and were removed from the estimation process.
Hycroft Mine Project
Page 112
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
11.5 Geology
The
geology of the Hycroft deposit has been presented in previous report sections. The primary occurrences which have control on the grade
distribution at Hycroft are Lithology, Alteration, and Structure. Each has an impact on mineralization.
11.6 Lithology
The
following are the main lithology or rock types in the Hycroft deposit:
● Alluvium
● Tuffaceous
Lake Bed Sediment, part of the TSG
● Camel
Conglomerate, part of the TSG, and eroded from the Kamma Volcanics
● Kamma
Volcanics, Tertiary, but older than the sulfur group conglomerates and sediments
● Auld
Lang Syne (ALS), Jurassic laminated siltstone, the basement of the deposit.
The
lithology interpretation was updated by Hycroft since the 2023 TRS. The primary change was a reduction in size of the TSG unit due to
detailed review of the original geologic logging by Hycroft geologists. New wire frame solids were developed and used to code the model
blocks to the nearest whole block. The main mineral hosts are the Camel and Kamma units; however, mineralization is found in all the
lithologic units.
Interpreted
solids representing the above rock types were provided by Hycroft and checked against logging by IMC. IMC found them appropriate for
use in the development of the resource model. Figure 11-1 is an east–west cross-section illustrating the major rock types looking
north.
Hycroft Mine Project
Page 113
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
11-1: East–West Cross-Section 44000-N Looking North, Showing Lithology Types
Source:
Hycroft, 2025
11.7 Alteration
Alteration
consists of:
● acid
leach
● argillic
● silicic
● propylitic
● unaltered.
Hycroft
provided alteration solids to IMC that have not been updated since the 2023 TRS. IMC checked those solids against the logged database
and found them to be acceptable for use in development of the resource model. In summary, when propylitic alteration was encountered,
boundary analysis and basic statistics indicated that it was statistically similar to the argillic altered material, and it was combined
with argillic during block grade estimation.
Silicic
alteration is common and tends to be deeper and generally more prevalent in the eastern portion of the deposit. Boundary and statistical
analysis indicate that the silicic altered material is generally higher grade than the argillic-propylitic altered rock. Figure 11-2
is an east–west cross-section through the interpreted alterations, looking north.
Hycroft Mine Project
Page 114
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
11-2: East–West Cross-Section 44000-N Looking North, Showing Alterations
Source:
Hycroft, 2025
11.8 Structure
Several
north–south striking basin and range faults cut through the Hycroft deposit. In addition to those faults, the deposit is cut by
the Ramp Fault and the west dipping East Fault. The East Fault is interpreted to be a thick shear zone and appears to be the orientation
and probably the conduit of mineralization in the eastern portion of the deposit. The footwall of the East Fault has minor low-grade
mineralization in the Kamma formation.
Figure
11-3 is a map view of the faults and the numbering system assigned to the fault blocks between the faults. The fault block numbers will
be used to define the domains and search parameters for block grade estimation.
There
are additional interpreted faults through the deposit, but after review by the Hycroft geology and modeling team, the faults and fault
blocks on Figure 11-3 were selected as those that had impact or control on the mineralization.
Hycroft Mine Project
Page 115
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
11-3: Structure and Domain Interpretation (Plan View)
Source:
Hycroft, 2025
Hycroft Mine Project
Page 116
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
11.9 Domains
Domains
for grade estimation are a combination of structure, alteration, and lithology. The domain boundaries were developed by studying the
basic statistics by Hycroft and by boundary analysis completed by IMC to confirm the domain interpretation.
Boundary
analysis selects the assay (or composite) information from both sides of the boundary being tested at several different separation distances.
IMC then completes a series of statistical hypothesis tests to confirm if the data on either side of the boundary could have come from
the same or different statistical populations.
As
a result of the work described above, the selected 22 domains are summarized on Table 11-4. In addition to the domains created from boundary
analysis, Hycroft identified and created 16 additional discrete domains to represent high-grade (greater than or equal to 4 oz/ton) silver
veins. The silver domains create additional boundaries which isolate the higher-grade veins from the lower grade disseminated silver
to prevent too much smearing during estimation. The domains are identified in Table 11-5, where 6,000 series represent the Vortex area,
and 7,000 series represent the Brimstone area. Figure 11-4 shows the location of the high-grade silver domains. These domains are treated
as hard boundaries where composites outside the boundary do not influence the inside, and the composites inside do not influence outside
the boundary.
Sulfide
sulfur utilized a different set of domains based on similar analysis as applied to gold and silver. There are three domains for sulfide
sulfur illustrated on Table 11-6.
Table
11-4: Population Domains for Grade Estimation
Domain
Name
Structure
Block
Lithology
Alteration
Description
Alluvium
All
Alluvium
All
Alluvium
TSG_seds
All
TSG
All
Tertiary
Lake Bed Sediments (TSG)
auld
lang syne
All
ALS
All
ALS
formation
acid
leach
All
All
Acid
Leach
Acid
Leach Alteration
domain_1_arg_prop
1
Kamma+Camel
Argillic+Propylitic
West
of the Range Fault, North of the Camel Fault
domain_1_silicic
1
Kamma+Camel
Silicic
West
of the Range Fault, North of the Camel Fault
domain_1_unaltered
1
Kamma+Camel
Unaltered
West
of the Range Fault, North of the Camel Fault
Domain_2_arg_prop
2
Kamma+Camel
Argillic+Propylitic
Between
Range and Central Faults, North of the Camel Fault
domain_2_silicic
2
Kamma+Camel
Silicic
Between
Range and Central Faults, North of the Camel Fault
domain_2_unaltered
2
Kamma+Camel
Unaltered
Between
Range and Central Faults, North of the Camel Fault
domain_3_arg_prop
3
Kamma+Camel
Argillic+Propylitic
Between
Central and East, Albert Fault, North of the Camel Fault
domain_3_silicic
3
Kamma+Camel
Silicic
Between
Central and East, Albert Fault, North of the Camel Fault
domain_3_unaltered
3
Kamma+Camel
Unaltered
Between
Central and East, Albert Fault, North of the Camel Fault
domain_4_arg_prop
4
Kamma+Camel
Argillic+Propylitic
East
of East Fault, South of the Ramp Fault
domain_4_silicic
4
Kamma+Camel
Silicic
East
of East Fault, South of the Ramp fault
domain_4_unaltered
4
Kamma+Camel
Unaltered
East
of East Fault, South of the Ramp fault
domain_5_arg_prop
5
Kamma+Camel
Argillic+Propylitic
South
of the Camel Fault, West of the East Fault
domain_5_silicic
5
Kamma+Camel
Silicic
South
of the Camel Fault, West of the East Fault
domain_5_unaltered
5
Kamma+Camel
Unaltered
South
of the Camel Fault, West of the East Fault
domain_6_arg_prop
6
Kamma+Camel
Argillic+Propylitic
East
of Albert Fault, North of Ramp fault
domain_6_silicic
6
Kamma+Camel
Silicic
East
of Albert Fault, North of Ramp fault
domain_6_unaltered
6
Kamma+Camel
Unaltered
East
of Albert Fault, North of Ramp fault
Hycroft Mine Project
Page 117
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
11-5: High-grade Silver Vein Domains
Domain
Name
Structure
Block
Lithology
Alteration
Description
ag_6001
3
Kamma
Argillic+Propylitic+Silicic
Vortex
High-grade silver vein
ag_6002
3
Kamma
Argillic+Propylitic+Silicic
Vortex
High-grade silver vein
ag_6003
3,4
Kamma
Argillic+Propylitic+Silicic
Vortex
High-grade silver vein
ag_6004
3
Kamma
Argillic+Propylitic+Silicic
Vortex
High-grade silver vein
ag_6005
3,4
Kamma
Argillic+Propylitic+Silicic
Vortex
High-grade silver vein
ag_6006
3
Kamma
Argillic+Propylitic+Silicic
Vortex
High-grade silver vein
ag_6007
3
Kamma
Argillic+Propylitic+Silicic
Vortex
High-grade silver vein
ag_6008
3
Kamma
Argillic+Propylitic+Silicic
Vortex
High-grade silver vein
ag_6009
3
Kamma
Argillic+Propylitic+Silicic
Vortex
High-grade silver vein
ag_6010
3
Kamma
Argillic+Propylitic+Silicic
Vortex
High-grade silver vein
ag_6011
3
Kamma
Argillic+Propylitic+Silicic
Vortex
High-grade silver vein
ag_6012
3
Kamma
Argillic+Propylitic+Silicic
Vortex
High-grade silver vein
ag_7001
3
Kamma
Argillic+Propylitic+Silicic
Brimstone
High-grade silver vein
ag_7002
3
Kamma
Argillic+Propylitic+Silicic
Brimstone
High-grade silver vein
ag_7004
3
Kamma
Argillic+Propylitic+Silicic
Brimstone
High-grade silver vein
ag_7005
3
Kamma
Argillic+Propylitic+Silicic
Brimstone
High-grade silver vein
Table
11-6: Sulfide Domains
Sulfide
Domain Number
Structure
Block
Lithology
Alteration
Description
1
All
All
Acid
Leach
Alluvium
2
3,4,6
All
All
East
of the Central fault
4
1,2,5
All
All
West
of the Central fault flat dipping
Hycroft Mine Project
Page 118
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
11-4: Structure and Domain Interpretation with Silver Wireframes (plan view)
Source:
Hycroft, 2025
Hycroft Mine Project
Page 119
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
11.10 Assay
Caps
Prior
to grade estimation, high-grade outliers were capped to limit undue impact on block grade estimation. Histograms were studied by Hycroft
within each of the domains to set cap values. IMC spot checked the cap values using cumulative frequency plots. In all cases, only a
small percentage of high valued samples were capped, generally less than 0.5% of the database. Table 11-7 summarizes the cap values that
were applied to assays prior to calculating composites.
Table
11-7: Assay Cap Values
Domain
Gold
Cap Value (oz/ton)
Silver
Cap Value (oz/ton)
Alluvium
0.10
3
TSG_Seds
0.06
7
Auld
Lang Syne
0.07
4
Acid
Leach
0.25
5
domain_1_arg_prop
0.07
5
domain_1_silicic
0.09
15
domain_1_unaltered
0.06
3
Domain_2_arg_prop
0.36
12
domain_2_silicic
0.55
34
domain_2_unaltered
0.04
2.5
domain_3_arg_prop
0.35
30
domain_3_silicic
0.65
55
domain_3_unaltered
0.05
10
domain_4_arg_prop
0.07
6
domain_4_silicic
0.15
15
domain_4_unaltered
0.07
2
domain_5_arg_prop
0.03
0.5
domain_5_silicic
0.04
3.5
domain_5_unaltered
0.03
1
domain_6_arg_prop
0.06
1.5
domain_6_silicic
0.12
30
domain_6_unaltered
0.07
4
ag_6001
n/a
12
ag_6002
n/a
14
ag_6003
n/a
35
ag_6004
n/a
15
ag_6005
n/a
8
ag_6006
n/a
20
ag_6007
n/a
12
ag_6008
n/a
14
ag_6009
n/a
25
ag_6010
n/a
20
ag_6011
n/a
8
ag_6012
n/a
20
ag_7001
n/a
300
ag_7002
n/a
15
ag_7004
n/a
60
ag_7005
n/a
9
Hycroft Mine Project
Page 120
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
gold cyanide to fire assay ratio was capped at 1.0 to assure that there were no values with cyanide assay greater than fire assay when
estimating the model.
In
all cases above, the stockpile drilling and the drilling in the Crofoot leach pad were excluded from the analysis as they do not represent
in-situ mineralization.
Sulfide
cap values were applied to the original sulfide data prior to compositing. The cap levels by sulfide domain are summarized on Table 11-8.
Table
11-8: Sulfide Cap Values Prior to Compositing
Alteration
Structure
Blocks
Lithology
Sulfide
Cap Level % Sulfide
Acid
Leach
All
All
12.00%
Argilic
All
All
17.00%
Propylitic
All
All
n/a
Silicic
All
All
28.00%
Unaltered
All
All
12.00%
11.11 Bench
Height Confirmation
A
test was completed to confirm the selection of bench height for the model. The assay database was composited into alternative bench height
intervals of 20 to 50 ft in 5-ft intervals. For each set of composites, the number of composites above cutoff and the average grade of
those composites above cutoff were calculated. The number of composites multiplied by the average grade is used as an approximation of
contained metal above cutoff. Multiple cutoffs of 0.001 through 0.007 oz/ton Au were tested at each of the bench heights. The stockpile
and leach pad drilling were not included in the analysis.
Figure
11-5 indicates that the gold grade is not particularly sensitive to bench height and the selected bench height of 40 ft is a reasonable
value considering the relatively high ore production rate being considered at Hycroft (nearly 60,000 t/d).
Future
work could consider increasing the bench height to 50 ft, but 50 ft is only about a 1.2% improvement over the contained metal at 40 ft.
Hycroft Mine Project
Page 121
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
11-5: Bench Height Analysis
Source:
IMC, 2025
11.12 Composites
Downhole
(length) composites were created from the capped, raw assay values for input to block grade estimation. Composite lengths of 40 ft were
used for gold and silver estimation outside of the silver veins. Within the silver veins, the composite length was set to 10 ft due to
the narrow width of the interpreted veins.
The
capped assays were composited at 40 ft down-hole intervals, respecting the alteration and mineral domain boundaries described above.
A minimum of 20 ft was required for a composite and anything less than 20 ft was applied to the previous interval. Table 11-9 summarizes
the basic statistics of the composited assay data.
Table
11-10 summarizes the basic statistics of the composited sulfide-sulfur data as 25 ft composites.
Hycroft Mine Project
Page 122
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
11-9: Basic Statistics of Composites, In-Situ Rock, Eliminating Years 1982 to 1987
Domain
Number
Structure
Block Code
Lithology
Alteration
Statistics
Summary for Composites
Statistic
Au
oz/ton
Ag
oz/ton
CnAu/
AuFa Ratio
alluvium
All
Alluvium
All
N
=
2,644
1,849
1,058
Mean
=
0.0028
0.0873
0.5370
Max
=
0.0508
1.6595
1
Std
=
0.0039
0.1134
0.26
TSG_seds
All
TSG
All
N
=
1,465
1,254
363
Mean
=
0.0025
0.0882
0.2380
Max
=
0.0336
4.2323
1
Std
=
0.0042
0.1814
0.214
auld
lang syne
All
ALS
All
N
=
49
51
9
Mean
=
0.0014
0.0410
0.2700
Max
=
0.0105
0.2061
0.45
Std
=
0.0019
0.0428
0.132
acid
leach
All
All
Acid
Leach
N
=
5,401
1,621
3,486
Mean
=
0.0048
0.0888
0.6070
Max
=
0.1245
1.9186
1
Std
=
0.0076
0.1645
0.252
domain_1_arg_prop
1
Kamma+Camel
Argillic+Propylitic
N
=
373
352
80
Mean
=
0.0020
0.0745
0.1950
Max
=
0.0198
1.0011
0.688
Std
=
0.0032
0.0858
0.17
domain_1_silicic
1
Kamma+Camel
Silicic
N
=
824
795
513
Mean
=
0.0071
0.1983
0.1210
Max
=
0.0476
6.4177
1
Std
=
0.0065
0.4468
0.167
domain_1_unaltered
1
Kamma+Camel
Unaltered
N
=
305
306
44
Mean
=
0.0017
0.0918
0.4180
Max
=
0.0205
1.1522
0.863
Std
=
0.003
0.1271
0.258
Domain_2_arg_prop
2
Kamma+Camel
Argillic+Propylitic
N
=
4,461
3,169
1,941
Mean
=
0.0040
0.0932
0.4100
Max
=
0.1091
4.8678
1
Std
=
0.0066
0.2059
0.287
domain_2_silicic
2
Kamma+Camel
Silicic
N
=
10,458
7,120
8,503
Mean
=
0.0100
0.1895
0.3220
Max
=
0.3368
11.5751
1
Std
=
0.0101
0.4312
0.27
domain_2_unaltered
2
Kamma+Camel
Unaltered
N
=
151
128
49
Mean
=
0.0030
0.0800
0.3330
Max
=
0.0328
0.8482
1
Std
=
0.0046
0.132
0.274
domain_3_arg_prop
3
Kamma+Camel
Argillic+Propylitic
N
=
7,101
5,944
2,386
Mean
=
0.0033
0.1091
0.3090
Max
=
0.1395
5.9384
1
Std
=
0.0062
0.2488
0.253
domain_3_silicic
3
Kamma+Camel
Silicic
N
=
16,860
13,688
12,995
Mean
=
0.0085
0.3065
0.2780
Max
=
0.251
36.5706
1
Std
=
0.0094
0.6761
0.247
domain_3_unaltered
3
Kamma+Camel
Unaltered
N
=
723
384
363
Mean
=
0.0023
0.1048
0.5680
Max
=
0.0349
3.5645
1
Std
=
0.0034
0.2502
0.294
domain_4_arg_prop
4
Kamma+Camel
Argillic+Propylitic
N
=
1,203
1,146
224
Mean
=
0.0017
0.0738
0.3990
Max
=
0.0338
1.932
1
Std
=
0.0028
0.1335
0.275
domain_4_silicic
4
Kamma+Camel
Silicic
N
=
1,232
995
563
Mean
=
0.0040
0.1787
0.3980
Max
=
0.0604
3.9584
1
Std
=
0.0051
0.3188
0.29
domain_4_unaltered
4
Kamma+Camel
Unaltered
N
=
283
259
55
Mean
=
0.0012
0.0290
0.3850
Max
=
0.0323
0.6248
0.935
Std
=
0.003
0.0558
0.186
domain_5_arg_prop
5
Kamma+Camel
Argillic+Propylitic
N
=
107
100
11
Mean
=
0.0008
0.0830
0.3170
Max
=
0.0193
0.2503
0.7
Std
=
0.0025
0.0349
0.25
domain_5_silicic
5
Kamma+Camel
Silicic
N
=
207
198
50
Mean
=
0.0021
0.0914
0.1760
Max
=
0.0214
0.7186
0.863
Std
=
0.0039
0.0958
0.203
domain_5_unaltered
5
Kamma+Camel
Unaltered
N
=
94
93
-
Mean
=
0.0004
0.0797
-
Max
=
0.003
0.2559
-
Std
=
0.0005
0.0381
-
Hycroft Mine Project
Page 123
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Domain
Number
Structure
Block Code
Lithology
Alteration
Statistics
Summary for Composites
Statistic
Au
oz/ton
Ag
oz/ton
CnAu/
AuFa Ratio
domain_6_arg_prop
6
Kamma+Camel
Argillic+Propylitic
N
=
896
774
83
Mean
=
0.0009
0.0696
0.4590
Max
=
0.0298
0.3795
1
Std
=
0.0018
0.0529
0.311
domain_6_silicic
6
Kamma+Camel
Silicic
N
=
583
496
225
Mean
=
0.0041
0.1869
0.2690
Max
=
0.0382
10.7052
1
Std
=
0.0051
0.5849
0.241
domain_6_unaltered
6
Kamma+Camel
Unaltered
N
=
161
136
97
Mean
=
0.0037
0.1936
0.5050
Max
=
0.0199
1.175
0.906
Std
=
0.0039
0.2161
0.177
ag_6001
3
Kamma
Argillic+Propylitic+Silicic
N
=
n/a
41
n/a
Mean
=
n/a
4.2624
n/a
Max
=
n/a
12
n/a
Std
=
n/a
3.4599
n/a
ag_6002
3
Kamma
Argillic+Propylitic+Silicic
N
=
n/a
18
n/a
Mean
=
n/a
5.3505
n/a
Max
=
n/a
11.8884
n/a
Std
=
n/a
2.9268
n/a
ag_6003
3,4
Kamma
Argillic+Propylitic+Silicic
N
=
n/a
18
n/a
Mean
=
n/a
8.8920
n/a
Max
=
n/a
26.8903
n/a
Std
=
n/a
9.1648
n/a
ag_6004
3
Kamma
Argillic+Propylitic+Silicic
N
=
n/a
12
n/a
Mean
=
n/a
6.6931
n/a
Max
=
n/a
15
n/a
Std
=
n/a
4.9057
n/a
ag_6005
3,4
Kamma
Argillic+Propylitic+Silicic
N
=
n/a
12
n/a
Mean
=
n/a
4.2462
n/a
Max
=
n/a
8
n/a
Std
=
n/a
2.4865
n/a
ag_6006
3
Kamma
Argillic+Propylitic+Silicic
N
=
n/a
15
n/a
Mean
=
n/a
7.7032
n/a
Max
=
n/a
18.3126
n/a
Std
=
n/a
5.1522
n/a
ag_6007
3
Kamma
Argillic+Propylitic+Silicic
N
=
n/a
25
n/a
Mean
=
n/a
5.3803
n/a
Max
=
n/a
11.1771
n/a
Std
=
n/a
3.2084
n/a
ag_6008
3
Kamma
Argillic+Propylitic+Silicic
N
=
n/a
23
n/a
Mean
=
n/a
4.5142
n/a
Max
=
n/a
13.0085
n/a
Std
=
n/a
3.5674
n/a
ag_6009
3
Kamma
Argillic+Propylitic+Silicic
N
=
n/a
34
n/a
Mean
=
n/a
8.9273
n/a
Max
=
n/a
25
n/a
Std
=
n/a
6.6283
n/a
ag_6010
3
Kamma
Argillic+Propylitic+Silicic
N
=
n/a
40
n/a
Mean
=
n/a
6.0614
n/a
Max
=
n/a
20
n/a
Std
=
n/a
5.3179
n/a
ag_6011
3
Kamma
Argillic+Propylitic+Silicic
N
=
n/a
22
n/a
Mean
=
n/a
4.3523
n/a
Max
=
n/a
8
n/a
Std
=
n/a
1.656
n/a
ag_6012
3
Kamma
Argillic+Propylitic+Silicic
N
=
n/a
29
n/a
Mean
=
n/a
5.9920
n/a
Max
=
n/a
18.645
n/a
Std
=
n/a
5.5774
n/a
ag_7001
3
Kamma
Argillic+Propylitic+Silicic
N
=
n/a
79
n/a
Mean
=
n/a
25.4563
n/a
Max
=
n/a
157.5105
n/a
Std
=
n/a
36.8384
n/a
ag_7002
3
Kamma
Argillic+Propylitic+Silicic
N
=
n/a
14
n/a
Mean
=
n/a
4.8935
n/a
Max
=
n/a
15
n/a
Std
=
n/a
4.3965
n/a
ag_7004
3
Kamma
Argillic+Propylitic+Silicic
N
=
n/a
11
n/a
Mean
=
n/a
11.0018
n/a
Max
=
n/a
52.5782
n/a
Std
=
n/a
18.7548
n/a
ag_7005
3
Kamma
Argillic+Propylitic+Silicic
N
=
n/a
8
n/a
Mean
=
n/a
4.5161
n/a
Max
=
n/a
6.2646
n/a
Std
=
n/a
1.4602
n/a
Hycroft Mine Project
Page 124
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
11-10: Basic Statistics of 25 ft Sulfide Composites by Sulfide Domain
Sulfide
Domain Number
Structure
Blocks
Lithology
Alteration
Basic
Statistics of 25ft Composites
1
All
All
Acid
Leach
N
=
319
Mean
=
1.94
Max
=
12.00
Std
=
2.36
2
3,4,5,6
All
All
N
=
8,544
Mean
=
1.54
Max
=
28.00
Std
=
1.45
4
1,2,5
All
All
N
=
4,623
Mean
=
1.82
Max
=
26.20
Std
=
1.14
11.13 Variography
Variograms
were prepared and analyzed by mineralized domain during earlier work on the MRE. The guidance for search orientation and distance that
was developed from that work has been applied to the grade assignment techniques applied to this model. A few illustrative variograms
have been prepared using the database and domain boundaries applied to this model to provide support to the selected search parameters.
Figure
11-6: Gold Variograms for Silicic Material Between the Central Fault and East Fault
Down
Dip to West
North-South
Source:
IMC, 2023
Figure
11-7: Gold Variograms for Silicic Material Between the Range Fault and Central Fault
East-West
North
Source:
IMC, 2023
Hycroft Mine Project
Page 125
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
11.14 Block
Grade Estimation
Block
grade estimation was broken into four groups of estimates: gold, silver, gold cyanide ratio (cnratau), sulfide-sulfur. The boundaries
and controls on each of the four were different as might be expected with the differences in geologic occurrence in each case.
11.14.1 Gold
Gold
estimations utilized the 22 domains defined previously. Those domain boundaries were treated as “hard” boundaries during
estimation. The estimation used the 40 ft composites noted earlier and inverse distance cubed (1/d3) as the estimation method.
Search parameters are provided on Table 11-11.
The
grade estimation used a maximum of ten composites with a maximum of three composites from one hole. A single composite could be used
to assign a block grade, but that grade would be considered as inferred category (Class is discussed later in this section).
Test
runs of ordinary kriging have been applied in previous models. The intent of selecting the inverse distance method was to develop a better
planning model with less smoothing during block estimation and to provide an estimate of block values that would be predictive of actual
mine head grades once appropriate mining cutoffs were applied.
Block
gold grade estimation was done in two estimation passes:
1. Block
grades were estimated without the 1982 to 1987 drilling, applying the methods described here
in text.
2. The
mineral resource classes of measured, indicated, and inferred were established without the
use of the 1982-1987 data.
A
second pass of gold block grade estimation was made incorporating the 1982 to 1987 data after the bias correction of 0.56 was applied.
Any blocks that were added in addition to those in Step 1 above were coded as Inferred.
11.14.2 Silver
Silver
utilized the 38 domains defined previously. Those domain boundaries were treated as “hard” boundaries during estimation.
As discussed earlier, silver composites were broken by domain boundaries where high-grade silver mineralization occurs, the composites
are set to 10 ft length inside the high-grade domains and 40 ft outside of the high-grade domain. Silver was estimated using 1/d3
methodology.
The
estimation strategy within the high-grade domains used a three-pass approach incorporating a small ellipse in the first pass and a larger
ellipse in the subsequent passes. Outside of the high-grade domains, the estimation used a one pass approach. Search parameters are provided
on Table 11-11.
Two
domains that are not inside the high-grade structures, incorporated a high-grade search limit where composites above a certain grade
were capped again beyond a specified search distance. This process includes the high-grade values but limits their extent to minimize
high-grade smearing over neighboring low-grade values.
Hycroft Mine Project
Page 126
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
11-11: Grade Estimation Parameters for Au, Ag
Domain
Variable
Ellipsoid
Ranges
(ft)
Ellipsoid
Directions
(°)
Composite
Counts
Drill
Hole Limit
HG
Restrictions
Max
Interm
Min
Dip
Dip
Azimuth
Pitch
Min
Max
Max
per
oz/ton
Search
Limit (ft)
Alluvium
Au
150
150
25
0
270
0
1
10
3
n/a
n/a
Ag
150
150
25
0
270
0
1
10
3
n/a
n/a
TSG_seds
Au
270
270
50
0
270
0
1
10
3
n/a
n/a
Ag
270
270
50
0
270
0
1
10
3
n/a
n/a
auld
lang syne
Au
150
150
50
40
285
0
1
10
3
n/a
n/a
Ag
150
150
50
40
285
0
1
10
3
n/a
n/a
acid
leach
Au
270
270
50
0
270
0
1
10
3
n/a
n/a
Ag
270
270
50
0
270
0
1
10
3
n/a
n/a
domain_1_arg_prop
Au
150
150
50
0
270
0
1
10
3
n/a
n/a
Ag
150
150
50
0
270
0
1
10
3
n/a
n/a
domain_1_silicic
Au
300
300
50
0
270
0
1
10
3
n/a
n/a
Ag
300
300
50
0
270
0
1
10
3
n/a
n/a
domain_1_unaltered
Au
150
150
50
0
270
0
1
10
3
n/a
n/a
Ag
150
150
50
0
270
0
1
10
3
n/a
n/a
Domain_2_arg_prop
Au
250
250
50
0
270
0
1
10
3
n/a
n/a
Ag
250
250
50
0
270
0
1
10
3
n/a
n/a
domain_2_silicic
Au
300
300
50
0
270
0
1
10
3
n/a
n/a
Ag
300
300
50
0
270
0
1
10
3
n/a
n/a
domain_2_unaltered
Au
150
150
50
0
270
0
1
10
3
n/a
n/a
Ag
150
150
50
0
270
0
1
10
3
n/a
n/a
domain_3_arg_prop
Au
300
300
50
40
285
0
1
10
3
n/a
n/a
Ag
300
300
50
40
285
0
1
10
3
20
50
domain_3_silicic
Au
300
300
50
40
285
0
1
10
3
n/a
n/a
Ag
300
300
50
40
285
0
1
10
3
20
50
domain_3_unaltered
Au
150
150
50
40
285
0
1
10
3
n/a
n/a
Ag
150
150
50
40
285
0
1
10
3
n/a
n/a
domain_4_arg_prop
Au
250
250
50
40
285
0
1
10
3
n/a
n/a
Ag
250
250
50
40
285
0
1
10
3
n/a
n/a
domain_4_silicic
Au
300
300
50
40
285
0
1
10
3
n/a
n/a
Ag
300
300
50
40
285
0
1
10
3
n/a
n/a
domain_4_unaltered
Au
150
150
50
40
285
0
1
10
3
n/a
n/a
Ag
150
150
50
40
285
0
1
10
3
n/a
n/a
domain_5_arg_prop
Au
250
250
50
0
270
0
1
10
3
n/a
n/a
Ag
250
250
50
0
270
0
1
10
3
n/a
n/a
Hycroft Mine Project
Page 127
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Domain
Variable
Ellipsoid
Ranges
(ft)
Ellipsoid
Directions
(°)
Composite
Counts
Drill
Hole Limit
HG
Restrictions
Max
Interm
Min
Dip
Dip
Azimuth
Pitch
Min
Max
Max
per
oz/ton
Search
Limit (ft)
domain_5_silicic
Au
300
300
50
0
270
0
1
10
3
n/a
n/a
Ag
300
300
50
0
270
0
1
10
3
n/a
n/a
domain_5_unaltered
Au
150
150
50
0
270
0
1
10
3
n/a
n/a
Ag
150
150
50
0
270
0
1
10
3
n/a
n/a
domain_6_arg_prop
Au
250
250
50
40
285
0
1
10
3
n/a
n/a
Ag
250
250
50
40
285
0
1
10
3
n/a
n/a
domain_6_silicic
Au
300
300
50
40
285
0
1
10
3
n/a
n/a
Ag
300
300
50
40
285
0
1
10
3
n/a
n/a
domain_6_unaltered
Au
150
150
50
40
285
0
1
10
3
n/a
n/a
Ag
150
150
50
40
285
0
1
10
3
n/a
n/a
ag_6001
pass
1
120
60
30
20
270
90
2
12
2
n/a
n/a
pass
2
180
90
45
20
270
90
2
12
2
n/a
n/a
pass
3
240
120
60
20
270
90
1
12
n/a
n/a
n/a
ag_6002
pass
1
120
60
30
20
270
90
2
12
2
n/a
n/a
pass
2
180
90
45
20
270
90
2
12
2
n/a
n/a
pass
3
240
120
60
20
270
90
1
12
n/a
n/a
n/a
ag_6003
pass
1
120
60
30
20
270
90
2
12
2
n/a
n/a
pass
2
180
90
45
20
270
90
2
12
2
n/a
n/a
pass
3
240
120
60
20
270
90
1
12
n/a
n/a
n/a
ag_6004
pass
1
120
60
30
20
270
90
2
12
2
n/a
n/a
pass
2
180
90
45
20
270
90
2
12
2
n/a
n/a
pass
3
240
120
60
20
270
90
1
12
n/a
n/a
n/a
ag_6005
pass
1
120
60
30
20
270
90
2
12
2
n/a
n/a
pass
2
180
90
45
20
270
90
2
12
2
n/a
n/a
pass
3
240
120
60
20
270
90
1
12
n/a
n/a
n/a
ag_6006
pass
1
120
60
30
50
300
90
2
12
2
n/a
n/a
pass
2
180
90
45
50
300
90
2
12
2
n/a
n/a
pass
3
240
120
60
50
300
90
1
12
n/a
n/a
n/a
ag_6007
pass
1
120
60
30
20
270
90
2
12
2
n/a
n/a
pass
2
180
90
45
20
270
90
2
12
2
n/a
n/a
pass
3
240
120
60
20
270
90
1
12
n/a
n/a
n/a
ag_6008
pass
1
120
60
30
20
270
90
2
12
2
n/a
n/a
pass
2
180
90
45
20
270
90
2
12
2
n/a
n/a
pass
3
240
120
60
20
270
90
1
12
n/a
n/a
n/a
ag_6009
pass
1
120
60
30
20
270
90
2
12
2
n/a
n/a
pass
2
180
90
45
20
270
90
2
12
2
n/a
n/a
pass
3
240
120
60
20
270
90
1
12
n/a
n/a
n/a
Hycroft Mine Project
Page 128
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Domain
Variable
Ellipsoid
Ranges
(ft)
Ellipsoid
Directions
(°)
Composite
Counts
Drill
Hole Limit
HG
Restrictions
Max
Interm
Min
Dip
Dip
Azimuth
Pitch
Min
Max
Max
per
oz/ton
Search
Limit (ft)
ag_6010
pass
1
120
60
30
20
270
90
2
12
2
n/a
n/a
pass
2
180
90
45
20
270
90
2
12
2
n/a
n/a
pass
3
240
120
60
20
270
90
1
12
n/a
n/a
n/a
ag_6011
pass
1
120
60
30
20
270
90
2
12
2
n/a
n/a
pass
2
180
90
45
20
270
90
2
12
2
n/a
n/a
pass
3
240
120
60
20
270
90
1
12
n/a
n/a
n/a
ag_6012
pass
1
120
60
30
20
270
90
2
12
2
n/a
n/a
pass
2
180
90
45
20
270
90
2
12
2
n/a
n/a
pass
3
240
120
60
20
270
90
1
12
n/a
n/a
n/a
ag_7001
pass
1
120
60
30
50
300
90
2
12
2
n/a
n/a
pass
2
180
90
45
50
300
90
2
12
2
n/a
n/a
pass
3
240
120
60
50
300
90
1
12
n/a
n/a
n/a
ag_7002
pass
1
120
60
30
50
300
90
2
12
2
n/a
n/a
pass
2
180
90
45
50
300
90
2
12
2
n/a
n/a
pass
3
240
120
60
50
300
90
1
12
n/a
n/a
n/a
ag_7004
pass
1
120
60
30
50
300
90
2
12
2
n/a
n/a
pass
2
180
90
45
50
300
90
2
12
2
n/a
n/a
pass
3
240
120
60
50
300
90
1
12
n/a
n/a
n/a
ag_7005
pass
1
120
60
30
50
300
90
2
12
2
n/a
n/a
pass
2
180
90
45
50
300
90
2
12
2
n/a
n/a
pass
3
240
120
60
50
300
90
1
12
n/a
n/a
n/a
11.14.3 Cyanide
Ratio
About
75% of the assay database for fire gold was also assayed for cyanide soluble gold. The cyanide soluble assay is a direct indication of
the cyanide amenability of the mineralized material to gold and silver recovery by cyanidation. Much of the upper portion of the deposit
received cyanide soluble assays for gold and silver.
CnAu/FaAu
was used to indicate cyanide amenability. The ratio, where it is available, can be interpreted as an indication of oxidation that has
occurred in the rock mass.
The
domains selected for gold and silver mineralization (previously shown in Table 11-4) reflect the original hydrothermal mineralization.
The cyanide ratio however reflects the oxidation process as a secondary impact.
Hycroft Mine Project
Page 129
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
A
review of cross-sections of the cyanide ratio data indicated two populations of cnratau:
1. A
generally horizontal band near topography reflecting surface water and oxidation that looks
like a conventional oxidation blanket.
2. Isolated
values at depth that likely reflect oxidation downward along structure with limited later
extent.
To
estimate cnratau, a boundary was developed between the upper oxide blanket and the lower structural controlled oxidation. This was completed
by visual analysis of cnratau cross-sections.
The
boundary surface was defined as a horizontal plane on the 4,000 ft. elevation from the eastern edge of the model to the 19,000 East line.
From there the surface trends upward to the 4,400 ft. elevation at the 21,000 East line. From 21,000 east to the east edge of the model,
the 4,400 ft. elevation is applied. Blocks above the surface were coded with a value of 1 in a variable called “Contrat”.
Blocks below the surface were coded with a Contrat value of 2.
Table
11-12 summarizes the parameters used to estimate the cnratau within each block. Once the ratio was assigned, block values of cyanide
soluble Au could be calculated where required. Composite requirements: max =10, min =1, max per hole =3.
Table
11-12: Estimation Parameters for Cyanide Ratio, All Three Domains utilized 1/D3
Cn
Ratio Domain “Contrat”
Structure
Block Code
Description
Parameters
Applied to 40 ft Composites
Variable
Orientation,
Degrees
Search
Radii, (ft)
Maximum
Composites per Drillhole
Dip
Dir
Plunge
Rotation
Prim
Second
Perpend
1
All
Near
Surface Oxidation
cnratau
0
0
0
700
700
50
3
2
3,4,6
Structural
Oxidation, East of Central Fault
cnratau
285
-40
0
150
150
50
3
3
1,2,3,5
Structural
Oxidation, West of Central Fault
cnratau
270
-90
0
150
150
50
3
11.14.4 Sulfide
Sulfur
Sulfide
sulfur was estimated to provide an improved localized cost for concentrate processing. The cost of concentrate processing is dependent
on the amount of sulfide sulfur in the mill feed. The current POX process has been adjusted to match the full range of sulfide sulfur
found in the flotation concentrate. Most of the sulfide sulfur is in the form of pyrite. Pyrite exists everywhere throughout the deposit,
including in the oxidized portion. In particular, the acid leach alteration type contains native sulfur which also reports to the LECO
assay method for sulfide sulfur.
The
presence of sulfide sulfur is not impacted by the oxidation state or rock type. Population tests indicate that the only independent population
is the acid leach alteration. The dip orientation for the estimation parameters was, however, adjusted based on structure.
Hycroft Mine Project
Page 130
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
sulfide sulfur LECO data was performed on selected drillholes. The sulfide sulfur block grades were estimated from the 25 ft composite
LECO data as described in previous sections. Composite counts were a maximum of 10, minimum of one with a maximum of three composites
per drill hole.
Table
11-13 summarizes the estimation parameters used to assign sulfide sulfur to the model blocks.
Table
11-13: Sulfide Sulfur Estimation Parameters, All Three Domains Utilized 1/D3
Structure
Block Code
Description
Variable
Orientation,
Degrees
Search
Radii, (ft)
Dip
Dir
Plunge
Rotation
Prim
Second
Perpend
All
Acid
Leach Alteration
Sulfd
0
0
0
650
650
200
3,4,6
East
of Central Fault
Sulfd
285
-40
0
650
650
200
1,2,3,5
West
of Central Fault
Sulfd
0
0
0
650
650
200
Due
to the low number of sulfide sulfur composites, default values were assigned based on alteration type to those blocks without estimated
sulfide sulfur. Sulfide sulfur can be an input to project cost so leaving blocks un-estimated would underestimate project costs.
The
default values were assigned as follows in Table 11-14. Default values were assigned to blocks that did not receive a sulfide sulfur
value from the estimation process.
In
the development of the POX process, reagent consumption and power costs were consistent across the range of sulfide sulfur levels identified.
Therefore, a fixed value could be applied to the operating costs.
Table
11-14: Sulfide Sulfur Default Values if Not Estimated
Description
Default
Sulfide Sulfur %
Acid
Leach
1.7167
Argillic
1.5226
Silicic
1.8335
Propylitic
1.1057
Unaltered
0.782
Hycroft Mine Project
Page 131
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
11.14.5 Density
Bulk
density was assigned to in-situ rock based on density data collected by Hycroft and their predecessors. Average density values were set
based on alteration type within the hard or in-situ units. The exception was the ALS rock type which was assigned a single value not
impacted by alteration.
Alluvium,
back fill, and stockpiles were guided by the few test values available but were generally based on the density values assigned to an
earlier block model completed in 2019. Table 11-15 summarizes the densities assigned to the model.
Table
11-15: Density Assigned to the Block Model
Description
Specific
Gravity
lbs/ft
Cu
Ktons
per Model Block
Acid
Leach
2.2654
141.424
4.5256
Argillic
2.2094
137.928
4.4137
Silicic
2.5055
156.413
5.0052
Propylitic
2.3193
144.789
4.6333
Alluvium
1.7808
111.172
3.5575
Auld
Lang Syne
2.652
165.559
5.2979
Unassigned
Blocks
2.3193
144.789
4.6333
Stockpile
Specific
Gravity
lbs/ft
Cu
Ktons
per Block
100
1.6026
100.047
3.2015
101,
102, 103, 104, 105, 106
1.7049
106.433
3.4059
120
(Crofoot Leach Pad)
2.0000
124.856
3.9954
11.14.6 Stockpile
Grade Estimation
The
Hycroft pits have incurred both backfilling and in-pit stockpiling. Potential sulfide mill feed that has been incurred during the mining
of oxide heap leach ores have been stockpiled. That material is a potential future mill feed to a sulfide processing facility.
Hycroft
developed interpreted solids based on survey data of the stockpiles.
Some
of the stockpiles at Hycroft have been drilled by Sonic drilling and RC sampling methods. The grade of those stockpiles that contained
stockpile drilling were assigned with the assays from those holes. Stockpiles that were estimated all used a search of 600 x 600 x 200
ft and 1/D1 methods to estimate Au, Ag, Sulfide Sulfur and cnratau. Densities were assigned as summarized in the previous sub-section.
Where there were no stockpile drilling assays, average tonnage and grade of each stockpile based on the blast hole grade control information
was used.
Hycroft Mine Project
Page 132
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Blocks
were assigned stockpile codes as summarized in Table 11-16.
Table
11-16: Stockpiles Assigned Grades by Inverse Distance Estimation
Stockpile
Codes
Location
Variables
Estimated by 1/D1
Au,
Ag, Sulfide Sulfur, CnAu/FaAu Ratio
Dip
Dir
Plunge
Rotation
Prim (ft)
Second (ft)
Perpend (ft)
101
Brimstone Stockpile 1
0
90
0
600
600
200
102
Brimstone Stockpile 2
0
90
0
600
600
200
104
Central Stockpile 1
0
90
0
600
600
200
120
Crofoot Leach Pad
0
90
0
600
600
200
Stockpile
Grades Assigned by Hycroft Production History
Stockpile
Codes
Location
Au
oz/ton
Ag
oz/ton
Sulfide
Sulfur %
CnAu/FaAu
Ratio
100
General Fill
0
0
0
0
103
Brimstone Stockpile 3
0.0148
0.6514
2.51
0.2
105
Central Stockpile 2
0.0131
0.2308
1.89
0.25
106
Gyro Stockpile
0.019
0.848
2.97
0.18
120
Crofoot Leach Pad
-
-
1.74
-
Note:
No sulfide sulfur data exists for the Crofoot Leach Pad (120) so a default value was assigned for processing costs
The
Crofoot leach pad (code 120) was assigned an inferred confidence classification. All other graded stockpiles were assigned an Indicated
confidence classification.
11.14.7 Treatment
of 1982 – 1987 Data
The
observed high bias with the 1982 – 1987 data was discussed and illustrated in Section 9. Half of the 1982-1987 data have been historically
mined out. The 1982-1987 drill data was included using the following steps:
1. The
procedures described in the previous sub-sections and in Section 11.15 regarding classification
were first completed using the drill hole composites that had excluded the 1982 to 1987 drill
data.
2. Once
completed, the block gold grades and the block class codes were stored in separate variables.
3. The
1982-1987 composite data was corrected for potential high bias by multiplying each composite
by a factor of 0.56, based on the nearest neighbor comparison to post 2005 data described
in Section 9.
4. The
gold estimation procedure was repeated using the identical parameters as described in the
previous sub-sections and in item 1 above.
5. Any
additional blocks that were estimated in pass 2 were added to the gold grade and coded as
“Inferred.”
The
procedure outlined above did not change the gold block grade of the blocks estimated in pass 1 without the 1982-1987 data. It was not
necessary to update the silver because there were no silver assays within the 1982-1987 data.
Hycroft Mine Project
Page 133
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
11.15 Classification
Individual
blocks in the model were assigned classification codes as defined within S-K 1300. As noted earlier, the stockpiles were assigned classification
codes of 2 for Indicated class and the Crofoot leach pad was assigned a code of 3 for inferred.
The
in-situ rock values were assigned classification codes based on the inverse distance estimation of Au. During that estimation process,
the number of composites that were used to estimate the block was stored along with the distance between the block and the closest composite.
Those two parameters were used to assign classification code in the following manner to blocks estimated without the 1982-1987 data.
If
closest distance <= 125 ft and number of composites = 10, Class = 1 Measured
Else
If
closest distance <=225 ft and number of composites >=4, Class = 2 Indicated
Otherwise
Remaining
Estimated Blocks Class = 3 Inferred
After
the above coding was complete, the additional blocks that resulted from inclusion of the bias corrected 1982-1987 data were coded as
inferred.
As
noted in Section 11.14.4, sulfide sulfur information is limited in number compared to gold and silver assays. The confidence procedures
that are described in the previous paragraph are to be applied to metallurgical processes that utilize sulfide sulfur to estimated process
cost such as POX. Default assignments of sulfide sulfur to blocks with estimated gold and silver are appropriate for cost estimation.
The
previous paragraphs discuss several items of uncertainty in the database that have caused components of the mineralization to be classified
as inferred. There is indication that those inferred components are mineralized, but the uncertainty in the data or lack of data contributes
to an inferred level of grade estimation.
Measured
mineralization has a sound level of reliability due to the close spacing (125 ft) and large number of samples contributing to the grade
estimates. Indicated level is slightly more uncertain than measured due to the wider spacing of the data and fewer number of samples
used for estimation. The definitions of measured, indicated, and inferred are consistent with the definitions within SK-1300.
Figure
11-8 is a cross-section showing the classification for Hycroft resources.
Hycroft Mine Project
Page 134
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
11-8: E-W Cross-section at 41000-N, Showing Confidence Codes
Note:
Red (1) = Measured, Green (2) = Indicated, Blue (3) = Inferred. Source: Hycroft, 2025
11.16 Model
Verification
The
block model was verified by several methods before being used to determine mineral resources:
● Detailed
Visual Checks of Drilling versus Block Estimates.
● A
Bias Check for Each Domain.
● Swath
Plots.
● IMC
Smear Check.
Hycroft Mine Project
Page 135
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
visual check of the block model is one of the most useful and informative processes that was used to confirm the practicality of the
block model. IMC completed visual checks on plan and sections for all the estimated variables in the model. In addition to IMC visual
checks, the Hycroft engineering and geology team on site have also reviewed the model.
Figure
11-9 and Figure 11-10 are cross sections through the block model with drilling as visual checks.
Figure
11-9: E-W Cross-section at 41000-N, Visual Check of Gold Grades in Drillholes and Block Model
Note:
Warmer Colors are Higher Grade. Source: Hycroft, 2025
Hycroft Mine Project
Page 136
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
11-10: E-W Cross-section at 41000-N, Visual Check of Silver Grades in Drillholes and Block Model
Note:
Warmer Colors are Higher Grade. Source: Hycroft, 2025
11.16.1 Swath
Plots
Hycroft
produced comparative statistics, including inverse distance cubed (ID3), nearest neighbor (NN) and inverse distance squared
(ID2) estimations, and swath plots for all deposits. Swath plots provide a visual indication if the block model follows
the grade trends indicated by the supporting data and if there is any observable local bias in the block grade estimation. The
swath plots produced generally demonstrated good correlation, with block grades being somewhat smoothed relative to composite grades,
as expected.
Figure
11-11 is an example for the swath plots in the X and Y (model east and north) directions across the deposit for the gold estimation.
Figure 11-12 and Figure 11-13 illustrate the same swath plots for silver and sulfide sulfur respectively.
The
green histogram represents the volume of estimated blocks within the resource pit for each 160 ft slice of the model.
Hycroft Mine Project
Page 137
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
11-11: Swath Plots for Gold, X = East and Y = North Slices, 160 ft Wide Slices
Source:
Hycroft, 2025
Hycroft Mine Project
Page 138
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
11-12: Swath Plots for Silver, X = East and Y = North Slices, 160 ft Slices
Source:
Hycroft, 2025
Hycroft Mine Project
Page 139
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
11-13: Swath Plots for Sulfide Sulfur, X = East and Y = North Slices, 160 ft Slices
Source:
Hycroft, 2025
Hycroft Mine Project
Page 140
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
11.16.2 Smear
Check
IMC
used a simple test to understand the amount of grade smoothing within the block model and to confirm that the model grades are not high
biased. The test is referred to internally as the “smear check.”
The
procedure is as follows:
● A
range of cutoff grades are selected for the check process. Typically, they bracket the potential
planning cutoff grades.
● For
each cutoff grade being tested, the blocks above cutoff are identified.
● All
composites contained within those blocks are identified.
● Average
grade of the composites and blocks are tabulated.
● Percentage
of the contained composites less than cutoff are calculated.
Table
11-17 summarizes the results for both Au and Ag in-situ rock. Stockpiles and stockpile drillholes have been removed from this analysis.
In all cases, the model mean grade is less than or equal to the mean grade of the contained composites. This is because the block estimate
also draws from composites that are outside of the test shape.
Less
than cutoff, is indicative of the amount of averaging or “smearing” of grade that has occurred in the estimation process.
Ideally this value should be less than about 10 to 15% in the range of cutoff grades. The gold and sulfide sulfur responses meet these
criteria over a range of the deposit grades.
Table
11-17: IMC Smear Check
Cutoff
Grade
%
Comps Less than Cutoff
Number
of Comps in Shape
Composite
Grade (oz/ton)
Number
of Blocks in Shape
Model
Grade
(oz/ton)
Au
Composites vs Model Au
0.002
6.24
24,464
0.009
673,328
0.008
0.003
7.31
22,073
0.010
585,073
0.009
0.004
9.10
20,000
0.010
511,894
0.009
0.005
11.54
17,758
0.011
445,637
0.010
0.006
13.39
15,577
0.012
380,290
0.011
0.007
15.08
13,349
0.013
318,446
0.012
0.008
15.84
11,331
0.014
262,200
0.013
0.009
18.36
9,446
0.015
213,726
0.014
0.010
20.04
7,830
0.016
171,559
0.015
Ag
Composites vs Model Ag
0.100
15.52
16,074
0.353
500,629
0.302
0.200
21.81
8,259
0.531
221,681
0.505
0.300
25.83
4,916
0.729
122,015
0.720
Hycroft Mine Project
Page 141
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Cutoff
Grade
%
Comps Less than Cutoff
Number
of Comps in Shape
Composite
Grade (oz/ton)
Number
of Blocks in Shape
Model
Grade
(oz/ton)
0.400
27.16
3,328
0.934
80,459
0.914
0.500
28.17
2,446
1.076
57,512
1.100
0.600
29.70
1,943
1.217
43,761
1.274
Sulfide
Sulfur Composites vs Model, Default Values Removed from Analysis
0.25
4.73
11,813
1.86
792,323
1.78
0.50
3.28
10,887
1.98
758,989
1.85
1.00
4.99
9,547
2.15
670,013
1.99
1.50
8.07
7,773
2.34
532,655
2.18
2.00
13.61
4,181
2.87
272,917
2.56
Note:
Below End 2021 Topography, Without stockpile blocks or drilling, and without data from 1982 through 1987 Drilling. The silver check does
not include the vein domains
Silver
grade responses at 0.20 oz/ton and above indicate a modeled mineralized zone will have 22 to 29% of the composite values inside the modeled
shape that are less than the cutoff shape. Although not ideal, the result for silver is acceptable.
As
an additional test on silver, the blocks within the MRE pit with positive economic value were averaged to determine their average silver
grade. The average of all composites was identified within the same envelope. The statistical mean of the resource containing silver
composites is 0.55 oz/ton after capping. The average silver grade of the resource blocks is 0.32 oz/ton. The result indicates that the
observed grade smearing in silver is not overestimating the contained silver in the MRE.
11.17 Mineral
Resource Estimate
The
MRE at the Hycroft property is currently envisioned to be produced from a conventional hard rock open pit mine feeding two process facilities:
1. Oxide
material will be routed to ROM cyanide heap leach, producing gold and silver doré.
2. Sulfide
material will be allocated to a Flotation milling process followed by POX of the concentrate
to make a gold and silver doré.
The
terms of reference for this MRE are mineralization in-place. The procedures described in the following paragraphs establish that the
stated mineral resources have RPEE.
Mineral
resources were developed using the block model and pit optimization software to determine mineralization with reasonable prospects for
economic extraction of the mineral resource as defined by S-K 1300. The optimization software compares the cost of production versus
the benefit of metal sales to develop an estimated open pit geometry. The pit walls of the resulting pit are at breakeven economics where
costs equal benefits.
Hycroft Mine Project
Page 142
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
cutoff grade that is reported for this statement of mineral resources is based on the estimated costs and metal prices on Table 11-18.
The internal or marginal cutoff is applied and reported where the benefits of selling the recovered metal will pay for the processing
and fixed general and administrative (G&A) costs.
Table
11-18 summarizes the economic and recovery parameters that were used to define the pit that established the MRE. The process costs were
developed by Ausenco and Hycroft based on recent cost estimation. Mine operating cost estimates were developed by IMC by scaling from
preliminary mine planning and cost estimation completed during early 2022.
The
cutoff grade is presented as an NSR. A marginal or internal cutoff grade is consequently $0.01/ton. An estimate of the Net of Process
value is also provided in terms of Equivalent Gold Grade. Metal prices for the MRE were $3,100 /oz Au, and $36.00/oz Ag. Spot prices
for Au and Ag in 2025 ranged from US$2,798 to US$4,323/ oz Au and US$31.34 to US$71.63/ oz Ag respectively. The prices selected for determination
of mineral resources are conservative relative to current metal prices and do not include extensive price extrapolation.
The
MRE is presented on Table 11-19 using US customary units and on Table 11-20 in metric units. Mineral resources are not mineral
reserves, and do not have demonstrated economic viability.
The
risks to the Hycroft MRE are future changes in project costs and project recoveries as well as metal prices that can have a substantial
impact on the MRE. Process recoveries in the grade ranges near the cutoff grades may be less than the recoveries presented on Table 11-18.
Additional process testing could result in modifications to the recovery and process costs that could result in reductions in the mineral
resource.
The
categories of measured, indicated, and inferred reflect different drill densities as noted in Section 11.15. Uncertainties in the drill
database have been minimized by the following two treatment components of the database:
1. The
1982 through 1987 drilling and assay data, which appears to be biased, has been corrected
for bias and incorporated only in the estimation of inferred mineral resources.
2. The
cyanide soluble silver assays which measure the cyanide amenable silver content have not
been used in the MRE.
The
slope angles input for the pit optimization software was based on work completed by Call & Nicholas Inc, (CNI) completed in February
of 2022 with additional documentation in October of 2023. IMC has reviewed these documents and has accepted the slope angle recommendations
for use in the development of the MRE.
IMC
is a third-party consulting firm with people who can act as a qualified person for the MRE. IMC holds the opinion that all relevant technical
and economic factors likely to influence the project or economic extraction could be resolved with further work and that this statement
of mineral resources meets the requirements to show RPEE.
Hycroft Mine Project
Page 143
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
11-18: Economic and Technical Parameters for Hycroft MRE
Cost
Assumptions
Mining
Cost, Base
$1.65/ton
material moved
+
Bench Incremental Cost Below 4660
$0.018/ton
per bench of depth
Categorization
of Oxidation Type based on the AuCn/AuFA Ratio = cnratau
Oxide
>=0.7
Transition
between 0.3 and 0.7
Sulfide
<=0.3
Process
Cost for Flotation and POX
Total
Mill Cost for Sulfide and Transition
$16.73/ton
of feed to float plant
ROM
Leach for Oxide,
$1.88/ton
of feed to ROM Leach
ROM
Leach for Transition Sulfide
$3.63/ton
of feed to ROM Leach
Mill
Process Recoveries
Mill
Recoveries
Flotation
POX
Extraction
Total
Gold
89.5%
93.5%
99.0%
82.8%
of
(AuFA)
Silver
92.9%
86.0%
97.0%
77.5%
of
(Total Silver Assay)
ROM
Heap Leach Recoveries
ROM
Leach Recovery
Oxide
Transition
Gold
75.0%
75.0%
of
(AuCn)
Silver
12.2%
12.2%
of
(Total Silver Assay)
Refining
Recoveries
Au
Ag
Mill
+ POX Payable
99.5%
99.5%
Leach
Process Payable
99.5%
99.5%
Doré
Transport and Refining Cost
Gold
$5.00/oz
Silver
$0.50/oz
Metal
Price Assumptions
Heap
Leach AuCN Cutoffs
Mill-POX
Au Equiv
Gold
Silver
Internal
Cutoff
Internal
Cutoff
$3,100/oz
$36.00/oz
Oxide
0.0008
oz/ton
0.0066
oz/t AuEquiv
Transition
0.0016
oz/ton
Gold
Equivalent for Heap Leach = Cyanide Gold + 0.0019 x Total Silver Assay
Or
at average gold leach recovery AuEq = Fire Gold + 0.0035 Total Silver Assay
Gold
Equivalent for Flotation + Concentration = Fire Assay Gold + Total Silver Assay x 0.0107
Hycroft Mine Project
Page 144
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
11-19: Hycroft MRE as of January 21, 2026, US customary Units
Classification
Cutoff
Grade
$
Net
of
Refining
Approximate
Cutoff,
AuEq (oz/ton)
Ktons
Gold
oz/ton
Silver
oz/ton
Sulfide
Sulfur%
Contained
Ounces
Gold
Oz
x 1000
Silver
Oz
x 1000
Heap
Leach Resource
Measured
$1.88
- $3.63
0.001
- 0.002
92,994
0.005
0.11
1.83
446
10,322
Indicated
$1.88
- $3.63
0.001
- 0.002
110,374
0.004
0.09
1.54
475
9,492
Meas
+ Ind
$1.88
- $3.63
0.001
- 0.002
203,368
0.005
0.10
1.67
921
19,814
Inferred
$1.88
- $3.63
0.001
- 0.002
110,018
0.005
0.09
1.41
528
10,122
Flotation
Mill + Concentrate Treatment by Pressure Oxidation and Cyanide Leach
Measured
$16.73
0.007
734,571
0.011
0.43
2.03
8,154
316,600
Indicated
$16.73
0.007
748,876
0.010
0.30
1.84
7,339
226,161
Meas
+ Ind
$16.73
0.007
1,483,447
0.010
0.37
1.93
15,493
542,761
Inferred
$16.73
0.007
459,646
0.010
0.27
1.76
4,505
122,725
Combined
Mineral Resources Leach Plus Mill
Measured
$1.88
- $16.73
0.001
- 0.007
827,565
0.010
0.40
2.01
8,600
326,922
Indicated
$1.88
- $16.73
0.001
- 0.007
859,250
0.009
0.27
1.80
7,814
235,653
Meas
+ Ind
$1.88
- $16.73
0.001
- 0.007
1,686,815
0.010
0.33
1.90
16,414
562,575
Inferred
$1.88
- $16.73
0.001
- 0.007
569,664
0.009
0.23
1.69
5,033
132,847
Notes:
1. Mineral
resources based on metal prices of $3,100/troy oz Au and $36.00/troy oz Ag.
2. Cutoffs
are Income – Refining Cost = NSR.
3. Gold
Equivalent (AuEq) for Heap Leach = Cyanide Gold + 0.0019 x Total Silver Assay, or at average
gold leach recovery AuEq = Fire Gold + 0.0035 Total Silver Assay.
4. Gold
Equivalent for Mill + Pressure Oxidation = Fire Gold + 0.0107 x Total Silver Assay.
5. Numbers
may not match exactly due to rounding.
6. Mineral
resources are contained within a computer-generated optimized pit.
7. Total
material in that pit is 5.42 billion tons.
8. Mineral
resources are not mineral reserves, and detailed economic considerations have not been applied.
9. Modifying
factors for mine and process design have not been applied.
10. All
units are US customary. Ktons means 1,000 short tons of 2,000 lbs Au and Ag grades
are in troy ounces per short ton (oz/ton).
Hycroft Mine Project
Page 145
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
11-20: Hycroft MRE as of 21 January 2026, Metric Units
Classification
Cutoff
Grade
$
Net
of
Refining
Approximate
Cutoff,
AuEq (g/tonne)
Ktonnes
Gold
(g/tonne)
Silver
(g/tonne)
Sulfide
Sulfur
(%)
Contained
Ounces
Gold
Silver
Oz
x 1000
Oz
x 1000
Heap
Leach Resource
Measured
$2.07
- $4.00
0.027
- 0.055
84,364
0.164
3.80
1.83
446
10,322
Indicated
$2.07
- $4.00
0.027
- 0.055
100,131
0.147
2.95
1.54
475
9,492
Meas
+ Ind
$2.07
- $4.00
0.027
- 0.055
184,495
0.155
3.34
1.67
921
19,814
Inferred
$2.07
- $4.00
0.027
- 0.055
99,808
0.164
3.15
1.41
528
10,122
Flotation
Mill + Concentrate Treatment by Pressure Oxidation and Cyanide Leach
Measured
$18.44
0.206
666,403
0.380
14.76
2.03
8,154
316,600
Indicated
$18.44
0.206
679,380
0.336
10.34
1.84
7,339
226,161
Meas
+ Ind
$18.44
0.206
1,345,783
0.358
12.53
1.93
15,493
542,761
Inferred
$18.44
0.206
416,991
0.336
9.14
1.76
4,505
122,725
Combined
Mineral Resources, Leach Plus Mill
Measured
$2.07
- $18.44
0.027
- 0.206
750,767
0.356
13.53
2.01
8,600
326,922
Indicated
$2.07
- $18.44
0.027
- 0.206
779,512
0.311
9.39
1.80
7,814
235,653
Meas
+ Ind
$2.07
- $18.44
0.027
- 0.206
1,530,279
0.333
11.42
1.90
16,414
562,575
Inferred
$2.07
- $18.44
0.027
- 0.206
516,799
0.303
7.99
1.69
5,033
132,847
Notes:
1. Mineral
resources based on metal prices of $3,100/ oz Au and $36.00/ oz Ag.
2. Cutoffs
are Income – Refining Cost = NSR.
3. Gold
Equivalent for Heap Leach = Cyanide Gold + 0.0019 x Total Silver Assay.
4. Gold
Equivalent for Mill + Pressure Oxidation = Fire Gold + 0.0107 x Total Silver Assay.
5. Numbers
may not match exactly due to rounding.
6. Mineral
resources are contained within a computer-generated optimized pit.
7. Total
material in that pit is 4.92 billion tonnes.
8. All
units on this table are metric: Ktonnes means 1,000 tonnes. Au and Ag grades are in grams
per tonne (g/tonne).
9. Mineral
resources are not mineral reserves, and detailed economic considerations have not been applied.
10. Modifying
factors for mine and process design have not been applied.
Contained
within the MRE at Hycroft are a series of high-grade silver veins at Brimstone and zones of higher silver concentrations in Vortex that
are associated with a low angle breccia body. The modeling process of these high-grade silver domains was described earlier in this section.
Those domains are contained within the MRE on Table 11-19 and Table 11-20. Table 11-21 to Table 11-23 are the tabulation of the gold
and silver within the domain volumes that are contained within the MRE in Table 11-19 and Table 11-20.
The
domains are in two areas of the deposit referred to as Brimstone and Vortex. The contained metal is illustrated at three different silver
cutoff grades. Specific mine plans have not been completed but it is envisioned that these domains could be either mined in an open pit
methodology and high-grade material could be comingled with lower-grade material from that specific pit. Or as an alternative, this material
could be potentially targeted for an underground mine methodology. Additional metallurgical process development may be required to validate
gold and silver recovery values in these specific areas.
Hycroft Mine Project
Page 146
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
11-21: High-grade Silver Bearing Domains, Contained within the MRE at 2 oz/ton Cutoff Grade, US customary Units
Classification
Cutoff Grade
Silver
(oz/ton)
Ktons
Gold
(oz/ton)
Silver
(oz/ton)
Sulfide
Sulfur (%)
Gold
Contained
oz x 1000
Silver
Contained
oz x 1000
Brimstone
Measured
2.00
3,195
0.011
8.35
1.33
35
26,686
Indicated
2.00
330
0.010
3.11
1.87
3
1,025
Meas
+ Ind
2.00
3,525
0.011
7.86
1.38
38
27,711
Inferred
2.00
15
0.008
3.52
1.13
0
52
Vortex
Measured
2.00
9,126
0.018
3.81
1.49
160
34,781
Indicated
2.00
7,342
0.014
3.78
1.24
100
27,726
Meas
+ Ind
2.00
16,468
0.016
3.80
1.38
261
62,507
Inferred
2.00
3,644
0.014
3.65
1.27
50
13,307
Brimstone
+ Vortex
Measured
2.00
12,322
0.016
4.99
1.45
195
61,467
Indicated
2.00
7,671
0.013
3.75
1.26
104
28,750
Meas
+ Ind
2.00
19,993
0.015
4.51
1.38
299
90,218
Inferred
2.00
3,659
0.014
3.65
1.27
51
13,359
Table
11-22: High-grade Silver Bearing Domains, Contained within the MRE at 3 oz/ton Cutoff Grade, US customary Units
Classification
Cutoff
Grade Silver
(oz/ton)
Ktons
Gold
(oz/ton)
Silver
(oz/ton)
Sulfide
Sulfur
(%)
Gold
Contained
oz x 1000
Silver
Contained
oz x 1000
Brimstone
Measured
3.00
1,841
0.010
12.75
1.25
19
23,476
Indicated
3.00
109
0.008
4.55
2.14
1
494
Meas
+ Ind
3.00
1,949
0.010
12.30
1.30
20
23,970
Inferred
3.00
10
0.009
4.13
1.23
0
40
Vortex
Measured
3.00
4,494
0.017
5.24
1.39
74
23,568
Indicated
3.00
3,899
0.014
4.98
1.16
54
19,416
Meas
+ Ind
3.00
8,393
0.015
5.12
1.28
128
42,984
Inferred
3.00
2,023
0.010
4.63
1.30
21
9,374
Brimstone
+ Vortex
Measured
3.00
6,335
0.015
7.43
1.35
93
47,045
Indicated
3.00
4,007
0.014
4.97
1.19
55
19,909
Meas
+ Ind
3.00
10,342
0.014
6.47
1.29
148
66,954
Inferred
3.00
2,032
0.010
4.63
1.30
21
9,414
Hycroft Mine Project
Page 147
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
11-23: High-grade Silver Bearing Domains, Contained within the MRE at 4 oz/ton Cutoff Grade, US customary Units
Classification
Cutoff
Grade Silver
(oz/ton)
Ktons
Gold
(oz/ton)
Silver
(oz/ton)
Sulfide
Sulfur
(%)
Gold
Contained
oz x 1000
Silver
Contained
oz x 1000
Brimstone
Measured
4.00
1,386
0.011
15.81
1.23
15
21,912
Indicated
4.00
61
0.007
5.39
2.10
0
331
Meas
+ Ind
4.00
1,447
0.010
15.37
1.27
15
22,243
Inferred
4.00
10
0.009
4.13
1.23
0
40
Vortex
Measured
4.00
2,679
0.017
6.48
1.37
46
17,350
Indicated
4.00
2,452
0.015
5.88
1.13
36
14,426
Meas
+ Ind
4.00
5,131
0.016
6.19
1.26
82
31,776
Inferred
4.00
1,326
0.010
5.26
1.26
13
6,969
Brimstone
+ Vortex
Measured
4.00
4,065
0.015
9.66
1.33
60
39,262
Indicated
4.00
2,513
0.015
5.87
1.15
37
14,757
Meas
+ Ind
4.00
6,578
0.015
8.21
1.26
97
54,019
Inferred
4.00
1,335
0.010
5.25
1.26
13
7,009
Table
11-24: High-grade Silver Bearing Domains, Contained within the MRE at 68.57 g/ton (2 oz/ton) Cutoff Grade, Metric Units
Classification
Cutoff
Grade Silver (g/tonne)
Ktonnes
Gold
(g/tonne)
Silver
(g/tonne)
Sulfide
Sulfur
(%)
Contained
Ounces
Gold
Oz x 1000
Silver
Oz x 1000
Brimstone
Measured
68.57
2,899
0.372
286.35
1.33
35
26,686
Indicated
68.57
299
0.332
106.62
1.87
3
1,025
Meas
+ Ind
68.57
3,198
0.368
269.54
1.38
38
27,711
Inferred
68.57
13
0.289
120.74
1.13
0
52
Vortex
Measured
68.57
8,279
0.603
130.67
1.49
160
34,781
Indicated
68.57
6,660
0.469
129.48
1.24
100
27,726
Meas
+ Ind
68.57
14,940
0.543
130.14
1.38
261
62,507
Inferred
68.57
3,306
0.475
125.20
1.27
50
13,307
Brimstone
+ Vortex
Measured
68.57
11,178
0.543
171.04
1.45
195
61,467
Indicated
68.57
6,959
0.463
128.49
1.26
104
28,750
Meas
+ Ind
68.57
18,137
0.512
154.71
1.38
299
90,218
Inferred
68.57
3,319
0.474
125.18
1.27
51
13,359
Table
11-25: High-grade Silver Bearing Domains, Contained within the MRE at 102.86 g/ton (3 oz/ton) Cutoff Grade, Metric Units
Classification
Cutoff
Grade Silver
(g/tonne)
Ktonnes
Gold
(g/tonne)
Silver
(g/tonne)
Sulfide
Sulfur
(%)
Contained
Ounces
Gold
Oz x 1000
Silver
Oz x 1000
Brimstone
Measured
102.86
1,670
0.353
437.24
1.25
19
23,476
Indicated
102.86
98
0.281
155.98
2.14
1
494
Meas
+ Ind
102.86
1,768
0.349
421.58
1.30
20
23,970
Inferred
102.86
9
0.297
141.73
1.23
0
40
Vortex
Measured
102.86
4,077
0.566
179.80
1.39
74
23,568
Indicated
102.86
3,537
0.477
170.74
1.16
54
19,416
Meas
+ Ind
102.86
7,614
0.525
175.59
1.28
128
42,984
Inferred
102.86
1,835
0.349
158.91
1.30
21
9,374
Brimstone
+ Vortex
Measured
102.86
5,747
0.504
254.61
1.35
93
47,045
Indicated
102.86
3,635
0.472
170.34
1.19
55
19,909
Meas
+ Ind
102.86
9,382
0.492
221.96
1.29
148
66,954
Inferred
102.86
1,844
0.348
158.82
1.30
21
9,414
Table
11-26: High-grade Silver Bearing Domains, Contained within the MRE at 137.14 g/t (4 oz/ton) Cutoff Grade, Metric Units
Classification
Cutoff Grade Silver
(g/tonne)
Ktonnes
Gold
(g/tonne)
Silver
(g/tonne)
Sulfide
Sulfur
(%)
Contained
Ounces
Gold
Oz x 1000
Silver
Oz x 1000
Brimstone
Measured
137.14
1,257
0.361
542.02
1.23
15
21,912
Indicated
137.14
56
0.244
184.93
2.10
0
331
Meas
+ Ind
137.14
1,313
0.357
526.88
1.27
15
22,243
Inferred
137.14
9
0.297
141.73
1.23
0
40
Vortex
Measured
137.14
2,430
0.587
222.07
1.37
46
17,350
Indicated
137.14
2,225
0.504
201.70
1.13
36
14,426
Meas
+ Ind
137.14
4,655
0.548
212.34
1.26
82
31,776
Inferred
137.14
1,203
0.338
180.23
1.26
13
6,969
Brimstone
+ Vortex
Measured
137.14
3,687
0.510
331.17
1.33
60
39,262
Indicated
137.14
2,280
0.498
201.29
1.15
37
14,757
Meas
+ Ind
137.14
5,968
0.505
281.55
1.26
97
54,019
Inferred
137.14
1,211
0.338
179.95
1.26
13
7,009
Hycroft Mine Project
Page 148
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
12 Mineral
Reserve
This
section is not relevant to the technical report summary.
13 Mining
Methods
13.1 Overview
Hycroft
is planned as a conventional hard rock open pit operation. IMC developed a mine plan that produces the required process feed and moves
sufficient mine waste to assure continued release of the mineralization. The mine plan is based on measured and indicated mineralization
that was estimated in the mineral resource block model described in Section 11.
Inferred
mineralization was not included within this initial assessment for two reasons: (1) there is sufficient measured and indicated mineralization
to feed the process plant for over 50 years, and (2) to reduce the changes in the mine schedule and potentially minable material as the
project moves toward a pre-feasibility study in the future.
The
mine will feed two processing facilities:
1. A
flotation mill followed by pressure oxidation and leaching of the concentrate, and
2. A
ROM heap leach for mineralization that is amenable to direct cyanide leaching.
The
mine production schedule is summarized on Figure 13-1 with tabular detail on Table 13-1.
The
cutoff grade for the schedule is based on income net of process:
● Income
net of process = Net Return after Refining – Process Costs
Calculation
of the cutoff using net of process allows for the use of a single parameter for cutoff grade across both process facilities. Details
of the development of the mine plan and schedule are reported later in this section.
Figure
13-1 illustrates the planned mine material movement by year for this initial assessment. Mill process, heap leach, and stockpiled mill
process material are shown along with the required waste movement. Total material per year starts with 11.3 Mtons/a in preproduction
and increases to 71.2 Mtons/a for years 1 through 3. Additional equipment is acquired later so that total material movement is increased
to 81.5 to 82.0 Mtons/a from year 5 to year 27. From year 28 until the end of the mine life, the total material movement reduces to around
70 Mtons/a (See Table 13-1).
The
material planned for milling and leaching on the production schedule is potentially minable material. They do not constitute mineral
reserves at this time.
Approximately
240 M tons of low-grade Mill Feed material is stockpiled throughout the mine life. This material is not fed to the mill and is not part
of the economic analysis in this report. Further trade-off studies will analyze the opportunity to feed this additional material through
the process plant to benefit from the additional revenue.
Hycroft Mine Project
Page 149
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
13- 1: Hycroft Initial Assessment Mine Plan Schedule
Source:
IMC, 2026
Hycroft Mine Project
Page 150
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
13-1: Hycroft Initial Assessment Mine Production Schedule, Measured and Indicated Mineralization
Year
Mill
Cutoff
Mill
Oxide
Leach, $0.01 Net of Process Cutoff
Transition
Leach, $0.01 Net of Process Cutoff
Low
Grd Mill Stkp, $0.01 Net of Process Cutoff
Waste
Total
Net
of Process ($/ton)
Ktons
Net
of Process ($/ton)
Fire
Gold (oz/t)
Silver
(oz/ton)
Sulfide
Sulfur (%)
Ktons
Net
of Process ($/ton)
Fire
Gold (oz/ton)
Silver
(oz/ton)
Cyanide
Ratio CnAu/FaAu
Sulfide
Sulfur (%)
Ktons
Net
of Process ($/ton)
Fire
Gold (oz/ton)
Silver
(oz/ton)
Cyanide
Ratio CnAu/FaAu
Sulfide
Sulfur (%)
Ktons
Net
of Process ($/ton)
Fire
Gold (oz/ton)
Silver
(oz/ton)
Sulfide
Sulfur (%)
Ktons
Ktons
Preprod
-
-
-
-
-
-
861
3.55
0.003
0.11
0.78
2.47
1,601
6.66
0.007
0.14
0.58
3.43
-
-
-
-
-
8,871
11,333
1
13.00
14,068
29.53
0.016
0.21
2.11
1,916
5.11
0.004
0.11
0.78
1.82
8,908
4.16
0.007
0.14
0.47
2.26
1,005
6.34
0.008
0.15
2.69
45,302
71,200
2
13.50
20,841
26.01
0.013
0.35
2.45
2,426
1.65
0.002
0.06
0.79
1.48
3,314
3.89
0.007
0.11
0.46
2.11
2,301
9.80
0.009
0.18
2.84
42,318
71,200
3
15.00
20,841
38.31
0.016
0.52
2.31
1,077
6.99
0.005
0.08
0.78
1.88
16,151
3.79
0.007
0.09
0.45
1.65
15,846
6.82
0.008
0.13
2.08
17,285
71,200
4
15.00
20,841
34.59
0.015
0.53
2.32
3,610
5.14
0.004
0.10
0.77
2.16
11,013
3.66
0.006
0.18
0.51
2.41
10,547
7.07
0.007
0.21
2.33
28,335
74,347
5
15.00
20,841
29.24
0.014
0.43
2.87
6,940
6.72
0.005
0.06
0.79
1.65
9,673
4.76
0.006
0.09
0.57
1.85
12,656
8.09
0.007
0.24
2.42
31,389
81,500
6
16.00
20,841
29.73
0.014
0.43
2.22
1,638
7.02
0.005
0.14
0.74
1.20
13,175
4.55
0.006
0.18
0.51
1.43
12,134
9.80
0.009
0.16
2.70
33,712
81,500
7
14.00
20,841
29.74
0.013
0.52
2.03
1,414
5.32
0.004
0.18
0.78
1.25
4,936
2.76
0.005
0.19
0.48
1.51
13,682
7.18
0.007
0.19
2.16
40,627
81,500
8
14.00
20,841
26.17
0.014
0.25
2.06
325
5.33
0.003
0.17
0.86
0.71
3,051
3.07
0.007
0.14
0.41
1.82
14,148
6.76
0.008
0.14
2.14
43,135
81,500
9
7.00
20,841
20.74
0.012
0.23
1.95
13
0.23
0.001
0.05
0.73
0.44
94
1.41
0.004
0.06
0.48
0.67
2,904
3.66
0.007
0.14
2.13
58,149
82,000
10
4.00
20,841
21.08
0.011
0.34
2.00
1,506
2.45
0.002
0.08
0.79
0.96
1,335
1.79
0.004
0.09
0.54
1.38
2,365
2.23
0.006
0.12
1.93
55,954
82,000
11
4.50
20,841
16.39
0.009
0.37
1.97
1,202
4.48
0.003
0.10
0.80
1.74
7,452
1.61
0.004
0.13
0.48
1.77
6,453
2.15
0.006
0.18
1.92
46,052
82,000
12
7.00
20,841
19.93
0.010
0.37
2.04
2,531
2.89
0.003
0.08
0.77
1.02
3,522
2.00
0.005
0.12
0.50
1.64
9,288
3.61
0.006
0.19
2.02
45,818
82,000
13
7.00
20,841
26.32
0.011
0.52
2.16
1,021
5.38
0.004
0.07
0.79
1.29
7,280
2.19
0.005
0.12
0.50
1.52
7,915
3.42
0.006
0.18
2.06
44,943
82,000
14
6.00
20,841
21.20
0.011
0.35
2.26
93
7.34
0.004
0.27
0.98
0.53
419
1.57
0.005
0.16
0.39
1.83
8,696
3.39
0.006
0.18
1.95
51,952
82,000
15
2.00
20,841
19.87
0.011
0.31
1.87
2,772
4.97
0.004
0.05
0.80
1.62
8,284
3.19
0.005
0.09
0.52
1.73
501
1.03
0.006
0.13
2.03
49,602
82,000
16
3.00
20,841
18.83
0.010
0.36
2.07
2,012
2.27
0.002
0.07
0.77
1.24
3,105
2.04
0.005
0.14
0.48
2.67
2,591
1.82
0.005
0.19
2.18
53,451
82,000
17
2.00
20,841
14.36
0.009
0.31
2.43
815
7.24
0.005
0.12
0.76
1.70
4,002
3.13
0.005
0.15
0.53
2.59
1,578
0.98
0.005
0.16
2.23
54,763
82,000
18
8.00
20,841
17.68
0.010
0.32
2.61
1,937
7.10
0.005
0.17
0.76
1.32
2,970
3.57
0.006
0.13
0.51
2.27
13,730
4.37
0.006
0.17
2.41
42,521
82,000
19
4.00
20,841
16.64
0.010
0.26
2.21
718
0.95
0.001
0.09
0.81
1.80
1,483
2.53
0.006
0.12
0.46
2.35
14,391
5.15
0.007
0.18
2.37
44,568
82,000
20
7.00
20,841
14.87
0.010
0.25
1.71
10
3.55
0.003
0.09
0.75
2.00
116
0.99
0.005
0.13
0.38
1.88
11,377
3.76
0.006
0.17
1.94
49,656
82,000
21
7.00
20,841
22.62
0.012
0.34
1.57
30
0.80
0.001
0.02
0.78
1.47
358
0.97
0.005
0.12
0.38
1.64
11,773
3.49
0.006
0.15
1.74
48,997
82,000
22
10.00
20,841
42.57
0.018
0.51
1.45
1,950
5.26
0.004
0.14
0.79
1.09
950
2.57
0.005
0.17
0.51
1.83
9,772
4.62
0.007
0.15
1.77
48,487
82,000
23
8.00
20,841
40.67
0.015
0.72
1.18
3,134
4.07
0.003
0.10
0.77
1.35
1,570
2.20
0.004
0.09
0.59
1.53
3,584
4.03
0.006
0.16
1.79
52,872
82,000
24
6.00
20,841
45.65
0.014
1.04
1.13
5,516
4.92
0.003
0.12
0.79
1.63
3,935
1.88
0.004
0.11
0.57
1.60
1,296
3.19
0.006
0.18
1.57
50,411
82,000
25
9.00
20,841
37.35
0.012
0.83
1.61
4,365
7.79
0.005
0.16
0.78
1.56
7,971
3.21
0.005
0.15
0.55
1.61
2,388
4.98
0.006
0.23
1.68
46,435
82,000
26
9.00
20,841
35.59
0.014
0.58
1.82
1,238
8.04
0.005
0.17
0.83
1.50
3,137
2.89
0.005
0.16
0.49
1.64
2,289
4.85
0.007
0.15
1.77
54,496
82,000
27
8.00
20,841
33.84
0.010
0.90
1.65
1,413
4.51
0.003
0.17
0.80
1.69
2,502
2.50
0.005
0.15
0.53
2.15
7,190
3.96
0.007
0.14
1.55
50,053
82,000
28
4.00
20,841
36.85
0.009
1.13
1.74
581
8.49
0.005
0.13
0.81
1.28
445
1.31
0.005
0.13
0.40
1.91
3,838
2.03
0.006
0.16
1.54
48,295
74,000
29
4.00
20,841
17.78
0.010
0.32
2.02
74
9.49
0.006
0.10
0.78
3.07
1,229
3.02
0.005
0.10
0.56
1.95
3,722
1.96
0.006
0.16
1.93
48,134
74,000
30
2.50
20,841
15.38
0.010
0.20
1.90
5
15.73
0.010
0.26
0.74
1.83
204
1.37
0.004
0.09
0.47
2.51
2,223
1.29
0.006
0.12
1.96
50,727
74,000
31
2.50
20,841
17.31
0.011
0.18
1.92
1,121
6.15
0.004
0.06
0.84
2.01
489
3.73
0.005
0.05
0.59
2.04
1,491
1.28
0.006
0.14
2.09
50,059
74,000
Hycroft Mine Project
Page 151
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Year
Mill
Cutoff
Mill
Oxide
Leach, $0.01 Net of Process Cutoff
Transition
Leach, $0.01 Net of Process Cutoff
Low
Grd Mill Stkp, $0.01 Net of Process Cutoff
Waste
Total
Net
of Process ($/ton)
Ktons
Net
of Process ($/ton)
Fire
Gold (oz/t)
Silver
(oz/ton)
Sulfide
Sulfur (%)
Ktons
Net
of Process ($/ton)
Fire
Gold (oz/ton)
Silver
(oz/ton)
Cyanide
Ratio CnAu/FaAu
Sulfide
Sulfur (%)
Ktons
Net
of Process ($/ton)
Fire
Gold (oz/ton)
Silver
(oz/ton)
Cyanide
Ratio CnAu/FaAu
Sulfide
Sulfur (%)
Ktons
Net
of Process ($/ton)
Fire
Gold (oz/ton)
Silver
(oz/ton)
Sulfide
Sulfur (%)
Ktons
Ktons
32
2.50
20,841
15.24
0.011
0.16
1.89
727
2.96
0.002
0.11
0.88
1.15
149
1.23
0.004
0.14
0.54
0.56
1,061
1.40
0.006
0.12
2.01
53,222
76,000
33
2.50
20,841
14.60
0.011
0.16
1.85
460
1.63
0.002
0.13
0.78
0.39
274
0.83
0.003
0.20
0.55
0.49
801
1.35
0.006
0.11
1.81
53,624
76,000
34
2.50
20,841
16.42
0.011
0.19
1.84
9
5.21
0.004
0.20
0.74
1.09
978
1.25
0.004
0.17
0.48
0.76
677
1.42
0.006
0.11
2.24
53,495
76,000
35
2.50
20,841
16.78
0.011
0.19
1.98
48
7.42
0.005
0.13
0.74
1.80
574
1.52
0.004
0.16
0.47
1.14
593
1.48
0.006
0.14
2.33
53,944
76,000
36
2.50
20,841
15.29
0.009
0.30
1.74
1,228
6.86
0.005
0.06
0.78
1.32
6,408
2.58
0.005
0.13
0.52
1.47
747
1.38
0.006
0.15
1.73
46,775
76,000
37
2.50
20,841
26.91
0.012
0.47
2.36
168
6.08
0.004
0.14
0.91
1.07
238
1.49
0.005
0.13
0.43
1.40
1,560
1.35
0.005
0.17
1.98
51,192
74,000
38
2.50
20,841
24.95
0.011
0.53
2.34
229
12.00
0.007
0.13
0.76
1.20
1,354
3.55
0.006
0.11
0.49
1.62
1,510
1.31
0.005
0.17
1.82
46,566
70,500
39
2.50
20,841
25.43
0.012
0.47
1.82
531
4.33
0.003
0.13
0.74
2.06
454
2.03
0.004
0.15
0.57
1.73
1,503
1.26
0.005
0.16
1.67
47,171
70,500
40
2.50
20,841
26.65
0.010
0.69
1.47
998
4.54
0.003
0.16
0.74
1.70
942
3.56
0.006
0.11
0.53
1.90
2,003
1.24
0.006
0.14
1.71
45,715
70,500
41
2.50
20,841
34.50
0.011
0.85
1.54
675
2.46
0.002
0.14
0.74
1.89
937
2.43
0.004
0.13
0.57
1.81
1,486
1.23
0.005
0.16
1.50
46,561
70,500
42
2.50
20,841
17.02
0.010
0.28
1.78
687
0.65
0.001
0.14
0.95
2.20
862
2.57
0.005
0.12
0.46
2.26
1,643
1.24
0.005
0.17
1.85
46,467
70,500
43
2.50
20,841
15.02
0.011
0.16
1.84
18
4.22
0.003
0.08
0.94
2.40
48
2.63
0.005
0.08
0.51
2.36
1,751
1.35
0.006
0.09
2.05
47,842
70,500
44
2.50
20,841
14.66
0.011
0.16
1.92
192
0.41
0.001
0.06
0.99
2.21
59
2.02
0.005
0.13
0.41
2.00
1,402
1.39
0.006
0.12
1.90
48,006
70,500
45
2.50
20,841
13.15
0.010
0.14
2.21
368
0.52
0.001
0.06
0.99
1.67
211
2.26
0.006
0.05
0.42
2.28
2,141
1.34
0.006
0.09
2.00
47,038
70,600
46
2.50
20,841
12.76
0.010
0.14
1.91
34
3.72
0.002
0.06
0.96
1.79
317
1.89
0.005
0.11
0.50
1.96
1,910
1.34
0.006
0.11
1.84
47,498
70,600
47
2.50
20,841
19.28
0.011
0.29
1.83
117
0.91
0.001
0.08
0.98
1.32
153
2.36
0.005
0.12
0.54
2.00
1,893
1.21
0.006
0.13
1.84
49,370
72,374
48
2.50
20,841
24.54
0.012
0.41
1.78
15
43.38
0.019
0.19
1.00
2.24
309
2.24
0.005
0.10
0.45
2.20
1,030
1.32
0.006
0.13
1.96
33,556
55,750
49
2.50
20,841
23.81
0.011
0.42
1.65
-
-
-
-
-
-
114
1.13
0.005
0.15
0.36
2.34
749
1.30
0.006
0.14
1.76
33,706
55,409
50
2.50
20,841
35.11
0.011
0.89
1.33
-
-
-
-
-
-
102
1.81
0.005
0.17
0.40
1.06
737
1.45
0.005
0.18
1.38
19,302
40,982
51
2.50
11,008
42.99
0.011
1.16
1.13
-
-
-
-
-
-
86
0.55
0.004
0.22
0.33
1.20
964
1.15
0.005
0.22
1.15
12,300
24,358
Total
-
1,046,284
24.34
0.012
0.43
1.93
60,768
5.11
0.004
0.12
-
1.55
149,242
3.25
0.006
0.14
-
1.83
239,839
4.76
0.007
0.16
2.08
2,320,719
3,816,853
Hycroft Mine Project
Page 152
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
13.2 Geotechnical
and Hydrologic Information
Slope
angles for the mine plan were recommended by Call & Nicholas, Inc. (CNI) during February of 2022 with additional documentation in
October of 2023. Inter-ramp slope angles range from 25 to 45 degrees depending on the rock type, alteration, and pit geometry. IMC has
reviewed this work and has accepted the slope angle recommendations for use in the development of this mine plan.
13.3 Phase
Design
The
final pit and phase designs were based on computer generated Lerch-Grossman (LG) pits that were generated at a range of metal prices.
The input parameters for the LG pits were summarized on Table 11-18. There was one modification to the MRE pit parameters on Table 11-18
when applied to the mine plan. The mine plan LG pits targeted measured and indicated class mineralization only. Inferred was treated
as waste in the mine planning process.
Multiple
nested LG pits were generated to assist in establishing the final pit and the best overall extraction sequence. The metal prices for
design were $$3,100/oz gold and $36.00/oz silver. Those prices were reduced in increments by the price ratios shown in Table 13-2. Table
13-2 and Figure 13-2 summarize the results of the nested LG runs in both tabular and graphic form. All cones on the table were tabulated
at the design metal prices of $3,100/oz Au, and $36/oz Ag.
Table
13-2 and Figure 13-2 indicate that the financial benefit of increasing the pit size beyond the 85% price ratio was marginal. As a result,
the 85% pit was used as the target for final pit design. The 85% pit is highlighted on the table and illustrated on the graph. Additional
check pits were developed with bench discounting applied. The impact of the bench discounting was minor.
Based
on the pit geometries of the nested LG pits, a series of 19 phase designs were generated for input into the mine plan. Those phase designs
followed the extraction sequence suggested by the LG pit runs. Phase designs utilized the inter-ramp slope designs on combined with the
following design parameters:
●
Road Width
125 ft
●
Maximum
Road Gradient
10%
●
Minimum
Mining Width
300
ft
Table
13-3 summarizes the contained tonnage in each phase at the internal cutoff grade.
Figure
13-3 illustrates the extraction sequence of the phases.
The
phases were ranked economically based on the profit per ton ore and the cost per equivalent ounce gold to set the phase extraction sequence.
That ranking was adjusted as required to accommodate the practical extraction sequence.
At
any point in time, the Mine will be a combination of three to four phase designs operating simultaneously.
Hycroft Mine Project
Page 153
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
13-2: Summary of Lerch-Grossman Computer Pit Generation
Au
Price
($)
Price
Ratio
Mill
Process
Leach
Process
Waste
(Ktons)
Total
(Ktons)
Ktons
Net
of Process ($/ton)
Fire
Gold (oz/ton)
Total
Silver (oz/ton)
Ktons
Net
of Process ($/ton)
Fire
Gold (oz/ton)
Total
Silver (oz/ton)
310
10%
1,097
151.36
0.029
3.50
206
8.14
0.008
0.08
334
1,637
465
15%
1,748
126.65
0.025
2.97
434
13.51
0.010
0.08
553
2,735
620
20%
2,573
106.48
0.025
2.20
562
13.34
0.010
0.08
742
3,877
775
25%
4,938
76.85
0.021
1.49
1,298
10.59
0.008
0.08
1,713
7,949
930
30%
8,372
62.48
0.019
1.11
2,027
10.04
0.008
0.10
3,171
13,570
1,085
35%
13,659
52.02
0.018
0.85
4,024
7.59
0.007
0.10
5,490
23,173
1,240
40%
27,258
43.00
0.016
0.67
7,829
6.00
0.006
0.10
13,563
48,650
1,395
45%
85,969
34.89
0.014
0.59
28,356
4.66
0.005
0.11
75,539
189,864
1,550
50%
144,389
30.29
0.013
0.51
38,746
4.39
0.005
0.11
108,094
291,228
1,581
51%
169,775
29.58
0.013
0.50
52,508
4.23
0.005
0.11
140,786
363,070
1,612
52%
175,867
29.33
0.013
0.50
53,945
4.23
0.005
0.11
146,644
376,455
1,643
53%
186,969
28.78
0.013
0.48
55,680
4.22
0.005
0.11
153,832
396,480
1,674
54%
588,778
23.31
0.011
0.43
84,161
3.72
0.004
0.11
673,438
1,346,377
1,705
55%
598,930
23.30
0.011
0.43
85,077
3.72
0.004
0.11
687,143
1,371,150
1,860
60%
776,490
23.03
0.011
0.44
114,870
3.73
0.004
0.11
1,001,378
1,892,739
2,015
65%
906,288
22.30
0.011
0.41
124,912
3.75
0.004
0.11
1,182,421
2,213,621
2,170
70%
1,059,314
21.51
0.011
0.39
141,087
3.93
0.005
0.11
1,446,359
2,646,760
2,325
75%
1,155,463
21.19
0.011
0.39
154,053
3.89
0.005
0.10
1,668,707
2,978,222
2,480
80%
1,252,532
20.91
0.011
0.38
164,321
3.84
0.005
0.10
1,976,220
3,393,073
2,635
85%
1,305,935
20.75
0.011
0.38
170,142
3.81
0.005
0.10
2,180,037
3,656,113
2,790
90%
1,343,023
20.63
0.011
0.38
175,053
3.79
0.005
0.10
2,333,196
3,851,272
2,945
95%
1,368,413
20.47
0.011
0.38
177,864
3.77
0.005
0.10
2,411,860
3,958,138
3,100
100%
1,388,947
20.35
0.011
0.37
180,494
3.75
0.005
0.10
2,492,069
4,061,510
Note:
1. All
Cutoff grades on this table are Internal Cutoff, Net of Process >= $0.01/ton
Hycroft Mine Project
Page 154
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
13-2: Summary of Lerch-Grossman Computer Pit Generation
Source:
IMC, 2026
Table
13-3 : Contained Tonnage by Internal Cutoff Grade
Extraction
Sequence
Area
Mill
Process Material
Heap
Leach Process Material
Waste
Total
Ktons
NPR
$/ton
Au
oz/ton
Ag
oz/ton
Ktons
NPR
$/ton
Au
oz/ton
Ag
oz/ton
Ktons
Ktons
1
Central
60,039
$22.39
0.012
0.30
4,079
$3.22
0.004
0.09
28,382
92,500
2
Brimstone
42,823
$24.93
0.012
0.43
5,414
$3.36
0.004
0.12
13,300
61,537
3
Bay
18,696
$24.06
0.015
0.13
2,891
$4.51
0.006
0.06
28,538
50,124
4
Brimstone
82,264
$17.71
0.010
0.34
14,222
$2.84
0.004
0.10
83,534
180,019
5
Bay
20,041
$16.31
0.012
0.09
6,700
$3.71
0.006
0.05
10,958
37,700
6
Bay
20,865
$18.98
0.012
0.07
18,176
$5.42
0.005
0.06
44,313
83,354
7
Camel
20,685
$25.19
0.010
0.60
5,956
$3.13
0.004
0.12
28,896
55,537
8
Camel
61,954
$18.62
0.011
0.24
3,445
$3.20
0.004
0.15
48,563
113,962
9
Brimstone/Vortex
75,566
$13.91
0.009
0.32
11,122
$2.15
0.004
0.11
189,237
275,925
10
Brimstone
68,101
$15.53
0.009
0.32
12,788
$2.45
0.004
0.09
118,884
199,773
11
Vortex
226,663
$21.96
0.011
0.43
12,684
$3.23
0.004
0.12
260,253
499,600
12
Central
26,092
$21.62
0.012
0.32
11,040
$3.69
0.005
0.08
82,325
119,457
13
Brimstone
73,941
$32.58
0.011
0.78
27,927
$4.18
0.004
0.12
192,274
294,142
14
Camel
124,473
$15.09
0.011
0.16
7,928
$5.03
0.005
0.12
192,700
325,101
15
Vortex
107,980
$27.15
0.011
0.60
3,594
$1.66
0.003
0.14
297,178
408,753
16
Brimstone
59,873
$15.69
0.009
0.32
5,066
$3.23
0.004
0.14
153,301
218,239
17
Central
14,018
$11.57
0.007
0.36
9,674
$3.76
0.005
0.12
24,596
48,288
18
Camel
118,762
$13.56
0.010
0.17
1,025
$1.31
0.003
0.06
216,108
335,895
19
Vortex
103,387
$25.44
0.011
0.55
5,919
$2.79
0.004
0.12
307,381
416,686
Hycroft Mine Project
Page 155
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
13-3: Phase Schematic and Extraction Sequence
Source:
IMC, 2026
Hycroft Mine Project
Page 156
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
13.4 Production
Schedule
The
Mine production schedule was developed after completing a number of iterations. The goals of the production schedule were as follows:
1. Assure
practical and operational mine geometries.
2. Select
a total material rate that assured ore release and provided for efficient use of mine capital
equipment.
3. Maximize
the project net present value (NPV) by adjusting mine cutoff grades and total material movement.
Table
13-1 presents the mine production schedule for the LOM plan. The cutoff grade to the mill process was adjusted annually to maximize the
NPV of the mine production schedule by producing higher grade and consequently more metal in the early years of the mine life. The elevated
mill feed cutoff resulted in low grade potential sulfide feed being sent to a low-grade mill stockpile.
Each
block in the model was evaluated for its net benefit by both heap leach and mill processing. Mill cutoff grades were applied to the mill
net of process only. During each year, blocks that were not routed to the mill were evaluated to see if they had sufficient heap leach
benefit to provide positive economic benefit on the heap leach pad. Those blocks were re-routed to the heap leach pad. Low grade sulfide
mill feed material was stockpiled for eventual re-mining to the mill after the pit was exhausted. Re-mining and processing of the stockpile
should consider the potential for loss of process recovery due to exposure to weathering for an extended period of time. Re-mining and
processing of the stockpile is not part of the economic model in this study.
Figure
13-4 and Figure 13-5 illustrate the approximate recovered metal produced over the life of the open pit. The benefit of the elevated cutoff
grades in the initial years can be observed with the higher level of gold production in the early years of the mine life. The relative
metal contribution of the heap leach compared to the mill is also evident in the graphs. Figure 13-6 illustrates the approximate recovered
equivalent gold based on metal prices of $3,100 oz Au, and $36/oz Ag.
Figure
13-7 through Figure 13-17 illustrate the mine and waste storage plan. At any point in time, three to four phases are active to release
the process feed, to sustain a consistent total material movement.
Waste
is delivered to the large storage facility located west and south of the mine. Once areas of the mine are complete, in-pit backfill is
utilized for waste storage. The heap leach process material is planned to be delivered to the Brimstone or Jungo heap leach pads located
north of the mine. Low grade sulfide stockpile material is hauled to an area west of the Brimstone and Jungo heap leach pads. Mill process
material is hauled to the primary crusher located just west of the Brimstone heap leach facility.
Hycroft Mine Project
Page 157
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
13-4: Approximate Recovered Gold by Year
Source:
IMC, 2026
Figure
13-5: Approximate Recovered Silver by Year
Source:
IMC, 2026
Hycroft Mine Project
Page 158
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
13-6: Approximate Recovered Equivalent Gold Ounces by Year Based on $3,100/oz Au and $36/oz Ag
Source:
IMC, 2026
Hycroft Mine Project
Page 159
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
13-7: Mine and Waste Storage Plan – Pre-production
Source:
IMC, 2026
Hycroft Mine Project
Page 160
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
13-8: Mine and Waste Storage Plan - End of Year 1
Source:
IMC, 2026
Hycroft Mine Project
Page 161
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
13-9: Mine and Waste Storage Plan – End of Year 2
Source:
IMC, 2026
Hycroft Mine Project
Page 162
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
13-10: Mine and Waste Storage Plan - End of Year 3
Source :
IMC, 2026
Hycroft Mine Project
Page 163
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
13-11: Mine and Waste Storage Plan - End of Year 4
Source:
IMC, 2026
Hycroft Mine Project
Page 164
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
13-12: Mine and Waste Storage Plan – End of Year 5
Source:
IMC, 2026
Hycroft Mine Project
Page 165
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
13-13: Mine and Waste Storage Plan – End of Year 10
Source:
IMC, 2026
Hycroft Mine Project
Page 166
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
13-14: Mine and Waste Storage Plan – End of Year 20
Source:
IMC, 2026
Hycroft Mine Project
Page 167
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
13-15: Mine and Waste Storage Plan – End of Year 30
Source
IMC, 2026
Hycroft Mine Project
Page 168
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
13-16: Mine and Waste Storage Plan – End of Year 40
Source
IMC, 2026
Hycroft Mine Project
Page 169
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
13-17: Mine and Waste Storage Plan – End of Year 51
Source
IMC, 2026
Hycroft Mine Project
Page 170
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
13.5 Mining
Equipment
Mine
equipment was selected for the project under the assumption that Hycroft would own the equipment and operate the mine. Contract mining
has not been considered for this initial assessment. Table 13-4 summarizes the major mine equipment list.
Mine
equipment for this study has been assumed to be diesel powered, negating the requirement for a pit electrical power distribution system.
Mechanical availability has been assumed to be 85% with 95% use of that availability. The mine is assumed to operate year-round on a
two-shift-per-day, 12-hour shift schedule requiring a four-crew rotation system. IMC has assumed that 10 shifts per year will be lost
due to weather or other delays, so that there are 720 planned operating shifts per year. Standard inefficiencies are incorporated into
each shift, such that equipment cycles operate for 550 minutes per shift (11 hours at 50 minutes per hour).
Mine
equipment requirements for drilling and loading equipment were estimated based on typical production rates and Hycroft average
material densities. The rock and alternation types at Hycroft cover a broad range of mechanical properties from relatively soft to
competent. IMC selected rotary blast hole drills with 70,000 LBF pull down and 10 ⅝ inches (”) bits. Four drills
of that type will be required, which matches the typical number of operating pushbacks.
Two
types of loading equipment have been selected: (1) 44.5 yd3 hydraulic front shovels, and (2) 30 yd3 front end loaders.
Two shovels and two loaders are required. The four loading units match the typical number of operating pushbacks, and the front-end loaders
provide the flexibility to adjust production rates between pushbacks as required.
Haul
trucks were sized at 250-ton units to provide a good match to the loading units. Haul profiles were measured for each material type to
each destination annually for each of the first 10 years of the mine plan. After year 10, five-year increments were used for haul profile
measurements. Truck haul time was calculated over each profile using haul time simulation. Fixed times were added for loading under the
shovel or loader and for maneuvering and dumping at the crusher, stockpile, leach pad, or waste storage.
In
addition to the above units, a substantial fleet of auxiliary equipment is provided to maintain the mine in good working order.
● A
total of five track dozers of the D9 class are provided to complete pioneering, position
material on the dumps, leach pads, and stockpiles, and assist with in-pit drop cuts.
● A
total of four-wheel dozers of the Cat 834 class are provided to help maintain the roads and
support the loading equipment. One wheel dozer is matched to each set of drills and loading
units.
● A
total of three graders with 16 ft moldboards is provided for haul road maintenance.
● A
total of three water trucks on 100-ton truck frames is provided to maintain air quality with
dust control.
● A
15 yd front loader and three 100-ton trucks are provided as auxiliary support units.
They will assist with pioneering, road construction, and other minor material movement tasks
around the mine.
Hycroft Mine Project
Page 171
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
A
support drill is provided for secondary and special blasting, and a backhoe is provided for trenching, drainage, and utility line movement
in the mine area.
In
addition, a significant fleet of minor equipment is provided including blast hole stemmers, flatbed trucks, Ammonium Nitrate Fuel Oil
Mix (ANFO) slurry trucks, lube and fuel trucks, crane trucks, tire handler, mechanics trucks, welders trucks, forklifts, man vans, pickup
trucks, light plants, and a tractor and lowboy to assist with drill moves. A mine dispatch system is included as are a prill silo and
powder magazine.
Table
13-4: Major Mine Equipment
Mine
Major Equipment Fleet on Hand
Equipment
Type
-1
1
2
3
4
5
6
7
8
9
10
11-15
16-20
21-25
26-30
31-35
36-40
41-45
46-51
70,000
Pull Dn Drill, 10 ⅝”
1
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
3
Hydralic
Shovel, 44.5 yd3
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
30
yd3 Loader (Cat 994)
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
250
Ton Haul Truck
6
18
21
21
21
25
25
25
25
27
27
27
28
32
28
27
26
26
29
Track
Dozer, D9 Class
3
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
4
Wheel
Dozer, Cat 834 Class
2
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
3
Grader
16 ft Moldboard
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
100
Ton Water Truck (Cat777 Frame)
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
Cat
992 Wheel Loader
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
100
Ton Aux Truck
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
2
Support
Rock Drill
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Cat
330 Excavator
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total
26
46
49
49
49
52
52
52
54
56
56
56
56
61
58
56
56
54
54
13.6
Mine Manpower Requirements
Mine
hourly manpower was estimated to operate and maintain the mine equipment listed in the previous sub-section. The four-crew rotation was
incorporated when calculating manpower requirements.
Hycroft Mine Project
Page 172
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
13-5 summarizes the mine hourly personnel required to operate and maintain the mine.
Table
13-5: Mine Hourly Personnel
Job
Title
Annual
Cost
Years
Prep
1
2
3
4
5
6
7
8
9
10
11-15
16-20
21-25
26-30
31-35
36-40
41-45
46-51
Mine
Operations
Drill
Operator
127,738
2
11
11
11
12
13
13
13
13
13
13
13
13
13
12
12
11
11
9
Shovel
Operator
136,628
1
5
5
5
6
6
6
6
6
6
6
6
6
6
6
6
5
5
4
Loader
Operator
136,628
1
5
5
5
6
6
6
6
6
6
6
6
6
6
6
6
6
5
5
Haul
Truck Driver
118,638
10
56
65
58
68
79
75
73
80
85
72
86
88
104
86
70
77
82
91
Track
Dozer Operator
118,638
5
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
13
Tire
Dozer Operator
118,638
4
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
10
Grader
Operator
118,638
6
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
Service
Crew
118,638
16
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
21
Blasting
Crew
124,705
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
Dispatch
Operator
124,705
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
Laborer
98,418
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
Operations
Total
-
69
163
172
165
178
190
186
184
191
196
183
197
199
215
196
180
185
189
189
Mine
Maintenance
Mechanic
136,837
7
22
23
22
24
26
25
25
26
27
25
27
28
30
27
25
26
27
27
Mechanic's
Helper
127,772
8
27
28
27
29
31
30
30
31
33
30
33
33
36
33
30
31
32
32
Welder
127,772
3
10
11
10
11
12
12
11
12
12
12
12
13
14
12
12
12
12
12
Electrician
127,772
1
1
2
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Fuel
and Lube Maintenance
118,638
4
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
Tire
Maintenance
118,638
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Laborer
98,418
2
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
Maintenance
Total
-
26
74
78
74
80
85
83
82
85
88
83
88
90
96
88
83
85
87
87
VS&A
at 10%
-
10
24
25
24
26
28
27
27
28
28
27
29
29
31
28
26
27
28
28
Total
Labor Requirement
-
105
261
275
263
284
303
296
293
304
312
293
314
318
342
312
289
297
304
304
Maintenance/Operations
Ratio
-
0.38
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.46
0.46
0.46
0.46
Note:
1. Service Crew operates Rock Drill, Excavators, Water Truck, etc.
Hycroft Mine Project
Page 173
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
13-6 summaries the mine salaried staff to provide engineering, supervision, and geology functions. The list includes those salaried personnel
directly related to the Mine and does not include overall site wide supervision, processing, or logistics support.
Table
13-6: Mine Salaried Staff
Job
Title
Annual
Cost (US$)
Number
Mine
Operations
Mine
Superintendent
227,241
1
General
Foreman
200,447
1
Mine
Shift Supervisor
150,766
4
Drill
and Blast Supervisor
150,766
1
Mine
Clerk
89,944
1
Mine
Trainer
144,712
1
Mine
Operations Total
-
9
Mine
Maintenance
Maint.
Superintendent
255,942
1
Maint.
General Foreman
189,455
1
Maint.
Shift Supervisor
150,766
4
Maintenance
Planner
160,353
1
Maintenance
Trainer
144,712
1
Maintenance
Clerk
89,944
1
Mine
Maintenance Total
-
9
Mine
Engineering
Supervising
Mine Engineer
231,620
1
Senior
Mining Engineer
178,689
1
Mine
Engineer
149,969
1
Sr.
Surveyor
154,358
1
Surveyor
Helper
109,795
2
Clerk
89,944
1
Mine
Engineering Total
-
7
Mine
Geology
Senior
Mine Geologist
202,449
1
Mine
Geologist
166,246
1
Sr
Geotechnical Engineer
166,246
1
Geotechnical
Engineer
101,096
1
Sampler
109,795
8
Mine
Geology Total
-
12
Total
Personnel
-
37
Note:
Annual Cost includes Fringe Benefits
Hycroft Mine Project
Page 174
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
14
Processing and Recovery Methods
14.1 Overview
Hycroft
has an established operating history utilizing heap leach processing and has previously produced gold and silver through heap leach operation.
The proposed processing strategy continues to build upon this demonstrated operating approach and existing site infrastructure to support
project development. Oxide material and transition material will continue to be processed using heap leach and will be stacked on engineering
heap leach pads and irrigated with cyanide solution to recover gold and silver. Pregnant leach solution generated from the heap leach
operation will be collected and processed through the existing Merrill-Crowe recovery circuit and associated process facilities. Transition
material is included in the heap leach processing strategy where supported by the current assumption adopted for the economic assessment.
However, uncertainty remains regarding transition material heap leach performance due to limited dedicated metallurgical testwork. Additional
transition material heap leach testing is recommended during the next study phase to improve confidence in recovery assumptions, leach
kinetics, reagent consumption, and permeability characteristics.
As
discussed in Section 10, a significant portion of the gold in the Hycroft mineralized material is refractory due to its association with
pyrite, marcasite, and other sulfide minerals. A process flowsheet was developed to treat sulfide mineralized material. These materials
are ground and floated to produce a concentrate. The concentrate is then oxidized in the POX plant and subsequently cyanide leached to
extract gold and silver.
The
key Project plant design criteria are as follows:
● Major
equipment is designed for a nominal throughput of 57,100 ton/d.
● The
existing crushing circuit consists of primary, secondary, and tertiary crushing, supported
by a coarse ore stockpile and a crushed ore stockpile with dedicated feeders to provide continuous
feed to the downstream process plant.
● Process
flowsheets include three stages of crushing followed by two stages of ball milling, flotation,
POX, a cyanide leaching circuit for oxidized flotation concentrate, Merrill-Crowe circuit,
and tailings handling facilities, with an overall availability of 92%, given:
○ design
head grades of 0.015 oz/ton Au, 0.41 oz/ton Ag, and 2.41% sulfide sulfur, and
○ overall
process recovery of 82.8% gold and 77.5% silver, given the LOM average grades.
Pregnant
solution from the cyanide leach circuit will be processed in the existing Merrill-Crowe zinc cementation facilities.
Hycroft Mine Project
Page 175
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
recovery rates used in the process plant design and financial model are based on the testwork results provided in Section 10. These results
may be updated as further work is done as the project advances.
14.2
Process Flowsheet
Figure
14-1 presents an overall process flow diagram depicting the proposed major unit operations for the refractory mineralized materials.
Figure
14-1: Sulfide Sulfur Process Plant Flowsheet
Source:
Ausenco, 2026
Hycroft Mine Project
Page 176
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
existing crushing plant will process the ROM material using three stages of crushing to reduce the feed from a nominal top size of 35”
to a product size with a P80 of 0.6”. The grinding circuit will consist of a two-stage ball milling configuration.
Each stage of ball mills will operate in closed circuits with hydrocyclones. The cyclone overflow from second stage will be directed
to a rougher flotation circuit to recover the gold and silver in a flotation concentrate.
Rougher
flotation tailings will be thickened in a tailings thickener prior to transfer to the final tailings pump box.
The
flotation concentrate will be oxidized in autoclaves at a temperature of 428 °F and a pressure of 454 psi, with a residence time
of 60 minutes. The discharge from each autoclave will pass through two flash vessels, where heat will be released, cooling the slurry
to approximately 220 °F. The slurry will then be pumped to the hot cure circuit, where the slurry temperature will be maintained
between 195 °F and 220 °F for 10 hours to dissolve basic ferric sulfate (BFS) formed during the pressure oxidation process.
Following
hot curing, the process will separate the base metal rich acidic liquors from the oxidized solids. This separation will be achieved using
a three-stage CCD wash thickener circuit, removing more than 98% of the sulfuric acid and the dissolved metal sulfates. The washed, thickened
slurry will then be contacted with steam from the autoclave flash vessels to heat the slurry to approximately 203 °F ahead of a four-stage
lime boil circuit. The addition of milk of lime will raise the slurry pH to 10.5, decomposing silver jarosites and enabling silver recovery
in the downstream leach circuit. Following the lime boil circuit, the slurry will be cooled to approximately 108 °F in cooling towers
and pumped to the leach circuit.
The
lime addition in the lime boil circuit will provide sufficient protective alkalinity for the leach circuit, and no further lime addition
will be required during leaching.
The
acidic overflow from CCD thickener No. 1 will be pumped to the autoclave plant to quench flash steam. The quench vessel underflow will
be treated with limestone slurry in the solution neutralization circuit to remove ferric iron. Neutralization will be carried out in
six mechanically agitated neutralization tanks operating in series, with limestone slurry added to the first four neutralization tanks
and milk of lime added to the final two neutralization tanks precipitating remaining metal sulfates. The neutralized slurry will be dewatered
in a high-rate neutralization thickener. Thickener underflow (sludge) will be pumped to the final tailings pump box and deposited in
the TMF, while thickener overflow will be cooled to approximately 108°F in cooling towers and pumped to POX wash and cooling
water tank and process water tank.
The
oxidized flotation concentrate will be leached in stirred tanks using a cyanide solution to dissolve gold and silver. Discharge slurry
from the leach circuit will be washed in a four-stage CCD circuit. The overflow from the CCD thickener No. 1 will constitute pregnant
solution, which will be deaerated and treated in the existing Merrill- Crowe zinc cementation circuit to precipitate gold and silver.
The resulting precious metals precipitate will be filtered and then smelted on site to produce gold–silver doré bars.
Hycroft Mine Project
Page 177
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Underflow
slurry from the fourth wash thickener will be treated with sulfur dioxide (added as sodium metabisulphite) and oxygen in a series of
agitated tanks to detoxify residual cyanide in the leach residue. Following cyanide destruction, the detoxified tailings will be combined
with rougher flotation tailings and pumped to the TMF for impoundment.
14.3
Plant Design
The
key process design criteria listed in Table 14-1 form the basis of the process flowsheet design and selection of mechanical
equipment. The major process equipment is presented in Table 14-2.
Table
14-1: Process Design Criteria
Parameter
Unit
Value
Plant
Throughput
ton/day
57,100
Head
Grade–design
oz/ton
Au
0.015
oz/ton
Ag
0.410
Sulfide
sulfur, %
2.41
Overall
Recovery (From mineralized material to doré)–Au
%
82.8
Overall
Recovery (From mineralized material to doré)–Ag
%
77.5
Plant
Availability
%
92
Bond
Crusher Work Index–design (75th percentile)
kWh/ton
17.9
Bond
Ball Mill Work Index–design (75th percentile)
kWh/ton
19.0
Abrasion
Index (average)
g
0.430
Flotation
Concentrate Mass Pull – design
%
22
Rougher
Flotation Residence Time
Min
48
POX
Sulfide Oxidation
%
99
Autoclave
Residence Time
Min
60
Autoclave
Operating Temperature
°F
428
Autoclave
Operating Pressure
Psi
454
Hot
Cure Temperature
°F
220
Hot
Cure Residence Time
H
10
Lime
Boil Temperature
°F
206
Lime
Boil Residence Time
hr
12
Number
of POX CCD Wash Stages
-
3
POX
CCD Wash Efficiency
%
98
POX
CCD Overflow Neutralization Residence Time
H
6
Flotation
Concentrate Leach Residence Time
H
24
Concentrate
Leach Slurry Density
%
solids (wt/wt)
35
Number
of CCD Wash Stages
-
4
CCD
Wash Efficiency
%
98
Metal
Recovery Method
Merrill-Crowe
Cyanide
Destruction Method
SO2
/ Air
Hycroft Mine Project
Page 178
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
14-2: Major Process Equipment
Equipment
Type
Quantity/Size
Crushing
Primary
crusher (Existing)
Gyratory
crusher (62 × 113 in)
1
× 1,000 HP
Secondary
crusher (Existing)
Cone
crusher (Raptor XL1300)
2
x 1,300 HP (2 operating)
Tertiary
crusher (Existing)
Cone
crusher (Raptor XL1300)
2
x 1,300 HP (2 operating)
Grinding
Primary
grinding ball mill
Ball
mill
26
ft dia. x 39.5 ft EGL; 2 x 21,500 HP (2 operating)
Secondary
grinding ball mill
Ball
mill
26
ft dia. x 39.5 ft EGL, 2 x 21,500 HP (2 operating)
Flotation
Rougher
flotation cell
Forced-air
tank cells
12
x 17,660 ft3 (2 banks)
Concentrate
Thickening
Concentrate
thickener
High-rate
thickener
1
x 157 ft dia.
Pressure
Oxidation (POX)
Autoclave
Pressure
oxidation autoclave
16.2
ft ID x 142.8 ft length
(2
trains)
Flash
tanks
Pressure
flash vessels
22.9
ft ID x 40.6 ft length
(2
tanks per stage, 1 stage per train)
High
pressure cyclonic separator
Cyclonic
separator
2
per train
Pressure
scrubber
Venturi
scrubber
1
per train
Low
pressure cyclonic separator
Cyclonic
separator
1
per train
Oxidized
slurry seal leg tank
Seal
leg tank
8,000
gal, 1 per train
Lime
boil preheater
Slurry
heat exchanger
60,000
gal, 2 units
Autoclave
steam quench vessel
Quench
vessel
42,000
gal, 1 per train
Hot
cure tank
Agitated
tanks
5
x 751,000 gal
Lime
boil tank
Agitated
tanks
4
x 1,145,000 gal
Slurry
Neutralization
Slurry
washing by CCDs
High-rate
thickener
3
x 197 ft dia
CCD
overflow neutralization
Neutralization
tanks
6
x 736,000 gal
Neutralization
thickener
High-rate
thickener
1
x 115 ft dia
Cooling
towers
Cooling
towers
7
units (3 slurry cooling, 4 solution cooling)
Leaching
Leach
tanks
Agitated
leach tanks
6
x 1.1 million gal
Leach
CCD and Cyanide Destruction
CCD
thickener
High-rate
thickener
4
x 200 ft dia
Cyanide
destruction
Agitated
tanks
2
x 332,000 gal
Rougher
Tailings Thickening
Tailing
thickener
High
rate
223
ft dia
Hycroft Mine Project
Page 179
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
14.4
Process Description
14.4.1
Crushing Area
The
mill was designed to operate at a nominal capacity of 57,100 ton/day (at 75th percentile mineralized material hardness).
The
existing crushing plant includes one primary crusher (60” x 113”), two secondary crushers (XL1300 Standard), and two tertiary
crushers (XL1300 Short Head).
14.4.1.1
Primary Crushing and Coarse Ore Stockpile
ROM
mineralized material will be transported by haul trucks from the mine to the existing primary crusher and dumped into a dump pocket.
The primary crusher is a 60” x 113” gyratory crusher with an open side setting of 178 mm (7”) and a feed opening
of 1,524 mm (60”). The crusher is powered by a 1000-hp motor.
The
crushed material will be discharged via a surge bin to an apron feeder. The mineralized material will then be transferred by a stacker
conveyor and discharged to a coarse ore stockpile. A belt scale will be installed on the stacker conveyor to measure the quantity of
crushed mineralized material delivered, and a self-cleaning magnet will be installed upstream of the stockpile to remove any tramp steel.
The
coarse material stockpile has a live capacity of 75,000 tons and a total capacity of 300,000 tons.
The
crushed mineralized materials will be reclaimed via two reclaim tunnels located beneath the stockpile. Each reclaim line consists of
three reclaim feeders (two operating and one standby) and a reclaim transfer conveyor.
Dust
suppression systems and baghouses are installed to control dust generated by haul trucks, crushers, and other material handling equipment.
14.4.1.2 Secondary
and Tertiary Crushing
Hycroft
has installed four FLS Raptor XL1300 cone crushers – two with standard cavities and two with short head cavities, serving secondary
and tertiary crushing duties, respectively. Each crusher is driven by a 1,300-hp motor and is fed from a bin through a feeder and vibrating
screen.
Coarse
mineralized material will be conveyed to the secondary crusher feed bin and distributed to the secondary screens. Oversize from the secondary
screens will report to the secondary crushers, while screen undersize will be discharged to screen undersize conveyor. The secondary
crusher will operate at a closed side setting (CSS) of 1.2”, producing material with a P80 of 1.3”.
Secondary
crusher product will be conveyed to the tertiary crusher feed bin and distributed to the tertiary screens, Oversize from the tertiary
screens will report to the tertiary crushers, while tertiary screen undersize will be discharged to screen undersize conveyor and transferred
to the crushed product conveyor. The tertiary crushers will operate at a CSS of 0.9”, producing material with a P80
of ⅜”.
Hycroft Mine Project
Page 180
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Overall,
the crushing plant product will have a P80 of ⅜”.
14.4.1.3
Crushed Ore Stockpile
The
crushed product stockpile has a live capacity of 31,000 tons and a total capacity of 124,000 tons.
The
crushed product will be reclaimed via two reclaim tunnels located beneath the crushed product stockpile. Each reclaim line consists of
two reclaim feeders (one operating and one standby) and a primary ball mill feed conveyor.
14.4.2
Grinding Circuit
The
grinding circuit consists of two parallel primary ball mills followed by two parallel secondary ball mills, arranged in a two-stage ball
milling configuration. Each primary ball mill operates in closed circuit with a cluster of hydrocyclones.
Crushed
mineralized material will be delivered by two primary ball mill feed conveyors to the two primary ball mills (26 ft diameter ×
39.5 ft effective grinding length). Each primary ball mill is powered by a 21,500 hp drive. Primary ball mill discharge will report to
a primary cyclone feed pump box, where dilution water will be added to control pulp density. The slurry will then be pumped to a cluster
of 30” hydrocyclones. Primary cyclone underflow will return to the primary ball mills, while primary cyclone overflow will
report to the secondary cyclone feed pump box, where it will combine with secondary ball mill discharge and dilution water.
The
combined slurry will be pumped into a secondary hydrocyclone cluster (30” cyclones). Secondary cyclone underflow will
report to the secondary ball mills (26 ft diameter × 39.5 ft EGL), each powered by a 21,500 hp drive. Secondary cyclone overflow
will constitute the final grinding product and will be directed to the flotation circuit after passing through trash screens. The target
grind size is a P80 of 85 µm.
14.4.3 Rougher
Flotation
The
rougher flotation circuit will be designed to produce a concentrate at 22% mass pull, containing a significant portion of the gold and
silver from the sulfide mineralized material. The flotation concentrate will be oxidized in a POX circuit prior to feeding in a concentrate
leach circuit to dissolve gold and silver from the flotation concentrate. The resulting pregnant solution will be further processed in
a Merrill-Crowe circuit.
Cyclone
overflow will gravitate over the vibrating trash screens to remove foreign material prior to flotation. Screen oversize will report to
a trash bunker for periodic removal, while trash screen undersize will be pumped to two rougher flotation conditioning tanks.
Bench-scale
flotation testing determined an average laboratory flotation time of 19 minutes. Applying a 2.5 scale-up factor, the required plant residence
time is approximately 47.5 minutes.
Hycroft Mine Project
Page 181
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Flotation
concentrates will be pumped to a concentrate thickener. Rougher flotation tailings will be pumped to a rougher tailings thickener (223
ft diameter) and thickened to 60% solids prior to pumping to the tailing storage facility.
Flotation
reagents will include PAX as collector and MIBC or equivalent as frother. Flotation will be conducted at the pH of 4.7 and will therefore
require sulfuric acid (H2SO4) for pH control in the flotation conditioning tanks. Blowers will supply air to the
flotation cells.
Average
recoveries to the flotation concentrate of 89.5% gold and 92.9% silver were estimated based on laboratory test results.
14.4.4
Concentrate Thickening
Flotation
concentrate will be thickened in a high-rate thickener to produce a slurry of sufficient density for feed to the POX plant. Concentrate
from the rougher flotation circuit will be dewatered in a 157 ft diameter concentrate thickener to a slurry density of 49% solids. The
thickener underflow will be pumped to the pressure oxidation plant, while thickener overflow will be recycled to the thickener feed for
dilution and directed to the process water tank.
14.4.5
POX and Neutralization
14.4.5.1
POX Feed System
The
flotation concentrate will be transferred via a screen covered POX feed tank to four POX feed storage tanks, which will provide 12 hours
of buffering capacity between the Concentrator and POX sections. The POX feed tank will be equipped with a vibrating screen to reject
any +10-mesh deleterious material and protect the autoclave feed pumps. Screen oversize will be collected and periodically analyzed to
determine the appropriate disposal location. The four POX feed storage tanks will operate in parallel and will be capable of feeding
either autoclave train.
14.4.5.2
Pressure Oxidation
The
POX facility will comprise two autoclave circuits. Each circuit will include a high-pressure slurry feed system, slurry preheater, an
autoclave vessel with agitators, flash vessels, and a gas handling system. Autoclave operation will be supported by agitator seal systems,
a steam boiler for start-up, and a high-pressure cooling water system for autoclave temperature control.
Slurry
will be pumped into the first compartment of each autoclave using positive displacement pumps. The autoclaves will be mechanically agitated
horizontal pressure vessels with approximate internal dimensions of 16.2 ft inside diameter and an overall length of 142.8 ft. Each autoclave
will operate at 428 °F and 454 psi, and will consist of five compartments equipped with eight agitators, providing a nominal retention
time of 60 minutes. The agitators in the first autoclave compartment will be driven by variable speed drives to optimize oxygen mass
transfer. The first compartment is larger than the downstream compartments and contains four agitators to ensure that the introduction
of cold slurry does not adversely affect the front-end reactor temperature or reduce the initial oxidation reaction rate.
Hycroft Mine Project
Page 182
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Oxidation
of sulfides is an exothermic reaction, and to prevent overheating of the autoclaves, significant quantities of cooling water will be
added to each compartment.
Steam
will be required to heat the autoclaves during cold start-up conditions. Steam will be injected into the vapor space of the autoclaves
with the agitators operating, and the autoclave will be preheated at a controlled, predetermined rate.
14.4.5.3
Flash System and Gas Cleaning
Due
to the high autoclave discharge volume, each autoclave train will include two parallel single stage flash tanks, followed by two parallel
high pressure cyclonic separators. The flash tanks will be equipped with level control valves and blast tubes to reduce pressure to near
atmospheric conditions, generating large quantities of flash steam. The majority of slurry particles entrained in the steam will be removed
in the cyclonic separators operating in parallel. Slurry discharged from the flash tanks and cyclonic separators will report to a closed
seal leg tank, from which pumps will transfer the slurry to the subsequent process step.
The
relatively cleaned flash steam from the two cyclonic separators will then combine into a single direct contact “splash” heater,
which will be used to heat CCD underflow ahead of the lime boil circuit. Each autoclave train will be equipped with a splash heater,
resulting in excess heating capacity. The heaters will be designed to operate without slurry, if required, and to pass the full stream
load directly to the steam condensation and cleaning system.
Residual
steam from the heaters will be partially condensed in a quench vessel, after which inert gases will be cleaned using a venturi scrubber
to remove acidic droplets and solid particles. Vent streams from the autoclaves and the seal leg tank vents will be routed to the same
venturi scrubber, which will condense most of the remaining steam when the heat exchangers and quench vessels are in operation. The scrubber
system will also be capable of operating in a steam cleaning only mode when the heat exchangers and quench vessels are not in service.
All
vent streams will be combined in a common blast spool prior to entering the venturi scrubber. Cold raw water will be continuously added
to the clean (cold) side of the scrubber tank to maintain the minimum operating level. Underflow from the scrubber and quench tanks will
be directed to the dirty (hot) side of the scrubber tank. Pumps will transfer the hot, dirty, and slightly acidic spent scrubber water
to the solution neutralization circuit.
14.4.5.4
Oxygen Plant
The
oxygen plant will supply gaseous oxygen to support the pressure oxidation process. Oxygen will be produced on site using cryogenic air
separation units and injected directly into the autoclaves through spargers located beneath each agitator to promote sulfide oxidation.
Approximately 70% of the total oxygen demand will be injected into the first compartment, distributed evenly among the four spargers/agitators.
About 20% of the oxygen demand will be split between compartment 2 and 3, with the remaining oxygen injected into the final two compartments.
Hycroft Mine Project
Page 183
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
14.4.5.5
Hot Curing
The
oxidized slurry will be processed through five cascading tanks operating in series, providing a total residence time of 10 hours to ensure
dissolution of ferric sulfate. Slurry entering the hot cure circuit will be at approximately 221 °F and will exit at approximately
212 °F. Following curing, the slurry will flow by gravity to the first POX CCD thickener.
14.4.5.6
POX CCD Washing
A
three-stage POX CCD circuit will be used to wash slurry from the hot cure circuit and remove acid and dissolved metal salts from the
pressure oxidation residue. Each thickener will be 197 ft in diameter.
Slurry
will advance through the POX CCD thickeners in series, while wash solution flows in the opposite (countercurrent) direction, with fresh
washing water added to the final stage. Overflow solution from the first POX CCD thickener will be routed to the autoclave flash steam
quench and solution neutralization circuit. Washed slurry from the final POX CCD thickener will be heated and forwarded to the lime boil
circuit.
The
POX CCD circuit will be designed to achieve a wash efficiency of approximately 98%.
14.4.5.7
Neutralization Circuit
Neutralization
of acidity and precipitation of metals and sulfate from the POX CCD overflow solution and the quench and scrubbing solutions will be
carried out in the neutralization circuit. The neutralization circuit will comprise four stages of limestone addition followed by two
stages of milk of lime treatment.
The
limestone and lime reactor tanks will be arranged in a staggered, cascading configuration, allowing slurry to flow by gravity from one
stage to the next. Limestone slurry will be metered into a limestone sludge mix tank, where it will be blended with recycled neutralization
thickener underflow to condition the recycled solids and promote precipitation seeding. Overflow from the mix tank will feed to the first
neutralization tank. Neutralized slurry will flow by gravity from the final lime neutralization tank to the neutralization thickener.
Neutralization thickener underflow will be pumped to the tailings storage facility (TMF) via the final tailings pump box, where neutralization
thickener overflow will be directed to the neutralization thickener overflow tank and pumped to the solution cooling towers.
14.4.5.8
Solution Cooling
Neutralization
thickener overflow solution will be pumped to a bank of four cooling towers to reduce temperature. The cooled solution will then be pumped
to the POX water tank and process water tank.
14.4.5.9
Lime Boil Process
Underflow
from the POX CCD circuit thickener will be pumped to the lime boil heat exchangers, where the slurry will be reheated to a temperature
of 206 °F using steam from the autoclave flash system. The reheated slurry will be treated with lime to effectively decompose silver
jarosites formed during the POX and hot cure stages, thereby enabling improved silver extraction in the downstream leach circuit.
Hycroft Mine Project
Page 184
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
lime boil circuit will consist of four agitated tanks. Lime boil discharge slurry will be cooled to approximately 108 °F in
three slurry cooling towers and then pumped to the cyanide leach circuit for gold and silver extraction.
14.4.5.10
Limestone Plant
Ground
limestone and lime will be required for neutralization of acidic liquors and pH control in the leach circuit. The limestone plant will
include crushing and grinding facilities, producing limestone ground to a product size with a P80 of 53 µm.
14.4.6
Gold and Silver Recovery from Flotation Concentrate
The
oxidized flotation concentrate (approximately 35% wt/wt solids) will be leached in the concentrate leaching circuit, which will consist
of six mechanically agitated leach tanks operating in series.
Sodium
cyanide (NaCN) will be added to the leach circuit to dissolve gold and silver. The primary cyanide addition point will be the leach feed
distribution box, with additional dosing points located at leach tank No.3 and No.5. Lime addition in the upstream lime boil circuit
will provide sufficient protective alkalinity for the leach circuit and no additional lime addition will be required during leaching.
Estimated extraction in the concentrate leach circuit is 93.5% for gold and 86.0% for silver.
Air
will be introduced into the leach circuit through the leach tank agitator shafts to maintain an air to leach rate of approximately 7.75
Nm3 oxygen per ton of solids in the circuit. The concentrate leach circuit will be designed for a total retention time of
24 hours, evenly distributed across the six leach tanks. Slurry exiting the leach circuit will flow by gravity to the CCD circuit for
recovery of pregnant solution from the leached slurry.
To
facilitate maintenance of individual leach tanks, the circuit will include provisions to bypass any single leach tank, allowing slurry
to report directly to the downstream leach tank. This configuration will allow one tank to be taken out of service without requiring
a shutdown of the entire circuit.
The
leach circuit will be serviced by a vertical cantilevered centrifugal sump pump, which will return collected spillage to a nearby leach
tank.
14.4.7
CCD Circuit
A
four-stage CCD washing circuit will be used to recover pregnant solution from the cyanide-leached slurry.
Leached
slurry will flow by gravity through a four-stage CCD circuit, with solids advancing sequentially to the final thickener (CCD No. 4).
Washed tailings from CCD No. 4 underflow will be pumped to the cyanide destruction circuit. Barren solution from the Merrill-Crowe circuit
will be added to CCD No. 4 as wash water, while overflow solution will advance counter currently through the CCD stages. Overflow from
the first CCD thickener will be collected in a CCD overflow tank and fed to the Merrill-Crowe circuit.
Hycroft Mine Project
Page 185
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
washing ratio, defined as the flow rate of washing barren solution from the Merrill-Crowe plant to the solids flow rate in the CCD circuit
feed, will be 4.5:1, providing an overall CCD washing efficiency of greater than 98%.
Solids
settling will be enhanced by the addition of diluted flocculant at each CCD stage. Antiscalant can be added to the pregnant solution
tank, as required, to inhibit scale formation in the Merrill-Crowe circuit.
A
vertically cantilevered centrifugal sump pump will be provided in the CCD area to return spillage to the circuit.
14.4.8
Merrill-Crowe Precipitation and Refinery (Existing)
Due
to the high silver content in the pregnant leach solution (PLS), gold and silver will be recovered using zinc cementation. Hycroft currently
has two Merrill-Crowe plants. The Brimstone plant has a capacity of 5,000 gal/min, while the North plant is considerably larger, with
a capacity of 21,000 gal/min. The combined capacity of the two Merrill-Crowe facilities is approximately 26,000 gal/min.
Upon
mill start up, the Merrill-Crowe plants will process pregnant solutions from both the mill and the heap leach operations.
14.4.8.1
Merrill-Crowe
PLS
from the CCD circuit will be pumped to the PLS tank at the Merrill-Crowe facilities, where it will be combined with solution from the
heap leach operation. The combined solution will then be pumped to clarifying filters to remove suspended solids. Filtered PLS will flow
through a deaeration column, where dissolved oxygen will be removed. Zinc will then be added to the filtered, deaerated solution, which
will be pumped to precipitate filters. The resulting precipitate, containing gold and silver, will be recovered in the filter. Barren
solution will flow to a storage tank for reuse in the mill or heap leach.
Precious
metal recovery from solution to zinc precipitate is expected to be approximately 99.5%.
14.4.8.2
Gold and Silver Refinery
Wet
filter cake from the Merrill-Crowe circuit will be transferred to retort pans and proceeded in a retort furnace to remove moisture and
mercury. Water and mercury will be sequentially volatilized from the precipitate by heating under partial vacuum. Exhaust gases will
pass through multiple stages of condensers, where mercury and water will be collected and drained into a collection vessel. Residual
mercury in the retort off-gas will be removed using a sulfur-impregnated carbon packed bed prior to discharge to the atmosphere. Retorts
will be operated in batch mode, with an approximate cycle time of 18 hours.
Hycroft Mine Project
Page 186
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
dried filter cake will then be mixed with flux and transferred to an electric arc furnace, where it will be smelted to produce gold-silver
doré.
14.4.9
Cyanide Destruction
Washed
leach residue slurry from the CCD circuit will be treated using a sulfur dioxide (SO2)-oxygen (O2) process to reduce
the CNWAD cyanide concentration to less than 5 mg/L.
Thickened,
washed tailings slurry from the final CCD thickener, at a solids concentration of approximately 35%, will be pumped to the cyanide destruction
tanks. In the SO2-O2 process, sodium metabisulphite (SMBS), oxygen, copper sulfate (as catalyst), and milk of lime
will be added to oxidize residual free cyanide and CNWAD species to cyanate, thereby reducing CNWAD concentrations
to the target level prior to final tailings disposal. The cyanide destruction circuit will consist of two mechanically agitated tanks,
providing a total residence time of two hours.
Oxygen
will be supplied from the oxygen plant as required and introduced into the tanks via the agitator shafts. CNWAD concentration
in the cyanide destruction discharge will be monitored through regular sampling and analysis.
The
cyanide destruction circuit will be serviced by a dedicated sump pump, with any spillage in the area returned to the cyanide destruction
feed box
14.4.10
Final Tailings and Reclaim Water Transport
Combined
thickened tailings generated from the flotation process, POX neutralization, and cyanide destruction circuits will be conveyed from the
tailings thickener to the TMF, following completion of TMF construction. A return water pipeline will convey reclaim water from the TMF
seepage ponds back to the process plant along the same corridor.
14.5
Energy, Water, and Process Materials Requirements
14.5.1
Reagent Handling and Storage
The
mixing and storage area for each reagent will be located proximate to their respective addition points throughout the plant. Reagents
delivered in bulk bags will be transferred from storage to the mixing areas by forklift. Electric hoists serving the reagent areas will
lift the bulk bags to the respective reagent bag brakers, which will be located above the reagent mixing tanks.
The
reagent handling system will include unloading and storage facilities, mixing tanks, stock tanks, transfer pumps, and feeding equipment.
Quick
lime will be delivered to the plant in regular bulk shipments and received in three 400 t storage silos, which at design operating rates
will provide approximately three days of storage capacity. Lime will be slaked in a package slaking system. The resulting milk of lime
slurry, at approximately 16% CaO solids %w/v, will be stored in an agitated tank and distributed to the various addition points via a
ring-main system.
Hycroft Mine Project
Page 187
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Sodium
cyanide will be supplied in liquid form by using DOT-412 tankers, each carrying approximately 6,400 gal of 30% cyanide solution, and
will be received in a 25,000-gal storage tank. Diluted cyanide solution at approximately 23% cyanide will be stored in an agitated day
tank, providing approximately four hours of cyanide supply at nominal production rates. From the day tank, sodium cyanide solution will
be distributed to the leach circuits and Merrill-Crowe circuit as required. The cyanide storage and day tank will be fully contained
in a bunded area and physically separated from the main plant site.
Limestone
will be delivered to the site by rail and offloaded to a stockpile. A front-end loader will transfer limestone to a hopper feeding the
limestone crushing and grinding circuits. Ground limestone slurry, at 38% solids, will be stored in a limestone slurry tank providing
12 hours of retention time.
Table
14-3 summarizes the reagents proposed for the process plant.
Table
14-3: Summary of Reagent Used in the Process Plant
Reagent
Preparation
Method
Use
Lime
Received
as quicklime from 20 t pneumatic tanker trucks and transferred to silos; slaked and mixed to 16% strength; pumped to a storage tank
and distributed to lime boil, POX neutralization, and cyanide destruction circuits as required
pH
control added as required
Sodium
Cyanide
Received
as 30% cyanide solution in 6,400 gal of DOT 412 tanker trucks and transferred to a 25,000-gal storage tank; diluted to 23% NaCN in
a day tank; dosed via metering pumps to the concentrate cyanide leaching circuit and Merrill-Crowe circuit as required.
Gold
and silver leaching agent
Flocculant
Received
as powder in 1,000 kg bags; mixed to 0.25% storing strength; transferred to a storage tank. Dosed directly to concentrate thickener,
POX CCD washing thickeners, neutralization thickener, CCD washing thickeners, and tailings thickener with dilution as required
Flocculation
in thickeners
Oxygen
Produced
on site by the oxygen plant, gasified, and distributed to POX and cyanide destruction circuits
Oxidation
reagent, cyanide destruction reagent
PAX
Received
as pellets in 1,000 kg super sacks; mixed to 15% solution strength and transferred to a storage tank; dosed via multiple metering
pumps to the required locations within the grinding and flotation circuit
Flotation
collector
Frother
Delivered
in liquid form by tanker truck and transferred to a 25,000-gal storage tank; dosed via multiple metering pumps to the required locations
within the flotation circuit
Flotation
frother
Diatomaceous
Earth
Received
as powder in 25 kg bags; mixed to about 5% solution strength; dosed to the clarifier and precipitate filters in Merrill-Crowe circuit
Precoat
and body feed in Merrill-Crowe circuit
Zinc
Powder
Received
as powder in 50 lb bags; dosed via feeder to Zn mixing cone through at controlled rate in Merrill-Crowe circuit
Precipitation
regent in Merrill Crowe circuit
Copper
Sulfate
Received
as powder in 500 kg bags; mixed to 10% solution strength and transferred to a storage tank; dosed to the cyanide destruction circuit
Catalyst
for cyanide destruction process
Sodium
Metabisulfite
Received
as powder in 1,250 kg super sacks; mixed to 15% solution strength and transferred to a storage tank; dosed to the cyanide destruction
circuit.
Reactant
for cyanide destruction process
Antiscalant
Delivered
in liquid form in IBC totes; dosed neat (undiluted) to barren solution and process water tanks
Scale
inhibition
Flux
Received
as bulk powder; blended with calcined charges prior to smelting
Smelting
flux
Limestone
Delivered
to the site by rail and offloaded to a stockpile
Neutralization
reagent for acid generated in POX circuit
Hycroft Mine Project
Page 188
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
estimated annual consumption based on nominal usage for major plant reagents is summarized in Table 14-4.
Table
14-4: Annual Consumption for Major Reagents
Reagent
Annual
Consumption (ton/a)
Quicklime
102,943
Sodium
cyanide
9,567
Flocculant
2,757
Collector
(PAX)
8,508
Frother
(MIBC)
756
Sulfuric
acid
69
Limestone
813,085
Copper
Sulfate
304
Sodium
Metabisulphite (SMBS)
3,452
Antiscalant
321
Diatomaceous
Earth
1,267
Zinc
dust
574
14.5.2
Fresh Water, Fire Water and Potable Water
Provisions
will be made for fresh water supply from the water wells with fresh water transferred to a fresh/fire water storage tank.
Fresh
water will be used for reagent mixing and preparation, general process uses in the crushing area, and gland water.
Wherever
practicable, process water or barren solution will be used throughout the plant to minimize freshwater consumption. The total freshwater
requirement for the plant is estimated at approximately 6,680 gal/min.
Hycroft
plans to install a larger onsite potable water system sized to meet the requirements of the POX option, for the current IA-EA study,
a potable water treatment system is not required.
14.5.3
Process Water, and Barren Solution
Process
water will consist of reclaimed water from the concentrate thickener overflow, rougher tailings thickener overflow, TMF return water,
and excess process water from the solution cooling towers. Process water will be used in the grinding and flotation circuits and in the
limestone slurry preparation circuit.
POX
Process water will consist of a solution from the solution cooling towers with freshwater make-up as required. POX process water will
be used for POX flash vessel cooling and POX CCD washing.
Hycroft Mine Project
Page 189
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Barren
solution from the Merrill-Crowe circuit will be stored in the existing barren solution tank and recycled to the CCD washing circuit as
wash water. Barren solution will also be used as gland seal water for CCD thickener underflow pumps to minimize freshwater consumption.
Excess barren solution will be routed to the heap leach operation.
14.5.4
Oxygen Plant
The
oxygen plant will consist of an air separation unit (ASU) supplying gaseous oxygen and trickle liquid oxygen to support the pressure
oxidation process. The ASU design is based on equipment and processes that are widely used in the cryogenic gas industry, employing a
conventional air separation process. Oxygen production will be achieved through the cryogenic distillation of air.
The
oxygen plant will have a nominal oxygen production capacity of approximately 2,204 ton/d, with an installed power requirement of approximately
32 MW. Oxygen will be produced at a purity of 99.5% and delivered at a pressure of approximately 116 psig (8 bar).
Oxygen
will be used for POX circuit and cyanide destruction circuit.
14.5.5
Electrical Power
The
total peak operating load for the project is estimated to be 124.3 MW.
14.5.6
High-Pressure and Low-Pressure Air
14.5.6.1
High Pressure Air
High-pressure
air at 110 psi(g) will be supplied by high-pressure air compressors operating in a lead-lag configuration to serve the neutralization
tanks and leach tanks. All high-pressure air produced will be dried and filtered and will be used to meet both plant air and instrument
air requirements. Dried air will be distributed via the process plant air receiver.
14.5.6.2
Low Pressure Air for Flotation Circuit
Low
pressure air for the flotation cells will be supplied by four dedicated blowers.
Hycroft Mine Project
Page 190
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
15
Infrastructure
15.1
Introduction
This
section discusses existing and proposed infrastructure for the Hycroft PEA. The proposed facilities include the Northeast TMF,
the Waste Rock Storage Facility (WRSF), the Process Plant Site and associated infrastructure, the Limestone Plant, and new rail spur.
This section also details the proposed ancillary facilities planned over the LOM, and the proposed upgrades of existing facilities. An
overview of existing site infrastructure, site access, accommodations, and utilities is provided in this section. The layout of proposed
and existing infrastructure is shown below in Figure 15-1.
Figure
15-1: Site Layout
Source:
Ausenco, 2026
Hycroft Mine Project
Page 191
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
15.2
Site Access
15.2.1
Offsite Access and Security
Jungo
Road (Nevada State Route 49) which connects the town of Winnemucca to Gerlach, is the main offsite access road to Hycroft Mine. This
roadway is an all-weather dirt/gravel surfaced road that is well maintained by Humboldt County, Pershing County, and Hycroft. Jungo Road
runs parallel to the site at the north and west extents and is accessible off the I-80E. The main gate to the Site is located within
a few hundred feet from the Jungo Roadway. Figure 15-2, below, detail major nearby towns and Jungo Road in relation to the Hycroft Mine
Site.
Figure
15-2: Site Access and Major Towns Near Hycroft Mine
Source:
Google Earth, 2026
Hycroft Mine Project
Page 192
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
A
major east-west bound railway runs adjacent to the mine site. Imports and exports via this railway shall be facilitated by the proposed
rail spur discussed in Section 15.2.3 Rail Spur.
The
main access guard house will be relocated as part of the layout improvement of the ancillary facilities. Primary access to the site will
be regulated by swipe cards. The guard house will continue to house the security personnel offices, safety training rooms and medical
facilities.
15.2.2
Onsite Access
Most
of the existing onsite access and haul roads will remain. The project considers the development of plant access roads, a TMF access road,
and a TMF construction haul road. The geometric design of the roads considers factors such as traffic, topography, and speed to provide
a safe design that is cost effective compatible with project commitments.
Road
drainage has been designed to eliminate or minimize road wear, road damage, downstream flooding, and erosion. Roads will be graded to
convey stormwater away from the roads and plant facilities. Road drainage structures include parallel ditches and culverts for crossings.
15.2.2.1
Plant Access Roads
Approximately
0.6 miles of new plant access roads will be built branching out of existing roads and connecting different areas of the plant. Plant
access roads are designed to be dirt roads with a maximum grade of 10% and a speed limit of 25 miles per hour (mph). Road will
have a minimum of two 12-foot lanes and allow delivery access.
15.2.2.2
TMF Access Road
A
new access road approximately 5.6 miles long will connect the process plant with the TMF running parallel to the tailings delivery and
reclaim water pipeline corridor. This dirt road runs through one section of mountainous terrain and will have a maximum grade of 10%
and a speed limit of 25 mph. The access road will have two 12-foot lanes.
15.2.2.3
TMF Construction Haul Road
A
new TMF construction haul road approximately 3.4 miles long will connect the WRSF with the TMF. This road will allow haulage of
waste rock for the TMF embankment construction. This haul road will cross the TMF access road instead of running parallel to it. The
road runs through one section of mountainous terrain. This dirt haul road will have a maximum grade of 10% and a speed limit of 25 mph.
The haul road will have two 60-foot lanes.
15.2.3
Rail Spur
The
Hycroft Project will require a rail spur to extend access of the Union Pacific rail line located northwest of the plant to the Project
site. The additional rail siding is designed to receive reagents and consumables such as limestone, grinding media, fuel and other supplies
required by the proposed process plant. The rail siding is vital for the export of salable precious metals.
Hycroft Mine Project
Page 193
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Hycroft
hired Mountain States Contracting Inc. to provide the design and cost estimate for this rail spur. Included in the design and cost estimate
is the rail siding, required turnouts, derails, signals, tracks, ballast, bridges, and civil work to install and operate a rail loadout
facility. The facility will have tracks to store rail cars as well as a loadout out port for rail hopper cars. The rail spur design layout
proposed by Mountain States Contracting Inc is shown below in Figure 15-3.
Figure
15-3: Rail Spur Design
Source:
Ausenco, 2026
Hycroft Mine Project
Page 194
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
15.3
New Infrastructure
This
section details all required on, and off-site support infrastructure required for the operation of the sulfide ore processing plant.
New onsite infrastructure includes new process plant facilities and its supporting tie-ins for its inclusion to the existing crushing
facility, heap leach, and North Merrill-Crowe facility; most of the existing onsite access and haul roads will remain. Hycroft has identified
the following offsite infrastructure for inclusion in this study: a main transmission line feeding the site and substation, mine power
distribution, the rail spur for deliveries and shipping and the development of a freshwater production well field.
Onsite
infrastructure to support the proposed process plant includes:
● tie-ins
to existing site utilities
○ water
○ compressed
air
○ sewer
and potable water
● new
power distribution lines and grids, substations and electrical rooms
● new
process control system and control room
● new
reagent buildings including an oxygen plant and limestone offloading, storage and slaking
facilities
● expanding,
repurposing or modifying existing offices, maintenance areas, laboratories, and ancillary
facilities throughout the mine.
15.3.1
New and Existing Facilities Layout
Ausenco
designed the processing plant facility to tie into the existing crushing facility, which includes the primary crusher, secondary crushers
and tertiary crushers. The overall site layout is shown in Figure 15-4. Figure 15-5 illustrates the existing crushing facility and ancillary
buildings at the mine site while Figure 15-6 shows the proposed process plant layout developed for this Project. The proposed limestone
offloading and rail spur planned for the Project is shown in Figure 15-7. Figure 15-8 shows the North Merrill-Crowe Facility and associated
ponds. The TMF is detailed in Figure 15.10 and the WRSF locations are depicted in Figure 15-14.
Existing
facilities on site consist of two administration buildings, a mobile maintenance shop, a light vehicle maintenance shop, a warehouse,
an assay laboratory, three heap leach pads (Crofoot, North, Brimstone), primary, secondary, and tertiary crushers, two Merrill-Crowe
Process Plants, a refinery, and other service-related structures. Table 15-1, below, details the existing Hycroft buildings based on
owner-provided information. Many of the existing ancillary buildings are shown in Figure 15-5 through Figure 15-9.
Hycroft Mine Project
Page 195
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
15-1: Existing Hycroft Buildings
Hycroft Equipment
Reference
Ausenco
WSP Area
Description
BG 001
7000
Jungo
Road
BG 900
6600
Administration
Building
BG 902
6600
Old
Core Building
BG 903
6700
Light
Vehicle Fuel Island
BG 904
6600
Laboratory
Building
BG 905
4100
Lime
Silo
BG 906
6600
Safety
Building
BG 907
4100
Mill
Building
BG 908
6600
Welding
Shop
BG 910
6600
Shifter
Building
BG 911
4100
Operations Lineout Building
BG 912
6600
Warehouse
Building
BG 913
6600
Wash
Pad
BG 914
6600
New
Maintenance Shop
BG 915
7200
Fire
Water Pump House #1 – Old Shop
BG 916
7200
Fire
Water Pump House #2 – New Shop
BG 917
6600
Light
Vehicle / Tire Shop
BG 919
6500
Flocka
Communications Building
BG 920
6500
Pump
Room Communications Building
BG 921
6600
Direct
Charge Building
BG 922
6700
Upper
Fuel Island
BG 923
6600
Fabrication
Shop
BG 924
6600
Process
Maintenance Trailer
BG 926
6600
Human
Resource Building
BG 928
6600
Technical
Services Building
BG 929
6600
Geology
Trailer
BG 930
6600
Front
Gate Guard Shack
BG 932
4400
North
Merrill-Crowe Building / Rest Rooms
BG 933
6500
Lower
Server Room
BG 934
4400
Press
Room North Merrill-Crowe
BG 935
6400
Electrical
Dry Storage
BG 936
6600
Mechanical
Dry Storage
BG 937
6700
Lower
Fuel Island
Hycroft Mine Project
Page 196
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
15-4: Overall Site Layout
Source:
Ausenco, 2026
Hycroft Mine Project
Page 197
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
five boxes shown in Figure 15-4 are expanded in the figures below.
Figure
15-5: Existing Crushing Facility and Surrounding Infrastructure
Source:
Ausenco, 2026
Hycroft Mine Project
Page 198
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
15-6: The Proposed Process Plant Generic Site Plan
Source:
Ausenco, 2026
Hycroft Mine Project
Page 199
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
15-7: Proposed Limestone Plant and Rail Spur
Source:
Ausenco, 2026
Hycroft Mine Project
Page 200
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
15-8: North Merrill-Crowe Plant
Source:
Ausenco, 2026
Hycroft Mine Project
Page 201
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
15-9: Existing Mine Ancillary Buildings
Source:
Ausenco, 2022
Hycroft Mine Project
Page 202
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Newly
proposed ancillary facilities that have been designed and budgeted to support the Project are shown below in Table 15-2.
Table
15-2: New Ancillary Facilities Planned over the LOM
Facility
Name
Purpose
Crushed
Ore Stockpile Cover
Round
dome to 313 ft Diameter X 104 ft Height
Laboratory
New
Assay Lab
Haul
Truck Fuel Station
New
Fuel Station to service the mine equipment
Technical
Services Building
An
additional building to support the new process plant
Maintenance
Shop
New
maintenance shop for capital and consumable spare parts
Crusher
Maintenance Building
New
crusher maintenance building in mine Year 5.
15.3.2
Upgrades
to Existing Facilities
Table
15-3 list the proposed upgrades to the existing facilities at the mine required to support the Project.
Table
15-3: Proposed Upgrades for Existing Facilities
Existing
Building Name
Proposed
Upgrades
Lime
Silo
The
existing lime silo will be relocated closer to primary crusher
Warehouse
The
existing warehouse will be expanded and will include a larger storage yard in mine Year 3
Gate
And Security Building
The
existing front gate/guard shack will be relocated to improve traffic flow
Truck
Shop
Add
an additional wash bay to the existing Truck Shop
Primary
Crusher Building
Upgrade
the existing primary crusher building
Crusher
Control Room
Upgrade
the existing crusher control room
Mine
Operation Building
Repurpose
the existing Mine Ops building to meet mine staffing needs and space.
Operation
Lineout Building
The
existing Operation Lineout building will be converted to a 4-plex in mine Year 5
Process
Maintenance
Expand
existing process maintenance for new equipment assembly in mine Year 1
North
Merrill-Crowe
Expand
North Merrill-Crowe building for increased process operations and administration by mine Year 2
Technical
Services Building
Rehabilitate
the existing technical services building
15.3.3
Accommodation
Hycroft
Mine is located within a well-known mining jurisdiction near three communities: Winnemucca (Humboldt Country), Lovelock (Pershing County),
and Gerlach (Washoe County). The majority of the mine’s employees reside in Winnemucca and Lovelock, with a small number from Gerlach.
These towns are shown above in map-form in Figure 15-2.
Hycroft Mine Project
Page 203
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Most
of Hycroft’s site employees are likely to reside in the town of Winnemucca (Humboldt Country), located 54 miles east of the mine.
This town is accessible via a transcontinental railroad and a small public airport. A high clearance truck or SUV is recommended for
the 90-minute commute from Winnemucca to site.
Winnemucca
has the required infrastructure (short- and long-term rooming and boarding facilities, dining establishments, shopping, emergency services,
schools, etc.) to support the maximum workforce and dependents required for the Project. As such, the construction labor force will be
housed in Winnemucca and transported 54 miles via a contracted bus service to the job site.
15.4
Stockpiles
15.4.1
Mineralized
Stockpiles
The
mine plan and processing schedule includes long term stockpiling of mineralized material. These stockpiles consist of the coarse ore
stockpile and the crushed ore stockpile based at the proposed process plant. The coarse ore stockpile has a live capacity of 56,000 tons
and a total capacity of 175,400 tons while the crushed ore stockpile has a live capacity of 34,000 tons and a total capacity of 113,000
tons, with a round dome cover for the elements.
These
stockpiles will support the existing crushing circuit availability of 31.3% for primary crushing and 65.1% combined for secondary and
tertiary crushing. These stockpiles will allow buffer material flow between the crushers and mill.
15.4.2
Growth
Media Stockpile
During
construction of the TMF, growth medium will be stripped and stockpiled for future placement on the TMF surface and exposed embankment
surfaces during reclamation.
15.4.3
Limestone
Stockpile
Limestone
will be delivered to the site by rail and offloaded to a stockpile.
15.5
Tailings
Management Facilities
The
primary design objectives of the Hycroft Northeast TMF are the secure containment of tailings and the protection of regional groundwater
and surface water during mine operations and post-closure. The design of the TMF and accompanying water management facilities has considered
the following:
●
Staged
development of the facility over the LOM.
●
Impoundment
geomembrane liner and overliner collection system to minimize potential seepage into the subgrade and groundwater
●
Control,
collection, and removal of water from the facility for reuse as process water to the maximum extent practical.
●
Closure
that takes into account long-term geochemical and physical stability to protect the environment and waterways using best available
technology based on the physical and geochemical characteristics of the tailings
Hycroft Mine Project
Page 204
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
TMF has been designed to accommodate over 1.05 Btons of tailings produced over the LOM. The combined tailings embankment and impoundment
occupy an ultimate footprint of approximately 4,915 acres. WSP has provided civil, geotechnical, and mechanical engineering services
for the Hycroft mine since 2010. The 2026 PEA TMF design and drawings utilizing information from previous TMF studies completed for the
Hycroft Mine.
The
Northeast TMF PEA design incorporates data from several previous technical studies to meet the industry standards for design of TMF in
accordance with GISTM 2020 Standards. The TMF embankment will be expanded during operations using centerline method of construction for
the main embankment and downstream construction for the north embankment. The design criteria for the tailings facility are based on
the information available during the development of the previous studies and this PEA along with applicable design standards.
15.5.1
Facility
Design Basis
The
TMF design basis was developed considering the mine Schedule, processing technology, and most importantly designing a safety and stable
TMF that protect the environment. Below is the design basis utilized in the development of the TMF.
The
general operational TMF parameters are:
●
average
production rate of 57,000 tpd
●
LOM
of 51 years
●
required
storage capacity of 1.05 Btons
●
tailings
discharge percent solids content of 48%
●
subaerial
deposition
●
average
tailings in-situ dry density ranging from 74 pounds per cubic foot (pcf) (starter facility) to 92 pcf (ultimate facility).
The
design of the Hycroft Northeast TMF was developed based on the following major guidelines, regulations, client and site requirements,
and industry best practices.
●
Nevada
Administrative Code (NAC) Division 445A – Water Controls
●
NAC
525 – Dam Safety
●
Mining
Association of Canada (MAC), A Guide to the Management of Tailings Facilities (MAC 2019)
●
International
Council of Metals and Mining (ICMM), Global Industry Standard on Tailings Management (GISTM 2020)
Hycroft Mine Project
Page 205
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
facility design drawings meet the following objectives:
●
Solution
containment compatible with “zero-discharge” design concepts using a geomembrane liner, and meeting or exceeding Nevada
Administrative Code (NAC) regulations.
●
Safe,
statically and seismically stable, and operationally feasible facilities.
●
Containment
using waste rock material as a embankment fill.
●
“Design
for Closure” philosophy to manage closure considerations during the construction and operation of the facilities.
Based
on a conceptual qualitative dam breach analysis, the Northeast TMF is considered a Very High consequence dam. Based on this
classification, design criteria for geotechnical stability and for minimum return periods for design earthquake and flood events are
presented in Table 15-4 and Table 15-5. A figure of the ultimate TMF facility relative to the Hycroft Site is shown Figure
15-10.
Table
15-4: Minimum Pre-feasibility Seismic Design Criteria for Stability for Very High Dam Classification
Lifecycle
Loading
Condition
Minimum
Factor of Safety
Design
Event
Operation/Long
Term
Static
1.5
Steady
state seepage, normal reservoir level
Seismic
loading (pseudo-static)
1.1
1
in 5,000–year, normal reservoir level
Closure
– Passive Care
Static
1.5
Steady
state seepage, normal reservoir level
Long-term
Post Closure Static
1.5
Steady
state seepage, normal reservoir level
Seismic
loading (pseudo-static)
1.1
1
in 10,000-year, lowered reservoir level
Table
15-5: Minimum Pre-feasibility Hydrologic Design Criteria for Very High Dam Classification
Lifecycle
Flood
Event
Operation/Long
Term
1
in 5,000-year contained within TMF
Closure
– Passive Care
1
in 10,000-year conveyed by closure down chute
Hycroft Mine Project
Page 206
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
15-10: TMF Facility Layout
Source:
WSP, 2026
Hycroft Mine Project
Page 207
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
15.5.2
TMF
Design
15.5.2.1
Embankment
Construction
The
Northeast TMF will be constructed using ROM waste rock generated from open pit mining operations. waste rock will be transported
by mine haul trucks to a designated staging area northwest of the main embankment. During construction, waste rock will be transported
by the contractor from the staging area to the embankment location(s) and placed as engineered fill in thin controlled and compacted
lifts. The ultimate embankment will have a maximum height of 335 ft from crest to downstream toe and a crest width of 75 ft. Downstream
slope angles for all stages of construction will be a minimum of 2.5H:1V. Two general types of embankment construction methods will be
utilized including:
●
Main
Embankment Dam: Centerline Raise Construction
●
North
Embankment Dams: Downstream Raise Construction.
The
initial starter embankment constructed for Stage 1 will have a maximum height of 92 ft from crest to the downstream toe. Based on the
milling schedule presented in Table 13-1, Stage 1 is designed to store approximately 15.25 Mt over an eight-month period at a tailings
production rate of 57,000 tons per day and a dry density of 74 pcf. After completion of the starter embankment, the embankment crest
will be raised in stages utilizing a combination of downstream and centerline construction methods as presented on Figure 15-11 and Figure
15-12.
Figure
15-11: TMF Main Dam Section
Source:
WSP, 2026
Hycroft Mine Project
Page 208
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
15- 12: TMF North Dam Section
Source:
WSP, 2026
Centerline
Raise Construction method will be used for subsequent raises of the main embankment. The second stage of development will store three
years of tailings, while subsequent stages will each accommodate between five and eight years of additional tailings storage.
A
chimney drain will be installed along the dam centerline to control seepage through the dam and maintain a drained downstream zone for
stability. Geomembrane liner will be installed in the impoundment and along the dam foundation beneath the embankment terminating at
the containment berm downstream of the chimney drain.
Downstream
Raise Construction method will be used for the ridge and saddle dams of the north embankment. downstream construction and will be accomplished
by extending a new embankment against the existing downstream slope of the previous stage and then raising the embankment to the new
crest elevation for each stage. The upstream face of the North Embankment will be lined with geomembrane for all raises of the embankment.
A chimney drain will not be installed, since the upstream face of the embankment is lined with geomembrane.
15.5.2.2
Containment
and Underdrain System
In
general, the TMF impoundment area is gently sloping to the northwest and well-suited for a geomembrane liner system. Basin grading will
consist of clearing and grubbing native vegetation, removing and stockpiling growth medium material for use during reclamation, and smoothing
surface irregularities to promote gravity drainage to the reclaim pond.
An
80-mil HDPE geomembrane liner will be installed to cover the entire basin on top of a prepared bedding layer and will extend beneath
the main embankment to the containment berm below the chimney drain.
Hycroft Mine Project
Page 209
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
An
underdrain piping system will be placed above the basin geomembrane liner and will collect tailings seepage within the basin and convey
the tailings water by gravity through the embankment to the Underdrain Collection Pond located at the downstream toe of the main embankment.
The underdrain system will consist of a network of regularly spaced perforated dual-wall pipes bedded in drainage gravel. Below the containment
berm the underdrain pipe will transition into a solid wall non-perforated pipe to Underdrain Collection Pond. Alluvial material will
then be placed to cover the liner and underdrain system prior to tailings deposition to act as a filter to prevent migration of tailings
into the drainage gravel.
15.5.2.3
Foundation
Settlement
The
embankments that form the TMF will be constructed primarily on dense to very dense alluvium overlying weathered bedrock which is expected
to be relatively incompressible. The alluvium that blankets the TMF site extends to a depth of up to 43 ft bgs. Based on these foundation
materials, settlements from the ultimate dam configuration are not expected to pose a risk to the TMF embankment’s structural integrity.
Piping systems can readily be updated during future design stages to accommodate any anticipated differential settlements.
15.5.2.4
Geotechnical
Stability
To
comply with GISTM (2020) and NAC (2014) standards, the PEA design of TMF shown in Figure 15-10 meets or exceeds the following minimum
design requirements:
●
Minimum
design static (steady-state seepage) factor of safety (FOS) of 1.50.
●
Minimum
design pseudo-static factor of safety of 1.10
●
Seismic
design criteria based on the GISTM 2020 failure consequence classification of Very High are:
○
the
design earthquake during operations is the 1 in 5,000-year return event. The peak ground acceleration for this event is estimated
to be 0.273 g.
○
the
design earthquake post closure is the 1 in 10,000-year return event. The PGA for this event is estimated to be 0.398 g.
A
two-dimensional (2-D) limit-equilibrium (LEM) stability modeling was used to evaluate the stability of the dam in operational and closure
conditions under both static and earthquake loads. While liquefaction potential of the tailings and foundation materials is a possibility,
the post-earth earthquake liquefied condition was not evaluated for PEA design. Effects of liquefaction on TMF performance and stability
are credible risks and must be addressed in future phases of design.
A
pseudo-static analysis is a type of LEM analysis was used as a screening tool to assess the stability of a slope under loading from the
design earthquake. In this analysis, stability models were used to determine the Factor of Safety (FOS) of the slope when subjected to
seismic loading from the design earthquake event. To comply with GISTM (2020) for a Very High consequence classification dam, the seismic
design events were selected according to Table 15-6.
Hycroft Mine Project
Page 210
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
15- 6: Selected Ground Motions and Associated Seismic Coefficients
Pseudo-static
Model
Probabilistic
SHA Results
Probability
of Exceedance
(Return
period)
Mean
Peak Ground Acceleration (PGA), g
Seismic
Coefficient, k (G)
Operations
(Active Care)
1%
in 50 years (4,975 year)
0.273
0.182
Closure
(Passive Care)
0.5%
in 50 years (9,975 year)
0.398
0.265
All
the calculated FOS were found to be above the minimum criterion which the prefeasibility dam, as designed, is deemed to be stable with
respect to geotechnical, geometric, and seismic loading conditions evaluated. These analyses are preliminary, and the level of both field
and laboratory geotechnical characterization used to support these analyses were completed at a prefeasibility level.
15.5.2.5
TMF
Surface Water Management
TMF
Surface Water management is addressed in Section 15.10.2.2.
15.5.2.6
Monitoring
To
support construction-level design and permitting, a detailed geotechnical monitoring plan will be prepared that defines the roles and
responsibilities of key stakeholders (Owner, operator, engineer) for safe and stable TMF construction and operation. Monitoring will
be accomplished through both measurements of monitoring points (e.g., survey monuments, piezometers readings), and visual observations
of surface conditions.
15.5.2.7
Closure
The
TMF conceptual closure and reclamation plan is shown on Figure 15-13. The general closure design strategy includes construction of a
durable cover system that can generally remain in passive care for the main cover system with active care required for maintenance of
surface water channels and as needed for monitoring. Growth medium stripped during TMF construction should be stockpiled for future placement
on the TMF surface and exposed embankment surfaces during reclamation.
The
downstream embankments that form the TMF have been designed with 2.5H to 1V downstream slopes that are sufficiently flat for effective
revegetation. The tailings surface will be covered with a layer of rockfill overlain by stockpiled growth medium and revegetated. Capping
of the tailings will start at the end of deposition of Stage 8 on areas where the tailings have reached final elevation. Capping material
is expected to be sourced from onsite locations. Cover infiltration modeling has not been performed for this PEA to support estimation
of closure cover thickness required on the tailings surface. For this Prefeasibility Study, Golder selected a three-foot-thick composite
soil cover system above the final tailings surface (2 ft of waste rock and one foot of growth medium) and a one-foot-thick growth
medium layer above the downstream embankment slopes. The closure cover will be graded with drainage swales to convey surface runoff to
the closure spillway to the south of the main embankment. Surface water will be conveyed and discharged into the natural drainage north
of the Underdrain and Event Ponds.
Hycroft Mine Project
Page 211
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
closure systems will be designed to have the same characteristics as the pre-development natural drainage systems. The closure spillway
will be designed to convey the inflow resulting from the 10,000-year, 24-hour storm, assuming the permanent diversion channel overtops
onto the TMF closure surface. Maintenance may be required to provide repair for any damage created by larger or more intense storms.
Figure
15-13: TMF Closure Plan
Source:
WSP, 2026
15.6
Waste
Rock Storage Facility
The
Hycroft project will feature a WRSF, to store all non-mineralized materials from the pits. Initially, there will be two facilities,
one to the west and one to the south. By the end of Mine Year 10, the two facilities will begin to merge into one single facility that
is on the southwest perimeter of the developing pit.
Hycroft Mine Project
Page 212
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
15-14 Waste Rock Storage Facilities
Source:
IMC, 2026
Slope
stability analyses, material properties, and stacking geometry were the basis for foundation and dump formation design conditions. The
dump will generally have inter-bench slope angle of 1.5H:1V with 50 ft high and 60 ft wide benches with some localized exceptions. The
configuration of each bench has been developed assuming that the waste rock will be stacked with an overall slope of 3H: 1V. The dump
will be built over a previously disturbed area.
Water
management for the WRSF consists of two systems: upstream diversion channels for non-contact water (water flow from natural slopes) and
a seepage collection system within the stockpile for contact water. These systems are further described in Section 15.10.3.
The
physical stability of the WRSF will be monitored using geotechnical instrumentation installed in the facilities. The proposed instrumentation
includes survey markers, vibrating wire piezometers, hydraulic piezometers and inclinometers.
Once
areas of the mine are complete, in-pit backfill may also be utilized for waste storage, if required. During closure, areas close to the
Waste Rock facility will be selected for harvesting topsoil and growth media suitable for vegetative growth.
15.7
Power
and Electrical
Power
is currently supplied to the site via nearby power lines fed directly from the main power grid, using the grid-side substation. It is
assumed that 2 x 120 kV powerlines will be required. The estimated installed load for plant is 160 MW and estimated operating load is
124 MW. Power will have to supply the site via the Nevada Power Imlay Substation and across the existing power line corridor up to Jungo
Road and then west along Jungo Road to Site. The proposed power supply configurations can be seen below in Figure 15-15 and Figure 15-16.
Hycroft Mine Project
Page 213
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
15-15: Proposed Power Line from Imlay Relay Station (Nevada Historical Marker 49) to Jungo Road (49 Road) - NTS
Source:
Google Maps, 2026
Hycroft Mine Project
Page 214
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
15-16: Proposed Power Line along Jungo Road (Road 49) to Hycroft Mine Site (in total approximately 57 miles) - NTS
Source:
Google Maps, 2026
15.8
Communication
The
site currently operates with data and telephone communications provided by microwave facilities serviced from two different locations,
alongside a 140-foot tower near the administration building, providing cellular communications throughout the site. Voice and data are
already distributed throughout the mine via fiber optic cable, and cellular communication is available throughout the Mine site. If necessary,
upgrades will be provided based on assessment by the current service provider during the execution phase of the project.
15.9
Fuel
Diesel
fuel prices were provided by Hycroft at $3.76/gal for use in the economic assessment. Contracts for the purchase and delivery of the
major consumables, including fuel, are in place and are renewed on an annual or bi-annual basis. Once complete, fuel will be delivered
to site via the proposed rail spur, set to extend the existing Union Pacific rail line located north of the plant.
Fuel
on site is stored within a fuel island. Hycroft plans to replace the existing fuel island with a high efficiency fuel island in Mine
Years 3 and 4.
15.10
Water
Supply and Management
The
climate data utilized in this study were sourced from Rye Patch Dam climate station (ID 2670192-1) located approximately 32 miles southeast
of the mine site. (Golder, 2022). Monthly precipitation and pan evaporation data were obtained from this weather station. Table 15-7
provides a summary of the average monthly climate data.
Hycroft Mine Project
Page 215
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
15-7: Weather Station Summary
Parameter
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Average
Annual
Max
Average Temperature (°F)
42.8
49.7
57.5
65.6
75
84.2
94.2
92.3
83.3
70.6
54.3
44.5
67.8
Min
Average Temperature (°F)
17.7
22.5
26.2
31.2
39.2
46.2
52.3
49.4
41.5
31.8
23.8
18.3
33.3
Mean
Precipitation (in)
0.78
0.68
0.72
0.85
0.99
0.75
0.28
0.29
0.38
0.64
0.69
0.72
7.77
Mean
Pan Evaporation (in)
0
0
3.71
5.83
7.38
9.23
11.15
10.06
6.95
4.3
0.77
0
59.38
Table
15-8 presents the precipitation data for 24-hour storm events used in design process. Rainfall depths corresponding to a 100-year frequency
were used in the design of both the channels and ponds.
Table
15-8: Summary of Storm Event with Associated Rainfall Intensity
Return
Period
24-hour
(inches)
10-Year
1.31
100-Year
2.03
500-Year
2.58
1,000-Year
2.93
5,000-Year
3.27
10,000-Year
3.48
Existing
water management controls will remain in place for the proposed project. Additional water controls for proposed structures and the overall
site water balance are described in the following sections.
15.10.1
Fresh
Water, Fire Water and Potable Water
Hycroft
controls 16 distinct water-right permits granted from the Nevada Division of Water Resources (NDWR) in the form of either direct ownership
or through leases from other private parties. Water rights on site are controlled by 14 permits in or around the Black Rock Desert Basin.
These permits can be referenced in Table 4-1, Section 4. Hycroft currently owns a land position and water rights sufficient to support
all planned facilities and process water demands. Freshwater at site is supplied via four water wells; one of which supplies potable
water to site.
Fresh
water is needed on site for reagent mixing and preparation, processing in the crushing area, and as gland water. These water consumption
needs will be minimized where possible via the use of process water or barren solution in lieu of fresh water. An estimated 7,260 gal/min
is required for the plant.
Hycroft Mine Project
Page 216
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
potable water well is located one mile south of the Crofoot Heap. Once taken from these wells, fresh water is to be transferred
to a fresh/fire water storage tank. Provisions will be made for the fresh water to be supplied from the water wells. Fresh water will
be transferred to a fresh/fire water storage tank.
In
addition to the existing active and inactive freshwater production wells located at the well field southwest of the mine, an additional
four wells shall be installed to deliver freshwater to site. A budget has been included to upgrade the existing freshwater pumps and
include off-plot piping for a freshwater pipeline to a new freshwater tank at the process plant. The power supply to the new production
wells is planned for the existing power line servicing the existing well field assuming it is sufficient.
15.10.2
Tailings
Water Management
15.10.2.1
Tailing
Deposition Management and Return Water
Slurry
pumps at the tailings thickener will send concentrated tailings to the TMF through a tailings transport (delivery) pipeline at a solids
concentration of 48% wt/wt. The tailings transport pipeline will consist of a pipe laid in an HDPE-lined containment channel. A tailings
distribution system placed around the perimeter of each stage of TMF expansion will allow deposition in the basin using thin-layer subaerial
deposition methods.
The
distribution system has been designed by Ausenco and will include a 36” diameter distribution manifold and distribution
branch pipelines, and valves and spigots. Tailings will be spigoted from the south, west, and east sides of the TMF to create a supernatant
pool to the south near the Main Embankment. Focused spigoting from the Main Embankment will control the pool away from the embankment.
The
return water pipeline from the TMF to the plant has been designed by Ausenco and will consist of a carrier pipeline within an HDPE-lined
containment channel. In the first stage(s) of operation, underflow and decant water from the TMF will drain to the Underdrain Collection
Pond, where all of the return water will then be pumped to the plant for reuse. In later years, barge mounted pumps will be installed
in the TMF and a majority of the return water would be pumped directly to the plant from the supernatant pool. The Underdrain Collection
Pond pumps would thereafter be used only for underflow water draining from the underdrain pipe system and embankment chimney drain.
15.10.2.2
TMF
Surface Water Management
During
operation, temporary storm water diversion channels will be constructed around the TMF impoundment to convey runoff around the proposed
TMF ultimate footprint. Temporary stormwater diversion channels will be constructed at 0.5% grade for each stage of TMF construction.
Temporary channels are sized to convey peak flows from the 25-yr, 24-hour storm, while maintaining 6” of freeboard,
and convey flows from the 100-year, 24-hour storm with no freeboard. Any precipitation that runs off downslope of the temporary stormwater
diversion channels will report to the impoundment area and will subsequently flow into the Underdrain Pond or Event Pond. During closure,
all temporary diversion channels will be reclaimed and water will be managed by channels on the surface of the TMF.
Hycroft Mine Project
Page 217
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
permanent diversion system will be constructed during Stage 1 and will remain in place during the life of the TMF and into long-term
closure. The permanent diversion channel is sized to convey peak flows from the 100-yr, 24-hour storm, while maintaining 6”
of freeboard. The permanent diversion channel was design to handle flows from up to the 500-year, 24-hour storm, with no freeboard,
to prevent surface runoff from contacting the TMF.
The
TMF supernatant pool and dam crest were designed to consider 2ft of freeboard above the tailings surface during each stage in
operations. However, the main embankment crest elevations consider inflow from storm events assuming the permanent diversion channel
fails during extreme storms. During normal operation, the TMF is designed to contain all process fluids, annual precipitation, and storm
flows resulting from the 1 in 100-year, 24-hour storm event falling on the impoundment catchment area below the temporary stormwater
diversion channels.
During
operation, the TMF is design to contain runoff from the 5,000-year, 24-hour storm event. During closure, the conceptual reclamation plan
consists of a cover system that includes channels on the closed tailings cover surface to manage runoff to the TMF surface and a spillway
that will convey runoff from the 10,000-year, 24-hour storm event. During long-term closure, the closure diversion channels will route
storm water over the closed TMF tailings surface to the historic supernatant pool location at the southern edge of the impoundment. A
closure spillway will be constructed through native ground to discharge surface water to the natural drainage north of the Underdrain
and Event Ponds.
15.10.3
WRSF
Water Management
15.10.3.1
WRSF
Seepage
The
proposed seepage collection system for the five dumps is made up of corrugated and perforated double-walled HDPE pipes with a diameter
of 300 mm for the main pipes, and 100 mm for the secondary pipes. The seepage collection system was sized for the 100-year, 24-hour duration
flood event. The installation of the seepage collection system will be executed during subgrade preparation and before placement of waste
rock. The seepage collection system will discharge impacted water to the downstream collection ponds.
Collection
ponds have storage depths of 15 ft and rectangular polygonal base, with 2H: 1V side slopes, based on stability analysis. These ponds
have a freeboard of 5 ft above the maximum storage level, in addition to a 1.60 ft high berm around the upper perimeter. The ponds will
be double lined with geosynthetic clay (GCL) and smooth 1.5 mm HDPE geomembrane. Water collected in seepage collected ponds will be trucked
back to the process plant for reuse.
15.10.3.2
WRSF
Surface Water Management
Diversion
channels have been designed to capture, divert, and minimize the surface runoff infiltration through the base of the waste rock dumps.
Diversion channels will discharge into natural drainage points or existing/projected structures. The dimensioning of the hydraulic structures
has been carried out based on the maximum flow values estimated for the project’s 100-year, 24-hour flood event. Diversion channels
will have a minimum slope of 2% in addition to riprap lining for erosion control. Only the Vortex, West, and Bay dumps will require the
construction of diversion channels.
Hycroft Mine Project
Page 218
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
15.10.4
Plant
Site Stormwater Runoff and Drainage
The
proposed plant site is divided into sub-catchments. Runoff from the sub-catchments will be conveyed away from the work area with perimeter
drainage ditches and culverts. Slopes between pads of the process plant will be erosion protected with hydromulch. Ditches and culverts
will convey stormwater to a sedimentation pond located to the south of the process plant adjacent to the oxygen plant. Mine affected
runoff within the project area will be captured and recycled for us as process water.
Plant
site ditches, culverts and the stormwater pond were sized based for one in 100-year, 24-hour duration flood event. The pond will have
a storage capacity of 9,850 yd3 with 1 vertical to 2.5 horizontal internal side slopes and will be lined with HDPE liner and
will serve the secondary purpose of emergency containment for spills from the process plant tanks. The design of the pond includes a
spillway for excess stormwater to be released to the environment in the southwest direction away from the plant after sedimentation of
particles.
15.10.5
Site
Water Balance
A
LOM water balance model was developed using GoldSim© software and considers the full life cycle of the Project. Key mine facilities
and water management processes are represented in the model, in addition to modeling surface water runoff. The key objectives of the
site water balance were to estimate water effluents of mine facilities and estimate make-up water requirements considering contact water
reuse.
The
site wide water balance schematic is shown in Figure 15-17.
Hycroft Mine Project
Page 219
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
15-17: Hycroft Water Balance Schematic
Source:
Ausenco, 2022
The
water balance model was developed using GoldSim© software. For stochastic analyses, GoldSim© uses the Monte Carlo method to
generate monthly precipitation and evaporation time series, which are used as input climatic variable for the water balance model. A
stochastics simulation was developed using different possible precipitation sequences that may contain groups of consecutive dry or wet
years. For this purpose, synthetic series of monthly rainfall and evaporation of 15 years length were created.
The
modeling process run over 250 simulations to obtain acceptable probabilistic estimates of the effluent flows for mean percentile 1%
(dry years), and percentile 99% (wet years). Results of the water balance model in GoldSim are expressed in mean values, and those
corresponding to situations of extreme abundance and scarcity denoted by percentiles of 100 years of return period
(percentile of non-exceedance of 1% and 99% or risk of exceedance of 99% and 1%, respectively).
Hycroft Mine Project
Page 220
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
probabilistic terms used in the description of the results include:
●
Monthly
average: The average monthly flow of all the simulation was estimated.
●
Maximum
monthly with 1% of risk (p99%): Considering all the simulations, the 99% percentile of non-exceedance or 1% of monthly risk was estimated.
This means that there is a 1% probability that the reported value will be exceeded due to excess rainfall in one month of the period
of simulation.
●
Minimum
monthly with 1% of risk (p1%): Considering all the simulations, the 99% percentile of exceedance or 1% of monthly risk was estimated.
This means that there is a 1% probability that the reported value will be succeeded due to lack of rainfall in one month of the period
of simulation.
Table
15-9 shows the LOM monthly average, the maximum (p99% or wet conditions), the minimum (p1% or dry conditions) make-up water demand. Figure
15-18 shows the make-up water demand variation through the operation stage. On average, make-up water requirements start at approximately
6,500 gal/min on the first year of operations. This requirement decreases to approximately 5,000 gal/min for Years 2 through 9. Average
make-up water requirements further decrease to 4,400 gal/min for Years 10 through 13. Lastly, Years 14 and 15 have an average make-up
water demand of 3,200 gal/min.
Table
15-9: Monthly Maximum Flows Demand
Facility
Operation
Stage (gal/min)
Monthly
average
Wet
Conditions (p99%)
Dry
Conditions (p1%)
Well
System
4,694
6,967
1,861
Note:
99% percentile of non-exceedance.
Figure
15-18: Total Fresh Water Demand
Source:
Ausenco, 2022
Hycroft Mine Project
Page 221
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
15.10.6
Pit
Dewatering
SRK
Consulting (U.S.), Inc. (SRK), working with Hycroft prepared a Technical Memorandum that describes the hydrogeologic conditions, preliminary
dewatering estimates, and associated costs for POX PFS Project. The hydrogeology of the mine and surroundings is complex. It includes
a fault associated fluid barriers/conduits, high temperature groundwater, and the presence of hydrogen sulfide (H2S)
gas. SRK conducted a three-year hydrogeologic data collection program incorporated pumping and monitoring wells, vibrating wire piezometers
(VWP’s), core hole hydraulic testing, and short and long-term aquifer testing to characterize the local and regional (to the extent
possible) groundwater system. The depth to groundwater is 700 ft below ground surface (bgs). Four depressurization wells are planned
for dewatering the pit. SRK supplied a preliminary design for the location of the dewatering pumps, and pipeline required to convey water
to the process plant from the pit. Power to these pumps will tie off existing powerlines in the area or the pumps maybe diesel-fueled
if circumstances warrant.
15.11
Hazard
Considerations
The
climate at the Hycroft Site is arid with an average precipitation of 7.7 in/a falling mostly in the spring and winter months. Winds tend
to be light in this area; however, occasional sandstorms or dust storms have been observed in spring months.
Temperatures
in winter range from an average of 20 °F at night to 40 °F during the day. Fluctuations between freezing and non-freezing temperatures
is sufficient to induce freeze–thaw cycling in near-surface soils, particularly in fine-grained or moisture-bearing materials.
Winter snowpack is light, and snow does not normally present logistical problems.
Slope
stability on site is governed by prevailing geotechnical conditions. According to the January 2012 Call & Nicholas, Inc. summary
report of the 2011 reserve pit slope stability assessment, the principal factors governing slope stability are (1) the argillically altered
Camel Conglomerate (Tc) and associated lakebed sediments (Tsg), (2) the thinly bedded siltstones of the Auld Lang Syne Formation, which
are interpreted to dip toward the pit along the east walls of the Vortex and Brimstone pits, and (3) the East Fault.
Michael
W. West and Associates Inc. (MWWAI) concluded after conducting a review of the Hycroft deterministic seismic hazard assessment in 2012,
that seismicity in the area was low to moderate with no relation to mapped faults. Additionally, he noted that no faults in the area
were classified as “active” or “capable”. According to MWWAI, these findings are consistent with the United States
Geological Survey National Probabilistic Seismic Hazard Model.
15.12
Comments
on Project Infrastructure
The
Project is located within the established Hycroft Mine site and represents a brownfield development. A new sulfide ore processing plant
is proposed. This plant will be integrated into the existing mining complex via tie-ins to current crushing infrastructure, utilities,
and site services. Existing access roads across the site, in addition to many existing structures and facilities will remain in service.
Hycroft Mine Project
Page 222
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
Hycroft site currently includes primary, secondary, and tertiary crushing facilities, heap leach pads, the Merrill-Crowe processing plant
complex, a refinery, administration buildings, maintenance shops, warehouse and laboratory facilities, fuel storage, and various ancillary
service structures. Communications infrastructure is in place across the site and includes microwave-serviced data and telephone systems,
fiber optic distribution, and site-wide cellular coverage.
The
mine and its staffing requirements are supported by the nearby town of Winnemucca approximately 54 miles from site. Additional workforce
may be drawn from the other nearby towns of Lovelock and Gerlach. Surveys indicate that the town of Winnemucca is large enough to provide
adequate housing, personal services, and transportation infrastructure to support both operational and construction workforce requirements.
A contracted bus service will provide transportation from Winnemucca to site.
Existing
community infrastructure is considered sufficient to support both current and future staffing levels, with construction personnel transported
to site via contracted bus services.
The
proposed processing facility is designed to connect to the existing crushing circuit and North Merrill-Crowe facility. The proposed scope
of work includes electrical distribution upgrades, new substations, process control systems, reagent handling facilities (including oxygen
and limestone systems), and selective expansion or repurposing of existing maintenance and administrative buildings.
The
site currently has access to grid power. Additional transmission capacity is required to support the new plant. The total estimated load
factoring for load growth, including power for the oxygen plant, is 170 MW. Tie-ins to existing utilities shall include water, compressed
air, and potable and sewer systems. The development of a freshwater production well field is also planned to support freshwater needs
throughout the LOM.
A
rail spur extension from the Union Pacific line is planned to support delivery of reagents, consumables, and fuel, and to facilitate
shipment of salable metals. Additionally, the existing fuel island is to be replaced with a higher-efficiency system during the LOM.
Ancillary
structures including a covered crushed ore stockpile, new laboratory and maintenance facilities, fuel station upgrades, and technical
services expansion are proposed to support operations over the LOM. In addition to this, select existing buildings will be relocated,
expanded, rehabilitated, or repurposed.
Hycroft Mine Project
Page 223
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
16
Market
Studies and Contracts
16.1
Market
Studies
Hycroft
Mining has not completed any formal marketing studies with regards to gold production that will result from the mining and processing
of ore from the Project into gold and silver doré bars. Gold and silver production is expected to be sold on the spot market,
with the terms and conditions of sales contracts expected to be typical of similar contracts for the sale of doré throughout the
world. Gold and silver are principal precious metals traded at spot prices for immediate delivery. The market for gold and silver is
very liquid with many buyers and sellers - trading typically spans 24 hours/day across multiple locations around the world, making
it straightforward to obtain a reliable market price at any time. The depth and stability of these markets support the expectation that
gold and silver doré produced from the Project can be sold throughout the LOM.
16.2
Commodity
Price Projections
The
economic analysis for the Project was performed assuming a base case gold and silver price of US$3,600/oz and US$48.00/oz respectively.
These prices are based on the average of long-term consensus price forecasts from numerous financial institutions as of April 2026.
16.3
Contracts
Hycroft
has not at this stage entered into agreements related to refining Hycroft products, transporting products to market or smelting facilities,
or insuring doré and/or concentrate products. As of this time, Hycroft does not have open hedging contracts or forwards agreements
for their products. Marketing of doré is expected to be arranged through contractual relationships with major refineries for secure
transportation of metal and refining. The cost of transporting and refining doré included in the economic analysis are US$5.00/oz
for gold and US$0.50/oz for silver, based on terms recently published for comparable projects. Transportation and treatment contracts
are not currently in place, though easily obtainable.
Hycroft Mine Project
Page 224
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
17
Environmental
Studies, Permitting, and Plan, Negotiations, or Agreements with Local Individuals or Groups
17.1
Overview
This
section provides an environmental overview of the Project. It outlines existing biological and physical baseline conditions, proposed
new baseline studies to support future permitting, existing permits, and permitting requirements to support the proposed revisions to
the Project. This section also discusses socio-economic baseline conditions, community engagement, and conceptual mine closure and reclamation
planning for the Project.
The
Mine is located on public land administered by the Bureau of Land Management (BLM) and private land controlled by Hycroft Resources and
Development, LLC, a wholly owned subsidiary of Hycroft Mining Holding Company. The Mine lies within the Sulfur Mining District, approximately
54 miles west of Winnemucca, Nevada. Access to the site is via Jungo Road (a Humboldt County maintained road).
Hycroft
is authorized for ore extraction and processing, water management, engineering, environmental studies, and exploration. Existing facilities
on site include two administration buildings, a laboratory, a mobile maintenance shop, a light vehicle maintenance shop, a warehouse,
leach pads, primary, secondary, and tertiary crushing systems, two Merrill-Crowe process plants, and a refinery. The Mine is permitted
for both heap leach and milling operations.
Hycroft
is proposing the development of new infrastructure to support the requirements of the modified Project. Updates include construction
of the North TMF, Waste Rock Storage Facilities (WRSF), rail spurs, and a new process plant area.
17.2
Environmental
Considerations
17.2.1
Baseline
and Supporting Studies
The
Mine has conducted numerous environmental baseline studies as part of their previous permitting efforts and continues to collect certain
environmental baseline data. The Mine area has been surveyed for surface water resources, including Waters of the United States (WOTUS),
biological resources, cultural resources, and groundwater resources. These studies include:
●
Summary
of Field Investigations and Conceptual Hydrogeology Report (2013)
●
Hydrogeologic
Characterization Report (2014)
●
Baseline
Spring Inventory and Surface Water Monitoring, Hycroft Mine (2014)
●
Rock
and Water Baseline Characterization for the Phase II Expansion Project – Hycroft Mine (2014)
●
Air
Quality Impact Analysis (2017).
Hycroft Mine Project
Page 225
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
17.2.1.1
Hydrology
and Climate
The
Mine lies on the eastern edge of the Black Rock Desert, and there are no streams, rivers, or lakes in the immediate vicinity of the Project.
Spring baseline surveys have been conducted biannually since 2011 within a 10-mile radius around the Mine. A total of 31 sites were identified
in the baseline study. These included natural springs, man-made springs, and seasonal wetted areas. Nine of the sites were identified
for monitoring to evaluate surface water resources near the Mine. Additionally, JBR Environmental Consultants, Inc. conducted spring
surveys in 2012 and 2013 encompassing 560 square miles west of the Mine to assess whether groundwater pumping at the mine would impact
other springs in the Black Rock Desert. Survey data and groundwater modeling predictions did not indicate drawdown would extend near
any of the inventoried springs.
The
Mine is in a semi-arid high desert environment, and climate is controlled primarily by the Sierra Nevada Range with minimal rainfall.
Climate data including precipitation, temperature, and pan evaporation have been obtained from the Western Regional Climate Center’s
database for the National Weather Service Cooperative Station at the Rye Patch Dam. The station is located approximately 32 miles from
the Mine at a similar elevation and provides data from 1935-2012. The recorded precipitation at the Rye Patch Dam weather station averaged
8.93” annually. Additional precipitation data were collected at the Mine weather station from 2010-2012 and from
the Rye Patch Dam weather station. Annual pan evaporation at the Rye Patch Dam is 59.38 in/a and the recorded average temperature is
51 °F.
17.2.1.2
Hydrogeology
A
total of 16 wells and 23 piezometers are installed to evaluate the hydrogeologic baseline conditions at the Mine, with the majority of
data being collected between 2010 and 2013. Instrumentation is located throughout the Mine site and completed in a variety of geologic
formations representing the site. Static groundwater varies from 20 to 800 ft bgs and varies from 150 to 800 ft bgs directly beneath
the mining operations. Groundwater generally flows southeast to northwest from recharge in the volcanic highlands to discharge in the
alluvial basin beneath the Black Rock Desert. Results are summarized in detail in the Hydrogeologic Characterization Report and the Summary
of Field Investigations and Conceptual Hydrogeology Report which were both developed in 2013 in support of the Phase II Expansion Project.
17.2.1.3
Soils,
Vegetation and Wildlife Monitoring
The
Mine released a Biological Baseline Report in 2019 that incorporated the results of 2014, 2015, and 2016 surveys conducted since the
original release of the report in 2012. The report also included clarifications, edits, and missing information requested by BLM, as
well as revised information based on updated Project details. The report focuses on soil, vegetation, and wildlife surveys and provides
background consultation with regulatory agencies, as well as field methodologies and survey results. The combined surveys areas make
up the “Biological Survey Area,” which encompasses the proposed area of disturbance of the Project. BLM has stated that any
new areas that would be disturbed would require baseline surveys.
Hycroft Mine Project
Page 226
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Eight
soil units have been mapped by Natural Resources Conservation Service within the 2012-2014 Biological Survey Area. The soil units are
described both in the Soil Survey of Humboldt County, Nevada, West Part (NRCS, 2003) and Soil Survey of Pershing Country, Nevada, West
Part (NRCS, 1998). There are no serious limitations related to soil quality that would limit the proposed development or future reclamation
efforts.
Stantec
completed vegetation surveys of the Biological Survey Area in 2012 and 2014, which included vegetation community mapping, floristic inventory,
and noxious, invasive, and non-native species surveys. Twenty-eight vegetation communities were mapped, with the dominant communities
being Desert Scrub-Wyoming Sagebrush (28%), Shadscale-Annual Grassland (23%), and Desert Scrub (10%). One noxious weed species, the five-stamen
tamarisk, was identified during the surveys.
Eleven
occurrences of one BLM sensitive plant species, sand cholla, were noted within the Biological Survey Area. As with all cacti in Nevada,
the sand cholla is a protected cactus species, which requires a permit prior to commercial harvest. Botanists also identified 700 buckwheat
occurrences, which is a known host plant to insects on the BLM Winnemucca District’s special status species list.
Overall,
there is no presence of BLM sensitive plant species present on or near the Project which would present limitations to the proposed Project
updates.
Stantec
completed wildlife surveys of the Biological Survey Area from 2012-2016. Surveys ranged from General Wildlife surveys to more targeted
surveys studying migratory birds, bats, western burrowing owls, greater sage-grouse, and various butterfly species.
BLM
sensitive species identified during the surveys were:
●
Brewer’s
sparrow
●
Sage
thrasher
●
Loggerhead
shrikes
●
Western
burrowing owl.
Baseline
surveys also identified the BLM sensitive species golden eagle (Aquila chrysaetos) in and around the Project site. The Biological Baseline
Report details the results of golden eagle nest surveys conducted from 2012-2016, including information on nest condition, nest status,
and the number of young. Eagles observed to be off the nest were checked for any evidence of nesting behavior, such as mated pairs, territorial
defense, carrying nest material, or transporting food. Annual raptor and golden eagle surveys are completed annually, and results are
submitted to the BLM as stand-alone reports.
The
proposed modifications to the recovery process will not impact on the footprint of planned disturbance for the Project, and therefore
additional wildlife baseline studies may not be required to support the Plan of Operations amendment.
Hycroft Mine Project
Page 227
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
17.2.1.4
Geochemistry
The
Mine has a waste rock characterization program which is performed in phases related to approved or proposed mining areas. Most recently,
Phase 4 of the program was completed to collect additional data for the Phase II Expansion Project to ensure it is spatially representative
of the material proposed to be mined as part of the Project. Static testing was completed to address total acid generating or neutralizing
potential of the samples and concentration of constituents in leachates derived from the material. Kinetic testing for this Project is
the standard humidity cell test (HCT) procedure.
The
Phase 3 and 4 programs also included analysis of ore grade material, with 56 samples being collected and analyzed. From ABA testing,
all but one ore grade sample showed uncertain potential for acid generation or potential for acid generation. ABA and NAG for ore grade
samples fall within the same range as waste rock samples.
Pit
wall and floor samples have been collected to evaluate geochemical interactions between groundwater, pit walls, and the water quality
of the pit lake over time. The pit wall and floor sample are composed of the same material identified and characterized during the Phase
1-4 waste rock programs. Kinetic testing has shown that the submerged pit walls in a post mining environment have the potential to generate
acid and leach metals into the anticipated lake.
Three
types of tailings materials were analyzed as part of the Rail Spur Project EA: 26 variability composites, 6 master domain composites,
and 8 bulk samples representing tailings. The samples underwent whole rock analysis, ABA, NAG testing, meteoric water mobility procedure
testing, and mineralogy testing, and were deemed to be representative of site materials.
17.2.1.5
Air
Quality
The
Mine is located within the Humboldt and Pershing Counties, which lies within Air Quality Hydrographic Basin 28, which is unclassified
for PM10, CO, SO2, and NOx. In 2017, Stantec completed an Air Quality Impact Analysis (AQIA) for the Phase II Expansion Project,
which was later updated in 2018. The study includes near-field dispersion modeling to determine impacts of the Phase II Expansion Project
against the Nevada Ambient Air Quality Standards and the National Ambient Air Quality Standards. The study included ancillary sources
of emissions such as lime silos, storage tanks, and lighting plants, as well as fugitive, process, and traffic emissions. Monitoring
data from the Lehman Caves in Great Basin National Park was utilized to simulate background concentrations of pollutants of concern in
the Mine area. Modeling suggests that emissions from the approved Project will fall well below the lowest applicable air quality standards
for all constituents.
17.2.2
Environmental
Monitoring
The
Mine has developed a series of environmental management and monitoring plans which are required to guide the development and operation
of the Project to limit environmental impacts. These plans are developed to address legal requirements and committed Environmental Protection
Measures (EPMs) made by the Mine during Project permitting and recent Plan of Operations amendments.
Hycroft Mine Project
Page 228
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
following is a list of Hycroft Environmental Management and Monitoring Plans:
●
Waste
Rock Management Plan
●
Quality
Assurance Plan
●
Eagle
Conservation Plan
●
Stormwater
Pollution Prevention Plan
●
Solid
and Hazardous Waste Management Plan
●
Noxious
Weed Monitoring and Control Plan
●
Interim
Closure Plan
●
Monitoring
Plan
●
Surface
Area Disturbance Dust Control Plan
●
Lighting
Management Plan
●
Historic
Properties Treatment Plan.
17.2.3
Water
Management
Details
of the water management protocols have been included in each of the permits. These include, but not limited to, specific designated measuring
and monitoring locations, sample schedules, sample sizes, testing parameters, reporting protocols, internal and third-party reviews and
summaries, and notification protocols for any non-conformances or irregularities. Specifically, water management requirements are outlined
in the Plan of Operation Permit, Permit to Operate a Public Water System, Water Pollution Control Permits, and each of the Pond Permits.
17.3
Permitting
Considerations
The
Mine operates under a series of permits which are issued by both federal and state regulators. Table 17-1 highlights the permits necessary
to operate the Mine. The permits listed in bold are likely to require updates based on the proposed revisions to the Project.
Hycroft Mine Project
Page 229
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
17-1: Current Major Environmental Permits and Permits Necessary to Operate the Mine
Operating
Permits
Issuing
Agency
Number
Status
Plan
of Operations
BLM
N64641
Current
Mercury
Operating Permit to Construct
NDEP
Bureau of Air Pollution Control
AP1041-2255
Current
Class
I Air Quality Operating Permit to Construct
NDEP
Bureau of Air Pollution Control
AP1041-2964
Current
Class
II Air Quality Permit
NDEP
Bureau of Air Pollution Control
AP1041-0334.05
Current
Permit
to Operate a Public Water System
NDEP
Bureau of Safe Drinking Water
HU-0864-12NTNC
Current
Water
Pollution Control Permit-Crofoot Project
NDEP
Bureau of Mining Regulation & Reclamation
NEV60013
Current
Water
Pollution Control Permit-Hycroft Mine
NDEP
Bureau of Mining Regulation & Reclamation
NEV94114
Current
(Application Shield)
Reclamation
Permit
NDEP
Bureau of Mining Regulation & Reclamation
134
Current
Mining
General Stormwater Pollution Prevention Permit
NDEP
Bureau of Water Pollution Control
NVR
300000
Current
Class
III Landfill Waiver
NDEP
Bureau of Waste Management
F-346
Current
Artificial
Pond Permit (Brimstone Process Ponds)
NV
Department of Wildlife
S34481
Current
Artificial
Pond Permit (Crofoot Process Ponds)
NV
Department of Wildlife
S36665
Current
Artificial
Pond Permit (North Process Ponds)
NV
Department of Wildlife
S36661
Current
Septic
Onsite Disposal
NDEP
Bureau of Water Pollution Control
GNEVOSD09L-0048
Current
Dam
Safety Permits
NV
Division of Water Resources
J-273
Current
Hazardous
Materials Storage Permit
NV
State Fire Marshal
8250
Current
Special
Use Permit
Pershing
County
SUP
12-04
Current
Special
Use Permit
Humboldt
County
UH-12-04
Current
Golden
Eagle Take Permit
US
Fish & Wildlife Service
MB90099B-0
Current
17.3.1
Federal
Permits
17.3.1.1
Bureau
of Land Management Plan of Operations
The
Mine is currently authorized to operate under a Plan of Operations (Plan) (NVN-064641) under 43 Code of Federal Regulations [CFR] 3809
which has gone through several amendments. In 2012, the BLM issued a Record of Decision (ROD) for an EIS conducted for the Mine to expand
their heap leach operations, open pits, and waste rock facilities. In 2014, the BLM issued a Decision Record with an EA authorizing Hycroft’s
Plan of Operations for construction and operations of a rail spur, open pit expansion, and construction of a processing complex, including
the TMF located northeast of the mine.
The
Mine is preparing materials for a modification to the Plan of Operations to propose the following updates to the Project.
Hycroft Mine Project
Page 230
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
New
process plant that will be separate from the existing crushing facility and North Merril Crowe facility. The process plant will feature:
●
modifications
to existing crush circuit conveyor layout with additional feeders and a new rock breaker
●
new
process plant, including:
○
new
grinding circuit with four ball mills
○
new
multistage flotation circuit
○
new
POX circuit including lime boil tanks
○
new
leach circuit.
●
new
process control room, power distribution lines, grids, substations, and electrical rooms to support the processing plant
●
new
TMF located northeast of the Mine
●
new
access roads to the process plant and TMF, as well as a TMF construction haul road
●
an
additional rail siding of the existing Union Pacific rail line located in the NW location of the plant
●
WRSF
features additional waste rock dumps
The
review and approval process for the revisions to the Plan Application by the BLM constitutes a federal action under the National Environmental
Policy Act (NEPA) and BLM regulations. Thus, for the BLM to process the Plan Application, they are required to comply with NEPA and prepare
either an EA, or an EIS.
17.3.1.2
Bureau
of Land Management Pre-Application Planning
As
part of the pre-plan application planning process with the BLM, an initial meeting is scheduled between the proponent and the BLM to
discuss the anticipated scope of the amended mining operation and to review the likely environmental resource baseline data needed for
the processing of the Plan Amendment by the BLM. This initial meeting generally occurs prior to the submittal of the Plan Application,
depending on the anticipated complexity of the mining operations and baseline data needs, which varies for each Project.
The
process for collecting baseline data generally includes the development of baseline data collection work plans, which are submitted to
the BLM for review and approval prior to initiating the baseline data collection. Following approval, field surveys are conducted to
collect relevant baseline data. Depending on the environmental resources to be evaluated, desktop studies may be utilized in lieu of
field surveys. Findings of the field surveys are then summarized in a report that documents the data collected. These technical reports
are then submitted to the BLM for review and approval. In some cases, the baseline data collection process will also involve the State
of Nevada, depending on the resource being assessed, particularly for geochemical and hydrological surveys.
Hycroft Mine Project
Page 231
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
most recent baseline data for the Project was collected as part of the 2019 EIS process. Additions to baseline data, and additional studies
may be required as part of the proposed revisions to the Project.
17.3.1.3
Plan
of Operations Processing
The
Plan Application is submitted to the BLM and the Nevada Division of Environmental Protection (NDEP) Bureau of Mining Regulation &
Reclamation (BMRR) for any surface disturbance in excess of five acres. The Plan Application describes the operational procedures for
the construction, operation, and closure of the Project. As required by the BLM and BMRR, the Plan Application includes a waste rock
management plan, quality assurance plan, a stormwater plan, a spill prevention plan, a reclamation plan, a monitoring plan, and an interim
management plan. In addition, a reclamation report with a Reclamation Cost Estimate (RCE) for the closure of the Project is required.
The content of the Plan Application is based on the Mine plan design and the data gathered as part of the environmental baseline studies.
The Plan Application includes all mine and processing design information and mining methods. The BLM determines the completeness of the
Plan Application and, when the completeness letter is submitted to the proponent, the NEPA process begins. The RCE is reviewed by both
agencies, and the bond is determined prior to the BLM issuing a decision record on the Plan Application and BMRR issuing the Nevada Reclamation
Permit (NRP).
The
Plan Application will be submitted for the Project when operational and baseline surveys are complete, and operations and designs for
the Project are at a level where a Plan Application can be developed to the necessary level of detail. Key baseline reports for the Project
will be included in the Plan Application submittal to the BLM and BMRR.
The
BLM will need to complete their administrative review of the Plan Application and issue a determination prior to moving on to the NEPA
process.
17.3.1.4
Golden
Eagle Take Permit
Golden
eagles were observed in and around the Project site during environmental baseline studies. The Mine is working directly with the BLM
and the USFWS on the management of this species and submits annual survey reports to the BLM. As part of the permitting process, the
Mine will submit a golden eagle take permit application to USFWS requesting authorization to remove inactive golden eagle nests and incidental
take under the Bald and Golden Eagle Protection Act (BGEPA).
17.3.1.5
National
Environmental Policy Act
The
NEPA process is triggered by the issuance of a Completeness letter for the Plan Application. The NEPA review process is completed with
either an EA or an EIS.
The
EA process is conducted in accordance with NEPA regulations (40 CFR 1500 et. seq.), BLM, as lead federal agency, guidelines for implementing
the NEPA in BLM Handbook H-1790-1 (updated January 2008), and BLM Washington Office Bulletin 94-310. The intent of the EA or the EIS
is to assess the direct, indirect, residual, and cumulative effects of the Project and to determine the significance of those effects.
Scoping is conducted by the BLM and includes a determination of the environmental resources to be analyzed in the EA or the EIS, as well
as a degree of analysis for each environmental resource. The scope of the cumulative analysis is also addressed during the scoping process.
Following scoping and baseline information review, the EA or the EIS is prepared. When the BLM determines the EA or the EIS is complete,
it will be submitted to the public for review. Comments received from the public would be incorporated into either a revised EA or the
decision record, and for the EIS either a final EIS or a Record of Decision. Under an EA, there can be no significant impact. The preparation
of an EIS is a lengthier and more expensive process than an EA. The Project proponent pays the third-party contractor to prepare the
EIS and pays recovery costs to the BLM for any work on the Project by BLM specialists.
Hycroft Mine Project
Page 232
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
17.3.2 State
of Nevada Permits
There
are several environmental permits issued by the NDEP. NDEP will issue permits that address water and air pollution, as well as land reclamation.
The Nevada Division of Water Resources (NDWR) issues water rights for the use and management of water.
17.3.2.1 Nevada
Reclamation Permit
Hycroft
currently operates under a NRP under the Nevada Administrative Code [NAC] 519A) (Plan Application) issued by the NDEP. Hycroft will need
to modify the NRP from the BMRR to include construction, operation, and reclamation details as applicable to the modified Project design.
The contents of the modification are prescribed in the NAC Section 519A.140. Based on the Memorandum of Understanding between the BLM
and NDEP, a joint application is submitted to the BLM and BMRR that addresses the requirements of the modified Plan and NRP.
17.3.2.2 Water
Pollution Control Permit
The
water pollution control permits (WPCPs) from the BMRR will be revised to include the updated designs to construct, operate, and close
a mining facility in the State of Nevada. The contents of the application are prescribed in the NAC Section 445A.394 through 445A.399.
The revised WPCP applications for the Project will be updated based on the following:
● Open
pit mining, with an anticipated post-mining pit lake formation.
● Storage
of non-acid and acid generating waste rock.
● Exploration.
● Dewatering
and water management.
● Mill,
NTF, and process plant management.
● Ancillary
facilities that include stormwater diversions, and sediment control basin.
WPCP
applications include an engineering design for waste rock storage areas and mill/tailings facilities, waste rock characterization reports,
hydrogeological summary reports, engineering design for process components including methods for the control of stormwater runoff, and
containment reports detailing specifications for containment of process fluids. Applications will also contain the appropriate WPCP plans,
including a process fluid management plan, a monitoring plan, an emergency response plan, a temporary closure plan, and a tentative plan
for permanent closure of the Mine.
Hycroft Mine Project
Page 233
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
17.3.2.3 Air
Quality Operating Permits
The
Mine currently operates under a Class II Air Quality Operating Permit, a Mercury Operating Permit, and a Class I Operating Permit to
Construct which include the Gyro Crushing Circuit, lime silos, and the Mill Project. A new Operating Permit to Construct could be required
by the NDEP Bureau of Air Pollution Control (BAPC) for a roasting plant, and the existing permits may need to be revised to reflect the
proposed changes to the Project. The permit modification applications would include specifics on each process component that could emit
air pollutants and a detailed emissions inventory, as well as air quality modeling. The application preparation and processing time frame
ranges from three to nine months, depending on the type of permit.
17.3.2.4 Water
Rights
The
Mine currently holds 16 separate water rights permits administered by the NDWR. These rights are leased to Hycroft. The water resources
to support the Mine are held under 14 of the water rights permits in the Black Rock Desert Basin and a total of 21,457.95 acre-ft/a
(6.99 billion gal of water per year). The remaining two water rights permits are held outside of the Black Rock Desert Hydrographic Basin
and are used to support maintenance of Jungo Road.
The
proposed changes to the Project are not expected to materially change the water requirements of the operation, and thus the existing
water rights permits will provide sufficient water to support those changes.
17.3.3 Additional
Permits and Authorizations
In
addition to the principal environmental permits outlined above, Table 17-2 lists other notifications or ministerial permits that may
likely be necessary to operate the Project.
Table
17-2: Ministerial Permits, Plans and Notifications
Notification/Permit
Agency
Timeframes
Above
Ground Storage Tank Permit
Nevada
Bureau of Corrective Actions
Up
to six months to register. Cost is $100/tank per year and a requirement to perform monthly visual inspections.
Agreement
for Road Maintenance
Humboldt
and Pershing Counties
Up
to six months to negotiate the agreement with the county roads department and the county commission.
Explosives
Permit
Bureau
of Alcohol, Tobacco, Firearms, and Explosives
n/a
Explosives
User’s License (User’s Clearance)
Bureau
of Alcohol, Tobacco, Firearms, and Explosives
n/a
Fire
and Life Safety
Nevada
State Fire Marshal
Approximately
one month for review and approval. Applicant to submit a notification letter prior to construction and operation.
Hycroft Mine Project
Page 234
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Notification/Permit
Agency
Timeframes
Hazardous
Materials Permit
Nevada
State Fire Marshal
Approximately
two months for review and approval. Applicant must submit a notification letter 30 days prior to the start of operations and then
annually by March 1st of each year.
Industrial
Artificial Pond Permit
Nevada
Department of Wildlife
Four
weeks
Leach
Pad Commencement
Nevada
Bureau of Mining Regulation and Reclamation
One
week
Leach
Pad As-Built Report
Nevada
Bureau of Mining Regulation and Reclamation
Four
weeks
Process
Plant As-Built Report
Nevada
Bureau of Mining Regulation and Reclamation
Four
weeks
Dam
Safety Permit
Nevada
Division of Water Resources
Two
months
Mine
ID Number
Mine
Safety & Health Administration
One
week
Mine
Opening Notification
Nevada
Division of Minerals
One
week
Mine
Registry
Nevada
Division of Minerals
One
week
Notification
of Commencement of Operations
Mine
Safety & Health Administration
One
week
Production/Dewatering
Wells - Proof of Completion
Nevada
Division of Water Resources
One
week
Radio
License
Federal
Communications Commission
One
week
RCRA
Waste Mgt. ID - Mine
Nevada
Bureau of Sustainable Materials Management/U.S. Environmental Protection Agency
Two
weeks
Well
Drilling Permit (Notice of Intent to Drill)
Nevada
Division of Water Resources
One
week
Potable
Water System
Nevada
Bureau of Safe Drinking Water
Eight
months
Septic
System
Nevada
Bureau of Water Pollution Control
Six
months to prepare application (including the mercury control system) and process to obtain the permit.
17.4 Social
Considerations
Social
and community impacts are considered and evaluated for the revision to the Plan Application and would be used in the NEPA process. Potentially
affected Native American tribes, tribal organizations, and/or individuals are consulted during the preparation of all plan amendments
to advise on the proposed projects that may affect cultural sites, resources, and traditional activities. During the most recent permitting
for the Phase II Expansion Project in 2019, the BLM engaged:
● Fort
McDermitt Paiute and Shoshone Tribe
● Fallon
Paiute-Shoshone Tribe
● Battle
Mountain Band of the Te-Moak Tribe of Western Shoshone
● Lovelock
Paiute Tribe
Hycroft Mine Project
Page 235
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
● Pyramid
Lake Paiute Tribe
● Summit
Lake Paiute Tribe
● Winnemucca
Indian Colony.
Common
concerns raised by the tribes during consultation meetings and site visits included:
● environmental
concerns with quarries
● management
of archaeological finds, and disturbance of cultural resources such as rock stacks
● eagle
nest removal
● wildlife
issues around the North TMF.
Potential
community impacts to existing population and demographics, income, employment, economy, public finance, housing, community facilities,
and community services are evaluated for potential impacts as part of the NEPA process. There are no known social or community issues
that would have a material impact on the Project’s ability to extract mineral resources. Identified socioeconomic issues (employment,
payroll, services and supply purchases, and state and local tax payments) are anticipated to be positive.
Should
the proposed changes to the Project initiate an EIS, there would be a public scoping process involving public open house meetings. Members
of the public are free to attend the sessions in person or provide questions in writing. In the past, public concerns have included,
but not limited to:
● air
quality impacts and emissions from the Mine
● impacts
on cultural resources
● mitigation
measures to reduce environmental impacts
● impacts
on golden eagle nests and breeding territory
● site
reclamation.
Future
Project updates will require continued engagement with Native American tribes and the public to understand concerns and identify key
mitigations to environmental and social impacts. Engagement will be carried out by the proponent as well as regulators such as BLM and
USFWS.
17.4.1 National
Register of Historic Places
The
preservation of historic places and culturally significant resources is considered when a Project is being permitted. Updates to the
Project may require additional assessment to determine whether any NRHP-eligible sites and culturally sensitive resources, such as rock
stacks, would be affected by the new Project layout. There is a risk of community concerns if the new NTF will impact culturally sensitive
areas or culturally sensitive species such as eagles.
Hycroft Mine Project
Page 236
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
17.5 Closure
and Reclamation Planning
17.5.1 Closure
and Reclamation Plans
A
Tentative Plan for Permanent Closure (TPPC) for the Mine is in place and is currently being updated for future submission to the BMRR
with the application to modify the WPCP (NEV0094114). In the TPPC, the proposed NTF closure approach would consist of fluid management
through evaporation, covering the NTF with a geosynthetic cover and growth media, and then revegetation. The design of the process components
is not sufficiently advanced to determine the closure costs. Any residual NTF drainage will be managed with evaporation cells. Surface
management surety bonds currently total US$58.7 million with $58.3 million securing financial assurance requirements for the mine and
$0.4 million securing financial assurance requirements for the water supply well field and exploration within the Project boundary. Future
increases in reclamation bonding will either be through surety bonds supported by restricted cash balances or by letters of credit issued
by banks.
Mine
closure and reclamation will be performed in accordance with BLM and State of Nevada regulations and guidelines. Mining activities that
occur near a National Conservation Area and associated pioneer trails will require careful planning and design, and particular attention
will be paid to leaving a post-mining land configuration that minimizes visual impact. Facility expansions will continue to be designed
and constructed to meet or exceed state and federal design criteria. The WRSFs will continue to be evaluated for their potential to release
pollutants and monitored routinely in accordance with an approved waste rock management plan. After operations cease, effluent from the
heap leach facilities will be allowed to drain until the rate of flow can be passively managed through evaporation or a combination of
evaporation and infiltration. Current studies are gathering additional hydrology and geochemistry data for use in the development of
final closure plans that meet the regulatory standards. All buildings and facilities not identified for a post-mining use will be razed
during the salvage and site demolition phase.
17.5.2 Closure
Cost Estimates
A
Tentative Plan for Permanent Closure (TPPC) for the Mine is in place and is currently being updated for future submission to the BMRR
with the application to modify the WPCP (NEV0094114). In the TPPC, the proposed TMF closure approach would consist of fluid management
through evaporation, covering the TMF with a geosynthetic cover and growth media, and then revegetation. The design of the process components
is not sufficiently advanced to determine the closure costs. Any residual TMF drainage will be managed with evaporation cells. Surface
management surety bonds currently total US$58.7 million with $58.3 million securing financial assurance requirements for the mine and
$0.4 million securing financial assurance requirements for the water supply well field and exploration within the Project boundary. Future
increases in reclamation bonding will either be through surety bonds supported by restricted cash balances or by letters of credit issued
by banks.
17.6 Comments
on Environmental Studies, Permitting and Social or Community Impact
The
scope of environmental studies undertaken by Hycroft are sufficient to address all permitting and environmental review requirements.
The Mine currently holds all the necessary permits to operate. However, modifications to a number of those permits are necessary to construct
and operate and complete the updates to the project as outlined in this document.
Hycroft
has engaged in communications with all identified tribes that have expressed interest in the Project. There are no residences or towns
in the immediate vicinity of the Project. The nearest community is Winnemucca, Nevada, approximately 60 miles northeast of the Project.
Hycroft Mine Project
Page 237
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
18 Capital
and Operating Costs
18.1 Introduction
The
capital and operating costs described in this technical report are based on open-pit mining operations for the Hycroft project. The process
plant is designed to treat 57,100 st/d of mineralized material over a mine life of 51 years.
18.2 Capital
Costs
18.2.1 Overview
The
capital cost estimate was developed in Q1 2026 to target a level of accuracy of -30% to +50%, which aligns with an Association for the
Advancement of Cost Engineering International (AACE International) Class 5 level estimate. The estimate includes mining, processing,
on-site infrastructure, off-site infrastructure, project indirects, project delivery, owners’ costs, and provisions. The total
initial capital costs for the Project are estimated at US$2,434 million, including capitalized operating costs, and contingency. The
LOM sustaining costs are estimated at US$3,107 million, while the closure costs are estimated at US$243 million. The capital cost summary
is presented in Table 18-1.
Table
18-1: Capital Cost Summary
WBS
Description
Capital
Cost (US$M)
Sustaining
Cost (US$M)
Total
Cost1 (US$M)
1000
Mining
194
1,171
1,365
2000
Crushing
48
60
109
3000
Sulfide
Process
915
776
1,692
4000
Oxide
Process
16
46
63
5000
Waste
Rock Storage & TMF
208
515
723
6000
Onsite
Infrastructure
139
9
148
7000
Offsite
Infrastructure
43
366
409
Total
Direct Costs
1,563
2,944
4,507
8000
Indirects
382
27
409
9000
Provisions
448
136
584
10000
Owner’s
Costs
41
-
41
Total
Capital Cost
2,434
3,107
5,541
Note:
1. Totals
may not match due to rounding
Hycroft Mine Project
Page 238
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
18.2.2 Basis
of Estimate
The
capital cost estimate was developed in Q1 2026 in U.S. dollars (US$). The estimate is based on budgetary quotations for equipment from
recent advanced studies, supplemented with Ausenco’s in-house database, and informed by Ausenco’s experience from similar
operations in North America.
The
following data were used as the basis of estimate:
● Mining
schedules.
● PEA-level
engineering design by Ausenco, including but not limited to design criteria, equipment lists,
and material take-offs (MTOs).
● Budgetary
equipment quotes from similar recently completed advanced studies.
● Additional
data such as lang factors and indirect costs from similar recently completed studies and
projects.
The
estimate also adhered to the following parameters:
● No
allowance was made for exchange rate fluctuations.
● No
escalation was added to the final estimate.
18.2.3 Mine
Capital Costs
Table
18-2 summarizes the annual mine capital costs for both initial and sustaining capital cost.
Preproduction
mine development (preproduction stripping) is shown as a separate line item at nearly US$37.4 million. All other capital is for mine
mobile equipment.
Sustaining
capital includes both equipment replacements and fleet size increases for haul trucks.
Mine
capital costs include:
● all
mine mobile equipment that are required to operate and maintain the mine
● mine
maintenance equipment, and shop tools
● an
allowance is included for the initial spare parts inventory
● mine
engineering equipment: computers, survey equipment, etc.
● a
dispatch system
● a
mine radio system.
Hycroft Mine Project
Page 239
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
mine capital costs do not include:
● mine
office buildings or shop buildings
● mobile
equipment that is not required by the mine
● infrastructure
or process plant related costs
● equipment
salvage credit
● contingency.
Table
18-2: Baseline Mine Capital Cost (without Accuracy or Contingency adjustment)
Year
Mine
Equipment
Mine
Preproduction
Development
(US$M)
Total
Mine
Capital
(US$M)
Initial
Capital
Cost
(US$M)
Sustaining
Capital
(US$M)
Preproduction
111.5
–
37.4
148.9
1
–
123.3
–
123.3
2
–
19.0
–
19.0
3
–
–
–
–
4
–
1.5
–
1.5
5
–
25.6
–
25.6
6
–
20.2
–
20.2
7
–
11.9
–
11.9
8
–
1.5
–
1.5
9
–
20.0
–
20.0
10
–
42.7
–
42.7
11-15
–
50.0
–
50.0
16-20
–
44.5
–
44.5
21-25
–
214.6
–
214.6
26-30
–
32.4
–
32.4
31-35
–
74.2
–
74.2
36-40
–
26.7
–
26.7
41-45
–
162.2
–
162.2
46-51
–
30.4
–
30.4
Total
111.5
900.7
37.4
1,049.6
Accuracy2
and Contingency3
27.5
270.3
17.6
315.4
Total
139
1,171
55
1,365
Note:
1. Totals may not match due to rounding; 2. 10% Accuracy adjustment applied to large fleet items; 3 Includes
25% Contingency
Hycroft Mine Project
Page 240
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
18.2.4 Process
Capital Costs
The
selection and sizing of process equipment requirements was based on process flowsheets and process design criteria as defined in Section
14. All major equipment was sized based on the process’ mass balance, as dictated by the process design criteria, to develop a
mechanical equipment list (MEL). The MEL was then developed through recent budgetary quotations. The remaining value of the equipment
list was developed through benchmarking against recent execution projects and advanced studies. Refurbishment costs for the existing
equipment at primary crushing, heap leach, Merrill Crowe and refinery were included as part of initial capital cost.
The
process plant and infrastructure engineering design was completed to an IA-EA study level of definition, allowing for the bulk material
quantities (steel, concrete, piping, cables, instruments, etc.) to be derived for the major commodities using lang factors. Plant earthworks
costs were derived from MTOs.
The
total capital costs for the process plant are US$1,188 million. The capital cost breakdown for the process plant is summarized in Table
18-3.
Table
18-3: Process Plant Capital Cost Breakdown
WBS
Description
Initial
Costs (US$M)
2100
Primary
Crushing
10.6
2200
Coarse
Ore Storage and Reclaim
8.4
2400
Crushed
Ore Stockpile
29.3
3100
Process
Plant Building
11.7
3200
Grinding
and Screening
200.8
3300
Flotation
36.6
3400
Concentrate
Thickening & Tailing Handling
12.1
3500
Pressure
Oxidation
383.6
3600
CCD
& Cyanide Destruction
22.4
3700
Reagents
53.3
3800
Process
Services
194.1
3900
Tailings
and Reclaim
0.7
4100
Heap
Leach
2.7
4200
Brimstone
Merrill-Crowe
0.4
4400
North
Merrill-Crowe
9.2
4500
North
Refinery
3.8
Total
979.7
Note:
Totals may not match due to rounding
Hycroft Mine Project
Page 241
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
18.2.5 Infrastructure
Capital Costs
18.2.5.1 On-site
infrastructure
The
on-site infrastructure costs consist of bulk earthworks, power switchyard and distribution, fuel storage, sewage, potable water, plant
and infrastructure buildings, tailings facility and pipelines, temporary construction camp, and site services and mobile equipment. The
total on-site infrastructure costs are estimated at US$139 million and are illustrated in Table 18-4.
Table
18-4: On-Site Infrastructure Capital Cost Breakdown
WBS
Description
Initial
Costs (US$M)
5200
Tailing
management Facility
207.8
6100
Site
Civil Infrastructure
53.7
6200
Water
Systems
6.1
6300
Sewage,
Waste and Water Systems
0.3
6400
Electrical
Services
78.2
6800
Plant
Mobile Equipment
0.9
Total
347.0
Note:
Totals may not match due to rounding
18.2.5.2 Off-Site
infrastructure
The
off-site infrastructure costs consist of water supply and power supply. The cost for the HV substation, step down substation and transmission
lines are included as a lease back agreement. 10% downpayment is included as part of the initial capital. The remaining is included as
lease payment as described in Section 18.2.8.3.
The
total off-site infrastructure costs are estimated at US$43 million and are illustrated in Table 18-5.
Table
18-5: Off-Site Infrastructure Capital Cost Breakdown
WBS
Description
Initial
Costs (US$M)
7300
Rail
Spur
22.6
7400
Offsite
Power Line
20.3
Total
42.8
Note:
Totals may not match due to rounding
18.2.6 Indirect
Capital Costs
Indirect
costs include project preliminaries, field indirects (temporary construction facilities, camp, and associated services), commissioning
and operational readiness, vendor representative support, spares, first fills, and project delivery (engineering services and construction
management). Total indirect costs are estimated at US$382 million and are illustrated in Table 18-6.
Hycroft Mine Project
Page 242
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
18-6: Indirect Capital Cost Breakdown
WBS
Description
Initial
Costs (US$M)
8100
Project
Preliminaries
34.2
8200
Temporary
Facilities
20.5
8300
Temporary
Services
82.2
8500
Cranage
1.6
8600
EPCM
Costs
205.5
8700
Commissioning
Support
3.6
8800
First
Fills/Spares
27.0
8900
Vendor
support
7.2
Total
Indirect Costs
381.8
Note:
Totals may not match due to rounding
18.2.7 Owner
(Corporate) Capital Costs
Owner
costs for pre-production have been estimated by factors. The estimated cost of US$41 million includes:
● owner’s
project team and expenses
● administration,
finance, insurance and legal fees
○ including
pre-production general and administrative costs
● environmental
consultation and management
● human
resources, recruiting, and training
● permitting
and regulatory compliance activities
● stakeholder
relations
● site
security.
18.2.8 Sustaining
Capital
18.2.8.1 Mining
Sustaining Costs
Down
payments, lease payments, and purchases for the mine equipment fleet scheduled throughout the LOM are capitalized through the sustaining
periods of the project.
Hycroft Mine Project
Page 243
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
18-7 summarizes the mining sustaining cost estimates for the Project.
Table
18-7: Mining Sustaining Capital Costs
Year
Sustaining
Capital Cost (US$M)
1
123.3
2
19
3
–
4
1.5
5
25.6
6
20.2
7
11.9
8
1.5
9
20
10
42.7
15-Nov
50
16-20
44.5
21-25
214.6
26-30
32.4
31-35
74.2
36-40
26.7
41-45
162.2
46-51
30.4
Total
900.7
Note:
Totals may not match due to rounding
18.2.8.2 Process
Sustaining Costs
The
sustaining costs for the process plant are associated with the refurbishment and maintenance required for the process plant equipment
incurred every five years from Year 20 to Year 45. The total sustaining capital cost is estimated at US$892 million.
18.2.8.3 Infrastructure
Sustaining Costs
The
sustaining capital costs for the on-site infrastructure are associated with the staged expansion of the TMF in Years 3, 8, 13, 22, 31,
and 43. These costs also include EPCM and contingency costs associated with the construction of the TMF. The total sustaining capital
cost is estimated at US$678 million.
The
sustaining capital costs for the off-site infrastructure are associated with the lease payments for the HV substation, step down substation
and transmission lines. Total lease payments of US$18.3 million/year at 8% interest rate are included for 20 years as sustaining costs.
Hycroft Mine Project
Page 244
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
18.2.9 Contingency
Costs
Contingency
costs account for the difference in costs between the estimated and actual cost of materials and equipment. The contingency is developed
based upon the level of study and considers the level of project definition, the source or methodology of the estimates, and the expected
accuracy range. It allows the capital estimate to include a provision to cover the risk from uncertainties that may arise in between
the time the capital cost was developed compared to the actual costs during construction and pre-production.
The
contingency for the Project has been built up by considering each individual WBS area. The contingency included in the initial capital
costs is estimated at US$448 million for the process plant and supporting infrastructure and US$45 million for mining. The total contingency
for the initial capital costs for the project is estimated at US$493 million or 25.6% of total direct and indirect costs. The contingency
of 25.6% reflects the current level of engineering definition and remaining uncertainty associated with process development, infrastructure
assumptions, and estimate maturity at the Initial Assessment stage. No adjustment was made solely to meeting a reporting threshold.
18.2.10 Closure
and Reclamation Planning
Closure
and reclamation costs for the Project include allocations for:
● process
plant and on-site infrastructure
● TMF,
WRSF and Water Management
● mining
and haul roads
● long-term
environmental monitoring.
The
total closure and reclamation costs are estimated at US$243 million.
18.3 Operating
Costs
18.3.1 Overview
The
operating cost estimate was developed in Q1 2026 to target a level of accuracy of -30% to +50%, which aligns with an Association for
the Advancement of Cost Engineering International (AACE International) Class 5 level estimate. The total operating costs for the Project
are estimated at US$21.96/ton processed (milled and heap leached) or US$27,592 million over the 51-year mine life. These operating costs
do not include pre-production operating costs. A summary of operating costs is presented in Table 18-8.
Hycroft Mine Project
Page 245
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
18-8: Operating Cost Summary
Cost
Area
LOM
Total (US$M)1
US$/ton
processed
%
of Total
Mining
8,6832
6.91
31.5
Process
18,245
14.52
66.1
G&A
664
0.53
2.4
Total
27,592
21.96
100
Note:
1. Totals
may not match due to rounding
2. Includes
10% contingency
18.3.2 Basis
of Estimate
The
following was used to determine the project’s LOM process operating costs in agreement with the cost definition and estimate methodologies
outlined below. This basis considers the development of a process plant designed to treat 57,100 t/d of mineralized material. Process
unit operations were benchmarked against similar or comparable processing plants to ensure accuracy of cost estimates.
Assumptions
made in developing the process operating cost estimate are listed below:
● Mill
production is designed to treat 57,100 t/d of mineralized material.
● Process
plant operating costs are calculated based on labor, power consumption, reagents, consumables,
and process plant maintenance.
● Off-site
gold refining, insurance, and transportation costs are excluded, as they are included elsewhere
in the financial model.
● Labor
rates were sourced from recent execution projects in the region.
Workforce
will be comprised of local and regional workers.
Management
and administrative staff will be on a 5/2 rotation (5 days in, 2 days out), whereas process plant labor was estimated based on continuous
operation using a four-crew rotation.
● G&A
costs were baselined against previous project experience.
● Grinding
media consumption rates have been estimated based on the mill feed characteristics.
● Reagent
consumption rates have been estimated based on the metallurgical testwork results.
○ Reagents
and consumable prices were obtained via email quotes from local vendors.
● The
unit rate power cost of US$0.075/kWh was adopted based on the NV Energy GS-3 tariff.
Hycroft Mine Project
Page 246
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
● The
unit rate fuel cost for gasoline is US$4.28/gal based on the regional monthly three-year
trailing average for Nevada.
The
Basis of Estimate Costs for mining are described in section 18.3.3.
18.3.3 Mine
Operating Costs
Table
18-9 illustrates the mine operating costs on an annual basis for the first 10 years of the mine life. After Year 10, the costs have been
calculated over five-year periods. Operating costs were developed using a cost of diesel fuel of US$3.76/gal. Consumables for lubricants,
spare parts, and wear items have all been incorporated into the estimated operating costs. Labor costs were illustrated in the manpower
tables in Section 13.
Mine
operating costs include:
● drilling,
blasting, loading, hauling, and support equipment costs for the mine operation
● delivery
of material to the crusher, waste storage, or leach pad and placement of that material on
the dump, stockpile, or leach pad
● construction
and maintenance of all mine roads where mine haul trucks operate
● mine
supervision, engineering, and geology personnel
● operating
labor and maintenance labor including burden
● maintenance
of all mine equipment
● an
allowance is included to cover pit dewatering, software licenses, and assaying
● blasting
costs are based on owner loading of blast holes and blasting.
Mine
operating costs do not include:
● crushing,
conveying, processing, recontouring, or reclamation costs
● remining
of the low-grade stockpile after mine closure in Year 51
● closure
or reclamation costs.
Remining
of the low-grade stockpile and haulage to the crusher after completion of the mine life would cost $1.04/ton of stockpile moved.
Table
18-9 provides more detail regarding the breakdown of mine operating costs on a cost per ton of material moved basis for the individual
unit operations excluding contingency.
Hycroft Mine Project
Page 247
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
18-9: Mine Operating Cost per Ton of Total Material Moved, US$/ton (Mine Costs)
Mining
Year
Total
Material
(Mtons)
Drilling
(US$/ton)
Blasting
(US$/ton)
Loading
(US$/ton)
Hauling
(US$/ton)
Auxiliary
(US$/ton)
General
Mine
(US$/ton)
General
Maint.
(US$/ton)
G&A
(US$/ton)
TOTAL
(US$/ton)
Total
Cost
(US$M)
Preproduction
11.3
0.152
0.251
0.264
0.742
1.000
0.187
0.126
0.577
3.300
37.4
1
71.2
0.148
0.177
0.257
0.684
0.332
0.051
0.061
0.117
1.826
130.0
2
71.2
0.148
0.177
0.257
0.802
0.332
0.051
0.062
0.119
1.947
138.6
3
71.2
0.147
0.177
0.252
0.711
0.331
0.051
0.061
0.117
1.846
131.4
4
74.3
0.149
0.176
0.257
0.803
0.318
0.050
0.061
0.111
1.924
143.0
5
81.5
0.148
0.175
0.255
0.848
0.290
0.047
0.058
0.104
1.925
156.9
6
81.5
0.148
0.175
0.255
0.806
0.289
0.047
0.058
0.103
1.882
153.4
7
81.5
0.149
0.175
0.257
0.783
0.289
0.047
0.058
0.103
1.861
151.6
8
81.5
0.149
0.175
0.257
0.856
0.289
0.047
0.058
0.104
1.936
157.8
9
82.0
0.149
0.175
0.260
0.907
0.288
0.047
0.059
0.105
1.990
163.1
10
82.0
0.149
0.175
0.259
0.772
0.288
0.047
0.058
0.102
1.851
151.7
11-15
410.0
0.149
0.175
0.258
0.915
0.282
0.047
0.059
0.105
1.990
815.8
16-20
410.0
0.149
0.175
0.258
0.944
0.283
0.047
0.060
0.106
2.020
828.3
21-25
410.0
0.149
0.175
0.258
1.108
0.282
0.047
0.061
0.109
2.188
897.2
26-30
386.0
0.149
0.175
0.260
0.974
0.300
0.048
0.061
0.111
2.079
802.5
31-35
378.0
0.150
0.176
0.262
0.815
0.308
0.049
0.061
0.110
1.929
729.2
36-40
361.0
0.149
0.176
0.260
0.939
0.321
0.050
0.063
0.116
2.074
749.8
41-45
352.0
0.149
0.177
0.259
1.015
0.329
0.050
0.065
0.120
2.165
763.4
46-51
319.5
0.149
0.180
0.260
1.379
0.353
0.056
0.075
0.146
2.597
8298
Total
or Avg
3,816.9
0.149
0.176
0.259
0.961
0.307
0.049
0.062
0.115
2.078
7,931.1
Note:
Totals may not match due to rounding
18.3.4 Process
Operating Costs
The
LOM average process operating cost was estimated at US$16.65/ton for process plant and US$2.49/ton for heap leach operation (oxide
and transition material). Table 18-10 summarizes the LOM operating costs expected for the process area.
Table
18-10: Process Plant Operating Cost Summary
Cost
Center
M
US$/a
US$/ton
(LOM Average)
Reagents
177
8.61
Consumables
51
2.47
Plant
Maintenance
21
1.03
Mobile
Equipment
2
0.09
Hycroft Mine Project
Page 248
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Cost
Center
M
US$/a
US$/ton
(LOM Average)
Power
76
3.66
Labor
16
0.80
Total
(LOM) - Plant Feed
342
16.65
Reagents
and Consumables
17
2.05
Mobile
Equipment
2
0.26
Labor
2
0.19
Total
(LOM) - Heap Leach Feed
20
2.49
Total
(LOM) – Combined Processed
362
14.52
18.3.4.1 Labor
Process
labor costs were derived from a staffing plan and applying prevailing hourly or annual labor rates in the area. The burden rates of 40%
are included for salaried personnel and hourly personnel.
The
staffing plan summary and labor costs are shown in Table 18-11 below.
Table
18-11: Process Plant Labor Cost Summary
Staff
Number
of personnel
Annual
Labor Cost (US$M/a)
Labor
Cost (US$/ton)
Process
Plant Administration
6
0.7
0.03
Process
Plant Operation
76
7.8
0.37
Process
Plant Maintenance
47
5.3
0.26
Technical
Services
26
2.7
0.13
Process
Plant Sub-Total
155
16.4
0.80
Heap
Leach Operation
16
1.5
0.19
Heap
Leach Sub-Total
16
1.5
0.19
Total
(Process Plant + Heap Leach)
171
17.5
0.56
Note:
Totals may not match due to rounding
The
estimated labor costs are US$0.80/ton for process plant and US$0.17/ton for heap leach operation. A total of 171 persons are required
for the process plant, process maintenance shop, and heap leach operation.
18.3.4.2 Electrical
Power
The
LOM average of electrical energy consumption in the process area is estimated to be 1,008 gigawatt-hours per year (GWh/a) or approximately
34.4 kilowatt-hours per ton (kWh/ton) of milled and heap leach material.
Electricity
will be provided to site at a unit cost of US$0.075/kWh based on the recent operation (2021 to 2023).
The
unit power cost is estimated at US$3.66/ton processed.
Hycroft Mine Project
Page 249
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
18.3.4.3 Plant
Maintenance
An
allowance was made to cover the cost of maintenance of all items not specifically identified and the cost of maintenance of the facilities.
The allowance was calculated for each project area as a percentage of the tangible equipment cost. The cost for maintenance supplies
was estimated at US$1.03/ton processed.
18.3.4.4 Reagents
Individual
reagent consumption rates were estimated based on metallurgical testwork results and benchmarking against similar project operations.
Budgetary quotations for reagents were obtained from local suppliers where available, with an allowance for freight to site.
A
summary of process reagent consumption and costs are included in Table 18-12.
Table
18-12: Reagent Consumption Summary
Item
Unit
Consumption
Rate (t/Mton plant feed)
Unit
Cost
(US$)
Cost
(US$/ton) LOM Average
Flotation
Collector
(PAX)
0.43
3,310
1.49
Frother
(MIBC)
0.04
3,310
0.14
Sulfuric
acid (H2SO4)
0.00
150
0.00
Concentrate
Thickening
Flocculant
0.01
3,780
0.05
POX,
Neutralization, Concentrate Leach
Quick
lime
5.44
280
1.58
Flocculant
0.03
3,780
0.10
Limestone
43.01
82
3.66
Flocculant
0.00
3,780
0.01
Sodium
cyanide
0.51
2,644
1.39
CCD
& Cyanide Destruction
Flocculant
0.06
3,780
0.22
Sodium
Metabisulphite (SMBS)
0.18
1,124
0.21
Copper
Sulfate (CuSO4)
0.02
4,100
0.07
Process
Services (incl. Oxygen Plant)
Antiscalant
0.022
6,243
0.11
Tailings
and Reclaim
Flocculant
0.05
3,780
0.18
Merrill
Crowe
Zinc
dust
0.03
7,500
0.24
Diatomaceous
earth
0.07
650
0.05
Refinery
Borax
0.603
2,373
0.00
Silica
0.303
1,909
0.00
Sodium
Nitrate
0.0503
1,920
0.00
Hycroft Mine Project
Page 250
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Item
Unit
Consumption
Rate (t/Mton plant feed)
Unit
Cost
(US$)
Cost
(US$/ton) LOM Average
Sodium
Carbonate
0.0503
683
0.00
Process
Plant Sub-Total
-
-
8.61
Heap
Leach
Quick
lime
4.50
280
1.40
Cyanide
0.25
2,644
0.73
Zinc
dust
0.01
7,500
0.04
Diatomaceous
earth
0.05
650
0.03
Heap
Leach Sub-Total
-
-
2.05
Total
(Process Plant + Heap Leach)
-
-
6.02
Note:
1. Totals
may not match due to rounding
2. The
unit consumption rate is expressed as L/ton of plant feed.
3. The
unit consumption rate is expressed as lb/lb precipitate.
The
cost of reagents was estimated at US$8.61/ton for process plant and US$2.05/ton for heap leach operation.
18.3.4.5 Consumables
Wear
material (crusher and grinding mill liners and screen panels) and grinding media were based on industry practice for the crusher and
grinding operations. A summary of process consumable consumption and costs are included in Table 18-13.
Table
18-13: Process Plant Consumable Consumption Summary
Item
Consumption
Rate
Units
Unit
Cost
(US$’000)
Cost
(US$’000/a)
Cost
(US$/ton) LOM Average
Crushing
Primary
gyratory crusher liners
3
units/a
527
1,580
0.08
Secondary
crusher liners
6
units/a
253
1,515
0.08
Tertiary
crusher liners
6
units/a
253
1,515
0.08
Secondary
screen deck panels
16
units/a
57
917
0.05
Tertiary
screen deck panels
8
units/a
40
321
0.02
Grinding
and Screening
Ball
mill media
28,469
ton/a
1.4
39,914
2.11
Ball
mill liners
4.0
units/a
913
3,653
0.19
Trash
screen deck panels
4.0
units/a
33
131
0.01
Limestone
Preparation
Limestone
cone crusher liner
2
units/a
21
41
0.00
Limestone
ball mill media
570
ton/a
1.4
800
0.04
Limestone
ball mill liner
1.0
units/a
105
105
0.01
Hycroft Mine Project
Page 251
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Item
Consumption
Rate
Units
Unit
Cost
(US$’000)
Cost
(US$’000/a)
Cost
(US$/ton) LOM Average
Trash
screen deck panels
2
units/a
7.2
14
0.00
Refinery
Crucibles
12
units/a
1.9
23
0.00
Miscellaneous
consumables (filter cloths, bullion boxes, seals, labels) - allowance
-
-
40
40
0.00
Refinery
Miscellaneous
consumables (filter cloths, bullion boxes, seals, labels) - allowance
-
-
1,000
1,000
0.05
Total
-
-
-
-
2.47
The
cost of consumables was estimated at US$2.47/ton for process plant.
18.3.5 General
and Administrative Operating Costs
The
annual general and administrative costs to support the mining operations of US$13 million were developed on a unit cost and quantity
basis and utilized data from similar project operating records.
G&A
costs include expenses associated with site management, administrative support, and general site services required to sustain plant operations
but not directly related to mineral processing activities. These costs cover site maintenance (e.g., road maintenance materials), human
resources functions such as recruiting and training, health and safety programs, environmental monitoring and compliance, information
technology and communications services, and general mobile support equipment. Additional G&A components include contracted services,
insurance, permitting and licensing fees, sanitation and waste management, snow removal, accommodation and travel costs, and general
office administration such as utilities, office supplies, postage, and audit services. These expenditures represent the overhead required
to maintain safe, compliant, and efficient site operations.
These
costs include G&A labor, such as site management, administrative staff, human resources personnel, health and safety staff, environmental
personnel, and other support functions.
Hycroft Mine Project
Page 252
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
19 Economic
Analysis
19.1 Overview
The
results of the economic analysis discussed in this section represent forward-looking information as defined under U.S. securities law.
The results depend on inputs that are subject to a number of known and unknown risks, uncertainties and other factors that may cause
actual results to differ materially from those presented here.
Information
that is forward-looking include:
● Mineral
Resource Estimate
● assumed
commodity prices and exchange rates
● the
proposed mine production plan
● projected
mining and process recovery rates
● assumptions
as to mining dilution
● capital
and operating cost estimates and working capital requirements
● assumptions
as to closure costs and closure requirements
● assumptions
as to environmental, permitting and social consideration and risks.
Additional
risks to the forward-looking information include:
● changes
to costs of production from what is assumed
● unrecognized
environmental risks
● unanticipated
reclamation expenses
● unexpected
variations in quantity of mineralized material, grade or recovery rates
● geotechnical
or hydrogeological considerations differing from what was assumed
● failure
of mining methods to operate as anticipated
● failure
of plant, equipment or processes to operate as anticipated
● changes
to assumptions as to the availability of electrical power, and the power rates used in the
operating cost estimates and financial analysis
● ability
to maintain the social license to operate
● accidents,
labor disputes and other risks of the mining industry
● changes
to interest rates
● changes
to tax rates and availability of allowances for depreciation and amortization.
Hycroft Mine Project
Page 253
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
This
economic assessment is preliminary in nature and there is no certainty that the economic assessment will be realized. However, the economic
assessment does not include any inferred mineral resources.
19.2 Methodologies
Used
The
project has been evaluated using a discounted cash flow (DCF) analysis based on a 5% discount rate. Cash inflows consist of annual revenue
projections. Cash outflows consist of capital expenditures, including pre-production costs, operating costs, taxes, and royalties. These
are subtracted from the inflows to arrive at the annual cash flow projections. Cash flows are taken to occur at the midpoint of each
period.
It
must be noted that tax calculations involve complex variables that can only be accurately determined during operations, and as such,
the actual post-tax results may differ from those estimated. A sensitivity analysis was performed to assess the impact of variations
in metals price, discount rate, head grade, recovery, total operating costs, and initial capital costs. The capital and operating cost
estimates developed specifically for this project are presented in Section 18 of this report in Q1 2026 US dollars. The economic analysis
has been run on a constant dollar basis with no inflation.
19.3 Financial
Model Parameters
19.3.1 Assumptions
The
economic analysis was performed assuming the base case silver price of US$48.00/oz and gold price of US$3,600/oz. The forecasts used
are meant to reflect the average metals price expectation over the life of the project. No price inflation or escalation factors were
considered. Commodity prices can be volatile, and there is the potential for deviation from the forecast.
The
economic analysis also used the following assumptions:
● The
construction period will be 24 months.
● The
production life is 51 years, with the last year being a partial year.
● Cost
estimates are in constant Q1 2026 US dollars for capital and operating costs, with no inflation
or escalation factors considered.
● Results
are based on 100% ownership with a 2.14% private royalty applying to NSR.
● Capital
costs are funded with 100% equity (no financing assumed).
● All
cash flows are discounted to the start of the construction period using a mid-period discounting
convention.
● All
metal products will be sold in the same year they are produced.
● Project
revenue will be derived from the sale of gold-silver doré bars.
● No
contractual arrangement for refining currently exists.
19.3.2 Taxes
Mining
Tax Plan LLC has prepared the U.S federal and state income tax computation based on the Internal Revenue Code of 1986, as amended and
the regulations thereunder including Nevada Revised Statutes as in effect as of May 1, 2026. Any subsequent changes or modifications
to U.S. federal or state tax statutes, regulations or to the judicial and administrative interpretations thereof may impact the federal
and state income tax computations. We have not audited or verified any of the economic or operating assumptions of the Preliminary Economic
Assessment but have made inquiries to properly classified revenue, expenses and capital expenditures consistent with federal and state
income tax statutes, regulations and case law.
The
following is a summary of tax elections incorporated into this tax computation:
● The
overall effective federal and state income tax rate for Hycroft Mining Holding Corporation
is 21% for federal tax purposes. Nevada does not impose income tax.
● All
tax elections have been made in order to maximize the net present value of the mine on an
annual basis to the extent allowed.
● The
Hycroft mine will be treated as a single mineral property under Section 614.
● Hycroft
will elect to deduct exploration costs under Section 168(a) and deduct mine development under
Section 616(a) subject to the corporate preference adjustment under Section 291(b)(2) to
the extent incurred.
● Hycroft
will not elect out of federal Section 168(k) bonus depreciation except for tax year 2028.
● Hycroft
will elect Section 468 to deduct reclamation over the life of the mine.
● Hycroft
will sell its production outside of the U.S. and is therefore eligible for Section 250 FDII
deduction available on exported goods.
● Hycroft’s
net operating losses and other tax attributes as of December 31, 2025 of Hycroft utilized
in this model are subject to prior Section 382 limitations.
● No
Section 382 ownership changes are expected to occur after December 31, 2025 which could limit
the availability of tax attributes during the construction and/or during the subsequent operation
of the mine.
● The
Nevada gold and silver excise tax liability has been computed in accordance with the Nevada
Revised Statue 363D and the administrative code thereunder. The tax applies on gross revenue
in excess of $20,000,000 but not more than $150,000,000, at a rate of 0.75% with an annual
exemption on the first $20 million in sales and thereafter sales are tax at a rate of 1.10%.
Hycroft Mine Project
Page 254
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
The
Nevada Net Proceeds of Mines tax liability has been computed in accordance with the Nevada Revised Statue 362 and the administrative
code thereunder. The tax rate applied is 5.0% based on the annual profitability of the Mine.
At
the assumed metal prices, total payments are estimated to be US$3,618 million over the LOM.
19.3.3 Royalties
Royalties
payable for the Hycroft Project include a 2.14% private NSR royalty (1.5% NSR grossed up 30% for withholding taxes). Total royalty payments
are US$1,155 million over the life of the mine and are part of the project economics.
19.4 Economic
Analysis
The
economic analysis was performed assuming a 5% discount rate. The pre-tax NPV discounted at 5% is US$5,437 million; the IRR is 18.9%,
and payback period is 4.3 years. On a post-tax basis, the NPV discounted at 5% is US$4,344 million, the IRR is 16.9%, and the payback
period is 4.7 years. A summary of project economics is shown graphically in Figure 19-1 and listed in Table 19-1. The analysis was done
on an annual cashflow basis; the cashflow output is shown Table 19-2.
Readers
are cautioned that the assessment is preliminary in nature and there is no certainty that the economic assessment will be realized However,
it does not include any inferred mineral resources.
Figure
19-1 : Project Post-Tax Unlevered Cashflow
Source:
Ausenco, 2026
Hycroft Mine Project
Page 255
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
19-1: Economic Analysis Summary Table
Unit
Value
General
Inputs
Gold
Price
USD$/oz
3,600
Silver
Price
USD$/oz
48.00
Discount
Rate
%
5.0
LOM
Production
Total
Mineralized Material Mined
kst
1,496,134
Total
Waste Mined
kst
2,320,719
Average
Strip Ratio
w:o
1.55
Life
of Mine
years
50.5
Total
Mill Feed Processed
kst
1,046,284
Average
Mill Feed Grade (Au)
oz/st
0.012
Average
Mill Feed Grade (Ag)
oz/st
0.43
Total
Leach Material Processed
kst
210,010
Average
Leach Feed Grade (Au)
oz/st
0.005
Average
Leach Feed Grade (Ag)
oz/st
0.12
Total
Recovered Gold
koz
10,476
Total
Recovered Silver
koz
349,208
Average
Mill Feed Gold Recovery
%
82.8
Average
Mill Feed Silver Recovery
%
77.5
Average
Leach Gold Recovery
%
40.0
Average
Leach Silver Recovery
%
12.0
Life
of Mine Payable Gold Production
koz
10,424
Life
of Mine Payable Silver Production
koz
347,462
Life
of Mine Payable Gold Equivalent Production
koz
15,057
Refining,
Royalties
Gold
Payable
%
99.5
Silver
Payable
%
99.5
NSR
Royalty
%
NSR
2.14
Refining
Costs – Au
US$/oz
5.00
Refining
Costs – Ag
US$/oz
0.50
LOM
Operating Costs
Mining
Cost
US$/st
mined
2.28
Mining
Cost
US$/st
processed
6.91
Processing
Cost
US$/st
processed
14.52
G&A
Cost
US$/st
processed
0.53
Total
Operating Cost
US$/st
processed
21.96
Cash
Costs1
US$/oz
AuEq
1,924
All-In
Sustaining Cost2
US$/oz
AuEq
2,147
Capital
Costs
Initial
Capital
US$M
2,434
Sustaining
Capital
US$M
3,107
Closure
Costs
US$M
243
Financials
Pre-Tax
NPV (5%)
US$M
5,437
Pre-Tax
IRR
%
18.9
Pre-Tax
Payback
years
4.3
Post-Tax
NPV (5%)
US$M
4,344
Post-Tax
IRR
%
16.9
Post-Tax
Payback
years
4.7
Notes:
1. Cash
costs consist of mining costs, processing costs, mine-level G&A and refining charges
and royalties.
2. AISC
includes cash costs plus sustaining capital and closure costs.
Hycroft Mine Project
Page 256
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
19-2 : Life of Mine Economics
Units
Total/Avg
-2
-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Free
Cash Flow
Revenue
US$M
54,205
—
22
878
1,119
1,573
1,431
1,303
1,325
1,240
1,102
937
971
906
969
1,165
965
1,008
935
830
914
855
796
998
1,517
1,503
1,692
1,509
1,374
Operating
Cost
US$M
(27,592)
—
(18)
(444)
(563)
(592)
(591)
(639)
(601)
(556)
(555)
(543)
(541)
(574)
(566)
(584)
(562)
(575)
(568)
(590)
(598)
(567)
(533)
(541)
(540)
(530)
(541)
(580)
(547)
Refining
Charges
US$M
(226)
—
(0)
(2)
(4)
(6)
(6)
(5)
(5)
(5)
(3)
(3)
(4)
(4)
(4)
(5)
(4)
(4)
(4)
(3)
(4)
(3)
(3)
(4)
(6)
(7)
(10)
(8)
(6)
Royalties
US$M
(1,155)
—
(0)
(19)
(24)
(34)
(30)
(28)
(28)
(26)
(24)
(20)
(21)
(19)
(21)
(25)
(21)
(21)
(20)
(18)
(19)
(18)
(17)
(21)
(32)
(32)
(36)
(32)
(29)
EBITDA
US$M
25,232
—
3
413
528
942
803
631
691
652
520
370
405
309
378
551
378
408
343
219
292
266
243
431
939
934
1,106
889
791
Initial
Capex
US$M
(2,434)
(672)
(1,762)
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
Sustaining
Capex
US$M
(3,107)
—
—
(179)
(180)
(18)
(20)
(52)
(45)
(131)
(20)
(44)
(74)
(31)
(140)
(31)
(31)
(31)
(30)
(30)
(30)
(30)
(179)
(155)
(56)
(56)
(56)
(204)
(8)
Closure
Capex
US$M
(243)
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
Changes
in Working Capital
US$M
—
—
(1)
(35)
(10)
(19)
6
5
(1)
3
6
7
(1)
3
(3)
(8)
8
(2)
3
4
(3)
2
2
(8)
(21)
1
(8)
8
6
Pre-Tax
Unlevered Free Cash Flow
US$M
19,447
(672)
(1,760)
199
338
905
788
585
646
525
506
333
330
280
236
512
355
375
316
194
259
238
67
268
862
879
1,043
692
788
Pre-Tax
Cumulative Unlevered Free Cash Flow
US$M
19,447
(672)
(2,432)
(2,233)
(1,895)
(989)
(201)
384
1,030
1,554
2,060
2,393
2,723
3,003
3,239
3,751
4,107
4,481
4,798
4,991
5,250
5,489
5,556
5,824
6,686
7,564
8,607
9,299
10,087
Tax
Payable
US$M
(3,618)
—
(0)
(9)
(27)
(38)
(69)
(67)
(70)
(78)
(76)
(81)
(53)
(54)
(45)
(48)
(85)
(57)
(61)
(49)
(31)
(41)
(36)
(25)
(64)
(156)
(157)
(184)
(124)
Post-Tax
Unlevered Free Cash Flow
US$M
15,829
(672)
(1,760)
190
311
867
719
518
576
447
430
252
277
226
191
464
270
318
256
144
228
198
31
243
798
723
885
508
664
Post-Tax
Cumulative Unlevered Free Cash Flow
US$M
15,829
(672)
(2,432)
(2,242)
(1,931)
(1,063)
(344)
174
750
1,197
1,627
1,878
2,156
2,382
2,573
3,037
3,307
3,625
3,880
4,025
4,253
4,451
4,482
4,725
5,523
6,245
7,131
7,639
8,302
Production
Total
Resource Mined
kton
1,496,134
—
2,462
25,898
28,882
53,915
46,012
50,111
47,788
40,873
38,365
23,852
26,046
35,948
36,182
37,057
30,048
32,398
28,549
27,237
39,479
37,432
32,344
33,003
33,513
29,128
31,589
35,565
27,504
Total
Waste Mined
kton
2,320,719
—
8,871
45,302
42,318
17,285
28,335
31,389
33,712
40,627
43,135
58,149
55,954
46,052
45,818
44,943
51,952
49,602
53,451
54,763
42,521
44,568
49,656
48,997
48,487
52,872
50,411
46,435
54,496
Strip
Ratio
w:o
1.55
—
3.60
1.75
1.47
0.32
0.62
0.63
0.71
0.99
1.12
2.44
2.15
1.28
1.27
1.21
1.73
1.53
1.87
2.01
1.08
1.19
1.54
1.48
1.45
1.82
1.60
1.31
1.98
Mill
Feed
kton
1,046,284
—
—
14,068
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
Mill
Head Grade (Au)
oz/ton
0.012
—
—
0.016
0.013
0.016
0.015
0.014
0.014
0.013
0.014
0.012
0.011
0.009
0.010
0.011
0.011
0.011
0.010
0.009
0.010
0.010
0.010
0.012
0.018
0.015
0.014
0.012
0.014
Mill
Head Grade (Ag)
oz/ton
0.43
—
—
0.21
0.35
0.52
0.53
0.43
0.43
0.52
0.25
0.23
0.34
0.37
0.37
0.52
0.35
0.31
0.36
0.31
0.32
0.26
0.25
0.34
0.51
0.72
1.04
0.83
0.58
Mill
Recovery (Au)
%
82.8
—
—
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
Mill
Recovery (Ag)
%
77.5
—
—
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
Heap
Leach Feed
kton
210,010
—
2,462
10,825
5,740
17,228
14,623
16,614
14,813
6,350
3,376
107
2,840
8,654
6,052
8,301
511
11,056
5,116
4,817
4,907
2,201
126
388
2,900
4,704
9,451
12,335
4,375
Heap
Leach Head Grade (Au)
oz/ton
0.005
—
0.006
0.006
0.005
0.007
0.005
0.005
0.006
0.005
0.006
0.004
0.003
0.004
0.004
0.005
0.005
0.005
0.004
0.005
0.005
0.004
0.005
0.004
0.004
0.003
0.004
0.005
0.005
Heap
Leach Head Grade (Ag)
oz/ton
0.12
—
0.13
0.13
0.09
0.09
0.16
0.08
0.17
0.18
0.14
0.06
0.08
0.13
0.10
0.11
0.18
0.08
0.11
0.14
0.14
0.11
0.12
0.11
0.15
0.10
0.12
0.15
0.16
Heap
Leach Recovery (Au)
%
40.0
—
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
Heap
Leach Recovery (Ag)
%
12.0
—
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
Payable
Gold
koz
10,424
—
6
211
236
324
280
268
272
230
252
211
197
170
188
211
193
212
182
162
184
181
169
204
312
264
246
238
256
Payable
Silver
koz
347,462
—
39
2,455
5,639
8,474
8,801
7,041
7,209
8,556
4,040
3,725
5,450
6,154
6,071
8,425
5,601
5,092
5,843
5,129
5,209
4,221
3,947
5,503
8,235
11,546
16,806
13,600
9,426
Payable
Gold Equivalent
koz
15,057
—
6
244
311
437
397
362
368
345
306
260
270
252
269
324
268
280
260
231
254
237
221
277
422
417
470
419
382
Revenue
US$M
54,205
—
22
878
1,119
1,573
1,431
1,303
1,325
1,240
1,102
937
971
906
969
1,165
965
1,008
935
830
914
855
796
998
1,517
1,503
1,692
1,509
1,374
Operating
Costs
Total
Operating Costs
US$M
27,592
—
18
444
563
592
591
639
601
556
555
543
541
574
566
584
562
575
568
590
598
567
533
541
540
530
541
580
547
Mine
Operating Costs
US$M
8,683
—
—
143
152
145
157
173
169
167
174
179
167
179
179
179
179
179
182
182
182
182
182
197
197
197
197
197
177
Processing
Costs
US$M
18,245
—
11
288
397
434
421
453
418
376
369
351
361
382
374
391
370
382
373
394
403
372
338
331
330
320
330
370
358
G&A
Costs
US$M
664
—
7
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
Hycroft Mine Project
Page 257
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Units
Total/Avg
-2
-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Refining
Costs & Royalties
Refining
Charge
US$M
226
—
0
2
4
6
6
5
5
5
3
3
4
4
4
5
4
4
4
3
4
3
3
4
6
7
10
8
6
Total
Revenue
US$M
54,205
—
22
878
1,119
1,573
1,431
1,303
1,325
1,240
1,102
937
971
906
969
1,165
965
1,008
935
830
914
855
796
998
1,517
1,503
1,692
1,509
1,374
Less:
Refining Costs
US$M
(226)
—
(0)
(2)
(4)
(6)
(6)
(5)
(5)
(5)
(3)
(3)
(4)
(4)
(4)
(5)
(4)
(4)
(4)
(3)
(4)
(3)
(3)
(4)
(6)
(7)
(10)
(8)
(6)
Total
Net Revenue
US$M
53,979
—
22
876
1,115
1,567
1,425
1,298
1,320
1,235
1,099
934
967
902
965
1,160
961
1,004
931
826
910
852
793
994
1,512
1,496
1,683
1,501
1,368
NSR
Royalty
%
2.14
—
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
Royalties
US$M
1,155
—
0
19
24
34
30
28
28
26
24
20
21
19
21
25
21
21
20
18
19
18
17
21
32
32
36
32
29
Cash
Costs
Cash
Cost1
US$/oz
AuEq
1,924
—
3,066
1,907
1,901
1,444
1,580
1,855
1,722
1,706
1,901
2,176
2,097
2,373
2,195
1,897
2,188
2,144
2,279
2,649
2,448
2,480
2,499
2,043
1,372
1,363
1,247
1,480
1,527
All-in
Sustaining Cost (AISC 2)
US$/oz
AuEq
2,147
—
3,066
2,639
2,480
1,486
1,631
1,998
1,843
2,088
1,967
2,346
2,371
2,497
2,714
1,993
2,305
2,255
2,394
2,779
2,566
2,606
3,307
2,603
1,505
1,497
1,366
1,968
1,549
Capital
Expenditures
Initial
Capital
US$M
2,434
672
1,762
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
Total
Sustaining Capital
US$M
3,107
—
—
179
180
18
20
52
45
131
20
44
74
31
140
31
31
31
30
30
30
30
179
155
56
56
56
204
8
Closure
Cost
US$M
243
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
Total
Capital Expenditures
US$M
5,785
672
1,762
179
180
18
20
52
45
131
20
44
74
31
140
31
31
31
30
30
30
30
179
155
56
56
56
204
8
Units
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
Free
Cash Flow
Revenue
US$M
1,361
1,443
885
804
858
797
781
832
839
868
1,117
1,088
1,085
1,148
1,353
860
790
781
744
734
909
1,052
1,034
1,365
839
—
—
Operating
Cost
US$M
(535)
(531)
(549)
(539)
(527)
(524)
(521)
(522)
(528)
(543)
(554)
(557)
(524)
(508)
(514)
(527)
(526)
(531)
(549)
(516)
(511)
(508)
(500)
(482)
(323)
—
—
Refining
Charges
US$M
(8)
(10)
(3)
(3)
(2)
(2)
(2)
(2)
(2)
(3)
(5)
(5)
(5)
(6)
(8)
(3)
(2)
(2)
(2)
(2)
(3)
(4)
(4)
(8)
(5)
—
—
Royalties
US$M
(29)
(31)
(19)
(17)
(18)
(17)
(17)
(18)
(18)
(19)
(24)
(23)
(23)
(24)
(29)
(18)
(17)
(17)
(16)
(16)
(19)
(22)
(22)
(29)
(18)
—
—
EBITDA
US$M
788
871
313
245
310
255
241
290
290
303
535
503
532
610
803
312
244
231
177
200
376
517
508
846
493
—
—
Initial
Capex
US$M
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
Sustaining
Capex
US$M
(8)
(8)
(8)
(257)
(19)
(19)
(19)
(19)
(168)
(7)
(7)
(7)
(7)
(156)
(42)
(178)
(42)
(42)
(191)
(7)
(7)
(7)
(7)
(7)
(7)
—
—
Closure
Capex
US$M
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
(243)
Changes
in Working Capital
US$M
1
(3)
23
3
(2)
2
1
(2)
(0)
(1)
(10)
1
0
(3)
(8)
20
3
0
2
0
(7)
(6)
1
(14)
56
—
—
Pre-Tax
Unlevered Free Cash Flow
US$M
780
859
327
(8)
288
238
222
268
122
295
518
498
526
452
752
154
205
189
(12)
194
362
505
502
825
542
—
(243)
Pre-Tax
Cumulative Unlevered Free Cash Flow
US$M
10,867
11,727
12,054
12,046
12,334
12,572
12,794
13,063
13,185
13,480
13,998
14,495
15,021
15,472
16,225
16,378
16,583
16,772
16,760
16,954
17,316
17,821
18,323
19,148
19,691
19,691
19,447
Tax
Payable
US$M
(136)
(137)
(145)
(50)
(20)
(42)
(40)
(39)
(46)
(30)
(53)
(91)
(86)
(92)
(86)
(129)
(37)
(37)
(34)
(16)
(28)
(64)
(88)
(90)
(142)
(76)
—
Post-Tax
Unlevered Free Cash Flow
US$M
644
723
183
(58)
268
195
182
230
76
265
465
406
439
360
666
24
168
152
(46)
179
333
441
414
736
401
(76)
(243)
Post-Tax
Cumulative Unlevered Free Cash Flow
US$M
8,947
9,669
9,852
9,794
10,062
10,258
10,440
10,670
10,746
11,010
11,475
11,882
12,321
12,681
13,347
13,371
13,539
13,691
13,645
13,824
14,157
14,598
15,012
15,747
16,148
16,072
15,829
Production
Total
Resource Mined
kton
31,947
25,705
25,866
23,273
23,941
22,778
22,376
22,505
22,056
29,225
22,808
23,934
23,329
24,785
23,939
24,033
22,658
22,494
23,562
23,102
23,004
22,195
21,703
21,680
12,058
—
—
Total
Waste Mined
kton
50,053
48,295
48,134
50,727
50,059
53,222
53,624
53,495
53,944
46,775
51,192
46,566
47,171
45,715
46,561
46,467
47,842
48,006
47,038
47,498
49,370
33,556
33,706
19,302
12,300
—
—
Strip
Ratio
w:o
1.57
1.88
1.86
2.18
2.09
2.34
2.40
2.38
2.45
1.60
2.24
1.95
2.02
1.84
1.95
1.93
2.11
2.13
2.00
2.06
2.15
1.51
1.55
0.89
1.02
—
—
Mill
Feed
kton
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
20,841
11,008
—
—
Mill
Head Grade (Au)
oz/ton
0.010
0.009
0.010
0.010
0.011
0.011
0.011
0.011
0.011
0.009
0.012
0.011
0.012
0.010
0.011
0.010
0.011
0.011
0.010
0.010
0.011
0.012
0.011
0.011
0.011
—
—
Mill
Head Grade (Ag)
oz/ton
0.90
1.13
0.32
0.20
0.18
0.16
0.16
0.19
0.19
0.30
0.47
0.53
0.47
0.69
0.85
0.28
0.16
0.16
0.14
0.14
0.29
0.41
0.42
0.89
1.16
—
—
Hycroft Mine Project
Page 258
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Units
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
Mill
Recovery (Au)
%
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
82.8
—
—
Mill
Recovery (Ag)
%
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
77.5
—
—
Heap
Leach Feed
kton
3,916
1,026
1,303
209
1,610
877
734
987
622
7,636
406
1,583
985
1,940
1,612
1,548
66
251
580
351
270
324
114
102
86
—
—
Heap
Leach Head Grade (Au)
oz/ton
0.004
0.005
0.005
0.004
0.004
0.002
0.002
0.004
0.004
0.005
0.004
0.006
0.004
0.004
0.003
0.003
0.004
0.002
0.003
0.004
0.003
0.006
0.005
0.005
0.004
—
—
Heap
Leach Head Grade (Ag)
oz/ton
0.16
0.13
0.10
0.09
0.06
0.11
0.16
0.17
0.16
0.12
0.14
0.12
0.14
0.13
0.13
0.13
0.08
0.07
0.06
0.11
0.10
0.10
0.15
0.17
0.22
—
—
Heap
Leach Recovery (Au)
%
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
—
—
Heap
Leach Recovery (Ag)
%
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
—
—
Payable
Gold
koz
184
159
177
180
199
187
183
191
193
176
209
189
199
171
193
179
184
182
176
174
190
204
197
188
102
—
—
Payable
Silver
koz
14,557
18,152
5,132
3,251
2,974
2,576
2,508
3,042
3,015
4,861
7,568
8,511
7,636
11,133
13,706
4,522
2,646
2,617
2,327
2,242
4,711
6,600
6,790
14,329
9,819
—
—
Payable
Gold Equivalent
koz
378
401
246
223
238
222
217
231
233
241
310
302
301
319
376
239
219
217
207
204
253
292
287
379
233
—
—
Revenue
US$M
1,361
1,443
885
804
858
797
781
832
839
868
1,117
1,088
1,085
1,148
1,353
860
790
781
744
734
909
1,052
1,034
1,365
839
—
—
Operating
Costs
Total
Operating Costs
US$M
535
531
549
539
527
524
521
522
528
543
554
557
524
508
514
527
526
531
549
516
511
508
500
482
323
—
—
Mine
Operating Costs
US$M
177
177
177
177
160
160
160
160
160
165
165
165
165
165
168
168
168
168
168
152
152
152
152
152
152
—
—
Processing
Costs
US$M
346
342
360
349
354
350
347
349
355
366
376
379
346
330
333
346
346
350
368
351
346
343
335
317
164
—
—
G&A
Costs
US$M
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
7
—
—
Refining
Costs & Royalties
Refining
Charge
US$M
8
10
3
3
2
2
2
2
2
3
5
5
5
6
8
3
2
2
2
2
3
4
4
8
5
—
—
Total
Revenue
US$M
1,361
1,443
885
804
858
797
781
832
839
868
1,117
1,088
1,085
1,148
1,353
860
790
781
744
734
909
1,052
1,034
1,365
839
—
—
Less:
Refining Costs
US$M
(8)
(10)
(3)
(3)
(2)
(2)
(2)
(2)
(2)
(3)
(5)
(5)
(5)
(6)
(8)
(3)
(2)
(2)
(2)
(2)
(3)
(4)
(4)
(8)
(5)
—
—
Total
Net Revenue
US$M
1,352
1,433
881
801
855
795
778
830
837
865
1,112
1,083
1,080
1,142
1,346
857
787
779
742
732
906
1,048
1,030
1,357
834
—
—
NSR
Royalty
%
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
—
—
Royalties
US$M
29
31
19
17
18
17
17
18
18
19
24
23
23
24
29
18
17
17
16
16
19
22
22
29
18
—
—
Cash
Costs
Cash
Cost1
US$/oz
AuEq
1,515
1,427
2,327
2,501
2,300
2,450
2,489
2,346
2,355
2,343
1,876
1,935
1,833
1,688
1,465
2,296
2,487
2,536
2,742
2,616
2,113
1,830
1,833
1,370
1,485
—
—
All-in
Sustaining Cost (AISC 2)
US$/oz
AuEq
1,537
1,448
2,361
3,651
2,381
2,537
2,578
2,430
3,075
2,372
1,898
1,958
1,856
2,176
1,577
3,042
2,679
2,730
3,666
2,649
2,139
1,853
1,856
1,387
1,513
—
—
Capital
Expenditures
Initial
Capital
US$M
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
Total
Sustaining Capital
US$M
8
8
8
257
19
19
19
19
168
7
7
7
7
156
42
178
42
42
191
7
7
7
7
7
7
—
—
Closure
Cost
US$M
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
243
Total
Capital Expenditures
US$M
8
8
8
257
19
19
19
19
168
7
7
7
7
156
42
178
42
42
191
7
7
7
7
7
7
—
243
Notes:
1. Cash
costs consist of mining costs, processing costs, mine-level G&A and refining charges
and royalties.
2. AISC
includes cash costs plus sustaining capital and closure costs.
3. Dollar
figures in Real 2026 US$M unless otherwise noted.
4. Total/Avg
Column is for the entire LOM, Year -2 to Year 53.
Hycroft Mine Project
Page 259
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
19.5 Sensitivity
Analysis
A
sensitivity analysis was conducted on the base case NPV and IRR of the project using the following variables: discount rate, head grade,
recovery, total operating cost, initial capital cost, as well as silver and gold prices, which were encompassed in a single variable,
metal price. Table 19-3 and Table 19-4 summarize the pre-tax and post-tax sensitivities of the project.
Table
19-3: Pre-Tax NPV (US$M) and IRR (%) Sensitivity Analysis
Pre-Tax
NPV5% Sensitivity to Discount Rate
Pre-Tax
IRR Sensitivity to Discount Rate
Metal
Price
Metal
Price
Discount
Rate
(20%)
(10%)
0%
10%
20%
Discount
Rate
(20%)
(10%)
0%
10%
20%
1.0%
6,399
10,514
14,629
18,744
22,859
1.0%
9.8
14.5
18.9
23.2
27.3
3.0%
3,391
6,041
8,690
11,340
13,989
3.0%
9.8
14.5
18.9
23.2
27.3
5.0%
1,746
3,591
5,437
7,282
9,127
5.0%
9.8
14.5
18.9
23.2
27.3
8.0%
449
1,650
2,852
4,054
5,256
8.0%
9.8
14.5
18.9
23.2
27.3
10.0%
(36)
919
1,874
2,829
3,784
10.0%
9.8
14.5
18.9
23.2
27.3
Pre-Tax
NPV5% Sensitivity to Operating Costs
Pre-Tax
IRR Sensitivity to Operating Costs
Metal
Price
Metal
Price
Operating
Costs
(20%)
(10%)
0%
10%
20%
Operating
Costs
(20%)
(10%)
0%
10%
20%
(20.0%)
3,639
5,484
7,329
9,175
11,020
(20.0%)
14.5
18.9
23.1
27.2
31.1
(10.0%)
2,693
4,538
6,383
8,228
10,073
(10.0%)
12.2
16.7
21.0
25.2
29.2
—
1,746
3,591
5,437
7,282
9,127
—
9.8
14.5
18.9
23.2
27.3
10.0%
800
2,645
4,490
6,336
8,181
10.0%
7.3
12.2
16.7
21.1
25.3
20.0%
(146)
1,699
3,544
5,389
7,234
20.0%
4.5
9.8
14.5
19.0
23.3
Pre-Tax
NPV5% Sensitivity to Initial Capital
Pre-Tax
IRR Sensitivity to Initial Capital
Metal
Price
Metal
Price
Initial
Capital
(20%)
(10%)
0%
10%
20%
Initial
Capital
(20%)
(10%)
0%
10%
20%
(20.0%)
2,208
4,054
5,899
7,744
9,589
(20.0%)
12.5
18.1
23.5
28.6
33.4
(10.0%)
1,977
3,822
5,668
7,513
9,358
(10.0%)
11.0
16.1
21.0
25.6
30.1
—
1,746
3,591
5,437
7,282
9,127
—
9.8
14.5
18.9
23.2
27.3
10.0%
1,515
3,360
5,206
7,051
8,896
10.0%
8.8
13.1
17.2
21.2
25.0
20.0%
1,284
3,129
4,975
6,820
8,665
20.0%
8.0
12.0
15.8
19.5
23.0
Pre-Tax
NPV5% Sensitivity to Head Grade
Pre-Tax
IRR Sensitivity to Head Grade
Metal
Price
Metal
Price
Head
Grade
(20%)
(10%)
0%
10%
20%
Head
Grade
(20%)
(10%)
0%
10%
20%
(20.0%)
(1,191)
285
1,761
3,237
4,713
(20.0%)
0.7
5.8
9.9
13.6
17.2
(10.0%)
277
1,938
3,599
5,259
6,920
(10.0%)
5.8
10.3
14.5
18.5
22.4
—
1,746
3,591
5,437
7,282
9,127
—
9.8
14.5
18.9
23.2
27.3
10.0%
3,215
5,245
7,275
9,304
11,334
10.0%
13.5
18.5
23.2
27.7
32.0
20.0%
4,684
6,898
9,112
11,327
13,541
20.0%
17.1
22.3
27.3
32.0
36.5
Pre-Tax
NPV5% Sensitivity to Recovery
Pre-Tax
IRR Sensitivity to Recovery
Metal
Price
Metal
Price
Recovery
(20%)
(10%)
0%
10%
20%
Recovery
(20%)
(10%)
0%
10%
20%
(20.0%)
(1,191)
285
1,761
3,237
4,713
(20.0%)
0.7
5.8
9.9
13.6
17.2
(10.0%)
277
1,938
3,599
5,259
6,920
(10.0%)
5.8
10.3
14.5
18.5
22.4
—
1,746
3,591
5,437
7,282
9,127
—
9.8
14.5
18.9
23.2
27.3
10.0%
3,215
5,245
7,275
9,304
11,334
10.0%
13.5
18.5
23.2
27.7
32.0
20.0%
4,684
6,898
9,112
11,327
13,541
20.0%
17.1
22.3
27.3
32.0
36.5
Hycroft Mine Project
Page 260
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
19-4: Post-Tax NPV (US$M) and IRR (%) Sensitivity Analysis
Post-Tax
NPV5% Sensitivity to Discount Rate
Post-Tax
IRR Sensitivity to Discount Rate
Metal
Price
Metal
Price
Discount
Rate
(20%)
(10%)
0%
10%
20%
Discount
Rate
(20%)
(10%)
0%
10%
20%
1.0%
5,042
8,472
11,896
15,306
18,708
1.0%
8.6
12.9
16.9
20.8
24.6
3.0%
2,584
4,809
7,027
9,233
11,433
3.0%
8.6
12.9
16.9
20.8
24.6
5.0%
1,226
2,790
4,344
5,887
7,426
5.0%
8.6
12.9
16.9
20.8
24.6
8.0%
144
1,176
2,197
3,209
4,217
8.0%
8.6
12.9
16.9
20.8
24.6
10.0%
(264)
563
1,379
2,187
2,991
10.0%
8.6
12.9
16.9
20.8
24.6
Post-Tax
NPV5% Sensitivity to Operating Costs
Post-Tax
IRR Sensitivity to Operating Costs
Metal
Price
Metal
Price
Operating
Costs
(20%)
(10%)
0%
10%
20%
Operating
Costs
(20%)
(10%)
0%
10%
20%
(20.0%)
2,850
4,399
5,941
7,477
9,009
(20.0%)
12.9
17.0
20.8
24.5
28.2
(10.0%)
2,042
3,598
5,143
6,684
8,219
(10.0%)
10.8
15.0
18.9
22.7
26.4
—
1,226
2,790
4,344
5,887
7,426
—
8.6
12.9
16.9
20.8
24.6
10.0%
394
1,978
3,537
5,088
6,630
10.0%
6.2
10.7
14.9
18.9
22.7
20.0%
(456)
1,160
2,725
4,283
5,831
20.0%
3.5
8.5
12.8
16.9
20.9
Post-Tax
NPV5% Sensitivity to Initial Capital
Post-Tax
IRR Sensitivity to Initial Capital
Metal
Price
Metal
Price
Initial
Capital
(20%)
(10%)
0%
10%
20%
Initial
Capital
(20%)
(10%)
0%
10%
20%
(20.0%)
1,644
3,204
4,754
6,294
7,830
(20.0%)
10.9
16.1
21.0
25.7
30.1
(10.0%)
1,436
2,997
4,549
6,091
7,628
(10.0%)
9.7
14.3
18.8
23.0
27.1
—
1,226
2,790
4,344
5,887
7,426
—
8.6
12.9
16.9
20.8
24.6
10.0%
1,015
2,582
4,137
5,682
7,223
10.0%
7.7
11.7
15.4
19.0
22.5
20.0%
802
2,375
3,929
5,477
7,019
20.0%
7.0
10.7
14.1
17.5
20.7
Post-Tax
NPV5% Sensitivity to Head Grade
Post-Tax
IRR Sensitivity to Head Grade
Metal
Price
Metal
Price
Head
Grade
(20%)
(10%)
0%
10%
20%
Head
Grade
(20%)
(10%)
0%
10%
20%
(20.0%)
(1,405)
(43)
1,239
2,490
3,736
(20.0%)
0.0
4.9
8.7
12.1
15.4
(10.0%)
(50)
1,390
2,796
4,195
5,585
(10.0%)
4.8
9.1
12.9
16.6
20.1
—
1,226
2,790
4,344
5,887
7,426
—
8.6
12.9
16.9
20.8
24.6
10.0%
2,472
4,183
5,881
7,573
9,260
10.0%
12.0
16.5
20.8
24.9
28.9
20.0%
3,711
5,567
7,414
9,254
11,087
20.0%
15.3
20.0
24.6
28.9
33.1
Post-Tax
NPV5% Sensitivity to Recovery
Post-Tax
IRR Sensitivity to Recovery
Metal
Price
Metal
Price
Recovery
(20%)
(10%)
0%
10%
20%
Recovery
(20%)
(10%)
0%
10%
20%
(20.0%)
(1,405)
(43)
1,239
2,490
3,736
(20.0%)
0.0
4.9
8.7
12.1
15.4
(10.0%)
(50)
1,390
2,796
4,195
5,585
(10.0%)
4.8
9.1
12.9
16.6
20.1
—
1,226
2,790
4,344
5,887
7,426
—
8.6
12.9
16.9
20.8
24.6
10.0%
2,472
4,183
5,881
7,573
9,260
10.0%
12.0
16.5
20.8
24.9
28.9
20.0%
3,711
5,567
7,414
9,254
11,087
20.0%
15.3
20.0
24.6
28.9
33.1
Hycroft Mine Project
Page 261
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
As
shown in Figure 19-2 and Figure 19-3, the sensitivity analysis revealed that the project is most sensitive to changes in metal price,
head grade, and recovery.
Figure
19-2: Pre-Tax Sensitivity Analysis Results
Note:
Metal price, head grade, and recovery series overlap on the above figures
Hycroft Mine Project
Page 262
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Figure
19-3: Post-Tax Sensitivity Analysis Results
Note:
Metal price, head grade, and recovery series overlap on the above figures. Source: Ausenco, 2026
Hycroft Mine Project
Page 263
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
20 Adjacent
Properties
The
Rosebud mine is located about 4.7 miles south-east of the Mine (Figure 20-1). Rosebud was operated as an underground stope mine between
1997 and 2000 by a joint venture between Hecla and Newmont. Additional details are available online at mindat.org. Information disclosed
at this site has not been verified by a Qualified Person and may not necessarily indicative of the mineralization at Hycroft, which is
the subject of this Technical Report.
Figure
20-1 : Location of Rosebud Property
Source:
Hycroft, 2023
The
deposit is part of a large, low-sulfidation hydrothermal system extending throughout most of the Kamma Mountains. Specifically, the deposit
is a low-temperature epithermal, quartz-sericite, gold and silver deposit within Miocene andesitic and rhyolitic volcanics and volcaniclastics.
The volcanics unconformably overlie a Jurassic/Triassic metasediment basement, which also hosts precious metal mineralization.
Main
structural elements include the east-west trending South Ridge Fault and the northeast trending Rosebud Shear, which displays up to 2,000
ft of left-lateral displacement and about 400 ft of normal displacement. The South Ridge Fault is a mineralized listric normal fault
which acted as a conduit for mineralizing fluids.
The
mining method was overhand cut and fill with access via a decline. Equipment was rubber-tired, including drill jumbos, rock bolters,
3.5-yard loaders, and 20-ton haul trucks. Typical ore panels were 14 ft high, 18 ft wide and about 80 ft long. These were backfilled
with cemented materials batched at the surface and hauled underground.
Ore
was direct shipped to the Carlin district for processing.
The
QP has been unable to verify the information in this section, and the information is not necessarily indicative of the mineralization
on the property that is the subject of the technical report summary.
21 Other
Relevant Data and Information
There
is no information in this section of the TRS.
Hycroft Mine Project
Page 264
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
22 Interpretation
and Conclusions
22.1 Introduction
The
QPs note the following interpretations and conclusions in their respective areas of expertise, based on the review of data available
for this Report.
22.2 Mineral
Tenure, Surface Rights, Water Rights, Royalties and Agreements
Hycroft
controls all surface and mineral rights within the Hycroft MRE area. No further land acquisition is required for the operation of the
mine and contemplated processing facilities.
22.3 Geology
and Mineralization
The
Hycroft deposit is a low-sulfidation, epithermal, hot springs system that contains gold and silver mineralization. Radiometric dating
of adularia (potassium feldspar) indicates that the main phase of gold and silver mineralization formed approximately four million years
ago (Ebert and Rye, 1997) when hydrothermal fluids were fed upward along high angle, normal faults. Low-grade gold and silver mineralization
were co-deposited with silica and potassium feldspar throughout porous rock types.
22.4 Exploration
The
exploration drilling, sample preparation, analysis and security are typical for the US mining industry and is acceptable for application
to mineral resource determination.
Within
the block model, there are 5,813 drillholes with 516,901 drill intervals amounting to 2,668,616 ft of drilling. The work outlined is
a summary of over a year’s worth of data verification and checking by Hycroft and IMC personnel. As a result, the Hycroft and IMC
teams have gained significant confidence in this data set. IMC holds the opinion that the database as utilized in this statement of mineral
resources inclusive the edits and corrections outlined is appropriate for the estimation of mineral resources.
The
QP considers that exploration drilling, sampling, sample preparation, analytical methods and security are acceptable, are in line with
industry-standard practices, and are adequate for mineral resource determination.
Hycroft Mine Project
Page 265
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
22.5 Metallurgical
Testwork
Metallurgical
testwork has been conducted at multiple accredited laboratories with the following results:
● The
mineralized material at Hycroft is considered very abrasive.
● The
mineralized material at Hycroft is considered hard with respect to grinding.
● Silver
recovery decreases at low pH ranges (<5.0) during oxidation, indicating the need for a
lime boil step following POX.
● Oxygen
consumption in POX circuit is primarily a function of the sulfide sulfur content of the concentrate.
To achieve approximately 95% sulfide oxidation, about 0.19 ton of oxygen per ton of concentrate
is required.
● Metallurgical
testwork completed between 2021 and 2025 confirms that Hycroft sulfide mineralization is
amenable to a flotation and POX processing route. Optimized flotation conditions significantly
improved gold recoveries, and subsequent POX testing demonstrated that POX followed by hot
cure, lime boil, and cyanide leaching is a technically viable and repeatable flowsheet for
treating pyrite concentrate.
22.6 Mineral
Resource Estimate
Mineral
resources were developed based on a conventional computer-based block model of the deposit and the application of open pit optimization
software to determine the mineralization with reasonable expectation of economic extraction.
Each
block was evaluated to determine which process provides the best net return after operating cost. The following two processes were identified:
● ROM
cyanide heap leaching of oxide and some transition materials.
● Milling,
Flotation, POX, Hot Cure, and Lime Boil followed by Cyanide Leach and Merrill-Crowe of sulfide
and some transition materials.
The
MRE is based on metal prices of $3,100/oz Au and $36.00/oz Ag. Mineral resources were contained within a computer-generated pit.
Hycroft Mine Project
Page 266
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Table
22-1: Hycroft Mineral Resources as of 21 January 2026, US customary Units
Classification
$
Net of
Process/ton
Approximate
Cutoff, AuEq oz/ton
Ktons
Gold
oz/ton
Silver
oz/ton
Sulfide
%
Contained
Ounces
Gold
Oz x 1000
Silver
Oz x 1000
Heap
Leach Resource
Measured
$1.88
- $3.63
0.001
- 0.002
92,994
0.005
0.11
1.83
446
10,322
Indicated
$1.88
- $3.63
0.001
- 0.002
110,374
0.004
0.09
1.54
475
9,492
Meas
+ Ind
$1.88
- $3.63
0.001
- 0.002
203,368
0.005
0.10
1.67
921
19,814
Inferred
$1.88
- $3.63
0.001
- 0.002
110,018
0.005
0.09
1.41
528
10,122
Flotation
Mill + Concentrate Treatment by Pressure Oxidation and Cyanide Leach
Measured
$16.73
0.007
734,571
0.011
0.43
2.03
8,154
316,600
Indicated
$16.73
0.007
748,876
0.010
0.30
1.84
7,339
226,161
Meas
+ Ind
$16.73
0.007
1,483,447
0.010
0.37
1.93
15,493
542,761
Inferred
$16.73
0.007
459,646
0.010
0.27
1.76
4,505
122,725
Combined
Mineral Resources Leach Plus Mill
Measured
$1.88
- $16.73
0.001
- 0.007
827,565
0.010
0.40
2.01
8,600
326,922
Indicated
$1.88
- $16.73
0.001
- 0.007
859,250
0.009
0.27
1.80
7,814
235,653
Meas
+ Ind
$1.88
- $16.73
0.001
- 0.007
1,686,815
0.010
0.33
1.90
16,414
562,575
Inferred
$1.88
- $16.73
0.001
- 0.007
569,664
0.009
0.23
1.69
5,033
132,847
Notes:
1. Mineral
resources based on metal prices of $3,100/oz Au and $36.00/oz Ag.
2. Cutoffs
are income – process cost = NPR = NSR – Process + G&A Opex.
3. Gold
Equivalent (AuEq) for Heap Leach = Cyanide Gold + 0.0019 x Total Silver Assay, or at average
gold leach recovery AuEq = Fire Gold + 0.0035 Total Silver Assay.
4. Gold
Equivalent for Mill + Pressure Oxidation = Fire Gold + 0.0107 x Total Silver Assay.
5. Numbers
may not match exactly due to rounding.
6. Mineral
resources are contained within a computer-generated optimized pit.
7. Total
material in the pit is 5.42 billion tons.
8. Mineral
resources are not mineral reserves, and detailed economic considerations have not been applied.
9. Modifying
factors for mine and process design have not been applied.
10. All
units are US customary. Ktons means 1,000 short tons of 2,000 lbs. Au and Ag grades
are in troy ounces per short ton (oz/ton).
Contained
within the MRE at Hycroft are a series of high-grade silver veins at Brimstone and zones of higher silver concentrations in Vortex that
are associated with a low angle breccia body. Table 22-2 is the tabulation of gold and silver within the domain volumes that are contained
within the MRE at 2 oz/ton cutoff grade in US customary units.
Table
22-2: High-grade
Silver Bearing Domains, Contained within the Mineral Resource at 2 oz/ton Cutoff Grade, US customary Units
Classification
Cutoff
Grade Silver oz/ton
Ktons
Gold
oz/ton
Silver
oz/ton
Sulfide
Sulfur%
Gold
Contained
oz x 1000
Silver
Contained
oz x 1000
Brimstone
Measured
2.00
3,195
0.011
8.35
1.33
35
26,686
Indicated
2.00
330
0.010
3.11
1.87
3
1,025
Meas
+ Ind
2.00
3,525
0.011
7.86
1.38
38
27,711
Inferred
2.00
15
0.008
3.52
1.13
0
52
Vortex
Measured
2.00
9,126
0.018
3.81
1.49
160
34,781
Indicated
2.00
7,342
0.014
3.78
1.24
100
27,726
Meas
+ Ind
2.00
16,468
0.016
3.80
1.38
261
62,507
Inferred
2.00
3,644
0.014
3.65
1.27
50
13,307
Brimstone
+ Vortex
Measured
2.00
12,322
0.016
4.99
1.45
195
61,467
Indicated
2.00
7,671
0.013
3.75
1.26
104
28,750
Meas
+ Ind
2.00
19,993
0.015
4.51
1.38
299
90,218
Inferred
2.00
3,659
0.014
3.65
1.27
51
13,359
22.7 Recovery
Plan
The
proposed recovery methods for the Project are conventional and appropriate for the mineralization types identified at Hycroft. The process
design incorporates two established treatment pathways: (i) cyanide heap leaching of ROM oxide and select transition materials, and (ii)
milling, flotation, and POX of sulfide and higher-sulfur transition materials, followed by cyanide leaching and Merrill-Crowe recovery.
The
sulfide processing flowsheet, comprising three-stage crushing, grinding, flotation concentration, concentrate thickening, POX, neutralization,
CCD washing, cyanide leaching, and zinc precipitation, is based on well-established industry practices for treatment of refractory gold-silver
mineralized material. The selected POX conditions, downstream neutralization and conditioning steps (including hot curing and lime boil),
and subsequent cyanide leaching are consistent with standard approaches for oxidation of sulfide concentrates and recovery of precious
metals.
The
use of Merrill-Crowe zinc precipitation for gold and silver recovery is appropriate given the anticipated solution chemistry and elevated
silver content. Integration of heap leach and milling/POX circuits, including handling of combined pregnant solutions and shared recovery
infrastructure, is considered practical and consistent with current operations at the site.
Hycroft Mine Project
Page 267
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Testwork
results support the application of the selected flowsheet, including flotation performance and POX oxidation behavior, although further
metallurgical testwork is recommended at the PFS level to confirm design criteria, optimize operating parameters, and reduce technical
uncertainty. Key areas for further work include flotation optimization, POX operating conditions, reagent consumptions, and solid-liquid
separation performance.
In
the opinion of the Qualified Person, the proposed recovery methods are suitable for the current level of study and provide a reasonable
basis for the process design and economic evaluation presented in this report. The recovery methods are considered to be consistent with
industry standards and applicable to the mineralization types identified, subject to the recommended further testwork and design refinement.
22.8 Infrastructure
The
Hycroft Site is accessible via Jungo Road (Nevada State Route 49), an all-weather gravel roadway connecting the mine to the town of Winnemucca
and Interstate 80. Most current and future Hycroft employees reside in Winnemucca; transportation to site will be provided as required.
A Union Pacific rail line runs adjacent to the mine, and a proposed rail spur and siding will allow for the delivery of bulk consumables
including limestone, grinding media, and fuels. Rail infrastructure will also facilitate the shipment of finished products. New access
roads shall be constructed to provide access to the new process plant and other proposed infrastructure. The new roads will complement
the existing site haul roads which are to remain largely in use.
The
proposed process plant will tie into the existing crushing circuit and portions of the current processing infrastructure. Upgrades to
existing infrastructure are also planned to support the expanded operation. These upgrades include the relocation of existing site assets,
expanding storage capacity, or expanding the operational or control of select facilities. Existing administrative and operational facilities
will be repurposed where possible, while new ancillary facilities such as a laboratory, fueling station, maintenance shop, or other supporting
infrastructure will be constructed to support Hycroft operations.
The
site currently has power from the grid. Upgrades to site power distribution systems are proposed to support the increased power demand
of the new process facility.
Existing
telecommunication infrastructure currently supports data connectivity throughout the site.
Consumables
including fuels and reagents are to be supplied to site via the proposed rail spur connecting the site to the nearby Union Pacific line.
This transport system will also support the movement of Hycroft products off-site.
Water
will be captured and stored from groundwater wells within the Black Rock Desert Basin. Drainage infrastructure on site will capture runoff
water and recycle it to reduce freshwater demand at the process plant. A life-of-mine water balance model was developed to evaluate operational
water requirements and variability under different climatic conditions.
The
infrastructure design approach adopted prioritizes integrating new facilities within the network of existing facilities and upgrading
existing facilities such that they may continue to support the project. Regional transportation and power networks will continue to serve
the Hycroft Site.
Hycroft Mine Project
Page 268
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
22.8.1
Tailings
Management Facility
The
TMF uses conventional designs and assumes construction in a total of eight stages and zero discharge of process solutions. The TMF will
fill the broad valley immediately northeast of the mill site and requires the main and north embankments to impound the tailings. The
main embankment will cross the natural drainage on the west side of the TMF, and the north embankment will be constructed along the northern
ridge. The facility will provide continuous containment of process solutions through the installation of a vertical chimney drain and
engineered lining systems, extending across the impoundment basin and below a portion of the main embankment and along the upstream side
of the north the embankment. The design can store runoff from the basin and direct precipitation on the facility resulting from the 5,000-year,
24-hour storm event during operation and the 10,000-year, 24-hour storm event post-closure.
● The
relevant results and interpretations related to the TMF design are based on the data and
other information summarized in this Report.
● Section
23 describes the recommended work and site investigations to be completed for detailed design
and permitting of the TMF.
22.9 Markets
and Contracts
Gold
and silver doré will be sold on the spot market under terms typical of comparable doré sales contracts. No refining, transportation,
or hedging contracts are currently in place, though these are considered readily obtainable. Doré refining and marketing will
occur through agreements with established refineries with terms aligning with industry standards.
22.10 Capital
Cost Estimate
The
capital cost estimate was developed in Q1 2026 to target a level of accuracy of -30% to +50%, and contingency is less than 25% which
aligns with an Association for the Advancement of Cost Engineering International (AACE International) Class 5 level estimate. The estimate
includes mining, processing, on-site infrastructure, off-site infrastructure, project indirects, project delivery, owners’ costs,
and provisions. The total initial capital costs for the Project are estimated at US$2,434 million, including capitalized operating costs,
and contingency. The LOM sustaining costs are estimated at US$3,107 million, while the closure costs are estimated at US$243 million.
22.11 Operating
Cost Estimate
The
operating cost estimate was developed in Q1 2026 to target a level of accuracy of -30% to +50%, and contingency is less than 25% which
aligns with an Association for the Advancement of Cost Engineering International (AACE International) Class 5 level estimate. The total
operating costs for the Project are estimated at US$21.96/t processed or US$27,592 million over the 51-year mine life. These operating
costs do not include pre-production operating costs.
Hycroft Mine Project
Page 269
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
22.12 Economic
Analysis
The
economic analysis was performed assuming a 5% discount rate. The pre-tax NPV discounted at 5% is US$5,437 million; the IRR is 18.9%,
and payback period is 4.3 years. On a post-tax basis, the NPV discounted at 5% is US$4,344 million, the IRR is 16.9%, and the payback
period is 4.7 years.
A
sensitivity analysis was conducted on the base case NPV and IRR of the project using the following variables: discount rate, head grade,
recovery, total operating cost, initial capital cost, as well as silver and gold prices, which were encompassed in a single variable,
metal price. The sensitivity analysis revealed that the project is most sensitive to changes in metal price, head grade, and recovery.
22.13 Risks
and Opportunities
22.13.1 Risks
22.13.1.1 Exploration
There
are structural complexities with yet underdetermined kinematics controlling the high-grade silver veins requiring additional drilling
for further definition.
22.13.1.2 Sample
Preparation, Analysis and Security
In
the future, IMC recommends that complete QA/QC procedures be applied to silver and sulfide sulfur assaying and sampling. Regular sampling
for QA/QC should be applied to those values in the same way as they have been recently applied to gold.
22.13.1.3 Metallurgical
Testing
While
the available metallurgical testwork supports the proposed flotation followed by POX flowsheet, several risks remain at the current level
of study. Previous test programs did not fully evaluate mercury deportment during POX, and additional work is required to confirm mercury
behavior in autoclave off-gas and determine whether mercury capture systems will be required to meet environmental compliance requirements.
The potential need for such systems may result in additional capital and operating costs.
Uncertainty
also remains with respect to POX performance, including oxidation efficiency, reagent consumption, and downstream process behavior, as
well as variability in metallurgical response across different ore types. The assumed gold and silver recoveries are based on available
testwork and are subject to refinement as additional data become available. In addition, operating cost estimates are sensitive to reagent
consumption and market-driven pricing, including energy and consumables, which may fluctuate over time and impact overall project economics.
No
metallurgical testwork has been completed on transition material for heap leach processing. Heap leach recovery, leach kinetics, reagent
consumption, and permeability characteristics therefore remain uncertain, and the current assumptions may not fully represent actual
operating performance. Additional transition material heap leach testwork is recommended in future study phases to reduce technical uncertainty.
Hycroft Mine Project
Page 270
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
22.13.1.4 Mineral
Resource Estimate
The
risks to the MRE are project costs and project recoveries as well as metal prices that can have a substantial impact both positive and
negative.
Cutoff
grades for both heap leach and concentrator processing are low due to the current high level of metal prices.
Any
reduction of process recovery near the heap leach or concentrator cutoff grades could result in a loss of mineral resource.
22.13.1.5 Processing
and Recovery Methods
The
proposed recovery methods, consisting of flotation followed by POX and cyanide leaching, are supported by available metallurgical testwork;
however, uncertainties remain at the current level of study. Key risks include incomplete definition of POX performance and downstream
process behavior, and potential impacts from mercury deportment and reagent consumption. These factors may affect gold and silver recoveries
and increase operating costs, and recovery assumptions remain subject to refinement as additional testwork is completed. The brownfield
nature of some of the process plant introduces risk for cost and reliability.
22.13.1.6 Infrastructure
The
crushing facility, process plant, and associated office have a proposed location within 500 m of the pit blasting zone. This introduces
the risk of blast-induced vibration, flyrock, or dust impacting facilities or personnel. The long mine life for plant and infrastructure,
as well as the connection to grid which is critical to get the project into operation.
22.13.1.7 TMF
● The
TMF has been sized to provide containment and storage of up to 1.05 Btons of tailings at
an overall settled dry density of 92 pcf. Throughout operation of the TMF, testing in-situ
tailings for density and strength properties may indicate a lower density is achieved due
to various factors including increased water for slurry distribution. This would result in
an additional stage beyond Stage 8 presented in this Report. In this event, local, State,
and Federal permitting may be required and an increase construction sustaining capital and
operating costs would be required for the additional stage.
● At
this stage of the Project, there is reasonable certainty that the location and design of
the TMF as presented for this PEA study will be used as planned. No significant design changes
are likely to be required provided that no material changes in location, geotechnical parameters,
or design are needed as a result of the ongoing and future local, State, and Federal permitting
process and future investigations and studies.
Hycroft Mine Project
Page 271
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
● If
actual activities related to the construction, management, operation, and closure of the
TMF do differ materially from the results summarized in this Report, then the reasonably
foreseeable impacts of these risks and uncertainties are most likely to be project delays
and additional costs. However, any such delays or additional costs may reasonably be expected
to be managed in the ordinary course and should not impact overall project viability.
● Construction
work in Nevada is seasonal. Poor weather during the construction season may result in delays
to the Project schedule.
● If
additional, or alternative, borrow areas are required for construction and/or reclamation
of the TMF that are more distant than contemplated in this prefeasibility study, then construction
and/or reclamation construction costs of the TMF will increase as compared to the costs estimated
in this Report.
22.13.2 Opportunities
22.13.2.1 Exploration
Hycroft
holds a large land package with good growth potential.
Multiple
episodes of mineralization within a well-developed structural framework may result in discovery of additional mineral trends that are
open along strike and at depth.
Expanding
the use of IP geophysics in the mineralization zone may identify multiple untested targets in the existing data set. This emerging technology
has a proven record of success in similar applications.
22.13.2.2 Metallurgical
Testing
Additional
metallurgical testwork provides opportunities to further optimize the POX circuit design and potentially reduce capital and operating
costs. Key testwork opportunities include evaluating POX kinetics to confirm minimum autoclave retention time, assessing the impact of
flotation grind size and mass pull on concentrate quality and POX performance, and optimizing oxygen partial pressure and utilization.
Additional work is also recommended to confirm autothermal operation, characterize solids–liquid separation performance for flotation
concentrate and POX discharge, and better define POX discharge chemistry to optimize neutralization and downstream processing. Targeted
off-gas and condensate characterization may also be required to support environmental compliance requirements.
Alternatives
for processing flotation concentrates are under process development, including but not limited to, roasting and sulfide sulfur recovery
for sulfuric acid production. This has the potential to reduce operating costs, raise gold and silver recoveries and create an additional
revenue stream.
22.13.2.3 Mineral
Resource Estimate
Alternatives
are under evaluation for treatment of flotation concentrates. Improvements and confirmation of those alternatives could provide significant
financial benefit and increase the volume and value of the MRE.
Minimal
geotechnical information has been gathered resulting in very conservative slope parameters applied. Adding geotechnical data from the
drilling and logging program may improve the alteration model which could lead to more beneficial slope parameters, thus reducing stripping
ratios.
22.13.2.4 Processing
and Recovery Methods
The
metallurgical testwork completed to date indicates that the proposed recovery methods are technically viable and provide opportunities
for further optimization. Additional metallurgical testing and process refinement are expected to improve recovery performance, optimize
operating conditions, and enhance overall process efficiency. Continued advancement of the flowsheet is anticipated to reduce technical
uncertainty and support increased confidence in recovery assumptions as the Project progresses to a PFS study.
22.13.2.5 Infrastructure
22.13.2.5.1 TMF
There
may be an opportunity to reduce capital construction costs for the TMF by using the mine haulage fleet for embankment and compact embankment
fill, rather than a contractor. Additional cost savings may be achieved by increasing or decreasing intermediate TMF staged embankment
construction to align with mine planning opportunities for more or less suitable waste materials.
The
TMF has been sized to provide containment and storage of up to 1.05 Btons of tailings at an overall settled dry density of 92 pcf. Throughout
the operation of the TMF, in-situ testing of tailings for density and strength properties may indicate that a higher density is achieved.
This would result in either additional storage capacity beyond the Stage 8 design volume, or the ability to reduce the final Stage 8
dam crest elevation to match the in-situ tailings density.
Additional
closer to the pit areas or pit backfill opportunities should be explored in the next phase of the project. Changing the location of the
WRSF can have an impact on overall waste rock haulage costs.
Hycroft Mine Project
Page 272
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
23 Recommendations
23.1 Estimated
Program Costs
Table
23-1 provides estimated program costs.
Table
23-1: Estimated Program Costs
Program
Cost
Estimated
Cost (US$)
Updated
Technical Report with Economics
200,000
Exploration
Drilling East and South
1,600,000
Exploration
Drilling Deep in Brimstone/Vortex
14,500,000
Regional
Exploration Targets
500,000
Exploration
for Leachable Opportunities (Bay and Camel)
1,800,000
Exploration
- Leach Pads and Stockpiles
800,000
Sample
Preparation - Procedural Upgrade
50,000
Metallurgical
and Process Testwork Programs
1,500,000
Mineral
Resource - Alternative Processing Method Development
800,000
Mineral
Resource and Mine Planning – Additional Geotechnical Testing
300,000
Total:
22,050,000
Note:
1. All
costs are subject to change based on project results
23.2 Exploration
● Increase
the drill hole density in the Bay area.
● Continue
to develop drill plans in the exploration target areas to the east (Manganese and Wildrose)
and south (Oscar), to further expand the resource.
● Continue
deep exploration on Brimstone and Vortex high-grade mineralization.
● Drill
the Bay and Camel targets to fully define leachable opportunities.
● Continue
developing regional exploration targets.
● Continue
exploring the total land package that Hycroft holds, including more geological mapping, soil
and chip samples, geophysical information and drilling.
● Drill
out the current leach pads and stockpiles to better define potential economic benefit to
future processing activities.
Hycroft Mine Project
Page 273
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
23.3 Sample
Preparation, Analysis and Security
Always
complete QA/QC analysis on all potentially economic minerals including gold, silver, and sulfide sulfur. Avoid selective application
of quality controls during the drilling, sampling, and assay process.
23.4 Metallurgical
Testing
It
is recommended that Hycroft continue to evaluate known oxide/transition zones for further heap leach feed material. Also, Hycroft should
investigate the potential to re-leach material from historic heap leach pads for an additional revenue source.
● Undertake
additional metallurgical testwork specifically on transition material to validate recovery
assumptions, and operating parameters, as transition material performance to the heap has
been identified as a project risk.
It
is also recommended that Hycroft undertake additional metallurgical testwork covering flotation, POX, leaching, solids–liquid separation,
cyanide destruction, and Merrill-Crowe processes. The results of this testwork should allow Hycroft to:
● optimize
the flotation reagent suite to reduce operating costs
● optimize
the autoclave retention time required for variations in flotation concentrate product size
● evaluate
the potential to reduce autoclave oxygen partial pressure to the range of 15–30 psi
● generate
additional recovery data as a function of retention time and extent of sulfide oxidation
● investigate
each of the POX, Hot Cure, and Lime Boil stages in sufficient detail to reduce capital costs
by reducing lime and limestone consumption, eliminating unnecessary process steps or shortening
retention times, thereby reducing equipment sizing and cost
● investigate
POX discharge solution chemistry and limestone/lime consumptions to reduce operating costs
● determine
whether flotation mass pull can be reduced. The sulfide grade of the concentrate may be marginal
with respect to providing sufficient exothermic energy to sustain autoclave reactions. This
information is required to determine whether preheating is necessary ahead of POX
● obtain
solids–liquid separation performance data and flocculant requirements for all thickeners,
including tailings, concentrate, POX CCDs, and leach residue CCDs. Higher underflow density
from the concentrate thickener would be beneficial to the autoclave heat balance
● optimize
cyanide addition and quantify cyanide consumption in the leach circuit, including levels
of free and WAD cyanide post-leach
● optimize
reagent consumption in the cyanide destruction circuit by developing an accurate and reliable
SO₂/CN ratio
● determine
whether post-leach solution chemistry impacts Merrill-Crowe recovery efficiency.
Hycroft Mine Project
Page 274
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
23.5 Mineral
Resource Estimate
Continue
evaluation and testing of alternative processing methods of flotation concentrates.
Always
complete QA/QC analysis on all potentially economic minerals including gold, silver, and sulfide sulfur.
Gather
more geotechnical information from previous core samples and with the addition of new geotechnical core holes to improve slope stability
parameters.
23.6 Infrastructure
A
power study is currently underway to determine the power line voltage and the number of powerlines required to feed the process plant.
Currently, power is supplied to the site via nearby power lines which are energized via the main power grid. This technical report assumes
that 2 x 120 kV powerlines will be required. Considering load growth and demand from the oxygen plant, the total estimated operating
load is 160 MW (including the existing crushing plant and North Merrill-Crowe loads which are to be transferred to the new power distribution
system once operational). The power will be delivered through one 120 kV overhead power line stretching 52 miles onto the site.
23.6.1 TMF
To
advance the TMF design beyond this PEA study level, WSP recommends the following evaluations, studies, and documents to support future
feasibility-level and detailed design suitable for permitting:
● Dam
breach analysis and inundation mapping to assess downstream impacts and validate the Dam
consequence classification of “Very High”.
● Completion
of a Failure Modes and Effects Analysis (FMEA) workshop for selection and/or or confirmation
of the GISTM 2020 Failure Consequence Classification of Very High.
● Supplemental
geotechnical evaluations based on revised TMF geometry to include, but not limited to:
○ optimization
of TMF layout taking advantage of topography
○ geotechnical
investigation and laboratory program, that may include geotechnical boreholes, test pits,
geophysics, instrumentation installation, and laboratory program to determine physical and
mechanical properties of foundation soils and bedrock, construction materials, and tailings
○ characterization
of geologic and foundations conditions, embankment construction materials, drainage and geomembrane
bedding materials
○ update
the site-specific seismic and geologic hazard assessment
○ update
stability and deformation analyses
○ perform
tailings, embankment materials, and foundation liquefaction assessment
○ perform
foundation and embankment settlement analyses
Hycroft Mine Project
Page 275
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
○ completion
of a hydrogeologic evaluation within the TMF area for groundwater and artesian springs
○ update
TMF design based on mine schedule, process technology, geotechnical, hydrogeology, hydrology,
and engineering analyses
○ update
surface water management design based on updated TMF layout
○ development
of a monthly time-step water balance that include extreme wet and dry annual climate conditions
with consideration for climate change
○ completion
of a seepage and consolidation model for the long-term closure condition of the tailings
○ preparation
of a preliminary TMF closure plan, including design of closure cover channels and closure
spillway and outlet structure
○ update
capital, sustaining capital, and operating costs based on future investigations and design
of the TMF.
As
additional information is obtained, assumptions made in this study can be verified or updated to advance the project to the next level
of design. The cost of implementing the above recommendations is estimated at US$1,360,000.
Hycroft Mine Project
Page 276
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
24 References
Ausenco
Engineering USA South Inc. (2023). Initial Assessment Technical Report Summary; Humboldt and Pershing Counties, Nevada Prepared by Ausenco
for Hycroft Mining Holding Corp. Effective Date: March 27, 2023.
Ausenco
Engineering USA South Inc, (2022). Technical Report Summary of Initial Assessment on the Hycroft Mine, Nevada, United States of America.
Prepared by Ausenco for Hycroft Mining Holding Corp. Effective Date: February 18, 2022.
Bailey,
E.H, & Phoenix, D.A. (1944). Quicksilver deposits in Nevada (University of Nevada Bulletin, Vol.38, No.5; Geology and Mining
Series No 41). Nevada State Bureau of Mines.
Bates,
W.R. (2001). A proposed exploration program for the hycroft mine. Unpublished Vista Gold report.
Bureau
of Land Management (BLM). (2019). Hycroft mine phase II expansion project draft environmental impact statement (DOI-BLM-NV-W030-2015-007).
U.S. Bureau of Land Management Winnemucca District Office, Black Rock Field Office, in coordination with U.S. Fish and Wildlife Service
Pacific Southwest Region Division of Migratory Bird Management. May 2019.
California’s
Office of Statewide Health Planning and Development (OSHPD), OSHPD Seismic design maps website for Hycroft Mine, Reference: ASCE
7-16, Site Class: D, Risk Category. Visited 20 Aug 2021. I Available at: https://seismicmaps.org/.
Clark,
I.C. (1918). recently recognized alunite deposits at sulphur, Humboldt County, Nevada. Engineering and Mining Journal, 106(4), 159-162..
Couch,
B.F. & Carpenter, J. A. (1943). Nevada’s metal and mineral production (1859-1940 inclusive). (University of Nevada
Bulletin, Vol. 37, No.4; Geology and Mining Series No. 38). Nevada State Bureau of Mines.
Ebert,
S.W., & Rye, R.O. (1997). Secondary precious metal enrichment by steam-heated fluids in the Crofoot-Lewis hot spring gold -silver
deposit. Economic Geology, v.92(5), 578-600. https://doi.org/10.2113/gsecongeo.92.5.578
Friberg,
R.S. (1980). Detailed evaluation report of the sulphur Au Ag prospect, Humboldt and Pershing Counties, Nevada. Unpublished Homestake
Mining Company Report, 32 p.
Fulton,
J.A., & Smith, A.M. (1932). Sulphur mining district file manuscript: Nevada Bureau of Mines and Geology Mining District Files
(includes alunite production notes from 1931). Nevada Bureau of Mines and Geology, University of Nevada.
Hycroft Mine Project
Page 277
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Golder.
(2011a). Pre-feasibility design report. Prepared by Golder Associates Inc for Allied Nevada Gold Corporation,, revised September
2011.
Golder.
(2011b). Earthquake Ground Motions for the North and South Heap Leach Facilities Seismic Analyses and Design, Hycroft Mine, Nevada.
Technical Memorandum prepared by Alan Hull and Eric Cannon of Golder Associates Inc. for Chris MacMahon of Golder Associates Inc. October
26, 2011.
Golder.
(2014a). Feasibility design report, Tailings Management Facility, Hycroft Mine, Nevada. Report prepared by Golder Associates Inc.
for Allied Nevada Gold Corporation. November 20, 2014.
Golder.
(2014b). Geotechnical Characterization of Pilot Plant Mill Tailings. Report prepared by Golder Associates Inc. for Allied Nevada
Gold Corporation. 2014.
Golder.
(2014c). Hycroft Tailings – Consolidation Modelling. Report prepared by Golder Associates Inc. for Allied Nevada Gold Corporation.
2014.
Golder.
(2014d). Tailings Stage-Density Relationship for Feasibility Design. Report prepared by Golder Associates Inc. for Allied Nevada
Gold Corporation. 2014.
Golder.
(2014e). Geotechnical Characterization of Pilot Plant Mill Tailings, Rev. 1. Report prepared by Golder Associates Inc. for Allied
Nevada Gold Corporation. September 8, 2014.
Golder.,
(2016). Feasibility Design Report, Tailings Management Facility (TMF). Report prepared for Hycroft Mining Corporation by Golder
Associates. November 3, 2016.
Golder.
(2022). Hycroft Tailings Management Facility – Prefeasibility Design Report. for Hycroft Mining Corporation as of January
28, 2022.
Hazen
Research Inc. (2011). POX-CIL Evaluation of Hycroft Flotation Concentrates, Hazen Project 11232 Report and Appendices A-F.
Hazen
Research Inc. (2011). Evaluation of Hycroft Blend Flotation Concentrate, Hazen Project 11243-01 Report and Appendix.
Hazen
Research Inc. (2011). Evaluation of Kappes, Cassiday & Associates Flotation Concentrate, Hazen Project 11307 Report and Appendix.
Hazen
Research Inc. (2014). Atmospheric Alkaline Oxidation Pre-treatment Pilot Plant of Hycroft Flotation Concentrates, Hazen Project 11859.
Hazen
Research Inc. (2014). Phase 2 Atmospheric Alkaline Oxidation of Hycroft Flotation Concentrate, Hazen Project 11821.
Hycroft Mine Project
Page 278
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Humboldt
County Building Department. (2018). 2018 code amendments. Retrieved August 20, 2021. Available at: https://www.humboldtcountynv.gov/DocumentCenter/View/3415/2018-Code-Admendments-Approved.
Hycroft
Mining Holding Corporation. (2021). Hycroft building a world-class operation. [PowerPoint presentation]; April 20, 2021. http://www.hycroftmining.com/wp-content/uploads/2021-Presentation-4-19-21.pdf.
Hycroft
Resources and Development, Inc. (HRDI). (2017). Fact Sheet Pursuant to Hycroft Mine Project, Permit Number: NEV0094114. Renewal 2017,
Fact Sheet Revision 01. https://ndep.nv.gov/uploads/documents/NEV0094114dfsFY20.pdf.
Hycroft
Resources and Development, Inc. (HRDI). (2018). Hycroft Mine amendment to plan of operations (NVN-064641) Phase II Expansion Project.
Prepared for the United States Department of the Interior, Bureau of Land Management, Black Rock Field Office, Winnemucca, Nevada. April
2014. Revised June 2014, Revised January 2017, Revised March 2017, and Revised June 2018.
Hynes-Griffin,
M.E., & Franklin, A. G. (1984). Rationalizing the seismic coefficient method. Miscellaneous Paper GL-84-13, Geotechnical Laboratory,
U. S. Army Engineer Waterways Experiment Station, Vicksburg, Mississippi.
Ibrado,
A.S., Roth, D.K., Snider, J.W., Brown, R.A., Harris, D.A., Pennstrom, W.J., Peterson, A.T. (2014). NI 43-101 Technical Report Mill
Expansion Feasibility Study Technical Report, Winnemucca, Nevada, USA. Prepared by M3 Engineering & Technology Corp for Allied
Nevada Gold Corp., Effective date: November 03, 2014.
ICMM,
UNEP, & PRI (2020). Global Industry Standards on Tailings Management (GISTM).
Jones,
J.C. (1921). Report on the Property of the Ag Camel Mining and Development Company, Sulphur, Nevada. Unpublished Ag Camel Mining and
Development Company Report, 6p.
J.P.
Morgan Private Bank. (n.d). Is It a Golden Era for Gold? https://privatebank.jpmorgan.com/nam/en/insights/markets-and-investing/is-it-a-golden-era-for-gold
Kappes,
Cassidy & Associates. (2013). Hycroft Pressure Oxidation and Leach Test Work (Project No. 189 C/Report I.D. KCA0120225_HY18_02
/ Mainfile No. 7665). Internal report prepared for Hycroft.
London
Bullion Market Association (LBMA), 2025, Month Unknown. LBMA Annual Precious Metals Forecast Survey 2025 – Winners Announced. https://www.lbma.org.uk/articles/lbma-annual-precious-metals-forecast-survey-2025-winners-announced
McLean,
D.A. (1991). Geology of the Crofoot Mine. unpublished Report prepared for Hycroft Resources and Development Inc. 11p.
Michael
W. West & Associates, Inc. (MMW). (2012). Review of Seismogenic Potential of the Kamma (East) Fault and Design Ground Motions,
Proposed Heap Leach Facilities, Hycroft Mine, Humboldt County, Nevada. Report prepared by MMW for Knight Piésold & Company.
December 18, 2012.
Hycroft Mine Project
Page 279
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Newman,
S., DeLong, R.F., Clarkson, B. M., Carew, T., Hartmann, M. (2019). Hycroft Project Technical Report Summary: Heap Leaching Feasibility
Study, Winnemucca, Nevada, USA. Prepared by M3 Engineering & Technology Corp for Hycroft, Effective date: July 31, 2019.
Pershing
County Building Department. (n.d.). Commercial Guidelines: Minimum Standards for Building Plans (new commercial project permit application
checklist for commercial structures, such as Groups: A, B, E, F, H, I, M, R, and S occupancies). Retrieved August 16, 2021. Available
at: https://www.pershingcountynv.gov /document_center /Department/Building%20Department/CommercialGuidelines-002.pdf.
Prenn,
N. (2006). Technical Report – Vista Gold Corp., Hycroft Mine, Winnemucca, Nevada, USA, NI 43-101 Technical Report. Prepared
by Mine Development Associates (MDA) for Vista Gold Corp. 142 pages.
SGS
Minerals Services. (2009). The Recovery of Au and Ag from Hycroft Project Sulphide Samples, Allied Nevada Gold Corporation –
Hycroft Project – 12012-001 (Report 3).
SGS
Minerals Services. (2013). An Investigation into Oxidative Pretreatment of Hycroft Flotation Concentrates,SGS Project 13224-001/003
– Final Report.
Shawn
Gooch, P.E., (2020). Hycroft Resources and Development, Inc. (HDRI) Hycroft Mine Project NEV0094114 (Renewal 2017, Fact Sheet Revision
01).
SRK
Consulting Inc (SRK). (2022). Preliminary Estimate of Dewatering Requirements to Support 2021 Pre-Feasibility Study Technical Memorandum.
Precious
Metals Insights. (2025). Price Sensitivity of Above-ground Silver Stocks. The Silver Institute. https://silverinstitute.org/wp-content/uploads/2025/02Final_Price_Sensitivity_of_Above-Ground-Silver-Stocks.pdf
Metals
Focus. (2025). World Silver Survey 2025. The Silver Institute. https://silverinstitute.org
The
Silver Institute, (2026). Global Silver Investment to Remain Strong in 2026 Against the Backdrop of a Sixth Consecutive Annual
Market Deficit.
https://silverinstitute.org/global-silver-investment-to-remain-strong-in-2026-against-the-backdrop-of-a-sixth-consecutive-annual-market-deficit/
United
States Geologic Survey, USGS. (2014). Unified Hazard Tool. U.S. Department of the Interior. https://earthquake.usgs.gov/hazards/interactive/index.php.
Vandenburg,
W.O. (1938). Reconnaissance of Mining Districts in Humboldt County, Nevada; U.S. Bureau of Mines Circular 6995, 47p.
Wallace,
A.B. (1980). Geology of the Sulphur District, Southwestern Humboldt County, Nevada. Unpublished report for the Society of Economic
Geologists Field Trip Guidebook.
Hycroft Mine Project
Page 280
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Ware,
G.H. (1989). Surface Mapping, Sampling and Selected Cross-Sections. Unpublished report for Hycroft Resources & Development.
Wilden
R. (1964). Geology of Mineral Deposits of Humboldt County, Nevada. Nevada Bureau of Mines, Bulletin 59, 154p.
Wilson,
S. E. (2008). Technical Report - Allied Nevada Gold Corp., Hycroft Mine, Winnemucca, Nevada, USA. NI 43-101 Technical Report (Effective
Date: January 16, 2008). Prepared for Allied Nevada Gold Corp.
World
Gold Council. (2026). Gold Demand Trends: Q4 and Full Year 2025. https://www.gold.org/goldhub/research/gold-demand-trends
World
Gold Council, (n.d.). “Gold: The Most Effective Commodity Investment – Why it is Under-Represented in Commodity Indices
and the Potential Impact on Your Portfolio.
https://www.gold.org/goldhub/gold-focus/2019/09/gold-most-effective-commodity-investment
WSP
(2024). Hycroft Mine Tailings Management Facility Preliminary Design. Hycroft Mine. Winnemucca, Nevada, USA.
WSP
(2026). Hycroft Mine Tailings Management Facility Conceptual Design Update to Store 1.05B Tons Preliminary Economic Assessment Design
Level. Hycroft Mine. Winnemucca, Nervada, USA.
25 Reliance
on Information Provided by the Registrant
Table
25-1 provides a detailed list of information provided by Hycroft (Registrant) for matters discussed in this Technical Report Summary.
Table
25-1: Information Provided by Hycroft
Category
TRS
Section
Reliance
Legal
Matters
Section
3 - Property Description and Location
Information
and documentation regarding mineral titles, surface land agreements, current permitting status, royalties and other agreements provided
by Hycroft.
Post
Tax Evaluation
Section
19 - Economic Analysis
Macroeconomic
trends, data and assumptions and interest rates - Post Tax Calculations
The
QPs consider it reasonable to rely upon Hycroft for this information because Hycroft, along with its legal and other advisors, are best
positioned to access and interpret existing information and documentation concerning these legal matters and interpretation of the same
is outside of the expertise of the QPs.
Hycroft Mine Project
Page 281
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Appendix
A – Patented Claims
Claim
Name
Patent
No.
Mineral
Survey No.
Admission
Placer
908431
4355
Black
Rock (portion)
1064817
4688A
Black
Rock (portion)
1064817
4688A
Brime
Stone Placer - aka Brimstone Placer
1001727
4600
Cold
Sulphur Placer
83151
3225
Green
Rock Placer (portion) - aka Green Rock No. 1
1223182
4839
4857
Green
Rock Placer (portion) - aka Green Rock No. 2
1223182
4839
4857
Green
Rock Placer (portion) - aka Green Rock No. 3
1223182
4839
4857
Green
Rock Placer (portion) - aka Green Rock No. 4
1223182
4839
4857
Hilltop
Placer (portion)
1008652
4598
Hilltop
Placer (portion)
1008652
4598
Hilltop
Placer (portion)
1008652
4598
Occult
Placer (portion)
1008652
4598
Occult
Placer (portion)
1008652
4598
Occult
Placer (portion)
1008652
4598
Scheol
No. 9 Placer
1008652
4598
Sheol
No. 4 Placer (portion)
908431
4355
Sheol
No. 5 Placer (portion)
908431
4355
Sheol
No. 6 Placer
908431
4355
Sheol
No. 7 Placer
908431
4355
Sheol
No. 8 Placer
908431
4355
Sheol
Nos. 4 & 5 Placer (portions)
908431
4355
Sheol
Sulphur Mine No. 1 Placer
908431
4355
Sheol
Sulphur Mine No. 2 Placer
908431
4355
Sheol
Sulphur Mine No. 3 Placer
908431
4355
Swager
Placer
1213605
4839
West
Virginia No. 1
1064817
4688A
West
Virginia No. 2
1064817
4688A
Hycroft Mine Project
Page 282
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Appendix
B – Unpatented Claims
Unpatented
Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
Airstrip
#1
4/09/1958
Crofoot
Henry
NMC88292
Humboldt
Airstrip
#2
4/09/1958
Crofoot
Henry
NMC88293
Humboldt
Airstrip
#3
4/09/1958
Crofoot
Henry
NMC88294
Humboldt
Airstrip
#4
4/02/1958
Crofoot
Henry
NMC88295
Humboldt
Airstrip
#5
4/02/1958
Crofoot
Henry
NMC88296
Humboldt
Airstrip
Fraction
7/27/1967
Crofoot
Henry
NMC88297
Humboldt
Albert
Lode 1
1/27/2026
Hycroft
Resources & Development, LLC
In
Process - Application Submitted
Humboldt
Albert
Lode 2
1/27/2026
Hycroft
Resources & Development, LLC
In
Process - Application Submitted
Humboldt
Albert
3/11/1989
Kolb
Theodore A
NMC546000
Humboldt
Alunite
11/04/1980
Lewis
Frank W
NMC181012
Humboldt
Alunite
#2
11/04/1980
Lewis
Frank W
NMC181013
Humboldt
Anita
3/11/1989
Kolb
Theodore A
NMC545998
Humboldt
Ashlode
3/11/1989
Kolb
Theodore A
NMC545999
Humboldt
Blackrock
#2
3/11/1989
Kolb
Theodore A
NMC545996
Humboldt
CKC
#1
3/03/1973
Crofoot
Daniel M
NMC88348
Humboldt
CKC
#10
3/11/1989
Crofoot
Daniel M
NMC546001
Humboldt
CKC
#11
3/11/1989
Crofoot
Daniel M
NMC546002
Humboldt
CKC
#13
3/11/1989
Crofoot
Daniel M
NMC546003
Humboldt
CKC
#14
3/11/1989
Crofoot
Daniel M
NMC546004
Humboldt
CKC
#15
8/14/1987
Crofoot
Daniel M
NMC444112
Humboldt
CKC
#2
3/03/1973
Crofoot
Daniel M
NMC88349
Humboldt
CKC
#3
4/03/1973
Crofoot
Daniel M
NMC88350
Humboldt
CKC
#4
4/03/1973
Crofoot
Daniel M
NMC88351
Humboldt
CKC
#5
4/03/1973
Crofoot
Daniel M
NMC88352
Humboldt
CKC
#6
4/03/1973
Crofoot
Daniel M
NMC88353
Humboldt
CKC
#7
9/06/1973
Crofoot
Daniel M
NMC88354
Humboldt
DIA
#1
8/25/1983
Lewis
Frank W
NMC284248
Humboldt
DIA
#2
8/25/1983
Lewis
Frank W
NMC284249
Humboldt
DIA
#3
8/25/1983
Lewis
Frank W
NMC284250
Humboldt
DIA
#4
8/25/1983
Lewis
Frank W
NMC284251
Humboldt
DIA
#5
8/25/1983
Lewis
Frank W
NMC284252
Humboldt
FG
223
9/05/2006
Hycroft
Res & Dev Inc
NMC939256
Humboldt
FG
224
9/05/2006
Hycroft
Res & Dev Inc
NMC939257
Humboldt
FG
225
9/05/2006
Hycroft
Res & Dev Inc
NMC939258
Humboldt
FG
270
9/01/2006
Hycroft
Res & Dev Inc
NMC939291
Humboldt
FG
271
9/01/2006
Hycroft
Res & Dev Inc
NMC939292
Humboldt
FG
272
9/01/2006
Hycroft
Res & Dev Inc
NMC939293
Humboldt
FG
273
9/01/2006
Hycroft
Res & Dev Inc
NMC939294
Humboldt
FG
274
9/01/2006
Hycroft
Res & Dev Inc
NMC939295
Humboldt
FG
319
9/01/2006
Hycroft
Res & Dev Inc
NMC939332
Humboldt
FG
320
9/01/2006
Hycroft
Res & Dev Inc
NMC939333
Humboldt
FG
321
9/01/2006
Hycroft
Res & Dev Inc
NMC939334
Humboldt
Hycroft Mine Project
Page 283
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
FG
322
9/01/2006
Hycroft
Res & Dev Inc
NMC939335
Humboldt
FG
323
9/01/2006
Hycroft
Res & Dev Inc
NMC939336
Humboldt
FG
368
9/01/2006
Hycroft
Res & Dev Inc
NMC939373
Humboldt
FG
369
9/01/2006
Hycroft
Res & Dev Inc
NMC939374
Humboldt
FG
370
9/01/2006
Hycroft
Res & Dev Inc
NMC939375
Humboldt
FG
371
9/01/2006
Hycroft
Res & Dev Inc
NMC939376
Humboldt
FG
372
9/01/2006
Hycroft
Res & Dev Inc
NMC939377
Humboldt
FG
373
9/01/2006
Hycroft
Res & Dev Inc
NMC939378
Humboldt
FG
374
9/01/2006
Hycroft
Res & Dev Inc
NMC939379
Humboldt
FG
375
9/01/2006
Hycroft
Res & Dev Inc
NMC939380
Humboldt
FG
376
9/01/2006
Hycroft
Res & Dev Inc
NMC939381
Humboldt
FG
421
9/01/2006
Hycroft
Res & Dev Inc
NMC939426
Humboldt
FG
423
9/01/2006
Hycroft
Res & Dev Inc
NMC939428
Humboldt
FG
424
9/01/2006
Hycroft
Res & Dev Inc
NMC939429
Humboldt
FG
425
9/01/2006
Hycroft
Res & Dev Inc
NMC939430
Humboldt
FG
426
9/01/2006
Hycroft
Res & Dev Inc
NMC939431
Humboldt
FG
427
9/01/2006
Hycroft
Res & Dev Inc
NMC939432
Humboldt
FG
428
9/01/2006
Hycroft
Res & Dev Inc
NMC939433
Humboldt
FG
429
9/01/2006
Hycroft
Res & Dev Inc
NMC939434
Humboldt
FG
430
9/01/2006
Hycroft
Res & Dev Inc
NMC939435
Humboldt
FG
431
9/01/2006
Hycroft
Res & Dev Inc
NMC939436
Humboldt
FG
432
9/01/2006
Hycroft
Res & Dev Inc
NMC939437
Humboldt
FG422
9/01/2006
Hycroft
Res & Dev Inc
NMC939427
Humboldt
HRDI
224
4/15/2014
Hycroft
Res & Dev Inc
NMC1102182
Humboldt
HRDI
225
4/15/2014
Hycroft
Res & Dev Inc
NMC1102183
Humboldt
HRDI
226
4/15/2014
Hycroft
Res & Dev Inc
NMC1102184
Humboldt
HRDI
227
4/15/2014
Hycroft
Res & Dev Inc
NMC1102185
Humboldt
HRDI
228
4/15/2014
Hycroft
Res & Dev Inc
NMC1102186
Humboldt
HRDI
229
4/15/2014
Hycroft
Res & Dev Inc
NMC1102187
Humboldt
HRDI
230
4/15/2014
Hycroft
Res & Dev Inc
NMC1102188
Humboldt
Mayo
3/11/1989
Hycroft
Res & Dev Inc
NMC545997
Humboldt
NC
1
8/14/2010
Hycroft
Res & Dev Inc
NMC1027839
Humboldt
NC
10
8/14/2010
Hycroft
Res & Dev Inc
NMC1027848
Humboldt
NC
11
8/14/2010
Hycroft
Res & Dev Inc
NMC1027849
Humboldt
NC
110
8/14/2010
Hycroft
Res & Dev Inc
NMC1027948
Humboldt
NC
111
8/14/2010
Hycroft
Res & Dev Inc
NMC1027949
Humboldt
NC
112
8/14/2010
Hycroft
Res & Dev Inc
NMC1027950
Humboldt
NC
113
8/14/2010
Hycroft
Res & Dev Inc
NMC1027951
Humboldt
NC
114
8/14/2010
Hycroft
Res & Dev Inc
NMC1027952
Humboldt
NC
115
8/14/2010
Hycroft
Res & Dev Inc
NMC1027953
Humboldt
NC
116
8/14/2010
Hycroft
Res & Dev Inc
NMC1027954
Humboldt
NC
117
8/14/2010
Hycroft
Res & Dev Inc
NMC1027955
Humboldt
NC
118
8/14/2010
Hycroft
Res & Dev Inc
NMC1027956
Humboldt
NC
119
8/14/2010
Hycroft
Res & Dev Inc
NMC1027957
Humboldt
NC
12
8/14/2010
Hycroft
Res & Dev Inc
NMC1027850
Humboldt
NC
120
8/14/2010
Hycroft
Res & Dev Inc
NMC1027958
Humboldt
NC
121
8/14/2010
Hycroft
Res & Dev Inc
NMC1027959
Humboldt
NC
122
8/14/2010
Hycroft
Res & Dev Inc
NMC1027960
Humboldt
Hycroft Mine Project
Page 284
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NC
123
8/14/2010
Hycroft
Res & Dev Inc
NMC1027961
Humboldt
NC
124
8/14/2010
Hycroft
Res & Dev Inc
NMC1027962
Humboldt
NC
125
8/14/2010
Hycroft
Res & Dev Inc
NMC1027963
Humboldt
NC
126
8/14/2010
Hycroft
Res & Dev Inc
NMC1027964
Humboldt
NC
127
8/14/2010
Hycroft
Res & Dev Inc
NMC1027965
Humboldt
NC
128
8/14/2010
Hycroft
Res & Dev Inc
NMC1027966
Humboldt
NC
129
8/14/2010
Hycroft
Res & Dev Inc
NMC1027967
Humboldt
NC
13
8/14/2010
Hycroft
Res & Dev Inc
NMC1027851
Humboldt
NC
130
8/14/2010
Hycroft
Res & Dev Inc
NMC1027968
Humboldt
NC
131
8/14/2010
Hycroft
Res & Dev Inc
NMC1027969
Humboldt
NC
14
8/14/2010
Hycroft
Res & Dev Inc
NMC1027852
Humboldt
NC
15
8/14/2010
Hycroft
Res & Dev Inc
NMC1027853
Humboldt
NC
151
8/14/2010
Hycroft
Res & Dev Inc
NMC1027989
Humboldt
NC
152
8/14/2010
Hycroft
Res & Dev Inc
NMC1027990
Humboldt
NC
153
8/14/2010
Hycroft
Res & Dev Inc
NMC1027991
Humboldt
NC
154
8/14/2010
Hycroft
Res & Dev Inc
NMC1027992
Humboldt
NC
155
8/14/2010
Hycroft
Res & Dev Inc
NMC1027993
Humboldt
NC
156
8/14/2010
Hycroft
Res & Dev Inc
NMC1027994
Humboldt
NC
157
8/14/2010
Hycroft
Res & Dev Inc
NMC1027995
Humboldt
NC
158
8/14/2010
Hycroft
Res & Dev Inc
NMC1027996
Humboldt
NC
159
8/14/2010
Hycroft
Res & Dev Inc
NMC1027997
Humboldt
NC
16
8/14/2010
Hycroft
Res & Dev Inc
NMC1027854
Humboldt
NC
160
8/14/2010
Hycroft
Res & Dev Inc
NMC1027998
Humboldt
NC
161
8/14/2010
Hycroft
Res & Dev Inc
NMC1027999
Humboldt
NC
162
8/14/2010
Hycroft
Res & Dev Inc
NMC1028000
Humboldt
NC
163
8/14/2010
Hycroft
Res & Dev Inc
NMC1028001
Humboldt
NC
164
8/14/2010
Hycroft
Res & Dev Inc
NMC1028002
Humboldt
NC
165
8/14/2010
Hycroft
Res & Dev Inc
NMC1028003
Humboldt
NC
166
8/14/2010
Hycroft
Res & Dev Inc
NMC1028004
Humboldt
NC
167
8/14/2010
Hycroft
Res & Dev Inc
NMC1028005
Humboldt
NC
168
8/14/2010
Hycroft
Res & Dev Inc
NMC1028006
Humboldt
NC
169
8/14/2010
Hycroft
Res & Dev Inc
NMC1028007
Humboldt
NC
189
8/14/2010
Hycroft
Res & Dev Inc
NMC1028027
Humboldt
NC
190
8/14/2010
Hycroft
Res & Dev Inc
NMC1028028
Humboldt
NC
191
8/14/2010
Hycroft
Res & Dev Inc
NMC1028029
Humboldt
NC
192
8/14/2010
Hycroft
Res & Dev Inc
NMC1028030
Humboldt
NC
193
8/14/2010
Hycroft
Res & Dev Inc
NMC1028031
Humboldt
NC
194
8/14/2010
Hycroft
Res & Dev Inc
NMC1028032
Humboldt
NC
195
8/14/2010
Hycroft
Res & Dev Inc
NMC1028033
Humboldt
NC
196
8/14/2010
Hycroft
Res & Dev Inc
NMC1028034
Humboldt
NC
197
8/14/2010
Hycroft
Res & Dev Inc
NMC1028035
Humboldt
NC
198
8/14/2010
Hycroft
Res & Dev Inc
NMC1028036
Humboldt
NC
199
8/14/2010
Hycroft
Res & Dev Inc
NMC1028037
Humboldt
NC
2
8/14/2010
Hycroft
Res & Dev Inc
NMC1027840
Humboldt
NC
200
8/14/2010
Hycroft
Res & Dev Inc
NMC1028038
Humboldt
NC
201
8/14/2010
Hycroft
Res & Dev Inc
NMC1028039
Humboldt
NC
202
8/14/2010
Hycroft
Res & Dev Inc
NMC1028040
Humboldt
NC
203
8/14/2010
Hycroft
Res & Dev Inc
NMC1028041
Humboldt
Hycroft Mine Project
Page 285
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NC
204
8/14/2010
Hycroft
Res & Dev Inc
NMC1028042
Humboldt
NC
224
8/14/2010
Hycroft
Res & Dev Inc
NMC1028062
Humboldt
NC
225
8/14/2010
Hycroft
Res & Dev Inc
NMC1028063
Humboldt
NC
226
8/14/2010
Hycroft
Res & Dev Inc
NMC1028064
Humboldt
NC
227
8/14/2010
Hycroft
Res & Dev Inc
NMC1028065
Humboldt
NC
228
8/14/2010
Hycroft
Res & Dev Inc
NMC1028066
Humboldt
NC
229
8/14/2010
Hycroft
Res & Dev Inc
NMC1028067
Humboldt
NC
230
8/14/2010
Hycroft
Res & Dev Inc
NMC1028068
Humboldt
NC
231
8/14/2010
Hycroft
Res & Dev Inc
NMC1028069
Humboldt
NC
232
8/14/2010
Hycroft
Res & Dev Inc
NMC1028070
Humboldt
NC
233
8/14/2010
Hycroft
Res & Dev Inc
NMC1028071
Humboldt
NC
234
8/14/2010
Hycroft
Res & Dev Inc
NMC1028072
Humboldt
NC
235
8/14/2010
Hycroft
Res & Dev Inc
NMC1028073
Humboldt
NC
236
8/14/2010
Hycroft
Res & Dev Inc
NMC1028074
Humboldt
NC
237
8/14/2010
Hycroft
Res & Dev Inc
NMC1028075
Humboldt
NC
238
8/14/2010
Hycroft
Res & Dev Inc
NMC1028076
Humboldt
NC
239
8/14/2010
Hycroft
Res & Dev Inc
NMC1028077
Humboldt
NC
259
8/14/2010
Hycroft
Res & Dev Inc
NMC1028097
Humboldt
NC
260
8/14/2010
Hycroft
Res & Dev Inc
NMC1028098
Humboldt
NC
261
8/14/2010
Hycroft
Res & Dev Inc
NMC1028099
Humboldt
NC
262
8/14/2010
Hycroft
Res & Dev Inc
NMC1028100
Humboldt
NC
263
8/14/2010
Hycroft
Res & Dev Inc
NMC1028101
Humboldt
NC
264
8/14/2010
Hycroft
Res & Dev Inc
NMC1028102
Humboldt
NC
265
8/14/2010
Hycroft
Res & Dev Inc
NMC1028103
Humboldt
NC
266
8/14/2010
Hycroft
Res & Dev Inc
NMC1028104
Humboldt
NC
267
8/14/2010
Hycroft
Res & Dev Inc
NMC1028105
Humboldt
NC
268
8/14/2010
Hycroft
Res & Dev Inc
NMC1028106
Humboldt
NC
269
8/14/2010
Hycroft
Res & Dev Inc
NMC1028107
Humboldt
NC
270
8/14/2010
Hycroft
Res & Dev Inc
NMC1028108
Humboldt
NC
271
8/14/2010
Hycroft
Res & Dev Inc
NMC1028109
Humboldt
NC
272
8/14/2010
Hycroft
Res & Dev Inc
NMC1028110
Humboldt
NC
273
8/14/2010
Hycroft
Res & Dev Inc
NMC1028111
Humboldt
NC
293
8/14/2010
Hycroft
Res & Dev Inc
NMC1028131
Humboldt
NC
294
8/14/2010
Hycroft
Res & Dev Inc
NMC1028132
Humboldt
NC
295
8/14/2010
Hycroft
Res & Dev Inc
NMC1028133
Humboldt
NC
296
8/14/2010
Hycroft
Res & Dev Inc
NMC1028134
Humboldt
NC
297
8/14/2010
Hycroft
Res & Dev Inc
NMC1028135
Humboldt
NC
298
8/14/2010
Hycroft
Res & Dev Inc
NMC1028136
Humboldt
NC
299
8/14/2010
Hycroft
Res & Dev Inc
NMC1028137
Humboldt
NC
3
8/14/2010
Hycroft
Res & Dev Inc
NMC1027841
Humboldt
NC
300
8/14/2010
Hycroft
Res & Dev Inc
NMC1028138
Humboldt
NC
301
8/14/2010
Hycroft
Res & Dev Inc
NMC1028139
Humboldt
NC
302
8/14/2010
Hycroft
Res & Dev Inc
NMC1028140
Humboldt
NC
303
8/14/2010
Hycroft
Res & Dev Inc
NMC1028141
Humboldt
NC
304
8/14/2010
Hycroft
Res & Dev Inc
NMC1028142
Humboldt
NC
305
8/14/2010
Hycroft
Res & Dev Inc
NMC1028143
Humboldt
NC
31
8/14/2010
Hycroft
Res & Dev Inc
NMC1027869
Humboldt
NC
32
8/14/2010
Hycroft
Res & Dev Inc
NMC1027870
Humboldt
Hycroft Mine Project
Page 286
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NC
33
8/14/2010
Hycroft
Res & Dev Inc
NMC1027871
Humboldt
NC
34
8/14/2010
Hycroft
Res & Dev Inc
NMC1027872
Humboldt
NC
35
8/14/2010
Hycroft
Res & Dev Inc
NMC1027873
Humboldt
NC
36
8/14/2010
Hycroft
Res & Dev Inc
NMC1027874
Humboldt
NC
37
8/14/2010
Hycroft
Res & Dev Inc
NMC1027875
Humboldt
NC
38
8/14/2010
Hycroft
Res & Dev Inc
NMC1027876
Humboldt
NC
39
8/14/2010
Hycroft
Res & Dev Inc
NMC1027877
Humboldt
NC
4
8/14/2010
Hycroft
Res & Dev Inc
NMC1027842
Humboldt
NC
40
8/14/2010
Hycroft
Res & Dev Inc
NMC1027878
Humboldt
NC
41
8/14/2010
Hycroft
Res & Dev Inc
NMC1027879
Humboldt
NC
42
8/14/2010
Hycroft
Res & Dev Inc
NMC1027880
Humboldt
NC
43
8/14/2010
Hycroft
Res & Dev Inc
NMC1027881
Humboldt
NC
44
8/14/2010
Hycroft
Res & Dev Inc
NMC1027882
Humboldt
NC
45
8/14/2010
Hycroft
Res & Dev Inc
NMC1027883
Humboldt
NC
46
8/14/2010
Hycroft
Res & Dev Inc
NMC1027884
Humboldt
NC
47
8/14/2010
Hycroft
Res & Dev Inc
NMC1027885
Humboldt
NC
48
8/14/2010
Hycroft
Res & Dev Inc
NMC1027886
Humboldt
NC
49
8/14/2010
Hycroft
Res & Dev Inc
NMC1027887
Humboldt
NC
5
8/14/2010
Hycroft
Res & Dev Inc
NMC1027843
Humboldt
NC
6
8/14/2010
Hycroft
Res & Dev Inc
NMC1027844
Humboldt
NC
69
8/14/2010
Hycroft
Res & Dev Inc
NMC1027907
Humboldt
NC
7
8/14/2010
Hycroft
Res & Dev Inc
NMC1027845
Humboldt
NC
70
8/14/2010
Hycroft
Res & Dev Inc
NMC1027908
Humboldt
NC
71
8/14/2010
Hycroft
Res & Dev Inc
NMC1027909
Humboldt
NC
72
8/14/2010
Hycroft
Res & Dev Inc
NMC1027910
Humboldt
NC
73
8/14/2010
Hycroft
Res & Dev Inc
NMC1027911
Humboldt
NC
74
8/14/2010
Hycroft
Res & Dev Inc
NMC1027912
Humboldt
NC
75
8/14/2010
Hycroft
Res & Dev Inc
NMC1027913
Humboldt
NC
76
8/14/2010
Hycroft
Res & Dev Inc
NMC1027914
Humboldt
NC
77
8/14/2010
Hycroft
Res & Dev Inc
NMC1027915
Humboldt
NC
78
8/14/2010
Hycroft
Res & Dev Inc
NMC1027916
Humboldt
NC
79
8/14/2010
Hycroft
Res & Dev Inc
NMC1027917
Humboldt
NC
8
8/14/2010
Hycroft
Res & Dev Inc
NMC1027846
Humboldt
NC
80
8/14/2010
Hycroft
Res & Dev Inc
NMC1027918
Humboldt
NC
81
8/14/2010
Hycroft
Res & Dev Inc
NMC1027919
Humboldt
NC
82
8/14/2010
Hycroft
Res & Dev Inc
NMC1027920
Humboldt
NC
83
8/14/2010
Hycroft
Res & Dev Inc
NMC1027921
Humboldt
NC
84
8/14/2010
Hycroft
Res & Dev Inc
NMC1027922
Humboldt
NC
85
8/14/2010
Hycroft
Res & Dev Inc
NMC1027923
Humboldt
NC
86
8/14/2010
Hycroft
Res & Dev Inc
NMC1027924
Humboldt
NC
87
8/14/2010
Hycroft
Res & Dev Inc
NMC1027925
Humboldt
NC
88
8/14/2010
Hycroft
Res & Dev Inc
NMC1027926
Humboldt
NC
89
8/14/2010
Hycroft
Res & Dev Inc
NMC1027927
Humboldt
NC
9
8/14/2010
Hycroft
Res & Dev Inc
NMC1027847
Humboldt
NC
90
8/14/2010
Hycroft
Res & Dev Inc
NMC1027928
Humboldt
NFG
1
10/10/2006
Hycroft
Res & Dev Inc
NMC939506
Humboldt
NFG
10
10/10/2006
Hycroft
Res & Dev Inc
NMC939515
Humboldt
NFG
100
10/10/2006
Hycroft
Res & Dev Inc
NMC939604
Humboldt
Hycroft Mine Project
Page 287
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NFG
101
10/10/2006
Hycroft
Res & Dev Inc
NMC939605
Humboldt
NFG
102
10/10/2006
Hycroft
Res & Dev Inc
NMC939606
Humboldt
NFG
103
10/10/2006
Hycroft
Res & Dev Inc
NMC939607
Humboldt
NFG
104
10/10/2006
Hycroft
Res & Dev Inc
NMC939608
Humboldt
NFG
105
10/10/2006
Hycroft
Res & Dev Inc
NMC939609
Humboldt
NFG
106
10/10/2006
Hycroft
Res & Dev Inc
NMC939610
Humboldt
NFG
107
10/10/2006
Hycroft
Res & Dev Inc
NMC939611
Humboldt
NFG
108
10/10/2006
Hycroft
Res & Dev Inc
NMC939612
Humboldt
NFG
109
10/10/2006
Hycroft
Res & Dev Inc
NMC939613
Humboldt
NFG
11
10/10/2006
Hycroft
Res & Dev Inc
NMC939516
Humboldt
NFG
110
10/10/2006
Hycroft
Res & Dev Inc
NMC939614
Humboldt
NFG
111
10/10/2006
Hycroft
Res & Dev Inc
NMC939615
Humboldt
NFG
112
10/10/2006
Hycroft
Res & Dev Inc
NMC939616
Humboldt
NFG
113
10/10/2006
Hycroft
Res & Dev Inc
NMC939617
Humboldt
NFG
114
10/10/2006
Hycroft
Res & Dev Inc
NMC939618
Humboldt
NFG
115
10/10/2006
Hycroft
Res & Dev Inc
NMC939619
Humboldt
NFG
116
10/10/2006
Hycroft
Res & Dev Inc
NMC939620
Humboldt
NFG
117
10/10/2006
Hycroft
Res & Dev Inc
NMC939621
Humboldt
NFG
118
10/10/2006
Hycroft
Res & Dev Inc
NMC939622
Humboldt
NFG
119
10/10/2006
Hycroft
Res & Dev Inc
NMC939623
Humboldt
NFG
12
10/10/2006
Hycroft
Res & Dev Inc
NMC939517
Humboldt
NFG
120
10/10/2006
Hycroft
Res & Dev Inc
NMC939624
Humboldt
NFG
121
10/10/2006
Hycroft
Res & Dev Inc
NMC939625
Humboldt
NFG
122
10/10/2006
Hycroft
Res & Dev Inc
NMC939626
Humboldt
NFG
123
10/10/2006
Hycroft
Res & Dev Inc
NMC939627
Humboldt
NFG
124
10/10/2006
Hycroft
Res & Dev Inc
NMC939628
Humboldt
NFG
125
10/10/2006
Hycroft
Res & Dev Inc
NMC939629
Humboldt
NFG
126
10/10/2006
Hycroft
Res & Dev Inc
NMC939630
Humboldt
NFG
127
10/10/2006
Hycroft
Res & Dev Inc
NMC939631
Humboldt
NFG
128
10/10/2006
Hycroft
Res & Dev Inc
NMC939632
Humboldt
NFG
129
10/10/2006
Hycroft
Res & Dev Inc
NMC939633
Humboldt
NFG
13
10/10/2006
Hycroft
Res & Dev Inc
NMC939518
Humboldt
NFG
130
10/10/2006
Hycroft
Res & Dev Inc
NMC939634
Humboldt
NFG
131
10/10/2006
Hycroft
Res & Dev Inc
NMC939635
Humboldt
NFG
132
10/10/2006
Hycroft
Res & Dev Inc
NMC939636
Humboldt
NFG
133
10/10/2006
Hycroft
Res & Dev Inc
NMC939637
Humboldt
NFG
134
10/10/2006
Hycroft
Res & Dev Inc
NMC939638
Humboldt
NFG
135
10/10/2006
Hycroft
Res & Dev Inc
NMC939639
Humboldt
NFG
136
10/10/2006
Hycroft
Res & Dev Inc
NMC939640
Humboldt
NFG
137
10/10/2006
Hycroft
Res & Dev Inc
NMC939641
Humboldt
NFG
138
10/10/2006
Hycroft
Res & Dev Inc
NMC939642
Humboldt
NFG
139
10/10/2006
Hycroft
Res & Dev Inc
NMC939643
Humboldt
NFG
14
10/10/2006
Hycroft
Res & Dev Inc
NMC939519
Humboldt
NFG
140
10/10/2006
Hycroft
Res & Dev Inc
NMC939644
Humboldt
NFG
141
10/10/2006
Hycroft
Res & Dev Inc
NMC939645
Humboldt
NFG
142
10/10/2006
Hycroft
Res & Dev Inc
NMC939646
Humboldt
NFG
143
10/10/2006
Hycroft
Res & Dev Inc
NMC939647
Humboldt
NFG
144
10/10/2006
Hycroft
Res & Dev Inc
NMC939648
Humboldt
Hycroft Mine Project
Page 288
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NFG
145
10/10/2006
Hycroft
Res & Dev Inc
NMC939649
Humboldt
NFG
146
10/10/2006
Hycroft
Res & Dev Inc
NMC939650
Humboldt
NFG
147
10/10/2006
Hycroft
Res & Dev Inc
NMC939651
Humboldt
NFG
148
10/10/2006
Hycroft
Res & Dev Inc
NMC939652
Humboldt
NFG
149
10/10/2006
Hycroft
Res & Dev Inc
NMC939653
Humboldt
NFG
15
10/10/2006
Hycroft
Res & Dev Inc
NMC939520
Humboldt
NFG
150
10/10/2006
Hycroft
Res & Dev Inc
NMC939654
Humboldt
NFG
151
10/10/2006
Hycroft
Res & Dev Inc
NMC939655
Humboldt
NFG
152
10/10/2006
Hycroft
Res & Dev Inc
NMC939656
Humboldt
NFG
153
10/10/2006
Hycroft
Res & Dev Inc
NMC939657
Humboldt
NFG
154
10/10/2006
Hycroft
Res & Dev Inc
NMC939658
Humboldt
NFG
155
10/10/2006
Hycroft
Res & Dev Inc
NMC939659
Humboldt
NFG
156
10/10/2006
Hycroft
Res & Dev Inc
NMC939660
Humboldt
NFG
157
10/10/2006
Hycroft
Res & Dev Inc
NMC939661
Humboldt
NFG
158
10/10/2006
Hycroft
Res & Dev Inc
NMC939662
Humboldt
NFG
159
10/10/2006
Hycroft
Res & Dev Inc
NMC939663
Humboldt
NFG
16
10/10/2006
Hycroft
Res & Dev Inc
NMC939521
Humboldt
NFG
160
10/10/2006
Hycroft
Res & Dev Inc
NMC939664
Humboldt
NFG
161
10/10/2006
Hycroft
Res & Dev Inc
NMC939665
Humboldt
NFG
162
10/10/2006
Hycroft
Res & Dev Inc
NMC939666
Humboldt
NFG
163
10/10/2006
Hycroft
Res & Dev Inc
NMC939667
Humboldt
NFG
164
10/10/2006
Hycroft
Res & Dev Inc
NMC939668
Humboldt
NFG
165
10/10/2006
Hycroft
Res & Dev Inc
NMC939669
Humboldt
NFG
166
10/10/2006
Hycroft
Res & Dev Inc
NMC939670
Humboldt
NFG
167
10/10/2006
Hycroft
Res & Dev Inc
NMC939671
Humboldt
NFG
168
10/10/2006
Hycroft
Res & Dev Inc
NMC939672
Humboldt
NFG
169
10/10/2006
Hycroft
Res & Dev Inc
NMC939673
Humboldt
NFG
17
10/10/2006
Hycroft
Res & Dev Inc
NMC939522
Humboldt
NFG
170
10/10/2006
Hycroft
Res & Dev Inc
NMC939674
Humboldt
NFG
171
10/10/2006
Hycroft
Res & Dev Inc
NMC939675
Humboldt
NFG
172
10/10/2006
Hycroft
Res & Dev Inc
NMC939676
Humboldt
NFG
173
10/10/2006
Hycroft
Res & Dev Inc
NMC939677
Humboldt
NFG
174
10/10/2006
Hycroft
Res & Dev Inc
NMC939678
Humboldt
NFG
175
10/10/2006
Hycroft
Res & Dev Inc
NMC939679
Humboldt
NFG
176
10/10/2006
Hycroft
Res & Dev Inc
NMC939680
Humboldt
NFG
177
10/10/2006
Hycroft
Res & Dev Inc
NMC939681
Humboldt
NFG
178
10/10/2006
Hycroft
Res & Dev Inc
NMC939682
Humboldt
NFG
179
10/10/2006
Hycroft
Res & Dev Inc
NMC939683
Humboldt
NFG
18
10/10/2006
Hycroft
Res & Dev Inc
NMC939523
Humboldt
NFG
180
10/10/2006
Hycroft
Res & Dev Inc
NMC939684
Humboldt
NFG
181
10/10/2006
Hycroft
Res & Dev Inc
NMC939685
Humboldt
NFG
182
10/10/2006
Hycroft
Res & Dev Inc
NMC939686
Humboldt
NFG
183
10/10/2006
Hycroft
Res & Dev Inc
NMC939687
Humboldt
NFG
184
10/10/2006
Hycroft
Res & Dev Inc
NMC939688
Humboldt
NFG
185
10/10/2006
Hycroft
Res & Dev Inc
NMC939689
Humboldt
NFG
186
10/10/2006
Hycroft
Res & Dev Inc
NMC939690
Humboldt
NFG
187
10/10/2006
Hycroft
Res & Dev Inc
NMC939691
Humboldt
NFG
19
10/10/2006
Hycroft
Res & Dev Inc
NMC939524
Humboldt
Hycroft Mine Project
Page 289
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NFG
2
10/10/2006
Hycroft
Res & Dev Inc
NMC939507
Humboldt
NFG
20
10/10/2006
Hycroft
Res & Dev Inc
NMC939525
Humboldt
NFG
21
10/10/2006
Hycroft
Res & Dev Inc
NMC939526
Humboldt
NFG
22
10/10/2006
Hycroft
Res & Dev Inc
NMC939527
Humboldt
NFG
23
10/10/2006
Hycroft
Res & Dev Inc
NMC939528
Humboldt
NFG
24
10/10/2006
Hycroft
Res & Dev Inc
NMC939529
Humboldt
NFG
25
10/10/2006
Hycroft
Res & Dev Inc
NMC939530
Humboldt
NFG
26
10/10/2006
Hycroft
Res & Dev Inc
NMC939531
Humboldt
NFG
27
10/10/2006
Hycroft
Res & Dev Inc
NMC939532
Humboldt
NFG
28
10/10/2006
Hycroft
Res & Dev Inc
NMC939533
Humboldt
NFG
29
10/10/2006
Hycroft
Res & Dev Inc
NMC939534
Humboldt
NFG
3
10/10/2006
Hycroft
Res & Dev Inc
NMC939508
Humboldt
NFG
30
10/10/2006
Hycroft
Res & Dev Inc
NMC939535
Humboldt
NFG
31
10/10/2006
Hycroft
Res & Dev Inc
NMC939536
Humboldt
NFG
32
10/10/2006
Hycroft
Res & Dev Inc
NMC939537
Humboldt
NFG
33
10/10/2006
Hycroft
Res & Dev Inc
NMC939538
Humboldt
NFG
34
10/10/2006
Hycroft
Res & Dev Inc
NMC939539
Humboldt
NFG
35
10/10/2006
Hycroft
Res & Dev Inc
NMC939540
Humboldt
NFG
36
10/10/2006
Hycroft
Res & Dev Inc
NMC939541
Humboldt
NFG
37
10/10/2006
Hycroft
Res & Dev Inc
NMC939542
Humboldt
NFG
38
10/10/2006
Hycroft
Res & Dev Inc
NMC939543
Humboldt
NFG
39
10/10/2006
Hycroft
Res & Dev Inc
NMC939544
Humboldt
NFG
4
10/10/2006
Hycroft
Res & Dev Inc
NMC939509
Humboldt
NFG
40
10/10/2006
Hycroft
Res & Dev Inc
NMC939545
Humboldt
NFG
41
10/10/2006
Hycroft
Res & Dev Inc
NMC939546
Humboldt
NFG
42
10/10/2006
Hycroft
Res & Dev Inc
NMC939547
Humboldt
NFG
43
10/10/2006
Hycroft
Res & Dev Inc
NMC939548
Humboldt
NFG
44
10/10/2006
Hycroft
Res & Dev Inc
NMC939549
Humboldt
NFG
45
10/10/2006
Hycroft
Res & Dev Inc
NMC939550
Humboldt
NFG
46
10/10/2006
Hycroft
Res & Dev Inc
NMC939551
Humboldt
NFG
47
10/10/2006
Hycroft
Res & Dev Inc
NMC939552
Humboldt
NFG
48
10/10/2006
Hycroft
Res & Dev Inc
NMC939553
Humboldt
NFG
49
10/10/2006
Hycroft
Res & Dev Inc
NMC939554
Humboldt
NFG
5
10/10/2006
Hycroft
Res & Dev Inc
NMC939510
Humboldt
NFG
50
10/10/2006
Hycroft
Res & Dev Inc
NMC939555
Humboldt
NFG
51
10/10/2006
Hycroft
Res & Dev Inc
NMC939556
Humboldt
NFG
52
10/10/2006
Hycroft
Res & Dev Inc
NMC939557
Humboldt
NFG
53
10/10/2006
Hycroft
Res & Dev Inc
NMC939558
Humboldt
NFG
54
10/10/2006
Hycroft
Res & Dev Inc
NMC939559
Humboldt
NFG
55
10/10/2006
Hycroft
Res & Dev Inc
NMC939560
Humboldt
NFG
56
10/10/2006
Hycroft
Res & Dev Inc
NMC939561
Humboldt
NFG
57
10/10/2006
Hycroft
Res & Dev Inc
NMC939562
Humboldt
NFG
58
10/10/2006
Hycroft
Res & Dev Inc
NMC939563
Humboldt
NFG
59
10/10/2006
Hycroft
Res & Dev Inc
NMC939564
Humboldt
NFG
6
10/10/2006
Hycroft
Res & Dev Inc
NMC939511
Humboldt
NFG
60
10/10/2006
Hycroft
Res & Dev Inc
NMC939565
Humboldt
NFG
61
10/10/2006
Hycroft
Res & Dev Inc
NMC939566
Humboldt
NFG
62
10/10/2006
Hycroft
Res & Dev Inc
NMC939567
Humboldt
Hycroft Mine Project
Page 290
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NFG
63
10/10/2006
Hycroft
Res & Dev Inc
NMC939568
Humboldt
NFG
64
10/10/2006
Hycroft
Res & Dev Inc
NMC939569
Humboldt
NFG
65
10/10/2006
Hycroft
Res & Dev Inc
NMC939570
Humboldt
NFG
66
10/10/2006
Hycroft
Res & Dev Inc
NMC939571
Humboldt
NFG
67
10/10/2006
Hycroft
Res & Dev Inc
NMC939572
Humboldt
NFG
68
10/10/2006
Hycroft
Res & Dev Inc
NMC939573
Humboldt
NFG
69
10/10/2006
Hycroft
Res & Dev Inc
NMC939574
Humboldt
NFG
7
10/10/2006
Hycroft
Res & Dev Inc
NMC939512
Humboldt
NFG
70
10/10/2006
Hycroft
Res & Dev Inc
NMC939575
Humboldt
NFG
71
10/10/2006
Hycroft
Res & Dev Inc
NMC939576
Humboldt
NFG
72
10/10/2006
Hycroft
Res & Dev Inc
NMC939577
Humboldt
NFG
73
10/10/2006
Hycroft
Res & Dev Inc
NMC939578
Humboldt
NFG
74
10/10/2006
Hycroft
Res & Dev Inc
NMC939579
Humboldt
NFG
76
10/10/2006
Hycroft
Res & Dev Inc
NMC939580
Humboldt
NFG
78
10/10/2006
Hycroft
Res & Dev Inc
NMC939582
Humboldt
NFG
79
10/10/2006
Hycroft
Res & Dev Inc
NMC939583
Humboldt
NFG
8
10/10/2006
Hycroft
Res & Dev Inc
NMC939513
Humboldt
NFG
80
10/10/2006
Hycroft
Res & Dev Inc
NMC939584
Humboldt
NFG
81
10/10/2006
Hycroft
Res & Dev Inc
NMC939585
Humboldt
NFG
82
10/10/2006
Hycroft
Res & Dev Inc
NMC939586
Humboldt
NFG
83
10/10/2006
Hycroft
Res & Dev Inc
NMC939587
Humboldt
NFG
84
10/10/2006
Hycroft
Res & Dev Inc
NMC939588
Humboldt
NFG
85
10/10/2006
Hycroft
Res & Dev Inc
NMC939589
Humboldt
NFG
86
10/10/2006
Hycroft
Res & Dev Inc
NMC939590
Humboldt
NFG
87
10/10/2006
Hycroft
Res & Dev Inc
NMC939591
Humboldt
NFG
88
10/10/2006
Hycroft
Res & Dev Inc
NMC939592
Humboldt
NFG
89
10/10/2006
Hycroft
Res & Dev Inc
NMC939593
Humboldt
NFG
9
10/10/2006
Hycroft
Res & Dev Inc
NMC939514
Humboldt
NFG
90
10/10/2006
Hycroft
Res & Dev Inc
NMC939594
Humboldt
NFG
91
10/10/2006
Hycroft
Res & Dev Inc
NMC939595
Humboldt
NFG
92
10/10/2006
Hycroft
Res & Dev Inc
NMC939596
Humboldt
NFG
93
10/10/2006
Hycroft
Res & Dev Inc
NMC939597
Humboldt
NFG
94
10/10/2006
Hycroft
Res & Dev Inc
NMC939598
Humboldt
NFG
95
10/10/2006
Hycroft
Res & Dev Inc
NMC939599
Humboldt
NFG
96
10/10/2006
Hycroft
Res & Dev Inc
NMC939600
Humboldt
NFG
97
10/10/2006
Hycroft
Res & Dev Inc
NMC939601
Humboldt
NFG
98
10/10/2006
Hycroft
Res & Dev Inc
NMC939602
Humboldt
NFG
99
10/10/2006
Hycroft
Res & Dev Inc
NMC939603
Humboldt
NFG77
10/10/2006
Hycroft
Res & Dev Inc
NMC939581
Humboldt
NFRA
1
11/07/2007
Victory
Exploration Inc.
NMC977833
Humboldt
NFRA
2
11/07/2007
Victory
Exploration Inc.
NMC977834
Humboldt
NFRA
20
11/08/2007
Victory
Exploration Inc.
NMC977852
Humboldt
NFRA
3
11/07/2007
Victory
Exploration Inc.
NMC977835
Humboldt
NFRA16
11/07/2007
Victory
Exploration Inc.
NMC977848
Humboldt
NFRA17
11/07/2007
Victory
Exploration Inc.
NMC977849
Humboldt
NFRA18
11/07/2007
Victory
Exploration Inc.
NMC977850
Humboldt
NFRA19
11/07/2007
Victory
Exploration Inc.
NMC977851
Humboldt
NH
1
5/04/2008
Hycroft
Res & Dev Inc
NMC990154
Humboldt
Hycroft Mine Project
Page 291
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NH
10
5/04/2008
Hycroft
Res & Dev Inc
NMC990163
Humboldt
NH
100
5/03/2008
Hycroft
Res & Dev Inc
NMC990253
Humboldt
NH
101
5/03/2008
Hycroft
Res & Dev Inc
NMC990254
Humboldt
NH
102
5/03/2008
Hycroft
Res & Dev Inc
NMC990255
Humboldt
NH
103
5/03/2008
Hycroft
Res & Dev Inc
NMC990256
Humboldt
NH
104
5/03/2008
Hycroft
Res & Dev Inc
NMC990257
Humboldt
NH
105
5/03/2008
Hycroft
Res & Dev Inc
NMC990258
Humboldt
NH
106
5/03/2008
Hycroft
Res & Dev Inc
NMC990259
Humboldt
NH
107
5/03/2008
Hycroft
Res & Dev Inc
NMC990260
Humboldt
NH
108
5/03/2008
Hycroft
Res & Dev Inc
NMC990261
Humboldt
NH
109
5/03/2008
Hycroft
Res & Dev Inc
NMC990262
Humboldt
NH
11
5/04/2008
Hycroft
Res & Dev Inc
NMC990164
Humboldt
NH
110
5/03/2008
Hycroft
Res & Dev Inc
NMC990263
Humboldt
NH
111
5/03/2008
Hycroft
Res & Dev Inc
NMC990264
Humboldt
NH
112
5/03/2008
Hycroft
Res & Dev Inc
NMC990265
Humboldt
NH
113
5/03/2008
Hycroft
Res & Dev Inc
NMC990266
Humboldt
NH
114
5/03/2008
Hycroft
Res & Dev Inc
NMC990267
Humboldt
NH
115
5/03/2008
Hycroft
Res & Dev Inc
NMC990268
Humboldt
NH
116
5/03/2008
Hycroft
Res & Dev Inc
NMC990269
Humboldt
NH
117
5/03/2008
Hycroft
Res & Dev Inc
NMC990270
Humboldt
NH
118
5/03/2008
Hycroft
Res & Dev Inc
NMC990271
Humboldt
NH
119
5/03/2008
Hycroft
Res & Dev Inc
NMC990272
Humboldt
NH
12
5/04/2008
Hycroft
Res & Dev Inc
NMC990165
Humboldt
NH
120
5/03/2008
Hycroft
Res & Dev Inc
NMC990273
Humboldt
NH
121
5/03/2008
Hycroft
Res & Dev Inc
NMC990274
Humboldt
NH
122
5/03/2008
Hycroft
Res & Dev Inc
NMC990275
Humboldt
NH
123
5/03/2008
Hycroft
Res & Dev Inc
NMC990276
Humboldt
NH
124
5/03/2008
Hycroft
Res & Dev Inc
NMC990277
Humboldt
NH
125
5/03/2008
Hycroft
Res & Dev Inc
NMC990278
Humboldt
NH
126
5/03/2008
Hycroft
Res & Dev Inc
NMC990279
Humboldt
NH
127
5/03/2008
Hycroft
Res & Dev Inc
NMC990280
Humboldt
NH
128
5/03/2008
Hycroft
Res & Dev Inc
NMC990281
Humboldt
NH
129
5/03/2008
Hycroft
Res & Dev Inc
NMC990282
Humboldt
NH
13
5/04/2008
Hycroft
Res & Dev Inc
NMC990166
Humboldt
NH
130
5/03/2008
Hycroft
Res & Dev Inc
NMC990283
Humboldt
NH
131
5/03/2008
Hycroft
Res & Dev Inc
NMC990284
Humboldt
NH
132
5/03/2008
Hycroft
Res & Dev Inc
NMC990285
Humboldt
NH
133
5/03/2008
Hycroft
Res & Dev Inc
NMC990286
Humboldt
NH
134
5/03/2008
Hycroft
Res & Dev Inc
NMC990287
Humboldt
NH
135
5/03/2008
Hycroft
Res & Dev Inc
NMC990288
Humboldt
NH
136
5/03/2008
Hycroft
Res & Dev Inc
NMC990289
Humboldt
NH
137
5/03/2008
Hycroft
Res & Dev Inc
NMC990290
Humboldt
NH
138
5/03/2008
Hycroft
Res & Dev Inc
NMC990291
Humboldt
NH
139
5/03/2008
Hycroft
Res & Dev Inc
NMC990292
Humboldt
NH
14
5/04/2008
Hycroft
Res & Dev Inc
NMC990167
Humboldt
NH
140
5/03/2008
Hycroft
Res & Dev Inc
NMC990293
Humboldt
NH
141
5/03/2008
Hycroft
Res & Dev Inc
NMC990294
Humboldt
NH
142
5/03/2008
Hycroft
Res & Dev Inc
NMC990295
Humboldt
Hycroft Mine Project
Page 292
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NH
143
5/03/2008
Hycroft
Res & Dev Inc
NMC990296
Humboldt
NH
144
5/03/2008
Hycroft
Res & Dev Inc
NMC990297
Humboldt
NH
145
5/03/2008
Hycroft
Res & Dev Inc
NMC990298
Humboldt
NH
146
5/03/2008
Hycroft
Res & Dev Inc
NMC990299
Humboldt
NH
147
5/03/2008
Hycroft
Res & Dev Inc
NMC990300
Humboldt
NH
148
5/03/2008
Hycroft
Res & Dev Inc
NMC990301
Humboldt
NH
149
5/03/2008
Hycroft
Res & Dev Inc
NMC990302
Humboldt
NH
15
5/04/2008
Hycroft
Res & Dev Inc
NMC990168
Humboldt
NH
150
5/03/2008
Hycroft
Res & Dev Inc
NMC990303
Humboldt
NH
151
5/02/2008
Hycroft
Res & Dev Inc
NMC990304
Humboldt
NH
152
5/02/2008
Hycroft
Res & Dev Inc
NMC990305
Humboldt
NH
153
5/02/2008
Hycroft
Res & Dev Inc
NMC990306
Humboldt
NH
154
5/02/2008
Hycroft
Res & Dev Inc
NMC990307
Humboldt
NH
155
5/02/2008
Hycroft
Res & Dev Inc
NMC990308
Humboldt
NH
156
5/02/2008
Hycroft
Res & Dev Inc
NMC990309
Humboldt
NH
157
5/02/2008
Hycroft
Res & Dev Inc
NMC990310
Humboldt
NH
158
5/02/2008
Hycroft
Res & Dev Inc
NMC990311
Humboldt
NH
159
5/02/2008
Hycroft
Res & Dev Inc
NMC990312
Humboldt
NH
16
5/04/2008
Hycroft
Res & Dev Inc
NMC990169
Humboldt
NH
160
5/02/2008
Hycroft
Res & Dev Inc
NMC990313
Humboldt
NH
161
5/02/2008
Hycroft
Res & Dev Inc
NMC990314
Humboldt
NH
162
5/02/2008
Hycroft
Res & Dev Inc
NMC990315
Humboldt
NH
163
5/02/2008
Hycroft
Res & Dev Inc
NMC990316
Humboldt
NH
164
5/02/2008
Hycroft
Res & Dev Inc
NMC990317
Humboldt
NH
165
5/02/2008
Hycroft
Res & Dev Inc
NMC990318
Humboldt
NH
166
5/02/2008
Hycroft
Res & Dev Inc
NMC990319
Humboldt
NH
167
5/02/2008
Hycroft
Res & Dev Inc
NMC990320
Humboldt
NH
168
5/02/2008
Hycroft
Res & Dev Inc
NMC990321
Humboldt
NH
169
5/02/2008
Hycroft
Res & Dev Inc
NMC990322
Humboldt
NH
17
5/04/2008
Hycroft
Res & Dev Inc
NMC990170
Humboldt
NH
170
5/02/2008
Hycroft
Res & Dev Inc
NMC990323
Humboldt
NH
171
5/02/2008
Hycroft
Res & Dev Inc
NMC990324
Humboldt
NH
172
5/02/2008
Hycroft
Res & Dev Inc
NMC990325
Humboldt
NH
173
5/02/2008
Hycroft
Res & Dev Inc
NMC990326
Humboldt
NH
174
5/02/2008
Hycroft
Res & Dev Inc
NMC990327
Humboldt
NH
175
5/02/2008
Hycroft
Res & Dev Inc
NMC990328
Humboldt
NH
176
5/02/2008
Hycroft
Res & Dev Inc
NMC990329
Humboldt
NH
177
5/02/2008
Hycroft
Res & Dev Inc
NMC990330
Humboldt
NH
178
5/02/2008
Hycroft
Res & Dev Inc
NMC990331
Humboldt
NH
179
5/02/2008
Hycroft
Res & Dev Inc
NMC990332
Humboldt
NH
18
5/04/2008
Hycroft
Res & Dev Inc
NMC990171
Humboldt
NH
180
5/02/2008
Hycroft
Res & Dev Inc
NMC990333
Humboldt
NH
181
5/02/2008
Hycroft
Res & Dev Inc
NMC990334
Humboldt
NH
182
5/02/2008
Hycroft
Res & Dev Inc
NMC990335
Humboldt
NH
183
5/02/2008
Hycroft
Res & Dev Inc
NMC990336
Humboldt
NH
184
5/02/2008
Hycroft
Res & Dev Inc
NMC990337
Humboldt
NH
185
5/02/2008
Hycroft
Res & Dev Inc
NMC990338
Humboldt
NH
186
5/02/2008
Hycroft
Res & Dev Inc
NMC990339
Humboldt
Hycroft Mine Project
Page 293
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NH
187
5/02/2008
Hycroft
Res & Dev Inc
NMC990340
Humboldt
NH
188
5/02/2008
Hycroft
Res & Dev Inc
NMC990341
Humboldt
NH
189
5/02/2008
Hycroft
Res & Dev Inc
NMC990342
Humboldt
NH
19
5/04/2008
Hycroft
Res & Dev Inc
NMC990172
Humboldt
NH
190
5/02/2008
Hycroft
Res & Dev Inc
NMC990343
Humboldt
NH
191
5/02/2008
Hycroft
Res & Dev Inc
NMC990344
Humboldt
NH
192
5/02/2008
Hycroft
Res & Dev Inc
NMC990345
Humboldt
NH
193
5/02/2008
Hycroft
Res & Dev Inc
NMC990346
Humboldt
NH
194
5/02/2008
Hycroft
Res & Dev Inc
NMC990347
Humboldt
NH
195
5/02/2008
Hycroft
Res & Dev Inc
NMC990348
Humboldt
NH
196
5/02/2008
Hycroft
Res & Dev Inc
NMC990349
Humboldt
NH
197
5/02/2008
Hycroft
Res & Dev Inc
NMC990350
Humboldt
NH
198
5/02/2008
Hycroft
Res & Dev Inc
NMC990351
Humboldt
NH
199
5/02/2008
Hycroft
Res & Dev Inc
NMC990352
Humboldt
NH
2
5/04/2008
Hycroft
Res & Dev Inc
NMC990155
Humboldt
NH
20
5/04/2008
Hycroft
Res & Dev Inc
NMC990173
Humboldt
NH
200
5/02/2008
Hycroft
Res & Dev Inc
NMC990353
Humboldt
NH
201
5/02/2008
Hycroft
Res & Dev Inc
NMC990354
Humboldt
NH
202
5/02/2008
Hycroft
Res & Dev Inc
NMC990355
Humboldt
NH
203
5/02/2008
Hycroft
Res & Dev Inc
NMC990356
Humboldt
NH
204
5/02/2008
Hycroft
Res & Dev Inc
NMC990357
Humboldt
NH
205
5/02/2008
Hycroft
Res & Dev Inc
NMC990358
Humboldt
NH
206
5/02/2008
Hycroft
Res & Dev Inc
NMC990359
Humboldt
NH
207
5/02/2008
Hycroft
Res & Dev Inc
NMC990360
Humboldt
NH
208
5/02/2008
Hycroft
Res & Dev Inc
NMC990361
Humboldt
NH
209
5/02/2008
Hycroft
Res & Dev Inc
NMC990362
Humboldt
NH
21
5/04/2008
Hycroft
Res & Dev Inc
NMC990174
Humboldt
NH
210
5/02/2008
Hycroft
Res & Dev Inc
NMC990363
Humboldt
NH
211
5/02/2008
Hycroft
Res & Dev Inc
NMC990364
Humboldt
NH
212
5/02/2008
Hycroft
Res & Dev Inc
NMC990365
Humboldt
NH
213
5/02/2008
Hycroft
Res & Dev Inc
NMC990366
Humboldt
NH
214
5/02/2008
Hycroft
Res & Dev Inc
NMC990367
Humboldt
NH
215
5/02/2008
Hycroft
Res & Dev Inc
NMC990368
Humboldt
NH
216
5/02/2008
Hycroft
Res & Dev Inc
NMC990369
Humboldt
NH
217
5/02/2008
Hycroft
Res & Dev Inc
NMC990370
Humboldt
NH
218
5/02/2008
Hycroft
Res & Dev Inc
NMC990371
Humboldt
NH
219
5/02/2008
Hycroft
Res & Dev Inc
NMC990372
Humboldt
NH
22
5/04/2008
Hycroft
Res & Dev Inc
NMC990175
Humboldt
NH
220
5/02/2008
Hycroft
Res & Dev Inc
NMC990373
Humboldt
NH
221
5/02/2008
Hycroft
Res & Dev Inc
NMC990374
Humboldt
NH
222
5/02/2008
Hycroft
Res & Dev Inc
NMC990375
Humboldt
NH
223
5/02/2008
Hycroft
Res & Dev Inc
NMC990376
Humboldt
NH
224
5/02/2008
Hycroft
Res & Dev Inc
NMC990377
Humboldt
NH
225
5/02/2008
Hycroft
Res & Dev Inc
NMC990378
Humboldt
NH
226
5/02/2008
Hycroft
Res & Dev Inc
NMC990379
Humboldt
NH
227
5/02/2008
Hycroft
Res & Dev Inc
NMC990380
Humboldt
NH
228
5/02/2008
Hycroft
Res & Dev Inc
NMC990381
Humboldt
NH
229
5/02/2008
Hycroft
Res & Dev Inc
NMC990382
Humboldt
Hycroft Mine Project
Page 294
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NH
23
5/04/2008
Hycroft
Res & Dev Inc
NMC990176
Humboldt
NH
230
5/02/2008
Hycroft
Res & Dev Inc
NMC990383
Humboldt
NH
231
5/02/2008
Hycroft
Res & Dev Inc
NMC990384
Humboldt
NH
232
5/02/2008
Hycroft
Res & Dev Inc
NMC990385
Humboldt
NH
233
5/02/2008
Hycroft
Res & Dev Inc
NMC990386
Humboldt
NH
234
5/02/2008
Hycroft
Res & Dev Inc
NMC990387
Humboldt
NH
235
5/02/2008
Hycroft
Res & Dev Inc
NMC990388
Humboldt
NH
236
5/02/2008
Hycroft
Res & Dev Inc
NMC990389
Humboldt
NH
237
5/02/2008
Hycroft
Res & Dev Inc
NMC990390
Humboldt
NH
238
5/02/2008
Hycroft
Res & Dev Inc
NMC990391
Humboldt
NH
239
5/02/2008
Hycroft
Res & Dev Inc
NMC990392
Humboldt
NH
24
5/04/2008
Hycroft
Res & Dev Inc
NMC990177
Humboldt
NH
240
5/02/2008
Hycroft
Res & Dev Inc
NMC990393
Humboldt
NH
241
5/02/2008
Hycroft
Res & Dev Inc
NMC990394
Humboldt
NH
242
5/02/2008
Hycroft
Res & Dev Inc
NMC990395
Humboldt
NH
243
5/02/2008
Hycroft
Res & Dev Inc
NMC990396
Humboldt
NH
244
5/02/2008
Hycroft
Res & Dev Inc
NMC990397
Humboldt
NH
245
5/02/2008
Hycroft
Res & Dev Inc
NMC990398
Humboldt
NH
246
5/02/2008
Hycroft
Res & Dev Inc
NMC990399
Humboldt
NH
247
5/02/2008
Hycroft
Res & Dev Inc
NMC990400
Humboldt
NH
248
5/02/2008
Hycroft
Res & Dev Inc
NMC990401
Humboldt
NH
249
5/02/2008
Hycroft
Res & Dev Inc
NMC990402
Humboldt
NH
25
5/04/2008
Hycroft
Res & Dev Inc
NMC990178
Humboldt
NH
250
5/02/2008
Hycroft
Res & Dev Inc
NMC990403
Humboldt
NH
251
5/02/2008
Hycroft
Res & Dev Inc
NMC990404
Humboldt
NH
252
5/02/2008
Hycroft
Res & Dev Inc
NMC990405
Humboldt
NH
253
5/02/2008
Hycroft
Res & Dev Inc
NMC990406
Humboldt
NH
254
5/02/2008
Hycroft
Res & Dev Inc
NMC990407
Humboldt
NH
255
5/01/2008
Hycroft
Res & Dev Inc
NMC990408
Humboldt
NH
256
5/01/2008
Hycroft
Res & Dev Inc
NMC990409
Humboldt
NH
257
5/01/2008
Hycroft
Res & Dev Inc
NMC990410
Humboldt
NH
258
5/01/2008
Hycroft
Res & Dev Inc
NMC990411
Humboldt
NH
259
5/01/2008
Hycroft
Res & Dev Inc
NMC990412
Humboldt
NH
26
5/04/2008
Hycroft
Res & Dev Inc
NMC990179
Humboldt
NH
260
5/01/2008
Hycroft
Res & Dev Inc
NMC990413
Humboldt
NH
261
5/01/2008
Hycroft
Res & Dev Inc
NMC990414
Humboldt
NH
262
5/01/2008
Hycroft
Res & Dev Inc
NMC990415
Humboldt
NH
263
5/01/2008
Hycroft
Res & Dev Inc
NMC990416
Humboldt
NH
264
5/01/2008
Hycroft
Res & Dev Inc
NMC990417
Humboldt
NH
265
5/01/2008
Hycroft
Res & Dev Inc
NMC990418
Humboldt
NH
266
5/01/2008
Hycroft
Res & Dev Inc
NMC990419
Humboldt
NH
267
5/01/2008
Hycroft
Res & Dev Inc
NMC990420
Humboldt
NH
268
5/01/2008
Hycroft
Res & Dev Inc
NMC990421
Humboldt
NH
269
5/01/2008
Hycroft
Res & Dev Inc
NMC990422
Humboldt
NH
27
5/04/2008
Hycroft
Res & Dev Inc
NMC990180
Humboldt
NH
270
5/01/2008
Hycroft
Res & Dev Inc
NMC990423
Humboldt
NH
271
5/01/2008
Hycroft
Res & Dev Inc
NMC990424
Humboldt
NH
272
5/01/2008
Hycroft
Res & Dev Inc
NMC990425
Humboldt
Hycroft Mine Project
Page 295
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NH
273
5/01/2008
Hycroft
Res & Dev Inc
NMC990426
Humboldt
NH
274
5/01/2008
Hycroft
Res & Dev Inc
NMC990427
Humboldt
NH
275
5/01/2008
Hycroft
Res & Dev Inc
NMC990428
Humboldt
NH
276
5/01/2008
Hycroft
Res & Dev Inc
NMC990429
Humboldt
NH
277
5/01/2008
Hycroft
Res & Dev Inc
NMC990430
Humboldt
NH
278
5/01/2008
Hycroft
Res & Dev Inc
NMC990431
Humboldt
NH
279
5/01/2008
Hycroft
Res & Dev Inc
NMC990432
Humboldt
NH
28
5/04/2008
Hycroft
Res & Dev Inc
NMC990181
Humboldt
NH
280
5/01/2008
Hycroft
Res & Dev Inc
NMC990433
Humboldt
NH
281
5/01/2008
Hycroft
Res & Dev Inc
NMC990434
Humboldt
NH
282
5/01/2008
Hycroft
Res & Dev Inc
NMC990435
Humboldt
NH
283
5/01/2008
Hycroft
Res & Dev Inc
NMC990436
Humboldt
NH
284
5/01/2008
Hycroft
Res & Dev Inc
NMC990437
Humboldt
NH
285
5/01/2008
Hycroft
Res & Dev Inc
NMC990438
Humboldt
NH
286
5/01/2008
Hycroft
Res & Dev Inc
NMC990439
Humboldt
NH
287
5/01/2008
Hycroft
Res & Dev Inc
NMC990440
Humboldt
NH
288
5/01/2008
Hycroft
Res & Dev Inc
NMC990441
Humboldt
NH
289
5/01/2008
Hycroft
Res & Dev Inc
NMC990442
Humboldt
NH
29
5/04/2008
Hycroft
Res & Dev Inc
NMC990182
Humboldt
NH
290
5/01/2008
Hycroft
Res & Dev Inc
NMC990443
Humboldt
NH
291
5/01/2008
Hycroft
Res & Dev Inc
NMC990444
Humboldt
NH
292
5/01/2008
Hycroft
Res & Dev Inc
NMC990445
Humboldt
NH
293
5/01/2008
Hycroft
Res & Dev Inc
NMC990446
Humboldt
NH
294
5/01/2008
Hycroft
Res & Dev Inc
NMC990447
Humboldt
NH
295
5/01/2008
Hycroft
Res & Dev Inc
NMC990448
Humboldt
NH
296
5/01/2008
Hycroft
Res & Dev Inc
NMC990449
Humboldt
NH
297
5/01/2008
Hycroft
Res & Dev Inc
NMC990450
Humboldt
NH
298
5/01/2008
Hycroft
Res & Dev Inc
NMC990451
Humboldt
NH
299
5/01/2008
Hycroft
Res & Dev Inc
NMC990452
Humboldt
NH
3
5/04/2008
Hycroft
Res & Dev Inc
NMC990156
Humboldt
NH
30
5/04/2008
Hycroft
Res & Dev Inc
NMC990183
Humboldt
NH
300
5/01/2008
Hycroft
Res & Dev Inc
NMC990453
Humboldt
NH
301
5/01/2008
Hycroft
Res & Dev Inc
NMC990454
Humboldt
NH
302
5/01/2008
Hycroft
Res & Dev Inc
NMC990455
Humboldt
NH
303
5/01/2008
Hycroft
Res & Dev Inc
NMC990456
Humboldt
NH
304
5/01/2008
Hycroft
Res & Dev Inc
NMC990457
Humboldt
NH
305
5/01/2008
Hycroft
Res & Dev Inc
NMC990458
Humboldt
NH
306
5/01/2008
Hycroft
Res & Dev Inc
NMC990459
Humboldt
NH
307
5/01/2008
Hycroft
Res & Dev Inc
NMC990460
Humboldt
NH
308
5/01/2008
Hycroft
Res & Dev Inc
NMC990461
Humboldt
NH
309
5/01/2008
Hycroft
Res & Dev Inc
NMC990462
Humboldt
NH
31
5/04/2008
Hycroft
Res & Dev Inc
NMC990184
Humboldt
NH
310
5/01/2008
Hycroft
Res & Dev Inc
NMC990463
Humboldt
NH
311
5/01/2008
Hycroft
Res & Dev Inc
NMC990464
Humboldt
NH
312
5/01/2008
Hycroft
Res & Dev Inc
NMC990465
Humboldt
NH
313
5/01/2008
Hycroft
Res & Dev Inc
NMC990466
Humboldt
NH
314
5/01/2008
Hycroft
Res & Dev Inc
NMC990467
Humboldt
NH
315
5/01/2008
Hycroft
Res & Dev Inc
NMC990468
Humboldt
Hycroft Mine Project
Page 296
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NH
316
5/01/2008
Hycroft
Res & Dev Inc
NMC990469
Humboldt
NH
317
5/01/2008
Hycroft
Res & Dev Inc
NMC990470
Humboldt
NH
318
5/01/2008
Hycroft
Res & Dev Inc
NMC990471
Humboldt
NH
319
5/01/2008
Hycroft
Res & Dev Inc
NMC990472
Humboldt
NH
32
5/04/2008
Hycroft
Res & Dev Inc
NMC990185
Humboldt
NH
320
5/01/2008
Hycroft
Res & Dev Inc
NMC990473
Humboldt
NH
321
5/01/2008
Hycroft
Res & Dev Inc
NMC990474
Humboldt
NH
322
5/01/2008
Hycroft
Res & Dev Inc
NMC990475
Humboldt
NH
323
5/01/2008
Hycroft
Res & Dev Inc
NMC990476
Humboldt
NH
324
5/01/2008
Hycroft
Res & Dev Inc
NMC990477
Humboldt
NH
325
5/01/2008
Hycroft
Res & Dev Inc
NMC990478
Humboldt
NH
326
5/01/2008
Hycroft
Res & Dev Inc
NMC990479
Humboldt
NH
327
5/01/2008
Hycroft
Res & Dev Inc
NMC990480
Humboldt
NH
328
5/01/2008
Hycroft
Res & Dev Inc
NMC990481
Humboldt
NH
329
5/01/2008
Hycroft
Res & Dev Inc
NMC990482
Humboldt
NH
33
5/04/2008
Hycroft
Res & Dev Inc
NMC990186
Humboldt
NH
330
5/01/2008
Hycroft
Res & Dev Inc
NMC990483
Humboldt
NH
331
5/01/2008
Hycroft
Res & Dev Inc
NMC990484
Humboldt
NH
332
5/01/2008
Hycroft
Res & Dev Inc
NMC990485
Humboldt
NH
333
5/01/2008
Hycroft
Res & Dev Inc
NMC990486
Humboldt
NH
334
5/01/2008
Hycroft
Res & Dev Inc
NMC990487
Humboldt
NH
335
5/01/2008
Hycroft
Res & Dev Inc
NMC990488
Humboldt
NH
336
5/01/2008
Hycroft
Res & Dev Inc
NMC990489
Humboldt
NH
337
5/01/2008
Hycroft
Res & Dev Inc
NMC990490
Humboldt
NH
338
5/01/2008
Hycroft
Res & Dev Inc
NMC990491
Humboldt
NH
339
5/01/2008
Hycroft
Res & Dev Inc
NMC990492
Humboldt
NH
34
5/04/2008
Hycroft
Res & Dev Inc
NMC990187
Humboldt
NH
340
5/01/2008
Hycroft
Res & Dev Inc
NMC990493
Humboldt
NH
341
5/01/2008
Hycroft
Res & Dev Inc
NMC990494
Humboldt
NH
342
5/01/2008
Hycroft
Res & Dev Inc
NMC990495
Humboldt
NH
343
5/01/2008
Hycroft
Res & Dev Inc
NMC990496
Humboldt
NH
344
5/01/2008
Hycroft
Res & Dev Inc
NMC990497
Humboldt
NH
345
5/01/2008
Hycroft
Res & Dev Inc
NMC990498
Humboldt
NH
346
5/01/2008
Hycroft
Res & Dev Inc
NMC990499
Humboldt
NH
347
5/01/2008
Hycroft
Res & Dev Inc
NMC990500
Humboldt
NH
348
5/01/2008
Hycroft
Res & Dev Inc
NMC990501
Humboldt
NH
349
5/01/2008
Hycroft
Res & Dev Inc
NMC990502
Humboldt
NH
35
5/04/2008
Hycroft
Res & Dev Inc
NMC990188
Humboldt
NH
350
5/01/2008
Hycroft
Res & Dev Inc
NMC990503
Humboldt
NH
351
5/01/2008
Hycroft
Res & Dev Inc
NMC990504
Humboldt
NH
352
5/01/2008
Hycroft
Res & Dev Inc
NMC990505
Humboldt
NH
353
5/01/2008
Hycroft
Res & Dev Inc
NMC990506
Humboldt
NH
354
5/01/2008
Hycroft
Res & Dev Inc
NMC990507
Humboldt
NH
355
5/01/2008
Hycroft
Res & Dev Inc
NMC990508
Humboldt
NH
356
5/01/2008
Hycroft
Res & Dev Inc
NMC990509
Humboldt
NH
357
5/01/2008
Hycroft
Res & Dev Inc
NMC990510
Humboldt
NH
358
5/01/2008
Hycroft
Res & Dev Inc
NMC990511
Humboldt
NH
359
4/28/2008
Hycroft
Res & Dev Inc
NMC990512
Humboldt
Hycroft Mine Project
Page 297
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NH
36
5/04/2008
Hycroft
Res & Dev Inc
NMC990189
Humboldt
NH
360
4/28/2008
Hycroft
Res & Dev Inc
NMC990513
Humboldt
NH
361
4/28/2008
Hycroft
Res & Dev Inc
NMC990514
Humboldt
NH
362
4/28/2008
Hycroft
Res & Dev Inc
NMC990515
Humboldt
NH
363
4/28/2008
Hycroft
Res & Dev Inc
NMC990516
Humboldt
NH
364
4/28/2008
Hycroft
Res & Dev Inc
NMC990517
Humboldt
NH
365
4/28/2008
Hycroft
Res & Dev Inc
NMC990518
Humboldt
NH
366
4/28/2008
Hycroft
Res & Dev Inc
NMC990519
Humboldt
NH
367
4/28/2008
Hycroft
Res & Dev Inc
NMC990520
Humboldt
NH
368
4/28/2008
Hycroft
Res & Dev Inc
NMC990521
Humboldt
NH
369
4/28/2008
Hycroft
Res & Dev Inc
NMC990522
Humboldt
NH
37
5/04/2008
Hycroft
Res & Dev Inc
NMC990190
Humboldt
NH
370
4/28/2008
Hycroft
Res & Dev Inc
NMC990523
Humboldt
NH
371
4/28/2008
Hycroft
Res & Dev Inc
NMC990524
Humboldt
NH
372
4/28/2008
Hycroft
Res & Dev Inc
NMC990525
Humboldt
NH
373
4/28/2008
Hycroft
Res & Dev Inc
NMC990526
Humboldt
NH
374
4/28/2008
Hycroft
Res & Dev Inc
NMC990527
Humboldt
NH
375
4/28/2008
Hycroft
Res & Dev Inc
NMC990528
Humboldt
NH
376
4/28/2008
Hycroft
Res & Dev Inc
NMC990529
Humboldt
NH
377
4/28/2008
Hycroft
Res & Dev Inc
NMC990530
Humboldt
NH
378
4/28/2008
Hycroft
Res & Dev Inc
NMC990531
Humboldt
NH
379
4/28/2008
Hycroft
Res & Dev Inc
NMC990532
Humboldt
NH
38
5/04/2008
Hycroft
Res & Dev Inc
NMC990191
Humboldt
NH
380
4/28/2008
Hycroft
Res & Dev Inc
NMC990533
Humboldt
NH
381
4/28/2008
Hycroft
Res & Dev Inc
NMC990534
Humboldt
NH
382
4/28/2008
Hycroft
Res & Dev Inc
NMC990535
Humboldt
NH
383
4/28/2008
Hycroft
Res & Dev Inc
NMC990536
Humboldt
NH
384
4/28/2008
Hycroft
Res & Dev Inc
NMC990537
Humboldt
NH
385
4/28/2008
Hycroft
Res & Dev Inc
NMC990538
Humboldt
NH
386
4/28/2008
Hycroft
Res & Dev Inc
NMC990539
Humboldt
NH
387
4/28/2008
Hycroft
Res & Dev Inc
NMC990540
Humboldt
NH
388
4/28/2008
Hycroft
Res & Dev Inc
NMC990541
Humboldt
NH
389
4/28/2008
Hycroft
Res & Dev Inc
NMC990542
Humboldt
NH
39
5/04/2008
Hycroft
Res & Dev Inc
NMC990192
Humboldt
NH
390
4/28/2008
Hycroft
Res & Dev Inc
NMC990543
Humboldt
NH
391
4/28/2008
Hycroft
Res & Dev Inc
NMC990544
Humboldt
NH
392
4/28/2008
Hycroft
Res & Dev Inc
NMC990545
Humboldt
NH
393
4/28/2008
Hycroft
Res & Dev Inc
NMC990546
Humboldt
NH
394
4/28/2008
Hycroft
Res & Dev Inc
NMC990547
Humboldt
NH
395
4/28/2008
Hycroft
Res & Dev Inc
NMC990548
Humboldt
NH
396
4/28/2008
Hycroft
Res & Dev Inc
NMC990549
Humboldt
NH
397
4/28/2008
Hycroft
Res & Dev Inc
NMC990550
Humboldt
NH
398
4/28/2008
Hycroft
Res & Dev Inc
NMC990551
Humboldt
NH
399
4/28/2008
Hycroft
Res & Dev Inc
NMC990552
Humboldt
NH
4
5/04/2008
Hycroft
Res & Dev Inc
NMC990157
Humboldt
NH
40
5/04/2008
Hycroft
Res & Dev Inc
NMC990193
Humboldt
NH
400
4/28/2008
Hycroft
Res & Dev Inc
NMC990553
Humboldt
NH
401
4/28/2008
Hycroft
Res & Dev Inc
NMC990554
Humboldt
Hycroft Mine Project
Page 298
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NH
402
4/28/2008
Hycroft
Res & Dev Inc
NMC990555
Humboldt
NH
403
4/28/2008
Hycroft
Res & Dev Inc
NMC990556
Humboldt
NH
404
4/28/2008
Hycroft
Res & Dev Inc
NMC990557
Humboldt
NH
405
4/28/2008
Hycroft
Res & Dev Inc
NMC990558
Humboldt
NH
406
4/28/2008
Hycroft
Res & Dev Inc
NMC990559
Humboldt
NH
407
4/28/2008
Hycroft
Res & Dev Inc
NMC990560
Humboldt
NH
408
4/28/2008
Hycroft
Res & Dev Inc
NMC990561
Humboldt
NH
409
4/28/2008
Hycroft
Res & Dev Inc
NMC990562
Humboldt
NH
41
5/04/2008
Hycroft
Res & Dev Inc
NMC990194
Humboldt
NH
410
4/28/2008
Hycroft
Res & Dev Inc
NMC990563
Humboldt
NH
411
4/28/2008
Hycroft
Res & Dev Inc
NMC990564
Humboldt
NH
412
4/28/2008
Hycroft
Res & Dev Inc
NMC990565
Humboldt
NH
413
4/28/2008
Hycroft
Res & Dev Inc
NMC990566
Humboldt
NH
414
4/28/2008
Hycroft
Res & Dev Inc
NMC990567
Humboldt
NH
415
4/28/2008
Hycroft
Res & Dev Inc
NMC990568
Humboldt
NH
416
4/28/2008
Hycroft
Res & Dev Inc
NMC990569
Humboldt
NH
417
4/28/2008
Hycroft
Res & Dev Inc
NMC990570
Humboldt
NH
418
4/28/2008
Hycroft
Res & Dev Inc
NMC990571
Humboldt
NH
419
4/28/2008
Hycroft
Res & Dev Inc
NMC990572
Humboldt
NH
42
5/04/2008
Hycroft
Res & Dev Inc
NMC990195
Humboldt
NH
420
4/28/2008
Hycroft
Res & Dev Inc
NMC990573
Humboldt
NH
421
4/28/2008
Hycroft
Res & Dev Inc
NMC990574
Humboldt
NH
422
4/28/2008
Hycroft
Res & Dev Inc
NMC990575
Humboldt
NH
423
4/28/2008
Hycroft
Res & Dev Inc
NMC990576
Humboldt
NH
424
4/28/2008
Hycroft
Res & Dev Inc
NMC990577
Humboldt
NH
425
4/28/2008
Hycroft
Res & Dev Inc
NMC990578
Humboldt
NH
426
4/28/2008
Hycroft
Res & Dev Inc
NMC990579
Humboldt
NH
427
4/28/2008
Hycroft
Res & Dev Inc
NMC990580
Humboldt
NH
428
4/28/2008
Hycroft
Res & Dev Inc
NMC990581
Humboldt
NH
429
4/28/2008
Hycroft
Res & Dev Inc
NMC990582
Humboldt
NH
43
5/04/2008
Hycroft
Res & Dev Inc
NMC990196
Humboldt
NH
430
4/28/2008
Hycroft
Res & Dev Inc
NMC990583
Humboldt
NH
431
4/28/2008
Hycroft
Res & Dev Inc
NMC990584
Humboldt
NH
436
4/28/2008
Hycroft
Res & Dev Inc
NMC990589
Humboldt
NH
44
5/04/2008
Hycroft
Res & Dev Inc
NMC990197
Humboldt
NH
440
4/28/2008
Hycroft
Res & Dev Inc
NMC990593
Humboldt
NH
441
4/28/2008
Hycroft
Res & Dev Inc
NMC990594
Humboldt
NH
444
4/28/2008
Hycroft
Res & Dev Inc
NMC990597
Humboldt
NH
445
4/28/2008
Hycroft
Res & Dev Inc
NMC990598
Humboldt
NH
446
4/28/2008
Hycroft
Res & Dev Inc
NMC990599
Humboldt
NH
447
4/28/2008
Hycroft
Res & Dev Inc
NMC990600
Humboldt
NH
448
4/28/2008
Hycroft
Res & Dev Inc
NMC990601
Humboldt
NH
449
4/28/2008
Hycroft
Res & Dev Inc
NMC990602
Humboldt
NH
45
5/04/2008
Hycroft
Res & Dev Inc
NMC990198
Humboldt
NH
451
4/28/2008
Hycroft
Res & Dev Inc
NMC990604
Humboldt
NH
452
4/28/2008
Hycroft
Res & Dev Inc
NMC990605
Humboldt
NH
453
4/28/2008
Hycroft
Res & Dev Inc
NMC990606
Humboldt
NH
454
4/28/2008
Hycroft
Res & Dev Inc
NMC990607
Humboldt
Hycroft Mine Project
Page 299
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NH
455
4/28/2008
Hycroft
Res & Dev Inc
NMC990608
Humboldt
NH
456
4/28/2008
Hycroft
Res & Dev Inc
NMC990609
Humboldt
NH
457
4/28/2008
Hycroft
Res & Dev Inc
NMC990610
Humboldt
NH
458
4/28/2008
Hycroft
Res & Dev Inc
NMC990611
Humboldt
NH
459
4/28/2008
Hycroft
Res & Dev Inc
NMC990612
Humboldt
NH
46
5/04/2008
Hycroft
Res & Dev Inc
NMC990199
Humboldt
NH
460
4/28/2008
Hycroft
Res & Dev Inc
NMC990613
Humboldt
NH
461
4/28/2008
Hycroft
Res & Dev Inc
NMC990614
Humboldt
NH
462
4/28/2008
Hycroft
Res & Dev Inc
NMC990615
Humboldt
NH
463
4/28/2008
Hycroft
Res & Dev Inc
NMC990616
Humboldt
NH
464
4/28/2008
Hycroft
Res & Dev Inc
NMC990617
Humboldt
NH
465
4/28/2008
Hycroft
Res & Dev Inc
NMC990618
Humboldt
NH
466
4/28/2008
Hycroft
Res & Dev Inc
NMC990619
Humboldt
NH
467
4/28/2008
Hycroft
Res & Dev Inc
NMC990620
Humboldt
NH
468
4/28/2008
Hycroft
Res & Dev Inc
NMC990621
Humboldt
NH
469
4/28/2008
Hycroft
Res & Dev Inc
NMC990622
Humboldt
NH
47
5/03/2008
Hycroft
Res & Dev Inc
NMC990200
Humboldt
NH
470
4/28/2008
Hycroft
Res & Dev Inc
NMC990623
Humboldt
NH
471
4/28/2008
Hycroft
Res & Dev Inc
NMC990624
Humboldt
NH
472
4/28/2008
Hycroft
Res & Dev Inc
NMC990625
Humboldt
NH
473
4/28/2008
Hycroft
Res & Dev Inc
NMC990626
Humboldt
NH
474
4/28/2008
Hycroft
Res & Dev Inc
NMC990627
Humboldt
NH
475
4/28/2008
Hycroft
Res & Dev Inc
NMC990628
Humboldt
NH
476
4/28/2008
Hycroft
Res & Dev Inc
NMC990629
Humboldt
NH
477
4/28/2008
Hycroft
Res & Dev Inc
NMC990630
Humboldt
NH
478
4/28/2008
Hycroft
Res & Dev Inc
NMC990631
Humboldt
NH
479
4/28/2008
Hycroft
Res & Dev Inc
NMC990632
Humboldt
NH
48
5/03/2008
Hycroft
Res & Dev Inc
NMC990201
Humboldt
NH
480
4/28/2008
Hycroft
Res & Dev Inc
NMC990633
Humboldt
NH
481
4/28/2008
Hycroft
Res & Dev Inc
NMC990634
Humboldt
NH
482
4/28/2008
Hycroft
Res & Dev Inc
NMC990635
Humboldt
NH
483
4/28/2008
Hycroft
Res & Dev Inc
NMC990636
Humboldt
NH
484
4/28/2008
Hycroft
Res & Dev Inc
NMC990637
Humboldt
NH
485
4/29/2008
Hycroft
Res & Dev Inc
NMC990638
Humboldt
NH
486
4/29/2008
Hycroft
Res & Dev Inc
NMC990639
Humboldt
NH
487
4/29/2008
Hycroft
Res & Dev Inc
NMC990640
Humboldt
NH
488
4/29/2008
Hycroft
Res & Dev Inc
NMC990641
Humboldt
NH
489
4/29/2008
Hycroft
Res & Dev Inc
NMC990642
Humboldt
NH
49
5/03/2008
Hycroft
Res & Dev Inc
NMC990202
Humboldt
NH
490
4/29/2008
Hycroft
Res & Dev Inc
NMC990643
Humboldt
NH
491
4/29/2008
Hycroft
Res & Dev Inc
NMC990644
Humboldt
NH
492
4/29/2008
Hycroft
Res & Dev Inc
NMC990645
Humboldt
NH
493
4/29/2008
Hycroft
Res & Dev Inc
NMC990646
Humboldt
NH
494
4/29/2008
Hycroft
Res & Dev Inc
NMC990647
Humboldt
NH
495
4/29/2008
Hycroft
Res & Dev Inc
NMC990648
Humboldt
NH
496
4/29/2008
Hycroft
Res & Dev Inc
NMC990649
Humboldt
NH
497
4/29/2008
Hycroft
Res & Dev Inc
NMC990650
Humboldt
NH
498
4/29/2008
Hycroft
Res & Dev Inc
NMC990651
Humboldt
Hycroft Mine Project
Page 300
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NH
499
4/29/2008
Hycroft
Res & Dev Inc
NMC990652
Humboldt
NH
5
5/04/2008
Hycroft
Res & Dev Inc
NMC990158
Humboldt
NH
50
5/03/2008
Hycroft
Res & Dev Inc
NMC990203
Humboldt
NH
500
4/29/2008
Hycroft
Res & Dev Inc
NMC990653
Humboldt
NH
51
5/03/2008
Hycroft
Res & Dev Inc
NMC990204
Humboldt
NH
52
5/03/2008
Hycroft
Res & Dev Inc
NMC990205
Humboldt
NH
53
5/03/2008
Hycroft
Res & Dev Inc
NMC990206
Humboldt
NH
54
5/03/2008
Hycroft
Res & Dev Inc
NMC990207
Humboldt
NH
55
5/03/2008
Hycroft
Res & Dev Inc
NMC990208
Humboldt
NH
56
5/03/2008
Hycroft
Res & Dev Inc
NMC990209
Humboldt
NH
57
5/03/2008
Hycroft
Res & Dev Inc
NMC990210
Humboldt
NH
58
5/03/2008
Hycroft
Res & Dev Inc
NMC990211
Humboldt
NH
59
5/03/2008
Hycroft
Res & Dev Inc
NMC990212
Humboldt
NH
6
5/04/2008
Hycroft
Res & Dev Inc
NMC990159
Humboldt
NH
60
5/03/2008
Hycroft
Res & Dev Inc
NMC990213
Humboldt
NH
61
5/03/2008
Hycroft
Res & Dev Inc
NMC990214
Humboldt
NH
62
5/03/2008
Hycroft
Res & Dev Inc
NMC990215
Humboldt
NH
63
5/03/2008
Hycroft
Res & Dev Inc
NMC990216
Humboldt
NH
64
5/03/2008
Hycroft
Res & Dev Inc
NMC990217
Humboldt
NH
65
5/03/2008
Hycroft
Res & Dev Inc
NMC990218
Humboldt
NH
66
5/03/2008
Hycroft
Res & Dev Inc
NMC990219
Humboldt
NH
67
5/03/2008
Hycroft
Res & Dev Inc
NMC990220
Humboldt
NH
68
5/03/2008
Hycroft
Res & Dev Inc
NMC990221
Humboldt
NH
69
5/03/2008
Hycroft
Res & Dev Inc
NMC990222
Humboldt
NH
7
5/04/2008
Hycroft
Res & Dev Inc
NMC990160
Humboldt
NH
70
5/03/2008
Hycroft
Res & Dev Inc
NMC990223
Humboldt
NH
71
5/03/2008
Hycroft
Res & Dev Inc
NMC990224
Humboldt
NH
72
5/03/2008
Hycroft
Res & Dev Inc
NMC990225
Humboldt
NH
73
5/03/2008
Hycroft
Res & Dev Inc
NMC990226
Humboldt
NH
74
5/03/2008
Hycroft
Res & Dev Inc
NMC990227
Humboldt
NH
75
5/03/2008
Hycroft
Res & Dev Inc
NMC990228
Humboldt
NH
76
5/03/2008
Hycroft
Res & Dev Inc
NMC990229
Humboldt
NH
77
5/03/2008
Hycroft
Res & Dev Inc
NMC990230
Humboldt
NH
78
5/03/2008
Hycroft
Res & Dev Inc
NMC990231
Humboldt
NH
79
5/03/2008
Hycroft
Res & Dev Inc
NMC990232
Humboldt
NH
8
5/04/2008
Hycroft
Res & Dev Inc
NMC990161
Humboldt
NH
80
5/03/2008
Hycroft
Res & Dev Inc
NMC990233
Humboldt
NH
81
5/03/2008
Hycroft
Res & Dev Inc
NMC990234
Humboldt
NH
82
5/03/2008
Hycroft
Res & Dev Inc
NMC990235
Humboldt
NH
83
5/03/2008
Hycroft
Res & Dev Inc
NMC990236
Humboldt
NH
84
5/03/2008
Hycroft
Res & Dev Inc
NMC990237
Humboldt
NH
85
5/03/2008
Hycroft
Res & Dev Inc
NMC990238
Humboldt
NH
86
5/03/2008
Hycroft
Res & Dev Inc
NMC990239
Humboldt
NH
87
5/03/2008
Hycroft
Res & Dev Inc
NMC990240
Humboldt
NH
88
5/03/2008
Hycroft
Res & Dev Inc
NMC990241
Humboldt
NH
89
5/03/2008
Hycroft
Res & Dev Inc
NMC990242
Humboldt
NH
9
5/04/2008
Hycroft
Res & Dev Inc
NMC990162
Humboldt
NH
90
5/03/2008
Hycroft
Res & Dev Inc
NMC990243
Humboldt
Hycroft Mine Project
Page 301
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NH
91
5/03/2008
Hycroft
Res & Dev Inc
NMC990244
Humboldt
NH
92
5/03/2008
Hycroft
Res & Dev Inc
NMC990245
Humboldt
NH
93
5/03/2008
Hycroft
Res & Dev Inc
NMC990246
Humboldt
NH
94
5/03/2008
Hycroft
Res & Dev Inc
NMC990247
Humboldt
NH
95
5/03/2008
Hycroft
Res & Dev Inc
NMC990248
Humboldt
NH
96
5/03/2008
Hycroft
Res & Dev Inc
NMC990249
Humboldt
NH
97
5/03/2008
Hycroft
Res & Dev Inc
NMC990250
Humboldt
NH
98
5/03/2008
Hycroft
Res & Dev Inc
NMC990251
Humboldt
NH
99
5/03/2008
Hycroft
Res & Dev Inc
NMC990252
Humboldt
NH432
4/28/2008
Hycroft
Res & Dev Inc
NMC990585
Humboldt
NH433
4/28/2008
Hycroft
Res & Dev Inc
NMC990586
Humboldt
NH434
4/28/2008
Hycroft
Res & Dev Inc
NMC990587
Humboldt
NH435
4/28/2008
Hycroft
Res & Dev Inc
NMC990588
Humboldt
NH437
4/28/2008
Hycroft
Res & Dev Inc
NMC990590
Humboldt
NH438
4/28/2008
Hycroft
Res & Dev Inc
NMC990591
Humboldt
NH439
4/28/2008
Hycroft
Res & Dev Inc
NMC990592
Humboldt
NH442
4/28/2008
Hycroft
Res & Dev Inc
NMC990595
Humboldt
NH443
4/28/2008
Hycroft
Res & Dev Inc
NMC990596
Humboldt
NH450
4/28/2008
Hycroft
Res & Dev Inc
NMC990603
Humboldt
Pacific
#2
11/04/1980
Lewis
Frank W
NMC181010
Humboldt
RFG
# 39
6/28/1987
Lewis
Frank W
NMC436884
Humboldt
RFG
# 72
6/28/1987
Lewis
Frank W
NMC436912
Humboldt
RFG
#0BF
1/30/1980
Hrdi
NMC143488
Humboldt
RFG
#1
12/20/1979
Hrdi
NMC143252
Humboldt
RFG
#10
12/20/1979
Hrdi
NMC143261
Humboldt
RFG
#11
1/03/1980
Hrdi
NMC143262
Humboldt
RFG
#12
1/03/1980
Hrdi
NMC143263
Humboldt
RFG
#12A
2/20/1980
Hrdi
NMC143490
Humboldt
RFG
#13
12/27/1979
Hrdi
NMC143264
Humboldt
RFG
#13A
2/20/1980
Hrdi
NMC143491
Humboldt
RFG
#15
1/03/1980
Hrdi
NMC143266
Humboldt
RFG
#16
1/03/1980
Hrdi
NMC143267
Humboldt
RFG
#168
2/01/1980
Hrdi
NMC143347
Humboldt
RFG
#169
2/01/1980
Hrdi
NMC143348
Humboldt
RFG
#17
1/03/1980
Hrdi
NMC143268
Humboldt
RFG
#170
2/01/1980
Hrdi
NMC143349
Humboldt
RFG
#171
2/01/1980
Hrdi
NMC143350
Humboldt
RFG
#172
1/31/1980
Hrdi
NMC143351
Humboldt
RFG
#173
1/31/1980
Hrdi
NMC143352
Humboldt
RFG
#174
1/31/1980
Hrdi
NMC143353
Humboldt
RFG
#175
1/31/1980
Hrdi
NMC143354
Humboldt
RFG
#176
1/31/1980
Hrdi
NMC143355
Humboldt
RFG
#177
1/31/1980
Hrdi
NMC143356
Humboldt
RFG
#178
2/01/1980
Hrdi
NMC143357
Humboldt
RFG
#179
2/01/1980
Hrdi
NMC143358
Humboldt
RFG
#18
1/03/1980
Hrdi
NMC143269
Humboldt
RFG
#180
2/01/1980
Hrdi
NMC143359
Humboldt
RFG
#181
2/01/1980
Hrdi
NMC143360
Humboldt
Hycroft Mine Project
Page 302
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
RFG
#182
2/01/1980
Hrdi
NMC143361
Humboldt
RFG
#183
2/01/1980
Hrdi
NMC143362
Humboldt
RFG
#184
2/01/1980
Hrdi
NMC143363
Humboldt
RFG
#185
2/01/1980
Hrdi
NMC143364
Humboldt
RFG
#186
1/31/1980
Hrdi
NMC143365
Humboldt
RFG
#187
2/01/1980
Hrdi
NMC143366
Humboldt
RFG
#188
1/31/1980
Hrdi
NMC143367
Humboldt
RFG
#189
2/01/1980
Hrdi
NMC143368
Humboldt
RFG
#19
1/03/1980
Hrdi
NMC143270
Humboldt
RFG
#190
1/31/1980
Hrdi
NMC143369
Humboldt
RFG
#191
2/01/1980
Hrdi
NMC143370
Humboldt
RFG
#192
1/31/1980
Hrdi
NMC143371
Humboldt
RFG
#193
2/01/1980
Hrdi
NMC143372
Humboldt
RFG
#194
1/31/1980
Hrdi
NMC143373
Humboldt
RFG
#195
2/01/1980
Hrdi
NMC143374
Humboldt
RFG
#196
1/31/1980
Hrdi
NMC143375
Humboldt
RFG
#197
2/01/1980
Hrdi
NMC143376
Humboldt
RFG
#198
1/31/1980
Hrdi
NMC143377
Humboldt
RFG
#199
2/01/1980
Hrdi
NMC143378
Humboldt
RFG
#1FS
1/27/1980
Hrdi
NMC143489
Humboldt
RFG
#2
12/20/1979
Hrdi
NMC143253
Humboldt
RFG
#20
1/03/1980
Hrdi
NMC143271
Humboldt
RFG
#200
1/31/1980
Hrdi
NMC143379
Humboldt
RFG
#201
2/05/1980
Hrdi
NMC143380
Humboldt
RFG
#201A
2/05/1980
Hrdi
NMC143504
Humboldt
RFG
#202
1/03/1980
Hrdi
NMC143381
Humboldt
RFG
#203
1/30/1980
Hrdi
NMC143382
Humboldt
RFG
#204
1/30/1980
Hrdi
NMC143383
Humboldt
RFG
#205
1/30/1980
Hrdi
NMC143384
Humboldt
RFG
#206
1/30/1980
Hrdi
NMC143385
Humboldt
RFG
#207
1/30/1980
Hrdi
NMC143386
Humboldt
RFG
#208
1/30/1980
Hrdi
NMC143387
Humboldt
RFG
#209
1/30/1980
Hrdi
NMC143388
Humboldt
RFG
#21
1/03/1980
Hrdi
NMC143272
Humboldt
RFG
#210
1/30/1980
Hrdi
NMC143389
Humboldt
RFG
#211
1/30/1980
Hrdi
NMC143390
Humboldt
RFG
#212
1/30/1980
Hrdi
NMC143391
Humboldt
RFG
#213
1/30/1980
Hrdi
NMC143392
Humboldt
RFG
#214
1/30/1980
Hrdi
NMC143393
Humboldt
RFG
#215
1/30/1980
Hrdi
NMC143394
Humboldt
RFG
#2158
2/14/1980
Hrdi
NMC143505
Humboldt
RFG
#216
1/30/1980
Hrdi
NMC143395
Humboldt
RFG
#217
1/30/1980
Hrdi
NMC143396
Humboldt
RFG
#2178
2/14/1980
Hrdi
NMC143506
Humboldt
RFG
#218
2/13/1980
Hrdi
NMC143397
Humboldt
RFG
#2188
2/04/1980
Hrdi
NMC143508
Humboldt
RFG
#218A
2/04/1980
Hrdi
NMC143507
Humboldt
RFG
#219
2/13/1980
Hrdi
NMC143398
Humboldt
Hycroft Mine Project
Page 303
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
RFG
#2198
2/13/1980
Hrdi
NMC143509
Humboldt
RFG
#22
1/03/1980
Hrdi
NMC143273
Humboldt
RFG
#220
1/31/1980
Hrdi
NMC143399
Humboldt
RFG
#221
1/31/1980
Hrdi
NMC143400
Humboldt
RFG
#222
1/31/1980
Hrdi
NMC143401
Humboldt
RFG
#223
1/31/1980
Hrdi
NMC143402
Humboldt
RFG
#224
1/26/1980
Hrdi
NMC143403
Humboldt
RFG
#225
1/26/1980
Hrdi
NMC143404
Humboldt
RFG
#226
1/26/1980
Hrdi
NMC143405
Humboldt
RFG
#227
1/26/1980
Hrdi
NMC143406
Humboldt
RFG
#22A
2/20/1980
Hrdi
NMC143492
Humboldt
RFG
#23
1/03/1980
Hrdi
NMC143274
Humboldt
RFG
#238F
1/29/1980
Hrdi
NMC143510
Humboldt
RFG
#239
1/26/1980
Hrdi
NMC143407
Humboldt
RFG
#239
2/22/1980
Hrdi
NMC143598
Humboldt
RFG
#239A
2/22/1980
Hrdi
NMC143511
Humboldt
RFG
#24
12/22/1979
Hrdi
NMC143275
Humboldt
RFG
#240
2/22/1980
Hrdi
NMC143408
Humboldt
RFG
#240
2/22/1980
Hrdi
NMC143597
Humboldt
RFG
#241
3/11/1980
Hrdi
NMC143409
Humboldt
RFG
#241A
3/11/1980
Hrdi
NMC143596
Humboldt
RFG
#242
3/11/1980
Hrdi
NMC143410
Humboldt
RFG
#243
2/01/1980
Hrdi
NMC143411
Humboldt
RFG
#244
2/03/1980
Hrdi
NMC143412
Humboldt
RFG
#245
2/03/1980
Hrdi
NMC143413
Humboldt
RFG
#246
2/03/1980
Hrdi
NMC143414
Humboldt
RFG
#247
2/03/1980
Hrdi
NMC143415
Humboldt
RFG
#248
2/03/1980
Hrdi
NMC143416
Humboldt
RFG
#25
12/22/1979
Hrdi
NMC143276
Humboldt
RFG
#26
1/05/1980
Hrdi
NMC143277
Humboldt
RFG
#262
1/11/1980
Hrdi
NMC143487
Humboldt
RFG
#264
1/11/1980
Hrdi
NMC143417
Humboldt
RFG
#265
1/11/1980
Hrdi
NMC143418
Humboldt
RFG
#266
1/17/1980
Hrdi
NMC143419
Humboldt
RFG
#267
1/17/1980
Hrdi
NMC143420
Humboldt
RFG
#268
1/17/1980
Hrdi
NMC143421
Humboldt
RFG
#269
1/17/1980
Hrdi
NMC143422
Humboldt
RFG
#27
1/05/1980
Hrdi
NMC143278
Humboldt
RFG
#270
1/17/1980
Hrdi
NMC143423
Humboldt
RFG
#271
1/17/1980
Hrdi
NMC143424
Humboldt
RFG
#28
1/05/1980
Hrdi
NMC143279
Humboldt
RFG
#288
3/11/1989
Crofoot
Daniel M
NMC546067
Humboldt
RFG
#29
1/05/1980
Hrdi
NMC143280
Humboldt
RFG
#290
3/11/1989
Crofoot
Daniel M
NMC546068
Humboldt
RFG
#292
3/11/1989
Crofoot
Daniel M
NMC546069
Humboldt
RFG
#294
3/11/1989
Crofoot
Daniel M
NMC546070
Humboldt
RFG
#296
3/11/1989
Crofoot
Daniel M
NMC546071
Humboldt
RFG
#298
2/06/1980
Hrdi
NMC143494
Humboldt
Hycroft Mine Project
Page 304
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
RFG
#298
3/11/1989
Crofoot
Daniel M
NMC546072
Humboldt
RFG
#29A
2/06/1980
Hrdi
NMC143493
Humboldt
RFG
#3
12/20/1979
Hrdi
NMC143254
Humboldt
RFG
#30
12/22/1979
Hrdi
NMC143281
Humboldt
RFG
#300
3/11/1989
Crofoot
Daniel M
NMC546073
Humboldt
RFG
#302
3/11/1989
Crofoot
Daniel M
NMC546074
Humboldt
RFG
#304
3/11/1989
Crofoot
Daniel M
NMC546075
Humboldt
RFG
#305
1/18/1980
Hrdi
NMC143444
Humboldt
RFG
#306
1/18/1980
Hrdi
NMC143445
Humboldt
RFG
#307
1/18/1980
Hrdi
NMC143446
Humboldt
RFG
#30A
1/05/1980
Hrdi
NMC143495
Humboldt
RFG
#31
12/22/1979
Hrdi
NMC143282
Humboldt
RFG
#32
12/22/1979
Hrdi
NMC143283
Humboldt
RFG
#322
3/11/1989
Crofoot
Daniel M
NMC546076
Humboldt
RFG
#323
3/11/1989
Crofoot
Daniel M
NMC546077
Humboldt
RFG
#324
3/11/1989
Crofoot
Daniel M
NMC546078
Humboldt
RFG
#325
3/11/1989
Crofoot
Daniel M
NMC546079
Humboldt
RFG
#326
3/11/1989
Crofoot
Daniel M
NMC546080
Humboldt
RFG
#327
3/11/1989
Crofoot
Daniel M
NMC546081
Humboldt
RFG
#328
1/11/1980
Hrdi
NMC143453
Humboldt
RFG
#329
3/11/1989
Crofoot
Daniel M
NMC546082
Humboldt
RFG
#33
3/10/1989
Crofoot
Daniel M
NMC546005
Humboldt
RFG
#330
1/11/1980
Hrdi
NMC143455
Humboldt
RFG
#331
3/11/1989
Crofoot
Daniel M
NMC546083
Humboldt
RFG
#332
1/11/1980
Hrdi
NMC143457
Humboldt
RFG
#333
3/11/1989
Crofoot
Daniel M
NMC546084
Humboldt
RFG
#334
1/11/1980
Hrdi
NMC143459
Humboldt
RFG
#335
3/11/1989
Crofoot
Daniel M
NMC546085
Humboldt
RFG
#336
1/11/1980
Hrdi
NMC143461
Humboldt
RFG
#337
3/11/1989
Crofoot
Daniel M
NMC546086
Humboldt
RFG
#338
1/22/1980
Hrdi
NMC143463
Humboldt
RFG
#339
3/11/1989
Crofoot
Daniel M
NMC546087
Humboldt
RFG
#34
12/22/1979
Hrdi
NMC143285
Humboldt
RFG
#340
1/22/1980
Hrdi
NMC143465
Humboldt
RFG
#341
3/11/1989
Crofoot
Daniel M
NMC546088
Humboldt
RFG
#342
1/22/1980
Hrdi
NMC143467
Humboldt
RFG
#343
3/11/1989
Crofoot
Daniel M
NMC546089
Humboldt
RFG
#35
3/10/1989
Crofoot
Daniel M
NMC546006
Humboldt
RFG
#358
1/31/1980
Hrdi
NMC143469
Humboldt
RFG
#359
1/31/1980
Hrdi
NMC143470
Humboldt
RFG
#36
12/22/1979
Hrdi
NMC143287
Humboldt
RFG
#360
1/31/1980
Hrdi
NMC143471
Humboldt
RFG
#361
1/31/1980
Hrdi
NMC143472
Humboldt
RFG
#362
1/31/1980
Homestake
Mng Co Of Ca
NMC143473
Humboldt
RFG
#362A
2/05/1980
Hrdi
NMC143512
Humboldt
RFG
#363
1/31/1980
Hrdi
NMC143474
Humboldt
RFG
#364
1/31/1980
Homestake
Mng Co Of Ca
NMC143475
Humboldt
RFG
#364A
2/05/1980
Hrdi
NMC143513
Humboldt
Hycroft Mine Project
Page 305
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
RFG
#365
1/31/1980
Hrdi
NMC143476
Humboldt
RFG
#366
1/31/1980
Homestake
Mng Co Of Ca
NMC143477
Humboldt
RFG
#366A
2/06/1980
Hrdi
NMC143514
Humboldt
RFG
#367
1/31/1980
Hrdi
NMC143478
Humboldt
RFG
#368
2/01/1980
Homestake
Mng Co Of Ca
NMC143479
Humboldt
RFG
#368
2/07/1980
Hrdi
NMC143497
Humboldt
RFG
#368A
2/06/1980
Hrdi
NMC143515
Humboldt
RFG
#36A
2/07/1980
Hrdi
NMC143496
Humboldt
RFG
#37
3/10/1989
Crofoot
Daniel M
NMC546007
Humboldt
RFG
#38
3/10/1989
Crofoot
Daniel M
NMC546008
Humboldt
RFG
#39A
3/10/1989
Crofoot
Daniel M
NMC546009
Humboldt
RFG
#4
12/20/1979
Hrdi
NMC143255
Humboldt
RFG
#40
1/07/1980
Hrdi
NMC143291
Humboldt
RFG
#400
10/25/1980
Hrdi
NMC175062
Humboldt
RFG
#401
10/25/1980
Hrdi
NMC175063
Humboldt
RFG
#402
10/25/1980
Hrdi
NMC175064
Humboldt
RFG
#403
10/25/1980
Hrdi
NMC175065
Humboldt
RFG
#404
10/17/1980
Hrdi
NMC175066
Humboldt
RFG
#405
10/17/1980
Hrdi
NMC175067
Humboldt
RFG
#406
10/17/1980
Hrdi
NMC175068
Humboldt
RFG
#407
10/17/1980
Hrdi
NMC175069
Humboldt
RFG
#408
10/17/1980
Hrdi
NMC175070
Humboldt
RFG
#409
10/17/1980
Hrdi
NMC175071
Humboldt
RFG
#41
1/07/1980
Hrdi
NMC143292
Humboldt
RFG
#410
10/17/1980
Hrdi
NMC175072
Humboldt
RFG
#411
10/17/1980
Hrdi
NMC175073
Humboldt
RFG
#412
10/17/1980
Hrdi
NMC175074
Humboldt
RFG
#413
10/17/1980
Hrdi
NMC175075
Humboldt
RFG
#414
10/17/1980
Hrdi
NMC175076
Humboldt
RFG
#415
10/17/1980
Hrdi
NMC175077
Humboldt
RFG
#416
10/17/1980
Hrdi
NMC175078
Humboldt
RFG
#417
10/17/1980
Hrdi
NMC175079
Humboldt
RFG
#418
10/17/1980
Hrdi
NMC175080
Humboldt
RFG
#419
10/17/1980
Hrdi
NMC175081
Humboldt
RFG
#42
3/10/1989
Crofoot
Daniel M
NMC546010
Humboldt
RFG
#420
10/17/1980
Hrdi
NMC175082
Humboldt
RFG
#421
10/17/1980
Hrdi
NMC175083
Humboldt
RFG
#422
10/17/1980
Hrdi
NMC175084
Humboldt
RFG
#423
10/17/1980
Hrdi
NMC175085
Humboldt
RFG
#424
10/17/1980
Hrdi
NMC175086
Humboldt
RFG
#425
10/17/1980
Hrdi
NMC175087
Humboldt
RFG
#426
10/17/1980
Hrdi
NMC175088
Humboldt
RFG
#43
3/10/1989
Crofoot
Daniel M
NMC546011
Humboldt
RFG
#44
3/10/1989
Crofoot
Daniel M
NMC546012
Humboldt
RFG
#45
3/10/1989
Crofoot
Daniel M
NMC546013
Humboldt
RFG
#46
3/10/1989
Crofoot
Daniel M
NMC546014
Humboldt
RFG
#47
3/10/1989
Crofoot
Daniel M
NMC546015
Humboldt
RFG
#48
3/10/1989
Crofoot
Daniel M
NMC546016
Humboldt
RFG
#49
3/10/1989
Crofoot
Daniel M
NMC546017
Humboldt
Hycroft Mine Project
Page 306
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
RFG
#5
12/20/1979
Hrdi
NMC143256
Humboldt
RFG
#50
3/10/1989
Crofoot
Daniel M
NMC546018
Humboldt
RFG
#51
3/10/1989
Crofoot
Daniel M
NMC546019
Humboldt
RFG
#52
3/10/1989
Crofoot
Daniel M
NMC546020
Humboldt
RFG
#52A
3/10/1989
Crofoot
Daniel M
NMC546021
Humboldt
RFG
#53
3/10/1989
Crofoot
Daniel M
NMC546022
Humboldt
RFG
#54
3/10/1989
Crofoot
Daniel M
NMC546023
Humboldt
RFG
#55
1/09/1980
Hrdi
NMC143306
Humboldt
RFG
#56
1/09/1980
Hrdi
NMC143307
Humboldt
RFG
#57
3/10/1989
Crofoot
Daniel M
NMC546024
Humboldt
RFG
#58
3/10/1989
Crofoot
Daniel M
NMC546025
Humboldt
RFG
#59
3/10/1989
Crofoot
Daniel M
NMC546026
Humboldt
RFG
#6
12/20/1979
Hrdi
NMC143257
Humboldt
RFG
#60
3/10/1989
Crofoot
Daniel M
NMC546027
Humboldt
RFG
#61
3/10/1989
Crofoot
Daniel M
NMC546028
Humboldt
RFG
#62
3/10/1989
Crofoot
Daniel M
NMC546029
Humboldt
RFG
#63
3/10/1989
Crofoot
Daniel M
NMC546030
Humboldt
RFG
#64
3/10/1989
Crofoot
Daniel M
NMC546031
Humboldt
RFG
#65
3/10/1989
Crofoot
Daniel M
NMC546032
Humboldt
RFG
#66
3/10/1989
Crofoot
Daniel M
NMC546033
Humboldt
RFG
#67
3/10/1989
Crofoot
Daniel M
NMC546034
Humboldt
RFG
#67A
3/10/1989
Crofoot
Daniel M
NMC546035
Humboldt
RFG
#68
3/10/1989
Crofoot
Daniel M
NMC546036
Humboldt
RFG
#68A
3/10/1989
Crofoot
Daniel M
NMC546037
Humboldt
RFG
#69
1/10/1980
Hrdi
NMC143320
Humboldt
RFG
#7
12/20/1979
Hrdi
NMC143258
Humboldt
RFG
#70
1/10/1980
Hrdi
NMC143321
Humboldt
RFG
#71
3/11/1989
Crofoot
Daniel M
NMC546038
Humboldt
RFG
#73
3/11/1989
Crofoot
Daniel M
NMC546039
Humboldt
RFG
#74
3/11/1989
Crofoot
Daniel M
NMC546040
Humboldt
RFG
#75
3/11/1989
Crofoot
Daniel M
NMC546041
Humboldt
RFG
#76
3/11/1989
Crofoot
Daniel M
NMC546042
Humboldt
RFG
#77
3/11/1989
Crofoot
Daniel M
NMC546043
Humboldt
RFG
#78
3/11/1989
Crofoot
Daniel M
NMC546044
Humboldt
RFG
#79
3/11/1989
Crofoot
Daniel M
NMC546045
Humboldt
RFG
#8
12/20/1979
Hrdi
NMC143259
Humboldt
RFG
#80
3/11/1989
Crofoot
Daniel M
NMC546046
Humboldt
RFG
#81
3/11/1989
Crofoot
Daniel M
NMC546047
Humboldt
RFG
#81A
3/11/1989
Crofoot
Daniel M
NMC546048
Humboldt
RFG
#82
3/11/1989
Crofoot
Daniel M
NMC546049
Humboldt
RFG
#83
3/11/1989
Crofoot
Daniel M
NMC546050
Humboldt
RFG
#85
3/11/1989
Crofoot
Daniel M
NMC546052
Humboldt
RFG
#86
3/11/1989
Crofoot
Daniel M
NMC546053
Humboldt
RFG
#87
3/11/1989
Crofoot
Daniel M
NMC546054
Humboldt
RFG
#88
3/11/1989
Crofoot
Daniel M
NMC546055
Humboldt
RFG
#89
3/11/1989
Crofoot
Daniel M
NMC546056
Humboldt
Hycroft Mine Project
Page 307
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
RFG
#9
12/20/1979
Hrdi
NMC143260
Humboldt
RFG
#90
3/11/1989
Crofoot
Daniel M
NMC546057
Humboldt
RFG
#91
3/11/1989
Crofoot
Daniel M
NMC546058
Humboldt
RFG
#92
3/11/1989
Crofoot
Daniel M
NMC546059
Humboldt
RFG
#93
3/11/1989
Crofoot
Daniel M
NMC546060
Humboldt
RFG
#94
3/11/1989
Crofoot
Daniel M
NMC546061
Humboldt
RFG
#95
3/11/1989
Crofoot
Daniel M
NMC546062
Humboldt
RFG
#97
3/11/1989
Crofoot
Daniel M
NMC546063
Humboldt
RFG
102
5/20/2006
Hycroft
Res & Dev Inc
NMC932886
Humboldt
RFG
126
5/20/2006
Hycroft
Res & Dev Inc
NMC932903
Humboldt
RFG
128
5/20/2006
Hycroft
Res & Dev Inc
NMC932904
Humboldt
RFG
258
5/20/2006
Hycroft
Res & Dev Inc
NMC932912
Humboldt
RFG
260
5/20/2006
Hycroft
Res & Dev Inc
NMC932913
Humboldt
RFG
286
5/20/2006
Hycroft
Res & Dev Inc
NMC932914
Humboldt
RFG
287
5/20/2006
Hycroft
Res & Dev Inc
NMC932915
Humboldt
RFG
289
5/20/2006
Hycroft
Res & Dev Inc
NMC932916
Humboldt
RFG
291
5/20/2006
Hycroft
Res & Dev Inc
NMC932917
Humboldt
RFG
293
5/20/2006
Hycroft
Res & Dev Inc
NMC932918
Humboldt
RFG
295
5/20/2006
Hycroft
Res & Dev Inc
NMC932919
Humboldt
RFG
297
5/20/2006
Hycroft
Res & Dev Inc
NMC932920
Humboldt
RFG
299
5/20/2006
Hycroft
Res & Dev Inc
NMC932921
Humboldt
RFG
301
5/20/2006
Hycroft
Res & Dev Inc
NMC932922
Humboldt
RFG
303
5/20/2006
Hycroft
Res & Dev Inc
NMC932923
Humboldt
RFG
94A
5/20/2006
Hycroft
Res & Dev Inc
NMC932885
Humboldt
RFG
Fraction #427
10/17/1980
Hrdi
NMC175089
Humboldt
RFG#14
1/03/1980
Hrdi
NMC143265
Humboldt
RFG#328X
5/15/1984
Lewis
Frank W
NMC307553
Humboldt
RFG#84
3/11/1989
Crofoot
Daniel M
NMC546051
Humboldt
RFG-130-A
1/08/2008
Victory
Exploration Inc.
NMC985654
Humboldt
RFGM
1
6/18/2009
Hycroft
Res & Dev Inc
NMC1008652
Humboldt
RFGM
10
6/18/2009
Hycroft
Res & Dev Inc
NMC1008661
Humboldt
RFGM
10A
6/18/2009
Hycroft
Res & Dev Inc
NMC1008716
Humboldt
RFGM
11
6/18/2009
Hycroft
Res & Dev Inc
NMC1008662
Humboldt
RFGM
11A
6/18/2009
Hycroft
Res & Dev Inc
NMC1008717
Humboldt
RFGM
12
6/18/2009
Hycroft
Res & Dev Inc
NMC1008663
Humboldt
RFGM
12A
6/18/2009
Hycroft
Res & Dev Inc
NMC1008718
Humboldt
RFGM
12B
6/18/2009
Hycroft
Res & Dev Inc
NMC1008728
Humboldt
RFGM
13
6/18/2009
Hycroft
Res & Dev Inc
NMC1008664
Humboldt
RFGM
13A
6/18/2009
Hycroft
Res & Dev Inc
NMC1008719
Humboldt
RFGM
13B
6/18/2009
Hycroft
Res & Dev Inc
NMC1008729
Humboldt
RFGM
14
6/18/2009
Hycroft
Res & Dev Inc
NMC1008665
Humboldt
RFGM
14A
6/18/2009
Hycroft
Res & Dev Inc
NMC1008720
Humboldt
RFGM
15
6/18/2009
Hycroft
Res & Dev Inc
NMC1008666
Humboldt
RFGM
16
6/18/2009
Hycroft
Res & Dev Inc
NMC1008667
Humboldt
RFGM
17
6/18/2009
Hycroft
Res & Dev Inc
NMC1008668
Humboldt
RFGM
171
6/18/2009
Hycroft
Res & Dev Inc
NMC1008691
Humboldt
RFGM
172
6/18/2009
Hycroft
Res & Dev Inc
NMC1008692
Humboldt
RFGM
176
6/18/2009
Hycroft
Res & Dev Inc
NMC1008693
Humboldt
RFGM
177
6/18/2009
Hycroft
Res & Dev Inc
NMC1008694
Humboldt
Hycroft Mine Project
Page 308
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
RFGM
177A
6/18/2009
Hycroft
Res & Dev Inc
NMC1008725
Humboldt
RFGM
178
6/18/2009
Hycroft
Res & Dev Inc
NMC1008695
Humboldt
RFGM
179
6/18/2009
Hycroft
Res & Dev Inc
NMC1008696
Humboldt
RFGM
18
6/18/2009
Hycroft
Res & Dev Inc
NMC1008669
Humboldt
RFGM
180
6/18/2009
Hycroft
Res & Dev Inc
NMC1008697
Humboldt
RFGM
181
6/18/2009
Hycroft
Res & Dev Inc
NMC1008698
Humboldt
RFGM
182
6/18/2009
Hycroft
Res & Dev Inc
NMC1008699
Humboldt
RFGM
183
6/18/2009
Hycroft
Res & Dev Inc
NMC1008700
Humboldt
RFGM
184
6/18/2009
Hycroft
Res & Dev Inc
NMC1008701
Humboldt
RFGM
186
6/18/2009
Hycroft
Res & Dev Inc
NMC1008702
Humboldt
RFGM
187
6/18/2009
Hycroft
Res & Dev Inc
NMC1008703
Humboldt
RFGM
18A
6/18/2009
Hycroft
Res & Dev Inc
NMC1008721
Humboldt
RFGM
19
6/18/2009
Hycroft
Res & Dev Inc
NMC1008670
Humboldt
RFGM
2
6/18/2009
Hycroft
Res & Dev Inc
NMC1008653
Humboldt
RFGM
20
6/18/2009
Hycroft
Res & Dev Inc
NMC1008671
Humboldt
RFGM
20A
6/18/2009
Hycroft
Res & Dev Inc
NMC1008722
Humboldt
RFGM
21
6/18/2009
Hycroft
Res & Dev Inc
NMC1008672
Humboldt
RFGM
22
6/18/2009
Hycroft
Res & Dev Inc
NMC1008673
Humboldt
RFGM
22A
6/18/2009
Hycroft
Res & Dev Inc
NMC1008723
Humboldt
RFGM
22B
6/18/2009
Hycroft
Res & Dev Inc
NMC1008730
Humboldt
RFGM
23
6/18/2009
Hycroft
Res & Dev Inc
NMC1008674
Humboldt
RFGM
24
6/18/2009
Hycroft
Res & Dev Inc
NMC1008675
Humboldt
RFGM
25
6/18/2009
Hycroft
Res & Dev Inc
NMC1008676
Humboldt
RFGM
26
6/18/2009
Hycroft
Res & Dev Inc
NMC1008677
Humboldt
RFGM
27
6/18/2009
Hycroft
Res & Dev Inc
NMC1008678
Humboldt
RFGM
27A
6/18/2009
Hycroft
Res & Dev Inc
NMC1008724
Humboldt
RFGM
28
6/18/2009
Hycroft
Res & Dev Inc
NMC1008679
Humboldt
RFGM
29
6/18/2009
Hycroft
Res & Dev Inc
NMC1008680
Humboldt
RFGM
3
6/18/2009
Hycroft
Res & Dev Inc
NMC1008654
Humboldt
RFGM
30
6/18/2009
Hycroft
Res & Dev Inc
NMC1008681
Humboldt
RFGM
31
6/18/2009
Hycroft
Res & Dev Inc
NMC1008682
Humboldt
RFGM
32
6/18/2009
Hycroft
Res & Dev Inc
NMC1008683
Humboldt
RFGM
33
6/18/2009
Hycroft
Res & Dev Inc
NMC1008684
Humboldt
RFGM
34
6/18/2009
Hycroft
Res & Dev Inc
NMC1008685
Humboldt
RFGM
357
6/18/2009
Hycroft
Res & Dev Inc
NMC1008704
Humboldt
RFGM
358
6/18/2009
Hycroft
Res & Dev Inc
NMC1008705
Humboldt
RFGM
358A
6/18/2009
Hycroft
Res & Dev Inc
NMC1008726
Humboldt
RFGM
359
6/18/2009
Hycroft
Res & Dev Inc
NMC1008706
Humboldt
RFGM
359A
6/18/2009
Hycroft
Res & Dev Inc
NMC1008727
Humboldt
RFGM
360
6/18/2009
Hycroft
Res & Dev Inc
NMC1008707
Humboldt
RFGM
361
6/18/2009
Hycroft
Res & Dev Inc
NMC1008708
Humboldt
RFGM
363
6/18/2009
Hycroft
Res & Dev Inc
NMC1008709
Humboldt
RFGM
365
6/18/2009
Hycroft
Res & Dev Inc
NMC1008710
Humboldt
RFGM
367
6/18/2009
Hycroft
Res & Dev Inc
NMC1008711
Humboldt
RFGM
4
6/18/2009
Hycroft
Res & Dev Inc
NMC1008655
Humboldt
RFGM
40
6/18/2009
Hycroft
Res & Dev Inc
NMC1008686
Humboldt
RFGM
41
6/18/2009
Hycroft
Res & Dev Inc
NMC1008687
Humboldt
RFGM
42
6/18/2009
Hycroft
Res & Dev Inc
NMC1008688
Humboldt
Hycroft Mine Project
Page 309
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
RFGM
43
6/18/2009
Hycroft
Res & Dev Inc
NMC1008689
Humboldt
RFGM
5
6/18/2009
Hycroft
Res & Dev Inc
NMC1008656
Humboldt
RFGM
57
6/18/2009
Hycroft
Res & Dev Inc
NMC1008690
Humboldt
RFGM
6
6/18/2009
Hycroft
Res & Dev Inc
NMC1008657
Humboldt
RFGM
6A
6/18/2009
Hycroft
Res & Dev Inc
NMC1008712
Humboldt
RFGM
7
6/18/2009
Hycroft
Res & Dev Inc
NMC1008658
Humboldt
RFGM
7A
6/18/2009
Hycroft
Res & Dev Inc
NMC1008713
Humboldt
RFGM
8
6/18/2009
Hycroft
Res & Dev Inc
NMC1008659
Humboldt
RFGM
8A
6/18/2009
Hycroft
Res & Dev Inc
NMC1008714
Humboldt
RFGM
9
6/18/2009
Hycroft
Res & Dev Inc
NMC1008660
Humboldt
RFGM
9A
6/18/2009
Hycroft
Res & Dev Inc
NMC1008715
Humboldt
SH
1
4/20/2008
Hycroft
Res & Dev Inc
NMC990654
Humboldt
SH
10
4/20/2008
Hycroft
Res & Dev Inc
NMC990663
Humboldt
SH
100
4/06/2008
Hycroft
Res & Dev Inc
NMC990753
Humboldt
SH
101
4/06/2008
Hycroft
Res & Dev Inc
NMC990754
Humboldt
SH
102
4/06/2008
Hycroft
Res & Dev Inc
NMC990755
Humboldt
SH
103
4/06/2008
Hycroft
Res & Dev Inc
NMC990756
Humboldt
SH
104
4/06/2008
Hycroft
Res & Dev Inc
NMC990757
Humboldt
SH
105
4/06/2008
Hycroft
Res & Dev Inc
NMC990758
Humboldt
SH
106
4/06/2008
Hycroft
Res & Dev Inc
NMC990759
Humboldt
SH
107
4/06/2008
Hycroft
Res & Dev Inc
NMC990760
Humboldt
SH
108
4/06/2008
Hycroft
Res & Dev Inc
NMC990761
Humboldt
SH
109
4/06/2008
Hycroft
Res & Dev Inc
NMC990762
Humboldt
SH
11
4/20/2008
Hycroft
Res & Dev Inc
NMC990664
Humboldt
SH
110
4/06/2008
Hycroft
Res & Dev Inc
NMC990763
Humboldt
SH
111
4/06/2008
Hycroft
Res & Dev Inc
NMC990764
Humboldt
SH
112
4/06/2008
Hycroft
Res & Dev Inc
NMC990765
Humboldt
SH
113
4/06/2008
Hycroft
Res & Dev Inc
NMC990766
Humboldt
SH
114
4/06/2008
Hycroft
Res & Dev Inc
NMC990767
Humboldt
SH
115
4/06/2008
Hycroft
Res & Dev Inc
NMC990768
Humboldt
SH
116
4/05/2008
Hycroft
Res & Dev Inc
NMC990769
Humboldt
SH
117
4/05/2008
Hycroft
Res & Dev Inc
NMC990770
Humboldt
SH
118
4/05/2008
Hycroft
Res & Dev Inc
NMC990771
Humboldt
SH
119
4/05/2008
Hycroft
Res & Dev Inc
NMC990772
Humboldt
SH
12
4/20/2008
Hycroft
Res & Dev Inc
NMC990665
Humboldt
SH
120
4/05/2008
Hycroft
Res & Dev Inc
NMC990773
Humboldt
SH
121
4/05/2008
Hycroft
Res & Dev Inc
NMC990774
Humboldt
SH
122
4/05/2008
Hycroft
Res & Dev Inc
NMC990775
Humboldt
SH
123
4/05/2008
Hycroft
Res & Dev Inc
NMC990776
Humboldt
SH
124
4/05/2008
Hycroft
Res & Dev Inc
NMC990777
Humboldt
SH
125
4/05/2008
Hycroft
Res & Dev Inc
NMC990778
Humboldt
SH
126
4/05/2008
Hycroft
Res & Dev Inc
NMC990779
Humboldt
SH
127
4/05/2008
Hycroft
Res & Dev Inc
NMC990780
Humboldt
SH
128
4/05/2008
Hycroft
Res & Dev Inc
NMC990781
Humboldt
SH
129
4/05/2008
Hycroft
Res & Dev Inc
NMC990782
Humboldt
SH
13
4/20/2008
Hycroft
Res & Dev Inc
NMC990666
Humboldt
SH
130
4/06/2008
Hycroft
Res & Dev Inc
NMC990783
Humboldt
SH
131
4/06/2008
Hycroft
Res & Dev Inc
NMC990784
Humboldt
Hycroft Mine Project
Page 310
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
SH
132
4/06/2008
Hycroft
Res & Dev Inc
NMC990785
Humboldt
SH
133
4/06/2008
Hycroft
Res & Dev Inc
NMC990786
Humboldt
SH
134
4/06/2008
Hycroft
Res & Dev Inc
NMC990787
Humboldt
SH
135
4/06/2008
Hycroft
Res & Dev Inc
NMC990788
Humboldt
SH
136
4/06/2008
Hycroft
Res & Dev Inc
NMC990789
Humboldt
SH
137
4/06/2008
Hycroft
Res & Dev Inc
NMC990790
Humboldt
SH
138
4/06/2008
Hycroft
Res & Dev Inc
NMC990791
Humboldt
SH
139
4/06/2008
Hycroft
Res & Dev Inc
NMC990792
Humboldt
SH
14
4/20/2008
Hycroft
Res & Dev Inc
NMC990667
Humboldt
SH
140
4/06/2008
Hycroft
Res & Dev Inc
NMC990793
Humboldt
SH
141
4/06/2008
Hycroft
Res & Dev Inc
NMC990794
Humboldt
SH
142
4/06/2008
Hycroft
Res & Dev Inc
NMC990795
Humboldt
SH
143
4/06/2008
Hycroft
Res & Dev Inc
NMC990796
Humboldt
SH
144
4/06/2008
Hycroft
Res & Dev Inc
NMC990797
Humboldt
SH
145
4/06/2008
Hycroft
Res & Dev Inc
NMC990798
Humboldt
SH
146
4/06/2008
Hycroft
Res & Dev Inc
NMC990799
Humboldt
SH
147
4/06/2008
Hycroft
Res & Dev Inc
NMC990800
Humboldt
SH
148
4/06/2008
Hycroft
Res & Dev Inc
NMC990801
Humboldt
SH
149
4/06/2008
Hycroft
Res & Dev Inc
NMC990802
Humboldt
SH
15
4/20/2008
Hycroft
Res & Dev Inc
NMC990668
Humboldt
SH
150
4/06/2008
Hycroft
Res & Dev Inc
NMC990803
Humboldt
SH
151
4/06/2008
Hycroft
Res & Dev Inc
NMC990804
Humboldt
SH
152
4/06/2008
Hycroft
Res & Dev Inc
NMC990805
Humboldt
SH
153
4/06/2008
Hycroft
Res & Dev Inc
NMC990806
Humboldt
SH
154
4/06/2008
Hycroft
Res & Dev Inc
NMC990807
Humboldt
SH
155
4/05/2008
Hycroft
Res & Dev Inc
NMC990808
Humboldt
SH
156
4/05/2008
Hycroft
Res & Dev Inc
NMC990809
Humboldt
SH
157
4/05/2008
Hycroft
Res & Dev Inc
NMC990810
Humboldt
SH
158
4/05/2008
Hycroft
Res & Dev Inc
NMC990811
Humboldt
SH
159
4/05/2008
Hycroft
Res & Dev Inc
NMC990812
Humboldt
SH
16
4/20/2008
Hycroft
Res & Dev Inc
NMC990669
Humboldt
SH
160
4/05/2008
Hycroft
Res & Dev Inc
NMC990813
Humboldt
SH
161
4/05/2008
Hycroft
Res & Dev Inc
NMC990814
Humboldt
SH
162
4/05/2008
Hycroft
Res & Dev Inc
NMC990815
Humboldt
SH
163
4/05/2008
Hycroft
Res & Dev Inc
NMC990816
Humboldt
SH
164
4/05/2008
Hycroft
Res & Dev Inc
NMC990817
Humboldt
SH
165
4/05/2008
Hycroft
Res & Dev Inc
NMC990818
Humboldt
SH
166
4/05/2008
Hycroft
Res & Dev Inc
NMC990819
Humboldt
SH
167
4/05/2008
Hycroft
Res & Dev Inc
NMC990820
Humboldt
SH
168
4/05/2008
Hycroft
Res & Dev Inc
NMC990821
Humboldt
SH
17
4/20/2008
Hycroft
Res & Dev Inc
NMC990670
Humboldt
SH
18
4/20/2008
Hycroft
Res & Dev Inc
NMC990671
Humboldt
SH
19
4/20/2008
Hycroft
Res & Dev Inc
NMC990672
Humboldt
SH
2
4/20/2008
Hycroft
Res & Dev Inc
NMC990655
Humboldt
SH
20
4/20/2008
Hycroft
Res & Dev Inc
NMC990673
Humboldt
SH
21
4/20/2008
Hycroft
Res & Dev Inc
NMC990674
Humboldt
SH
22
4/20/2008
Hycroft
Res & Dev Inc
NMC990675
Humboldt
SH
23
4/20/2008
Hycroft
Res & Dev Inc
NMC990676
Humboldt
Hycroft Mine Project
Page 311
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
SH
24
4/20/2008
Hycroft
Res & Dev Inc
NMC990677
Humboldt
SH
25
4/20/2008
Hycroft
Res & Dev Inc
NMC990678
Humboldt
SH
26
4/20/2008
Hycroft
Res & Dev Inc
NMC990679
Humboldt
SH
27
4/20/2008
Hycroft
Res & Dev Inc
NMC990680
Humboldt
SH
28
4/20/2008
Hycroft
Res & Dev Inc
NMC990681
Humboldt
SH
29
4/20/2008
Hycroft
Res & Dev Inc
NMC990682
Humboldt
SH
3
4/20/2008
Hycroft
Res & Dev Inc
NMC990656
Humboldt
SH
30
4/20/2008
Hycroft
Res & Dev Inc
NMC990683
Humboldt
SH
31
4/20/2008
Hycroft
Res & Dev Inc
NMC990684
Humboldt
SH
32
4/06/2008
Hycroft
Res & Dev Inc
NMC990685
Humboldt
SH
33
4/06/2008
Hycroft
Res & Dev Inc
NMC990686
Humboldt
SH
34
4/06/2008
Hycroft
Res & Dev Inc
NMC990687
Humboldt
SH
35
4/06/2008
Hycroft
Res & Dev Inc
NMC990688
Humboldt
SH
350
4/21/2008
Hycroft
Res & Dev Inc
NMC991002
Humboldt
SH
351
4/21/2008
Hycroft
Res & Dev Inc
NMC991003
Humboldt
SH
352
4/21/2008
Hycroft
Res & Dev Inc
NMC991004
Humboldt
SH
36
4/06/2008
Hycroft
Res & Dev Inc
NMC990689
Humboldt
SH
37
4/06/2008
Hycroft
Res & Dev Inc
NMC990690
Humboldt
SH
373
4/21/2008
Hycroft
Res & Dev Inc
NMC991025
Humboldt
SH
374
4/21/2008
Hycroft
Res & Dev Inc
NMC991026
Humboldt
SH
375
4/21/2008
Hycroft
Res & Dev Inc
NMC991027
Humboldt
SH
376
4/21/2008
Hycroft
Res & Dev Inc
NMC991028
Humboldt
SH
377
4/21/2008
Hycroft
Res & Dev Inc
NMC991029
Humboldt
SH
378
4/21/2008
Hycroft
Res & Dev Inc
NMC991030
Humboldt
SH
379
4/21/2008
Hycroft
Res & Dev Inc
NMC991031
Humboldt
SH
38
4/06/2008
Hycroft
Res & Dev Inc
NMC990691
Humboldt
SH
380
4/21/2008
Hycroft
Res & Dev Inc
NMC991032
Humboldt
SH
381
4/21/2008
Hycroft
Res & Dev Inc
NMC991033
Humboldt
SH
39
4/06/2008
Hycroft
Res & Dev Inc
NMC990692
Humboldt
SH
396
4/21/2008
Hycroft
Res & Dev Inc
NMC991048
Humboldt
SH
397
4/21/2008
Hycroft
Res & Dev Inc
NMC991049
Humboldt
SH
398
4/21/2008
Hycroft
Res & Dev Inc
NMC991050
Humboldt
SH
399
4/21/2008
Hycroft
Res & Dev Inc
NMC991051
Humboldt
SH
400
4/21/2008
Hycroft
Res & Dev Inc
NMC991052
Humboldt
SH
401
4/21/2008
Hycroft
Res & Dev Inc
NMC991053
Humboldt
SH
402
4/21/2008
Hycroft
Res & Dev Inc
NMC991054
Humboldt
SH
403
4/21/2008
Hycroft
Res & Dev Inc
NMC991055
Humboldt
SH
404
4/21/2008
Hycroft
Res & Dev Inc
NMC991056
Humboldt
SH
405
4/21/2008
Hycroft
Res & Dev Inc
NMC991057
Humboldt
SH
406
4/21/2008
Hycroft
Res & Dev Inc
NMC991058
Humboldt
SH
41
4/06/2008
Hycroft
Res & Dev Inc
NMC990694
Humboldt
SH
419
4/21/2008
Hycroft
Res & Dev Inc
NMC991071
Humboldt
SH
42
4/06/2008
Hycroft
Res & Dev Inc
NMC990695
Humboldt
SH
420
4/21/2008
Hycroft
Res & Dev Inc
NMC991072
Humboldt
SH
421
4/21/2008
Hycroft
Res & Dev Inc
NMC991073
Humboldt
SH
422
4/21/2008
Hycroft
Res & Dev Inc
NMC991074
Humboldt
SH
423
4/21/2008
Hycroft
Res & Dev Inc
NMC991075
Humboldt
SH
424
4/21/2008
Hycroft
Res & Dev Inc
NMC991076
Humboldt
Hycroft Mine Project
Page 312
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
SH
425
4/21/2008
Hycroft
Res & Dev Inc
NMC991077
Humboldt
SH
426
4/21/2008
Hycroft
Res & Dev Inc
NMC991078
Humboldt
SH
427
4/21/2008
Hycroft
Res & Dev Inc
NMC991079
Humboldt
SH
428
4/21/2008
Hycroft
Res & Dev Inc
NMC991080
Humboldt
SH
429
4/21/2008
Hycroft
Res & Dev Inc
NMC991081
Humboldt
SH
43
4/06/2008
Hycroft
Res & Dev Inc
NMC990696
Humboldt
SH
430
4/21/2008
Hycroft
Res & Dev Inc
NMC991082
Humboldt
SH
439
4/21/2008
Hycroft
Res & Dev Inc
NMC991090
Humboldt
SH
44
4/06/2008
Hycroft
Res & Dev Inc
NMC990697
Humboldt
SH
440
4/21/2008
Hycroft
Res & Dev Inc
NMC991091
Humboldt
SH
441
4/21/2008
Hycroft
Res & Dev Inc
NMC991092
Humboldt
SH
442
4/21/2008
Hycroft
Res & Dev Inc
NMC991093
Humboldt
SH
443
4/21/2008
Hycroft
Res & Dev Inc
NMC991094
Humboldt
SH
444
4/21/2008
Hycroft
Res & Dev Inc
NMC991095
Humboldt
SH
445
4/21/2008
Hycroft
Res & Dev Inc
NMC991096
Humboldt
SH
446
4/21/2008
Hycroft
Res & Dev Inc
NMC991097
Humboldt
SH
447
4/21/2008
Hycroft
Res & Dev Inc
NMC991098
Humboldt
SH
448
4/21/2008
Hycroft
Res & Dev Inc
NMC991099
Humboldt
SH
449
4/21/2008
Hycroft
Res & Dev Inc
NMC991100
Humboldt
SH
45
4/06/2008
Hycroft
Res & Dev Inc
NMC990698
Humboldt
SH
450
4/21/2008
Hycroft
Res & Dev Inc
NMC991101
Humboldt
SH
451
4/21/2008
Hycroft
Res & Dev Inc
NMC991102
Humboldt
SH
452
4/21/2008
Hycroft
Res & Dev Inc
NMC991103
Humboldt
SH
453
4/21/2008
Hycroft
Res & Dev Inc
NMC991104
Humboldt
SH
454
4/21/2008
Hycroft
Res & Dev Inc
NMC991105
Humboldt
SH
455
4/21/2008
Hycroft
Res & Dev Inc
NMC991106
Humboldt
SH
456
4/21/2008
Hycroft
Res & Dev Inc
NMC991107
Humboldt
SH
46
4/06/2008
Hycroft
Res & Dev Inc
NMC990699
Humboldt
SH
47
4/06/2008
Hycroft
Res & Dev Inc
NMC990700
Humboldt
SH
48
4/06/2008
Hycroft
Res & Dev Inc
NMC990701
Humboldt
SH
49
4/06/2008
Hycroft
Res & Dev Inc
NMC990702
Humboldt
SH
5
4/20/2008
Hycroft
Res & Dev Inc
NMC990658
Humboldt
SH
50
4/06/2008
Hycroft
Res & Dev Inc
NMC990703
Humboldt
SH
51
4/06/2008
Hycroft
Res & Dev Inc
NMC990704
Humboldt
SH
52
4/06/2008
Hycroft
Res & Dev Inc
NMC990705
Humboldt
SH
53
4/06/2008
Hycroft
Res & Dev Inc
NMC990706
Humboldt
SH
54
4/06/2008
Hycroft
Res & Dev Inc
NMC990707
Humboldt
SH
55
4/06/2008
Hycroft
Res & Dev Inc
NMC990708
Humboldt
SH
56
4/06/2008
Hycroft
Res & Dev Inc
NMC990709
Humboldt
SH
57
4/06/2008
Hycroft
Res & Dev Inc
NMC990710
Humboldt
SH
58
4/06/2008
Hycroft
Res & Dev Inc
NMC990711
Humboldt
SH
59
4/06/2008
Hycroft
Res & Dev Inc
NMC990712
Humboldt
SH
6
4/20/2008
Hycroft
Res & Dev Inc
NMC990659
Humboldt
SH
60
4/06/2008
Hycroft
Res & Dev Inc
NMC990713
Humboldt
SH
61
4/06/2008
Hycroft
Res & Dev Inc
NMC990714
Humboldt
SH
62
4/06/2008
Hycroft
Res & Dev Inc
NMC990715
Humboldt
SH
63
4/06/2008
Hycroft
Res & Dev Inc
NMC990716
Humboldt
SH
64
4/06/2008
Hycroft
Res & Dev Inc
NMC990717
Humboldt
Hycroft Mine Project
Page 313
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
SH
65
4/06/2008
Hycroft
Res & Dev Inc
NMC990718
Humboldt
SH
66
4/06/2008
Hycroft
Res & Dev Inc
NMC990719
Humboldt
SH
67
4/06/2008
Hycroft
Res & Dev Inc
NMC990720
Humboldt
SH
68
4/06/2008
Hycroft
Res & Dev Inc
NMC990721
Humboldt
SH
69
4/06/2008
Hycroft
Res & Dev Inc
NMC990722
Humboldt
SH
7
4/20/2008
Hycroft
Res & Dev Inc
NMC990660
Humboldt
SH
70
4/06/2008
Hycroft
Res & Dev Inc
NMC990723
Humboldt
SH
71
4/06/2008
Hycroft
Res & Dev Inc
NMC990724
Humboldt
SH
72
4/06/2008
Hycroft
Res & Dev Inc
NMC990725
Humboldt
SH
73
4/06/2008
Hycroft
Res & Dev Inc
NMC990726
Humboldt
SH
74
4/06/2008
Hycroft
Res & Dev Inc
NMC990727
Humboldt
SH
75
4/06/2008
Hycroft
Res & Dev Inc
NMC990728
Humboldt
SH
76
4/06/2008
Hycroft
Res & Dev Inc
NMC990729
Humboldt
SH
77
4/06/2008
Hycroft
Res & Dev Inc
NMC990730
Humboldt
SH
78
4/06/2008
Hycroft
Res & Dev Inc
NMC990731
Humboldt
SH
79
4/06/2008
Hycroft
Res & Dev Inc
NMC990732
Humboldt
SH
8
4/20/2008
Hycroft
Res & Dev Inc
NMC990661
Humboldt
SH
80
4/06/2008
Hycroft
Res & Dev Inc
NMC990733
Humboldt
SH
81
4/06/2008
Hycroft
Res & Dev Inc
NMC990734
Humboldt
SH
82
4/05/2008
Hycroft
Res & Dev Inc
NMC990735
Humboldt
SH
83
4/05/2008
Hycroft
Res & Dev Inc
NMC990736
Humboldt
SH
84
4/05/2008
Hycroft
Res & Dev Inc
NMC990737
Humboldt
SH
85
4/05/2008
Hycroft
Res & Dev Inc
NMC990738
Humboldt
SH
86
4/05/2008
Hycroft
Res & Dev Inc
NMC990739
Humboldt
SH
87
4/05/2008
Hycroft
Res & Dev Inc
NMC990740
Humboldt
SH
88
4/05/2008
Hycroft
Res & Dev Inc
NMC990741
Humboldt
SH
89
4/05/2008
Hycroft
Res & Dev Inc
NMC990742
Humboldt
SH
9
4/20/2008
Hycroft
Res & Dev Inc
NMC990662
Humboldt
SH
90
4/05/2008
Hycroft
Res & Dev Inc
NMC990743
Humboldt
SH
91
4/06/2008
Hycroft
Res & Dev Inc
NMC990744
Humboldt
SH
92
4/06/2008
Hycroft
Res & Dev Inc
NMC990745
Humboldt
SH
93
4/06/2008
Hycroft
Res & Dev Inc
NMC990746
Humboldt
SH
94
4/06/2008
Hycroft
Res & Dev Inc
NMC990747
Humboldt
SH
95
4/06/2008
Hycroft
Res & Dev Inc
NMC990748
Humboldt
SH
96
4/06/2008
Hycroft
Res & Dev Inc
NMC990749
Humboldt
SH
97
4/06/2008
Hycroft
Res & Dev Inc
NMC990750
Humboldt
SH
98
4/06/2008
Hycroft
Res & Dev Inc
NMC990751
Humboldt
SH
99
4/06/2008
Hycroft
Res & Dev Inc
NMC990752
Humboldt
SH4
4/20/2008
Hycroft
Res & Dev Inc
NMC990657
Humboldt
SH40
4/06/2008
Hycroft
Res & Dev Inc
NMC990693
Humboldt
SL
1
10/18/2012
Hycroft
Res & Dev Inc
NMC1080086
Humboldt
SL
2
10/18/2012
Hycroft
Res & Dev Inc
NMC1080087
Humboldt
SL
3
10/18/2012
Hycroft
Res & Dev Inc
NMC1080088
Humboldt
SL
4
10/18/2012
Hycroft
Res & Dev Inc
NMC1080089
Humboldt
SL
5
10/18/2012
Hycroft
Res & Dev Inc
NMC1080090
Humboldt
SL
6
10/18/2012
Hycroft
Res & Dev Inc
NMC1080091
Humboldt
Sulphate
11/04/1980
Lewis
Frank W
NMC181011
Humboldt
Triple
L #1
10/13/1979
Lewis
Frank W
NMC127534
Humboldt
Hycroft Mine Project
Page 314
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
Triple
L #2
10/13/1979
Lewis
Frank W
NMC127535
Humboldt
Triple
L #3
10/13/1979
Lewis
Frank W
NMC127536
Humboldt
Triple
L #4
10/13/1979
Lewis
Frank W
NMC127537
Humboldt
Triple
L #5
10/13/1979
Lewis
Frank W
NMC127538
Humboldt
WKM-1
9/30/1997
F
W Lewis Inc
NMC780688
Humboldt
WKM-10
9/30/1997
F
W Lewis Inc
NMC780697
Humboldt
WKM-11
9/30/1997
F
W Lewis Inc
NMC780698
Humboldt
WKM-12
9/30/1997
F
W Lewis Inc
NMC780699
Humboldt
WKM-13
9/30/1997
F
W Lewis Inc
NMC780700
Humboldt
WKM-14
9/30/1997
F
W Lewis Inc
NMC780701
Humboldt
WKM-15
9/30/1997
F
W Lewis Inc
NMC780702
Humboldt
WKM-16
9/30/1997
F
W Lewis Inc
NMC780703
Humboldt
WKM-17
9/30/1997
F
W Lewis Inc
NMC780704
Humboldt
WKM-18
9/30/1997
F
W Lewis Inc
NMC780705
Humboldt
WKM-19
10/01/1997
F
W Lewis Inc
NMC780706
Humboldt
WKM-2
9/30/1997
F
W Lewis Inc
NMC780689
Humboldt
WKM-20
10/01/1997
F
W Lewis Inc
NMC780707
Humboldt
WKM-21
10/01/1997
F
W Lewis Inc
NMC780708
Humboldt
WKM-22
10/01/1997
F
W Lewis Inc
NMC780709
Humboldt
WKM-23
10/01/1997
F
W Lewis Inc
NMC780710
Humboldt
WKM-24
10/01/1997
F
W Lewis Inc
NMC780711
Humboldt
WKM-25
10/01/1997
F
W Lewis Inc
NMC780712
Humboldt
WKM-26
10/01/1997
F
W Lewis Inc
NMC780713
Humboldt
WKM-27
10/01/1997
F
W Lewis Inc
NMC780714
Humboldt
WKM-28
10/01/1997
F
W Lewis Inc
NMC780715
Humboldt
WKM-29
10/01/1997
F
W Lewis Inc
NMC780716
Humboldt
WKM-3
9/30/1997
F
W Lewis Inc
NMC780690
Humboldt
WKM-30
10/01/1997
F
W Lewis Inc
NMC780717
Humboldt
WKM-31
10/01/1997
F
W Lewis Inc
NMC780718
Humboldt
WKM-32
10/01/1997
F
W Lewis Inc
NMC780719
Humboldt
WKM-33
10/01/1997
F
W Lewis Inc
NMC780720
Humboldt
WKM-34
10/01/1997
F
W Lewis Inc
NMC780721
Humboldt
WKM-35
10/01/1997
F
W Lewis Inc
NMC780722
Humboldt
WKM-36
10/01/1997
F
W Lewis Inc
NMC780723
Humboldt
WKM-37
10/01/1997
F
W Lewis Inc
NMC780724
Humboldt
WKM-38
10/01/1997
F
W Lewis Inc
NMC780725
Humboldt
WKM-39
10/01/1997
F
W Lewis Inc
NMC780726
Humboldt
WKM-4
9/30/1997
F
W Lewis Inc
NMC780691
Humboldt
WKM-40
10/01/1997
F
W Lewis Inc
NMC780727
Humboldt
WKM-41
10/01/1997
F
W Lewis Inc
NMC780728
Humboldt
WKM-42
10/01/1997
F
W Lewis Inc
NMC780729
Humboldt
WKM-43
10/01/1997
F
W Lewis Inc
NMC780730
Humboldt
WKM-44
10/01/1997
F
W Lewis Inc
NMC780731
Humboldt
WKM-45
10/01/1997
F
W Lewis Inc
NMC780732
Humboldt
WKM-46
10/01/1997
F
W Lewis Inc
NMC780733
Humboldt
WKM-47
10/01/1997
F
W Lewis Inc
NMC780734
Humboldt
WKM-48
10/01/1997
F
W Lewis Inc
NMC780735
Humboldt
Hycroft Mine Project
Page 315
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
WKM-5
9/30/1997
F
W Lewis Inc
NMC780692
Humboldt
WKM-50
10/01/1997
F
W Lewis Inc
NMC780736
Humboldt
WKM-51
10/02/1997
F
W Lewis Inc
NMC780737
Humboldt
WKM-52
10/02/1997
F
W Lewis Inc
NMC780738
Humboldt
WKM-53
10/02/1997
F
W Lewis Inc
NMC780739
Humboldt
WKM-54
10/02/1997
F
W Lewis Inc
NMC780740
Humboldt
WKM-55
10/02/1997
F
W Lewis Inc
NMC780741
Humboldt
WKM-56
10/02/1997
F
W Lewis Inc
NMC780742
Humboldt
WKM-57
10/02/1997
F
W Lewis Inc
NMC780743
Humboldt
WKM-58
10/02/1997
F
W Lewis Inc
NMC780744
Humboldt
WKM-6
9/30/1997
F
W Lewis Inc
NMC780693
Humboldt
WKM-60
10/06/1997
F
W Lewis Inc
NMC780745
Humboldt
WKM-62
10/06/1997
F
W Lewis Inc
NMC780746
Humboldt
WKM-64
10/06/1997
F
W Lewis Inc
NMC780747
Humboldt
WKM-7
9/30/1997
F
W Lewis Inc
NMC780694
Humboldt
WKM-8
9/30/1997
F
W Lewis Inc
NMC780695
Humboldt
WKM-9
9/30/1997
F
W Lewis Inc
NMC780696
Humboldt
FG
49
12/18/2013
Hycroft
Res & Dev Inc
NMC1100166
Pershing
FG
71
12/18/2013
Hycroft
Res & Dev Inc
NMC1100167
Pershing
HRD1212
4/16/2014
Hycroft
Res & Dev Inc
NMC1102169
Pershing
HRDI
218
4/16/2014
Hycroft
Res & Dev Inc
NMC1102176
Pershing
HRDI
219
4/16/2014
Hycroft
Res & Dev Inc
NMC1102177
Pershing
HRDI
1
12/16/2013
Hycroft
Res & Dev Inc
NMC1100176
Pershing
HRDI
10
12/16/2013
Hycroft
Res & Dev Inc
NMC1100185
Pershing
HRDI
100
4/8/2014
Hycroft
Res & Dev Inc
NMC1102058
Pershing
HRDI
101
4/8/2014
Hycroft
Res & Dev Inc
NMC1102059
Pershing
HRDI
102
4/8/2014
Hycroft
Res & Dev Inc
NMC1102060
Pershing
HRDI
103
4/8/2014
Hycroft
Res & Dev Inc
NMC1102061
Pershing
HRDI
104
4/8/2014
Hycroft
Res & Dev Inc
NMC1102062
Pershing
HRDI
105
4/8/2014
Hycroft
Res & Dev Inc
NMC1102063
Pershing
HRDI
106
4/8/2014
Hycroft
Res & Dev Inc
NMC1102064
Pershing
HRDI
107
4/8/2014
Hycroft
Res & Dev Inc
NMC1102065
Pershing
HRDI
108
4/8/2014
Hycroft
Res & Dev Inc
NMC1102066
Pershing
HRDI
109
4/8/2014
Hycroft
Res & Dev Inc
NMC1102067
Pershing
HRDI
11
12/16/2013
Hycroft
Res & Dev Inc
NMC1100186
Pershing
HRDI
110
4/8/2014
Hycroft
Res & Dev Inc
NMC1102068
Pershing
HRDI
111
4/9/2014
Hycroft
Res & Dev Inc
NMC1102069
Pershing
HRDI
112
4/9/2014
Hycroft
Res & Dev Inc
NMC1102070
Pershing
HRDI
113
4/9/2014
Hycroft
Res & Dev Inc
NMC1102071
Pershing
HRDI
114
4/9/2014
Hycroft
Res & Dev Inc
NMC1102072
Pershing
HRDI
115
4/9/2014
Hycroft
Res & Dev Inc
NMC1102073
Pershing
HRDI
116
4/9/2014
Hycroft
Res & Dev Inc
NMC1102074
Pershing
HRDI
117
4/9/2014
Hycroft
Res & Dev Inc
NMC1102075
Pershing
HRDI
118
4/9/2014
Hycroft
Res & Dev Inc
NMC1102076
Pershing
HRDI
119
4/9/2014
Hycroft
Res & Dev Inc
NMC1102077
Pershing
HRDI
12
12/16/2013
Hycroft
Res & Dev Inc
NMC1100187
Pershing
HRDI
120
4/9/2014
Hycroft
Res & Dev Inc
NMC1102078
Pershing
HRDI
121
4/9/2014
Hycroft
Res & Dev Inc
NMC1102079
Pershing
HRDI
122
4/9/2014
Hycroft
Res & Dev Inc
NMC1102080
Pershing
Hycroft Mine Project
Page 316
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
HRDI
123
4/9/2014
Hycroft
Res & Dev Inc
NMC1102081
Pershing
HRDI
124
4/9/2014
Hycroft
Res & Dev Inc
NMC1102082
Pershing
HRDI
125
4/9/2014
Hycroft
Res & Dev Inc
NMC1102083
Pershing
HRDI
126
4/9/2014
Hycroft
Res & Dev Inc
NMC1102084
Pershing
HRDI
127
4/9/2014
Hycroft
Res & Dev Inc
NMC1102085
Pershing
HRDI
128
4/9/2014
Hycroft
Res & Dev Inc
NMC1102086
Pershing
HRDI
129
4/9/2014
Hycroft
Res & Dev Inc
NMC1102087
Pershing
HRDI
13
12/16/2013
Hycroft
Res & Dev Inc
NMC1100188
Pershing
HRDI
130
4/9/2014
Hycroft
Res & Dev Inc
NMC1102088
Pershing
HRDI
131
4/9/2014
Hycroft
Res & Dev Inc
NMC1102089
Pershing
HRDI
132
4/9/2014
Hycroft
Res & Dev Inc
NMC1102090
Pershing
HRDI
133
4/9/2014
Hycroft
Res & Dev Inc
NMC1102091
Pershing
HRDI
134
4/9/2014
Hycroft
Res & Dev Inc
NMC1102092
Pershing
HRDI
135
4/9/2014
Hycroft
Res & Dev Inc
NMC1102093
Pershing
HRDI
136
4/9/2014
Hycroft
Res & Dev Inc
NMC1102094
Pershing
HRDI
137
4/9/2014
Hycroft
Res & Dev Inc
NMC1102095
Pershing
HRDI
138
4/9/2014
Hycroft
Res & Dev Inc
NMC1102096
Pershing
HRDI
139
4/9/2014
Hycroft
Res & Dev Inc
NMC1102097
Pershing
HRDI
14
12/16/2013
Hycroft
Res & Dev Inc
NMC1100189
Pershing
HRDI
140
4/9/2014
Hycroft
Res & Dev Inc
NMC1102098
Pershing
HRDI
141
4/9/2014
Hycroft
Res & Dev Inc
NMC1102099
Pershing
HRDI
142
4/9/2014
Hycroft
Res & Dev Inc
NMC1102100
Pershing
HRDI
143
4/9/2014
Hycroft
Res & Dev Inc
NMC1102101
Pershing
HRDI
144
4/10/2014
Hycroft
Res & Dev Inc
NMC1102102
Pershing
HRDI
145
4/10/2014
Hycroft
Res & Dev Inc
NMC1102103
Pershing
HRDI
146
4/10/2014
Hycroft
Res & Dev Inc
NMC1102104
Pershing
HRDI
147
4/10/2014
Hycroft
Res & Dev Inc
NMC1102105
Pershing
HRDI
148
4/10/2014
Hycroft
Res & Dev Inc
NMC1102106
Pershing
HRDI
149
4/10/2014
Hycroft
Res & Dev Inc
NMC1102107
Pershing
HRDI
15
12/16/2013
Hycroft
Res & Dev Inc
NMC1100190
Pershing
HRDI
150
4/10/2014
Hycroft
Res & Dev Inc
NMC1102108
Pershing
HRDI
151
4/10/2014
Hycroft
Res & Dev Inc
NMC1102109
Pershing
HRDI
152
4/10/2014
Hycroft
Res & Dev Inc
NMC1102110
Pershing
HRDI
153
4/10/2014
Hycroft
Res & Dev Inc
NMC1102111
Pershing
HRDI
154
4/9/2014
Hycroft
Res & Dev Inc
NMC1102112
Pershing
HRDI
155
4/9/2014
Hycroft
Res & Dev Inc
NMC1102113
Pershing
HRDI
156
4/9/2014
Hycroft
Res & Dev Inc
NMC1102114
Pershing
HRDI
157
4/9/2014
Hycroft
Res & Dev Inc
NMC1102115
Pershing
HRDI
158
4/10/2014
Hycroft
Res & Dev Inc
NMC1102116
Pershing
HRDI
159
4/10/2014
Hycroft
Res & Dev Inc
NMC1102117
Pershing
HRDI
16
12/16/2013
Hycroft
Res & Dev Inc
NMC1100191
Pershing
HRDI
160
4/10/2014
Hycroft
Res & Dev Inc
NMC1102118
Pershing
HRDI
161
4/10/2014
Hycroft
Res & Dev Inc
NMC1102119
Pershing
HRDI
162
4/10/2014
Hycroft
Res & Dev Inc
NMC1102120
Pershing
HRDI
163
4/10/2014
Hycroft
Res & Dev Inc
NMC1102121
Pershing
HRDI
164
4/10/2014
Hycroft
Res & Dev Inc
NMC1102122
Pershing
HRDI
165
4/10/2014
Hycroft
Res & Dev Inc
NMC1102123
Pershing
HRDI
166
4/10/2014
Hycroft
Res & Dev Inc
NMC1102124
Pershing
Hycroft Mine Project
Page 317
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
HRDI
167
4/10/2014
Hycroft
Res & Dev Inc
NMC1102125
Pershing
HRDI
168
4/9/2014
Hycroft
Res & Dev Inc
NMC1102126
Pershing
HRDI
169
4/9/2014
Hycroft
Res & Dev Inc
NMC1102127
Pershing
HRDI
17
12/16/2013
Hycroft
Res & Dev Inc
NMC1100192
Pershing
HRDI
170
4/9/2014
Hycroft
Res & Dev Inc
NMC1102128
Pershing
HRDI
171
4/9/2014
Hycroft
Res & Dev Inc
NMC1102129
Pershing
HRDI
172
4/11/2014
Hycroft
Res & Dev Inc
NMC1102130
Pershing
HRDI
173
4/11/2014
Hycroft
Res & Dev Inc
NMC1102131
Pershing
HRDI
174
4/11/2014
Hycroft
Res & Dev Inc
NMC1102132
Pershing
HRDI
175
4/11/2014
Hycroft
Res & Dev Inc
NMC1102133
Pershing
HRDI
176
4/11/2014
Hycroft
Res & Dev Inc
NMC1102134
Pershing
HRDI
177
4/11/2014
Hycroft
Res & Dev Inc
NMC1102135
Pershing
HRDI
178
4/11/2014
Hycroft
Res & Dev Inc
NMC1102136
Pershing
HRDI
179
4/11/2014
Hycroft
Res & Dev Inc
NMC1102137
Pershing
HRDI
18
12/16/2013
Hycroft
Res & Dev Inc
NMC1100193
Pershing
HRDI
180
4/11/2014
Hycroft
Res & Dev Inc
NMC1102138
Pershing
HRDI
181
4/11/2014
Hycroft
Res & Dev Inc
NMC1102139
Pershing
HRDI
182
4/11/2014
Hycroft
Res & Dev Inc
NMC1102140
Pershing
HRDI
183
4/11/2014
Hycroft
Res & Dev Inc
NMC1102141
Pershing
HRDI
184
4/11/2014
Hycroft
Res & Dev Inc
NMC1102142
Pershing
HRDI
185
4/11/2014
Hycroft
Res & Dev Inc
NMC1102143
Pershing
HRDI
186
4/11/2014
Hycroft
Res & Dev Inc
NMC1102144
Pershing
HRDI
187
4/11/2014
Hycroft
Res & Dev Inc
NMC1102145
Pershing
HRDI
188
4/10/2014
Hycroft
Res & Dev Inc
NMC1102146
Pershing
HRDI
189
4/10/2014
Hycroft
Res & Dev Inc
NMC1102147
Pershing
HRDI
19
12/16/2013
Hycroft
Res & Dev Inc
NMC1100194
Pershing
HRDI
190
4/10/2014
Hycroft
Res & Dev Inc
NMC1102148
Pershing
HRDI
191
4/10/2014
Hycroft
Res & Dev Inc
NMC1102149
Pershing
HRDI
192
4/15/2014
Hycroft
Res & Dev Inc
NMC1102150
Pershing
HRDI
193
4/15/2014
Hycroft
Res & Dev Inc
NMC1102151
Pershing
HRDI
194
4/10/2014
Hycroft
Res & Dev Inc
NMC1102152
Pershing
HRDI
195
4/10/2014
Hycroft
Res & Dev Inc
NMC1102153
Pershing
HRDI
196
4/10/2014
Hycroft
Res & Dev Inc
NMC1102154
Pershing
HRDI
197
4/10/2014
Hycroft
Res & Dev Inc
NMC1102155
Pershing
HRDI
198
4/16/2014
Hycroft
Res & Dev Inc
NMC1102156
Pershing
HRDI
199
4/10/2014
Hycroft
Res & Dev Inc
NMC1102157
Pershing
HRDI
2
12/16/2013
Hycroft
Res & Dev Inc
NMC1100177
Pershing
HRDI
20
12/16/2013
Hycroft
Res & Dev Inc
NMC1100195
Pershing
HRDI
200
4/15/2014
Hycroft
Res & Dev Inc
NMC1102158
Pershing
HRDI
201
4/15/2014
Hycroft
Res & Dev Inc
NMC1102159
Pershing
HRDI
202
4/10/2014
Hycroft
Res & Dev Inc
NMC1102160
Pershing
HRDI
203
4/16/2014
Hycroft
Res & Dev Inc
NMC1102161
Pershing
HRDI
204
4/16/2014
Hycroft
Res & Dev Inc
NMC1102162
Pershing
HRDI
205
4/16/2014
Hycroft
Res & Dev Inc
NMC1102163
Pershing
HRDI
206
4/16/2014
Hycroft
Res & Dev Inc
NMC1102164
Pershing
HRDI
207
4/16/2014
Hycroft
Res & Dev Inc
NMC1102165
Pershing
HRDI
208
4/16/2014
Hycroft
Res & Dev Inc
NMC1102166
Pershing
HRDI
209
4/16/2014
Hycroft
Res & Dev Inc
NMC1102167
Pershing
HRDI
21
12/16/2013
Hycroft
Res & Dev Inc
NMC1100196
Pershing
Hycroft Mine Project
Page 318
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
HRDI
210
4/16/2014
Hycroft
Res & Dev Inc
NMC1102168
Pershing
HRDI
211
4/16/2014
Hycroft
Res & Dev Inc
NMC1102170
Pershing
HRDI
213
4/16/2014
Hycroft
Res & Dev Inc
NMC1102171
Pershing
HRDI
214
4/16/2014
Hycroft
Res & Dev Inc
NMC1102172
Pershing
HRDI
215
4/16/2014
Hycroft
Res & Dev Inc
NMC1102173
Pershing
HRDI
216
4/16/2014
Hycroft
Res & Dev Inc
NMC1102174
Pershing
HRDI
217
4/16/2014
Hycroft
Res & Dev Inc
NMC1102175
Pershing
HRDI
22
12/16/2013
Hycroft
Res & Dev Inc
NMC1100197
Pershing
HRDI
220
4/16/2014
Hycroft
Res & Dev Inc
NMC1102178
Pershing
HRDI
221
4/15/2014
Hycroft
Res & Dev Inc
NMC1102179
Pershing
HRDI
222
4/15/2014
Hycroft
Res & Dev Inc
NMC1102180
Pershing
HRDI
223
4/15/2014
Hycroft
Res & Dev Inc
NMC1102181
Pershing
HRDI
23
12/16/2013
Hycroft
Res & Dev Inc
NMC1100198
Pershing
HRDI
24
12/16/2013
Hycroft
Res & Dev Inc
NMC1100199
Pershing
HRDI
25
12/16/2013
Hycroft
Res & Dev Inc
NMC1100200
Pershing
HRDI
26
12/16/2013
Hycroft
Res & Dev Inc
NMC1100201
Pershing
HRDI
27
12/16/2013
Hycroft
Res & Dev Inc
NMC1100202
Pershing
HRDI
28
12/17/2013
Hycroft
Res & Dev Inc
NMC1100203
Pershing
HRDI
29
12/17/2013
Hycroft
Res & Dev Inc
NMC1100204
Pershing
HRDI
3
12/16/2013
Hycroft
Res & Dev Inc
NMC1100178
Pershing
HRDI
30
12/17/2013
Hycroft
Res & Dev Inc
NMC1100205
Pershing
HRDI
31
12/17/2013
Hycroft
Res & Dev Inc
NMC1100206
Pershing
HRDI
32
12/17/2013
Hycroft
Res & Dev Inc
NMC1100207
Pershing
HRDI
33
12/17/2013
Hycroft
Res & Dev Inc
NMC1100208
Pershing
HRDI
34
12/18/2013
Hycroft
Res & Dev Inc
NMC1100209
Pershing
HRDI
35
12/18/2013
Hycroft
Res & Dev Inc
NMC1100210
Pershing
HRDI
36
12/17/2013
Hycroft
Res & Dev Inc
NMC1100211
Pershing
HRDI
37
12/17/2013
Hycroft
Res & Dev Inc
NMC1100212
Pershing
HRDI
38
12/17/2013
Hycroft
Res & Dev Inc
NMC1100213
Pershing
HRDI
39
12/17/2013
Hycroft
Res & Dev Inc
NMC1100214
Pershing
HRDI
4
12/16/2013
Hycroft
Res & Dev Inc
NMC1100179
Pershing
HRDI
40
12/17/2013
Hycroft
Res & Dev Inc
NMC1100215
Pershing
HRDI
41
12/17/2013
Hycroft
Res & Dev Inc
NMC1100216
Pershing
HRDI
42
12/17/2013
Hycroft
Res & Dev Inc
NMC1100217
Pershing
HRDI
43
12/17/2013
Hycroft
Res & Dev Inc
NMC1100218
Pershing
HRDI
44
12/17/2013
Hycroft
Res & Dev Inc
NMC1100219
Pershing
HRDI
45
12/17/2013
Hycroft
Res & Dev Inc
NMC1100220
Pershing
HRDI
46
12/17/2013
Hycroft
Res & Dev Inc
NMC1100221
Pershing
HRDI
47
4/7/2014
Hycroft
Res & Dev Inc
NMC1102005
Pershing
HRDI
48
4/7/2014
Hycroft
Res & Dev Inc
NMC1102006
Pershing
HRDI
49
4/7/2014
Hycroft
Res & Dev Inc
NMC1102007
Pershing
HRDI
5
12/16/2013
Hycroft
Res & Dev Inc
NMC1100180
Pershing
HRDI
50
4/7/2014
Hycroft
Res & Dev Inc
NMC1102008
Pershing
HRDI
51
4/7/2014
Hycroft
Res & Dev Inc
NMC1102009
Pershing
HRDI
52
4/7/2014
Hycroft
Res & Dev Inc
NMC1102010
Pershing
HRDI
53
4/7/2014
Hycroft
Res & Dev Inc
NMC1102011
Pershing
HRDI
54
4/7/2014
Hycroft
Res & Dev Inc
NMC1102012
Pershing
Hycroft Mine Project
Page 319
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
HRDI
55
4/7/2014
Hycroft
Res & Dev Inc
NMC1102013
Pershing
HRDI
56
4/7/2014
Hycroft
Res & Dev Inc
NMC1102014
Pershing
HRDI
57
4/7/2014
Hycroft
Res & Dev Inc
NMC1102015
Pershing
HRDI
58
4/7/2014
Hycroft
Res & Dev Inc
NMC1102016
Pershing
HRDI
59
4/7/2014
Hycroft
Res & Dev Inc
NMC1102017
Pershing
HRDI
6
12/16/2013
Hycroft
Res & Dev Inc
NMC1100181
Pershing
HRDI
60
4/7/2014
Hycroft
Res & Dev Inc
NMC1102018
Pershing
HRDI
61
4/7/2014
Hycroft
Res & Dev Inc
NMC1102019
Pershing
HRDI
62
4/7/2014
Hycroft
Res & Dev Inc
NMC1102020
Pershing
HRDI
63
4/7/2014
Hycroft
Res & Dev Inc
NMC1102021
Pershing
HRDI
64
4/7/2014
Hycroft
Res & Dev Inc
NMC1102022
Pershing
HRDI
65
4/7/2014
Hycroft
Res & Dev Inc
NMC1102023
Pershing
HRDI
66
4/7/2014
Hycroft
Res & Dev Inc
NMC1102024
Pershing
HRDI
67
4/7/2014
Hycroft
Res & Dev Inc
NMC1102025
Pershing
HRDI
68
4/7/2014
Hycroft
Res & Dev Inc
NMC1102026
Pershing
HRDI
69
4/7/2014
Hycroft
Res & Dev Inc
NMC1102027
Pershing
HRDI
7
12/16/2013
Hycroft
Res & Dev Inc
NMC1100182
Pershing
HRDI
70
4/7/2014
Hycroft
Res & Dev Inc
NMC1102028
Pershing
HRDI
71
4/7/2014
Hycroft
Res & Dev Inc
NMC1102029
Pershing
HRDI
72
4/7/2014
Hycroft
Res & Dev Inc
NMC1102030
Pershing
HRDI
73
4/7/2014
Hycroft
Res & Dev Inc
NMC1102031
Pershing
HRDI
74
4/7/2014
Hycroft
Res & Dev Inc
NMC1102032
Pershing
HRDI
75
4/7/2014
Hycroft
Res & Dev Inc
NMC1102033
Pershing
HRDI
76
4/7/2014
Hycroft
Res & Dev Inc
NMC1102034
Pershing
HRDI
77
4/8/2014
Hycroft
Res & Dev Inc
NMC1102035
Pershing
HRDI
78
4/8/2014
Hycroft
Res & Dev Inc
NMC1102036
Pershing
HRDI
79
4/8/2014
Hycroft
Res & Dev Inc
NMC1102037
Pershing
HRDI
8
12/16/2013
Hycroft
Res & Dev Inc
NMC1100183
Pershing
HRDI
80
4/8/2014
Hycroft
Res & Dev Inc
NMC1102038
Pershing
HRDI
81
4/8/2014
Hycroft
Res & Dev Inc
NMC1102039
Pershing
HRDI
82
4/8/2014
Hycroft
Res & Dev Inc
NMC1102040
Pershing
HRDI
83
4/8/2014
Hycroft
Res & Dev Inc
NMC1102041
Pershing
HRDI
84
4/8/2014
Hycroft
Res & Dev Inc
NMC1102042
Pershing
HRDI
85
4/8/2014
Hycroft
Res & Dev Inc
NMC1102043
Pershing
HRDI
86
4/8/2014
Hycroft
Res & Dev Inc
NMC1102044
Pershing
HRDI
87
4/8/2014
Hycroft
Res & Dev Inc
NMC1102045
Pershing
HRDI
88
4/8/2014
Hycroft
Res & Dev Inc
NMC1102046
Pershing
HRDI
89
4/8/2014
Hycroft
Res & Dev Inc
NMC1102047
Pershing
HRDI
9
12/16/2013
Hycroft
Res & Dev Inc
NMC1100184
Pershing
HRDI
90
4/8/2014
Hycroft
Res & Dev Inc
NMC1102048
Pershing
HRDI
91
4/8/2014
Hycroft
Res & Dev Inc
NMC1102049
Pershing
HRDI
92
4/8/2014
Hycroft
Res & Dev Inc
NMC1102050
Pershing
HRDI
93
4/8/2014
Hycroft
Res & Dev Inc
NMC1102051
Pershing
HRDI
94
4/8/2014
Hycroft
Res & Dev Inc
NMC1102052
Pershing
HRDI
95
4/8/2014
Hycroft
Res & Dev Inc
NMC1102053
Pershing
HRDI
96
4/8/2014
Hycroft
Res & Dev Inc
NMC1102054
Pershing
HRDI
97
4/8/2014
Hycroft
Res & Dev Inc
NMC1102055
Pershing
HRDI
98
4/8/2014
Hycroft
Res & Dev Inc
NMC1102056
Pershing
Hycroft Mine Project
Page 320
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
HRDI
99
4/8/2014
Hycroft
Res & Dev Inc
NMC1102057
Pershing
NC
102
8/13/2010
Hycroft
Res & Dev Inc
NMC1027940
Pershing
NC
103
8/13/2010
Hycroft
Res & Dev Inc
NMC1027941
Pershing
NC
104
8/13/2010
Hycroft
Res & Dev Inc
NMC1027942
Pershing
NC
105
8/13/2010
Hycroft
Res & Dev Inc
NMC1027943
Pershing
NC
106
8/13/2010
Hycroft
Res & Dev Inc
NMC1027944
Pershing
NC
107
8/13/2010
Hycroft
Res & Dev Inc
NMC1027945
Pershing
NC
108
8/13/2010
Hycroft
Res & Dev Inc
NMC1027946
Pershing
NC
109
8/13/2010
Hycroft
Res & Dev Inc
NMC1027947
Pershing
NC
133
8/13/2010
Hycroft
Res & Dev Inc
NMC1027971
Pershing
NC
134
8/13/2010
Hycroft
Res & Dev Inc
NMC1027972
Pershing
NC
135
8/13/2010
Hycroft
Res & Dev Inc
NMC1027973
Pershing
NC
136
8/13/2010
Hycroft
Res & Dev Inc
NMC1027974
Pershing
NC
137
8/13/2010
Hycroft
Res & Dev Inc
NMC1027975
Pershing
NC
138
8/13/2010
Hycroft
Res & Dev Inc
NMC1027976
Pershing
NC
139
8/13/2010
Hycroft
Res & Dev Inc
NMC1027977
Pershing
NC
140
8/13/2010
Hycroft
Res & Dev Inc
NMC1027978
Pershing
NC
141
8/13/2010
Hycroft
Res & Dev Inc
NMC1027979
Pershing
NC
142
8/13/2010
Hycroft
Res & Dev Inc
NMC1027980
Pershing
NC
143
8/13/2010
Hycroft
Res & Dev Inc
NMC1027981
Pershing
NC
144
8/13/2010
Hycroft
Res & Dev Inc
NMC1027982
Pershing
NC
145
8/13/2010
Hycroft
Res & Dev Inc
NMC1027983
Pershing
NC
146
8/13/2010
Hycroft
Res & Dev Inc
NMC1027984
Pershing
NC
147
8/13/2010
Hycroft
Res & Dev Inc
NMC1027985
Pershing
NC
148
8/13/2010
Hycroft
Res & Dev Inc
NMC1027986
Pershing
NC
149
8/13/2010
Hycroft
Res & Dev Inc
NMC1027987
Pershing
NC
150
8/13/2010
Hycroft
Res & Dev Inc
NMC1027988
Pershing
NC
171
8/13/2010
Hycroft
Res & Dev Inc
NMC1028009
Pershing
NC
172
8/13/2010
Hycroft
Res & Dev Inc
NMC1028010
Pershing
NC
173
8/13/2010
Hycroft
Res & Dev Inc
NMC1028011
Pershing
NC
174
8/13/2010
Hycroft
Res & Dev Inc
NMC1028012
Pershing
NC
175
8/13/2010
Hycroft
Res & Dev Inc
NMC1028013
Pershing
NC
176
8/13/2010
Hycroft
Res & Dev Inc
NMC1028014
Pershing
NC
177
8/13/2010
Hycroft
Res & Dev Inc
NMC1028015
Pershing
NC
178
8/13/2010
Hycroft
Res & Dev Inc
NMC1028016
Pershing
NC
179
8/13/2010
Hycroft
Res & Dev Inc
NMC1028017
Pershing
NC
180
8/13/2010
Hycroft
Res & Dev Inc
NMC1028018
Pershing
NC
181
8/13/2010
Hycroft
Res & Dev Inc
NMC1028019
Pershing
NC
182
8/13/2010
Hycroft
Res & Dev Inc
NMC1028020
Pershing
NC
183
8/13/2010
Hycroft
Res & Dev Inc
NMC1028021
Pershing
NC
184
8/13/2010
Hycroft
Res & Dev Inc
NMC1028022
Pershing
NC
185
8/13/2010
Hycroft
Res & Dev Inc
NMC1028023
Pershing
NC
186
8/13/2010
Hycroft
Res & Dev Inc
NMC1028024
Pershing
NC
187
8/13/2010
Hycroft
Res & Dev Inc
NMC1028025
Pershing
NC
188
8/13/2010
Hycroft
Res & Dev Inc
NMC1028026
Pershing
NC
206
8/13/2010
Hycroft
Res & Dev Inc
NMC1028044
Pershing
NC
207
8/13/2010
Hycroft
Res & Dev Inc
NMC1028045
Pershing
NC
208
8/13/2010
Hycroft
Res & Dev Inc
NMC1028046
Pershing
Hycroft Mine Project
Page 321
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NC
209
8/13/2010
Hycroft
Res & Dev Inc
NMC1028047
Pershing
NC
210
8/13/2010
Hycroft
Res & Dev Inc
NMC1028048
Pershing
NC
211
8/13/2010
Hycroft
Res & Dev Inc
NMC1028049
Pershing
NC
212
8/13/2010
Hycroft
Res & Dev Inc
NMC1028050
Pershing
NC
213
8/13/2010
Hycroft
Res & Dev Inc
NMC1028051
Pershing
NC
214
8/13/2010
Hycroft
Res & Dev Inc
NMC1028052
Pershing
NC
215
8/13/2010
Hycroft
Res & Dev Inc
NMC1028053
Pershing
NC
216
8/13/2010
Hycroft
Res & Dev Inc
NMC1028054
Pershing
NC
217
8/13/2010
Hycroft
Res & Dev Inc
NMC1028055
Pershing
NC
218
8/13/2010
Hycroft
Res & Dev Inc
NMC1028056
Pershing
NC
219
8/13/2010
Hycroft
Res & Dev Inc
NMC1028057
Pershing
NC
220
8/13/2010
Hycroft
Res & Dev Inc
NMC1028058
Pershing
NC
221
8/13/2010
Hycroft
Res & Dev Inc
NMC1028059
Pershing
NC
222
8/13/2010
Hycroft
Res & Dev Inc
NMC1028060
Pershing
NC
223
8/13/2010
Hycroft
Res & Dev Inc
NMC1028061
Pershing
NC
241
8/13/2010
Hycroft
Res & Dev Inc
NMC1028079
Pershing
NC
242
8/13/2010
Hycroft
Res & Dev Inc
NMC1028080
Pershing
NC
243
8/13/2010
Hycroft
Res & Dev Inc
NMC1028081
Pershing
NC
244
8/13/2010
Hycroft
Res & Dev Inc
NMC1028082
Pershing
NC
245
8/13/2010
Hycroft
Res & Dev Inc
NMC1028083
Pershing
NC
246
8/13/2010
Hycroft
Res & Dev Inc
NMC1028084
Pershing
NC
247
8/13/2010
Hycroft
Res & Dev Inc
NMC1028085
Pershing
NC
248
8/13/2010
Hycroft
Res & Dev Inc
NMC1028086
Pershing
NC
249
8/13/2010
Hycroft
Res & Dev Inc
NMC1028087
Pershing
NC
250
8/13/2010
Hycroft
Res & Dev Inc
NMC1028088
Pershing
NC
251
8/13/2010
Hycroft
Res & Dev Inc
NMC1028089
Pershing
NC
252
8/13/2010
Hycroft
Res & Dev Inc
NMC1028090
Pershing
NC
253
8/13/2010
Hycroft
Res & Dev Inc
NMC1028091
Pershing
NC
254
8/13/2010
Hycroft
Res & Dev Inc
NMC1028092
Pershing
NC
255
8/13/2010
Hycroft
Res & Dev Inc
NMC1028093
Pershing
NC
256
8/13/2010
Hycroft
Res & Dev Inc
NMC1028094
Pershing
NC
257
8/13/2010
Hycroft
Res & Dev Inc
NMC1028095
Pershing
NC
258
8/13/2010
Hycroft
Res & Dev Inc
NMC1028096
Pershing
NC
275
8/13/2010
Hycroft
Res & Dev Inc
NMC1028113
Pershing
NC
276
8/13/2010
Hycroft
Res & Dev Inc
NMC1028114
Pershing
NC
277
8/13/2010
Hycroft
Res & Dev Inc
NMC1028115
Pershing
NC
278
8/13/2010
Hycroft
Res & Dev Inc
NMC1028116
Pershing
NC
279
8/13/2010
Hycroft
Res & Dev Inc
NMC1028117
Pershing
NC
280
8/13/2010
Hycroft
Res & Dev Inc
NMC1028118
Pershing
NC
281
8/13/2010
Hycroft
Res & Dev Inc
NMC1028119
Pershing
NC
282
8/13/2010
Hycroft
Res & Dev Inc
NMC1028120
Pershing
NC
283
8/13/2010
Hycroft
Res & Dev Inc
NMC1028121
Pershing
NC
284
8/13/2010
Hycroft
Res & Dev Inc
NMC1028122
Pershing
NC
285
8/13/2010
Hycroft
Res & Dev Inc
NMC1028123
Pershing
NC
286
8/13/2010
Hycroft
Res & Dev Inc
NMC1028124
Pershing
NC
287
8/13/2010
Hycroft
Res & Dev Inc
NMC1028125
Pershing
NC
288
8/13/2010
Hycroft
Res & Dev Inc
NMC1028126
Pershing
NC
289
8/13/2010
Hycroft
Res & Dev Inc
NMC1028127
Pershing
Hycroft Mine Project
Page 322
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NC
290
8/13/2010
Hycroft
Res & Dev Inc
NMC1028128
Pershing
NC
291
8/13/2010
Hycroft
Res & Dev Inc
NMC1028129
Pershing
NC
292
8/13/2010
Hycroft
Res & Dev Inc
NMC1028130
Pershing
NC
307
8/13/2010
Hycroft
Res & Dev Inc
NMC1028145
Pershing
NC
308
8/13/2010
Hycroft
Res & Dev Inc
NMC1028146
Pershing
NC
309
8/13/2010
Hycroft
Res & Dev Inc
NMC1028147
Pershing
NC
310
8/13/2010
Hycroft
Res & Dev Inc
NMC1028148
Pershing
NC
311
8/13/2010
Hycroft
Res & Dev Inc
NMC1028149
Pershing
NC
312
8/13/2010
Hycroft
Res & Dev Inc
NMC1028150
Pershing
NC
313
8/13/2010
Hycroft
Res & Dev Inc
NMC1028151
Pershing
NC
314
8/13/2010
Hycroft
Res & Dev Inc
NMC1028152
Pershing
NC
315
8/13/2010
Hycroft
Res & Dev Inc
NMC1028153
Pershing
NC
316
8/13/2010
Hycroft
Res & Dev Inc
NMC1028154
Pershing
NC
317
8/13/2010
Hycroft
Res & Dev Inc
NMC1028155
Pershing
NC
318
8/13/2010
Hycroft
Res & Dev Inc
NMC1028156
Pershing
NC
319
8/13/2010
Hycroft
Res & Dev Inc
NMC1028157
Pershing
NC
320
8/13/2010
Hycroft
Res & Dev Inc
NMC1028158
Pershing
NC
321
8/13/2010
Hycroft
Res & Dev Inc
NMC1028159
Pershing
NC
322
8/13/2010
Hycroft
Res & Dev Inc
NMC1028160
Pershing
NC
323
8/13/2010
Hycroft
Res & Dev Inc
NMC1028161
Pershing
NC
324
8/13/2010
Hycroft
Res & Dev Inc
NMC1028162
Pershing
OS
1
9/11/2012
Hycroft
Res & Dev Inc
NMC1078793
Pershing
OS
10
9/11/2012
Hycroft
Res & Dev Inc
NMC1078802
Pershing
OS
11
9/11/2012
Hycroft
Res & Dev Inc
NMC1078803
Pershing
OS
12
9/11/2012
Hycroft
Res & Dev Inc
NMC1078804
Pershing
OS
2
9/11/2012
Hycroft
Res & Dev Inc
NMC1078794
Pershing
OS
3
9/11/2012
Hycroft
Res & Dev Inc
NMC1078795
Pershing
OS
4
9/11/2012
Hycroft
Res & Dev Inc
NMC1078796
Pershing
OS
5
9/11/2012
Hycroft
Res & Dev Inc
NMC1078797
Pershing
OS
6
9/11/2012
Hycroft
Res & Dev Inc
NMC1078798
Pershing
OS
7
9/11/2012
Hycroft
Res & Dev Inc
NMC1078799
Pershing
OS
8
9/11/2012
Hycroft
Res & Dev Inc
NMC1078800
Pershing
OS
9
9/11/2012
Hycroft
Res & Dev Inc
NMC1078801
Pershing
OSC
1
10/28/2010
Hycroft
Res & Dev Inc
NMC1035889
Pershing
OSC
2
10/28/2010
Hycroft
Res & Dev Inc
NMC1035890
Pershing
OSC
3
10/28/2010
Hycroft
Res & Dev Inc
NMC1035891
Pershing
OSC
35
11/1/2010
Hycroft
Res & Dev Inc
NMC1035895
Pershing
OSC
36
10/29/2010
Hycroft
Res & Dev Inc
NMC1035896
Pershing
OSC
37
10/29/2010
Hycroft
Res & Dev Inc
NMC1035897
Pershing
OSC
38
11/1/2010
Hycroft
Res & Dev Inc
NMC1035898
Pershing
OSC
39
10/29/2010
Hycroft
Res & Dev Inc
NMC1035899
Pershing
OSC
4
10/28/2010
Hycroft
Res & Dev Inc
NMC1035892
Pershing
OSC
40
10/29/2010
Hycroft
Res & Dev Inc
NMC1035900
Pershing
OSC
41
11/1/2010
Hycroft
Res & Dev Inc
NMC1035901
Pershing
OSC
42
10/29/2010
Hycroft
Res & Dev Inc
NMC1035902
Pershing
OSC
43
10/29/2010
Hycroft
Res & Dev Inc
NMC1035903
Pershing
OSC
44
11/1/2010
Hycroft
Res & Dev Inc
NMC1035904
Pershing
OSC
45
10/29/2010
Hycroft
Res & Dev Inc
NMC1035905
Pershing
Hycroft Mine Project
Page 323
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
OSC
46
10/29/2010
Hycroft
Res & Dev Inc
NMC1035906
Pershing
OSC
47
10/31/2010
Hycroft
Res & Dev Inc
NMC1035907
Pershing
OSC
48
10/31/2010
Hycroft
Res & Dev Inc
NMC1035908
Pershing
OSC
49
10/31/2010
Hycroft
Res & Dev Inc
NMC1035909
Pershing
OSC
5
10/28/2010
Hycroft
Res & Dev Inc
NMC1035893
Pershing
OSC
50
10/31/2010
Hycroft
Res & Dev Inc
NMC1035910
Pershing
OSC
51
10/31/2010
Hycroft
Res & Dev Inc
NMC1035911
Pershing
OSC
52
10/31/2010
Hycroft
Res & Dev Inc
NMC1035912
Pershing
OSC
53
10/31/2010
Hycroft
Res & Dev Inc
NMC1035913
Pershing
OSC
54
10/31/2010
Hycroft
Res & Dev Inc
NMC1035914
Pershing
OSC
55
10/31/2010
Hycroft
Res & Dev Inc
NMC1035915
Pershing
OSC
56
10/31/2010
Hycroft
Res & Dev Inc
NMC1035916
Pershing
OSC
57
10/31/2010
Hycroft
Res & Dev Inc
NMC1035917
Pershing
OSC
58
10/31/2010
Hycroft
Res & Dev Inc
NMC1035918
Pershing
OSC
59
10/31/2010
Hycroft
Res & Dev Inc
NMC1035919
Pershing
OSC
6
10/28/2010
Hycroft
Res & Dev Inc
NMC1035894
Pershing
OSC
60
10/31/2010
Hycroft
Res & Dev Inc
NMC1035920
Pershing
OSC
61
10/31/2010
Hycroft
Res & Dev Inc
NMC1035921
Pershing
OSC
62
10/31/2010
Hycroft
Res & Dev Inc
NMC1035922
Pershing
OSC
63
10/31/2010
Hycroft
Res & Dev Inc
NMC1035923
Pershing
OSC
64
10/31/2010
Hycroft
Res & Dev Inc
NMC1035924
Pershing
OSC
65
10/31/2010
Hycroft
Res & Dev Inc
NMC1035925
Pershing
OSC
66
10/31/2010
Hycroft
Res & Dev Inc
NMC1035926
Pershing
OSC
67
11/1/2010
Hycroft
Res & Dev Inc
NMC1035927
Pershing
OSC
68
11/1/2010
Hycroft
Res & Dev Inc
NMC1035928
Pershing
OSC
69
11/1/2010
Hycroft
Res & Dev Inc
NMC1035929
Pershing
OSC
70
11/1/2010
Hycroft
Res & Dev Inc
NMC1035930
Pershing
OSC
71
11/1/2010
Hycroft
Res & Dev Inc
NMC1035931
Pershing
OSC
72
11/1/2010
Hycroft
Res & Dev Inc
NMC1035932
Pershing
OSC
73
11/1/2010
Hycroft
Res & Dev Inc
NMC1035933
Pershing
OSC
74
11/1/2010
Hycroft
Res & Dev Inc
NMC1035934
Pershing
OSC
75
11/1/2010
Hycroft
Res & Dev Inc
NMC1035935
Pershing
OSC
76
11/1/2010
Hycroft
Res & Dev Inc
NMC1035936
Pershing
RMK
1
9/27/2012
Hycroft
Res & Dev Inc
NMC1078774
Pershing
RMK
10
9/27/2012
Hycroft
Res & Dev Inc
NMC1078783
Pershing
RMK
11
9/27/2012
Hycroft
Res & Dev Inc
NMC1078784
Pershing
RMK
12
9/27/2012
Hycroft
Res & Dev Inc
NMC1078785
Pershing
RMK
13
9/27/2012
Hycroft
Res & Dev Inc
NMC1078786
Pershing
RMK
14
9/27/2012
Hycroft
Res & Dev Inc
NMC1078787
Pershing
RMK
15
9/27/2012
Hycroft
Res & Dev Inc
NMC1078788
Pershing
RMK
16
9/27/2012
Hycroft
Res & Dev Inc
NMC1078789
Pershing
RMK
17
9/27/2012
Hycroft
Res & Dev Inc
NMC1078790
Pershing
RMK
18
9/27/2012
Hycroft
Res & Dev Inc
NMC1078791
Pershing
RMK
19
9/27/2012
Hycroft
Res & Dev Inc
NMC1078792
Pershing
RMK
2
9/27/2012
Hycroft
Res & Dev Inc
NMC1078775
Pershing
RMK
3
9/27/2012
Hycroft
Res & Dev Inc
NMC1078776
Pershing
RMK
4
9/27/2012
Hycroft
Res & Dev Inc
NMC1078777
Pershing
RMK
5
9/27/2012
Hycroft
Res & Dev Inc
NMC1078778
Pershing
Hycroft Mine Project
Page 324
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
RMK
6
9/27/2012
Hycroft
Res & Dev Inc
NMC1078779
Pershing
RMK
7
9/27/2012
Hycroft
Res & Dev Inc
NMC1078780
Pershing
RMK
8
9/27/2012
Hycroft
Res & Dev Inc
NMC1078781
Pershing
RMK
9
9/27/2012
Hycroft
Res & Dev Inc
NMC1078782
Pershing
WCR
100
7/25/2012
Hycroft
Res & Dev Inc
NMC1076520
Pershing
WCR
101
7/25/2012
Hycroft
Res & Dev Inc
NMC1076521
Pershing
WCR
102
7/25/2012
Hycroft
Res & Dev Inc
NMC1076522
Pershing
WCR
103
7/26/2012
Hycroft
Res & Dev Inc
NMC1076523
Pershing
WCR
104
7/26/2012
Hycroft
Res & Dev Inc
NMC1076524
Pershing
WCR
105
7/26/2012
Hycroft
Res & Dev Inc
NMC1076525
Pershing
WCR
106
7/26/2012
Hycroft
Res & Dev Inc
NMC1076526
Pershing
WCR
107
7/26/2012
Hycroft
Res & Dev Inc
NMC1076527
Pershing
WCR
108
7/26/2012
Hycroft
Res & Dev Inc
NMC1076528
Pershing
WCR
109
7/25/2012
Hycroft
Res & Dev Inc
NMC1076529
Pershing
WCR
11
7/26/2012
Hycroft
Res & Dev Inc
NMC1076453
Pershing
WCR
110
7/25/2012
Hycroft
Res & Dev Inc
NMC1076530
Pershing
WCR
111
7/25/2012
Hycroft
Res & Dev Inc
NMC1076531
Pershing
WCR
112
7/25/2012
Hycroft
Res & Dev Inc
NMC1076532
Pershing
WCR
113
7/25/2012
Hycroft
Res & Dev Inc
NMC1076533
Pershing
WCR
114
7/25/2012
Hycroft
Res & Dev Inc
NMC1076534
Pershing
WCR
115
7/25/2012
Hycroft
Res & Dev Inc
NMC1076535
Pershing
WCR
116
7/25/2012
Hycroft
Res & Dev Inc
NMC1076536
Pershing
WCR
117
7/25/2012
Hycroft
Res & Dev Inc
NMC1076537
Pershing
WCR
12
7/26/2012
Hycroft
Res & Dev Inc
NMC1076454
Pershing
WCR
13
7/26/2012
Hycroft
Res & Dev Inc
NMC1076455
Pershing
WCR
14
7/26/2012
Hycroft
Res & Dev Inc
NMC1076456
Pershing
WCR
15
7/26/2012
Hycroft
Res & Dev Inc
NMC1076457
Pershing
WCR
16
7/26/2012
Hycroft
Res & Dev Inc
NMC1076458
Pershing
WCR
17
7/26/2012
Hycroft
Res & Dev Inc
NMC1076459
Pershing
WCR
18
7/26/2012
Hycroft
Res & Dev Inc
NMC1076460
Pershing
WCR
19
7/26/2012
Hycroft
Res & Dev Inc
NMC1076461
Pershing
WCR
20
7/26/2012
Hycroft
Res & Dev Inc
NMC1076462
Pershing
WCR
21
7/26/2012
Hycroft
Res & Dev Inc
NMC1076463
Pershing
WCR
22
7/26/2012
Hycroft
Res & Dev Inc
NMC1076464
Pershing
WCR
23
7/26/2012
Hycroft
Res & Dev Inc
NMC1076465
Pershing
WCR
24
7/26/2012
Hycroft
Res & Dev Inc
NMC1076466
Pershing
WCR
25
7/26/2012
Hycroft
Res & Dev Inc
NMC1076467
Pershing
WCR
26
7/26/2012
Hycroft
Res & Dev Inc
NMC1076468
Pershing
WCR
27
7/26/2012
Hycroft
Res & Dev Inc
NMC1076469
Pershing
WCR
28
7/26/2012
Hycroft
Res & Dev Inc
NMC1076470
Pershing
WCR
29
7/26/2012
Hycroft
Res & Dev Inc
NMC1076471
Pershing
WCR
30
7/26/2012
Hycroft
Res & Dev Inc
NMC1076472
Pershing
WCR
31
7/26/2012
Hycroft
Res & Dev Inc
NMC1076473
Pershing
WCR
32
7/26/2012
Hycroft
Res & Dev Inc
NMC1076474
Pershing
WCR
33
7/26/2012
Hycroft
Res & Dev Inc
NMC1076475
Pershing
WCR
34
7/26/2012
Hycroft
Res & Dev Inc
NMC1076476
Pershing
WCR
35
7/26/2012
Hycroft
Res & Dev Inc
NMC1076477
Pershing
WCR
36
7/26/2012
Hycroft
Res & Dev Inc
NMC1076478
Pershing
Hycroft Mine Project
Page 325
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
WCR
47
7/25/2012
Hycroft
Res & Dev Inc
NMC1076479
Pershing
WCR
48
7/25/2012
Hycroft
Res & Dev Inc
NMC1076480
Pershing
WCR
49
7/25/2012
Hycroft
Res & Dev Inc
NMC1076481
Pershing
WCR
50
7/25/2012
Hycroft
Res & Dev Inc
NMC1076482
Pershing
WCR
51
7/25/2012
Hycroft
Res & Dev Inc
NMC1076483
Pershing
WCR
52
7/25/2012
Hycroft
Res & Dev Inc
NMC1076484
Pershing
WCR
53
7/25/2012
Hycroft
Res & Dev Inc
NMC1076485
Pershing
WCR
54
7/25/2012
Hycroft
Res & Dev Inc
NMC1076486
Pershing
WCR
55
7/25/2012
Hycroft
Res & Dev Inc
NMC1076487
Pershing
WCR
56
7/25/2012
Hycroft
Res & Dev Inc
NMC1076488
Pershing
WCR
57
7/25/2012
Hycroft
Res & Dev Inc
NMC1076489
Pershing
WCR
58
7/25/2012
Hycroft
Res & Dev Inc
NMC1076490
Pershing
WCR
59
7/25/2012
Hycroft
Res & Dev Inc
NMC1076491
Pershing
WCR
60
7/25/2012
Hycroft
Res & Dev Inc
NMC1076492
Pershing
WCR
61
7/25/2012
Hycroft
Res & Dev Inc
NMC1076493
Pershing
WCR
62
7/25/2012
Hycroft
Res & Dev Inc
NMC1076494
Pershing
WCR
63
7/25/2012
Hycroft
Res & Dev Inc
NMC1076495
Pershing
WCR
64
7/25/2012
Hycroft
Res & Dev Inc
NMC1076496
Pershing
WCR
65
7/25/2012
Hycroft
Res & Dev Inc
NMC1076497
Pershing
WCR
66
7/25/2012
Hycroft
Res & Dev Inc
NMC1076498
Pershing
WCR
67
7/25/2012
Hycroft
Res & Dev Inc
NMC1076499
Pershing
WCR
68
7/25/2012
Hycroft
Res & Dev Inc
NMC1076500
Pershing
WCR
69
7/25/2012
Hycroft
Res & Dev Inc
NMC1076501
Pershing
WCR
70
7/25/2012
Hycroft
Res & Dev Inc
NMC1076502
Pershing
WCR
71
7/25/2012
Hycroft
Res & Dev Inc
NMC1076503
Pershing
WCR
72
7/25/2012
Hycroft
Res & Dev Inc
NMC1076504
Pershing
WCR
73
7/25/2012
Hycroft
Res & Dev Inc
NMC1076505
Pershing
WCR
74
7/25/2012
Hycroft
Res & Dev Inc
NMC1076506
Pershing
WCR
75
7/25/2012
Hycroft
Res & Dev Inc
NMC1076507
Pershing
WCR
76
7/25/2012
Hycroft
Res & Dev Inc
NMC1076508
Pershing
WCR
77
7/25/2012
Hycroft
Res & Dev Inc
NMC1076509
Pershing
WCR
78
7/25/2012
Hycroft
Res & Dev Inc
NMC1076510
Pershing
WCR
79
7/25/2012
Hycroft
Res & Dev Inc
NMC1076511
Pershing
WCR
80
7/25/2012
Hycroft
Res & Dev Inc
NMC1076512
Pershing
WCR
81
7/25/2012
Hycroft
Res & Dev Inc
NMC1076513
Pershing
WCR
82
7/25/2012
Hycroft
Res & Dev Inc
NMC1076514
Pershing
WCR
83
7/25/2012
Hycroft
Res & Dev Inc
NMC1076515
Pershing
WCR
84
7/25/2012
Hycroft
Res & Dev Inc
NMC1076516
Pershing
WCR
97
7/25/2012
Hycroft
Res & Dev Inc
NMC1076517
Pershing
WCR
98
7/25/2012
Hycroft
Res & Dev Inc
NMC1076518
Pershing
WCR
99
7/25/2012
Hycroft
Res & Dev Inc
NMC1076519
Pershing
CKC#8
9/6/1973
Crofoot
Daniel M
NMC
88355
Pershing
CKC#9
9/6/1973
Crofoot
Daniel M
NMC
88356
Pershing
FG
1
9/1/2006
Hycroft
Res & Dev Inc
NMC
939059
Pershing
FG
10
9/11/2006
Hycroft
Res & Dev Inc
NMC
939068
Pershing
FG
100
9/2/2006
Hycroft
Res & Dev Inc
NMC
939157
Pershing
FG
101
9/2/2006
Hycroft
Res & Dev Inc
NMC
939158
Pershing
FG
102
9/2/2006
Hycroft
Res & Dev Inc
NMC
939159
Pershing
Hycroft Mine Project
Page 326
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
FG
103
9/2/2006
Hycroft
Res & Dev Inc
NMC
939160
Pershing
FG
104
9/2/2006
Hycroft
Res & Dev Inc
NMC
939161
Pershing
FG
105
9/2/2006
Hycroft
Res & Dev Inc
NMC
939162
Pershing
FG
106
9/2/2006
Hycroft
Res & Dev Inc
NMC
939163
Pershing
FG
107
9/2/2006
Hycroft
Res & Dev Inc
NMC
939164
Pershing
FG
108
9/2/2006
Hycroft
Res & Dev Inc
NMC
939165
Pershing
FG
109
9/2/2006
Hycroft
Res & Dev Inc
NMC
939166
Pershing
FG
11
9/11/2006
Hycroft
Res & Dev Inc
NMC
939069
Pershing
FG
110
9/2/2006
Hycroft
Res & Dev Inc
NMC
939167
Pershing
FG
111
9/2/2006
Hycroft
Res & Dev Inc
NMC
939168
Pershing
FG
112
9/2/2006
Hycroft
Res & Dev Inc
NMC
939169
Pershing
FG
113
9/8/2006
Hycroft
Res & Dev Inc
NMC
939170
Pershing
FG
114
9/8/2006
Hycroft
Res & Dev Inc
NMC
939171
Pershing
FG
115
9/8/2006
Hycroft
Res & Dev Inc
NMC
939172
Pershing
FG
116
9/8/2006
Hycroft
Res & Dev Inc
NMC
939173
Pershing
FG
12
9/11/2006
Hycroft
Res & Dev Inc
NMC
939070
Pershing
FG
121
9/9/2006
Hycroft
Res & Dev Inc
NMC
939174
Pershing
FG
122
9/9/2006
Hycroft
Res & Dev Inc
NMC
939175
Pershing
FG
123
9/9/2006
Hycroft
Res & Dev Inc
NMC
939176
Pershing
FG
124
9/9/2006
Hycroft
Res & Dev Inc
NMC
939177
Pershing
FG
125
9/9/2006
Hycroft
Res & Dev Inc
NMC
939178
Pershing
FG
126
9/9/2006
Hycroft
Res & Dev Inc
NMC
939179
Pershing
FG
127
9/9/2006
Hycroft
Res & Dev Inc
NMC
939180
Pershing
FG
13
9/1/2006
Hycroft
Res & Dev Inc
NMC
939071
Pershing
FG
130
9/11/2006
Hycroft
Res & Dev Inc
NMC
939181
Pershing
FG
131
9/11/2006
Hycroft
Res & Dev Inc
NMC
939182
Pershing
FG
132
9/11/2006
Hycroft
Res & Dev Inc
NMC
939183
Pershing
FG
133
9/11/2006
Hycroft
Res & Dev Inc
NMC
939184
Pershing
FG
134
9/11/2006
Hycroft
Res & Dev Inc
NMC
939185
Pershing
FG
135
9/11/2006
Hycroft
Res & Dev Inc
NMC
939186
Pershing
FG
136
9/11/2006
Hycroft
Res & Dev Inc
NMC
939187
Pershing
FG
137
9/2/2006
Hycroft
Res & Dev Inc
NMC
939188
Pershing
FG
138
9/2/2006
Hycroft
Res & Dev Inc
NMC
939189
Pershing
FG
139
9/2/2006
Hycroft
Res & Dev Inc
NMC
939190
Pershing
FG
14
9/1/2006
Hycroft
Res & Dev Inc
NMC
939072
Pershing
FG
140
9/2/2006
Hycroft
Res & Dev Inc
NMC
939191
Pershing
FG
141
9/2/2006
Hycroft
Res & Dev Inc
NMC
939192
Pershing
FG
142
9/2/2006
Hycroft
Res & Dev Inc
NMC
939193
Pershing
FG
143
9/2/2006
Hycroft
Res & Dev Inc
NMC
939194
Pershing
FG
144
9/2/2006
Hycroft
Res & Dev Inc
NMC
939195
Pershing
FG
145
9/2/2006
Hycroft
Res & Dev Inc
NMC
939196
Pershing
FG
146
9/2/2006
Hycroft
Res & Dev Inc
NMC
939197
Pershing
FG
147
9/2/2006
Hycroft
Res & Dev Inc
NMC
939198
Pershing
FG
148
9/2/2006
Hycroft
Res & Dev Inc
NMC
939199
Pershing
FG
149
9/2/2006
Hycroft
Res & Dev Inc
NMC
939200
Pershing
FG
15
9/1/2006
Hycroft
Res & Dev Inc
NMC
939073
Pershing
FG
150
9/2/2006
Hycroft
Res & Dev Inc
NMC
939201
Pershing
FG
151
9/2/2006
Hycroft
Res & Dev Inc
NMC
939202
Pershing
Hycroft Mine Project
Page 327
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
FG
152
9/2/2006
Hycroft
Res & Dev Inc
NMC
939203
Pershing
FG
153
9/2/2006
Hycroft
Res & Dev Inc
NMC
939204
Pershing
FG
154
9/2/2006
Hycroft
Res & Dev Inc
NMC
939205
Pershing
FG
155
9/2/2006
Hycroft
Res & Dev Inc
NMC
939206
Pershing
FG
156
9/8/2006
Hycroft
Res & Dev Inc
NMC
939207
Pershing
FG
157
9/8/2006
Hycroft
Res & Dev Inc
NMC
939208
Pershing
FG
158
9/8/2006
Hycroft
Res & Dev Inc
NMC
939209
Pershing
FG
159
9/8/2006
Hycroft
Res & Dev Inc
NMC
939210
Pershing
FG
16
9/1/2006
Hycroft
Res & Dev Inc
NMC
939074
Pershing
FG
160
9/8/2006
Hycroft
Res & Dev Inc
NMC
939211
Pershing
FG
161
9/8/2006
Hycroft
Res & Dev Inc
NMC
939212
Pershing
FG
162
9/8/2006
Hycroft
Res & Dev Inc
NMC
939213
Pershing
FG
164
9/8/2006
Hycroft
Res & Dev Inc
NMC
939214
Pershing
FG
165
9/8/2006
Hycroft
Res & Dev Inc
NMC
939215
Pershing
FG
166
9/8/2006
Hycroft
Res & Dev Inc
NMC
939216
Pershing
FG
167
9/8/2006
Hycroft
Res & Dev Inc
NMC
939217
Pershing
FG
17
9/1/2006
Hycroft
Res & Dev Inc
NMC
939075
Pershing
FG
173
9/11/2006
Hycroft
Res & Dev Inc
NMC
939218
Pershing
FG
174
9/11/2006
Hycroft
Res & Dev Inc
NMC
939219
Pershing
FG
175
9/11/2006
Hycroft
Res & Dev Inc
NMC
939220
Pershing
FG
176
9/11/2006
Hycroft
Res & Dev Inc
NMC
939221
Pershing
FG
177
9/11/2006
Hycroft
Res & Dev Inc
NMC
939222
Pershing
FG
178
9/11/2006
Hycroft
Res & Dev Inc
NMC
939223
Pershing
FG
179
9/11/2006
Hycroft
Res & Dev Inc
NMC
939224
Pershing
FG
18
9/1/2006
Hycroft
Res & Dev Inc
NMC
939076
Pershing
FG
180
9/2/2006
Hycroft
Res & Dev Inc
NMC
939225
Pershing
FG
181
9/2/2006
Hycroft
Res & Dev Inc
NMC
939226
Pershing
FG
182
9/2/2006
Hycroft
Res & Dev Inc
NMC
939227
Pershing
FG
183
9/2/2006
Hycroft
Res & Dev Inc
NMC
939228
Pershing
FG
184
9/2/2006
Hycroft
Res & Dev Inc
NMC
939229
Pershing
FG
185
9/2/2006
Hycroft
Res & Dev Inc
NMC
939230
Pershing
FG
186
9/2/2006
Hycroft
Res & Dev Inc
NMC
939231
Pershing
FG
187
9/2/2006
Hycroft
Res & Dev Inc
NMC
939232
Pershing
FG
188
9/2/2006
Hycroft
Res & Dev Inc
NMC
939233
Pershing
FG
189
9/2/2006
Hycroft
Res & Dev Inc
NMC
939234
Pershing
FG
19
9/1/2006
Hycroft
Res & Dev Inc
NMC
939077
Pershing
FG
190
9/2/2006
Hycroft
Res & Dev Inc
NMC
939235
Pershing
FG
191
9/2/2006
Hycroft
Res & Dev Inc
NMC
939236
Pershing
FG
192
9/2/2006
Hycroft
Res & Dev Inc
NMC
939237
Pershing
FG
193
9/2/2006
Hycroft
Res & Dev Inc
NMC
939238
Pershing
FG
194
9/2/2006
Hycroft
Res & Dev Inc
NMC
939239
Pershing
FG
195
9/2/2006
Hycroft
Res & Dev Inc
NMC
939240
Pershing
FG
196
9/2/2006
Hycroft
Res & Dev Inc
NMC
939241
Pershing
FG
197
9/2/2006
Hycroft
Res & Dev Inc
NMC
939242
Pershing
FG
198
9/8/2006
Hycroft
Res & Dev Inc
NMC
939243
Pershing
FG
199
9/8/2006
Hycroft
Res & Dev Inc
NMC
939244
Pershing
FG
2
9/1/2006
Hycroft
Res & Dev Inc
NMC
939060
Pershing
FG
20
9/1/2006
Hycroft
Res & Dev Inc
NMC
939078
Pershing
Hycroft Mine Project
Page 328
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
FG
200
9/8/2006
Hycroft
Res & Dev Inc
NMC
939245
Pershing
FG
201
9/8/2006
Hycroft
Res & Dev Inc
NMC
939246
Pershing
FG
202
9/8/2006
Hycroft
Res & Dev Inc
NMC
939247
Pershing
FG
21
9/1/2006
Hycroft
Res & Dev Inc
NMC
939079
Pershing
FG
215
9/11/2006
Hycroft
Res & Dev Inc
NMC
939248
Pershing
FG
216
9/11/2006
Hycroft
Res & Dev Inc
NMC
939249
Pershing
FG
217
9/11/2006
Hycroft
Res & Dev Inc
NMC
939250
Pershing
FG
218
9/11/2006
Hycroft
Res & Dev Inc
NMC
939251
Pershing
FG
219
9/11/2006
Hycroft
Res & Dev Inc
NMC
939252
Pershing
FG
22
9/1/2006
Hycroft
Res & Dev Inc
NMC
939080
Pershing
FG
220
9/11/2006
Hycroft
Res & Dev Inc
NMC
939253
Pershing
FG
221
9/11/2006
Hycroft
Res & Dev Inc
NMC
939254
Pershing
FG
222
9/11/2006
Hycroft
Res & Dev Inc
NMC
939255
Pershing
FG
227
9/2/2006
Hycroft
Res & Dev Inc
NMC
939260
Pershing
FG
228
9/2/2006
Hycroft
Res & Dev Inc
NMC
939261
Pershing
FG
229
9/2/2006
Hycroft
Res & Dev Inc
NMC
939262
Pershing
FG
23
9/11/2006
Hycroft
Res & Dev Inc
NMC
939081
Pershing
FG
230
9/2/2006
Hycroft
Res & Dev Inc
NMC
939263
Pershing
FG
231
9/2/2006
Hycroft
Res & Dev Inc
NMC
939264
Pershing
FG
232
9/2/2006
Hycroft
Res & Dev Inc
NMC
939265
Pershing
FG
233
9/2/2006
Hycroft
Res & Dev Inc
NMC
939266
Pershing
FG
234
9/2/2006
Hycroft
Res & Dev Inc
NMC
939267
Pershing
FG
235
9/2/2006
Hycroft
Res & Dev Inc
NMC
939268
Pershing
FG
236
9/2/2006
Hycroft
Res & Dev Inc
NMC
939269
Pershing
FG
237
9/2/2006
Hycroft
Res & Dev Inc
NMC
939270
Pershing
FG
238
9/2/2006
Hycroft
Res & Dev Inc
NMC
939271
Pershing
FG
239
9/2/2006
Hycroft
Res & Dev Inc
NMC
939272
Pershing
FG
24
9/11/2006
Hycroft
Res & Dev Inc
NMC
939082
Pershing
FG
240
9/2/2006
Hycroft
Res & Dev Inc
NMC
939273
Pershing
FG
241
9/2/2006
Hycroft
Res & Dev Inc
NMC
939274
Pershing
FG
242
9/2/2006
Hycroft
Res & Dev Inc
NMC
939275
Pershing
FG
243
9/2/2006
Hycroft
Res & Dev Inc
NMC
939276
Pershing
FG
244
9/2/2006
Hycroft
Res & Dev Inc
NMC
939277
Pershing
FG
245
9/8/2006
Hycroft
Res & Dev Inc
NMC
939278
Pershing
FG
246
9/8/2006
Hycroft
Res & Dev Inc
NMC
939279
Pershing
FG
247
9/8/2006
Hycroft
Res & Dev Inc
NMC
939280
Pershing
FG
248
9/8/2006
Hycroft
Res & Dev Inc
NMC
939281
Pershing
FG
249
9/8/2006
Hycroft
Res & Dev Inc
NMC
939282
Pershing
FG
25
9/11/2006
Hycroft
Res & Dev Inc
NMC
939083
Pershing
FG
26
9/11/2006
Hycroft
Res & Dev Inc
NMC
939084
Pershing
FG
262
9/11/2006
Hycroft
Res & Dev Inc
NMC
939283
Pershing
FG
263
9/11/2006
Hycroft
Res & Dev Inc
NMC
939284
Pershing
FG
264
9/11/2006
Hycroft
Res & Dev Inc
NMC
939285
Pershing
FG
265
9/11/2006
Hycroft
Res & Dev Inc
NMC
939286
Pershing
FG
266
9/11/2006
Hycroft
Res & Dev Inc
NMC
939287
Pershing
FG
267
9/11/2006
Hycroft
Res & Dev Inc
NMC
939288
Pershing
FG
268
9/11/2006
Hycroft
Res & Dev Inc
NMC
939289
Pershing
FG
269
9/11/2006
Hycroft
Res & Dev Inc
NMC
939290
Pershing
Hycroft Mine Project
Page 329
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
FG
27
9/5/2006
Hycroft
Res & Dev Inc
NMC
939085
Pershing
FG
276
9/1/2006
Hycroft
Res & Dev Inc
NMC
939297
Pershing
FG
277
9/1/2006
Hycroft
Res & Dev Inc
NMC
939298
Pershing
FG
278
9/1/2006
Hycroft
Res & Dev Inc
NMC
939299
Pershing
FG
279
9/1/2006
Hycroft
Res & Dev Inc
NMC
939300
Pershing
FG
28
9/5/2006
Hycroft
Res & Dev Inc
NMC
939086
Pershing
FG
280
9/1/2006
Hycroft
Res & Dev Inc
NMC
939301
Pershing
FG
281
9/1/2006
Hycroft
Res & Dev Inc
NMC
939302
Pershing
FG
282
9/1/2006
Hycroft
Res & Dev Inc
NMC
939303
Pershing
FG
283
9/1/2006
Hycroft
Res & Dev Inc
NMC
939304
Pershing
FG
284
9/1/2006
Hycroft
Res & Dev Inc
NMC
939305
Pershing
FG
285
9/1/2006
Hycroft
Res & Dev Inc
NMC
939306
Pershing
FG
286
9/1/2006
Hycroft
Res & Dev Inc
NMC
939307
Pershing
FG
287
9/1/2006
Hycroft
Res & Dev Inc
NMC
939308
Pershing
FG
288
9/1/2006
Hycroft
Res & Dev Inc
NMC
939309
Pershing
FG
289
9/1/2006
Hycroft
Res & Dev Inc
NMC
939310
Pershing
FG
29
9/5/2006
Hycroft
Res & Dev Inc
NMC
939087
Pershing
FG
290
9/1/2006
Hycroft
Res & Dev Inc
NMC
939311
Pershing
FG
291
9/1/2006
Hycroft
Res & Dev Inc
NMC
939312
Pershing
FG
292
9/1/2006
Hycroft
Res & Dev Inc
NMC
939313
Pershing
FG
293
9/1/2006
Hycroft
Res & Dev Inc
NMC
939314
Pershing
FG
294
9/10/2006
Hycroft
Res & Dev Inc
NMC
939315
Pershing
FG
295
9/10/2006
Hycroft
Res & Dev Inc
NMC
939316
Pershing
FG
296
9/10/2006
Hycroft
Res & Dev Inc
NMC
939317
Pershing
FG
297
9/10/2006
Hycroft
Res & Dev Inc
NMC
939318
Pershing
FG
298
9/10/2006
Hycroft
Res & Dev Inc
NMC
939319
Pershing
FG
299
9/10/2006
Hycroft
Res & Dev Inc
NMC
939320
Pershing
FG
3
9/1/2006
Hycroft
Res & Dev Inc
NMC
939061
Pershing
FG
30
9/1/2006
Hycroft
Res & Dev Inc
NMC
939088
Pershing
FG
300
9/10/2006
Hycroft
Res & Dev Inc
NMC
939321
Pershing
FG
301
9/10/2006
Hycroft
Res & Dev Inc
NMC
939322
Pershing
FG
302
9/10/2006
Hycroft
Res & Dev Inc
NMC
939323
Pershing
FG
31
9/1/2006
Hycroft
Res & Dev Inc
NMC
939089
Pershing
FG
311
9/10/2006
Hycroft
Res & Dev Inc
NMC
939324
Pershing
FG
312
9/10/2006
Hycroft
Res & Dev Inc
NMC
939325
Pershing
FG
313
9/10/2006
Hycroft
Res & Dev Inc
NMC
939326
Pershing
FG
314
9/10/2006
Hycroft
Res & Dev Inc
NMC
939327
Pershing
FG
315
9/10/2006
Hycroft
Res & Dev Inc
NMC
939328
Pershing
FG
316
9/10/2006
Hycroft
Res & Dev Inc
NMC
939329
Pershing
FG
317
9/10/2006
Hycroft
Res & Dev Inc
NMC
939330
Pershing
FG
318
9/10/2006
Hycroft
Res & Dev Inc
NMC
939331
Pershing
FG
32
9/1/2006
Hycroft
Res & Dev Inc
NMC
939090
Pershing
FG
325
9/1/2006
Hycroft
Res & Dev Inc
NMC
939338
Pershing
FG
326
9/1/2006
Hycroft
Res & Dev Inc
NMC
939339
Pershing
FG
327
9/1/2006
Hycroft
Res & Dev Inc
NMC
939340
Pershing
FG
328
9/1/2006
Hycroft
Res & Dev Inc
NMC
939341
Pershing
FG
329
9/1/2006
Hycroft
Res & Dev Inc
NMC
939342
Pershing
Hycroft Mine Project
Page 330
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
FG
33
9/1/2006
Hycroft
Res & Dev Inc
NMC
939091
Pershing
FG
330
9/1/2006
Hycroft
Res & Dev Inc
NMC
939343
Pershing
FG
331
9/1/2006
Hycroft
Res & Dev Inc
NMC
939344
Pershing
FG
332
9/1/2006
Hycroft
Res & Dev Inc
NMC
939345
Pershing
FG
333
9/1/2006
Hycroft
Res & Dev Inc
NMC
939346
Pershing
FG
334
9/1/2006
Hycroft
Res & Dev Inc
NMC
939347
Pershing
FG
335
9/1/2006
Hycroft
Res & Dev Inc
NMC
939348
Pershing
FG
336
9/1/2006
Hycroft
Res & Dev Inc
NMC
939349
Pershing
FG
337
9/1/2006
Hycroft
Res & Dev Inc
NMC
939350
Pershing
FG
338
9/1/2006
Hycroft
Res & Dev Inc
NMC
939351
Pershing
FG
339
9/1/2006
Hycroft
Res & Dev Inc
NMC
939352
Pershing
FG
34
9/1/2006
Hycroft
Res & Dev Inc
NMC
939092
Pershing
FG
340
9/1/2006
Hycroft
Res & Dev Inc
NMC
939353
Pershing
FG
341
9/1/2006
Hycroft
Res & Dev Inc
NMC
939354
Pershing
FG
342
9/1/2006
Hycroft
Res & Dev Inc
NMC
939355
Pershing
FG
343
9/10/2006
Hycroft
Res & Dev Inc
NMC
939356
Pershing
FG
344
9/10/2006
Hycroft
Res & Dev Inc
NMC
939357
Pershing
FG
345
9/10/2006
Hycroft
Res & Dev Inc
NMC
939358
Pershing
FG
346
9/10/2006
Hycroft
Res & Dev Inc
NMC
939359
Pershing
FG
347
9/10/2006
Hycroft
Res & Dev Inc
NMC
939360
Pershing
FG
349
9/10/2006
Hycroft
Res & Dev Inc
NMC
939362
Pershing
FG
35
9/1/2006
Hycroft
Res & Dev Inc
NMC
939093
Pershing
FG
350
9/10/2006
Hycroft
Res & Dev Inc
NMC
939363
Pershing
FG
351
9/10/2006
Hycroft
Res & Dev Inc
NMC
939364
Pershing
FG
36
9/1/2006
Hycroft
Res & Dev Inc
NMC
939094
Pershing
FG
360
9/10/2006
Hycroft
Res & Dev Inc
NMC
939365
Pershing
FG
361
9/10/2006
Hycroft
Res & Dev Inc
NMC
939366
Pershing
FG
362
9/10/2006
Hycroft
Res & Dev Inc
NMC
939367
Pershing
FG
363
9/10/2006
Hycroft
Res & Dev Inc
NMC
939368
Pershing
FG
364
9/10/2006
Hycroft
Res & Dev Inc
NMC
939369
Pershing
FG
365
9/10/2006
Hycroft
Res & Dev Inc
NMC
939370
Pershing
FG
366
9/10/2006
Hycroft
Res & Dev Inc
NMC
939371
Pershing
FG
367
9/10/2006
Hycroft
Res & Dev Inc
NMC
939372
Pershing
FG
37
9/1/2006
Hycroft
Res & Dev Inc
NMC
939095
Pershing
FG
378
9/1/2006
Hycroft
Res & Dev Inc
NMC
939383
Pershing
FG
379
9/1/2006
Hycroft
Res & Dev Inc
NMC
939384
Pershing
FG
380
9/1/2006
Hycroft
Res & Dev Inc
NMC
939385
Pershing
FG
381
9/1/2006
Hycroft
Res & Dev Inc
NMC
939386
Pershing
FG
382
9/1/2006
Hycroft
Res & Dev Inc
NMC
939387
Pershing
FG
383
9/1/2006
Hycroft
Res & Dev Inc
NMC
939388
Pershing
FG
384
9/1/2006
Hycroft
Res & Dev Inc
NMC
939389
Pershing
FG
385
9/1/2006
Hycroft
Res & Dev Inc
NMC
939390
Pershing
FG
386
9/1/2006
Hycroft
Res & Dev Inc
NMC
939391
Pershing
FG
387
9/1/2006
Hycroft
Res & Dev Inc
NMC
939392
Pershing
FG
388
9/1/2006
Hycroft
Res & Dev Inc
NMC
939393
Pershing
FG
389
9/1/2006
Hycroft
Res & Dev Inc
NMC
939394
Pershing
FG
39
9/1/2006
Hycroft
Res & Dev Inc
NMC
939097
Pershing
FG
390
9/1/2006
Hycroft
Res & Dev Inc
NMC
939395
Pershing
FG
391
9/1/2006
Hycroft
Res & Dev Inc
NMC
939396
Pershing
Hycroft Mine Project
Page 331
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
FG
392
9/1/2006
Hycroft
Res & Dev Inc
NMC
939397
Pershing
FG
393
9/1/2006
Hycroft
Res & Dev Inc
NMC
939398
Pershing
FG
394
9/1/2006
Hycroft
Res & Dev Inc
NMC
939399
Pershing
FG
395
9/1/2006
Hycroft
Res & Dev Inc
NMC
939400
Pershing
FG
396
9/10/2006
Hycroft
Res & Dev Inc
NMC
939401
Pershing
FG
397
9/10/2006
Hycroft
Res & Dev Inc
NMC
939402
Pershing
FG
398
9/10/2006
Hycroft
Res & Dev Inc
NMC
939403
Pershing
FG
399
9/10/2006
Hycroft
Res & Dev Inc
NMC
939404
Pershing
FG
4
9/1/2006
Hycroft
Res & Dev Inc
NMC
939062
Pershing
FG
40
9/11/2006
Hycroft
Res & Dev Inc
NMC
939098
Pershing
FG
400
9/10/2006
Hycroft
Res & Dev Inc
NMC
939405
Pershing
FG
401
9/10/2006
Hycroft
Res & Dev Inc
NMC
939406
Pershing
FG
402
9/10/2006
Hycroft
Res & Dev Inc
NMC
939407
Pershing
FG
403
9/10/2006
Hycroft
Res & Dev Inc
NMC
939408
Pershing
FG
404
9/10/2006
Hycroft
Res & Dev Inc
NMC
939409
Pershing
FG
405
9/10/2006
Hycroft
Res & Dev Inc
NMC
939410
Pershing
FG
406
9/10/2006
Hycroft
Res & Dev Inc
NMC
939411
Pershing
FG
407
9/10/2006
Hycroft
Res & Dev Inc
NMC
939412
Pershing
FG
408
9/10/2006
Hycroft
Res & Dev Inc
NMC
939413
Pershing
FG
409
9/10/2006
Hycroft
Res & Dev Inc
NMC
939414
Pershing
FG
41
9/11/2006
Hycroft
Res & Dev Inc
NMC
939099
Pershing
FG
410
9/10/2006
Hycroft
Res & Dev Inc
NMC
939415
Pershing
FG
411
9/10/2006
Hycroft
Res & Dev Inc
NMC
939416
Pershing
FG
412
9/10/2006
Hycroft
Res & Dev Inc
NMC
939417
Pershing
FG
413
9/10/2006
Hycroft
Res & Dev Inc
NMC
939418
Pershing
FG
414
9/10/2006
Hycroft
Res & Dev Inc
NMC
939419
Pershing
FG
415
9/10/2006
Hycroft
Res & Dev Inc
NMC
939420
Pershing
FG
416
9/10/2006
Hycroft
Res & Dev Inc
NMC
939421
Pershing
FG
417
9/10/2006
Hycroft
Res & Dev Inc
NMC
939422
Pershing
FG
418
9/10/2006
Hycroft
Res & Dev Inc
NMC
939423
Pershing
FG
419
9/10/2006
Hycroft
Res & Dev Inc
NMC
939424
Pershing
FG
42
9/11/2006
Hycroft
Res & Dev Inc
NMC
939100
Pershing
FG
420
9/10/2006
Hycroft
Res & Dev Inc
NMC
939425
Pershing
FG
43
9/11/2006
Hycroft
Res & Dev Inc
NMC
939101
Pershing
FG
434
9/1/2006
Hycroft
Res & Dev Inc
NMC
939439
Pershing
FG
435
9/1/2006
Hycroft
Res & Dev Inc
NMC
939440
Pershing
FG
436
9/1/2006
Hycroft
Res & Dev Inc
NMC
939441
Pershing
FG
437
9/1/2006
Hycroft
Res & Dev Inc
NMC
939442
Pershing
FG
438
9/1/2006
Hycroft
Res & Dev Inc
NMC
939443
Pershing
FG
439
9/1/2006
Hycroft
Res & Dev Inc
NMC
939444
Pershing
FG
44
9/2/2006
Hycroft
Res & Dev Inc
NMC
939102
Pershing
FG
440
9/1/2006
Hycroft
Res & Dev Inc
NMC
939445
Pershing
FG
441
9/1/2006
Hycroft
Res & Dev Inc
NMC
939446
Pershing
FG
442
9/1/2006
Hycroft
Res & Dev Inc
NMC
939447
Pershing
FG
443
9/1/2006
Hycroft
Res & Dev Inc
NMC
939448
Pershing
FG
444
9/1/2006
Hycroft
Res & Dev Inc
NMC
939449
Pershing
FG
445
9/1/2006
Hycroft
Res & Dev Inc
NMC
939450
Pershing
FG
446
9/1/2006
Hycroft
Res & Dev Inc
NMC
939451
Pershing
Hycroft Mine Project
Page 332
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
FG
447
9/1/2006
Hycroft
Res & Dev Inc
NMC
939452
Pershing
FG
448
9/1/2006
Hycroft
Res & Dev Inc
NMC
939453
Pershing
FG
449
9/1/2006
Hycroft
Res & Dev Inc
NMC
939454
Pershing
FG
45
9/2/2006
Hycroft
Res & Dev Inc
NMC
939103
Pershing
FG
450
9/1/2006
Hycroft
Res & Dev Inc
NMC
939455
Pershing
FG
451
9/1/2006
Hycroft
Res & Dev Inc
NMC
939456
Pershing
FG
452
9/10/2006
Hycroft
Res & Dev Inc
NMC
939457
Pershing
FG
453
9/10/2006
Hycroft
Res & Dev Inc
NMC
939458
Pershing
FG
454
9/10/2006
Hycroft
Res & Dev Inc
NMC
939459
Pershing
FG
455
9/10/2006
Hycroft
Res & Dev Inc
NMC
939460
Pershing
FG
456
9/10/2006
Hycroft
Res & Dev Inc
NMC
939461
Pershing
FG
457
9/10/2006
Hycroft
Res & Dev Inc
NMC
939462
Pershing
FG
458
9/10/2006
Hycroft
Res & Dev Inc
NMC
939463
Pershing
FG
459
9/10/2006
Hycroft
Res & Dev Inc
NMC
939464
Pershing
FG
46
9/2/2006
Hycroft
Res & Dev Inc
NMC
939104
Pershing
FG
460
9/10/2006
Hycroft
Res & Dev Inc
NMC
939465
Pershing
FG
461
9/10/2006
Hycroft
Res & Dev Inc
NMC
939466
Pershing
FG
462
9/10/2006
Hycroft
Res & Dev Inc
NMC
939467
Pershing
FG
463
9/10/2006
Hycroft
Res & Dev Inc
NMC
939468
Pershing
FG
464
9/10/2006
Hycroft
Res & Dev Inc
NMC
939469
Pershing
FG
465
9/10/2006
Hycroft
Res & Dev Inc
NMC
939470
Pershing
FG
466
9/10/2006
Hycroft
Res & Dev Inc
NMC
939471
Pershing
FG
467
9/10/2006
Hycroft
Res & Dev Inc
NMC
939472
Pershing
FG
468
9/10/2006
Hycroft
Res & Dev Inc
NMC
939473
Pershing
FG
469
9/10/2006
Hycroft
Res & Dev Inc
NMC
939474
Pershing
FG
47
9/2/2006
Hycroft
Res & Dev Inc
NMC
939105
Pershing
FG
470
9/10/2006
Hycroft
Res & Dev Inc
NMC
939475
Pershing
FG
471
9/10/2006
Hycroft
Res & Dev Inc
NMC
939476
Pershing
FG
472
9/10/2006
Hycroft
Res & Dev Inc
NMC
939477
Pershing
FG
473
9/10/2006
Hycroft
Res & Dev Inc
NMC
939478
Pershing
FG
474
9/10/2006
Hycroft
Res & Dev Inc
NMC
939479
Pershing
FG
475
9/10/2006
Hycroft
Res & Dev Inc
NMC
939480
Pershing
FG
476
9/10/2006
Hycroft
Res & Dev Inc
NMC
939481
Pershing
FG
477
9/11/2006
Hycroft
Res & Dev Inc
NMC
939482
Pershing
FG
478
9/11/2006
Hycroft
Res & Dev Inc
NMC
939483
Pershing
FG
479
9/11/2006
Hycroft
Res & Dev Inc
NMC
939484
Pershing
FG
48
9/2/2006
Hycroft
Res & Dev Inc
NMC
939106
Pershing
FG
480
9/11/2006
Hycroft
Res & Dev Inc
NMC
939485
Pershing
FG
481
9/11/2006
Hycroft
Res & Dev Inc
NMC
939486
Pershing
FG
482
9/11/2006
Hycroft
Res & Dev Inc
NMC
939487
Pershing
FG
483
9/11/2006
Hycroft
Res & Dev Inc
NMC
939488
Pershing
FG
484
9/11/2006
Hycroft
Res & Dev Inc
NMC
939489
Pershing
FG
485
9/11/2006
Hycroft
Res & Dev Inc
NMC
939490
Pershing
FG
486
9/11/2006
Hycroft
Res & Dev Inc
NMC
939491
Pershing
FG
487
9/11/2006
Hycroft
Res & Dev Inc
NMC
939492
Pershing
FG
488
9/11/2006
Hycroft
Res & Dev Inc
NMC
939493
Pershing
FG
489
9/11/2006
Hycroft
Res & Dev Inc
NMC
939494
Pershing
Hycroft Mine Project
Page 333
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
FG
49
9/2/2006
Hycroft
Res & Dev Inc
NMC
939107
Pershing
FG
490
9/11/2006
Hycroft
Res & Dev Inc
NMC
939495
Pershing
FG
491
9/9/2006
Hycroft
Res & Dev Inc
NMC
939496
Pershing
FG
492
9/11/2006
Hycroft
Res & Dev Inc
NMC
939497
Pershing
FG
493
9/11/2006
Hycroft
Res & Dev Inc
NMC
939498
Pershing
FG
494
9/11/2006
Hycroft
Res & Dev Inc
NMC
939499
Pershing
FG
495
9/11/2006
Hycroft
Res & Dev Inc
NMC
939500
Pershing
FG
496
9/9/2006
Hycroft
Res & Dev Inc
NMC
939501
Pershing
FG
497
9/11/2006
Hycroft
Res & Dev Inc
NMC
939502
Pershing
FG
498
9/11/2006
Hycroft
Res & Dev Inc
NMC
939503
Pershing
FG
499
9/11/2006
Hycroft
Res & Dev Inc
NMC
939504
Pershing
FG
5
9/1/2006
Hycroft
Res & Dev Inc
NMC
939063
Pershing
FG
50
9/2/2006
Hycroft
Res & Dev Inc
NMC
939108
Pershing
FG
500
9/11/2006
Hycroft
Res & Dev Inc
NMC
939505
Pershing
FG
51
9/2/2006
Hycroft
Res & Dev Inc
NMC
939109
Pershing
FG
52
9/2/2006
Hycroft
Res & Dev Inc
NMC
939110
Pershing
FG
53
9/8/2006
Hycroft
Res & Dev Inc
NMC
939111
Pershing
FG
54
9/8/2006
Hycroft
Res & Dev Inc
NMC
939112
Pershing
FG
55
9/8/2006
Hycroft
Res & Dev Inc
NMC
939113
Pershing
FG
56
9/9/2006
Hycroft
Res & Dev Inc
NMC
939114
Pershing
FG
57
9/9/2006
Hycroft
Res & Dev Inc
NMC
939115
Pershing
FG
58
9/9/2006
Hycroft
Res & Dev Inc
NMC
939116
Pershing
FG
59
9/9/2006
Hycroft
Res & Dev Inc
NMC
939117
Pershing
FG
6
9/1/2006
Hycroft
Res & Dev Inc
NMC
939064
Pershing
FG
60
9/9/2006
Hycroft
Res & Dev Inc
NMC
939118
Pershing
FG
61
9/9/2006
Hycroft
Res & Dev Inc
NMC
939119
Pershing
FG
62
9/9/2006
Hycroft
Res & Dev Inc
NMC
939120
Pershing
FG
63
9/9/2006
Hycroft
Res & Dev Inc
NMC
939121
Pershing
FG
64
9/9/2006
Hycroft
Res & Dev Inc
NMC
939122
Pershing
FG
65
9/9/2006
Hycroft
Res & Dev Inc
NMC
939123
Pershing
FG
66
9/9/2006
Hycroft
Res & Dev Inc
NMC
939124
Pershing
FG
67
9/9/2006
Hycroft
Res & Dev Inc
NMC
939125
Pershing
FG
68
9/9/2006
Hycroft
Res & Dev Inc
NMC
939126
Pershing
FG
69
9/9/2006
Hycroft
Res & Dev Inc
NMC
939127
Pershing
FG
7
9/1/2006
Hycroft
Res & Dev Inc
NMC
939065
Pershing
FG
70
9/2/2006
Hycroft
Res & Dev Inc
NMC
939128
Pershing
FG
71
9/2/2006
Hycroft
Res & Dev Inc
NMC
939129
Pershing
FG
73
9/2/2006
Hycroft
Res & Dev Inc
NMC
939131
Pershing
FG
74
9/2/2006
Hycroft
Res & Dev Inc
NMC
939132
Pershing
FG
75
9/2/2006
Hycroft
Res & Dev Inc
NMC
939133
Pershing
FG
76
9/2/2006
Hycroft
Res & Dev Inc
NMC
939134
Pershing
FG
77
9/2/2006
Hycroft
Res & Dev Inc
NMC
939135
Pershing
FG
78
9/2/2006
Hycroft
Res & Dev Inc
NMC
939136
Pershing
FG
79
9/2/2006
Hycroft
Res & Dev Inc
NMC
939137
Pershing
FG
8
9/1/2006
Hycroft
Res & Dev Inc
NMC
939066
Pershing
FG
80
9/2/2006
Hycroft
Res & Dev Inc
NMC
939138
Pershing
FG
81
9/2/2006
Hycroft
Res & Dev Inc
NMC
939139
Pershing
FG
82
9/8/2006
Hycroft
Res & Dev Inc
NMC
939140
Pershing
FG
84
9/8/2006
Hycroft
Res & Dev Inc
NMC
939141
Pershing
Hycroft Mine Project
Page 334
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
FG
85
9/9/2006
Hycroft
Res & Dev Inc
NMC
939142
Pershing
FG
86
9/9/2006
Hycroft
Res & Dev Inc
NMC
939143
Pershing
FG
87
9/9/2006
Hycroft
Res & Dev Inc
NMC
939144
Pershing
FG
88
9/9/2006
Hycroft
Res & Dev Inc
NMC
939145
Pershing
FG
89
9/9/2006
Hycroft
Res & Dev Inc
NMC
939146
Pershing
FG
9
9/11/2006
Hycroft
Res & Dev Inc
NMC
939067
Pershing
FG
90
9/9/2006
Hycroft
Res & Dev Inc
NMC
939147
Pershing
FG
91
9/9/2006
Hycroft
Res & Dev Inc
NMC
939148
Pershing
FG
92
9/9/2006
Hycroft
Res & Dev Inc
NMC
939149
Pershing
FG
93
9/9/2006
Hycroft
Res & Dev Inc
NMC
939150
Pershing
FG
94
9/9/2006
Hycroft
Res & Dev Inc
NMC
939151
Pershing
FG
95
9/9/2006
Hycroft
Res & Dev Inc
NMC
939152
Pershing
FG
96
9/9/2006
Hycroft
Res & Dev Inc
NMC
939153
Pershing
FG
97
9/9/2006
Hycroft
Res & Dev Inc
NMC
939154
Pershing
FG
98
9/9/2006
Hycroft
Res & Dev Inc
NMC
939155
Pershing
FG
99
9/2/2006
Hycroft
Res & Dev Inc
NMC
939156
Pershing
FG348
9/10/2006
Hycroft
Res & Dev Inc
NMC
939361
Pershing
FG38
9/1/2006
Hycroft
Res & Dev Inc
NMC
939096
Pershing
FG72
9/2/2006
Hycroft
Res & Dev Inc
NMC
939130
Pershing
Nadine
#1
1/20/2007
Hrdi
NMC
946619
Pershing
NC
100
8/13/2010
Hycroft
Res & Dev Inc
NMC1027938
Pershing
NC
101
8/13/2010
Hycroft
Res & Dev Inc
NMC1027939
Pershing
NC
18
8/13/2010
Hycroft
Res & Dev Inc
NMC1027856
Pershing
NC
19
8/13/2010
Hycroft
Res & Dev Inc
NMC1027857
Pershing
NC
20
8/13/2010
Hycroft
Res & Dev Inc
NMC1027858
Pershing
NC
21
8/13/2010
Hycroft
Res & Dev Inc
NMC1027859
Pershing
NC
22
8/13/2010
Hycroft
Res & Dev Inc
NMC1027860
Pershing
NC
23
8/13/2010
Hycroft
Res & Dev Inc
NMC1027861
Pershing
NC
24
8/13/2010
Hycroft
Res & Dev Inc
NMC1027862
Pershing
NC
25
8/13/2010
Hycroft
Res & Dev Inc
NMC1027863
Pershing
NC
26
8/13/2010
Hycroft
Res & Dev Inc
NMC1027864
Pershing
NC
27
8/13/2010
Hycroft
Res & Dev Inc
NMC1027865
Pershing
NC
28
8/13/2010
Hycroft
Res & Dev Inc
NMC1027866
Pershing
NC
29
8/13/2010
Hycroft
Res & Dev Inc
NMC1027867
Pershing
NC
30
8/13/2010
Hycroft
Res & Dev Inc
NMC1027868
Pershing
NC
51
8/13/2010
Hycroft
Res & Dev Inc
NMC1027889
Pershing
NC
52
8/13/2010
Hycroft
Res & Dev Inc
NMC1027890
Pershing
NC
53
8/13/2010
Hycroft
Res & Dev Inc
NMC1027891
Pershing
NC
54
8/13/2010
Hycroft
Res & Dev Inc
NMC1027892
Pershing
NC
55
8/13/2010
Hycroft
Res & Dev Inc
NMC1027893
Pershing
NC
56
8/13/2010
Hycroft
Res & Dev Inc
NMC1027894
Pershing
NC
57
8/13/2010
Hycroft
Res & Dev Inc
NMC1027895
Pershing
NC
58
8/13/2010
Hycroft
Res & Dev Inc
NMC1027896
Pershing
NC
59
8/13/2010
Hycroft
Res & Dev Inc
NMC1027897
Pershing
NC
60
8/13/2010
Hycroft
Res & Dev Inc
NMC1027898
Pershing
NC
61
8/13/2010
Hycroft
Res & Dev Inc
NMC1027899
Pershing
NC
62
8/13/2010
Hycroft
Res & Dev Inc
NMC1027900
Pershing
NC
63
8/13/2010
Hycroft
Res & Dev Inc
NMC1027901
Pershing
Hycroft Mine Project
Page 335
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
NC
64
8/13/2010
Hycroft
Res & Dev Inc
NMC1027902
Pershing
NC
65
8/13/2010
Hycroft
Res & Dev Inc
NMC1027903
Pershing
NC
66
8/13/2010
Hycroft
Res & Dev Inc
NMC1027904
Pershing
NC
67
8/13/2010
Hycroft
Res & Dev Inc
NMC1027905
Pershing
NC
68
8/13/2010
Hycroft
Res & Dev Inc
NMC1027906
Pershing
NC
92
8/13/2010
Hycroft
Res & Dev Inc
NMC1027930
Pershing
NC
93
8/13/2010
Hycroft
Res & Dev Inc
NMC1027931
Pershing
NC
94
8/13/2010
Hycroft
Res & Dev Inc
NMC1027932
Pershing
NC
95
8/13/2010
Hycroft
Res & Dev Inc
NMC1027933
Pershing
NC
96
8/13/2010
Hycroft
Res & Dev Inc
NMC1027934
Pershing
NC
97
8/13/2010
Hycroft
Res & Dev Inc
NMC1027935
Pershing
NC
98
8/13/2010
Hycroft
Res & Dev Inc
NMC1027936
Pershing
NC
99
8/13/2010
Hycroft
Res & Dev Inc
NMC1027937
Pershing
NFRA
10
11/8/2007
Victory
Exploration Inc.
NMC
977842
Pershing
NFRA
11
11/8/2007
Victory
Exploration Inc.
NMC
977843
Pershing
NFRA
21
11/8/2007
Victory
Exploration Inc.
NMC
977853
Pershing
NFRA
22
11/8/2007
Victory
Exploration Inc.
NMC
977854
Pershing
NFRA
25
11/8/2007
Victory
Exploration Inc.
NMC
977857
Pershing
NFRA
6
11/8/2007
Victory
Exploration Inc.
NMC
977838
Pershing
NFRA
7
11/8/2007
Victory
Exploration Inc.
NMC
977839
Pershing
NFRA
8
11/8/2007
Victory
Exploration Inc.
NMC
977840
Pershing
NFRA
9
11/8/2007
Victory
Exploration Inc.
NMC
977841
Pershing
RFG
#120
1/24/1980
Lewis
Frank W
NMC
141680
Pershing
RFG
#121
1/24/1980
Lewis
Frank W
NMC
141681
Pershing
RFG
#122
1/24/1980
Lewis
Frank W
NMC
141682
Pershing
RFG
#123
1/24/1980
Lewis
Frank W
NMC
141683
Pershing
RFG
#124
1/24/1980
Lewis
Frank W
NMC
141684
Pershing
RFG
#125
1/24/1980
Lewis
Frank W
NMC
141685
Pershing
RFG
#135
1/9/1980
Lewis
Frank W
NMC
141692
Pershing
RFG
#137
1/9/1980
Lewis
Frank W
NMC
141694
Pershing
RFG
#139
1/9/1980
Lewis
Frank W
NMC
141696
Pershing
RFG
#141
1/9/1980
Lewis
Frank W
NMC
141698
Pershing
RFG
#143
1/22/1980
Lewis
Frank W
NMC
141700
Pershing
RFG
#145
1/22/1980
Lewis
Frank W
NMC
141702
Pershing
RFG
#147
1/22/1980
Lewis
Frank W
NMC
141704
Pershing
RFG
#148
1/22/1980
Lewis
Frank W
NMC
141705
Pershing
RFG
#149
1/22/1980
Lewis
Frank W
NMC
141706
Pershing
RFG
#150
1/22/1980
Lewis
Frank W
NMC
141707
Pershing
RFG
#151
1/22/1980
Lewis
Frank W
NMC
141708
Pershing
RFG
#152
1/22/1980
Lewis
Frank W
NMC
141709
Pershing
RFG
#153
1/22/1980
Lewis
Frank W
NMC
141710
Pershing
RFG
#154
1/22/1980
Lewis
Frank W
NMC
141711
Pershing
RFG
#155
1/22/1980
Lewis
Frank W
NMC
141712
Pershing
RFG
#156
1/22/1980
Lewis
Frank W
NMC
141713
Pershing
RFG
#157
1/22/1980
Lewis
Frank W
NMC
141714
Pershing
RFG
#158
1/22/1980
Lewis
Frank W
NMC
141715
Pershing
RFG
#159
1/22/1980
Lewis
Frank W
NMC
141716
Pershing
RFG
#160
1/22/1980
Lewis
Frank W
NMC
141717
Pershing
Hycroft Mine Project
Page 336
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
RFG
#161
1/22/1980
Lewis
Frank W
NMC
141718
Pershing
RFG
#162
1/23/1980
Lewis
Frank W
NMC
141719
Pershing
RFG
#163
1/23/1980
Lewis
Frank W
NMC
141720
Pershing
RFG
#164
1/23/1980
Lewis
Frank W
NMC
141721
Pershing
RFG
#165
1/23/1980
Lewis
Frank W
NMC
141722
Pershing
RFG
#166
1/23/1980
Lewis
Frank W
NMC
141723
Pershing
RFG
#167
1/23/1980
Lewis
Frank W
NMC
141724
Pershing
RFG
#201A
12/28/1979
Lewis
Frank W
NMC
141726
Pershing
RFG
#202A
12/28/1979
Lewis
Frank W
NMC
141727
Pershing
RFG
#203A
12/28/1979
Lewis
Frank W
NMC
141728
Pershing
RFG
#204A
12/28/1979
Lewis
Frank W
NMC
141729
Pershing
RFG
#205A
12/28/1979
Lewis
Frank W
NMC
141730
Pershing
RFG
#206A
12/28/1979
Lewis
Frank W
NMC
141731
Pershing
RFG
#207A
12/28/1979
Lewis
Frank W
NMC
141732
Pershing
RFG
#208A
12/28/1979
Lewis
Frank W
NMC
141733
Pershing
RFG
#209A
12/28/1979
Lewis
Frank W
NMC
141734
Pershing
RFG
#210A
12/28/1979
Lewis
Frank W
NMC
141735
Pershing
RFG
#211A
12/28/1979
Lewis
Frank W
NMC
141736
Pershing
RFG
#212A
12/28/1979
Lewis
Frank W
NMC
141737
Pershing
RFG
#213A
12/28/1979
Lewis
Frank W
NMC
141738
Pershing
RFG
#214A
12/28/1979
Lewis
Frank W
NMC
141739
Pershing
RFG
#215A
12/28/1979
Lewis
Frank W
NMC
141740
Pershing
RFG
#216A
12/28/1979
Lewis
Frank W
NMC
141741
Pershing
RFG
#217A
12/28/1979
Lewis
Frank W
NMC
141742
Pershing
RFG
#218A
12/28/1979
Lewis
Frank W
NMC
141743
Pershing
RFG
#219A
12/28/1979
Lewis
Frank W
NMC
141744
Pershing
RFG
#220A
12/28/1979
Lewis
Frank W
NMC
141745
Pershing
RFG
#221A
12/28/1979
Lewis
Frank W
NMC
141746
Pershing
RFG
#222A
12/28/1979
Lewis
Frank W
NMC
141747
Pershing
RFG
#223A
12/28/1979
Lewis
Frank W
NMC
141748
Pershing
RFG
#225A
1/7/1980
Lewis
Frank W
NMC
141750
Pershing
RFG
#226A
1/7/1980
Lewis
Frank W
NMC
141751
Pershing
RFG
#227A
1/7/1980
Lewis
Frank W
NMC
141752
Pershing
RFG
#228A
1/7/1980
Lewis
Frank W
NMC
141754
Pershing
RFG
#229
1/25/1980
Lewis
Frank W
NMC
141755
Pershing
RFG
#229A
1/7/1980
Lewis
Frank W
NMC
141756
Pershing
RFG
#230A
1/7/1980
Lewis
Frank W
NMC
141758
Pershing
RFG
#231
1/25/1980
Lewis
Frank W
NMC
141759
Pershing
RFG
#231A
1/7/1980
Lewis
Frank W
NMC
141760
Pershing
RFG
#232A
1/7/1980
Lewis
Frank W
NMC
141761
Pershing
RFG
#233
1/26/1980
Lewis
Frank W
NMC
141762
Pershing
RFG
#233A
1/7/1980
Lewis
Frank W
NMC
141763
Pershing
RFG
#234A
1/7/1980
Lewis
Frank W
NMC
141765
Pershing
RFG
#235A
1/7/1980
Lewis
Frank W
NMC
141767
Pershing
RFG
#236A
1/8/1980
Lewis
Frank W
NMC
141769
Pershing
RFG
#237A
1/8/1980
Lewis
Frank W
NMC
141771
Pershing
RFG
#238A
1/8/1980
Lewis
Frank W
NMC
141772
Pershing
RFG
#239A
1/8/1980
Lewis
Frank W
NMC
141773
Pershing
Hycroft Mine Project
Page 337
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
RFG
#240A
1/8/1980
Lewis
Frank W
NMC
141774
Pershing
RFG
#241A
1/8/1980
Lewis
Frank W
NMC
141775
Pershing
RFG
#251
1/11/1980
Lewis
Frank W
NMC
141777
Pershing
RFG
#253
1/11/1980
Lewis
Frank W
NMC
141779
Pershing
RFG
#255
1/11/1980
Hrdi
NMC
141781
Pershing
RFG
107
5/20/2006
Hycroft
Res & Dev Inc
NMC
932890
Pershing
RFG
109
5/20/2006
Hycroft
Res & Dev Inc
NMC
932892
Pershing
RFG
111
5/20/2006
Hycroft
Res & Dev Inc
NMC
932894
Pershing
RFG
113
5/20/2006
Hycroft
Res & Dev Inc
NMC
932896
Pershing
RFG
114
5/20/2006
Hycroft
Res & Dev Inc
NMC
932897
Pershing
RFG
115
5/20/2006
Hycroft
Res & Dev Inc
NMC
932898
Pershing
RFG
116
5/20/2006
Hycroft
Res & Dev Inc
NMC
932899
Pershing
RFG
117
5/20/2006
Hycroft
Res & Dev Inc
NMC
932900
Pershing
RFG
118
5/20/2006
Hycroft
Res & Dev Inc
NMC
932901
Pershing
RFG
119
5/20/2006
Hycroft
Res & Dev Inc
NMC
932902
Pershing
RFG
142
5/20/2006
Hycroft
Res & Dev Inc
NMC
932908
Pershing
RFG
144
5/20/2006
Hycroft
Res & Dev Inc
NMC
932909
Pershing
RFG
146
5/20/2006
Hycroft
Res & Dev Inc
NMC
932910
Pershing
RFG#224A
1/7/1980
Lewis
Frank W
NMC
141749
Pershing
SH
169
4/24/2008
Hycroft
Res & Dev Inc
NMC
990822
Pershing
SH
170
4/24/2008
Hycroft
Res & Dev Inc
NMC
990823
Pershing
SH
171
4/24/2008
Hycroft
Res & Dev Inc
NMC
990824
Pershing
SH
172
4/24/2008
Hycroft
Res & Dev Inc
NMC
990825
Pershing
SH
173
4/24/2008
Hycroft
Res & Dev Inc
NMC
990826
Pershing
SH
174
4/24/2008
Hycroft
Res & Dev Inc
NMC
990827
Pershing
SH
175
4/24/2008
Hycroft
Res & Dev Inc
NMC
990828
Pershing
SH
176
4/24/2008
Hycroft
Res & Dev Inc
NMC990829
Pershing
SH
177
4/24/2008
Hycroft
Res & Dev Inc
NMC
990830
Pershing
SH
178
4/24/2008
Hycroft
Res & Dev Inc
NMC
990831
Pershing
SH
179
4/24/2008
Hycroft
Res & Dev Inc
NMC
990832
Pershing
SH
180
4/24/2008
Hycroft
Res & Dev Inc
NMC
990833
Pershing
SH
181
4/24/2008
Hycroft
Res & Dev Inc
NMC
990834
Pershing
SH
182
4/24/2008
Hycroft
Res & Dev Inc
NMC
990835
Pershing
SH
183
4/24/2008
Hycroft
Res & Dev Inc
NMC
990836
Pershing
SH
184
4/24/2008
Hycroft
Res & Dev Inc
NMC
990837
Pershing
SH
185
4/24/2008
Hycroft
Res & Dev Inc
NMC
990838
Pershing
SH
186
4/24/2008
Hycroft
Res & Dev Inc
NMC
990839
Pershing
SH
187
4/24/2008
Hycroft
Res & Dev Inc
NMC
990840
Pershing
SH
188
4/24/2008
Hycroft
Res & Dev Inc
NMC
990841
Pershing
SH
189
4/24/2008
Hycroft
Res & Dev Inc
NMC
990842
Pershing
SH
190
4/24/2008
Hycroft
Res & Dev Inc
NMC
990843
Pershing
SH
191
4/24/2008
Hycroft
Res & Dev Inc
NMC
990844
Pershing
SH
192
4/24/2008
Hycroft
Res & Dev Inc
NMC
990845
Pershing
SH
193
4/24/2008
Hycroft
Res & Dev Inc
NMC
990846
Pershing
SH
194
4/24/2008
Hycroft
Res & Dev Inc
NMC
990847
Pershing
SH
195
4/24/2008
Hycroft
Res & Dev Inc
NMC
990848
Pershing
SH
196
4/24/2008
Hycroft
Res & Dev Inc
NMC
990849
Pershing
SH
197
4/24/2008
Hycroft
Res & Dev Inc
NMC990850
Pershing
Hycroft Mine Project
Page 338
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
SH
198
4/24/2008
Hycroft
Res & Dev Inc
NMC
990851
Pershing
SH
199
4/24/2008
Hycroft
Res & Dev Inc
NMC
990852
Pershing
SH
200
4/24/2008
Hycroft
Res & Dev Inc
NMC
990853
Pershing
SH
201
4/24/2008
Hycroft
Res & Dev Inc
NMC
990854
Pershing
SH
202
4/24/2008
Hycroft
Res & Dev Inc
NMC
990855
Pershing
SH
203
4/24/2008
Hycroft
Res & Dev Inc
NMC
990856
Pershing
SH
204
4/24/2008
Hycroft
Res & Dev Inc
NMC
990857
Pershing
SH
205
4/24/2008
Hycroft
Res & Dev Inc
NMC
990858
Pershing
SH
206
4/24/2008
Hycroft
Res & Dev Inc
NMC
990859
Pershing
SH
207
4/24/2008
Hycroft
Res & Dev Inc
NMC
990860
Pershing
SH
208
4/24/2008
Hycroft
Res & Dev Inc
NMC
990861
Pershing
SH
209
4/24/2008
Hycroft
Res & Dev Inc
NMC
990862
Pershing
SH
210
4/24/2008
Hycroft
Res & Dev Inc
NMC
990863
Pershing
SH
211
4/24/2008
Hycroft
Res & Dev Inc
NMC
990864
Pershing
SH
212
4/24/2008
Hycroft
Res & Dev Inc
NMC
990865
Pershing
SH
213
4/24/2008
Hycroft
Res & Dev Inc
NMC
990866
Pershing
SH
214
4/24/2008
Hycroft
Res & Dev Inc
NMC
990867
Pershing
SH
215
4/24/2008
Hycroft
Res & Dev Inc
NMC
990868
Pershing
SH
216
4/24/2008
Hycroft
Res & Dev Inc
NMC
990869
Pershing
SH
217
4/24/2008
Hycroft
Res & Dev Inc
NMC
990870
Pershing
SH
218
4/24/2008
Hycroft
Res & Dev Inc
NMC
990871
Pershing
SH
219
4/24/2008
Hycroft
Res & Dev Inc
NMC
990872
Pershing
SH
220
4/24/2008
Hycroft
Res & Dev Inc
NMC
990873
Pershing
SH
221
4/24/2008
Hycroft
Res & Dev Inc
NMC
990874
Pershing
SH
222
4/24/2008
Hycroft
Res & Dev Inc
NMC
990875
Pershing
SH
223
4/24/2008
Hycroft
Res & Dev Inc
NMC
990876
Pershing
SH
224
4/24/2008
Hycroft
Res & Dev Inc
NMC
990877
Pershing
SH
225
4/24/2008
Hycroft
Res & Dev Inc
NMC
990878
Pershing
SH
226
4/24/2008
Hycroft
Res & Dev Inc
NMC
990879
Pershing
SH
227
4/24/2008
Hycroft
Res & Dev Inc
NMC
990880
Pershing
SH
228
4/24/2008
Hycroft
Res & Dev Inc
NMC
990881
Pershing
SH
229
4/24/2008
Hycroft
Res & Dev Inc
NMC
990882
Pershing
SH
230
4/24/2008
Hycroft
Res & Dev Inc
NMC
990883
Pershing
SH
231
4/23/2008
Hycroft
Res & Dev Inc
NMC
990884
Pershing
SH
235
4/23/2008
Hycroft
Res & Dev Inc
NMC
990888
Pershing
SH
236
4/23/2008
Hycroft
Res & Dev Inc
NMC
990889
Pershing
SH
237
4/23/2008
Hycroft
Res & Dev Inc
NMC
990890
Pershing
SH
238
4/23/2008
Hycroft
Res & Dev Inc
NMC
990891
Pershing
SH
239
4/23/2008
Hycroft
Res & Dev Inc
NMC
990892
Pershing
SH
240
4/23/2008
Hycroft
Res & Dev Inc
NMC
990893
Pershing
SH
241
4/23/2008
Hycroft
Res & Dev Inc
NMC
990894
Pershing
SH
244
4/23/2008
Hycroft
Res & Dev Inc
NMC
990895
Pershing
SH
245
4/23/2008
Hycroft
Res & Dev Inc
NMC
990896
Pershing
SH
247
4/23/2008
Hycroft
Res & Dev Inc
NMC
990900
Pershing
SH
249
4/23/2008
Hycroft
Res & Dev Inc
NMC
990905
Pershing
SH
250
4/23/2008
Hycroft
Res & Dev Inc
NMC
990901
Pershing
SH
251
4/23/2008
Hycroft
Res & Dev Inc
NMC
990902
Pershing
SH
252
4/25/2008
Hycroft
Res & Dev Inc
NMC
990903
Pershing
Hycroft Mine Project
Page 339
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
SH
253
4/25/2008
Hycroft
Res & Dev Inc
NMC
990904
Pershing
SH
254
4/25/2008
Hycroft
Res & Dev Inc
NMC
990906
Pershing
SH
255
4/25/2008
Hycroft
Res & Dev Inc
NMC
990907
Pershing
SH
256
4/25/2008
Hycroft
Res & Dev Inc
NMC
990908
Pershing
SH
257
4/25/2008
Hycroft
Res & Dev Inc
NMC
990909
Pershing
SH
258
4/25/2008
Hycroft
Res & Dev Inc
NMC
990910
Pershing
SH
259
4/25/2008
Hycroft
Res & Dev Inc
NMC
990911
Pershing
SH
260
4/25/2008
Hycroft
Res & Dev Inc
NMC
990912
Pershing
SH
261
4/25/2008
Hycroft
Res & Dev Inc
NMC
990913
Pershing
SH
262
4/25/2008
Hycroft
Res & Dev Inc
NMC
990914
Pershing
SH
263
4/25/2008
Hycroft
Res & Dev Inc
NMC
990915
Pershing
SH
265
4/25/2008
Hycroft
Res & Dev Inc
NMC
990917
Pershing
SH
266
4/25/2008
Hycroft
Res & Dev Inc
NMC
990918
Pershing
SH
269
4/23/2008
Hycroft
Res & Dev Inc
NMC
990921
Pershing
SH
270
4/23/2008
Hycroft
Res & Dev Inc
NMC
990922
Pershing
SH
271
4/23/2008
Hycroft
Res & Dev Inc
NMC
990923
Pershing
SH
272
4/23/2008
Hycroft
Res & Dev Inc
NMC
990924
Pershing
SH
273
4/23/2008
Hycroft
Res & Dev Inc
NMC
990925
Pershing
SH
274
4/23/2008
Hycroft
Res & Dev Inc
NMC
990926
Pershing
SH
276
4/23/2008
Hycroft
Res & Dev Inc
NMC
990928
Pershing
SH
277
4/23/2008
Hycroft
Res & Dev Inc
NMC
990929
Pershing
SH
278
4/22/2008
Hycroft
Res & Dev Inc
NMC
990930
Pershing
SH
279
4/22/2008
Hycroft
Res & Dev Inc
NMC
990931
Pershing
SH
280
4/22/2008
Hycroft
Res & Dev Inc
NMC
990932
Pershing
SH
281
4/22/2008
Hycroft
Res & Dev Inc
NMC
990933
Pershing
SH
282
4/22/2008
Hycroft
Res & Dev Inc
NMC
990934
Pershing
SH
284
4/22/2008
Hycroft
Res & Dev Inc
NMC
990936
Pershing
SH
285
4/22/2008
Hycroft
Res & Dev Inc
NMC
990937
Pershing
SH
286
4/22/2008
Hycroft
Res & Dev Inc
NMC
990938
Pershing
SH
288
4/22/2008
Hycroft
Res & Dev Inc
NMC
990940
Pershing
SH
290
4/22/2008
Hycroft
Res & Dev Inc
NMC990942
Pershing
SH
291
4/22/2008
Hycroft
Res & Dev Inc
NMC
990943
Pershing
SH
292
4/22/2008
Hycroft
Res & Dev Inc
NMC
990944
Pershing
SH
293
4/22/2008
Hycroft
Res & Dev Inc
NMC
990945
Pershing
SH
294
4/22/2008
Hycroft
Res & Dev Inc
NMC
990946
Pershing
SH
296
4/22/2008
Hycroft
Res & Dev Inc
NMC
990948
Pershing
SH
297
4/22/2008
Hycroft
Res & Dev Inc
NMC
990956
Pershing
SH
298
4/22/2008
Hycroft
Res & Dev Inc
NMC
990957
Pershing
SH
300
4/22/2008
Hycroft
Res & Dev Inc
NMC
990950
Pershing
SH
301
4/22/2008
Hycroft
Res & Dev Inc
NMC
990951
Pershing
SH
303
4/22/2008
Hycroft
Res & Dev Inc
NMC
990953
Pershing
SH
304
4/22/2008
Hycroft
Res & Dev Inc
NMC
990954
Pershing
SH
305
4/22/2008
Hycroft
Res & Dev Inc
NMC
990955
Pershing
SH
307
4/22/2008
Hycroft
Res & Dev Inc
NMC
990959
Pershing
SH
308
4/22/2008
Hycroft
Res & Dev Inc
NMC
990960
Pershing
SH
309
4/22/2008
Hycroft
Res & Dev Inc
NMC
990961
Pershing
SH
310
4/22/2008
Hycroft
Res & Dev Inc
NMC
990962
Pershing
SH
311
4/22/2008
Hycroft
Res & Dev Inc
NMC
990963
Pershing
Hycroft Mine Project
Page 340
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
SH
312
4/22/2008
Hycroft
Res & Dev Inc
NMC
990964
Pershing
SH
313
4/22/2008
Hycroft
Res & Dev Inc
NMC
990965
Pershing
SH
314
4/22/2008
Hycroft
Res & Dev Inc
NMC
990966
Pershing
SH
315
4/22/2008
Hycroft
Res & Dev Inc
NMC
990967
Pershing
SH
316
4/22/2008
Hycroft
Res & Dev Inc
NMC
990968
Pershing
SH
317
4/22/2008
Hycroft
Res & Dev Inc
NMC
990969
Pershing
SH
318
4/22/2008
Hycroft
Res & Dev Inc
NMC
990970
Pershing
SH
319
4/22/2008
Hycroft
Res & Dev Inc
NMC
990971
Pershing
SH
320
4/22/2008
Hycroft
Res & Dev Inc
NMC
990972
Pershing
SH
321
4/22/2008
Hycroft
Res & Dev Inc
NMC
990973
Pershing
SH
323
4/22/2008
Hycroft
Res & Dev Inc
NMC
990975
Pershing
SH
324
4/22/2008
Hycroft
Res & Dev Inc
NMC
990976
Pershing
SH
325
4/22/2008
Hycroft
Res & Dev Inc
NMC
990977
Pershing
SH
326
4/22/2008
Hycroft
Res & Dev Inc
NMC
990978
Pershing
SH
327
4/22/2008
Hycroft
Res & Dev Inc
NMC
990979
Pershing
SH
328
4/22/2008
Hycroft
Res & Dev Inc
NMC
990980
Pershing
SH
334
4/22/2008
Hycroft
Res & Dev Inc
NMC
990986
Pershing
SH
335
4/22/2008
Hycroft
Res & Dev Inc
NMC
990987
Pershing
SH
336
4/22/2008
Hycroft
Res & Dev Inc
NMC
990988
Pershing
SH
337
4/22/2008
Hycroft
Res & Dev Inc
NMC
990989
Pershing
SH
338
4/22/2008
Hycroft
Res & Dev Inc
NMC
990990
Pershing
SH
339
4/22/2008
Hycroft
Res & Dev Inc
NMC
990991
Pershing
SH
340
4/22/2008
Hycroft
Res & Dev Inc
NMC
990992
Pershing
SH
341
4/22/2008
Hycroft
Res & Dev Inc
NMC
990993
Pershing
SH
342
4/22/2008
Hycroft
Res & Dev Inc
NMC
990994
Pershing
SH
343
4/22/2008
Hycroft
Res & Dev Inc
NMC
990995
Pershing
SH
345
4/22/2008
Hycroft
Res & Dev Inc
NMC
990997
Pershing
SH
346
4/21/2008
Hycroft
Res & Dev Inc
NMC
990998
Pershing
SH
347
4/21/2008
Hycroft
Res & Dev Inc
NMC
990999
Pershing
SH
358
4/21/2008
Hycroft
Res & Dev Inc
NMC
991010
Pershing
SH
359
4/21/2008
Hycroft
Res & Dev Inc
NMC
991011
Pershing
SH
360
4/21/2008
Hycroft
Res & Dev Inc
NMC
991012
Pershing
SH
361
4/21/2008
Hycroft
Res & Dev Inc
NMC
991013
Pershing
SH
362
4/21/2008
Hycroft
Res & Dev Inc
NMC
991014
Pershing
SH
363
4/21/2008
Hycroft
Res & Dev Inc
NMC
991015
Pershing
SH
364
4/21/2008
Hycroft
Res & Dev Inc
NMC
991016
Pershing
SH
365
4/21/2008
Hycroft
Res & Dev Inc
NMC
991017
Pershing
SH
366
4/21/2008
Hycroft
Res & Dev Inc
NMC
991018
Pershing
SH
367
4/21/2008
Hycroft
Res & Dev Inc
NMC
991019
Pershing
SH
368
4/21/2008
Hycroft
Res & Dev Inc
NMC
991020
Pershing
SH
370
4/21/2008
Hycroft
Res & Dev Inc
NMC
991022
Pershing
SH
387
4/21/2008
Hycroft
Res & Dev Inc
NMC
991039
Pershing
SH
388
4/21/2008
Hycroft
Res & Dev Inc
NMC
991040
Pershing
SH
389
4/21/2008
Hycroft
Res & Dev Inc
NMC
991041
Pershing
SH
390
4/21/2008
Hycroft
Res & Dev Inc
NMC
991042
Pershing
SH
391
4/21/2008
Hycroft
Res & Dev Inc
NMC
991043
Pershing
SH
392
4/21/2008
Hycroft
Res & Dev Inc
NMC
991044
Pershing
SH
393
4/21/2008
Hycroft
Res & Dev Inc
NMC
991045
Pershing
Hycroft Mine Project
Page 341
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
SH
394
4/21/2008
Hycroft
Res & Dev Inc
NMC
991046
Pershing
SH
395
4/21/2008
Hycroft
Res & Dev Inc
NMC
991047
Pershing
SH
412
4/21/2008
Hycroft
Res & Dev Inc
NMC
991064
Pershing
SH
413
4/21/2008
Hycroft
Res & Dev Inc
NMC
991065
Pershing
SH
414
4/21/2008
Hycroft
Res & Dev Inc
NMC
991066
Pershing
SH
415
4/21/2008
Hycroft
Res & Dev Inc
NMC
991067
Pershing
SH
416
4/21/2008
Hycroft
Res & Dev Inc
NMC
991068
Pershing
SH
417
4/21/2008
Hycroft
Res & Dev Inc
NMC
991069
Pershing
SH
435
4/21/2008
Hycroft
Res & Dev Inc
NMC
991210
Pershing
SH
436
4/21/2008
Hycroft
Res & Dev Inc
NMC
991087
Pershing
SH
437
4/21/2008
Hycroft
Res & Dev Inc
NMC
991088
Pershing
SH
438
4/21/2008
Hycroft
Res & Dev Inc
NMC
991089
Pershing
SH
461
4/22/2008
Hycroft
Res & Dev Inc
NMC
991112
Pershing
SH
462
4/22/2008
Hycroft
Res & Dev Inc
NMC
991113
Pershing
SH
463
4/22/2008
Hycroft
Res & Dev Inc
NMC
991114
Pershing
SH
468
4/22/2008
Hycroft
Res & Dev Inc
NMC
991119
Pershing
SH
469
4/22/2008
Hycroft
Res & Dev Inc
NMC
991120
Pershing
SH
470
4/22/2008
Hycroft
Res & Dev Inc
NMC
991121
Pershing
SH
471
4/22/2008
Hycroft
Res & Dev Inc
NMC
991122
Pershing
SH
473
4/22/2008
Hycroft
Res & Dev Inc
NMC
991124
Pershing
SH
474
4/22/2008
Hycroft
Res & Dev Inc
NMC
991125
Pershing
SH
477
4/22/2008
Hycroft
Res & Dev Inc
NMC
991128
Pershing
SH
478
4/22/2008
Hycroft
Res & Dev Inc
NMC
991129
Pershing
SH
480
4/22/2008
Hycroft
Res & Dev Inc
NMC
991131
Pershing
SH
481
4/22/2008
Hycroft
Res & Dev Inc
NMC
991132
Pershing
SH
482
4/22/2008
Hycroft
Res & Dev Inc
NMC
991133
Pershing
SH
483
4/22/2008
Hycroft
Res & Dev Inc
NMC
991134
Pershing
SH
485
4/22/2008
Hycroft
Res & Dev Inc
NMC
991136
Pershing
SH
486
4/22/2008
Hycroft
Res & Dev Inc
NMC
991137
Pershing
SH
488
4/22/2008
Hycroft
Res & Dev Inc
NMC
991139
Pershing
SH
489
4/22/2008
Hycroft
Res & Dev Inc
NMC
991140
Pershing
SH
490
4/22/2008
Hycroft
Res & Dev Inc
NMC991141
Pershing
SH
491
4/22/2008
Hycroft
Res & Dev Inc
NMC
991142
Pershing
SH
492
4/22/2008
Hycroft
Res & Dev Inc
NMC
991143
Pershing
SH
493
4/22/2008
Hycroft
Res & Dev Inc
NMC
991144
Pershing
SH
497
4/22/2008
Hycroft
Res & Dev Inc
NMC
991148
Pershing
SH
498
4/22/2008
Hycroft
Res & Dev Inc
NMC
991149
Pershing
SH
499
4/22/2008
Hycroft
Res & Dev Inc
NMC
991150
Pershing
SH
500
4/22/2008
Hycroft
Res & Dev Inc
NMC
991151
Pershing
SH
501
4/22/2008
Hycroft
Res & Dev Inc
NMC
991152
Pershing
SH
502
4/22/2008
Hycroft
Res & Dev Inc
NMC
991153
Pershing
SH
503
4/22/2008
Hycroft
Res & Dev Inc
NMC
991154
Pershing
SH
504
4/22/2008
Hycroft
Res & Dev Inc
NMC
991155
Pershing
SH
505
4/22/2008
Hycroft
Res & Dev Inc
NMC
991156
Pershing
SH
507
4/22/2008
Hycroft
Res & Dev Inc
NMC
991158
Pershing
SH
508
4/22/2008
Hycroft
Res & Dev Inc
NMC
991159
Pershing
SH
509
4/22/2008
Hycroft
Res & Dev Inc
NMC
991160
Pershing
SH
510
4/22/2008
Hycroft
Res & Dev Inc
NMC
991161
Pershing
Hycroft Mine Project
Page 342
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
SH
511
4/22/2008
Hycroft
Res & Dev Inc
NMC
991162
Pershing
SH
512
4/22/2008
Hycroft
Res & Dev Inc
NMC
991163
Pershing
SH
513
4/22/2008
Hycroft
Res & Dev Inc
NMC
991164
Pershing
SH
514
4/22/2008
Hycroft
Res & Dev Inc
NMC
991165
Pershing
SH
515
4/22/2008
Hycroft
Res & Dev Inc
NMC
991166
Pershing
SH
516
4/22/2008
Hycroft
Res & Dev Inc
NMC
991167
Pershing
SH
517
4/22/2008
Hycroft
Res & Dev Inc
NMC
991168
Pershing
SH
519
4/22/2008
Hycroft
Res & Dev Inc
NMC
991170
Pershing
SH
520
4/22/2008
Hycroft
Res & Dev Inc
NMC
991171
Pershing
SH
521
4/22/2008
Hycroft
Res & Dev Inc
NMC
991172
Pershing
SH
523
4/22/2008
Hycroft
Res & Dev Inc
NMC
991174
Pershing
SH
524
4/22/2008
Hycroft
Res & Dev Inc
NMC
991175
Pershing
SH
526
4/22/2008
Hycroft
Res & Dev Inc
NMC
991177
Pershing
SH
528
4/22/2008
Hycroft
Res & Dev Inc
NMC
991179
Pershing
SH
529
4/22/2008
Hycroft
Res & Dev Inc
NMC
991180
Pershing
SH
530
4/22/2008
Hycroft
Res & Dev Inc
NMC
991181
Pershing
SH
531
4/22/2008
Hycroft
Res & Dev Inc
NMC
991182
Pershing
SH
532
4/22/2008
Hycroft
Res & Dev Inc
NMC
991183
Pershing
SH
533
4/22/2008
Hycroft
Res & Dev Inc
NMC
991184
Pershing
SH
534
4/22/2008
Hycroft
Res & Dev Inc
NMC
991185
Pershing
SH
535
4/22/2008
Hycroft
Res & Dev Inc
NMC
991186
Pershing
SH
536
4/22/2008
Hycroft
Res & Dev Inc
NMC
991187
Pershing
SH
537
4/22/2008
Hycroft
Res & Dev Inc
NMC
991188
Pershing
SH
538
4/22/2008
Hycroft
Res & Dev Inc
NMC
991189
Pershing
SH
539
4/22/2008
Hycroft
Res & Dev Inc
NMC
991190
Pershing
SH
540
4/22/2008
Hycroft
Res & Dev Inc
NMC
991191
Pershing
SH
541
4/22/2008
Hycroft
Res & Dev Inc
NMC
991192
Pershing
SH
542
4/22/2008
Hycroft
Res & Dev Inc
NMC
991193
Pershing
SH
543
4/22/2008
Hycroft
Res & Dev Inc
NMC
991194
Pershing
SH
544
4/22/2008
Hycroft
Res & Dev Inc
NMC
991195
Pershing
SH
545
4/22/2008
Hycroft
Res & Dev Inc
NMC
991196
Pershing
SH
546
4/22/2008
Hycroft
Res & Dev Inc
NMC
991197
Pershing
SH
548
4/22/2008
Hycroft
Res & Dev Inc
NMC
991199
Pershing
SH
549
4/22/2008
Hycroft
Res & Dev Inc
NMC
991200
Pershing
SH
550
4/22/2008
Hycroft
Res & Dev Inc
NMC
991201
Pershing
SH
551
4/22/2008
Hycroft
Res & Dev Inc
NMC
991202
Pershing
SH
552
4/22/2008
Hycroft
Res & Dev Inc
NMC
991203
Pershing
SH
553
4/22/2008
Hycroft
Res & Dev Inc
NMC
991204
Pershing
SH
554
4/22/2008
Hycroft
Res & Dev Inc
NMC
991205
Pershing
SH
555
4/22/2008
Hycroft
Res & Dev Inc
NMC
991206
Pershing
SH
556
4/22/2008
Hycroft
Res & Dev Inc
NMC
991207
Pershing
SH
557
4/22/2008
Hycroft
Res & Dev Inc
NMC
991208
Pershing
SH
558
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022749
Pershing
SH
559
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022750
Pershing
SH
560
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022751
Pershing
SH
561
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022752
Pershing
SH
562
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022753
Pershing
SH
563
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022754
Pershing
Hycroft Mine Project
Page 343
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
SH
564
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022755
Pershing
SH
565
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022756
Pershing
SH
566
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022757
Pershing
SH
567
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022758
Pershing
SH
568
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022759
Pershing
SH
569
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022760
Pershing
SH
570
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022761
Pershing
SH
571
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022762
Pershing
SH
572
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022763
Pershing
SH
573
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022764
Pershing
SH
574
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022765
Pershing
SH
575
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022766
Pershing
SH
576
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022767
Pershing
SH
577
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022768
Pershing
SH
578
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022769
Pershing
SH
579
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022770
Pershing
SH
580
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022771
Pershing
SH
581
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022772
Pershing
SH
582
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022773
Pershing
SH
583
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022774
Pershing
SH
584
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022775
Pershing
SH
585
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022776
Pershing
SH
586
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022777
Pershing
SH
587
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022778
Pershing
SH
588
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022779
Pershing
SH
589
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022780
Pershing
SH
590
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022781
Pershing
SH
591
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022782
Pershing
SH
592
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022783
Pershing
SH
593
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022784
Pershing
SH
594
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022785
Pershing
SH
595
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022786
Pershing
SH
596
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022787
Pershing
SH
597
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022788
Pershing
SH
598
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022789
Pershing
SH
599
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022790
Pershing
SH
600
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022791
Pershing
SH
601
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022792
Pershing
SH
602
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022793
Pershing
SH
603
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022794
Pershing
SH
604
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022795
Pershing
SH
605
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022796
Pershing
SH
606
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022797
Pershing
SH
607
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022798
Pershing
SH
608
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022799
Pershing
SH
609
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022800
Pershing
SH
610
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022801
Pershing
SH
611
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022802
Pershing
Hycroft Mine Project
Page 344
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
SH
612
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022803
Pershing
SH
613
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022804
Pershing
SH
614
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022805
Pershing
SH
615
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022806
Pershing
SH
616
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022807
Pershing
SH
617
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022808
Pershing
SH
618
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022809
Pershing
SH
619
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022810
Pershing
SH
620
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022811
Pershing
SH
621
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022812
Pershing
SH
622
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022813
Pershing
SH
623
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022814
Pershing
SH
624
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022815
Pershing
SH
625
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022816
Pershing
SH
626
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022817
Pershing
SH
627
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022818
Pershing
SH
628
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022819
Pershing
SH
629
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022820
Pershing
SH
630
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022821
Pershing
SH
631
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022822
Pershing
SH
632
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022823
Pershing
SH
633
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022824
Pershing
SH
232
4/23/2008
Hycroft
Res & Dev Inc
NMC
990885
Pershing
SH
233
4/23/2008
Hycroft
Res & Dev Inc
NMC
990886
Pershing
SH
234
4/23/2008
Hycroft
Res & Dev Inc
NMC
990887
Pershing
SH
242
4/23/2008
Hycroft
Res & Dev Inc
NMC
990898
Pershing
SH
243
4/23/2008
Hycroft
Res & Dev Inc
NMC
990899
Pershing
SH
246
4/23/2008
Hycroft
Res & Dev Inc
NMC
990897
Pershing
SH
248
4/23/2008
Hycroft
Res & Dev Inc
NMC
991209
Pershing
SH
264
4/25/2008
Hycroft
Res & Dev Inc
NMC
990916
Pershing
SH
267
4/23/2008
Hycroft
Res & Dev Inc
NMC
990919
Pershing
SH
268
4/23/2008
Hycroft
Res & Dev Inc
NMC
990920
Pershing
SH
275
4/23/2008
Hycroft
Res & Dev Inc
NMC
990927
Pershing
SH
283
4/22/2008
Hycroft
Res & Dev Inc
NMC
990935
Pershing
SH
287
4/22/2008
Hycroft
Res & Dev Inc
NMC
990939
Pershing
SH
289
4/22/2008
Hycroft
Res & Dev Inc
NMC
990941
Pershing
SH
295
4/22/2008
Hycroft
Res & Dev Inc
NMC
990947
Pershing
SH
299
4/22/2008
Hycroft
Res & Dev Inc
NMC
990949
Pershing
SH
302
4/22/2008
Hycroft
Res & Dev Inc
NMC
990952
Pershing
SH
306
4/22/2008
Hycroft
Res & Dev Inc
NMC
990958
Pershing
SH
322
4/22/2008
Hycroft
Res & Dev Inc
NMC
990974
Pershing
SH
344
4/22/2008
Hycroft
Res & Dev Inc
NMC
990996
Pershing
SH
369
4/21/2008
Hycroft
Res & Dev Inc
NMC
991021
Pershing
SH
386
4/21/2008
Hycroft
Res & Dev Inc
NMC
991038
Pershing
SH
418
4/21/2008
Hycroft
Res & Dev Inc
NMC
991070
Pershing
SH
457
4/22/2008
Hycroft
Res & Dev Inc
NMC
991108
Pershing
SH
458
4/22/2008
Hycroft
Res & Dev Inc
NMC
991109
Pershing
SH
459
4/22/2008
Hycroft
Res & Dev Inc
NMC
991110
Pershing
Hycroft Mine Project
Page 345
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
SH
460
4/22/2008
Hycroft
Res & Dev Inc
NMC
991111
Pershing
SH
464
4/22/2008
Hycroft
Res & Dev Inc
NMC991115
Pershing
SH
465
4/22/2008
Hycroft
Res & Dev Inc
NMC
991116
Pershing
SH
466
4/22/2008
Hycroft
Res & Dev Inc
NMC991117
Pershing
SH
467
4/22/2008
Hycroft
Res & Dev Inc
NMC
991118
Pershing
SH
472
4/22/2008
Hycroft
Res & Dev Inc
NMC
991123
Pershing
SH
475
4/22/2008
Hycroft
Res & Dev Inc
NMC
991126
Pershing
SH
476
4/22/2008
Hycroft
Res & Dev Inc
NMC
991127
Pershing
SH
479
4/22/2008
Hycroft
Res & Dev Inc
NMC
991130
Pershing
SH
484
4/22/2008
Hycroft
Res & Dev Inc
NMC
991135
Pershing
SH
487
4/22/2008
Hycroft
Res & Dev Inc
NMC
991138
Pershing
SH
494
4/22/2008
Hycroft
Res & Dev Inc
NMC
991145
Pershing
SH
495
4/22/2008
Hycroft
Res & Dev Inc
NMC
991146
Pershing
SH
496
4/22/2008
Hycroft
Res & Dev Inc
NMC
991147
Pershing
SH
506
4/22/2008
Hycroft
Res & Dev Inc
NMC
991157
Pershing
SH
518
4/22/2008
Hycroft
Res & Dev Inc
NMC
991169
Pershing
SH
522
4/22/2008
Hycroft
Res & Dev Inc
NMC
991173
Pershing
SH
525
4/22/2008
Hycroft
Res & Dev Inc
NMC
991176
Pershing
SH
527
4/22/2008
Hycroft
Res & Dev Inc
NMC
991178
Pershing
SH
547
4/22/2008
Hycroft
Res & Dev Inc
NMC
991198
Pershing
SH
634
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022825
Pershing
SH
635
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022826
Pershing
SH
636
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022827
Pershing
SH
637
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022828
Pershing
SH
638
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022829
Pershing
SH
639
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022830
Pershing
SH
640
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022831
Pershing
SH
641
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022832
Pershing
SH
642
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022833
Pershing
SH
643
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022834
Pershing
SH
644
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022835
Pershing
SH
645
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022836
Pershing
SH
646
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022837
Pershing
SH
647
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022838
Pershing
SH
648
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022839
Pershing
SH
649
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022840
Pershing
SH
650
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022841
Pershing
SH
651
3/13/2010
Hycroft
Res & Dev Inc
NMC
1022842
Pershing
WCD
1
3/22/2006
Hycroft
Res & Dev Inc
NMC
928826
Pershing
WCD
17
4/21/2006
Hycroft
Res & Dev Inc
NMC
928836
Pershing
WCD
18
4/21/2006
Hycroft
Res & Dev Inc
NMC
928837
Pershing
WCD
19
4/21/2006
Hycroft
Res & Dev Inc
NMC
928838
Pershing
WCD
2
3/22/2006
Hycroft
Res & Dev Inc
NMC
928827
Pershing
WCD
20
4/21/2006
Hycroft
Res & Dev Inc
NMC
928839
Pershing
WCD
21
4/21/2006
Hycroft
Res & Dev Inc
NMC
928840
Pershing
WCD
22
4/21/2006
Hycroft
Res & Dev Inc
NMC
928841
Pershing
WCD
23
4/21/2006
Hycroft
Res & Dev Inc
NMC
928842
Pershing
WCD
24
4/21/2006
Hycroft
Res & Dev Inc
NMC
928843
Pershing
Hycroft Mine Project
Page 346
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
WCD
25
4/21/2006
Hycroft
Res & Dev Inc
NMC
928844
Pershing
WCD
26
4/21/2006
Hycroft
Res & Dev Inc
NMC
928845
Pershing
WCD
3
3/22/2006
Hycroft
Res & Dev Inc
NMC
928828
Pershing
WCD
4
4/22/2006
Hycroft
Res & Dev Inc
NMC
928829
Pershing
WCX
10
9/8/2006
Hycroft
Res & Dev Inc
NMC
941262
Pershing
WCX
5
9/8/2006
Hycroft
Res & Dev Inc
NMC
941257
Pershing
WCX
6
9/8/2006
Hycroft
Res & Dev Inc
NMC
941258
Pershing
WCX
7
9/8/2006
Hycroft
Res & Dev Inc
NMC
941259
Pershing
WCX
8
9/8/2006
Hycroft
Res & Dev Inc
NMC
941260
Pershing
WCX
9
9/8/2006
Hycroft
Res & Dev Inc
NMC
941261
Pershing
WCX
34
9/8/2006
Hycroft
Res & Dev Inc
NMC
941263
Pershing
WCX
35
9/8/2006
Hycroft
Res & Dev Inc
NMC
941264
Pershing
WCX
36
9/8/2006
Hycroft
Res & Dev Inc
NMC
941265
Pershing
WCX
37
9/8/2006
Hycroft
Res & Dev Inc
NMC
941266
Pershing
WCX
38
9/8/2006
Hycroft
Res & Dev Inc
NMC
941267
Pershing
WCX
39
9/8/2006
Hycroft
Res & Dev Inc
NMC
941268
Pershing
WCX
40
9/8/2006
Hycroft
Res & Dev Inc
NMC
941269
Pershing
WCX
41
9/8/2006
Hycroft
Res & Dev Inc
NMC
941270
Pershing
WCX
42
9/8/2006
Hycroft
Res & Dev Inc
NMC
941271
Pershing
WCX
43
9/8/2006
Hycroft
Res & Dev Inc
NMC
941272
Pershing
WCX
44
9/8/2006
Hycroft
Res & Dev Inc
NMC
941273
Pershing
WCX
45
9/8/2006
Hycroft
Res & Dev Inc
NMC
941274
Pershing
WCX
46
9/8/2006
Hycroft
Res & Dev Inc
NMC
941275
Pershing
WCX
47
9/8/2006
Hycroft
Res & Dev Inc
NMC
941276
Pershing
WCX
48
9/8/2006
Hycroft
Res & Dev Inc
NMC
941277
Pershing
WCX
49
9/8/2006
Hycroft
Res & Dev Inc
NMC
941278
Pershing
WCX
50
9/8/2006
Hycroft
Res & Dev Inc
NMC
941279
Pershing
WCX
51
9/8/2006
Hycroft
Res & Dev Inc
NMC
941280
Pershing
WCX
52
9/8/2006
Hycroft
Res & Dev Inc
NMC
941281
Pershing
WCX
53
9/8/2006
Hycroft
Res & Dev Inc
NMC
941282
Pershing
WCX
54
9/8/2006
Hycroft
Res & Dev Inc
NMC
941283
Pershing
WCX
55
9/8/2006
Hycroft
Res & Dev Inc
NMC
941284
Pershing
WCX
56
9/8/2006
Hycroft
Res & Dev Inc
NMC
941285
Pershing
WCX
57
9/8/2006
Hycroft
Res & Dev Inc
NMC
941286
Pershing
WCX
58
9/8/2006
Hycroft
Res & Dev Inc
NMC
941287
Pershing
WRC
10
3/13/1995
Hycroft
Res & Dev Inc
NMC
714261
Pershing
WRC
11
3/13/1995
Hycroft
Res & Dev Inc
NMC
714262
Pershing
WRC
12
3/13/1995
Hycroft
Res & Dev Inc
NMC
714263
Pershing
WRC
13
3/13/1995
Hycroft
Res & Dev Inc
NMC
714264
Pershing
WRC
14
3/13/1995
Hycroft
Res & Dev Inc
NMC
714265
Pershing
WRC
15
3/13/1995
Hycroft
Res & Dev Inc
NMC
714266
Pershing
WRC
16
3/13/1995
Hycroft
Res & Dev Inc
NMC
714267
Pershing
WRC
17
3/13/1995
Hycroft
Res & Dev Inc
NMC
714268
Pershing
WRC
19
3/13/1995
Hycroft
Res & Dev Inc
NMC
714270
Pershing
WRC
1
3/13/1995
Hycroft
Res & Dev Inc
NMC
714252
Pershing
WRC
18
3/13/1995
Hycroft
Res & Dev Inc
NMC
714269
Pershing
WRC
2
3/13/1995
Hycroft
Res & Dev Inc
NMC
714253
Pershing
WRC
20
3/13/1995
Hycroft
Res & Dev Inc
NMC
714271
Pershing
Hycroft Mine Project
Page 347
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
WRC
21
3/13/1995
Hycroft
Res & Dev Inc
NMC
714272
Pershing
WRC
22
3/13/1995
Hycroft
Res & Dev Inc
NMC
714273
Pershing
WRC
23
3/13/1995
Hycroft
Res & Dev Inc
NMC
714274
Pershing
WRC
24
3/13/1995
Hycroft
Res & Dev Inc
NMC
714275
Pershing
WRC
25
3/13/1995
Hycroft
Res & Dev Inc
NMC
714276
Pershing
WRC
26
3/13/1995
Hycroft
Res & Dev Inc
NMC
714277
Pershing
WRC
27
3/13/1995
Hycroft
Res & Dev Inc
NMC
714278
Pershing
WRC
28
3/13/1995
Hycroft
Res & Dev Inc
NMC
714279
Pershing
WRC
29
3/13/1995
Hycroft
Res & Dev Inc
NMC
714280
Pershing
WRC
3
3/13/1995
Hycroft
Res & Dev Inc
NMC
714254
Pershing
WRC
30
3/13/1995
Hycroft
Res & Dev Inc
NMC
714281
Pershing
WRC
31
3/13/1995
Hycroft
Res & Dev Inc
NMC
714282
Pershing
WRC
32
3/14/1995
Hycroft
Res & Dev Inc
NMC
714283
Pershing
WRC
33
3/14/1995
Hycroft
Res & Dev Inc
NMC
714284
Pershing
WRC
34
3/14/1995
Hycroft
Res & Dev Inc
NMC
714285
Pershing
WRC
35
3/14/1995
Hycroft
Res & Dev Inc
NMC
714286
Pershing
WRC
36
3/14/1995
Hycroft
Res & Dev Inc
NMC
714287
Pershing
WRC
37
3/14/1995
Hycroft
Res & Dev Inc
NMC
714288
Pershing
WRC
38
3/14/1995
Hycroft
Res & Dev Inc
NMC
714289
Pershing
WRC
39
3/14/1995
Hycroft
Res & Dev Inc
NMC
714290
Pershing
WRC
4
3/13/1995
Hycroft
Res & Dev Inc
NMC
714255
Pershing
WRC
40
3/14/1995
Hycroft
Res & Dev Inc
NMC
714291
Pershing
WRC
41
3/14/1995
Hycroft
Res & Dev Inc
NMC
714292
Pershing
WRC
42
3/14/1995
Hycroft
Res & Dev Inc
NMC
714293
Pershing
WRC
43
3/14/1995
Hycroft
Res & Dev Inc
NMC
714294
Pershing
WRC
44
3/14/1995
Hycroft
Res & Dev Inc
NMC
714295
Pershing
WRC
45
3/14/1995
Hycroft
Res & Dev Inc
NMC
714296
Pershing
WRC
46
3/14/1995
Hycroft
Res & Dev Inc
NMC
714297
Pershing
WRC
47
3/14/1995
Hycroft
Res & Dev Inc
NMC
714298
Pershing
WRC
48
3/14/1995
Hycroft
Res & Dev Inc
NMC
714299
Pershing
WRC
49
3/14/1995
Hycroft
Res & Dev Inc
NMC
714300
Pershing
WRC
5
3/13/1995
Hycroft
Res & Dev Inc
NMC
714256
Pershing
WRC
50
3/14/1995
Hycroft
Res & Dev Inc
NMC
714301
Pershing
WRC
51
3/14/1995
Hycroft
Res & Dev Inc
NMC
714302
Pershing
WRC
52
3/14/1995
Hycroft
Res & Dev Inc
NMC
714303
Pershing
WRC
53
3/14/1995
Hycroft
Res & Dev Inc
NMC
714304
Pershing
WRC
54
3/14/1995
Hycroft
Res & Dev Inc
NMC
714305
Pershing
WRC
55
3/14/1995
Hycroft
Res & Dev Inc
NMC
714306
Pershing
WRC
56
3/14/1995
Hycroft
Res & Dev Inc
NMC
714307
Pershing
WRC
57
3/14/1995
Hycroft
Res & Dev Inc
NMC
714308
Pershing
WRC
58
3/14/1995
Hycroft
Res & Dev Inc
NMC
714309
Pershing
WRC
6
3/13/1995
Hycroft
Res & Dev Inc
NMC
714257
Pershing
WRC
60
3/14/1995
Hycroft
Res & Dev Inc
NMC
714311
Pershing
WRC
7
3/13/1995
Hycroft
Res & Dev Inc
NMC
714258
Pershing
WRC
8
3/13/1995
Hycroft
Res & Dev Inc
NMC
714259
Pershing
WRC
82
3/14/1995
Hycroft
Res & Dev Inc
NMC
714313
Pershing
WRC
84
3/14/1995
Hycroft
Res & Dev Inc
NMC
714315
Pershing
WRC
87
3/14/1995
Hycroft
Res & Dev Inc
NMC
714317
Pershing
Hycroft Mine Project
Page 348
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
WRC
88
3/14/1995
Hycroft
Res & Dev Inc
NMC
714318
Pershing
WRC
89
3/14/1995
Hycroft
Res & Dev Inc
NMC
714319
Pershing
WRC
9
3/13/1995
Hycroft
Res & Dev Inc
NMC
714260
Pershing
WRC
90
3/14/1995
Hycroft
Res & Dev Inc
NMC
714320
Pershing
WRC
91
3/14/1995
Hycroft
Res & Dev Inc
NMC
714321
Pershing
CKC
#12
8/14/1987
Crofoot
Daniel M
NMC444109
Pershing/Humboldt
FG
226
9/5/2006
Hycroft
Res & Dev Inc
NMC
939259
Pershing/Humboldt
FG
275
9/1/2006
Hycroft
Res & Dev Inc
NMC
939296
Pershing/Humboldt
FG
324
9/1/2006
Hycroft
Res & Dev Inc
NMC
939337
Pershing/Humboldt
FG
377
9/1/2006
Hycroft
Res & Dev Inc
NMC
939382
Pershing/Humboldt
FG
433
9/1/2006
Hycroft
Res & Dev Inc
NMC
939438
Pershing/Humboldt
NC
132
8/14/2010
Hycroft
Res & Dev Inc
NMC1027970
Pershing/Humboldt
NC
17
8/14/2010
Hycroft
Res & Dev Inc
NMC1027855
Pershing/Humboldt
NC
170
8/14/2010
Hycroft
Res & Dev Inc
NMC1028008
Pershing/Humboldt
NC
205
8/14/2010
Hycroft
Res & Dev Inc
NMC1028043
Pershing/Humboldt
NC
240
8/14/2010
Hycroft
Res & Dev Inc
NMC1028078
Pershing/Humboldt
NC
274
8/14/2010
Hycroft
Res & Dev Inc
NMC1028112
Pershing/Humboldt
NC
306
8/14/2010
Hycroft
Res & Dev Inc
NMC1028144
Pershing/Humboldt
NC
50
8/14/2010
Hycroft
Res & Dev Inc
NMC1027888
Pershing/Humboldt
NC
91
8/14/2010
Hycroft
Res & Dev Inc
NMC1027929
Pershing/Humboldt
NFRA
12
11/7/2007
Victory
Exploration Inc.
NMC
977844
Pershing/Humboldt
NFRA
13
11/7/2007
Victory
Exploration Inc.
NMC
977845
Pershing/Humboldt
NFRA
14
11/7/2007
Victory
Exploration Inc.
NMC
977846
Pershing/Humboldt
NFRA
15
11/7/2007
Victory
Exploration Inc.
NMC
977847
Pershing/Humboldt
NFRA
23
11/7/2007
Victory
Exploration Inc.
NMC
977855
Pershing/Humboldt
NFRA
24
11/7/2007
Victory
Exploration Inc.
NMC
977856
Pershing/Humboldt
NFRA
4
11/7/2007
Victory
Exploration Inc.
NMC
977836
Pershing/Humboldt
NFRA
5
11/7/2007
Victory
Exploration Inc.
NMC
977837
Pershing/Humboldt
RFG
#101
3/11/1989
Crofoot
Daniel M
NMC
546065
Pershing/Humboldt
RFG
#103
3/11/1989
Crofoot
Daniel M
NMC
546066
Pershing/Humboldt
RFG
#127
1/9/1980
Lewis
Frank W
NMC
141686
Pershing/Humboldt
RFG
#129
1/9/1980
Lewis
Frank W
NMC
141687
Pershing/Humboldt
RFG
#131
1/9/1980
Lewis
Frank W
NMC
141688
Pershing/Humboldt
RFG
#132
1/9/1980
Lewis
Frank W
NMC
141689
Pershing/Humboldt
RFG
#133
1/9/1980
Lewis
Frank W
NMC
141690
Pershing/Humboldt
RFG
#134
1/9/1980
Lewis
Frank W
NMC
141691
Pershing/Humboldt
RFG
#200A
12/28/1979
Lewis
Frank W
NMC
141725
Pershing/Humboldt
RFG
#228
1/25/1980
Lewis
Frank W
NMC
141753
Pershing/Humboldt
RFG
#230
1/25/1980
Lewis
Frank W
NMC
141757
Pershing/Humboldt
RFG
#234
1/26/1980
Lewis
Frank W
NMC
141764
Pershing/Humboldt
RFG
#235
1/26/1980
Lewis
Frank W
NMC
141766
Pershing/Humboldt
RFG
#236
1/26/1980
Lewis
Frank W
NMC
141768
Pershing/Humboldt
RFG
#237
1/30/1980
Lewis
Frank W
NMC
141770
Pershing/Humboldt
RFG
#250
1/11/1980
Lewis
Frank W
NMC
141776
Pershing/Humboldt
RFG
#252
1/11/1980
Lewis
Frank W
NMC
141778
Pershing/Humboldt
RFG
#254
1/11/1980
Lewis
Frank W
NMC
141780
Pershing/Humboldt
RFG
#257
1/11/1980
Hadi
NMC
141783
Pershing/Humboldt
RFG
#259
1/11/1980
Hadi
NMC
141784
Pershing/Humboldt
Hycroft Mine Project
Page 349
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
Unpatented Claim
Name
Location
Date
Claimant
BLM
Serial Number
Filing
County
RFG
#261
1/11/1980
Hadi
NMC
141785
Pershing/Humboldt
RFG
#263
1/11/1980
Hadi
NMC
141786
Pershing/Humboldt
RFG
#99
3/11/1989
Crofoot
Daniel M
NMC
546064
Pershing/Humboldt
RFG
104
5/20/2006
Hycroft
Res & Dev Inc
NMC
932887
Pershing/Humboldt
RFG
105
5/20/2006
Hycroft
Res & Dev Inc
NMC
932888
Pershing/Humboldt
RFG
106
5/20/2006
Hycroft
Res & Dev Inc
NMC
932889
Pershing/Humboldt
RFG
108
5/20/2006
Hycroft
Res & Dev Inc
NMC
932891
Pershing/Humboldt
RFG
110
5/20/2006
Hycroft
Res & Dev Inc
NMC
932893
Pershing/Humboldt
RFG
112
5/20/2006
Hycroft
Res & Dev Inc
NMC
932895
Pershing/Humboldt
RFG
136
5/20/2006
Hycroft
Res & Dev Inc
NMC
932905
Pershing/Humboldt
RFG
138
5/20/2006
Hycroft
Res & Dev Inc
NMC
932906
Pershing/Humboldt
RFG
140
5/20/2006
Hycroft
Res & Dev Inc
NMC
932907
Pershing/Humboldt
RFG
256
5/20/2006
Hycroft
Res & Dev Inc
NMC
932911
Pershing/Humboldt
SH
348
4/21/2008
Hycroft
Res & Dev Inc
NMC
991000
Pershing/Humboldt
SH
349
4/21/2008
Hycroft
Res & Dev Inc
NMC
991001
Pershing/Humboldt
SH
329
4/22/2008
Hycroft
Res & Dev Inc
NMC
990981
Pershing/Humboldt
SH
330
4/22/2008
Hycroft
Res & Dev Inc
NMC
990982
Pershing/Humboldt
SH
331
4/22/2008
Hycroft
Res & Dev Inc
NMC
990983
Pershing/Humboldt
SH
332
4/22/2008
Hycroft
Res & Dev Inc
NMC
990984
Pershing/Humboldt
SH
333
4/22/2008
Hycroft
Res & Dev Inc
NMC
990985
Pershing/Humboldt
SH
353
4/21/2008
Hycroft
Res & Dev Inc
NMC
991005
Pershing/Humboldt
SH
354
4/21/2008
Hycroft
Res & Dev Inc
NMC
991006
Pershing/Humboldt
SH
355
4/21/2008
Hycroft
Res & Dev Inc
NMC
991007
Pershing/Humboldt
SH
356
4/21/2008
Hycroft
Res & Dev Inc
NMC
991008
Pershing/Humboldt
SH
357
4/21/2008
Hycroft
Res & Dev Inc
NMC
991009
Pershing/Humboldt
SH
371
4/21/2008
Hycroft
Res & Dev Inc
NMC
991023
Pershing/Humboldt
SH
372
4/21/2008
Hycroft
Res & Dev Inc
NMC
991024
Pershing/Humboldt
SH
382
4/21/2008
Hycroft
Res & Dev Inc
NMC
991034
Pershing/Humboldt
SH
383
4/21/2008
Hycroft
Res & Dev Inc
NMC
991035
Pershing/Humboldt
SH
384
4/21/2008
Hycroft
Res & Dev Inc
NMC
991036
Pershing/Humboldt
SH
385
4/21/2008
Hycroft
Res & Dev Inc
NMC
991037
Pershing/Humboldt
SH
407
4/21/2008
Hycroft
Res & Dev Inc
NMC
991059
Pershing/Humboldt
SH
408
4/21/2008
Hycroft
Res & Dev Inc
NMC
991060
Pershing/Humboldt
SH
409
4/21/2008
Hycroft
Res & Dev Inc
NMC
991061
Pershing/Humboldt
SH
410
4/21/2008
Hycroft
Res & Dev Inc
NMC
991062
Pershing/Humboldt
SH
411
4/21/2008
Hycroft
Res & Dev Inc
NMC
991063
Pershing/Humboldt
SH
431
4/21/2008
Hycroft
Res & Dev Inc
NMC
991083
Pershing/Humboldt
SH
432
4/21/2008
Hycroft
Res & Dev Inc
NMC
991084
Pershing/Humboldt
SH
433
4/21/2008
Hycroft
Res & Dev Inc
NMC
991085
Pershing/Humboldt
SH
434
4/21/2008
Hycroft
Res & Dev Inc
NMC
991086
Pershing/Humboldt
Hycroft Mine Project
Page 350
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis
May 14, 2026
EX-99.1
EX-99.1
Filename: ex99-1.htm · Sequence: 6
Exhibit
99.1
Hycroft
Delivers $10 Billion NPV from Technical Report at Spot Prices
While
Advancing High-Grade Brimstone and Vortex Silver Discoveries
WINNEMUCCA,
NV, June 2, 2026 – Hycroft Mining Holding Corporation (Nasdaq: HYMC) (“Hycroft” or “the Company”),
is pleased to announce the results from its S-K 1300 Technical Report Summary and Initial Assessment (the “TRS”), which outlines
the economics and mine plan for a milling operation utilizing conventional pressure oxidation (“POX”) and heap leach processing
at the Hycroft Mine in Nevada, USA. All amounts are in US dollars, and all figures are presented in US customary units.
The
TRS demonstrates that Hycroft hosts a large-scale, long-life precious metals project with compelling economics and strong leverage to
rising gold and silver prices, reinforcing its position as a multi-generational, world-class asset in a Tier-1 jurisdiction. The TRS
is being filed concurrently with the SEC on EDGAR and is available on the Company’s website.
Basis
of the Technical Report
● Base
case commodity prices: $3,600 per ounce for gold and $48.00 per ounce for silver
● Spot
prices(1): $4,569 per ounce of gold and $77.94 per ounce of silver
● Mine
plan based on the 2026 Mineral Resource Estimate (16.4 million ounces of gold and 562.6
million ounces of silver Measured and Indicated)
● Inferred
mineral resources of 5.0 million ounces of gold and 132.8 million ounces of silver are not
included in the mine plan and represent an upside to the TRS economics
● Drill
results from the 2025-2026 exploration program are not included in the mine plan and represents
further upside
Highlights:
● Robust
Economics Demonstrate the Scale and Value of the Hycroft Mine:
○ Base
Case Net Present Value at 5% (“NPV5”) of $5.4 billion (pre-tax)
and $4.3 billion (post-tax)
○ Internal
Rate of Return (“IRR”) of 18.9% (pre-tax) and 16.9% (post-tax)
○ NPV5
at spot prices of $10.0 billion and IRR of 30.1% (post-tax)
○ Post-Tax
Payback: 4.7 years at Base case prices and 2.9 years at spot prices
○ Gross
revenues: $54.2 billion at Base case prices
● Significant
Leverage to Commodity Prices:
○ For
every $100 increase in gold price per ounce, the post-tax NPV5 increases by $300
million
○ For
every $5.00 increase in silver price per ounce, the post-tax NPV5 increases by
$460 million
● Multi-Decade
Production Profile at Meaningful Scale:
○ 51
year mine life
○ Average
annual production:
■ 204,000
ounces of gold
■ 6.8
million ounces of silver
■ 295,000
ounces gold equivalent(2) (“AuEq”)
(1)
Spot prices for gold and silver as of May 25, 2026
(2)
Silver is converted to AuEq using the ratio of $48.00/oz Ag to $3,600/oz Au
1
○ First
10 years deliver enhanced production averaging more than 330,000 ounces AuEq
○ Life
of Mine (“LOM”) production:
■ 10.4
million ounces of gold
■ 347.5
million ounces of silver
■ 15.1
million ounces AuEq
● Conventional
Plant Design, Layout and Processing:
○ Proven
POX processing technology
○ Existing
infrastructure on-site allows for reduced capital expenditures
○ Plant
designed to process 57,100 tons per day of mineralized material
○ LOM
average cash cost(3) of $1,924 per ounce AuEq and all-in sustaining cost (“AISC”)(4)
of $2,147 per ounce AuEq
○ Initial
capital costs: $2.4 billion and LOM sustaining capital costs of $3.1 billion
Significant
Upside and Optionality Remains:
● Potential
mine plan upside opportunities include:
○ Further
drilling to reclassify waste and inferred gold and silver resources to measured and indicated
resources enabling integration into future mine plans
○ Accelerated
access to high-grade zones at Brimstone and Vortex early in the mine life through targeted
optimization
○ Combining
underground mine option alongside the open pit benefiting from large scale production and
bringing high-grade ounces forward earlier in the mine life
○ New
oxide targets have been identified for potential heap leach early in the mine life
○ Extending
mine life or expanding production by processing stockpiled
low-grade mill feed material within the current mine plan but not included in the economic
analysis
● Current
mineral resource comprises less than 15% of the +64,000-acre land position as the Hycroft
system remains open in all directions and at depth for future growth
○ New
exploration targets identified for potential resource expansion opportunities including high-grade
and oxide targets
○ Significant
drilling campaign underway with two core drill rigs at Brimstone and Vortex, increasing to
four core drill rigs over the next quarter to expand and define these two high-grade systems
that currently remain open in all directions and at depth
● Roasting
test work is pending as an alternative processing option which could potentially enhance
project economics including potentially adding a meaningful third revenue stream from the
by-product production and sale of sulfuric acid, a strategically important industrial chemical
Diane
R. Garrett, Executive Chairman and Chief Executive Officer, commented: “This Technical Study confirms the scale, quality, and long-term
potential of the Hycroft Mine. The project delivers strong economics and significant leverage to rising gold and silver prices, reinforcing
Hycroft’s position as one of the sector’s most compelling large-scale development opportunities, located in a Tier 1 jurisdiction.
(3)
Cash costs consist of mining costs, processing costs, mine-level G&A, and refining charges and royalties
(4)
All-in sustaining costs includes cash costs plus sustaining capital and closure costs
2
Importantly,
we believe the most meaningful value creation opportunity remains ahead of us. By advancing the high-grade Brimstone and Vortex silver
systems, we see a clear path to further improving project economics and unlocking additional value. The Hycroft land package remains
a highly prospective environment, and we believe we are only at the beginning of demonstrating its true potential.”
For
additional context on the TRS, please visit our pre-recorded event with 6ix.
About
Hycroft Mining Holding Corporation
Hycroft
Mining Holding Corporation is a US-based gold and silver company exploring and developing the Hycroft Mine, among the world’s largest
precious metals deposits, located in northern Nevada, a Tier-1 mining jurisdiction. Hycroft is engaged in a robust exploration drill
program (2025-2026 exploration drill program) to expand and advance the two new high-grade silver systems – Brimstone and Vortex.
These discoveries represent a significant value driver for the Hycroft Mine.
For
further information, please contact:
E:
info@hycroftmining.com
Investor
Relations Phone: 775-245-0564
www.hycroftmining.com
Media:
Tavistock, Jos Simson / Emily Moss
E:
hycroft@tavistock.co.uk
Phone:
+44 207 920 3150
Cautionary
Statements Regarding the Initial Assessment and Mineral Resources
The
Initial Assessment is a preliminary technical and economic study that indicates the economic potential of the mineralization to support
the disclosure of mineral resources at the Hycroft Mine. The Initial Assessment, however, does not represent a feasibility study or a
pre-feasibility and does not demonstrate economic viability nor does it support a development decision, for which additional project
planning and design are needed. As a result, Hycroft plans to continue to estimate its resources at the Hycroft Mine and further develop
the project economics.
As
used in this news release, the terms “pre-feasibility study,” “feasibility study,” “initial assessment,”
“mineral reserve,” “mineral resource,” “measured mineral resource,” “indicated mineral resource”
and “inferred mineral resource”, as applicable, and other terms used herein are defined and used in accordance with S-K 1300.
The
Initial Assessment also does not include the conversion of mineral resources to mineral reserves. Under subpart 1300 of Regulation S-K,
mineral resources may not be classified as “mineral reserves” unless the determination has been made by a QP that the mineral
resources can be the basis of an economically viable project. Investors are specifically cautioned not to assume that any part or all
of the mineral deposits (including any mineral resources) in these categories will ever be converted into mineral reserves, as defined
by the SEC.
In
addition, estimates of inferred mineral resources have too high of a degree of uncertainty as to their existence and may not be converted
to a mineral reserve. Therefore, investors are cautioned not to assume that all or any part of an inferred mineral resource exists, that
it can be the basis of an economically viable project, or that it will ever be upgraded to a higher category. Likewise, investors are
cautioned not to assume that all or any part of measured or indicated mineral resources will ever be converted to mineral reserves.
Cautionary Note Regarding Forward-Looking
Statements
Certain
information set forth in this news release contains “forward-looking statements” and “forward-looking information”
within the meaning of applicable United States securities law (referred to herein as forward-looking statements). Forward-looking statements
are often identified by the use of words such as “may”, “will”, “could”, “would”, “anticipate”,
“believe”, “expect”, “intend”, “potential”, “estimate”, “budget”,
“scheduled”, “plans”, “planned”, “forecasts”, “goals” and similar expressions.
Except for statements of historical fact, certain information contained herein constitutes forward-looking statements which includes,
but is not limited to, statements with respect to: the future financial or operating performance of the Company, the Hycroft Mine and
its mineral properties; results from work performed to date; the estimation of mineral resources and reserves; the realization of mineral
resource and reserve estimates; the development, operational and economic results of the PEA for the Hycroft Mine, including cash flows,
revenue potential, development, expenditures, and timing thereof, extraction rates, LOM projections and cost estimates; timing of completion
of a technical report summarizing the results of the PEA; magnitude or quality of mineral deposits; anticipated advancement of the Project
mine plan; exploration expenditures, costs and timing of the development of new deposits; costs and timing of future exploration; permitting;
construction and optimization planning; estimates of metallurgical recovery rates; anticipated advancement of the Hycroft Mine, future
prospects and prospective inclusion of mineral resources in future mining activities; requirements for additional capital; the future
price of metals; government regulation of mining operations; environmental risks; the timing and possible outcome of pending regulatory
matters; the realization of the expected economics of the Project; future growth potential of the Project; and future development plans.
Forward-looking
statements are based on a number of factors and assumptions made by management and considered reasonable at the time such statement was
made. Assumptions and factors include: the Company’s ability to complete its planned exploration and development programs; the
absence of adverse conditions at the Hycroft Mine; no unforeseen operational delays; no material delays in obtaining necessary permits;
results of independent engineer technical reviews; the possibility of cost overruns and unanticipated costs and expenses; the price of
gold remaining at levels that continue to render the Hycroft Mine and the Company’s mineral properties economic; the Company’s
ability to continue raising necessary capital to finance operations; and the ability to realize on the mineral resource. Forward-looking
statements necessarily involve known and unknown risks and uncertainties, which may cause actual performance and financial results in
future periods to differ materially from any projections of future performance or result expressed or implied by such forward-looking
statements. These risks and uncertainties include, but are not limited to: general business, economic and competitive uncertainties;
the actual results of current and future exploration activities; conclusions of economic evaluations; meeting various expected cost estimates;
benefits of certain technology usage; changes in the Hycroft Mine parameters and/or economic assessments as plans continue to be refined;
future prices of metals; possible variations of mineral grade or recovery rates; the risk that actual costs may exceed estimated costs;
geological, mining and exploration technical problems; failure of plant, equipment or processes to operate as anticipated; accidents,
labor disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; risks related to local
communities; the speculative nature of mineral exploration and development (including the risks of obtaining necessary licenses, permits
and approvals from government authorities); title to properties; and other factors beyond the Company’s control and as well as
those factors included herein and elsewhere in the Company’s public disclosure. Although the Company has attempted to identify
important factors that could cause actual actions, events or results to differ materially from those described in the forward-looking
statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Readers
are advised to study and consider risk factors disclosed in the Company’s Annual Report on Form 10-K, as amended, for the fiscal
year ended December 31, 2025, and all other quarterly filings, available on the EDGAR profile for the Company at www.sec.gov.
3
Investors
are cautioned not to put undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of
the date of this news release and, accordingly, are subject to change after such date. The Company disclaims any intent or obligation
to update publicly or otherwise revise any forward-looking statements or the foregoing list of assumptions or factors, whether as a result
of new information, future events or otherwise, except in accordance with applicable securities laws. Investors are urged to read the
Company’s filings with U.S. Securities and Exchange Commission which can be viewed online under the Company’s profile on
EDGAR at www.sec.gov.
Cautionary
Note Regarding Non-GAAP Financial Measures
Alternative
performance measures in this news release such as “cash cost”, “AISC”, and Free Cash Flow are furnished to provide
additional information. These non-GAAP performance measures are included in this news release because these statistics are used as key
performance measures that management uses to monitor and assess performance of the Hycroft Mine, and to plan and assess the overall effectiveness
and efficiency of mining operations. These performance measures do not have a standardized meaning within the accounting principles generally
accepted in the Unites States of America (“GAAP”) and, therefore, amounts presented may not be comparable to similar data
presented by other mining companies. These performance measures should not be considered in isolation as a substitute for measures of
performance in accordance with GAAP.
Cash
Costs
Cash
costs include site operating costs (mining, processing, site G&A), refining charges and royalties (excludes corporate office G&A
and exploration expenses). While there is no standardized meaning of the measure across the industry, the Company believes that this
measure is useful to external users in assessing operating performance.
All-In
Sustaining Cost
Site
level AISC includes cash costs plus sustaining capital and closure costs. The Company believes that this measure is useful to external
users in assessing operating performance and the Company’s ability to generate free cash flow from potential operations.
Free
Cash Flow
Free
cash flows are revenues net of operating costs, royalties, capital expenditures, and cash taxes. The Company believes that this measure
is useful to the external users in assessing the Company’s ability to generate cash flows.
4
Appendix
The
S-K 1300 Technical Report Summary and Initial Assessment with Economic Analysis was prepared by Ausenco Engineering South USA with contributing
authors Ausenco Engineering South USA Inc., Independent Mining Consultants Inc. and WestLand Engineering & Environmental Services,
Inc.
The following are summaries of or
excerpts from the TRS, do not purport to be complete and are qualified in their entirety by reference to the full text of the TRS.
The
Hycroft Mine
The
Hycroft mine is among the world’s largest precious metals deposits. It is situated on the western flank of the Kamma Mountains
on the eastern edge of the Black Rock Desert approximately 54 miles west of Winnemucca in Humboldt and Pershing Counties, Nevada, a Tier-1
mining jurisdiction.
The
Technical Study is based on the 2026 Mineral Resource Estimate of 16.4 million ounces of gold and 562.5 million ounces of silver (measured
and indicated). An additional 5.0 million ounces of gold and 132.8 million ounces of silver exist in the inferred mineral resource category
which was not included in this study.
In
2023, Hycroft announced the discovery of two new high-grade silver systems within the known resource area and the Company is engaged
in a significant exploration drill program (2025-2026 drill program) designed to expand these two systems in addition to targeting newly
identified high-grade opportunities. These discoveries represent a significant value driver for the Hycroft Mine.
The
mine has existing facilities on site including administration buildings, mobile maintenance and light vehicle maintenance shops, warehouse,
leach pads, primary, secondary and tertiary crushing systems, assay lab, Merrill-Crowe process plants, refinery and components for a
larger second refinery.
Current
Property and Facilities Layout
5
Technical
Study Overview
The
Technical Study evaluates a heap leaching and milling operation at the Hycroft Mine based on a conventional flotation with POX flowsheet,
followed by hot cure, lime boil, cyanide leach, Merrill-Crowe precipitation and refining.
The
Technical Study was prepared by Ausenco Engineering USA South Inc. (“Ausenco”), Independent Mining Consultants, Inc. (“IMC”),
and WestLand Engineering & Environmental Services, Inc. (“WestLand”) in accordance with S-K 1300 and encompasses a mine
life of 51 years, processing approximately 57,100 tons per day of sulfide and transition mineralized material.
Economic
Analysis Summary
Unit
Value
General
Inputs
Gold
Price
USD$/oz
3,600
Silver
Price
USD$/oz
48
Discount
Rate
%
5
LOM
Production
Total
Mineralized Material Mined
kst
1,496,134
Total
Waste Mined
kst
2,320,719
Average
Strip Ratio
w:o
1.55
Life
of Mine
years
51
Total
Mill Feed Processed
kst
1,046,284
Average
Mill Feed Grade (Au)
oz/st
0.012
Average
Mill Feed Grade (Ag)
oz/st
0.43
Total
Leach Material Processed
kst
210,010
Average
Heap Leach Feed Grade (Au)
oz/st
0.005
Average
Heap Leach Feed Grade (Ag)
oz/st
0.12
Average
Mill Process Gold Recovery
%
82.8
Average
Mill Process Silver Recovery
%
77.5
Average
Heap Leach Gold Recovery
%
40.0
Average
Heap Leach Silver Recovery
%
12.0
Life
of Mine Payable Gold Production
koz
10,424
Life
of Mine Payable Silver Production
koz
347,462
Life
of Mine Payable Gold Equivalent Production
koz
15,057
Transport,
Refining, Royalties
Gold
Payable
%
99.5
Silver
Payable
%
99.5
NSR
Royalty (1.5% plus gross up)
%
NSR
2.14
Refining
Costs - Au
US$/oz
5.00
Refining
Costs - Ag
US$/oz
0.50
6
Unit
Value
LOM
Operating Costs
Mining
Cost
US$/st
mined
2.28
Mining
Cost
US$/st
processed
6.91
Mill
Processing Cost
US$/st
processed
16.65
Heap
Leach Processing Cost
US$/st
processed
2.49
G&A
Cost
US$/st
processed
0.53
Total
Operating Cost
US$/st
processed
21.96
Cash
Costs1
US$/oz
AuEq
1,924
All-In
Sustaining Cost2
US$/oz
AuEq
2,147
Capital
Costs
Initial
Capital
US$M
2,434
Sustaining
Capital
US$M
3,107
Closure
Costs
US$M
243
Financials
Pre-Tax
NPV (5%)
US$M
5,437
Pre-Tax
IRR
%
18.9
Pre-Tax
Payback
years
4.3
Post-Tax
NPV (5%)
US$M
4,344
Post-Tax
IRR
%
16.9
Post-Tax
Payback
years
4.7
1Cash
costs consist of mining costs, processing costs, mine-level G&A and refining charges and royalties
2AISC
includes cash costs plus sustaining capital and closure costs
Significant
Leverage to Gold and Silver Prices
7
LOM
Revenue
Capital
Costs
Description
Capital
Cost (US$M)
Sustaining
Cost (US$M)
Total
Cost
(US$M)
Mining
194
1,171
1,365
Crushing
48
60
109
Sulfide
Process
915
776
1,692
Oxide
Process
16
46
63
Waste
Rock Storage & TMF
208
515
723
Onsite
Infrastructure
139
9
148
Offsite
Infrastructure
43
366
409
Total
Direct Costs
1,563
2,944
4,507
Indirects
382
27
409
Provisions
448
136
584
Owner’s
Costs
41
-
41
Total
Capital Cost
2,434
3,107
5,541
Note:
Includes contingencies
Operating
Costs
The
total operating costs are estimated at $21.96/ton or $27.6 billion over the 51-year mine life. These operating costs do not include pre-production
operating costs. A summary of operating costs is presented in the table below.
Cost
Area
LOM
Total (US$M)
US$/ton
processed
%
of Total
Mining
8,683
6.91
31.5
Process
18,245
14.52
66.1
G&A
664
0.53
2.4
Total
27,592
21.96
100.0
Note:
Includes contingencies
The
TRS is based on the 2026 Measured and Indicated Mineral Resources Estimate (“MRE”). The mine plan is based only on measured
and indicated mineralization that was estimated in the mineral resource block model. Inferred mineralization was not included within
the TRS.
8
Hycroft
Mineral Resource Estimate as of 21 January 2026, US customary Units
Classification
Cutoff
Grade
$
Net
of
Refining
Approximate
Cutoff,
AuEq oz/ton
Ktons
Gold
oz/ton
Silver
oz/ton
Sulfide
Sulfur
%
Contained
Ounces
Gold
Oz
x 1000
Silver
Oz
x 1000
Heap
Leach Resource
Measured
$1.88
- $3.63
0.001
- 0.002
92,994
0.005
0.11
1.83
446
10,322
Indicated
$1.88
- $3.63
0.001
- 0.002
110,374
0.004
0.09
1.54
475
9,492
Meas
+ Ind
$1.88
- $3.63
0.001
- 0.002
203,368
0.005
0.10
1.67
921
19,814
Inferred
$1.88
- $3.63
0.001
- 0.002
110,018
0.005
0.09
1.41
528
10,122
Flotation
Mill + Concentrate Treatment by Pressure Oxidation and Cyanide Leach
Measured
$16.73
0.007
734,571
0.011
0.43
2.03
8,154
316,600
Indicated
$16.73
0.007
748,876
0.010
0.30
1.84
7,339
226,161
Meas
+ Ind
$16.73
0.007
1,483,447
0.010
0.37
1.93
15,493
542,761
Inferred
$16.73
0.007
459,646
0.010
0.27
1.76
4,505
122,725
Combined
Mineral Resources Leach Plus Mill
Measured
$1.88
- $16.73
0.001
- 0.007
827,565
0.010
0.40
2.01
8,600
326,922
Indicated
$1.88
- $16.73
0.001
- 0.007
859,250
0.009
0.27
1.80
7,814
235,653
Meas
+ Ind
$1.88
- $16.73
0.001
- 0.007
1,686,815
0.010
0.33
1.90
16,414
562,575
Inferred
$1.88
- $16.73
0.001
- 0.007
569,664
0.009
0.23
1.69
5,033
132,847
Notes:
1. Mineral
resources based on metal prices of $3,100/troy oz Au and $36.00/troy oz Ag
2. Cutoffs
are Income – Refining Cost = NSR
3. Gold
Equivalent (AuEq) for Heap Leach = Cyanide Gold + 0.0019 x Total Silver Assay,
or at average gold leach recovery AuEq = Fire Gold + 0.0035 Total Silver Assay
4. Gold
Equivalent for Mill + Pressure Oxidation = Fire Gold + 0.0107 x Total Silver Assay
5. Numbers
may not match exactly due to rounding
6. Mineral
resources are contained within a computer-generated optimized pit
7. Total
material in that pit is 5.42 billion tons
8. Mineral
resources are not mineral reserves, and detailed economic considerations have not been applied
9. Modifying
factors for mine and process design have not been applied
10. All
units are US customary Ktons means 1,000 short tons. Au and Ag grades are in troy ounces
per short ton (oz/ton)
Mining
Methods
Hycroft
is planned as a conventional hard rock open pit operation. The mine plan is based on measured and indicated mineralization that was estimated
in the mineral resource block model. Independent Mining Consultants developed a mine plan that produces the required process feed and
moves sufficient mine waste to assure continued release of the mineralization.
The
mine will feed two processing facilities:
1. A
flotation mill followed by pressure oxidation and leaching of the concentrate, and
2. A
Run-of-Mine (“ROM”) heap leach for mineralization that is amenable to direct
cyanide leaching.
The
cutoff grade for the schedule is based on income net of process:
● Income
net of process = Net Return after Refining – Process Costs
Total
mined material begins with 11.3 million tons per annum in preproduction and increases to 71.2 million tons per annum in Years 1 through
3. Additional equipment is acquired later in the mine life with total material movement increasing to 82.0 million tons per annum from
Years 5 to 27. From Year 28 until the end of the mine life (Year 51) the total material mined reduces to 70 million tons per annum.
9
The
material planned for milling and leaching on the production schedule is potentially minable material. They do not constitute mineral
reserves at this time.
Low-grade
mill feed material is stockpiled throughout the mine life. This material is not fed to the mill and is not part of the economic analysis
in this report. Further trade-off studies will analyze the opportunity to feed this additional material through the process plant.
Mined
Tons & Payable Gold Equivalent Ounces
Production
Schedule
The
following graphs reflect the approximate recovered metal produced over the mine life and the relative metal contribution of the heap
leach compared to the mill.
Recovered
Gold and Silver by Year
10
Processing
and Recovery Methods
A
significant portion of the gold and silver in the material going to the process plant is refractory due to its association with pyrite,
marcasite, and other sulfide minerals. Oxide and some transition material will be processed on a heap leach pad. A process flowsheet
was developed to treat sulfide and certain transition mineralization. These materials are ground and floated to produce a concentrate.
The concentrate is then oxidized in the POX plant and subsequently cyanide leached to extract gold and silver.
The
key process plant design criteria are:
● Major
equipment is designed for a nominal throughput of 57,100 tons/day
● Plant
process recovery of 82.8% gold and 77.5% silver, given the LOM average grades
● Existing
crushing circuit consists of primary, secondary, and tertiary crushing, supported by a coarse
ore stockpile and a crushed ore stockpile with dedicated feeders to provide continuous feed
to the downstream process plant
● Process
flowsheets include three stages of crushing followed by two stages of ball milling, flotation,
POX, a cyanide leaching circuit for oxidized flotation concentrate, Merrill-Crowe circuit,
and Tailings Management Facilities (“TMF”), with an overall availability of 92%
Pregnant
solution from the cyanide leach circuit will be processed in the existing Merrill-Crowe zinc cementation facilities.
Infrastructure
The
Hycroft Mine benefits from substantial existing infrastructure constructed and operated over decades of prior production. Key existing
facilities include:
● Crushing
facility
● Heap
leach pads
● North
Merrill-Crowe facility
● Onsite
access, haul roads and a major east–west railway pass adjacent to the Hycroft property
● Truck
shop
● Maintenance
building
● Laboratory
and administrative buildings
● Power
is supplied to the site from nearby power lines
● Potable
water is sourced from a well
11
New
infrastructure to be constructed includes the Northeast TMF, a Waste Rock Storage Facility, the Process Plant Site and associated infrastructure,
a Limestone Plant, and a new rail spur.
The
proposed processing facility is designed to be inclusive with (or “of”) the existing crushing circuit and North Merrill-Crowe
facility. The proposed scope of work includes electrical distribution upgrades, new substations, process control systems, reagent handling
facilities (including oxygen and limestone systems), and selective expansion or repurposing of existing maintenance and administrative
buildings.
The
site currently has access to grid power. Additional transmission capacity is required to support the new plant. The total estimated load
factoring for load growth, including power for the oxygen plant, is 160 MW. Tie-ins to existing utilities will include water, compressed
air, and potable and sewer systems. The development of a freshwater production well field is also planned to support freshwater needs
throughout the LOM.
A
rail spur extension from the Union Pacific line is planned to support delivery of reagents, consumables, and fuel. Additionally, the
existing fuel island is to be replaced with a higher-efficiency system during the LOM.
Ancillary
structures including a covered crushed ore stockpile, new laboratory and maintenance facilities, fuel station upgrades, and technical
services expansion are proposed to support operations over the LOM. In addition to this, selected existing buildings will be relocated,
expanded, rehabilitated, or repurposed.
Contracts
Hycroft
Mine is subject to a royalty agreement (Sprott Royalty Agreement) with SPRL II which was initiated on May 29, 2020. The royalty is accounted
for by Hycroft as a deferred gain liability in which Hycroft received a cash consideration of US$30.0 million in exchange for a perpetual
royalty equal to 1.5% (2.14% including withholding tax gross up) of Net Smelter Returns (NSR) from Hycroft Mine.
Environmental,
Permitting and Social Considerations
The
Mine is located on public land administered by the Bureau of Land Management (“BLM”) and private land controlled by Hycroft
Resources and Development, LLC, a wholly owned subsidiary of Hycroft Mining Holding Company.
Hycroft
is currently authorized to operate under a plan of operations (“POO”) for ore extraction and processing, water management,
engineering, environmental studies, and exploration. In 2012, the BLM issued a Record of Decision (“ROD”) for an EIS conducted
for the Mine to expand heap leach operations, open pits, and waste rock facilities. In 2014, the BLM issued a Decision Record with an
Environmental Assessment authorizing Hycroft’s POO for construction and operations of a rail spur, open pit expansion, and construction
of a processing complex, including the TMF located northeast of the Mine.
The
TRS outlines development of additional infrastructure to support the modified Project including construction of a new TMF, waste rock
storage facilities, rail spur, and a new process plant area. Review and approval of proposed revisions to the POO by the BLM constitutes
a federal action under the National Environmental Policy Act and applicable BLM regulations. Accordingly, BLM review of the Plan Application
will require preparation of either an Environmental Assessment or an Environmental Impact Statement.
12
EX-99.2
EX-99.2
Filename: ex99-2.htm · Sequence: 7
Exhibit 99.2
GRAPHIC
GRAPHIC
Filename: ex1_001.jpg · Sequence: 8
Binary file (432065 bytes)
Download ex1_001.jpg
GRAPHIC
GRAPHIC
Filename: ex1_002.jpg · Sequence: 9
Binary file (117228 bytes)
Download ex1_002.jpg
GRAPHIC
GRAPHIC
Filename: ex1_003.jpg · Sequence: 10
Binary file (73776 bytes)
Download ex1_003.jpg
GRAPHIC
GRAPHIC
Filename: ex1_004.jpg · Sequence: 11
Binary file (55579 bytes)
Download ex1_004.jpg
GRAPHIC
GRAPHIC
Filename: ex1_005.jpg · Sequence: 12
Binary file (56550 bytes)
Download ex1_005.jpg
GRAPHIC
GRAPHIC
Filename: ex1_006.jpg · Sequence: 13
Binary file (115035 bytes)
Download ex1_006.jpg
GRAPHIC
GRAPHIC
Filename: ex1_007.jpg · Sequence: 14
Binary file (38424 bytes)
Download ex1_007.jpg
GRAPHIC
GRAPHIC
Filename: ex1_008.jpg · Sequence: 15
Binary file (43457 bytes)
Download ex1_008.jpg
GRAPHIC
GRAPHIC
Filename: ex1_009.jpg · Sequence: 16
Binary file (49810 bytes)
Download ex1_009.jpg
GRAPHIC
GRAPHIC
Filename: ex1_010.jpg · Sequence: 17
Binary file (40919 bytes)
Download ex1_010.jpg
GRAPHIC
GRAPHIC
Filename: ex1_011.jpg · Sequence: 18
Binary file (30193 bytes)
Download ex1_011.jpg
GRAPHIC
GRAPHIC
Filename: ex1_012.jpg · Sequence: 19
Binary file (33699 bytes)
Download ex1_012.jpg
GRAPHIC
GRAPHIC
Filename: ex1_013.jpg · Sequence: 20
Binary file (36156 bytes)
Download ex1_013.jpg
GRAPHIC
GRAPHIC
Filename: ex1_014.jpg · Sequence: 21
Binary file (37890 bytes)
Download ex1_014.jpg
GRAPHIC
GRAPHIC
Filename: ex1_015.jpg · Sequence: 22
Binary file (53968 bytes)
Download ex1_015.jpg
GRAPHIC
GRAPHIC
Filename: ex1_016.jpg · Sequence: 23
Binary file (88823 bytes)
Download ex1_016.jpg
GRAPHIC
GRAPHIC
Filename: ex1_017.jpg · Sequence: 24
Binary file (62740 bytes)
Download ex1_017.jpg
GRAPHIC
GRAPHIC
Filename: ex1_018.jpg · Sequence: 25
Binary file (61516 bytes)
Download ex1_018.jpg
GRAPHIC
GRAPHIC
Filename: ex1_019.jpg · Sequence: 26
Binary file (40664 bytes)
Download ex1_019.jpg
GRAPHIC
GRAPHIC
Filename: ex1_020.jpg · Sequence: 27
Binary file (35845 bytes)
Download ex1_020.jpg
GRAPHIC
GRAPHIC
Filename: ex1_021.jpg · Sequence: 28
Binary file (80851 bytes)
Download ex1_021.jpg
GRAPHIC
GRAPHIC
Filename: ex1_022.jpg · Sequence: 29
Binary file (98223 bytes)
Download ex1_022.jpg
GRAPHIC
GRAPHIC
Filename: ex1_023.jpg · Sequence: 30
Binary file (97894 bytes)
Download ex1_023.jpg
GRAPHIC
GRAPHIC
Filename: ex1_024.jpg · Sequence: 31
Binary file (84081 bytes)
Download ex1_024.jpg
GRAPHIC
GRAPHIC
Filename: ex1_025.jpg · Sequence: 32
Binary file (97741 bytes)
Download ex1_025.jpg
GRAPHIC
GRAPHIC
Filename: ex1_026.jpg · Sequence: 33
Binary file (111679 bytes)
Download ex1_026.jpg
GRAPHIC
GRAPHIC
Filename: ex1_027.jpg · Sequence: 34
Binary file (269374 bytes)
Download ex1_027.jpg
GRAPHIC
GRAPHIC
Filename: ex1_028.jpg · Sequence: 35
Binary file (267052 bytes)
Download ex1_028.jpg
GRAPHIC
GRAPHIC
Filename: ex1_029.jpg · Sequence: 36
Binary file (113021 bytes)
Download ex1_029.jpg
GRAPHIC
GRAPHIC
Filename: ex1_030.jpg · Sequence: 37
Binary file (102953 bytes)
Download ex1_030.jpg
GRAPHIC
GRAPHIC
Filename: ex1_031.jpg · Sequence: 38
Binary file (62380 bytes)
Download ex1_031.jpg
GRAPHIC
GRAPHIC
Filename: ex1_032.jpg · Sequence: 39
Binary file (93448 bytes)
Download ex1_032.jpg
GRAPHIC
GRAPHIC
Filename: ex1_033.jpg · Sequence: 40
Binary file (85030 bytes)
Download ex1_033.jpg
GRAPHIC
GRAPHIC
Filename: ex1_034.jpg · Sequence: 41
Binary file (85420 bytes)
Download ex1_034.jpg
GRAPHIC
GRAPHIC
Filename: ex1_035.jpg · Sequence: 42
Binary file (88914 bytes)
Download ex1_035.jpg
GRAPHIC
GRAPHIC
Filename: ex1_036.jpg · Sequence: 43
Binary file (50064 bytes)
Download ex1_036.jpg
GRAPHIC
GRAPHIC
Filename: ex1_037.jpg · Sequence: 44
Binary file (72277 bytes)
Download ex1_037.jpg
GRAPHIC
GRAPHIC
Filename: ex1_038.jpg · Sequence: 45
Binary file (69303 bytes)
Download ex1_038.jpg
GRAPHIC
GRAPHIC
Filename: ex1_039.jpg · Sequence: 46
Binary file (62306 bytes)
Download ex1_039.jpg
GRAPHIC
GRAPHIC
Filename: ex1_040.jpg · Sequence: 47
Binary file (83557 bytes)
Download ex1_040.jpg
GRAPHIC
GRAPHIC
Filename: ex1_041.jpg · Sequence: 48
Binary file (338415 bytes)
Download ex1_041.jpg
GRAPHIC
GRAPHIC
Filename: ex1_042.jpg · Sequence: 49
Binary file (446128 bytes)
Download ex1_042.jpg
GRAPHIC
GRAPHIC
Filename: ex1_043.jpg · Sequence: 50
Binary file (302512 bytes)
Download ex1_043.jpg
GRAPHIC
GRAPHIC
Filename: ex1_044.jpg · Sequence: 51
Binary file (307960 bytes)
Download ex1_044.jpg
GRAPHIC
GRAPHIC
Filename: ex1_045.jpg · Sequence: 52
Binary file (89445 bytes)
Download ex1_045.jpg
GRAPHIC
GRAPHIC
Filename: ex1_046.jpg · Sequence: 53
Binary file (40281 bytes)
Download ex1_046.jpg
GRAPHIC
GRAPHIC
Filename: ex1_047.jpg · Sequence: 54
Binary file (53475 bytes)
Download ex1_047.jpg
GRAPHIC
GRAPHIC
Filename: ex1_048.jpg · Sequence: 55
Binary file (52651 bytes)
Download ex1_048.jpg
GRAPHIC
GRAPHIC
Filename: ex1_049.jpg · Sequence: 56
Binary file (50446 bytes)
Download ex1_049.jpg
GRAPHIC
GRAPHIC
Filename: ex1_050.jpg · Sequence: 57
Binary file (49788 bytes)
Download ex1_050.jpg
GRAPHIC
GRAPHIC
Filename: ex1_051.jpg · Sequence: 58
Binary file (314138 bytes)
Download ex1_051.jpg
GRAPHIC
GRAPHIC
Filename: ex1_052.jpg · Sequence: 59
Binary file (297355 bytes)
Download ex1_052.jpg
GRAPHIC
GRAPHIC
Filename: ex1_053.jpg · Sequence: 60
Binary file (335815 bytes)
Download ex1_053.jpg
GRAPHIC
GRAPHIC
Filename: ex1_057.jpg · Sequence: 61
Binary file (91746 bytes)
Download ex1_057.jpg
GRAPHIC
GRAPHIC
Filename: ex1_058.jpg · Sequence: 62
Binary file (33310 bytes)
Download ex1_058.jpg
GRAPHIC
GRAPHIC
Filename: ex1_059.jpg · Sequence: 63
Binary file (31465 bytes)
Download ex1_059.jpg
GRAPHIC
GRAPHIC
Filename: ex1_060.jpg · Sequence: 64
Binary file (69873 bytes)
Download ex1_060.jpg
GRAPHIC
GRAPHIC
Filename: ex1_061.jpg · Sequence: 65
Binary file (50231 bytes)
Download ex1_061.jpg
GRAPHIC
GRAPHIC
Filename: ex1_062.jpg · Sequence: 66
Binary file (72111 bytes)
Download ex1_062.jpg
GRAPHIC
GRAPHIC
Filename: ex1_063.jpg · Sequence: 67
Binary file (252759 bytes)
Download ex1_063.jpg
GRAPHIC
GRAPHIC
Filename: ex1_064.jpg · Sequence: 68
Binary file (242867 bytes)
Download ex1_064.jpg
GRAPHIC
GRAPHIC
Filename: ex1_065.jpg · Sequence: 69
Binary file (238369 bytes)
Download ex1_065.jpg
GRAPHIC
GRAPHIC
Filename: ex1_066.jpg · Sequence: 70
Binary file (239357 bytes)
Download ex1_066.jpg
GRAPHIC
GRAPHIC
Filename: ex1_067.jpg · Sequence: 71
Binary file (241078 bytes)
Download ex1_067.jpg
GRAPHIC
GRAPHIC
Filename: ex1_068.jpg · Sequence: 72
Binary file (239913 bytes)
Download ex1_068.jpg
GRAPHIC
GRAPHIC
Filename: ex1_069.jpg · Sequence: 73
Binary file (238685 bytes)
Download ex1_069.jpg
GRAPHIC
GRAPHIC
Filename: ex1_070.jpg · Sequence: 74
Binary file (239014 bytes)
Download ex1_070.jpg
GRAPHIC
GRAPHIC
Filename: ex1_071.jpg · Sequence: 75
Binary file (244227 bytes)
Download ex1_071.jpg
GRAPHIC
GRAPHIC
Filename: ex1_072.jpg · Sequence: 76
Binary file (247534 bytes)
Download ex1_072.jpg
GRAPHIC
GRAPHIC
Filename: ex1_073.jpg · Sequence: 77
Binary file (251745 bytes)
Download ex1_073.jpg
GRAPHIC
GRAPHIC
Filename: ex1_074.jpg · Sequence: 78
Binary file (116941 bytes)
Download ex1_074.jpg
GRAPHIC
GRAPHIC
Filename: ex1_075.jpg · Sequence: 79
Binary file (121183 bytes)
Download ex1_075.jpg
GRAPHIC
GRAPHIC
Filename: ex1_076.jpg · Sequence: 80
Binary file (238358 bytes)
Download ex1_076.jpg
GRAPHIC
GRAPHIC
Filename: ex1_077.jpg · Sequence: 81
Binary file (173261 bytes)
Download ex1_077.jpg
GRAPHIC
GRAPHIC
Filename: ex1_078.jpg · Sequence: 82
Binary file (177612 bytes)
Download ex1_078.jpg
GRAPHIC
GRAPHIC
Filename: ex1_079.jpg · Sequence: 83
Binary file (156176 bytes)
Download ex1_079.jpg
GRAPHIC
GRAPHIC
Filename: ex1_080.jpg · Sequence: 84
Binary file (185466 bytes)
Download ex1_080.jpg
GRAPHIC
GRAPHIC
Filename: ex1_081.jpg · Sequence: 85
Binary file (112515 bytes)
Download ex1_081.jpg
GRAPHIC
GRAPHIC
Filename: ex1_082.jpg · Sequence: 86
Binary file (120087 bytes)
Download ex1_082.jpg
GRAPHIC
GRAPHIC
Filename: ex1_083.jpg · Sequence: 87
Binary file (160494 bytes)
Download ex1_083.jpg
GRAPHIC
GRAPHIC
Filename: ex1_084.jpg · Sequence: 88
Binary file (267858 bytes)
Download ex1_084.jpg
GRAPHIC
GRAPHIC
Filename: ex1_085.jpg · Sequence: 89
Binary file (236215 bytes)
Download ex1_085.jpg
GRAPHIC
GRAPHIC
Filename: ex1_086.jpg · Sequence: 90
Binary file (201303 bytes)
Download ex1_086.jpg
GRAPHIC
GRAPHIC
Filename: ex1_087.jpg · Sequence: 91
Binary file (314864 bytes)
Download ex1_087.jpg
GRAPHIC
GRAPHIC
Filename: ex1_088.jpg · Sequence: 92
Binary file (339142 bytes)
Download ex1_088.jpg
GRAPHIC
GRAPHIC
Filename: ex1_089.jpg · Sequence: 93
Binary file (47424 bytes)
Download ex1_089.jpg
GRAPHIC
GRAPHIC
Filename: ex1_090.jpg · Sequence: 94
Binary file (48596 bytes)
Download ex1_090.jpg
GRAPHIC
GRAPHIC
Filename: ex1_091.jpg · Sequence: 95
Binary file (107008 bytes)
Download ex1_091.jpg
GRAPHIC
GRAPHIC
Filename: ex1_092.jpg · Sequence: 96
Binary file (80974 bytes)
Download ex1_092.jpg
GRAPHIC
GRAPHIC
Filename: ex1_093.jpg · Sequence: 97
Binary file (30965 bytes)
Download ex1_093.jpg
GRAPHIC
GRAPHIC
Filename: ex1_094.jpg · Sequence: 98
Binary file (27175 bytes)
Download ex1_094.jpg
GRAPHIC
GRAPHIC
Filename: ex1_095.jpg · Sequence: 99
Binary file (23026 bytes)
Download ex1_095.jpg
GRAPHIC
GRAPHIC
Filename: ex1_096.jpg · Sequence: 100
Binary file (24292 bytes)
Download ex1_096.jpg
GRAPHIC
GRAPHIC
Filename: ex1_097.jpg · Sequence: 101
Binary file (21841 bytes)
Download ex1_097.jpg
GRAPHIC
GRAPHIC
Filename: ex1_098.jpg · Sequence: 102
Binary file (27063 bytes)
Download ex1_098.jpg
GRAPHIC
GRAPHIC
Filename: logo_001.jpg · Sequence: 103
Binary file (4208 bytes)
Download logo_001.jpg
GRAPHIC
GRAPHIC
Filename: logo_002.jpg · Sequence: 104
Binary file (9293 bytes)
Download logo_002.jpg
GRAPHIC
GRAPHIC
Filename: slide_002.jpg · Sequence: 105
Binary file (16794 bytes)
Download slide_002.jpg
GRAPHIC
GRAPHIC
Filename: ex99-1_001.jpg · Sequence: 106
Binary file (38625 bytes)
Download ex99-1_001.jpg
GRAPHIC
GRAPHIC
Filename: ex99-1_008.jpg · Sequence: 107
Binary file (11455 bytes)
Download ex99-1_008.jpg
GRAPHIC
GRAPHIC
Filename: ex99-1_002.jpg · Sequence: 108
Binary file (523591 bytes)
Download ex99-1_002.jpg
GRAPHIC
GRAPHIC
Filename: ex99-1_003.jpg · Sequence: 109
Binary file (105840 bytes)
Download ex99-1_003.jpg
GRAPHIC
GRAPHIC
Filename: ex99-1_004.jpg · Sequence: 110
Binary file (134876 bytes)
Download ex99-1_004.jpg
GRAPHIC
GRAPHIC
Filename: ex99-1_005.jpg · Sequence: 111
Binary file (204486 bytes)
Download ex99-1_005.jpg
GRAPHIC
GRAPHIC
Filename: ex99-1_006.jpg · Sequence: 112
Binary file (122985 bytes)
Download ex99-1_006.jpg
GRAPHIC
GRAPHIC
Filename: ex99-1_007.jpg · Sequence: 113
Binary file (87737 bytes)
Download ex99-1_007.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_001.jpg · Sequence: 114
Binary file (335739 bytes)
Download ex99-2_001.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_002.jpg · Sequence: 115
Binary file (586767 bytes)
Download ex99-2_002.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_003.jpg · Sequence: 116
Binary file (366414 bytes)
Download ex99-2_003.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_004.jpg · Sequence: 117
Binary file (540402 bytes)
Download ex99-2_004.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_005.jpg · Sequence: 118
Binary file (429104 bytes)
Download ex99-2_005.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_006.jpg · Sequence: 119
Binary file (490698 bytes)
Download ex99-2_006.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_007.jpg · Sequence: 120
Binary file (191346 bytes)
Download ex99-2_007.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_008.jpg · Sequence: 121
Binary file (186124 bytes)
Download ex99-2_008.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_009.jpg · Sequence: 122
Binary file (276880 bytes)
Download ex99-2_009.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_010.jpg · Sequence: 123
Binary file (268079 bytes)
Download ex99-2_010.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_011.jpg · Sequence: 124
Binary file (791249 bytes)
Download ex99-2_011.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_012.jpg · Sequence: 125
Binary file (224093 bytes)
Download ex99-2_012.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_013.jpg · Sequence: 126
Binary file (299372 bytes)
Download ex99-2_013.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_014.jpg · Sequence: 127
Binary file (569401 bytes)
Download ex99-2_014.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_015.jpg · Sequence: 128
Binary file (845030 bytes)
Download ex99-2_015.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_016.jpg · Sequence: 129
Binary file (478940 bytes)
Download ex99-2_016.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_017.jpg · Sequence: 130
Binary file (675617 bytes)
Download ex99-2_017.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_018.jpg · Sequence: 131
Binary file (597555 bytes)
Download ex99-2_018.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_019.jpg · Sequence: 132
Binary file (575610 bytes)
Download ex99-2_019.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_020.jpg · Sequence: 133
Binary file (605668 bytes)
Download ex99-2_020.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_021.jpg · Sequence: 134
Binary file (721436 bytes)
Download ex99-2_021.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_022.jpg · Sequence: 135
Binary file (662677 bytes)
Download ex99-2_022.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_023.jpg · Sequence: 136
Binary file (365037 bytes)
Download ex99-2_023.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_024.jpg · Sequence: 137
Binary file (448414 bytes)
Download ex99-2_024.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_025.jpg · Sequence: 138
Binary file (427025 bytes)
Download ex99-2_025.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_026.jpg · Sequence: 139
Binary file (472252 bytes)
Download ex99-2_026.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_027.jpg · Sequence: 140
Binary file (583683 bytes)
Download ex99-2_027.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_028.jpg · Sequence: 141
Binary file (268885 bytes)
Download ex99-2_028.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_029.jpg · Sequence: 142
Binary file (332221 bytes)
Download ex99-2_029.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_030.jpg · Sequence: 143
Binary file (293125 bytes)
Download ex99-2_030.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_031.jpg · Sequence: 144
Binary file (190169 bytes)
Download ex99-2_031.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_032.jpg · Sequence: 145
Binary file (282961 bytes)
Download ex99-2_032.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_033.jpg · Sequence: 146
Binary file (298513 bytes)
Download ex99-2_033.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_034.jpg · Sequence: 147
Binary file (318772 bytes)
Download ex99-2_034.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_035.jpg · Sequence: 148
Binary file (355982 bytes)
Download ex99-2_035.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_036.jpg · Sequence: 149
Binary file (349020 bytes)
Download ex99-2_036.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_037.jpg · Sequence: 150
Binary file (270884 bytes)
Download ex99-2_037.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_038.jpg · Sequence: 151
Binary file (209520 bytes)
Download ex99-2_038.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_039.jpg · Sequence: 152
Binary file (298379 bytes)
Download ex99-2_039.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_040.jpg · Sequence: 153
Binary file (406915 bytes)
Download ex99-2_040.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_041.jpg · Sequence: 154
Binary file (360898 bytes)
Download ex99-2_041.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_042.jpg · Sequence: 155
Binary file (432600 bytes)
Download ex99-2_042.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_043.jpg · Sequence: 156
Binary file (396486 bytes)
Download ex99-2_043.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_044.jpg · Sequence: 157
Binary file (292827 bytes)
Download ex99-2_044.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_045.jpg · Sequence: 158
Binary file (309422 bytes)
Download ex99-2_045.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_046.jpg · Sequence: 159
Binary file (638416 bytes)
Download ex99-2_046.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_047.jpg · Sequence: 160
Binary file (582866 bytes)
Download ex99-2_047.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_048.jpg · Sequence: 161
Binary file (628271 bytes)
Download ex99-2_048.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_049.jpg · Sequence: 162
Binary file (616651 bytes)
Download ex99-2_049.jpg
GRAPHIC
GRAPHIC
Filename: ex99-2_050.jpg · Sequence: 163
Binary file (676344 bytes)
Download ex99-2_050.jpg
XML — IDEA: XBRL DOCUMENT
XML
Filename: R1.htm · Sequence: 168
v3.26.1
Cover
Jun. 02, 2026
Cover [Abstract]
Document Type
8-K
Amendment Flag
false
Document Period End Date
Jun. 02, 2026
Entity File Number
001-38387
Entity Registrant Name
HYCROFT
MINING HOLDING CORPORATION
Entity Central Index Key
0001718405
Entity Tax Identification Number
82-2657796
Entity Incorporation, State or Country Code
DE
Entity Address, Address Line One
P.O.
Box 3030
Entity Address, City or Town
Winnemucca
Entity Address, State or Province
NV
Entity Address, Postal Zip Code
89446
City Area Code
(775)
Local Phone Number
304-0260
Written Communications
false
Soliciting Material
false
Pre-commencement Tender Offer
false
Pre-commencement Issuer Tender Offer
false
Title of 12(b) Security
Class A common stock, par value $0.0001 per share
Trading Symbol
HYMC
Security Exchange Name
NASDAQ
Entity Emerging Growth Company
false
X
- Definition
Boolean flag that is true when the XBRL content amends previously-filed or accepted submission.
+ References
No definition available.
+ Details
Name:
dei_AmendmentFlag
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Area code of city
+ References
No definition available.
+ Details
Name:
dei_CityAreaCode
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Cover page.
+ References
No definition available.
+ Details
Name:
dei_CoverAbstract
Namespace Prefix:
dei_
Data Type:
xbrli:stringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
For the EDGAR submission types of Form 8-K: the date of the report, the date of the earliest event reported; for the EDGAR submission types of Form N-1A: the filing date; for all other submission types: the end of the reporting or transition period. The format of the date is YYYY-MM-DD.
+ References
No definition available.
+ Details
Name:
dei_DocumentPeriodEndDate
Namespace Prefix:
dei_
Data Type:
xbrli:dateItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The type of document being provided (such as 10-K, 10-Q, 485BPOS, etc). The document type is limited to the same value as the supporting SEC submission type, or the word 'Other'.
+ References
No definition available.
+ Details
Name:
dei_DocumentType
Namespace Prefix:
dei_
Data Type:
dei:submissionTypeItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Address Line 1 such as Attn, Building Name, Street Name
+ References
No definition available.
+ Details
Name:
dei_EntityAddressAddressLine1
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the City or Town
+ References
No definition available.
+ Details
Name:
dei_EntityAddressCityOrTown
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Code for the postal or zip code
+ References
No definition available.
+ Details
Name:
dei_EntityAddressPostalZipCode
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the state or province.
+ References
No definition available.
+ Details
Name:
dei_EntityAddressStateOrProvince
Namespace Prefix:
dei_
Data Type:
dei:stateOrProvinceItemType
Balance Type:
na
Period Type:
duration
X
- Definition
A unique 10-digit SEC-issued value to identify entities that have filed disclosures with the SEC. It is commonly abbreviated as CIK.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityCentralIndexKey
Namespace Prefix:
dei_
Data Type:
dei:centralIndexKeyItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Indicate if registrant meets the emerging growth company criteria.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityEmergingGrowthCompany
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Commission file number. The field allows up to 17 characters. The prefix may contain 1-3 digits, the sequence number may contain 1-8 digits, the optional suffix may contain 1-4 characters, and the fields are separated with a hyphen.
+ References
No definition available.
+ Details
Name:
dei_EntityFileNumber
Namespace Prefix:
dei_
Data Type:
dei:fileNumberItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Two-character EDGAR code representing the state or country of incorporation.
+ References
No definition available.
+ Details
Name:
dei_EntityIncorporationStateCountryCode
Namespace Prefix:
dei_
Data Type:
dei:edgarStateCountryItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The exact name of the entity filing the report as specified in its charter, which is required by forms filed with the SEC.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityRegistrantName
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The Tax Identification Number (TIN), also known as an Employer Identification Number (EIN), is a unique 9-digit value assigned by the IRS.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityTaxIdentificationNumber
Namespace Prefix:
dei_
Data Type:
dei:employerIdItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Local phone number for entity.
+ References
No definition available.
+ Details
Name:
dei_LocalPhoneNumber
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 13e
-Subsection 4c
+ Details
Name:
dei_PreCommencementIssuerTenderOffer
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 14d
-Subsection 2b
+ Details
Name:
dei_PreCommencementTenderOffer
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Title of a 12(b) registered security.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b
+ Details
Name:
dei_Security12bTitle
Namespace Prefix:
dei_
Data Type:
dei:securityTitleItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the Exchange on which a security is registered.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection d1-1
+ Details
Name:
dei_SecurityExchangeName
Namespace Prefix:
dei_
Data Type:
dei:edgarExchangeCodeItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as soliciting material pursuant to Rule 14a-12 under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 14a
-Subsection 12
+ Details
Name:
dei_SolicitingMaterial
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Trading symbol of an instrument as listed on an exchange.
+ References
No definition available.
+ Details
Name:
dei_TradingSymbol
Namespace Prefix:
dei_
Data Type:
dei:tradingSymbolItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as written communications pursuant to Rule 425 under the Securities Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Securities Act
-Number 230
-Section 425
+ Details
Name:
dei_WrittenCommunications
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration