Form 8-K
8-K — i-80 Gold Corp.
Accession: 0001193125-26-397337
Filed: 2026-09-22
Period: 2026-09-21
CIK: 0001853962
SIC: 1040 (GOLD & SILVER ORES)
Item: Other Events
Item: Financial Statements and Exhibits
Documents
8-K — d29391d8k.htm (Primary)
EX-23.1 (d29391dex231.htm)
EX-23.2 (d29391dex232.htm)
EX-23.3 (d29391dex233.htm)
EX-23.4 (d29391dex234.htm)
EX-23.5 (d29391dex235.htm)
EX-23.6 (d29391dex236.htm)
EX-23.7 (d29391dex237.htm)
EX-99.1 (d29391dex991.htm)
GRAPHIC (g29391dsp0073.jpg)
GRAPHIC (g29391dsp009.jpg)
GRAPHIC (g29391dsp074.jpg)
GRAPHIC (g29391dsp121.jpg)
GRAPHIC (g29391dsp122.jpg)
GRAPHIC (g29391dsp92.jpg)
GRAPHIC (g29391g04i44.jpg)
GRAPHIC (g29391g0920004437544.jpg)
GRAPHIC (g29391g0920004438030.jpg)
GRAPHIC (g29391g0920004438271.jpg)
GRAPHIC (g29391g0920004438535.jpg)
GRAPHIC (g29391g0920004438799.jpg)
GRAPHIC (g29391g0920004439072.jpg)
GRAPHIC (g29391g0920004439391.jpg)
GRAPHIC (g29391g0920004439735.jpg)
GRAPHIC (g29391g0920004439991.jpg)
GRAPHIC (g29391g0920004440261.jpg)
GRAPHIC (g29391g0920004440531.jpg)
GRAPHIC (g29391g0920004440788.jpg)
GRAPHIC (g29391g0920004441097.jpg)
GRAPHIC (g29391g0920004441430.jpg)
GRAPHIC (g29391g0920004442438.jpg)
GRAPHIC (g29391g0920004442707.jpg)
GRAPHIC (g29391g0920004442996.jpg)
GRAPHIC (g29391g0920004443371.jpg)
GRAPHIC (g29391g0920004443765.jpg)
GRAPHIC (g29391g0920004444130.jpg)
GRAPHIC (g29391g0920004444589.jpg)
GRAPHIC (g29391g0920004445238.jpg)
GRAPHIC (g29391g0920004445552.jpg)
GRAPHIC (g29391g0920004445859.jpg)
GRAPHIC (g29391g0920004446153.jpg)
GRAPHIC (g29391g0920004446470.jpg)
GRAPHIC (g29391g0920004446770.jpg)
GRAPHIC (g29391g0920004447108.jpg)
GRAPHIC (g29391g0920004447433.jpg)
GRAPHIC (g29391g0920004643511.jpg)
GRAPHIC (g29391g0920004644095.jpg)
GRAPHIC (g29391g0920004644536.jpg)
GRAPHIC (g29391g0920004644758.jpg)
GRAPHIC (g29391g0920004645276.jpg)
GRAPHIC (g29391g0920004645801.jpg)
GRAPHIC (g29391g0920004646089.jpg)
GRAPHIC (g29391g0920004646361.jpg)
GRAPHIC (g29391g0920005016878.jpg)
GRAPHIC (g29391g0920005017541.jpg)
GRAPHIC (g29391g0920005017923.jpg)
GRAPHIC (g29391g0920005018771.jpg)
GRAPHIC (g29391g0920005019678.jpg)
GRAPHIC (g29391g0920005020076.jpg)
GRAPHIC (g29391g0920005020462.jpg)
GRAPHIC (g29391g0920005020923.jpg)
GRAPHIC (g29391g0920005021315.jpg)
GRAPHIC (g29391g0920005021706.jpg)
GRAPHIC (g29391g0920005022051.jpg)
GRAPHIC (g29391g0920005022408.jpg)
GRAPHIC (g29391g0920005022745.jpg)
GRAPHIC (g29391g0920005023148.jpg)
GRAPHIC (g29391g0920005023595.jpg)
GRAPHIC (g29391g0920005024004.jpg)
GRAPHIC (g29391g0920005024451.jpg)
GRAPHIC (g29391g0920005032842.jpg)
GRAPHIC (g29391g0920005033350.jpg)
GRAPHIC (g29391g0920005034207.jpg)
GRAPHIC (g29391g0920005034612.jpg)
GRAPHIC (g29391g0920005035193.jpg)
GRAPHIC (g29391g0920005035526.jpg)
GRAPHIC (g29391g0920005035897.jpg)
GRAPHIC (g29391g0920005036689.jpg)
GRAPHIC (g29391g0920005037201.jpg)
GRAPHIC (g29391g0920005037716.jpg)
GRAPHIC (g29391g0920005038211.jpg)
GRAPHIC (g29391g0920005038743.jpg)
GRAPHIC (g29391g0920005039227.jpg)
GRAPHIC (g29391g0920005039664.jpg)
GRAPHIC (g29391g0920005040161.jpg)
GRAPHIC (g29391g0920005040708.jpg)
GRAPHIC (g29391g0920005041368.jpg)
GRAPHIC (g29391g0920005042179.jpg)
GRAPHIC (g29391g0920005043216.jpg)
GRAPHIC (g29391g0920005044096.jpg)
GRAPHIC (g29391g0920005044759.jpg)
GRAPHIC (g29391g0920005045413.jpg)
GRAPHIC (g29391g0920005045916.jpg)
GRAPHIC (g29391g0920005046414.jpg)
GRAPHIC (g29391g0920005046980.jpg)
GRAPHIC (g29391g0920005047600.jpg)
GRAPHIC (g29391g0920005048331.jpg)
GRAPHIC (g29391g0920005049003.jpg)
GRAPHIC (g29391g0920005049634.jpg)
GRAPHIC (g29391g0920005102618.jpg)
GRAPHIC (g29391g0920005103799.jpg)
GRAPHIC (g29391g0920005104722.jpg)
GRAPHIC (g29391g0920005105190.jpg)
GRAPHIC (g29391g0920005105963.jpg)
GRAPHIC (g29391g0920005106574.jpg)
GRAPHIC (g29391g0920005107292.jpg)
GRAPHIC (g29391g0920005109262.jpg)
GRAPHIC (g29391g0920005110337.jpg)
GRAPHIC (g29391g0920005112153.jpg)
GRAPHIC (g29391g0920005606249.jpg)
GRAPHIC (g29391g0920005606745.jpg)
GRAPHIC (g29391g0920005607126.jpg)
GRAPHIC (g29391g0920005607520.jpg)
GRAPHIC (g29391g0920005607899.jpg)
GRAPHIC (g29391g0920005608216.jpg)
GRAPHIC (g29391g0920005608589.jpg)
GRAPHIC (g29391g0920005608936.jpg)
GRAPHIC (g29391g0920005610280.jpg)
GRAPHIC (g29391g0920005610752.jpg)
GRAPHIC (g29391g0920005611158.jpg)
GRAPHIC (g29391g0920005611636.jpg)
GRAPHIC (g29391g0920005612065.jpg)
GRAPHIC (g29391g0920005612540.jpg)
GRAPHIC (g29391g0920005615688.jpg)
GRAPHIC (g29391g0920005616158.jpg)
GRAPHIC (g29391g0920005616600.jpg)
GRAPHIC (g29391g0920005617052.jpg)
GRAPHIC (g29391g0920010012213.jpg)
GRAPHIC (g29391g0920010012550.jpg)
GRAPHIC (g29391g0920010013100.jpg)
GRAPHIC (g29391g0920010013846.jpg)
GRAPHIC (g29391g0920010014188.jpg)
GRAPHIC (g29391g0920010014492.jpg)
GRAPHIC (g29391g0920010014824.jpg)
GRAPHIC (g29391g0920010015124.jpg)
GRAPHIC (g29391g0920010016329.jpg)
GRAPHIC (g29391g0920010016640.jpg)
GRAPHIC (g29391g0920010016956.jpg)
GRAPHIC (g29391g0920010017313.jpg)
GRAPHIC (g29391g0920010017637.jpg)
GRAPHIC (g29391g0920010017968.jpg)
GRAPHIC (g29391g0920010018321.jpg)
GRAPHIC (g29391g0920010019596.jpg)
GRAPHIC (g29391g0920010020022.jpg)
GRAPHIC (g29391g0920010020578.jpg)
GRAPHIC (g29391g0920010021018.jpg)
GRAPHIC (g29391g0920010021489.jpg)
GRAPHIC (g29391g0920010021976.jpg)
GRAPHIC (g29391g0920010022472.jpg)
GRAPHIC (g29391g0920010023056.jpg)
GRAPHIC (g29391g0920010023641.jpg)
GRAPHIC (g29391g0920010024069.jpg)
GRAPHIC (g29391g0920010024483.jpg)
GRAPHIC (g29391g0920010538356.jpg)
GRAPHIC (g29391g0920010602141.jpg)
GRAPHIC (g29391g0920010602704.jpg)
GRAPHIC (g29391g0920010603263.jpg)
GRAPHIC (g29391g0920010603753.jpg)
GRAPHIC (g29391g0920010604327.jpg)
GRAPHIC (g29391g0920010605044.jpg)
GRAPHIC (g29391g0920010605681.jpg)
GRAPHIC (g29391g0920010608465.jpg)
GRAPHIC (g29391g0920010608976.jpg)
GRAPHIC (g29391g0920010610195.jpg)
GRAPHIC (g29391g0920010610941.jpg)
GRAPHIC (g29391g0920010611893.jpg)
GRAPHIC (g29391g0920010958549.jpg)
GRAPHIC (g29391g0920011000501.jpg)
GRAPHIC (g29391g0920011000904.jpg)
GRAPHIC (g29391g0920023810870.jpg)
GRAPHIC (g29391g0920024059039.jpg)
GRAPHIC (g29391g0920024733318.jpg)
GRAPHIC (g29391g0920024743418.jpg)
GRAPHIC (g29391g0920024745256.jpg)
GRAPHIC (g29391g0920024747113.jpg)
GRAPHIC (g29391g0920024748935.jpg)
GRAPHIC (g29391g0920024751492.jpg)
GRAPHIC (g29391g0920024753379.jpg)
GRAPHIC (g29391g0920024755097.jpg)
GRAPHIC (g29391g0920024756867.jpg)
GRAPHIC (g29391g0920024758578.jpg)
GRAPHIC (g29391g0920033544669.jpg)
GRAPHIC (g29391g0920033544947.jpg)
GRAPHIC (g29391g0920033545241.jpg)
GRAPHIC (g29391g0920033545506.jpg)
GRAPHIC (g29391g0920033546058.jpg)
GRAPHIC (g29391g0920033547424.jpg)
GRAPHIC (g29391g0920034521476.jpg)
GRAPHIC (g29391g0920034521860.jpg)
GRAPHIC (g29391g0920034522251.jpg)
GRAPHIC (g29391g0920034522548.jpg)
GRAPHIC (g29391g0920050457197.jpg)
GRAPHIC (g29391g0920050457990.jpg)
GRAPHIC (g29391g0920050458575.jpg)
GRAPHIC (g29391g0920050459207.jpg)
GRAPHIC (g29391g0920050459714.jpg)
GRAPHIC (g29391g0922102101789.jpg)
GRAPHIC (g29391g0922102102377.jpg)
GRAPHIC (g29391g0922102102770.jpg)
GRAPHIC (g29391g0922102103037.jpg)
GRAPHIC (g29391g0922102103305.jpg)
GRAPHIC (g29391g12p53.jpg)
GRAPHIC (g29391g21w47.jpg)
GRAPHIC (g29391g36j30.jpg)
GRAPHIC (g29391g39v72.jpg)
GRAPHIC (g29391g41j55.jpg)
GRAPHIC (g29391g49p29.jpg)
GRAPHIC (g29391g52o46.jpg)
GRAPHIC (g29391g61e03.jpg)
GRAPHIC (g29391g70n57.jpg)
GRAPHIC (g29391g72d14.jpg)
GRAPHIC (g29391g80m01.jpg)
GRAPHIC (g29391g93q72.jpg)
GRAPHIC (g29391page282.jpg)
GRAPHIC (g29391page283.jpg)
GRAPHIC (g29391page284.jpg)
XML — IDEA: XBRL DOCUMENT (R1.htm)
8-K
8-K (Primary)
Filename: d29391d8k.htm · Sequence: 1
8-K
00-0000000 0001853962 false 0001853962 2026-09-21 2026-09-21 0001853962 us-gaap:CommonStockMember 2026-09-21 2026-09-21 0001853962 us-gaap:WarrantMember 2026-09-21 2026-09-21
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 8-K
CURRENT REPORT
Pursuant to Section 13 or15(d)
of the Securities Exchange Act of 1934
Date of Report (Date of earliest event reported): September 21, 2026
i-80 GOLD CORP.
(Exact name of registrant as specified in its charter)
British Columbia
001-41382
N/A
(State or other jurisdiction of
incorporation or organization)
(Commission
File Number)
(I.R.S. Employer
Identification No.)
150 York Street, Suite 1802, Toronto, Ontario
M5H 3S5
(Address of principal executive offices)
(Zip Code)
Registrant’s telephone number, including area code: (775) 525-6450
(Former name or former address, if changed since last report)
Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:
☐
Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
☐
Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
☐
Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
☐
Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))
Securities registered pursuant to Section 12(b) of the Act:
Title of each class
Trading
Symbol(s)
Name of each exchange
on which registered
Common Shares
IAUX
NYSE American
Warrants to Purchase Common Shares
IAUX.WS
NYSE American
Common Shares
IAU
TSX
Warrants to Purchase Common Shares
IAU.WT.U
TSX
Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§240.12b-2 of this chapter).
Emerging growth company ☒
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Item 8.01
Other Events.
Updated Pre-Feasibility Study and Technical Report Summary for the Granite Creek Underground Project
On September 21, 2026, the Company provided the SEC Technical Report Summary, Pre-Feasibility Study, Granite Creek, Humboldt County, NV for its Granite Creek Underground Project, dated September 21, 2026 with an effective date of March 31, 2026, ( the “PFS”) prepared in accordance with the Securities and Exchange Commission S-K regulations (Title 17, Part 229, Items 601 and 1300 through 1305) for the Company by the following third-party qualified persons: SRK Consulting (U.S.), Inc., Global Resource Engineering, Practical Mining LLC, TR Raponi Consulting Ltd., Hatch Associates Consultants, Inc., and WSP USA Inc. The PFS was also prepared by Kenji Umeno, and employee of the Company. None of the third-party qualified persons are affiliated with the Company or any other entity that has an ownership, royalty, or other interest in the property.
Mineral resources and mineral reserves are reported using the definitions in Subpart 229.1300 – Disclosure by Registrants Engaged in Mining Operations in Regulation S-K 1300 (“S-K 1300”). All capital and operating cost estimates meet the requirements of S-K 1300. Unless otherwise indicated, all financial values are reported in United States dollars. Totals may not sum correctly due to rounding.
The information below is based on, or extracted from, the SEC Technical Report Summary, Pre-Feasibility Study, Granite Creek, Humboldt County, NV, dated September 21, 2026 with an effective date of March 31, 2026.
Table 1: Granite Creek Underground PFS Key Operating and Financial Metrics
Project Economics
Unit
Gold Price
$/oz
$
2,750
Pre-Tax NPV(5%)(3)
$M
$
138
After-Tax NPV(5%)(3)
$M
$
118
After-Tax Cash Flow(3)
$M
$
153
Production Profile
Mine Life
years
8.5
Total Ore Mined
000s tonnes
2,172
Mined Ore Grade
g/t Au
7.88
Total Stockpile Processed
000s tonnes
26
Total Ore Processed
000s tonnes
2,198
Gold Grade Processed
g/t Au
7.87
Total Gold Contained
000s oz
556
Average Gold Recovery
%
87
%
Total Gold Recovered
000s oz
485
Average Annual Gold Production (2028-2032)
000s oz
75.1
Average Annual Gold Production (LOM)
000s oz
53.9
Unit Operating Costs
LOM Operating Cost
Mining (ore and waste)
$/t mined
$
182
Processing (refractory and oxide)
$/t milled
$
122
Transportation & Power Costs
$/t milled
$
31
Surface Op Costs
$/t mined
$
54
G&A, Taxes and Royalties(7)
$/t milled
$
71
Total Cash Costs - LOM(4)
$/oz
$
2,076
Total Cash Costs - (2028-2032)(4)
$/oz
$
1,827
All-in Sustaining Costs - LOM(4,5)
(Excl. Lone Tree Refurbishment Capital)
$/oz
$
2,273
All-in Sustaining Costs - (2028-2032)(4,5)
(Excl. Lone Tree Refurbishment Capital)
$/oz
$
1,915
Total Capital Costs
Sustaining Capital
$M
$
82.9
Lone Tree Autoclave Capital Allocation
$M
$
49.3
Closure Costs
$M
$
12.7
Total Capital & Closure Costs
$M
$
144.9
For detailed metrics presented on an annual basis, see the Granite Creek Underground Detailed Cash Flow Model in Table 1 in the Appendix.
Initial Mineral Reserve Estimate and Updated Mineral Resource Estimate
The updated underground mineral resource estimate included in the PFS incorporates approximately 36,470 meters of drilling from 164 core holes conducted between 2023 through the end of 2025, relative to the resource estimate that formed the basis of the PEA published in March 2025.(1) The PEA has been superseded by this PFS. Numerous step-out drill holes have resulted in a larger mineralized envelope, while infill drilling increased definition and confidence in the mineral resource and supported conversion of a majority of the resource to mineral reserves.
The resource estimate was prepared using stope optimization software which is in line with industry recommended best practices for the assessment of the in-situ mineralization which satisfies the reporting criteria of the Reasonable Prospects for Eventual Economic Extraction (RPEEE). Additionally, a more conservative approach was applied to establish the creation of grade shell domains to match current mining methods, resulting in lower grades than in the previously published PEA. These updated grades are in line with the average grade currently mined at Granite Creek and are believed to more accurately reflect the expected grades of the orebody.
For more information regarding the estimation parameters and assumptions of the mineral resources and mineral reserves, please see Sections 11 and 12 of the PFS, respectively.
Exploration
The ongoing 2026 exploration program includes a combination of infill drilling to support continued reserve development for optimized ongoing mine operations and step-out drilling to expand the current and known mineralization within the South Pacific Zone, which remains open to the north and at depth, and the Rangefront, Otto, and Ogee zones.
Additional near-mine exploration targets include the CX Zone beneath the historical CX pit, which is not currently included in the underground mineral resource. Previous drilling in the CX Zone includes high-grade intercepts from legacy holes, including 18.0 g/t Au over 9.1 m in hole HPR 078 and 15.3 g/t Au over 9.1 m in RHC-1763, and i-80 hole of 36.4 g/t Au over 9.1 m in iGM21-06.(8) A successful drill program in the CX Zone has the potential to add high-grade ounces to the mineral resource and near-term mine plan. The Company intends to evaluate the high-grade portion of the CX Zone as an underground target as part of an anticipated extensive multi-year drill program planned to commence in 2027. Multiple near-mine targets are still to be evaluated over a multi-year drill program with the potential to extend the mine life.
Table 2: Granite Creek Underground Mineral Reserve Estimate as of March 31, 2026(2)
Mineral Reserves
Classification
Domain
Tonnage
(000s tonnes)
Au Grade
(g/t)
Au Contained
(000s oz)
Proven
Ogee
71
9.34
21.2
Otto
171
7.04
38.7
South Pacific
40
11.21
14.5
Stockpile
26
7.33
6.2
Total
308
8.13
80.6
Probable
Ogee
88
7.95
22.4
Otto
366
6.70
78.8
South Pacific
1,437
8.11
374.7
Total
1,890
7.83
475.9
Proven and Probable
Ogee
158
8.57
43.6
Otto
537
6.81
117.6
South Pacific
1,477
8.19
389.2
Stockpile
26
7.33
6.2
Total
2,198
7.87
556.5
Notes:
1.
All figures are rounded to reflect the relative accuracy of the estimates. Totals may not sum due to rounding. Mineral Reserves have been stated on the basis of a mine design, mine plan, and economic model.
2.
Mineral Reserves are reported using a stope center of gravity (“CoG”) range of 4.42 g/t (0.13 oz/st) Au – 6.41 g/t (0.19 oz/st) Au and an incremental processing CoG range of 1.51 g/t (0.04 oz/st) Au – 2.91 g/t (0.09 oz/st) Au depending on the processing method. The CoG calculations assume a US$2,500/oz Au price, and 60% to 92% metallurgical recovery depending on the processing method applied.
3.
Operating costs include mining (US$190.18/tonne), processing (US$59.94/tonne to US$131.13/tonne), G&A (US$22.29/tonne), shipping costs (US$16.04/tonne). Additionally, a 6% royalty and 0.75% excise tax are applied, along with treatment/refinery charges of US$1.85/oz Au.
4.
The reserves are mined using the underhand drift and fill method with cemented waste rock backfill. Mining dilution of 10% is included in the reserve at zero grade.
5.
Stockpile mineral reserves reflect ore mined and placed on surface stockpiles prior to the effective date of the PFS and not yet processed.
6.
The Mineral Reserves were estimated by SRK Consulting, U.S. (Inc.), a Qualified Person under S-K 1300.
All reported underground mineral reserves are fully attributable to the Company. The point of reference for the reporting of mineral reserves is the in-situ diluted tonnage and grades contained within the Mine Design, which accounts for the modifying factors.
Table 3: Exclusive Mineral Resource Statement for Granite Creek Underground – Effective Date March 31, 2026
Mineral Resource Estimate
Classification
Zone
Mass
(000s
tonnes)
Mass
Attributable
(000s
tonnes)
Au Grade
(g/t)
Material
Content Au
(000s oz)
Attributable
Material Content
Au (000s oz)
Measured
Ogee
175
175
6.82
38.4
38.3
Otto
166
166
5.58
29.7
29.7
SPZ
31
31
6.44
6.5
6.5
Total
372
372
6.23
74.6
74.5
Indicated
Ogee
241
241
6.52
50.6
50.6
Otto
425
425
5.23
71.5
71.5
SPZ
771
771
4.70
116.6
116.6
Total
1,438
1,438
5.16
238.6
238.6
Measured & Indicated
Ogee
417
417
6.64
89.0
89.9
Otto
591
591
5.32
101.2
101.2
SPZ
803
803
4.77
123.1
123.1
Total
1,810
1,810
5.38
313.3
313.1
Inferred
Ogee
38
38
6.71
8.3
8.3
Otto
417
417
7.62
102.0
102.0
SPZ
415
405
6.49
86.6
83.9
Total
871
860
7.04
197.0
194.2
Notes:
1.
Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, market or other relevant issues. The deposit has been classified as Measured, Indicated and Inferred based on confidence in the geological model and drill spacing. The quantity and grade of reported Inferred resources are uncertain in nature, and there has not been sufficient work to define these Inferred Mineral Resources as Indicated or Measured resources. There is no certainty that any part of a mineral resource will ever be converted into mineral reserves.
2.
Mineral Resources are reported on an exclusive basis with units reported in in Metric Tonnes, grade is reported in grams/tonnes, and metal in 000’s troy ounces.
3.
Mineral Resources are reported within mineable stopes which have been defined based on metal price assumptions,* variable metallurgical recovery assumptions, mining costs, processing costs, shipping, G&A costs. Metal Pricing is based on Gold (US$3,000 /oz). Other key assumptions include:
*
Mining Costs (US$/t 190.18);
*
Autoclave Processing Cost (US$/t 131.13), Low-grade Oxide (US$/t 59.94)
*
Autoclave Recoveries ranging 77.6%-93.4% (average 87.6%) and Oxide recoveries ranging 60.0%-87.4% (average 68.9%);
*
Shipping Costs (US$/t 16.04) and G&A Costs (US$/t 22.29);
*
Totaling US$/t 281.45 – 359.64 for underground mining and processing;
*
Based on the variable recoveries an average cut-off grade of 3.75 - 9.81 g/t (0.286 oz/st) has been used reporting.
4.
Mineral Resources have been depleted for previous underground mining activity, and reported on an attributable basis.
5.
Mineral Resources are based on validated data, which have been subjected to quality analysis/quality control (QA/QC) analysis, using capped, composited samples at 2 m (5ft) intervals. Estimation has been completed using a combination of OK and IDW estimation methodologies and classified based on confidence in the underlying data and drill spacing. Mineral resource tonnages have been rounded to reflect the precision of the estimate.
6.
The mineral resources were estimated by SRK Consulting (U.S.), Inc.
7.
Rounding of some figures may lead to minor discrepancies in totals.
8.
The point of reference for the reporting of mineral resources is the in-situ diluted tonnage and grades contained within the defined mineable stope optimizer limits.
Table 4: Granite Creek Open Pit Mineral Resource Statement
Deposit
Cutoff
Grade
(ppm)
Mass
(000’s tonnes)
Mass
(000’s short tons)
Mass
Attributable
(000’s tonnes)
Au
Grade
(g/t)
Au
Grade
(opt)
Au
Contained
(‘000s tr oz)
Attributable
Material Content
Au (000’s tr oz)
Measured
Pit B
0.2
3,900
4,299
3,575
1.06
0.031
133.49
122.37
Pit A
0.2
1,098
1,211
1,007
0.71
0.021
25.08
22.99
CX
0.2
13,493
14,873
12,835
1.10
0.032
478.41
454.02
Mag
0.2
15,055
16,596
14,703
1.03
0.030
499.50
487.90
Total
33,546
36,978
32,121
1.05
0.031
1,136.47
1,087.28
Indicated
Pit B
0.2
823
907
754
0.64
0.019
16.86
15.45
Pit A
0.2
969
1,069
889
0.68
0.020
21.06
19.30
CX
0.2
4,423
4,876
4,189
1.00
0.029
141.96
133.03
Mag
0.2
11,509
12,687
11,415
0.74
0.022
275.03
272.53
Total
17,725
19,538
17,247
0.80
0.023
454.91
440.32
Measured + Indicated
Pit B
0.2
4,723
5,206
4,329
0.99
0.029
150.34
137.82
Pit A
0.2
2,068
2,280
1,896
0.69
0.020
46.13
42.29
CX
0.2
17,916
19,749
17,024
1.08
0.031
620.37
587.05
Mag
0.2
26,565
29,283
26,119
0.91
0.026
774.53
760.43
Total
51,271
56,517
49,368
0.97
0.028
1,591.38
1,527.60
Inferred
Pit B
0.2
50
55
46
0.52
0.015
0.84
0.77
Pit A
0.2
440
485
403
0.44
0.013
6.22
5.70
CX
0.2
1,997
2,201
1,921
0.94
0.028
60.66
58.24
Mag
0.2
1,339
1,476
1,320
0.75
0.022
32.12
31.69
Total
3,826
4,217
3,689
0.81
0.024
99.84
96.40
1)
The effective date of the Mineral Resources Estimate is March 31, 2026
2)
The Qualified Persons for the estimate is GRE.
3)
Mineral resources are not ore reserves and are not demonstrably economically recoverable.
4)
Mineral resources are reported at a 0.20 g/t cutoff, an assumed gold price of 3,000 $/tr. oz, using variable recovery, a slope angle of 41 degrees, 6% royalty, heap leach processing cost $9.04 per tonne (includes admin), CIL processing cost of $17.22 per tonne (includes admin). The point of reference for the reporting of open pit Mineral Resources is the tonnage and grades contained within the Whittle pit shell limits, reported at a 0.20 g/t cut-off grade using variable metallurgical recove
5)
Attributable resources are those resources excluding certain thrid party claims in the Pinson #1A-18A unpatented mining claims and in the Section 28 Fee lands.
Figure 3: Granite Creek Underground Project Plan View
Figure 4: Granite Creek Underground Longitudinal Section
Project Overview
Granite Creek Underground is a fully permitted, constructed and operating gold mine currently ramping up towards steady-state production. It is the first brownfield project to be redeveloped under the Company’s development plan. The broader Granite Creek property (the “Property”) also hosts the Granite Creek open pit oxide deposit adjacent to the underground mine, which is currently advancing through early-stage permitting and technical work. Situated in the Potosi mining district, the Property lies approximately 43 kilometers northeast of Winnemucca, within Humboldt County, Nevada at the intersection of the highly prolific Battle Mountain-Eureka and Getchell gold trends.
Since 1980, the Property has produced approximately one million ounces of gold from both underground and open pit mining. The current underground minerals resources are primarily hosted adjacent to, but independent of, the past-producing open pits on the Property. Additionally, the Property hosts the Mag and CX oxide open pit resources.
Figure 5: Regional Map of i-80 Gold Assets in Northern Nevada
Geology and Mineralization
Mineralization at Granite Creek Underground is Carlin-type, with gold hosted in fine-grained arsenian pyrite similar to the nearby deposit at the Turquoise Ridge Complex. The primary host rocks at the Project are interbedded shale, siltstone, and limestone of the Ordovician Comus Formation. Higher-grade mineralization is found underground, proximal to the Cretaceous Osgood Mountains stock where the Comus Formation has been metamorphosed to marble and hornfels. Mineralization is strongly structurally controlled, typically by inverted thrust faults trending north to northeast. The Company has conducted significant exploration since acquiring the property in 2021 which led to the discovery of the South Pacific Zone, a northeastern extension of the existing underground deposit.
Mining
Granite Creek Underground is currently ramping up production and is expected to achieve commercial production in late 2026. The mine currently produces approximately 540 tonnes of ore per day and is operated by a local mining contractor with more than three decades of underground mining experience in northern Nevada. The mining rate is expected to rise to approximately 900 tonnes per day at full production supporting higher gold production. The PFS outlines an updated mine life of approximately 8.5 years with annual steady state gold production of approximately 75,000 ounces. The PFS incorporates the Project’s current operating costs, outlined in Table 6 and the Appendix.
Underground access is through portals located in the north wall of the CX pit. The main decline provides personnel and equipment access to all areas of the mine and can accommodate 30-ton haul trucks. Mining will be conducted using underhand drift and fill methods with cemented waste rockfill optimized for the Project’s ground conditions. Production drifts are 15 feet x 15 feet with a 14% decline. Mining of the Ogee and Otto zones are between the 4,790-foot level and 4,150-foot level and the decline to the South Pacific Zone is developed to the 3,950-foot level. Fresh air comes in from a fresh air portal at the bottom of the CX pit and is connected to the various workings through raises. The haulage ramp serves as an exhaust drift.
Production drift widths will be maintained at 15 feet or less to minimize dilution and enhance recovery. Underhand drift and fill mining is well suited for the ground conditions at the Project and allows for a high degree of selectivity, productivity, and safety for mine personnel. This mining method also results in backfill with superior geotechnical quality compared to the in-situ rock.
Processing
Metallurgical testing has demonstrated that the Ogee, Otto and South Pacific zones at Granite Creek Underground contain predominantly single refractory material and require an oxidation process to increase gold extraction using cyanidation. While samples responded to both alkaline and acid pressure oxidation, significant metallurgical testing has demonstrated that an acidic autoclave environment achieved higher sulfide oxidation and superior gold recovery rates. These results confirm that the Project’s ore can be processed via the Lone Tree Plant’s acid pressure oxidation (“POX”) conditions once the Plant is recommissioned.
The PFS incorporates an updated processing strategy that assumes third-party toll milling arrangements and associated over-the-road trucking costs through to mid-2027. To maximize the proportion of Granite Creek Underground sulfide material processed at the Company’s Lone Tree Plant and reduce reliance on third-party processing, the mine plan assumes the stockpiling of sulfide refractory material beginning approximately six months prior to the planned commissioning of the Company’s wholly owned Lone Tree Plant in late 2027. Beginning in 2028, the PFS incorporates the anticipated lower processing costs associated with hauling refractory ore and processing it through the Lone Tree Plant.(6) The acidic environment has higher operating costs versus alkaline, however, the higher costs are mostly offset by higher recoveries. The PEA envisaged a combination of acidic and alkaline operating environment.
Oxide mineralization is present in all zones within all deposits. Mine operations to date have encountered a higher proportion of oxide ore than what has been defined in the resource estimate and PFS. The oxide mineralization not accounted for in the PFS presents an opportunity to process this material in the Lone Tree Plant throughout the LOM with lower overall operating costs. Work is underway to determine the cost benefit. The PFS only incorporates a small component of oxide mineralization in the Ogee Zone. Oxide ore will be sold to a third party under an existing sales agreement until mid-2027 and then stockpiled similarly to the refractory ore. The oxide ore will be processed directly by the carbon-in-leach (“CIL”) circuit at the Lone Tree Plant, bypassing the POX circuit.
Ore at Granite Creek Underground is screened before shipping to remove oversize material, reducing the tonnes shipped and processed while increasing the grade delivered for processing. The potential economic benefits of this practice continue to be evaluated and were not incorporated into the PFS, representing a potential opportunity for future optimization.
A LOM processing schedule is illustrated in Figure 6.
Table 6: LOM Mining and Processing Unit Costs
LOM Mining and Processing Unit Costs
Mining (ore and waste)
$
/t mined
$
182
Surface Op Costs
$
/t mined
$
54
Processing - Lone Tree Autoclave
$
/t milled
$
105
Processing - Lone Tree Oxide
$
/t milled
$
34
Transportation
$
/t milled
$
16
Power Costs
$
/t milled
$
15
G&A
$
/t milled
$
23
Taxes and Royalties(7)
$
/t milled
$
49
Total
$
/t milled
$
458
Note to table above:
Numbers may not add up due to rounding and differences in $/t mined vs $/t milled.
Figure 6: LOM Annual Processing Schedule
Hydrology Update
Water inflow volumes to the mine have stabilized and continue to be managed well using the current underground pumping system, which presently operates near capacity. Work on an enhanced pumping system, that includes expanded sumps at lower levels and higher-capacity pumps, continues to advance. Pump installation will continue throughout the remainder of 2026 to increase overall water discharge capacity as the mine progresses at depth. The current dewatering model estimates residual passive inflow into Granite Creek will exceed 2,500 to 2,700 gallons per minute until the additional dewatering wells advance below the current workings. The second water treatment plant has been constructed and is currently in commissioning, which is expected to increase surface water treatment capacity by approximately 3,500 gallons per minute to support the Company’s long-term groundwater management objectives.
Capital Costs
LOM sustaining capital is estimated at $82.9 million, including all surface and underground development. A Lone Tree Plant refurbishment capital allocation of $49.3 million, as well as a closure and reclamation costs of $12.7 million are also included in the total PFS LOM capital cost (see Table 7). The Lone Tree autoclave refurbishment capital allocation of $49.3 million has been derived using a $25.97/tonne charge multiplied by the estimated total potential tonnage expected to be processed at the Lone Tree Plant (1.9 Mt) in the future from Granite Creek Underground.
Table 7: LOM Capital Cost Summary
LOM Capital
($Millions)
Underground Mine Capital
$
60.7
Surface Mine Capital*
$
22.2
Sustaining Capital
$
82.9
Lone Tree Plant Refurbishment Capital Allocation
$
49.3
Closure and Reclamation Costs
$
12.7
Total Capital
$
144.9
*
Surface mine capital includes approximately $5.6 million of capitalized costs in connection with underground mine development.
Operating Costs
During the five years of steady-state production following the commissioning of the Company’s wholly-owned Lone Tree Plant (2028 to 2032), the PFS estimates cash costs(4) of $1,827/oz Au and all-in sustaining costs(4,5) of $1,915/oz Au (see Table 8).
During the LOM, the PFS estimates cash costs(1) of $2,076/oz Au and all-in sustaining costs(4,5) of $2,273/oz Au, which includes the earlier period of third-party toll milling prior to Lone Tree’s commissioning and the final two years when production is currently expected to wind down (see Table 8).
Table 8 outlines the operating costs during the first five years of steady-state production following the commencement of processing at the Lone Tree Plant, excluding the earlier years of third-party toll processing and the final two years of the LOM.
The annual cash waterfall above in Figures 7 and 8 demonstrates the importance of the planned refurbishment of the Company’s Lone Tree Plant and the ending of third-party toll milling, which is expected to increase production and cash flow beginning in 2028 once commissioned. Figure 9 illustrates operating costs over the Project’s estimated production profile.
Table 8: Total and Unit Operating Cost Summary: Five-Year Steady-State Period Following Lone Tree Plant Commissioning
2028 - 2032
Total Costs
Unit Cost
Cost per Ounce
Cost Analysis
(Base Case Scenario of $2,750/oz Au)
($Millions)
($/t)
($/oz Au)
Mining (Ore and Waste)
$
271
$172/t mined
$
721
Processing (Refractory and Oxide)
$
177
$104/t milled
$
470
Transportation & Power Costs
$
48
$29/t milled
$
129
Surface Op Costs
$
77
$49/t mined
$
206
G&A, Taxes and Royalties(7)
$
113
$67/t milled
$
301
Total Operating Cost/Cash Costs(4)
$
686
$405/t milled
$
1,827
Sustaining Capital
$
33
$20/t milled
$
89
Lone Tree Plant Refurbishment Capital Allocation
$
41
$26/t milled*
$
108
Closure Costs
$
0
$0/t milled
$
0
All-in Sustaining Costs(4)
$
760
$449/t milled
$
2,023
All-in Sustaining Costs(4,5)
(Excluding Lone Tree Plant Refurbishment Capital)
$
720
$425/t milled
$
1,915
Notes to table above:
Numbers may not add up due to rounding and differences in $/t mined vs $/t milled.
*
Based solely on tonnes milled through the Lone Tree autoclave.
Table 9: Total and Unit Operating Cost Summary: LOM
LOM
Total Costs
Unit Cost
Cost per Ounce
Cost Analysis
(Base Case Scenario of $2,750/oz Au)
($Millions)
($/t )
($/oz Au)
Mining (Ore and Waste)
$
396
$182/t mined
$
816
Processing (Refractory and Oxide)
$
268
$122/t milled
$
552
Transportation & Power Costs
$
69
$31/t milled
$
142
Surface Op Costs
$
118
$54/t mined
$
243
G&A, Taxes and Royalties(7)
$
157
$71/t milled
$
323
Total Operating Cost/Cash Costs(4)
$
1,008
$458/t milled
$
2,076
Sustaining Capital
$
83
$38/t milled
$
171
Lone Tree Plant Refurbishment Allocation
$
49
$26/t milled*
$
102
Closure Costs
$
13
$6/t milled
$
26
All-in Sustaining Costs(4)
$
1,153
$524/t milled
$
2,375
All-in Sustaining Costs(4,5)
(Excluding Lone Tree Plant Refurbishment Capital)
$
1,103
$502/t milled
$
2,273
Notes to table above:
Numbers may not add up due to rounding and differences in $/t mined vs $/t milled.
*
Based solely on tonnes milled through the Lone Tree autoclave.
Figure 9: LOM Production and Cost Profile (Excluding Lone Tree Plant Refurbishment Capital Allocation)
Permitting
The Granite Creek Underground mine is fully permitted. The primary focus for the operations remains compliance and reporting requirements associated with existing site permits. Other than potential minor modifications to existing site permits for operational purposes, no other major permitting actions are expected in the foreseeable future.
Technical Disclosure and Qualified Persons
The PFS focuses solely on pre-feasibility-level technical work for Granite Creek Underground. The PFS does not update the work in the March 2025 PEA in respect of the Granite Creek open pit other than an updated mineral resource estimate, which remains subject to separate ongoing technical studies and permitting activities. The updated Granite Creek open pit mineral resource estimate included in the PFS accounted for an increase in gold price resulting in a larger optimized pit shell, equating to an increase in the overall open pit mineral resource inventory.
The PFS will contain detailed descriptions of data verification, sampling and assay procedures, quality assurance and quality control measures, key assumptions, parameters, risks and other factors supporting the mineral resource and mineral reserve estimates and the economic analysis. Inferred mineral resources are too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability, and there is no certainty that the results of the PFS will be realized.
Endnotes
(1)
A Preliminary Economic Assessment/Initial Assessment (“PEA”) on the Granite Creek Property was previously prepared by the Company in accordance with S-K 1300, filed in March 2025. The PFS focuses solely on feasibility-level technical work for Granite Creek Underground and does not update the previous work in the PEA in respect of the Granite Creek open pit, which remains subject to separate ongoing technical studies and permitting activities by the Company.
(2)
All reported mineral reserves for Granite Creek underground are fully attributable to the Company. All reported underground and open pit mineral resources are 100% attributable to the Company with the exception of a fee parcel and certain unpatented mining claims, which resources are 91.67% attributable to the Company.
(3)
The Mineral Reserve estimate is based on the Mineral Resource estimate depleted through March 31, 2026. The associated reserve mine plan therefore begins April 1, 2026. For purposes of the economic analysis, the reserve schedule was shifted one month such that the economic model begins May 1, 2026. This timing adjustment does not change the Mineral Reserve inventory, mine plan, or scheduled quantities, and does not result in double counting of production.
(4)
This is a non-GAAP measure. Please see the section titled “Non-GAAP Financial Performance Measures” below.
(5)
All-in sustaining costs presented exclude the allocation of Lone Tree Plant autoclave refurbishment capital. The Lone Tree autoclave capital allocation of $49.3M has been derived using a $25.97/tonne charge multiplied by the total tonnage processed at Lone Tree (1.90 million tonne).
(6)
Pending the successful completion of the refurbishment and commissioning of the Company’s Lone Tree autoclave and carbon-in-leach Plant.
(7)
Calculated based on a Base Case scenario of $2,750/oz; includes net profit interest (NPI) and refining. Royalties include a 10% NPI to Gold Royalty Corp. The illustrative NPI interests stated herein do not include the impacts of any future open pit projects on the Property, to which the NPI interest similarly applies. Payments made under the NPI are only made after recovery by the Company of all “recoverable costs” as further described under Chapter 3 of the PFS.
(8)
These historical drill results were generated by Homestake Mining Company in 1997 and Pinson Mining Company in 1995 and were not generated by i-80 Gold. The results have been reviewed by Tyler Hill, VP Geology for the Company. No QA/QC data is available for these results, however these holes were found to be acceptable for use in the 2026 Granite Creek open pit resource estimate as conducted by Global Resource Engineering (GRE).
Cautionary Statement Regarding Forward-Looking Information
Certain statements in this report constitute “forward-looking statements” or “forward-looking information” within the meaning of applicable securities laws, including but not limited to, statements regarding the updated results of the Technical Studies , such as future estimates of internal rates of return, net present value, future production, estimates of cash cost, proposed mining plans and methods, mine life estimates, cash flow forecasts, metal recoveries, estimates of capital and operating costs, timing for permitting and environmental assessments, timing, completion and results of feasibility studies, and the size and timing of phased development of the Project. Furthermore, forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by the Company as of the date of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. With respect to this specific forward-looking information concerning the development of the Project, the Company has based its assumptions and analysis on certain factors that are inherently uncertain. Uncertainties include: (i) the adequacy of infrastructure; (ii) geological characteristics; (iii) metallurgical characteristics of the mineralization; (iv) the ability to develop adequate processing capacity; (v) the price of gold, silver and other commodities; (vi) the availability of equipment and facilities necessary to complete development; (vii) the cost of consumables and mining and processing equipment; (viii) unforeseen technological and engineering problems; (ix) natural disasters and/or accidents; (x) currency fluctuations; (xi) changes in regulations; (xii) the compliance by and/or key suppliers with terms of agreements; (xiii) the availability and productivity of skilled labour; (xiv) the regulation of the mining industry by various governmental agencies, including permitting and environmental assessments; (xv) the ability to raise sufficient capital to develop such projects; (xiv) changes in project scope or design; and (xv) political factors.
All statements other than statements of historical fact are forward-looking statements. Often, but not always, forward-looking statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “continues”, “forecasts”, “projects”, “predicts”, “intends”, “anticipates” or “believes”, or variations of, or the negatives of, such words and phrases, or state that certain actions, events or results “may”, “could”, “would”, “should”, “might” or “will” be taken, occur or be achieved. Readers are cautioned that the assumptions used in the preparation of information, although considered reasonable at the time of preparation, may prove to be inaccurate and, as such, reliance should not be placed on forward-looking statements. The Company’s actual results, performance or achievement could differ materially from those expressed in, or implied by, these forward-looking statements and, accordingly, no assurance can be given that any of the events anticipated by the forward-looking statements will transpire or occur, or if any of them do so, what benefits, if any, that the Company will derive therefrom. By their nature, forward looking statements are subject to numerous risks and uncertainties, some of which are beyond the Company’s control, including general economic and industry conditions, volatility of commodity prices, title risks and uncertainties, uncertainty in geological, metallurgical and geotechnical studies and opinions, and ability to access sufficient capital from internal and external sources such as selling assets, restructuring debt or obtaining additional equity capital on terms that may be onerous or highly dilutive.
This report also contains references to estimates of mineral resources. The estimation of mineral resources is inherently uncertain and involves subjective judgments about many relevant factors. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The accuracy of any such estimates is a function of the quantity and quality of available data, and of the assumptions made and judgments used in engineering and geological interpretation (including estimated future production from the Project, the anticipated tonnages and grades that will be mined and the estimated level of recovery that will be realized), which may prove to be unreliable and depend, to a certain extent, upon the analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate. Mineral resource estimates may have to be re-estimated based on: (i) fluctuations in commodities prices; (ii) results of drilling, (iii) metallurgical testing and other studies; (iv) proposed mining operations, including dilution; (v) the evaluation of mine plans subsequent to the date of any estimates; and (vi) the possible failure to receive required permits, approvals and licenses or changes to existing mining licenses.
Forward-looking statements and information involve significant known and unknown risks and uncertainties, should not be read as guarantees of future performance or results and will not necessarily be accurate indicators of whether or not such results will be achieved. A number of factors could cause actual results to differ materially from the results expressed or implied by such forward-looking statements or information, including, but not limited to: the Company’s ability to finance the development of its mineral properties; assumptions and discount rates being appropriately applied to the PFS, uncertainty as to whether there will ever be production at the Company’s mineral exploration and development properties; risks related to the Company’s ability to commence production at the Project and generate material revenues or obtain adequate financing for its planned exploration and development activities; uncertainties
relating to the assumptions underlying resource and reserve estimates; mining and development risks, including risks related to infrastructure, accidents, equipment breakdowns, labor disputes, bad weather, non-compliance with environmental and permit requirements or other unanticipated difficulties with or interruptions in development, construction or production; the geology, grade and continuity of the Company’s mineral deposits; the uncertainties involving success of exploration, development and mining activities; permitting timelines; government regulation of mining operations; environmental risks; unanticipated reclamation expenses; prices for energy inputs, labor, materials, supplies and services; uncertainties involved in the interpretation of drilling results and geological tests and the estimation of reserves and resources; unexpected cost increases in estimated capital and operating costs; the need to obtain permits and government approvals; material adverse changes, unexpected changes in laws, rules or regulations, or their enforcement by applicable authorities; the failure of parties to contracts with the Company to perform as agreed; social or labor unrest; changes in commodity prices; and the failure of exploration programs or studies to deliver anticipated results or results that would justify and support continued exploration, studies, development or operations. For a more detailed discussion of such risks and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements, refer to i-80 Gold’s filings with Securities and Exchange Commission at www.sec.gov, including the most recent Annual Report on Form 10-K.
Non-GAAP Financial Performance Measures
The Company has included certain terms or performance measures in this report commonly used in the gold mining industry that are not defined under United States Generally Accepted Accounting Principles (“US GAAP”). This includes: all-in sustaining costs per ounce and cash cost per ounce – including and excluding the allocated Lone Tree Plant refurbishment capital. Non-IFRS/Non-GAAP financial performance measures do not have any standardized meaning prescribed under US GAAP, and therefore, they may not be comparable to similar measures employed by other companies. The data presented is intended to provide additional information and should not be considered in isolation or as a substitute for measures prepared in accordance with US GAAP and should be read in conjunction with the Company’s financial statements. Because the Company has provided these measures on a forward-looking basis, it is unable to present a quantitative reconciliation to the most directly comparable financial measure calculated and presented in accordance with US GAAP without unreasonable efforts. This is due to the inherent difficulty of forecasting the timing or amount of various reconciling items that would impact the most directly comparable forward-looking US GAAP measure that have not yet occurred, are outside of the Company’s control and/or cannot be reasonably predicted. The cost build-ups in the accompanying tables show the principal components used to calculate the disclosed measures.
Definitions
“All-in sustaining costs” is a non-GAAP financial measure calculated based on guidance published by the World Gold Council (“WGC”). The WGC is a market development organization for the gold industry and is an association whose membership comprises leading gold mining companies. Although the WGC is not a mining industry regulatory organization, it worked closely with its member companies to develop these metrics. Adoption of the all-in sustaining cost metric is voluntary and not necessarily standard, and therefore, this measure presented by the Company may not be comparable to similar measures presented by other issuers. The Company believes that the all-in sustaining cost measure complements existing measures and ratios reported by the Company. All-in sustaining cost includes both operating and capital costs required to sustain gold production on an ongoing basis. Sustaining operating costs represent expenditures expected to be incurred at the Project that are considered necessary to maintain production. Sustaining capital represents expected capital expenditures comprising mine development costs, including capitalized waste, and ongoing replacement of mine equipment and other capital facilities, and does not include expected capital expenditures for major growth projects or enhancement capital for significant infrastructure improvements. The Company’s presentation of AISC excluding the allocated Lone Tree Plant refurbishment capital is an additional non-GAAP measure and should be read together with the accompanying cost build-up. “Cash cost per gold ounce” is a common financial performance measure in the gold mining industry but has no standard meaning under US GAAP. The Company believes that, in addition to conventional measures prepared in accordance with US GAAP, certain investors use this information to evaluate the Company’s performance and ability to generate cash flow. Cash cost figures are calculated in accordance with a standard developed by The Gold Institute. The Gold Institute ceased operations in 2002, but the standard is considered the accepted standard of reporting cash cost of production in North America. Adoption of the standard is voluntary, and the cost measures presented may not be comparable to other similarly titled measures of other companies.
For a more detailed breakdown on how these measures were calculated, please see the Tables 7 and 8.
APPENDIX
Table 1: Granite Creek Underground Project Detailed Cash Flow Model
Table is continued on next page
APPENDIX Table 1: Granite Creek Underground Project Detailed Cash Flow Model Granite Creek Underground UNITS TOTAL LOM 2028 - 2032 (2) 2026E 2027E 2028E 2029E 2030E 2031E 2032E 2033E 2034E MINING Mine Life Years 8.3 5 Refractory Ore Mined k tonnes 2,139 1,560 161.8 192.0 330.3 329.9 289.0 336.7 273.6 175.9 50.2 Refractory Ore Mined Grade g/t 7.85 7.86 7.52 7.42 7.67 7.71 8.06 7.88 8.04 8.09 9.20 Oxide Ore Mined k tonnes 33 13 7.7 11.7 4.7 3.3 2.5 2.6 0.3 - - Oxide Ore Mined Grade g/t 10.02 10.43 11.8 8.4 12.1 9.1 10.8 9.7 3.1 - - Total Ore Mined k tonnes 2,172 1,573 169.6 203.7 335.0 333.2 291.5 339.3 274.0 175.9 50.2 Daily Mining Rate tpd 724 874 465 558 918 913 799 930 751 482 137 Stockpile Used in Processing k tonnes 26 - 26.2 Stockpile Grade g/t 7.33 7.3 PROCESSING Total Material for Processing k tonnes 2,198 1,692 162 118 454 333 292 339 274 176 50 Gold Average Grade g/t Au 7.87 7.9 7.77 7.07 7.75 7.73 8.08 7.89 8.04 8.09 9.20 Contained Gold ‘000 oz Au 556.5 429 40.5 26.8 113.2 82.8 75.7 86.1 70.8 45.8 14.8 Toll Mill Processing (3rd party processing) Total Tonnes Processed k tonnes 266 - 156 110 Gold Grade g/t Au 7.33 0.00 7.59 6.96 Contained Gold ‘000 oz Au 63 - 38 25 Gold Average Recovery % 90% 0% 90% 90% Recovered Gold ‘000 oz Au 56 - 34.4 22.1 Lone Tree Autoclave Processing Total Tonnes Processed k tonnes 1,899 1,673 444 330 289 337 274 176 50 Gold Grade g/t Au 7.91 7.85 7.70 7.71 8.06 7.88 8.04 8.09 9.20 Contained Gold ‘000 oz Au 483 423 110 82 75 85 71 46 15 Gold Average Recovery % 87% 87% 87% 87% 87% 87% 87% 87% 87% Recovered Gold ‘000 oz Au 422 371 98.2 71.8 65.8 74.2 61.2 38.2 12.4 Oxide Processing (Third-party ore purchase agreement until 2028) Total Tonnes Processed k tonnes 33 19 5.6 8.1 10.4 3.3 2.5 2.6 0.3 - - Gold Grade g/t Au 10.02 9.85 12.93 8.43 10.12 9.08 10.77 9.71 3.14 - - Silver Grade g/t Ag 0.00 0.00 - - - - - - - - Contained Gold ‘000 oz Au 10.6 6.1 2.3 2.2 3.4 1.0 0.9 0.8 0.0 - - Gold Payability / Recovery % 69% 76% 60% 60% 76% 75% 74% 75% 66% - - Recovered Gold ‘000 oz Au 7.3 4.6 1.4 1.3 2.6 0.7 0.6 0.6 0.0 - - Total Tonnes Processed k tonnes 2,198 1,692 162.1 118.0 454.4 333.2 291.5 339.3 274.0 175.9 50.2 Total Gold Production(3) ‘000 oz Au 485.4 375.7 35.7 23.5 100.8 72.5 66.4 74.8 61.2 38.2 12.4 Recoverable Ag ounces remaining (BOP) REVENUE Gold Price US$/oz Au $2,750 $2,750 $2,750 $2,750 $2,750 $2,750 $2,750 $2,750 $2,750 $2,750 $2,750 Revenues (@99.75% payability) US$M $1,331 $1,031 $98 $64 $276 $199 $182 $205 $168 $105 $34 OPERATING COSTS Mining Costs (Mineralized Material incl. Backfill) Surface Op Costs Processing - Refractory / Autoclave Processing - Refractory / Third party Processing - Oxide (2028 Onwards) Transportation Power Costs G&A Total Operating Cost US$M US$M US$M US$M US$M US$M US$M US$M US$M $396 $118 $200 $68 $0.65 $36 $33 $50 $271 $77 $176 $0 $0.65 $28 $20 $30 $33.2 $40.7 $52.6 $56.9 $55.3 $57.8 $48.3 $35.4 $15.9 $7.0 $13.5 $14.9 $15.6 $15.7 $16.0 $15.2 $12.0 $7.9 - - $46.7 $34.7 $30.4 $35.4 $28.8 $18.5 $5.3 $39.7 $27.9 - - - - - - - - - $0.4 $0.1 $0.1 $0.1 $0.0 - - $1.3 $2.8 $6.0 $6.0 $5.2 $6.1 $4.9 $3.1 $0.9 $1.8 $3.3 $3.7 $4.1 $4.2 $4.2 $4.2 $4.2 $3.1 $3.2 $5.8 $5.9 $6.3 $6.2 $6.0 $6.1 $5.8 $4.5 $86.3 $93.9 $130.2 $123.6 $117.1 $125.5 $107.4 $79.0 $37.7 $901 $604 Refining Royalties & State Taxes(4) NPI4 US$M US$M US$M $2.6 $104.5 $0.0 $2.0 $80.4 $0.0 $0.2 $0.1 $0.5 $0.4 $0.4 $0.4 $0.3 $0.2 $0.1 $7.3 $4.6 $20.0 $14.4 $13.3 $18.0 $14.7 $9.2 $3.0 - - - - - - - - - Unit Costs ($/t) Mining Costs (Ore & Waste ) Surface Op Costs Processing - Refractory / Autoclave Processing - Refractory / Third party Processing - Oxide (2028 Onwards) Transportation Power Costs G&A Total US$/t mined US$/t mined US$/t milled US$/t milled US$/t milled US$/t milled US$/t milled US$/t milled US$/t milled $182 $54 $105 $254 $34.0 $16.5 $172 $49 $105 $0 $34.0 $16.6 $196 $200 $157 $171 $190 $170 $176 $201 $318 $41 $66 $45 $47 $54 $47 $55 $68 $158 - - $105 $105 $105 $105 $105 $105 $105 $254 $254 - - - - - - - - - $34 $34 $34 $34 $34 - - $8 $24 $13 $18 $18 $18 $18 $18 $18 $11 $28 $8 $12 $14 $12 $15 $24 $62 $20 $49 $13 $19 $21 $18 $22 $33 $90 $15 $23 $12 $18 $410 $357 $532 $796 $286 $371 $402 $370 $392 $449 $751 Table is continued on next page Notes to table above: This is a non-GAAP measure. Please see the section titled “Non-GAAP Financial Performance Measures” above. The Mineral Reserve estimate is based on the block model depleted through March 31, 2026. The associated reserve mine plan therefore begins April 1, 2026. For purposes of the economic analysis, the reserve schedule was shifted one month such that the economic model begins May 1, 2026. This timing adjustment does not change the Mineral Reserve inventory, mine plan, or scheduled quantities and does not result in double counting of production. The PFS is based on a mineral reserve and resource estimate derived from drilling data 2023 through to the end of 2025 and should not be relied upon for production forecasts in 2026. The Company expects recovered gold ounces of between 30,000 to 40,000 ounces in 2026 from Granite Creek Underground. Royalties include a 10% net profit interest (NPI) to Gold Royalty Corp. and refining. The illustrative NPI interests stated herein do not include the impacts of any future open pit projects on the Property, to which the NPI interest similarly applies. Payments made under the NPI are only made after recovery by the Company of all “recoverable costs” as further described under Chapter 4 of the NI-43-101 Study. 5. All-in Sustaining Costs presented excludes the allocation of Lone Tree autoclave refurbishment capital.
Granite Creek underground UNITS TOTAL LOM 2028-2032 2026(2)E 2027E 2028E 2029E 2030E 2031E 2032E 2033E 2034E CAPITAL EXPENDTURES Lone Tree Capital Allocation US$M $49.3 $40.5 - $3.0 $8.6 $8.6 $7.5 $8.7 $7.1 $4.6 $1.3 Mine Capex US$M $60.7 $30.1 $16.6 $11.8 $10.3 $6.7 $4.4 $4.4 $4.4 $2.3 - Surface Capitalized Costs US$M $22.2 $3.2 $15.6 $3.4 $1.7 $0.6 $0.5 $0.3 $0.0 - - Closure Costs US$M $12.7 $0.0 - - - - - - - - $12.7Total Capital US$M $144.9 $73.8 $32.2 $18.1 $20.6 $15.9 $12.4 $13.5 $11.5 $6.8 $14.0 CASH COSTS & AISC Total Cash Costs (Inc. Royalties)(1) US$/oz $2,076 $1,827 $2,622 $4,208 $1,496 $1,1910 $1,968 $1,922 $2,002 $2,317 $3,297 All-in Sustaining Costs(1)(5) US$/oz $2,375 $2,023 $3,524 $4,980 $1,701 $2,129 $2,154 $2,102 $2,190 $2,496 $4,428All-in Sustaining Costs, Excluding Lone Tree US$/oz $2,273 $1,915 $3,524 $4,854 $1,615 $2,011 $2,041 $1,985 $2,073 $2,376 $4,322 Capital Allocation(1)(5) CASH FLOW ANALYSIS Revenue net of Refining US$M $1,329 $1,028 $98 $64 $276 $198 $182 $205 $167 $104 $34 Royalty and NPI(4) US$M ($104) ($80) ($7) ($5) ($20) ($14) ($13) ($18) ($15) ($9) ($3) Operating Costs US$M ($901) ($604) ($86) ($94) ($130) ($124) ($117) ($125) ($107) ($79) ($38) Depreciation US$M ($145) ($57) ($1) ($5) ($8) ($10) ($12) ($13) ($15) ($16) ($66) Net Operating Income US$M $179 $287 $3 ($40) $118 $51 $40 $48 $31 $0 ($73) Income Taxes US$M ($25) ($25) ($0) ($0) ($5) ($3) ($5) ($7) ($5) ($0) ($0) Net Income US$M $153 $263 $3 ($40) $113 $47 $35 $42 $25 $0 ($73) Depreciation US$M $145 $57 $1 $5 $8 $10 $12 $13 $15 $16 $66 Working Capital US$M $0 ($7) ($5) ($11) ($8) ($1) ($7) ($2) $10 ($1) $3 Operating Cash Flow US$M $298 $312 ($1) ($24) $113 $56 $40 $53 $50 $15 ($4)Capital Expenditures (incl. closure costs) US$M ($145) ($74) ($32) ($18)($21) ($16) ($12) ($13) ($11) ($7) ($14) NET CASH FLOW(2) US$M $153 $238 ($33) ($42) $92 $40 $28 $40 $38 $8 ($18) After-tax NPV 5% of discounting(2) US$M $118
Notes to table above:
1.
This is a non-GAAP measure. Please see the section titled “Non-GAAP Financial Performance Measures” above.
2.
The Mineral Reserve estimate is based on the block model depleted through March 31, 2026. The associated reserve mine plan therefore begins April 1, 2026. For purposes of the economic analysis, the reserve schedule was shifted one month such that the economic model begins May 1, 2026. This timing adjustment does not change the Mineral Reserve inventory, mine plan, or scheduled quantities and does not result in double counting of production.
3.
The PFS is based on a mineral reserve and resource estimate derived from drilling data 2023 through to the end of 2025 and should not be relied upon for production forecasts in 2026. The Company expects recovered gold ounces of between 30,000 to 40,000 ounces in 2026 from Granite Creek Underground.
4.
Royalties include a 10% net profit interest (NPI) to Gold Royalty Corp. and refining. The illustrative NPI interests stated herein do not include the impacts of any future open pit projects on the Property, to which the NPI interest similarly applies. Payments made under the NPI are only made after recovery by the Company of all “recoverable costs” as further described under Chapter 4 of the NI-43-101 Study.
Item 9.01
Financial Statements and Exhibits.
(d) Exhibits.
Exhibit
No.
Description
23.1
Consent of SRK Consulting (U.S.), Inc.
23.2
Consent of Global Resource Engineering
23.3
Consent of TR Raponi Consulting Ltd.
23.4
Consent of WSP USA Inc.
23.5
Consent of Practical Mining LLC
23.6
Consent of Hatch Associates Consultants, Inc.
23.7
Consent of Kenji Umeno
99.1
SEC Technical Report Summary, Pre-Feasibility Study, Granite Creek, Humboldt County, NV dated September 21, 2026 with an effective date of March 31, 2026
104
Cover Page Interactive Data File (embedded with the inline XBRL document)
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.
i-80 GOLD CORP.
Date: September 22, 2026
By:
/s/ Ryan Snow
Ryan Snow
Chief Financial Officer
EX-23.1
EX-23.1
Filename: d29391dex231.htm · Sequence: 2
EX-23.1
Exhibit 23.1
CONSENT OF SRK CONSULTING (U.S.), INC.
In connection with the i-80 Gold Corp. Current Report on Form 8-K dated
September 21, 2026 (the “Form 8-K”), the undersigned consents to:
i.
the filing and use of the technical report summary titled “SEC Technical Report Summary Pre-Feasibility Study Granite Creek, Humboldt County, NV” dated September 21, 2026, with an effective date of March 31, 2026 (the “Granite Creek Mine 1300 Report”) as referenced in the
Form 8-K;
ii.
the use of and reference to their name, including their status as an expert or “qualified person”,
(as described in Subpart 1300 of Regulation S-K promulgated by the Securities and Exchange Commission), in connection with the Granite Creek Mine 1300 Report, the Form
8-K, the Registration Statement on Form S-8 (File No. 333-280725) (the “Form
S-8 Registration Statement”) and the Registration Statements on Form S-3, as amended and supplemented (File Nos. 333-286531
and 333-287243) (together with the Form S-8 Registration Statement, “Registration Statements”); and
iii.
any extracts or summaries of the Granite Creek Mine 1300 Report included or incorporated by reference in the
Form 8-K or the Registration Statements and the use of any information derived, summarized, quoted or referenced from the Granite Creek Mine 1300 Report, or portions thereof, that was prepared by them, that
they supervised the preparation of, and/or that was reviewed and approved by them, that is included or incorporated by reference in the Form 8-K and which is incorporated by reference in the Registration
Statements.
Date: September 21, 2026
SRK Consulting (U.S.), Inc.
By:
/s/ Benjamin Parsons
Name:
Benjamin Parsons
Title:
SRK Consulting (U.S.), Inc. President
EX-23.2
EX-23.2
Filename: d29391dex232.htm · Sequence: 3
EX-23.2
Exhibit 23.2
CONSENT OF GLOBAL RESOURCE ENGINEERING
In connection with the i-80 Gold Corp. Current Report on Form 8-K dated
September 21, 2026 (the “Form 8-K”), the undersigned consents to:
i.
the filing and use of the technical report summary titled “SEC Technical Report Summary Pre-Feasibility Study Granite Creek, Humboldt County, NV” dated September 21, 2026, with an effective date of March 31, 2026 (the “Granite Creek Mine 1300 Report”) as referenced in the
Form 8-K;
ii.
the use of and reference to their name, including their status as an expert or “qualified person”,
(as described in Subpart 1300 of Regulation S-K promulgated by the Securities and Exchange Commission), in connection with the Granite Creek Mine 1300 Report, the Form
8-K, the Registration Statement on Form S-8 (File No. 333-280725) (the “Form
S-8 Registration Statement”) and the Registration Statements on Form S-3, as amended and supplemented (File Nos. 333-286531
and 333-287243) (together with the Form S-8 Registration Statement, “Registration Statements”); and
iii.
any extracts or summaries of the Granite Creek Mine 1300 Report included or incorporated by reference in the
Form 8-K or the Registration Statements and the use of any information derived, summarized, quoted or referenced from the Granite Creek Mine 1300 Report, or portions thereof, that was prepared by them, that
they supervised the preparation of, and/or that was reviewed and approved by them, that is included or incorporated by reference in the Form 8-K and which is incorporated by reference in the Registration
Statements.
Date: September 21, 2026
Global Resource Engineering
By:
/s/ Terre Lane
Name:
Terre Lane
Title:
Principal Mining Engineer
EX-23.3
EX-23.3
Filename: d29391dex233.htm · Sequence: 4
EX-23.3
Exhibit 23.3
CONSENT OF TR RAPONI CONSULTING LTD.
In
connection with the i-80 Gold Corp. Current Report on Form 8-K dated September 21, 2026 (the “Form 8-K”), the
undersigned consents to:
i.
the filing and use of the technical report summary titled “SEC Technical Report Summary Pre-Feasibility Study Granite Creek, Humboldt County, NV” dated September 21, 2026, with an effective date of March 31, 2026 (the “Granite Creek Mine 1300 Report”) as referenced in the
Form 8-K;
ii.
the use of and reference to their name, including their status as an expert or “qualified person”,
(as described in Subpart 1300 of Regulation S-K promulgated by the Securities and Exchange Commission), in connection with the Granite Creek Mine 1300 Report, the Form
8-K, the Registration Statement on Form S-8 (File No. 333-280725) (the “Form
S-8 Registration Statement”) and the Registration Statements on Form S-3, as amended and supplemented (File Nos. 333-286531
and 333-287243) (together with the Form S-8 Registration Statement, “Registration Statements”); and
iii.
any extracts or summaries of the Granite Creek Mine 1300 Report included or incorporated by reference in the
Form 8-K or the Registration Statements and the use of any information derived, summarized, quoted or referenced from the Granite Creek Mine 1300 Report, or portions thereof, that was prepared by them, that
they supervised the preparation of, and/or that was reviewed and approved by them, that is included or incorporated by reference in the Form 8-K and which is incorporated by reference in the Registration
Statements.
Date: September 21, 2026
TR Raponi Consulting Ltd.
By:
/s/ Tommaso Roberto Raponi
Name:
Tommaso Roberto Raponi
Title:
President
EX-23.4
EX-23.4
Filename: d29391dex234.htm · Sequence: 5
EX-23.4
Exhibit 23.4
CONSENT OF WSP USA INC.
WSP USA Inc.
(“WSP”) states that it is responsible for preparing or supervising the preparation of part(s) of the Technical Report Summary, titled “SEC Technical Report Summary Pre-Feasibility Study
Granite Creek, Humboldt County, NV” (the “Technical Report Summary”) dated September 21, 2026, with an effective date of March 31, 2026.
Furthermore, WSP states that:
I.
WSP consents to the public filing of the Technical Report Summary by
i-80 Gold Corp. (the “Company”);
II.
The Technical Report Summary was prepared in accordance with Subpart 1300 of Regulation S-K promulgated by the U.S. Securities and Exchange Commission and supports the Current Report on Form 8-K dated September 21, 2026 (the “Form 8-K”);
III.
WSP consents, as a company whose principal business is providing engineering or geoscientific services, and
whose business gives authority to a statement made by the company, to the use of WSP’s name in the Form 8-k, to any quotation from or summarization in the Form 8-K
of the parts of the Technical Report Summary for which WSP is responsible, to the filing of the Technical Report Summary as an exhibit to the Form 8-K, and to the incorporation by reference in the
Company’s Registration Statements on Form S-8 (File No. 333-280725) (the “Form S-8 Registration
Statement”) and the Registration Statements on Form S-3, as amended and supplemented (File Nos. 333-286531 and
333-287243) (together with the Form S-8 Registration Statement, “Registration Statements”);
IV.
WSP confirms that it has read the portions of the Form 8-K relating to
the parts of the Technical Report Summary for which WSP is responsible, and that such portions of the 8-K fairly and accurately reflect such information.
Dated September 21, 2026
WSP USA, Inc.
Authorized Signatory
/s/ Mathew Oommen
Name: Mathew Oommen
Title: Senior Vice President
EX-23.5
EX-23.5
Filename: d29391dex235.htm · Sequence: 6
EX-23.5
Exhibit 23.5
CONSENT OF PRACTICAL MINING LLC
In
connection with the i-80 Gold Corp. Current Report on Form 8-K dated September 21, 2026 (the “Form 8-K”), the
undersigned consents to:
i.
the filing and use of the technical report summary titled “SEC Technical Report Summary Pre-Feasibility Study Granite Creek, Humboldt County, NV” dated September 21, 2026, with an effective date of March 31, 2026 (the “Granite Creek Mine 1300 Report”) as referenced in the
Form 8-K;
ii.
the use of and reference to their name, including their status as an expert or “qualified person”,
(as described in Subpart 1300 of Regulation S-K promulgated by the Securities and Exchange Commission), in connection with the Granite Creek Mine 1300 Report, the Form
8-K, the Registration Statement on Form S-8 (File No. 333-280725) (the “Form
S-8 Registration Statement”) and the Registration Statements on Form S-3, as amended and supplemented (File Nos. 333-286531
and 333-287243) (together with the Form S-8 Registration Statement, “Registration Statements”); and
iii.
any extracts or summaries of the Granite Creek Mine 1300 Report included or incorporated by reference in the
Form 8-K or the Registration Statements and the use of any information derived, summarized, quoted or referenced from the Granite Creek Mine 1300 Report, or portions thereof, that was prepared by them, that
they supervised the preparation of, and/or that was reviewed and approved by them, that is included or incorporated by reference in the Form 8-K and which is incorporated by reference in the Registration
Statements.
Date: September 21, 2026
Practical Mining LLC
By:
/s/ Dagny G. Odell
Name:
Dagny G. Odell
Title:
Manager
EX-23.6
EX-23.6
Filename: d29391dex236.htm · Sequence: 7
EX-23.6
Exhibit 23.6
CONSENT OF HATCH
In connection with the i-80 Gold Corp. Current Report on Form 8-K dated September 21, 2026 (the “Form 8-K”), the undersigned consents to:
i.
the filing and use of the technical report summary titled “SEC Technical Report Summary Pre-Feasibility Study Granite Creek, Humboldt County, NV” dated September 21, 2026, with an effective date of March 31, 2026 (the “Granite Creek Mine 1300 Report”) as referenced in the
Form 8-K;
ii.
the use of and reference to their name, including their status as an expert or “qualified person”,
(as described in Subpart 1300 of Regulation S-K promulgated by the Securities and Exchange Commission), in connection with the Granite Creek Mine 1300 Report, the Form
8-K, the Registration Statement on Form S-8 (File No. 333-280725) (the “Form
S-8 Registration Statement”) and the Registration Statements on Form S-3, as amended and supplemented (File Nos. 333-286531
and 333-287243) (together with the Form S-8 Registration Statement, “Registration Statements”); and
iii.
any extracts or summaries of the Granite Creek Mine 1300 Report included or incorporated by reference in the
Form 8-K or the Registration Statements and the use of any information derived, summarized, quoted or referenced from the Granite Creek Mine 1300 Report, or portions thereof, that was prepared by them, that
they supervised the preparation of, and/or that was reviewed and approved by them, that is included or incorporated by reference in the Form 8-K and which is incorporated by reference in the Registration
Statements.
Date: September 21, 2026
Hatch
By:
/s/ William McCombe
Name:
William McCombe, P.Eng
Title:
Global Director, Gold
EX-23.7
EX-23.7
Filename: d29391dex237.htm · Sequence: 8
EX-23.7
Exhibit 23.7
CONSENT OF KENJI UMENO, P.ENG
In
connection with the i-80 Gold Corp. Current Report on Form 8-K dated September 21, 2026 (the “Form 8-K”), the
undersigned consents to:
i.
the filing and use of the technical report summary titled “SEC Technical Report Summary Pre-Feasibility Study Granite Creek, Humboldt County, NV” dated September 21, 2026, with an effective date of March 31, 2026 (the “Granite Creek Mine 1300 Report”) as referenced in the
Form 8-K;
ii.
the use of and reference to their name, including their status as an expert or “qualified person”,
(as described in Subpart 1300 of Regulation S-K promulgated by the Securities and Exchange Commission), in connection with the Granite Creek Mine 1300 Report, the Form
8-K, the Registration Statement on Form S-8 (File No. 333-280725) (the “Form
S-8 Registration Statement”) and the Registration Statements on Form S-3, as amended and supplemented (File Nos. 333-286531
and 333-287243) (together with the Form S-8 Registration Statement, “Registration Statements”); and
iii.
any extracts or summaries of the Granite Creek Mine 1300 Report included or incorporated by reference in the
Form 8-K or the Registration Statements and the use of any information derived, summarized, quoted or referenced from the Granite Creek Mine 1300 Report, or portions thereof, that was prepared by them, that
they supervised the preparation of, and/or that was reviewed and approved by them, that is included or incorporated by reference in the Form 8-K and which is incorporated by reference in the Registration
Statements.
Date: September 21, 2026
By:
/s/ Kenji Umeno
Name:
Kenji Umeno, P.Eng
EX-99.1
EX-99.1
Filename: d29391dex991.htm · Sequence: 9
EX-99.1
Exhibit 99.1
SEC Technical Report Summary
Pre-Feasibility Study
Granite Creek
Humboldt County, NV
Effective Date: March 31, 2026
Report Date:
September 21, 2026
Report Prepared for
i-80 Gold Corp.
5190 Neil Road Suite 460
Reno, Nevada 89502
Report Prepared by
SRK Consulting (U.S.), Inc.
999 Seventeenth Street, Suite 400
Denver, CO 80202
SRK Project Number: USPR002507
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page ii
Table of Contents
1 Executive Summary
1
1.1 Property Description (Including Mineral Rights) and Ownership
1
1.2 Geology and Mineralization
1
1.3 Status of Exploration, Development and Operations
2
1.4 Mineral Resource and Mineral Reserve Estimates
3
1.4.1 Underground
3
1.4.2 Open Pit
5
1.5 Metallurgical Testing and Recovery Methods
6
1.6 Mineral Reserve
7
1.7 Summary Capital and Operating Cost Estimates
9
1.8 Economic Analysis
10
1.9 Permitting Requirements
12
1.10 Conclusions and Recommendations
14
1.10.1 Drilling
14
1.10.2 Mining
14
1.10.3 Metallurgical Testing
15
1.10.4 Permitting / Environmental
15
1.10.5 Economics
15
2 Introduction
16
2.1 Registrant for Whom the Technical Report Summary was Prepared
16
2.2 Terms of Reference and Purpose of the Report
16
2.3 Sources of Information
16
2.4 Details of Inspection
16
2.5 Report Version Update
17
3 Property Description
18
3.1 Property Description
18
3.2 Mineral Tenure and Surface Rights
18
3.2.1 Owned Unpatented Mining Claims
22
3.2.2 Leased Unpatented Mining Claims
22
3.2.3 Fee Lands
22
3.3 Royalties and Net Profit Interests
22
3.3.1 1996 Royal Gold Royalty – Granite Creek Property (Royal Gold, Inc. –
Current Holder)
23
3.3.2 2026 Franco- Nevada Royalty – Granite Creek Property – 1.5% to 3%
NSR
24
3.3.3 Pinson Private Royalty – Pinson Claims – 3.125% NSR (Noceto, Phillips,
Murphy - Current Holders) & 0.17% NSR (FN USA & S&G Pinson – Current Holders)
24
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page iii
3.3.4 Pinson Royalty – Section 21 Bee Dee 21-56 Claims – 0.5% NSR (Pinson
Mining Company – Current Holder)
24
3.3.5 2001 Royal Gold Royalty – Section 21, 29 & Pacific Claims – 3-5%
NSR (Royal Gold Inc. - Current Holder)
24
3.3.6 Goldfield Royalty – Section 33 – 2% NSR (FN USA - Current
Holder)
25
3.3.7 Bee Dee Reserved Royalty - Bee Dee Claims - 2% NSR Royalty (FN USA (50%) and
S&G Pinson, LLC (50%) – Current Holders)
25
3.3.8 Section 28 Private Royalty – Section 28 Fee lands - 2% NSR (Murphy, Noceto,
Phillips, D. and J. Christison – Current Holders)
25
3.3.9 Mineral Production Royalty Agreement – Granite Creek Property - 10% Net
Profit Interest (NGM - Current Holder)
25
3.4 History of Ownership and Prior Mining
26
3.5 Environmental Liabilities
26
3.6 Permits and Authorizations
26
4 Accessibility, Climate, Local Resources, Infrastructure and
Physiography
27
4.1 Topography, Elevation and Vegetation
27
4.2 Means of Access
27
4.3 Climate and Length of Operating Season
27
4.4 Infrastructure Availability and Sources
27
4.4.1 Water
28
4.4.2 Electricity
28
4.4.3 Personnel
28
4.4.4 Supplies
28
5 History
29
5.1 Previous Operations
29
5.2 Exploration and Development of Previous Owners or Operators
29
6 Geological Setting, Mineralization, and Deposit
31
6.1 Regional, Local and Property Geology
31
6.1.1 Regional Geology
31
6.1.2 Local Geology
33
6.1.3 Property Geology
36
6.2 Mineral Deposit
42
6.3 Stratigraphic Column and Local Geology Cross-Section
42
7 Exploration
45
7.1 Exploration Work (Other Than Drilling)
45
7.1.1 Procedures and Parameters Relating to the Surveys and Investigations
45
7.1.2 Sampling Methods and Sample Quality
49
7.1.3 Information About the Area Covered
49
7.1.4 Significant Results and Interpretation
49
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page iv
7.2 Exploration Drilling
57
7.2.1 Drilling Type and Extent
57
7.2.2 Drilling, Sampling, or Recovery Factors
67
7.2.3 Drilling Results and Interpretation
68
7.3 Hydrogeology
78
7.4 Geotechnical Data, Testing and Analysis
85
7.5 Property Plan View
85
7.6 Exploration Target
85
8 Sample Preparation, Analysis and Security
86
8.1 Sample Preparation Methods and Quality Control Measures
86
8.2 Sample Preparation, Assaying and Analytical Procedures
86
8.3 Quality Control Procedures/Quality Assurance
87
8.4 Opinion on Adequacy
102
8.5 Non-Conventional Industry Practice
103
9 Data Verification
104
9.1 Data Verification Procedures
104
9.2 WSP Verification
119
9.3 Limitations
119
9.4 Opinion on Data Adequacy
119
10 Mineral Processing and Metallurgical Testing
121
10.1 Metallurgical Testing Programs
121
10.2 Sample Representativeness
136
10.3 Laboratories
149
10.4 Relevant Results
150
10.5 Adequacy of Data and Non-Conventional Industry Practice
170
11 Mineral Resource Estimate
172
11.1 Open Pit
172
11.1.1 Drillhole Database
172
11.1.2 Topography
174
11.1.3 Geologic Model
175
11.1.4 Estimation Domains
176
11.1.5 Compositing
183
11.1.6 Evaluation of Outliers
186
11.1.7 Density
187
11.1.8 Variography
187
11.1.9 Block Model Parameters
188
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page v
11.1.10 Estimation Domains
188
11.1.11 Estimation Parameters
189
11.1.12 Geometallurgical Modeling
190
11.1.13 Block Model Validation
191
11.1.14 Mineral Resource Classification
199
11.1.15 Open Pit Mineral Resource Statement
201
11.1.16 Mineral Resource Sensitivity by Domain
203
11.1.17 Factors that Could Affect Open Pit Mineral Resources
206
11.2 Underground Mineral Resources
206
11.2.1 Drillhole Database
206
11.2.2 Topography and Mining Depletion
208
11.2.3 Geological Model
210
11.2.4 Estimation Domain Analysis
210
11.2.5 Compositing
223
11.2.6 Assay Capping
226
11.2.7 Variogram Analysis and Modeling
230
11.2.8 Block Model Parameters
233
11.2.9 Estimation Methodology
234
11.2.10 Geo-Metallurgical Parameters
241
11.2.11 Density
251
11.2.12 Model Validation
251
11.2.13 Classification
264
11.2.14 Underground Mineral Resource Statement
268
11.2.15 Mineral Resource Sensitivity
271
11.2.16 Sources of Uncertainty
273
11.2.17 Reconciliation
274
11.2.18 Relevant Factors
275
12 Mineral Reserve Estimates
282
12.1 Key Assumptions, Parameters, and Methods Used
282
12.2 Cut-Off Grades Estimates
285
12.3 Reserves Classification and Criteria
286
12.4 Multiple Commodity Reserve
286
12.5 Impact of Changes of Modifying Factors to the Mineral Reserve
Estimates
286
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page vi
13 Mining Methods
287
13.1 Parameters Relevant to Mine Designs and Plans
287
13.1.1 Geotechnical
287
13.1.2 Hydrological
293
13.1.3 Ventilation
295
13.2 Production Rates, Expected Mine Life, Mining Unit Dimensions, and Mining
Dilution and Recovery Factors
301
13.3 Requirements for Stripping, Underground Development, and Backfilling
308
13.4 Required Mining Equipment Fleet and Machinery, and Personnel
309
13.5 Final Mine Outline Map
311
14 Processing and Recovery Methods
313
14.1 Lone Tree Facility Historical Processing
313
14.2 Lone Tree Facility Process Description
313
14.2.1 Key Process Design Criteria
316
14.2.2 Ore Reclaim
316
14.2.3 Grinding
317
14.2.4 Thickening and Acidulation
318
14.2.5 Pressure Oxidation
318
14.2.6 POX Off-Gas Treatment
319
14.2.7 Neutralization
320
14.2.8 Carbon-in-Leach
320
14.2.9 Carbon Elution and Regeneration
321
14.2.10 Cyanide Destruction
322
14.2.11 Tailings Management
322
14.2.12 Water Distributions
323
14.2.13 Reagents
324
14.2.14 Oxygen Plant
324
14.2.15 Compressed Air
325
14.2.16 Utilities Consumption
325
14.2.17 Water Consumption
325
14.3 Third-Party Refractory Processing
326
15 Infrastructure
329
15.1 Summary
329
15.2 Access and Local Resources
329
15.3 Administrative Facilities
330
15.4 Dewatering
331
15.4.1 Dewatering Wells
331
15.4.2 Monitoring Wells and VWPs
334
15.4.3 Underground Contact Water Management
338
15.4.4 Water Treatment and Rapid Infiltration Basins
339
15.4.5 Fresh Water Supply
343
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page vii
15.5 Electrical
343
15.6 Portal Facilities
344
15.7 Backfill Aggregate Crusher
346
15.8 Screen Plant
346
15.9 Waste Rock Disposal (WRD)
347
15.10 Waste Disposal
349
15.11 Communications
350
15.12 Equipment
350
16 Market Studies
351
16.1 Market Information
351
16.2 Contracts and Status
353
17 Environmental Studies, Permitting, and Plans, Negotiations, or Agreements
with Local Individuals or Groups
355
17.1 Environmental Study Results
355
17.2 Requirements and Plans for Waste and Tailings Disposal, Site Monitoring, and
Water Management During Operations and After Mine Closure
359
17.3 Project Permitting
362
17.4 Local Individuals and Groups
364
17.5 Mine Closure
365
17.6 Adequacy of Plans
367
17.7 Commitments to Ensure Local Procurement and Hiring
367
18 Capital and Operating Costs
368
18.1 Underground
368
18.1.1 Expected Accuracy of Cost Estimates
368
18.1.2 Capital Cost Estimates
368
18.1.3 Operating Cost Estimates
368
18.1.4 Closure and Reclamation
370
18.1.5 Infrastructure
370
18.2 Surface Operating Costs
370
18.2.1 Autoclave Capital Cost Allocation (Processing Fee)
372
18.2.2 Operating Cost Estimates
375
18.2.3 General and Administrative Costs
379
19 Economic Analysis
380
19.1 General Description
380
19.2 Results
389
19.3 Sensitivity Analysis
408
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page viii
20 Adjacent Properties
410
21 Other Relevant Data and Information
412
22 Interpretation and Conclusions
413
23 Recommendations
422
23.1 Recommended Work Programs
422
23.2 Recommended Work Program Costs
425
24 References
426
25 Reliance on Information Provided by the Registrant
432
26 Date and Signature Page
434
Appendices
1
Appendix A: Consent Letter
2
List of Tables
Table 1-1: Inclusive Mineral Resource Statement for Granite Creek Underground - Effective Date March 31, 2026
4
Table 1-2: Exclusive Mineral Resource Statement for Granite Creek Underground - Effective Date March 31, 2026
5
Table 1-3: Granite Creek Open Pit Mineral Resource Statement
6
Table 1-4: Underground Cut-off Grade Parameters
8
Table 1-5: Mineral Reserve Estimate for Granite Creek as of March 31, 2026 - SRK Consulting (U.S.), Inc.
9
Table 1-6: Life of Mine Capital Costs
10
Table 1-7: Life of Mine Operating Costs
10
Table 1-8: Indicative Economic Result
11
Table 2-1: Site Visit Participants
17
Table 3-1: Summary of Mineral and Surface Title Holders, Granite Creek Project
20
Table 3-2: Holding Costs, Granite Creek Project
21
Table 3-3: Owned Unpatented Claims, Granite Creek Project
21
Table 3-4: Leased Unpatented Claims, Granite Creek Project
21
Table 7-1: Salient Results of the Ogee Zone Channel Sample Assays
57
Table 7-2: Summary of Historical Drilling (pre i-80) on the Granite Creek Property Since 1970
59
Table 7-3: PMC Drilling 1970 to 1996
59
Table 7-4: PMC – Homestake Drilling 1997 to 2000
59
Table 7-5: PMC – Barrick Drilling 2003
59
Table 7-6: Atna Drilling 2004
60
Table 7-7: Atna Drilling 2005 to 2006
60
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page ix
Table 7-8: PMC (Barrick) Drilling 2007
60
Table 7-9: PMC (Barrick) 2008 Drilling
61
Table 7-10: 2012 Atna Mag Pit Core Drilling
61
Table 7-11: 2013 to 2015 Atna Underground Development RC Drilling
61
Table 7-12: Drillholes Within the Current Property Boundary by Type and Operator
63
Table 8-1: Historical (pre-i-80) Operators, Periods, and Analytical Laboratories at Granite Creek
87
Table 8-2: Historical (pre-i-80) CRMs at Granite Creek — Certified Au Values and Insertion Counts
88
Table 8-3: i-80 Gold CRM Catalog Used at Granite Creek, 2021 to 2026 (year-to-date) — Certified Au Values and Insertion Counts
91
Table 8-4: Lower Limit of Detection (LLD) and 5xLLD Blank Acceptance Threshold by Gold Analytical Method
95
Table 8-5: Duplicate Tolerance Envelopes Applied to the i-80 Gold Drillhole Assay Database
96
Table 8-6: Annual QA/QC Insertion Summary, i-80 Gold Drillhole Sampling at Granite Creek, 2021 to 2026
100
Table 9-1: i-80 Standard Operating Procedure List
112
Table 10-1: Metallurgical Test Work Programs
121
Table 10-2: Underground Samples Batch Pressure Oxidation Conditions from FLS Program
123
Table 10-3: Granite Creek Underground Metallurgical Sample Blends for Additional Testing
124
Table 10-4: Granite Creek Underground Metallurgical Testing Program Follow-Up BTAC Test Conditions
124
Table 10-5: Granite Creek Underground Metallurgical Testing Program Continuous POX Run Test Conditions
124
Table 10-6: Underground Blend Samples Cyanide Detox Conditions from FLS Program
126
Table 10-7: Proportions of Continuous Pressure Oxidation Feed from i-80 Sources
127
Table 10-8: Particle Size Analysis of Continuous Pressure Oxidation Blend and Components
128
Table 10-9: Continuous Pressure Oxidation Test Conditions
128
Table 10-10: Continuous Pressure Oxidation Testing, Cyanide Detoxification Conditions
133
Table 10-11: Malvern Laser Diffraction Particle Size Analysis of Continuous Pressure Oxidation Samples
134
Table 10-12: Required Solids Feed Concentration Ranges
134
Table 10-13: Continuous Fill Tests on Continuous Pressure Oxidation Samples
134
Table 10-14: Slurry Rheology on Continuous Pressure Oxidation Samples
134
Table 10-15: Pressure Filtration on Cyanide Detoxification Samples
135
Table 10-16: Bond Ball Mill Grindability Test Results
135
Table 10-17: Underground Samples Head Assays from FLS Program
137
Table 10-18: Composition of Continuous Pressure Oxidation Feed Blend
138
Table 10-19: South Pacific Test Program Sample List
138
Table 10-20: Projected Feed from Granite Creek Underground
149
Table 10-21: Summary of Feed Values for Granite Creek Test Programs
149
Table 10-22: Autoclave Pre-Treatment Tests from Dawson Test Work Program
150
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page x
Table 10-23: Underground Samples Baseline and Batch Pressure Oxidation CIL Results from FLS Program
153
Table 10-24: Granite Creek Underground Metallurgical Testing Program Follow-Up BTAC Sulfide
Oxidation Results Compared to Predicted Results
154
Table 10-25: Granite Creek Underground Metallurgical Testing Program Follow-Up BTAC Gold Recovery
Results Compared to Predicted Results
155
Table 10-26: Underground Samples (OAPC) Continuous Autoclave Tests from FLS Program
156
Table 10-27: Underground Cyanide Detox Reagent Consumption from FLS Program
157
Table 10-28: Underground Cyanide Detox WAD from FLS Program
157
Table 10-29: Pressure Oxidation Continuous Test, Sulfide Sulfur Oxidation and Carbonate Decomposition
158
Table 10-30: Bench Top Autoclave Tests on Continuous Pressure Oxidation Feed Blend
158
Table 10-31: Continuous Pressure Oxidation, CIL Au Recovery
159
Table 10-32: Bench Top Autoclave, CIL Au Recovery
159
Table 10-33: POX Results
161
Table 10-34: Baseline CIL Results
162
Table 10-35: POX Residue CIL Results
163
Table 10-36: Gold Recovery Results from Toll Milling BTAC Tests
165
Table 10-37: BTAC Gold Recovery Results on Otto Zone Samples
168
Table 11-1: Negative Values in Drillhole Database
174
Table 11-2: Open Pit Estimation Zone and Pit Name
177
Table 11-3: Open Pit Numeric Indicator Model Parameters
177
Table 11-4: Open Pit Compositing Interval Statistics
185
Table 11-5: Open Pit Compositing Comparison, 6 m (20 ft) Intervals
186
Table 11-6: Open Pit Upper Clipping (Capping) Au ppm Values by Domain
187
Table 11-7: Open Pit Domain Density Summary
187
Table 11-8: Open Pit Variogram Parameters
188
Table 11-9: Open Pit Block Model Parameters
188
Table 11-10: Open Pit ID2 Estimation Parameters
190
Table 11-11: Open Pit Combined Estimator Hierarchy
190
Table 11-12: Open Pit Comparison of Composite Values to Grade Estimation Methods
195
Table 11-13: Open Pit Mineral Resource Classification Parameters
200
Table 11-14: Open Pit Parameters for Resource Class Numeric Indicator Model
200
Table 11-15: Granite Creek Resource Parameters for Open Pit Optimization
202
Table 11-16: Granite Creek Open Pit Mineral Resource Statement
203
Table 11-17: Granite Creek Mineral Resource Sensitivity to Cut-off Grade – Reported on 100% basis
204
Table 11-18: Summary of Drilling and Sampling in Target Area
207
Table 11-19: Summary of Drilling and Sampling Information Available within Leapfrog
207
Table 11-20: Summary of Domains and Criteria Used
221
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page xi
Table 11-21: Summary of Raw vs. Capped Composite Statistics per Domain
230
Table 11-22: Summary of Gold Variogram Parameters
231
Table 11-23: Summary of Rotated Prototype Parameters Used in Granite Creek Model
234
Table 11-24: Summary of Faults and Key Structures Used to Define Variable Orientations for Estimation
235
Table 11-25: Summary of Estimation Parameters for Gold Estimates
240
Table 11-26: Summary Statistics and Coverage of Raw Sampling per Metallurgical Parameter vs. Gold Coverage
242
Table 11-27: Summary Statistics of Capped Composites (5 ft), Showing Capping (Maximum) Levels per Metallurgical Elements
243
Table 11-28: Summary of Variogram Parameters Used for Metallurgical Elements
245
Table 11-29: Summary of Search Parameters Used for AuCN
246
Table 11-30: Summary Estimation Parameters (CO3 %)
247
Table 11-31: Summary Estimation Parameters (Preg Rob %)
248
Table 11-32: Summary Estimation Parameters (Total Organic Carbon, TOC %)
249
Table 11-33: Summary Estimation Parameters (Sulfide Sulfur %)
250
Table 11-34: Density Values Used in the Underground Model
251
Table 11-35: Summary Statistics of Raw and Declustered Composite Grades vs. Block Estimates and NN-Assigned Values (0 g/t Cut-off)
259
Table 11-36: Summary of Mineral Resource Cut-off and MSO Assumptions
269
Table 11-37: Inclusive Mineral Resource Statement for Granite Creek Underground - Effective Date March 31, 2026
270
Table 11-38: Exclusive Mineral Resource Statement for Granite Creek Underground - Effective Date March 31, 2026
271
Table 11-39: Grade Sensitivity (Combined Measured and Indicated), inside MSO on a 100% Project basis
272
Table 11-40: Grade Sensitivity Table (Inferred), inside MSO on a 100% Project Basis
273
Table 11-41: Open Pit Mineral Resource Sensitivity by Domain
277
Table 11-42: Underground Mineral Resource Sensitivity (1 of 2)
280
Table 11-43: Underground Mineral Resource Sensitivity (2 of 2)
281
Table 12-1: Mineral Reserve Estimate for Granite Creek Underground – Effective Date March 31, 2026
284
Table 12-2: Underground Cut-off Grade Parameters
285
Table 13-1: Geotechnical Domains
289
Table 13-2: Geotechnical Parameters for the Three Geotechnical Domains
289
Table 13-3: RMR Summary for Each Geotechnical Domain
290
Table 13-4: Major Joint Sets Defined by Televiewer Data Analysis in Dips Software
290
Table 13-5: Stress Analysis from Assumed Depth and k Value of 0.75
291
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page xii
Table 13-6: Ground Support Recommendations for Granite Creek SPZ Development and Mining
291
Table 13-7: Recommended Operating Practices for Ground Support Installation
292
Table 13-8: Site Visit Temperature and Humidity Data
295
Table 13-9: MSHA Standards
297
Table 13-10: Capital Cost Estimate
300
Table 13-11: Annual Operating Cost Estimate
300
Table 13-12: Productivity Rates
305
Table 13-13: Schedule Parameters for Underground Mining
306
Table 13-14: Granite Creek Annual Production Schedule
307
Table 13-15: Mobile Equipment Fleet
310
Table 13-16: Granite Creek Manpower
311
Table 14-1: Summary of Key Process Statistics
316
Table 14-2: Design Scenarios for Lone Tree Autoclave Feed
316
Table 14-3: Lone Tree Facility Water Consumption by Type
325
Table 14-4: Lone Tree Facility Energy Usage by Area
326
Table 15-1: Granite Creek Active Dewatering Wells
333
Table 15-2: Summary of Locations, Construction Information and Water Levels for Dewatering Wells, Monitoring Wells, and Piezometers
336
Table 15-3: Projected Electrical Demand by Area
343
Table 15-4: WRD Capacity
348
Table 17-1: MWMP Results of Rock Placed in CX Pit 2005 to 2022
356
Table 17-2: MWMP Results of Rock Placed in CX Pit 2023 to 2025
357
Table 17-3: Water Quality April 2023 to January 2025
357
Table 17-4: Granite Creek Mine Project Permits
363
Table 18-1: Estimated Mining Capital Cost
368
Table 18-2: Mining Operating Costs
369
Table 18-3: Infrastructure Capital Cost Estimates1
370
Table 18-4: Infrastructure Unit Operating Cost Estimates
371
Table 18-5: Annual Infrastructure Operating Costs (US$000’s)
371
Table 18-6: Unit Costs for Over-the-Road Ore Haulage
372
Table 18-7:Capital Cost Summary
373
Table 18-8: Sustaining CAPEX Assumptions for Lone Tree
374
Table 18-9: Lone Tree Processing Facility Operating Cost Summary
375
Table 18-10: Lone Tree Pressure Oxidation-CIL Power Costs
375
Table 18-11: Lone Tree Pressure Oxidation-CIL Labor Costs
377
Table 18-12: Lone Tree Pressure Oxidation-CIL Maintenance Costs.
377
Table 18-13: Lone Tree Pressure Oxidation-CIL Consumable Costs
377
Table 18-14: Key Consumables Costs for Lone Tree Pressure Oxidation-CIL
378
Table 18-15: Lone Tree Pressure Oxidation-CIL Facility Costs
378
Table 18-16: Lone Tree Processing Facility Operating Cost Summary
378
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page xiii
Table 18-17: Average Annual G&A Spend
379
Table 19-1: Basic Model Parameters
380
Table 19-2: Net Proceeds of Mineral Tax Sliding Scale
381
Table 19-3: Life-of-Mine Production Summary
383
Table 19-4: Granite Creek Processing Summary
384
Table 19-5: Granite Creek Mining Cost Summary
386
Table 19-6: Granite Creek Processing Costs
387
Table 19-7: Granite Creek Surface Costs
387
Table 19-8: Granite Creek Power Costs
387
Table 19-9: Granite Creek G&A Costs
387
Table 19-10: Modeled Sustaining Capital
388
Table 19-11: Indicative Economic Results
389
Table 19-12: Economic Results – Tabular Data
390
Table 23-1: Summary of Costs for Open Pit and Underground Recommended Work Programs
425
Table 25-1: Reliance on Information Provided by the Registrant
433
List of Figures
Figure 1-1: Annual Cash Flow Summary
12
Figure 3-1: Granite Creek Project Location
18
Figure 3-2: Land Position Map, Granite Creek Project
19
Figure 6-1: Regional Geology Map
33
Figure 6-2: Local Geology Map
35
Figure 6-3: Property Geology Map
40
Figure 6-4: Alteration of the Mag Pit
41
Figure 6-5: Granite Creek Stratigraphic Column
43
Figure 6-6: Cross-section A-A’ looking Northeast showing Structure, Lithology and Mineralization
44
Figure 7-1: Gravity Survey, 2,587 Stations, Magee Geophysical Services, 2006
46
Figure 7-2: Location of the MT Survey Lines on the Geology and Pit Locations (Left) and on the Residual Gravity (Right)
48
Figure 7-3: Pinson Local Gravity Interpretation
50
Figure 7-4: MT Resistivity Depth Inversion for Line 6090
51
Figure 7-5: MT Resistivity Depth Inversion for Line 12300
52
Figure 7-6: MT Resistivity Depth Inversion for Line 13860
53
Figure 7-7: MT Resistivity Depth Inversion for Line 15300
54
Figure 7-8: MT Resistivity Depth Inversion for Line 17160
55
Figure 7-9: MT Resistivity Depth Inversion for Line 19230
56
Figure 7-10: Granite Creek Project Drill Plan by Operator
58
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page xiv
Figure 7-11: Plan View Section Lines of Granite Creek Mine Project
62
Figure 7-12: Drilling by Hole Type Completed by PMC
64
Figure 7-13: Drilling by Type Completed by PMC with Barrick as Operator
65
Figure 7-14: Drilling Completed by Atna
66
Figure 7-15: Drilling Completed by i-80
67
Figure 7-16: Vertical Section A-A’ of the Mag Pit Area
69
Figure 7-17: Vertical Section B-B1 of the Pit CX and C Area
70
Figure 7-18: Vertical Section C-C1 of the Pit A Area
71
Figure 7-19: Vertical Section D-D1 of the Pit B Area
72
Figure 7-20: Vertical Section E-E1 of the Underground Resource Area
73
Figure 7-21: Plan View Showing Section Locations through the Underground Resource Area
74
Figure 7-22: Section A-A’ Showing Drilling in the CX Zone, 30.5 m (100 ft) thick, looking North
75
Figure 7-23: Section B-B’ Showing Drilling in the Otto and Ogee Zones, looking North
76
Figure 7-24: Section C-C Showing Drilling in the SPZ, 130 m (100 ft) thick, looking North
77
Figure 7-25: Well Locations
79
Figure 7-26: Timeline for Hydrogeologic Characterization with Relationship to Mining
80
Figure 7-27: Predicted Passive Inflow and Dewatering Well Pumping
82
Figure 7-28: Predicted Groundwater Elevation in the Vicinity of Ore Bodies: Otto, Ogee, and South Pacific
83
Figure 7-29: Predictive and Passive Inflows from Scenarios One and Two
84
Figure 8-1: Historical Rocklabs CRM Control Chart (OxD57, Representative)
89
Figure 8-2: Historical Blank Control Chart, 2005 to 2018
89
Figure 8-3: Historical Combined Duplicate Scatter, 2005 to 2018
90
Figure 8-4: CDN-GS-7J Control Chart, i-80 Era
92
Figure 8-5: CDN-GS-30C Control Chart, i-80 Era
92
Figure 8-6: CDN-GS-P6E Control Chart, i-80 Era
93
Figure 8-7: OREAS-277 Control Chart, i-80 Era
93
Figure 8-8: OREAS-279 Control Chart, i-80 Era
94
Figure 8-9: OREAS-282 Control Chart, i-80 Era
94
Figure 8-10: i-80 Era Blank Control Chart, 2021 to Q1 2026
95
Figure 8-11: Field (Quarter-core) Duplicate Scatter, i-80 Era
97
Figure 8-12: Preparation (Coarse Reject) Duplicate Scatter, i-80 Era
98
Figure 8-13: Lab (Pulp / Analytical) Duplicate Scatter, i-80 Era
99
Figure 8-14: Check Sample Report Primary vs. Check Assay Scatter, Au, 2023 to 2026
102
Figure 9-1: Underground Working Heading at Granite Creek Showing Mineralized Structure with Sample
Outline and Drill Pattern Marks Observed During the QP Site Visit
106
Figure 9-2: Underground Working Heading at Granite Creek Showing Exposed Mineralized Face Observed During the QP Site Visit
107
Figure 9-3: Drill Core from Hole iGS22-07 (1,499 to 1,482 m (581 ft)) with Printed Assay Sheet
Used by the QP to Cross-Check Mineralization Against Database-Recorded Au and Ag Grades
109
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page xv
Figure 9-4: Drill Core from Hole iGS23-05 (1,498 to 1,491 m (610 ft)) with Printed Assay Sheet
Used by QP to Cross-Check Mineralization Against Database Au and Ag Grades
110
Figure 9-5: Diamond Core Saw Station at the Lone Tree Laboratory Facility
113
Figure 9-6: Palleted and Tarped Coarse Reject and Core Storage Yard at the Lone Tree Facility
114
Figure 9-7: Pulp Sample Storage at the Lone Tree Facility
115
Figure 9-8: Specific Gravity (Water Immersion) Measurement Station at the Lone Tree Laboratory Facility
117
Figure 10-1: Granite Creek POX Pilot Plant Sulfide Oxidation Profile
125
Figure 10-2: Continuous Pressure Oxidation Program Flow Sheet
127
Figure 10-3: Continuous Pressure Oxidation Autoclave at FLSmidth
129
Figure 10-4: Continuous Pressure Oxidation Slurry Temperature Profile
130
Figure 10-5: Continuous Pressure Oxidation Vessel Pressure Profile
130
Figure 10-6: Continuous Pressure Oxidation Vent Oxygen Purity
131
Figure 10-7: Continuous Pressure Oxidation Calculated Feed Flow Rate
131
Figure 10-8: Continuous Pressure Oxidation Sulfide Oxidation Profile
132
Figure 10-9: CNWAD Concentration in Cyanide Detoxification
133
Figure 10-10: SGS Metallurgical Program Head Assays
139
Figure 10-11: Bulk Modal (QEMSCAN) Results
141
Figure 10-12: Pyrite/Marcasite Liberation by Mass
142
Figure 10-13: Arsenopyrite Liberation by Mass
142
Figure 10-14: Silicate Liberation by Mass
143
Figure 10-15: Carbonate Liberation by Mass
144
Figure 10-16: Locations of Metallurgical Samples (Section View)
145
Figure 10-17: Locations of Metallurgical Samples (Plan View)
146
Figure 10-18: Distribution of Gold Grade in Metallurgical Samples
147
Figure 10-19: Distribution of Organic Carbon in Metallurgical Samples
147
Figure 10-20: Distribution of Carbonate in Metallurgical Samples
148
Figure 10-21: Distribution of Sulfide Sulfur in Metallurgical Samples
148
Figure 10-22: Gold Cyanide Solubility and Sulfide Influence – Ogee Samples
151
Figure 10-23: CIL Gold Recovery as a Function of Sulfide Sulfur Oxidation – Underground Samples
154
Figure 10-24: Neutralization Lime Usage in Continuous Pressure Oxidation Discharge
159
Figure 10-25: South Pacific Gold Recovery as a Function of Sulfide Oxidation (SGS 2026)
164
Figure 10-26: CIL Recovery vs Cyanide Soluble Gold Percent
166
Figure 10-27: CIL Recovery vs Feed Sulfide Sulfur Content
166
Figure 10-28: OG Zone Gold Recovery vs Gold Head Grade
167
Figure 10-29: OG Zone Gold Recovery vs Organic Carbon Content
168
Figure 10-30: Sulfide Oxidation vs Carbonate Content, 45-Minute Retention Time, Acidic Conditions
169
Figure 10-31: Mass Loss versus Carbonate Content, 45-Minute Retention Time, Acidic Conditions
169
Figure 10-32: CIL Gold Recovery vs CIL Feed Sulfide Sulfur, All Conditions
170
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page xvi
Figure 11-1: Drillhole Used Plan View on Topography
173
Figure 11-2: Current Topography Used for Open Pit Resource Estimation
175
Figure 11-3: Open Pit Geologic Model, Oblique View
176
Figure 11-4: Open Pit Estimation Zones
177
Figure 11-5: Example of Numeric Indicator High-Grade Trend Analysis, Mag Pit
178
Figure 11-6: Open Pit Zone 3 Sub-Domains
179
Figure 11-7: High-Grade and Low-Grade Open Pit Domains in the CX Fault
180
Figure 11-8: Box and Whisker Plot of Open Pit Estimation Domains
181
Figure 11-9: Histograms of the High-Grade and Low-Grade Distributions in Zones 1 and 2
182
Figure 11-10: Histograms of the High-Grade and Low-Grade Distributions in Zones 3 and 4
183
Figure 11-11: Open Pit Sample Interval Length Statistics of Au ppm Assays
184
Figure 11-12: Open Pit Compositing Comparison, 6 m (20 ft) Intervals
185
Figure 11-13: Example of Open Pit Cumulative Log Probability Plot, Zone 1 HG
186
Figure 11-14: Open Pit Numeric Indicator Models
189
Figure 11-15: Open Pit Zone 1 Visual Comparison Composite to Block Model Grade, Plan View
191
Figure 11-16: Open Pit Zone 2 Visual Comparison Composite to Block Model Grade, Plan View
192
Figure 11-17: Open Pit Zone 3 Visual Comparison Composite to Block Model Grade Plan View
192
Figure 11-18: Open Pit Zone 4 Visual Comparison Composite to Block Model Grade Plan View
193
Figure 11-19: Open Pit Zone 1 Section Composites and Block Model Cross Sections
193
Figure 11-20: Open Pit Zone 2 Section Composites and Block Model Cross Section
194
Figure 11-21: Open Pit Zone 3 Section Composites and Block Model Cross Section
194
Figure 11-22: Open Pit Zone 4 Section Composites and Block Model Cross Section
195
Figure 11-23: Cumulative Frequency of Composite and Estimated Block Grades
196
Figure 11-24: X Axis, Zone 1 High-Grade Domain
197
Figure 11-25: Open Pit Swath Plot, Y Axis, Zone 1 High-Grade Domain X axis, Zone 1 High-Grade Domain
198
Figure 11-26: Open Pit Swath Plot Z Axis, Zone 1 High-Grade Domain
199
Figure 11-27: Open Pit Constrained Resource Class All Areas Plan View
200
Figure 11-28: Plan Showing Collar Locations and Borehole Traces within the MRE-Focused Dataset
208
Figure 11-29: Isometric View Showing Open Pit Depletion (Surface) and Underground Workings (Grey)
209
Figure 11-30: Plan Showing Main Defined Mineralization Domain Boundary Areas at the Granite Creek Underground Operation
212
Figure 11-31: Plan Showing Main Defined Mineralization Areas at the Granite Creek Underground Operation
213
Figure 11-32: Long Section (Looking Northwest) Showing Main Defined Mineralization Areas at the Granite Creek Underground Operation
214
Figure 11-33: Example of EDA Analysis in X-10 to Identify Potential Changes in Grade Populations within the Ogee Domain
215
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page xvii
Figure 11-34: Example of Log-Probability Plots Showing Polynomial Model Fitting (Pink) and Potential Trend Breaks (Yellow)
216
Figure 11-35: Example of Sensitivity Analysis on ISO Values Completed by SRK for the Ogee Domain
218
Figure 11-36: Level Plan 4230 Showing Selected Ogee and Otto Domain Boundaries vs. Sampling (Including Grade Control Muck Sampling)
219
Figure 11-37: SRK Domain Model Used for Grade Estimation
222
Figure 11-38: Box-Whisker Plot Showing Gold Grade Distributions within the SRK Domained Models, showing mean grades.
223
Figure 11-39: Log Probability Plot Showing Sampling Length in Diamond and RC Sampling at Granite Creek
224
Figure 11-40: Summary of Sampling Lengths Inside the High-Grade Domains within Diamond and RC Drillholes
225
Figure 11-41: Examples of X-10 Capping Analysis Showing Capped Values in Yellow
227
Figure 11-42: Capping Analysis Showing Breaks in Data Population (Ogee HG Domain)
228
Figure 11-43: Capping Analysis Showing Breaks in Data Population (Otto HG Domain)
228
Figure 11-44: Capping Analysis Showing Breaks in Data Population (Ogee SPZ Domain)
229
Figure 11-45: Modeled Normal Score Downhole Variograms and Directional Correlograms for OgeeHG (Gold)
232
Figure 11-46: Modeled Normal Score Downhole and Directional Variograms for OttoHG (Gold)
232
Figure 11-47: Modeled Normal Score Downhole and Directional Variograms for SPZHG (Gold)
233
Figure 11-48: Block Size Analysis, Ogee HG Domain
236
Figure 11-49: KNA Analysis on Number of Samples vs. Slope of Regression (Top) and Impact of Negative Weights (Bottom) — Ogee HG Domain
237
Figure 11-50: KNA Analysis on Number of Samples vs. Slope of Regression (Top) and Impact of Negative Weights (Bottom) — SPZ HG Domain
238
Figure 11-51: Plan Section Showing Block Grades vs. Composites (Ogee)
252
Figure 11-52: Cross Section Showing Block Grades vs. Composites (Ogee)
253
Figure 11-53: Level Plan (Map) Showing Block Grades vs. Composites (Otto)
254
Figure 11-54: Cross Section Showing Block Grades vs. Composites (Otto)
255
Figure 11-55: Plan Showing Block Grades vs. Composites (SPZ)
256
Figure 11-56: Cross Section Showing Block Grades vs. Composites (SPZ)
257
Figure 11-57: Swath Plot Analysis of Au (g/t), Ogee HG Domain
261
Figure 11-58: Swath Plot Analysis of Au (g/t), Otto HG Domain
262
Figure 11-59: Swath Plot Analysis of Au (g/t), SPZ HG Domain
263
Figure 11-60: Long Section Showing Final Measured (red/brown) and Indicated Shapes (green) Selected for Granite Creek
265
Figure 11-61: Cross Section Showing Final Measured and Indicated Shapes Selected for Granite Creek (Ogee and Otto Domains)
266
Figure 11-62: Cross Section Showing Final Measured and Indicated Shapes Selected for Granite Creek (SPZ Domains)
267
Figure 11-63: Final Classification Shown Against Filtered Mineral Resource Blocks
268
Figure 12-1: General Locations of the Granite Creek Deposit
282
Figure 13-1: Contact Water Measurements
294
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page xviii
Figure 13-2: Future Mine Airflow Configuration
296
Figure 13-3: Surface Fan Installation General Arrangement
299
Figure 13-4: Production Design with MSO Guidance
301
Figure 13-5: Schematic of Cut Mining Sequence
302
Figure 13-6: Production Mining Sequence
303
Figure 13-7: Underground Infrastructure Location
304
Figure 13-8: Granite Creek Mine Design Looking Northwest
305
Figure 13-9: Granite Creek Annual Production Schedule
307
Figure 13-10: Final Mine Outline Map
312
Figure 14-1: Overall Process Flow Diagram for the Lone Tree Facility
315
Figure 14-2: Ore Stockpile Area Layout Diagram
317
Figure 14-3: Third-Party Pressure Oxidation Facility Flow Diagram
327
Figure 15-1: Granite Creek Overview
330
Figure 15-2: Granite Creek Administration Area
331
Figure 15-3: Map of Dewatering Wells, Monitoring Wells, Piezometers at Granite Creek
335
Figure 15-4: Granite Creek Weekly Average Passive Infiltration
338
Figure 15-5: Underground Contact Water Collection and Discharge System
339
Figure 15-6: Map of Current and Planned RIBs at Granite Creek
340
Figure 15-7: Existing Water Treatment Plant (800 gpm capacity)
341
Figure 15-8: WTP-2 Process Flow
342
Figure 15-9: Granite Creek Electrical Distribution and Dewatering System
344
Figure 15-10: Granite Creek Portal Facilities
345
Figure 15-11: Screen Plant Area General Arrangement (OMC 2026)
347
Figure 15-12: C (Blue) and CX (Green) Pit WRD Plan
349
Figure 16-1: Average Annual Demand for Gold – by Sector
352
Figure 16-2: Daily Spot Gold Price
352
Figure 18-1: Yearly Mine Operating Cost Profile
369
Figure 18-2: Organizational Chart for Lone Tree Pressure Oxidation-CIL
376
Figure 19-1: Granite Creek Mining Profile (imperial)
382
Figure 19-2: Granite Creek Mining Profile (metric)
382
Figure 19-3: Granite Creek Processing Profile
384
Figure 19-4: LoM Operating Cost Summary
385
Figure 19-5: LoM Operating Cost Contributions
385
Figure 19-6: Granite Creek Sustaining Capital Profile
388
Figure 19-7: Annual Cash Flow Summary
392
Figure 19-8: Sensitivity Analysis
392
Figure 20-1: Summary of Gold Production at Turquoise Ridge (as reported by Barrick 2024)
393
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page xix
Figure 20-2: Barrick Mineral Resource Statement for Turquoise Ridge (effective date December 31, 2023) – reported on 100% basis
394
Figure 20-3: Barrick Mineral Reserve Statement for Turquoise Ridge (effective date December 31, 2023) – reported on 100% basis
394
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page xx
List of Abbreviations
The metric system has been used throughout this report. Tonnes are metric of 1,000 kg, or 2,204.6 lb. All currency is in U.S. dollars (US$)
unless otherwise stated.
Abbreviation
Unit or Term
A
ampere
AA
atomic absorption
A/m2
amperes per square meter
ANFO
ammonium nitrate fuel oil
Ag
silver
Au
gold
AuEq
gold equivalent grade
°C
degrees Centigrade
CCD
counter-current decantation
CIL
carbon-in-leach
CoG
cut-off grade
cm
centimeter
cm2
square centimeter
cm3
cubic centimeter
cfm
cubic feet per minute
ConfC
confidence code
CRec
core recovery
CSS
closed-side setting
CTW
calculated true width
°
degree (degrees)
dia.
diameter
EIS
Environmental Impact Statement
EMP
Environmental Management Plan
FA
fire assay
ft
foot (feet)
ft2
square foot (feet)
ft3
cubic foot (feet)
g
gram
gal
gallon
g/L
gram per liter
g-mol
gram-mole
gpm
gallons per minute
g/t
grams per tonne
ha
hectares
HDPE
Height Density Polyethylene
hp
horsepower
HTW
horizontal true width
ICP
induced couple plasma
ID2
inverse-distance squared
ID3
inverse-distance cubed
IFC
International Finance Corporation
ILS
Intermediate Leach Solution
kA
kiloamperes
kg
kilograms
km
kilometer
km2
square kilometer
koz
thousand troy ounce
kt
thousand tonnes
kt/d
thousand tonnes per day
kt/y
thousand tonnes per year
kV
kilovolt
kW
kilowatt
kWh
kilowatt-hour
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page xxi
Abbreviation
Unit or Term
kWh/t
kilowatt-hour per metric tonne
L
liter
L/sec
liters per second
L/sec/m
liters per second per meter
lb
pound
LHD
Long-Haul Dump truck
LLDDP
Linear Low Density Polyethylene Plastic
LOI
Loss On Ignition
LoM
Life-of-Mine
m
meter
m2
square meter
m3
cubic meter
masl
meters above sea level
MARN
Ministry of the Environment and Natural Resources
MDA
Mine Development Associates
mg/L
milligrams/liter
mm
millimeter
mm2
square millimeter
mm3
cubic millimeter
MME
Mine & Mill Engineering
Moz
million troy ounces
Mt
million tonnes
MTW
measured true width
MW
million watts
m.y.
million years
NGO
non-governmental organization
NI 43-101
Canadian National Instrument 43-101
OSC
Ontario Securities Commission
oz
troy ounce
%
percent
PLC
Programmable Logic Controller
PLS
Pregnant Leach Solution
PMF
probable maximum flood
ppb
parts per billion
ppm
parts per million
QA/QC
Quality Assurance/Quality Control
RC
rotary circulation drilling
RoM
Run-of-Mine
RQD
Rock Quality Description
SEC
U.S. Securities & Exchange Commission
sec
second
SG
specific gravity
SPT
standard penetration testing
st
short ton (2,000 pounds)
t
tonne (metric ton) (2,204.6 pounds)
t/h
tonnes per hour
t/d
tonnes per day
t/y
tonnes per year
TSF
tailings storage facility
TSP
total suspended particulates
µm
micron or microns
V
volts
VFD
variable frequency drive
W
watt
XRD
x-ray diffraction
y
year
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
1
1
Executive Summary
This report was prepared as a Pre-Feasibility Study-level Technical Report Summary in accordance with the Securities and Exchange Commission
(SEC) S-K regulations (Title 17, Part 229, Items 601 and 1300 through 1305) for i-80 Gold Corp. (“i-80” or the
“Registrant”) by SRK Consulting (U.S.), Inc. (SRK) on the Granite Creek Underground Project (the “ Project “).
1.1
Property Description (Including Mineral Rights) and Ownership
The Granite Creek Project is located in Humboldt County, Nevada, 45 kilometers (km) (28 miles (mi)) northeast of the town of Winnemucca, and it
is part of the historic Potosi mining district. It is centered at roughly 41° 8’ N latitude and 117° 15.5’ W longitude. It encompasses about 4,506 acres (1,823.5 hectares (ha)) including owned unpatented claims, leased unpatented
claims and owned surface fee land. i-80 Gold purchased the Granite Creek property from Waterton Global in June 2020.
1.2
Geology and Mineralization
The Property is located on the eastern flank of the Osgood Mountains within the Basin and Range tectonic province of northern Nevada. The
Granite Creek Mine occurs within a northeast-trending structural corridor known as the Getchell gold trend. This trend also encompasses a number of gold deposits located outside the Property including the Preble, Getchell, Turquoise Ridge, and Twin
Creeks. These deposits are hosted in Paleozoic marine sedimentary rocks. Gold mineralization at the Property is described as a Carlin-type, sedimentary-rock hosted system.
The Property geology comprises a sequence of Cambrian to Ordovician sedimentary rocks that form part of the Osgood Mountain Terrane and the
Osgood Mountains. Much of the Property comprises shales, hornfels sedimentary rocks and limestone interbeds of the Preble Formation, and an overlying (or juxtaposed), alternating sequence of limestone, shale, and dolomite with tuffaceous shale and
intraformational conglomerates belonging to the Comus Formation. The Preble and Comus Formations have been folded into a broad north-plunging anticline and have been intruded by a large Cretaceous granodiorite stock, resulting in irregular contact
metamorphism.
Gold mineralization at the Property is strongly structurally controlled, occurring at favorable sites within a fault network
occurring around the eastern edge of the Osgood granodiorite and predominantly within Comus Formation host rocks. Mineralization is commonly associated with the decarbonatization of carbonate rocks and the introduction of silica, fine grained
pyrite, arsenian pyrite, and remobilized carbon. Continuity of mineralization is highly variable, ranging from 40 to 4,500 feet (ft) (12 to 1,372 meters (m)) in strike extent, 250 to 1,800 ft (76 to 550 m (1,804 ft)) in down-dip extent and 5 to 400 ft (1.5 to 122 m (400 ft)) in thickness. The underground mineralization has a variable thickness between 5 and 30 ft (1.5 and 9 m (30 ft)).
Oxidation reaches depths of up to 550 m (1,800 ft) within fault zones. Oxide mineralization includes pervasive limonite, hematite, along with
other iron and arsenic oxides. Historical production from the open pits was focused on oxidized material.
Underground mineralization
displays pervasive argillization and decarbonatization of host lithologies, along with the formation of dissolution collapse breccias and intense shearing. Where the alteration is strongest, the altered zones consist of punky, spongy decarbonized
limestone in an argillically altered fine-grained, carbon-rich matrix (Gustavson, 2012). Silicification is minor and occurs as a broad overprint on the zone. Underground production includes both sulfide and oxide material.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
2
1.3
Status of Exploration, Development and Operations
Exploration at Granite Creek since the 1970’s has combined geologic mapping, geochemical sampling, and geophysical surveys (gravity,
magnetics, and IP/EM/MT/CSAMT), contributing to the discovery of several open pit gold deposits at the Property.
Since acquiring Granite
Creek in 2021, i-80 has not conducted new surface geophysical or geochemical programs but has focused the exploration on drilling known targets with the aim to develop Mineral Resources and reserves to support
mining operations. The Project is currently in operation and an underground exploration and development program targeting the South Pacific Zone (SPZ) at depth was completed during 2025, comprising approximately 174 m (570 ft) of development
drifting and 16,531 m (54,236 ft) of drilling.
Since 1970, a total of 2,083 drillholes totaling 291,312 m (955,748 ft) have been completed
at the Property by successive operators (Pinson Mining Company (PMC) and predecessors, Homestake, Barrick, and Atna).
Drilling completed
by i-80 has expanded substantially since the Granite Creek Initial Assessment (IA) Technical Report (March 2025). The 2021 and 2022 programs, approximately 69 and 154 holes, respectively, were reviewed in
whole or in part by the previous QP as part of that IA as they focused on the open pit potential for the Project.
i-80 increased the exploration drilling materially between 2023 – 2025 with approximately:
•
In 2023 a total of 278 holes were completed which included a deep SPZ infill program.
•
In 2024 approximately 185 holes were added to continue the SPZ infill campaign; and
•
In 2025 there was an increase in the number of holes to approximately 379 holes with the introduction of
underground production drilling alongside ongoing surface drilling. Drilling continued into Q1 2026 as the tail of the SPZ infill campaign and the start of new exploration drilling targeting the Ogee, Otto, Adam Peak, and Range Front fault systems.
In total, i-80 Gold has drilled 1,083 holes within the current property
boundary; 438 core holes for 93,552 m (306,929 ft) and 645 RC holes for 30,252 m (99,252 ft), for a combined total of 123,804 m (406,181 ft) combined. To date the drilling has been concentrated on the underground Ogee, Otto, and SPZ mineralization.
All holes have been drilled and logged using standard diamond core methods with downhole surveying and structural/geotechnical logging
captured directly in the acQuire database. Core handling follows a documented chain of custody from the drill site through sample preparation, with sample security procedures maintained throughout. Sample preparation and analysis for the i-80 Gold program has been performed by independent, accredited commercial laboratories (ALS Minerals (ALS), and MSA Labs (MSA) from 2025), with primary gold analysis transitioning from conventional fire assay to
Chrysos Photon Assay in 2025.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
3
1.4
Mineral Resource and Mineral Reserve Estimates
1.4.1
Underground
SRK completed the underground MRE using an updated geological and mineralization model built in Leapfrog® Edge, based on i-80’s drillhole database (cut-off date February 17, 2026) restricted to the area around
current underground operations. Three principal mineralized areas are recognized which include Ogee, Otto, and the SPZ, each split into high- and low-grade sub-domains
together with a separate South Pacific Zone hanging-wall domain (SPZhw), all controlled by a system of faults and structures including the CX West Fault, the Range Front Fault, and domain boundaries A, B, and C.
Grade estimation used 2 m (5 ft) composites, domain-specific high-grade capping (typically reducing mean grades by 2.5% to 5.0 %, with
more aggressive capping in the lower-grade Ogee domain), and variogram models developed for each domain. Grades were interpolated using Ordinary Kriging and Inverse Distance Weighting with variable search orientations tied to local fault geometry,
within a block model using 15 ft x 15 ft x 15 ft parent blocks.
The classification is based on standards as defined by the Society for
Mining, Metallurgy and Exploration (SME). The Mineral Resources at the Project have been classified as Measured, Indicated and Inferred based on drillhole spacing, composite and hole counts, and geostatistical confidence in each domain.
To determine the reasonable prospects for economic extraction (RPEE), SRK has used the following key assumptions for costing, and metallurgical
recoveries. Mining costs via underground cut and fill are estimated at US$/t 190.18, with processing costs estimated at US$/t 131.13 for the autoclave processing, and US$/t 59.94 for the oxide CIL processing. Shipping costs of US$16.04 and G&A
costs of US$/t 22.29 have been used for both material types.
Metallurgical recoveries are based on the outcomes of both the historical and
the most recent metallurgical test work completed by i-80. To define the limits for processing route selection and estimated recoveries, SRK estimated AuCn (ppm), TOC% (percent), PregRob% (percent), and
Sulfide Sulfur % (percent), which were reviewed and used by the mining team in relation to the metallurgical recovery. SRK worked with i-80 to review the findings of the metallurgical studies which indicated
that the metallurgical recoveries range between 77.6% to 93.4% (average 87.6%) for the autoclave and 60.0% to 87.4% (average 68.9%) for the oxide material.
SRK has used an MSO, using Deswik Mining Software to determine the limits for the underground RPEE and were reported within mineable shapes
generated using a mineable stope optimizer (MSO). For reporting purposes given the proximity and similar mineralization the SPZhw has been combined with the SPZ MSO domains for the final reporting.
The gold price selected for Mineral Resources has been based on review of market consensus forecast data through a database which SRK
subscribe, and review by the QP of industry standards, i-80 and peers considering a time period of 10 years. It is the QP’s opinion that this is a reasonable forecast for the time considered and the
current time of the mine being in operation (ramping up production), to cover short term pricing and future long term pricing. The point of reference for the reporting of mineral resources is the in-situ
diluted tonnage and grades contained with the defined MSO limits.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
4
The underground Mineral Resource Statement, effective March 31, 2026, is summarized
below (Measured & Indicated by domain, plus separately reported Inferred), with tonnage and metal presented on both a 100% Project basis and the Company Attributable basis.
Table 1-1: Inclusive Mineral Resource Statement for Granite Creek Underground - Effective Date
March 31, 2026
Classification
Domain
Mass
(000’s
tonnes)
Mass
Attributable
(000’s
tonnes)
Au
Grade
(g/t)
Material
Content Au
(000’s t. oz)
Attributable
Material
Content Au
(000’s t. oz)
Measured
Ogee
231
231
7.88
58.6
58.5
Otto
310
310
6.69
66.6
66.6
SPZ
65
65
9.85
20.7
20.7
Total
606
606
7.49
145.9
145.8
Indicated
Ogee
322
321
7.06
73.0
72.9
Otto
746
746
6.26
150.2
150.2
SPZ
2,055
2,055
7.42
490.4
490.4
Total
3,122
3,122
7.11
713.6
713.5
M&I
Ogee
553
552
7.40
131.6
131.4
Otto
1,056
1,056
6.39
216.8
216.8
SPZ
2,120
2,120
7.50
511.1
511.1
Total
3,729
3,728
7.17
859.5
859.3
Inferred
Ogee
39
38
6.70
8.3
8.3
Otto
425
425
7.63
104.4
104.4
SPZ
429
418
6.53
90.1
87.4
Total
893
882
7.06
202.8
200.1
Source: SRK, 2026
Notes:
1.
Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The estimate of
Mineral Resources may be materially affected by environmental, permitting, legal, title, market or other relevant issues. The deposit has been classified as Measured, Indicated and Inferred based on confidence in the geological model and drill
spacing. The quantity and grade of reported Inferred resources are uncertain in nature, and there has not been sufficient work to define these Inferred Mineral Resources as Indicated or Measured resources. There is no certainty that any part of a
mineral resource will ever be converted into reserves.
2.
Mineral Resources are reported on an inclusive basis with units reported in Metric Tonnes, grade is reported in
grams/tonnes, and metal in 000’s troy ounces.
3.
Mineral Resources are reported within Mineable Stopes which have been defined based on metal price
assumptions,* variable metallurgical recovery assumptions, mining costs, processing costs, shipping, G&A costs. Metal Pricing is based on Gold (US$3,000 /oz). Other key assumptions include:
*
Mining Costs (US$/t 190.18);
*
Autoclave Processing Cost (US$/t 131.13), Low-grade Oxide (US$/t 59.94)
*
Autoclave Recoveries ranging 77.6% - 93.4% (average 87.6%) and Oxide recoveries ranging 60.0% - 87.4% (average
68.9%);
*
Shipping Costs (US$/t 16.04) and G&A Costs (US$/t 22.29);
*
Totaling US$/t 281.45 – 359.64 for underground mining and Processing;
*
Based on the variable recoveries an average cut-off grade of 3.75 -
9.81 g/t (0.286 oz/st) has been used reporting.
4.
Mineral Resources have been depleted for previous underground mining activity, and reported on an attributable
basis
5.
Mineral Resources are based on validated data, which have been subjected to QA/QC analysis, using capped,
composited samples at 2 m (5ft) intervals. Estimation has been completed using a combination of OK and IDW estimation methodologies and classified based on confidence in the underlying data and drill spacing. Mineral resource tonnages have been
rounded to reflect the precision of the estimate.
6.
The mineral resources were estimated by SRK Consulting (U.S.), Inc.
7.
Rounding of some figures may lead to minor discrepancies in totals.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
5
Table 1-2: Exclusive Mineral Resource Statement
for Granite Creek Underground - Effective Date March 31, 2026
Classification
Domain
Mass
(000’s
tonnes)
Mass
Attributable
(000’s
tonnes)
Au
Grade
(g/t)
Material
Content Au
(000’s t. oz)
Attributable
Material
Content Au
(000’s t. oz)
Measured
Ogee
175
175
6.82
38.4
38.3
Otto
166
166
5.58
29.7
29.7
SPZ
31
31
6.44
6.5
6.5
Total
372
372
6.23
74.6
74.5
Indicated
Ogee
241
241
6.52
50.6
50.6
Otto
425
425
5.23
71.5
71.5
SPZ
771
771
4.70
116.6
116.6
Total
1,438
1,438
5.16
238.6
238.6
M&I
Ogee
417
416
6.64
89.0
88.9
Otto
591
591
5.32
101.2
101.2
SPZ
803
803
4.77
123.1
123.1
Total
1,810
1,810
5.38
313.3
313.1
Inferred
Ogee
38
38
6.71
8.3
8.3
Otto
417
417
7.62
102.0
102.0
SPZ
415
405
6.49
86.6
83.9
Total
871
860
7.04
197.0
194.2
Source: SRK, 2026
Notes:
1.
Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The estimate of
Mineral Resources may be materially affected by environmental, permitting, legal, title, market or other relevant issues. The deposit has been classified as Measured, Indicated and Inferred based on confidence in the geological model and drill
spacing. The quantity and grade of reported Inferred resources are uncertain in nature, and there has not been sufficient work to define these Inferred Mineral Resources as Indicated or Measured resources. There is no certainty that any part of a
mineral resource will ever be converted into reserves.
2.
Mineral Resources are reported on an Exclusive basis with units reported in in Metric Tonnes, grade is reported
in grams/tonnes, and metal in 000’s troy ounces.
3.
Mineral Resources are reported fully diluted within Mineable Stopes which have been defined based on metal
price assumptions,* variable metallurgical recovery assumptions, mining costs, processing costs, shipping, G&A costs. Metal Pricing is based on Gold (US$3,000 /oz). Other key assumptions include:
*
Mining Costs (US$/t 190.18);
*
Autoclave Processing Cost (US$/t 131.13), Low-grade Oxide (US$/t 59.94)
*
Autoclave Recoveries ranging 77.6% - 93.4% (average 87.6%) and Oxide recoveries ranging 60.0% - 87.4% (average
68.9%);
*
Shipping Costs (US$/t 16.04) and G&A Costs (US$/t 22.29);
*
Totaling US$/t 281.45 – 359.64 for underground mining and Processing;
*
Based on the variable recoveries an average cut-off grade of 3.75 -
9.81 g/t (0.286 oz/st) has been used reporting.
4.
Mineral Resources have been depleted for previous underground mining activity, and reported on an attributable
basis
5.
Mineral Resources are based on validated data, which have been subjected to QA/QC analysis, using capped,
composited samples at 2 m (5ft) intervals. Estimation has been completed using a combination of OK and IDW estimation methodologies and classified based on confidence in the underlying data and drill spacing. Mineral resource tonnages have been
rounded to reflect the precision of the estimate.
6.
The mineral resources were estimated by SRK Consulting (U.S.), Inc.
7.
Rounding of some figures may lead to minor discrepancies in totals.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
6
1.4.2
Open Pit
Table 1-3 shows the pit-constrained open pit Mineral Resource
at a gold grade cut-off of 0.20 g/t. (0.005 oz/st)
Table
1-3: Granite Creek Open Pit Mineral Resource Statement
Deposit
Cutoff
Grade
(ppm)
Mass
(000’s
tonnes)
Mass
(000’s
short
tons)
Mass
Attributable
(000’s tonnes)
Au
Grade
(g/t)
Au
Grade
(opt)
Au
Contained
(‘000s tr oz)
Attributable
Material
Content Au
(000’s tr oz)
Measured
Pit B
0.2
3,900
4,299
3,575
1.06
0.031
133.49
122.37
Pit A
0.2
1,098
1,211
1,007
0.71
0.021
25.08
22.99
CX
0.2
13,493
14,873
12,835
1.10
0.032
478.41
454.02
Mag
0.2
15,055
16,596
14,703
1.03
0.030
499.50
487.90
Total
33,546
36,978
32,121
1.05
0.031
1,136.47
1,087.28
Indicated
Pit B
0.2
823
907
754
0.64
0.019
16.86
15.45
Pit A
0.2
969
1,069
889
0.68
0.020
21.06
19.30
CX
0.2
4,423
4,876
4,189
1.00
0.029
141.96
133.03
Mag
0.2
11,509
12,687
11,415
0.74
0.022
275.03
272.53
Total
17,725
19,538
17,247
0.80
0.023
454.91
440.32
Measured + Indicated
Pit B
0.2
4,723
5,206
4,329
0.99
0.029
150.34
137.82
Pit A
0.2
2,068
2,280
1,896
0.69
0.020
46.13
42.29
CX
0.2
17,916
19,749
17,024
1.08
0.031
620.37
587.05
Mag
0.2
26,565
29,283
26,119
0.91
0.026
774.53
760.43
Total
51,271
56,517
49,368
0.97
0.028
1,591.38
1,527.60
Inferred
Pit B
0.2
50
55
46
0.52
0.015
0.84
0.77
Pit A
0.2
440
485
403
0.44
0.013
6.22
5.70
CX
0.2
1,997
2,201
1,921
0.94
0.028
60.66
58.24
Mag
0.2
1,339
1,476
1,320
0.75
0.022
32.12
31.69
Total
3,826
4,217
3,689
0.81
0.024
99.84
96.40
1)
The effective date of the Mineral Resources Estimate is March 31, 2026
2)
The Qualified Persons for the estimate is GRE.
3)
Mineral resources are not ore reserves and are not demonstrably economically recoverable.
4)
Mineral resources are reported at a 0.20 g/t cutoff, an assumed gold price of 3,000 $/tr. oz, using variable
recovery, a slope angle of 41 degrees, 6% royalty, heap leach processing cost $9.04 per tonne (includes admin), CIL processing cost of $17.22 per tonne (includes admin).
5)
Attributable resources are those resources excluding certain third party claims in the Pinson #1A-18A unpatented mining claims and in the Section 28 Fee lands.
Please note
that Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
1.5
Metallurgical Testing and Recovery Methods
Metallurgical test work to support the Granite Creek Project has been undertaken at several commercial laboratories including:
•
Dawson Metallurgical Laboratories
•
FLSmidth
•
McClelland Laboratories
•
SGS
Scope of testing has included bench top autoclave and CIL, cyanide destruction, and solid-liquid separation, along with continuous pressure
oxidation testing. The results of these tests were used to inform the projected gold recoveries for the Project.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
7
Granite Creek production will be hauled to the refurbished Lone Tree pressure oxidation
facility for processing. Lone Tree unit operations include:
•
Ore Reclaim, Grinding, and Thickening and Acidulation
•
Pressure Oxidation
•
POX Off-gas Treatment and Quench Water Loop
•
Neutralization, Carbon-in-Leach,
and Cyanide Destruction
•
Tailings Thickening and Filtration
•
Acid Wash, Carbon Stripping, and Carbon Regeneration
•
Electrowinning and Refinery
•
Plant and Instrument Air
•
Oxygen Plant
•
Reagent Preparation and Storage
•
Process and Plant Services Cooling Towers
•
Water Distribution
•
Steam Generating Plant and Propane Storage
Tailings thickening and filtration are new operations at Lone Tree required for filtered tailings disposal. The Lone Tree autoclave will
operate under acid conditions as this provides superior gold recoveries compared to alkaline pressure oxidation.
Granite Creek production
can also be shipped for third party processing.
1.6
Mineral Reserve
Underground Mineral Reserves were estimated by SRK. Estimates were prepared for the Ogee, Otto and SP zones located beneath and adjacent to the
historically mined open pit.
Potential mining blocks are generated from the resource block model based on the deposit geometry,
metallurgical process, and block values. Measured Mineral Resources were converted to Proven Mineral Reserves and Indicated Mineral Resources were converted to Probable Mineral Reserves by applying the appropriate modifying factors, as described
herein. Inferred Mineral Resources were not converted to Mineral Reserves. However, where Inferred Mineral Resources are contained within the Mineral Reserves designs, they were assigned zero grade and are considered internal dilution.
Current estimated project costs and the calculated economic cut-off grade (CoG) are shown inTable 1-4. For reporting reserves within the design, a stope cut-off range of 4.42 g/t (0.13 oz/st) Au and 6.41 g/t (0.19 oz/st) Au was used for oxide material and range of 5.21 g/t
(0.15 oz/st) Au and 6.17 g/t (0.18 oz/st) Au was used for the sulfide material. Development headings generate additional material grading between 1.51 g/t (0.04 oz/st) Au and 2.19 g/t (0.06 oz/st) Au oxide material and2.47 g/t (0.07 oz/st) Au and
02.91 g/t (0.08 oz/st) Au for sulfide material. This material is economic to process on an incremental basis and is therefore included in the mineral reserve estimate.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
8
Table 1-4: Underground Cut-off Grade Parameters
Process
Method1
Parameter
Imperial Value
Imperial Unit
Metric Value
Metric Unit
Gold Price
2,500
US$/oz
80.3769
US$/g
TC/RC
1.85
US$/oz
0.0595
US$/g
NSR Royalty
6%
Nevada Excise Tax
0.75%
Oxides
Metallurgical Recovery
60.0% - 87.4%
Mining Cost
172.53
US$/st
190.18
US$/t
Process Cost
54.38
US$/st
59.94
US$/t
Shipping Cost
14.55
US$/st
16.04
US$/t
G&A Cost
20.22
US$/st
22.29
US$/t
Total Cost
261.68
US$/st
288.45
US$/t
Stope Cut-off Grade
0.129 – 0.187
oz/st Au
4.423–6.411
g/t Au
Processing Cut-off Grade2
0.044 – 0.064
oz/st Au
1.509–2.194
g/t Au
Sulfide
Metallurgical Recovery
77.6% - 92.2%
Mining Cost
172.53
US$/st
190.18
US$/t
Process Cost
118.96
US$/st
131.13
US$/t
Shipping Cost
14.55
US$/st
16.04
US$/t
G&A Cost
20.22
US$/st
22.29
US$/t
Total Cost
326.26
US$/st
359.64
US$/t
Cut-off Grade
0.152–0.180
oz/st Au
5.211–6.171
g/t Au
Processing Cut-off Grade2
0.072–0.085
oz/st Au
2.469–2.914
g/t Au
Source: SRK, 2026
1
Dynamic cut-off grade was used for the reserves design based on whether
the material is oxide or sulfide.
2
Processing Cut-off Grade considers the processing cost and G&A
cost.
Mineral Reserves were classified using the 2014 Canadian Institute of Mining Metallurgy and Petroleum Definition
Standards on Mineral Resources and Mineral Reserves (CIM Definition Standards). Indicated Mineral Resources were converted to Probable Mineral Reserves by applying the appropriate modifying factors, as described herein, to potential mining shapes
created during the mine design process. In the same manner, Measured Mineral Resources were converted to Proven Mineral Reserves.
A 3D
design has been created representing the planned reserve mining areas. The underground mine design process resulted in 2.20 Mt (2.42 Mst) of Mineral Reserves at an average grade of 7.87 g/t (0.23 oz/st) Au. Table
1-5 presents the mineral reserve statement as of March 31, 2026.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
9
Table 1-5: Mineral Reserve Estimate for Granite
Creek as of March 31, 2026—SRK Consulting (U.S.), Inc.
Classification
Domain
Metric Units
Imperial Units
Tonnage
(000’ tonnes)
Au Grade
(g/t)
Tonnage
(000’s s. tons)
Au Grade
(oz/st)
Au Metal
Content
(000’s t. oz)
Proven
Ogee
71
9.34
78
0.27
21.2
Otto
171
7.04
189
0.21
38.7
SP
40
11.21
44
0.33
14.5
Stockpile
26
7.33
29
0.21
6.2
Total
308
8.13
340
0.24
80.6
Probable
Ogee
88
7.95
97
0.23
22.4
Otto
366
6.70
403
0.20
78.8
SP
1,437
8.11
1,584
0.24
374.7
Total
1,890
7.83
2,084
0.23
475.9
Proven + Probable
Ogee
158
8.57
174
0.25
43.6
Otto
537
6.81
592
0.20
117.6
SP
1,477
8.19
1,628
0.24
389.2
Stockpile
26
7.33
29
0.21
6.2
Total
2,198
7.87
2,423
0.23
556.5
Source: SRK, 2026
Notes:
•
All figures are rounded to reflect the relative accuracy of the estimates. Totals may not sum due to rounding.
Mineral Reserves have been stated on the basis of a mine design, mine plan, and economic model.
•
Reserves are reported using a stope CoG range of 4.42 g/t (0.13 oz/st) Au – 6.41 g/t (0.19 oz/st) Au and an
incremental processing CoG range of 1.51 g/t (0.04 oz/st) Au – 2.91 g/t (0.08 oz/st) Au depending on the processing method. The CoG calculations assume a US$2,500/oz Au price, and 60% to 92% metallurgical recovery depending on the processing
method applied.
•
Operating costs include mining (US$190.18/tonne), processing (US$59.94/tonne to US$131.13/tonne), G&A
(US$22.29/tonne), Shipping Costs (US$/t 16.04).. Additionally, a 6% royalty and 0.75% Excise Tax are applied, along with TC/RC charges of US$1.85/oz Au.
•
The reserves are mined using the underhand drift and fill method with cemented waste rock backfill. Mining
dilution of 10% is included in the reserve at zero grade.
•
Stockpile reserves reflect ore mined and placed on surface stockpiles prior to the effective date and not yet
processed.
•
The Mineral Reserves were estimated by SRK Consulting, U.S. (Inc.).
1.7
Summary Capital and Operating Cost Estimates
Costs for processing vary depending on ore type and processing method.
For processing refractory ore at Lone Tree, costs are as follows:
•
Sustaining OPEX of US$25.99/metric ton (processing fee). The processing fee has been presented by i-80 as an
Autoclave CAPEX Allocation as noted in Table 1-6
•
Processing cost of US$105.16/metric ton
For processing oxide ore at Lone Tree, costs are US$33.97/metric ton.
For third-party toll processing, costs are in accordance with the terms of the toll-milling contract and consist of costs incurred by the third
party for processing, a treatment charge that varies based on the gold price and any penalties for material that does not meet the specifications of the contract.
LoM capital costs are summarized in Table 1-6.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
10
Table 1-6: Life of Mine Capital Costs
Capital Costs
Unit
Value
Mine Capex
US$
M
60.74
Autoclave Capex Allocation
US$
M
49.33
Surface Capitalized Costs
US$
M
22.19
Closure
US$
M
12.66
Total
US$
M
144.92
Source: SRK, 2026
US$M: US$ million
LoM Operating
Costs are summarized in Table 1-7.
Table 1-7: Life of
Mine Operating Costs
Operating Costs
Unit
Value
Mining Cost
US$M
395.98
Oxide Cost
US$M
0.65
Autoclave Cost
US$M
267.30
Ore Transport Cost
US$M
36.27
Surface Ops Cost
US$M
117.85
Power Cost
US$M
32.77
G&A Cost
US$M
49.87
Total
US$M
900.68
Mining Cost
USD/ton ore
165.38
Oxide Cost
USD/ton ore processed
17.95
Autoclave Cost
USD/ton ore processed
111.97
Ore Transport Cost
USD/ton ore
15.15
Total Processing Cost
USD/ton ore processed
125.53
Surface Ops Cost
USD/ton ore
49.22
Power Cost
USD/ton ore
13.69
G&A Cost
USD/ton ore
20.58
Total
USD/ton ore processed
371.67
Mining Cost
USD/tonne ore
182.30
Oxide Cost
USD/tonne ore processed
19.78
Autoclave Cost
USD/tonne ore processed
123.43
Ore Transport Cost
USD/tonne ore
16.70
Total Processing Cost
USD/tonne ore processed
138.37
Surface Ops Cost
USD/tonne ore
54.25
Power Cost
USD/tonne ore
15.09
G&A Cost
USD/tonne ore
22.68
Total
USD/tonne ore processed
409.69
Source: SRK, 2026
US$M: US$ million
1.8
Economic Analysis
Economic analysis, including estimation of capital and operating costs, is inherently a forward-looking exercise. These estimates rely upon a
range of assumptions and forecasts that are subject to change depending upon macroeconomic conditions, operating strategy and new data collected through future study or operations and therefore actual economic outcomes often deviate significantly
from forecasts.
The Granite Creek operation consists of an underground mine with no onsite processing facility that mines and transports
gold ore to offsite processing facilities.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
11
The economic analysis metrics are prepared on annual
after-tax basis in US$. The results of the analysis are presented in Table 1-8. The results indicate that at a gold price of US$2,750/oz, the after tax NPV @ 5% is
US$118 million.
Table 1-8: Indicative Economic Result
LOM Cash Flow
Unit
Value
Total Revenue
US$M
1,328.81
Royalty
US$M
(104.47
)
Total Opex
US$M
(900.68
)
Operating Margin
US$M
323.65
Operating Margin Ratio
%
24
%
Taxes Paid
US$M
(25.35
)
Free Cashflow
US$M
153.38
Before-Tax
Free Cash Flow
US$M
178.73
NPV @ 5%
US$M
137.66
NPV @ 7.5%
US$M
120.98
NPV @ 10%
US$M
106.39
After-Tax
Free Cash Flow
US$M
153.38
NPV @ 5%
US$M
117.55
NPV @ 7.5%
US$M
102.97
NPV @ 10%
US$M
90.19
Source: SRK, 2026
US$M: US$ million
Within the
constraints of this analysis, the operation’s NPV appears to be most sensitive to metal prices, recovery assumptions and mined grades.
A summary of the cash flow on an annual basis if presented in Figure 1-1.
Source: SRK, 2026
Figure 1-1: Annual Cash Flow Summary
1.9
Permitting Requirements
The Granite Creek Underground Project occupies a site with mining history dating to the 1940’s. The Project supports a historic surface
mining operation and the current underground operation. The surface operation is permitted through Bureau of Land Management (BLM) and NDEP, while the underground operation is located on private property and is permitted through the NDEP. Limited
underground support facilities are permitted through the surface mine permits, under the jurisdiction of the BLM and NDEP.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
12
The surface operations have been the subject of environmental review since 1975, when the
first Environmental Assessment (EA) was prepared for the U.S. Department of the Interior – Bureau of Land Management (BLM) under the National Environmental Policy Act (NEPA). Two further assessments followed in 1992 and 2003. The surface
permits have been updated from time to time to accommodate closure and underground support facilities.
The majority of the current
underground project sits on private land and falls under the jurisdiction of the Nevada Division of Environmental Protection – Bureau of Mining Regulation and Reclamation (NDEP-BMRR) the underground operation permit has been updated from time-to-time to accommodate ongoing operations.
Geochemical
testing, beginning with a comprehensive 1998 study and continued through quarterly sampling from 2005 to 2025, consistently shows that waste rock placed in the CX Pit has strong acid-neutralizing capacity and low potential for acid rock drainage
(ARD). The main water-quality concern is metal leaching, particularly arsenic and antimony, which periodically exceed NDEP reference values in bedrock groundwater and underground mine water. These constituents are actively managed through the
site’s water treatment plant (WTP), which reliably brings effluent into compliance. A metals attenuation study is under development to support site specific discharge requirements that could reduce water treatment requirements for select
constituents and lower WTP operational costs. Surface water in Granite Creek and alluvial groundwater both meet applicable standards. The Mag Pit lake, monitored since 2015, shows elevated arsenic and manganese, but a 2025 SRK ecological risk
assessment (ERA) concluded these levels are not likely to cause harm to receptors. Modeling of the pit lake’s long-term, post-closure water quality indicates compliance with state standards over a
100-year horizon, with a proven contingency treatment (ferric sulfate dosing) available if arsenic levels were to rise.
SRK is not aware of any known environmental issue that would materially impede extraction of the project’s Mineral Resources or reserves.
One issue with potential cost implications was identified in 2025: petroleum-contaminated soil was found within CX Pit waste rock backfill. Because the exact location of the contaminated material is not known, as much as 1.17 million tons of
backfill may need to be re-handled and sampled. Osgood is working with NDEP-BMRR to develop a management plan and remediate the issue; this represents the project’s principal environmental cost
uncertainty rather than a permitting or resource-access risk.
The project operates under a full suite of state and federal environmental
management plans covering water management, waste rock handling, spill response, monitoring, and closure, most recently updated as part of permit amendments. No ore is processed on site; mined material is trucked to a permitted third-party facility.
Waste rock is placed in the CX Pit and C Pit under the terms of the site’s water pollution control permit and is sampled quarterly for acid-generation and metal-leaching potential. No tailings are generated by current operations, and the two
legacy tailings facilities on site have been reclaimed and released from financial assurance obligations. A second water treatment plant is planned to handle the project’s growing water management needs, and stormwater is actively diverted
around the site through an engineered pipe system under an active general permit. Monitoring spans water quality, waste rock chemistry, air quality, surface disturbance and reclamation, and stormwater controls, and the site’s permit-monitoring
obligations are all current.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
13
The project holds the permits needed for its current operations from Humboldt County, the
State of Nevada, and the BLM, with no permitting actions currently pending before any agency. Water rights total 3,746 ha (9,256 acre)-feet annually, of which 465 ha (1,149 acre)-feet is consumptive use, drawn primarily from certificated rights and
permits within a groundwater basin designated by the State Engineer for closer administration; this designation reflects committed water rights relative to the basin’s yield rather than evidence of depletion. Financial assurance bonding for
reclamation is in place and current, with the next required three-year bond review anticipated in 2028 to 2029.
Osgood Mining has no
formal agreements with local communities currently but maintains ongoing stakeholder engagement through periodic town hall meetings in Winnemucca, participation in regional economic development efforts, and support for local education initiatives.
The company follows i-80 Gold Corp’s broader corporate governance policies on local procurement and hiring.
Closure planning follows established state and federal reclamation requirements, with the current mine plan assuming the CX Pit is backfilled
(and the Mag Pit lake becomes a long-term groundwater sink posing no identified risk to regional groundwater quality. The current reclamation cost estimate, prepared using Nevada’s standardized cost model, is US$8.64 million; this figure
reflects a government-administered closure scenario and is expected to differ from the cost the operator would actually incur, and from the eventual cost at the 2032 anticipated closure date, as site conditions evolve. Overall, given the depth of
the existing regulatory framework and the documentation reviewed, SRK’s opinion is that the project’s current environmental, permitting, and community plans are adequate.
1.10
Conclusions and Recommendations
1.10.1
Drilling
The QP considers that the drilling and sampling information is sufficiently reliable to interpret the boundaries of the mineralized structures
and domain interpretations, and that the sample grade data are sufficiently reliable to support the MRE. The QP also notes that mineralization remains open at the deposit.
The 2027 to 2028 exploration program targets five zones at Granite Creek: the CX Fault depth / north extension, Rangefront and Adam Peak, the
Ogee Zone, SPZ infill and depth extension, and the SPZ / Rangefront / Mag structural intersection.
The combined drill program comprises
128 planned drillholes totaling 32,614 m (107,000 ft) plus associated CX Fault underground development and a gravity survey at the SPZ / Rangefront / Mag intersection. The proposed work program has an estimated cost of US$16 million based on
current conditions.
In the opinion of the QP, the proposed program is technically reasonable and appropriately sequenced, with Rangefront
and Ogee prioritized ahead of active and planned underground development to reduce the risk of mining ahead of drill data, while the CX Fault program advances the known
oxide-to-sulfide transition at depth.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
14
Upon completion of the above items, an update to the geologic model and MRE should be
conducted, along with updated metallurgical updated recovery assumptions.
1.10.2
Mining
•
Mine infrastructure has been completed. Production ramp up has reached approximately 400 tons per day. The mining
contractor is in place with the full complement of equipment and personnel.
•
Decline development has accessed 700 vertical ft of mineralization of the Otto and Ogee zones. Development has
reached the top of the SPZ allowing additional active production stopes.
•
The drill lateral drift over the SPZ has been completed.
•
Reconciliation of the model to mill indicates process head ounces exceed model by 19%. This appears to be from
mining in a larger low-grade halo around high grade core.
•
Processed grade is lower than the
life-of-mine planned grade due to extensive mining of marginal mineralization below the economic cut-off grade.
1.10.3
Metallurgical Testing
•
Conduct additional variability sampling using the most recent mine plan to select samples to provide additional
recovery information to further populate recovery models.
•
Testing should attempt to establish head grade and extraction relationships for use in more detailed resource
modeling.
•
Mineralogy impacts need to be established and geologic domains within each resource need to be determined.
•
Testing of additional samples to provide comminution data to assess hardness variability within the zones and any
potential impacts on throughput in the Lone Tree process plant.
•
The estimated cost for the suggested next phase metallurgical program is US$150,000 based on current market
pricing.
1.10.4
Permitting / Environmental
Dewatering
Complete the planned dewatering well and re-evaluate the ground water model and inflow into the
underground workings.
1.10.5
Economics
The Granite Creek operation consists of an underground mine with no onsite processing facility that mines and transports gold ore to offsite
processing facilities. The operational life as modeled for this analysis is approximately 9 years. Under the forward-looking assumptions modeled and documented in this report, the operation is forecast to generate positive cumulative cash flow.
However, the Project does not generate positive free cashflow in 2026 and 2027 largely due to the higher processing costs incurred because of third-party processing of ore and a six-month stockpiling period in
2027. Cashflow is forecast to be negative at the end of the operational life as the operation winds down, and closure costs are incurred. This estimated cash flow is inherently forward-looking and dependent upon numerous assumptions and forecasts,
such as macroeconomic conditions, mine plans and operating strategy, that are subject to change.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
15
The results indicate that at a gold price of US$2,750/oz the
after-tax NPV @ 5% is US$118 million.
The sensitivity analysis performed indicates that the
operation’s NPV is most sensitive to metal prices, recovery assumptions and mined grades.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
16
2
Introduction
2.1
Registrant for Whom the Technical Report Summary was Prepared
This Technical Report Summary was prepared in accordance with the Securities and Exchange Commission (SEC)
S-K regulations (Title 17, Part 229, Items 601 and 1300 through 1305) for i-80 Gold Corp. (“i-80” or the
“Registrant”) on the Granite Creek Underground Project.
This Technical Report Summary is filed as an exhibit to i-80 Gold Corp.’s Current Report onForm 8-K.
2.2
Terms of Reference and Purpose of the Report
The quality of information, conclusions, and estimates contained herein is consistent with the level of effort involved in SRK’s
services, based on: i) information available at the time of preparation, ii) data supplied by outside sources, and iii) the assumptions, conditions, and qualifications set forth in this report. This report is intended for use by i-80 subject to the terms and conditions of its contract with SRK and relevant securities legislation.
The purpose of this Technical Report Summary is to report mineral resources, mineral reserves and exploration results.
The effective date of this report is March 31, 2026.
2.3
Sources of Information
The sources of information include data and reports supplied by i-80 personnel as well as documents
cited throughout this report and listed in the References section. It is the QP’s opinion that the information and test work provided is fit for purpose for the current level of study.
2.4
Details of Inspection
Site visits conducted by the qualified persons are summarized in Table 2-1.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
17
Table 2-1: Site Visit Participants
Company
Expertise
Date(s) of Visit
Details of Inspection
SRK Consulting
Geology
February 4, 2026
UG mine tour and GC, drill shed and core review
WSP
Geology, Infrastructure
November 5-6, 2025
The purpose of the visit was to review geological, geotechnical, mining, and infrastructure conditions relevant to the SPZ and planned mine expansion. The site visit included inspection of drill core, underground workings, ground
support systems, cemented rockfill production facilities, and the proposed ventilation raise location to surface.
WSP
Ventilation
November 5, 2025
UG mine tour and ventilation assessment including inspection of primary, booster, and auxiliary ventilation systems; review of active and planned mine workings, haulage routes, escapeways, and proposed ventilation raise locations;
collection of temperature and humidity data for Ventsim™ model calibration.
Observations made during the site visits were generally consistent with the geological model,
geotechnical logging database, underground mapping, laboratory testing results, and operational information reviewed for this study.
2.5
Report Version Update
The user of this document should ensure that this is the most recent Technical Report Summary for the property.
This Technical Report Summary updates a previously disclosed Initial Assessment (IA) on the Granite Creek Open Pit Project (reported
March 26, 2025). Based on additional drilling and a shift in focus to the underground operation, the qualified person has determined that the IA is no longer current and has been superseded by this Technical Report Summary. This Technical
Report Summary is not valid if a further Technical Report Summary has since been issued.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
18
3
Property Description
3.1
Property Description
The Granite Creek Project is located in Humboldt County, Nevada, 45 km (28 m) northeast of the town of Winnemucca, and it is part of the
historic Potosi mining district. It is centered at roughly 41° 8’ N latitude and 117° 15.5’ W longitude. It encompasses about 1,823.5 ha (4,506 acres) including owned unpatented claims, leased unpatented claims and owned surface
fee land. The federal land is administered by the BLM. Figure 3-1 shows the location of the Granite Creek Project
Source: SRK, 2026
Figure 3-1: Granite Creek Project Location
3.2
Mineral Tenure and Surface Rights
Mineral title to the Granite Creek Project is held by Osgood Mining Company, LLC (Osgood) and Premier Gold Mines USA, Inc., with additional
unpatented claims leased from third parties. Surface and mineral rights on fee lands are owned by Osgood. Osgood holds the operating permits and reclamation bonds for the Project and is responsible for all current mining and exploration activities.
The Land Position Map along with the summary of the mineral and surface titleholders for the Project can be found below in Figure 3-2 and Table 3-1.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
19
Source: SRK, 2026
Figure 3-2: Land Position Map, Granite Creek Project
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
20
Table 3-1: Summary of Mineral and Surface Title
Holders, Granite Creek Project
Legal Description
Identifying Numbers
Owner(s)
T38N R42E - Section 28 CX 1A-23A
(Unpatented Lode Mining Claims
BLM Serial No.: NMC319833 - NMC319855
Osgood Mining Company, LLC
T38N R42E - Section 28 PACIFIC 1A-7A
(Unpatented Lode Mining Claims)
BLM Serial No.: NMC319814 - NMC 319820
Osgood Mining Company, LLC
T38N R42E - Section 32 PINSON 1A-18A
(Unpatented Lode Mining Claims)
BLM Serial No.: NMC319856 - NMC319873
Osgood Mining Company, LLC (41.67%),
Premier
Gold Mines USA Inc. (50%), Michael C. Murphy (8.33%)
T38N R42E - Section 32
LEASED: BEE DEE 1A-18A, FRACTION 1 & 2
(Unpatented Lode Mining Claims)
BLM Serial No.: NMC282121 - NMC282122
Lessors: Franco-Nevada & S&G Pinson Lessee: Osgood Mining Company, LLC
T37N R42E - Section 6 LEASED: BEE DEE 21-56
(Unpatented Lode Mining Claims)
BLM Serial No.: NMC282123 - NMC282158
Lessors: Franco-Nevada & S&G Pinson Lessee: Osgood Mining Company, LLC
T38N R42E - Section 21
640 Acres
(FEE)
APN 07-0121-05
Osgood Mining Company, LLC
T38N R42E - Section 28
120 Acres
(FEE)
APN 07-0121-07
Osgood Mining Company, LLC (41.67%), Premier Gold Mines USA Inc. (50%), Michael C. Murphy (8.33%)
T38N R42E - Section 29
640 Acres
(FEE)
APN 07-0121-06
Osgood Mining Company, LLC
T38N R42E - Section 31
640 Acres
(FEE)
APN 07-0121-08
Premier Gold Mines USA Inc.
T38N R42E - Section 33
640 Acres
(FEE)
APN 07-0121-33
Osgood Mining Company, LLC
Source: i-80 Gold, 2026
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
21
Unpatented claims have annual maintenance fees of US$200 per claim payable to the BLM and a
notice of intent to hold (NIH) in the amount of US$12 per claim plus US$12 document filing fee payable to Humboldt County. Claim maintenance fees are paid through September 1, 2026, with the BLM. The NIH fees to Humboldt County are paid through
November 1, 2026; payments are current at the time of this report. All mineral claims and fee lands comprising the Granite Creek Project are valid, in good standing, and free of any known disputes at the effective date of this report. Fee land
is subject to Nevada State real property tax, and certain mine infrastructure is subject to Nevada State personal property tax. Leased unpatented claims are subject to yearly lease fees. Holding costs for 2026 are listed in Table 3-2.
Table 3-2: Holding Costs, Granite Creek Project
Description
Payee
Quantity
Amount (US$)
Unpatented Claim Maintenance Fee
BLM
104
20,800.00
Notice of Intent to Hold Unpatented Claims
Humboldt County
104
1,260.00
Real Property Taxes
Humboldt County
5 parcels
7,234.63
Personal Property Taxes
Humboldt County
various infrastructure
94,594.15
Lease fees, annually adjusted by CPI
Lease Holders
56 unpatented claims
122,495.24
Total
$
246,384.02
Source: SRK, 2026
Ownership of the Granite Creek Project land position comprises various forms of title. i-80 Gold Corp
owns 48 unpatented lode claims covering about 363 ha (897 acres) (Table 3-3), and leases 56 unpatented lode claims covering about 468 ha (1,156 acres) (Table 3-4). i-80 Gold Corp also owns, through its subsidiaries, fee surface land parcels covering about 777 ha (1,920 acres).
Table 3-3: Owned Unpatented Claims, Granite Creek Project
Claim Name
Location
BLM Legacy Number
Claim Type
Number
of Claims
PACIFIC #1A - #7A
Section 28 of Township 38 North, Range 42 East
NMC319814 -NMC 319820
Lode
7
CX #1A - CX #23A
Section 28 of Township 38 North, Range 42 East
NMC319833 -NMC319855
Lode
23
PINSON #1A - #18A
Section 32 of Township 38 North, Range 42 East
NMC319856 -NMC319873
Lode
18
Total Owned Unpatented Claims
48
Source: SRK, 2026
Table 3-4: Leased Unpatented Claims, Granite Creek Project
Claim Name
Location
BLM Legacy Number
Claim Type
Number of Claims
NEW BEE DEE FRAC. #1, #2
Section 32 of Township 38 North, Range 42 East
NMC282121, NMC282122
Lode
2
BEE DEE #21 -BEE DEE #56
NMC282123 -NMC282158
Lode
36
BEE DEE #1A
NMC319892 -NMC319909
Lode
18
Total Leased Unpatented Claims
56
Source: SRK, 2026
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
22
3.2.1
Owned Unpatented Mining Claims
i-80, through OMC, owns a 100% interest in the Pacific #1A-7A
as well as the CX1A-23A unpatented mining claims.
i-80,
through OMC and PGU, owns a 91.67% interest in the Pinson #1A-18A mining claims. The remaining 8.33% interest in these claims is owned by Michael Murphy and is not leased by OMC. The fact that OMC has not
leased the unowned 8.33% interest in these claims does not preclude OMC from mining the claims. By law, OMC, as the co-owner of an undivided interest in these claims, has the right to mine the claims without
permission or approval from (and even over any objections by) the other co-owner, subject, however, to an obligation on the part of OMC to account to the other co-owner
for their proportionate shares of mining revenues less their proportionate shares of mining expenses.
3.2.2
Leased Unpatented Mining Claims
Pursuant to a mining lease agreement from May 9, 1980, which has a term that extends until May 9, 2040, i-80, through OMC as current lessee thereunder, controls a 100% interest in the Bee Dee group of unpatented mining claims listed in Table 3-4 above. Following subsequent
assignments and corporate transactions, Franco-Nevada U.S. Corporation (50%) and S&G Pinson, LLC (50%) (“S&G Pinson”) are the current lessors under this lease (the “Bee Dee Lease Agreement”).
3.2.3
Fee Lands
“Fee land” refers to privately owned real property in which title has passed out of United States government ownership. Fee land at
the Granite Creek Project is identified by Humboldt County Assessor’s Parcel Number (APN) and, unless otherwise stated, comprises both the surface estate and the mineral estate. Fee land is distinguished from unpatented federal lode mining
claims, which are possessory interests in federal land administered by the BLM and remain subject to annual maintenance obligations.
i-80, through OMC, owns a 100% interest in Sections 29 and 33, Township 38 North, Range 42 East.
i-80, through OMC and PGU, also owns a 91.67% interest in the 120-acre (48.5-ha) parcel comprising the east 1⁄2 of the southwest 1⁄4 and southeast
1⁄4 of the southwest 1⁄4 of Section 28, Township 38 North, Range 42 East.
The remaining interest in this parcel is owned by Michael Murphy (8.33% undivided interest).
3.3
Royalties and Net Profit Interests
The Granite Creek Mine Project is subject to several net smelter royalty obligations, each with specific areas of applicability within the
Property and with rates that vary based on location or any pre-existing royalties on the land in question. In addition, there is one mineral production royalty agreement (the “MRPA”, defined
further below) which provides the counterparty with a 10% “net profits” interest (also as described further below) and is not contingent merely on production like a typical net smelter royalty agreement.
For the purposes of the economic analysis contained in this Report—which is restricted to the estimated mineral reserves for the
underground project at Granite Creek—the total combined applicable royalty is expected to be 7.5% until January 2031 and 9% thereafter. This total payable NSR and 10% “net profit” interest is based on the following facts and
qualifications:
•
The currently anticipated underground operations will impact areas under the Pacific Claims and portions of the
fee lands included in Section 29.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
23
•
The current 7.5% combined royalty applicable to the Pacific Claims and the Section 29 fee lands includes 1%
NSR and 3% NSR, respectively, owing under the 1996 Royal Gold Royalty:
•
0.17% of the royalty owing under the Section 29 fee lands is payable by the minority owner of this privately
held land and not OMC.
•
A Franco Nevada royalty (described further below) of 1.5% included within this 7.5% NSR estimate increases to a
3% NSR effective January 2031.
•
Applying the gold price assumptions used in this Report for the anticipated life of mine economic analysis
included in Chapter 22 (US$2,750 per gold oz), it is not anticipated that any “net profits” will be payable under the MRPA. However, if future gold prices are materially higher than as projected within this Report, then payments under
this MRPA may be triggered.
The following section describes the royalties present on the various land rights within the
Granite Creek Property.
3.3.1
1996 Royal Gold Royalty – Granite Creek Property (Royal Gold, Inc. – Current Holder)
In a NSR Royalty Agreement dated November 30, 1996, Pinson Mining Company (PMC) agreed to provide Rayrock
Mines, Inc. et al. an overriding NSR royalty that varied depending on the nature of the particular land holding and any underlying royalties existing on that land at the time of the transaction. Through a series of subsequent deeds, transfers and
corporate transactions this royalty interest is now held by Royal Gold, Inc. (which holds a 97.9% interest) and D.M. Duncan Inc. (which holds the remaining 2.1% interest), hereinafter referred to as the “1996 Royal Gold Royalty”.
The royalty under this agreement applies to the entire Granite Creek Property, but it is not payable until 200,000 troy ounces (oz) of gold
have been produced. Currently, based on historical production at Granite Creek post the execution of this NSR Royalty Agreement, the 200,000 oz threshold has now been reached, and this royalty is currently payable.
As noted, the royalty under this 1996 NSR Royalty Agreement is dependent on the land involved and, as applicable, any pre-existing royalty arrangements affixed to said lands. In practical terms it applies as follows:
•
Fee lands owned by PMC at November 30, 1996—which includes all current fee lands
now owned by OMC—the 1996 Royal Gold Royalty holders receive a 2.5% royalty on parcels not subject to an underlying or pre-existing royalty, and a 0.5% royalty on parcels subject to an underlying or pre-existing royalty, which increases to a 1% NSR royalty if the average gross value per ton of ore produced is greater than US$175/ton (which is currently the case at the time of this Report)
•
Fee lands leased by PMC at November 30, 1996 - the royalty varies from a minimum of
0.5% to a maximum of 5% depending on any underlying royalty. The royalty percentage is determined by the difference between a total royalty load of 6% less any underlying royalty; however, the royalty will never exceed 5% or be reduced to less than
0.5%. For example, if the underlying royalty is 4%, then the Royal Gold Royalty would be 6% less 4%, resulting in a 2% royalty payable to the holders of the Royal Gold Royalty. If the underlying royalty is 0.5%, the Royal Gold Royalty would be 6%
less 0.5% equaling 5.5%, which is greater than 5%, thus reducing the applicable royalty rate to 5%. If the underlying royalty is 6% or greater, the Royal Gold Royalty rate is limited to 0.5%
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
24
•
Unpatented lode mining claims owned by PMC at November 30, 1996 – which includes
all current claims other than the BeeDee claims within the Property—the royalty is 2.5% with a provision to further reduce this royalty if the U.S. Federal Government were ever to impose a “federal royalty payment obligation” on
said claims, subject to a minimum 1.0% NSR in all instances
•
Unpatented lode mining claims leased by PMC at November 30, 1996 – which is
comprised only of the BeeDee claims – the royalty percentage is determined by the difference between a total royalty load of 6% less than the underlying royalty; however, the royalty will never exceed 5% or be reduced to less than 0.5% (as
further articulated under (ii) above)
3.3.2
2026 Franco- Nevada Royalty – Granite Creek Property – 1.5% to 3% NSR
On March 16, 2026, the Company entered into a net smelter return royalty financing arrangement with Franco-Nevada U.S. Corporation
(“FN USA”), granting a perpetual royalty on production from the Company’s Granite Creek project area (the “FN NSR Royalty”). The royalty rate is 1.5% of net smelter returns through December 31, 2030, increasing to
3.0% thereafter. The royalty is payable monthly in cash or in-kind as refined gold or silver at Franco-Nevada’s election.
3.3.3
Pinson Private Royalty – Pinson Claims – 3.125% NSR (Noceto, Phillips, Murphy—Current
Holders) & 0.17% NSR (FN USA & S&G Pinson – Current Holders)
Pursuant to a mining lease
agreement dated May 27, 1980, certain lands were leased to Cordilleran Explorations general partnership which included the Pinson unpatented mining claims described in Table 3-1 and Table 3-3 above (the “Pinson Lease”). Through subsequent transfers and conveyances, the Pinson claims are now 91.67% owned by i-80 (through its wholly owned subsidiaries
OMC and PG USA). As part of the acquisition of the Pinson claims, three individuals, specifically. Mrs. Barbara P. Noceto, Mrs. Patricia Phillips and Mrs. Kate Murphy, conveyed their interest by way of Deed in exchange for a
reserved NSR proportionate to their ownership interest in the Pinson claims at that time. Other conveyances from original counterparties under the Pinson Lease similarly conveyed their interests in exchange for a reserved 2% NSR proportionate to
their ownership interest which currently equates to a 0.17% NSR royalty interest now held by FN USA and S&G Pinson in equal shares.
3.3.4
Pinson Royalty – Section 21 Bee Dee 21-56 Claims –
0.5% NSR (Pinson Mining Company – Current Holder)
By way of a NSR Royalty Deed dated May 6, 2022, Nevada
Gold Mines LLC grants owned and leased lands – including those in Section 21 and the Bee Dee 21-56 unpatented mining claims – to Pinson Mining Company and in exchange reserves a 0.5% NSR
royalty interest in production emanating from these lands.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
25
3.3.5
2001 Royal Gold Royalty – Section 21, 29 & Pacific Claims – 3-5% NSR (Royal Gold Inc.—Current Holder)
By way of a Deed dated
September 14, 2001, Cordilleran Explorations partnership (“Cordilleran”), the original developer of the Property, agreed to deed (or convey) certain properties – including al the patented lands in Section 21 and 29 of
Township 38 North, Range 42 East, as well as the unpatented Pacific Claims (1A-7A – the “Pacific Claims”) to Pinson Mining Company (PMC), all within the current Property area. In exchange,
Cordilleran retained a 3% NSR on Section 21 and 29 fee lands and a 5% NSR over the Pacific Claims Similar to the 1996 Royal Gold Royalty, following a series of subsequent deeds and transfers, Royal Gold, Inc. is the current owner of the 2001
Cordilleran Royalty – hereinafter the “2001 Royal Gold Royalty”.
3.3.6
Goldfield Royalty – Section 33 – 2% NSR (FN USA—Current Holder)
By way of a Special Warranty Deed dated November 11, 1981, The Goldfield Corporation sold and conveyed certain
properties – including all of the fee lands within Section 33 of Township 38 North, Range 42 East – in exchange for reserving a 2% NSR royalty over any production from said lands (the “Goldfield Royalty”).
Section 33 is now owned by OMC and the Goldfield Royalty is now owed to Franco Nevada U.S. Corporation.
3.3.7
Bee Dee Reserved Royalty—Bee Dee Claims—2% NSR Royalty (FN USA (50%) and S&G Pinson, LLC
(50%) – Current Holders)
As described in 4.2.2 above, OMC controls a 100% interest in the 56 Bee Dee
unpatented federal lode mining claims by way of the Bee Dee Lease Agreement. The Bee Dee Lease Agreement imposes a 2% net smelter returns (NSR) royalty on the Bee Dee claims in favor of the current lessors.
3.3.8
Section 28 Private Royalty – Section 28 Fee lands—2% NSR (Murphy, Noceto, Phillips, D.
and J. Christison – Current Holders)
Pursuant to a mining lease agreement dated May 27, 1980, certain
lands were leased to Cordilleran Explorations general partnership from the original which included the fee lands within Section 28 of Township 38 North, Range 42 East as described in Table 3-1 above.
Through subsequent transfers and conveyances, the fee lands within Section 28 are now 91.67% owned by i-80 (through its wholly owned subsidiaries OMC and PG USA). As part of the acquisition of the
Section 28 fee lands, five individuals noted above, conveyed their interest by way of Deed in exchange for a reserved NSR proportionate to their ownership interest in the Pinson claims at that time. As a result, gold production from the
Section 28 fee lands is subject to a 2% NSR royalty interest to the private parties noted above
3.3.9
Mineral Production Royalty Agreement – Granite Creek Property—10% Net Profit Interest
(NGM—Current Holder)
Pursuant to a mineral production royalty agreement entered into on August 10, 2011,
the entire Property is subject to a 10% “net profits” interest royalty, payable to the current counterparty under this agreement, Gold Royalty U.S. Corp. (the “NPI”).
The NPI is triggered after the first 120,000 ounces of gold (and/or the gold-equivalent of other minerals) are produced from the Property and
OMC has derived “net profits” from the said operation. Under the terms of the NPI, “net profits” are only derived once all “recoverable costs” have been realized by OMC. Recoverable costs are defined broadly to
include all exploration, development and mining related costs – including mine closure and reclamation costs, financing costs and all third-party costs including to government entities and all taxes—incurred by OMC in exploring,
developing and operating the Property. The Property has produced approximately 73,500 ounces as of the date of this Report.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
26
3.4
History of Ownership and Prior Mining
The Property has been explored by several individuals and mining/exploration companies since the late 1930’s. The original discovery on
the Property was made by Clovis Pinson and Charles Ogee in the mid to late 1930’s, but production did not occur until after World War II, when ore from the original discovery was shipped to and processed at the Getchell mine mill. In 1949 and
1950, total production from the Granite Creek Mine amounted to approximately 9,071 t (10,000 st) grading approximately 0.14 ounces per ton (opt) (4.8 g/t).
3.5
Environmental Liabilities
The Granite Creek Project’s principal identified environmental liability is the 2025 discovery of petroleum-contaminated soil within CX
Pit waste rock backfill; because the affected material’s exact location is unknown, as much as 1.17 million tons of backfill may require re-handling and remediation. Osgood is developing a
management plan with NDEP-BMRR to address it. Beyond this, the project carries a standard reclamation and closure bonding obligation, currently estimated at US$8.64 million under Nevada’s standardized cost model, which will be revised at
the next required three-year bond review (2028 to 2029) and is likely to differ from the operator’s actual future closure cost given expected changes in site conditions before the 2032 anticipated closure date. Ongoing water treatment
represent continuing costs tied to naturally elevated arsenic and antimony in site dewatering water, and a proven contingency treatment (ferric sulfate dosing) is available should arsenic rise in the post-closure Mag pit lake, though water quality
modeling indicates this is unlikely to be needed. A metals attenuation study has been commissioned to support site specific discharge requirements that will be used to optimize operational water treatment costs. Notably, the site’s two legacy
tailings storage facilities have already been reclaimed and released from financial assurance requirements and are explicitly not a liability of the current operator.
3.6
Permits and Authorizations
All permits and authorizations necessary to conduct the currently proposed work at the Granite Creek Underground Project have been identified
and are already in hand. The project holds a Plan of Operations from the BLM, a Class II Air Quality Operating Permit and Mercury Operating Permit to Construct, two Water Pollution Control Permits (covering the Granite Creek Mine and the Rapid
Infiltration Basins), two Nevada Reclamation Permits, a Mining Stormwater General Permit, an Onsite Sewage Disposal System Permit, a Hazardous Materials Permit, and an approved Waters of the United States Jurisdictional Determination from the USACE
valid through November 2030. These permits, issued by the BLM, the Nevada Division of Environmental Protection (through its Bureaus of Mining Regulation and Reclamation, Air Pollution Control, and Water Pollution Control), and other applicable
agencies, are all currently in good standing. There are no permitting actions pending before either the NDEP or the BLM, and the site is up-to-date on all monitoring
obligations tied to these permits.
Based on the information provided, no significant factors or risks were identified that would affect
Osgood’s right or ability to perform the proposed work. All permits required for current operations are held and in good standing, with no permitting actions pending before the BLM or NDEP for the current underground operations, and the site
is meeting all associated monitoring obligations. The Property’s mixed public / private land tenure is already reflected in the jurisdictional split between the BLM and the state.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
27
4
Accessibility, Climate, Local Resources, Infrastructure and Physiography
4.1
Topography, Elevation and Vegetation
The Project lies in the Basin and Range Province, a structural and physiographic province comprised of generally north to north-northeast
trending, fault bounded mountain ranges separated by alluvial filled valleys. The Project is located on the eastern flank of the Osgood Mountains. Topography is gentle to moderate at the Project, ranging from an elevation of 1,475 m (4,840 ft) at
the mine offices to 1,676 m (5,500 ft) at the crest of the historic CX pit highwall, and rises steeply to the west over 1,158 m (3,800 ft) to Adam Peak at the top of the Granite Creek drainage. Vegetation is typical of the high desert with sagebrush
on the alluvial fans, and juniper on the mountain slopes. Climate, physiography, and local topography do not present any material constraints to underground mining, surface infrastructure development, or year-round operations at the Project. Water
rights held by OMC are sufficient for its anticipated underground operations.
4.2
Means of Access
The Project can be reached by traveling east on US Interstate Highway 80 from Winnemucca to the Golconda exit, about 24 km (15 miles), then
following Nevada State Route 789 and the Getchell Mine Road northeast about 33.0 km (20.5 miles) to the Granite Creek Mine access road. The last 7.2 km (4.5 miles) is unpaved, well maintained gravel road. Areas of Route 789 are designated open
range, and travelers must watch for cattle. The Granite Creek security facility is located about 0.3 km (0.2 miles) west of the intersection with Route 789. Traveling from the east, the Golconda exit lies west of Battle Mountain about 58.7 km (36.5
miles) on Interstate Hwy 80. The route from Battle Mountain passes i-80’s Lone Tree facility, which lies south of the interstate about 31 km (19 miles) west of Battle Mountain. Access to the Granite
Creek Project is available year-round, with only minor, short-duration disruptions possible during severe winter snowstorms or summer lightning events.
4.3
Climate and Length of Operating Season
The climate in Humboldt County is typical of the high-desert environment. Typical summer temperatures average roughly 24°C (75°F) with
occasional day / night extremes of 41°C (105°F) / 4°C (40°F). Winter temperatures average roughly -1°C (30°F) with occasional day / night extremes ranging 60°F (16°C) / -12°C (-10°F). Average annual precipitation is about 8 inches, the majority of which accumulates as snowfall during the winter months. Typical snow accumulation is
roughly 3 inches on average at lower elevations, although occasional large storms may accumulate significantly more for short durations. Mining operations are able to continue year-round with brief pauses for summer lightning storms or unusually
heavy winter snowstorms.
4.4
Infrastructure Availability and Sources
Existing infrastructure at the Project includes an office building, dry and warehouse facilities, and a lined stockpile area on the surface.
Over 2,743 m (9,000 ft) of underground workings have been completed. The mine is accessed through either of two portals, and dual egress has been established for most areas of the mine; where dual egress is not possible, rescue chambers have been
installed. Equipment is repaired in an underground mine shop. Air doors and a ventilation fan provide required air supply to the workings in compliance with Mine Safety and Health Administration (MSHA) standards. Landline telephone and digital
subscriber line service are available at the Project site; cellular phone service is also available, but is dependent on the strength of receiving antennas, topography, and lines of sight.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
28
4.4.1
Water
Six deep dewatering wells have been drilled and cased, four of which are currently in operation, with the remaining two scheduled to come
online in Q2 2026. Dewatering water not consumed by operations is discharged through pipelines to four permitted rapid infiltration basins (RIBs), two of which have been constructed to date; the existing RIBs and associated pipelines re-infiltrate water produced in mine dewatering into the valley aquifer.
4.4.2
Electricity
Electrical infrastructure suitable for mine operations is installed at the Project.
4.4.3
Personnel
The town of Winnemucca has a population of about 8,400. Some experienced and general labor is available locally and from other small towns in
the region. There are several mining operations in the region and, as such, there is always competition for employees.
4.4.4
Supplies
Basic services are available in Winnemucca. Local mining districts have been active since the 1980’s, and mining suppliers and
contractors are accustomed to working in the area.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
29
5
History
5.1
Previous Operations
The Property has been explored by several individuals and mining / exploration companies since the late 1930’s. The original discovery on
the Property was made by Clovis Pinson and Charles Ogee in the mid to late-1930’s, but production did not occur until after World War II, when ore from the original discovery was shipped to and processed at the Getchell mine mill. In 1949 and
1950, total production from the Granite Creek mine amounted to approximately 9,071 t (10,000 st) grading approximately4.8 g/t (0.14 oz/t) gold.
The Property has had a succession of operators since exploration resumed in 1970: the Cordex I Syndicate and its successor, Pinson Mining
Company (PMC), operated the Property from 1970 through the mine’s closure in 2000; Homestake and Barrick held a 50/50 interest in PMC and conducted exploration from 1996 to 2003; Atna Resources Ltd. earned into and then acquired PMC’s
joint venture interest between 2004 and 2011 and operated the underground mine from 2012 until it was placed on care and maintenance in June 2013; Osgood Mining Company LLC (OMC), a wholly owned subsidiary of Waterton Global Resources Management,
acquired the Project in 2016; and i-80 Gold Corp acquired OMC in April 2021 and has operated the Project since.
Historically, the Granite Creek Mine Project, with small additions from the nearby Preble and Kramer Hill mines, was credited with gold
production in excess of 1 million ounces and less than 100,000 oz of silver (Tingley, 1998). PMC independently compiled a record of production and credited the Granite Creek Mine Property with production of 986,000 oz of gold through 1999.
Historic production figures for the Granite Creek Mine are compiled from a combination of company records and published sources and may be incomplete or approximate; these figures are presented for historical context only and should not be relied
upon as an indication of current Mineral Resources or Mineral Reserves.
i-80 previously completed
an Initial Assessment (IA) on the Granite Creek Open Pit Project, reported March 26, 2025; the status of that prior study relative to this Technical Report Summary is addressed in the Report Version Update (Section 2.5).
5.2
Exploration and Development of Previous Owners or Operators
The Cordex I Syndicate leased the Property in 1970 and, following a 1971 surface mapping and sampling program, completed 17 reverse circulation
(RC) drillholes in and around the 1940s-era Granite Creek Mine pit, confirming low-grade gold values. An 18th step-out hole
intercepted 27.4 m (90 ft) of 5.8 g/t (0.17 oz/t) gold, forming the basis for delineation of the ‘A’ Zone. Cordex and its successor, PMC, explored the Property largely through mapping and geochemical sampling, including a regional
mapping program from Preble to Getchell in the late 1970s, a 1:6,000-scale mapping program of the Property in 1983, and 1:2,400-scale mapping of the pit areas through
the active life of the mine. PMC began developing the A Pit in 1980 and produced gold in 1981; the B Pit followed in 1982. Step-out drilling in 1982-1983 identified the C and CX Zones northeast of the A Zone,
and drilling in 1984 identified an independent fault system that became the core of the Mag deposit, which entered production in 1987. PMC produced from the CX, CX West, and Mag pits into the mid-to-late 1990s, until falling gold prices and erratic mill feed forced closure of the oxide mill in early 1998; all active mining ceased in January 1999 and the Project was officially closed in May 2000.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
30
Homestake and Barrick, having become 50/50 partners in PMC, conducted an exploration program
from 1996 to 2000, expending approximately US$12 million exploring the deeper feeder fault zones of the Property for a large, high-grade gold system. The program identified gold mineralization with underground grades but did not identify a
deposit of sufficient size to be of development interest, and the partners concluded the program. Barrick acquired Homestake in 2003 and drilled three additional exploration drillholes.
Atna Resources Ltd. acquired an option in August 2004 to earn a 70% joint venture interest in the Property from PMC, completing its earn-in in 2006 after expending the required US$12 million. PMC elected to back-in for an additional 40% interest in April 2006 and spent over US$30 million on
surface and underground diamond core and RC drilling, underground drifting, and surface infrastructure (including rapid infiltration basins, a mineralized material stockpile pad, and underground electrical upgrades) before completing its claw-back
in early 2009, at which point PMC held 70% and Atna 30% of the joint venture. In September 2011, Atna acquired PMC’s 70% interest outright, along with an evergreen processing agreement with Barrick for processing underground refractory ores at
Barrick’s Goldstrike facilities. Underground development commenced in early 2012, and mine ramp-up began in late 2012; a total of 1,832 m (6,011 ft) of primary and secondary development was completed
during 2012 and 2013, and approximately 27,216 t (30,000 st) of ore containing 7,900 oz of gold were mined and shipped to off-site processing facilities. The mine was placed on care and maintenance in June
2013, driven primarily by the steep decline in gold prices that year; in May 2014, the underground mine was changed to an intermittent production status to test revised stoping methods and prove mining economics at small production rates.
Osgood Mining Company LLC (OMC), a wholly owned subsidiary of Waterton Global Resources Management, acquired the Project in 2016 and completed
drillhole database compilation and verification campaigns, including migration of the Atna database to Maxwell Datashed software (2017) and further verification (2018). In 2016, OMC completed a project-scale structural geology study —
surface and underground mapping, historical data review, and cross-section interpretation — that formed the basis of an updated 3D litho-structural model used for the 2020 Mineral Resource estimate (AMC, 2020). From 2017 to 2018, OMC also
completed an extensive drill material inventory and salvage program securing available drill core and RC chips. OMC maintained environmental permit compliance throughout its ownership and continued to maintain and improve site infrastructure,
including a third-party hydrology and dewatering review that led to pump replacement in 2019 and upgraded dewatering well process controls. In April 2021, i-80 Gold Corp — created as a spinout of Premier
Gold Mines Limited’s Nevada assets — acquired OMC from Waterton Global Resources Management, and additional land was purchased the following month. Further land acquisitions followed in 2021 (Section 31 fee land and Christison interests)
and 2022 (Section 21 fee land and BEE DEE unpatented claims lessee interest).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
31
6
Geological Setting, Mineralization, and Deposit
6.1
Regional, Local and Property Geology
6.1.1
Regional Geology
The Property is located on the eastern flank of the Osgood Mountains within the Basin and Range tectonic province of northern Nevada (Figure 6-1). The Granite Creek Mine, together with the Preble, Getchell, Turquoise Ridge, and Twin Creeks mines, lies on the Getchell gold trend, which generally strikes northeast-southwest and has been cross-cut by secondary north-south and northwest-southeast-trending structures. Deposits along the trend are hosted in Paleozoic marine sedimentary rocks exposed in the Osgood Mountains, which have been complexly
thrust faulted and intruded by the Cretaceous-aged (92 Ma) Osgood Mountains granodiorite stock. Gold mineralization at Granite Creek is characteristic of a Carlin-type gold system, similar to other deposits along the Getchell Trend. These units are
unconformably overlain by Miocene volcanic rocks.
The Osgood Mountains Range is underlain by Cambrian Osgood Mountain Quartzite, Cambrian
Preble Formation, Ordovician “Comus” Formation and the “upper plate” Valmy Formation. These units are unconformably overlain by the Permian Etchart Formation (Antler Peak Equivalent) of the Roberts Mountains overlap
assemblage, and by the Triassic Golconda allochthon. These uppermost units form a belt of outcrops flanking the western and northern sides of the Osgood Range. These rocks have been intruded by the Cretaceous-aged Osgood Mountains granodiorite
stock, which forms the core of the Osgood Mountains. Stratigraphy throughout the Osgood Mountains plunges north (Chevillon, et al., 2000). A significant thermal metamorphic aureole surrounds the stock. At least four Paleozoic units, defined by
structure, lithology, and age comprise the Osgood Mountains (McLachlan, et al., 2000). These include the:
•
Autochthonous Cambrian Osgood Mountains Quartzite and Preble Formation and Cambrian to Ordovician Comus Formation
•
Allochthonous Ordovician Valmy Formation, part of the Roberts Mountains allochthon
•
Antler overlap sequence including the Mississippian Goughs Canyon Formation, Pennsylvanian Battle Formation, and
Pennsylvanian-Permian Etchart Limestone
•
Allochthonous Pennsylvanian-Permian Farrel Canyon Formation, part of the Golconda allochthon
The autochthonous Cambrian-Ordovician package has been described by Jones (1991, cited in McLachlan et al. 2000) and
comprises the Osgood Mountains Quartzite, Preble Formation, and Comus Formation. All these units have undergone regional metamorphism and intense, northwest-directed folding (McLachlan, et al., 2000). At the Getchell Project, these two units are
folded together to form the northwest-verging Pinson anticline. The Comus and Preble Formations show distinct facies changes across the district. These units at Turquoise Ridge and Twin Creeks contain tuffs, pillow basalts, and mafic sills, none of
which are present in the same units at Granite Creek.
The Roberts Mountains allochthon described by Stenger et al. (1998) is exposed
at the Turquoise Ridge and Twin Creeks mines where it has been mapped as the Valmy Formation. The Roberts Mountains allochthon is composed of a thick (299 m (>980 ft)) sequence of mid-ocean ridge
basalts and intercalated pelagic sediments that have been thrust over the Twin Creeks member of the Comus Formation (Stenger, et al., 1998). This sequence has not been identified at the Granite Creek Mine but was likely present and eroded prior to
the present day.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
32
The Antler overlap sequence in the Osgood Mountains consists of the Pennsylvanian Battle
Formation, and Pennsylvanian-Permian Etchart and Adam Peak formations (McLachlan, et al., 2000). The Battle Conglomerate consists of cobbles and quartzite pebbles. The Etchart lies conformably on the Battle and consists of calcareous sandstone
underlying fossiliferous limestone. South of the Getchell Project, the Battle and Etchart lie unconformably on the Preble Formation and Osgood Mountain Quartzite (McLachlan, et al., 2000). These units are not present at the Granite Creek Mine
Project.
The Golconda allochthon comprises the Mississippian Goughs Canyon and the Pennsylvanian Permian Farrel Canyon formations present
along the northwest flank of the Osgood Mountains. The thrust strikes north to northeast from the central part of the range to the Dry Hills in the north (McLachlan, et al., 2000). These units are not present at the Granite Creek Mine Project.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
33
Source: SRK, 2026
Figure 6-1: Regional Geology Map
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
34
6.1.2
Local Geology
The geology throughout the Osgood Mountains is typified by folded
Cambrian-to-Ordovician sedimentary rocks intruded by Cretaceous stocks and cross-cut by later high-angle structural deformation
related to Basin and Range extension. The older rocks are overlain by Miocene andesitic basalt, with surrounding fault-bounded basins filled by Quaternary alluvial gravel. The Osgood Mountains trend generally northeast, although at a structural
hinge near the Granite Creek Mine the east flank of the range rotates and trends north toward the Getchell mine (Figure 6-2). Gold mineralization is primarily hosted by fine-grained marine sedimentary rocks
overlying a large stock of Cretaceous granodiorite. Cambrian-to-Ordovician siliciclastic and carbonate rocks have been intruded by the Cretaceous Osgood Mountains
granodiorite, forming large metamorphosed aureoles with several tungsten-bearing skarns, two of which occur on the Property. The Cambrian Osgood Mountains Quartzite is overlain by the Preble Formation and, in turn, the Ordovician Comus Formation;
both have been folded into a broad, north-plunging anticline — the Pinson Anticline — which is northeast-plunging and northwest-verging, extends approximately 4.8 km (3 miles) southwest from the Granite Creek Mine, and is cored by the
Preble Formation and flanked by the Comus Formation. Gold mineralization on the Property is primarily hosted in the Comus Formation and exhibits strong structural control, with the most important structural feature being the network of faults
bordering the escarpment marking the southern and eastern edge of the Osgood granodiorite. This fault system divides into three structural and stratigraphically mineralized zones, the Rangefront, CX, and Mag Zones, each defined by one or more major
structural elements.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
35
Source: i-80, 2026
Figure 6-2: Local Geology Map
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
36
The geology throughout the Osgood Mountains is typified by folded Cambrian-to-Ordovician sedimentary rocks intruded by Cretaceous stocks and cross-cut by later high-angle structural deformation related
to Basin and Range extension. The older rocks are overlain by Miocene andesitic basalt, with surrounding fault-bounded basins filled by Quaternary alluvial gravel. The Osgood Mountains trend generally northeast, although at a structural hinge near
the Granite Creek Mine the east flank of the range rotates and trends north toward the Getchell mine. Gold mineralization is primarily hosted by fine-grained marine sedimentary rocks overlying a large stock of Cretaceous granodiorite. Cambrian-to-Ordovician siliciclastic and carbonate rocks have been intruded by the Cretaceous Osgood Mountains granodiorite, forming large metamorphosed aureoles with several
tungsten-bearing skarns, two of which occur on the Property. The Cambrian Osgood Mountains Quartzite is overlain by the Preble Formation and, in turn, the Ordovician Comus Formation; both have been folded into a broad, north-plunging anticline
— the Pinson Anticline — which is northeast-plunging and northwest-verging, extends approximately 4.8 km (3 miles) southwest from the Granite Creek Mine, and is cored by the Preble Formation and flanked by the Comus Formation. Gold
mineralization on the Property is primarily hosted in the Comus Formation and exhibits strong structural control, with the most important structural feature being the network of faults bordering the escarpment marking the southern and eastern edge
of the Osgood granodiorite. This fault system divides into three structural and stratigraphically mineralized zones — the Rangefront, CX, and Mag Zones — each defined by one or more major structural elements.
6.1.3
Property Geology
In 2022, i-80 Gold Corp created an updated comprehensive geologic model for the Granite Creek Mine
Project, incorporating surface and underground mapping, structural analyses, geologic interpretation, and a complete 3D geologic model built in Leapfrog Geo using all available drillhole, surface and underground mapping, televiewer, and structural
analysis data. Structure at the Project is highly complex, reflecting multiple deformation events; regional deformation events (the Antler, Sonoma, and Elko orogenies) are likely responsible for the numerous overprinted fabrics and compressional
structures observed, which appear to have been dissected and/or reactivated by subsequent Basin and Range extension. i-80 recognizes a west-northwest-verging imbricate thrust system comprising the Rangefront,
Adam Peak, Otto, and CX faults, interpreting most of the compressional, westward transport along these faults to have pre-dated emplacement of the Osgood stock. The main structural element on the Property is
the Rangefront fault (strike 010° to 045°, dip 60° near-surface shallowing with depth); the Adam Peak and Otto faults are hanging wall splays off its northern extent, and the CX fault (strike 050°, dip 55°) lies to the east. The
Mag fault system, on the eastern portion of the Property, trends 335° and is a younger fault system associated with Tertiary extension, with the Mag and Mag West faults forming a horst block (Figure 6-3).
Significant named structural features on the Property include:
Rangefront Zone (RFZ)
A northeast-trending fault zone forming a broad, persistent zone of shearing and brecciation along the Range Front Fault, involving the entire
stratigraphic sequence at the Property, including the Cambrian Preble, Ordovician Comus, and Cretaceous granodiorite.
Range Front
Fault (RFF)
A prominent 010° to 045° striking normal fault defining the eastern front of the Osgood Mountains, juxtaposing
the Comus Formation in the hanging wall against the Preble Formation in the footwall. Originated as a west-verging thrust fault and has been reactivated as a down-to-the-east normal fault of significant, unknown displacement, with a near-surface dip of 60° that shallows with depth.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
37
Adam Peak Fault
A 048° striking hanging wall splay off the Rangefront fault with a near-surface dip of 72° that shallows with depth, reactivated as a
normal fault of unknown displacement.
Otto Fault
A 040° striking hanging wall splay off the Rangefront fault with a near-surface dip of 80° that shallows with depth, defined by a zone
of discrete anastomosing splays; its on-strike and down-dip extent defines the SPZ fault system.
CX West Fault
A
younger offsetting normal fault (strike 245°, dip 70°) with approximately 46 m (150 ft) of displacement, offsetting stratigraphy as well as the Adam Peak and Otto faults in a down-to-the-northwest direction.
Ogee Fault
A 10 to 30 m (100 ft) wide fault zone (strike 070°, dip 85°) juxtaposing the Upper and Lower Comus formations, defined by an
anastomosing system of splays and interpreted as a long-lived accommodation zone with multiple phases of reactivation, including recent right-lateral oblique-normal motion of unknown displacement.
Linehole Fault
A
through-going southwest-trending normal fault dipping 85° to the northwest with approximately 30 m (100 ft) of displacement, acting as a structural and mineralization boundary on the Property.
LH Fault
A splay
off the Linehole fault (strike 030°, dip 80°) with approximately 15 m (50 ft) of normal-sense displacement; its intersection with the Ogee fault is one of the most important and prolific structural intersections on the Property.
CX Fault
A
complex zone of brittle fracturing juxtaposing Upper Comus argillite against limestone beds of the Lower Comus, striking approximately 035° to 045° and dipping 55° to 65° southeast. Originated as a west-verging thrust and has been
reactivated as a normal fault with an unknown amount of down-to-the-southeast displacement.
SPZ Fault System
Comprises the along-strike and down-dip extent of the Otto fault and its associated splays, trending
northeast with a dip of approximately 50° to the southeast. The Upper and Lower Comus formations are often juxtaposed along this suite of faults, with a transition from weakly metamorphosed rock in the hanging wall to more strongly metamorphosed
rock in the footwall.
Mag Fault
A younger, through-going normal fault (strike 340°, dip 75°) related to Basin and Range extension, with unknown but
interpreted-significant down-to-the-east displacement.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
38
Mag Fault System
A northwest-trending suite of brittle faults defining the Mag pit; its two main faults, the east-northeast dipping Mag fault and the
west-southwest dipping Mag West fault, form a horst block within which mineralization is concentrated.
Mineralization at Granite Creek is
structurally controlled, with faults the primary control especially in high-grade underground zones, while lithologic contacts, bedding, and folds play an important role in near-surface (open pit) mineralization. High-grade mineralized zones are
moderately continuous along faults, with the most prolific zones at structural intersections. Gold mineralization occurs within pyrite in two stages — an early
non-ore-pyrite stage and a gold-bearing arsenian pyrite stage — and correlates with arsenic, antimony, mercury, and thallium.
Gold mineralization is primarily hosted by the Upper and Lower Comus Formations (argillite and interbedded argillite/limestone, respectively):
the Upper Comus is the primary host in the Mag Zone and hosts most surface resources, and is also locally mineralized within the B, C, CX, CX West, and portions of the RFZ; the Lower Comus hosts most of the high-grade underground resources. Near the
Osgood Mountains stock, including in the underground resource areas, host rock has been metamorphosed (argillite to hornfels, limestone to garnet/pyroxene/wollastonite/marble), and higher gold grades typically occur in these metamorphosed rocks
along fault zones. The Preble Formation is a poor host for gold mineralization but contains localized gold concentrations where brecciated and adjacent to major fluid conduits. Oxide mineralization (limonite, hematite, and other iron/arsenic oxides)
is extensive in the Ogee Zone and CX Fault system to a depth of 457 m (1,500 ft), and more variable within the RFF system, ranging from less than 152 m (500 ft) to 549 m (1,800 ft).
Dimensions and characteristics of the significant mineralized zones on the Property are as follows:
Mag Pit
Hosted by
Upper Comus Formation argillite; the mineralized zone is north-northwest oriented, sub-parallel to the Mag Fault, dips east-northeast, and plunges south-southeast. The tabular body has a strike length of
approximately 1,219 m (4,000 ft), varies from 61 to 122 m (200 to 400 ft) in width, and has an average down-dip extent of 137 m (450 ft). Mineralization is more disseminated and lower grade than the
Rangefront, CX, and Ogee zones, and is spatially associated with decarbonatization, kaolinization, silicification, and quartz veinlets.
Otto-Adam Peak Zone
Defined by the Otto and Adam Peak faults and their associated splays; trends northeast, dips southeast, plunges east-northeast, and is offset down-dip by the CX West fault. Mineralization is moderately continuous, controlled by a network of discrete anastomosing faults and splays within the Lower Comus Formation, with high-grade mineralization at fault
intersections. Strike length approximately 152 m (500 ft), vertical extent 213 m (700 ft), average width 23 m (75 ft).
Ogee Zone
An east-northeast trending, near-vertical mineralized zone controlled by the Ogee Fault and associated splays; the upper portion
plunges east-northeast at 55° and is strongly oxidized, while the lower portion is near vertical, mostly oxidized, and contains more comingled sulfide. Strike length 122 m (400 ft), vertical extent 457 m (1,500 ft), average width 23 m (75 ft).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
39
South Pacific Zone (SPZ)
A northeast-trending, southeast-dipping zone of high-grade, fault-bound mineralization with a northeast plunge of 45°, controlled by the
along-strike and down-dip extent of the Otto fault; highest grades are concentrated along faults juxtaposing the Upper and Lower Comus Formations. Strike length 381 m (1,250 ft),
down-dip extent 274 m (900 ft), average width 7.6 m (25 ft).
CX Zone
Consists of both near-surface (open pit) and higher-grade underground mineralization. The near-surface portion is controlled by the
through-going CX fault and its splays, is discontinuous, and is associated with pervasive argillization and decarbonatization within the Lower Comus Formation (strike length 1,066 m (3,500 ft), down-dip extent
122 m (400 ft), average width 23 m (75 ft)). The higher-grade underground portion is more tightly structurally controlled along the down-dip section of the CX Fault (strike length 305 m (1,000 ft), down-dip extent 366 m (1,200 ft), average width 12 m (40 ft)).
Rangefront Zone (RFZ)
Pervasively argillized and decarbonatized with intense brecciation along the lower-bounding Range Front Fault; mineralization occurs as
discontinuous amorphous bodies within the Comus Formation, with high-grade zones concentrated in the Lower Comus and anomalous mineralization present in the Preble Formation proximal to the RFF. Strike length approximately 290 m (950 ft), down-dip extent 335 m (1,100 ft), average width 30 m (100 ft).
Multiple areas of high-grade gold
mineralization are amenable to underground mining methods, including the Otto-Adam Peak, Ogee, SPZ, CW, and Rangefront zones; the current underground operation mines the Otto-Adam Peak and Ogee zones, with 2025 exploration focused on the SPZ,
together forming the underground Mineral Resource at the Project.
Alteration assemblages at Granite Creek include silicification,
decarbonatization, pyrite, and remobilization of carbon. In the CX Zone (encompassing the A, B, C, CX, and CX West pits), alteration style and intensity vary gradationally: in the B Pit, gold mineralization occurs in fractured shale and silty
carbonate that is weakly silicified and clay-altered; in the A Pit, alteration consists of intense silicification of carbonate lithologies and gold-rich jasperoid formation along structures, with gold grains typically less than 5 microns hosted as
inclusions in arsenian pyrite; in the C Pit, high-grade material is hosted in decarbonatized carbonates cross-cut by small faults. In the CX Pit, mineralization consists of silica and pyrite replacing
carbonate along narrow structures; in the CX-West Pit, mineralization is hosted in strongly calc-silicate carbonates with strong argillic alteration. In the Mag Pit, mineralization is associated with
decarbonatization, kaolinization, silicification, and quartz veining, with silicification occurring as replacement of decalcified lithologies and healing of fault gouge and breccia. The RFF Zone displays pervasive argillization and decarbonatization
with dissolution collapse breccias and intense shearing, with minor silicification as a broad overprint and calcite veining along the RFF margins (Figure 6-4)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
40
Source: SRK, 2026
Figure 6-3: Property Geology Map
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
41
Source: Chadwick 2002
Figure 6-4: Alteration of the Mag Pit
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
42
6.2
Mineral Deposit
The structural setting, alteration mineralogy, and mineralization characteristics of Granite Creek are consistent with Carlin-type deposits.
Carlin-type deposits formed in the mid-Tertiary after the onset of extension in an
east-west-trending, subduction-related magmatic belt. The deposits are located along long-lived, deep crustal structures inherited from Late Proterozoic rifting and the formation of a passive margin within Paleozoic carbonate sequences composed of
silty limestone to calcareous siltstone. The carbonate sequences are overlain by either structurally controlled siliciclastic sequences controlled by the Early Mississippian-aged Roberts Mountain allochthon or by stratigraphically controlled
siliciclastic sequences. The siliciclastic rocks are less permeable than the underlying carbonate rocks, which traps fluids along major structures, causing them to flow laterally into the permeable and reactive carbonate sequences.
Alteration of host carbonate sequences consists of decarbonatization, argillization, and selective silicification, forming jasperoid and
causing carbon flooding. Gangue minerals in Carlin-type deposits consist of calcite, siderite, and ferroan dolomites that can occur as geochemical fronts beyond the mineralized zones.
Gold deposition occurs in arsenian pyrite, is hosted within carbonaceous sequences near major high angle structural zones, and is concentrated
in structural traps and/or replacement horizons of reactive and permeable sedimentary beds.
Carlin-type deposits typically show enrichment
in antimony, arsenic, mercury, and thallium, caused by hydrothermal fluids with temperatures ranging from 180°C (356°F) to 230°C (446°F). The source of fluids is likely deep-seated magmas that release gold-bearing fluids at depths of
10 to 12 km (7 mi). These magmas formed during Eocene slab-rollback of the Farallon plate as upwelling asthenosphere impinged on a strongly metasomatized sub-continental lithospheric mantle. Tertiary dikes
associated with mineralization and radiometric age dates between 39 and 42 Ma, along with isotopic data, provide evidence toward this hypothesis. This genetic model represents the prevailing scientific interpretation for Carlin-type gold systems and
is based on regional observations and published studies; alternative interpretations may exist.
Structural pathways, reactive rocks, and
sources of heat, gold, sulfur, and iron are required for Carlin-type deposits to form. Large regional structures transecting reactive rocks create contacts, faults, and shears; these secondary structures create pathways and traps for hydrothermal
and metalliferous fluids. Mineralization at the Granite Creek Project exhibits the key geological, mineralogical, geochemical, and structural characteristics of Carlin-type gold deposits as described above.
6.3
Stratigraphic Column and Local Geology Cross-Section
The stratigraphy of the Osgood Mountains, from youngest to oldest, comprises Quaternary alluvium and basalt; Tertiary andesite/basalt flows,
rhyolitic tuffs, chert-shale-rhyolite clastics, and dacite/andesite dikes; the Cretaceous Osgood Mountains granodiorite/quartz diorite stock; Permian-Pennsylvanian Havallah Formation and Etchart Limestone; Pennsylvanian Battle Formation; and
Ordovician Valmy and Comus Formations overlying the Cambrian Preble Formation and Osgood Mountain Quartzite. Gold mineralization at the Property is primarily hosted in the Comus Formation, as shown in the stratigraphic column below (Figure 6-5) and the representative cross-section (Figure 6-6), which together illustrate the geometry of mineralization-controlling structural features, including faults and the
lithologic contact between the Upper and Lower Comus Formation.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
43
Source: SRK, 2026
Figure 6-5: Granite Creek Stratigraphic Column
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
44
Source: SRK, 2026
Figure 6-6: Cross-section A-A’ looking Northeast
showing Structure, Lithology and Mineralization
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
45
7
Exploration
Exploration techniques employed on the Property to define additional gold resources have consisted primarily of mapping, geochemical sampling,
geophysical surveys, and drilling. Use of these methods has resulted in the discovery of approximately one million ounces of gold in several open pit deposits. Atna became involved in Project planning in July 2004 and began drilling the Property in
August 2004 after execution of the earn-in agreement with PMC; i-80 Gold has not performed any new geophysical or surface geochemistry work. Exploration work other than
drilling is discussed in Section 7.1; drilling is discussed in Section 7.2; and hydrogeology and geotechnical data relevant to underground mine development are discussed in Sections 7.3 and 7.4.
7.1
Exploration Work (Other Than Drilling)
7.1.1
Procedures and Parameters Relating to the Surveys and Investigations
Cordex and its successor, PMC, explored the Property through geologic mapping and geochemical sampling, including a regional mapping program
from the Preble to the Getchell mines in the late 1970’s, a 1:6,000-scale mapping program of the Property in 1983, and a 1:2,400-scale mapping program of the
Pinson pit area through the active life of the mine. Bench mapping in the pits occurred during mining and was followed by detailed 1:1,200-scale mapping of the A, B, C, CX, Mag, CX West, and Blue Bell pits by
Tom Chadwick starting in 2000, completed under the Homestake / Barrick partnership agreement. In 2016, OMC contracted Robert Leonardson to complete a geological study focused on advancing the understanding of the structural framework and providing
exploration targeting guidance, including structural and geologic mapping of the open pits and underground exposures and construction of property-wide cross-sections. Numerous geophysical surveys have also been conducted on the Property, including
regional gravity and aeromagnetic surveys and detailed electromagnetic techniques — Induced Polarization (IP), Electromagnetics (EM), Magnetotellurics (MT), and Controlled Source Audio-frequency Magnetotellurics (CSAMT). A detailed gravity
survey was conducted by Magee Geophysical Services, LLC of Reno, Nevada in October 2006 (Figure 7-1), acquiring 2,587 gravity readings on a 100 m (328 ft) station spacing over approximately 27 square km (10
square miles); the results were interpreted by Fritz Geophysics in 2007.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
46
Source: Magee, 2006
Figure 7-1: Gravity Survey, 2,587 Stations, Magee Geophysical Services, 2006
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
47
In 2002, Quantec Geoscience was contracted to acquire TITAN 24 MT data over the Pinson
property. Six east-west lines were collected along the Rangefront, spaced on average around 610 m (2,000 ft) apart, with a dipole spacing along line of 91 m (300 ft). Quantec ran regular two-dimensional
inversions on the MT data to create resistivity depth sections (Figure 7-2).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
48
Source: i-80, 2026
Figure 7-2: Location of the MT Survey Lines on the Geology and Pit Locations (Left) and on the
Residual Gravity (Right)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
49
7.1.2
Sampling Methods and Sample Quality
Cordex collected 737 rock chip samples in conjunction with its mapping programs, assayed for gold, silver, arsenic, antimony, and mercury, with
select samples also analyzed for lead, zinc, copper, and manganese; the combined mapping/sampling programs were responsible for the discoveries of the Blue Bell and Felix Canyon deposits. PMC completed six float chip geochemical grids consisting of
8,756 samples covering the Mag deposit and along strike south of the A and B Pits. A biogeochemical sagebrush sampling program was conducted in the 1990s with inconclusive results. Under the Homestake/Barrick joint venture, an additional 312 rock
samples and 273 soil samples were collected on strike south of the existing pit areas and west of the A, B, C, and CX Pits. For underground channel sampling, Atna channel-sampled 14 ribs in the Ogee Zone and sent 74 rib and face samples out for
assay.
7.1.3
Information About the Area Covered
Historic mapping and geochemical sampling programs covered the Property from the Preble to the Getchell mines at regional scale, narrowing to 1:6,000-scale coverage of the Property (1983) and 1:2,400- to 1:1,200-scale coverage of individual pit areas through the active
mine life. The 2006 Magee gravity survey covered approximately 27 square km (10 square miles) on a 100 m (328 ft) station spacing (2,587 stations total). The 2002 Quantec TITAN 24 MT survey comprised six east-west lines along the Rangefront, spaced
on average around 610 m (2,000 ft) apart, with a 91 m (300 ft) dipole spacing along each line. Underground channel sampling in the Ogee Zone covered 14 ribs.
7.1.4
Significant Results and Interpretation
Mr. Leonardson’s 2016 structural study concluded that potential targets for additional gold mineralization occur at intersections of
the east-dipping, north-south faults (Rangefront/Mag) with the southeast-dipping CX-type faults, and at intersections of sub-vertical northwest-striking faults with CX-type faults; zones of limestone decarbonatization, such as those seen in the CX Pit, are also potential hosts for gold mineralization, indicating strong fluid/vapor flow through the rock mass. Identified areas
for further exploration include the intersection of the SOS and JP dikes on the south wall of the CX Pit (the largest block of decarbonatization on the Property); the Ogee pipe extension 457 to 549 m (1,500 to 1,800 ft) below the CX-C Pit, where historical hole HPC-070A intersected a 232 m (760 ft) interval of
low-to-moderate gold grades with high-grade mineralization near the proposed Ogee high-grade down-dip extension; the northern
continuation of the fault-propagated anticline in the western Mag Pit; the intersection of the Adam Peak Fault and the Mag Fault suite north of the Mag Pit; the CX-B Pit decarbonatization zone; and
decarbonatization zones on the Mag Pit west wall.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
50
Source: Fritz Geophysics, 2007
Figure 7-3: Pinson Local Gravity Interpretation
The existence of about 1,700 drillholes within the gravity survey area allowed a novel approach for interpreting the detailed gravity data
(Figure 7-3), correlating basement rock types defined by the basement gravity response with the general mapped geology. In 2008, Barrick interpreted the geophysical survey data at Pinson, combining the 2002 MT
survey, the 2006 gravity survey, and all available geological/geochemical information to define target areas requiring drillhole testing. Figure 7-4 through Figure 7-9
show MT resistivity depth inversions for each of the six survey lines, annotated with drilling, surface geological mapping, interpreted sectional geology, and structural targets.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
51
Source: i-80, 2026
Figure 7-4: MT Resistivity Depth Inversion for Line 6090
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
52
Source: i-80, 2026
Figure 7-5: MT Resistivity Depth Inversion for Line 12300
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
53
Source: i-80, 2026
Figure 7-6: MT Resistivity Depth Inversion for Line 13860
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
54
Source: i-80, 2026
Figure 7-7: MT Resistivity Depth Inversion for Line 15300
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
55
Source: i-80, 2026
Figure 7-8: MT Resistivity Depth Inversion for Line 17160
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
56
Source: i-80, 2026
Figure 7-9: MT Resistivity Depth Inversion for Line 19230
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
57
A small exploration drifting program was conducted on the upper ‘B’ zone by
Cordex in the 1970s to conduct bulk testing (results unavailable). In May 2005, Small Mine Development (SMD) of Boise, Idaho, was contracted by Atna to drive exploration drifts, crosscuts, and drill stations to evaluate the Range Front and CX
resource areas, completing 606 m (1,988 ft) of adit, 115 m (378 ft) of decline, and six diamond drill stations; a mineability test on the newly defined Ogee Zone extracted approximately 363 t (400 st) of material and indicated the possibility of drift-and-fill as a potential mining method. During 2008, approximately 211 m (693 ft) of development drifting was completed with significant geological data recorded in the
RFZ. Throughout 2024 and 2025, approximately 173.7 m (570 ft) of development drifting was completed for the South Pacific exploration drill program, which began June 2025 and concluded December 13, 2025, targeting SPZ mineralization with a
total of 16,531 m (54,235.7 ft) drilled to pre-feasibility-study-quality resource and reserve declaration density. Salient results of the Ogee Zone channel sample assays are summarized in Table 7-1; assays
indicated no high-grade mineralization except where the main drift intersected the Ogee Zone on the 4770 elevation.
Table 7-1: Salient Results of the Ogee Zone Channel Sample Assays
Sample No.
From ft
(m)
To ft
(m)
Length ft
(m)
Gold Grade opt
(g/t)
North Rib
RFUG-055
76 (23.1)
81 (24.7)
5 (1.5)
0.144 (4.94)
RFUG-056
81 (24.7)
85 (25.9)
4 (1.2)
0.445 (15.26)
RFUG-059
85 (25.9)
88 (26.8)
3 (0.9)
0.274 (9.39)
RFUG-061
88 (26.8)
93 (28.3)
5 (1.5)
1.448 (49.65)
RFUG-063
93 (28.3)
97 (29.6)
4 (1.2)
0.176 (6.03)
RFUG-064
97 (29.6)
101 (30.8)
4 (1.2)
0.739 (25.34)
RFUG-067
101 (30.8)
110 (33.5)
9 (2.7)
0.996 (34.15)
Weighted Average
34 (10.4)
0.682 (23.38)
South Rib
RFUG-081
77 (23.5)
80 (24.4)
3 (0.9)
0.106 (3.63)
RFUG-082
80 (24.4)
83 (25.3)
3 (0.9)
0.065 (2.23)
RFUG-083
83 (25.3)
93 (28.3)
10 (3)
1.082 (37.10)
RFUG-084
93 (28.3)
96 (29.3)
3 (0.9)
0.894 (30.65)
RFUG-086
96 (29.3)
99 (30.2)
3 (0.9)
0.355 (12.17)
RFUG-087
99 (30.2)
107 (32.6)
8 (2.4)
0.028 (0.96)
RFUG-088
107 (32.6)
112 (34.1)
5 (1.5)
0.228 (7.82)
Weighted Average
(10.7)
7.2
Exploration Drilling
7.2.1
Drilling Type and Extent
Since 1970, a total of 2,083 drillholes totaling 291,312 m (955,747.9 ft) have been drilled within the Property area by previous operators
(Figure 7-10) (drillhole data from prior to 1970 is no longer available). PMC and its predecessors, Rayrock Mines and the Cordex Syndicate, account for most of these holes (1,434 holes totaling 168,991.8 m
(554,435 ft)); Homestake drilled 165 holes totaling 48,831.3 m (160,207.7 ft) and Barrick drilled 166 holes totaling 37,195 m (122,031 ft), both acting as operators for PMC; Atna, the last company to operate at the Granite Creek Mine prior to i-80, drilled 318 holes totaling 36,293.8 m (119,074.1 ft). Table 7-2 presents a summary of this historical drilling; each period is described in further detail below.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
58
Source: i-80, 2026
Figure 7-10: Granite Creek Project Drill Plan by Operator
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
59
Table 7-2: Summary of Historical Drilling (pre i-80) on the Granite Creek Property Since 1970
Company
Surface RC
Surface Core
UG RC
UG Core
Total Holes
Total Footage
#
Holes
Footage
(ft)
#
Holes
Footage
(ft)
#
Holes
Footage
(ft)
#
Holes
Footage
(ft)
PMC
1,426
546,313.0
8
8,122.0
1,434
554,435.0
PMC (Homestake)
136
108,335.0
29
51,872.7
165
160,207.7
PMC (Barrick)
39
35,645.0
67
65,700.1
4
930.0
56
19,756.0
166
122,031.1
Atna
29
18,672.0
65
52,847.6
176
32,068.0
48
15,486.5
318
119,074.1
Total
1,630
708,965.0
169
178,542.4
180
32,998.0
104
35,242.5
2,083
955,747.9
Many holes drilled by PMC during this period were development holes drilled in and adjacent to existing
pits — over 1,400 holes within the A, B, C, CX, Mag, CX West, Felix, and Blue Bell pit areas, nearly all conventional rotary or RC; the eight core holes drilled (2,475.6 m (8,122 ft)) tested stratigraphy, metallurgy, or deep mineralized
structures in the B, C, CX, and Mag Pit areas (Table 7-3).
Table 7-3: PMC Drilling 1970 to 1996
Company
Surface RC
Surface Core
Total Holes
#
Holes
Footage
(ft)
Meters
(m)
#
Holes
Footage
(ft)
Meters
(m)
#
Holes
Total
Footage
(ft)
Total
Meters
(m)
PMC
1,426
546,313.0
166,516.2
8
8,122.0
2,475.6
1,434
554,435.0
168,991.8
Between 1997 and 2000, Homestake, as operator for PMC, drilled 165 holes, of which 136 (33,020.5 m
(108,335 ft)) were directed into the CX and RFF system (Table 7-4).
Table 7-4: PMC – Homestake Drilling 1997 to 2000
Company
Surface RC
Surface Core
Total Holes
#
Holes
Footage
(ft)
Meters
(m)
#
Holes
Footage
(ft)
Meters
(m)
#
Holes
Footage
(ft)
Meters
(m)
PMC (Homestake)
136
108,335.0
33.020.5
29
51,872.7
15.810.8
165
160,207.7
48,831.3
Four exploration holes were drilled by Barrick, operator at the time for PMC, to test extensions of the
CX Fault Zone near its projected intersection with the Mag Pit fault system; the drilling did not identify significant mineralized zones, and no additional work was conducted by Barrick (Table 7-5).
Table 7-5: PMC – Barrick Drilling 2003
Company
Surface RC
Surface Core
Total Holes
#
Holes
Footage
(ft)
Meters
(m)
#
Holes
Footage
(ft)
Meters
(m)
#
Holes
Footage
(ft)
Meters
(m)
PMC (Barrick)
3
3,340.00
1,018.0
1
3,003.30
915.4
4
6,343.30
1,933.4
Atna’s 2004 drilling followed up on mineralized zones previously identified by PMC and Homestake:
31 holes totaling 9,064.6 m (29,739.5 ft), comprising four RC holes and 27 core holes, with five objectives — improving grade / thickness definition where prior drilling was RC-only, infilling where
spacing exceeded 121.9 m (400 ft), expanding mineralized zones laterally and down-dip, obtaining rock quality data, and evaluating previously identified targets. Of the 31 holes, 13 (3,962.4 m (13,000 ft))
tested the CX Fault Zone and 18 (5,102.2 m (16,739.5 ft)) tested the RFF Zone (Table 7-6).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
60
Table 7-6: Atna Drilling 2004
Company
Surface RC
Surface Core
Total Holes
#
Holes
Footage
(ft)
Meterage
(m)
#
Holes
Footage
(ft)
Meterage
(m)
#
Holes
Total
Footage
(ft)
Total
Meterage
(m)
Atna
4
2,217.00
675.7
27
27,522.50
8,388.9
31
29,739.50
9,064.6
The 2005 to 2006 program aimed to define and delineate Measured and Indicated gold Mineral Resources in
the upper RFF Zone, testing the zone between 1,524 and 1,341 m (5,000 and 4,400 ft) amsl using both surface and underground drilling: 107 drillholes (16,818.9 m (55,180.1 ft)) in total, including 59 surface holes (12,098.6 m (39,693.6 ft), beginning
May 2005) and 48 underground holes (4,720.3 m (15,486.5 ft), beginning September 2005) in the Ogee, CX West, and Range Front targets (Table 7-7).
Table 7-7: Atna Drilling 2005 to 2006
Company
Surface RC
Surface Core
UG Core
Total Holes
#
Holes
Footage
(ft)
Meters
(m)
#
Holes
Footage
(ft)
Meters
(m)
#
Holes
Footage
(ft)
Meters
(m)
#
Holes
Total
Footage
(ft)
Meters
(m)
Atna
25
16,455.00
5,015.5
34
23,238.60
7,083.1
48
15,486.50
4,720.3
107
55,180.10
16,818.9
In August 2007, surface exploration and development drilling began using an Eklund RC drill rig and a
Major Drilling core rig, testing portions of the CX and RFF, the Ogee Zone, and the HPR104 area north of the Granite Creek Mine — 23 surface holes (5,765.7 m (18,916.2 ft)) were completed, with disappointing results (only thin, sub-economic zones of underground mining gold grades) (Table 7-8).
Table 7-8: PMC (Barrick) Drilling 2007
Company
Surface RC
Surface Core
Total Holes
#
Holes
Footage
(ft)
Meterage
(m)
#
Holes
Footage
(ft)
Meterage
(m)
Total
Holes
Total
Footage
Total
Meterage
(m)
PMC (Barrick)
7
4,935.00
1,504.2
16
13,981.20
4,261.5
23
18,916.20
5,765.7
Surface drilling began in January 2008 with three core drills and one RC drill testing areas north of
the CX West pit and the deep potential of the Getchell Fault system; underground exploration began in April 2008, rehabilitating existing workings and driving exploration headings into the Ogee and CX zones, followed by a second surface program in
August 2008 to twin RC holes suspected of downhole contamination. Total 2008 drilling comprised 29 surface RC holes (8,342.4 m (27,370 ft)), 50 surface core holes (14,848.5 m (48,715.6 ft)), four underground RC holes (283.5 m (930 ft)), and 56
underground core holes (6,021.6 m (19,756 ft)). Eight holes drilled north of the Pinson deposit to twin earlier drilling of the Range Front/Linehole Fault intersection (the HPR104 area) could not reproduce the earlier thick low-grade intercept (considered downhole contamination, and removed from the database), though follow-up core drilling intersected thin, higher-grade mineralization
structurally controlled by the Linehole Fault/Comus contact. Two deep drillholes (BPIN-010C to 867.3 m (2,845.5 ft) and BPIN-011A to 846.7 m (2,778 ft)) tested deep structural targets identified from the 2006 gravity survey; BPIN-010C returned
negative results, while BPIN-011A indicated a narrow, low-grade zone associated with decarbonatization and pyritized sediments (Table 7-9).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
61
Table 7-9: PMC (Barrick) 2008 Drilling
Company
Surface RC
Surface Core
UG RC
UG Core
Total
Holes
Total
Footage
#
Holes
Footage
(ft)
#
Holes
Footage
(ft)
#
Holes
Footage
(ft)
#
Holes
Footage
(ft)
PMC (Barrick)
29
27,370.0
50
48,715.6
4
930.0
56
19,756.0
139
96,771.6
In 2012, Atna completed four PQ-size core holes (636 m (2,086.5
ft)) to acquire column leach metallurgical samples from the Mag Pit resource area, plus 56 underground exploration RC holes (2,284.5 m (7,495 ft)) in the Ogee Zone (Table 7-10).
Table 7-10: 2012 Atna Mag Pit Core Drilling
Company
Surface Core
UG RC
Total Holes
#
Holes
Footage
(ft)
Meters
(m)
#
Holes
Footage
(ft)
Meters
(m)
#
Holes
Total Footage
(ft)
Meters
(m)
Atna
4
2,086.50
636.0
56
7,495.00
2,284.5
60
9,581.50
2,920.4
Between 2012 and 2015, Atna completed 120 underground RC holes totaling 7,489.9 m (24,573 ft), designed
to confirm continuity of mineralization and delineate stope configuration within the Ogee Zone for mining (Table 7-11).
Table 7-11: 2013 to 2015 Atna Underground Development RC Drilling
Company
UG RC
Total Holes
#
Holes
Footage
(ft)
Meters
(m)
#
Holes
Total Footage
(ft)
Meters
(m)
Atna
120
24,573.00
7,489.9
120
24,573.00
7,489.9
Figure 7-11 shows the drill plan of the Property in the area of
the 2021 Mineral Resource (red outline), coded by operator and time period, with section lines for the representative vertical sections presented in Section 7.2.3. All drilling described above predates
i-80’s involvement — i-80 had not conducted drilling on the Property at the time of the 2021 resource model.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
62
Source: i-80, 2026
Figure 7-11: Plan View Section Lines of Granite Creek Mine Project
The Granite Creek land position expanded in 2021, with infill drilling targeting the underground Mineral Resources. Table 7-12 lists the number of holes drilled within the current property boundary by type and operator, including holes drilled from surface and underground and Figure 7-12
throughFigure 7-14 no discoveries have been made beyond the core land package, and holes outside the core land package (all drilled by PMC) serve primarily to augment geological knowledge rather than
contribute to the resource estimate.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
63
Table 7-12: Drillholes Within the Current Property
Boundary by Type and Operator
Company
Core Holes
(includes RC
pre-
collar with Core Tail)
Core
Footage
RC
Holes
RC
Footage
Total
Holes
Total
Footage
i-80 Gold
438
306,929
645
99,252
1,083
406,181
Atna
113
68,334
205
50,740
318
119,074
PMC (Barrick)
123
85,456
43
36,575
166
122,031
PMC (Homestake)
29
51,872.7
136
108,335
165
160,208
PMC
8
8,122
1,426
546,313
1,434
554,435
Totals
711
520,714
2,455
841,215
3,166
1,361,929
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
64
Source: SRK, 2026
Figure 7-12: Drilling by Hole Type Completed by PMC
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
65
Source: SRK, 2026
Figure 7-13: Drilling by Type Completed by PMC with Barrick as Operator
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
66
Source: SRK, 2026
Figure 7-14: Drilling Completed by Atna
Drilling at Granite Creek is ongoing. The holes drilled by i-80 presented here were drilled from April
2021 through January 2026, with complete assay results by February 17, 2026 (the cutoff date for the current underground resource estimate). i-80 primarily uses core drilling for sample collection, with
most surface holes pre-collared using RC down to the water table and completed with HQ-size core, focused mainly on the Ogee and SPZ zones; underground holes were all
drilled as HQ-size core, focused on the Otto, Rangefront, Ogee, and SPZ zones. A Cubex RC rig is used by ore control geologists to assist short-term mining decisions. Figure
7-15 shows holes drilled by i-80.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
67
Source: SRK, 2026
Figure 7-15: Drilling Completed by i-80
7.2.2
Drilling, Sampling, or Recovery Factors
Initial surface collar locations are based on drill plan targeting, marked in the field by a geologist using a handheld GPS device loaded with
coordinates from Leapfrog Geo drill plans; drill rigs are aligned to the planned azimuth and inclination using north-seeking gyroscopic rig alignment tools, re-confirmed by the geologist. A final collar
location survey is performed by a professional contractor or i-80 Gold surveyor (UTM NAD83 Zone 11N international feet). Downhole surveys are performed by International Directional Services (IDS) of Elko on 50-foot intervals using a north-seeking gyroscopic downhole survey tool. Reverse circulation (RC) samples are collected by the drill contractor on five-foot intervals through a rotating splitter (cyclone), with
contamination minimized by regular cyclone cleaning and sample IDs/footage checked against a written sample log. Core is recovered via wire line core tube, boxed in labeled, partitioned waxed cardboard boxes in sequential order, with wooden blocks
marking
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
68
run footage and any drilling problems (caving, voids, core tube mismatches). Core recovery is measured as the ratio of recovered core length to drilled run length and has been excellent, at 99%
or greater, with any core loss (less than 1 m (2 ft)) limited to zones with stratigraphic voids. The authors believe the drilling procedures are adequate, and there are no drilling, sampling, or recovery factors that could materially impact the
accuracy and reliability of the results.
7.2.3
Drilling Results and Interpretation
Figure 7-16 through Figure 7-19 show representative vertical
sections through the four Open Pit areas (Mag, CX/C, A, and B), and Figure 7-20 shows a vertical section through the underground resource area, illustrating drilling results by operator and time period.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
69
Source: i-80, 2026
Note: Black line is a topographic surface. Not all items listed in the legend are on all sections
Figure 7-16: Vertical Section A-A’ of the Mag Pit
Area
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
70
Source: i-80, 2026
Note: Black line is a topographic surface. Not all items listed in the legend are on all sections.
Figure 7-17: Vertical Section B-B1 of the Pit CX and C Area
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
71
Source: i-80, 2026
Note: Black line is a topographic surface. Not all items listed in the legend are on all sections
Figure 7-18: Vertical Section C-C1 of the Pit A Area
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
72
Source: i-80, 2026
Note: Black line is a topographic surface. Not all items listed in the legend are on all sections
Figure 7-19: Vertical Section D-D1 of the Pit B Area
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
73
Source: i-80, 2026
Note: Black line is a topographic surface. Not all items listed in the legend are on all sections
Figure 7-20: Vertical Section E-E1 of the Underground
Resource Area
Example sections showing drilling in the underground resource area are shown in Figure
7-21 through Figure 7-24. Holes drilled by i-80 are labeled with hole name and shown with thicker traces; faults and mineralized
envelopes modeled at 0.1 oz Au (3 g) cut-off grade are shown for reference.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
74
Source: SRK, 2026
Figure 7-21: Plan View Showing Section Locations through the Underground Resource Area
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
75
Source: SRK, 2026
Figure 7-22: Section A-A’ Showing Drilling in the CX
Zone, 30.5 m (100 ft) thick, looking North
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
76
Source: SRK, 2026
Figure 7-23: Section B-B’ Showing Drilling in the
Otto and Ogee Zones, looking North
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
77
Source: SRK, 2026
Figure 7-24: Section C-C Showing Drilling in the SPZ, 130 m
(100 ft) thick, looking North
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
78
7.3
Hydrogeology
The geotechnical database developed by i-80 Gold comprises approximately 6,096 m (20,000 ft) of
geotechnically logged core from 40 drillholes, mostly since 2024, intersecting all major geotechnical units relevant to proposed mine development. Hydrogeological data — water table measurements, pore pressure distribution, and groundwater
flow direction — are collected in conjunction with exploration and geotechnical investigations, supplemented once mining commenced by in-pit and underground operational data. Groundwater dewatering and
monitoring wells are the primary data-collection method, supplemented by pore pressure data from vibrating wire piezometers (VWPs) and hydrologic testing (injection/slug tests, air-lift tests, short- and
long-term pumping tests, and spinner logging), analyzed using industry-standard analytical methods. Analytical and numerical groundwater flow models have been developed using hydraulic parameters from testing, 3D geological modeling, and historic
site data. From approximately 1980 through 2008, 14 dewatering wells and 42 monitoring wells were completed; from 2022 through 2025, 23 VWPs were installed in the underground mining area, with additional dewatering wells completed or deepened in
2023, 2024, and 2025 to 2026. There are currently 4 active dewatering wells, 41 active monitoring wells, and 16 active VWPs across 6 locations (Figure 7-25), with pumping rates ranging from 100 to 750 gpm.
Monitoring wells are sampled routinely and analyzed for the State of Nevada Profile I suite at certified laboratories (currently Western
Environmental Testing Laboratory and Pace Analytical, Reno, NV), per permitting requirements; monitor wells and piezometer-equipped exploration drillholes are monitored for water levels and piezometric heads, and surface water is measured and
sampled routinely as required by permits. The Project area has been the subject of multiple hydrogeologic characterization studies by successive owners/operators (WMC 1998, 2000, 2002, and 2005; SWS 2014; Piteau Associates 2018), and more recently i-80 has contracted LRE Water (formerly HydroGeoLogica, now part of Spheros Environmental) for groundwater level and pore pressure monitoring, dewatering well planning and oversight, and groundwater flow modeling
(Figure 7-26).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
79
Source: i-80, 2026
Figure 7-25: Well Locations
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
80
Source: i-80, 2026
Figure 7-26: Timeline for Hydrogeologic Characterization with Relationship to Mining
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
81
The Granite Creek Mine lies in the Great Basin region of the Basin and Range Physiographic
Province, a closed drainage system; Granite Creek is an ephemeral stream sourced from seasonal snowmelt, diverted and routed around the CX Pit and typically infiltrating into permeable alluvial deposits within 762 to 1,500 m (2,500 ft) downgradient,
with mean annual flow estimated at 0.28 cfs. High spring flows have historically been routed to the floor of the mined-out A and B pits, infiltrating into the CX shear zone, which is hydrologically connected
to the CX Pit and underground development. Two groundwater systems are recognized: an alluvial system, moving south-southeast toward the Humboldt River and well understood from historical monitoring, with saturated alluvium concentrated east and
southeast of the Mag Pit; and a bedrock system, controlled predominantly by stratigraphy and geologic structure, with major faults acting as either groundwater flow pathways or gouge-filled barriers, favoring hydraulically isolated fault-bounded
bedrock blocks.
The Mag Pit, excavated mostly in Upper Comus calcareous mudstones, siltstones, and carbonaceous shales, was dewatered from
1987 through April 1998 (initially by sumps, then dewatering wells #12 and #13 from 1991), after which the pit lake was rapidly filled in 2000 and has since generally declined with alluvial groundwater levels, reaching an elevation of 1,411.3 m
(4,630.3 ft) amsl as of January 2026. The CX Pit and underground mine workings lie along east-northeast-trending, steeply southeast-dipping shear zones in the Lower Comus Formation; the CX block has been dewatered from 2007 to present via four
operating dewatering wells (APW-1, BPW-3, BPW-5, and GCW-6) at a combined average rate of
approximately 1,450 gpm, supplemented by approximately 1,350 gpm of underground sump pumping. Water from dewatering wells not used operationally is discharged to four permitted rapid infiltration basins (RIBs), with two additional cells constructed
in Q2 2026; wells with elevated arsenic (APW-1, BPW-5, GCW-6) require treatment prior to discharge at the Water Treatment Plant
(WTP), with a second WTP planned for Q3 2026 to increase capacity to 4,000 gpm.
Spheros Environmental (formerly LRE Water) constructed and
calibrated a numerical groundwater flow model to historic water level measurements and passive inflow rates, used to evaluate the effectiveness of current dewatering wells and estimate passive inflow into the underground workings (UGWs) for the
current Life of Mine plan through 2032 (Figure 7-27). The model simulates current dewatering wells plus two additional wells (GCW-14 and
GCW-15) coming online in Q3 2026 at a conservative 500 gpm each. Passive inflow is predicted at approximately 1,050 gpm in Q1 2026, rising to a maximum of 1,500 gpm in Q1 2029 before leveling as mining
progresses primarily within an already-established cone of depression. The model was also used to estimate groundwater elevation at the Otto, Ogee, and SPZ ore bodies, all of which are predicted to remain below their starting vertical centroid
elevations, with the SPZ and Ogee expected to see more drawdown than Otto due to greater nearby UGW development and proximity to dewatering wells (Figure 7-28). The model results are considered a reasonable
representation of predicted groundwater levels and passive inflow, given good calibration to local historical data; modeling work is ongoing and is being refined as additional data becomes available (Figure
7-29).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
82
Source: i-80, 2026
Figure 7-27: Predicted Passive Inflow and Dewatering Well Pumping
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
83
Source: i-80, 2026
Figure 7-28: Predicted Groundwater Elevation in the Vicinity of Ore Bodies: Otto, Ogee, and South
Pacific
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
84
Source: i-80, 2026
Figure 7-29: Predictive and Passive Inflows from Scenarios One and Two
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
85
7.4
Geotechnical Data, Testing and Analysis
The geotechnical database developed by i-80 Gold comprises approximately 6,096 m (20,000 ft) of
geotechnically logged core from 40 drillholes distributed throughout the Project area, mostly drilled since 2024 using HQ-diameter core, intersecting all major geotechnical units relevant to proposed mine
development (the Upper Comus, Lower Comus, and SPZ fault-hosted mineralization). Geotechnical Rock Mass Rating (RMR) logging was completed on the drill core, providing the basis for geotechnical domains, rock mass classifications, representative
design parameters, and ground support recommendations for underground mine development, discussed further in Mining Methods (Item 13). The dataset was supplemented by independent WSP photo-logging of three complete and four partial core holes as
part of the data verification program. Rock fabric characterization was completed using optical and acoustic televiewer surveys from 11 drillholes, used to define the orientation and spacing of bedding and major joint sets, develop stereographic
projections of the principal structural domains within the Upper and Lower Comus units, and support kinematic analyses of structurally controlled failure mechanisms and excavation orientation assessments. Dedicated core holes were also drilled along
the proposed Vent Raise 1 and Vent Raise 2 alignments to support geotechnical stability assessments for those excavations.
7.5
Property Plan View
A plan view of the Property showing drillhole locations, coded by operator and significant time period, is presented as Figure 7.2.1-2.
7.6
Exploration Target
Exploration targets consist of five zones at Granite Creek: the CX Fault depth/north extension, Rangefront and Adam Peak, the Ogee Zone, SPZ
infill and depth extension, and the SPZ/ Rangefront /Mag structural intersection.
Rangefront and Ogee are prioritized ahead of active and
planned underground development to reduce the risk of mining ahead of drill data, while the CX Fault program advances the known oxide-to-sulfide transition at depth. If
successful, the program has the potential to add additional Mineral Resources at Rangefront, Adam Peak, Ogee, and the SPZ / Rangefront / Mag intersection, and to upgrade a portion of the existing SPZ Inferred resource to the indicated category. In
addition, mineralization drilled at the CX fault target could result in this area being brought into the mine plan in the near future, allowing flexibility in the mine plan for more active faces and mined tonnage.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
86
8
Sample Preparation, Analysis and Security
8.1
Sample Preparation Methods and Quality Control Measures
The Granite Creek drillhole database comprises two distinct data sets that differ materially in operator, laboratory, analytical method, sample
security practice, and QA/QC framework: historical (pre-i-80) drilling conducted between 1970 and 2016 under successive operators (PMC,
PMC-Homestake, PMC-Barrick, Atna Resources, and Atna Underground), and i-80 Gold Corp drilling conducted from program inception
in April 2021 through Q1 2026. Sample preparation procedures applied prior to shipment for the historical era were not consistently recorded for the earliest programs (PMC 1970-1996); from 1997 onward, core was logged, and split samples (Jones split
or equivalent) were prepared for shipment to the contract laboratory of record. Under the i-80 Gold program, diamond core drilling predominates, with reverse-circulation drilling used only for pre-collar sections that are logged but not routinely production-sampled. Core is transferred from the core barrel to a wax-impregnated box at the drill rig, washed, and
delivered to i-80 Gold’s Lone Tree core shed for logging and sampling. Logging captures recovery, Rock Quality Designation (RQD), lithology, alteration, oxidation, structure, and sulfide mineralization.
Sample intervals are assigned by a project geologist subject to the rules that a sample must not cross a geological contact or an obvious alteration/oxidation boundary, and a sample length must not exceed 3 m (10 ft); average core sample length from
2023 through Q1 2026 has been approximately 1.3 to 1.5 m (4.3 to 4.8 ft). Core is cut lengthwise with a 5 hp diamond saw using a 14-inch diamond-impregnated blade; soft, clay-rich, or rubbly intervals are
split rather than sawn to preserve sample integrity. The half-core sample is bagged in a heavy-duty Protexo plastic bag with a stapled paper sample tag, tied closed, and held for collection; the remaining half-core is returned to the original core
box and stored under weather-resistant pallet coverings at the Lone Tree facility.
Sample security and chain of custody have been
maintained throughout the i-80 Gold program. Sample bags are collected from the Lone Tree core shed directly by laboratory personnel (ALS or MSA, depending on the program year) and transported by the
laboratory to its preparation facility. Each sample carries a unique numeric tag stapled to the bag, and bags are tied closed for transport. Each hole is tracked under a dedicated dispatch (prefix MSAGCS25_xxxx for surface and MSAGCU25_xxxx for
underground holes processed by MSA Labs) and a corresponding laboratory work-order number. No chain-of-custody breaches have been reported over the period. Drilling
activity predating 2005 predates formal documentation of these procedures; sample security practices for the historical era prior to that point are not separately documented in the source records available to the QP.
8.2
Sample Preparation, Assaying and Analytical Procedures
Historical (pre-i-80) sample preparation and analysis were
performed by a succession of operator-selected laboratories, summarized in Table 8-1: ALS Chemex (Reno, NV) for PMC-Homestake (1997-2000), crushing to -10 mesh with a 300 g Jones split, pulverizing to -150 mesh, and 30 g fire assay with AA finish (detection limit 5 ppb); American Assay Laboratories (AAL, Sparks, NV) for PMC-Barrick (2000-2008), one-assay-ton fire assay with AA finish and multi-element 69-element
aqua-regia ICP-AES analysis; Inspectorate American Laboratories (IAL, Reno, NV; ISO 9002 accredited) for Atna’s surface program (2004-2013), a two-stage crush and
300 g Jones split pulverized to greater than 90% passing -150 mesh with 30 g fire assay and AA finish; and an on-site mine laboratory adjacent to the administration
building for Atna’s underground program (2011 to 2016), following the same general jaw-crush/Jones-split/pulverize/30 g fire-assay-charge sequence. No relationship between these historical laboratories
and the registrant (i-80 Gold Corp, which did not yet hold the property) is applicable.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
87
Table 8-1: Historical (pre-i-80) Operators, Periods, and Analytical Laboratories at Granite Creek
Operator
Period
Laboratory
Primary Au method
PMC
1970-1996
Not recorded
AA on cyanide leach; FA-AA above 0.01 oz/t
PMC-Homestake
1997-2000
ALS Chemex (Reno)
30 g FA-AA
(Au-AA23); FA-Gravimetric overlimit
PMC-Barrick
2000-2008
American Assay Labs (Sparks)
1 AT FA-AA;
FA-Gravimetric above 5 ppm
Atna (Surface)
2004-2013
Inspectorate American Labs (Reno)
30 g FA-AA; gravimetric above 3 g/t
Atna Underground
2011-2016
On-site mine laboratory
30 g FA on -150 mesh pulp
All sample preparation and analytical work performed under i-80
Gold’s tenure has been completed by independent commercial laboratories holding internationally recognized accreditations (ISO/IEC 17025 for analytical testing, ISO 9001 for quality management) — neither laboratory is affiliated with or
related to the registrant. ALS (Sparks and Elko, Nevada) was the sole laboratory in 2023 and 2024 and remains in use in parallel with MSA Labs from Q1 2026 for confirmation check-assay work. ALS sample preparation follows protocol PREP-31 (PREP-31AY in 2026): air-drying, whole-sample crushing to better than 70% passing 2 mm, riffle/rotary splitting to a 250 g subsample, and pulverizing to better than
85% passing 75 microns. MSA Labs (355 W River Street, Elko, Nevada) became the principal laboratory in 2025, following codes CRU-CPA (crushing to 2 mm and splitting to 500 g),
SPL-410 (riffle splitting to a 250 g subsample), and PPU-510 (pulverizing to better than 85% passing 75 microns). Coarse reject and pulp are retained at the laboratory
for follow-up work.
The principal analytical change over the
i-80 Gold program has been the transition of the primary gold method from conventional fire assay to Chrysos Photon Assay beginning in 2025. Through 2023 and 2024, gold was determined by ALS method Au-AA23, a 30 g fire-assay fusion with atomic-absorption finish (working range 0.005 to 10 ppm Au), with samples above the upper limit re-assayed by gravimetric finish (Au-GRA21, working range 0.05 to 10,000 ppm); a 35-element aqua-regia/ICP-AES suite (ME-ICP41)
was also determined. Beginning in 2025, gold was determined by MSA method CPA-Au-1 (Chrysos Photon Assay, detection limit 0.015 ppm Au), a
non-destructive X-ray activation technique analyzing a substantially larger effective sample mass (typically 400 to 600 g) than conventional 30 g fire assay;
multi-element analysis under the MSA program uses a four-acid ICP-MS suite (IMS-230, 50-plus elements) with mercury by aqua-regia
ICP-MS (IMS-130-Hg). In Q1 2026, the tail of the 2025 underground program was submitted to ALS in parallel with the MSA Photon
Assay program (Au-AA23/Au-GRA21, with a 48-element four-acid ICP-MS suite, ME-MS61m); samples from the new iGU26 hole series are excluded from the PFS database cut-off and will be incorporated in future updates.
8.3
Quality Control Procedures/Quality Assurance
From 2005 to 2015, drilling programs under Atna Resources (surface, 2005-2013), Barrick (2005-2008), and the Atna underground operation
(2011-2016) incorporated systematic QA/QC sample insertion (certified reference materials [CRMs], blanks, and field and preparation duplicates) into the sample stream; no QA/QC data is available for work conducted prior to 2005. QA/QC performance
from these pre-i-80 programs was reviewed in the Granite Creek IA Technical Report (March 2025)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
88
by the previous QP (GRE), and SRK has independently regenerated the historical control charts from the legacy assay database to verify the previous QP’s conclusions (Figure 8.3-1 through Figure 8.3-3). A total of 1,081 CRMs were inserted between 2005 and 2015 (555 by Atna in 2005, 2006, 2013, and 2015; 526 by Barrick in 2007, 2008, and 2012),
drawn from thirty-seven Rocklabs (New Zealand) and CDN Resource Laboratories (Vancouver, BC) standards at insertion rates averaging 2.7% (peak 5.5%; generally 1-in-20 to
1-in-25 samples); the principal CRMs, certified gold values, and insertion counts are summarized in Table 8-2. A total of 1,249
blank samples were reviewed, of which 270 exceeded the five-times-detection-limit threshold (maximum 1.02 ppm Au, four notable outliers); the previous QP concluded blank contamination was not material to the resource estimate. A total of 287
duplicate samples were reviewed, with field-duplicate scatter returning an R-squared of 0.93 (increased scatter at higher grades attributed to inhomogeneous coarse-gold distribution); duplicate type is not
preserved in the legacy database, so historical pairs are combined under a conservative ±30% field-duplicate envelope (Figure 8-1 through Figure 8-3).
Table 8-2: Historical
(pre-i-80) CRMs at Granite Creek — Certified Au Values and Insertion Counts
CRM
Supplier
Certified Au
(ppm)
± SD
(ppm)
N
(Au inserts)
CDN-GS-7J
CDN Resource Labs
7.34
0.29
194
OxD57
Rocklabs
0.413
0.012
181
CDN-GS-P6E
CDN Resource Labs
0.572
0.031
163
CDN-GS-8C
CDN Resource Labs
8.59
0.52
160
SF23
Rocklabs
0.831
0.027
137
OxH52
Rocklabs
1.291
0.025
130
SG31
Rocklabs
0.996
0.028
116
OxI54
Rocklabs
1.868
0.066
113
CDN-GS-30C
CDN Resource Labs
32.14
0.89
112
OxG60
Rocklabs
1.025
0.028
106
CDN-GS-P1A
CDN Resource Labs
0.143
0.008
105
OxC58
Rocklabs
0.201
0.007
104
SJ32
Rocklabs
2.645
0.068
102
OxF53
Rocklabs
0.810
0.029
95
OxK48
Rocklabs
3.557
0.042
94
OxA59
Rocklabs
0.0817
0.0052
91
OxN49
Rocklabs
7.635
0.189
82
SI25
Rocklabs
1.801
0.044
68
SK33
Rocklabs
4.041
0.103
65
OxP50
Rocklabs
14.890
0.493
37
SN26
Rocklabs
8.543
0.175
22
Other (16 Rocklabs / CDN CRMs)
Rocklabs / CDN
0.024 -14.99 (range)
varies
< 20 each
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
89
Source: SRK, 2026
Figure 8-1: Historical Rocklabs CRM Control Chart (OxD57, Representative)
Source: SRK, 2026
Figure 8-2: Historical Blank Control Chart, 2005 to 2018
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
90
Source: SRK, 2026
Figure 8-3: Historical Combined Duplicate Scatter, 2005 to 2018
i-80 Gold Corp acquired the Granite Creek Property in 2021 and commenced drilling in April 2021. From
program inception through 2025 (the PFS database cut-off), approximately 1,065 drillholes have been sampled and analyzed under a formal QA/QC program designed and implemented by
i-80 Gold Corp. The program is a four-stream design comprising CRMs, coarse blanks, sample (field) duplicates, and preparation duplicates, supplemented by independent third-party check assays —
consistent with current industry best practice. From 2023 onward, the program has targeted an overall control-sample insertion rate of 20% of submitted samples (approximately greater than 5% each of CRMs, blanks, and field duplicates, and greater
than 2.5% preparation duplicates), exceeding the typical 1-in-20 (5%) per-stream insertion rate observed in recent industry
surveys of SK-1300 technical reports. The 2021 and 2022 programs, conducted under a transitional QA/QC framework reviewed by the previous QP, operated at lower aggregate insertion rates of approximately 13% to
21%.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
91
CRMs are inserted at approximately one per twenty samples, with CRM identity rotated to
maintain coverage across the expected grade range. Acceptance follows the Shewhart control chart convention: assays within ±2 standard deviations (2SD) of the certified inter-laboratory mean are ‘in control’; assays between 2SD
and 3SD are ‘warning’ values triggering batch review; and assays beyond 3SD are treated as batch failures requiring corrective action, using standard deviations published by the CRM supplier (Rocklabs, CDN Resource Laboratories, or
Oreas). The CRM catalog has evolved over the program (Table 8-3): the 2021 and 2022 programs used CDN Resource Laboratories Carlin-style standards (CDN-GS-7J, CDN-GS-8C, CDN-GS-30C, CDN-GS-P1A, CDN-GS-P6E); 2024 introduced Oreas Carlin-style standards (OREAS-277, OREAS-279, OREAS-282); and 2025 onward added OREAS-238B, OREAS-241, and OREAS-241B.
During QP review, a subset of records carrying a mismatched CRM label were identified as wrong-standard inserts or data-entry transcription errors (rather than genuine laboratory failures) and were excluded from the CRM performance assessment; the
issue has been raised with i-80 Gold for database hygiene remediation. SRK has regenerated CRM control charts for each of the principal standards used over the period (Figure
8-4 through Figure 8-9).
Table 8-3: i-80 Gold CRM Catalog Used at Granite Creek, 2021 to 2026 (year-to-date) — Certified
Au Values and Insertion Counts
CRM
Supplier
Certified Au (ppm)
± SD (ppm)
n (Au inserts)
Period used
CDN-GS-30C
CDN Resource Labs
32.14
0.445
500
2021-2025
CDN-GS-P6E
CDN Resource Labs
0.572
0.0155
402
2022-2024
CDN-GS-P2B
CDN Resource Labs
0.433
0.011
385
2022-2025
CDN-GS-7J
CDN Resource Labs
7.34
0.145
354
2022-2026
OREAS-277
Oreas
3.39
0.18
258
2024-2026
OREAS-282
Oreas
14.05
0.3855
248
2024-2026
OREAS-279
Oreas
6.55
0.327
196
2024-2026
OREAS-238B
Oreas
3.16
0.10
140
2025-2026
OREAS-241
Oreas
7.06
0.15
127
2025-2026
CDN-GS-P1A
CDN Resource Labs
0.143
0.012
84
2021-2022
CDN-GS-8C
CDN Resource Labs
8.62
0.72
83
2021-2022
OREAS-241B
Oreas
7.058
0.163
45
2025-2026
CDN-GS-20C
CDN Resource Labs
19.67
0.381
13
2025
OREAS-273
Oreas
10.76
0.50
9
2025-2026
OREAS-264
Oreas
0.307
0.0185
5
2025
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
92
Source: SRK, 2026
Figure 8-4:
CDN-GS-7J Control Chart, i-80 Era
Source: SRK, 2026
Figure 8-5:
CDN-GS-30C Control Chart, i-80 Era
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
93
Source: SRK, 2026
Figure 8-6:
CDN-GS-P6E Control Chart, i-80 Era
Source: SRK, 2026
Figure 8-7: OREAS-277 Control Chart, i-80 Era
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
94
Source: SRK, 2026
Figure 8-8: OREAS-279 Control Chart, i-80 Era
Source: SRK, 2026
Figure 8-9: OREAS-282 Control Chart, i-80 Era
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
95
Coarse blanks (Vigoro brand crushed marble chips) are inserted to monitor the full
sample-preparation circuit for contamination or carry-over, placed where possible directly behind the highest-grade samples in each batch. The acceptance threshold is set at five times the analytical lower limit of detection (LLD; 0.025 ppm Au for
the conventional fire-assay methods used through 2024, held at the same conservative level for Photon Assay despite its slightly higher 0.015 ppm Au detection limit); LLDs and thresholds by method are summarized in Table 8-4. The i-80 era blank control chart regenerated by SRK (Figure 8-10) shows 89.8% of blank inserts (2,112 of 2,353) below the
5×LLD design threshold; 241 exceed it. Applying a materiality floor at 10×LLD (0.05 ppm Au) reclassifies 74 of the 241 exceedances as within acceptable range, yielding a revised pass rate of 92.9% (2,186 of 2,353). Of the remaining 167
failures, 128 (76%) were assayed at the Lone Tree in-house laboratory, spread across 2022 through 2025 rather than confined to a single period — discussed further under Opinion on Adequacy as a
laboratory-performance matter.
Table 8-4: Lower Limit of Detection (LLD) and 5xLLD Blank
Acceptance Threshold by Gold Analytical Method
Method
Lab
LLD (ppm Au)
5×LLD threshold
(ppm)
Au-AA23
ALS
0.005
0.025
Au-GRA21
ALS
0.05
0.25 (held at 0.025 conservatively)
ME-ICP41
ALS
0.001
0.005
ME-MS61m
ALS
0.005
0.025
CPA-Au-1
MSA
0.015
0.075 (held at 0.025 conservatively)
IMS-230
MSA
(multi-element)
n/a
Source: SRK, 2026
Figure 8-10: i-80 Era Blank Control Chart, 2021 to Q1
2026
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
96
Two duplicate streams are run: sample (field) duplicates, prepared at the Lone Tree core shed
by quarter-splitting selected core intervals (one quarter primary, one quarter duplicate — chosen over half-core duplication to preserve a portion of the original core for future reference), monitoring in situ sampling variance plus all
downstream preparation and assay variance; and preparation duplicates, prepared at the laboratory from the coarse-crushed reject of selected samples, monitoring laboratory preparation and analytical variance alone. The QP applied the duplicate-pair
regression framework of Thompson and Howarth (1978), with tolerance envelopes reflecting the additivity of in situ sampling, preparation, and analytical variance across stages: ±10% mean relative difference (MRD) for lab (pulp/analytical)
duplicates, ±20% MRD for preparation duplicates, and ±30% MRD for field (quarter-core) duplicates, reflecting the nuggety distribution of gold in Carlin-style mineralization (Table 8-5).
Preparation duplicates are additionally expected to return an R-squared of 0.99 or better across the analytical method’s mineralized working range. SRK has regenerated the duplicate scatter plots for the
i-80 era (Figure 8-11 through Figure 8-13).
Table 8-5: Duplicate Tolerance Envelopes Applied to the
i-80 Gold Drillhole Assay Database
Duplicate type
Variance sources
Envelope (MRD)
Basis
Lab (pulp)
Analytical only
±10%
QP-adopted basis: 9% RP observed for pulp >2 g/t Au
Preparation
Prep + analytical
±20%
QP judgment + typical CVAVE for Carlin-style prep
Field
(quarter-core)
In-situ + prep + analytical
±30%
QP judgment + typical CVAVE for nuggety Carlin-style gold
Historical (combined)
Type not preserved in
legacy DB
±30%
Conservative; assumes field-equivalent
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
97
Source: SRK, 2026
Figure 8-11: Field (Quarter-core) Duplicate Scatter, i-80
Era
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
98
Source: SRK, 2026
Figure 8-12: Preparation (Coarse Reject) Duplicate Scatter,
i-80 Era
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
99
Source: SRK, 2026
Figure 8-13: Lab (Pulp / Analytical) Duplicate Scatter, i-80
Era
Annual QA/QC insertion counts for the 2021 through Q1 2026 i-80 Gold drilling programs are
summarized in Table 8-6. The 2021 and 2022 reviews are drawn from the previous QP’s analysis in the Granite Creek IA Technical Report (March 2025); the 2023 through Q1 2026 reviews are based on the eight
quarterly QA/QC reports issued by i-80 Gold Corp.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
100
Table 8-6: Annual QA/QC Insertion Summary, i-80 Gold Drillhole Sampling at Granite Creek, 2021 to 2026
Year
Au-method
CRM
Au-method
Blank
Field dup
Prep dup
Lab dup
Check assay
Total
2021
109
122
89
94
1,568
0
1,982
2022
825
844
688
356
683
0
3,396
2023
260
169
116
113
78
69
805
2024
332
237
152
95
129
54
999
2025
970
741
386
388
1,081
411
3,977
2026 (YTD)
353
240
99
139
330
9
1,170
Total
2,849
2,353
1,530
1,185
3,869
543
12,329
2021
Approximately 69 holes drilled (20 surface diamond core, 9 metallurgical, 40 underground diamond core). The previous QP reviewed 1,395
drillhole samples with control samples inserted at 3.9% CRMs, 3.7% blanks, 2.4% field duplicates, and 2.7% preparation duplicates using five Carlin-style CDN standards; performance was acceptable, with no systematic CRM bias, blanks predominantly
below the detection-limit threshold, and preparation-duplicate R-squared of 0.99.
2022
Approximately
154 holes drilled (30 surface diamond core, 56 underground diamond core, 62 underground production core, 5 underground Cubex, 1 water well). The previous QP reviewed a three-hole, 800-sample sub-set with control samples inserted at 5.9% CRMs, 6.4% blanks, 6.0% field duplicates, and 3.0% preparation duplicates; performance was again acceptable. Beginning with 2023, the QA/QC framework was formalized to
the current 20% target insertion rate.
2023
Approximately 278 holes drilled, including a twelve-hole deep SPZ infill program (~5,904 m / 19,369 ft). Control samples were inserted at the
20% program target using CDN-GS-30C, CDN-GS-7J, and CDN-GS-P6E; SRK’s regenerated control charts show no consistent CRM bias, and all duplicate variance fell within acceptance. 69 check-assay samples (8 holes) were submitted to American Assay
Laboratories (AAL).
2024
Approximately 185 holes drilled, continuing the deep SPZ infill program. The principal QA/QC change was migration from CDN to Oreas standards (OREAS-277/279/282). One CRM exceedance was investigated and resolved by re-assay; duplicate variance was within acceptance for most pairs. 54 check-assay samples (3 holes)
were submitted to AAL.
2025
Approximately 379 holes drilled, marking a substantial expansion with the introduction of underground production drilling. SRK’s
regenerated control charts show weighted-average observed-to-certified ratios of 84.6% (Q3) and 98.1% (Q4); OREAS-238B/241/241B remained within ±1.5% of certified
in both quarters, while OREAS-282 averaged 82.0% of certified in Q3 before recovering to 96.0% in Q4 — carried forward as a corrective-action item under Opinion on Adequacy, below. 93.7% of 741 blanks
returned values below the 5×LLD threshold. Q4 2025 included the program’s first material check-assay round: 209 samples (10.5% QC) submitted to a third-party laboratory, with 93.0% of primaries within ±15% of the check result.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
101
Q1 2026
Drilling continued as the tail of the 2025 SPZ infill campaign and the start of 2026 exploration drilling targeting the Ogee, Otto, Adam Peak,
and Range Front fault systems; the PFS database cut-off restricts the dataset to holes iGU25-37, iGU25-37A, and iGU25-38. Two laboratories were used in parallel (MSA for iGS25/iGU25-prefix holes; ALS for the new iGU26 prefix), with overall control-sample insertion of 19.5% (214 of 1,097 samples). ALS blank failures were
attributed to minor pulverizer carry-over, with a procedural correction implemented; four OREAS-282 failures on the ALS gravimetric method were due to undersized pulp aliquots, and CRM submitted mass has been
increased going forward. A cross-laboratory check assay (24 MSA Photon Assay pulps re-analyzed by ALS fire assay) returned R = 0.9972 with a small negative bias of
-3.48% (ALS lower than MSA).
i-80’s Check Sample
Report identifies check-assay activity in every year from 2023 onward — 69 samples (8 holes) in 2023, 54 (3 holes) in 2024, 411 (37 holes) in 2025, and 9 (2 holes) in Q1 2026, totaling 543 samples across 49 holes. Lab destination was
determined by cross-referencing each sample’s check-side assay-method code against the corporate QC database: the 2023-2024 population (123 samples) is American Assay Laboratories, and the 2025-Q1 2026
population (420 samples) is ALS — both independent third-party laboratories. Across the full 543-sample population, SRK’s check-assay precision analysis (Figure
8-14) found a mean bias of -6.5% and a median of -3.5% (check assay relative to primary), with 75.3% of pairs within ±10%.
Documented corrective actions include: re-assay of the bracketed batch following the Q3 2024 OREAS-279 failure (all bracketed primaries confirmed within tolerance on re-run); flagging of a Q1 2024 sample-duplicate failure for follow-up coarse-reject re-assay; instruction to submit twice the prior CRM
material mass for check-assay submissions following the Q4 2025 undersized-aliquot findings; and a procedural correction at the ALS pulverizer sequence following the Q1 2026 blank carry-over findings.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
102
Source: SRK, 2026
Figure 8-14: Check Sample Report Primary vs. Check Assay Scatter, Au, 2023 to 2026
8.4
Opinion on Adequacy
Based on review of the eight quarterly QA/QC reports issued by i-80 Gold Corp over the period Q3 2023
to Q1 2026, the previous QP’s review of the 2021 and 2022 programs in the Granite Creek IA Technical Report (March 2025), the prior QPs’ reviews of the historical
(pre-i-80) data, and the Q1 2026 Photon Assay method-validation study, the QP concludes the following. Historical (pre-i-80) sample preparation, analytical, and QA/QC procedures from 2005 to 2016 are documented in prior technical reports and have been accepted as adequate for mineral resource estimation by all prior QPs,
including in the most recent (March 2025) IA Technical Report; no QA/QC data is available for the pre-2005 portion of the historical dataset, but the volume of subsequent drilling under the modern QA/QC
framework is sufficient to support the mineral resource estimate without exclusive reliance on the unverified historical data. i-80 Gold sample preparation was performed by independent ISO/IEC 17025-accredited
commercial laboratories (ALS Minerals and MSA Labs) using industry-standard preparation protocols appropriate for Carlin-style gold mineralization, consistently delivering the target product (greater than 85% passing 75 microns) with high
preparation precision (preparation-duplicate R-squared of 0.99 across the program; 0.9997 in Q1 2026).
Analytical methods used by i-80 Gold over the period are appropriate for the deposit style and grade
distribution. The 2021 to 2024 fire-assay approach (Au-AA23 with Au-GRA21 gravimetric overlimit) is the industry-standard method for sediment-hosted gold deposits. The
transition to Chrysos Photon Assay from 2025 onward has been independently validated against both conventional Fire Assay and Screen Fire Assay (R-squared of 0.994 or greater; mean bias +3% to +6%,
mechanistically explained by larger effective sample mass), and is fit-for-purpose as the primary analytical method for resource
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
103
estimation at Granite Creek. The i-80 Gold QA/QC program has consistently achieved or exceeded the design control-sample insertion rate of 20% across the
2023 to Q1 2026 period; the 2021 and 2022 programs operated at lower insertion rates within a transitional framework reviewed and accepted by the previous QP. CRM, blank, and duplicate performance has been within industry-accepted acceptance limits
in every quarter, with all identified failures appropriately investigated and corrected, or appropriately accepted; the Q3 2025 OREAS-282 low bias and the concentration of blank exceedances in Lone Tree in-house-assayed batches are the two items the QP has carried forward as ongoing laboratory-performance matters for continued monitoring. Sample security and chain of custody for the
i-80 Gold program are appropriate: samples were collected at i-80 Gold Corp’s secure Lone Tree core shed and transported in sealed sample bags directly by
laboratory personnel to the preparation facility, with no chain-of-custody breaches reported over the period.
In the QP’s opinion, the sample preparation, analytical, and security procedures used to generate the combined Granite Creek drillhole
assay database — historical (1970 to 2016) and i-80 Gold (2021 to Q1 2026) — are adequate to support mineral-resource estimation, and mineral-reserve and economic studies on the property. SRK
recommends that every QC sample record (CRM, blank, field duplicate, preparation duplicate, pulp duplicate, and check assay) be flagged in acQuire with its specific QC type and identity at the time of data entry or LIMS import, rather than relying
on generic, ambiguous, or system-generated placeholder identifiers; where a standard or blank record cannot be immediately matched to a certified value or known material at the time of entry, it should be flagged explicitly as ‘unresolved,
pending confirmation’ rather than left unflagged or carried under a temporary label. SRK further recommends that i-80 and its laboratories capture and retain
per-sample analysis order (or equivalent sample-sequence data) alongside QC results, so that future blank exceedances can be evaluated by a carry-over-percentage method rather than the coarser absolute-value
materiality floor applied in this report.
8.5
Non-Conventional Industry Practice
In Q1 2026, i-80 Gold Corp commissioned a three-way analytical
comparison of MSA Photon Assay (CPA-Au-1), conventional Fire Assay (AAL method IO-FAAu30), and Screen Fire Assay (AAL method G-FASFAu11) to assess whether Photon Assay — a non-destructive, higher-sample-mass technique that is comparatively new relative to conventional fire assay —
produces results statistically comparable to the established fire-assay methods, and to characterize any systematic bias. Photon Assay consistently returned slightly higher gold values than both fire-assay variants (a small positive bias of
approximately +0.55 ppm Au vs. Screen Fire Assay and +0.69 ppm Au vs. conventional Fire Assay), an effect that is expected and widely documented in the literature, arising from the non-destructive nature of
Photon Assay and its substantially larger effective sample mass (typically 400 to 600 g, versus a 30 g fire-assay charge), which better represents coarse-gold and nugget-effect populations. The coefficient of determination exceeded 0.994 against
both fire-assay reference methods across the analyzed grade range, and the Bland-Altman limits of agreement are narrow (approximately ±1 to 2 ppm Au) with no grade-dependent behavior. In the QP’s opinion, this validation supports the
reliability of Photon Assay as the primary gold analytical method for the Granite Creek resource estimation, with Screen Fire Assay recommended as a supplementary check method on samples flagged for coarse-gold or nugget-effect risk.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
104
9
Data Verification
Data supporting this technical report summary has been verified through two successive programs: a comprehensive verification program completed
by GRE in 2021 in support of the Granite Creek IA Technical Report (March 2025), and a further, independent verification program completed by SRK in 2026 in support of this Pre-Feasibility Study, comprising a site inspection, review of i-80’s Standard Operating Procedures, statistical review of the drilling database, and a systematic comparison of the assay database against original laboratory certificates. Both programs are described in
Section 9.1.
9.1
Data Verification Procedures
GRE completed a comprehensive, SK-1300-compliant data verification program to support the previously
disclosed IA of the Project (Initial Assessment SK-1300 Technical Report, Granite Creek Mine Project, Humboldt County, Nevada, USA, issued March 26, 2025). The GRE QPs carried out an on-site inspection on April 20, 2021, including review of key geological formations, structural controls, and mineralization, confirming that field observations were consistent with existing geological mapping
(Osgood, 2016); core and RC sample storage, handling, and condition were also inspected and found appropriate for that level of study. Approximately 752 RC and core sample intervals from four drillholes were visually checked against drill logs and
database records, confirming that logged lithologies and sample descriptions accurately matched the physical samples. To verify assay reliability, seven core/chip check samples and two surface rock chip samples were collected and submitted to Hazen
Research Inc. for fire assay; the check assays showed excellent correlation with the original results (R-squared approximately 0.99), with a t-Test indicating no
statistically significant bias between the original and check datasets. GRE’s Geology QP manually audited roughly 10% of original assay certificates from the 2021 to 2022 drilling campaigns against the digital database and identified no
material errors, and recommended that i-80 implement routine automated database audits after significant programs or database updates. Discipline-specific QPs concluded the data were adequate for IA purposes:
the Geology QP considered lithology, mineralization, and assay data reasonably accurate and suitable for mineral resource estimation; the Metallurgy QP found the metallurgical test work representative, professionally executed, and appropriate for
recovery assumptions; the Mine Planning QP verified key operating and cost assumptions against comparable operations and industry benchmarks; and the Environmental QP confirmed current compliance with Nevada permits and inferred that environmental
data met state QA/QC requirements for that study level. Overall, GRE’s QPs reported no limitations or failures in data verification and considered the datasets used in the Granite Creek IA reliable and appropriate for IA-level evaluation.
During February 2026, SRK conducted a site visit and tour of the Granite Creek
operation, including underground mine headings and the Lone Tree facility (core processing and sample storage). Mr. Burkett reviewed and discussed with site personnel the site geology, structure, mineralization, drilling, core logging and
sampling, density measurements, site security, core and sample storage, and data management procedures; the visit was hosted by a combination of i-80 management and site-based staff, with unrestricted access
to all aspects of the Project and all questions satisfactorily addressed by the Company. WSP coordinated and reviewed the 3D structural interpretation and geologic model constructed by i-80, and separately
undertook an exercise to calibrate the ventilation model to data collected during the site visit; the data used in the ventilation evaluation is considered adequate for the purpose used in this technical report.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
105
The QP completed a phased approach to verification of the data provided by i-80, comprising a site inspection, review of i-80 Standard Operating Procedures (SOPs), statistical review of the databases, review of mineralized drill core intervals, an
underground mine tour focused on active headings in mineralized material, and verification of assay certificates against original laboratory-issued documents; the QP also independently reviewed i-80’s
internal quality control program for analytical data and drilling survey confidence. It is the QP’s opinion that the current procedures and protocols in place for data collection and validation are acceptable for use in mineral resource
estimation. WSP separately spent two days on site comparing core shed observations of all major lithologic units with conditions underground, the geotechnical logging database, and the geologic model; in-place
Cemented Rock-fill (CRF) backfill was observed underground, backfill QA/QC procedures were reviewed, and the CRF backfill QA/QC database was reviewed for completeness and consistency of backfill strength verification over time. The data used in the
geotechnical evaluation is considered adequate for the purpose used in this technical report.
As part of the data verification program,
the QP conducted an underground mine tour of the Granite Creek operation focused on direct observation of mineralization in active working headings, to visually confirm the geological controls on mineralization, the geometry of the mineralized
structures, and the consistency of the lithological and structural relationships captured in the i-80 drillhole database and 3D geological model. The QP visited multiple working headings in mineralized
material and directly observed the hanging wall and footwall contacts of the mineralized structures, the character and continuity of vein and breccia textures, the distribution of sulfide and oxide mineralogy, and the structural attitudes of the
controlling faults (Figure 9-1 and Figure 9-2). These observations were compared against the i-80 structural and lithological
model and used to independently validate the geologic model and the mineralization domaining strategy applied during resource estimation; the character of the mineralization observed in situ is consistent with the logged descriptions, domain
boundaries, and assay distributions stored in the database for the corresponding drillhole intervals.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
106
Source: SRK, 2026
Figure 9-1: Underground Working Heading at Granite Creek Showing Mineralized Structure with Sample
Outline and Drill Pattern Marks Observed During the QP Site Visit
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
107
Source: SRK, 2026
Figure 9-2: Underground Working Heading at Granite Creek Showing Exposed Mineralized Face Observed
During the QP Site Visit
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
108
Following the underground tour, the QP spent time at the
on-site core logging facility reviewing retained drill core from recent infill and definition drilling, selecting core boxes spanning a range of grade intervals and mineralization styles represented in the
resource model. For each interval reviewed, the QP placed printed assay sheets for the corresponding drillhole alongside the core box and cross-checked the visual character of the mineralization against the Au and Ag grades recorded in the database,
interval by interval (Figure 9-3 and Figure 9-4). The visual character of the mineralized intervals (degree of structural damage) was consistent with the recorded Au and
Ag grades — elevated-grade intervals corresponded to visibly mineralized and damaged core, and low-grade intervals corresponded to weakly mineralized or barren core with little structural deformation;
lithology was not part of this review. No discrepancies were identified between the observed mineralization and the corresponding database Au and Ag grades. Together, the mine tour and the core review provided the QP with an independent, field-based
check on the integrity of the mineralization-domain and assay data used in mineral resource estimation.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
109
Source: SRK, 2026
Figure 9-3: Drill Core from Hole iGS22-07 (1,499 to 1,482 m
(581 ft)) with Printed Assay Sheet Used by the QP to Cross-Check Mineralization Against Database-Recorded Au and Ag Grades
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
110
Source: SRK, 2026
Figure 9-4: Drill Core from Hole iGS23-05 (1,498 to 1,491 m
(610 ft)) with Printed Assay Sheet Used by QP to Cross-Check Mineralization Against Database Au and Ag Grades
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
111
The QP conducted a systematic comparison of the Au and Ag values stored in the i-80 acQuire drilling database against the original analytical values reported in laboratory certificates issued by ALS Minerals, MSALABS, and American Assay Laboratories (AAL), to confirm that the database
accurately reflects the laboratory-reported results with no transcription or data-management errors. The comparison was conducted programmatically using CSV-format laboratory certificate exports: 138
certificate files were processed, encompassing 14,127 sample rows across the surface and underground drilling programs. Database records were matched to certificate entries by sample ID — of the certificate samples, 10,139 were present in the
assay database and 3,988 were lab-inserted QC materials (blanks, CRMs, laboratory duplicates) not retained in the project assay table. A 5% discrepancy threshold was applied to flag samples with differing Au
or Ag values.
The initial comparison flagged 13 samples exceeding the 5% threshold, all involving the Au value; these were individually
reviewed, and the laboratory was contacted for clarification. MSALABS provided updated certificate documentation for the affected Photon Assay jobs, consisting of dedicated Au-only Photon Assay re-run reports issued separately from the primary multi-element certificates for samples flagged as Heterogeneous Block (‘HB’) during the initial Photon Assay screen. Once incorporated, the 13 flagged
samples resolved as follows: six samples (MSALABS job ELK2510227) were Photon Assay re-run reconciliations — the database had correctly stored the Au value from the authoritative Au-only re-run certificate, and the initial comparison had referenced only the multi-element certificate without accounting for the sibling
re-run file, so no database correction was required; the remaining seven samples (across MSALABS lab jobs ELK2510221, ELK2510270, and ELK2610263) were database discrepancies — drillhole sample rows
existing in the database with no assay value populated, despite valid laboratory certificates (six at or below the 0.015 ppm Au detection limit and one at 0.018 ppm Au), representing database ingest gaps rather than transcription errors, now
documented and provided to i-80 for re-ingest; given the very low grades and limited count, the impact on the mineral resource estimate is considered negligible.
Following resolution of all 13 samples, the comparison was re-run against the updated database and revised certificates, confirming a 99.90% match (7,181 of 7,188 compared samples) between the database Au
values and the original laboratory-reported values; the seven residual samples (non-mineralized) were not received prior to the PFS database cut-off date (February 2,
2026).
The QP performed statistical analyses on the drilling database to check for potential erroneous data in the collar, downhole
survey, geology/lithology, specific gravity, and assay tables, including descriptive statistics, charting, and review of potential outlier and erroneous data, to identify errors common among drilling databases (zero values, treatment of
below-detection-limit values, negative or non-numeric values, extreme outliers, and interpretation of the distribution of mineralization across the Property). As part of the updated Mineral Resource reporting,
SRK completed a detailed review of the database provided; through discussion with the i-80 geological team, several issues were noted and addressed prior to modeling. Seven holes
(GCPR25-050, GCPR25-309, GCPR24-108, GCPRPR25-054,
GCPR25-045, GCPR25-349, GCPR25-330) showed potential downhole contamination with high-grade smearing down the hole; in all but GCPR25-045, selected intervals were reset to trace to avoid local overstatement of gold. Two holes (GCPU22-34 and GCPU22-55) contained low-grade assays within areas of expected grade but had no collar records in hard copy, and were potentially misplaced in the model — these were removed from the estimation dataset. A further hole with a low-grade interval (iGU22-44) was reviewed but kept in place, as records confirmed its location.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
112
i-80 has a well-documented series of SOPs covering
core handling, geological and geotechnical logging, sample collection, chain of custody, QA/QC submission protocols, sample preparation and analysis guidelines, and sample retention policy, applicable to all
i-80 employees and contractors at any i-80 site including Granite Creek; SOPs are updated on an as-required basis. Data
verification occurs prior to incorporation of data into final databases. i-80’s SOPs are listed in Table 9-1, with the
sub-sections below summarizing the SOPs reviewed by the QP. The QP reviewed the SOPs and found them to meet SME standards; the SOPs are specifically designed to comply with U.S. SEC S-K 1300 disclosure requirements for exploration projects. During the site visit, core was not being processed, so the QP did not observe site personnel acting in accordance with the SOPs.
Table 9-1: i-80 Standard Operating Procedure List
SOP Protocol
Version
SOP Updated Date
Core Logging Procedure
Rev. 3
October 2024
Exploration Drill Sampling and Chain of Custody
v1.2
December 2021
Sampling and Assay Quality Control Guidelines
v1.2
December 2021
Sample Analysis Guidelines
v1.2
March 2022
Sample Retention Guidelines
v1.3
April 2022
Core drilling is carried out by a reputable contractor using a diamond bit and core barrel to obtain
runs of up to 3 m (10 ft) (Figure 9-5); the standard diameter for exploration drilling at Granite Creek is HQ (21⁄2-inch
diameter core). Core boxes are labeled with the hole ID and footage interval and are collected from the drill site daily by i-80 geologists or geotechnicians and transported to the logging facility (Figure 9-6). Sample intervals are selected by the project geologist based on geological interpretation, lithology, alteration, and structural contacts; sample lengths are nominally 1 to 2 m (5 ft) in ore-zone intervals and up to 3 m (10 ft) in waste. Regular samples consist of one half of the core cut lengthwise with a diamond saw, with the remaining half retained in labeled boxes for the life of the project.
Sample identifications follow a 13-character alphanumeric format (the Granite Creek underground program prefix is GCEXU, e.g., GCEXU25002980); scannable sample tags are affixed to sample bags, with the sample
ID also transcribed by permanent marker as a backup, and each bag sealed with a tie. All samples remain under the control of i-80 management from collection through delivery to the laboratory, stored while
awaiting shipment in a secure facility not accessible to unauthorized personnel (Figure 9-7), and transported by i-80 staff or a laboratory-approved carrier.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
113
Source: SRK, 2025
Figure 9-5: Diamond Core Saw Station at the Lone Tree Laboratory Facility
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
114
Source: SRK, 2025
Figure 9-6: Palleted and Tarped Coarse Reject and Core Storage Yard at the Lone Tree Facility
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
115
Source: SRK, 2025
Figure 9-7: Pulp Sample Storage at the Lone Tree Facility
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
116
Prior to logging, core is washed and scrubbed to remove drill fluids and mud, so geological
textures can be clearly observed, with core boxes oriented in ascending order and box labels verified for accuracy before logging commences. All geological and geotechnical data are recorded directly in acQuire database software via remote desktop
connection to the i-80 server; drillhole metadata (hole ID, start/end dates, actual depth, drilling company, hole type) are entered upon hole completion using the project Drillhole Tracker spreadsheet as the
source document. Rock Quality Designation (RQD) is measured for each 2 m (5 ft) interval by summing the lengths of competent core pieces above a minimum threshold (NQ: 0.34 ft; HQ: 0.40 ft; PQ: 0.55 ft), recording total recovery and RQD footage;
geological logging captures lithology, alteration, oxidation, sulfide mineralogy, veining, and structures at a level of detail appropriate for resource modeling, with non-overlapping, consecutive logging
intervals. Bulk density (specific gravity) is measured using either the wax immersion method or the vacuum sealer method (Figure 9-8), with one density sample selected per stratigraphic unit and increased
sampling density in the ore zone and altered intervals; samples are dried for a minimum of two hours before measurement, and density data are recorded directly in acQuire. Core is photographed in labeled boxes after logging and before cutting, taken
wet to improve color and texture contrast, and named by hole ID and footage interval for upload to the i-80 SharePoint.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
117
Source: SRK, 2025
Figure 9-8: Specific Gravity (Water Immersion) Measurement Station at the Lone Tree Laboratory
Facility
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
118
Sample preparation is completed at ALS located in Sparks, Nevada; the prepared pulp is a
minimum of 30 g, ground to 85% passing 200 mesh, with prepared pulps returned from the commercial laboratory after analysis and stored in a dry, secure location. The primary analytical program for all samples includes: gold fire assay (AuFA) with
atomic absorption (AA) finish for all samples (samples returning greater than 10 ppm Au at commercial laboratories are re-analyzed with a gravimetric finish); gold cyanide (AuCN) assay with AA finish for all
underground exploration and production samples where AuFA exceeds 2 ppm, and for open-pit samples where AuFA exceeds 0.2 ppm; carbon and sulfur analyses by LECO method (total carbon, carbonate, sulfate sulfur,
sulfide sulfur, and total sulfur) on selected exploration and production samples; and multi-element ICP analyses on exploration samples where AuFA exceeds 2 ppm, on all surface exploration samples regardless of gold grade, and on every fourth
underground production drillhole, covering a 40-element suite (Ag, Al, As, Ba, Bi, Ca, Cd, Ce, Co, Cr, Cu — total and cyanide-soluble, Fe, Hg, K, Li, Mg, Mn, Mo, Na, Nb, Nd, Ni, P, Pb, Rb, Sb, Sc, Se,
Sn, Sr, Te, Th, Tl, U, V, W, Zn, and Zr).
i-80’s QA/QC program is designed to meet the
minimum standards of the SME and to comply with U.S. SEC S-K 1300 disclosure requirements, documented in the i-80 Sampling and Assay Quality Control Guidelines (v1.2,
December 2021). The overall QA/QC insertion rate is a minimum of 17.5% of total submitted samples, comprising: CRMs — commercial standards supplied by CDN Resource Laboratories (or equivalent), inserted at a minimum rate of 5% of submitted
samples with at least two standards of different grades per submission, required to fall within ±3 standard deviations of the certified expected value (failure triggers re-assay of all samples between
adjacent passing standards); blanks — coarse marble-chip blank material inserted at a minimum rate of 5%, acceptable when less than five times the laboratory’s gold detection limit, preferentially placed after high-grade standards to
detect contamination (failure triggers re-assay of all samples between adjacent passing blanks); and duplicates — field duplicates (second half of split core) at 5% of submitted samples targeting
competent rock intervals (±20% relative-difference acceptance, pending accumulation of project-specific variance data), preparation duplicates (coarse reject split at the laboratory) at 2.5% (±15% relative difference), and analytical
duplicates (pulp re-split at the laboratory) assessed as required (±10% relative difference). External check analyses are conducted by submitting 5% to 10% of pulps to an independent secondary
laboratory using the same digestion and analytical finish as the primary laboratory, acceptable within ±10% accuracy and ±10% precision; serious discrepancies (greater than 15% for fire assay, greater than 20% for cyanide methods)
trigger submission to a third ISO-certified laboratory. All QA/QC data are reviewed on receipt of each assay certificate, and no results are released until QA/QC controls are validated; results are compiled
and reported quarterly to the i-80 Senior Resource Geologist, including performance statistics for standards, blanks, and duplicates, Thompson-Howarth precision plots, and documentation of any failures,
corrective actions, and re-assays.
i-80’s Sample
Retention Guidelines (v1.3, April 2022) govern the storage and disposal of all sample materials from the Granite Creek Project: one half of the split diamond drill core is retained in labeled boxes for the life of the project at the Lone Tree core
shed; coarse reject material generated during laboratory sample preparation is retained for a minimum of three years, stored in dry conditions (palleted and tarped, or in labeled barrels) to allow retrieval by batch; sample pulps are stored for the
life of the project at the Lone Tree Laboratory or commercial laboratory facility; and disposal of coarse reject, core, or sample pulps requires written approval from the VP Geology and must follow i-80
environmental disposal protocols.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
119
9.2
WSP Verification
WSP spent two days on site comparing core shed observations of all major lithologic units with conditions underground, the geotechnical logging
database, and the geologic model. Selected core intervals were independently reviewed against available core photographs and geotechnical logging records as part of the data verification process. Observations of
in-placed cemented rockfill (CRF) backfill were made underground, backfill QA/QC procedures were reviewed, and the CRF backfill QA/QC database was reviewed for completeness and consistency of backfill strength
verification over time. Data used in the geotechnical evaluation is considered adequate for the purpose used in this technical report.
WSP
spent one day on site and completed a ventilation assessment including inspection of primary, booster, and auxiliary ventilation systems, as well as a review of active and planned mine workings, haulage routes, escapeways, and proposed ventilation
raise locations. Temperature and humidity data were collected for Ventsim™ model calibration. The data used in the ventilation evaluation is considered adequate for the purpose used in this
technical report.
9.3
Limitations
The following items are identified as known limitations on data verification and are accounted for in mineral resource classification by the
QP: the QP did not directly supervise or oversee data acquisition of any drilling, logging, or analytical data used in the determination of mineral resources — the QP reviewed summary data, technical reporting, and supporting documentation,
and performed independent verification, with all descriptions of procedures and methods provided by i-80; and the QP has not conducted a visit or inspection of the analytical laboratories providing the
baseline analytical data supporting resources, though the laboratories used are considered reputable and independent facilities suitable for the analyses performed.
9.4
Opinion on Data Adequacy
It is the QP’s opinion that the data provided by i-80 for the Granite Creek Project are
reasonable, reliable, and of acceptable quality and quantity to support the mineral resource estimate and the technical disclosures presented in this Technical Report Summary. The drilling, sampling, sample preparation, analytical, data management,
and QA/QC procedures applied at Granite Creek are consistent with SME Best Practice Guidelines and satisfy the disclosure requirements of U.S. SEC S-K 1300. This opinion is based on the data verification
activities completed by the QP, summarized as follows: the assay database vs. analytical certificate comparison confirmed a 99.90% match between the i-80 database Au values and the original laboratory
certificates across the 7,188 samples available for direct comparison (the seven residual non-mineralized samples were not received prior to the PFS database cut-off
date); the underground mine tour, through direct observation of mineralization in active working headings, confirmed the geometry, hanging wall and footwall contacts, and structural controls represented in the
i-80 geological model and mineralization domaining; the core inspection, through cross-check of database-recorded Au and Ag grades against retained drill core, confirmed that the database accurately represents
the in situ mineralization distribution and grade; and the SOP and QA/QC program review found i-80’s Standard Operating Procedures, QA/QC insertion rates, acceptance criteria, and sample retention
practices fit for purpose and consistent with industry best practice. This opinion is subject to the limitations on data verification identified in Section 9.2, which are accounted for in the QP’s mineral resource classification.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
120
10
Mineral Processing and Metallurgical Testing
Metallurgical test work supporting the Granite Creek Underground Project comprises five test programs completed between 2005 and 2026: an
initial autoclave pre-treatment program by Dawson Metallurgical Laboratories (2005-2006); a comprehensive sample characterization, comminution, and pressure oxidation test program by FLSmidth (2022-2023); a
pilot-scale continuous pressure oxidation program by FLSmidth (2025-2026) on a blended feed representing the early years of commercial operation across three i-80 Gold properties; a pressure oxidation and
cyanidation program by SGS focused on the South Pacific Zone (2025-2026); and ongoing bench top autoclave testing performed by the third-party toll milling facility that currently processes Granite Creek Underground production. The nature and extent
of this testing (Section 10.1), the representativeness of the samples tested (Section 10.2), the laboratories involved (Section 10.3), the resulting gold recovery estimates (Section 10.4), and the adequacy of the supporting data (Section 10.5) are
discussed below. Note that all metallurgical test work described in this section pertains to Granite Creek Underground. Testing on Granite Creek open pit samples is historical. No current metallurgical testing has been completed on Granite Creek
Open Pit samples. The current Granite Creek Open Pit work is acceptable for the purposes of resource estimation.
10.1
Metallurgical Testing Programs
A list of the metallurgical test work programs conducted on Granite Creek Underground samples is shown in Table
10-1: an initial autoclave pre-treatment program completed by Dawson Metallurgical Laboratories in 2005 and 2006; a comprehensive sample characterization, comminution,
pressure oxidation, and downstream processing program completed by FLSmidth in 2022 and 2023; a continuous pilot-scale pressure oxidation program completed by FLSmidth in 2025 and 2026 on a blended feed representing the early years of commercial
operation; a pressure oxidation and cyanidation program completed by SGS in 2025 and 2026 focused on the South Pacific Zone (SPZ); and ongoing bench top autoclave testing performed by the third-party toll milling facility currently processing
Granite Creek Underground production. The nature and extent of the testing and analytical procedures used in each program are described below.
Table 10-1: Metallurgical Test Work Programs
Date
Laboratory
Accreditation
Description
2005 / 2006
Dawson Metallurgical Laboratories
No information available. Independent of i80 Gold.
Bench Top Autoclave and CIL
2022
FLSmidth Minerals Testing and Research Center
No accreditations provided on their website.
Independent of i80 Gold.
Bench Top Autoclave and CIL
Bench Top Roaster
and CIL
Continuous Autoclave and CIL
Cyanide Destruction
Solid-Liquid Separation
2025
FLSmidth Minerals Testing and Research Center
No accreditations provided on their website.
Independent of i80 Gold.
Continuous Autoclave and CIL (blend)
Cyanide
Destruction (blend)
Solid-Liquid Separation (blend)
2025
McClelland Laboratories Inc.
No accreditations provided on their website.
Independent of i80 Gold.
Sample preparation and particle Size Analysis
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
121
2025
SGS Lakefield Research Ltd.
Conforms to the requirements of the ISO/IEC 17025 standard for specific registered tests.
Independent of i-80 Gold.
Bench Top Autoclave and CIL
2023 and Ongoing
3rd Party Toll Milling Facility Laboratory
No accreditations provided on their website.
Independent of i80 Gold.
Bench Top Autoclave and CIL
Dawson Metallurgical Program (2005-2006)
Dawson Metallurgical Laboratories completed autoclave metallurgical test work programs on samples from the Granite Creek underground workings
(Ogee samples) on behalf of Atna (Dawson, 2005; Dawson, 2006a; Dawson, 2006b), reported in an initial 2005 program (Ogee Right Rib/Left Rib and RF Zone samples RF_Met-1,
RF_Met-2, and RF_Met-4) followed by a 2006 program (CX Zone samples APCX-204, APCX-211, APCX-219, and APCX-226; the undefined sample AMW-002; and re-tests of the 2005 program’s
Met1 and Met2 samples). The objective of both programs was to determine whether the underground samples, identified as refractory, could be treated using autoclave pre-treatment, as Atna was considering
contracting with a third party for autoclave treatment and downstream processing of the underground material. The scope of the test work included head assays (gold, sulfur speciation, and carbon speciation), baseline cyanide leach shake-out tests on ground feed samples, and pressure oxidation test work: samples were ground to a P80 of 75 µm or 45 µm, acidulated with sulfuric acid to a pH of 1.8 to 2.0 for one hour to digest
carbonate minerals ahead of autoclave treatment (standard methodology for whole-material autoclave treatment in Nevada), then processed in an autoclave at 225°C (437°F) for a one-hour residence time,
35% solids w/w pulp density, and an oxygen overpressure of 3,176 kPa (460 psi). Lime was added to the autoclave residue to raise the pH to 10.0-10.5 prior to a cyanide leach test simulating CIL (carbon-in-leach) processing to determine gold recovery.
FLSmidth Metallurgical Program (2022-2023)
In early 2022, FLSmidth (FLS) was contracted to undertake a series of tests on Granite Creek underground samples, completed in early 2023. The
program’s objectives were sample characterization, mineralogical studies, comminution testing, acid/alkaline batch pressure oxidation (POX) followed by batch cyanidation and preg-robbing tests, a continuous POX test followed by batch
neutralization, cyanidation, cyanide detoxification, and solids-liquids separation testing, and a batch of POX-CIL tests on three composite blends.
Comminution testing (Bond ball mill work index, BWi) was conducted on selected samples, limited to Bond ball mill work index testing since no
comminution circuit design is required for this study — production will initially be toll milled at a Nevada Gold Mines process facility, and eventually processed through the refurbished Lone Tree facility. Tests were run using a 106 µm
closing screen size, targeting a grind size k80 of 75 µm. The overall average work index was 16.4 (imperial, classified as hard), with
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
122
a 75th-percentile (normal design) value of 19.0 (very hard). By zone, the OG Zone averaged 18.9 (very hard, 75th percentile 20.3, very hard) with the oxide samples showing similar hardness to the
sulfide samples; the Otto Zone averaged 16.2 (hard, 75th percentile 17.4, hard); the Adams Peak Zone averaged 12.8 (medium, 75th percentile 13.2, medium); and the Deep Range Front and Range Front Zone samples were classified as medium hardness while
the South Pacific Zone (SPZ) sample was classified as very hard. Mineralogy (XRD) and swelling clay analysis showed gangue mineralogy of quartz, k-feldspar, muscovite, clays (kaolinite and swelling clay), and
calcite, with pyrite and marcasite present in all samples as the primary sulfides; two samples (APL and APLG) showed higher percentages of swelling clay that may require attention during POX treatment — addressed in later test conditions
through trona addition (see below).
Analytical direct cyanide leach shake tests were conducted on pulverized samples from each of the 17
selected samples in centrifuge tubes on a shaker for 60 minutes, with pH adjusted to 10.5 using lime slurry, followed by centrifuging and gold analysis by AA on the pregnant solution, to provide a baseline recovery. Preg-robbing leach tests were
performed similarly, on samples spiked with a stock solution containing a known amount of gold, to measure a preg-rob index (PRI) comparing the amount of gold adsorbed onto the solids to the leached gold.
All metallurgical samples (with the exception of OGOX) were subjected to a series of Batch Autoclave (BTAC) tests under six different
conditions (A through F), summarized in Table 10-2. Test conditions B, C, D, and F replicate Lone Tree autoclave operating conditions. Conditions A and E used acidic
pre-acidulation (one hour, 98% concentrated sulfuric acid) at two temperatures — Condition A added acid in a stoichiometric ratio for carbonate destruction, and Condition E targeted a CO3/S2- weight ratio of 1 — while Conditions C and D tested trona addition (10 kg/t and 5 kg/t respectively) to counteract swelling-clay effects under alkaline conditions. Continuous POX testing was
subsequently used to confirm the batch test results (see below). Carbon-in-Leach bottle roll tests were performed on each sample and on the discharge of each BTAC test,
at CIL conditions of 21°C, 35% solids, 20 g/L carbon, pH 10.5-11, initial cyanide addition of 2.5 g/t NaCN, and a 24-hour residence time.
Table 10-2: Underground Samples Batch Pressure Oxidation Conditions from FLS Program
POX Condition
A
B
C
D
E
F
Acidulation
Yes
No
No
No
Yes
No
POX
Acid
Alkaline
Alkaline
Alkaline
Acid
Alkaline
Trona Dosage (kg/t)
None
None
10
5
None
None
Temperature (oC)
225
199
199
199
199
199
O2 Overpressure (kPag)
689
689
689
689
689
689
Target Gauge Pressure (kPag)
3137
2103
2103
2103
2103
2103
Pulp Density (% solids)
30
30
30
30
30
30
Particle Size, k80 (µm)
75
75
75
75
75
53
Retention Time (min)
60
45
45
45
45
45
Follow-up tests were conducted on three sample blends (Table 10-3) to optimize alkaline POX conditions against benchtop roasting, evaluating longer retention time under alkaline (Lone Tree) conditions and confirming the effect of trona addition, using the five test conditions
summarized in Table 10-4. Benchtop roasting (BTR) was performed in a Carbolite HTR rotary reactor tube furnace: a dry ground sample was weighed into a tared borosilicate glass reactor and subjected to a two-stage roast with oxygen (99.9% purity) gas applied across the roaster bed, at a first-stage temperature of 986°C for 30 minutes, a second-stage temperature of 1,058°C for 15 minutes, a 5°C/minute
ramp rate, an oxygen rate of 2 cc/minute, and a sample feed weight of 500 to 550 g.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
123
Table 10-3: Granite Creek Underground
Metallurgical Sample Blends for Additional Testing
Sample
Composition
Blend 1
65% OTHG, 34% APHG
Blend 2
50% OTLG, 34% OUT, 16% APL
Blend 3
60% OUT, 27% APHG, 13%
OTLG
Table 10-4: Granite Creek Underground Metallurgical Testing Program
Follow-Up BTAC Test Conditions
Test Condition
I
II
III
IV
V
Acidulation
No
No
No
No
No
POX Condition
Alkaline
Alkaline
Alkaline
Alkaline
Alkaline
Trona Dosage (kg/t)
None
None
20
10
None
Temperature (°C)
199
199
199
199
199
O2 Overpressure (kPag)
689
689
689
689
689
Pulp Density (% solids)
30
30
30
30
30
Particle Size, k80 (µm)
75
75
75
75
75
Retention Time (min)
60
45
45
45
75
A continuous POX test was completed using composite sample OAPC across three conditions (Table 10-5), selected from the batch BTAC results as the conditions producing the highest sulfide oxidation and gold recovery for that sample: Run 1-Condition B (alkaline, no
reagents, six 45-minute turnover intervals), Run 2-Condition E (partially acidulated, six 45-minute turnover intervals), and Run 3-Condition A (fully acidulated, six 60-minute turnover intervals at 225°C/437°F). The three runs operated back-to-back for approximately 16 hours, excluding autoclave heating and cooling time; profile samples were collected once steady state was achieved and again after three volume changeovers, and 16 L of POX
discharge were collected and weighed at each changeover for downstream testing. The continuous autoclave feed rate was approximately 13.31 kg/hour of solids for Runs 1 and 2 (45-minute residence time) and
approximately 9.98 kg/hour for Run 3 (60-minute residence time). Figure 10-1 shows the resulting sulfide oxidation profile by autoclave compartment, from autoclave feed
to autoclave discharge: oxidation began quickly in compartments 1 to 2 and reached near-full oxidation by compartment 3 for Runs 2 and 3, while Run 1 (alkaline) did not reach the same level of oxidation as the other two runs.
Table 10-5: Granite Creek Underground Metallurgical Testing Program Continuous POX Run Test
Conditions
Test Condition
B (Run 1)
E (Run 2)
A (Run 3)
POX Condition
Alkaline
Acid
Acid
Acidulation
No
Partial
Complete
Trona Dosage (kg/t)
0
0
0
Temperature (oC)
199
199
225
O2 Overpressure (kPag)
689
689
689
Total Pressure (kPag)
2096
2096
3130
Pulp Density (% solids)
30
30
30
Particle Size, k80 (µm)
75
75
75
Retention Time (min)
45
45
60
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
124
Source: TR Raponi Consulting Ltd. (2023)
Figure 10-1: Granite Creek POX Pilot Plant Sulfide Oxidation Profile
Cyanide destruction tests were performed using the SO2/air process, originally
developed and patented by Inco Ltd. (now Vale), in which SO2 plus air oxidizes cyanide into cyanate, catalyzed by the addition of copper ions; typical retention times to achieve less than 5
mg/L weak-acid-dissociable cyanide (CNWAD) are 1 to 2 hours at pH 7.5 to 9.5, and the process is capable of achieving discharge concentrations below 1 mg/L CNWAD (though it is not suited to directly reducing total cyanide (CNT). SO2 is typically supplied as sodium metabisulphite (SMBS) solution
dissolved on site, or as elemental sulfur combusted to generate SO2 on site for larger users. A total of 32 L of transitional continuous POX discharge material, collected from the beginning of
Run 2, was used to conduct a bulk 24-hour Carbon-in-Leach test at standard CIL conditions; the resulting slurry then underwent
cyanide detox testing with continuous SMBS and copper sulfate addition, at the two sets of conditions summarized in Table 10-6. The objective in this program was to achieve a discharge concentration of <50
mg/L CNWAD.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
125
Table 10-6: Underground Blend Samples Cyanide
Detox Conditions from FLS Program
Test Number
1
2
Feed Slurry
Bulk CIL
Oxidizing Agent
SMBS
Feed CNWAD (mg/L)
177
182
SO2:CNWAD (g/g)
8
5
Retention Time (h)
1
1
Copper (mg/L)
25
25
pH range
8.0
-
9.0
8.0
-
9.0
Number of Turnovers
6
6
Total Continuous Time (h)
4.5
4.5
Temp °C
25
25
POX discharge slurry samples from Runs 1, 2, and 3, plus the product slurry from Detox Test 1 (the POX Run 2
sample), were retained for solids-liquids separation testing to determine optimum thickener sizing and operating parameters, evaluating pre-leach thickener duty for the POX discharge samples and tailings
thickener duty for the cyanide detox sample. Flocculant screening on the Run 1 sample tested five flocculants (905VHM, 910VHM, 913VHM, 923VHM, and 934VHM); 913VHM (an anionic polyacrylamide flocculant of medium molecular weight and low charge
density, substitutable with any comparable product) was found to provide the best overflow clarity and settling velocities and was selected for subsequent testing on all samples. FLSmidth also conducted pressure filtration tests using a bench-scale
unit capable of simulating FLSmidth’s recessed-chamber and membrane-squeeze-chamber configurations across a range of feed solids concentrations, pressure profiles, and cake thicknesses; the Detox
Tailings sample was tested at a feed of 48% solids by weight to simulate feeding from a thickener underflow.
FLSmidth Metallurgical
Program (2025-2026)
In 2025, a program was undertaken at the pilot-scale autoclave facility at the FLSmidth Minerals Testing and
Research Center in Salt Lake City, Utah, to simulate continuous pressure oxidation conditions similar to those expected in the commercial plant, using a blended feed made up of ore from Granite Creek, Ruby Hill, and Cove — the three i-80 operations expected to supply feed in the early years of commercial operation. The block flow diagram of the pilot-scale flow sheet is shown in Figure 10-2. The program
comprised feed preparation (crushing and grinding), blending, acidulation (where specified), continuous pressure oxidation, neutralization, CIL, and cyanide detoxification; various products of the program were also used for bulk CIL, cyanide detox,
solids-liquid separation, and slurry rheology testing.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
126
Source: i-80 Gold
Figure 10-2: Continuous Pressure Oxidation Program Flow Sheet
For the Granite Creek portion of the composite, rejected sample material from active underground mining was used; for Ruby Hill, available core
from the 426 Zone (planned for the early years of mining) was used; and for Cove, the UHPRODCOMP sample, composited to represent the early years of mining, was used. Blend proportions (Table 10-7) were
determined from the expected feed tonnages of the early years of plant operation from the three sources: 26% Granite Creek, 58% Ruby Hill, and 16% Cove.
Table 10-7: Proportions of Continuous Pressure Oxidation Feed from
i-80 Sources
Project
Proportion of Blend (%)
Granite Creek
26
Ruby Hill
58
Cove
16
The three source materials were prepared individually before blending. Samples were stage-crushed to -10 mesh, then ground in 12 kg batches at 60% solids with water using a rod mill, targeting a P80 of 75 microns; grind studies determined the correct grind time for each sample via dip sampling, wet screening
(coarse +20 micron and fine -20 micron fractions), drying at 50°C (122°F), and Ro-Tap sizing of the coarse fraction. Leftover material from the continuous test
(constituents and blend) was analyzed by McClelland Labs of Reno, Nevada for particle size (Table 10-8), and McClelland subsequently performed bench-scale autoclave tests on each of the components.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
127
Table 10-8: Particle Size Analysis of Continuous
Pressure Oxidation Blend and Components
Sieve Size (µm)
Cumulative Weight Passing (%)
Granite Creek
Ruby Hill
Cove
Blend
150
98.9
96.1
98.4
96.2
104
91.3
90.7
92.6
90.6
74
76.9
82.0
79.1
77.5
53
67.4
74.9
66.6
69.8
43
61.7
70.0
60.3
63.9
38
58.9
67.6
57.6
62.5
P80 (µm)
79.3
67.3
75.3
78.7
Three conditions were tested over three continuous runs, selected to match the expected temperature and
pressure conditions of the Lone Tree autoclave, in either alkaline (Run 1) or acidic (Runs 2 and 3) mode, with 45-minute (Runs 1 and 2) or 60-minute (Run 3) retention
time (Table 10-9). Samples for Runs 2 and 3 were acidulated by slowly adding the stoichiometric quantity of sulfuric acid required for full carbonate destruction over 2 to 3 hours to prevent bubbling and
frothing; the acidified slurry was noticeably more viscous than the alkaline Run 1 feed. Testing used a titanium continuous autoclave with a dynamic operating volume of 27 L (including gas hold-up), a flash
discharge system, and six compartments (the first two only partly divided and treated as a single compartment, with cooling water addition available to manage temperature there); a photograph of the autoclave is shown in Figure 10-3. Set points for pre-heat and shell temperature were determined from prior projects of similar sulfide grade and target temperature. At the end of each run, a set of seven
profile samples was taken (POX feed; compartment samples 1-2, 3, 4, 5, and 6; and POX discharge), and a total of 50 L of continuous autoclave discharge from the end of Run 2 was collected as a bulk sample.
Table 10-9: Continuous Pressure Oxidation Test Conditions
Test Condition
Run 1
Run 2
Run 3
Acidulation
No
Yes
Yes
Temperature (°C)
199
199
199
O2 Overpressure (kPag)
689
689
689
Total Pressure (kPag)
2,103
2,103
2,103
% Solids by Weight
30
30
3,0
Retention Time (min)
45
45
60
Total Run Time (h)
3.5
4.0
4.5
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
128
Source: FLSmidth (2026)
Figure 10-3: Continuous Pressure Oxidation Autoclave at FLSmidth
The slurry temperature profile of the autoclave compartments over the course of testing is shown in Figure
10-4; the target temperature of 199°C (390°F) was reasonably met, with some notable excursions in Run 2. The overall autoclave pressure, shown inFigure 10-5,
showed no significant variation from the target of 2,103 kPag (305 psig) throughout testing. Vent oxygen purity, targeted at 90%, is shown in Figure 10-6; purity dropped below target at times, likely due to
carbonate decomposition during the alkaline phase and at the start of acidic pressure oxidation as acidulated feed mixed with the autoclave’s alkaline contents, then increased as the acidic runs proceeded. The higher viscosity of the
acidulated slurry caused several upset events where feed pumping was halted due to obstruction; water was added during the acidulated runs to improve pumpability, with pumping rate slowed to compensate and maintain the required retention time,
reflected in the calculated feed flow rate shown in Figure 10-7. The progression of sulfide oxidation over autoclave residence time, from the profile samples, is shown in Figure
10-8.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
129
Source: FLSmidth (2026)
Figure 10-4: Continuous Pressure Oxidation Slurry Temperature Profile
Source: FLSmidth (2026)
Figure 10-5: Continuous Pressure Oxidation Vessel Pressure Profile
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
130
Source: FLSmidth (2026)
Figure 10-6: Continuous Pressure Oxidation Vent Oxygen Purity
Source: FLSmidth (2026)
Figure 10-7: Continuous Pressure Oxidation Calculated Feed Flow Rate
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
131
Source: FLSmidth (2026)
Figure 10-8: Continuous Pressure Oxidation Sulfide Oxidation Profile
Following pressure oxidation, samples were neutralized in a hot water bath at 60°C (140°F) with overhead mixing and air sparging, with
lime added over a 3-hour period to target a pH of 10.5 (the bulk sample collected during pressure oxidation was not neutralized). Neutralized samples were then subjected to bench-scale CIL leach tests using
activated carbon, similar to the bench-scale program; the bulk sample was leached in a bulk CIL reactor for 24 hours using the same conditions but with pH adjustment during leaching rather than bulk neutralization, and was subsequently used for
cyanide detox and solids-liquids separation testing. Each of Runs 1 through 3 was tested in duplicate CIL runs. Benchtop autoclave tests on the same blended feed used in the continuous test were CIL-leached
using the same conditions as the prior bench top program for comparison.
The bulk sample, after 24 hours of CIL leaching, was screened to
remove carbon and dosed with sodium metabisulfite (SMBS) as the SO2 source and copper sulfate as catalyst, in a series of two tests at the conditions shown in Table 10-10. In both tests, CNWAD concentrations
were reduced to below 5 mg/L after one hour of retention time, as shown in Figure 10-9.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
132
Table 10-10: Continuous Pressure Oxidation
Testing, Cyanide Detoxification Conditions
Test 1
Test 2
Feed CNWAD (mg/L)
110
106
SO2/CNWAD (g/g)
11
6
Retention Time (h)
1
1
Copper Concentration (mg/L)
43
31
pH Range
8-10
8-10
Number of Turnovers
4
4
Total Continuous Time (h)
4
4
Temperature (°C)
25
25
Lime Consumption (kg/t)
1.87
1.87
SO2 Consumption (kg/t)
2.77
1.40
CuSO4 Consumption (kg/t)
0.10
0.07
Lime:SO2 (w/w)
0.67
1.34
Source: FLSmidth (2026)
Figure 10-9: CNWAD Concentration in Cyanide
Detoxification
Subsamples of material from the continuous pressure oxidation program were used for thickening, rheology, and
filtration test work at FLSmidth. Malvern laser diffraction particle size analyses of the autoclave feed, autoclave discharge, and detox tailings samples are shown in Table 10-11 (the AC Feed sample,
representative of autoclave feed during the continuous test, was analyzed after acidulation). Flux testing determined the optimum feedwell suspended solids concentration ranges for flocculation shown in Table
10-12 — quite low ranges, indicating significant internal dilution will be required in thickener feedwells for optimum settling. Continuous fill tests measuring predicted thickener underflow densities
are shown in Table 10-13: acceptable underflow densities were achieved for the AC Discharge and Detox Tails samples at bed retention times of up to two hours (typical for an operating thickener), though it is
unclear why the AC Feed sample produced a comparatively low
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
133
underflow density; rise rates were appropriate for a high-rate thickener while providing acceptable overflow clarity. Dynamic rheology testing, performed at expected underflow densities using a cup-and-bob apparatus on underflow from the continuous fill tests, is shown in Table 10-14; underflow yield stresses were found to be
acceptable for centrifugal pumping, and dynamic viscosity analysis showed reduced viscosity with increasing shear rate. Pressure filtration testing on the Detox Tails sample, using recessed chambers with a bench-scale filtration unit across a range
of feed solids concentrations, pressure profiles, and cake thicknesses, is shown in Table 10-15; the final cake moisture was high relative to the specification needed for filtered tailings stacking, and
filtration rates of 63 to 91 kg/m2/h were roughly an order of magnitude lower than typical tailings filtration, attributed to the fine feed particle size distribution and the oxidized nature of the solids — further thickening and filtration
test work on the products of pressure oxidation, CIL, and cyanide detoxification will be required to reach targeted moisture and filtration rates.
Table 10-11: Malvern Laser Diffraction Particle Size Analysis of Continuous Pressure Oxidation
Samples
AC Feed
AC Discharge
Detox Tails
D90 (µm)
75
76
50
D80 (µm)
~49
43
~23
D50 (µm)
13
12
6
D20 (µm)
~2.3
2.7
~1.7
D10 (µm)
1.2
1.4
1.0
Table 10-12: Required Solids Feed Concentration Ranges
Sample
Solids
Feed
Concentration Range for
Highest Flux Rate (%)
AC Feed
1 – 2
AC Discharge
5 – 7
Detox Tails
3 – 5
Table 10-13: Continuous Fill Tests on Continuous Pressure Oxidation
Samples
AC Feed
AC Discharge
Detox Tails
Feed Suspended Solids Concentration (%)
1.5
6
5
Flocculant Dose Range Tested (g/t)
50 - 100
60 - 80
40 -65
Unit Area Range Tested (m2/tpd)
0.13 - 0.25
0.04 -0.10
0.042 - 0.10
Internal Rise Rate Range Tested (m/h)
12.0 - 23.3
10.6 - 18.7
9.1 - 21.7
Est. Bed Suspended Solids – 0.5 hr (wt%)
15.3
35.9
36.5
Est. Bed Suspended Solids – 1 hr (wt%)
18.7
41.0
41.5
Est. Bed Suspended Solids – 2 hr (wt%)
23.2
44.8
45.8
Est. Bed Suspended Solids – 3 hr (wt%)
26.5
47.1
47.0
Est. Bed Suspended Solids – 6 hr (wt%)
28.3
48.2
47.5
Recommended Floc Dose Range (g/t)
70 - 80
70 - 80
55 - 65
Design Unit Area (m2/tpd)
0.25
0.07
0.07
Design Overflow Clarity (mg/L)
55 - 65
75 - 90
< 50
Table 10-14: Slurry Rheology on Continuous Pressure Oxidation
Samples
AC Feed
AC Discharge
Detox Tails
Underflow Density (wt%)
19
40
41
Yield Stress (Pa)
1.65
40.5
18.7
Bingham Plastic Viscosity (cP)
14.4
20.6
28.7
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
134
Table 10-15: Pressure Filtration on Cyanide
Detoxification Samples
Detox Tails
Chamber Type
Recessed
Filter Media
POPR 966
Feed Suspended Solids (wt%)
41
Feed Pressure (kPa)
1,000 & 1,500
Fill Time (min)
5.25 – 9.0
Cake Thickness (mm)
32 & 50
Air Blow Pressure (kPa)
310 – 700
Air Blow Time (min)
10
Filtrate Quality (ppm)
5,243 – 7,219
Ultimate Cake Moisture (wt%)
28.7 – 29.9
Dry Cake Density (kg/m3)
1,202 – 1,236
Final Filtration Rate (kg/m2/h)
63 – 91
SGS Metallurgical Program (2025-2026)
In 2025, a metallurgical test program was conducted at SGS in Lakefield, Ontario, Canada, focused on the South Pacific Zone (SPZ), for which
there was not a significant amount of prior test work; the program focused on pressure oxidation followed by gold recovery by CIL and was completed in 2026.
Bond ball mill grindability tests were performed on samples SPZN, SPZCOM1, SPZCOM2, and SPZCOM3 at a 105 µm grind size (Table 10-16).
Table 10-16: Bond Ball Mill Grindability Test
Results
Sample ID
Grind Size
(µm)
F80
(mm)
P80
(mm)
Work Index
(kWh/t)
Imperial
Work Index
(kWh/t)
Metric
SPZN
105
2,485
85
16.7
18.4
SPZCOM1
105
2,446
80
14.4
15.9
SPZCOM2
105
2,108
73
13.8
15.3
SPZCOM3
105
2,618
76
18.0
19.8
Pressure oxidation test work was undertaken on the eight SPZ samples to evaluate the effectiveness of
oxidative treatment in overcoming their refractory nature, at a grind target P80 of 75 µm, pre-acidulation residence time of 6 hours (where required), pulp density of 35% by weight, temperature of
199°C (390°F), pressure of 2,048 kPag, and residence time of 45, 60, or 75 minutes. Four tests per sample were run: one with no pre-acidulation and three with
pre-acidulation at varying residence time, using 2 L titanium autoclave vessels; acid addition (where required) was applied over a six-hour pre-acidulation period with hourly pH and ORP readings. Initial tests based pre-acidulation on the carbonate assay of each feed (targeting a 1:1
carbonate-to-sulfide ratio), but early results (POX tests 2R, 6, 10, 14, 22, and 26) showed solids clumping, unreacted solids, and poor sulfide oxidation; pre-acidulation was subsequently modified to target a pH of 2, which increased sulfide and arsenopyrite oxidation and gold recovery from CIL. Final POX pulp pH across the modified tests averaged 1.24, with an
average ORP of 581 mV (excluding POX 7, whose ORP of 21 mV likely reflected a malfunctioning probe).
Standard CIL bottle roll tests were
conducted on each of the eight samples, without POX pre-treatment, to provide a baseline recovery, at pH 10.5, NaCN concentration of 1.0 g/L, a 6-hour pre-aeration duration, and a 24-hour CIL residence time. POX residues were subsequently forwarded for CIL testing using the same conditions as the baseline CIL tests.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
135
Third-Party Toll Milling Bench Top Autoclave Tests
As part of the toll milling process, bench top autoclave tests are conducted at the on-site laboratory
of the third-party toll milling facility that currently processes Granite Creek Underground production, on a composite of each monthly delivery lot, to assign a gold recovery value to that lot’s production; the result is used, together with
the results from other feed components delivered that month, to reconcile the plant’s actual gold recovery to each individual component. The bench top tests are conducted at conditions analogous to the plant: a temperature of 225°C
(437°F), a pressure of 3,172 kPag (460 psig), and a residence time of 60 minutes.
10.2
Sample Representativeness
The degree to which the metallurgical test samples are representative of the various types and styles of mineralization at Granite Creek
Underground, and of the deposit as a whole, is discussed below by test program and supported by the spatial distribution and grade/composition variability of the samples tested.
FLSmidth 2022 Program Samples
The FLSmidth 2022 program tested 17 samples selected to span the primary mineralized zones of the Granite Creek Underground deposit — OG
Zone (upper and lower sulfide, oxide, and high-/low-grade variability samples), Otto Zone (upper and lower sulfide and high-/low-grade variability samples), Adams Peak
Zone (upper, lower, and high-/low-grade variability samples), the Otto/Adams Peak composite (OAPC), and variability samples from the Deep Range Front, Range Front, and South Pacific Zones — together with
dedicated comminution samples for each zone. Head assays for the sample set are shown in Table 10-17, ranging from 4.56 g/t (Adams Peak Zone lower) to 39.43 g/t Au (OG Zone comminution sample), with sulfide
sulfur content ranging up to 5.84% (Adams Peak Zone upper), reflecting the range of mineralization styles and grades present across the deposit.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
136
Table 10-17: Underground Samples Head Assays from
FLS Program
Sample
Number
Description
ID
Au g/t
Au oz/
st
Ag g/t
Ag oz/
st
S=%
Corg%
1
OG Zone Upper (Sulfide)
OGU
14.54
0.424
4.63
0.135
1.96
0.44
2
OG Zone Lower (Sulfide)
OGL
28.46
0.830
9.39
0.274
2.98
0.12
OG Zone Oxide
OGOX
12.48
0.364
11.55
0.337
0.43
0.34
3
OG Zone High Grade (Sulfide) Variability Sample
OGHG
37.71
1.100
7.41
0.216
3.89
0.10
4
OG Zone Low Grade (Sulfide) Variability Sample
OGLG
8.43
0.246
22.29
0.650
2.73
0.36
OG Zone Comminution Sample No. 1
OGCOM1
12.75
0.372
153.26
4.470
2.33
0.33
OG Zone Comminution Sample No. 2
OGCOM2
39.43
1.150
9.77
0.285
0.04
0.03
OG Zone Comminution Sample No. 3
OGCOM3
10.39
0.303
7.10
0.207
0.15
0.02
OG Zone Comminution Sample No. 4
OGCOM4
9.94
0.290
4.22
0.123
0.00
0.19
OG Zone Comminution Sample No. 5
OGCOM5
26.23
0.765
3.70
0.108
0.00
0.03
OG Zone Comminution Sample No. 6
OGCOM6
12.89
0.376
1.92
0.056
1.41
1.12
5
Otto Zone Upper (Sulfide)
OTU
16.70
0.487
4.01
0.117
1.14
0.18
6
Otto Zone Lower (Sulfide)
OTL
14.98
0.437
10.94
0.319
1.67
0.38
7
Otto Zone High Grade (Sulfide) Variability Sample
OTHG
20.40
0.595
12.89
0.376
0.79
0.19
8
Otto Zone Low Grade (Sulfide) Variability Sample
OTLG
6.24
0.182
1.10
0.032
1.48
0.22
Otto Zone Comminution Sample No. 1
OTCOM1
8.40
0.245
0.00
0.000
3.01
0.11
Otto Zone Comminution Sample No. 2
OTCOM2
13.92
0.406
0.99
0.029
1.81
0.47
Otto Zone Comminution Sample No. 3
OTCOM3
9.50
0.277
1.06
0.031
2.84
0.27
9
Adams Peak Zone Upper
APU
7.65
0.223
0.93
0.027
5.84
0.33
10
Adams Peak Zone Lower
APL
4.56
0.133
4.90
0.143
4.29
0.25
11
Adams Peak Zone High Grade Variability Sample
APHG
20.43
0.596
0.99
0.029
2.86
0.20
12
Adams Peak Zone Low Grade Variability Sample
APLG
6.45
0.188
8.23
0.240
3.20
0.13
Adams Peak Zone Comminution Sample No. 1
APCOM1
11.04
0.322
3.12
0.091
3.12
0.37
Adams Peak Zone Comminution Sample No. 2
APCOM2
11.76
0.343
15.05
0.439
3.85
0.17
13
Otto/Adams Peak Zone Composite
OAPC
11.35
0.331
3.67
0.107
2.25
0.24
14
Deep Range Front Zone Variability Sample
DRFV
6.31
0.184
2.78
0.081
1.73
0.26
15
Range Front Zone Variability Sample
RFV
7.30
0.213
2.85
0.083
2.33
0.17
16
South Pacific Zone Variability Sample
SPZV
20.16
0.588
1.23
0.036
2.79
0.75
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
137
FLSmidth 2025 Program Feed Blend
The FLSmidth 2025 continuous pressure oxidation program used a blended feed representing the early years of commercial operation across three i-80 properties — 26% Granite Creek, 58% Ruby Hill, and 16% Cove (Table 10-18) — rather than Granite Creek material alone; the assayed head composition of each
source and of the blend is shown in Table 10-18. The blend’s composition (11.8 g/t Au, 18.2% carbonate, and 1.94% sulfide sulfur, assayed) indicates a high level of carbonate and sulfide sulfur relative
to the design parameters of the Lone Tree pressure oxidation plant. Because the blend includes material from the Adam’s Peak Zone, which is not part of the Granite Creek Underground mine plan, recovery data from the continuous tests on this
blend were not used directly in Granite Creek Underground recovery modeling (see Section 10.4); the blend nonetheless demonstrates the pilot-scale continuous process response of Granite Creek material processed together with other i-80 feed sources under commercial-scale conditions.
Table
10-18: Composition of Continuous Pressure Oxidation Feed Blend
Project
Au
(g/t)
Au
(oz/st)
Corg
(%)
Ctotal
(%)
CO3
(%)
Stotal
(%)
Ssulfide
(%)
Granite Creek
9.5
0.277
0.39
3.2
13.8
1.8
1.52
Ruby Hill
6.8
0.198
0.11
3.3
16.1
2.7
2.43
Cove
15.1
0.440
0.11
6.7
32.9
0.9
0.86
Blend (assayed)
11.8
0.344
0.16
3.8
18.2
2.0
1.94
SGS 2025 Program Samples
The SGS 2025 program tested eight half-HQ-core samples selected
to represent the South Pacific Zone (SPZ) — south, middle, and north variability samples, high- and low-grade variability samples, and three comminution samples (Table
10-19). Gold grades of the delivered samples ranged from 5.34 to 21.8 g/t, with composite samples displaying a consistent gold grade around 15 g/t; gold cyanide analysis showed three samples (SPZM, SPZN, and
SPZCOM2) were highly refractory (AuCN less than 10% of total gold) while three others (SPZS, SPZHG, and SPZCOM3) displayed partial free gold or weak refractoriness. Sulfide sulfur levels varied from 1.3% to 3.4%, mercury from 42 to 256 g/t (likely
cinnabar), arsenic from 0.19% to 1.91%, total carbon from 0.47% to 4.7%, and carbonate from 0.49% to 20.2% — head assays for the sample set are shown in Figure 10-10.
Table 10-19: South Pacific Test Program Sample List
Sample ID
Sample Description
SPZS
South Pacific Zone South Variability Sample
SPZM
South Pacific Zone Middle Variability Sample
SPZN
South Pacific Zone North Variability Sample
SPZHG
South Pacific Zone High Grade Variability Sample
SPZLG
South Pacific Zone Low Grade Variability Sample
SPZCOM1
Comminution Sample No. 1
SPZCOM2
Comminution Sample No. 2
SPZCOM3
Comminution Sample No. 3
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
138
Source: SGS
Figure 10-10: SGS Metallurgical Program Head Assays
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
139
Mineralogical Representativeness (SGS Samples)
Bulk modal mineralogy conducted on four SGS samples (SPZS, SPZN, SPZHG, and SPZCOM2), shown in Figure
10-11, found the samples primarily composed of quartz (41% to 68%), calcite (4.6% to 32.7%), sericite/muscovite (5.8% to 11%), and clays (9.3% to 10.2%), with SPZCOM2 reporting the highest sulfide
concentration at 6.1%. The degree of particle liberation of pyrite-marcasite, arsenopyrite, silicates, and carbonates by mass is shown in Figure 10-12 through Figure
10-15: SPZHG showed the highest liberation of pyrite and arsenopyrite, while SPZCOM2 showed poor sulfide liberation and highly locked arsenopyrite; all samples showed poor liberation of arsenopyrite, with no
free arsenopyrite present, suggesting the refractory gold in the SPZ is likely associated with arsenic.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
140
Source: SGS, 2025
Figure 10-11: Bulk Modal (QEMSCAN) Results
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
141
Source: SGS (2026)
Figure 10-12: Pyrite/Marcasite Liberation by Mass
Source: SGS (2026)
Figure 10-13: Arsenopyrite Liberation by Mass
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
142
Source: SGS (2026)
Figure 10-14: Silicate Liberation by Mass
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
143
Source: SGS (2026)
Figure 10-15: Carbonate Liberation by Mass
Location of Metallurgical Samples
Figure 10-16 and Figure 10-17 show the locations of the test
samples for the recent FLSmidth and SGS test programs within the mining shapes of the Granite Creek deposits, in section and plan view respectively. From a spatial perspective, selection of samples for the Granite Creek metallurgical test programs
appears to represent the extents of the deposit.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
144
Source: i-80 Gold
Figure 10-16: Locations of Metallurgical Samples (Section View)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
145
Source: i-80 Gold
Figure 10-17: Locations of Metallurgical Samples (Plan View)
Variability and Representativeness of Metallurgical Samples
Figure 10-18 through Figure 10-21 are histograms illustrating
the variability of key attributes across the samples of the Granite Creek Underground test programs — gold grade, organic carbon content, carbonate content, and sulfide sulfur content.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
146
Source: i-80 Gold
Figure 10-18: Distribution of Gold Grade in Metallurgical Samples
Source: i-80 Gold
Figure 10-19: Distribution of Organic Carbon in Metallurgical Samples
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
147
Source: i-80 Gold
Figure 10-20: Distribution of Carbonate in Metallurgical Samples
Source: i-80 Gold
Figure 10-21: Distribution of Sulfide Sulfur in Metallurgical Samples
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
148
Table 10-20 shows the projected life-of-mine range of gold grade, organic carbon, carbonate, and sulfide sulfur content for Granite Creek Underground autoclave feed, and Table
10-21 compares the average and range of these feed characteristics for the FLS 2023 and SGS 2025 test programs against that projected feed. Based on this comparison, the grades of the samples tested — in
terms of gold, organic carbon, carbonate, and sulfide sulfur — are considered representative of the feed expected during mining.
Table 10-20: Projected Feed from Granite Creek Underground
Gold Grade
(g/t)
Gold Grade
(oz/st)
Organic
Carbon
(%)
Carbonate
(%)
Sulfide
Sulfur
(%)
Life of Mine
7.85
0.229
0.30
11.3
1.24
Annual Maximum
9.77
0.285
0.38
12.7
1.71
Annual Minimum
7.65
0.223
0.20
9.4
0.78
Table 10-21: Summary of Feed Values for Granite Creek Test
Programs
Gold Grade
(g/t)
Gold Grade
(oz/st)
Organic Carbon
(%)
Carbonate
(%)
Sulfide Sulfur
(%)
FLS 2023 Program
Average
14.6
0.426
0.28
8.8
2.2
Maximum
39.5
1.152
1.12
21.4
5.8
Minimum
4.5
0.131
0.02
0.01
0.0
SGS 2025 Program
Average
12.9
0.376
0.70
8.3
2.1
Maximum
21.8
0.636
1.30
20.2
2.7
Minimum
5.3
0.155
0.33
0.5
1.1
10.3
Laboratories
Metallurgical testing on Granite Creek Underground samples has been performed at five independent, commercial or contract laboratories and
facilities, none of which is affiliated with i-80 Gold Corp. (the registrant): Dawson Metallurgical Laboratories (Salt Lake City, Utah), which completed the 2005-2006 autoclave
pre-treatment program on behalf of Atna; FLSmidth, whose FLSmidth Minerals Testing and Research Center pilot-scale autoclave facility in Salt Lake City, Utah performed both the 2022-2023 bench-scale/continuous
test program and the 2025-2026 continuous pilot-plant program; McClelland Laboratories, Inc. (Reno, Nevada), which performed particle size analysis and bench-scale autoclave testing on the components and blend of the 2025 FLSmidth continuous
program; SGS, whose Lakefield, Ontario, Canada facility performed the 2025-2026 South Pacific Zone pressure oxidation and cyanidation test program; and the on-site laboratory of the third-party toll milling
facility that currently processes Granite Creek Underground production, which performs ongoing bench top autoclave testing on monthly production lots as part of the toll milling reconciliation process. Each of these laboratories is an established,
independent commercial metallurgical testing facility with no ownership, financial, or other relationship to i-80 Gold Corp. The source technical documentation reviewed by the QP does not state the specific
accreditation or certification status (e.g., ISO 17025) held by each laboratory for the metallurgical testing performed; accordingly, no representation of formal accreditation is made here beyond the independent, commercial nature of each facility.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
149
10.4
Relevant Results
The results of the metallurgical test programs, and the basis for recovery estimates and assumptions used in this technical report summary, are
presented below by test program, followed by the QP’s synthesis of expected gold recovery by mining zone and process route.
Dawson Program Results
The cyanide leach gold recoveries from the Dawson baseline tests and autoclave pre-treatment tests are
shown in Table 10-22. The refractory material responded well to autoclave pre-treatment: for samples with both a baseline cyanide leach (no pre-treatment) and an autoclave-residue cyanide leach, average recovery increased from 52% (baseline) to 92% (post-autoclave). There is a wide range of baseline gold recoveries — from 11% to 86% — among
samples with measured sulfide sulfur; an attempted correlation between sulfide sulfur content and baseline gold recovery had a very low coefficient of determination and is not presented. There was an inverse relationship between sulfide sulfur
content and cyanide solubility (no autoclave treatment), shown in Figure 10-22, with a reasonable correlation between solubility and sulfide grade; prior test work by McClelland Labs had found that sulfide
sulfur content did not correlate well with cyanide solubility, and other factors (such as the presence of organic carbon, and gold not directly associated with pyrite) also appear to influence cyanide solubility.
Table 10-22: Autoclave Pre-Treatment Tests from Dawson Test
Work Program
Sample
Year of
Test
Work
Program
Grind
P80
(µm)
Gold
Head
Assay
(g/t)
Gold
Head
Assay
(oz/st)
Total
Sulfide
Sulfur
(%)
Total
Carbon
(CO2)
Head
Assay
(%)
Cyanide Leach Gold
Recovery (%)
Baseline
Tests
Tests on
Autoclave
Residue
Ogee Samples
Ogee (Right Rib + Left Rib)
2005
75
13.71
0.400
0.0
0.82
86
93
RF Zone Samples
RF_Met-1 (33941)
2005
75
8.23
0.240
1.21
2.27
52
93
RF_Met-2 (33942)
2005
75
14.74
0.430
2.61
1.76
61
95
RF_Met-4 (34259)
2005
75
14.74
0.430
2.32
2.43
11
89
CX Zone Samples
APCX-204
2006
75
9.26
0.270
0.00
5.34
94
N/A
APCX-211
2006
75
11.31
0.330
0.00
4.29
85
N/A
APCX-219
2006
75
11.31
0.330
0.84
0.77
60
91
APCX-226
2006
45
19.20
0.560
1.53
2.70
42
94
Undefined Samples
AMW-002
2006
75
11.31
0.330
0.03
0.35
77
N/A
MET 1
2005
75
17.49
0.510
1.21
2.27
N/
A
93
MET 2
2005
75
10.97
0.320
2.61
1.76
N/
A
95
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
150
Source: i-80 Gold
Figure 10-22: Gold Cyanide Solubility and Sulfide Influence – Ogee Samples
FLSmidth 2022 Batch Autoclave Results
Averaged baseline and batch pressure oxidation CIL results by zone are shown in Table 10-23 Baseline
CIL tests confirmed the refractory nature of the samples, with an average recovery of 31.3% Au across all zones. Acidic BTAC conditions produced the highest gold recoveries: Condition A produced the highest average sulfide oxidation (95.6%) and
average recovery (88.6% Au), ranging from 70.2% (OGLG, 99.5% sulfide oxidation) to 95.7% (SPZV, 99.6% sulfide oxidation); Condition E produced the next-highest average sulfide oxidation (71.8%) and average recovery (79.0% Au), ranging from 42.2%
(APHG, 31.8% sulfide oxidation) to 94.5% (OGL, 61.7% sulfide oxidation). Alkaline conditions produced lower sulfide oxidation and recovery: Condition F (finer grind) performed best among the alkaline conditions, averaging 60.3% sulfide oxidation and
72.6% recovery; Condition B averaged 59.8% sulfide oxidation and 69.2% recovery; and the trona-addition conditions (C and D) produced the lowest results — Condition C averaged 44.1% sulfide oxidation and 61.5% recovery, and Condition D
averaged 46.7% sulfide oxidation and 64.6% recovery. By zone: Adam’s Peak and Deep Range Front were the most refractory based on baseline CIL recoveries, while the SPZ variability sample (SPZV) responded well to all BTAC conditions, averaging
90.5% recovery across sulfide oxidations ranging from 43.0% (Condition C, 79.0% recovery) to 99.5% (Condition A, 95.7% recovery). OG Zone samples showed a positive trend between gold head grade and recovery and had the highest recoveries of the
primary zones regardless of POX condition, with the highest average recoveries under Condition F followed by Condition A. Otto Zone and Adam’s Peak Zone samples showed no clear grade-recovery relationship; Otto Zone recoveries were highest
under acidic conditions (E followed by A), and Adam’s Peak Zone recoveries were highest under Condition A, with the other three conditions notably lower. The OAPC composite responded best to acidic Conditions A and E and
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
151
poorly to alkaline conditions. RFV and DRFV samples responded well only to Condition A (95.0% and 89.1% recovery respectively), with recoveries below 60% under all other conditions. Overall,
there is a positive trend between sulfide sulfur oxidation and gold recovery, shown in Figure 10-23
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
152
Table 10-23: Underground Samples Baseline and
Batch Pressure Oxidation CIL Results from FLS Program
Parameter
OG Zone
Otto Zone
Adam’s Peak
Otto /Adam’s Peak
Deep Range Front
Range Front
South Pacific
N/A
Baseline Recovery (% Au)
41.50
46.75
9.25
24.00
10.00
34.00
43.00
A
S Oxidation (%)
86.26
99.49
98.87
99.33
95.87
96.62
99.48
Recovery (% Au)
84.12
88.77
90.65
83.18
89.05
94.96
95.65
NaCN Consumption (kg/t)
0.66
0.75
0.66
0.50
0.61
0.31
0.80
B
S Oxidation (%)
71.11
56.10
57.71
44.00
32.95
42.06
98.68
Recovery (% Au)
85.17
67.12
61.33
56.88
42.79
59.32
94.19
NaCN Consumption (kg/t)
1.41
1.07
0.73
1.81
1.62
1.31
1.82
C
S Oxidation (%)
66.56
38.66
32.35
38.22
35.26
38.63
43.01
Recovery (% Au)
75.75
66.71
45.43
52.17
43.33
57.64
79.09
NaCN Consumption (kg/t)
1.11
1.07
1.60
1.79
1.71
1.91
1.17
D
S Oxidation (%)
60.60
37.91
42.81
35.56
31.21
34.76
80.47
Recovery (% Au)
80.40
66.93
52.71
50.99
40.10
57.79
84.98
NaCN Consumption (kg/t)
0.75
1.11
1.65
0.92
1.65
1.90
1.65
E
S Oxidation (%)
65.20
92.98
67.32
68.67
36.42
42.92
98.84
Recovery (% Au)
86.59
89.31
70.02
81.70
41.47
63.04
93.95
NaCN Consumption (kg/t)
1.31
0.99
1.42
0.38
0.47
1.80
1.85
F
S Oxidation (%)
67.68
60.17
58.13
44.89
32.95
45.06
98.80
Recovery (% Au)
86.40
72.76
65.74
61.13
45.18
60.99
94.83
NaCN Consumption (kg/t)
0.76
1.33
0.71
1.07
1.51
1.39
2.08
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
153
Source: TR Raponi Consulting Ltd. (2023)
Figure 10-23: CIL Gold Recovery as a Function of Sulfide Sulfur Oxidation – Underground
Samples
FLSmidth 2022 Follow-Up BTAC and Roasting Results
Actual and predicted sulfide oxidation results from the follow-up BTAC and roasting tests are compared
in Table 10-24, and gold recovery results in Table 10-25. Overall, actual sulfide oxidation exceeded predicted values, and gold recoveries slightly exceeded predicted
values; extended retention times did not significantly improve recovery, and trona addition again did not prove beneficial. Benchtop roasting (BTR) provided superior sulfide oxidation (average 97.0%) and gold recovery (average 83.0%) compared to all
alkaline BTAC blend results.
Table 10-24: Granite Creek Underground Metallurgical Testing
Program Follow-Up BTAC Sulfide Oxidation Results Compared to Predicted Results
Test Condition
Actual Results
Predicted Results
Blend 1
Blend 2
Blend 3
Average
Blend 1
Blend 2
Blend 3
Average
I
48
57
49
51
—
—
—
—
II
43
52
42
46
43
60
50
51
III
39
49
39
42
39
26
33
33
IV
37
35
41
38
36
33
37
35
V
55
52
45
51
—
—
—
—
BTR
99.0
93.9
98.2
97.0
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
154
Table 10-25: Granite Creek Underground
Metallurgical Testing Program Follow-Up BTAC Gold Recovery Results Compared to Predicted Results
Test Condition
Actual Results
Predicted Results
Blend 1
Blend 2
Blend 3
Average
Blend 1
Blend 2
Blend 3
Average
I
46
75
71
64
—
—
—
—
II
65
74
70
70
63
69
66
66
III
67
73
68
69
63
64
64
64
IV
52
73
69
65
62
68
65
65
V
69
77
66
71
—
—
—
—
BTR
84.0
85.0
80.0
83.0
FLSmidth 2022 Continuous POX Results
Continuous POX discharge leached in a hot stir tank showed no significant difference in gold recovery compared to POX discharge leached in a
bottle roll at ambient temperature; the primary effect of the higher temperature was increased lime and cyanide consumption. Table 10-26 compares results across the three continuous conditions: Conditions A
and E (acidic) achieved much higher gold recovery and sulfide oxidation than Condition B (alkaline),but also consumed significantly more lime and recovered much less silver. The acid POX conditions achieved higher sulfide oxidation and therefore
higher gold recoveries but required significantly more lime for neutralization; the resulting increased lime consumption likely caused much of the silver to be locked within jarosite, which did not appear to form under alkaline POX conditions
— a deleterious effect on silver recovery specific to the acidic POX route.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
155
Table 10-26: Underground Samples (OAPC) Continuous
Autoclave Tests from FLS Program
Parameter
Baseline Results
Run 1 (B) – Alkaline
Run 2 (E) – Partial Acidulation
Run 3 (A) – Full Acidulation
Bottle Roll Conditions
Hot Stir
Bottle Roll
BTAC
Hot Stir
Bottle Roll
BTAC
Hot Stir
Bottle Roll
BTAC
Sulfide Oxidation (%)
49
44
97
69
96
99
CIL Recovery (% Au)
24
63
63
57
89
91
81.7
91
91
83
CIL Recovery (% Ag)
16
50
42
—
3
3
—
2
1
—
Lime Consumption (kg/t)
1.3
5.23
2.99
—
43.3
39.19
—
55.88
52.75
—
Cyanide Consumption (kg/t)
2.45
2.95
1.79
1.81
2.56
1.83
0.38
3.3
1.64
0.50
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
156
FLSmidth 2022 Cyanide Detoxification Results
Reagent consumption in the two cyanide detox tests is shown in Table 10-27 (lime was used during bulk
CIL testing to prepare the feed for both detox tests). Final cyanide (CNWAD) results from both tests, sampled from the feed every two hours and from reactors 1, 2, and the discharge every hour,
are shown in Table 10-28; the additional SMBS added in Test 1 resulted in significantly lower CNWAD compared to Test 2.
Table 10-27: Underground Cyanide Detox Reagent Consumption from FLS Program
Reagent
Detox 1
Detox 2
Lime Consumption (kg/t)
1.44
1.44
SO2 Consumption (kg/t)
3.45
3.42
Lime:SO2 (wt/wt)
0.42
0.60
CuSO4 Maintained (mg/L)
29.6
32.1
CuSO4 Consumption (kg/t)
0.07
0.09
Table 10-28: Underground Cyanide Detox WAD from FLS Program
Time (h)
Detox 1
Detox 2
CNWAD (mg/L)
1
22.5
51.1
2
25.9
42.8
3
23.2
46.1
4
33.2
50.5
FLSmidth 2025 Continuous POX Results
Sulfide oxidation and carbonate decomposition results from the 2025 continuous pressure oxidation test are shown in Table 10-29. Run 2 (partial acidulation) showed lower-than-expected sulfide oxidation in the middle compartments, though results approached expectations by discharge; because acidic Run 2 immediately followed alkaline Run
1, higher residual carbonate levels in the autoclave may have created a lower-oxygen environment due to CO2 evolution, resulting in lower-than-expected sulfide oxidation for Run 2. As a point
of comparison, bench top autoclave tests on the same feed blend at the same conditions are shown in Table 10-30. The amount of lime required to raise the pH of the autoclave discharge slurry to its target
cyanide-leaching pH is shown in Figure 10-24. Gold recovery results from the continuous POX CIL tests (each run tested in duplicate) are shown in Table 10-31, and gold
recovery results from the corresponding bench top autoclave tests, CIL-leached under the same conditions, are shown in Table 10-32. The reason for the lower recoveries
achieved by the continuous pressure oxidation tests compared to the bench top tests, despite similar levels of sulfide sulfur oxidation, is not fully understood; as noted in Section 10.2, this continuous test blend includes Adam’s Peak
Zone material not part of the Granite Creek Underground mine plan, and its recovery results were accordingly not used directly in the zone-by-zone recovery modeling
presented later in this section.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
157
Table 10-29: Pressure Oxidation Continuous Test,
Sulfide Sulfur Oxidation and Carbonate Decomposition
Run
Sample
Sulfide Sulfur
Assayed
(%)
Carbonate
Assayed
(%)
Sulfide Oxidation,
Relative to Head
(%)
Carbonate
Decomposition,
Relative to Head
(%)
1
Feed
1.94
18.2
C1-2
1.49
16.9
24.4
8.55
C3
1.34
16.7
32.0
9.36
C4
1.32
16.5
33.0
10.5
C5
1.20
16.3
29.1
11.5
C6
1.10
16.0
44.2
13.4
Discharge
1.08
16.4
45.2
11.3
2
Feed
1.94
0.30
98.4
C1-2
1.23
0.08
37.6
99.6
C3
0.74
0.13
62.5
99.3
C4
0.47
0.15
76.2
99.2
C5
0.58
0.16
70.6
99.2
C6
0.52
0.15
73.6
99.2
Discharge
0.25
0.12
87.3
99.4
3
Feed
1.94
0.25
98.6
C1-2
0.51
0.10
74.1
99.5
C3
0.29
0.05
85.3
99.7
C4
0.20
0.05
89.9
99.7
C5
0.12
0.05
93.9
99.7
C6
0.20
0.05
89.9
99.7
Discharge
0.19
0.05
90.4
99.7
2
Bulk
0.41
0.16
78.9
99.1
Table 10-30: Bench Top Autoclave Tests on Continuous Pressure
Oxidation Feed Blend
Sample
Sulfide Oxidation
45-min Baseline
POX
(%)
45-min Acidic
POX
(%)
60-min Acidic
POX
(%)
75-min Acidic
POX
(%)
CONT
48
82
89
80
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
158
Source: FLSmidth (2026)
Figure 10-24: Neutralization Lime Usage in Continuous Pressure Oxidation Discharge
Table 10-31: Continuous Pressure Oxidation, CIL Au Recovery
Test
Au
Recovery
(%)
NaCN
Consumption
(kg/t)
NaCN
Consumption
(lb/st)
Lime
Consumption
(kg/t)
Lime
Consumption
(lb/st)
Run 1a
77
1.38
3.35
2.40
5.83
Run 1b
77
1.31
3.18
2.49
6.05
Run 2a
80
1.82
4.42
42.86
104.16
Run 2b
76
2.02
4.91
34.96
84.96
Run 3a
88
1.62
3.94
49.89
121.24
Run 3b
88
1.49
3.62
56.10
136.33
Bulk CIL
68
0.84
2.04
66.54
161.70
Table 10-32: Bench Top Autoclave, CIL Au Recovery
Sample
45-min
Baseline POX
(%)
45-min
Acidic POX
(%)
60-min
Acidic POX
(%)
75-min
Acidic POX
(%)
CONT
77
94
96
96
SGS Program Results
Results from the SGS pressure oxidation tests on the eight SPZ samples are shown in Table 10-33. The
initial tests, with insufficient acid addition, achieved low sulfide oxidation of 15% to 30%, corresponding to low free acidity, minimal iron in solution, and high residual sulfide and sulfur content; once sufficient acid was added during the pH-2 pre-acidulation, good to excellent sulfide oxidation efficiencies were achieved, confirming that free acid availability is the leading control on POX
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
159
performance for all SPZ samples tested. Results from the baseline CIL tests (without POX pre-treatment) are shown in Table
10-34; these tests averaged 26.9% gold recovery and ranged from 3.6% to 56.0%, confirming the refractory nature of the SPZ material. Results from CIL testing of the POX residues, using the same conditions as
the baseline tests, are shown in Table 10-35: the extent of sulfide oxidation was the controlling factor on gold recovery, with recovery consistently above 90% where POX oxidation was good to excellent, and
lower recoveries always associated with poor oxidation. This dependence of gold recovery on sulfide oxidation is illustrated in Figure 10-25.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
160
Table 10-33: POX Results
Test ID
Sample ID
Acid
Addition
(kg/t)
Acid Addition (lb/st)
POX Res.
Time
(min)
POX Disch.
Free Acid
(g/
L H2SO4)
POX
Residue S=
(%)
POX
Mass Loss
(%)
POX S=
Oxidation
(%)
POX 1
SPZS
0
0.00
45
0.0
0.82
4.8
28.3
POX 2R
SPZS
356
865.14
45
9.41
0.20
-7.3
80.3
POX 2RR
SPZS
281
682.88
45
12.6
0.27
-2.7
74.6
POX 3
SPZS
290
704.75
60
8.92
0.19
-7.6
81.2
POX 4
SPZS
325
789.81
75
11.3
0.08
-11.4
91.8
POX 5
SPZM
0
0.00
45
0.0
1.45
4.0
23.1
POX 6
SPZM
80
194.41
45
0.0
1.50
-2.2
15.3
POX 6R
SPZM
121
294.05
45
10.3
0.47
-2.1
73.5
POX 7
SPZM
215
522.49
60
20.0
0.16
-6.1
90.6
POX 8
SPZM
148
359.67
75
39.3
0.08
-8.0
95.2
POX 9
SPZN
0
0.00
45
0.0
1.76
2.3
23.9
POX 10
SPZN
177
430.14
45
5.0
0.84
-6.2
60.5
POX 10R
SPZN
217
527.35
45
13.5
1.19
-3.9
45.3
POX 11R
SPZN
298
724.19
60
14.1
0.34
-45.8
78.1
POX 12
SPZN
227
551.65
75
18.5
< 0.05
-8.1
97.6
POX 13
SPZHG
0
0.00
45
0.0
1.57
-0.1
25.1
POX 14
SPZHG
13
31.59
45
0.0
1.52
-0.4
27.3
POX 14R
SPZHG
55
133.66
45
16.0
0.06
2.9
97.2
POX 15
SPZHG
60
145.81
60
16.0
0.51
-16.4
71.7
POX 16
SPZHG
84
204.13
75
23.7
< 0.05
3.9
97.7
POX 17
SPZLG
0
0.00
45
0.0
1.92
-1.7
27.6
POX 18
SPZLG
107
260.03
45
20.4
0.07
1.9
97.5
POX 19
SPZLG
111
269.75
60
23.4
< 0.05
2.8
98.2
POX 20
SPZLG
123
298.91
75
21.7
< 0.05
-18.2
97.8
POX 21
SPZCOM1
0
0.00
45
0.0
1.69
2.7
24.9
POX 22
SPZCOM1
56
136.09
45
0.0
1.84
0.2
16.2
POX 22R
SPZCOM1
96
233.30
45
15.8
0.27
-0.5
87.6
POX 23
SPZCOM1
182
442.29
60
19.5
0.06
11.4
97.6
POX 23R
SPZCOM1
120
291.62
60
10.2
0.79
-24.4
55.1
POX 24
SPZCOM1
116
281.90
75
16.2
0.30
7.1
87.3
POX 25
SPZCOM2
0
0.00
45
0.0
2.24
0.9
15.3
POX 26
SPZCOM2
137
332.93
45
0.0
2.30
4.3
16.0
POX 26R
SPZCOM2
187
454.44
45
23.2
0.05
-2.7
98.0
POX 27
SPZCOM2
145
352.38
60
10.3
0.91
-2.6
64.4
POX 28
SPZCOM2
184
447.15
75
8.25
< 0.05
1.5
98.1
POX 29
SPZCOM3
0
0.00
45
25.1
0.35
2.8
84.4
POX 30
SPZCOM3
12
29.16
45
33.1
< 0.05
10.4
97.9
POX 31
SPZCOM3
0
0.00
60
26.3
< 0.05
4.3
97.8
POX 32
SPZCOM3
0
0.00
75
23.3
< 0.05
1.7
97.7
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
161
Table 10-34: Baseline CIL Results
Test
ID
Sample
ID
Calc
Head
Au (g/t)
Calc Head
Au
(oz/st)
Assayed
Residue
Au
(g/t)
Assayed
Residue Au
(oz/st)
Au
Extraction
(%)
NaCN
Consumption
(kg/t)
NaCN
Consumption
(lb/st)
CaO
Consumption
(kg/t)
CaO Consumption
(lb/st)
CIL 1
SPZS
14.42
0.421
6.35
0.185
56.0
1.15
2.79
1.35
3.28
CIL 2
SPZM
7.84
0.229
7.56
0.221
3.6
0.70
1.70
0.95
2.31
CIL 3
SPZN
12.81
0.374
12.15
0.354
5.2
0.67
1.63
0.99
2.41
CIL 4
SPZHG
29.60
0.863
14.15
0.413
52.2
1.31
3.18
1.96
4.76
CIL 5
SPZLG
5.79
0.169
5.2
0.152
10.2
0.96
2.33
0.97
2.36
CIL 6
SPZCOM1
16.70
0.487
13.15
0.384
21.2
1.69
4.11
2.79
6.78
CIL 7
SPZCOM2
16.08
0.469
14.15
0.413
12.0
1.02
2.48
1.19
2.89
CIL 8
SPZCOM3
16.00
0.467
7.28
0.212
54.5
3.09
7.51
9.07
22.04
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
162
Table 10-35: POX Residue CIL Results
Test ID
Sample ID
POX
Test ID
Calc Head Au
(g/t)
Calc
Head Au (oz/st)
Assayed Residue Au
(g/t)
Assayed
Residue Au (oz/st)
Au
Extraction
(%)
NaCN
Consumption
(kg/t)
NaCN
Consumption (lb/st)
CaO
Consumption
(kg/t)
CaO
Consumption (lb/st)
CIL 9
SPZS
1
10.9
0.318
2.44
0.071
77.6
0.92
2.24
0.97
2.36
CIL 10
SPZS
2R
9.53
0.278
0.68
0.020
92.9
1.09
2.65
2.16
5.25
CIL 12
SPZS
2RR
10.2
0.298
1.06
0.031
89.6
0.88
2.14
2.15
5.22
CIL 36
SPZS
3
9.75
0.284
0.64
0.019
93.5
0.75
1.82
3.43
8.34
CIL 37
SPZS
4
9.48
0.277
0.50
0.015
94.8
0.64
1.56
2.33
5.66
CIL 5
SPZM
5
8.19
0.239
4.07
0.119
50.3
1.13
2.75
0.89
2.16
CIL 6
SPZM
6
8.02
0.234
3.90
0.114
51.4
1.24
3.01
0.81
1.97
CIL 15
SPZM
6R
7.54
0.220
1.52
0.044
79.9
1.34
3.26
4.00
9.72
CIL 38
SPZM
7
11.7
0.341
1.45
0.042
87.6
1.65
4.01
6.98
16.96
CIL 39
SPZM
8
7.27
0.212
0.44
0.013
94.0
0.78
1.90
4.61
11.20
CIL 17
SPZN
9
12.3
0.359
5.59
0.163
54.4
1.15
2.79
0.99
2.41
CIL 18
SPZN
10
11.6
0.338
1.66
0.048
85.7
1.45
3.52
1.87
4.54
CIL 26
SPZN
10R
12.0
0.350
1.94
0.057
83.8
1.58
3.84
4.76
11.57
CIL 45
SPZN
11R
11.6
0.338
0.88
0.026
92.4
1.12
2.72
5.49
13.34
CIL 40
SPZN
12
11.4
0.333
2.41
0.070
78.9
0.76
1.85
3.99
9.70
CIL 13
SPZHG
13
23.6
0.688
6.85
0.200
70.9
1.16
2.82
0.91
2.21
CIL 14
SPZHG
14
22.8
0.665
6.85
0.200
69.9
1.13
2.75
0.93
2.26
CIL 16
SPZHG
14R
22.3
0.650
1.51
0.044
93.2
0.68
1.65
2.56
6.22
CIL 41
SPZHG
15
13.1
0.382
0.95
0.028
92.7
1.26
3.06
4.74
11.52
CIL 22
SPZHG
16
18.4
0.537
1.11
0.032
94.0
0.91
2.21
3.31
8.04
CIL 23
SPZLG
17
5.61
0.164
2.22
0.065
60.5
1.03
2.50
0.63
1.53
CIL 25
SPZLG
18
5.42
0.158
0.50
0.015
90.9
0.91
2.21
3.53
8.58
CIL 19
SPZLG
19
5.25
0.153
1.53
0.045
71.0
1.05
2.55
2.58
6.27
CIL 20
SPZLG
20
5.16
0.151
0.28
0.008
94.6
1.05
2.55
3.12
7.58
CIL 29
SPZCOM1
21
15.8
0.461
7.95
0.232
49.7
1.57
3.82
1.67
4.06
CIL 30
SPZCOM1
22
15.5
0.452
8.39
0.245
45.7
0.95
2.31
1.13
2.75
CIL 43
SPZCOM1
22R
15.3
0.446
2.29
0.067
85.1
0.81
1.97
4.29
10.43
CIL 46
SPZCOM1
23R
15.2
0.443
4.36
0.127
71.3
0.84
2.04
5.23
12.71
CIL 24
SPZCOM1
24
16.7
0.487
1.39
0.041
91.7
1.38
3.35
5.27
12.81
CIL 33
SPZCOM2
25
14.8
0.432
6.75
0.197
54.3
1.16
2.82
0.85
2.07
CIL 34
SPZCOM2
26
14.3
0.417
7.98
0.233
44.3
1.02
2.48
0.73
1.77
CIL 44
SPZCOM2
26R
14.4
0.420
3.01
0.088
79.2
0.61
1.48
3.63
8.82
CIL 21
SPZCOM2
27
14.4
0.420
1.19
0.035
91.7
1.39
3.38
3.31
8.04
CIL 28
SPZCOM2
28
16.2
0.473
0.44
0.013
97.3
1.08
2.62
4.48
10.89
CIL 29
SPZCOM3
29
16.8
0.490
0.89
0.026
94.7
1.14
2.77
5.50
13.37
CIL 35
SPZCOM3
30
15.8
0.461
0.49
0.014
96.9
1.01
2.45
3.41
8.29
CIL 31
SPZCOM3
31
16.2
0.473
0.62
0.018
96.2
1.13
2.75
3.64
8.85
CIL 32
SPZCOM3
32
15.1
0.440
0.69
0.020
95.5
1.13
2.75
4.13
10.04
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
163
Source: i-80 Gold
Figure 10-25: South Pacific Gold Recovery as a Function of Sulfide Oxidation (SGS 2026)
Third-Party Toll Milling Results
Gold recovery results from the monthly toll milling bench top autoclave tests, from October 2023 through December 2025, are shown in Table 10-36; recovery averaged 91.1%, ranging from 88.9% to 95.4%.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
164
Table 10-36: Gold Recovery Results from Toll
Milling BTAC Tests
Lot
Month
Calculated
Head
Grade Au
(g/t)
Calculated Head
Grade Au (oz/st)
Residue
Grade Au
(g/t)
Residue
Grade
Au (oz/
st)
Gold
Recovery
(%)
Oct-2023 (#1)
10.02
0.292
0.89
0.026
90.5
Oct-2023 (#2)
10.13
0.295
1.07
0.031
88.9
Mar-2025
6.78
0.198
0.59
0.017
90.1
Apr-2025
7.10
0.207
0.62
0.018
90.5
May-2025
5.83
0.170
0.57
0.017
89.1
Jun-2025
6.25
0.182
0.65
0.019
89.6
Jul-2025
9.60
0.280
0.86
0.025
90.2
Aug-2025
8.06
0.235
0.48
0.014
93.6
Sep-2025
7.86
0.229
0.34
0.010
95.4
Oct-2025
8.07
0.235
0.55
0.016
93.3
Nov-2025
6.47
0.189
0.50
0.015
91.4
Dec-2025
7.64
0.223
0.65
0.019
90.5
Gold Recovery — Basis for Recovery Estimates
Expected gold recoveries for the Granite Creek Underground Project were developed from the BTAC test data described above, by mining zone and
material type.
Oxide-type material will not require pressure oxidation to achieve acceptable gold recovery and will be processed directly
by CIL. Gold recovery in CIL bottle roll tests on Granite Creek Underground samples, as a function of cyanide-soluble gold percent and of sulfide sulfur content, is shown in Figure 10-26 and Figure 10-27, respectively; at the lower range of sulfide sulfur content, CIL recovery decreases approximately linearly with increasing sulfide sulfur, and this portion of the data was used to model oxide CIL recovery
(only samples below 1% sulfide sulfur were considered for the sulfide sulfur-based function, since samples above 1% sulfide sulfur would not be processed by CIL alone without pressure oxidation). Combining the two regressions as an average yields an
expression for gold recovery by CIL without pressure oxidation as a function of cyanide-soluble gold, fire-assayed gold, and sulfide sulfur content, capped at a maximum recovery of 87.4% (the maximum gold recovery achieved in any of the tests).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
165
Source: i-80 Gold
Figure 10-26: CIL Recovery vs Cyanide Soluble Gold Percent
Source: i-80 Gold
Figure 10-27: CIL Recovery vs Feed Sulfide Sulfur Content
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
166
Gold recovery by pressure oxidation and CIL at the Lone Tree facility is estimated by mining
zone, based on bench top autoclave tests conducted at FLSmidth and SGS at the expected operating conditions of the Lone Tree facility.
OG
Zone gold recovery is plotted as a function of gold head grade and organic carbon content in Figure 10-28 and Figure 10-29, respectively, for tests at the expected Lone
Tree operating conditions; combining these two regressions as an average yields an expression for gold recovery by CIL after pressure oxidation as a function of gold head grade and organic carbon content.
Source: i-80 Gold
Figure 10-28: OG Zone Gold Recovery vs Gold Head Grade
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
167
Source: i-80 Gold
Figure 10-29: OG Zone Gold Recovery vs Organic Carbon Content
Gold recovery of Otto Zone material was consistent across the four samples tested at expected Lone Tree operating conditions, shown in Table 10-37; the average of these values, 89.3%, was selected as the expected recovery by pressure oxidation-CIL at Lone Tree for the Otto Zone.
Table 10-37: BTAC Gold Recovery Results on Otto Zone Samples
Program
Sample ID
Au Recovery (%)
FLS-2023
OTU
90.0
FLS-2023
OTL
90.3
FLS-2023
OTHG
87.0
FLS-2023
OTLG
90.0
Recovery for the SPZ was estimated using data from tests conducted at expected Lone Tree conditions from the
2025 SGS program. Figure 10-30 through Figure 10-32 show sulfide oxidation versus carbonate content, mass loss in pressure oxidation versus carbonate content, and CIL
gold recovery as a function of CIL feed sulfide sulfur content (after POX), respectively. Samples with higher carbonate content tended to be less oxidized after acid pressure oxidation at Lone Tree conditions, and higher carbonate content resulted
in a mass gain as gypsum formed with sulfuric acid addition; the resulting sulfide sulfur grade of the POX residue controlled downstream CIL gold recovery, with higher residual sulfide values corresponding to lower gold recovery. Combining the
resulting regression lines with head sulfide sulfur content yields an expression for SPZ gold recovery as a function of carbonate and sulfide sulfur content in the feed, capped at 98.0% (the highest recovery achieved in any of the testing at
expected Lone Tree conditions).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
168
Source: i-80 Gold
Figure 10-30: Sulfide Oxidation vs Carbonate Content,
45-Minute Retention Time, Acidic Conditions
Source: i-80 Gold
Figure 10-31: Mass Loss versus Carbonate Content, 45-Minute
Retention Time, Acidic Conditions
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
169
Source: i-80 Gold
Figure 10-32: CIL Gold Recovery vs CIL Feed Sulfide Sulfur, All Conditions
The toll milling facility performs bench top autoclave testing on each monthly lot of sulfide material shipped to it, as described in
Section 10.1; the average recovery of these tests, 91.1%, has been relatively consistent within a tight range since inception of toll milling operations, and 91.1% is accordingly the expected recovery for material processed by pressure oxidation-CIL at the toll milling facility.
Several processing factors and deleterious elements were
identified across the test programs that affect, or could affect, gold and silver recovery: all FLSmidth 2022 samples demonstrated some degree of preg-robbing (average preg-robbing index 17.9%, ranging from 4.4% to 54.1%), consistent with historical
preg-robbing observed in Mag Pit samples, though CIL improved recoveries over baseline cyanide shake tests by only an average of 4.1%, indicating CIL counteracts preg-robbing only to a small extent; two FLSmidth 2022 samples (APL and APLG) showed
elevated swelling clay content that required attention (trona addition) during POX treatment; acidic POX conditions, while producing higher sulfide oxidation and gold recovery than alkaline conditions, consume substantially more lime and appear to
lock silver within jarosite, which does not form under alkaline conditions, resulting in markedly lower silver recovery under acidic POX; and SGS mineralogical work on the South Pacific Zone found no free arsenopyrite liberation in any sample,
suggesting the zone’s refractory gold is likely associated with arsenic. These factors are accounted for in the zone-specific recovery models described above.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
170
10.5
Adequacy of Data and Non-Conventional Industry Practice
The metallurgical test programs described in Sections 10.1 through 10.4 — spanning autoclave pre-treatment testing (Dawson, 2005-2006), comprehensive characterization and pressure oxidation testing (FLSmidth, 2022-2023), pilot-scale continuous pressure oxidation testing on a representative blended feed
(FLSmidth, 2025-2026), pressure oxidation and cyanidation testing focused on the South Pacific Zone (SGS, 2025-2026), and ongoing production-scale bench top autoclave testing at the third-party toll milling facility — collectively provide, in
the opinion of the QP, an adequate basis for the gold recovery estimates used in this technical report summary. The test samples span the primary mineralized zones of the Granite Creek Underground deposit (OG, Otto, Adams Peak, Deep Range Front,
Range Front, and South Pacific), and their grade and compositional characteristics (gold, organic carbon, carbonate, and sulfide sulfur) are consistent with the range expected in the projected life-of-mine feed (Section 10.2). Recovery estimates for each zone are based on regression relationships developed from batch and, where available, continuous test data at the expected operating conditions of
the Lone Tree pressure oxidation facility, informed by ongoing production-scale reconciliation data from the toll milling facility currently processing Granite Creek Underground material — providing an actual operating cross-check on the
bench-scale recovery estimates. The pressure oxidation (POX) and carbon-in-leach (CIL) processes tested for the refractory sulfide gold mineralization at Granite Creek
Underground, and the associated comminution, cyanide destruction, and solids-liquids separation test methods, are conventional, industry-standard metallurgical testing procedures for refractory Carlin-style gold ore; the analytical procedures used
across all five test programs are consistent with conventional industry practice, and no non-conventional testing procedures were identified in the source technical documentation reviewed by the QP.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
171
11
Mineral Resource Estimate
The Mineral Resource for the Granite Creek Underground Project has been developed as two separate estimates, reflecting the deposit’s two
distinct extraction methods. The open pit Mineral Resource was estimated by GRE and remains unchanged from the previously disclosed estimate in terms of underlying drilling, sampling, and technical information; GRE updated only its assessment of
reasonable prospects for economic extraction (RPEE) to reflect the current resource gold price. The underground Mineral Resource was estimated by SRK Consulting using the exploration database supporting the underground operation completed by i-80 Gold Corp. The effective date of both the open pit and underground Mineral Resource estimates is March 31, 2026.
11.1
Open Pit
The Mineral Resource Statement presented herein is updated from the 2025 Technical Report, “Initial Assessment SK-1300 Technical Report, Granite Creek Mine Project, Humbolt County, Nevada, USA,” with an effective date of December 31, 2024, and an issue date of March 26, 2025, with the following new data:
•
Seventeen new drillholes with 2,195 new gold assays have been added to the database.
•
Major faults used for structural trends of gold grade continuity have been updated with input from i-80 Geology team.
•
Economically feasible gold price based on a 36-month trailing average has
been calculated for defining potentially minable resources.
The Mineral Resources were estimated in conformity with the
Society for Mining, Metallurgy and Exploration (SME) best practice guidelines and are reported in accordance with the S-K 1300 Requirements. There is also no certainty that the Inferred Mineral Resources will
be converted to the Measured or Indicated categories through further drilling or into Mineral Reserves, once economic considerations are applied. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no
certainty that all or any part of the mineral resource will be converted into Mineral Reserves. The open pit project presently has no Mineral Reserves. Whittle Pit optimization was applied to the open pit MRE to assess the reasonable prospects for
economic extraction (RPEE) for the resource.
The open pit MRE for the Granite Creek Mine Project was completed by GRE an independent QP as
defined in SK-1300. The effective date of the open pit resource statement is March 31, 2026. In the opinion of GRE, the MRE reported here is a reasonable representation of the Mineral Resources found in
the open pit portion of the Granite Creek Mine Project at the current level of sampling.
11.1.1
Drillhole Database
GRE performed a data validation of the drillhole database prepared by i-80 for the Granite Creek
deposit and determined it to be of suitable accuracy to perform an MRE for the open pit portion of the property. More details regarding the validation of the drillhole database can be found in Section 12. The drill hole data for the Granite
Creek Mine Project was delivered as separate .csv files that contained exploration and production collar locations, drillhole survey orientations, sample intervals with gold assays in ppm, geologic intervals with lithology, alteration type, and
alteration strength. The collar locations are projected in a local grid system, with planar and elevation units in feet. All downhole intervals are captured in feet.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
172
The complete data set contained assays, collar, and survey data for a total of 2,855
exploration holes (surface, underground, and trench samples) and 695 production holes (surface and underground). Drilling is a mix of RC drilling, diamond drilling, and RC pre-collar with diamond drilling to
final depth. The exploration assay file contains 212,839 gold assays. The production data assay file contains 1,477 gold assays. The drillhole collar locations are shown in Figure 11-1.
Source: GRE, 2021, reviewed and confirmed 2026
Note: This figure is intended to show the relative distribution of surface drillhole collars on topography around the areas of interest. This
figure does not show all collars that have been drilled.
Figure 11-1: Drillhole Used Plan View
on Topography
A number of negative, missing, and blank assay values exist in the drillhole data files provided to GRE by i-80. Missing intervals and values were assumed to be non-mineralized and therefore assigned a value of half of the most common detection limit used to assay the samples.
Negative assay values were replaced according to Table 11-1.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
173
Table 11-1: Negative Values in Drillhole Database
Non-Positive
Value
Interpretation
Count In Data Set
Action Taken
-0.005
below detection limit of 0.005 opt
6417
replaced with 0.0857 ppm
-0.003
below detection limit of 0.003 ppm
2723
replaced with 0.0015 ppm
-0.9943
below detection limit of 0.029 opt
429
replaced with 0.0857 ppm
-5557
Sample Not Received
3
Omit
-5556
Sample Not Received
80
Omit
-0.0343
Half the detection limit of 0.002opt
926
replaced with 0.0343 ppm
-0.1714
below detection limit for 0.005 opt
52
replaced with 0.0857 ppm
-3394.2842
conversion of -99 opt to ppm
13
replaced with 0.0857 ppm
Source: GRE, 2026
11.1.2
Topography
Topography was provided by i-80 as .dxf files with triangulated surfaces. The files included both as
built surfaces showing dimensions of previously mined pits at their maximum depths, and present topography which includes backfill, pits, dumps, and surrounding topography. The current topographic data was loaded into Leapfrog Geo and used to
constrain the block model. The topographic data provided by i-80 was not rectangular, which is required within Leapfrog to generate models; therefore, GRE extrapolated topographic data around the edges to form
a rectangular surface (Figure 11-2). The extrapolated area, however, is not part of the resource estimate.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
174
Source: GRE, 2021, reviewed and confirmed 2026
Figure 11-2: Current Topography Used for Open Pit Resource Estimation
11.1.3
Geologic Model
The geologic model used to complete the MRE was developed by Dr. Samari of GRE using grouped majority composites for lithology based on
data provided to GRE as part of the drillhole database. Material below the current topography and above the as-built surface was classified as backfill and assigned an Au ppm grade of zero. Figure 11-3 illustrates the geologic model used in the resource estimation. The model was validated for geologic accuracy and found to be suitable for the purpose of mineral resource estimation by GRE as defined in SK-1300.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
175
Source: GRE, 2021, reviewed and confirmed 2026
Figure 11-3: Open Pit Geologic Model, Oblique View
11.1.4
Estimation Domains
Estimation zones were created by constraining the assays that surround the existing open pit areas (Figure
11-4). The underground zone to the North of Zone 3 / CX Pit was not considered since this area was estimated in the underground resource section of this technical report. Vertical extents of the estimation
zones range from 1,676 m (5,500 ft) amsl to 762 m (2,500 ft) amsl.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
176
Source: GRE, 2021, reviewed and confirmed 2026
Figure 11-4: Open Pit Estimation Zones
Table 11-2 summarizes the estimation zone numbers along with the corresponding pits.
Table 11-2: Open Pit Estimation Zone and Pit Name
Estimation Zone
Pit Name
Zone 1
A Pit
Zone 2
Mag Pit
Zone 3
CX Pit
Zone 4
B Pit
Source: GRE, 2021
Numeric indicator models using gold were constructed to better define the high-grade mineralized domains contained within the generalized
estimation domains to fit around the existing pits. The parameters used to define the indicator models are shown in Table 11-3.
Table 11-3: Open Pit Numeric Indicator Model Parameters
Estimation Zone
Indicator
Model
Cut-off (Au
ppm)
ISO Value
Search
Distance
(ft)
Search Distance
(m)
Dynamic Anisotropy
Zone 1
1.0
0.4
200
61.0
CX Fault
Zone 2
1.0
0.3
250
76.2
Mag Fault
Zone 3 CX
0.1
0.4
180
54.9
CX Fault
Zone 3 SOS Dike
0.1
0.4
100
30.5
SOS Dike
Zone 3 SOS XSECTION
0.1
0.3
150
45.7
SOS X Section Fault
Zone 4
1.0
0.3
200
61.0
NA*
*Because Zone 4 did not use dynamic anisotropy, a global trend set to the following parameters was used:
dip 90, dip Azimuth 100, pitch 75, and ellipse ratios max. 200, int. 200, min. 100.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
177
Source: GRE, 2021
Initial search ellipse orientations were set from examining the spatial orientation of the composites greater than 1 g/t (0.029 oz/st) (Figure 11-5). After initial construction of the high-grade solids using indicator models, it was noted that some of the high-grade numeric models had voids or otherwise poor geometry. When examining the fault structures,
it was noted that the high-grade domain corresponded well with the location and orientation of several fault structures. Dr. Samari of GRE then attempted to add a structural trend using dynamic anisotropy to the numeric model by constructing a
structural trend from the fault meshes. This improved the continuity of the indicator models and helped eliminate voids that were previously present in the indicator models. ISO factor values, which are defined as a specified numeric threshold value
used for indicator Radial Basis Function (RBF) interpolants to generate a volume, for interpolants were based on visually examining the mineralized body and using an iterative process to select a value that produced a reasonable geologic shape that
respected the informing data. If small islands of volume were created off the major trend, they were clipped out.
Source: GRE, 2021, reviewed and confirmed 2026
Note: The opaque red solid represents the high-grade domain. The transparent red solid is the low-grade
domain. Composite grades are shown at a cut-off of 1 ppm.
Figure 11-5: Example of Numeric Indicator High-Grade Trend Analysis, Mag Pit
One resource estimation zone,
Zone 3, was broken into several sub-domains after failing to produce a reasonable high grade numeric indicator model using a single global trend within the Zone 3 domain. It was noted that during the initial
attempt, branching solids formed displaying three distinct trends. Upon further investigation it was found that these trends corresponded to fault structures that crosscut the Zone 3 domain. The identified structural trends are the CX fault, the SOS
Dike, and the SOS X-Section.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
178
To construct estimation sub-domains, GRE offset the
fault meshes both forwards and backwards to a thickness that contained most of the high-grade intercept (Figure 11-6). Separate numeric estimators were constructed within these domains, and high-grade and low-grade zones were defined within the zones that contained the mineralized trends (Figure 11-7). To later avoid estimation boundary issues during resource estimation, the
volumes on either side of the mineralized domains were separated into sub domains. These include the HW 1, HW 2, HW 3, and FW zones.
Source: GRE, 2021, reviewed and confirmed 2026
Figure 11-6: Open Pit Zone 3 Sub-Domains
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
179
Source: GRE, 2021, reviewed and confirmed 2026
Note: The high-grade zone is shown in green, the low-grade domain is shown in purple.
Figure 11-7: High-Grade and Low-Grade Open Pit Domains in the CX Fault
Domain Analysis
To
check the validity of the high grade and low-grade estimation domains box and whisker plots were constructed, as shown in Figure 11-8. Generally, a good correlation was observed between the high -grade and
low-grade solids and the distribution of the grades contained within them.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
180
Source: GRE, 2026
Figure 11-8: Box and Whisker Plot of Open Pit Estimation Domains
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
181
Source: GRE, 2026
Figure 11-9: Histograms of the High-Grade and Low-Grade Distributions in Zones 1 and 2
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
182
Source: GRE, 2026
Figure 11-10: Histograms of the High-Grade and Low-Grade Distributions in Zones 3 and 4
11.1.5
Compositing
Sample data was composited to intervals of equal length as a bias reduction measure to ensure that the samples used in statistical analysis and
estimations were equally weighted. To accomplish compositing, Ms. Lane of GRE first examined the sample length interval histogram to determine the most common assay length (Figure 11-11).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
183
Source: GRE, 2026
Figure 11-11: Open Pit Sample Interval Length Statistics of Au ppm Assays
Once it was determined that 2 m (5 ft) was the primary assay length, Ms. Lane of GRE evaluated various compositing lengths using 2 m (5
ft) intervals to avoid splitting assays. It was decided that compositing on a 6 m (20 ft) interval represented a significant decrease in the variance of the data while not adversely decreasing the mean of the data set, as shown in Table 11-4. Therefore, Ms. Lane of GRE selected a 26 m (0 ft ) composite interval.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
184
Table 11-4: Open Pit Compositing Interval Statistics
Statistic
AU_ppm_Assays
Composite Interval
5 ft
10 ft
15 ft
20 ft
25 ft
Count
221,062
264,712
133,121
88,217
66,103
52,752
Length
1,323,435.3
1,323,396.9
1,323,367.4
1,322,037.1
1,321,859.4
1,321,327.9
Mean
0.362
0.362
0.361
0.358
0.357
0.354
SD
2.58
2.49
2.31
2.08
1.95
1.87
CV
7.1
6.9
6.4
5.8
5.5
5.3
Variance
6.6
6.2
5.4
4.3
3.8
3.5
Minimum
0
0
0
0
0
0
Q1
0.0170
0.0171
0.0171
0.0171
0.0171
0.0171
Q2
0.0170
0.0171
0.0274
0.0343
0.0343
0.0343
Q3
0.0860
0.0857
0.0857
0.0857
0.0857
0.0857
Maximum
290.06
290.06
290.06
119.89
94.33
85.08
Source: GRE, 2026
A box plot comparison of the 6 m (20 ft) composited and the uncomposited assays is shown in Figure
11-12. This comparison shows that compositing, while not changing the mean or quartiles, does drastically reduce the maximum value of grades. Table 11-5 shows the open
pit compositing comparison at 6 m (20 ft) intervals.
Source: GRE, 2026
Figure 11-12: Open Pit Compositing Comparison, 6 m (20 ft) Intervals
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
185
Table 11-5: Open Pit Compositing Comparison, 6 m (20 ft) Intervals
Statistic
Composited
Uncomposited
Count
67,143
224,077
Length
1,342,141.4
1,343,991.7
Mean
0.36
0.36
SD
1.95
2.58
CV
5.45
7.11
Variance
3.81
6.65
Minimum
0
0
Q1
0.017
0.017
Q2
0.034
0.017
Q3
0.086
0.086
Maximum
94.329
290.057
Source: GRE, 2026
11.1.6
Evaluation of Outliers
Cumulative probability plots for gold were completed for the composites within each estimation domain (Figure
11-13). A break in the population was identified and marked with the clipping line. Based on this analysis, Ms. Lane of GRE applied a maximum allowable value for the gold grade within each separate
domain, as shown in Table 11-6.
Source: GRE, 2026
Figure 11-13: Example of Open Pit Cumulative Log Probability Plot, Zone 1 HG
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
186
Table 11-6: Open Pit Upper Clipping (Capping) Au ppm Values by Domain
Zone
Sub-Domain
Clipping Value
Zone 1
HG
35
LG
NA
Zone 2
HG
10
LG
5
Zone 3
CX HG
20
CX LG
10
SOS DIKE HG
NA
SOS DIKE LG
NA
SOS XSECTION HG
NA
SOS XSECTION LG
NA
HW 1
7
HW 2
3
HW 3
7
FW
12
Zone 4
HG
NA
LG
3
Source: GRE, 2026
11.1.7
Density
Density was assigned to each domain in the block model based on a combination of rock type and grade, as shown in Table 11-7. The bulk densities are the same as those used in the 2020 Getchell Project Technical Report (AMC, 2020) and were originally supplied by OMC. The results for each domain fit well with GRE’s experience
with similar rock types.
Table 11-7: Open Pit Domain Density Summary
Unit
Au>=0.008 opt
(tonne/m3)
Au<0.008 opt
(tonne/m3)
Backfill
1.85
1.85
Alluvium
1.85
1.85
Granodiorite
2.7
2.7
Upper Comus
2.5
2.7
Lower Comus
2.51
2.64
Preble
2.42
2.6
Source: GRE, 2026
11.1.8
Variography
After iterative analysis, a good fit for the gold grade variography was found using pairwise relative variograms. The pairwise relative
variogram helps to smooth the variogram by scaling g(h) using the square of the mean of each sample pair of the data from calculating g(h). This helps make the
interpretation of the variogram model easier, and all variances calculated this way are relative to the mean of the sample pairs within the distribution.
Variogram analysis was completed on the samples within each of the high-grade and low-grade estimation domains to establish the direction of
maximum continuity between sample pairs. The range for each variogram was found using a global variogram. The nugget was calculated by examining the downhole variograms and determining where the short-range trend crossed the y-axis. Variograms were
oriented along the strike and dip of the visually observed high-grade trend of the composites, with the major axis oriented along the direction of maximum continuity (Table 11-8).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
187
Table 11-8: Open Pit Variogram Parameters
Zone
Sub-Domain
Dip
Dip Azimuth
Pitch
Major Axis
(ft)
Major Axis
(m)
Semi-Major
Axis (ft)
Semi-Major
Axis (m)
Minor Axis
(ft)
Minor Axis
(m)
Zone 1
Overall
38
134
75
200
61.0
200
61.0
100
30.5
HG
38
134
160
160
48.8
160
48.8
75
22.9
LG
38
134
75
175
53.3
175
53.3
60
18.3
Zone 2
Overall
50
70
105
250
76.2
250
76.2
100
30.5
HG
50
70
75
180
54.9
125
38.1
75
22.9
LG
50
70
105
300
91.4
200
61.0
200
61.0
Zone 3
Overall*
56
135
75
160
48.8
160
48.8
125
38.1
CX
56
135
75
180
54.9
160
48.8
70
21.3
CX HG
56
135
75
80
24.4
80
24.4
50
15.2
CX LG
56
135
75
50
15.2
50
15.2
50
15.2
SOS Dike
65
170
45
100
30.5
80
24.4
50
15.2
SOS DIKE HG
65
170
45
100
30.5
80
24.4
75
22.9
SOS DIKE LG
65
170
45
100
30.5
50
15.2
25
7.6
SOS XSECTION
80
170
80
150
45.7
125
38.1
50
15.2
SOS XSECTION HG
80
170
80
80
24.4
80
24.4
80
24.4
SOS XSECTION LG
80
170
105
150
45.7
125
38.1
50
15.2
HW 1
56
135
150
160
48.8
100
30.5
125
38.1
HW 2
56
135
100
160
48.8
160
48.8
125
38.1
HW 3
56
135
75
160
48.8
160
48.8
125
38.1
FW*
56
135
70
140
42.7
125
38.1
125
38.1
Zone 4
Overall
90
100
75
200
61.0
200
61.0
100
30.5
HG
90
100
90
60
18.3
60
18.3
25
7.6
LG
90
100
75
300
91.4
225
68.6
75
22.9
Source: GRE, 2026
11.1.9
Block Model Parameters
A 3D block model was developed to represent the open pit deposit using a block size of 25 ft x 25 ft x 20 ft. The block model dimensions and
model limits are shown in Table 11-9. The coordinate system used for the 3D modeling was based on the local grid system using imperial units of feet. The block model is un-rotated and contains no sub blocking.
Table 11-9: Open Pit Block Model Parameters
Parameter
Value
Base point
6000,7000,5800 (X,Y,Z)
Parent block size
25x25x20 (X,Y,Z)
Azimuth Rotation
0
Boundary size
9000,7000,3000 (X,Y,Z)
Size in Blocks
360x280x150 (X,Y,Z)
Sub-blocking
None
Source: GRE, 2026
11.1.10
Estimation Domains
The estimation domains used to constrain the MRE resulted from the numeric indicator models developed as part of the geologic model as
discussed in Section 14.2.4.
Figure 11-14 shows an overview of the estimation domains that
were used to constrain the mineral resource estimation for the open pit MRE.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
188
Source: GRE, 2021, reviewed and confirmed 2026
Figure 11-14: Open Pit Numeric Indicator Models
11.1.11
Estimation Parameters
Estimation within mineralized domain boundaries was performed using an inverse distance squared method with a minimum of 4 samples, a maximum
of 20 samples, and a drillhole limit of 2. Declustering objects were applied to all high-grade estimation domains. Dynamic anisotropy was applied where it was applicable based on faults that structurally control mineralization. The exception to this
was Zone 4, which has no apparent structural control that has yet been mapped. In this case, search ellipse orientation was determined from examining the spatial orientation of the composites greater than 1 g/t. (0.029 oz/st)
Search distances of the domained estimators were based on the variography for each sub-domain, as discussed in Section 14.1.7. Search
distances for domains that showed poor variography were replaced by the overall sub-domain or overall domain search distances. This method was used for the Zone 4 HG and LG estimations and the Zone 3 sub-domains. All estimations used hard boundaries
except for the boundaries between Zone 1 HG and Zone 3 HG and between Zone 1 LG and Zone 4 LG. Soft 40-foot boundaries were set up with filters between these boundaries since they are immediately adjacent to each other and could potentially have
continuity in grade estimation across these boundaries. The inverse distance estimation parameters for each domain are given in Table 11-10.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
189
Table 11-10: Open Pit ID2 Estimation Parameters
Zone
Sub-Domain
Dynamic
Anisotropy
Trend
Major
(ft)
Major
(m)
Semi-Major
(ft)
Semi-Major
(m)
Minor
(ft)
Minor
(m)
Zone 1
HG
Yes
CX Fault
160
48.8
160
48.8
75
22.9
LG
Yes
CX Fault
175
53.3
175
53.3
60
18.3
Zone 2
HG
Yes
Mag Fault
180
54.9
125
38.1
75
22.9
LG
Yes
Mag Fault
300
91.4
200
61.0
200
61.0
Zone 3
CX HG
Yes
CX Fault
180
54.9
160
48.8
70
21.3
CX LG
Yes
CX Fault
180
54.9
160
48.8
70
21.3
SOS DIKE HG
Yes
SOS Dike
100
30.5
80
24.4
50
15.2
SOS DIKE LG
Yes
SOS Dike
100
30.5
80
24.4
50
15.2
SOS XSECTION HG
Yes
SOS Xsection
150
45.7
125
38.1
50
15.2
SOS XSECTION LG
Yes
SOS Xsection
150
45.7
125
38.1
50
15.2
HW 1
Yes
CX Fault
160
48.8
100
30.5
125
38.1
HW 2
Yes
CX Fault
160
48.8
160
48.8
125
38.1
HW 3
Yes
CX Fault
160
48.8
160
48.8
125
38.1
FW
Yes
CX Fault
160
48.8
160
48.8
125
38.1
Zone 4
HG
No
90,100,90
200
61.0
200
61.0
100
30.5
LG
No
90,100,75
200
61.0
200
61.0
100
30.5
Source: GRE, 2026
After each domained estimator was constructed, a combined estimator was used to assign a hierarchical value to each domained estimation to
produce a single gold grade value. The combined estimator hierarchy is shown in Table 11-11.
Table 11-11: Open Pit Combined Estimator Hierarchy
Priority
Domained Estimation
Priority
Domained Estimation
1
Zone 1 HG
11
Zone 3 HW 3
2
Zone 1 LG
12
Zone 3 HW 1
3
Zone 2 HG
13
Zone 3 HW2
4
Zone 2 LG
14
Zone 3 FW
5
Zone 3 CX HG
15
Zone 4 HG
6
Zone 3 CX LG
16
Zone 4 LG
7
SOS Dike HG
17
Zone 1
8
SOS Dike LG
18
Zone 2
9
SOS Xsection HG
19
Zone 3
10
SOS Xsection LG
20
Zone 4
Source: GRE, 2026
The overall domain grade estimations were assigned to priority 17 to 20 so that they would fill in areas of the numeric estimator domains that
lacked the required number of samples to be able to estimate grade due to the small volume being estimated that excluded drillholes.
11.1.12
Geometallurgical Modeling
Section 13.5 goes into detail of how the gold recovery model was estimated and implemented in the block model.
Cyanide solubility was compared to all available interval information from the drilling data: gold assay, alteration, lithology, depth, etc.
From this available data, a principal component analysis, regression tree, and multivariate adaptive regression spline analysis were performed. A multivariate adaptive regression spline analysis model was created to predict cyanide solubility in
different zones using the available drilling data. Heap Leach (HLCL) recovery was determined by plotting the cyanide solubility with the column recovery. The carbon in leach (CIL) recovery equation was determined by plotting the trend with the
calculated head grade and CIL recovery.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
190
The input fields required in the recovery equations were added to the block model. Then, the
recovery equations were applied to the block model for HLCH and CIL recoveries. These recoveries, along with the Whittle inputs from Table 14 5, were used to determine which of the two processes would be applied to each block.
11.1.13
Block Model Validation
Validation of the estimated block grades for the open pit MRE were completed for each of the estimation domains. The resource block model
estimate was validated by:
•
Completing a series of visual inspections by comparisons of gold assay and composite grades to estimated block
values across the deposit in both horizontal and vertical sections.
•
Statistical comparison of parameters such as means, quantiles, and variance between 6 m (20 ft) composites,
Nearest Neighbor (NN), Inverse Distance squared (ID2), and Ordinary Kriged (OK) estimators to ensure that the grade estimations are representative of the composites they are based on.
•
Comparing average composite sample values with average estimated block grades along east, north, and elevation
orientations using swath grade trend plots.
Visual Inspection
The block model was examined in plan and section views to compare to drillhole locations and grades. Plan views and section views for each of
the estimation areas are shown in Figure 11-15 through Figure 11-22. Comparison of the block model grade from the assays did not reveal any major discrepancies. In the
section views, blocks above current topography have been removed.
Source: GRE, 2026
Figure 11-15: Open Pit Zone 1 Visual Comparison Composite to Block Model Grade, Plan View
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
191
Source: GRE, 2026
Figure 11-16: Open Pit Zone 2 Visual Comparison Composite to Block Model Grade, Plan View
Source: GRE, 2026
Figure 11-17: Open Pit Zone 3 Visual Comparison Composite to Block Model Grade Plan View
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
192
Source: GRE, 2026
Figure 11-18: Open Pit Zone 4 Visual Comparison Composite to Block Model Grade Plan View
Source: GRE, 2026
Figure 11-19: Open Pit Zone 1 Section Composites and Block Model Cross Sections
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
193
Source: GRE, 2026
Figure 11-20: Open Pit Zone 2 Section Composites and Block Model Cross Section
Source: GRE, 2026
Figure 11-21: Open Pit Zone 3 Section Composites and Block Model Cross Section
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
194
Source: GRE, 2026
Figure 11-22: Open Pit Zone 4 Section Composites and Block Model Cross Section
Statistical Comparison
To ensure
that the grade estimations are representative of the composites they are based on and validate the resource estimation results, the block model grade estimation statistics were analyzed. Ms. Lane of GRE compared the means, quantiles, and
variance between 20-foot composites, Nearest Neighbor (NN), Inverse Distance squared (ID2), and Ordinary Kriged (OK) estimators, as shown in Table 11-12. Blocks are confined to the 3000 US$/tr oz Whittle pit
at a cutoff grade of zero.
Table 11-12: Open Pit Comparison of Composite Values to Grade Estimation Methods
Parameter
Composites
Parameter
NN
ID2
OK
Count
14,380
Block Count
304,317
256,088
256,088
Mean
0.49
Mean
0.28
0.33
0.34
SD
1.86
SD
1.08
0.80
0.78
CV
3.81
CV
3.80
2.41
2.29
Variance
3.47
Variance
1.17
0.65
0.61
Minimum
0
Minimum
0
0.0
-0.5
Q1
0.02
Q1
0.02
0.03
0.03
Q2
0.04
Q2
0.04
0.08
0.08
Q3
0.18
Q3
0.09
0.25
0.26
Maximum
78.71
Maximum
35.00
32.19
27.27
Source: GRE, 2026
As expected, the NN estimator generates more blocks due to the lack of restrictions of having to use multiple samples and multiple drillholes
to estimate a block grade. Both ID2 and OK produced similar quantiles, means, variance, etc. The one marked difference seen between ID2 and OK is that is possible to have a negative value in Kriging as seen in the minimum value of the OK estimator
(Figure 11-23).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
195
Source: GRE, 2026
Figure 11-23: Cumulative Frequency of Composite and Estimated Block Grades
Swath Plots
Swath
plots of the various estimation methods (NN, ID2, and OK) were used to compare the results from each estimation method to the informing composite values and examine which method smoothed the estimated grades. As an example, swatch plots are provided
below for the Zone 1 high-grade and low -grade domains (Figure 11-24 though Figure 11-26). The swatch plots show a general trend that the ID2 estimator smoothed out
drastic swings in grade while not over smoothing local variability.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
196
Source: GRE, 2026
Figure 11-24: X Axis, Zone 1 High-Grade Domain
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
197
Source: GRE, 2026
Figure 11-25: Open Pit Swath Plot, Y Axis, Zone 1 High-Grade Domain X axis, Zone 1 High-Grade Domain
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
198
Source: GRE, 2026
Figure 11-26: Open Pit Swath Plot Z Axis, Zone 1 High-Grade Domain
11.1.14
Mineral Resource Classification
Block model quantities and grade estimates for the Granite Creek open pit deposit were classified according to the Society for Mining,
Metallurgy and Exploration (SME) guidelines.
Mineral Resources were classified as Measured, Indicated, or Inferred.
A Measured Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical
characteristics are estimated with confidence sufficient to allow the application of Modifying Factors to support detailed mine planning and final evaluation of the economic viability of the deposit. Geological evidence is derived from detailed and
reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of observation (SME, 2017). Due to the density of drill hole spacing around the historical pit and underground
excavations, GRE found it reasonable to classify portions of the resource as Measured.
Mineral resource classification involved a two-step
process using minimum distances and minimum numbers of samples to define resource classification initially before applying numeric indicator model to define a more continuous and reasonable resource classification. The criteria used in the first
step of the resource classification are listed in Table 11-13. Parameters used for the numeric indicator models for the second step of the resource classifications are listed in Table 11-14.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
199
Table 11-13: Open Pit Mineral Resource Classification Parameters
Resource Class
Minimum Distance (ft)
Minimum Distance (m)
Minimum Number of Samples
Measured
50
15.2
7
Indicated
100
30.5
5
Inferred
150
45.7
NA
Source: GRE, 2026
Table 11-14: Open Pit Parameters for Resource Class Numeric Indicator Model
Resource Class
Shape
Interpolant Distance (ft)
Interpolant Distance (m)
ISO
Measured
Isotropic
250
76.2
0.4
Indicated
Isotropic
250
76.2
0.4
Inferred
NA
NA
NA
Source: GRE, 2026
Because the classification was performed across all resource estimation domains, an isotropic search was used along with an interpolant
distance of 250, which was based on the average continuity of grade seen in the deposit. No numeric indicator model was constructed for the Inferred resource class, rather it was defined as any block with a calculated gold grade that did not fall
within the Measured or indicated numeric indicator domains that had a calculated gold grade. A plan view of the estimated resource classes is shown in Figure 11-27.
Source: GRE, 2026
Figure 11-27: Open Pit Constrained Resource Class All Areas Plan View
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
200
11.1.15
Open Pit Mineral Resource Statement
Society for Mining, Metallurgy and Exploration (2017) defines a mineral resource as: “a concentration or occurrence of solid
material of economic interest in or on the Earth’s crust in such form, grade or quality, and quantity that there are reasonable prospects for economic extraction. The location, quantity, grade or quality, continuity, and other geological
characteristics of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling.” The Mineral Resources may be impacted by further infill and exploration drilling that may result in
increases or decreases in future resource evaluations. The Mineral Resources may also be affected by subsequent assessment of mining, environmental, processing, permitting, taxation, socio-economic, and other factors. Mineral Resources are not
Mineral Reserves and do not have demonstrated economic viability. Mineral Reserves can only be estimated based on the results of an economic evaluation as part of a Preliminary Feasibility Study or Feasibility Study. As a result, no Mineral Reserves
have been estimated as part of this study. There is no certainty that all or any part of the Mineral Resources will be converted into a mineral reserve.
The requirement, “reasonable prospects for economic extraction,” generally implies that the quantity and grade estimates meet
certain economic thresholds and that the Mineral Resources are reported at a cut-off grade considering appropriate extraction scenarios and processing recoveries. To meet this requirement, Ms. Lane of GRE considered that major portions of the
Granite Creek deposit are amenable for open pit extraction.
To determine the quantities of material offering “reasonable prospects
for economic extraction” by an open pit, Ms. Lane of GRE constructed open pit scenarios developed from the resource block model estimate using Whittle’s Lerchs-Grossman miner “Pit Optimizer” software. Reasonable mining
assumptions were applied to evaluate the portions of the block model (Measured, Indicated, and Inferred blocks) that could be “reasonably expected” to be mined from an open pit. The optimization parameters presented in Table 11-15 were selected based on experience and benchmarking against similar projects. The results are used as a guide to assist in the preparation of a mineral resource statement and to select an appropriate resource
reporting cut-off grade. Ms. Lane of GRE considers that the blocks located within the resulting conceptual pit envelope show “reasonable prospects for economic extraction” and can be reported as a mineral resource.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
201
Table 11-15: Granite Creek Resource Parameters for Open Pit Optimization
Parameter
Items
Unit
Value
Costs
Mining Cost (waste/mineralized material)
US$/tonne mined
2.46
Heap Leach*
US$/tonne mineralized material treated
9.04
Carbon in Leach**
US$/tonne mineralized material treated
17.22
Recovery
Heap Leach (HLCH) Recovery with CN
Solubility <60
%
CN Solubility*100
HLCH Recovery with CN Solubility >= 60
%
((0.1225 * [Au_ppm]) + 0.4164)*100
CIL Recovery
%
((0.5388 * CN Solubility) + 0.3201)*100
Net revenue gold
Gold price
US$/oz
3,000
Selling costs and penalties***
US$/oz
114
Royalty
Total royalty (simplified)
%
6.00%
Slope angles
Slope Angle
degrees
41
Limits
HLCH
tonnes per year
2,975,000
CIL
tonnes per year
1,050,000
Source: GRE, 2026
1
HLCH and CIL costs include US$1.56/tonne milled for admin costs.
2
Various royalties are applicable at various points throughout the mine life, however for the scope of this
Technical Report, GRE has used a single 6% royalty for the open pit mineral resource.
3
The gold price used for this analysis is the 36-month trailing average gold price as of June 30, 2026.
4
This selling cost is used to apply the 6% royalty
The pit optimization used a royalty of 6%; however, the current royalty is approximately 7.5%. The GRE QP does not believe that the change in
royalty results in a material impact on the pit optimization.
Due to the large ratio of deposit size to block size and method of grade
estimation, the grade model is fully diluted, and the resource is 100% recoverable as estimated.
The gold price selected for the open pit
Mineral Resource has been based on review of the market study presented in Section 16 of this report, which has been compared to market consensus forecast data, review by the GRE QP of industry peers, plus discussion with i-80 technical teams. The
resource gold price of US$3,000/oz reflects the 36-month trailing average as of June 30, 2026. Based on review, it is the GRE QP’s opinion that this price is reasonable over a time period of 10 years, covering both short-term pricing and
future long-term pricing. The point of reference for the reporting of open pit Mineral Resources is the tonnage and grades contained within the Whittle pit shell limits, reported at a 0.20 g/t cut-off grade using variable metallurgical recovery.
The Granite Creek open pit mineral resource constrained by a Whittle pit shell that corresponds to a gold price of US$3,000 per troy ounce
is shown in Table 11-16. The reader is cautioned that the results from the pit optimization are used solely for testing the “reasonable prospects for economic extraction” by an open pit and do not
represent an attempt to estimate Mineral Reserves.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
202
Table 11-16: Granite Creek Open Pit Mineral Resource Statement
Deposit
Cutoff
Grade
(ppm)
Mass
(‘000s tonnes)
Mass
(‘000s short tons)
Au Grade
(g/t)
Au Grade
(opt)
Au Contained
(‘000s tr oz)
Measured
Pit B
0.2
3,900
4,299
1.06
0.031
133.49
Pit A
0.2
1,098
1,211
0.71
0.021
25.08
CX
0.2
13,493
14,873
1.10
0.032
478.41
Mag
0.2
15,055
16,596
1.03
0.030
499.50
Total
33,546
36,978
1.05
0.031
1,136.47
Indicated
Pit B
0.2
823
907
0.64
0.019
16.86
Pit A
0.2
969
1,069
0.68
0.020
21.06
CX
0.2
4,423
4,876
1.00
0.029
141.96
Mag
0.2
11,509
12,687
0.74
0.022
275.03
Total
17,725
19,538
0.80
0.023
454.91
Measured + Indicated
Pit B
0.2
4,723
5,206
0.99
0.029
150.34
Pit A
0.2
2,068
2,280
0.69
0.020
46.13
CX
0.2
17,916
19,749
1.08
0.031
620.37
Mag
0.2
26,565
29,282
0.91
0.026
774.53
Total
51,271
56,517
0.97
0.028
1,591.38
Inferred
Pit B
0.2
50
55
0.52
0.015
0.84
Pit A
0.2
440
485
0.44
0.013
6.22
CX
0.2
1,997
2,201
0.94
0.028
60.66
Mag
0.2
1,339
1,476
0.75
0.022
32.12
Total
3,826
4,217
0.81
0.024
99.84
Source: GRE, 2026
1) The effective date of the Mineral Resources Estimate is March 31, 2026
2) The Qualified Persons for the estimate are GRE.
3) Mineral Resources are not ore reserves and are not demonstrably economically recoverable.
4) Mineral Resources are reported at a 0.20 g/t (0.006 oz/st) cutoff, an assumed gold price of 3,000 US$/tr. oz, using variable recovery, a
slope angle of 41 degrees, 6% royalty, heap leach processing cost US$9.04 per tonne (includes admin), CIL processing cost of US$17.22 per tonne (includes admin).
11.1.16
Mineral Resource Sensitivity by Domain
Table 11-17 shows the sensitivity of the mineral resource to cut-off grade in each domain.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
203
Table 11-17: Granite Creek Mineral Resource
Sensitivity to Cut-off Grade – Reported on 100% basis
Deposit
Cutoff Grade
(ppm)
Mass
(000’s tonnes)
Mass
(000’s short tons)
Au Grade
(g/t)
Au Grade
(opt)
Au Contained
(000’s tr oz)
Measured
Pit B
0.1
5,131
5,656
0.84
0.025
139.202
0.15
4,399
4,849
0.96
0.028
136.288
0.2
3,900
4,299
1.06
0.031
133.487
0.25
3,501
3,859
1.16
0.034
130.620
0.3
3,153
3,476
1.26
0.037
127.537
0.35
2,856
3,148
1.36
0.040
124.449
0.4
2,629
2,897
1.44
0.042
121.702
0.45
2,391
2,635
1.54
0.045
118.446
0.5
2,187
2,410
1.64
0.048
115.323
Pit A
0.1
1,489
1,641
0.56
0.016
26.932
0.15
1,270
1,400
0.64
0.019
26.038
0.2
1,098
1,211
0.71
0.021
25.078
0.25
915
1,009
0.81
0.024
23.756
0.3
773
852
0.91
0.026
22.507
0.35
638
703
1.03
0.030
21.103
0.4
526
580
1.17
0.034
19.759
0.45
440
485
1.31
0.038
18.590
0.5
370
408
1.47
0.043
17.520
CX
0.1
18,417
20,301
0.85
0.025
500.907
0.15
15,362
16,933
0.99
0.029
488.857
0.2
13,493
14,873
1.10
0.032
478.406
0.25
12,117
13,356
1.20
0.035
468.522
0.3
11,130
12,268
1.29
0.037
459.863
0.35
10,282
11,334
1.36
0.040
451.026
0.4
9,577
10,557
1.44
0.042
442.531
0.45
8,944
9,859
1.51
0.044
433.891
0.5
8,344
9,198
1.58
0.046
424.760
Mag
0.1
18,446
20,333
0.87
0.025
515.371
0.15
16,524
18,214
0.96
0.028
507.759
0.2
15,055
16,596
1.03
0.030
499.500
0.25
13,683
15,083
1.11
0.032
489.626
0.3
12,603
13,893
1.18
0.035
480.080
0.35
11,672
12,866
1.25
0.037
470.359
0.4
10,721
11,818
1.33
0.039
458.902
0.45
9,852
10,860
1.41
0.041
447.027
0.5
9,114
10,046
1.49
0.043
435.771
Indicated
Pit B
0.1
1,491
1,643
0.42
0.012
19.963
0.15
1,098
1,210
0.52
0.015
18.406
0.2
823
907
0.64
0.019
16.857
0.25
587
647
0.80
0.023
15.168
0.3
433
477
0.99
0.029
13.825
0.35
347
382
1.16
0.034
12.925
0.4
279
307
1.35
0.039
12.113
0.45
243
268
1.49
0.043
11.635
0.5
207
229
1.66
0.049
11.090
Pit A
0.1
1,290
1,422
0.54
0.016
22.538
0.15
1,114
1,228
0.61
0.018
21.854
0.2
969
1,069
0.68
0.020
21.057
0.25
863
952
0.73
0.021
20.288
0.3
782
862
0.78
0.023
19.575
0.35
694
765
0.84
0.024
18.655
0.4
605
667
0.90
0.026
17.579
0.45
524
578
0.98
0.029
16.466
0.5
463
510
1.04
0.030
15.531
CX
0.1
6,949
7,660
0.69
0.020
153.509
0.15
5,406
5,959
0.85
0.025
147.421
0.2
4,423
4,876
1.00
0.029
141.964
0.25
3,755
4,139
1.14
0.033
137.167
0.3
3,364
3,708
1.24
0.036
133.734
0.35
3,102
3,419
1.31
0.038
131.006
0.4
2,875
3,169
1.39
0.040
128.266
0.45
2,652
2,924
1.47
0.043
125.225
0.5
2,482
2,736
1.54
0.045
122.621
Mag
0.1
15,095
16,640
0.60
0.018
291.797
0.15
13,067
14,403
0.68
0.020
283.755
0.2
11,509
12,687
0.74
0.022
275.034
0.25
10,179
11,221
0.81
0.024
265.446
0.3
9,029
9,953
0.88
0.026
255.304
0.35
8,018
8,838
0.95
0.028
244.767
0.4
7,160
7,893
1.02
0.030
234.421
0.45
6,245
6,884
1.11
0.032
221.921
0.5
5,416
5,970
1.20
0.035
209.258
Inferred
Pit B
0.1
72
79
0.40
0.012
0.919
0.15
52
57
0.51
0.015
0.848
0.2
50
55
0.52
0.015
0.837
0.25
45
50
0.55
0.016
0.804
0.3
39
43
0.60
0.017
0.746
0.35
30
33
0.67
0.020
0.655
0.4
24
27
0.75
0.022
0.582
0.45
23
26
0.76
0.022
0.569
0.5
21
23
0.80
0.023
0.528
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
204
Deposit
Cutoff Grade
(ppm)
Mass
(000’s tonnes)
Mass
(000’s short tons)
Au Grade
(g/t)
Au Grade
(opt)
Au Contained
(000’s tr oz)
Pit A
0.1
615
678
0.35
0.010
7.010
0.15
506
558
0.40
0.012
6.583
0.2
440
485
0.44
0.013
6.216
0.25
352
388
0.49
0.014
5.577
0.3
275
304
0.55
0.016
4.910
0.35
229
253
0.60
0.018
4.432
0.4
188
207
0.65
0.019
3.936
0.45
154
170
0.70
0.020
3.480
0.5
124
137
0.76
0.022
3.018
CX
0.1
3,155
3,478
0.65
0.019
65.995
0.15
2,464
2,716
0.80
0.023
63.252
0.2
1,997
2,201
0.94
0.028
60.660
0.25
1,734
1,912
1.05
0.031
58.790
0.3
1,574
1,735
1.13
0.033
57.387
0.35
1,426
1,572
1.22
0.036
55.846
0.4
1,316
1,451
1.29
0.038
54.524
0.45
1,232
1,358
1.35
0.039
53.370
0.5
1,146
1,263
1.41
0.041
52.064
Mag
0.1
1,901
2,095
0.57
0.017
34.750
0.15
1,594
1,757
0.65
0.019
33.550
0.2
1,339
1,476
0.75
0.022
32.123
0.25
1,036
1,142
0.90
0.026
29.916
0.3
783
863
1.10
0.032
27.723
0.35
699
770
1.20
0.035
26.851
0.4
635
700
1.28
0.037
26.090
0.45
612
675
1.31
0.038
25.783
0.5
602
664
1.32
0.039
25.631
Source: GRE, 2026
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
205
11.1.17
Factors that Could Affect Open Pit Mineral Resources
To the best of the QP’s knowledge, there are no known legal, political, environmental, permitting, title, taxation, socio-economic,
marketing, mining, metallurgical, or other factors that would further materially affect the open pit Mineral Resources reported herein.
There are no known significant factors or risks that may affect property access, title, or the right to perform work on the Property.
The open pit MRE could be materially affected negatively by low market prices for gold and by difficulties in material handling and processing
that would affect the recovery and production of gold. Changes in the estimated materials and supply costs, and in labor availability and rates are other factors that could materially affect the open pit MRE. The taxation and political environment
for mining in Nevada is relatively stable. The Project requires infrastructure development and permitting.
11.2
Underground Mineral Resources
SRK completed the MRE process using updated mineralization models. i-80 provided SRK with a comprehensive exploration database with logging
indicating the main geological features and units, including full assays from exploration and production. In addition to the database, SRK worked with i-80 on preliminary geological interpretations, on which, SRK made minor alterations accordingly.
The resource estimation methodology involved the following procedures:
•
Database compilation and verification
•
Construction of wireframe models for the fault networks and centerlines of mining development per vein
•
Definition of resource domains
•
Data conditioning (compositing and capping) for statistical and geostatistical analysis
•
Variography
•
Block modeling and grade interpolation
•
Resource validation and classification
•
Application of reporting CoG using the 2026 inputs
•
Preparation of the mineral resource statement
11.2.1
Drillhole Database
i-80 supplied SRK with extracts from the Central database (acQuire) in both csv and Leapfrog formats. The cut-off for the database was
February 17, 2026. The digital database includes both holes inside the area of interest and the regional drilling over the Granite Creek deposit. The database contains a total of 7,977 boreholes and production samples for 521,332.6 m
(1,710,408.7 ft) of drilling. SRK has limited the analysis for the study to the drilling in the near vicinity to the current underground operations and therefore has applied a spatial limitation of Easting between 8,200 to 12,800, and northing 9,000
to 15,000 in the local grid. The export reduced the total database to 6,800 holes which is a combination of the exploration, production and environmental drillhole data (Table 11-18).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
206
Table 11-18: Summary of Drilling and Sampling in Target Area
Drilling Type
Count
Sum of Depth (ft)
Sum of Depth (m)
Environmental
22
18,227.0
5,555.6
Exploration
1,669
905,284.2
275,930.6
Core
159
125,636.1
38,293.9
CV
111
29,903.0
9,114.4
CVM
1
1,000.0
304.8
DDH
131
55,777.7
17,001.0
Metallurgical
3
1,535.0
467.9
RC
1,075
456,390.0
139,107.7
RC/CORE
65
92,353.0
28,149.2
RC_CVM
1
1,940.0
591.3
RC_DDT
121
140,084.4
42,697.7
UNK
2
665.0
202.7
Production
5,109
243,178.1
74,120.7
Channel
544
48,624.3
14,820.7
Core
199
67,446.8
20,557.8
Cubex
641
89,857.0
27,388.4
Sludge
3,725
37,250.0
11,353.8
Grand Total
6,800
1,166,689.3
355,606.9
Source: SRK, 2026
The subset databased in Leapfrog used for the estimation is split into a series of tables taken from the central acQuire database is summarized
in Table 11-19, using the above defined spatial restrictions (whereby any holes which have intersections with the geographical area have been included in the export). The assay database contains the complete
multi-element data analysis plus basis for the geo-metallurgical analysis including PregRob (%), Total Organic Carbon (TOC %), Carbonate (CO3 %), and cyanide soluble gold Au_CN (ppm), which are used to aid in the gold recovery calculations.
Table 11-19: Summary of Drilling and Sampling Information Available within Leapfrog
Data Table
Data Type
Number of Columns
Number of Rows
collar
collar
19
6,800
survey
survey
8
35,633
Assay_Combined
interval
68
189,851
alteration
interval
22
54,079
density
interval
20
8,431
geotech
interval
11
60,593
lithology
interval
33
58,466
oxides
interval
20
47,247
structures
interval
12
21,935
sulfides
interval
20
45,239
veins
interval
14
14,175
point_structures
point
16
8,924
Source: SRK, 2026
During the review SRK noted several missing sampling intervals (60), which were reset to zero, and a total of 1,980 missing assays which were
omitted from the analysis. In addition to the absent values, SRK notes there are 10,774 occurrences of zero in the database which have been kept as they define areas which were not sampled and assumed to be waste by the geologist. Figure 11-28 shows the collar locations for all drillholes in the drillhole database and are colored coded by company drilled.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
207
Source: SRK, 2026
Figure 11-28: Plan Showing Collar Locations and Borehole Traces within the MRE-Focused Dataset
11.2.2
Topography and Mining Depletion
SRK has been supplied with a series of wireframes from the i-80 Geology team to reflect the current topography and the underground mining
depletion at the Granite Creek deposit. The depletion was based on a combination of both open pit mining and month-end depletion from the underground mining operation as of March 31, 2026. Separate models were produced by SRK for the open pit
and underground models to account for these separately.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
208
To create the depletion, SRK has imported the information provided by i-80 in the .dxf
formats supplied. The three key files used for the depletion are:
•
Regional Topo – Pre Mine.dxf
•
Mine Topo – Backfilled.dxf
•
GC_Merged_2603_Clean.dxf
SRK created a depletion model using the same prototype as the geological and mineralization models. The open pit depletion has been treated as
an erosional surface in Leapfrog®. SRK generated an “intrusion” model in Leapfrog® to account for the underground depletion
and sterilization around the workings. Overall, SRK considers the depletion model to accurately reflect the information provided. There is a low risk that these depletions do not accurately reflect the final pit or stopes, but SRK would not consider
that material and considers the current process as reasonable for the definition of the current Mineral Resources. An isometric view of the depletion model is seen below in Figure 11-29.
Source: SRK, 2026
Figure 11-29: Isometric View Showing Open Pit Depletion (Surface) and Underground Workings (Grey)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
209
11.2.3
Geological Model
SRK conducted a site visit to the Granite Creek Project located in Nevada on February 4, 2026. The purpose of the geological site visit
was in part to discuss the latest geological model developed by i-80 geological team which has been reviewed in detail by SRK, to understand the controls on the mineralization and to provide recommendations for adjustments as appropriate. Final work
on the geological model was completed on February 26, 2026.
During the review it was noted that the major structure and control on
fluid movement is associated with a series of key faults striking northeast and northeast-east, located to the north of the historical open pit mining operations.
The primary structural control is the northeast / southwest-striking, steeply dipping normal faults related to extension. The structures are
the main conduits for mineralizing fluids moving along strike and vertically. Lithologic contacts, bedding and localized folds also play an important role for developing mineralized zones. High-grade mineralized zones are moderately continuous along
faults with the most prolific zones occurring at structural intersections along the Rangefront, Otto, Ogee and South Pacific fault corridors.
i-80 geologists produced an updated fault model for the Granite Creek Project. The updated model is based on the review of the following
datasets. A total of 62 faults have been identified by i-80 and modeled of which a total of 57 are considered active as controlling features in the geological model at a regional level. These faults and structures were defined and confirmed by:
•
Onsite core review and geological logging
•
Core photos for verification
•
Geological mapping of the underground workings
Mineralization at Granite Creek is controlled by a combination of structural, lithologic, and intrusive features within a complex
intrusion-related hydrothermal system. In addition to the regional model
i-80 have supplied a mine scale geological model, which contains
more localized scale offsets. The mine-scale model carries a dedicated mine-scale set M1–M25 (plus M1 Offset) that isn’t in the Regional model, while dropping many of the Regional-only structures (the NNW / NS sets, several NE / EW
faults, Felix, Delaney, Mag_West, etc.).
11.2.4
Estimation Domain Analysis
SRK reviewed the current underground operation at Granite Creek as part of the site inspection. The current geological model and mineralization
at Granite Creek has identified three main areas of mineralization defined as the Ogee, Otto, and SPZ Additional mineralization potential exists outside these three areas but is not currently considered in the underground model as further
exploration is needed to better define the continuity. The three areas are controlled by faulting in the local areas which has acted as controls on the mineralization. The key faults used to define the fault blocks which host the mineralization are:
•
CX West Fault
•
Range Front Fault
•
Domain Boundary A (Boundary A)
•
Domain Boundary B (Boundary B)
•
Domain Boundary C (Boundary C)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
210
The Ogee domain is bound to the south by domain Boundary C, to the north by domain Boundary
B, and the domain Boundary A, cuts the mineralization to the northeast. The Otto domain is located to the north of Ogee and is bound between the Boundary B limit and the Front Range Fault to the west, with the Boundary A surface limiting the
mineralization to the northeast. SRK notes some mineralization remains to the west of the Range Front Fault within a local domain referred to as Osgood.
Further exploration work will be needed to confirm the depth, extent and geotechnical conditions of the mineralization. The current focus for
i-80 during the most recent exploration has been to test the depth extensions of the SPZ at the operation which is limited to a fault block below the CW-West Fault, with the current depth extents limited to the Boundary C surface. Above the CW-West
Fault the mineralization has been defined for the purpose of this study as the SPZ hanging wall Zone (SPZhw). A summary of the controls used to define the broad mineralization domain blocks is shown in Figure
11-30.
A review of the lithology shows the Range Front Fault marks the change between the Ocl
(hanging wall) and Cp (footwall) units, with most of the mineralization occurring within the Ocl unit of the overlying Ocu units. It is therefore assumed these are considered good hosts for the mineralization but that the lithological contacts
between these two units do not act as a lithological control. Additional analysis of the statistics by lithology also indicated higher grades in the vicinity of the faults which supports the observations made during the site inspection and knowledge
from the current operation.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
211
Source: SRK, 2026
Figure 11-30: Plan Showing Main Defined Mineralization Domain Boundary Areas at the Granite Creek Underground Operation
Using the defined limits of the three main boundary areas the first step has been to identify within these areas the regions of potential
mineralization (Figure 11-31 and Figure 11-32). To undertake this SRK initially defined three low-grade indicator grade shells based on a nominal 0.5 g/t (0.015 oz/st)
Au cut-off. To create the grade shells the sampling has been limited to each domain, with a series of structural trends generated based on selected local faults mapped at the current operation and interpreted from the diamond drilling data. The
structural model is under continual review and updates by the i-80 geological team are reviewed by SRK. Overall, it is opinion of SRK that the structures selected are reasonable for consideration controlling the mineralization, so the trends have
been modeled in Leapfrog using the “strongest along inputs” for Ogee and Otto but using a “blended” approach at SPZ due to most of the interpretation at depth being based on diamond drilling interpretation vs. underground
operations. Using this method each structure is assigned a strength and range with the range of influence being between 9 m and 14 m (30 to 45 ft. )The interpretations were then finalized using an ISO Value of 0.45 (which is defined by Leapfrog as
the confidence that the probability of the indicator shell will contain the cut-off value), which upon review by the QP was deemed to provide a reasonable limit to the edge of the mineralization for which the data could be coded to undertake the
estimation domain analysis.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
212
Source: Source: SRK, 2026
Figure 11-31: Plan Showing Main Defined Mineralization Areas at the Granite Creek Underground Operation
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
213
Source: SRK, 2026
Figure 11-32: Long Section (Looking Northwest) Showing Main Defined Mineralization Areas at the
Granite Creek Underground Operation
To undertake the estimation domain analysis SRK used a combination of Phinar X-10 (version
2.1.42.14) and Snowden Supervisor (v.9.2.5). Using the 0.5 g/t (0.015 oz/st) Au limits as a lower boundary of potentially economic mineralization SRK undertook a statistical analysis of the grade distribution within each domain using a combination
of log histograms, log-probability plots and noted in general there are still mixed populations within the domains defined. A review of the log-probability plots shows increases in the gradient of the curves above values in the order of 1.5 g/t
(0.044 oz/st) to 3.0 g/t (0.088 oz/st) Au within each of the domains. The changes in the population are noted to be subtle, and therefore further work on sensitivity was completed in Leapfrog to test a range of values. An example of the analysis is
shown in Figure 11-33 for the Otto domain with the interpreted possible trend breaks shown on the log-probability chart. Figure 11-34 shows the equivalent analysis using
Snowden supervisor for all domains on the log-probability highlighting potential changes in trend based on the QP’s opinion and analysis.
It is noted there remains a high-grade component (shown by the red line) for the mineralization above values of 10 to 15 g/t (0.438 oz/st) in
the example shown but based on the grade continuity and that typically < 5% of the data population within the boundary domains are above these values they have been combined with the >1.5 g/t (0.044 oz/st) grade domains.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
214
Source: SRK, 2026
Figure 11-33: Example of EDA Analysis in X-10 to Identify Potential Changes in Grade Populations
within the Ogee Domain
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
215
Source: SRK, 2026
Figure 11-34: Example of Log-Probability Plots Showing Polynomial Model Fitting (Pink) and Potential
Trend Breaks (Yellow)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
216
For each domain SRK completed a sensitivity analysis testing the impact of grade limits, the
use of structural trends, and variable search ranges during the indicator grade shell analysis. The final sensitivity test was completed initially on eight different cut-off grades 0.5, 1.0, 1.5, 2.0, 3.0, 3.5, 4.0, 10.0 g/t (0.292 oz/st). Based on
visual review and comparison to the i-80 mine production model it was then decided to focus on the grade ranges of 1.5 to 2.5 g/t (0.073 oz/st) for more detailed analysis. A total of 14 different models were generated on selected confidence levels
using various ISO values to understand the variable ranges in sample statistics for each scenario.
The results of each analysis were
captured with the wireframe volume, average grades, and the percentage of samples above and below cut-off tracked to determine the portion of internal waste for any given scenario. The results were then charted (Figure
11-35) and the final scenarios selected based on the QP’s opinion of an optimized search in terms of the proportion of internal waste vs. maintaining a reasonable volume and potential loss of metal
outside the indicator shells. These values tend to fall in the range of 0.44 to 0.45 ISO values based on the analysis.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
217
Source: SRK, 2026
Figure 11-35: Example of Sensitivity Analysis on ISO Values Completed by SRK for the Ogee Domain
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
218
During the review SRK has considered the statistical support for the domains but has also
reviewed the continuity of the mineralization in 3D in Leapfrog to ensure grade continuity is maintained (Figure 11-36). Where available in the upper portions of the active mine the results have been compared
to the grade control sampling (muck and sludge sampling) to visually check the preferred parameters.
The review of the geological
boundaries to the grade control has also aided in the assessment of the key faults and orientation controls used for the interpretation. Figure 14 36 provides an example of the review, with the key faults shown in gray on. It is the QP’s
opinion that the grade boundaries of the high-grade domains closely follow the limits of the high-grade data as defined by the muck sampling. In the case of the Ogee domain in the example shown, the two key orientations of a north-northeast limb and
a northeast limb are clearly shown which is supported by the mining activities in these areas of the mine.
Source: SRK, 2026
Figure 11-36: Level Plan 4230 Showing Selected Ogee and Otto Domain Boundaries vs. Sampling
(Including Grade Control Muck Sampling)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
219
The final domains were initially exported to dxf format and provided to the i-80 Geology team
for review. Several small areas were noted where some manual adjustments to the interpretation were needed to improve the geological interpretation (namely in areas of lower sampling volumes), which has been completed by SRK and then final review
and agreement reached with the i-80 Geology team that the selected grade shells are representative of the underlying geological controls.
Based on the review and in summary the following domains have been defined by SRK for use in the underground Mineral Resource (Table 11-20), with the domains shown in Figure 11-37.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
220
Table 11-20: Summary of Domains and Criteria Used
Domain
Wireframe
Description/Criteria
OgeeHG
GM_EstDomain – OgeeHG.dxf
Indicator 2.0 g/t Au, Trend = Ogee FS 2025_12, Range =300 ft, ISOVALUE 0.45
OgeeLG
GM_EstDomain – OgeeLG.dxf
Indicator 0.5 g/t Au, Trend = Ogee FS 2025_12, , Range =300 ft, ISOVALUE 0.45
OttoHG
GM_EstDomain – OttoHG.dxf
Indicator 2.0 g/t Au, Trend = OT FS 2025_12, Range =300 ft, ISOVALUE 0.45
OttoLG
GM_EstDomain – OttoLG.dxf
Indicator 0.5 g/t Au, Trend = OT FS 2025_12, , Range =300 ft, ISOVALUE 0.45
SPZHG
GM_EstDomain – SPZHG.dxf
Indicator 1.5 g/t Au, Trend = SPZ FS 2025_12, Range =300 ft, ISOVALUE 0.45
SPZLG
GM_EstDomain – SPZLG.dxf
Indicator 0.5 g/t Au, Trend = SPZ FS 2025_12, Range =300 ft, ISOVALUE 0.45
SPZhwHG
GM_EstDomain – SPZhwHG.dxf
Indicator 2.5 g/t Au, Trend = SPZ FS 2025_12, Range =175 ft, ISOVALUE 0.45
SPZhwLG
GM_EstDomain – SPZhwLG.dxf
Indicator 0.5 g/t Au, Trend = SPZ FS 2025_12, Range =175 ft, ISOVALUE 0.45
Source: SRK, 2026
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
221
Source: SRK, 2026
Figure 11-37: SRK Domain Model Used for Grade Estimation
As a final step, SRK has cross-checked statistically to ensure the domains are reasonable for the purpose of the grade estimation process and a
box-whisker plot of the final domained gold statistics is shown in Figure 11-38. It is the QP’s opinion that these represent valid domains for the purpose of estimation.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
222
Source: SRK, 2026
Figure 11-38: Box-Whisker Plot Showing Gold Grade Distributions within the SRK Domained Models,
showing mean grades.
11.2.5 Compositing
The composite length review indicates that approximately 90% of the samples taken are less than 1.53 m (5 ft) in length and that 98% of the
samples are less than 3.05 m (10 ft) in length (Figure 11-39). SRK completed this review on both the combined dataset and within the individual domains. Figure 11-40
shows the results of the analysis within the high-grade domains. The QP has opted to use a single composite length for all domains.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
223
Source: SRK, 2026
Figure 11-39: Log Probability Plot Showing Sampling Length in Diamond and RC Sampling at Granite
Creek
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
224
Source: SRK, 2026
Figure 11-40: Summary of Sampling Lengths Inside the High-Grade Domains within Diamond and RC
Drillholes
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
225
Based on this review SRK selected 1.53 m (5 ft) for the composite lengths for all estimation
domains, as in the QP’s opinion this better reflected the downhole grade variations noted in the drilling than the larger 10 or 5 m (15 ft) composites as shown in Figure 11-39 and Figure 11-40. SRK also noted the difference in the mean grades between the raw and composited data reported closer in the 1.53 m (5 ft) composites than the longer 3.05 (10 ft) composites.
SRK completed a statistical comparison of the composite lengths and the mean grades for Au (g/t) before capping, which reported within < 1%
difference in the mean grades for the mineralized data. However, on a zone-by-zone basis the QP noted there is a slight increase in the mean grade within the OgeeHG domain (approximately 2.5%), which in the QP’s opinion is acceptable. Overall,
in the QP’s opinion the 2 m (5 ft) composites were preferred.
11.2.6
Assay Capping
High-grade capping is undertaken where data is no longer considered to be part of the main population. The QP completed the analysis based on
log and raw probability plots and histograms which can be used to distinguish the grades at which samples have significant impacts on the local estimation and affect is considered extreme. The QP notes that the mean grades within the different
domains are sensitive to changes in the capping values.
SRK completed a statistical analysis of the impact of grade capping by importing
the geologically domained coded composites into Phinar’s X10 Geo (X10) statistical software packages for review. During the analysis, SRK reviewed the percentage of metal loss and the reduction in the coefficient of variation (CoV). Examples
of the capping showing a review of the data distribution at the highest grades completed in X10 are shown in Figure 11-41.
The high-grade domains which account for the majority of the Mineral Resources are shown in Figure
11-41 and Figure 11-42. The selected capping values have also been cross-checked to the impact on the distributions using Snowden Supervisor (v9.0.4) to ensure the
selected capping is appropriate relative to the log-histograms, log probability, mean and variance cumulative frequency plots, and the distribution of the cumulative metal above the selected cap (Figure
11-43).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
226
Source: SRK, 2026
Figure 11-41: Examples of X-10 Capping Analysis Showing Capped Values in Yellow
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
227
Source: SRK, 2026
Figure 11-42: Capping Analysis Showing Breaks in Data Population (Ogee HG Domain)
Source: SRK, 2026
Figure 11-43: Capping Analysis Showing Breaks in Data Population (Otto HG Domain)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
228
Source: SRK, 2026
Figure 11-44: Capping Analysis Showing Breaks in Data Population (Ogee SPZ Domain)
The analysis process has been completed for all the key elements used in the estimation process covering the gold and the geo-metallurgical
parameters discussed in more detail in Section 14.3.10 of this report. The capping levels have been selected (Table 11-21) where the populations were identified by the QP to be breaking down, but also
with the goal of reducing the coefficient of variation (CoV) to acceptable levels for the application of geostatistical methodology (1.5 to 2.0).
The capping levels typically reduced the mean grades in the order of 2.5% to 5.0% for most domains, except OgeeLG which has the largest
significant differences noted (-15.8%). The basis for the more significant capping at this domain was the relatively high coefficient of variation (2.42 in the raw data), which needed more aggressive capping to reduce the CoV compared to the other
domains. The QP notes that continuing to monitor this domain during the mining process should be considered to either identify if additional high-grade materials have been missed during the geological modeling, or if the grade capping needs further
adjustment based on reconciliation data as mining progresses. In all the domains the CoV has been reduced from high variability >2.0 to approximately 1.5 to 1.7 which in the QP’s opinion is reasonable for the application of geostatistics
and estimation and the results are summarized in Table 11-21.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
229
Table 11-21: Summary of Raw vs. Capped Composite
Statistics per Domain
Name
Parameter
Count
Minimum
Maximum
Mean
Variance
Std Dev
CoV
%
Change
OgeeHG
Au (g/t)
1668
0.00
134.85
12.37
283.70
16.84
1.36
-2.4%
AuCap
1668
0.00
70.00
12.07
239.67
15.48
1.28
OgeeLG
Au (g/t)
1768
0.00
82.43
3.44
69.00
8.31
2.42
-15.8%
AuCap
1768
0.00
24.00
2.89
31.25
5.59
1.93
OttoHG
Au (g/t)
1150
0.00
95.50
8.32
136.07
11.66
1.40
-1.4%
AuCap
1150
0.00
62.00
8.20
120.55
10.98
1.34
OttoLG
Au (g/t)
2030
0.00
67.20
2.58
29.39
5.42
2.10
-2.5%
AuCap
2030
0.00
32.00
2.52
24.50
4.95
1.97
SPZHG
Au (g/t)
940
0.00
140.91
9.43
159.62
12.63
1.34
-2.3%
AuCap
940
0.00
52.50
9.22
129.60
11.38
1.23
SPZLG
Au (g/t)
568
0.00
50.40
2.05
21.81
4.67
2.28
-6.3%
AuCap
568
0.00
20.00
1.92
14.87
3.86
2.01
SPZhwHG
Au (g/t)
44
0.02
64.50
11.91
199.53
14.13
1.19
0.0%
AuCap
44
0.02
64.50
11.91
199.53
14.13
1.19
SPZhwLG
Au (g/t)
194
0.00
10.90
1.41
2.66
1.63
1.15
-2.4%
AuCap
194
0.00
7.50
1.38
2.13
1.46
1.06
Source: SRK, 2026
11.2.7
Variogram Analysis and Modeling
The QP reviewed the geostatistical properties of the domains using Snowden Supervisor (v9.0.4) variogram analysis on the capped 1.53 m (5.02
ft) composite dataset for the Otto, Ogee, and SPZ domains (LG and HG domains for each). Based on the size of the data populations, initial test work for semi-variograms in the SPZhw (LG and HG) returned poor structures for directional variogram;
therefore, the QP elected to use omni- variograms within these domains.
The SRK workflow included review of the radial plot (to define the
general orientation), then definition of the Major, Semi-Major, and minor axis variograms, which in most cases have been orientated to a dip of 55° to 80°, dip azimuth of 130° to 155° and pitches ranging from of 65° to 120°.
The dip and orientations have been selected based on discussions with the Geology team’s analysis of key structures localized to each domain and visual trends noted in the mineralization. Variograms have been modeled using a combination of
variograms and correlograms depending on the quality of the experimental variogram data, which have been transformed and normalized in Supervisor and the parameters transferred to Leapfrog®
for the estimation process. Summary of gold variogram parameters are shown in Table 11-22 and Figure 11-45 through Figure 11-47.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
230
Table 11-22: Summary of Gold Variogram Parameters
Domain
Nugget
s1_sill
s1_maj
s1_semi
s1_min
s2_sill
s2_maj
s2_semi
s2_min
Dip
dip_azi
Pitch
Variance
OgeeHG
0.20
0.44
20
15
15
0.37
130
55
50
80
165
100
214.10
OgeeLG
0.20
0.44
20
15
15
0.37
130
55
50
80
155
65
25.80
OttoHG
0.22
0.55
20
10
10
0.23
70
60
30
80
155
65
107.90
OttoLG
0.27
0.58
10
10
10
0.15
115
55
35
80
155
65
23.80
SPZHG
0.24
0.44
40
30
15
0.32
230
175
50
55
130
120
125.60
SPZLG
0.22
0.55
10
10
10
0.23
70
60
30
80
155
65
13.90
SPZhwHG
0.21
0.39
10
10
10
0.40
65
65
65
80
155
65
269.60
SPZhwLG
0.21
0.51
10
10
10
0.28
60
60
60
80
155
65
2.20
Source: SRK, 2026
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
231
Source: SRK, 2026
Figure 11-45: Modeled Normal Score Downhole Variograms and Directional Correlograms for OgeeHG
(Gold)
Source: SRK, 2026
Figure 11-46: Modeled Normal Score Downhole and Directional Variograms for OttoHG (Gold)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
232
Source: SRK, 2026
Figure 11-47: Modeled Normal Score Downhole and Directional Variograms for SPZHG (Gold)
11.2.8
Block Model Parameters
SRK has produced the block models using Leapfrog® Edge (version 2025.3.1). The
procedure involved construction of wireframe models for the fault networks, lithology domains, definition of resource domains (Ogee, Otto, SPZ and the SPZhw), split into low and high-grade subdomains. SRK produced a single block model for
underground portion of the Project to cover the main areas of mineralization. A single model was generated to cover the estimation of all the key domains. Estimation was completed based on coded 1.53 m (5 ft) composites (based on the updated defined
wireframes), which have been capped to appropriate levels.
The resource evaluation work was completed by SRK. Grade estimation has been
based on block dimensions of 4.57 m x 4.57 m x 4.57 m or (15 ft x 15 ft x 15 ft). The block size reflects potential size variations for the geological units plus consideration for any underground smallest mining units (SMU). The block size is
consistent with the current grade underground production models to aid future reconciliation. SRK utilized sub-blocking methodology in Leapfrog®
(Octree), which allows subdivision of the parent block by division of (4, 8, 16, and 32) to accurately reflect the defined mineralization and lithological models. SRK has utilized sub-blocking to accurately
reflect the defined geological models, with a sub-block size of 0.57 m x 0.57 m x 1.14 m (1.875 ft x 1.875 ft x 3.75 ft) used to reflect the thickness and orientation of the domain wireframes (Table 11-23). It was also decided through discussions with the mining engineer to use an orientated grid which aligns to the strike of the mineralization. SRK used an azimuth of 60 degrees to align to the primary
mineralization orientation.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
233
Table 11-23: Summary of Rotated Prototype
Parameters Used in Granite Creek Model
Item
Origin
Extent
Block Size
Block
Count
Subblock
(ft)
(m)
(ft)
(m)
X
7,775.500
2,295
15
4.75
153
1.875
0.57
Y
11,743.045
4,200
15
4.75
280
1.875
0.57
Z
5,960.000
3,375
15
4.75
225
3.75
1.14
Rotation
60º (azimuth)
Source: SRK, 2026
11.2.9
Estimation Methodology
Grades have been interpolated for Au (g/t), using a combination of Ordinary Kriging and Inverse Distance Weighting (Power 3). SRK tested
several estimation scenarios for the Ogee, Otto, and SPZ domains. The primary focus for the parameter selection has been the OgeeHG and SPZHG (based on Ogee HG representing the current mining areas and SPZ HG providing the longer-term potential
within the main mineralization domains) to identify the sensitivity of the estimates to the maximum number of samples being used and the assumption to use a maximum of three composites per drillhole during the estimation process. The QP did not
lower performance of the estimators based on slope of regression and negative weights within the Otto HG domain compared to Ogee and SPZ HG domains, which is a function of the variogram, however it is the QP view that keeping the estimation
parameters relatively consistent in terms of block size and number of samples is preferred.
SRK has utilized variable orientation searches
to control the orientation of the estimates for the Granite Creek deposit. SRK tested both linear and variable orientation (default dip and strike orientations) for each zone.
The principal direction of mineralization can change across a domain, such as when the domain features an undulating, gently folded structure.
Using a single fixed orientation for the sample search and the variogram can result in poor sample selection and weighting locally. Using a variable orientation makes it possible to re-orient the search and
variogram according to local characteristics, which results in improved local value estimates. Variable orientations can have multiple inputs, including veins, bedding or faults, and practically are based on any selected mesh in the project. The
variable orientation can be applied to Kriging and inverse distance estimators.
To set up the variable orientations in Leapfrog the QP has
worked with the i-80 Geology team to identify the key features within each domain that impact the local grade distribution. Given the predominance of the higher-grade mineralization to be controlled by
faulting, selected fault surfaces formed the majority of the controls on the orientation. The i-80 team have been working during 2025 to 2026 to integrate variable search orientation into the operational level
grade estimates with success. To determine the final orientation parameters for each domain the QP used the initial models as presented by i-80 and then refined to the controls based on visual inspection of
rotations within the block model to avoid any sharp changes in the grade estimates outside the areas of influence of the faults. The QP noted a few occasions where the search ranges were being impacted by some mine scale cross faulting outside the
area of the mineralization and has therefore removed these from the analysis. A summary of the final fault structures used per vein is included in Table 11-24.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
234
Table 11-24: Summary of Faults and Key Structures
Used to Define Variable Orientations for Estimation
Azimuth: 0
Plunge: 0
VO, Ogee 2026_02
VO, Otto_RF 2026_02
VO, SPZ 2026_02 Exclude NE_12_Offset
GC - Mine: EW_4
GC - Mine: Adam Peak Offset Fault
GC - Mine: M9
GC - Mine: LH Offset Fault
GC - Mine: Adam_Peak_Fault
GC - Mine: M14
GC - Mine: LH_Fault
GC - Mine: EW_5
GC - Mine: M19
GC - Mine: M1
GC - Mine: M10
GC - Mine: M20
GC - Mine: M1 Offset
GC - Mine: M11
GC - Mine: M21
GC - Mine: M2
GC - Mine: M12
GC - Mine: M23
GC - Mine: M4
GC - Mine: M13
GC - Mine: M24
GC - Mine: M5
GC - Mine: M14
GC - Mine: M25
GC - Mine: M7
GC - Mine: M15
GC - Regional: Adam Peak Offset Fault
GC - Mine: M8
GC - Mine: NE_1
GC - Regional: Otto Offset Fault
GC - Mine: M9
GC - Mine: NE_10
GC - Regional: Otto Offset Splay
GC - Mine: M16
GC - Mine: NW_1
GC - Regional: Otto_Zone
GC - Mine: M17
GC - Mine: NW_2
GC - Regional: Otto_Zone_2
GC - Mine: M18
GC - Mine: Ogee Fault
GC - Regional: Otto_Zone_3
GC - Mine: NE_3
GC - Mine: Otto Offset Fault
GC - Regional: SPZ
GC - Mine: NE_13
GC - Mine: Otto_Fault
GC - Mine: NE_14
GC - Mine: Otto_Zone
GC - Mine: NNE 1
GC - Mine: Range_Front_Fault
GC - Mine: Ogee Fault
GC - Mine: Splat_Fault
GC - Mine: Otto Offset Splay
GC - Mine: Otto_Zone_2
GC - Mine: SPZ
Source: SRK, 2026
SRK also undertook a review of the use of a hard and soft boundary between the low-grade / high-grade
and boundaries to test if a hard or soft boundary was more appropriate. Given the use of 2 m(5 ft) composites, the analysis focused on 2 m (5 ft) and 3 m (10 ft) boundaries to allow the influence of either single or two samples across the various
boundaries. Based on visual review of the models and from boundary analysis the 2 m (5 ft) soft boundary was selected for the HG and LG domains.
SRK undertook a Kriging Neighborhood Analysis (KNA) in Snowden Supervisor to aid in the definition of the minimum and a maximum number of
composites to be used. The analysis looked at a range of block sizes (Figure 11-48) with 15 ft x 15 ft x 15 ft selected, and composites numbers ranging from 2 to 60 samples to review the impact on potential
smoothing on the grades. SRK noted for both domains through the KNA in Snowden that the number of negative weights increased significantly above 26 to 30 composites. A review of the statistics indicates that the sum of the negative weights first
impacts the estimates in the 8 to 12 sample range, and that within this range the estimation variance of the blocks has already been reduced by 52% to 59% with the reduction levelling out in the 16 to 20 composite range and shown in. Figure 11-49 and Figure 11-50.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
235
Source: SRK, 2026
Figure 11-48: Block Size Analysis, Ogee HG Domain
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
236
Source: SRK, 2026
Figure 11-49: KNA Analysis on Number of Samples vs. Slope of Regression (Top) and Impact of
Negative Weights (Bottom) — Ogee HG Domain
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
237
Source: SRK, 2026
Figure 11-50: KNA Analysis on Number of Samples vs. Slope of Regression (Top) and Impact of
Negative Weights (Bottom) — SPZ HG Domain
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
238
Based on the KNA analysis the QP completed a number of test estimates with various minimum
and maximum number of composites with the view of practically testing the selection ranges presented. The QP then reviewed the results and considered the impact of potential grade smoothing within each of the scenarios and concluded that the
preferred number of minimum and maximum samples in the first search should be in the order of 9 (minimum) and 12 (maximum) composites. A maximum of 4 composites per hole were used in the first and second pass which was reduced to 3 composites in the
final pass.
The decision to use a maximum of 12 composites vs. 16 or 20 composites (3 holes vs. 4 or 5 holes) was selected based on visual
validation and discussions with the i-80 technical team based on the current mining assumptions and model performance. A summary of the final gold parameters is contained in Table 11-25..
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
239
Table 11-25: Summary of Estimation Parameters for
Gold Estimates
General
Ellipsoid Ranges
Ellipsoid Orientation
Number of Samples
Outlier Restrictions
Drillhole Limit
Estimator
Name
Domain
Numeric Values
Maximum
Intermediate
Minimum
Variable Orientation
Minimum
Maximum
Method
Max Samples per
Hole
Apply Drillhole Limit
per Sector
Kr, AuCap: OgeeHG Trend SftP1
OgeeHG
AuCap
55
45
30
VO, Ogee 2026_02
9
12
None
4
TRUE
Kr, AuCap: OgeeHG Trend SftP2
OgeeHG
AuCap
125
90
60
VO, Ogee 2026_02
5
16
None
4
TRUE
Kr, AuCap: OgeeHG Trend SftP3
OgeeHG
AuCap
210
180
90
VO, Ogee 2026_02
5
12
None
3
TRUE
Kr, AuCap: OgeeLG Trend SftP1
OgeeLG
AuCap
65
65
30
VO, Ogee 2026_02
9
12
None
4
TRUE
Kr, AuCap: OgeeLG Trend SftP2
OgeeLG
AuCap
130
130
60
VO, Ogee 2026_02
5
16
None
4
TRUE
Kr, AuCap: OgeeLG Trend SftP3
OgeeLG
AuCap
210
210
100
VO, Ogee 2026_02
4
12
None
3
TRUE
Kr, AuCap: OttoHG Trend SftP1
OttoHG
AuCap
55
45
30
VO, Otto_RF 2026_02
9
12
None
4
TRUE
Kr, AuCap: OttoHG Trend SftP2
OttoHG
AuCap
105
90
60
VO, Otto_RF 2026_02
5
16
None
4
TRUE
Kr, AuCap: OttoHG Trend SftP3
OttoHG
AuCap
330
300
125
VO, Otto_RF 2026_02
4
12
None
3
TRUE
Kr, AuCap: OttoLG Trend SftP1
OttoLG
AuCap
55
30
20
VO, Otto_RF 2026_02
9
12
None
4
TRUE
Kr, AuCap: OttoLG Trend SftP2
OttoLG
AuCap
115
55
40
VO, Otto_RF 2026_02
5
16
None
4
TRUE
Kr, AuCap: OttoLG Trend SftP3
OttoLG
AuCap
172.5
110
70
VO, Otto_RF 2026_02
2
12
None
3
TRUE
Kr, AuCap: SPZHG Trend SftP1
SPZHG
AuCap
115
90
30
VO, SPZ 2026_02 Exclude NE_12_Offset
9
12
None
4
TRUE
Kr, AuCap: SPZHG Trend SftP2
SPZHG
AuCap
175
135
40
VO, SPZ 2026_02 Exclude NE_12_Offset
5
16
None
4
TRUE
Kr, AuCap: SPZHG Trend SftP3
SPZHG
AuCap
230
175
50
VO, SPZ 2026_02 Exclude NE_12_Offset
3
12
None
3
TRUE
Kr, AuCap: SPZhwHG Trend SftP1
SPZhwHG
AuCap
60
60
30
VO, SPZhw 2026_02
5
12
None
4
TRUE
Kr, AuCap: SPZhwHG Trend SftP2
SPZhwHG
AuCap
90
90
30
VO, SPZhw 2026_02
5
16
None
4
TRUE
Kr, AuCap: SPZhwHG Trend SftP3
SPZhwHG
AuCap
180
180
60
VO, SPZhw 2026_02
2
12
None
3
TRUE
Kr, AuCap: SPZhwLG Trend SftP1
SPZhwLG
AuCap
60
60
30
VO, SPZhw 2026_02
5
12
None
4
TRUE
Kr, AuCap: SPZhwLG Trend SftP2
SPZhwLG
AuCap
90
90
30
VO, SPZhw 2026_02
5
16
None
4
TRUE
Kr, AuCap: SPZhwLG Trend SftP3
SPZhwLG
AuCap
180
180
60
VO, SPZhw 2026_02
2
12
None
3
TRUE
Kr, AuCap: SPZLG Trend SftP1
SPZLG
AuCap
85
65
30
VO, SPZ 2026_02 Exclude NE_12_Offset
9
12
None
4
TRUE
Kr, AuCap: SPZLG Trend SftP2
SPZLG
AuCap
120
100
40
VO, SPZ 2026_02 Exclude NE_12_Offset
5
16
None
4
TRUE
Kr, AuCap: SPZLG Trend SftP3
SPZLG
AuCap
240
200
75
VO, SPZ 2026_02 Exclude NE_12_Offset
2
12
None
3
TRUE
Source: SRK, 2026
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
240
11.2.10 Geo-Metallurgical
Parameters
The mineralization at Granite includes refractory mineralization which requires different processing routes to maximize the recovery and value
for the material. The decision to direct material heap leaching or CIL methods and those that require autoclave treatment .is based on metallurgical indicators. The final decisions for material routing are expected to happen during the short-term
modeling and production stage of the Project. However, to provide a more accurate reflection of the mine plan within the long-term models and Mineral Reserves calculations, SRK has estimated the key metallurgical factors into the block model. The
factors are based on LECO assay analysis of selected samples taken by an i-80 geologist during the recent i-80 infill drilling program.
SRK completed a review of the key parameters which can impact the potential decision for processing routes and expected recoveries which
included:
•
Cyanide Soluble Gold (ppm) – AuCN_BestValue_ppm
•
Total Organic Carbon (%) – TOC_pct
•
PregRob (%) – PregRob_pct
•
Sulfide Sulfur (%) – SulfideSulfur_pct
•
CO3 (%) – CO3_LT_pct
Prior to the estimation of these elements the QP completed a review of the sampling available as the LECO test work has not been completed
routinely during the exploration phases. The results of the analysis (Table 11-26) indicated that there is limited coverage in the additional elements needed with limited datasets in the upper portions of the
mine in Ogee and Otto. It is the QP’s opinion that estimates within these regions would not be representative if the same restriction used in the grade estimates on only using Diamond and RC drilling sampling was applied. It is noted that the
coverage with the addition of the grade control sampling from within the current underground operation would significantly improve the sampling coverage for use in the metallurgical assessment.
The additional sampling consists of sampling defined as Muck Sampling and Sludge Sampling. The sludge sampling has not been included in the
analysis as it is the QP’s opinion that the samples are not representative as all sampling is assigned a default length. In comparison, the muck samples are taken from each round as the mining advances, and while these are not considered as
representative across the width of the advance, they are representative of each advance. The QP has therefore taken the approach to supplement the exploration database as used to define the gold estimates, with the aim to provide a more
representative local scale variability in the metallurgical parameters.
In addition to the parameters defined above and that the ratio of
gold vs. cyanide soluble gold ratio may impact the recovery curves to ensure accurate comparisons between the two values, SRK has also completed an additional estimate for gold using the muck samples defined in the block model as AuGC (g/t). In the
cases of the low-grade domains where there remains gaps in the paired data for Au and AuCN only the paired datasets have been used for OgeeLG, OttoLG and SPZLG.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
241
Table 11-26: Summary Statistics and Coverage of
Raw Sampling per Metallurgical Parameter vs. Gold Coverage
Name
Count
Length
Mean
Std Dev
CoV
Variance
Minimum
Maximum
% Coverage
Au_BestValue_ppm
OgeeHG
1,970.0
8,097.9
12.12
18.02
1.49
324.72
0.000
143.07
OgeeLG
1,912.0
8,619.6
3.40
8.96
2.63
80.27
0.000
114.67
OttoHG
1,222.0
5,582.1
8.21
12.27
1.49
150.57
0.000
130.42
OttoLG
2,061.0
9,870.9
2.58
5.66
2.20
32.06
0.000
67.20
SPZHG
1,063.0
4,554.6
9.31
13.98
1.50
195.58
0.000
140.91
SPZhwHG
53.0
215.1
11.93
15.80
1.32
249.60
0.008
79.00
SPZhwLG
193.0
947.4
1.41
1.92
1.36
3.67
0.000
15.15
SPZLG
601.0
2,704.1
2.03
5.14
2.54
26.38
0.000
51.50
AuCN_BestValue_ppm
OgeeHG
972.0
4,242.4
11.60
13.88
1.20
192.65
0.001
125.73
52.4
OgeeLG
577.0
2,666.0
5.38
9.10
1.69
82.72
0.001
104.40
30.9
OttoHG
578.0
2,630.3
4.13
8.69
2.11
75.59
0.015
72.37
47.1
OttoLG
677.0
3,189.9
1.99
4.57
2.30
20.86
0.001
34.48
32.3
SPZHG
748.0
3,135.2
2.05
5.24
2.55
27.42
0.001
47.74
68.8
SPZhwHG
25.0
106.6
1.53
1.76
1.15
3.11
0.034
6.10
49.6
SPZhwLG
113.0
553.9
0.46
0.65
1.42
0.42
0.014
3.27
58.5
SPZLG
244.0
1,058.2
1.13
2.91
2.58
8.47
0.001
19.49
39.1
CO3_LT_pct
OgeeHG
651.0
2,631.7
11.55
13.43
1.16
180.41
0.000
62.26
32.5
OgeeLG
428.0
1,912.3
15.99
13.90
0.87
193.21
0.000
54.88
22.2
OttoHG
493.0
2,187.1
19.30
15.15
0.79
229.59
0.000
61.20
39.2
OttoLG
444.0
2,051.7
14.47
14.54
1.00
211.40
0.000
66.06
20.8
SPZHG
789.0
3,344.9
12.66
13.20
1.04
174.17
0.000
64.66
73.4
SPZhwHG
17.0
62.7
6.48
7.91
1.22
62.62
0.200
29.35
29.1
SPZhwLG
44.0
208.0
13.58
16.19
1.19
262.08
0.864
54.60
22.0
SPZLG
327.0
1,446.4
17.14
16.40
0.96
269.09
0.000
57.10
53.5
PregRob_Pct
OgeeHG
144.0
607.8
6.87
15.16
2.21
229.87
0.000
95.00
7.5
OgeeLG
71.0
295.0
2.56
6.29
2.46
39.59
0.000
38.80
3.4
OttoHG
181.0
821.6
3.93
8.83
2.25
78.03
0.000
75.50
14.7
OttoLG
77.0
335.6
2.67
6.47
2.42
41.91
0.000
47.10
3.4
SPZHG
667.0
2,796.9
3.06
9.17
3.00
84.16
0.000
164.10
61.4
SPZhwHG
14.0
52.2
3.08
5.32
1.73
28.35
0.000
16.70
24.3
SPZhwLG
26.0
128.0
2.17
5.25
2.41
27.51
0.000
19.40
13.5
SPZLG
201.0
861.0
2.14
4.21
1.97
17.76
0.000
26.00
31.8
SulfideSulfur_pct
OgeeHG
651.0
2,631.7
0.50
0.94
1.87
0.88
0.000
6.11
32.5
OgeeLG
428.0
1,912.3
0.50
0.91
1.84
0.83
0.000
5.47
22.2
OttoHG
493.0
2,187.1
1.18
1.28
1.09
1.63
0.000
6.44
39.2
OttoLG
444.0
2,051.7
1.10
1.35
1.23
1.83
0.000
6.72
20.8
SPZHG
789.0
3,344.9
1.76
1.26
0.71
1.59
0.000
8.63
73.4
SPZhwHG
17.0
62.7
2.69
0.84
0.31
0.71
1.803
4.85
29.1
SPZhwLG
44.0
208.0
1.43
1.17
0.82
1.37
0.000
4.20
22.0
SPZLG
327.0
1,446.4
1.10
1.12
1.02
1.25
0.000
9.95
53.5
TOC_pct_D
OgeeHG
651.0
2,631.7
0.27
0.25
0.96
0.06
0.017
2.83
32.5
OgeeLG
428.0
1,912.3
0.25
0.23
0.92
0.05
0.000
2.02
22.2
OttoHG
493.0
2,187.1
0.19
0.18
0.94
0.03
0.002
1.36
39.2
OttoLG
444.0
2,051.7
0.21
0.24
1.17
0.06
0.000
5.17
20.8
SPZHG
789.0
3,344.9
0.47
0.60
1.26
0.35
0.008
6.79
73.4
SPZhwHG
17.0
62.7
1.64
2.00
1.22
3.99
0.082
5.53
29.1
SPZhwLG
44.0
208.0
1.11
1.14
1.03
1.30
0.019
4.07
22.0
SPZLG
327.0
1,446.4
0.62
0.85
1.38
0.73
0.000
5.10
53.5
Source: SRK, 2026
Note: % Coverage is based on the total length per domain of each element versus the Au BestValue ppm coverage.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
242
Based on the revised database using the muck samples, the process workflow used by SRK has
followed the same procedures as presented in the gold estimation process (Section 14.3.9). Capping has been completed per element with the AuGC values using the same capping parameters as presented in the gold estimates, with all other elements
considered on a case-by-case basis per domain. The capped statistics are presented in Table 11-27.
Table 11-27: Summary Statistics of Capped Composites (5 ft), Showing Capping (Maximum) Levels per
Metallurgical Elements
Name
Domain
Count
Length
Mean
Std
Dev
CoV
Variance
Minimum
Maximum
AuCn_cap
OgeeHG
938.0
4,667.3
11.22
11.91
1.06
141.87
0.00
52.00
OgeeLG
594.0
2,944.3
4.80
6.58
1.37
43.26
0.00
22.50
OttoHG
583.0
2,887.1
3.74
6.59
1.76
43.40
0.02
35.00
OttoLG
725.0
3,566.0
1.91
4.13
2.16
17.07
0.00
25.00
SPZHG
680.0
3,349.7
1.93
4.06
2.10
16.48
0.00
25.00
SPZhwHG
22.0
110.1
1.60
1.69
1.06
2.85
0.03
5.50
SPZhwLG
120.0
594.0
0.48
0.66
1.38
0.44
0.02
3.25
SPZLG
247.0
1,200.2
1.11
2.50
2.25
6.25
0.00
12.50
PregRob_Cap
OgeeHG
147.0
730.5
6.01
9.81
1.63
96.20
0.00
47.50
OgeeLG
73.0
355.5
2.24
4.54
2.02
20.59
0.00
19.50
OttoHG
188.0
938.4
3.25
4.74
1.45
22.42
0.00
21.50
OttoLG
85.0
413.9
2.26
3.62
1.60
13.12
0.00
17.50
SPZHG
613.0
3,026.2
2.51
4.28
1.70
18.31
0.00
20.00
SPZhwHG
11.0
55.2
3.24
4.55
1.40
20.72
0.00
15.00
SPZhwLG
32.0
157.0
2.03
4.47
2.20
19.96
0.00
15.00
SPZLG
205.0
999.8
2.24
3.83
1.71
14.70
0.00
15.50
TOCcap
OgeeHG
562.0
2,760.5
0.27
0.23
0.86
0.05
0.03
1.60
OgeeLG
403.0
1,959.5
0.25
0.21
0.84
0.04
0.00
1.35
OttoHG
469.0
2,317.5
0.20
0.18
0.93
0.03
0.00
1.36
OttoLG
452.0
2,181.5
0.21
0.20
0.92
0.04
0.00
1.95
SPZHG
711.0
3,506.7
0.46
0.52
1.12
0.27
0.01
3.30
SPZhwHG
13.0
65.2
1.60
1.96
1.22
3.82
0.10
5.00
SPZhwLG
45.0
217.5
1.49
2.67
1.79
7.13
0.02
13.30
SPZLG
316.0
1,540.4
0.61
0.79
1.30
0.62
0.01
3.50
SulfSulf_Cap
OgeeHG
562.0
2,760.5
0.49
0.82
1.67
0.67
0.00
3.65
OgeeLG
403.0
1,959.5
0.48
0.83
1.75
0.70
0.00
3.20
OttoHG
469.0
2,317.5
1.21
1.22
1.01
1.49
0.00
4.75
OttoLG
452.0
2,181.5
1.11
1.25
1.13
1.56
0.00
4.75
SPZHG
711.0
3,506.7
1.75
1.11
0.63
1.24
0.00
5.00
SPZhwHG
13.0
65.2
2.68
0.65
0.24
0.42
1.80
3.60
SPZhwLG
45.0
217.5
1.44
1.12
0.78
1.25
0.00
3.75
SPZLG
316.0
1,540.4
1.09
1.02
0.94
1.05
0.00
4.15
CO3cap
OgeeHG
562.0
2,760.5
11.30
12.32
1.09
151.80
0.00
50.00
OgeeLG
403.0
1,959.5
15.96
13.11
0.82
171.80
0.00
50.00
OttoHG
469.0
2,317.5
18.76
13.78
0.73
189.94
0.00
47.00
OttoLG
452.0
2,181.5
14.24
13.79
0.97
190.13
0.00
48.00
SPZHG
711.0
3,506.7
12.85
12.60
0.98
158.67
0.00
55.00
SPZhwHG
13.0
65.2
6.34
6.60
1.04
43.56
0.26
25.00
SPZhwLG
45.0
217.5
13.72
15.28
1.11
233.38
1.04
50.00
SPZLG
316.0
1,540.4
17.13
15.58
0.91
242.68
0.09
52.00
Source: SRK, 2026
SRK reviewed the geostatistical properties of the domains using Snowden Supervisor (version 9.0.4.0). Variography was completed on each of the
parameters, which have been modeled using nested double structured spherical variograms.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
243
Variograms have been modeled using a combination of variograms and correlograms depending on
the quality of the experimental variogram data, which have been transformed and normalized in Supervisor and the parameters transferred to Leapfrog® for the estimation process. A summary of
the parameters are shown in Table 11-28.
Estimation has been completed using a combination of
either Ordinary Kriging or Inverse Distance weighting using the capped 2 m (5 ft) composites and the same variable orientation as used for the primary elements. The estimation has been completed using a three-pass process using the parameters as
presented in Table 11-28 to Table 11-33.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
244
Table 11-28: Summary of Variogram Parameters Used
for Metallurgical Elements
Variable
Domain
Nugget
s1_sill
s1_major
s1_semi_major
s1_minor
s2_sill
s2_major
s2_semi_major
s2_minor
dip
dip_azimuth
Pitch
Variance
AuCN (cyanide-soluble gold)
OgeeHG
0.091
0.678
24
26
17
0.23
65
97
60
80
165
100
65.6
AuCN (cyanide-soluble gold)
OgeeLG
0.316
0.39
20
25
16
0.294
95
117
70
80
155
95
20.73
AuCN (cyanide-soluble gold)
OttoHG
0.159
0.488
22
14
20
0.353
300
265
80
70
140
45
24.68
AuCN (cyanide-soluble gold)
OttoLG
0.297
0.411
28
19
20
0.293
300
80
100
55
140
90
9.68
AuCN (cyanide-soluble gold)
SPZHG
0.345
0.329
30
30
15
0.326
170
120
50
55
130
120
15.1
AuCN (cyanide-soluble gold)
SPZLG
0.343
0.427
40
17
10
0.23
160
135
50
0
0
90
5.03
PregRob (preg-robbing)
OgeeHG
0.274
0.596
20
25
20
0.129
100
115
95
70
165
100
52.98
PregRob (preg-robbing)
OgeeLG
0.239
0.609
20
20
12
0.152
100
95
60
75
165
100
14.63
PregRob (preg-robbing)
OttoHG
0.174
0.64
30
30
17
0.187
310
300
58
80
150
45
15.19
PregRob (preg-robbing)
OttoLG
0.184
0.646
50
50
20
0.171
208
250
60
80
160
50
7.31
PregRob (preg-robbing)
SPZHG
0.222
0.427
50
50
27
0.351
260
260
73
55
130
120
16.95
PregRob (preg-robbing)
SPZLG
0.19
0.32
36
36
36
0.49
330
330
330
0
0
90
12.18
CO3 (carbonate)
OgeeHG
0.142
0.645
30
30
19
0.214
150
160
105
70
165
100
72.87
CO3 (carbonate)
OgeeLG
0.096
0.322
25
22
27
0.581
390
170
150
70
140
45
112.36
CO3 (carbonate)
OttoHG
0.095
0.42
26
20
15
0.485
253
210
117
70
140
45
88.66
CO3 (carbonate)
OttoLG
0.096
0.322
25
22
27
0.581
390
170
150
70
140
45
112.36
CO3 (carbonate)
SPZHG
0.122
0.413
60
26
17
0.465
300
285
90
55
130
120
148.29
CO3 (carbonate)
SPZLG
0.14
0.52
74
74
74
0.34
267
267
267
0
0
90
213.8
TOC (total organic carbon)
OgeeHG
0.114
0.503
25
30
20
0.383
248
204
215
55
345
80
0.04
TOC (total organic carbon)
OgeeLG
0.115
0.368
16
16
15
0.517
160
160
125
55
345
80
0.05
TOC (total organic carbon)
OttoHG
0.119
0.604
50
25
15
0.277
280
140
65
70
140
45
0.03
TOC (total organic carbon)
OttoLG
0.133
0.532
25
25
30
0.336
179
110
110
50
140
50
0.06
TOC (total organic carbon)
SPZHG
0.169
0.425
50
40
30
0.406
280
260
80
55
130
120
0.26
TOC (total organic carbon)
SPZLG
0.1
0.9
370
370
370
SulfS (sulfide sulfur)
OgeeHG
0.153
0.488
23
7
16
0.359
230
112
190
70
140
40
0.31
SulfS (sulfide sulfur)
OgeeLG
0.313
0.337
20
20
25
0.35
275
150
145
70
320
140
0.22
SulfS (sulfide sulfur)
OttoHG
0.211
0.432
30
41
20
0.357
360
260
62
70
140
45
0.76
SulfS (sulfide sulfur)
OttoLG
0.15
0.363
21
25
25
0.487
150
228
64
55
140
90
0.8
SulfS (sulfide sulfur)
SPZHG
0.21
0.301
40
40
15
0.489
330
210
60
55
130
120
1.15
SulfS (sulfide sulfur)
SPZLG
0.07
0.21
15
15
15
0.72
170
170
170
0
0
90
0.9256
Source: SRK, 2026
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
245
Table 11-29: Summary of Search Parameters Used for
AuCN
General
Ellipsoid Ranges
Ellipsoid Orientation
Number of Samples
Outlier
Restrictions
Drillhole Limit
Estimator Name
Domain
Numeric Values
Maximum
Intermediate
Minimum
Variable Orientation
Minimum
Maximum
Method
Max Samples
per Hole
Apply Drillhole Limit
per Sector
Kr, AuCN_Cap: Domain Trend P1
OgeeHGtrend
AuCn_cap
45
75
30
VO, Ogee 2026_02
5
12
None
4
TRUE
Kr, AuCN_Cap: Domain Trend P2
OgeeHGtrend
AuCn_cap
65
97
60
VO, Ogee 2026_02
5
16
None
4
TRUE
Kr, AuCN_Cap: Domain Trend P3
OgeeHGtrend
AuCn_cap
210
210
90
VO, Ogee 2026_02
5
16
None
4
TRUE
Kr, AuCN_Cap: Domain Trend P1
OgeeLGtrend
AuCn_cap
50
60
35
VO, Ogee 2026_02
5
12
None
4
TRUE
Kr, AuCN_Cap: Domain Trend P2
OgeeLGtrend
AuCn_cap
100
120
70
VO, Ogee 2026_02
5
16
None
4
TRUE
Kr, AuCN_Cap: Domain Trend P3
OgeeLGtrend
AuCn_cap
210
210
100
VO, Ogee 2026_02
5
16
None
4
TRUE
Kr, AuCN_Cap: Domain Trend P1
OttoHGtrend
AuCn_cap
75
65
40
VO, Otto_RF 2026_02
5
12
None
4
TRUE
Kr, AuCN_Cap: Domain Trend P2
OttoHGtrend
AuCn_cap
150
135
60
VO, Otto_RF 2026_02
5
16
None
4
TRUE
Kr, AuCN_Cap: Domain Trend P3
OttoHGtrend
AuCn_cap
330
300
125
VO, Otto_RF 2026_02
5
16
None
4
TRUE
Kr, AuCN_Cap: Domain Trend P1
OttoLGtrend
AuCn_cap
55
30
20
VO, Otto_RF 2026_02
5
12
None
4
TRUE
Kr, AuCN_Cap: Domain Trend P2
OttoLGtrend
AuCn_cap
115
55
40
VO, Otto_RF 2026_02
5
16
None
4
TRUE
Kr, AuCN_Cap: Domain Trend P3
OttoLGtrend
AuCn_cap
172.5
110
70
VO, Otto_RF 2026_02
5
16
None
4
TRUE
Kr, AuCN_Cap: Domain Trend P1
SPZHGtrend
AuCn_cap
85
60
30
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
12
None
4
TRUE
Kr, AuCN_Cap: Domain Trend P2
SPZHGtrend
AuCn_cap
125
85
50
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
16
None
4
TRUE
Kr, AuCN_Cap: Domain Trend P3
SPZHGtrend
AuCn_cap
230
175
60
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
16
None
4
TRUE
ID, AuCN_BestValue_ppm_D: Domain Trend P1
SPZhwHGtrend
AuCn_cap
60
60
30
VO, SPZhw 2026_02
5
12
None
4
TRUE
ID, AuCN_BestValue_ppm_D: Domain Trend P2
SPZhwHGtrend
AuCn_cap
90
90
30
VO, SPZhw 2026_02
5
16
None
4
TRUE
ID, AuCN_BestValue_ppm_D: Domain Trend P3
SPZhwHGtrend
AuCn_cap
180
180
60
VO, SPZhw 2026_02
4
12
None
4
TRUE
ID, AuCN_Cap: Domain Trend P1
SPZhwLGtrend
AuCn_cap
60
60
30
VO, SPZhw 2026_02
5
12
None
4
TRUE
ID, AuCN_Cap: Domain Trend P2
SPZhwLGtrend
AuCn_cap
90
90
30
VO, SPZhw 2026_02
5
16
None
4
TRUE
ID, AuCN_Cap: Domain Trend P3
SPZhwLGtrend
AuCn_cap
180
180
60
VO, SPZhw 2026_02
5
16
None
4
TRUE
Kr, AuCN_Cap: Domain Trend P1
SPZLGtrend
AuCn_cap
80
75
30
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
12
None
4
TRUE
Kr, AuCN_Cap: Domain Trend P2
SPZLGtrend
AuCn_cap
160
135
50
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
16
None
4
TRUE
Kr, AuCN_Cap: Domain Trend P3
SPZLGtrend
AuCn_cap
200
180
60
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
16
None
4
TRUE
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
246
Table 11-30: Summary Estimation Parameters (CO3 %)
General
Ellipsoid Ranges
Ellipsoid Orientation
Number of Samples
Outlier
Restrictions
Drillhole Limit
Estimator Name
Domain
Numeric Values
Maximum
Intermediate
Minimum
Variable Orientation
Minimum
Maximum
Method
Max Samples
per Hole
Apply Drillhole
Limit per Sector
Kr, CO3cap: Domain Trend P1
OgeeHGtrend
CO3cap
75
80
30
VO, Ogee 2026_02
9
20
None
4
TRUE
Kr, CO3cap: Domain Trend P2
OgeeHGtrend
CO3cap
150
160
60
VO, Ogee 2026_02
5
24
None
4
TRUE
Kr, CO3cap: Domain Trend P3
OgeeHGtrend
CO3cap
200
210
105
VO, Ogee 2026_02
5
16
None
4
TRUE
Kr, CO3cap: Domain Trend P1
OgeeLGtrend
CO3cap
65
100
45
VO, Ogee 2026_02
9
20
None
4
TRUE
Kr, CO3cap: Domain Trend P2
OgeeLGtrend
CO3cap
129
200
90
VO, Ogee 2026_02
5
24
None
4
TRUE
Kr, CO3cap: Domain Trend P3
OgeeLGtrend
CO3cap
195
300
135
VO, Ogee 2026_02
5
16
None
4
TRUE
Kr, CO3cap: Domain Trend P1
OttoHGtrend
CO3cap
125
105
60
VO, Otto_RF 2026_02
9
20
None
4
TRUE
Kr, CO3cap: Domain Trend P2
OttoHGtrend
CO3cap
190
160
90
VO, Otto_RF 2026_02
5
24
None
4
TRUE
Kr, CO3cap: Domain Trend P3
OttoHGtrend
CO3cap
250
210
120
VO, Otto_RF 2026_02
5
16
None
4
TRUE
Kr, CO3cap: Domain Trend P1
OttoLGtrend
CO3cap
145
65
55
VO, Otto_RF 2026_02
9
20
None
4
TRUE
Kr, CO3cap: Domain Trend P2
OttoLGtrend
CO3cap
290
130
110
VO, Otto_RF 2026_02
5
24
None
4
TRUE
Kr, CO3cap: Domain Trend P3
OttoLGtrend
CO3cap
390
170
150
VO, Otto_RF 2026_02
5
16
None
4
TRUE
Kr, CO3cap: Domain Trend P1
SPZHGtrend
CO3cap
85
65
40
VO, SPZ 2026_02 Exclude
NE_12_Offset
9
20
None
4
TRUE
Kr, CO3cap: Domain Trend P2
SPZHGtrend
CO3cap
150
145
45
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
24
None
4
TRUE
Kr, CO3cap: Domain Trend P3
SPZHGtrend
CO3cap
300
285
90
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
16
None
4
TRUE
Kr, CO3cap: Domain Trend P1
SPZhwHGtrend
CO3cap
60
60
30
VO, SPZhw 2026_02
5
16
None
4
TRUE
Kr, CO3cap: Domain Trend P2
SPZhwHGtrend
CO3cap
90
90
30
VO, SPZhw 2026_02
5
16
None
4
TRUE
Kr, CO3cap: Domain Trend P3
SPZhwHGtrend
CO3cap
180
180
60
VO, SPZhw 2026_02
4
12
None
4
TRUE
Kr, CO3cap: Domain Trend P1
SPZhwLGtrend
CO3cap
60
60
30
VO, SPZhw 2026_02
5
16
None
4
TRUE
Kr, CO3cap: Domain Trend P2
SPZhwLGtrend
CO3cap
90
90
30
VO, SPZhw 2026_02
5
16
None
4
TRUE
Kr, CO3cap: Domain Trend P3
SPZhwLGtrend
CO3cap
180
180
60
VO, SPZhw 2026_02
4
12
None
4
TRUE
Kr, CO3cap: Domain Trend P1
SPZLGtrend
CO3cap
70
70
30
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
16
None
4
TRUE
Kr, CO3cap: Domain Trend P2
SPZLGtrend
CO3cap
135
135
60
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
24
None
4
TRUE
Kr, CO3cap: Domain Trend P3
SPZLGtrend
CO3cap
270
270
100
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
16
None
4
TRUE
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
247
Table 11-31: Summary Estimation Parameters (Preg
Rob %)
General
Ellipsoid Ranges
Ellipsoid Orientation
Number of Samples
Outlier
Restrictions
Drillhole Limit
Estimator
Name
Domain
Numeric
Values
Maximum
Intermediate
Minimum
Variable Orientation
Minimum
Maximum
Method
Max Samples
per Hole
Apply Drillhole
Limit per Sector
ID, PregRob_Cap: Domain Trend P1
OgeeHG trend
PregRob_Cap
50
60
30
VO, Ogee 2026_02
9
20
None
4
TRUE
ID, PregRob_Cap: Domain Trend P2
OgeeHG trend
PregRob_Cap
100
115
60
VO, Ogee 2026_02
5
24
None
4
TRUE
ID, PregRob_Cap: Domain Trend P3
OgeeHG trend
PregRob_Cap
210
210
90
VO, Ogee 2026_02
5
16
None
4
TRUE
ID, PregRob_Cap: Domain Trend P1
OgeeLG trend
PregRob_Cap
50
45
30
VO, Ogee 2026_02
9
20
None
4
TRUE
ID, PregRob_Cap: Domain Trend P2
OgeeLG trend
PregRob_Cap
100
95
60
VO, Ogee 2026_02
5
24
None
4
TRUE
ID, PregRob_Cap: Domain Trend P3
OgeeLG trend
PregRob_Cap
200
190
120
VO, Ogee 2026_02
5
16
None
4
TRUE
ID, PregRob_Cap: Domain Trend P1
OttoHG trend
PregRob_Cap
80
75
30
VO, Otto_RF 2026_02
9
20
None
4
TRUE
ID, PregRob_Cap: Domain Trend P2
OttoHG trend
PregRob_Cap
155
150
60
VO, Otto_RF 2026_02
5
24
None
4
TRUE
ID, PregRob_Cap: Domain Trend P3
OttoHG trend
PregRob_Cap
235
225
90
VO, Otto_RF 2026_02
5
16
None
4
TRUE
ID, PregRob_Cap: Domain Trend P1
OttoLG trend
PregRob_Cap
75
85
30
VO, Otto_RF 2026_02
9
20
None
4
TRUE
ID, PregRob_Cap: Domain Trend P2
OttoLG trend
PregRob_Cap
156
195
60
VO, Otto_RF 2026_02
5
24
None
4
TRUE
ID, PregRob_Cap: Domain Trend P3
OttoLG trend
PregRob_Cap
210
250
90
VO, Otto_RF 2026_02
5
16
None
4
TRUE
ID, PregRob_Cap: Domain Trend P1
SPZHG trend
PregRob_Cap
65
65
35
VO, SPZ 2026_02 Exclude
NE_12_Offset
9
20
None
4
TRUE
ID, PregRob_Cap: Domain Trend P2
SPZHG trend
PregRob_Cap
130
130
55
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
24
None
4
TRUE
ID, PregRob_Cap: Domain Trend P3
SPZHG trend
PregRob_Cap
260
260
90
VO, SPZ 2026_02
Exclude
NE_12_Offset
5
16
None
4
TRUE
ID, PregRob_Cap: Domain Trend P1
SPZhwHG trend
PregRob_Cap
60
60
30
VO, SPZhw 2026_02
5
12
None
4
TRUE
ID, PregRob_Cap: Domain Trend P2
SPZhwHG trend
PregRob_Cap
90
90
30
VO, SPZhw 2026_02
4
12
None
3
TRUE
ID, PregRob_Cap: Domain Trend P3
SPZhwHG trend
PregRob_Cap
180
180
60
VO, SPZhw 2026_02
4
12
None
3
TRUE
ID, PregRob_Cap: Domain Trend P1
SPZhwLG trend
PregRob_Cap
60
60
30
VO, SPZhw 2026_02
5
12
None
4
TRUE
ID, PregRob_Cap: Domain Trend P2
SPZhwLG trend
PregRob_Cap
90
90
30
VO, SPZhw 2026_02
4
12
None
3
TRUE
ID, PregRob_Cap: Domain Trend P3
SPZhwLG trend
PregRob_Cap
180
180
60
VO, SPZhw 2026_02
2
12
None
3
TRUE
ID, PregRob_Cap: Domain Trend P1
SPZLG trend
PregRob_Cap
80
65
20
VO, SPZ 2026_02 Exclude
NE_12_Offset
9
20
None
4
TRUE
ID, PregRob_Cap: Domain Trend P2
SPZLG trend
PregRob_Cap
120
100
30
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
24
None
4
TRUE
ID, PregRob_Cap: Domain Trend P3
SPZLG trend
PregRob_Cap
160
130
60
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
16
None
4
TRUE
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
248
Table 11-32: Summary Estimation Parameters (Total
Organic Carbon, TOC %)
General
Ellipsoid Ranges
Ellipsoid Orientation
Number of Samples
Outlier
Restrictions
Drillhole Limit
Estimator Name
Domain
Numeric Values
Maximum
Intermediate
Minimum
Variable Orientation
Minimum
Maximum
Method
Max Samples
per Hole
Apply Drillhole
Limit per Sector
Kr, TOC_pct_D: Domain Trend P1
OgeeHG trend
TOCcap
75
50
30
VO, Ogee 2026_02
9
24
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P2
OgeeHG trend
TOCcap
150
75
50
VO, Ogee 2026_02
5
24
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P3
OgeeHG trend
TOCcap
200
100
70
VO, Ogee 2026_02
4
16
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P1
OgeeLG trend
TOCcap
80
80
60
VO, Ogee 2026_02
9
24
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P2
OgeeLG trend
TOCcap
160
160
90
VO, Ogee 2026_02
5
24
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P3
OgeeLG trend
TOCcap
200
200
155
VO, Ogee 2026_02
4
16
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P1
OttoHG trend
TOCcap
70
50
30
VO, Otto_RF 2026_02
9
24
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P2
OttoHG trend
TOCcap
140
105
65
VO, Otto_RF 2026_02
5
24
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P3
OttoHG trend
TOCcap
280
175
80
VO, Otto_RF 2026_02
4
16
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P1
OttoLG trend
TOCcap
55
30
20
VO, Otto_RF 2026_02
9
24
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P2
OttoLG trend
TOCcap
135
85
85
VO, Otto_RF 2026_02
5
24
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P3
OttoLG trend
TOCcap
180
110
110
VO, Otto_RF 2026_02
4
16
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P1
SPZHG trend
TOCcap
85
55
30
VO, SPZ 2026_02 Exclude
NE_12_Offset
9
24
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P2
SPZHG trend
TOCcap
165
105
45
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
24
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P3
SPZHG trend
TOCcap
330
210
60
VO, SPZ 2026_02 Exclude
NE_12_Offset
4
16
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P1
SPZhwHG trend
TOCcap
60
60
30
VO, SPZhw 2026_02
5
16
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P2
SPZhwHG trend
TOCcap
90
90
30
VO, SPZhw 2026_02
5
16
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P3
SPZhwHG trend
TOCcap
180
180
60
VO, SPZhw 2026_02
4
16
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P1
SPZhwLG trend
TOCcap
60
60
30
VO, SPZhw 2026_02
5
16
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P2
SPZhwLG trend
TOCcap
90
90
30
VO, SPZhw 2026_02
5
16
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P3
SPZhwLG trend
TOCcap
180
180
60
VO, SPZhw 2026_02
4
16
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P1
SPZLG trend
TOCcap
75
75
75
VO, SPZ 2026_02 Exclude
NE_12_Offset
9
24
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P2
SPZLG trend
TOCcap
170
170
170
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
24
None
4
TRUE
Kr, TOC_pct_D: Domain Trend P3
SPZLG trend
TOCcap
370
370
370
VO, SPZ 2026_02 Exclude
NE_12_Offset
4
16
None
4
TRUE
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
249
Table 11-33: Summary Estimation Parameters
(Sulfide Sulfur %)
General
Ellipsoid Ranges
Ellipsoid Orientation
Number of Samples
Outlier
Restrictions
Drillhole Limit
Estimator Name
Domain
Numeric Values
Maximum
Intermediate
Minimum
Variable Orientation
Minimum
Maximum
Method
Max Samples
per Hole
Apply Drillhole
Limit per Sector
ID, SulfideSulfur_pct_D: Domain Trend P1
OgeeHGtrend
SulfSulf_Cap
60
30
50
VO, Ogee 2026_02
9
24
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P2
OgeeHGtrend
SulfSulf_Cap
115
60
95
VO, Ogee 2026_02
5
24
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P3
OgeeHGtrend
SulfSulf_Cap
230
115
190
VO, Ogee 2026_02
5
16
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P1
OgeeLGtrend
SulfSulf_Cap
75
35
35
VO, Ogee 2026_02
9
24
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P2
OgeeLGtrend
SulfSulf_Cap
130
75
75
VO, Ogee 2026_02
5
24
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P3
OgeeLGtrend
SulfSulf_Cap
275
150
145
VO, Ogee 2026_02
5
16
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P1
OttoHGtrend
SulfSulf_Cap
90
80
30
VO, Otto_RF 2026_02
9
24
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P2
OttoHGtrend
SulfSulf_Cap
180
130
60
VO, Otto_RF 2026_02
5
24
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P3
OttoHGtrend
SulfSulf_Cap
270
195
75
VO, Otto_RF 2026_02
5
16
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P1
OttoLGtrend
SulfSulf_Cap
60
85
30
VO, Otto_RF 2026_02
9
24
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P2
OttoLGtrend
SulfSulf_Cap
115
170
50
VO, Otto_RF 2026_02
5
24
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P3
OttoLGtrend
SulfSulf_Cap
150
230
65
VO, Otto_RF 2026_02
5
16
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P1
SPZHGtrend
SulfSulf_Cap
80
50
30
VO, SPZ 2026_02 Exclude
NE_12_Offset
9
24
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P2
SPZHGtrend
SulfSulf_Cap
165
105
50
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
24
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P3
SPZHGtrend
SulfSulf_Cap
250
160
75
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
16
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P1
SPZhwHGtrend
SulfSulf_Cap
60
60
30
VO, SPZhw 2026_02
5
16
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P2
SPZhwHGtrend
SulfSulf_Cap
90
90
30
VO, SPZhw 2026_02
5
16
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P3
SPZhwHGtrend
SulfSulf_Cap
180
180
60
VO, SPZhw 2026_02
4
12
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P1
SPZhwLGtrend
SulfSulf_Cap
60
60
30
VO, SPZhw 2026_02
5
16
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P2
SPZhwLGtrend
SulfSulf_Cap
90
90
30
VO, SPZhw 2026_02
5
16
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P3
SPZhwLGtrend
SulfSulf_Cap
180
180
60
VO, SPZhw 2026_02
4
12
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P1
SPZLGtrend
SulfSulf_Cap
45
45
45
VO, SPZ 2026_02 Exclude
NE_12_Offset
9
24
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P2
SPZLGtrend
SulfSulf_Cap
170
170
170
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
24
None
4
TRUE
ID, SulfideSulfur_pct_D: Domain Trend P3
SPZLGtrend
SulfSulf_Cap
240
240
240
VO, SPZ 2026_02 Exclude
NE_12_Offset
5
16
None
4
TRUE
Source: SRK, 2026
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
250
11.2.11 Density
The drill database contains 419 density measurements collected from drilling and by the mine operations of the Granite Creek underground
Project. Density values are assigned to blocks based on the lithological unit. These values are summarized by lithology in Table 11-34.
Table 11-34: Density Values Used in the Underground Model
Lithologic Unit
Density
(tons/
ft3)
Density
(g/cm3)
Qal
0.0578
1.852
Cp
0.0826
2.646
Ocl
0.0820
2.627
Ocu
0.0814
2.608
Kgd
0.0819
2.624
Other
0.0820
2.628
Source: SRK, 2026
11.2.12 Model Validation
SRK has
validated the block model using the following techniques:
•
Visual inspection of block grades in comparison with informing drillhole sample data
•
Statistical comparison of estimation methods to raw sample data and Nearest Neighbor (NN) estimates
•
Sectional validation of the mean sample grades in comparison to the mean model grades
Visual Comparison
Visual inspection of block grades in comparison with informing drillhole sample data are shown in Figure
11-51 to Figure 11-56, for each domain. Overall, SRK considers the visual validation to be reasonable. The visual comparison of the 1.53 m (5 ft) composite to the
estimated block grades shows no obvious bias with a fair reflection of both the high and low-grade samples. Given the variable sample coverage SRK also inspected the grade continuity compared to the grade
control data which showed reasonable correlations for both high and low-grade areas. SRK completed the analysis on a
domain-by-domain level with additional focus being made to the boundary between the HG and LG domains, which when estimated using a hard contact was felt to produce a
sharp transition when a more gradational transition was assumed, thus 1.53 m (5 ft) soft boundaries were selected for the HG and LG domains.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
251
Source: SRK, 2026
Figure 11-51: Plan Section Showing Block Grades vs. Composites (Ogee)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
252
Source: SRK, 2026
Figure 11-52: Cross Section Showing Block Grades vs. Composites (Ogee)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
253
Source: SRK, 2026
Figure 11-53: Level Plan (Map) Showing Block Grades vs. Composites (Otto)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
254
Source: SRK, 2026
Figure 11-54: Cross Section Showing Block Grades vs. Composites (Otto)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
255
Source: SRK, 2026
Figure 11-55: Plan Showing Block Grades vs. Composites (SPZ)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
256
Source: SRK, 2026
Figure 11-56: Cross Section Showing Block Grades vs. Composites (SPZ)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
257
Statistical Analysis Comparison
Statistical analysis has been completed using a zero g/t cut-off as a global bias check. The results
show in general strong correlations in the mean grades between the Ordinary Kriging estimates, the declustered estimates and to some extent the NN estimates (Table 11-35). The majority of the mineralization is
contained within the high-grade domains, so SRK has focused its review on the high-grade domains with the results reporting <5% difference between the declustered (30 ft x 30 ft x 15 ft) composites and the block grade estimates. SRK noted a
slight improvement in the soft boundary results in the low-grade domains at Ogee and Otto, with the largest change in the estimates from the selection of the soft boundary occurring within the SPZ. SRK
highlights to the reader that the majority of the low-grade domains are in the order of 1.8 to 2.5 g/t (0.073 oz/st)which is significantly lower than the mining cut-off
grade and therefore has only been considered during the assignment of dilution, and thus, SRK does not consider these differences to be material.
SRK highlights there are some differences in the SPZhw domain which are notable, but this domain has a relatively low tonnage and high-grades,
therefore SRK has considered the lower confidence in these estimates during the classification process.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
258
Table 11-35: Summary Statistics of Raw and
Declustered Composite Grades vs. Block Estimates and NN-Assigned Values (0 g/t Cut-off)
Domain
Statistic
Composite
Au
(g/t)
Declustered Sample Data
Au
(g/t)
Block Estimate
Au(g/t)
Soft Boundary
Block
Estimate
Au(g/t)
Hard
Boundary
Block Estimate
NN Au (g/t)
Hard
Boundary
OgeeHG
Points
2,482.00
2,482.00
299,379.00
299,907.00
300,100.00
Mean
10.66
10.00
9.41
9.39
10.25
Std Dev
14.63
13.71
6.57
6.58
12.35
Variance
214.10
188.06
43.18
43.24
152.49
CV
1.37
1.37
0.70
0.70
1.21
Maximum
70.00
70.00
44.05
44.05
70.00
Minimum
0.00
0.00
0.02
0.00
0.00
Diff % (Raw vs. Estimate)
-11.8
%
-11.9
%
-3.9
%
Diff % (Declust vs. Estimate)
-6.0
%
-6.1
%
2.4
%
OgeeLG
Points
6,095.00
6,095.00
545,613.00
547,552.00
547,175.00
Mean
2.95
2.56
2.32
2.02
2.08
Std Dev
7.33
6.46
2.59
1.94
3.85
Variance
53.80
41.78
6.72
3.77
14.83
CV
2.49
2.52
1.12
0.96
1.85
Maximum
70.00
70.00
36.81
16.87
24.00
Minimum
0.00
0.00
0.00
0.00
0.00
Diff % (Raw vs. Estimate)
-21.2
%
-31.5
%
-29.5
%
Diff % (Declust vs. Estimate)
-9.5
%
-21.3
%
-19.0
%
OttoHG
Points
1,982.00
1,982.00
438,647.00
439,346.00
438,771.00
Mean
8.12
7.69
7.71
7.71
7.74
Std Dev
10.39
10.20
4.24
4.24
7.61
Variance
108.03
103.95
17.95
17.99
57.94
CV
1.28
1.33
0.55
0.55
0.98
Maximum
62.00
62.00
35.17
35.17
62.00
Minimum
0.00
0.00
0.00
0.00
0.00
Diff % (Raw vs. Estimate)
-5.0
%
-5.1
%
-4.7
%
Diff % (Declust vs. Estimate)
0.3
%
0.2
%
0.6
%
OttoLG
Points
6,214.00
6,214.00
998,700.00
1,011,333.00
1,011,110.00
Mean
2.43
2.19
2.26
1.81
1.87
Std Dev
5.38
5.08
2.23
1.75
3.06
Variance
28.91
25.80
4.98
3.06
9.35
CV
2.21
2.32
0.99
0.97
1.64
Maximum
62.00
62.00
42.86
18.62
32.00
Minimum
0.00
0.00
0.00
0.00
0.00
Diff % (Raw vs. Estimate)
-7.2
%
-25.6
%
-23.3
%
Diff % (Declust vs. Estimate)
3.0
%
-17.4
%
-14.9
%
SPZHG
Points
977.00
977.00
564,489.00
564,489.00
564,489.00
Mean
8.96
8.66
8.56
8.56
8.18
Std Dev
11.23
11.11
4.93
4.93
8.49
Variance
126.02
123.45
24.30
24.30
72.09
CV
1.25
1.28
0.58
0.58
1.04
Maximum
52.50
52.50
40.29
40.29
52.50
Minimum
0.00
0.00
0.00
0.00
0.00
Diff % (Raw vs. Estimate)
-4.4
%
-4.4
%
-8.7
%
Diff % (Declust vs. Estimate)
-1.1
%
-1.1
%
-5.5
%
SPZLG
Points
1,580.00
1,580.00
591,655.00
591,655.00
587,689.00
Mean
2.67
2.49
2.31
1.30
1.41
Std Dev
6.24
5.90
2.34
1.33
2.61
Variance
38.94
34.81
5.47
1.76
6.82
CV
2.34
2.37
1.01
1.02
1.85
Maximum
52.50
52.50
22.75
13.81
20.00
Minimum
0.00
0.00
0.00
0.00
0.00
Diff % (Raw vs. Estimate)
-13.4
%
-51.2
%
-47.2
%
Diff % (Declust vs. Estimate)
-7.1
%
-47.6
%
-43.3
%
SPZhwHG
Points
205.00
205.00
50,323.00
50,323.00
50,323.00
Mean
11.85
9.08
9.69
11.49
12.01
Std Dev
15.55
13.95
7.55
10.25
11.37
Variance
241.81
194.65
56.95
105.03
129.25
CV
1.31
1.54
0.78
0.89
0.95
Maximum
65.00
65.00
42.96
54.86
65.00
Minimum
0.00
0.00
0.00
0.00
0.00
Diff % (Raw vs. Estimate)
-18.2
%
-3.0
%
1.3
%
Diff % (Declust vs. Estimate)
6.7
%
26.5
%
32.2
%
SPZhwLG
Points
411.00
411.00
123,673.00
123,399.00
123,673.00
Mean
1.54
1.40
1.65
1.34
1.23
Std Dev
2.88
2.89
1.11
0.89
0.95
Variance
8.30
8.34
1.23
0.79
0.89
CV
1.88
2.06
0.67
0.66
0.77
Maximum
26.06
26.06
10.74
6.32
5.16
Minimum
0.00
0.00
0.00
0.00
0.02
Diff % (Raw vs. Estimate)
7.3
%
-13.0
%
-20.1
%
Diff % (Declust vs. Estimate)
17.4
%
-4.9
%
-12.6
%
Source: SRK, 2026
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
259
Swath Plots
A more local comparison between the blocks and the informing composites is made using swath plots. The comparisons show both the varying means
of the block and composites (declustered) along swaths or slices through the model, as well as the amount of data supporting the estimate in each swath. The swath plots show that there are no significant local biases in the estimation. Analysis was
completed on a domain-by-domain level for gold and all the other elements. Only gold results have been shown in Figure 11-57
through Figure 11-59 for the high-grade domains which carry the majority of the value for the Project. Overall, it is the QP’s opinion that the swath plots show similar trends for the three different
estimation methods with a close correlation between the NN and the estimated grades per swath. The declustered composite means show more variation which is expected due to a difference in sample support, but the peaks and troughs of the charts
display a reasonable correlation and therefore in the QP’s opinion are acceptable for the purpose of validation.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
260
Source: SRK, 2026
Figure 11-57: Swath Plot Analysis of Au (g/t), Ogee HG Domain
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
261
Source: SRK, 2026
Figure 11-58: Swath Plot Analysis of Au (g/t), Otto HG Domain
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
262
Source: SRK, 2026
Figure 11-59: Swath Plot Analysis of Au (g/t), SPZ HG Domain
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
263
11.2.13 Classification
Block model quantities and grade estimates for the Project were classified according to the Society for Mining, Metallurgy and Exploration
(2017).
Mineral Resource classification is typically a subjective concept. Industry best practices suggest that classification should
consider the confidence in the geological continuity of the mineralized structures, the quality and quantity of data supporting the estimates, and the geostatistical confidence in the tonnage and grade estimates. Appropriate classification criteria
should aim to integrate both concepts to delineate regular areas at similar resource classification.
Data quality, drillhole spacing, and
the interpreted continuity of grades controlled by the structures and high-grade domains allowed SRK to classify portions of the Project into Measured, Indicated, and Inferred Mineral Resources categories. SRK has based the current classification on
a review of the variograms, statistical support to the confidence of the estimates (Estimation Variance and Slope of Regression), number of composites and number of holes used to define each estimate:
•
Measured Mineral Resources: Measured blocks have been focused on drilling coverage and proximity to the
current workings within the drilling completed by i-80 averaging a 9.1 m x 9.1 m (30 ft x 30 ft) grid, with three drillholes and three composites. Using the equation:
•
[AuOK_trend: NDh]>=3 and [3 Holes: AvgD]<30 = Measured
•
Indicated Mineral Resources: Limited to drilling coverage within a 27.4 m x 27.4 m (90 ft x 90 ft) grid
completed and with a minimum three holes. Using the equation:
•
[AuOK_trend: NDh]>=3 and [3 Holes: AvgD]<90 = Indicated
•
Inferred Mineral Resources: All other material within the key modeled domains (which limits of 91 m (300 ft) were
applied to the range during definition).
The classification criteria was initially applied and based on study of the
variogram ranges, the QP then undertook a visual review of the grade and geological continuity to assess the level of consistency before applying the final assessment of confidence.
To achieve this the initial mathematical definitions have been completed, they are stored in the block model as Class1_Pass1, which have then
been converted into point data to allow for smoothing of the shapes to avoid block by block assignment. The generated shapes were created in Leapfrog and used a buffer of 2.3 m (7.5 ft) (half the block size) for Measured and 3 m (10 ft) (for
Indicated). The generated shapes were then reviewed by the QP and only areas deemed to demonstrate continuity were defined in the final classification process. Areas of low continuity were down-graded appropriately.
The final block model was generated by creating a stacked classification “geological” model in Leapfrog, which is overlain on the
grade estimation model for reporting.
A summary of the final classification for the key domains is shown in Figure 11-60 to Figure 11-63.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
264
Source: SRK, 2026
Figure 11-60: Long Section Showing Final Measured (red/brown) and Indicated Shapes (green) Selected
for Granite Creek
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
265
Source: SRK, 2026
Figure 11-61: Cross Section Showing Final Measured and Indicated Shapes Selected for Granite Creek
(Ogee and Otto Domains)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
266
Source: SRK, 2026
Figure 11-62: Cross Section Showing Final
Measured and Indicated Shapes Selected for Granite Creek (SPZ Domains)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
267
Source: SRK, 2026
Figure 11-63: Final Classification Shown
Against Filtered Mineral Resource Blocks
11.2.14
Underground Mineral Resource Statement
SME defines a Mineral Resource as:
“a concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such form, grade or quality,
and quantity that there are reasonable prospects for economic extraction.”
The reasonable prospects for economic extraction (RPEE)
requirement generally implies that the quantity and grade estimates meet certain economic thresholds and that the Mineral Resources are reported at an appropriate cut-off grade (CoG) taking into account
extraction scenarios and processing recoveries. “In order to meet reasonable prospects for economic extraction” requirement, Granite Creek has been deemed amenable to both open pit (discussed in Section 14.2) and underground mining
(based on a cut and fill mining methodology). Metallurgical test work programs have been used to define dynamic recoveries in the mining models which have also been applied to the RPEE assessment. The current underground mined material is currently
toll treated in an offsite autoclave process.
To determine the potential for RPEE, SRK has used the following key assumptions for costing,
and metallurgical recoveries. Metallurgical recoveries are based on the outcomes of both the historical and
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
268
the most recent metallurgical test work completed by i-80. To define the limits for processing route selection and estimated recoveries, SRK estimated AuCn
(ppm), TOC% (percent), PregRob% (percent), and Sulfide Sulfur % (percent), which were reviewed and used by the mining team in relation to the metallurgical recovery.
SRK worked with i-80 to review the findings of the metallurgical studies which indicated that the
metallurgical recoveries range between 77.6% to 93.4% (average 87.6%) for the autoclave and 60.0% to 87.4% (average 68.9%) for the oxide material. SRK has used an MSO, using Deswick Mining Software to determine the limits for the underground RPEE
(Table 11-36).
The gold price selected for Mineral Resources has been based on review of market
study as presented in section 16 of this report which has been compared to market consensus forecast data through a database to which SRK subscribes, review by the QP of industry peers, plus discussion with
i-80 technical teams. Based on the review SRK is considering the price reasonable over a time period of 10 years. It is the QP’s opinion that this is a reasonable forecast for the time considered and the
current time of the mine being in operation (ramping up production), to cover short-term pricing and future long-term pricing. The point of reference for the reporting of mineral resources is the in-situ
diluted tonnage and grades contained with the defined MSO limits.
Table 11-36: Summary of
Mineral Resource Cut-off and MSO Assumptions
Metric (costs)
Imperial (costs)
Process Method1
Parameter
Value
Unit
Value
Unit
Gold Price
3,000
US$/oz
3,000
US$/oz
TC/RC
1.85
US$/oz
1.85
US$/oz
NSR Royalty
6%
6%
Nevada Excise Tax
0.75%
0.75%
Oxides
Metallurgical Recovery
30.0%-86.5%
30.0%-86.5%
Mining Cost
190.18
US$/t
172.53
US$/st
Process Cost
59.94
US$/t
54.38
US$/st
Shipping Cost
16.04
US$/t
14.55
US$/st
G&A Cost
22.29
US$/t
20.22
US$/st
Total Cost
288.45
US$/t
261.68
US$/st
Stope Cut-off Grade
0.108 - 0.312
oz/st Au
0.108 - 0.312
oz/st Au
Cut-off Grade
3.38 - 9.75
g/t Au
3.38 - 9.75
g/t Au
Sulfide
Metallurgical Recovery
37.2%-97.0%
37.2%-97.0%
Mining Cost
190.18
US$/t
172.53
US$/st
Process Cost
131.13
US$/t
118.96
US$/st
Shipping Cost
16.04
US$/t
14.55
US$/st
G&A Cost
22.29
US$/t
20.22
US$/st
Total Cost
359.64
US$/t
326.26
US$/st
Cut-off Grade
0.120 - 0.314
oz/t Au
0.120 - 0.314
oz/st Au
Cut-off Grade
3.75 - 9.81
g/t Au
3.75 - 9.81
g/t Au
Source: SRK, 2026
$:US dollars
oz/st = troy ounce
per short ton
g/t = grams per metric tonne
1. Dynamic cut-off grade was used for the reserves design based on whether the material is oxide
or sulfide.
The final Mineral Resource for the underground portion of Granite Creek has been reported on a diluted basis within the MSO
defined shapes using the following conditions:
•
GM MSO Final = Resource
•
GM Classification = Measured, Indicated or Inferred
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
269
•
Au (g/t) > 0.00 g/t (0.000 oz/st)
The Mineral Resource statement for the underground portion of the Granite Creek Project is shown in Table
11-37 on an exclusive basis and as per SK-1300 the QP has reported the Mineral Resources on an Exclusive basis which has been defined by removing all material within the
mine design which was converted to Reserves, including a marginal small portion of Inferred from within the design which was considered as waste within the reserves. Note, for reporting purposes given the proximity and similar mineralization, the
SPZhw has been combined with the SPZ MSO domains for the final reporting.
Table 11-37:
Inclusive Mineral Resource Statement for Granite Creek Underground—Effective Date March 31, 2026
Classification
Domain
Mass
(000’s
tonnes)
Mass
Attributable
(000’s
tonnes)
Au
Grade
(g/t)
Material
Content Au
(000’s t. oz)
Attributable
Material Content
Au
(000’s t. oz)
Measured
Ogee
231
231
7.88
58.6
58.5
Otto
310
310
6.69
66.6
66.6
SPZ
65
65
9.85
20.7
20.7
Total
606
606
7.49
145.9
145.8
Indicated
Ogee
322
321
7.06
73.0
72.9
Otto
746
746
6.26
150.2
150.2
SPZ
2,055
2,055
7.42
490.4
490.4
Total
3,122
3,122
7.11
713.6
713.5
M&I
Ogee
553
552
7.40
131.6
131.4
Otto
1,056
1,056
6.39
216.8
216.8
SPZ
2,120
2,120
7.50
511.1
511.1
Total
3,729
3,728
7.17
859.5
859.3
Inferred
Ogee
39
38
6.70
8.3
8.3
Otto
425
425
7.63
104.4
104.4
SPZ
429
418
6.53
90.1
87.4
Total
893
882
7.06
202.8
200.1
Source: SRK, 2026
Notes:
1. Mineral Resources,
which are not Mineral Reserves, do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, market or other relevant issues. The deposit has been classified as
Measured, Indicated and Inferred based on confidence in the geological model and drill spacing. The quantity and grade of reported Inferred resources are uncertain in nature, and there has not been sufficient work to define these Inferred Mineral
Resources as Indicated or Measured resources. There is no certainty that any part of a mineral resource will ever be converted into reserves.
2. Mineral Resources are reported on an inclusive basis with units reported in in Metric Tonnes, grade is reported in grams/tonnes, and metal
in 000’s troy ounces.
3. Mineral Resources are reported within Mineable Stopes which have been defined based on metal price
assumptions,* variable metallurgical recovery assumptions, mining costs, processing costs, shipping, G&A costs. Metal Pricing is based on Gold (US$3,000 /oz). Other key assumptions include:
* Mining Costs (US$/t 190.18);
*
Autoclave Processing Cost (US$/t 131.13), Low-grade Oxide (US$/t 59.94)
* Autoclave Recoveries
ranging 77.6% - 93.4% (average 87.6%) and Oxide recoveries ranging 60.0% - 87.4% (average 68.9%);
* Shipping Costs (US$/t 16.04) and
G&A Costs (US$/t 22.29);
* Totaling US$/t 281.45 – 359.64 for underground mining and Processing;
* Based on the variable recoveries an average cut-off grade of 3.75—9.81 g/t (0.286 oz/st) has
been used reporting.
4. Mineral Resources have been depleted for previous underground mining activity, and reported on an attributable
basis
5. Mineral Resources are based on validated data, which have been subjected to QA/QC analysis, using capped, composited samples at 2
m (5ft) intervals. Estimation has been completed using a combination of OK and IDW estimation methodologies and classified based on confidence in the underlying data and drill spacing. Mineral resource tonnages have been rounded to reflect the
precision of the estimate.
6. The mineral resources were estimated by SRK Consulting (U.S.), Inc.
7. Rounding of some figures may lead to minor discrepancies in totals.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
270
Table 11-38: Exclusive Mineral Resource Statement
for Granite Creek Underground—Effective Date March 31, 2026
Classification
Domain
Mass
(000’s
tonnes)
Mass
Attributable
(000’s tonnes)
Au
Grade
(g/t)
Material
Content Au
(000’s t. oz)
Attributable Material
Content Au
(000’s t. oz)
Measured
Ogee
175
175
6.82
38.4
38.3
Otto
166
166
5.58
29.7
29.7
SPZ
31
31
6.44
6.5
6.5
Total
372
372
6.23
74.6
74.5
Indicated
Ogee
241
241
6.52
50.6
50.6
Otto
425
425
5.23
71.5
71.5
SPZ
771
771
4.70
116.6
116.6
Total
1,438
1,438
5.16
238.6
238.6
M&I
Ogee
417
416
6.64
89.0
88.9
Otto
591
591
5.32
101.2
101.2
SPZ
803
803
4.77
123.1
123.1
Total
1,810
1,810
5.38
313.3
313.1
Inferred
Ogee
38
38
6.71
8.3
8.3
Otto
417
417
7.62
102.0
102.0
SPZ
415
405
6.49
86.6
83.9
Total
871
860
7.04
197.0
194.2
Source: SRK, 2026
Notes:
1. Mineral
Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, market or other relevant issues. The deposit has been
classified as Measured, Indicated and Inferred based on confidence in the geological model and drill spacing. The quantity and grade of reported Inferred resources are uncertain in nature, and there has not been sufficient work to define these
Inferred Mineral Resources as Indicated or Measured resources. There is no certainty that any part of a mineral resource will ever be converted into reserves.
2. Mineral Resources are reported on an Exclusive basis with units reported in in Metric Tonnes, grade is reported in grams/tonnes, and metal
in 000’s troy ounces.
3. Mineral Resources are reported fully diluted within Mineable Stopes which have been defined based on metal
price assumptions,* variable metallurgical recovery assumptions, mining costs, processing costs, shipping, G&A costs. Metal Pricing is based on Gold (US$3,000 /oz). Other key assumptions include:
* Mining Costs (US$/t 190.18);
*
Autoclave Processing Cost (US$/t 131.13), Low-grade Oxide (US$/t 59.94)
* Autoclave Recoveries
ranging 77.6% - 93.4% (average 87.6%) and Oxide recoveries ranging 60.0% - 87.4% (average 68.9%);
* Shipping Costs (US$/t 16.04) and
G&A Costs (US$/t 22.29);
* Totaling US$/t 281.45 – 359.64 for underground mining and Processing;
* Based on the variable recoveries an average cut-off grade of 3.75—9.81 g/t (0.286 oz/st) has
been used reporting.
4. Mineral Resources have been depleted for previous underground mining activity, and reported on an attributable
basis
5. Mineral Resources are based on validated data, which have been subjected to QA/QC analysis, using capped, composited samples at 2
m (5ft) intervals. Estimation has been completed using a combination of OK and IDW estimation methodologies and classified based on confidence in the underlying data and drill spacing. Mineral resource tonnages have been rounded to reflect the
precision of the estimate.
6. The mineral resources were estimated by SRK Consulting (U.S.), Inc.
7. Rounding of some figures may lead to minor discrepancies in totals.
11.2.15
Mineral Resource Sensitivity
Table 11-39 Table 11-38 and Table 11-40 show the continuity of the grade estimates at various cut-off increments and the sensitivity of the mineral resource to changes in CoG. The reader should note that the
results presented herein have been limited to the current MSO shape and show limited growth on cut-off below 4.78 g/t (0.139 oz/st) Au, while comparison of in situ tonnage and grades may show greater growth.
The reader is cautioned that the values in Table 14 38 and Table 14 39 should not be misconstrued with the mineral resource statement. The values are only presented to show the sensitivity of the block model estimates to the selection of CoG. All
values are rounded to reflect the relative accuracy of the estimates.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
271
Table 11-39: Grade Sensitivity (Combined Measured
and Indicated), inside MSO on a 100% Project basis
Cut-Off
Classification
Mass
(000’s tonnes)
Au Grade
(g/t)
Material Content
Au (000’s t. oz)
Au (g/t) ≥ 0.00 g/t
M&I
3,729
7.17
859.5
Au (g/t) ≥ 0.50 g/t
M&I
3,324
8.04
859.0
Au (g/t) ≥ 1.00 g/t
M&I
3,274
8.15
857.8
Au (g/t) ≥ 1.50 g/t
M&I
3,210
8.29
855.2
Au (g/t) ≥ 2.00 g/t
M&I
3,145
8.42
851.5
Au (g/t) ≥ 2.50 g/t
M&I
3,075
8.56
846.5
Au (g/t) ≥ 3.00 g/t
M&I
3,007
8.69
840.5
Au (g/t) ≥ 3.50 g/t
M&I
2,923
8.85
831.7
Au (g/t) ≥ 4.00 g/t
M&I
2,813
9.05
818.4
Au (g/t) ≥ 4.25 g/t
M&I
2,742
9.18
808.9
Au (g/t) ≥ 4.50 g/t
M&I
2,742
9.18
808.9
Au (g/t) ≥ 4.75 g/t
M&I
2,562
9.50
782.7
Au (g/t) ≥ 5.00 g/t
M&I
2,457
9.70
766.4
Au (g/t) ≥ 5.25 g/t
M&I
2,356
9.90
749.7
Au (g/t) ≥ 5.50 g/t
M&I
2,254
10.10
732.1
Au (g/t) ≥ 5.75 g/t
M&I
2,148
10.32
712.8
Au (g/t) ≥ 6.00 g/t
M&I
2,043
10.55
693.0
Au (g/t) ≥ 6.25 g/t
M&I
1,944
10.78
673.5
Au (g/t) ≥ 6.50 g/t
M&I
1,851
11.00
654.5
Au (g/t) ≥ 6.75 g/t
M&I
1,754
11.24
633.7
Au (g/t) ≥ 7.00 g/t
M&I
1,662
11.48
613.5
Au (g/t) ≥ 7.25 g/t
M&I
1,576
11.72
593.7
Au (g/t) ≥ 7.50 g/t
M&I
1,493
11.96
574.0
Au (g/t) ≥ 8.00 g/t
M&I
1,327
12.49
532.7
Au (g/t) ≥ 8.50 g/t
M&I
1,185
13.00
495.1
Source: SRK, 2026
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
272
Table 11-40: Grade Sensitivity Table (Inferred),
inside MSO on a 100% Project Basis
Cut-Off
Classification
Mass
(000’s tonnes)
Au Grade (g/t)
Material Content
Au (000’s t. oz)
Au (g/t) ≥ 0.00 g/t
Inferred
893
7.06
202.8
Au (g/t) ≥ 0.50 g/t
Inferred
727
8.66
202.6
Au (g/t) ≥ 1.00 g/t
Inferred
717
8.78
202.4
Au (g/t) ≥ 1.50 g/t
Inferred
702
8.94
201.8
Au (g/t) ≥ 2.00 g/t
Inferred
684
9.13
200.7
Au (g/t) ≥ 2.50 g/t
Inferred
660
9.38
199.0
Au (g/t) ≥ 3.00 g/t
Inferred
635
9.64
196.8
Au (g/t) ≥ 3.50 g/t
Inferred
612
9.88
194.3
Au (g/t) ≥ 4.00 g/t
Inferred
590
10.11
191.8
Au (g/t) ≥ 4.25 g/t
Inferred
581
10.20
190.5
Au (g/t) ≥ 4.50 g/t
Inferred
581
10.20
190.5
Au (g/t) ≥ 4.75 g/t
Inferred
551
10.51
186.2
Au (g/t) ≥ 5.00 g/t
Inferred
530
10.73
183.0
Au (g/t) ≥ 5.25 g/t
Inferred
512
10.93
180.0
Au (g/t) ≥ 5.50 g/t
Inferred
500
11.07
177.8
Au (g/t) ≥ 5.75 g/t
Inferred
486
11.22
175.3
Au (g/t) ≥ 6.00 g/t
Inferred
471
11.39
172.4
Au (g/t) ≥ 6.25 g/t
Inferred
451
11.63
168.4
Au (g/t) ≥ 6.50 g/t
Inferred
432
11.86
164.6
Au (g/t) ≥ 6.75 g/t
Inferred
420
12.01
162.0
Au (g/t) ≥ 7.00 g/t
Inferred
391
12.39
155.7
Au (g/t) ≥ 7.25 g/t
Inferred
370
12.69
150.8
Au (g/t) ≥ 7.50 g/t
Inferred
360
12.83
148.6
Au (g/t) ≥ 8.00 g/t
Inferred
301
13.82
133.8
Au (g/t) ≥ 8.50 g/t
Inferred
267
14.53
124.7
Source: SRK, 2026
11.2.16
Sources of Uncertainty
Areas of uncertainty that may materially impact the MREs include impacts of the underlying supporting data, geological interpretation,
estimation parameters and economic assumptions:
SRK has considered the various sources of the data and accounted for these in the
QP’s opinion through the estimations methodology and classification systems applied. Areas with lower drilling density or lower continuity either geologically or grade based have been considered when assigning the level of confidence. Some
areas within the existing mining operations have relatively limited drilling cover from the diamond and RC drilling, but in the QP’s opinion the visual reconciliation to the muck and sludge samplings is acceptable to maintain the assigned
confidence.
In the estimation process for this style of deposit there is a degree of sensitivity to the grades related to the selected
capping levels, which the QP has applied based on their years of experience in the style of mineralization. Changes in capping (up or down), would result in higher or lower overall grades, but the QP has selected values based on analysis in two
separate software packages to test the impact on the contained metal at various caps to select the most appropriate values. As in any production environment the grades (and hence capping values), should be monitored through the reconciliation
process to confirm performance of the model.
In terms of the level of study and the available information it is the QP’s opinion
that the level of density sampling remains relatively low and there is some degree of uncertainty in the level of variability in the density within the different units. Reduction in density could result in lower tonnage and contained metal. However,
as this mine is an operating entity with active reconciliation to production it is not considered by the QP at this time that any variability would be material.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
273
SRK notes that future economic assessment could result in a change in the CoG which would
potentially result in a change in the tonnage of available mineable material. Mineralization represented by the resource block model was evaluated for reasonable prospects of economic extraction for underground mining methods by applying an
appropriate CoG, these can be impacted by:
•
Changes to long term metal price assumptions
•
Changes to the input values for mining, processing, and G&A costs to constrain the estimate
•
Changes to local interpretations of mineralization geometry and continuity of mineralized domains, including the
stratigraphic and structural models
•
Changes in the capping values can impact the sensitivity of the grade estimates and reconciliation data should be
reviewed to ensure consistency with grade distribution
•
Material types (oxide vs sulphide) is based on visual inspection and changes in material type could impact
metallurgical recovery
•
Changes to metallurgical recovery and geo-metallurgical assumptions
•
Changes to assumptions with an existing agreement or new agreements
•
Changes to environmental, permitting, and social license assumptions
It is the QP’s opinion that the risks highlighted above can be reduced through additional exploration and technical studies, but the
Mineral Resources as presented have accounted for the confidence where applicable.
11.2.17
Reconciliation
Production Reconciliation Process
i-80 performs routine reconciliation between the mineral resource (previous model only), underground
production and a short-term block model (STBM). Surveyed mining extents for individual development rounds were used to define the mined volumes, which were then intersected with the block models to extract modeled grades and contained gold within
the exact mined shapes. Recorded production tonnages and associated grade-control assays (assigned to each mining round) were compiled, and tonnage-weighted grades and contained ounces were calculated and compared to the model predictions on a
volume-matched basis.
The QP considers this approach is generally consistent with industry best practice for underground reconciliation as
it is based on surveyed mined volumes, uses tonnage-weighted comparisons, and evaluates performance by domain and through time. However, some implementation details (e.g., exact production grade basis, classification cut-offs, and linkage of the
reconciled model to current Mineral Resource / Reserve statement will need to be to the updated resource and reserves model needs to be completed. The reconciliation to the previous model showed a bias between the earlier model estimates and actual
production. In aggregate, mined grades and contained gold were higher than predicted by both the longer-term model and the STBM, indicating an overall positive reconciliation (i.e., the earlier models underestimated production). This positive bias
was concentrated in high-grade oxide and sulfide material, while some low-grade oxide material reconciled negatively, suggesting that grades in that category were over-estimated.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
274
i-80 interpreted these results as evidence that the
earlier model was conservative overall, with domain-specific biases that needed to be addressed. In particular, the strong positive reconciliation in high-grade material and negative reconciliation in parts of the low-grade oxide inventory highlight
the importance of domain-specific parameterization, grade capping / clamping strategies, and classification thresholds. These findings were considered in the development and refinement of the current geological and estimation models and in the
assessment of uncertainty and risk in the pre-feasibility-level Mineral Resource and Reserve estimates. The reconciliation is therefore used as a diagnostic tool to inform model improvement, rather than as a basis for current public disclosure of
Mineral Resources and Reserves
Comparison to the Previous Mineral Resources
No Exclusive Resource have previously been reported for the project as this is the first declared Mineral Resources, with the previous report
limited to an initial assessment. Comparison of the inclusive Mineral Resources noted an increase in the Measured and Indicated portion of the deposit from 775 kt at grade of 10.50 g/t Au for 261 koz of contained gold, to 3,729 kt at 7.17 g/t for
859 koz of contained gold. There was a reduction in the Inferred Mineral Resources from 782 kt of material at an average grade of 13.0 g/t for 326 koz, to 893 kt at 7.06 g/t Au for 203 koz of gold.
The differences in the models are attributed to the following key changes:
•
Depletion of mined material to March 31, 2026
•
Infill drilling completed during 2025 targeting high-grade extensions and infill of the PEA model material
•
Increase in the gold price used for the RPEE assessment from $2,175/oz to $3,000/oz
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
275
11.2.18
Relevant Factors
The QP is not aware of any additional Environmental, permitting, legal, title, taxation marketing or other factors that could affect resources.
The final domains were exported to .dxf format and provided to the i-80 Geology team for review;
several small areas needed manual adjustment to improve the geological interpretation (namely in areas of lower sampling volume), which was completed by SRK, with final review and agreement
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
276
Table 11-41: Open Pit Mineral Resource Sensitivity
by Domain
Deposit
Cutoff Grade (g/t)
Total Process Material
(‘000s tonnes)
Total Process Material
(‘000s short tons)
Au Grade
(g/t)
Au Grade
(opt)
Au Contained
(million tr
oz)
Measured
Pit B
0.1
5,131
5,656
0.84
0.025
0.139
0.15
4,399
4,849
0.96
0.028
0.136
0.2
3,900
4,299
1.06
0.031
0.133
0.25
3,501
3,859
1.16
0.034
0.131
0.3
3,153
3,476
1.26
0.037
0.128
0.35
2,856
3,148
1.36
0.040
0.124
0.4
2,629
2,897
1.44
0.042
0.122
0.45
2,391
2,635
1.54
0.045
0.118
0.5
2,187
2,410
1.64
0.048
0.115
Pit A
0.1
1,489
1,641
0.56
0.016
0.027
0.15
1,270
1,400
0.64
0.019
0.026
0.2
1,098
1,211
0.71
0.021
0.025
0.25
915
1,009
0.81
0.024
0.024
0.3
773
852
0.91
0.026
0.023
0.35
638
703
1.03
0.030
0.021
0.4
526
580
1.17
0.034
0.020
0.45
440
485
1.31
0.038
0.019
0.5
370
408
1.47
0.043
0.018
CX
0.1
18,417
20,301
0.85
0.025
0.501
0.15
15,362
16,933
0.99
0.029
0.489
0.2
13,493
14,873
1.10
0.032
0.478
0.25
12,117
13,356
1.20
0.035
0.469
0.3
11,130
12,268
1.29
0.037
0.460
0.35
10,282
11,334
1.36
0.040
0.451
0.4
9,577
10,557
1.44
0.042
0.443
0.45
8,944
9,859
1.51
0.044
0.434
0.5
8,344
9,198
1.58
0.046
0.425
Mag
0.1
18,446
20,333
0.87
0.025
0.515
0.15
16,524
18,214
0.96
0.028
0.508
0.2
15,055
16,596
1.03
0.030
0.500
0.25
13,683
15,083
1.11
0.032
0.490
0.3
12,603
13,893
1.18
0.035
0.480
0.35
11,672
12,866
1.25
0.037
0.470
0.4
10,721
11,818
1.33
0.039
0.459
0.45
9,852
10,860
1.41
0.041
0.447
0.5
9,114
10,046
1.49
0.043
0.436
Indicated
Pit B
0.1
1,491
1,643
0.42
0.012
0.020
0.15
1,098
1,210
0.52
0.015
0.018
0.2
823
907
0.64
0.019
0.017
0.25
587
647
0.80
0.023
0.015
0.3
433
477
0.99
0.029
0.014
0.35
347
382
1.16
0.034
0.013
0.4
279
307
1.35
0.039
0.012
0.45
243
268
1.49
0.043
0.012
0.5
207
229
1.66
0.049
0.011
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
277
Deposit
Cutoff Grade (g/t)
Total Process Material
(‘000s tonnes)
Total Process Material
(‘000s short tons)
Au Grade
(g/t)
Au Grade
(opt)
Au Contained
(million tr
oz)
Pit A
0.1
1,290
1,422
0.54
0.016
0.023
0.15
1,114
1,228
0.61
0.018
0.022
0.2
969
1,069
0.68
0.020
0.021
0.25
863
952
0.73
0.021
0.020
0.3
782
862
0.78
0.023
0.020
0.35
694
765
0.84
0.024
0.019
0.4
605
667
0.90
0.026
0.018
0.45
524
578
0.98
0.029
0.016
0.5
463
510
1.04
0.030
0.016
CX
0.1
6,949
7,660
0.69
0.020
0.154
0.15
5,406
5,959
0.85
0.025
0.147
0.2
4,423
4,876
1.00
0.029
0.142
0.25
3,755
4,139
1.14
0.033
0.137
0.3
3,364
3,708
1.24
0.036
0.134
0.35
3,102
3,419
1.31
0.038
0.131
0.4
2,875
3,169
1.39
0.040
0.128
0.45
2,652
2,924
1.47
0.043
0.125
0.5
2,482
2,736
1.54
0.045
0.123
Mag
0.1
15,095
16,640
0.60
0.018
0.292
0.15
13,067
14,403
0.68
0.020
0.284
0.2
11,509
12,687
0.74
0.022
0.275
0.25
10,179
11,221
0.81
0.024
0.265
0.3
9,029
9,953
0.88
0.026
0.255
0.35
8,018
8,838
0.95
0.028
0.245
0.4
7,160
7,893
1.02
0.030
0.234
0.45
6,245
6,884
1.11
0.032
0.222
0.5
5,416
5,970
1.20
0.035
0.209
Inferred
Pit B
0.1
72
79
0.40
0.012
0.001
0.15
52
57
0.51
0.015
0.001
0.2
50
55
0.52
0.015
0.001
0.25
45
50
0.55
0.016
0.001
0.3
39
43
0.60
0.017
0.001
0.35
30
33
0.67
0.020
0.001
0.4
24
27
0.75
0.022
0.001
0.45
23
26
0.76
0.022
0.001
0.5
21
23
0.80
0.023
0.001
Pit A
0.1
615
678
0.35
0.010
0.007
0.15
506
558
0.40
0.012
0.007
0.2
440
485
0.44
0.013
0.006
0.25
352
388
0.49
0.014
0.006
0.3
275
304
0.55
0.016
0.005
0.35
229
253
0.60
0.018
0.004
0.4
188
207
0.65
0.019
0.004
0.45
154
170
0.70
0.020
0.003
0.5
124
137
0.76
0.022
0.003
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
278
Deposit
Cutoff Grade (g/t)
Total Process Material
(‘000s tonnes)
Total Process Material
(‘000s short tons)
Au Grade
(g/t)
Au Grade
(opt)
Au Contained
(million tr
oz)
CX
0.1
3,155
3,478
0.65
0.019
0.066
0.15
2,464
2,716
0.80
0.023
0.063
0.2
1,997
2,201
0.94
0.028
0.061
0.25
1,734
1,912
1.05
0.031
0.059
0.3
1,574
1,735
1.13
0.033
0.057
0.35
1,426
1,572
1.22
0.036
0.056
0.4
1,316
1,451
1.29
0.038
0.055
0.45
1,232
1,358
1.35
0.039
0.053
0.5
1,146
1,263
1.41
0.041
0.052
Mag
0.1
1,901
2,095
0.57
0.017
0.035
0.15
1,594
1,757
0.65
0.019
0.034
0.2
1,339
1,476
0.75
0.022
0.032
0.25
1,036
1,142
0.90
0.026
0.030
0.3
783
863
1.10
0.032
0.028
0.35
699
770
1.20
0.035
0.027
0.4
635
700
1.28
0.037
0.026
0.45
612
675
1.31
0.038
0.026
0.5
602
664
1.32
0.039
0.026
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
279
Table 11-42: Underground Mineral Resource
Sensitivity (1 of 2)
Cut-Off
Classification
Mass
(Mt)
Average Value
Au (g/t)
Material Content
Au (g/t)
thousand t. oz
Au (g/t) ≥ 0.00 g/t
M&I
2.26
9.15
666.41
Au (g/t) ≥ 0.50 g/t
M&I
2.26
9.19
666.32
Au (g/t) ≥ 1.00 g/t
M&I
2.25
9.22
666.10
Au (g/t) ≥ 1.50 g/t
M&I
2.23
9.27
665.59
Au (g/t) ≥ 2.00 g/t
M&I
2.22
9.31
664.87
Au (g/t) ≥ 2.50 g/t
M&I
2.20
9.36
663.69
Au (g/t) ≥ 3.00 g/t
M&I
2.19
9.41
662.29
Au (g/t) ≥ 3.50 g/t
M&I
2.17
9.48
659.89
Au (g/t) ≥ 4.00 g/t
M&I
2.13
9.56
655.87
Au (g/t) ≥ 4.25 g/t
M&I
2.11
9.63
652.51
Au (g/t) ≥ 4.50 g/t
M&I
2.07
9.72
647.73
Au (g/t) ≥ 4.75 g/t
M&I
2.02
9.85
639.66
Au (g/t) ≥ 5.00 g/t
M&I
1.96
10.01
629.79
Au (g/t) ≥ 5.25 g/t
M&I
1.89
10.18
618.94
Au (g/t) ≥ 5.50 g/t
M&I
1.82
10.36
607.06
Au (g/t) ≥ 5.75 g/t
M&I
1.75
10.56
594.00
Au (g/t) ≥ 6.00 g/t
M&I
1.68
10.77
579.93
Au (g/t) ≥ 6.25 g/t
M&I
1.60
10.97
565.71
Au (g/t) ≥ 6.50 g/t
M&I
1.53
11.19
551.19
Au (g/t) ≥ 6.75 g/t
M&I
1.46
11.42
535.16
Au (g/t) ≥ 7.00 g/t
M&I
1.39
11.65
519.99
Au (g/t) ≥ 7.25 g/t
M&I
1.32
11.87
505.04
Au (g/t) ≥ 7.50 g/t
M&I
1.26
12.11
489.03
Au (g/t) ≥ 8.00 g/t
M&I
1.12
12.63
455.89
Au (g/t) ≥ 8.50 g/t
M&I
1.01
13.12
425.89
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
280
Table 11-43: Underground Mineral Resource
Sensitivity (2 of 2)
Cut-Off
Classification
Mass
(Mt)
Average Value
Au (g/t)
Material Content
Au (g/t)
thousand t. oz
Au (g/t) ≥ 0.00 g/t
Inferred
0.44
9.88
138.37
Au (g/t) ≥ 0.50 g/t
Inferred
0.43
9.98
138.35
Au (g/t) ≥ 1.00 g/t
Inferred
0.43
10.03
138.30
Au (g/t) ≥ 1.50 g/t
Inferred
0.43
10.08
138.20
Au (g/t) ≥ 2.00 g/t
Inferred
0.42
10.16
137.96
Au (g/t) ≥ 2.50 g/t
Inferred
0.42
10.29
137.47
Au (g/t) ≥ 3.00 g/t
Inferred
0.41
10.41
136.92
Au (g/t) ≥ 3.50 g/t
Inferred
0.40
10.53
136.21
Au (g/t) ≥ 4.00 g/t
Inferred
0.40
10.64
135.41
Au (g/t) ≥ 4.25 g/t
Inferred
0.39
10.70
134.94
Au (g/t) ≥ 4.50 g/t
Inferred
0.39
10.78
134.26
Au (g/t) ≥ 4.75 g/t
Inferred
0.38
10.95
132.68
Au (g/t) ≥ 5.00 g/t
Inferred
0.37
11.13
131.01
Au (g/t) ≥ 5.25 g/t
Inferred
0.36
11.30
129.31
Au (g/t) ≥ 5.50 g/t
Inferred
0.35
11.44
127.91
Au (g/t) ≥ 5.75 g/t
Inferred
0.34
11.58
126.39
Au (g/t) ≥ 6.00 g/t
Inferred
0.33
11.76
124.49
Au (g/t) ≥ 6.25 g/t
Inferred
0.31
12.01
121.63
Au (g/t) ≥ 6.50 g/t
Inferred
0.30
12.27
118.82
Au (g/t) ≥ 6.75 g/t
Inferred
0.29
12.41
117.36
Au (g/t) ≥ 7.00 g/t
Inferred
0.28
12.66
114.47
Au (g/t) ≥ 7.25 g/t
Inferred
0.27
12.94
111.41
Au (g/t) ≥ 7.50 g/t
Inferred
0.26
13.07
110.02
Au (g/t) ≥ 8.00 g/t
Inferred
0.22
14.14
98.98
Au (g/t) ≥ 8.50 g/t
Inferred
0.20
14.70
93.94
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
281
12
Mineral Reserve Estimates
Underground Mineral Reserves for the Granite Creek Project were estimated by SRK Consulting, for the Ogee, Otto, and SP zones located beneath
the historically mined open pit. The open pit Mineral Resource (Section 11) has no corresponding Mineral Reserve, no mineral reserves have been estimated for the open pit as part of this study as further technical work is needed to increase the
confidence in the modifying factors. Granite Creek is currently in production and is mined using an underhand drift-and-fill (DAF) method, with stopes backfilled
primarily using cemented waste rock backfill (CRF). The general location of the deposit is shown in Figure 12-1.
Source: SRK, 2026
Figure 12-1: General Locations of the Granite Creek Deposit
12.1
Key Assumptions, Parameters, and Methods Used
Potential mining blocks are generated from the resource block model based on the deposit geometry, metallurgical process, and block values.
Measured Mineral Resources were converted to Proven Mineral Reserves and Indicated Mineral Resources were converted to Probable Mineral Reserves by applying the modifying factors described below; Inferred Mineral Resources were not converted to
mineral reserves, where Inferred material is contained within the mineral reserve designs, it was assigned zero grade and treated as internal dilution.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
282
Mining Dilution
Dilution in the mineral reserves consists of internal and external dilution. Internal (planned) dilution depends on the geometry of the deposit
and the minimum mining width: where the width of above-cut-off-grade mineralization is less than the 4.5 m (15 ft) minimum mining
width, a limited amount of below-cut-off material is mined to achieve that minimum width, and this is treated as internal dilution. External dilution consists of below-cut-off material that overbreaks into the designed stope due to the geotechnical properties of the adjacent rock (from the host rock or from backfill in adjacent
drifts); an external dilution of 10% was applied to the drift-and-fill production shapes at zero grade.
Mining Recovery
A
stope recovery factor of 100% was applied to the reserves, determined based on what current mining has achieved (the drifts tend to overbreak, and the planned material is recovered). A development recovery factor of 100% was used for all lateral
development.
Mineral Reserves Estimates
The gold price selected for Mineral Reserves has been based on review of market study as presented in section 16 of this report which has been
compared to market consensus forecast data through a database to which SRK subscribes, review by the QP of industry peers, plus discussion with i-80 technical teams. Based on the review SRK is considering the
price reasonable over a time period of 10 years. It is the QP’s opinion that this is a reasonable forecast for the time considered and the current time of the mine being in operation (ramping up production), to cover short-term pricing and
future long-term pricing. A 3D mine design has been created representing the planned reserve mining areas for the Granite Creek underground operation. The point of reference for the reporting of mineral reserves is the
in-situ diluted tonnage and grades contained within the Mine Design, which accounts for the modifying factors.
The design process resulted in 2.20 Mt (2.42 Mst) of Proven and Probable Mineral Reserves at an average grade of 7.87 g/t (0.23 oz/st) Au, for
all commodities gold only (no other commodity is estimated — see Section 12.5). The cut-off grades and metallurgical recoveries underlying the estimate are discussed in Section 12.3. Table 12-1 presents the Mineral Reserve statement as of March 31, 2026.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
283
Table 12-1: Mineral Reserve Estimate for Granite
Creek Underground – Effective Date March 31, 2026
Classification
Domain
Metric Units
Imperial Units
Tonnage
(000’ tonnes)
Au Grade (g/t)
Tonnage
(000’s s. tons)
Au Grade (oz/st)
Au Metal Content
(000’s t. oz)
Proven
Ogee
71
9.34
78
0.27
21.2
Otto
171
7.04
189
0.21
38.7
SP
40
11.21
44
0.33
14.5
Stockpile
26
7.33
29
0.21
6.2
Total
308
8.13
340
0.24
80.6
Probable
Ogee
88
7.95
97
0.23
22.4
Otto
366
6.70
403
0.20
78.8
SP
1,437
8.11
1,584
0.24
374.7
Total
1,890
7.83
2,084
0.23
475.9
Proven + Probable
Ogee
158
8.57
174
0.25
43.6
Otto
537
6.81
592
0.20
117.6
SP
1,477
8.19
1,628
0.24
389.2
Stockpile
26
7.33
29
0.21
6.2
Total
2,198
7.87
2,423
0.23
556.5
Source: SRK, 2026
Notes:
•
All figures are rounded to reflect the relative accuracy of the estimates. Totals may not sum due to rounding.
Mineral Reserves have been stated on the basis of a mine design, mine plan, and economic model.
•
Reserves are reported using a stope CoG range of 4.42 g/t (0.13 oz/st) Au – 6.41 g/t (0.19 oz/st) Au and an
incremental processing CoG range of 1.51 g/t (0.04 oz/st) Au – 2.91 g/t (0.08 oz/st) Au depending on the processing method. The CoG calculations assume a US$2,500/oz Au price, and 60% to 92% metallurgical recovery depending on the processing
method applied.
•
Operating costs include mining (US$190.18/tonne), processing (US$59.94/tonne to US$131.13/tonne), G&A
(US$22.29/tonne), Shipping Costs (US$/t 16.04). Additionally, a 6% royalty and 0.75% Excise Tax are applied, along with TC/RC charges of US$1.85/oz Au.
•
The reserves are mined using the underhand drift and fill method with cemented waste rock backfill. Mining
dilution of 10% is included in the reserve at zero grade.
•
Stockpile reserves reflect ore mined and placed on surface stockpiles prior to the effective date and not yet
processed.
•
The Mineral Reserves were estimated by SRK Consulting, U.S. (Inc.).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
284
All figures are rounded to reflect the relative accuracy of the estimates; totals may not sum
due to rounding. Mineral Reserves are stated on the basis of a mine design, mine plan, and economic model, using the underhand drift-and-fill method with cemented waste
rock backfill and a mining dilution of 10% included in the reserve at zero grade. Stockpile reserves reflect ore mined and placed on surface stockpiles prior to the effective date and not yet processed. The Mineral Reserves were estimated by SRK.
The qualified person preparing the mineral resource estimates must round off, to appropriate significant figures chosen to reflect order
of accuracy, any estimates of quantity and grade or quality.
12.2
Cut-Off Grades Estimates
Current estimated project costs and the calculated economic cut-off grade (CoG) for the underground
Mineral Reserve are shown in Table 12-2. A dynamic cut-off grade was used based on whether material is oxide or sulfide: a stope
cut-off range of 4.42 to 6.41 g/t (0.13 to 0.19 oz/st) Au was used for oxide material, and 5.21 to 6.17 g/t (0.15 to 0.18 oz/st) Au for sulfide material. Development headings generate additional material
grading between 1.51 and 2.19 g/t (0.04 to 0.06 oz/st) Au for oxide material and 2.47 to 2.91 g/t (0.07 to 0.08 oz/st) Au for sulfide material; this material is economic to process on an incremental basis and is therefore included in the mineral
reserve estimate.
Table 12-2: Underground Cut-off
Grade Parameters
Process
Method1
Parameter
Imperial
Value
Imperial
Unit
Metric Value
Metric
Unit
Gold Price
2,500
US$
/oz
80.3769
US$
/g
TC/RC
1.85
US$
/oz
0.0595
US$
/g
NSR Royalty
6%
Nevada
Excise Tax
0.75%
Oxides
Metallurgical
Recovery
60.0% - 87.4%
Mining Cost
172.53
US$
/st
190.18
US$
/t
Process Cost
54.38
US$
/st
59.94
US$
/t
Shipping
Cost
14.55
US$
/st
16.04
US$
/t
G&A Cost
20.22
US$
/st
22.29
US$
/t
Total Cost
261.68
US$
/st
288.45
US$
/t
Stope
Cut-off
Grade
0.129 – 0.187
oz/st Au
4.423 – 6.411
g/t Au
Processing
Cut-off
Grade2
0.044 – 0.064
oz/st Au
1.509 – 2.194
g/t Au
Sulfide
Metallurgical
Recovery
77.6% - 92.2%
Mining Cost
172.53
US$
/st
190.18
US$
/t
Process Cost
118.96
US$
/st
131.13
US$
/t
Shipping
Cost
14.55
US$
/st
16.04
US$
/t
G&A Cost
20.22
US$
/st
22.29
US$
/t
Total Cost
326.26
US$
/st
359.64
US$
/t
Cut-off
Grade
0.15–0.18
oz/st Au
5.21–6.17
g/t Au
Processing
Cut-off
Grade2
0.07–0.08
oz/st Au
2.47–2.91
g/t Au
The cut-off grade calculations assume a US$2,500/troy oz Au
price, 60.0% to 92.2% metallurgical recovery depending on the processing method applied, mining costs of US$190.18/tonne, processing costs of US$59.94 to US$131.13/tonne, G&A costs of US$22.29/tonne, a 6% net smelter return royalty, a 0.75%
Nevada excise tax, and treatment/refining charges of US$1.85/oz Au.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
285
12.3
Reserves Classification and Criteria
Mineral Reserves for the Granite Creek Project are classified as Proven or Probable. Under the S-K 1300
definitions at 17 CFR 229.1300, a Proven Mineral Reserve is the economically mineable part of a Measured Mineral Resource and can only result from conversion of a Measured Mineral Resource; a Probable Mineral Reserve is the economically mineable
part of an Indicated, and in some cases a Measured, Mineral Resource. Consistent with this framework, Measured Mineral Resources at Granite Creek were converted to Proven Mineral Reserves, and Indicated Mineral Resources were converted to Probable
Mineral Reserves, by applying the modifying factors described in Section 12.1 to potential mining shapes created during the mine design process; Inferred Mineral Resources were not converted to mineral reserves.
12.4
Multiple Commodity Reserve
Not applicable. The Mineral Reserve for the Granite Creek Project is estimated for gold only; no other commodity grade or quantity is reported
in the source technical documentation for this deposit.
12.5
Impact of Changes of Modifying Factors to the Mineral Reserve Estimates
Mineral reserves are subject to risks typically associated with
drift-and-fill operations. In the QP’s opinion, these risks could materially affect the mineral reserves and include, but are not limited to, the following:
•
Differences between the mineral reserves metal price assumption and actual metal prices.
•
Changes in the interpretation of the deposit geometry and grade continuity.
•
Changes to the estimated gold grades, estimation strategy and input assumptions.
•
Changes to the density values applied to the mineralized domains.
•
Changes to mining, processing, and G&A costs used to determine the
cut-off grade.
•
Changes to metallurgical recovery rates.
•
Changes in the geotechnical assumptions leading to potential impacts to schedule, dilution and/or mining
recovery.
•
Changes to mining method in portions of the deposit.
•
Assumptions related to ongoing access to the site, retention of mineral tenure, obtaining necessary
environmental, mining, and other regulatory permits, and maintaining a social license to operate with relevant stakeholders.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
286
13
Mining Methods
The Granite Creek Mine currently produces 600 st of ore per day (216,000 st per year assuming 360 days per year) and is operated by a local
contractor. The contractor has operated a number of mines in northern Nevada over the past thirty years. The mine is accessed through the bottom of the open pit with a 4.57 m (15 ft) wide x 4.87 m (16 ft) high decline with a gradient of 13%. Mining
of the Ogee and Otto zones are between 4790 level and 4150 level and the decline to the SPZ is developed to 3950 level.
The mining method
used in Granite Creek is underhand drift and fill with cemented waste rockfill. The production drifts are 4.57 m (15 ft) x 4.57 m (15 ft). Mineralization is loaded on 30 t (33.1 st) mining trucks and hauled to the surface via the decline.
Fresh air comes in from a fresh air portal at the bottom of the pit and is connected to the various workings through raises. The haulage ramp
serves as an exhaust drift.
The proposed mining method for the life of Granite Creek mine will remain the same as the current operations.
The decline will continue down another 650 vertical ft to the bottom of the mine at a 14% gradient.
The ventilation plan will remain the
same with fresh air coming in from the fresh air portal, down raises and exhausted out the haulage ramp. A new 3.2 m (10.5 ft) diameter fresh air raise will be developed to supply enough air to the bottom of the mine.
13.1
Parameters Relevant to Mine Designs and Plans
13.1.1
Geotechnical
WSP, conducted a site visit to the Granite Creek Mine on November 5-6, 2025. The purpose of the visit
was to review geological, geotechnical, mining, and infrastructure conditions relevant to the SPZ and planned mine expansion. The site visit included inspection of drill core, underground workings, ground support systems, cemented rockfill
production facilities, and the proposed ventilation raise location to surface. Observations made during the site visit were used to validate geological interpretations, geotechnical domains, rock mass classifications, mining methods, ground support
recommendations, and ventilation raise development assumptions presented in this report.
The South Pacific Ore zone will be accessed via
the SPZ Decline and mined using the Underhand Cut and Fill method, replacing open stopes with jammed CRF. i-80 has been mining other ore bodies at Granite Creek with a similar mining method with success since
2022.
Benchmarking in the Region and at Granite Creek
Northern Nevada is a well-established underground gold mining region with significant experience available to draw upon for benchmark
comparison. The underhand cut and fill mine method has been demonstrated to be well suited for the challenging ground conditions in the region with other mining operations successfully applying the method including Turquoise Ridge, Cortez Hills,
Goldstrike, and others. Design parameters available to compare include:
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
287
•
Ground support design and implementation
•
Specialized heading advance techniques for difficult ground conditions
•
Backfill design and implementation
•
Minimum sill pillar thickness between mine levels
Benchmarking studies and a review of Warren (2016) indicate the SPZ mine method and designs in this report are in line with experience
gained at most underground mines in the region. Additionally, the current mine workforce draws from experience in the region including technical staff and operations.
Granite Creek has been operating successfully using underhand cut and fill since 2022. Installed ground support and CRF design have generally
included:
•
Moderate – good ground (Rock Mass Rating (RMR) 35 +) 2 m (8 ft) Swellex, 3 ft x 3 ft bolt spacing and wire
mesh and shotcrete where necessary.
•
Poor ground (RMR<30) 2 m (8 ft) Swellex, 2 ft x 2 ft bolt spacing and wire mesh and shotcrete where necessary.
This is typically in fault zones and ore body mining areas.
•
CRF backfill design of 700 psi with emplaced QA/QC program per Golder (2012) design.
The above ground support and backfill design has performed adequately thus far at the Granite Creek mine.
Cemented Rockfill Designs
CRF design strength determination was based on Stone et al., (2019) modified from Stone (1993) and Pakalnis (2005). The SPZ will implement
a CRF design strength of 700 psi (7% cement) with 2-inch minus crushed aggregate sourced from the CX West pit on surface. This is consistent with other ore body extraction designs at Granite Creek and with
recommendations by Golder (2012).
Backfill will be made using a typical pit mix configuration using a front end loader to mix aggregates
with a cement slurry into a consistent mixture. Mixed CRF will be loaded into haul trucks for dumping at the designated location underground. A jammer, (typically an LHD-or similar fitted for jamming) will be
used to “jam” CRF tight to the back underground.
i-80 will continue current practice
of their CRF QA/QC program consisting of:
•
Regular crushed aggregate sampling and testing targeting the ideal Talbot Curve for gradation distribution.
•
Regular CRF backfill cylinder sampling and testing to ensure minimum design strengths are met.
The CRF design strength, mixing operation, and QA/QC program for the SPZ is consistent with other operations in the area
operating in similar lithologies and ore extraction practices.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
288
Geotechnical Domains for Underground Mining and Development
Geotechnical domains in a mine are developed by dividing the rock mass into zones that exhibit similar engineering properties and will respond
similarly to mining activities. Table 13-1 indicates geotechnical domains developed for the SPZ based on evaluation of the geological model, geotechnical logging of core holes, underground observations, and
laboratory testing results.
Table 13-1: Geotechnical Domains
Geotechnical Domain
Lithology
Description
RMR/GSI
Upper Comus (Ocu)
Argillite
Strong rock (50 to 100 MPa) typically brittle in nature. Thinly bedded to massive
45 (25 to 50)
Lower Comus (Ocl)
Interbedded argillite and limestone, typically metamorphosed to hornfels (argillite) and marble (limestone) with calcsilicate mineral assemblages
Very strong rock >100 MPa moderately fractured to massive rock mass
60 (50+)
SPZ ore body and other faults
Breccia mixed with clay gouge. Clayey Gravel, roughly 10% to 15% clay
Angular breccia mixed with clay gouge. Clayey Gravel, roughly 10% to 15% clay.
20 (<25)
Laboratory Testing
Laboratory testing was performed to obtain strength and material parameters for the SPZ zone main rock types. Testing included 15 (5 with
modulus) Unconfined Compressive Strength (UCS), 27 Triaxial Compressive Strength (TCS), 10 Brazilian Tensile Strength (BTS), and 5 Unified Soil Classification (USCS) tests. Table 13-2 presents typical
properties for the SPZ mining area.
Table 13-2: Geotechnical Parameters for the Three
Geotechnical Domains
Domain
UCS
(MPa)
Tensile
Strength
(MPa)
Specific
Weight
(kg/
M3)
Youngs
Modulus
Ei (GPa)
Poisson’s
Ratio
USCS
Upper Comus
85
11
2788
99.9
0.25
NA
Lower Comus
134
14
2794
82.6
0.26
NA
SPZ Ore Body and Fault Zones
NA
NA
NA
NA
NA
Clayey
Gravel
(GC)
Note: Rock sample testing was performed at the WSP laboratory in Burnaby Canada and at the Earth
Mechanics Institute in Golden Colorado, USA. Soil Classification testing was performed at the WSP lab in Golden Colorado, USA.
Rock
Mass Classification
Geotechnical core logging provides the main source of information for classification of the rock masses in
each of the geotechnical domains within the SPZ mine area. Additional supplemental information includes underground observations from within the existing developments and observation of representative sections in the core shed. For this project, the
main classification system selected was the Rock Mass Rating (RMR) System (Bieniawski, 1976). Input parameters for the RMR system include:
•
Rock Quality Designation (RQD) from core logging based on Deer and Deer (1988)
•
Intact Rock Strength (ISRM R Strength) from core logging, underground mapping, and laboratory testing
•
Joint spacing from core logging and underground mapping
•
Joint condition rating from core logging and underground mapping
•
Groundwater rating is assumed to be damp-wet for empirical design, and
dry for numerical mode input parameters with groundwater conditions considered directly in the modeling conditions
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
289
Table 13-3 indicates the range of RMR estimates by
source for each geotechnical domain along with the representative values selected for estimating rock mass strength.
Table 13-3: RMR Summary for Each Geotechnical Domain
Domain
Range
i-80 Mode
WSP Logging Mode
Observations Underground
Design RMR
Upper Comus
0 to 70
20 to 30
40 to 50
40 to 50
45
Lower Comus
0 to 90
30 to 40
60 to 70
60 to 70
60
SPZ/Faults
0 to 40
NA
20 to 30
0 to 20
20
Geological Structural Assessment
Geologic structures can generally be defined as large-scale (mine wide) and small scale (rock fabric). Structure at the Granite Creek Project
is highly complex and indicative of multiple deformation events. Thickness and orientation of major structures are constrained by core logging, underground mapping, and 3D interpretive modeling (i.e., Leapfrog). Most faults outside the main ore
bodies and Range Front Fault are typically steeply dipping and average 2.4 to 3 m (8 to 10 ft) thick, with a maximum thickness of 6 m (20 ft).
Rock fabric data are available from 11 core holes with televiewer optical and acoustic structural pics. Stereographic analysis of the compiled
data was used to define the major joint sets. Table 13-4 summarizes the major sets defined through the analysis and used as basis for kinematic excavation stability analysis discussed subsequently.
Table 13-4: Major Joint Sets Defined by Televiewer Data Analysis in Dips Software
Design Joint Set Name
Bedding
Dip°
Bedding
Dip Dir°
J2 Dip°
J2 Dip
Dir°
J3
Dip°
J3 Dip
Dir°
Excavation
Orientation
Typical Bedding
50
62
34
243
80
150
NE and NW
Steep Bedding
84
100
15
23
81
160
NE and NW
Stress Assessment
Local geologic and large-scale structural information indicate an extensional in situ stress regime. Vertical stress estimates are assumed to
increase linearly with depth and proportional to the unit weight of the rock. Laboratory results indicated an average rock density of 174.9 pounds per cubic foot (pcf) (2802 kg/m3) with a maximum depth below ground surface of 457 m (1500 ft) = 1,822
psi (12.56 megapascal (MPa)). Basin and range extensional tectonics and back analysis of modeling studies (Sandback et al., 2020) suggest generally isotropic horizontal stress have a K value (horizontal / stress) of 0.75. Therefore, maximum
horizontal stress is assumed to be 1,366.5 (9.42 MPa). Table 13-5 lists assumed stress values assumed for this study.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
290
Table 13-5: Stress Analysis from Assumed Depth and
k Value of 0.75
Stress
Depth (ft)
Depth (m)
Density (pcf)
K
Stress (psi)
Stress (Mpa)
Vertical
1,500
457.2
174.9
—
1,822.0
12.56
Horizontal
1,500
457.2
174.9
0.75
1,366.0
9.4
Ground Support
Ground support design methodology consisted of the following steps:
•
Nevada-specific empirical support design based on Warren (2016), Warren et al., (2018), Pakalnis et al., (2008),
Pakalnis (2014), and Warren et al., (2020) as a starting point for ground support design
•
Kinematic Factor of Safety (FOS) stability checks based on design joint sets and empirical ground support design
•
2D numerical modeling checks on stability of development drifts and mining drifts based on in situ stress
analysis, mining induced stress, and input parameters from core logging and laboratory testing
Ground Support
Design
Table 13-6 presents the ground support recommendations for Granite Creek SPZ based
on empirical design, kinematic analysis, 2D numerical modeling, and a review of benchmarking studies for other mines in the region.
Table 13-6: Ground Support Recommendations for Granite Creek SPZ Development and Mining
Ground Type
Typical
Geotechnical
Domain
Drift Dimension
(WxH ft)
RMR/ GSI
(range)
Primary bolt 8 ft 120
kN
Swellex-type
bolt (ft x ft) (1)
Secondary Bolt
Spacing 12ft 240
kN Swellex-type
(ft x
ft)
Shotcrete
Type I
Lower Comus
15x16
60 (50+)
4x4
As needed
As needed
Type II
Upper Comus
15x16
45 (25-50)
3x3
As needed
As needed
Type III
Fault Zones Development
15x16
20 (<25)
2x2
6 x 6
3” minimum
Type III (temporary)
South Pacific Zone ore cuts
15x15
20 (<25)
2x2
As needed
As needed
All Intersections
All
Up to 20 ft circular diameter
All
As required above
6x6
As needed
(1)
Welded wire mesh is required and should be installed simultaneously with the primary bolt pattern.
Operational Considerations
Stand-up time in weak ground will be a primary risk to development in fault zones and in the top cuts
of the South Pacific ore body. Experience in these conditions at Granite Creek has shown that spiling with grouted self-drilling hollow-bar MAI bolts has proven effective in stabilizing the back to allow
installation of primary ground support. General operating practices for ground types are presented in Table 13-7 below.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
291
Table 13-7: Recommended Operating Practices for
Ground Support Installation
Ground
Type
Typical
Geotechnical
Domain
RMR (range)
Span (ft)
Span (m)
Unsupported
Standup Time
Operational
Considerations
I
Lower Comus
60 (55+)
16
4.9
1 month to 1 year
10 ft blast rounds, longer standup time, shotcrete not necessary
II
Upper Comus Development
45 (35-55)
16
4.9
1 to 4 days
8 to 10 ft rounds, likely will stand until next shift can install support, shotcrete where necessary
III
Fault Zone Development and SPZ ore body top cuts
20(<35)
15 to 16
Immediate collapse - hours
4 to 6 ft light blast rounds or muck advance, spiling or flash shotcrete prior mucking likely necessary
Overstressed mine openings, particularly on mining levels, is a common occurrence in Nevada underground
mines due to the generally poor ground conditions and typically results in a time-dependent (squeezing) ground response or convergence of the openings. Successful management of these conditions typically involves mining and backfilling as soon as
possible (within weeks) before squeezing becomes a problem. The selected ground support elements of Swellex-type bolts have a relatively high strain capacity and are well suited for these conditions.
Granite Creek has not experienced evidence of overstressed ground in ore zones or development drifts. However, experience in the region and 2D
Finite Element Analysis indicate that as mining progresses deeper, time-dependent deformation may be encountered, particularly in the top cuts of ore drives.
The minimum sill pillar thickness at Granite Creek is 9 m (30 ft) per mine policy. Modeling using 2D Finite Element Analysis of the minimum
sill pillar thickness indicates potential, but manageable overstressing of the pillar if mining levels are in direct vertical alignment. Staggering level advance so that these openings are not in direct vertical alignment will help to reduce or
prevent this condition from occurring.
Production schedules and ground support maintenance planning need to provide sufficient buffer or
contingency to account for ground support rehabilitation efforts if these conditions are experienced. Mining production schedules should be sequenced to reduce open stope time and backfill as soon as possible, particularly in top cuts.
Ventilation Raises
Two ventilation raises are planned for development (VR1 and VR2) connected by 213 m (700 ft) of underground drift, with an additional 152 m
(500 ft) of development access drift. VR1 is planned from surface (elevation 1,694 m (5,557 ft)) to a depth of approximately 600 ft (elevation 4,957). VR2 is a 91 m (300 ft) internal raise from elevation 4,500 to 4200. Stability analysis based on
cover core holes along VR1 and near the VR2 alignment indicates that raise bore methods are feasible with ground improvements over sections of both alignments. Specific ground improvements include:
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
292
•
The upper 18 m (60 ft) of alluvium in VR1 will require ground improvements such as grout injection and secant
piling.
•
Pre-excavation ground improvements will be required in VR1 from depths 18
to 61 m (60 to 200 ft) and the lower 23 m (75 ft).
•
Pre-excavation ground improvements will be required in limited sections
of the lower 30 m (100 ft) of VR2 within faulted intervals of greater than 2 m (6 ft).
Final lining is required in both
vent raises for long term stability (finished concrete or grouted in place steel liner) installed immediately after raise boring.
13.1.2
Hydrological
Groundwater Assumption
This study assumes the dewatering program will be effective and potential for adverse groundwater-related stability conditions will be
minimized. Accordingly, geotechnical analyses were completed assuming drained groundwater conditions.
Dewatering
There are seven existing sumps in the mine with a 60 HP pump in each sump. Dual 6-inch pipes are used
to transport the water along the decline to surface.
Water from the production faces is pumped by either
air-operated diaphragm or electrical pumps into either 2-inch or 4-inch HDPE discharge lines. The discharge lines are then routed
to the nearest main sump. Pipe size, pump-type, and pump size are adjusted as required to maintain safe access in the production headings. Most ore headings use a 2-inch
air-operated diaphragm pump while development headings most often use a 30 hp or 60 hp electric pump.
The Triple Sump consists of three 50 to 18 m (60 ft) long drifts spurring off of single access at the 4170 Level. Water from the mine is
discharged to Sump 8 and decants through drain holes to Sump 9 and then decants through a second set of drain to Sump 10 in an effort to clarify the water. A concrete weir and catwalk is installed in Sump 10 to allow the clarified water to flow to
the pumps while solids are left in the sump. The total installed capacity of the triple sump system is approximately 60,000 gallons.
Granite Creek has not seen significant additional increases in the amount of contact water encountered during mining since advance in the
exploration drift was completed. The exploration drift and the watercourse encountered in Sump 12 continue to serve as the primary point-sources into the mine. Total flows are estimated at 800 to 1000 gpm between the two sources. The balance is made
from water encountered in the ore headings; flow encountered in lower levels are generally balanced by a decrease in flow at higher levels on the same geologic structure. Figure 13-1 depicts the rolling
tracker for the contact water management system.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
293
Source: i-80, 2026
Figure 13-1: Contact Water Measurements
The current dewatering model estimates residual passive inflow into Granite Creek will exceed 2500 to 2700 gpm until the combined influence of
the second water treatment plant and additional dewatering wells advance the dewatering cone-of-depression below the current workings.
A Phase 2 upgrade to the dewatering system is in progress to achieve the following:
•
Discharge Line Upgrade:
•
The uphill piping system should be a single line capable of handling all the projected inflow.
•
HDPE is preferred to carbon-steel for material for installation in the decline.
•
Lift Stations:
•
The number of lift stations between the pit crest and the lowest point of the underground workings needs to be
minimized to control capital expenditures and ensure system reliability by decreasing the number of components (i.e., points-of-failure).
•
Lift Stations should be spaced as evenly as possible to balance head pressure to each pump and further increase
system reliability.
•
Station dimensions should fit in a standard muck bay (e.g., 15 ft W x 15 ft H x 50 ft L) where possible.
•
Pumps:
•
Pumps must operate within the pressure spec of the pipe.
•
Installed motor power should be delivered at 480V.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
294
•
Pump Style should allow for minimal maintenance in the presence of up-to
1% solids (or more).
•
Power:
•
Use of installed load-centers to transform voltage from feed to 480V is preferred to transformation at the
installation location.
•
Control Systems:
•
Variable Frequency Drives (VFDs): Granite Creek currently uses VFDs manufactured by Baker-Hughes and would prefer
to continue to use their product line to ensure parts commonality.
13.1.3
Ventilation
The following site visit observations and temperature/humidity data were collected to calibrate the mine ventilation model discussed under
Ventilation, below.
A site visit was completed on November 5, 2025, by WSP. A guided tour of the mine was completed with i-80 staff that included a visit and review of conditions at the main fan, booster, and auxiliary fans, as well as active working areas, the main haulage route, escapeways, and future ventilation raise locations.
Staff indicated the mine was very humid, with the likely source being groundwater seepage. However, neither SMD nor i-80 had humidity measurements available, so WSP collected this pertinent data while on Site
for use in calibrating the ventilation model. Overall ventilation practices, implementation, and management were discussed during the site visit with available i-80 and SMD personnel.
Temperature and humidity data collected during the site visit is shown in Table 13-8. Locations of
primary airflow in the mine were used to calibrate the existing mine Ventsim™ model since these data are believed to be the most reliable for calibration purposes. Non-working areas with limited airflow were excluded.
Table
13-8: Site Visit Temperature and Humidity Data
Test
Dry Bulb
(F)
Wet Bulb
(F)
Relative
Humidity
(%)
Dew Point
(F)
Location
Notes
1
59.2
50.0
52.2
41.7
Main fan (intake side)
2
58.7
49.7
52.8
41.5
Main fan (intake side)
3
80.0
77.2
88.5
76.3
4480 spiling roof area
(dead heading)
Discarded
4
78.3
71.5
72.3
68.6
4129
5
76.4
69.4
70.9
66.3
Lower decline three
(ventilation tube discharge point)
6
77.1
70.1
71.1
67.0
Exploration decline
(ventilation tube discharge point)
7
78.2
67.7
58.8
62.6
4110 future ventilation raise location
Discarded
8
79.0
65.6
49.6
58.5
Ventilation raise (4175 level)
Discarded
9
87.7
80.2
72.6
77.8
Exhaust near portal
Ventilation at the Granite Creek Mine is circulated through the two portals, one as intake and one as
exhaust. The haulage is on the only decline, which acts as the exhaust airway. Intake airflow is delivered through a series of raises that were developed through the center of the spirals on the decline. This Pre-Feasibility Study (PFS) expands upon
previous lower level of detail studies to describe
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
295
improvements with enhanced engineering and sensitivity analyses required. Figure 13-2 shows the airflow scheme for the planned mine development.
Source: WSP, 2026
Figure 13-2: Future Mine Airflow Configuration
Weather
The
psychrometric properties of the surface air were calculated using the weather data collected by i-80 over the last two years. From the data recorded, WSP calculated average values for summer and winter to be
used in modeling.
Diesel Equipment
Diesel equipment operating underground produces pollutants that must be diluted to safe working levels according to the United States Mine
Safety and Health Administration (MSHA). The comprehensive list of every diesel machine on site that has the potential to go underground must be examined for calculating adequate airflow. WSP applied airflow rates based upon the engines fitted to
each machine, assuming a similar horsepower (hp) rating where an exact engine is not listed.
When considering the total hp and cubic feet
per minute (cfm) ratings for the equipment, on average 44 cfm is applied for each hp operating in the mine. This considers that all equipment is on and operating for a whole shift, which should be seen as the maximum airflow requirements, not the
typical. WSP assumes that 80% of the equipment will be working in the mine during any shift, meaning that only about 336 thousand cubic feet per minute (kcfm) will be required under normal circumstances. The other 20% of equipment is assumed to
be in the maintenance shop or on surface and is not considered a part of the airflow demand calculation.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
296
Relevant MSHA Standards
To remain in compliance, the mine must comply with the following MSHA standards. The ventilation models developed by WSP respect these
standards to the fullest extent possible. Changes in infrastructure are recommended based on non-compliance with any of these limits. The relevant standards are shown in Table
13-9.
Table 13-9: MSHA Standards
MSHA Standard
Value
Units
Minimum Airflow per Person
200
Cfm
Carbon Monoxide Maximum Concentration
50
Ppm TWA
Nitrogen Dioxide Maximum Concentration
5
Ppm TWA
Diesel Particulate Matter (DPM) Maximum Concentration Limit
160
µg/m3 TWA
Respirable Silica Maximum Concentration Limit
50
µg/m3 TWA
General Respirable Dust Maximum Concentration Limit
2.0
mg/m3 TWA
Maximum Temperature Dry-Bulb
120
°F
Maximum Working Temperature Dry-Bulb1
90
°F
Maximum Working Temperature Wet-Bulb1
79
°F
Source: WSP, 2026
Notes:
(1)
These temperatures are the MSHA action limit. Work can be performed above these temperatures if required,
however, regimented breaks and personnel monitoring are required which slows production significantly.
Heating and
Cooling Requirements
WSP modeled the winter and summer stages, with allowances for localize heat generation from backfill curing,
to see the more extreme scenarios of temperatures and found that no cooling is required in the summer, although air temperatures will feel quite warm around diesel equipment and operators should remain in enclosed cabs whenever possible. Open cab
drills and bolters are expected to have sufficient cool airflow to keep operating conditions for personnel below the MSHA action limits. Dry-bulb temperatures in the decline will be locally elevated, wherever
haul trucks are present, and all haul trucks should be outfitted with functional air conditioning units. The most critical method to avoid excess heat in at the working faces is to duct air from the intake raise over an air door through the decline
to each level. The temperatures become too hot when reusing air from the decline, because of the truck traffic.
In the winter scheme,
intake air low temperatures are at, or slightly below, freezing. This can cause icing in the intake raise if wet-bulb temperatures remain below freezing for extended periods of time because humidity drops out
of the air and forms ice around the raise circumference. If enough ice builds up, the resistance of a small, open cross-section in the raise can stall the fan and cut off airflow. To mitigate this risk of reduced airflow and fan damage, WSP
recommends installing a 1.8 MBTU/hr propane heater near the fan and ducting it into the plenum just upstream of the vanes. This amount of heat is enough to raise the temperature of the air intake by 12°F dry bulb (6°F wet bulb) and should be
sufficient to prevent icing for 95% of the operating days during each year according to the site recorded temperature data. For the remaining 5% of the days, i-80 may either turn the fan off temporarily and
operate at a lower production rate or rent another 1.8 MBTU/hr unit to manage the icing risk on a case-by-case basis. Each heater is estimated to cost about US$40/hour
to operate.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
297
DPM and Dust Management
WSP simulated DPM using Ventsim™, which derives the concentrations from particulate
mixing and dispersion using the source diesel hp or user set emission rate as an input. Since the decline is exhausting, the highest concentration of DPM is experienced there, about 500
µg/m3 steady state. Therefore, WSP recommends equipment movement other than truck haulage is minimized on the decline. This initiative is expected to be adopted by i-80 already considering traffic on the decline slows production.
The silica dust simulation offered
very similar results to DPM, except dust is expected to drop out of the air at some point as it moves up the decline so leakage of dust from the decline to the intake raises is modeled as 0
µg/m3. There was no data provided to WSP to calculate or simulate fugitive dust loading in the mine, so silica dust was the focus. i-80 is in
compliance with regulations on silica dust exposure but had a few readings that were above the action level of 25 µg/m3 in the testing data provided. WSP does not recommend any
infrastructure or administrative changes for silica dust exposure beyond those recommended for airflow, heat, and DPM. However, closed cabin equipment with HEPA® filters would reduce silica
dust exposure in the same way the filters will reduce DPM exposure.
New Ventilation Raise Infrastructure Design
Improving on previous studies, the ventilation modeling completed by the engineering team at the Granite Creek property identified that
sufficient airflow could be achieved with a single raise from surface to the 4600 level, with drifts to bypass adverse ground conditions, and the development of an additional raise connecting the 4500 level to the 4200 level. The raises are designed
to be 4 m (12 ft) excavated diameter and 3.2 m (10.5 ft) finished with a sealed collar. Environmentally permitted space is limited so WSP has designed the new installation to fit within a small footprint. WSP engaged a vendor to quote a fan of
sufficient size and power to provide the required airflow to the operations. One permanent and one temporary (rental) 1.8 MBTU heater have been included at the raise collar along with a 10,000-gallon (80%
filled) propane tank for a week supply of fuel. The general arrangement of the surface fan infrastructure is shown in Figure 13-3. Variations of this design have been proposed to reduce costs but are not
included in this report.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
298
Source: WSP, 2026
Figure 13-3: Surface Fan Installation General Arrangement
Ventilation Capital and Operating Costs
After developing the ventilation schemes for the future mining operation, WSP estimated the number of air doors, regulators, fans, and duct
work stock to purchase. Some of these items are available in inventory at Granite Creek or sister properties, while other items will need to be purchased new. To reduce the capital cost to i-80, WSP has
assumed that available inventory will be used where applicable. Table 13-10 shows a list of the main capital expenditures that will be required for the future mining operations and were included in the
estimated cost.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
299
Table 13-10: Capital Cost Estimate
Item
Cost
(US$)
Raisebore Excavation
8,820,000
Surface 400 HP Fan Installation1
3,870,000
Underground Air Door Installations
1,720,000
Underground Fan And Ductwork
Installations4
1,500,000
Total
$
15,900,000
Source: WSP, 2026
Notes:
1.
Approximately 25% of the costs sourced from CostMine™
(Costmine Intelligence, 2024), the remainder from budgetary quotations.
2.
A total estimated cost of US$1.25 million for injection grouting was added to the raisebore excavation
based upon previous WSP projects of similar scope. Injection grouting for ground improvement costs can vary widely depending on the actual ground conditions observed.
3.
Shipping and installation costs are estimated to be 3-5 times the
amount of the raw materials cost. This is based on a basket of recent contractor bids received for various projects. Shipping and installation costs are not applied to the raisebore excavation cost.
4.
No drifting included in cost estimates.
5.
Only shipping cost of 15% applied to underground fan and ductwork installations because installation is assumed
to be completed by the full-time i-80 ventilation crew labor, with cost captured as an OPEX.
6.
Values may not add exactly due to rounding.
The operating costs associated with ventilation are almost entirely captured in power consumption, heating and labor for moving fans and
installing / removing ductwork. Fans require limited maintenance and are designed to work for 10 to 20 years without planned maintenance service if used properly. Likewise, air doors and regulators are designed with robust and simplistic properties
for use in harsh mining environments. The doors and regulators are operated by a hydraulic over electric system with few moving parts. Servicing is limited to basic functions like greasing rotating parts and exchanging hydraulic fluid at periodic
intervals. Table 13-11 shows the annual operating expenditure calculation.
Table 13-11: Annual Operating Cost Estimate
Item
Count
Hourly OPEX1
(US$)
Annual Operating
Hours2,3
Annual Cost
(US$)
Fans
400 HP
2
44.15
8322
735,000
250 HP
1
29.80
8322
248,000
75 HP
4
17.69
8322
147,000
40 HP
7
5.78
8322
289,000
Air Doors
18
0.09
8322
14,000
Heater
1
38.80
2891
112,000
Ventilation Crew Labor
2
63.00
8760
1,100,000
Getman A64 (Scissor deck)
1
46.58
7884
367,000
Total
$
3,000,000
Source: WSP, 2026
Notes:
1.
Fan, air door and mobile equipment maintenance hourly OPEX sourced from CostMine™ (Costmine Intelligence, 2024). Hourly labor cost sourced from i-80 actual data.
2.
Fans and air doors are considered to have 95% availability and operate year-round. Mobile equipment
availability is not considered since multiple machines are available.
3.
Power cost given by i-80 Gold was US$0.08/kWh.
4.
Values may not add exactly due to rounding.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
300
Conclusions and Recommendations
After conducting a series of Ventsim™ simulations, WSP concluded that ventilation at
the Granite Creek property can be improved through the following measures: the installation of a 10.5-ft finished diameter raise from surface to the 4600 level, followed by a drift to bypass adverse ground conditions, and the development of an
additional 10.5-ft finished diameter raise connecting the 4250 level to the 4200 level. This ventilation configuration is expected to be sufficient for the remainder of the mine life as presented in the i-80
PFS mine plans and the updated schedule provided by i-80 that includes additional reserves. The main capital additions that accompany the raise-bored excavation include another
400-hp fan, the upgrade of the existing fan motor from 250 hp to 400 hp, one 1.8 MBTU propane heater, one 10,000-gallon propane tank, and the necessary electrical
components for safe operation of the fan. These items are estimated to have a capital cost of US$15.9 million. Additional investment could be made in enclosed cabs for the equipment items which currently have open cabs, but WSP does not see
this as a necessity to comply with MSHA regulations based on the modeling completed. However, i-80 should monitor conditions and implement controls as necessary based on actual results. Additionally, to better
control DPM and silica dust exposure, WSP recommends all headings are ventilated directly from the intake raises with the ductwork passing over air doors placed in the crosscuts which connect the decline to the intake raises. This method provides
fresh air directly to working faces for an improved working environment.
13.2
Production Rates, Expected Mine Life, Mining Unit Dimensions, and Mining Dilution and Recovery Factors
Mine Stope optimization (MSO) within the Deswik software was used to determine the potentially economically minable
material. The variable cut-off was calculated and written into the block model. 15 ft x 15 ft drifts were generated over the deposit at different orientations to generate minable envelopes. Level intervals
were set to match the current mine plan. A mine design was generated using the envelopes as guidance. Figure 13-4 shows the minable envelopes and the mine design.
Source: SRK, 2026
Figure 13-4: Production Design with MSO Guidance
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
301
Level accesses are developed from the decline to access a maximum of five cuts. An attack
ramp provides access to the top cut (Cut 1), once the top cut is mined cemented backfill is placed and cured before the next attack ramp is developed to the bottom cut (Cut 2). A curing period of 21 days will be required before mining can occur
below. This continues until all the cuts are mined and backfilled. Figure 13-5 shows a schematic of the cut sequence.
Source: SRK, 2026
Figure 13-5: Schematic of Cut Mining Sequence
The mining sequence on a level generally follows a retreat sequence. The access drift is developed to the furthest point of the level and
retreats to the access. Mining adjacent to backfill requires 24 hours to allow the backfill to cure and prevent blast damage. Figure 13-6 shows the production drift sequencing of a typical level.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
302
Source: SRK, 2026
Figure 13-6: Production Mining Sequence
Underground infrastructure includes sumps for dewatering at roughly every 100 vertical ft. Load centers are located on the ramp to provide
power to the mining fronts. These cut outs start off as remucks as the decline is being developed and are repurposed after the ramp is complete.
The main maintenance shop is located on surface between the decline and the fresh air portal. A smaller maintenance bay is located underground
that stores hoses and consumables. The powder and cap magazine are located underground near the top of the mine. Figure 13-7 shows the location of the shop and powder and cap magazine.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
303
Source: SRK, 2026
Figure 13-7: Underground Infrastructure Location
A muck bay is placed at the entrance to each production pod and serves all the cuts within the pod. Trucks are loaded on the decline.
The cemented waste rock backfill plant is located on surface. The backfill material is loaded onto trucks at the plant and hauled to the drift
requiring backfill. Backfill is tight filled and allowed to cure.
The Granite Creek design resulted in 2.39 Mst at an average Au grade of
0.23 oz / st. Figure 13-8 shows the mine design colored by activity type.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
304
Source: SRK, 2026
Figure 13-8: Granite Creek Mine Design Looking Northwest
The production schedule is based on the mine design and Mineral Reserves discussed in Section 12. Productivity rates were generated based
on actual footage achieved by contractors at the mine as well as geotechnical inputs on ground quality.
The productivity rates used for
mine scheduling are based on the ground type defined in Section 13.1 for the top cuts and a constant rate for the undercuts, as they are mined under backfill. They are shown in Table 13-12.
Table 13-12: Productivity Rates
Activity Type
Ground Type
Rate1
Units
Capital Development
Type I
9.0
ft/d
Type II
8.0
ft/d
Type III
4.0
ft/d
Production
Type I
7.0
ft/d
Type II
6.0
ft/d
Type III
4.0
ft/d
Undercut
9.0
ft/d
Vertical Development
—
5.0
ft/d
Backfill
—
600
st/d
Source: WSP, 2026
(1)
All rates are per face. Multiple areas/faces are mined together to generate the production schedule.
General schedule parameters applicable to all underground mining activities are presented in Table 13-13.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
305
Table 13-13: Schedule Parameters for Underground
Mining
Schedule Parameters
Units
Value
Annual mining days(1)
days/year
365
Mining days per week
days/week
7
Shifts per day
shifts/day
2
Scheduled shift length
hrs/shift
12
Scheduled
Deductions
Line-Up and Safety Talk
hrs/shift
0.25
Travel - In
hrs/shift
0.25
Pre-Op Checks
hrs/shift
0.25
Lunch/Breaks (travel to lunchroom)
hrs/shift
1.00
Wash and grease at end of shift
hrs/shift
1.00
Operator unavailable and other interference
hrs/shift
0.25
Vehicle loading/Pick-up Area
hrs/shift
0.08
Travel - Out
hrs/shift
0.25
Total Non-Operating Time
hrs/shift
3.33
Total Operating Time
hrs/shift
8.67
Utilization of shift time
%
72
%
Source: WSP, 2026
Actual operational mining days are 360. For simplicity the schedule has been completed assuming 365 days, with
pro-rated productivity rates.
The production and development schedules were completed using Deswik
software. The mining operation schedule is based on 365 days per year, seven days per week, with two twelve-hour shifts each day. The production schedule continues with the current production target of 544.3 t (600 st)/d of ore and ramps up to 907.2
t (1,000 st)/d in 2028 as the SPZ is developed and headings become available.
Granite Creek has an
8.3-year projected mine life, from 2026 to 2034. Table 13-14 and Figure 13-9 summarize the production schedule.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
306
Table 13-14: Granite Creek Annual Production
Schedule
Period
Ore
Tonnes
(kt)
Ore Au
Grade
(g/t)
Au Metal
Content
(oz)
Waste
Tonne
(kt)
Backfill
Tonne
(kt)
Development
Length
(m)
20261
169.56
7.72
42,078
142.22
230.30
5,694
2027
203.65
7.48
48,969
132.82
244.31
6,050
2028
334.96
7.73
83,289
113.71
360.06
7,831
2029
333.23
7.73
82,769
82.44
366.25
7,215
2030
291.52
8.08
75,718
62.50
367.69
6,115
2031
339.27
7.89
86,084
66.07
378.97
6,993
2032
273.97
8.04
70,800
32.35
355.58
5,218
2033
175.89
8.09
45,768
11.43
225.79
3,160
2034
50.16
9.20
14,835
3.36
64.31
902
Total
2,172.20
7.88
550,311
646.90
2,593.26
49,178
Source: WSP, 2026
Last 8 months of 2026.
Source: WSP, 2026
Last 8 months of 2026.
Figure 13-9: Granite Creek Annual Production Schedule
Mine development drift and raise dimensions are described in Section 13.3. Mining dilution and mining recovery factors, and the
methodology used to derive them, are described in Section 12.1; a 10% external dilution (at zero grade) and 100% stope and development recovery were applied.
Dilution, Ore Loss & Grade Control
The ore control geologist targets viewing each active heading once per shift. The geologist takes a photo of the face and makes notes.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
307
Muck samples are collected by haul truck drivers at the windrow. Development headings receive
one sample per round and are automatically shipped as waste unless otherwise directed by the geologist. For ore headings, a sample is collected at the rate of roughly one sample per two trucks. The driver uses a hand-held sample scoop to fill a
sample bag half full (five to ten pounds), walking along the windrow and taking a scoop every 2 m (5 ft), making sure to collect both coarse and fine material. Sample bags have a tag with duplicate bar codes separated by a perforation. The
perforated portion of the tag includes space to handwrite sample source information including mine level, heading ID and distance, date and shift. The haul truck driver places completed sample bags in a designated location near the mine office
trailer. The ore control geologist collects the samples accumulated from the previous day and night shifts and uses the sample tag information to generate a sample submittal for the laboratory and fill the information to the ore control database.
The ore control geologist inserts QA/QC samples into the sample stream. A contract driver transports muck samples, Over the Road (OTR) truck samples as well as any drill samples to the Lone Tree laboratory once per day.
The Lone Tree lab analyzes samples for Au grade by fire assay and cyanide absorption, sulfide %, TOC, CO3, and preg-rob potential. The results
are used to characterize each round as oxide or autoclave refractory, high grade or low grade, or waste. Assays must be approved by the database administrator before the ore control geologist can enter assay results in the ore control database and
flag windrows for routing. The geologist ties color coded flagging associated with the assessed ore type to a lath at the end of the windrow. The windrow can then be moved to the stockpile corresponding to its ore type. The process typically takes
three days from mine face mucking to ore type determination and flagging.
High grade oxide and sulfide ores are screened to 3 inches at
the stockpile. The minus 3-inch portion is loaded for shipment to the appropriate ore processing location (autoclave or oxide mill). Screened oversize oxide material is placed in the low-grade oxide stockpile, which is shipped to the heap leach facility on a low priority basis. Oversized sulfide material is transferred to long term on-site low-grade sulfide stockpiles and is not shipped.
Ore is shipped to processing facilities using contract
OTR trucks. The truck driver receives a ticket number at the security gate and gives the ticket number to the loader operator at the stockpile. The loader operator loads the first bucket, then spills a small portion of every other bucket into a
small sample pile on the ground during the loading process. Once the loaded truck departs, the loader operator collects a sample from the sample pile and labels the bag with an ID associated with the truck ticket number. Sample bags are waterproof
to preserve moisture content. The loader operator places the samples at the designated sample location at the end of the shift, where they are collected by the ore control geologist who prepares a laboratory sample submittal and enters the sample
information into acQuire. Trucks are weighed near the security gate when departing the mine, and security personnel email a report of truck tons and ticket numbers at the end of the shift.
13.3
Requirements for Stripping, Underground Development, and Backfilling
Stripping
Not
applicable. Granite Creek is an underground operation; underground access is via the existing Granite Creek open pit and a decline (see Section 13.1), and no additional pit stripping is required to support underground production.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
308
Underground Development
Capital development is sized 15 ft x 15 ft with an arched back and includes the decline, sumps, ventilation drifts and mine load center. The
decline gradient averages 14%. Development avoids the main structures where possible. Where it intersects the faults, adequate ground support is used.
Operating development includes attack ramps to access the level, muck bays, production drifts and internal accesses to connect different pods.
The production drifts are 15 ft x 15 ft with a flat back, while all other development is 15 ft x 15 ft with an arched back. A 15 m (50 ft) offset between the production drift and a turn is maintained to allow for proper mucking and backfilling by
the LHD.
Fresh air raises are 3.2 m (10.5 ft) in diameter and are developed using a raise bore machine. A drill and blast drop raise
method is used for raises less than 30 m (100 ft).
All capital and operating development are performed by contractors.
Backfilling
The
mine production sequence includes the use of CRF to fill the voids left by the production drift. As the mining method is underhand drift and fill, the CRF needs to have adequate strength to provide a stable roof to work under. A higher strength CRF
with 7% cement is used to fill the drifts. For the life of mine, 2.86 Mst of backfill is required.
CRF is produced at the surface plant
and hauled underground to the drifts using trucks. A modified LHD with an extended boom and push plate attached to the end is used to tight fill the drift. Backfill aggregate is sourced from waste rock mined in the CX West open pit.
13.4
Required Mining Equipment Fleet and Machinery, and Personnel
Material Handling System
The mine plan assumes 10 t (11.0 st) LHDs will muck the ore from the production face to the muck bay located near the level access. From the
level access, 30 t (33.1 st) trucks are loaded and then hauled up the decline. Waste rock will be handled similarly and hauled to surface. The material haulage distances and cycle times were calculated using the haulage profile in Deswik. It is
assumed that the trucks will return with backfill.
The one-way haul distance for the waste
material increases as the mine gets deeper and averages 2,667 m (8,750 ft) over the life of the mine. The ore haulage distance averages 2,713 m (8,900 ft) over the life of the mine. Average roundtrip cycle times for waste and ore material is one
hour.
Equipment & Fleet – Contract Mining
The mobile equipment fleet will consist of diesel vehicles provided by the contractor. The estimate assumes equipment availabilities of 80% to
85%, a job efficiency factor of 83% (50 minute hour), and an activity efficiency factor that varies by activity.
The owner equipment will
include pickup trucks for staff and a core drill for definition drilling.
Table 13-15 summarizes
the mobile equipment required throughout the mine life.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
309
Table 13-15: Mobile Equipment Fleet
Equipment Type
Number
Required
2 Boom Jumbo
3
Bolter with Screen Handler
6
10 t Development LHD
4
Emulsion Loader
3
30 t Truck w/ Push Box
8
Scissor Lift
1
Multi-Lift
1
Boom Truck
1
Fuel Lube Truck
1
Grader
1
Shotcrete Truck
1
Transmixer Truck
1
Personnel Carrier
2
UG Forklift
1
Diamond Drill
1
4 x 4 Utility Vehicle
5
4 x 4 ATV
3
Mine Rescue Vehicle
1
Total Equipment
44
Source: WSP, 2026
Manpower & Operations – Contractor Model
Labor levels are estimated based on the production schedule and equipment needs. Development and production are performed by contractors. Staff
labor includes both the mine technical staff from owner and the contractor. Mine technical staff will work 4 @ 10-hour shifts per week. Operations will work twelve hours per shift, two shifts per day and seven
days per week.
The mine manpower required is shown in Table 13-16. This assumes a two to four crew
rotation for operations and maintenance.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
310
Table 13-16: Granite Creek Manpower
Labor Category
Position
Staffing
Technical Staff
Staff
UG Mine Manager
1
Staff
UG Mine General Foreman
1
Staff
Senior Mining Engineer
1
Staff
Short Term Planning Engineer
1
Staff
Geotechnical Engineer
1
Staff
Senior Mine Geologist
1
Staff
Mine Geologist
3
Staff
Surveyors
2
Staff
Administrative Assistant
1
Staff
Safety
1
Technical Staff Subtotal
13
Operation
Hourly
Lead Development Miner (jumbo)
5
Hourly
Development Miner (bolter)
9
Hourly
Blaster
5
Hourly
Development Helper (Services)
1
Hourly
LHD Operator
6
Hourly
Truck Operator
13
Hourly
Shotcrete/Transmixer Operator
7
Hourly
Lead Construction Miner
2
Hourly
Construction Miner
2
Hourly
General Laborer
4
Operation Subtotal
54
Maintenance
Staff
Maintenance Superintendent
1
Staff
Maintenance Planner
1
Hourly
Shop Supervisor
1
Hourly
Mechanic
5
Hourly
Electrician
2
Hourly
Instrumentation
2
Hourly
Welder
2
Hourly
Mechanic Helper
2
Hourly
Electrician Helper
2
Maintenance Subtotal
18
Mine Total Manpower
85
Source: WSP, 2026
13.5
Final Mine Outline Map
Figure 13-10 shows the final mine outline map.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
311
Source: WSP, 2026
Figure 13-10: Final Mine Outline Map
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
312
14
Processing and Recovery Methods
This section describes the methods by which ore from the Granite Creek Project is processed and gold is recovered. These methods include whole
ore pressure oxidation via the Lone Tree facility or a third-party facility.
14.1
Lone Tree Facility Historical Processing
The Lone Tree Mine is located immediately adjacent to US Interstate 80 (i-80), approximately 19 km (12
miles) west of Battle Mountain, NV, 80 km (50 miles) east of Winnemucca, NV, and 193 km (120 miles) west of Elko, NV. Mining commenced at Lone Tree in April 1991 with the first gold pour in August 1991. In 1993, a POX circuit was added to the
facility, which included a SAG / ball mill circuit, followed by a thickening circuit, the POX process for refractory gold ores, and finally CIL, carbon stripping, and refining.
In 1997, a 4,500-tpd flotation plant was constructed to make concentrate to supplement the whole ore
feed to the POX circuit. Excess concentrate was shipped to Newmont’s (now NGM) Twin Creeks POX plant or Carlin roaster. The Lone Tree processing facilities were shut down at the end of 2007. Since that time, the mills have been rotated on a
regular basis to lubricate the bearings. In general, the facility is still in place with most of the equipment sitting idle.
The objective
of i-80 Gold Corp is to refurbish and restart the POX circuit and associated unit operations, including the existing oxygen plant, to similar conditions as it was operating before the shutdown, while meeting
all new regulatory requirements. The flotation circuit is not being considered for restart. The POX circuit will have capability to operate under either acidic or basic conditions but is initially anticipated to be operated in an acidic environment.
In order to restart the process plant, new environmental regulations must be met limiting allowable mercury emissions. In February 2011,
the NDEP and the EPA brought about new standards to limit mercury emissions to 127 lb of mercury for every million tons of ore processed. In order to meet this requirement, the Lone Tree Facility will require several modifications. In 2022 and 2023
a number of multidiscipline site inspections were completed to assess the current facility condition and develop the requirements for the restart plan.
14.2
Lone Tree Facility Process Description
An overall process flow diagram for the Lone Tree Facility is shown in Figure 14-1. The process flow
sheet includes the following major processing areas:
•
Ore reclaim, grinding, and thickening and acidulation
•
Pressure oxidation
•
POX off-gas Treatment and quench water loop
•
Neutralization, carbon-in-leach,
and cyanide destruction
•
Tailings thickening and filtration
•
Acid wash, carbon stripping, and carbon regeneration
•
Electrowinning and refinery
•
Plant and instrument air
•
Oxygen plant
•
Reagent preparation and storage
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
313
•
Process and plant services cooling towers
•
Water distribution
•
Steam generating plant and propane storage
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
314
Source: i-80 Gold, 2025
Figure 14-1: Overall Process Flow Diagram for the Lone Tree Facility
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
315
14.2.1
Key Process Design Criteria
The Lone Tree POX Facility restart will have minimal changes made from the 1993 process design criteria (PDC). A new PDC was developed based on
the expected production sources as defined byi-80.
Key process design criteria are summarized in
Table 14-1.
Table 14-1: Summary of Key Process
Statistics
Criteria
Units
Value
Annual Mill Throughput
tonnes (tons)
827,806 (912,500)
Daily Throughput (per calendar day)
tonnes (tons)
2,268 (2,500)
Operating Throughput of Ore to Autoclave Circuit
mtph (stph)
111.2 (122.5)
Grinding Circuit Product Size,
P80
µm (US mesh)
74 (200)
Operating Time / Availability
%
85
Design Sulfur Treatment Rate
mtph (stph)
2.4 (2.7)
Gold Recovery
%
Varies
Silver Recovery
%
Varies
Source: i-80, 2026
The feed to the Lone Tree autoclave will consist of material from the various mines. The design scenarios showing the feed chemistry and grades
are shown in Table 14-2.
Table 14-2: Design Scenarios
for Lone Tree Autoclave Feed
Design Scenario
Unit
Case 2
Case 4
Case 6
Case 8
Case 10
Blend
100% Granite Creek
100% Ruby Hill
100% Cove
20% GC
40% RH
40% Cove
60% RH
40% Cove
Sulfide Sulfur
%
1.12
1.88
1.13
1.43
1.58
Carbonate
%
11.09
15.92
9.21
12.27
13.24
Organic Carbon
%
0.60
0.15
0.47
0.36
0.28
Gold Grade
g/t
11.3
5.83
11.3
9.26
7.89
Source: i-80, 2026
Specific to the Granite Creek Project, dependent on the characteristics of the ore, gold recovery is expected to vary over the life of the
mine. LOM average of refractory ore via pressure oxidation is expected to be 87.5%, with a range of 78.8% to 94.0%. The dependency of this recovery is discussed in Section 13.
14.2.2
Ore Reclaim
The purpose of the ore reclaim area is to store and reclaim ore for processing, which has been shipped to the Lone Tree processing facility via
highway trucks.
ROM ore will be delivered to the ore stockpile area. Production from various mining locations, specifically Granite Creek,
Cove, and Ruby Hill, will be dumped at designated locations within the storage area and blended into facility feed stockpiles.
The
stockpile will be sited to the north of existing plant buildings in an area of existing disturbance. The stockpile will include a lined base graded to drain to a geomembrane lined collection pond in order to convey and contain precipitation that
falls on the stockpile area. The collection pond is sized to contain run-off produced from the stockpile area during a 100-year /
24-hour storm event.
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
316
Ore will be hauled to the site and placed on the stockpile using conventional over-the-road tractor trailers. A front-end loader will be used to consolidate the trailer dumped piles of ore, and to transfer ore
from the stockpile to an existing feeder hopper located at the south end of the stockpile.
The stockpile area has been sized to provide
capacity for approximately 154,000 tonnes(170,000 tons) of ore to accommodate the shipment of ore to site and provide allowance for necessary blending.
A layout diagram of the area is shown in Figure 14-2.
Source: i-80 Gold, 2026
Figure 14-2: Ore Stockpile Area Layout Diagram
Additionally, the reclaim area is utilized for feed blending for the Lone Tree POX circuit. This blending will be used to manage sulfide sulfur
concentrations, gold grades, and carbonate grades feeding the autoclave to ensure stable circuit operation within the design criteria for the plant.
14.2.3
Grinding
The purpose of the grinding area is to reduce the ROM ore particle size to support target sulfide oxidation kinetics within the autoclave
resulting in increased gold recovery. The ROM feed particle size distribution will be sufficient to direct feed the ore to the grinding circuit without the need for pre-crushing. The grinding area contains a
SAG and ball mill circuit to produce the required grind size. The
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
317
SAG mill is fed via a conveyor from the dump hopper. The SAG mill discharges over a vibrating screen with oversize returned to the SAG mill feed conveyor. Vibrating screen undersize discharges
into the cyclone feed pump box together with ball mill discharge. The slurry is then pumped to the cyclones with the cyclone underflow gravitating to the ball mill and the cyclone overflow is directed to the POX feed thickening circuit.
14.2.4
Thickening and Acidulation
The purpose of the thickening area is to prepare the slurry for autoclave processing by densifying the product of the grinding circuit to
improve storage capacity of the downstream slurry storage tanks, improve the autoclave heat balance by reducing the water transferred to the autoclave, and improve the solids flow through the autoclave feed pumps. The thickened slurry is acidified
in two acidulation tanks with sulfuric acid to reduce the carbonate content in the autoclave feed to target a ratio of 1.1:1 carbonate-to-sulfide sulfur ratio. The
acidulation tanks double as feed storage tanks to provide a combined storage capacity of 12 hours.
The storage tanks ensure continuous
feed to the autoclave plant, unaffected by upstream throughput variations.
14.2.5
Pressure Oxidation
The POX autoclave circuit includes the slurry pre-heaters, autoclave feed, autoclave, pressure let down
vessels (flash system) and the POX ancillary services: autoclave agitator seal system, oxygen supply, high pressure cooling water, and high-pressure steam. The Lone Tree Facility restart expects the autoclave to operate under acidic conditions.
Slurry Heaters
The purpose of the slurry heaters is to capture excess energy discharged from the autoclave and
pre-heat the feed slurry prior to the autoclave process thereby reducing the total energy input required to operate the autoclave. The heating is achieved in two stages consisting of a series of two refractory
lined counter-current splash slurry heater vessels.
The heat source is flashed steam released from the autoclave discharge slurry during
the pressure letdown process. The splash slurry heaters are direct contact heat exchangers that provide a means of heat recovery via steam condensation. This reduces the off-gas load on the downstream off-gas equipment and reduces the required input steam from the steam boiler.
Autoclave Feed
The purpose of the autoclave feed area is to increase the pressure of the pre-heated slurry
above the autoclave operating pressure to facilitate transfer into the autoclave at the required pressure using the autoclave feed pumps. These pumps are positive displacement pumps selected for the design temperatures and pressures.
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
318
Autoclave
The purpose of the autoclave is to oxidize the refractory sulfide minerals under acidic conditions to liberate the gold trapped in the sulfide
sulfur minerals. The autoclave at Lone Tree is designed to operate at 198°C (389 °F) and 297 PSI(g) with a slurry residence time of 40 to 50 minutes and consists of four compartments. The design expects up to 97% cumulative sulfide sulfur
oxidation through the autoclave. High purity oxygen is introduced to all four compartments of the autoclave at controlled rates. Due to the low sulfur grades, steam is required to be continuously fed to the first compartment of the autoclave to
maintain the kinetically required oxidation temperature. The addition of oxygen and steam support the required oxidation rates to achieve the target sulfide sulfur oxidation. The autoclave slurry is discharged through a level control choke valve and
is fed to the high-pressure flash vessel in the pressure letdown system.
Flash System
The purpose of the flash system is to reduce the pressure and temperature of the autoclave discharge slurry, making it suitable for subsequent
unit operations downstream. The oxidized slurry undergoes a controlled pressure and temperature reduction process as it passes through two stages of flash vessels located downstream of the last autoclave compartment. The flash steam is recycled
upstream to preheat the autoclave feed slurry in Section 17.2.5.
Slurry Coolers
The purpose of the slurry coolers is to reduce the temperature of the incoming slurry from the
low-pressure flash vessel to prepare it for the downstream neutralization and CIL circuits through a series of six water-cooled shell and tube heat exchangers.
14.2.6
POX Off-Gas Treatment
The purpose of the POX off-gas treatment area is to effectively eliminate particulate matter present in
the POX vent stream, while simultaneously reducing the temperature and volume of the vent gas through direct contact condensation. The POX off-gas treatment circuit also includes a mercury removal step to
minimize autoclave mercury emissions to the environment.
Quench Vessel
The vent streams originating from the autoclave, low temperature and high temperature slurry heaters are directed to the quench vessel. The
purpose of the quench process is to reduce the gas load to the venturi scrubber by cooling and condensing the steam from the vent gas stream prior to feeding the scrubber. This process also indirectly aids in removing entrained particulate droplets
and contaminants. Non-condensed vapor and gases discharge from the top of the vessel and are fed to the Venturi Scrubber. Condensed solutions are directed to the quench water circuit.
Venturi Scrubber
The Venturi scrubber acts as the final stage of particulate gas cleaning prior to the mercury abatement carbon beds. Water containing removed
particulates is directed to the quench water circuit.
Emergency Relief Vessel
The purpose of the emergency relief vessel is to serve as an engineered discharge point for effectively managing relief events in the autoclave
and the off-gas circuit. Excess pressure beyond vessel Maximum Allowable Working Pressures (MAWP) within the system can occur due to loss of quench water, high pressure conditions in the autoclave, or elevated
pressure levels in the high-pressure flash vessel.
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
319
The vessel mitigates the consequences of an emergency release by separating any potential
slurry carryover from the gaseous emissions and reducing the velocity of the vent gas before it discharges to atmosphere. The gaseous emissions are discharged outside at the top of the POX mercury abatement structure. The collected solution in the
relief vessel is directed to the neutralization area sump pump, which transfers it to the neutralization distributor tank.
POX
Mercury Abatement
The purpose of POX mercury abatement system is to remove mercury and volatile organic compounds (VOC’s)
from the POX vent gas via adsorption on to activated carbon before the final discharge to the atmosphere.
Quench Water
Heated quench water and condensed steam in the POX off-gas circuit is collected, cooled, and reused
within the POX off-gas circuit. The quench water tank collects solutions from the quench vessel and Venturi scrubber, and discharges to the quench water clarifier for entrained solids separation. The clarified
solution is cooled via three cooling towers prior to being recirculated to the quench vessel. Excess cooling solution created from condensing vapors in the off gas is bled from the circuit to the mill water tank. The separated solids from the
clarifier underflow are pumped to the neutralization circuit where they rejoin with the cooled autoclave discharge slurry.
Cooling
Towers
The purpose of the cooling area is to reject heat absorbed within the process to the atmosphere. The solution cooling area
includes the process service cooling circuit and the plant service cooling circuit. The process cooling circuit rejects the heat from the autoclave cooling circuit and the elution circuit heat exchangers. The plant service cooling circuit provides
trim heat rejection from various equipment support systems throughout the plant. Standard treatment of the cooling water is performed with biocide and corrosion inhibitor.
14.2.7
Neutralization
The purpose of the neutralization circuit is to neutralize all free acid in the slurry, precipitate the heavy metals as their hydroxides, and
raise the pH to approximately 10.5 to ensure cyanide stability in the carbon-in-leach circuit for personnel safety and process optimization. The neutralization circuit,
comprised of a distributor and three tanks, is dosed with lime slurry to raise the pH of the autoclave discharge slurry. Sparged oxygen converts ferrous iron to ferric iron, reducing downstream cyanide consumption. The neutralized slurry from this
circuit is then fed to the CIL circuit for gold recovery.
14.2.8
Carbon-in-Leach
The purpose of the CIL circuit is to leach and extract gold and silver from the oxidized and neutralized slurry
using cyanidation and carbon adsorption. The CIL circuit provides retention time of 22 to 24 hours. The CIL circuit consists of six mechanically agitated tanks arranged in series. The agitators prevent solids settlement and maximize contact time
with cyanide and activated carbon to improve gold and silver recovery. Oxygen (as opposed to air) is sparged into each tank to maximize the rate of gold dissolution. Each tank is fitted with a carbon retention screen to keep activated carbon with
each tank while allowing slurry to flow to the next tank. Slurry and carbon are pumped upstream through the
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
320
circuit to provide counter current flow of the carbon relative to the slurry flow. Loaded carbon from the first CIL tank is pumped to an elution circuit for carbon stripping and regeneration.
Stripped, regenerated and sized barren carbon is fed to the last tank of the CIL circuit. The leached slurry is transferred from CIL to the cyanide destruction circuit.
14.2.9
Carbon Elution and Regeneration
The purpose of the elution circuit is to elute precious metals from the loaded carbon and transfer the resulting solution of high gold
concentration (pregnant eluate) to the refinery to produce doré. Barren carbon is thermally regenerated prior to addition to the CIL circuit.
Carbon Acid Wash
The purpose of acid wash is to rinse the loaded carbon from CIL with dilute nitric acid solution prior to the carbon stripping process.
Carbonate scale builds up on the activated carbon during the CIL process and fouls the carbon’s adsorption properties by depositing a layer of scale. If left intact, over time the scale will limit the adsorption capacity of the carbon and will
cause softening of the carbon in the regeneration kiln. The loaded carbon from CIL is first treated within the carbon acid wash vessel prior to treatment within the carbon stripping vessel.
Carbon Stripping
The purpose of the carbon strip circuit is to strip the acid washed loaded carbon of the adsorbed gold using a Pressure ZADRA Strip scheme at
149°C (300°F) and 414 kPag (60 psig). Pressure ZADRA strip uses several bed volumes of a recirculated solution to strip the precious metals off the loaded carbon. The cyanide solution is buffered by caustic to assist with gold elution. The
stripped carbon is then sent to carbon regeneration circuits. The resulting pregnant eluate is processed in the electrowinning circuit.
Elution Mercury Abatement
The purpose of elution mercury abatement system is to condition the off-gas leaving the pregnant and
barren solution tanks to remove fine particulate, solution aerosols, and condensed and gas phase mercury using absorption on to a new carbon bed.
Carbon Regeneration
The purpose of the carbon regeneration circuit is to restore the activated carbon’s ability to recover gold from the cyanidation circuit
solutions. The circuit also permits the introduction of new carbon to the process and removes carbon fines from the process.
As carbon is
used in the CIL and elution circuits, the surface and internal pore structure becomes contaminated with organic species. The organics foul the carbon, slow the gold adsorption rate, and decrease the gold loading capacity of the carbon. The carbon
reactivation electric kiln is a horizontal rotary kiln that heats the carbon in an inert atmosphere at 750°C (1400°F) and is specifically designed to remove the organic fouling and regenerate the carbon to an active state where it can be
used again to adsorb leached gold in the CIL circuit. The rotary kiln operates continuously until a batch of carbon is processed.
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
321
Carbon Fines Handling
Carbon fines that are too small to be mechanically separated from the slurry in the CIL circuit, and would lead to precious metal losses, are
collected and transferred by gravity from the reactivated carbon vibrating screen, carbon reactivation feed vibrating screen, kiln feed hopper, and carbon reactivation electric kiln. The carbon fines are dewatered in a filter press and discharged
into supersacks for external sale.
Refinery
The purpose of the refinery circuit is to recover concentrated gold from cyanide solutions via electrowinning (EW) and produce doré
bars.
Electrowinning
The EW circuit recovers gold from the pregnant eluate by applying a voltage across cathodes and anodes in cells. Pregnant eluate is pumped
through three EW cells to electrowin the gold and silver, along with other contaminants, into a sludge that plates onto the cathode mesh material. The plated sludge is manually washed from the cathodes and then melted and refined. Cathodes are made
from stainless steel mesh, and anodes are stainless steel punch plate.
Refining
The refining process is to produce doré bars by smelting retorted sludge mixed with fluxes. The fluxes form a slag to which contaminates
report to.
The sludge from the EW cells is first processed in a mercury retort oven to dry the sludge and remove the co-captured mercury from the precious metal recovery steps. The retorted gold sludge is then processed in a melt furnace to remove contaminants through slag and produce the final doré bars that are processed
by third party refineries for sale.
14.2.10
Cyanide Destruction
The purpose of the cyanide destruction (CND) circuit is to effectively reduce the concentration of cyanide in the final tail discharge and the
recycled process water to ensure compliance with predefined environmental standards and regulations. CND also improves the safety of the operation by reducing cyanide concentrations outside the CIL and elution circuits. The CND circuit targets a
specific concentration limit of 2.5 mg/L of residual weak acid-dissociable (CNWAD) cyanide. This reduction is accomplished through the application of the SO2/air cyanide destruction process
using oxygen in a series of two tanks, which oxidizes the cyanide (to cyanate) to meet the required concentration level. The cyanide destruction circuit is fed directly from the slurry discharge of the CIL circuit.
14.2.11
Tailings Management
The purpose of the tailings circuit is to increase the density of the detoxified tailings to aid with dry stacking of tailings residue.
Additionally, this circuit produces process water for internal use within the facility. The tailings circuit consists of a thickener as a first stage of solids densification. The thickener underflow is fed to a tailings filtration circuit which
dewaters the tailings sufficiently to support tailings dry stacking. The de-watered tailings from the filter presses are then dry stacked at the tailings storage facility.
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
322
The water removed from the tailings slurry is used as process water within the facility to
offset water requirements. Excess process water is processed via a reverse osmosis circuit to provide supplemental permeate, water to offset freshwater requirements.
Tailings Thickening and Overflow Clarification
The purpose of the tailings thickening area is to provide the initial stage of densification and to recycle process water for the facility via
thickener overflow using a conventional thickener. Dilute flocculant solution is added to the thickener feed to promote settling and clarify the thickener supernatant. The thickener underflow of 55 to 65 wt.% solids is pumped to a filtration feed
tank.
Tailings Filtration
Thickener underflow at 55% to 65% solids by weight is further dewatered via the four horizontal plate and frame tailings filter presses. They
are operated in coordinated filtration cycles, two operating and two standbys, to produce a filter cake with a target 15% moisture (17.65% geotechnical moisture). There are two different sizes of filter presses, with the legacy filter presses from
the prior operation being repurposed to provide additional filtration capacity, if needed to supplement the newly installed filter presses. The filter cake is collected by a mobile loader and transferred to the filtered tailings facility, the filter
press filtrate reports back to the tailings thickener.
Process Water
The tailings thickener overflow tank is the primary process water tank for the facility. The process water is used directly in grinding, CIL,
tailings filtration, and reagent make-up areas. Water in excess of that which is needed is treated in the reverse osmosis circuit. In case of process upsets surge water can be directed from the tailings
thickener overflow tank to the water surge pond. The pond provides surge capacity and has the ability to discharge to the tailings thickener deaerator tank to be fed back through the thickener if needed for solids removal and the overflow tank for
distribution to the other circuits if it does not contain solids.
Reverse Osmosis
The purpose of reverse osmosis (RO) is to treat excess process water to obtain a clean permeate water that can be used as fresh water
throughout the facility. The RO circuit comprises pressure filtration, an ultrafiltration system, and an RO system.
14.2.12
Water Distributions
There are eight types of defined water services at Lone Tree:
•
Fresh water – Is generally used for reagent make-up, and water
washing streams.
•
Gland water (fresh water) – Is used to supply gland water to slurry pumps.
•
Mill water – (grinding thickener overflow and process water) Is used to provide dilution water within the
milling circuit.
•
Potable water (fresh water) – Is used for safety showers and sanitary uses, generated from a new potable
water skid.
•
Demin water fresh water) – Is primarily used to supply the steam generating plant provided from a
demineralization water plant.
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
323
•
Process water (tailings thickener overflow) – Is used for mill water makeup. Additionally, it feeds the
reverse osmosis circuit.
•
Quench water (condensed steam from autoclave off-gas) – Is used
within the POX off-gas circuit as the source of direct cooling water.
•
Excess water (bleed stream from RO, Demin and Cooling towers) – Is discharged from the main processing
facility to the excess water treatment facility (battery limit for restart project).
14.2.13
Reagents
Each set of compatible reagent preparation and storage systems is located within dedicated containment areas to prevent erroneous mixing of
reagents. Storage tanks are equipped with level indicators, instrumentation, and alarms to reduce the risk of spills during normal operation. Appropriate ventilation, fire and safety protection, safety shower stations and Safety Data Sheet stations
are located throughout the facility.
The required reagents with their estimated consumption rates are as follows:
•
Ammonium bisulfite (65%) – 2.3 L/t (0.56 gal/ton)
•
Activated carbon – 0.036 kg/t (0.073 lb/ton)
•
Cooling tower antiscalant and corrosion inhibitor – 0.017 L/t (0.004 gal/ton)
•
Biocide – 0.004 L/t (0.001 gal/ton)
•
Caustic (50%) – 0.17 L/t (0.041 gal/ton)
•
Copper sulfate – 0.11 kg/t (0.215 lb/ton)
•
Flocculant – 0.13 kg/t (0.259 lb/ton)
•
Fuel – 0.23 L/t (0.054 gal/ton)
•
Glycol – 0.021 L/t (0.005 gal/ton)
•
Lime – 0.017 kg/t (0.033 lb/ton)
•
Nitric acid (35%) – 0.13 L/t (0.030 gal/ton)
•
Phosphate (10%) – 0.004 L/t (0.001 gal/ton)
•
Sodium cyanide (30%) – 0.32 kg/t (0.63 lb/ton)
•
Sodium sulfite (10%) – 0.004 L/t (0.001 gal/ton)
•
Sulfuric acid (93%) – 175 kg/t (350 lb/ton)
•
Propane – 10.9 L/t (2.61 gal/ton)
14.2.14
Oxygen Plant
High purity oxygen is primarily used for the oxidation of sulfides during the POX process, for iron conversion from ferrous to ferric in the
neutralization circuit, and for cyanide to cyanate conversion in cyanide destruction. Furthermore, during cyanidation, the addition of oxygen maximizes the rate of gold dissolution. At Lone Tree, oxygen will be supplied by a vendor owned and
operated oxygen plant through a Sale-of-Gas (SOG) contract, of which the vendor is responsible for supply, operation and maintenance of the facility. The oxygen plant is
mandated to supply up to 200 stpd of gaseous oxygen at 375 psi(g), delivered to the autoclave, and at reduced pressure to the neutralization tanks, CIL tanks, and cyanide destruction tanks for plant uses. Pressure reduction will be by i-80 Gold for the individual circuits.
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
324
14.2.15
Compressed Air
The Lone Tree facility includes separate instrument and plant air systems to support the facility’s air requirements with excess capacity
and redundancy built into the air system design.
14.2.16
Utilities Consumption
The plant consumptions for water and power are provided for the average processing case below and consider the design blend of material to be
processed within the Lone Tree Facility for the design life of operation.
14.2.17
Water Consumption
Table 14-3 provides a summary of the water consumption by type for the Lone Tree processing facility.
Table 14-3: Lone Tree Facility Water Consumption by Type
Type
Consumption
(m3/h)
Consumption
(gpm)
Mill Water
352
1 550
Fresh Water
130
570
Low Pressure Gland Water
24
105
High Pressure Gland Water
39
170
Demineralized Water
25
110
Potable Water
3
15
Source: i-80, 2026
Electrical Power Requirements
The estimated annual electrical energy requirements for the Lone Tree processing facility are summarized by area in Table 14-4. Annual power requirements are 142,090 MWh or 156 kWh/ton based on 85% availability.
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
325
Table 14-4: Lone Tree Facility Energy Usage by
Area
Area
Annual Energy Consumption
(MWh/y)
General Plant Wide
2,250
Water System
930
Potable Water
240
Process Water (RO and Process Water Tank)
4,900
Ore Reclaim
770
Refinery
2,310
POX Grinding
26,920
POX Grinding Thickening and Acidulation
1,890
Neutralization and CIL and Acid Storage
6,540
Carbon Stripping
4,090
Cyanide Destruction
690
Reagents
2,640
Plant Air and Propane
3,310
POX and POX Utilities
15,540
POX Demineralized Water System
2,660
Tailings Filtration
13,690
Plant Wide Electrical and Instrumentation
4,000
ABS and CN Storage
160
POX Mercury Abatement
900
Quench Water Treatment
4,020
Oxygen Plant
40,090
Existing Plant Areas
3,570
Total
142,090
Source: i-80, 2026
14.3
Third-Party Refractory Processing
Prior to the recommissioning of Lone Tree, production designated as refractory will be processed by a third party as part of a toll milling
agreement, details of which are provided in Section 19. Material will be transported by over-the-road trucks to the toll processor. The basic processing steps are
described in the following sections. A block flow diagram of this process is shown in Figure 14-3.
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
326
Source: i-80 Gold, 2026
Figure 14-3: Third-Party Pressure Oxidation Facility Flow Diagram
The pressure oxidation facility at the toll miller consists of SAG milling followed by two-stage ball
milling. The final grinding product is 80% passing 200 mesh. The cyclone overflow reports to a thickener. Thickener underflow reports to an acidification circuit where sulfuric acid is added as necessary to ensure adequate autoclave free acid
solution levels. The free acid concentration for Turquoise Ridge Complex ore needs to be maintained at >18 g/L. Thickener overflow solution is returned to the milling circuit. After acidulation, ore slurry is added to two identical autoclaves
that are operated in parallel. Two stages of flash heat recovery are used. Autoclave discharge is cooled before reporting to the lime neutralization circuit. Autoclave waste gas is cooled and scrubbed before discharging to the atmosphere. Oxide ore
and acidic oxidized sulfide ore slurry are combined in the neutralization circuit. After neutralization with the carbonate oxide ore and supplemental lime, the ore slurry reports to a CIL circuit where the ore is leached in cyanide solution to
extract the gold. Final tailings slurry is pumped to the tailings area. Tailings settle and decant solution is reclaimed and reused in the grinding circuit. Loaded carbon from the CIL circuit is transferred to the recovery plant. After acid washing
to remove inorganic contaminants, the carbon is transferred to the pressure Zadra stripping circuit. Gold is stripped from the carbon using caustic and cyanide solution at elevated temperature and pressure. Pregnant solution from the stripping
circuit is pumped to an electrowinning circuit where precious metal is removed from the solution as sludge. The sludge is filtered, dried in a mercury retort, mixed with fluxes, and refined into doré bars. After carbon stripping, the barren
carbon reports to the kiln regeneration circuit and returns to the CIL circuit.
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
327
Refractory material from Granite Creek is fed to the autoclave as a proportion of the overall
feed blend and processed in monthly batches. The quantity of gold in each batch is determined through net scale truck scale weights, moisture samples and gold assays by both parties. The gold recovery is determined using a bench scale autoclave test
and then scaled to the refinery production for that particular month.
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
328
15
Infrastructure
15.1
Summary
Previous operators of the Granite Creek Project constructed a large portion of the infrastructure required to operate the Granite Creek
underground mine. This includes:
•
The connection to the NV Energy grid
•
5 MW substation
•
13.8 kV distribution network
•
Administration building
•
Dry facilities
•
Three of the active dewatering wells
•
Two of the four permitted rapid infiltration basins
Since acquisition of the project, i-80 has added to the existing infrastructure with completion of:
•
Dewatering well GCW5
•
Deepening of well BPW5 to 677 m (2,220 ft)
•
Expansion of the dry facilities to accommodate 176 personnel
•
Installation of a rental Water Treatment Plant to treat 800 gpm for discharge to the RIB’s
Infrastructure construction in progress includes:
•
Drilling and completion of dewatering wells GCW14 and GCW15
•
Construction of a 3,300 gpm water treatment plant
•
Construction of the two remaining permitted RIBs
•
Expansion of the contact water handling system and tie it into the water treatment circuit
After completion of the infrastructure construction currently underway, the electrical power distribution, dewatering, water treatment,
administrative and related support infrastructure will be adequate to support the planned underground mine operations. The cost to complete infrastructure construction as of June 1, 2026, is US$5.7 million.
15.2
Access and Local Resources
The Granite Creek Mine is located 32 km (20 miles) northeast of Golconda. From Golconda follow NV789 (paved) northeast for approximately 26 km
(16 miles) followed by the Getchell Mine Road (unpaved) four miles to the Granite Creek access road. The towns of Winnemucca and Battle Mountain are 27 km (17 miles) west and 61 km (38 miles) east of Golconda respectively via Interstate 80.
Osgood Mining Co. (OMC) provides transportation only for senior level employees. The mine and drilling contractors provide light vehicles for
employee transportation. Parking at Granite Creek is available for personal and company vehicles adjacent to the administration building.
Winnemucca and Battle Mountain are both established communities serving the mines and ranches in the surrounding areas. As of the 2020 census,
the population of the cities of Winnemucca and Battle Mountain were 8,431 and 3,705, respectively.
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
329
Northern Nevada hosts several operating gold mines that produced a combined 3.5M ounces in
2024. The area is home to a skilled workforce, contractors and suppliers that can fulfill all the needs of Granite Creek.
15.3
Administrative Facilities
OMC offices, dry facilities, warehouse, truck scale and security office are located just off the Getchell Mine Road at the entrance to the
property (Figure 15-1). The dry facility is housed in the main administration building and a double wide trailer (Figure 15-2). It can serve a total of 176 OMC and
contractor employees. Office space is available to accommodate 25 employees and warehouse area totals 5,000 square feet (ft2) enclosed plus additional yard area. Site security and visitor check-in are provided at the main gate. Security also operates the truck scale where all ore trucks entering and leaving the property are weighed.
Source: OMC, 2026
Figure 15-1: Granite Creek Overview
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
330
Source: Google Earth, 2026
Figure 15-2: Granite Creek Administration Area
15.4
Dewatering
15.4.1
Dewatering Wells
There are four dewatering wells currently operating at the Project (APW-1, BPW-3, BPW-5 and GCW-6). In total, five wells existed prior to i-80’s purchase of the
property in 2021. BPW-2 and BPW-4 were both drilled and tested in 2008 but were never outfitted with permanent pump assemblies due to lower than anticipated production
rates and limited effectiveness for underground operations. GCW-6 was drilled in 2022, tested in Q1 2023 and put online Q1 2024. In Q3 2024, BPW-5 was deepened to a
total depth of approximately 671 m (2,200 ft), targeting the AP Offset structure for increased hydraulic head depressurization of the planned underground progression. As of Q1 2026, GCW-14 has been drilled and
tested and is awaiting completion of GCW-15 in Q2 2026 to allow for accurate sizing of the pump assemblies at both locations (Figure 15-3).
The currently operating wells (APW-1, BPW-3, BPW-5 and GCW-6) are pumping from the CX block hydrogeologic unit at a combined average rate of approximately 1,300 gpm with additional pumping of approximately 1,350 gpm
collected from sumps in the underground mine workings. Water is discharged to the Rapid Infiltration Basins (RIBs) on the southeast portion of the mine boundary for infiltration into the downgradient alluvial basin aquifer. A pipeline has been
constructed to connect the dewatering circuit to a water treatment circuit, so the water can be treated if required. Currently,
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
331
BPW- 3 (600 gpm) does not require treatment and discharges directly to the RIBs. Approximately200 gpm of
BPW-3’s production is routed to the site freshwater supply tank for mining operations, dust suppression and as support for fire suppression. The pump parameters for the dewatering wells are listed in
Table 15-1.
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
332
Table 15-1: Granite Creek Active Dewatering Wells
Well Identifier
Mine Coordinates
Elevation
(ft amsl)
Casing
Diameter
(inches)
Well Depth
(ft bgs)
Static
Water
Level
(ft bgs)
Screened
Interval
(ft bgs)
Average
Pumping
Rate
(gpm)
Pump
Power
(hp)
Pump
Set-Depth
(ft bgs)
Easting
(ft)
Northing
(ft)
APW-1
9890.2
10154.3
4722.3
18
620
380
120 -140
160 -180
200 -600
210
100
574
BPW-3
10188.9
9474.8
5057.1
18
1391
780
500 -540
580 -620
660 -700
740 -1380
600
400
1307
BPW-5
10387.1
11126.9
5093.9
18
12
2222
708
679 -1380
1400-2222
380
200
1290
GCW-6
10310.9
11742.9
5153.2
14
2093
742
803 - 2083
110
150
1950
GCW-14
11272.8
12953.1
5091.1
14
2178
758
966 - 2168
TBD
TBD
TBD
GCW-15
11176.6
12298.1
5086.2
14
TBD
TBD
TBD
TBD
TBD
TBD
Source: LRE, 2026
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
333
15.4.2
Monitoring Wells and VWPs
Monitoring wells and Vibrating Wire Piezometers (VWP) are used to collect hydrogeological data in support of mining operations. Currently,
there are 41 active monitoring wells and 16 active vibrating wire piezometers across 6 locations (Figure 15-3). Construction and recent water level data are provided in Table
15-2.
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
334
Source: LRE, 2026
Figure 15-3: Map of Dewatering Wells, Monitoring Wells, Piezometers at Granite Creek
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
335
Table 15-2: Summary of Locations, Construction
Information and Water Levels for Dewatering Wells, Monitoring Wells, and Piezometers
Identifier
Local Mine
Coordinates
Elevation of
Land Surface
(ft amsl)1
Year
Completed
Inclination
(degrees)2
Open Interval of Well
or VWP Setting
Geologic
Unit(s)
Depth
(ft bls)4
Static Water Level
Comments
Easting
(ft)
Northing
(ft)
Depth
(ft bls)3
Elevation
(ft amsl)
Elevation
(ft amsl)5
Date
(dd/mm/yyyy)
Dewatering Wells
APW-1
9889.60
10152.60
4722.28
2005
-90
120 to 600
4602 to 4122
Ocl
308.1
4414.18
27/08/2024
CX Pit (active)
BPW-2
9804.81
10554.13
4762.98
2008
-90
200 to 920
4563 to 3843
Ocl
385.4
4377.58
23/11/2024
CX Pit (inactive)
BPW-3
10188.94
9474.81
5057.14
2008
-90
500 to 1380
4557 to 3677
Ocl
662.53
4394.61
10/07/2024
South of CX Pit (active)
BPW-4
10806.54
9132.50
5011.94
2008
-90
540 to 1380
4472 to 3632
Ocl
627.5
4384.44
07/10/2024
South of CX Pit (inactive)
BPW-5
10387.06
11126.94
5093.90
2008 / 2024
-90
679 to 2222
4415 to 2872
Ocu; Ocl
703.06
4390.84
17/12/2024
Between Mag and CX West Pits (active)
GCW-06
10310.90
11742.90
5153.20
2022
-90
803 to 2083
4350 to 3070
Ocu; Ocl
1852.3
3300.90
27/12/2024
Between Mag and CX Pits (active); deepened 2025
GCW-14
11272.8
12953.1
5091.1
2025
-90
966 to 2166
4195 to 2295
Ocu, Ocl
747.57
4343.5
1/30/2027
North of Mag Pit (Inactive) 14 inch diameter casing
GCW-15
11176.6
12298.1
5086.2
TBD
TBD
TBD
TBD
Ocu, Ocl
TBD
TBD
TBD
North of Mag Pit (Inactive) 14-inch diameter casing. Currently drilling
Water Supply Wells
WW-7
15630.88
10407.68
4787.39
1984
-90
230 to 420
4557 to 4367
Qal
232.82
4554.57
6/30/2003
E of county road (inactive); 12-inch diameter casing; no sounding port for
water level measurement; alternate identifier PW7; owned by NGM
WW-8
15141.92
8899.17
4756.11
1987
-90
210 to 560
4546 to 4196
Qal
190
4566.11
31/08/2000
East side of county road (inactive); no sounding port for manual DTW
VWPsa
iGS22-17
11081.00
11264.70
4830.70
2022
—
—
—
Ocu
Mag Pit (active)
iGS22-17D_4188
10801.60
11478.90
—
2022
-62
736
4188
Ocu
—
—
—
iGS22-17C_3735
10588.50
11598.00
—
2022
-62
1250
3735
Ocl
—
—
—
iGS22-17B_3391
10428.30
11688.90
—
2022
-62
1640
3391
Ocl
—
—
—
iGS22-17A_3233
10354.60
11732.70
—
2022
-62
1820
3233
Ocl
—
—
—
iGS22-25
10411.80
11448.50
5104.00
2022
—
—
—
Ocu
Between Mag and CX Pit (active)
iGS22-25D_4281
10081.30
11747.90
—
2022
-63
937
4281
Ocl
—
—
—
iGS22-25C_4190
10049.50
11779.40
—
2022
-64
1038
4190
Ocl
—
—
—
iGS22-25B_4077
10010.20
11819.40
—
2022
-63
1164
4077
Ocl
—
—
—
iGS22-25A_3978
9975.60
11855.50
—
2022
-63
1275
3978
Ocl
—
—
—
iGS22-26
11247.10
12508.00
5092.00
2022
—
—
—
Qal
North of Mag Pit (active)
iGS22-26D_4199
11147.30
12590.70
—
2022
-83
902
4199
Ocu
—
—
—
iGS22-26C_3983
11124.00
12609.50
—
2022
-82
1120
3983
Ocu
—
—
—
iGS22-26B_3635
11087.10
12638.80
—
2022
-82
1472
3635
Ocu
—
—
—
iGS22-26A_3384
11061.10
12659.10
—
2022
-80
1725
3384
Ocl
—
—
—
iGS23-10A
11005.50
12407.30
5111.00
2023
—
—
—
Ocu
North of Mag Pit (active)
iGS23-10A_4412
10935.20
12481.40
—
2023
-81
707
4412
Ocu
—
—
—
iGS23-10A_3861
10857.40
12517.30
—
2023
-81
1264
3861
Ocu
—
—
—
iGS23-10A_3700
10830.50
12526.90
—
2023
-81
1428
3700
Ocu
—
—
—
iGS23-10A_3579
10811.70
12533.50
—
2023
-81
1552
3579
Ocl
—
—
—
iGS23-02A
11091.40
11430.30
4826.60
2023
—
—
—
Ocu
Mag Pit (active)
iGS23-02A_4128
10792.40
11906.90
—
2023
-52
898
4128
Ocu
—
—
—
iGS23-02A_3747
10634.20
12132.80
—
2023
-52
1371
3747
Ocu
—
—
—
iGS23-02A_3641
10592.10
12195.10
—
2023
-52
1500
3641
Ocl
—
—
—
Monitor Wells
GMWCX-1
9844.60
12588.10
5258.10
1997
-90
505 to 545
4753 to 4713
Ocl
382.8
4875.30
11/12/2024
GMWCX-2
8409.50
11701.20
5580.20
1997
-90
465 to 505
5115.2 to 5075.2
Kgd
278.92
5301.28
05/11/2024
GMWCX-3
8235.70
10619.10
5321.30
1997
-90
278 to 318
5043.3 to 5003.3
Cpy
274.45
5046.85
05/11/2024
GMWCX-4
7785.30
7991.50
5335.50
1997
-90
610 to 670
4725.5 to 4665.5
Cpy
506
4829.50
05/11/2024
GMWCX-5
10341.30
8970.70
5073.00
1997
-90
490 to 523
4583 to 4550
Ocl
DRY
DRY
11/05/2024
GMWCX-5D
10008.58
8670.70
5109.77
2008
-90
1000 to 1080
4109.77 to 1029.77
Ocl
711.68
4398.09
23/12/2024
Replacement for GMWCX-5
AMW-1
9857.09
10652.34
4762.31
2005
-90
900 to 960
3862.31 to 3802.31
Ocl
383.55
4378.76
23/12/2024
BPZ0802
11070.54
9224.37
4995.80
2008
-90
—
—
Qal
DRY
DRY
—
BPZ0803
9329.24
11014.22
5194.53
2008
-90
—
—
Ocl
678.8
4515.73
16/05/2024
GMW-HLMW-1
14221.21
4917.50
4692.27
1989
-90
254
—
Qal
264.06
4428.21
27/09/2023
GMW-RCH-588
15614.11
10449.75
4788.60
1995
-90
505
—
Qal
193.94
4594.66
28/09/2023
GMW-W7A
20480.58
10155.92
4657.70
1995
-90
110
—
Qal
125.94
4531.76
28/09/2023
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
336
Identifier
Local Mine
Coordinates
Elevation of
Land Surface
(ft amsl)1
Year
Completed
Inclination
(degrees)2
Open Interval of Well
or VWP Setting
Geologic
Unit(s)
Depth
(ft bls)4
Static Water Level
Comments
Easting
(ft)
Northing
(ft)
Depth
(ft bls)3
Elevation
(ft amsl)
Elevation
(ft amsl)5
Date
(dd/mm/yyyy)
MW 8
15140.35
8999.35
4757.01
1998
-90
212
—
Qal
154.87
4602.14
02/10/2023
RCH-1101
11440.58
12178.09
5060.51
1992
-90
264
465
Ocu
270.71
4789.80
05/06/2024
RCH-1280
13419.41
9893.00
4850.00
1991
-90
—
—
Qal
211.25
4638.75
23/12/2025
RCH-1305
10859.00
10333.45
5012.79
1992
-90
300
—
Ocu
DRY
DRY
—
Records indicate well has collapsed
RCH-1308
10981.17
9783.77
4996.49
1992
-90
285
—
Ocu
DRY
DRY
—
Records indicate well has collapsed
RCH-1309
10642.73
10744.50
5048.88
1991
-90
337
—
Ocu
DRY
DRY
—
Records indicate well has collapsed
RCH-1515
12602.88
9750.12
4895.68
1993
-90
219 to 465
4676.68 to 4430.68
Qal
258.1
4637.58
05/06/2024
RCH-1516
12395.45
10333.65
4904.70
1993
-90
229
—
Qal
DRY
DRY
—
Records indicate well has collapsed
RCH-1517
12458.51
10705.76
4915.72
1993
-90
229
—
Qal
DRY
DRY
—
Records indicate well has collapsed
RMW2NE
15915.24
7792.24
4718.68
2005
-90
178 to 218
4540.68 to 4500.68
Qal
104.16
4614.52
15/02/2024
RMW2SE
15902.63
7292.08
4711.48
2005
-90
158 to 198
4553.48 to 4513.48
Qal
91.35
4620.13
15/02/2024
RMW2W/GMWMW2A
13432.00
9194.40
4838.20
1992
-90
140
500
Qal
203.91
4634.29
20/03/2024
RMW3NE
15621.68
6584.88
4710.37
2005
-90
158 to 198
4552.37 to 4512.37
Qal
90.52
4619.85
15/02/2024
RMW3SE
15488.44
6250.25
4706.13
2005
-90
158 to 198
4548.13 to 4508.13
Qal
87.59
4618.54
15/02/2024
RMW3W
13681.94
7080.52
4804.22
2005
-90
278 to 318
4526.22 to 4486.22
Qal
179.19
4625.03
15/02/2024
WELL 10
10454.99
11200.32
5084.57
1992
-90
242
542
Ocu
DRY
DRY
16/05/2024
Records indicate well has collapsed
WELL 2A
13452.52
9148.66
4839.80
1992
-90
144 to 450
4695.8 to 4389.8
Ocu
204.15
4635.65
05/06/2024
WELL 6
8381.24
9858.41
5168.70
1998
-90
274
—
Cpy
248.75
4919.95
16/05/2024
WSW-W#11
10907.57
12300.59
5117.49
1998
-90
105 to 505
5012.49 to 4612.49
Ocu
DRY
DRY
—
WSW-W#2
13024.00
9420.00
4861.90
1992
-90
251 to 555
4610.9 to 4306.9
Ocu
228.83
4633.07
05/06/2024
WSW-W#9B
10323.65
11966.86
5173.91
1998
-90
264 to 617
4909.91 to 4556.91
Ocl
DRY
DRY
—
Rib Piezometers
RPZ2E
14833.50
8020.25
4768.41
2005
-90
58 to 138
4710.41 to 4630.41
Qal
90.03
4678.38
15/02/2024
RPZ2N
14732.84
8348.93
4771.00
2005
-90
58 to 138
4713 to 4633
Qal
128.5
4642.50
15/02/2024
RPZ2S
14595.45
7762.05
4773.27
2005
-90
58 to 138
4715.27 to 4635.27
Qal
81.05
4692.22
15/02/2024
RPZ2W
14496.42
8090.13
4785.56
2005
-90
58 to 138
4727.56 to 4647.56
Qal
88.58
4696.98
15/02/2024
RPZ3E
14388.32
6615.05
4763.06
2005
-90
58 to 138
4705.06 to 4625.06
Qal
DRY
DRY
15/02/2024
RPZ3N
14377.55
6939.79
4772.25
2005
-90
58 to 138
4714.25 to 4634.25
Qal
DRY
DRY
15/02/2024
RPZ3S
14140.12
6414.30
4766.55
2005
-90
58 to 138
4708.55 to 4628.55
Qal
DRY
DRY
15/02/2024
RPZ3W
14124.26
6741.97
4778.56
2005
-90
58 to 138
4720.56 to 4640.56
Qal
DRY
DRY
15/02/2024
Source: LRE, 2026
(a)
Feet above mean sea level; for wells, elevation of land surface at surface casing; for VWPs elevation of
surface casing at land surface is provided;
(b)
Degrees from horizontal at bottom of well or depth of VWP along inclined borehole using IDS survey
(c)
Feet below land surface for wells; feet along inclined borehole for VWPs based on IDS inclination survey and
Leapfrog Geologic Model positioning
(d)
Feet below land surface for wells
(e)
Feet below land surface for wells; depth to water subtracted from collar elevation
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
337
15.4.3 Underground Contact Water Management
Contact water discharge volume reached a maximum of 1,400 gpm when mining the South Pacific exploration drift started in late 2024 (Figure 15-4). The current groundwater model predicts inflow to the underground workings will decrease from a maximum of approximately 1,500 gpm to a minimum of approximately 500 gpm as the cone of depression created
by the surface dewatering wells reduces the hydraulic head on the underground workings (Section 10.4.6). (Spheros Environmental 2026).
Source: OMC, 2026
Figure 15-4: Granite Creek Weekly Average Passive Infiltration
Water encountered in underground excavations is collected in a series of sumps excavated along the main decline. Water from the sumps is pumped
from the mine via two six-inch diameter SDR 11 HDPE pipelines routed through the primary development to the surface (Figure 15-5). Sumps eight through ten serve as the
main collection point for contact water.
Expansion of the contact water managements system to handle the anticipated inflow increase will
add a 250-HP submersible pump in Sump 10, pumping into a 12-inch diameter discharge line. A series of three 450-HP booster pumps
will be located at appropriate intervals along the discharge line to overcome static head and friction losses. All pumps will be powered by variable frequency drives. The underground contact water system expansion is estimated to cost
US$2.79 million (Jones 2026).
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
338
Source: OMC, 2026
Figure 15-5: Underground Contact Water Collection and Discharge System
15.4.4
Water Treatment and Rapid Infiltration Basins
Water from the dewatering wells that is not utilized for operations is currently discharged to Rapid Infiltration Basins (RIBs) on the east
side of the Getchell Mine Road through HDPE pipelines. Two of the four permitted RIBs (NEV2005102) have been constructed to date, with discharge to one of the two cells at any given time (Figure 15-6). When
RIB maintenance is required, discharge is routed to the dormant cell. Current dewatering efforts are well under the permitted 6,900 gpm threshold of the RIBs and the RIB infiltration is sufficiently limiting surface ponding in the active cell. As
dewatering efforts have increased in recent years, i-80 has constructed the remaining two permitted cells (1 and 4) in Q2 2026. This will increase the surface area of the infiltration basins, allowing for
proper future operations and cycling between cells for maintenance as the produced volumes increase with planned dewatering infrastructure upgrades.
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
339
A portable rental water treatment plant capable of 800 gpm is in use currently to treat water
from three wells (APW-1, BPW-5 and GCW-6) which does not meet the minimum required water quality standards for direct discharge
to the RIBs (Figure 15-7). The Mag Pit serves as a diversion route for off-spec plant water but is limited by continuous monitoring and adjustments within the closed
loop plant system.
Due to the depth and planned production rates of wells GCW-14 and GCW-15, a second plant has been designed to treat approximately 3,300 gpm and is planned to begin operating in Q3 2026(Figure 15-8). The original plant will also be available
for treatment, allowing for a combined total treatment capacity of approximately 4,100 gpm.
Source: Forsgren, 2026
Figure 15-6: Map of Current and Planned RIBs at Granite Creek
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
340
Source: Practical Mining, 2026
Figure 15-7: Existing Water Treatment Plant (800 gpm capacity)
September 2026
SRK Consulting (U.S.), Inc.
NI
43-101 Technical Report – Granite Creek
Page
341
Source: Forsgen, 2025
Figure 15-8: WTP-2 Process Flow
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
342
15.4.5
Fresh Water Supply
WW-8, east of Getchell Road, has historically been utilized as a potable water well for the Project
(Figure 15-3). The well is completed in basin alluvial deposits to a depth of 5,177 m (80 ft) and can produce approximately 60 gpm. The well is currently not in use but may be utilized as a potable water
source if needed for future operations.
15.5
Electrical
The Granite Creek project is connected to NV Energy’s 120kv transmission line that parallels the Getchell Mine Road. The Main substation
is located adjacent to the mine access road and has a rated capacity of 5,000 kva. The current substation capacity is sufficient to support the project through to the completion of underground mining (Table
15-3). Power is distributed throughout the site at 13.8 kv (Figure 15-9). Pad mounted or pole mounted transformers are located adjacent to each dewatering well, water
treatment plant, backfill aggregate crushing plant and the mine portal. The underground mine is supplied by a single 4.16 kv feeder entering at the main portal. A second 13.8 or 4.16 kv underground feeder is planned northeast of the portal that will
enter the mine through a borehole or the planned ventilation raise.
Substation repairs and main transformer replacement were initiated in
Q1 2026 following a main transformer fire. As of the effective date of this report the substation has returned to operation.
Table 15-3: Projected Electrical Demand by Area
Area
kva
Dewatering Wells
700
WTP1
70
WTP2
490
Existing Underground Feed
1,100
Future Underground Feed
1,100
Portal Facilities
680
Admin, Dry and Offices
30
Miscellaneous
70
Total
4,240
Source: Woolever, 2026
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
343
Source: OMC, 2026
Figure 15-9: Granite Creek Electrical Distribution and Dewatering System
15.6
Portal Facilities
The mine is accessed through either of two portals, one providing fresh air intake and the other exhaust. Existing portal facilities also
include an equipment maintenance shop, fueling area with diesel and oil storage, contractor offices, and electrical switchgear supplying power to surface facilities and the 4.16kv underground feeder (Figure
15-10).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
344
Source: OMC, 2026
Figure 15-10: Granite Creek Portal Facilities
The lined fuel and oil storage area contains a double-lined 10,000-gallon diesel tank, a 500-gallon gasoline tank, minor amounts of lubricants and oils, and a waste oil holding tank.
The mine
contractor supplies a backfill plant consisting of a cement silo, a colloidal grout mixing tank, pumps, and a mixing sump where aggregate is mixed with the cement grout with a front-end loader. The mine
contractor also supplies a shotcrete mixing plant with a dedicated cement silo and auger mixer.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
345
15.7
Backfill Aggregate Crusher
Backfill aggregate is mined from the CX West pit and crushed to a nominal 4-inch maximum size. A
contractor is mobilized as needed to mine and crush backfill aggregate. A typical campaign produces 300 to 400 ktons of aggregate.
15.8
Screen Plant
Before transporting mineralized material to the process plant, OMC removes material greater than nominal four inches using a diesel-powered
screen plant located on a lined stockpile area near the CX pit ramp. The grade of the course material removed is below the process cutoff grade and is sent to the waste rock disposal area. Figure 15-11 shows
the general arrangement of the lined pad and screen plant.
Fuel and oil storage for surface support equipment is also staged on the lined
screen and stockpile pad. It consists of a double-lined 10,000-gallon diesel tank, a 500-gallon gasoline tank, minor amounts of lubricants and oils, and a waste oil
holding tank.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
346
Source: OMC, 2026
Figure 15-11: Screen Plant Area General Arrangement (OMC 2026)
15.9
Waste Rock Disposal (WRD)
The infiltration basin located at the bottom of the CX Pit (Figure 15-10) must remain in service until
commissioning of WTP-2 is complete. During that period mined waste rock will be disposed of in the C pit.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
347
Mined waste over the Life of Mine (LOM) will be placed in the bottom of the CX Pit and the C
Pit as shown in Figure 15-12. The Waste Rock Disposal (WRD) plan has sufficient volume for all waste rock mined over the current LOM plan (Table 15-4).
Table 15-4: WRD Capacity
WRD Phase
Color
Capacity
(tons)
Capacity
(tonnes)
CX Pit
Green
475,000
430,912
C Pit
Blue
700,000
635,029
Total WRD Capacity
1,175,000
1,065,941
LOM Plan Waste
660,000
598,742
Excess WRD Capacity
515,000
467,200
Source: OMC, 2026
Waste rock from the underground mine does not contain significant sulfide minerals and is dispersed among an abundance of oxidizing material.
The high acid neutralization potential of the waste stream facilitates disposal in unlined waste rock facilities.
WRD in the CX pit will
be placed in 20 to 40-foot lifts across the CX Pit. C Pit WRD will be dumped from the 5200 elevation in a single lift approximately 76 m (250 ft) high. The WRD slope is the natural angle of repose and is
estimated to be 33 degrees. The in-place density for both dumps is planned at 0.058 tons/ft3.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
348
Source: OMC, 2026
Figure 15-12: C (Blue) and CX (Green) Pit WRD Plan
15.10
Waste Disposal
Granite Creek does not have an active permitted Class III landfill. A contractor transports household and
non-hazardous waste to an authorized landfill located offsite. Hazardous wastes are collected in the appropriate manor and temporarily stored onsite until removed and transported to an approved disposal site
for the type of waste being disposed of.
The administration offices and dry are serviced by a septic system installed in the early
1990’s. The system consists of a 4000 gal septic tank and leach field. The septic tank is pumped annually. Portable toilets are located in suitable locations across the site. These are serviced regularly by a qualified contractor and the waste
disposed of offsite at an approved facility.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
349
15.11
Communications
Granite Creek site communications infrastructure is built on a resilient fiber-optic backbone that spans surface and underground areas,
providing high-bandwidth, low-latency connectivity for operational systems, control rooms, and data centers. The fiber network supports enterprise services (voice over IP, CCTV, telemetry, SCADA, and
high-speed data transfer), links surface and underground network nodes, and enables centralized monitoring, automated reporting, and remote access for maintenance and engineering teams. Redundant routing and diverse-path cabling are implemented
where possible to minimize single points of failure and to preserve critical communications during maintenance or incidents.
Wireless
coverage is provided by UHF radio across the surface areas and VHF radio throughout the underground workings. Surface UHF systems deliver clear, mobile voice communications for haulage, processing, and surface crews and integrate with dispatch and
incident response systems. Underground VHF channels are optimized for penetration in tunnels and confined spaces, ensuring reliable miner-to-control-room voice
communications, emergency signaling, and personnel tracking support. Both radio systems are tied in to the fiber network and dispatch consoles, so voice, data, and alarms are consolidated for situational awareness; routine testing, battery/spare
management, and periodic coverage surveys maintain reliability and safety compliance.
Additionally,
i-80 Gold Corp has a FEMCO, a simple, rugged mine-phone system, that provides a dedicated copper-wire voice circuit to metal handset phones installed at key surface and underground locations (shafts, drifts,
refuge stations, pump rooms, crushers, access points and control rooms). The system is intentionally low technology: line-powered drop lines feed magneto-style or dry-cell metal telephones that ring locally
and require no active switching equipment in the handset, ensuring survivable voice communications during power outages and after blast events. FEMCO trunks terminate at protected junction boxes and a small central exchange/gateway that provides
console access for dispatch and cross-connects into the primary fiber backbone and radio dispatch consoles. Typical design features include corrosion-resistant, armored copper cable, sealed metal enclosures, surge/protection modules at entry points,
labeled station circuits, and redundant routing of critical drops where practical. Operational practices include periodic loop and continuity testing, battery/dry-cell replacement schedules (or line-power
verification), maintenance logs for handset and cable condition, and weekly functional checks of gateway-to-dispatch connectivity and ringing. Limitations and
mitigations are: FEMCO delivers highly reliable voice-on-wire but has no native data, CCTV, or IP functionality, i.e., it cannot use the gateway to bridge alarms or
status signals to SCADA/CCTV or carry an isolated emergency voice conversation into the enterprise systems. The use of the FEMCO system is included in emergency response plans by ensuring clear signage of phone locations and FEMCO maintenance with
fiber and radio testing to preserve end to end communications resilience.
15.12
Equipment
Mobile and fixed equipment additions planned over the LOM include the following:
•
Front end loader
•
Cat 745C articulated haul truck (leased)
•
Air compressor
•
Portal truck weigh scale
•
Back-up generator
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
350
16
Market Studies
Ore will be predominantly processed at the Lone Tree processing facility where the final product will be doré, which will be refined
through a certified refinery (North American or global) and sold to any one of several financial institutions at the spot gold price on public markets. There is also a small revenue stream from gold-bearing carbon fines and slags, which are
byproducts of the doré production process. These products are purchased by third parties at the spot price at contracted payable rates with associated fees for treatment.
Prior to refurbishment and restarting up of the Lone Tree facility, the material will be processed via a third party. A toll milling agreement
is currently in place, governing the terms of the processing of Granite Creek sulfide material when being processed by the third party. Oxide material from Granite Creek will be sold to a third party until Lone Tree is operational.
16.1
Market Information
Market Demand
A
report (World Gold Council, 2025) by the World Gold Council in November 2025 summarized the global demand for gold as follows:
“Economic, social and geopolitical trends have contributed to fundamental shifts in demand for gold. Across the globe, rising tensions
and financial market uncertainties are fueling interest among institutional investors and retails savers, supported by increased ease of access to physical gold and gold-backed funds. Among central banks, there has been sustained gold buying since
the Global Financial Crisis, accelerating still further in recent years. In China and India, rising wealth has fostered retail appetite for bars, coins and jewelry, reinforcing gold’s cultural and financial significance across Asia. In
industry, gold’s durability, conductivity and malleability make it a core component of AI infrastructure and other advanced technologies.”
The distribution of demand for gold is illustrated in Figure 16-1. As the demand for gold is high, and
the product is in a highly refined form, the gold produced at Lone Tree from the Granite Creek Project is not exposed to material market risk in terms of its ability to sell products or receive competitive terms. The toll milling contract is
effective until December 31, 2027, at which point it is expected that the Lone Tree processing facility will be operational and capable of processing the refractory ore from Granite Creek.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
351
Source: World Gold Council, 2025
Figure 16-1: Average Annual Demand for Gold – by Sector
Gold Price Assumptions
The selection of gold prices for the purpose of delineating Mineral Resources and Mineral Reserves is described below.
Figure 16-2 shows the daily spot gold price since January 2020, along with the three-year trailing
average. At the end of July 2026, the spot gold price was US$4,042/oz and the three-year trailing average price was US$3,099/oz.
Source: i-80, 2026
Figure 16-2: Daily Spot Gold Price
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
352
In accordance with industry accepted practices, higher metal prices are used for the MREs
ensuring the mineral Reserves are a subset of, and not constrained by, the Mineral Resources, and which satisfies the test of reasonable prospects for economic extraction.
For the Project, the following gold prices were assumed:
•
US$3,000/oz for Mineral Resources
•
US$2,750/oz for the economic model
•
US$2,500/oz for Mineral Reserves
16.2
Contracts and Status
Dore and Byproducts
i-80 Gold has treatment and refining contracts in place with their respective service providers for the
processing of doré and associated byproducts. The terms of these contracts are typical of other gold mining companies in Nevada and globally.
Toll Milling Autoclave Contract
The agreement that i-80 Gold currently has in place allows for the Company to process ore at a
third-party processing facility at a rate of approximately 30,000 tonnes (33,069.3 st) per month provided the material meets the specifications for such material set out in the contract. The Company will be credited with gold recovered from this
material during processing and pay for processing based on a fee schedule of costs required to process the material.
Key specifics of the
contract are as follows:
•
Mass of material will be determined by net truck weights of material delivered and moisture content determined by
sampling, monthly
•
Gold grade of material will be determined by the mean of assays of a split sample of each truck delivery, by i-80 and the third-party processor, with the option to use a third umpire sample assay to settle difference outside the splitting limit of 5%, monthly
•
Gold recovery of material from Granite Creek, processed by the third-party processor will be determined from
bench top autoclave tests and CIL bottle roll tests replicating plant conditions, and reconciled to the actual recovery obtained during the time period of processing, monthly
•
Silver production credit will be allocated quarterly based on the silver produced and the delivered mass and
grade of material from Granite Creek during that quarter
•
Costs of processing under the Tolling Agreement will be determined monthly as follows:
•
Costs for processing, annual downtime and maintenance, selling, tailings storage and disposal, sustaining
capital and G&A costs are determined for each monthly processing lot
•
Additional costs are incurred if the material is determined to be
non-conforming to the specifications of the contract
•
Tolling charges are determined based on the prevailing gold price for the month of processing and range between
US$53.92 and US$238.88 per tonne of ore processed
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
353
•
Specifications for conforming material include the following:
•
CO3 less than 15%
•
Organic carbon less than 0.5%
•
Sulfide sulfur above 1.0%
•
Moisture less than 8%
•
Preg-rob value less than 40%
•
Maximums on certain constituents including the following:
•
Mercury, 50 ppm
•
Arsenic, 5,000 ppm
•
Lead, 150 ppm
•
Zinc, 200 ppm
•
Total Copper, 0.25%
•
Selenium, 3 ppm
•
Barium, 500 ppm
•
Chromium, 100 ppm
•
Cadmium, 3 ppm
•
Cyanide Soluble Copper, 250 ppm
•
Antimony, 1,500 ppm
•
Free gold, none
•
Iron, 8%
•
Tramp metal and plastic, none
Ore Purchase Agreement
The ore purchase agreement that i-80 currently has with the third party enables i-80 to sell the oxide material produced from the Granite Creek mine. It is purchased by the buyer at a pre-determined payable rate dependent on the gold grade, the sulfide
content and the gold price. The range of payable rates is 40% to 75%, with a minimum accepted grade of 0.075 oz/t, a 3.4 point decrease in payable rate with every 0.1% increase in sulfide sulfur and a maximum accepted sulfide content of 1.0%. The
measurement of trucks and associated samples, along with mill scale readings and samples are used to determine the gold content sold by i-80.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
354
17
Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups
The site is a producing underground operation built on a historical mine site that has been impacted by operations
and exploration since the 1940’s. The majority of historical surface disturbances have been reclaimed in accordance with state and federal requirements. In the valley to the east of the site, there are several center-pivot irrigation systems
that are utilized for growing alfalfa. These adjacent water users may be beneficially impacted by the mine contributing groundwater to the rapid infiltration basins (RIBs). They are located at distance (and in the opposite direction of the
prevailing wind), thus making them unlikely to be impacted by noise or dust from current operations.
17.1
Environmental Study Results
The original Pinson Mine was seeking authorization from the U.S. Department of the Interior - Bureau of Land Management (BLM) in 1975, just six
years after the promulgation of the National Environmental Policy Act (NEPA). As such, the BLM was required to prepare an Environmental Assessment (EA) analyzing the potential impacts associated with the mine operations. The Environmental
Assessment, Pinson Project, Humboldt County, Nevada, for Lacanex Mining Company, Ltd. (Dames & Moore, 1975) examined the baseline conditions and potential environmental impacts for a number of resources, including: socioeconomics,
geology, soils, hydrology and hydrogeology, ecology, meteorology, and archeology.
A subsequent EA was prepared in 1992 (Environmental
Management Associates, 1992) for an expansion of the Pinson Mine which examined: physiography, geology, soils, hydrology and hydrogeology, air quality, vegetation and range resources, wildlife, cultural and paleontological resources, visuals, noise,
land use, and socioeconomics. A third EA was prepared (JBR, 2003) for an amendment to the closure and reclamation plans of the Pinson Mine with respect to the CX Pit and long-term management of discharge of Granite Creek, which was being diverted
through a series of pipes and culverts through the mining area. In addition to a reexamination of the previously analyzed resources, environmental justice was added to the assessment.
Based on the previous analyses conducted on the older Pinson Mine, the BLM found that the amendment to the existing Plan of Operations by
Osgood for the Granite Creek Underground Project (which only has a small surface footprint and nexus to federal public lands) had been sufficiently analyzed to allow for a Determination of NEPA Adequacy (DNA) and approval by the BLM.
The remaining activities associated with the Granite Creek Underground Project are being conducted on private lands under jurisdiction and
purview of the Nevada Division of Environmental Protection - Bureau of Mining Regulation and Reclamation (NDEP-BMRR). The following section discusses more recent environmental studies relevant to the current Granite Creek Project.
Geochemistry
The
site has had limited geochemical characterization throughout its history. Most of the geochemical characterization test work was performed by Water Management Consultants, Inc. (WMC) in 1998. This study involved acid-base accounting (ABA), metals
enrichment by acid-digestion and ICP-MS, and kinetic tests. Fifty-one rock samples were tested statically, and 15 of those samples were selected for kinetic humidity
cell testing (HCT). Samples were selected from a variety of lithologies and locations but were designed to primarily focus on the Mag and CX future pit wall material (WMC, 1998).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
355
Results from the ICP-MS analysis showed that major
element abundance was controlled by rock type, with calcium abundant in carbonate-bearing rocks, and silica and aluminum concentrations abundant in silici-clastic rocks. Arsenic was found to be elevated in three samples and associated with
hydrothermal deposits. ABA results indicated that the rock had low acid-generating potential (AP). Tested rocks had low sulfur, neutral paste pH, and abundant neutralization potential (NP) that resulted in 49 out of 51 samples being classified as non-acid generating based on the Canada Centre for Mineral and Energy Technology (CANMET) standards of NP / AP >3 (WMC, 1998).
Kinetic cells were run for a minimum of 20 weeks, with some running for a total of 28 weeks. Rates of acid rock drainage (ARD) generation were
tracked weekly, and the change in acidity and alkalinity was used to provide a quantitative estimate of whether the retained alkalinity would outlast the acid generation. Only one cell showed potential for acid generation: an argillite with 0.47%
sulfur. This sample had consistently acidic pHs (4 to 2.2 S.U.) with sulfate in the hundreds to thousands of mg/L range. All other kinetic cells had neutral to basic pH (7 to 9 S.U.), alkalinity between 20 to 40 mg/L, and no quantifiable acidity.
Monthly leachate analyses largely confirmed the weekly results. Metals in leachate were generally within the reference values, but some samples showed elevated levels of antimony and arsenic multiple times after the initial stabilization period.
Additionally, the two cells that were uncertain under the acid-generation calculation showed levels of aluminum, antimony, arsenic, copper, iron, lead, and thallium after the initial stabilization period that were above NDEP Profile I reference
values at the time. While the remaining cells were not over the reference value at the time, the arsenic and antimony reference values were lowered in 2006 to 0.006 and 0.010 mg/L, respectively, which makes all the cells retrospectively over the new
reference values. However, there was not a particular rock type that was consistently exhibiting acid generating or metal leaching potential (WMC, 1998).
Since 1998, the site has performed periodic sampling characterizing waste rock authorized for disposal by backfill to the bottom of the CX pit.
In the sample set taken from 2005 to 2022, theNP / AP ratio of this rock has varied from 2.5 to 568, confirming the presence of limestone layers within the Comus Sediments (see Section 7.0), that will readily neutralize any acid generated from
the dissolution of sulfide minerals . In addition to ABA tests, Meteoric Water Mobility Procedure (MWMP) tests have been performed on the waste rock deposited in the bottom of the CX Pit. The minimum and maximum MWMP concentrations of constituents
in exceedance of NDEP Profile I reference values is tabulated in Table 17-1 (Stantec Consulting Services, 2023).
Table 17-1: MWMP Results of Rock Placed in CX Pit 2005 to 2022
Analyte
NDEP Profile I Reference Value
Maximum
Minimum
Antimony (mg/L)
0.006
0.070
0.001
Arsenic (mg/L)
0.010
2.200
0.015
Nitrate (mg/L)
10
150.0
0.6
Sulfate (mg/L)
500
800
3
Total Dissolved Solids (TDS) (mg/L)
1000
1,900
27
Quarterly sampling of the waste rock for the sample set taken from 2023 to 2025 indicates theNP / AP ratio of
this rock has varied from 12.7 to 62.4, confirming that the materials remain consistent with previous characterization data. Additionally, MWMP tests have been conducted on the waste rock deposited in the bottom of the CX Pit. The MWMP results for
the rock placed in the CX pit are tabulated in Table 17-2.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
356
Table 17-2: MWMP Results of Rock Placed in CX Pit
2023 to 2025
Analyte
NDEP Profile I
Reference Value
Maximum
Minimum
Antimony (mg/L)
0.006
0.601
<0.003
Arsenic (mg/L)
0.010
1.3
<0.005
Nitrate (mg/L)
10
57.4
0.2
TDS (mg/L)
1,000
1,970
300
Note: Data was not available to calculate the weighted average. The geometric mean and mean were calculated for
comparative purposes.
The project, with the current quarterly geochemical data, is consistent with the historical assessment that the
backfilled rock does not appear to pose an ARD risk and only appears to pose minimal metal leaching (ML) risk in regard to antimony and arsenic release.
Onsite Water Quality
Water is sampled from many sources:
•
Underground dewatering wells (APW1, BPW3, BPW5, GCW-06)
•
Background groundwater wells
•
Underground mine sumps
•
Contact Water
•
Surface water
•
Mag Pit lake
•
RIBs
•
Influent and effluent from the WTP
Bedrock groundwater from the underground dewatering wells has variable chemistry, which is reflective of the variable groundwater flow between
different mineralized and unmineralized geologic units. In general, the groundwater from unmineralized blocks has lower arsenic and antimony than from mineralized blocks. The pH of bedrock groundwater ranges between 6.8 to 8.4 S.U., with TDS from
180 to 1,500 mg/L and alkalinity between 74 and 134 mg/L. Some bedrock groundwater also exceeds the NDEP Profile I reference values for some metals, particularly for arsenic, cadmium, iron, manganese, nickel, and zinc (Osgood Mining Company LLC,
2023).
The site has maintained continuous bedrock groundwater quality monitoring for the purposes of compliance with NDEP-BMRR Water
Pollution Control Permits (WPCP). A summary of the most recent water quality data for antimony and arsenic is compiled in Table 17-3.
Table 17-3: Water Quality April 2023 to January 2025
Location ID
Antimony Ranges (mg/L)
Arsenic Range (mg/L)
APW1
0.0025 – 0.0041
0.029 – 0.059
BPW3
0.0025
0.02 – 0.027
BPW5
0.0025
0.012 – 0.037
GCW-06
0.0035 – 0.0085
0.33 – 1.0
RIB Distribution Pipeline
0.0025
0.023 – 0.028
WTP Effluent
0.0025 – 0.003
0.005 – 0.015
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
357
Most natural water meets NDEP Profile I reference values for antimony, though there are
occasional exceedances. The majority of bedrock groundwater onsite exceeds NDEP Profile I reference values for arsenic; however, the WTP effluent water quality demonstrates the WTP’s ability to meet arsenic reference values. An arsenic
attenuation study is ongoing to address the high arsenic concentrations found in most groundwater.
Underground mine water is most impacted
by metal leaching with analyzed samples collected from April to August 2024 exhibiting NDEP Profile I reference value exceedances for arsenic (ranging from 0.03 mg/L to 0.375 mg/L), antimony (ranging from 0.015 mg/L to 0.115 mg/L) and thallium
(ranging from 0.003 mg/L to 0.014 mg/L). Range-front background alluvial groundwater quality has historically been relatively consistent over the period of record, with few exceedances of NDEP Profile I reference values, and some indication that
natural chemical attenuation is occurring (Enviroscientists, Inc. Water Management Consultants, 2005). Alluvial groundwater on the project is monitored by numerous wells and is well understood. Onsite alluvial groundwater generally meets NDEP
Profile I water quality reference values, with most trace metals at or below analytical laboratory limits (Osgood Mining Company LLC, 2023).
Granite Creek is located adjacent to the site and flows ephemerally during the spring and summer in response to snow melt and precipitation
events. It is currently diverted through a series of pipes and culverts around the southern rim of the CX Pit to the original stream channel location downgradient of the pit. The water quality is consistently good, with all constituent
concentrations below the NDEP Profile I reference values for surface water (Osgood Mining Company LLC, 2020).
The Mag Pit lake water
quality has been monitored consistently since 2015. Samples have been taken from the top, middle, and bottom of the water column to establish any chemical differences in water quality with depth. Over 10 years of sampling, the average arsenic
surface concentration of the Mag Pit is 0.029 mg/L, the middle of the water column in the Mag Pit has 0.029 mg/L arsenic, and the bottom of the Mag Pit has 0.032 mg/L arsenic. All layers show consistently high TDS (around 1,000 mg/L) and sulfate
(490 to 580 mg/L). The bottom of the Mag Pit also appears to be elevated in manganese up to maximum of 0.53 mg/L in 2021 (LRE Water, 2024).
An Ecological Risk Assessment (SRK, 2025) conducted using the historical Mag Pit lake water quality results concluded that harmful effects to
potential receptors, as a result of exposure to existing water in the Mag Pit lake, are not likely.
Pit Lake Future Water
Quality
The current mine plan assumes that the CX Pit will be backfilled and will have a pit lake. LRE work has supported the
post-closure formation of the CX Pit lake. An investigation of future CX Pit wall material and backfill was conducted by WMC in 1998. This was followed up by a pit lake model to predict future pit lake water quality. WMC found that the majority of
future pit wall rock were acid-neutralizing, with paste pH >7 S.U. and average sulfur content of 0.053% weight. Most rock had significant neutralization potential, with an average of 115 tons of CaCO3 per 1,000 tons of rock.
The lake will behave as a hydrologic sink with no discharge
of impounded waters to the surface or groundwater. The waste rock backfilled to the bottom of the CX Pit will be inundated by rising post-mining pit lake waters to an estimated minimum depth of approximately 9 m (30 ft). Inundation of the backfill
will cut off the oxygen supply and reduce or eliminate the potential for the backfill to generate acidic conditions. Pit lake predictive modeling reports indicate that long-term post-mining lake water will be in compliance with WPCP NEV2005103, with
many metals concentrations less than the analytical laboratory reporting limit, significantly below Nevada reference values except arsenic (0.019 mg/L).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
358
Ongoing work from LRE (unpublished as of the effective date) addresses the post-closure
formation of a lake in the Mag pit which shows that it will also be a hydraulic sink. The results of post-closure water quality model simulations (Piteau, 2023) indicate that no parameters are likely to exceed NDEP Profile III reference values
(established to assess post-closure pit lakes in the State of Nevada) over the course of the 100-year simulation time frame. The CX Pit lake is predicted to be slightly alkaline with TDS on the order of 1,612
mg/L to 4,290 mg/L.
In the event that post-mining arsenic concentrations rise above acceptable levels, the modeling predicts that the
addition of ferric sulfate solution (Fe2(SO4)3) at a rate of 0.23 grams per
gallon would reduce the concentrations of arsenic to below the analytical laboratory reporting limit in the short and long term. The model result is well supported by the ferric sulfate dosing program that was tested at the CX Pit lake in 2001 to
help reduce arsenic concentrations reported in the pit lake at that time (Beale & Feehan, 2005).
Known Environmental
Issues
SRK is not currently aware of any known environmental issues that could materially impact the Osgood’s ability to
extract the Mineral Resources or Mineral Reserves of the Granite Creek Underground Project.
However, there does exist an environmental
issue that may impact project economics. Petroleum Contaminated Soils (PCS) were discovered in 2025 within the CX Pit waste rock backfill material. While Osgood estimates that only about 290 to 320 cubic yards of PCS material was disposed of in the
backfill, it is not known precisely where that material was placed, resulting in the possibility that most, if not all, of the 1.17 million tons of waste rock will need to be rehandled and sampled for contamination. Osgood is currently working
with the NDEP-BMRR on the preparation of a PCS Management Plan and remedial efforts to address this issue.
17.2
Requirements and Plans for Waste and Tailings Disposal, Site Monitoring, and Water Management During
Operations and After Mine Closure
Environmental management plans have been prepared as part of the state and federal
permitting processes authorizing the Granite Creek Project. Requisite state environmental management plans which are part of the WPCP and Reclamation Permit programs under Nevada Administrative Code (NAC) 445A.398 and NAC 519A.270, respectively,
include:
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
359
•
Fluid management plan
•
Monitoring plan
•
Emergency response plan
•
PCS management plan (pending)
•
Temporary and seasonal closure plans
•
Tentative plan for permanent closure
•
Reclamation plan
Federal environmental management plans incorporate many of the same plans as are required by the State of Nevada; these are specified in Title
43 of the Code of Federal Regulations Part 3809.401(b) (43 CFR § 3809.401(b)) and include:
•
Water management plan
•
Rock characterization and handling plan
•
Spill contingency plan
•
Quality assurance plan
•
Reclamation plan
•
Monitoring plan
•
Interim management plan
The state environmental management plans were originally submitted to the NDEP-BMRR as part of the WPCP and Reclamation Permit applications.
Most of the management plans were updated and resubmitted as part of amendments to the Granite Creek Underground Project.
Ore
Handling
No onsite processing occurs at the Granite Creek Underground Project at this time. All mineral ore mined at the site is
transported offsite for processing under agreement at other permitted facilities. Ore-grade mineralized material encountered during exploration activities is transported to the surface, crushed or remain as
run of mine material, and stockpiled in a temporary stockpile on the mineralized material stockpile pad or clay-lined ore storage pad. The stockpiled material is then transported offsite to a permitted precious metal processing facility for recovery
of precious metals. Transport for offsite processing is contracted to a locally based trucking firm.
Waste Rock Management
Non-ore rock (waste rock) is transported from the underground by trucks to the surface. Under the
terms and conditions of the WPCP (NEV2005103), placement of non-ore rock is authorized for the placement into CX and C pits. The non-ore rock from the CX decline has
been, and will continue to be, end-dumped over the edge of the 4760 bench towards the bottom of the CX Pit.
There are no plans at present to commence construction of a decline originating in the southwest highwall on the 4700 bench of the Mag Pit.
However, if such construction is initiated at some point in the future, the Mag decline may produce non-ore rock which may also be placed in the approved but not yet constructed engineered waste rock dump
located southeast of the existing Mag Pit or within the Mag Pit on private lands. Non-ore rock will be dumped to construct ten-foot lifts built with an overall slope of
three horizontal to one vertical (3H:1V) to facilitate reclamation. The non-ore rock will be dumped at the angle of repose. To eliminate run-on and minimize potential
surface water degradation, the non-ore rock will not be constructed within ephemeral drainage channels.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
360
The WPCP requires monthly and/or quarterly monitoring of
non-ore rock, as well as non-ore rock specifically originating in the CX Underground Development and ore. The non-ore rock
sampling program at the Project includes collection of composite samples of non-ore rock and ore mined during the quarter and analysis by a State-certified analytical laboratory for NDEP Profile I constituents
via MWMP testing, and static ABA to assess the potential for the non-ore rock to generate acid. Results of the required periodic monitoring will be analyzed to ensure protection of the waters of the State, and
alert Osgood to the need, if necessary, to alter non-ore rock handling and storage procedures.
Tailings Management
See Item 15 (Infrastructure), Tailings Disposal, for the Project’s tailings disposal status.
Water Management
Mine Dewatering
Mine dewatering is discussed in Item 15 (Infrastructure), Power, Water and Pipelines.
Water Treatment Plant
Treatment of dewatering water is discussed in Item 15 (Infrastructure), Power, Water and Pipelines.
An additional WTP (a modular twin of the existing system) will be designed and built to accommodate the greater water disposal needs of the
project.
Stormwater
As required by NAC 445A.433(1)(c), stormwater from the watershed upgradient of the Project is diverted around the Project utilizing the Granite
Creek ephemeral drainageway, including twin 8-inch diameter HDPE pipes through which surface water flows for a time generally during the first two quarters of the year and in relation to snowmelt occurring in
the bowl near the top of the Osgood Mountains west of the Project. Osgood continues to maintain the diversion and monitor the flow as required by the Permit to ensure the integrity and adequacy of the diversion system. The Mining Stormwater General
Permit for Facility ID MSW-266 will remain active until the facility is permanently closed, reclamation is completed, and bonding is released, thus ensuring continued erosion and sedimentation control.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
361
Monitoring Requirements
Monitoring of the Granite Creek Mine / Project is accomplished on multiple levels and across various regulatory programs; these include:
•
Water Quality pursuant to NAC 445A.398(3)(a) and (c) and WPCPs, including baseline and operational, surface
and groundwater water quality, ponds, pit lake (as applicable), stormwater, etc.
•
Waste Rock generated during the quarter will be analyzed for meteoric water mobility procedures (MWMP), NDEP
Profile I parameters, and geochemical properties.
•
Air Quality and emissions monitoring through the Surface Disturbance Permit and Class II Air Quality
Operating Permit.
•
Surface disturbances, reclamation, and revegetation monitoring through the plan of operations and reclamation
permit.
•
Stormwater flows in Granite Creek and inspections of the facility, including Best Management Practices (BMPs),
structural controls, and high-risk, non-contact offsite discharge areas.
Currently, the site has been executing all environmental monitoring requirements required to maintain the permits associated with the
underground operation. All permit monitoring requirements are up to date.
Human Health and Safety
Public safety will be maintained throughout the life of the Project. All equipment and other facilities will be maintained in a safe and
orderly manner. The Project area will remain fenced during the life of the Project to ensure public safety. Site access will be restricted to employees and authorized visitors by not allowing unauthorized visitors into the Project Area. The site has
a plan for responding to emergencies. The intent of this plan is to outline and establish responsibilities and guidelines for actions to be taken by Project personnel in the event of a spill or pollutant release on the Project property.
17.3
Project Permitting
The Granite Creek Project includes both public and private lands within Humboldt County, Nevada. Therefore, the project falls under the
jurisdiction and permitting requirements of Humboldt County, the State of Nevada (principally the various bureaus within the NDEP), and federally through the BLM (though a limited nexus to federal jurisdiction exists at this time). Table 17-4 presents the list of permits and authorizations under which the Osgood Mining Company is currently permitted to carry out mining operations and reclamation activities at Granite Creek.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
362
Table 17-4: Granite Creek Mine Project Permits
Permit Name
Agency
Permit Number
Plan of Operations Granite Creek Mine Project
BLM
NVNV105956928 (Legacy Serial # NVN-064101)
Class II Air Quality Operating Permit
NDEP-BAPC
AP1041-3086.02
Mercury Operating Permit to Construct
NDEP-BAPC
MOPTC AP1041-3089 (de minimis)
Water Pollution Control Permit - Rapid Infiltration Basins
NDEP-BMRR
NEV2005102
Water Pollution Control Permit - Granite Creek Mine
NDEP-BMRR
NEV2005103
Granite Creek Mine Nevada Reclamation Permit
NDEP-BMRR
0047
Granite Creek UG Mine Nevada Reclamation Permit
NDEP-BMRR
0242
Mining Stormwater General Permit
NDEP-BWPC
NVR300000: MSW-42365
Onsite Sewage Disposal System
NDEP-BWPC
GNEVOSDS09S0177
Hazardous Materials Permit
Nevada State Fire Marshal
133539 (renews annually)
Waters of the United States Jurisdictional Determination
USACE
Approved Jurisdictional Determination (AJD) received from USACE November 19, 2025 (valid until November 19, 2030)
Water Rights
The Nevada Division of Water Resources (NDWR) is responsible for quantifying existing water rights, monitoring water use, and distributing
water in accordance with:
•
Court decrees
•
Reviewing water availability
•
Reviewing the construction and operation of dams (among other regulatory activities)
Water appropriations are managed through the NDWR and the State Engineer’s office; this is important to the Granite Creek Project because
the Kelly Creek Area hydrographic basin (Area No. 0) in which the operations are located, has been designated through NDWR Order No. O-536. Groundwater basins are typically designated as needing increased
regulation and administration by the State Engineer when the total quantity of committed groundwater resources (water rights permits) approach or exceed the estimated perennial yield (average annual groundwater recharge) from the basin. By
designating a basin, the State Engineer is granted additional authority in the administration of groundwater resources within the designated basin. Designation of a water basin by the State Engineer does not necessarily mean that the groundwater
resources are being depleted, only that the appropriated water rights exceed the estimated perennial yield.
Osgood Mining Company,
LLC’s water rights at the Granite Creek Mine have a total combined duty of 3,746 ha (9,256 acre)-feet annually (AFA), of which 1,149 AFA is for consumptive use (Osgood, 2024). Water usage for the Project is managed via three certificated water
rights (798 AFA) and 12 permits (8,458 AFA), three of which are block permits. All water rights are subject to State Engineer’s Order 1087 (Block Order). An additional 1,364 AFA are currently ‘Ready For Action’ by the NDWR under
permits 94443 and 94864. All use from the mine, including consumptive and non-consumptive use, is reported monthly on a site pumpage report and the specific meter readings are recorded and subsequently
uploaded monthly to NDWR’s online meter database.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
363
Current Permitting Activities
There are currently no pending permitting actions before the NDEP nor the BLM with respect to the Granite Creek Underground Project.
Performance or Reclamation Bonding
Pursuant to state and federal regulations, any operator who conducts mining operations under an approved plan of operations and/or reclamation
permit must furnish a bond in an amount sufficient for stabilizing and reclaiming all areas disturbed by the operations. Bonding amounts are based on the operator complying with all applicable operating and reclamation requirements as outlined in
the regulations at 43 CFR § 3809.420 and NAC 519A.350 et seq. Section 17.5 provides additional details on the currently calculated financial assurance estimate for the operations. Current reclamation cost estimates (RCEs) will
remain in effect until updated as part of a state and federal permitting action (pending) or next 3-year bond review (anticipated in 2028 and 2029).
17.4
Local Individuals and Groups
Osgood Mining currently has no plans, formal negotiations, or executed agreements with local communities or individuals as part of the
technical and economic factors necessary to demonstrate reasonable prospects for economic extraction of Granite Creek Project Mineral Resources.
Stakeholder Engagement
The following information on community relations and stakeholder consultation has been provided by Osgood Mining personnel (2026).
Mining activities at the Granite Creek property (formerly known as the Pinson Mine) date back to the 1940s, with intermittent periods of
operation continuing to the present day. Throughout its history, the operation has played an important role in the economic development of Humboldt County by creating employment opportunities and generating both direct and indirect economic benefits
for the region.
Osgood Mining Company periodically hosts Town Hall meetings in Winnemucca, Nevada, to provide local stakeholders with
operational updates and opportunities for open dialogue. The company also partners with the Nevada 95-80 Regional Development Authority during its annual economic development conference and collaborates with
the Humboldt County School District, Great Basin College and the Mining Industry Foundation, to support educational initiatives that strengthen opportunities for local students and the broader community.
Beyond these partnerships, Osgood Mining places a high priority on maintaining positive, long-term relationships with local government
officials, ranchers, neighboring landowners, and other community stakeholders, ensuring their perspectives are heard, respected, and considered throughout the development process. Through these ongoing efforts, Osgood Mining strives to be a
responsible and trusted community partner, supporting the long-term well-being of the region and its residents throughout the life of the Granite Creek Project.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
364
17.5
Mine Closure
Closure Planning
Mine closure and reclamation requirements in the State of Nevada are addressed on several levels and by several authorities:
•
Federal requirements are generally covered in the plan of operations under the BLM’s 43 CFR §
3809.401(b)(3) which state that, at the earliest feasible time, the operator shall reclaim the area disturbed, except to the extent necessary to preserve evidence of mineralization, by taking reasonable measures to prevent or control on-site and off-site damage to the federal lands.
•
State of Nevada requirements are stipulated in both the WPCP’s tentative plans for permanent closure (TPPC)
and final plans for permanent closure (FPPC) under NAC 445A.396 and 445A.446 / .447, respectively, and the reclamation permit requirements under NAC 519A.
•
The Humboldt County Regional Master Plan outlines broad goals encouraging responsible mining operations that
minimize environmental footprints and protect the county’s natural capital. It supports projects that remain compatible with long term land use planning but relies on external agencies to mandate the actual technical reclamation.
The state closure and stabilization requirements under the WPCP pertain to process and
non-process components (sources), such as mill components, heap leach pads, tailings impoundments, pits, pit lakes, waste rock dumps, ore stockpiles, fueling facilities, and any other associated mine
components that, if not properly managed during operation and closure, could potentially lead to the degradation of waters of the State. A mining facility operator / permittee must submit a TPPC as part of any application for a new WPCP or
modification of an existing permit. A FPPC must be submitted to the agency at least two years prior to the anticipated closure of the mine site, or any component (source) thereof. This plan must provide closure goals and a detailed methodology of
activities necessary to achieve chemical stabilization of all known and potential contaminants at the site or component, as applicable. The FPPC must include a detailed description of proposed monitoring that will be conducted to demonstrate how the
closure goals will be met.
Disturbance on both public and private land is subject to state mine reclamation regulations (NAC 519A).
Reclamation of disturbed areas resulting from activities associated with the facilities will be completed in accordance with NDEP and BLM regulations. The objectives of the reclamation work include the following:
•
Ensure public safety
•
Reduce or eliminate potential environmental impacts
•
Return the site to a condition that will support future use
•
Control infiltration, erosion, sedimentation, and related degradation of existing drainages in an effort to
minimize off-site impacts
•
Employ reclamation practices using proven methods that do not require ongoing maintenance
•
Considering these objectives, reclamation activities are designed to:
•
Stabilize the disturbed areas to a safe condition
•
Protect both disturbed and undisturbed areas from unnecessary and undue degradation
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
365
To the extent practicable, reclamation and closure activities will be conducted concurrently
to reduce the overall reclamation and closure costs, minimize environmental liabilities, and limit financial assurance exposure. The revegetation release criteria for reclaimed areas are presented in the “Guidelines for Successful Revegetation
for the Nevada Division of Environmental Protection, the Bureau of Land Management, and the U.S.D.A. Forest Service” (NDEP, 2016). The revegetation goal is to achieve the plant cover similar to adjacent lands as soon as possible, which, on a
denuded salt playa, is relatively simple.
Mine Closure Design Criteria
The following design criteria and assumptions were applied by Mountain Valley Professionals (MVP, 2026) in the development of the mine closure
cost estimate:
•
All key regulatory reclamation and closure requirements will be met.
•
All regrading of mine waste structures will be performed during operations.
•
An approved rangeland grass mix will be used. Grassland and wildlife habitat with grazing is the anticipated
post-mining land use.
•
All buildings, power lines, and other infrastructure will be removed.
•
The RIBs will be filled in and reclaimed.
•
Granite Creek will be restored to a channel similar to the pre-mining
flow path.
•
The future water quality in the post-closure Mag Pit lake should meet NDEP Profile III reference values (SRK,
2025) under the current closure scenario (i.e., no open pit mining, independent pits at closure). The lake will be a terminal sink for water; therefore, a long-term risk to groundwater quality has not been identified.
•
Other than the issues discussed above, there are no other potential water quality or water quantity impacts at
the Granite Creek Mine upon closure.
Closure Cost Estimate
This current estimate for the reclamation and closure of the Granite Creek Project (US$8.64 million) (MVP, 2026) was prepared in the Nevada
Standardized Reclamation Cost Estimator (SRCE), Version 1.4.1 Build 17c. The SRCE model has been in use since 2006 in the State of Nevada after validation by both state and federal regulators and mining industry representatives. The estimate
utilized a cost data file (CDF) prepared by the NDEP-BMRR, which was released on August 1, 2025. The CDF utilizes the unit rates below:
•
Labor rates from federally mandated Davis-Bacon rates
•
Rental equipment rates quoted from Cashman Caterpillar in Reno, Nevada
•
Miscellaneous unit rates from Nevada mining vendor quotes (e.g., seeding, well abandonment, etc.)
•
Costs for some activities and supplies are from the 2024 RS Means Heavy Construction database (where activities
include labor, they are modified to use the Davis-Bacon wages)
The SRCE model utilizes first principles to calculate
various costs for activities related to mining operations. Inputs for these equations range from equipment efficiencies, labor efficiencies, fuel consumption rates, area calculations, unit rates for labor / equipment / consumables, etc. Some costs
estimated in the SRCE model (such as those for demolition) are estimated based on productivities and crews from the RS Means Heavy Construction database but use the standardized labor and equipment rates included in the CDF. Other, site-specific
costs may be calculated by the operator and included in one of the user sheets.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
366
The rates for the CDF are supplied by the NDEP-BMRR and vetted for usage in reclamation
estimates throughout the state of Nevada, as well as several surrounding jurisdictions. Davis-Bacon labor rates are based on government contracts with select labor unions and may be higher than those that would be incurred by an operator in a
self-performed closure scenario where in-house or non-union contract labor can be used. The costs within a reclamation estimate prepared for a regulatory agency often
have additional overhead costs related to government oversight of the closure project; the same is true of the values associated with equipment. The rates within the government-prepared CDF are leased rates (which include capital and operating
costs), as opposed to an owner / operator fleet already having a majority of the equipment on hand and partially or fully amortized or potentially easier access to equipment. The bond cost estimate includes 10% for contractor overhead and profit, 6%
for engineering and design, 6% for contingency, 6% for government project management, and 4% for bonding and insurance. The total indirect markup of the reclamation bond estimate is 37%. While this total markup is likely sufficient to cover the
project management and overhead (G&A) costs in a self-performed closure, they are not detailed enough to make a judgement whether they are adequate in this case. Normally, a self-performed LoM closure cost will include a project-specific list of
G&A costs for both management and overhead items like telephones, office supplies, electricity, etc.
Limitation on the Closure
Cost Estimate
The government required reclamation cost estimate was utilized to provide a basis for financial assurance. This type
of estimate reflects the cost that the government agency responsible for closing the site would be responsible for in the event that an operator fails to meet their obligation. If Osgood, rather than the government, closes the site in accordance
with their current mine plan and approved closure plan, the cost of closure is likely to be different from the financial assurance cost estimate approved by the government. There are a number of costs that are included in the financial assurance
estimate that would only be incurred by the government, such as government contract administration. Other costs (such as head office costs, a number of human resource costs, taxes, fees, and other operator-specific costs that are not included in the
financial assurance cost estimate) would likely be incurred by Osgood during closure of the site.
Furthermore, because closure of the site
is not expected until 2032, based on the forecast reserve production plan, the closure cost estimate represents future costs based on current expectations of site conditions at that date. In all probability, site conditions at closure will be
different from currently expected; therefore, the current estimate of closure costs is unlikely to reflect the actual closure cost that will be incurred in the future.
17.6
Adequacy of Plans
Given the robust state and federal regulatory requirements in Nevada and review of the available documentation, it is SRK’s opinion that
the current plans are adequate to address any issues related to environmental compliance, permitting, and local individuals or groups.
17.7
Commitments to Ensure Local Procurement and Hiring
i-80 Gold Corp. maintains specific corporate governance policies for all its operations, including
those at Granite Creek, including providing and supporting access to employment and procurement opportunities for communities and Indigenous groups (i-80 Gold Supply Chain Policy, March 31, 2025).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
367
18
Capital and Operating Costs
18.1
Underground
18.1.1
Expected Accuracy of Cost Estimates
Estimation of capital and operating costs is essential to the evaluation of the economic viability of a prospective project. These factors,
combined with revenue and other expense projections, form the basis for the financial analysis. Capital (CAPEX) and operating (OPEX) costs for Granite Creek were estimated based on actual data from i-80, the
life of mine plan described above, estimates of materials and labor based on that design, predicted consumption of power and supplies, budgetary quotes for major equipment, labor requirements, and estimates from contractors.
18.1.2
Capital Cost Estimates
The mining capital cost estimate is based on a first principal cost model buildup and actual costs from
i-80. The total capital estimate is US$60.74 million. A 5% contingency, or US$2.77 million, is included in the total CAPEX.
The CAPEX estimate includes lateral and vertical capital development, mine infrastructure, mobile equipment and infill drilling.
Development costs are derived from the mining schedule prepared by SRK. The prepared mining schedule includes footages of development combined
with unit costs and is based on site specific data to estimate the cost of these development activities. The breakdown of the estimated capital costs is shown in Table 18-1.
Table 18-1: Estimated Mining Capital Cost
Item
US$M
Capital Lateral Development Cost
9.34
Capital Vertical Development Cost
12.71
Mine Infrastructure and Equipment
4.75
Rebuilds
0.90
Infill Drilling
30.27
Contingency (5%)
2.77
Total
60.74
Source: SRK, 2024
US$M: US$ million
18.1.3
Operating Cost Estimates
The life of mine operating costs are US$408.13 million. SRK estimated the required mining equipment fleet, required production operating
hours, and manpower to arrive at an estimate of the mining costs that the mining operations would incur. The mining costs were developed from first principles with client inputs on actual cost data and contractor quotes. The mining operating costs
are presented in the following categories:
•
Drilling
•
Blasting
•
Mucking
•
Hauling
•
Backfill
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
368
•
Support Equipment Operations
•
Miscellaneous Operations (various support operations, etc.)
•
Mine Engineering (mine technical personnel and technical consulting)
•
Mine Administration and Supervision (mine and maintenance supervision, etc.)
•
Contractor Equipment Rental
A summary of the LoM unit mine operating costs is presented in Table 18-2.
Table 18-2: Mining Operating Costs
Category
US$M
US$/st
US$/t
Operating Development
157.68
65.07
71.73
Backfill
48.74
20.11
22.17
Truck Haulage
36.16
14.92
16.45
Mine Services and Maintenance
70.53
29.10
32.08
Power
12.15
5.01
5.52
Technical Services and Management
13.07
5.39
5.94
Contractor Equipment Rental
69.81
28.81
31.76
Total
408.13
168.42
185.65
Source: SRK, 2026
US$M: US$ million
Figure 18-1 shows the OPEX cost profile for the life of mine.
Source: SRK, 2026
Figure 18-1: Yearly Mine Operating Cost Profile
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
369
Key inputs and assumptions used to estimate the OPEX cost are as follows:
•
Development and production are performed by contractors. Contractors provide labor and equipment. The Owner
provides the consumables such as diesel, explosives, ground support, etc.
•
Backfill costs assume the haulage and placement of rockfill to the stopes. Costs for operating the backfill plant
and aggregate costs are estimated separately.
•
Material movement assumes haulage of material from the stope to the portal ore pad.
•
Power costs only assume the additional power needed to support the life of mine plan. The current power
requirement is estimated separately.
18.1.4
Closure and Reclamation
Total reclamation costs are estimated at US$8.6M. An additional approximately US$4M is estimated for environmental clean up and reclamation for
a total closure cost estimate of US$12.7M. Reclamation costs are only for the underground mine-related disturbance. Legacy reclamation costs are included in the open pit estimates.
18.1.5
Infrastructure
PMC constructed significant infrastructure prior to i-80’s acquisition of the Granite Creek
Project. Work is ongoing for the completion of RIBs one and four, water treatment plant #2, and wells GCW-14 and GCW-15. Estimated capital spending remaining for the Project as of June 1, 2026, are shown
inTable 18-3. Capital estimates are from existing construction contracts, current and prior purchase orders, and OMC engineering estimates.
Table 18-3: Infrastructure Capital Cost
Estimates1
Area
Capex Remaining1 ($M)
Source
WTP#2
$
6.7
Forsgren
Dewatering Wells GCW14 & GCW15
$
2.6
OMC
Monitoring Wells Rehab
$
1.7
OMC
RIBs 1&4 and Rib Monitoring Wells
$
0.5
OMC
Potable Water Treatment System
$
0.8
OMC
Electrical Distribution
$
0.3
OMC
Equipment
$
1.3
Mobile Equipment
$
1.9
OMC
Light Vehicles
$
1.0
OMC
Total
$
16.6
Source: Practical Mining, 2026
(1) As of June 1, 2026
US$M: US$ million
For purposes
of the economic analysis, Surface Mine Capital also includes approximately US$5.6 million of costs capitalized in connection with underground mine development. These costs are incremental to the US$16.6 million infrastructure capital cost
estimate presented in Table 18-3.
18.2
Surface Operating Costs
Operating costs for the surface infrastructure and support functions were derived from historical costs during the period from January 2024
through May 2026 and engineering estimates as appropriate (Table 18-4).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
370
Surface labor totals 23 hourly, supervisory and contract personnel tasked with WTP operation
and maintenance, well operation and maintenance, ore waste and backfill aggregate movement to and from the portals, screen plant operation, haul road maintenance, and maintenance of all site buildings and facilities.
Electrical power consumption was calculated from historic billed kwh plus new surface loads planned during the
life-of-mine (Table 18-5). New electric loads added in the underground mine are captured with the underground mining costs.
Existing power demand for the underground mine is included with the infrastructure baseline demand. Power costs are estimated at the historic average of US$0.077/kwh.
Table 18-4: Infrastructure Unit Operating Cost Estimates
Area
Operating
(US$/ore
ton)
Operating
(US$/ore
tonne)
Source
WTP#1
3.83
4.22
Veolia
WTP#2
17.06
18.80
Forsgren
Electrical
8.61
9.49
OMC
Surface Labor
9.56
10.53
OMC
Surface Support Equipment and Supplies
8.67
9.56
OMC
Backfill Aggregate
10.11
11.14
OMC
Total
57.83
63.75
Source: Practical Mining, 2026
Table 18-5: Annual Infrastructure Operating Costs (US$000’s)
Area
2026
2027
2028
2029
2030
2031
2032
2033
2034
Total
Surface Labor
1,356
2,776
2,782
2,777
2,777
2,777
2,784
2,776
2,077
22,883
Surface Support
1,655
2,046
2,822
2,990
2,883
3,094
2,682
1,846
739
20,758
WTP1
889
936
988
1,078
1,112
1,112
1,112
1,112
834
9,171
WTP2
1,965
4,500
4,621
5,042
5,202
5,202
5,202
5,202
3,902
40,839
Electrical
1,117
2,205
2,327
2,538
2,618
2,618
2,620
2,618
1,962
20,623
Backfill Aggregate
1,160
3,223
3,713
3,739
3,745
3,793
3,374
1,084
369
24,200
Total
8,143
15,686
17,252
18,164
18,338
18,596
17,775
14,638
9,882
138,474
Source: Practical Mining, 2026
Operating costs for over-the-road haulage of ore from Granite
Creek to either Lone Tree or third-party processors are part of a contracting agreement with a commercial hauler, with rates as follows:
•
US$5.44 per wet ton for ore transport
•
US$175 per hour for travel time
•
Additional fuel surcharge
Costs for transporting ore to the destinations for processing is shown in Table 18-6, based on historic
2026 invoices received.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
371
Table 18-6: Unit Costs for Over-the-Road Ore Haulage
Destination
Operating
(US$/ore ton)
Operating
(US$/ore tonne)
Lone Tree
16.21
17.87
Third-Party Ore Processing Plant
7.10
7.83
Source: i-80 Gold, 2026
18.2.1
Autoclave Capital Cost Allocation (Processing Fee)
i-80 plans to operate their mines in a hub and spoke arrangement.
i-80’s plan is to ship ore to the Lone Tree Mill acting as the hub. This is analogous to third-party ore or concentrate processing that is currently being used for ore being mined from Granite Creek
(i.e. Nevada Gold Mines). Given that Lone Tree is not a captive processing facility, i-80 has elected to use the mill as a toll treatment facility both internally and potentially externally. As the Lone Tree
Mill will be operating in a toll treatment capacity, i-80 intends to allocate the Lone Tree Mill’s refurbishment capital cost to each of the mine sites.
The capital cost estimate was developed by an experienced team of engineers, designers and cost estimators from Hatch.
The capital costs for the project have been prepared in accordance with standard industry practices and guidelines provided by the Association
for the Advancement of Cost Engineering (AACE) international recommended practice 47R-11. Using the guidelines provided in practice 47R-11, the cost estimate is
considered to be an AACE Class 3 estimate.
Basis of Estimate
The estimate is inclusive of the entire mill scope from feed ore stockpile to filtered tails material placement in the tailings storage
facility.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
372
The estimate includes the following key components:
•
Labor costs comprised of unit manhours, productivity adjustments and contractor-provided labor rates.
•
Equipment and bulk material costs for permanently installed equipment and facilities.
•
Costs associated with relocation, replacement and refurbishment items based on the site findings to bring the
process operations up to name plate production.
•
Construction indirect costs for the support and maintenance of the site during the construction period.
•
Other indirect costs such as EPCM, freight, first fills, and spares.
•
Contingency has been applied in accordance with AACE Class 3 Guidelines and a Qualitative Risk Assessment of
the estimate.
•
Owner’s Cost provided by i-80 for inclusion in the capital cost
estimate.
•
Forward escalation has been excluded from the capital cost estimate.
•
All costs are expressed in Q3 2025 United States Dollars.
Estimate Classification
The Mill estimate follows established guidelines for producing a CAPEX according to the Hatch procedures in alignment with AACE estimating
standard practice. The estimate was completed to a high-definition AACE Class 3 estimate with an intended accuracy of -15% to +15%.
Direct Costs
Direct costs
are generally quantity based and include all the permanent equipment, materials, labor, and subcontractor costs associated with the physical construction of the permanent facility / asset.
Discipline Estimates, Quantity Development, and MTOs
The following section outlines the basis for how the engineering discipline cost estimates and quantities were developed by the engineering
team. The cost estimates for all tagged equipment and some contracts were generally developed through the use of technical specifications and the use of firm or budgetary bid packages. The material quantities were developed from the 3D model, new
drawings, and engineering calculations and lists, supported by existing drawings information collected during site visits. The cost estimates for MTOs were obtained using budget pricing.
All engineering input to the estimate was controlled through the use of estimate control sheets and material
take-off forms.
The disciplines involved in direct input to the estimate are as follows: Civil,
Architectural, Structural, Mechanical, Piping, Electrical, and Instrumentation & Controls.
Indirect Costs
Indirect costs include items that are necessary for the completion of the project but are not directly related to the direct construction
costs. These costs are detailed in the section below and were generated by the project management and estimating team with input from i-80.
The indirect costs categories used within this estimate are as follows: Construction Indirects, Vendor Representatives, Spare Parts, First
Fills, Freight and EPCM.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
373
Capital Cost Summary
The estimated capital cost is presented in Table 18-7. The total Lone Tree Mill Restart project capital
cost estimate is US$430 million USD as of Q3 2025.
Table 18-7:Capital Cost Summary
Capital Cost Estimate Summary
Description
Total Amount (US$M)
Subtotal Direct Cost
252.6
Subtotal Indirect Cost
109.3
Total Direct + Indirect Cost
361.9
Contingency
43.4
Subtotal Cost (Excluding Owner’s Cost)
405.3
Owner’s Cost
25.0
Total Project Cost
430.3
Source: Hatch, 2026
US$M: US$ million
Capital
Cost Conversion to Sustaining CAPEX Cost
As i-80 intends to operate the Lone Tree Mill in a
toll treatment arrangement, the overall capital cost must be converted into a sustaining cost per ton of processed ore. The calculated yearly operating cost for the refurbishment can be attributed to each operating mine based on their throughput.
To convert from a fixed capital cost estimate to an sustaining cost estimate the following assumptions were used:
•
Nameplate capacity for each year of operation
•
Design mine life of 20 years
•
Discount rate set to 0%
•
Cost equally attributed to each ton of ore processed
These assumptions have the potential to have a significant effect on the capital attribution to each year. For instance, should the mill
operate for 25 years the effective cost per ton processed would decrease. In any year when the design tons to be processed are not processed this will inflate the effective operating cost per ton.
The selected assumptions align with the design and are to the best of the Authors knowledge accurate for the operating life of the Mill.
The Financial mine life for the CAPEX conversion was set by i-80 at 20 years. This is in contrast with
the project’s design life of 15 years. This financial mine life was set based on i-80’s operating experience and the benchmarking of the other Autoclave facilities in Northern Nevada. The
expectation is that the sustaining capital and maintenance costs included in the Lone Tree Mill operating cost estimate cover the expected expenses to keep the plant operating for 20 years (Table 18-8).
Table 18-8: Sustaining CAPEX Assumptions for Lone Tree
Description
Units
Value
Capital Cost
US$M Q3 2025
430
Life of Mine
Years
20
Solids Throughput
st / annum
912,500
Design Life Solids processed
Millions of st
18.25
Sustaining Processing Cost
US$ / st
23.56
Source: Hatch, 2026
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
374
The sustaining cost for the refurbishment of the Lone Tree Mill is US$23.56/st. This cost is
applicable to every ton processed at Lone Tree.
Processing Costs – Lone Tree
The operating cost for the Lone Tree Processing Facility has been summarized by component as shown in Table
18-9.
Table 18-9: Lone Tree Processing Facility
Operating Cost Summary
Category
Unit Cost
(US$/tonne)
Unit Cost
(US$/ton)
Power
14.61
13.25
Labor
13.62
12.36
Maintenance
7.86
7.13
Consumables
61.87
56.13
Facility
7.21
6.54
Total
105.16
95.4
Source: Hatch, 2026
Power
The
electrical power requirements are estimated by plant area based on the equipment sizing for all equipment included on the electrical load list. A unit power cost of US$0.10/kWh has been assumed based on NV Energy rate sheet and preliminary contract
with i-80.
Electrical costs are summarized in Table 18-10.
Table 18-10: Lone Tree Pressure Oxidation-CIL Power
Costs
Area
Annual Consumption
(MWh)
Annual Cost
(US$)
Unit Cost
(US$/ton)
Unit Cost
(US$/tonne)
Comminution
26,628
2,662,900
2.92
3.22
POX and Utilities
19,412
1,941,200
2.13
2.34
CIL, Elution and Refinery
11,206
1,120,600
1.23
1.35
Tailings
19,898
1,989,900
2.18
2.40
Ancillary
22,775
2,277,600
2.50
2.75
Oxygen Plant
20,998
2,099,800
2.30
2.54
Total
120,917
12,092,000
13.25
14.61
Source: Hatch, 2026
Labor
Labor costs
include the salaries, taxes, and wages for 90 staff members required to directly support the restart of the Lone Tree processing facility, including administration, operations, maintenance, and technical services personnel. Additional roles required
to support the entire site and the management office at Lone Tree have been captured separately by i-80 and are excluded from the cost estimate.
The organizational structure for plant personnel is shown in Figure 18-2.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
375
Source: i-80 Gold, 2026
Figure 18-2: Organizational Chart for Lone Tree Pressure
Oxidation-CIL
Labor costs are summarized in Table
18-11.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
376
Table 18-11: Lone Tree Pressure Oxidation-CIL Labor Costs
Area
Total Headcount
Annual Cost
(US$)
Unit Cost
(US$/tonne)
Unit Cost
(US$/ton)
Shared Personnel
23
3,640,000
4.40
3.99
Comminution
14.3
1,648,000
1.99
1.81
POX and Utilities
10.3
1,208,000
1.46
1.32
CIL, Elution and Refinery
16.3
1,850,000
2.23
2.03
Tailings
26.3
2,936,000
3.55
3.22
Ancillary
0
—
—
—
Oxygen Plant
0
—
—
—
Total
90
11,282,000
13.63
12.36
Source: i-80 Gold, 2026
Maintenance
Maintenance material costs are calculated based on previous experience and similar sized plants. The maintenance costs are estimated as annual
costs based on the partial direct costs from the capital cost estimate. Partial direct costs exclude install labor, architectural, steel, concrete, and earthworks costs.
Maintenance costs are summarized in Table 18-12.
Table 18-12: Lone Tree Pressure Oxidation-CIL Maintenance
Costs.
Area
Annual Cost
(US$)
Unit Cost
(US$/tonne)
Unit
Cost
(US$/ton)
Comminution
366,900
0.44
0.40
POX and Utilities
3,622,000
4.38
3.97
CIL, Elution and Refinery
639,800
0.77
0.70
Tailings
831,800
1.00
0.91
Ancillary
1,049,600
1.27
1.15
Oxygen Plant
—
—
—
Total
6,510,100
7.86
7.13
Source: i-80 Gold, 2026
Consumables
Consumable costs are estimated based on a reagent list prepared using the process flow diagrams and design criteria. Reagent consumption rates
were obtained from the mass balance and used to calculate the annual cost. Most of the consumable unit costs were provided by i-80 via vendor quotes or actual pricing from the currently operating Lone Tree
plant, while others were estimated based on assumptions, online database, and reference projects.
Consumables costs are summarized in
Table 18-13.
Table 18-13: Lone Tree Pressure Oxidation-CIL Consumable Costs
Area
Annual Cost
(US$)
Unit Cost
(US$/tonne)
Unit Cost
(US$/ton)
Comminution
3,253,700
3.93
3.57
POX and Utilities
32,397,500
39.14
35.50
CIL, Elution and Refinery
320,000
0.39
0.35
Tailings
736,600
0.89
0.81
Ancillary
16,347,200
19.75
17.91
Total
53,055,000
64.09
58.14
Source: i-80 Gold, 2026
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
377
The key consumables for the operation and their cost information are shown in Table 18-14.
Table 18-14: Key Consumables Costs for Lone Tree
Pressure Oxidation-CIL
Consumable
Annual Cost
(US$)
Unit Cost
(US$/tonne)
Unit Cost
(US$/ton)
Unit Price
(US$)
Sulfuric Acid (93%)
31,896,400
38.53
34.95
220/tonne
Quicklime
9,638,700
11.64
10.56
354/tonne
Propane
3,703,900
4.47
4.06
0.412/L
Ammonium Bisulfite (65%)
1,122,500
1.36
1.23
0.579/L
Sodium Cyanide
801,600
0.97
0.88
3.06/kg
Source: i-80 Gold, 2026
Facilities
Facility costs include operation of the oxygen plant under the ‘sale of gas’ agreement, mobile support equipment for the plant and
site services including allowances for health and safety supplies and training.
Facility costs are summarized in Table 18-15.
Table 18-15: Lone Tree Pressure Oxidation-CIL Facility Costs
Area
Annual Cost
(US$)
Unit Cost
(US$/tonne)
Unit Cost
(US$/ton)
Oxygen Plant
2,460,000
2.97
2.70
Mobile Equipment
2,175,300
2.63
2.38
Site Services
109,200
0.13
0.12
Total
4,744,500
5.73
5.20
Source: i-80 Gold, 2026
CIL at Lone Tree (Oxide Processing)
The operating cost estimate for oxide processing at Lone Tree was derived from the operating cost estimate for the sulfides with adjustments
made due to bypassing of the autoclave and lower demand on ancillary facilities. The modified operating costs are shown in Table 18-16.
Table 18-16: Lone Tree Processing Facility Operating Cost Summary
Category
Unit Cost
(US$/tonne)
Unit Cost
(US$/ton)
Power
9.30
8.44
Labor
11.11
10.08
Maintenance
3.14
2.85
Consumables
7.09
6.43
Facility
3.34
3.03
Total
33.97
30.82
Source: i-80 Gold, 2026
Third-Party Autoclave Facility Operating Costs
Costs for third-party processing of sulfide material are covered by the toll milling agreement and consist of costs incurred by the third party
for processing, a treatment charge that varies based on the gold price and any penalties for material that does not meet the specifications of the contract.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
378
18.2.3
General and Administrative Costs
General and Administrative costs for this analysis are based on current Granite Creek actuals and forecasts and are categorized as follows:
•
Environmental - material, licenses, training and professional services
•
G&A – G&A payroll expenses, material, property tax and other general costs
•
Health and Safety - material, licenses, professional services and training
•
Human Resources – recruiting and human resources
•
Information Technology – information technology material, licenses and professional services.
General and Administrative staff at the operation consists of five personnel. Corporate costs are allocated to site
where appropriate when support is provided.
A summary of the average annual G&A cost build-up
is presented in Table 18-17. The LoM total G&A spend is US$49.9 million.
Table 18-17: Average Annual G&A Spend
Area
Unit
Value
Environmental
US$
M
0.7
G&A
US$
M
4.6
Health and Safety
US$
M
0.3
Human Resources
US$
M
0.0
Information Technology
US$
M
0.3
Total
US$
M
5.9
Source: SRK, 2026
US$M: US$ million
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
379
19
Economic Analysis
19.1
General Description
A cash flow model was prepared to evaluate the Granite Creek Project on a real basis. The model was developed on a monthly basis to match the
mine plan generated for this exercise from provided start date through the exhaustion of the Mineral Reserves. The indicative model results are summarized on an annual basis and presented in this section alongside the main assumptions used in the
model. The model results are presented in U.S. dollars (US$), unless otherwise stated. While the model inputs are primarily in imperial units, the model summary and results have been calculated in metric units. For the avoidance of confusion, both
unit systems are provided in the tables in this section.
The economic model is based on mine plans and other inputs that were prepared as
outlined in previous sections.
Capital and operating costs were developed in previous section and the
build-ups and the associated accuracy and contingencies can be found in those sections.
All
results and technical and cost information are presented in this section on a 100% basis reflective of i-80 Gold’s ownership unless otherwise stated.
As with capital and operating cost and pricing forecasts, the economic analysis is inherently a forward-looking exercise. These estimates rely
upon a range of assumptions and forecasts that are subject to change depending upon macroeconomic conditions, operating strategy and new data collected through future study and operation.
Basic Model Parameters
Key criteria used in the analysis are presented throughout this section. Basic model parameters are summarized in Table 19-1.
Table 19-1: Basic Model Parameters
Description
Value
TEM Time Zero Start Date
May 1, 2026
Operations Start
May 1, 2026
Mine Life
8.3 years
Discount Rate
5%
Source: SRK, 2026
All costs incurred prior to the model start date are considered sunk costs. The potential impact of these costs on the economics of the Project
is not evaluated. This includes contributions to depreciation and working capital as these items are assumed to have a zero balance at model start.
Closure costs are assumed to be incurred as a single cost at the end of the mine life.
The selected Project discount rate is 5%, as directed by i-80 Gold.
Foreign exchange impacts were deemed negligible as most, if not all, costs and revenues are denominated in US dollars.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
380
External Factors
Pricing
Modeled prices
are based on the prices developed in the Market Study section of this report. The prices are modeled as US$2,750/oz over the life of the Project.
All product streams produced by the operation are modeled as being subject to the price presented above.
Taxes and Royalties
As
modeled, the Project is subject to a federal income tax rate estimated at 21%. All expended capital is subject to depreciation. All capital depreciation in the model occurs via straight line method over an eight-year period.
Taxable income is adjusted by depletion which is calculated via cost depletion methodology and percentage depletion methodology appropriate to
the operation and varies depending upon the period of operation.
The property is subject to the Nevada Commerce Tax which is modeled at a
rate of 0.051% of the gross proceeds.
The Project is also subject to the Nevada Net Proceeds of Minerals Tax which is a sliding scale tax
applied to the net proceeds of the operation. The sliding scale is calculated from a ratio of net proceeds to gross proceeds. The applicable tax rate is presented in Table 19-2.
Table 19-2: Net Proceeds of Mineral Tax Sliding Scale
NP/GP Lower Limit
(%)
NP/GP Upper Limit
(%)
Tax Rate
(%)
10
—
2.0
18
10
2.5
26
18
3.0
34
26
3.5
42
34
4.0
50
42
4.5
50
4.5
Source: State of Nevada
Property tax has been included in the model and is captured in the G&A cost.
i-80 Gold has indicated that approximately US$46.7 million in existing loss carryforwards will
apply to the property. This amount is modeled as a loss carryforward opening balance.
The Project is subject to a number of royalties as
outlined in previous sections. These royalties vary in rate and area of influence. For modeling purposes a combined royalty rate of 7.5% is applied to all material through 2030. All material after that date is subject to a royalty of 9.0%. Royalty
costs total US$104 million over the life of the Project as modeled for this analysis.
Working Capital
The assumptions used for working capital in this analysis are as follows:
•
Accounts Receivable (A/R): 1 month delay
•
Accounts Payable (A/P): 1 month delay
•
Zero opening balance for A/R and A/P
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
381
Technical Factors
Mining Profile
The
modeled mining profile was developed by SRK. The details of mining profile are presented previously in this report. No modifications were made to the profile for use in the economic model. The modeled profile is presented in Figure 19-1 and Figure 19-2.
Source: SRK, 2026
Figure 19-1: Granite Creek Mining Profile (imperial)
Source: SRK, 2026
Figure 19-2: Granite Creek Mining Profile (metric)
Table 19-3 is a summary of the estimated mine production over a
9-year mine life for the operation. Ore mined refers to Proven and Probable Mineral Reserves.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
382
Table 19-3: Life-of-Mine Production Summary
LOM Mining
Unit
Value
Autoclave Ore Mined
tons
2,358,273
Oxide Ore Mined
tons
36,171
Total Ore Mined
tons
2,394,444
Autoclave Ore Mined
tonnes
2,139,392
Oxide Ore Mined
tonnes
32,814
Total Ore Mined
tonnes
2,172,206
Average Mined Autoclave Ore Grade
oz/ton
0.23
Average Mined Oxide Ore Grade
oz/ton
0.29
Average Mined Ore Grade
oz/ton
0.23
Average Mined Autoclave Ore Grade
g/t
7.85
Average Mined Oxide Ore Grade
g/t
10.02
Average Mined Ore Grade
g/t
7.88
Contained Autoclave Gold
ounces
539,738
Contained Oxide Gold
ounces
10,573
Contained Ore Gold
ounces
550,311
Stockpile
tons
28,930
Stockpile
tonnes
26,245
Stockpile Grade
oz/ton
0.21
Stockpile Grade
g/t
7.33
Stockpile Contained Gold
ounces
6,181
Source: SRK, 2026
Processing Profile
Material from the Project is processed at either NGM facilities or i-80 gold facilities through an
autoclave circuit or an oxide ore circuit. As i-80 Gold completes their processing facilities, ore will stop being shipped to NGM facilities for processing and will instead be shipped to i-80 Gold’s facilities for processing. The i-80 Gold processing facility is expected to be operational in January 2028. In July 2027, Granite Creek will stop shipping
ore to NGM facilities and ore will instead be stockpiled at thei-80 processing facility. Once the facility comes on-line with an expected 2,500 tons per day capacity the
stockpile will be drawn down and processed alongside the direct feed ore. All ore mined or in stockpiles is processed as outline above. The resulting production profile is presented in Figure 19-3.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
383
Source: SRK, 2026
Figure 19-3: Granite Creek Processing Profile
A summary of the modeled LoM processing profile is presented in Table 19-4.
Table 19-4: Granite Creek Processing Summary
LOM Processing
Unit
Value
Autoclave
Ore Ounces Processed
ounces
545,919
Recovery
%
87.6%
Recovered Ore Ounces
ounces
478,095
Oxide
Ore Ounces Processed
ounces
10,573
Recovery
%
68.9%
Recovered Ore Ounces
ounces
7,284
Total
Total Ounces Processed
ounces
556,492
Recovery
%
87.2%
Total Ounces Recovered
ounces
485,379
Source: SRK, 2026
Operating Costs
Operating
costs are modeled in US dollars and can be categorized as mining, surface, power, processing and G&A costs. No contingency amounts have been added to the operating costs within the model. A summary of the operating costs over the life of the
operation is presented in Figure 19-4. Operating costs total US$900.7 million over life of mine at a rate of US$371.67/ton processed (US$409.69/t processed).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
384
Source: SRK, 2026
Figure 19-4: LoM Operating Cost Summary
The contributions of the different operating cost segments over the life of the operation are presented in Figure 19-5.
Source: SRK, 2026
Figure 19-5: LoM Operating Cost Contributions
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
385
Mining
The mining cost profile was developed external to the model and incorporated into the model as a fixed cost. The result of this approach is
presented in Table 19-5.
Table 19-5: Granite Creek
Mining Cost Summary
LoM Mining Costs
Unit
Value
Mining Cost (w/o power)
US$M
395.98
US$
/ton mined
165.38
US$
/t mined
182.30
Source: SRK, 2026
US$M: US$ million
Processing
Processing costs were developed external to the model and incorporated into the model as variable costs. Ore transportation costs were included
in the processing costs for modelling purposes. The result of this approach is presented in Table 19-6.
Table 19-6: Granite Creek Processing Costs
LoM Processing Costs
Unit
Value
Processing Cost
US$
M
304.21
US$
/ton processed
125.53
US$
/t processed
138.37
Source: SRK, 2026
US$M: US$ million
Surface
Costs
Surface Costs were developed external to the model and incorporated on a fixed basis. The result of this approach is
presented in Table 19-7.
Table 19-7: Granite Creek
Surface Costs
LoM Surface Costs
Unit
Value
Surface Cost (w/o power)
US$
M
117.85
US$
/ton mined
49.22
US$
/t mined
54.25
Source: SRK, 2026
US$M: US$ million
Power
Costs
Power consumption for surface and underground was calculated external to the model and incorporated into the model on a
fixed basis. A power cost of US$0.08/kwH was applied in the model. The result of this approach is presented in Table 19-8.
Table 19-8: Granite Creek Power Costs
LoM Power Costs
Unit
Value
Power Cost
US$
M
32.77
US$
/ton mined
13.69
US$
/t mined
15.09
Source: SRK, 2026
US$M: US$ million
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
386
G&A
G&A was calculated external to the model and incorporated into the model on a fixed basis. The result of this approach is presented in Table 19-9.
Table 19-9: Granite Creek G&A Costs
LoM G&A Costs
Unit
Value
G&A Cost
US$
M
49.87
US$
/ton processed
20.58
US$
/t processed
22.68
Source: SRK, 2026
US$M: US$ million
Selling
Costs
Selling costs consist of the transport costs associated with moving the operation’s product to the selling point
refining charges incurred. Doré refining and freight costs are modeled as follows:
•
99.75% payable Au
•
US$1.77/troy oz Au refining cost
•
US$3.69/troy ounce transportation cost
Capital Costs
Sustaining capital estimates were developed external to the model as outlined in the previous sections. No additional contingency has been
included in the model. General closure costs are modeled as sustaining capital and are captured as a one-time payment the year following cessation of operations.
Total sustaining capital is presented in Table 19-10.
Table 19-10: Modeled Sustaining Capital
Capital Costs
Unit
Value
Mine Capex
US$
M
60.74
Autoclave Capex Allocation
US$
M
49.33
Surface Capitalized Costs
US$
M
22.19
Closure
US$
M
12.66
Total
US$
M
144.92
Source: SRK, 2026
The modeled capital profile is presented in Figure 19-6.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
387
Source: SRK, 2026
Figure 19-6: Granite Creek Sustaining Capital Profile
19.2
Results
The economic analysis metrics are prepared on annual after-tax basis in US dollars. The results of the
analysis are presented in Table 19-11. The results indicate that at a gold price of US$2,750 the after tax NPV @ 5% is US$118 million. As the Project is in operation, IRR and payback timeframe are not
relevant metrics.
Table 19-11: Indicative Economic Results
LOM Cash Flow
Unit
Value
Total Revenue
US$
M
1,328.81
Royalty
US$
M
(104.47
)
Total Opex
US$
M
(900.68
)
Operating Margin
US$
M
323.65
Operating Margin Ratio
%
24
%
Taxes Paid
US$
M
(25.35
)
Free Cash Flow
US$
M
153.38
Before Tax
Free Cash Flow
US$
M
178.73
NPV @ 5%
US$
M
137.66
NPV @ 7.5%
US$
M
120.98
NPV @ 10%
US$
M
106.39
After Tax
Free Cash Flow
US$
M
153.38
NPV @ 5%
US$
M
117.55
NPV @ 7.5%
US$
M
102.97
NPV @ 10%
US$
M
90.19
Source: SRK, 2026
US$M: US$ million
The Project
does not generate positive free cashflow in 2026 and 2027 largely due to the higher processing costs incurred as a result of third-party processing of ore and a six-month stockpiling period in 2027. Cashflow
is forecast to be negative at the end of the operational life as the operation winds down, and closure costs are incurred.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
388
This estimated cash flow is inherently forward-looking and dependent upon numerous
assumptions and forecasts, such as macroeconomic conditions, mine plans and operating strategy, that are subject to change.
The life of
mine AISC cost is estimated at US$2,375/oz Au.
The economic result and back-up chart information
for the charts withing this section are presented on an annual basis in Table 19-12 and Figure 19-7.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
389
Table 19-12: Economic Results – Tabular
Data
Cashflow Model Data Summary
Granite Creek
Period Start
1-May-26
1-Jan-27
1-Jan-28
1-Jan-29
1-Jan-30
1-Jan-31
1-Jan-32
1-Jan-33
1-Jan-34
Period End
31-Dec-26
31-Dec-27
31-Dec-28
31-Dec-29
31-Dec-30
31-Dec-31
31-Dec-32
31-Dec-33
31-Dec-34
Calendar Year
Total
2026
2027
2028
2029
2030
2031
2032
2033
2034
Cashflow
Income
Net Revenue
USD
1,328,812,296
97,853,880
64,222,781
275,823,877
198,447,769
181,837,035
204,880,336
167,489,136
104,443,793
33,813,689
Total
USD
1,328,812,296
97,853,880
64,222,781
275,823,877
198,447,769
181,837,035
204,880,336
167,489,136
104,443,793
33,813,689
Operational Expenditure
Fixed
USD
(563,700,553
)
(43,427,268
)
(59,957,658
)
(73,417,431
)
(78,752,715
)
(77,217,002
)
(79,732,922
)
(69,599,378
)
(53,205,072
)
(28,391,108
)
Variable
USD
(336,984,135
)
(42,858,496
)
(33,990,592
)
(56,739,659
)
(44,889,267
)
(39,861,250
)
(45,734,756
)
(37,837,640
)
(25,792,531
)
(9,279,945
)
Total
USD
(900,684,688
)
(86,285,764
)
(93,948,250
)
(130,157,090
)
(123,641,981
)
(117,078,251
)
(125,467,678
)
(107,437,017
)
(78,997,603
)
(37,671,052
)
Royalty
USD
(104,473,217
)
(7,251,737
)
(4,641,556
)
(20,029,635
)
(14,427,325
)
(13,253,919
)
(17,983,111
)
(14,697,023
)
(9,203,789
)
(2,985,125
)
Working Capital Adjustment
USD
0
(5,311,948
)
10,960,294
(7,793,197
)
(1,214,654
)
(6,589,214
)
(1,682,841
)
9,844,588
(1,211,660
)
2,998,633
Capital Costs
Mine Capex
USD
(60,739,069
)
(16,606,202
)
(11,785,494
)
(10,306,973
)
(6,693,201
)
(4,364,800
)
(4,364,800
)
(4,364,800
)
(2,252,800
)
—
Autoclave Capex Allocation
USD
(49,326,013
)
—
(2,952,940
)
(8,577,679
)
(8,568,711
)
(7,505,803
)
(8,743,674
)
(7,106,626
)
(4,568,008
)
(1,302,572
)
Surface Capitalized Costs
USD
(22,194,094
)
(15,617,998
)
(3,370,385
)
(1,708,365
)
(612,736
)
(524,157
)
(345,033
)
(15,419
)
—
—
Closure
USD
(12,660,000
)
—
—
—
—
—
—
—
—
(12,660,000
)
Total
USD
(144,919,176
)
(32,224,199
)
(18,108,819
)
(20,593,017
)
(15,874,648
)
(12,394,760
)
(13,453,508
)
(11,486,845
)
(6,820,808
)
(13,962,572
)
Cashflow Before Funding
USD
178,730,749
(33,219,769
)
(41,515,550
)
97,250,781
43,288,839
32,520,495
46,292,558
43,710,407
8,209,683
(17,806,693
)
Cashflow Before Tax
USD
178,730,749
(33,219,769
)
(41,515,550
)
97,250,781
43,288,839
32,520,495
46,292,558
43,710,407
8,209,683
(17,806,693
)
Tax Paid
USD
(25,352,526
)
(169,482
)
(167,309
)
(5,099,687
)
(3,232,502
)
(4,586,767
)
(6,543,604
)
(5,279,478
)
(184,483
)
(89,216
)
Net Cashflow
USD
153,378,223
(33,389,251
)
(41,682,859
)
92,151,094
40,056,337
27,933,729
39,748,954
38,430,929
8,025,200
(17,895,909
)
Ounces Payable
ounces
484,166
35,654
23,400
100,499
72,306
66,254
74,650
61,026
38,055
12,320
Gold Price
USD/
oz
2,750
2,750
2,750
2,750
2,750
2,750
2,750
2,750
2,750
2,750
Cash Cost
Royalty and Operating Cost
USD
1,005,157,905
93,537,501
98,589,806
150,186,725
138,069,306
130,332,171
143,450,789
122,134,040
88,201,392
40,656,177
Cash Cost
USD
1,005,157,905
93,537,501
98,589,806
150,186,725
138,069,306
130,332,171
143,450,789
122,134,040
88,201,392
40,656,177
Cash Cost
USD/
oz
2,076
2,623
4,213
1,494
1,910
1,967
1,922
2,001
2,318
3,300
All-in Sustaining Cost
Cash Cost
USD
1,005,157,905
93,537,501
98,589,806
150,186,725
138,069,306
130,332,171
143,450,789
122,134,040
88,201,392
40,656,177
Sustaining Capital
USD
144,919,176
32,224,199
18,108,819
20,593,017
15,874,648
12,394,760
13,453,508
11,486,845
6,820,808
13,962,572
All-in Sustaining Cost
USD
1,150,081,546
125,761,700
116,698,625
170,779,899
153,944,276
142,727,326
156,904,937
133,623,317
95,022,450
54,619,015
All-in Sustaining Cost
USD/
oz
2,375
3,527
4,987
1,699
2,129
2,154
2,102
2,190
2,497
4,433
Project Cashflow (unfinanced)
Revenue
USD
1,328,812,296
97,853,880
64,222,781
275,823,877
198,447,769
181,837,035
204,880,336
167,489,136
104,443,793
33,813,689
Operating Cost
USD
(900,684,688
)
(86,285,764
)
(93,948,250
)
(130,157,090
)
(123,641,981
)
(117,078,251
)
(125,467,678
)
(107,437,017
)
(78,997,603
)
(37,671,052
)
Working Capital Adjustment
USD
0
(5,311,948
)
10,960,294
(7,793,197
)
(1,214,654
)
(6,589,214
)
(1,682,841
)
9,844,588
(1,211,660
)
2,998,633
Royalty
USD
(104,473,217
)
(7,251,737
)
(4,641,556
)
(20,029,635
)
(14,427,325
)
(13,253,919
)
(17,983,111
)
(14,697,023
)
(9,203,789
)
(2,985,125
)
Sustaining Capital
USD
(144,919,176
)
(32,224,199
)
(18,108,819
)
(20,593,017
)
(15,874,648
)
(12,394,760
)
(13,453,508
)
(11,486,845
)
(6,820,808
)
(13,962,572
)
Tax Paid
USD
(25,352,526
)
(169,482
)
(167,309
)
(5,099,687
)
(3,232,502
)
(4,586,767
)
(6,543,604
)
(5,279,478
)
(184,483
)
(89,216
)
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
390
Project Net Cashflow
USD
153,378,223
(33,389,251
)
(41,682,859
)
92,151,094
40,056,337
27,933,729
39,748,954
38,430,929
8,025,200
(17,895,909
)
Cumulative Net Cashflow
USD
(33,389,251
)
(75,072,111
)
17,078,984
57,135,320
85,069,049
124,818,003
163,248,932
171,274,132
153,378,223
Operating Cost (LOM)
Mining Cost
USD
395,983,226
33,170,017
40,658,268
52,583,668
56,857,053
55,329,645
57,780,356
48,306,983
35,362,501
15,934,735
Surface Costs
USD
117,851,064
7,026,057
13,480,558
14,925,111
15,626,448
15,719,939
15,978,152
15,154,514
12,020,119
7,920,165
G&A
USD
49,866,263
3,231,194
5,818,831
5,908,652
6,269,214
6,167,417
5,974,413
6,137,881
5,822,452
4,536,208
Power Costs
USD
32,773,646
1,836,886
3,328,773
3,711,340
4,126,599
4,174,254
4,179,053
4,154,765
4,152,659
3,109,316
Processing Costs
USD
304,210,489
41,021,610
30,661,819
53,028,319
40,762,668
35,686,995
41,555,702
33,682,875
21,639,872
6,170,629
Total Opex
USD
900,684,688
86,285,764
93,948,250
130,157,090
123,641,981
117,078,251
125,467,678
107,437,017
78,997,603
37,671,052
Mining Profile
Autoclave Ore Mined
tons
2,358,273
178,372
211,605
364,078
363,697
318,582
371,124
301,639
193,888
55,287
Oxide Ore Mined
tons
36,171
8,531
12,885
5,147
3,623
2,764
2,862
359
—
—
Autoclave Ore Mined
tonnes
2,139,392
161,816
191,965
330,286
329,941
289,013
336,678
273,643
175,893
50,156
Oxide Ore Mined
tonnes
32,814
7,739
11,689
4,669
3,287
2,508
2,596
326
—
—
Autoclave Ore Grade
oz/ton
0.23
0.22
0.22
0.22
0.22
0.23
0.23
0.23
0.24
0.27
Oxide Ore Grade
oz/ton
0.29
0.34
0.24
0.35
0.26
0.31
0.28
0.09
—
—
Autoclave Ore Grade
g/t
7.85
7.52
6.11
6.31
6.35
6.63
6.48
6.62
6.66
7.57
Oxide Ore Grade
g/t
10.02
9.72
6.89
9.97
7.47
8.86
7.99
2.58
—
—
Autoclave Ore Ounces Mined
ounces
539,738
39,139
45,825
81,471
81,810
74,850
85,274
70,767
45,768
14,835
Oxide Ore Ounces Mined
ounces
10,573
2,939
3,145
1,818
959
868
811
33
—
—
Production Profile
Autoclave Gold Recovered
ounces
478,095
34,352
22,138
98,172
71,766
65,778
74,231
61,158
38,150
12,351
Oxide Gold Recovered
ounces
7,284
1,392
1,321
2,579
721
643
606
22
—
—
Gold Price
USD/
oz
2,750
2,750
2,750
2,750
2,750
2,750
2,750
2,750
2,750
2,750
Cash Cost
USD/
oz
2,076
2,623
4,213
1,494
1,910
1,967
1,922
2,001
2,318
3,300
AISC
USD/
oz
2,375
3,527
4,987
1,699
2,129
2,154
2,102
2,190
2,497
4,433
Capital Cost
Mine Capex
USD
60,739,069
16,606,202
11,785,494
10,306,973
6,693,201
4,364,800
4,364,800
4,364,800
2,252,800
—
Autoclave Capex Allocation
USD
49,326,013
—
2,952,940
8,577,679
8,568,711
7,505,803
8,743,674
7,106,626
4,568,008
1,302,572
Surface Capitalized Costs
USD
22,194,094
15,617,998
3,370,385
1,708,365
612,736
524,157
345,033
15,419
—
—
Closure
USD
12,660,000
—
—
—
—
—
—
—
—
12,660,000
Total
USD
144,919,176
32,224,199
18,108,819
20,593,017
15,874,648
12,394,760
13,453,508
11,486,845
6,820,808
13,962,572
Source: SRK, 2026
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
391
Source: SRK, 2026
Figure 19-7: Annual Cash Flow Summary
19.3
Sensitivity Analysis
A sensitivity analysis was performed to determine the relative sensitivity of the Project’s NPV to a number of key parameters (Figure 19-8). This is accomplished by flexing each parameter upwards and downwards by 10%. Within the constraints of this analysis, the Project appears to be most sensitive to metal price recovery assumptions within the
processing plant and mined grades.
SRK cautions that this sensitivity analysis is for information only and notes that these parameters
were flexed in isolation within the model and are assumed to be uncorrelated with one another which may not be reflective of reality. Additionally, the amount of flex in the selected parameters may violate physical or environmental constraints
present at the operation.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
392
Source: SRK, 2026
Figure 19-8: Sensitivity Analysis
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
393
20
Adjacent Properties
Most of the mineral rights surrounding Granite Creek are owned or controlled by Nevada Gold Mines. The only reported mining activities adjacent
to Granite Creek were conducted by Nevada Gold Mines at the Turquoise Ridge Complex (TRC) where approximately 28 Moz Au have been produced since 1938 to 2023 (Figure 20-1). The TRC is in Humboldt County,
approximately 64 km (40 mi) northeast of Winnemucca and approximately 10 km (6 mi) north of the Granite Creek Mine. Historic and current production at TRC includes open-pit and underground mining.
Source: Barrick, 2024
Figure 20-1: Summary of Gold Production at Turquoise Ridge (as reported by Barrick 2024)
Deposits that compose the TRC are Carlin-type, structurally and stratigraphically controlled and sediment-hosted. They contain disseminated micrometer-sized gold occurring on arsenic-rich pyrite rims, primarily within decalcified, carbonaceous rocks. Preferred host lithologies for gold mineralization are the Comus Formation, followed by the Valmy and
Etchart Formations. Sub-microscopic gold mineralization is associated with arsenian pyrite, quartz, calcite, realgar, and orpiment. Gold mineralization is likely Eocene in age, and it is overprinted in some
areas by a late stage of realgar, orpiment, and calcite. Gold-bearing zones can be located close to granodiorite and dacite dikes and beneath basaltic sills, evidencing the importance of rheologic contacts to mineralization (Barrick., 2024). The
most recent public disclosure of the Mineral Resources and Mineral Reserves for the Project are reported in the technical report entitled “NI 43-101 Technical Report on the Turquoise Ridge Complex
Humbolt County, Nevada, USA”, dated March 15, 2024, with an effective date of December 31, 2023. A summary of the Mineral Resource and Mineral Reserve statements are shown in Figure 20-2 and
Figure 20-3. The QP has been unable to verify the information on production,
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
394
mineral resources and mineral reserves included for the adjacent properties. This type of adjacent property information is not necessarily indicative of the mineralization at Granite Creek. In
addition, the QP is not aware of any declared mineral resource that might have an impact on Granite Creek’s Mineral Resources, Mineral Reserves or mining operations.
Source: Barrick, 2024
Figure 20-2: Barrick Mineral Resource Statement for Turquoise Ridge (effective date
December 31, 2023) – reported on 100% basis
Source: Barrick, 2024
Figure 20-3: Barrick Mineral Reserve Statement for Turquoise Ridge (effective date December 31,
2023) – reported on 100% basis
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
395
21
Other Relevant Data and Information
There is no other relevant data or information necessary to make this Technical Report Summary understandable and not misleading beyond what
has already been disclosed in the preceding items of this report.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
396
22
Interpretation and Conclusions
Drilling
A total
of 2,083 drillholes for 291,312 m (955,748 ft) have been completed at the Property since 1970 by successive operators, including PMC and its predecessors, Homestake, Barrick, and Atna. Since acquiring the Property in 2021, i-80 Gold has completed a further 1,083 drillholes for 123,804 m (406,181 ft) within the current property boundary, comprising 438 core holes for 93,552 m (306,929 ft) (including RC
pre-collars with core tails) and 645 RC holes for 30,252 m (99,252 ft).
The i-80 drilling has completed definition and infill of the underground Ogee, Otto, and SPZ mineralization, and has expanded substantially year on year: approximately 69 holes in 2021, 154 in 2022, 278 in 2023, 185 in
2024, and 379 in 2025, the latter marking the introduction of underground production drilling alongside continuing surface drilling. Drilling continued into Q1 2026 as the tail of the 2025 deep SPZ infill campaign together with the start of a new
exploration program targeting the Ogee, Otto, Adam Peak, and Range Front fault systems. All holes supporting the current estimate were drilled between April 2021 and January 2026, with complete assay results returned by February 17, 2026, the
database cut-off date for this study.
Surface holes are generally
pre-collared using RC to the water table and completed with HQ-diameter core; underground holes have been drilled entirely as HQ core. Two RC water wells and one RC
piezometer were also drilled and sampled. Short-term ore-control RC drilling completed with a Cubex rig is used by mine geologists for grade-control decisions only and is not merged into the resource database.
A separate geotechnical drilling program of approximately 6,100 m (20,000 ft) across 40 holes has been completed to support underground
mine design, incorporating Rock Mass Rating logging, acoustic televiewer surveys in 11 holes, and dedicated geotechnical holes for the VR1 and VR2 vent raises.
Core recovery across the i-80 programs is reported at 99% or greater, with recorded core loss limited
to short intervals where voids are present in the stratigraphy. Sample intervals are assigned by the project geologist and are not permitted to cross geological, alteration, or oxidation boundaries, and do not exceed 3.05 m (10 ft); average core
sample length from 2023 through Q1 2026 has been 1.25 to 1.46 m (4.1 to 1.5 m (4.8 ft)), with nominal 0.61 to 1.52 m (2 to 2 m (5 ft)) intervals through mineralized zones. Downhole surveys are completed on all holes at 15.25 m (50 ft) intervals by
an independent contractor using north-seeking gyroscopic tools, and all geological and geotechnical logging is recorded directly into the acQuire database management system. Sample security and chain of custody are maintained from the drill site
through to the laboratory, with no chain-of-custody breaches reported over the period.
No QA/QC data is available for the pre-2005 portion of the historical dataset; however, the volume of
subsequent drilling completed under the modern QA/QC framework is sufficient to support the MRE without exclusive reliance on the unverified historical data, and therefore it is the QP’s opinion that it is not material.
Drilling programs completed at the Property between 2005 and 2015 incorporated QA/QC monitoring through the insertion of CRMs, blanks, and
duplicates. These programs were reviewed by the prior QPs, most recently by GRE (2025), which found no material errors and concluded the historical assay database to be acceptable for Mineral Resource estimation, subject to observations on insertion
rates and duplicate precision typical of programs of that era. The QP has also reviewed this data and agrees with these conclusions.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
397
Since 2021, and formalized from the 2023 program onward,
i-80 has operated a four-stream QA/QC program comprising CRMs, coarse blanks, field duplicates, and preparation duplicates, supplemented by independent third-party check assays. The program targets an overall
control-sample insertion rate of 20% of submitted samples. The 2021 and 2022 programs operated under a transitional framework at aggregate rates of approximately 13% to 21%. Sample preparation and analysis have been performed throughout by
independent ISO/IEC 17025-accredited commercial laboratories, being ALS through 2024 and MSA Labs as principal laboratory from 2025.
CRM
performance, assessed at two and three standard deviations of the certified mean, showed no consistent bias across the principal standards used. i-80 2,353 blanks inserted over the i-80 era, 89.8% returned values below the 5x lower-limit-of-detection design threshold; applying a materiality floor at 10x detection
limit, consistent with the QP’s assessment of what constitutes material contamination, raises the effective pass rate to >92.5% with the majority of the failures concentrated in batches assayed at the Lone Tree in-house laboratory rather than distributed across the independent commercial laboratories.
Duplicate
performance was assessed against tolerance envelopes derived using the Thompson and Howarth (1978) framework, with preparation duplicates returning an R-squared of 0.99 across the program and 0.9997 in Q1
2026, which indicates a strong correlation between laboratories. There is, a gap in Third-party check assays programs between 2023 and early 2024, which the QP discussed with i-80, and it was noted as a
datatype labelling issue in the database versus a lack of submissions. This is recommended to be addressed in the database. The program recommenced, and the data labelling fixed from 2025; across the full population of 543 check samples from 49
holes, the mean bias is -6.5% and the median -3.5% relative to the primary assay, with 75.3% of pairs agreeing within plus or minus 10%, which the QP on review has
deemed acceptable.
The transition of the primary gold method from conventional fire assay to Chrysos Photon Assay in 2025 was
independently validated by the QP in a three-way comparison against conventional Fire Assay and Screen Fire Assay, returning coefficients of determination in excess of 0.994 against both reference methods with
a small positive bias in the Photon Assay results that is mechanistically explained by, and consistent with, the substantially larger effective sample mass analyzed. The QP separately compared the assay database against original laboratory
certificates across 138 certificate files and 14,127 sample rows, confirming a 99.90% match on gold values for the 7,188 directly comparable samples; the small number of residual items were resolved as laboratory
re-run reconciliations or database ingest gaps of negligible grade impact and have been provided to i-80 for correction.
It is the QP’s opinion that the drilling and sampling completed at Granite Creek are of a type, quantity, quality, and spatial
distribution appropriate to the style of mineralization, and that the drilling, sampling, sample preparation, analytical, and security procedures applied across both the historical and i-80 programs are
adequate and reasonable for use in the Mineral Resource estimation process. The QP further considers the resulting database adequate to support the Mineral Reserve estimate and the technical disclosures presented in this Report, consistent with
Society for Mining, Metallurgy and Exploration (2017) and the disclosure requirements of S-K 1300.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
398
Environmental and Permitting
The environmental and permitting information reviewed indicates that Granite Creek is well characterized and currently operating under an
established, in-good-standing permit base, supporting reasonable confidence that environmental and permitting factors will not materially disrupt continued operations or the reliability of the underlying
resource and reserve estimates. The principal uncertainty affecting projected economic outcomes is the 2025 discovery of petroleum-contaminated soil in the CX Pit backfill: because the extent of contamination is not precisely known, remediation
could require re-handling of up to 1.17 million tons of waste rock at a cost that is not yet quantified, and this remains an open-ended exposure until Osgood and NDEP-BMRR finalize a management plan. A
related, lower-order uncertainty is the site’s reclamation and closure cost estimate (US$8.64 million), which reflects a government cost model rather than Osgood’s actual self-performed costs, will be revised at the next three-year bond
review (2028 to 2029), and may shift further as site conditions evolve ahead of the anticipated 2032 closure. Ongoing management of elevated arsenic and antimony in site water, and the designated status of the Kelly Creek hydrographic basin under
Nevada water law, add continuing operating costs and a modest constraint on securing incremental water rights, respectively, but neither is expected to limit the project’s ability to operate under its existing permits. None of these risks and
uncertainties are considered reasonably likely to threaten the project’s overall economic viability, as they are cost and scheduling matters addressable through established treatment technologies and routine regulatory processes rather than
threats to continued permitting, access, or operation of the Project.
Metallurgy
Granite Creek underground samples were refractory with baseline CIL gold recoveries ranging from 9% to 46%, averaging 31%;
Shake flask tests with gold cyanide spikes were used to determine preg robbing index. The average preg-robbing index was 17.9%, ranging from
4.4% to 54.1%.;
Bench top autoclave batch pressure oxidation tests were completed on all samples with 2 sets of acid conditions and four
sets of alkaline conditions. Acid conditions resulted in higher sulfur oxidations and higher gold recoveries;
Three continuous pressure
oxidation runs were completed with two acid and one alkaline sets of conditions based on the batch results. The continuous results followed the results of the batch tests with the acid conditions producing higher sulfur oxidations and gold
recoveries. High acid additions required for high carbonate samples resulted in lower sulfide oxidation and pressure oxidation viscosity issues;
Overall gold recoveries increased with increasing sulfur oxidation;
Cyanide destruction tests on CIL tailings using the SO2/air process reduced weak acid
dissociable cyanide concentrations to below 5 mg/L using established reagent addition rates and retention time;
Thickening and filtration
tests on CIL tailings showed high thickening unit area requirements and low filtration rates.
Arsenic concentrations in the samples
averaged 0.29%, largely occurring as arsenian pyrite with only trace amounts of arsenopyrite.
Sulfide minerals were predominantly pyrite
with some marcasite.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
399
Mercury concentrations ranged from 31 ppm to 138 ppm, averaging 81 ppm. These concentrations
will require mercury capture and abatement equipment in the process flowsheet.
Sample Representativity
Samples were selected to provide spatial and grade representation of three zones in the Granite Creek underground deposit as seen in Figure 10-16 and Figure 10-17. The samples’ metallurgical response is likely to represent the zone’s general behavior, but additional sampling of each zone to confirm the
metallurgical response will reduce uncertainty. The 33 samples tested in the FLS and SGS programs provide the required coverage for this study. Grade distributions of the samples as outlined in section 13.2.2, reflect grade distributions with the
resource.
Test Work on Underground Samples
The two recent testwork programs and one historical program confirm that refractory Granite Creek samples are amenable to pressure oxidation
followed by CIL to provide acceptable gold recoveries. While the samples respond to both alkaline and acid pressure oxidation, superior recoveries were achieved with acid pressure oxidation. The results confirm that Granite Creek production can be
processed through the Lone Tree acid pressure oxidation conditions once restarted. The testwork also confirmed that Granite Creek production can be processed through acid pressure oxidation at third party processors.
Mineral Resources
The Mineral Resource for the Granite Creek deposit comprises both open pit and underground components. These have been estimated separately by
GRE (open pit) and SRK (underground) using block modeling methods appropriate to each mining environment.
The open pit Mineral Resource
was estimated by GRE and remains unchanged in terms of input technical information, drilling and sampling from the previously disclosed estimate; however, GRE has updated the assessment of reasonable prospects for economic extraction (RPEE) to
reflect the updated resource gold price. The Mineral Resources for the Granite Creek open pit mine project were estimated in conformity with the Society for Mining, Metallurgy and Exploration (2017) guidelines and are reported in accordance
with the S-K 1300. This mineral resource estimate includes Inferred Mineral Resources. Inferred resources are defined as resources that are “…reasonably expected that the majority of the Inferred
Mineral Resources could be upgraded to indicated.” by additional drilling. There is also no certainty that the Inferred Mineral Resources will be converted to the Measured or Indicated categories through further drilling or into Mineral
Reserves, once economic considerations are applied. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resource will be converted into Mineral
Reserves. The project presently has no Mineral Reserves. Whittle Pit optimization was applied to the open pit mineral resource estimate to assess the reasonable prospects for economic extraction for the resource.
In the opinion of the QP, the Mineral Resource model presented in this report is representative of the informing data, which is of sufficient
quality and quantity to support the Mineral Resource estimate to the classifications applied.
The underground Mineral Resource has been
estimated by SRK Consulting. SRK completed the MRE process using the updated exploration database which targeted the underground operation completed by i-80.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
400
The open pit Mineral Resource was estimated by GRE, and remains unchanged in terms of input
technical information, drilling and sampling from the previously disclosed estimate; however, GRE has updated the assessment of reasonable prospects for economic extraction (RPEE) to reflect the updated resource gold price. The effective date of
both the open pit and underground MREs is March 31, 2026.
For the underground Mineral Resource, which is the focus of current mining
and near-term development, mineralization is modeled within three principal structurally controlled domains: Ogee, Otto, and the SPZ, with a fourth smaller domain defined in the SPZhw, located above the CX West Fault. Each of these is subdivided
into high-grade (HG) and low-grade (LG) sub-domains.
Domain boundaries were defined using indicator grade shells at a nominal 0.5 g/t
(0.015 oz/st) Au threshold for the low-grade and 1.5 to 2.5 g/t (0.073 oz/st) Au for the high-grade (refined using an ISO-value of approximately 0.44 to 0.45 probability). The domains have been constrained
geologically by key structural elements including the CX West Fault, Range Front Fault, and the interpreted domain boundaries A, B, and C. These interpretations were cross-checked against underground grade-control data and verified during the
QP’s site inspection of active mine headings.
Gold grades were estimated using capped 1.53 m (5 ft) composites and a combination of
Ordinary Kriging and Inverse Distance Weighting. Search orientations and variogram models were aligned with the principal fault and vein orientations that control each domain. Gold grade continuity supports the use of orientated domain-specific
variogram models for the Ogee, Otto, and SPZ (HG and LG) domains. Whereas sample density in the SPZhw sub-domain was insufficient to support a robust directional variograms and therefore omni-directional variograms were applied. Estimation
parameters were refined using Kriging Neighborhood Analysis (KNA), resulting in a first-pass search using 9–12 composites (maximum 4 composites per hole, reduced to 3 in the final pass, which equates to a minimum of 3 holes in the first pass
and 2 holes in the second and third passes).
Geometallurgical parameters (cyanide-soluble gold, total organic carbon [TOC], preg-robbing
indices [PregRob], sulfide sulfur, and carbonate [CO₃]) were estimated within the same domain framework and using the same orientation concepts as gold. These estimates were supplemented with underground muck-sample data to improve local
coverage, particularly in the upper Ogee and Otto areas where exploration-drilling coverage for these parameters is limited. Oxide and sulfide boundaries have been defined based on visual logging of the drilling which were interpretated using
indicator values for the highest oxidation state, which was then combined with additional oxide domain models provided by i-80, with the results compared to the logging and sulfur grades for confirmation.
Block model validation, including visual checks, statistical comparisons, and swath-plot comparisons against composites and Nearest Neighbor
(NN) estimates, indicates no material local bias existed based on the comparison of the declustered composite mean, nearest neighbor and block estimates. High-grade domain estimates are within approximately 5% of declustered composite means.
Mineral Resources are classified as Measured, Indicated, or Inferred in accordance with the SME Definition Standards (SME, 2017), based on
drilling density, the number of composites and drillholes informing each block estimate, and geostatistical confidence measures (estimation variance and slope of regression).
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
401
Resources are reported on a diluted basis within stope shapes generated MSO (Deswik MSO), at
an average cut-off grade of 3.38 to 9.81 g/t (0.286 oz/st) Au, based on a gold price of US$3,250/oz, variable recoveries (range between 37.2 % to 97.0 % for the autoclave and 30.0 % to 86.5 % for the oxide material) and
reasonable assumptions for mining, processing, and general and administrative costs.
It is the QP’s opinion that the underground and
open pit MREs for Granite Creek are based on adequate exploration and production data, utilize estimation methods and classification criteria appropriate for the style of mineralization, and are reasonable for public disclosure as Mineral Resources
under NI 43-101. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
Mineral
Reserves
Mineral Reserves were classified using the Society for Mining, Metallurgy and Exploration (2017) Standards for
Mineral Resources and Mineral Reserves. Indicated Mineral Resources were converted to Probable Mineral Reserves by applying the appropriate modifying factors, as described herein, to potential mining shapes created during the mine design process. In
the same manner, Measured Mineral Resources were converted to Proven Mineral Reserves.
Mineral Reserves are subject to risks typically
associated with drift and fill operations. These risks could affect the reserves and include, but are not limited to, the following:
•
Differences between the Mineral Reserves metal price assumption and actual metal prices.
•
Changes in the interpretation of the deposit geometry and continuity.
•
Changes to the estimated gold grades for the deposit.
•
Changes to mining, processing, and G&A costs used to determine the
cut-off grade.
•
Changes to metallurgical recovery rates.
•
Changes in the geotechnical assumptions leading to potential impacts to schedule, dilution and/or mining
recovery.
•
Changes to mining method in portions of the deposit.
•
Assumptions related to ongoing access to the site, retention of mineral tenure, obtaining necessary
environmental, mining, and other regulatory permits, and maintaining a social license to operate with relevant stakeholders.
Mining and Infrastructure
Mining
Mine
infrastructure has been completed. Production ramp up has reached approximately 600 ore tons per day. The mining contractor is in place with the full complement of equipment and personnel.
Decline development has accessed 700 vertical ft of mineralization of the Otto and Ogee zones. Development has reached the top of the SPZ
allowing additional active production stopes.
The drill lateral drift over the SPZ has been completed.
Reconciliation of the model to mill indicates process head ounces exceed model by 19%. This appears to be from mining in a larger low-grade halo around high grade core.
Processed grade is lower than the
life-of-mine planned grade due to extensive mining of marginal mineralization below the economic cut-off grade.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
402
Mine Ventilation
After a comprehensive review of ventilation data and analysis, WSP concludes that the recommendations in this report are adequate to support
pre-feasibility level design. WSP’s experience indicate that these methods and design parameters are in line with best practices at other successful operations in the region. i-80 has been operating the
Granite Creek Mine since 2022 without major complications. In addition, the technical staff and mining workforce draw from extensive experience in the region, further increasing the confidence in successfully mining the South Pacific Ore body.
Outside adjustments made within normal mining practices, WSP does not foresee any major complications that would drastically impact the pre-feasibility estimates proposed in this report.
Infrastructure
Previous
operators of the Granite Creek Project constructed a large portion of the infrastructure required to operate the Granite Creek underground mine. This includes:
•
Connection to the NV Energy grid
•
5 MW substation
•
13.8 kV distribution network
•
Administration building
•
Dry facilities
•
Three of the active dewatering wells
•
Two of the four permitted rapid infiltration basins
Since acquisition of the project, i-80 has added to the existing infrastructure with completion of:
•
Dewatering well GCW5
•
Deepening of well BPW5 to 677 m (2,220 ft)
•
Expansion of the dry facilities to accommodate 176 personnel
•
Installation of a rental Water Treatment Plant to treat 800 gpm of dewatering water for discharge to the ribs
Infrastructure construction in progress includes:
•
Drilling and completion of dewatering wells GCW14 and GCW15
•
Construction of a 3,300 gpm water treatment plant
•
Construction of the two remaining permitted RIBs
•
Expansion of the contact water handling system and tie-in into the water
treatment circuit
After completion of the infrastructure construction currently underway, the electrical power
distribution, dewatering, water treatment, administrative and related support infrastructure will be adequate to support the planned underground mine operations.
Economics
The
Granite Creek operation consists of an underground mine with no onsite processing facility that mines and transports gold ore to offsite processing facilities. The operational life as modeled for this analysis is approximately 9 years. Under the
forward-looking assumptions modeled and documented in this report, the operation is forecast to generate positive cumulative cash flow. However, the Project does not generate positive free cashflow in 2026 and 2027 largely due to the higher
processing costs incurred as a result of third-party processing of ore and a six-month stockpiling period in 2027.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
403
Cashflow is forecast to be negative at the end of the operational life as the operation winds down, and closure costs are incurred. This estimated cash flow is inherently forward-looking and
dependent upon numerous assumptions and forecasts, such as macroeconomic conditions, mine plans and operating strategy, that are subject to change.
The results demonstrate that at a gold price of US$2,750/oz the after-tax NPV @ 5% is
US$118 million.
The sensitivity analysis performed indicates that the operation’s NPV is most sensitive to metal price,
recovery assumptions and mined grades.
Risks and Uncertainties
Risks
Environmental and Permitting
•
Petroleum-contaminated soil discovered in 2025 within CX pit backfill – location not precisely known, so
remediation could require re-handling of up to 1.17 million tons of waste rock at a cost that isn’t yet quantified.
•
Reclamation / closure cost estimate (US$8.64 million) is based on a government cost model, not Osgood’s
actual self-performed costs, and is due for revision at the next three-year bond review (2028 to 2029) – actual future liability could differ.
•
Ongoing reliance on water treatment for dewatering water discharged to the RIBs could impact operating cost that
continues for the operational life of mine.
•
Kelly Creek hydrographic basin is designated for closer administration by the Nevada State Engineer, which could
make it harder to secure additional water rights if the project needs more in the future.
•
Regulatory reference values can tighten over time (arsenic/antimony standards were lowered in 2006), which is a
precedent for future standards potentially affecting compliance costs.
Recovery Methods
While acid pressure oxidation provides higher gold recoveries and alkaline pressure oxidation, testing of Granite Creek samples showed high
acid additions required for high carbonate samples results in low sulfide oxidation and slurry viscosity problems. Careful blending of Granite Creek production will be required to ensure these problems do not occur at the Lone Tree pressure
oxidation facility during operations.
Lone Tree tailings management will rely on filtered tailings disposal. Testing has shown low
filtration rates for tailings samples. Efficient operation and maintenance of the tailings filters will be required to ensure design operating time is achieved to avoid unplanned downtime.
Opportunities
Mining
•
Upgrade of some or all the Inferred Mineral Resources to higher-confidence classification categories, with
additional drilling and supporting studies, such that this higher confidence material could potentially be converted to mineral reserves.
•
Exploration and step out drilling for the potential to expand the mineral resource inventory, with potential
resource to reserve conversion.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
404
•
There is potential for a positive impact to the operating cost by considering owner operated operation instead of
the current contractor operated operation.
Environmental and Permitting
•
All permits required for current operations are already held and in good standing, with no permitting actions
pending before the BLM or NDEP – low near-term permitting risk.
•
Legacy tailings storage facilities have already been reclaimed and released from financial assurance, removing a
common source of closure liability.
•
Attenuation study to support site specific discharge requirements to reduce WTP operational costs.
•
Improvement of productivity/production rates as dewatering operations are implemented, and passive inflow to the
underground workings is decreased.
•
Arsenic treatment technology (WTP, ferric sulfate dosing) is already proven at this site, de-risking the main long-term water quality contingency.
•
No onsite processing or new tailings generation under the current plan, which limits the project’s
environmental footprint and closure complexity relative to a milling operation.
•
Nearly three decades of consistent geochemical data (1998 to 2025) show waste rock is reliably non-acid-generating, supporting confidence in the mine plan without unexpected ARD-related costs.
•
Established, positive community relations track record (town halls, regional partnerships) with no unresolved
stakeholder conflicts.
•
An additional 1,364 AFA of water rights is currently ‘Ready for Action’ with NDWR and could be
secured to support future expansion.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
405
23
Recommendations
23.1
Recommended Work Programs
Metallurgical Testing
•
Conduct additional variability sampling using the most recent mine plan to select samples to provide additional
recovery information to further populate recovery models.
•
Testing should attempt to establish head grade and extraction relationships for use in more detailed resource
modelling;
•
Mineralogy impacts need to be established and geologic domains within each resource need to be determined;
•
Testing of additional samples to provide comminution data to assess hardness variability within the zones and any
potential impacts on throughput in the Lone Tree process plant.
•
The estimated cost for the suggested next phase metallurgical program is US$150,000 based on current market
pricing.
Geology
The QP considers that the drilling and sampling information is sufficiently reliable to interpret the boundaries of the mineralized structures
and domain interpretations, and that the sample grade data are sufficiently reliable to support the MRE.
The 2027–2028 exploration
program targets five zones at Granite Creek: the CX Fault depth/north extension, Rangefront and Adam Peak, the Ogee Zone, SPZ infill and depth extension, and the SPZ/ Rangefront /Mag structural intersection.
The combined drill program comprises 128 planned drillholes totaling 32,614 m (107,000 ft). plus associated CX Fault underground development
and a gravity survey at the SPZ/Rangefront/Mag intersection. The proposed work program has an estimated cost of US$16M based on current conditions and is defined in Table 23-1.
In the opinion of the Qualified Person, the proposed program is technically reasonable and appropriately sequenced, with Rangefront and Ogee
prioritized ahead of active and planned underground development to reduce the risk of mining ahead of drill data, while the CX Fault program advances the known
oxide-to-sulfide transition at depth. If successful, the program has the potential to add additional mineral resources at Rangefront, Adam Peak, Ogee, and the SPZ /
Rangefront / Mag intersection, and to upgrade a portion of the existing SPZ inferred resource to the indicated category. In addition, mineralization drilled at the CX fault target could result in this area being brought into the mine plan in the
near future, allowing flexibility in the mine plan for more active faces and mined tonnage.
Upon completion of the above items, an update
to the geologic model and MRE should be conducted, along with updated metallurgical updated recovery assumptions.
Environmental and
Permitting
•
The ongoing metals attenuation study should be completed, and its findings used to support site specific
discharge requirements to optimize operational WTP costs.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
406
•
The unpublished LRE post-closure Mag Pit Lake modeling should be finalized to firm up long-term closure water
quality predictions.
•
Given the Kelly Creek basin’s designated status, Osgood should evaluate whether to proactively secure its
1,364 AFA of “Ready for Action” water rights before basin administration tightens further.
•
Ahead of the next three-year bond review (2028 to 2029), SRK recommends Osgood develops an independent,
self-performed closure cost estimate, incorporating updated PCS remediation costs once known, to better anticipate the Project’s actual future reclamation liability rather than relying solely on the government SRCE model used for financial
assurance.
None of these programs are expected to be material in cost relative to the Project, and none are
prerequisites to continued operation under existing permits.
Infrastructure
The following recommendations are offered for improving costs and optimizing operations of the Granite Creek Underground Mine.
•
Perform a cost / benefit analysis for installing power factor correction at the Granite Creek electrical
substation.
•
Install power meters to assist with optimization of costs by at a minimum distinguishing between underground and
surface electrical consumption.
•
Evaluate the installation of a real time monitoring system with adequate flow meters, piezometers, and any other
required instrumentation to optimize mine dewatering efficiency and costs.
•
Investigate the acquisition of a real time highwall monitoring system to provide early warning of a potential
fall of ground, protecting workers, equipment and infrastructure.
Granite Creek Open Pit Technical Study
The Granite Creek open pit Mineral Resources were not included in the Mineral Reserve estimate or economic analysis presented in this
Pre-Feasibility Study. Although the Open Pit was evaluated as part of the 2025 IA, the engineering and supporting technical information available as of the effective date of this Technical Report were not sufficiently advanced to support development
of a PFS- or FS-level mine plan.
Since completion of the
IA, additional trade-off work has been completed to evaluate alternative processing routes, production capacities, mine sequence, capital requirements, and development strategies for the open pit. This work
was intended to support selection of a preferred development pathway and subsequent project advancement rather than establish a feasibility-level mine plan. The recent trade-off study specifically describes
its purpose as evaluating realistic development pathways and relative performance rather than defining a feasibility-level mine plan.
Additional technical work is ongoing to advance the open pit towards a PFS level of definition. This work includes geotechnical
characterization and design of proposed process and mine waste management facilities, evaluation of pit slope stability and development of appropriate geotechnical design criteria, further development of the selected processing configuration,
additional drilling and testing, an updated MRE, mine planning and continued environmental and permitting activities. The current infrastructure program includes PFS-level HLF and TSF design supported by site
characterization and geotechnical investigation.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
407
It is recommended that the ongoing technical studies be completed and integrated into an
updated open pit mine design, production schedule, capital and operating cost estimates, and economic analysis. Completion of this work will provide the technical basis required to evaluate the potential conversion of applicable open pit Mineral
Resources to Mineral Reserves and potential incorporation of the open pit into a future Granite Creek development plan. The estimated cost of the recommended work program is summarized in Table 23-1.
The estimated costs presented in Table 23-1 are budgetary and are intended to provide an order-of-magnitude estimate of the expenditures required to advance the Granite Creek Open Pit to the next level of study. The PFS engineering and Technical Report estimate is
based on recent comparable study proposals and excludes the separately identified geotechnical investigations, pit slope evaluation, and additional drilling and testing and metallurgical testing.
Ventilation
It is
recommended that i-80 should monitor conditions and implement controls as necessary based on actual results to comply with MSHA regulations and provide a safe working environment. WSP recommends, in accordance
with the cost specified in this report, that all headings are ventilated directly from the intake raises for better control of DPM and silica dust exposure, with the ductwork passing over air doors placed in the crosscuts that connect the decline to
the intake raises. This method provides fresh air directly to working faces for an improved working environment. Additional investment could be made in enclosed cabs for the equipment items which currently have open cabs and in a study for the
optimization of future raise locations. The investment in closed cab equipment would be the responsibility of the contract miner SMD, and it is assumed costs would not be passed through to i-80. WSP recommends
a raise optimization ventilation study and estimates the cost to be approximately US$50,000. Further recommendations related to the geotechnical and construction risks and costs of the raise development are outlined in the Geotechnical portion of
this section.
Geotechnical
Opportunities may exist to optimize the primary ventilation system and reduce capital costs through evaluation of alternate primary vent raise
alignments. Potential alternatives could include shorter raise lengths and alignments located within more competent ground conditions, which may reduce construction complexity, ground improvement requirements, and long-term support needs.
Advancement of an alternative raise alignment would require additional geotechnical investigation, including drilling of a dedicated geotechnical cover hole, televiewer logging, and completion of a geotechnical stability assessment to confirm
feasibility and support design development.
The estimated cost of evaluating a 1000 ft alignment is US$210,000, comprising approximately
US$150,000 for drilling, US$10,000 for televiewer surveying, and US$50,000 for geotechnical engineering assessment and reporting. This investigation would provide additional information to support optimization of the ventilation raise design and
associated project capital costs.
23.2
Recommended Work Program Costs
Table 23-1 summarizes the costs for recommended work programs.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
408
Table 23-1: Summary of Costs for Open Pit and
Underground Recommended Work Programs
Recommended Work
Estimated Cost
(US$M)
Estimate Basis
Open Pit Focused Work
Open Pit PFS Engineering and Technical Report
2.00
Budgetary
estimate based on
recent
comparable study
proposals
Infrastructure and Facility Geotechnical Studies
0.54
Current proposal
Pit Slope Geotechnical Evaluation
0.25
Budgetary
allowance
Additional Drilling and Testing
3.00
Estimated footage
and unit rates
Additional Metallurgical Testing
0.35
Budgetary
allowance based
on comparable
metallurgical test
programs
SubTotal
6.14
Underground Focused Work Programs
Exploration Drilling and Infill
16.0
Estimated @
US$4 M per
annum
Raise optimization ventilation study
0.05
Ventilation Raise Alignment Geotechnical Evaluation
0.21
Budgetary
estimate
SubTotal
16.26
US$M: US$ million
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
409
24
References
AMC, (2020). Technical Report Getchell Project NI 43-101 Technical Report, prepared for Premier Gold
Mines Limited / Premier Gold Mines, USA, Inc., by AMC Consultants Pty Ltd, Nussipakynova, D., Humboldt County, Nevada, USA, July 23, 2020 / October 16, 2020, 200 pp.
AMC, (2019). Technical Report, Osgood Pinson Deposit NI 43-101 Technical Report, prepared for Osgood
Mining Company, LLC, by AMC Mining Consultants (Canada) Ltd., Humboldt County, Nevada, USA, October 17, 2019, 219 pages.
Atna (2007).
Technical Report Update Pinson Gold Property, Humboldt County, Nevada, USA, prepared for Atna Resources Ltd., by Mine Development Associates, Scott E. Wilson, Reno, Nevada, June 1, 2007, 122 p.
Barrick, (2008). Pinson Geological / Geophysical Targeting, prepared for Pinson Mining Company, by Barrick Gold Corporation, Elko, Nevada,
2008, Internal Exploration Report.
Beale, G., Feehan, T., (2005). Hydrology Related to the Proposed Pinson Declines, Reno, NV, Water
Management Consultants, 2005.
Bieniawski, Z.T., (1976). Rock Mass Classifications in Rock Engineering, Johannesburg, Proceedings of the
Symposium on Exploration for Rock Engineering, November 1976, 106p.
BLM, (2001). Granite Creek Administrative Draft Environmental
Assessment N63-EA01-xx, prepared for Pinson Mining Company, by Bureau of Land Management, Winnemucca Field Office, Nevada, 2001,
Chadwick, T. H., (2002). Plate 1: Structure and Lithology of the CS, C and Portions of the A Pits, Humboldt Co., NV, Barrick Gold Exploration
Inc. Pinson Mine, April 2002.
Chevillon, V. E., et al., (2000). Geologic Overview of the Getchell Gold Mine Geology, Exploration and Ore
Deposits, Humboldt County, Nevada. [ed.] A. E.J. Crafford. Geology and Ore Deposits 2000: The Great Basin and Beyond, Geological Society of Nevada Symposium Proceedings. 2000, pp. 113-121.
Costmine Intelligence, (2024). Mine & Mill Equipment Cost Guide 2024 Underground Equipment, prepared for Costmine Intelligence, by
InfoMine USA, Inc., Spokane Valley, 2024, Underground Equipment Volume.
Dames and Moore, (1975). Environmental Assessment, Pinson Project,
Humboldt County, Nevada, Prepared for Lacanex Mining Company Ltd., Stored with William Harvey Gross Papers (Collection No. 09675). American Heritage Center, University of Wyoming, Laramie, WY.
Dawson, (2005). Dawson Autoclave Leach Report, prepared for Atna Resources Ltd., by Dawson Metallurgical Laboratories Inc., Salt Lake City,
Utah, November 3, 2005, Report No. DML P-2895
Dawson, (2006a). Pinson Underground Project,
Results of Head Analyses and Autoclave/Cyanide Leach Tests on Samples from the Atna-Pinson Project, Project No. P-2895A, B & C, April 14. 2006a.
Dawson, (2006b). Results of Sample Preparation and Head Analysis on Ogee Samples from the Atna-Pinson Project, Project No. P-2895D, April 24, 2006b.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
410
Edmondo, G., McDonald, D. and Stanley, W. R., (2007). Technical Report Update Pinson Gold
Property, Humboldt County, Nevada USA, June 2007, National Instrument 43-101 (NI 43-101) Technical Report.
Environmental Management Associates. 1992.
Enviroscientists, Inc., (2005). Water Pollution Control Permit Application – Pinson Exploration Infiltration Project, prepared for Atna
Resources, by Enviroscientists, Inc. Water Management Consultants, 2005.
Fiddes, C., Langhans, J., Schmiesing, P., Becker, J., Webber, T.,
and Bottoms, S. (2024). NI 43-101 technical report on the Turquoise Ridge Complex, Humboldt County, Nevada, USA [Technical report]. Barrick Gold Corporation.
https://s25.q4cdn.com/322814910/files/doc_downloads/operations/ngm/Turquoise-Ridge-Technical-Report-March2024.pdf, March 15, 2024
FLS, (2023). Osgood Mining Company - Granite Creek Thickening and Filtration Testing Report, prepared for Osgood Mining Company, by FLSmidth
Inc., Jan. 25, 2023.
FLS, (2023). Osgood Mining Company - Granite Creek Pressure Oxidation, Carbon-in-leach Testing, Preg-Rob Testing, prepared for Osgood Mining Company, by FLSmidth Inc., Midvale, Utah, March 6, 2023.
Forsgren Associates Inc., (2025). Granite Creek Mine WTP-2 Process Flow Diagram, prepared for i-80 Gold Corp., by Forsgren Associates Inc., Engineering Design Team, Humboldt County, Nevada, October 2025, Sheet 1 of 1.
Forsgren Associates Inc. 2026.
Foster, J. M. and Kretschmer, E. L., (1991). Geology of the Mag Deposit, Pinson Mine, Humboldt County, Nevada. [ed.] G. L. Raines, et al.
Geology and Ore Deposits of the Great Basin: Geological Society of Nevada 1990 Symposium Proceedings. 1991, pp. 845-856.
Foster, J. M., (1994). Gold in Arsenian Framboidal Pyrite in Deep CX Core Hole DDH-1541, Humboldt
County, Nevada, Pinson Mining Company Internal Report, Unpublished.
Fritz Geophysics, (2007). Data Processing and Interpretation of
Gravity Data, Pinson Property, Elko County, Nevada, prepared for Pinson Mining Company (Atna Resources Ltd.), Fort Collins, Colorado, 2007, Internal Corporate Technical Report
GRE, (2021). Preliminary Economic Assessment NI 43-101 Technical Report, Granite Creek Mine Project,
Humboldt County, Nevada, USA, prepared for i-80 Gold Corp., by Global Resource Engineering, Ltd., Humboldt County, Nevada, USA, November 8, 2021, 237 pages.
GRE (Global Resource Engineering). 2026.
Golder, (2014). NI 43-101 Technical Report, Pinson Project, Preliminary Feasibility Study, Humboldt
County, Nevada, prepared for Atna Resources Ltd., by Golder Associates Inc., Humboldt County, Nevada, June 30, 2014.
Gustavson
Associates LLC, (2012). NI 43-101 Technical Report on the Mineral Resources of the Pinson Mine, Humboldt County, Nevada, prepared for Atna Resources Ltd., by Donald E. Hulse and Terre A. Lane, Lakewood,
Colorado, March 30, 2012, 143 p.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
411
HGL, (2022b). i-80 Gold Granite Creek Mine –
Summary of 2022 VWP Installations and Preliminary Monitoring Results, prepared for i-80 Gold Corp., by HydroGeoLogica, Inc., Lakewood, CO, November 1, 2022.
HGL, (2023). Dewatering Well GCW-06, Granite Creek Mine, Humboldt County, Nevada, prepared for i-80 Gold Corp, by HydroGeoLogica, Inc., Humboldt County, Nevada, June 7, 2023.
HGL, (2023).
Groundwater Flow Model Results for Assessing Dewatering and Passive Inflow of Planned Underground Mine Workings, prepared for i-80 Gold Corp., by HydroGeoLogica, Inc., Humboldt County, NV, August 14,
2023.
Hofstra, A. H. and Cline, J. S., (2000). Characteristics and Models for Carlin-Type Gold Deposits. Society of Economic Geologists
Reviews. 2000, Vol. 13, pp. 163-220.
Hotz, P. E. and Willden, R., (1964). Geology and Mineral
Deposits of the Osgood Mountains Quadrangle, Humboldt County, Nevada: U.S. Geological Survey Professional Paper 431. 1964.
Infomine,
(2020). costs.infomine.com, online, December 2020, https://costs.infomine.com/.
JBR. 2003.
Jones, A. E., (1991). Tectonic Significance of Paleozoic and Early Mesozoic Terrane Accretion in Northern Nevada, Berkeley, California,
University of California, Berkeley, Ph.D. dissertation. 1991, 256 p.
Kretschmer, E. L., (1985). Geology of the Mag Deposit, Humboldt
County, Nevada, Pinson Mining Company Internal Report, Unpublished Internal Report, 1985, Nevada Bureau of Mines and Geology Digital Mining District Files Collection ID 36800069.
Kretschmer, E.L., (1984). Geology of the Pinson and Preble Gold Deposits, Humboldt County, Nevada, Tucson, Arizona, Arizona Geological Society
Digest, 1984, Vol. 15, pp. 59-66.
LRE Water, (2024). Granite Creek Mine Dewatering Updated,
PowerPoint Presentation prepared for i-80 Gold Corp, by LRE Water, Denver, CO, 2024.
LRE Water,
(2025). Results of Deepening and Testing Dewatering Well BPW-5, Granite Creek Mine, Humboldt County, Nevada, prepared for i80 Gold Corp., by LRE Water, Humboldt County, Nevada, 2025.
Lupo, J. F., (2005). Heap Leach Facility Liner Design, Lakewood, Colorado, Golder Associates, Inc., 2005.
Magee Geophysical Services, (2006). Detailed Gravity Survey over the Pinson Property, prepared for Atna Resources Ltd., by Magee Geophysical
Services LLC, Reno, Nevada, October 2006, 2,587 gravity readings covering approximately 27 sq km.
McClelland, D., (1999b). Report on Heap
Leach Cyanidation, Column Leach Tests - Pinson Mine CX Pit Bulk Ore Samples, Sparks, NV, McClelland Laboratories, Inc., June 16, 1999b, MLI Job No. 2630
McClelland, D., (1999a). Report on Heap Leach, Direct and CIL Cyanidation and “Preg-Robbing” Tests - Various Mag Pit Samples and
Composites, and CX Pit ‘bulk Ore, Sparks, NV, McClelland Laboratories, Inc., March 1999a, MLI Job No. 2532, Addendum, and C.O. #1, 2 and 3, i80gold.com
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
412
McClelland, (2014). Summary Report on Heap Leach Cyanidation Testing - Mag Pit Pinson Drill
Core composites, prepared for Atna Resources Ltd., by McClelland Laboratories, Inc., McClelland, D., Sparks, NV, January 16, 2014, MLI Job No. 3746.
McClelland, (2013). Summary Report on Ore Variability Testing - Mag Pit Pinson Drill Core Composites, prepared for Atna Resources Ltd., by
McClelland Laboratories, Inc., McClelland, D., Sparks, NV, February 7, 2013, MLI Job No. 3746.
McLachlan, C. D., Struhsacker, E.
M. and Thompson, W. F., (2000). The Gold Deposits of Pinson Mining Company: A Review of the Geology and Mining History through 1999, Humboldt County, Nevada, GSN Symposium Proceedings, May 2000, pp. 1043–1058.
Crafford, A. E. J., (2000). Geology and Ore Deposits 2000: The Great Basin and Beyond, Reno, Nevada, Geological Society of Nevada Symposium
Proceedings, May 15-18, 2000, pp. 123-153, gsnv.org.
Mine
Safety and Health Administration, (2025). Engine Approvals, prepared for United States Department of Labor, by Mine Safety and Health Administration, Washington DC, 2025.
Muntean, J. L., Cline, J. S., Simon, A. C., Longo, A. A., (2011). Magmatic-Hydrothermal Origin of Nevada’s Carlin-type Gold Deposits,
London, Nature Geoscience, January 23, 2011, Vol. 4, pp. 122-127, nature.com.
MVP (Mountain
Valley Professionals). 2026.
NDEP, (2016). Attachment A: Guidance for surety release in mining projects [Bureau of Mining Regulation and
Reclamation Guidance Document]. Nevada Department of Conservation and Natural Resources.nv.gov, September 2016
Nevada Gold Mines LLC.,
NGM, (2020). Technical Report on the Turquoise Ridge Complex, State of Nevada, U.S.A., prepared for Barrick Gold Corporation and Newmont Corporation, by Nevada Gold Mines LLC, Humboldt County, Nevada, March 25, 2020, NI 43-101 Report.
Osgood Mining LLC, (2016). Pinson Narrative, prepared for Osgood Mining LLC, by Osgood
Mining LLC, R. W. Leonardson, Humboldt County, Nevada, November 2016, Unpublished Company Report.
OMC, (2020). Fact Sheet, Osgood Mining
Company, Pinson Mining Project, Permit No. Nev2005103 (Renewed 2018), prepared for Nevada Division of Environmental Protection, by Osgood Mining Company, LLC, Carson City, Nevada, 2020.
OMC, (2020). Fact Sheet for Pinson Rapid Infiltration Basins Water Pollution Control Permit NEV2005102, prepared for Nevada Division of
Environmental Protection, by Osgood Mining Company, LLC, Humboldt County, Nevada, 2020.
OMC (2019). OMC Pinson Metallurgy Summary,
prepared for Osgood Mining Company, LLC, by Osgood Mining Company, LLC, Nevada, April 2019.
OMC, (2016). Leonardson, R. W. Pinson,
Narrative, Nov 2016, Unpublished Osgood Mining LLC Company Report.
OMC, (2023). Application to Renew Water Pollution Control Permit
NEV2005103, prepared for Osgood Mining Company, LLC, by Osgood Mining Company, LLC, Humboldt County, Nevada, May 2023, 1-125.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
413
OMC, (2024).
OMC, (2026). Osgood Mining Company Internal Memorandum, prepared for Osgood Mining Company, by Osgood Mining Company, Trevor Jones, Humboldt
County, April 2026.
PMC, (2015). Internal Ore and Ore Stockpile Tracking and Control, prepared for Atna Resources Ltd., by Pinson Mining
Company, Humboldt County, Nevada, October 5, 2015.
Piteau Associates, (2018). Mag and CX Pits Updated Pit Lake Models, prepared for
Osgood Mining Company LLC, by Piteau Associates, Reno, NV, September 10, 2018.
Piteau Associates, (2023). Mag and CX Pit Updated Pit
Lake Models, Project 4797, prepared for Osgood Mining Company, LLC, by Piteau Associates USA Ltd., Reno, Nevada, November 2023.
Practical
Mining LLC, (2023). Granite Creek LOM Development and Stopes. Email communication and files received July 6, 2023, from Dagny Odell (Practical Mining) to Daniel Weber (HGL). Drawing files (.dwg): GraniteCreekLOMDev.dwg and
GraniteCreekLOMStopes.dwg.
Spheros Environmental, (2026). Granite Creek Numerical Model Update, Denver, CO, Spheros Environmental, January
2026.
Radtke, A.S., (1985). Geology of the Carlin Gold Deposit, Nevada, Reston, Virginia, U.S., Geological Survey Professional Paper,
1267, 1985, 124 p., https://usgs.gov.
Ridgley, V., et al., (2005). Project Update Pinson Gold Project, Humboldt County, Nevada, USA. [ed.]
H. N. Rhoden, R. C. Steinenger and P. G. Vikre. Symposium 2005, Window to the World: Geological Society of Nevada 2005 Symposium Proceedings, May 2005, p. 103.
Sandbak, L. A., Urcheck, J., & Warren, S. N., (2020). Basin and range extensional tectonics and back analysis of modeling studies at the
Turquoise Ridge underground mine, In Proceedings of the 54th U.S. Rock Mechanics / Geomechanics Symposium, American Rock Mechanics Association (ARMA). [Paper No. ARMA-2020-1926].
SWS, (2014). CX Pit Lake Modeling Update. Prepared for Atna Resources Inc., Golconda, Nevada, by Schlumberger Water Services, February 19,
2014, 5298/R1.
SGS Canada Inc., (2026). An Investigation into Metallurgical Test Work on Granite Creek South Pacific Zone Ore from the
Granite Creek Mine. Jun. 11, 2026
Silberman, M. L., Berger, B. R. and Koski, R. A., (1974). K-Ar
Age Relations of Granodiorite Emplacement and Tungsten and Gold Mineralization Near the Getchell Mine, Humboldt County, Nevada, Lancaster, Pennsylvania, Economic Geology, August 1, 1974, Vol. 69, No. 5, pp.
646-656, doi.org.
Sim, R., (2005). Revised Technical Report on the Pinson Gold Property, Humboldt
County, Nevada, Vancouver, British Columbia, Atna Resources Ltd. and Pinson Mining Company (via SEDAR), October 11, 2005, Technical Report (NI 43-101), 93 pages, sedarplus.ca.
SRK Consulting (U.S.), Inc. (SRK). 2025. Granite Creek Mine, Ecological Risk Assessment for Pit Lakes. Prepared for Osgood Mining Company, LLC:
Reno, Nevada. Project number: USPR001947. Issued August 2025.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
414
Smee, B.W., Bloom, L., Arne, D. and Heberlein, D., (2024). Practical applications of quality
assurance and quality control in mineral exploration, resource estimation and mining programmes: a review of recommended international practices, London, Geochemistry: Exploration, Environment, Analysis, April 23, 2024, Volume 24, Issue 2, https://pubs.geoscienceworld.org/gsl/geea/article/24/2/geochem2023-046/638622/Practical-applications-of-quality-assurance-and.
Stantec Consulting Services, (2023). Waste Rock Management Plan - Granite Creek Mining Project prepared for
Osgood Mining LLC, by Stantec Consulting Services Inc., s.l., 2023.
Stenger, D. P., et al., (1998). Deposition of Gold in Carlin-type
Deposits: The Role of Sulfidation and Decarbonation at Twin Creeks, Nevada, Economic Geology, 1998, Vol. 93, pp. 201-215.
Stoker, P. T., (2006). Newmont Australia Technical Services Sampling Notes, prepared for Newmont Australia Technical Services, by AMC
Consultants, January 2006.
Thompson, M. and Howarth, R.J., (1978). A new approach to the estimation of analytical precision, Journal of
Geochemical Exploration, March 1978, Volume 9, Issue 1, Pages 23-30, https://doi.org/10.1016/0375-6742(78)90035-3
Thompson, W. F., (2003). Geologic Stoping Report for the Pinson Properties: Internal Company Report, Humboldt County, Nevada, Internal Company
Report, 2 March. 2003.
Tingley, J. V., (1998). Mining districts of Nevada (2nd ed., Report 47), Reno, Nevada, Nevada Bureau of Mines and
Geology, 1998, 305 p. unr.edu
Wallace, A. and Wittkopp, R. W., (1983). The Mode of Occurrence of Gold at the Pinson Mine as Determined by
Microprobe Analyses, and Metallurgical Implications: Unpublished Pinson Mining Company Report. 1983.
WMC, (1998). Results of Hydrogeologic
and Geochemical Studies at Pinson and Provisional Closure Plan for the CX and Mag Pits, prepared for Pinson Mining Company, by Water Management Consultants, Inc., Winnemucca, Nevada, July 1998, Report No. 2163/R2.
WMC, (2000). Amended Closure Plan for the CX Pit, prepared for Pinson Mining Company, by Water Management Consultants, Inc., Humboldt County,
Nevada, September 19, 2000.
WMC, (1998). Results of Hydrogeologic and Geochemical Studies at Pinson and Provisional Closure Plan for
the CX Pit, Geochemical Test Work, prepared for Pinson Mining Company, by Water Management Consultants, Inc., Denver, CO, 1998, Chapter 4.
WMC, (2002). Pinson Mining Company - CX Pit Status Report on Closure and Updated Pit Lake Modeling Predictions, prepared for Pinson Mining
Company, by Water Management Consultants, Inc., Winnemucca, Nevada, January 2002, Report No. 2163/R9.
WMC, (2005). Hydrology Related to
the Proposed Pinson Declines. Technical Memorandum, prepared for Enviroscientists, Inc. by Water Management Consultants, Inc., Reno, Nevada, August 24, 2005.
Wilmot, (2006). Met Testwork Results Atna-Pinson Project, prepared for Atna Resources Ltd. (the project operators at the time), by Wilmot,
2006, Internal Metallurgical Report
Woolever, Dakota, (2026) First Electric Assessment of Granite Creek Site Electrical Loads, July
2026.
World Gold Council, (2025) Gold in the Global Economy: Market, Mining and Modernisation, World Gold Council, Nov. 2025,
www.gold.org/about-gold/gold-global-economy.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
415
25
Reliance on Information Provided by the Registrant
In compliance to the SEC S-K regulation Subpart 1302 (f)(1), SRK may rely on information provided by
the registrant in preparing its findings and conclusions regarding the following aspects of modifying factors:
(i) Macroeconomic trends,
data, and assumptions, and interest rates;
(ii) Marketing information and plans within the control of the registrant;
(iii) Legal matters outside the expertise of the qualified person, such as statutory and regulatory interpretations affecting the mine plan;
(iv) Environmental matters outside the expertise of the qualified person;
(v) Accommodations the registrant commits or plans to provide to local individuals or groups in connection with its mine plans; and
(vi) Governmental factors outside the expertise of the qualified person.
The Consultant’s opinion contained herein is based on information provided to the Consultants by
i-80 throughout the course of the investigations. Table 25 1 of this section of the Technical Report Summary will:
(i) Identify the categories of information provided by the registrant;
(ii) Identify the particular portions of the Technical Report Summary that were prepared in reliance on information provided by the registrant
pursuant to Subpart 1302 (f)(1), and the extent of that reliance; and
(iii) Disclose why the qualified person considers it reasonable to
rely upon the registrant for any of the information specified in Subpart 1302 (f)(1).
The Consultant’s opinion contained herein is
based on information provided to the Consultants by i-80 throughout the course of the investigations. SRK has relied upon the work of other consultants in the project areas in support of this Technical Report.
The Consultants used their experience to determine if the information from previous reports was suitable for inclusion in this technical
report and adjusted information that required amending. This report includes technical information, which required subsequent calculations to derive subtotals, totals and weighted averages. Such calculations inherently involve a degree of rounding
and consequently introduce a margin of error. Where these occur, the Consultants do not consider them to be material.
These items have not
been independently reviewed by SRK and SRK did not seek an independent legal opinion of these items.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
416
Table 25-1: Reliance on Information Provided by
the Registrant
Category
Report Item/ Portion
Portion of
Technical Report
Summary
Disclose why the Qualified
Person
considers it reasonable to rely upon the
registrant
Macroeconomic trends, data, and assumptions, and interest rates
Item 19 – Economic Analysis (External Factors: Pricing, Taxes and Royalties)
Gold price assumptions and discount rate used in the economic model
Corporate pricing decks, tax structuring, and discount rate assumptions are set at the registrant’s corporate finance level and are outside the QP’s mining/geological expertise.
Marketing information and plans within the control of the registrant
Item 16 – Market Studies and Contracts (Contracts and Status)\
Toll Milling Autoclave Contract, Ore Purchase Agreement, and doré/byproduct offtake arrangements
These are registrant-negotiated commercial agreements; the QP relies on the registrant’s own account of contract terms rather than independently verifying them.
Legal matters outside the expertise of the qualified person, such as statutory and regulatory interpretations affecting the mine plan
Item 3 – Property Description (Encumbrances / royalty burdens)
Mineral tenure status and the 5 disclosed royalty interests
Interpretation of property tenure and royalty legal standing is outside the QP’s expertise; consistent with the source report’s own statement that SRK did not seek an independent legal opinion of these items (see
verbatim text above).
Environmental matters outside the expertise of the qualified person
Item 17 – Environmental Studies, Permitting and Social or Community Impact (Environmental Management and Planning; Mine Closure)
Environmental compliance status, closure cost/bonding basis, and the Petroleum Contaminated Soils remediation approach
Environmental regulatory compliance assessment relies on the registrant’s environmental staff and consultants, outside the mining QP’s direct expertise.
Accommodations the registrant commits or plans to provide to local individuals or groups in connection with its mine plans
Item 17 – Environmental Studies, Permitting and Social or Community Impact (Plans, Negotiations, or Agreements with Local Individuals or Groups)
Community agreements and accommodations
Commitments to local stakeholders are registrant-controlled business decisions, not independently verifiable technical facts.
Governmental factors outside the expertise of the qualified person
Item 17 – Environmental Studies, Permitting and Social or Community Impact (Project Permitting)
Item 19 – Economic Analysis
Permitting status, current permitting activities, and performance/reclamation bonding. Application tax and the impact of existing loss carryforward balances.
Interpretation of governmental regulatory requirements and permitting status relies on the registrant’s own compliance representations. Registrant control over the applicability of tax losses
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
417
26
Date and Signature Page
Signed on this 21st Day of September, 2026.
Prepared by
/s/ SRK Consulting (U.S.), Inc,
SRK Consulting (U.S.), Inc,
Prepared by
/s/ Global Resource Engineering
Global Resource Engineering (GRE)
Prepared by
/s/ TR Raponi Consulting Ltd.
TR Raponi Consulting Ltd.
Prepared by
/s/ WSP
WSP
Prepared by
/s/ Practical Mining
Practical Mining
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
418
Prepared by
/s/ i-80 Gold Corp.
i-80 Gold Corp.
Prepared by
/s/ Hatch Ltd.
Hatch Ltd.
All data used as source material plus the text, tables, figures, and attachments of this document have been reviewed and prepared in
accordance with generally accepted industry practices.
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
419
Appendices
September 2026
SRK Consulting (U.S.), Inc.
SEC
Technical Report Summary – Granite Creek
Page
420
Appendix A: Consent Letter
September 2026
GRAPHIC
GRAPHIC
Filename: g29391dsp0073.jpg · Sequence: 14
Binary file (26138 bytes)
Download g29391dsp0073.jpg
GRAPHIC
GRAPHIC
Filename: g29391dsp009.jpg · Sequence: 15
Binary file (27904 bytes)
Download g29391dsp009.jpg
GRAPHIC
GRAPHIC
Filename: g29391dsp074.jpg · Sequence: 16
Binary file (24299 bytes)
Download g29391dsp074.jpg
GRAPHIC
GRAPHIC
Filename: g29391dsp121.jpg · Sequence: 17
Binary file (187487 bytes)
Download g29391dsp121.jpg
GRAPHIC
GRAPHIC
Filename: g29391dsp122.jpg · Sequence: 18
Binary file (145300 bytes)
Download g29391dsp122.jpg
GRAPHIC
GRAPHIC
Filename: g29391dsp92.jpg · Sequence: 19
Binary file (46301 bytes)
Download g29391dsp92.jpg
GRAPHIC
GRAPHIC
Filename: g29391g04i44.jpg · Sequence: 20
Binary file (65575 bytes)
Download g29391g04i44.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004437544.jpg · Sequence: 21
Binary file (42034 bytes)
Download g29391g0920004437544.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004438030.jpg · Sequence: 22
Binary file (35461 bytes)
Download g29391g0920004438030.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004438271.jpg · Sequence: 23
Binary file (40599 bytes)
Download g29391g0920004438271.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004438535.jpg · Sequence: 24
Binary file (27088 bytes)
Download g29391g0920004438535.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004438799.jpg · Sequence: 25
Binary file (31490 bytes)
Download g29391g0920004438799.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004439072.jpg · Sequence: 26
Binary file (30160 bytes)
Download g29391g0920004439072.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004439391.jpg · Sequence: 27
Binary file (150149 bytes)
Download g29391g0920004439391.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004439735.jpg · Sequence: 28
Binary file (113556 bytes)
Download g29391g0920004439735.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004439991.jpg · Sequence: 29
Binary file (44615 bytes)
Download g29391g0920004439991.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004440261.jpg · Sequence: 30
Binary file (47300 bytes)
Download g29391g0920004440261.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004440531.jpg · Sequence: 31
Binary file (52984 bytes)
Download g29391g0920004440531.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004440788.jpg · Sequence: 32
Binary file (51345 bytes)
Download g29391g0920004440788.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004441097.jpg · Sequence: 33
Binary file (39989 bytes)
Download g29391g0920004441097.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004441430.jpg · Sequence: 34
Binary file (56879 bytes)
Download g29391g0920004441430.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004442438.jpg · Sequence: 35
Binary file (28762 bytes)
Download g29391g0920004442438.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004442707.jpg · Sequence: 36
Binary file (29786 bytes)
Download g29391g0920004442707.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004442996.jpg · Sequence: 37
Binary file (29476 bytes)
Download g29391g0920004442996.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004443371.jpg · Sequence: 38
Binary file (29110 bytes)
Download g29391g0920004443371.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004443765.jpg · Sequence: 39
Binary file (30049 bytes)
Download g29391g0920004443765.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004444130.jpg · Sequence: 40
Binary file (25195 bytes)
Download g29391g0920004444130.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004444589.jpg · Sequence: 41
Binary file (25615 bytes)
Download g29391g0920004444589.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004445238.jpg · Sequence: 42
Binary file (38910 bytes)
Download g29391g0920004445238.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004445552.jpg · Sequence: 43
Binary file (31576 bytes)
Download g29391g0920004445552.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004445859.jpg · Sequence: 44
Binary file (29947 bytes)
Download g29391g0920004445859.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004446153.jpg · Sequence: 45
Binary file (31837 bytes)
Download g29391g0920004446153.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004446470.jpg · Sequence: 46
Binary file (31039 bytes)
Download g29391g0920004446470.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004446770.jpg · Sequence: 47
Binary file (23203 bytes)
Download g29391g0920004446770.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004447108.jpg · Sequence: 48
Binary file (26924 bytes)
Download g29391g0920004447108.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004447433.jpg · Sequence: 49
Binary file (29323 bytes)
Download g29391g0920004447433.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004643511.jpg · Sequence: 50
Binary file (22389 bytes)
Download g29391g0920004643511.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004644095.jpg · Sequence: 51
Binary file (23873 bytes)
Download g29391g0920004644095.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004644536.jpg · Sequence: 52
Binary file (21377 bytes)
Download g29391g0920004644536.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004644758.jpg · Sequence: 53
Binary file (24367 bytes)
Download g29391g0920004644758.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004645276.jpg · Sequence: 54
Binary file (24151 bytes)
Download g29391g0920004645276.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004645801.jpg · Sequence: 55
Binary file (69640 bytes)
Download g29391g0920004645801.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004646089.jpg · Sequence: 56
Binary file (58430 bytes)
Download g29391g0920004646089.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920004646361.jpg · Sequence: 57
Binary file (59527 bytes)
Download g29391g0920004646361.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005016878.jpg · Sequence: 58
Binary file (196587 bytes)
Download g29391g0920005016878.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005017541.jpg · Sequence: 59
Binary file (75325 bytes)
Download g29391g0920005017541.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005017923.jpg · Sequence: 60
Binary file (91018 bytes)
Download g29391g0920005017923.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005018771.jpg · Sequence: 61
Binary file (86660 bytes)
Download g29391g0920005018771.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005019678.jpg · Sequence: 62
Binary file (41998 bytes)
Download g29391g0920005019678.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005020076.jpg · Sequence: 63
Binary file (27675 bytes)
Download g29391g0920005020076.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005020462.jpg · Sequence: 64
Binary file (65714 bytes)
Download g29391g0920005020462.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005020923.jpg · Sequence: 65
Binary file (47057 bytes)
Download g29391g0920005020923.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005021315.jpg · Sequence: 66
Binary file (49803 bytes)
Download g29391g0920005021315.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005021706.jpg · Sequence: 67
Binary file (46984 bytes)
Download g29391g0920005021706.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005022051.jpg · Sequence: 68
Binary file (43807 bytes)
Download g29391g0920005022051.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005022408.jpg · Sequence: 69
Binary file (42974 bytes)
Download g29391g0920005022408.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005022745.jpg · Sequence: 70
Binary file (43613 bytes)
Download g29391g0920005022745.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005023148.jpg · Sequence: 71
Binary file (42217 bytes)
Download g29391g0920005023148.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005023595.jpg · Sequence: 72
Binary file (76083 bytes)
Download g29391g0920005023595.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005024004.jpg · Sequence: 73
Binary file (71819 bytes)
Download g29391g0920005024004.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005024451.jpg · Sequence: 74
Binary file (61216 bytes)
Download g29391g0920005024451.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005032842.jpg · Sequence: 75
Binary file (84266 bytes)
Download g29391g0920005032842.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005033350.jpg · Sequence: 76
Binary file (89747 bytes)
Download g29391g0920005033350.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005034207.jpg · Sequence: 77
Binary file (110951 bytes)
Download g29391g0920005034207.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005034612.jpg · Sequence: 78
Binary file (109601 bytes)
Download g29391g0920005034612.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005035193.jpg · Sequence: 79
Binary file (55461 bytes)
Download g29391g0920005035193.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005035526.jpg · Sequence: 80
Binary file (58677 bytes)
Download g29391g0920005035526.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005035897.jpg · Sequence: 81
Binary file (178783 bytes)
Download g29391g0920005035897.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005036689.jpg · Sequence: 82
Binary file (119605 bytes)
Download g29391g0920005036689.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005037201.jpg · Sequence: 83
Binary file (107781 bytes)
Download g29391g0920005037201.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005037716.jpg · Sequence: 84
Binary file (90447 bytes)
Download g29391g0920005037716.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005038211.jpg · Sequence: 85
Binary file (78303 bytes)
Download g29391g0920005038211.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005038743.jpg · Sequence: 86
Binary file (73688 bytes)
Download g29391g0920005038743.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005039227.jpg · Sequence: 87
Binary file (74257 bytes)
Download g29391g0920005039227.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005039664.jpg · Sequence: 88
Binary file (74787 bytes)
Download g29391g0920005039664.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005040161.jpg · Sequence: 89
Binary file (71233 bytes)
Download g29391g0920005040161.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005040708.jpg · Sequence: 90
Binary file (88824 bytes)
Download g29391g0920005040708.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005041368.jpg · Sequence: 91
Binary file (76323 bytes)
Download g29391g0920005041368.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005042179.jpg · Sequence: 92
Binary file (95324 bytes)
Download g29391g0920005042179.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005043216.jpg · Sequence: 93
Binary file (49902 bytes)
Download g29391g0920005043216.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005044096.jpg · Sequence: 94
Binary file (47349 bytes)
Download g29391g0920005044096.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005044759.jpg · Sequence: 95
Binary file (43079 bytes)
Download g29391g0920005044759.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005045413.jpg · Sequence: 96
Binary file (70628 bytes)
Download g29391g0920005045413.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005045916.jpg · Sequence: 97
Binary file (61843 bytes)
Download g29391g0920005045916.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005046414.jpg · Sequence: 98
Binary file (55897 bytes)
Download g29391g0920005046414.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005046980.jpg · Sequence: 99
Binary file (71245 bytes)
Download g29391g0920005046980.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005047600.jpg · Sequence: 100
Binary file (76564 bytes)
Download g29391g0920005047600.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005048331.jpg · Sequence: 101
Binary file (45962 bytes)
Download g29391g0920005048331.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005049003.jpg · Sequence: 102
Binary file (88286 bytes)
Download g29391g0920005049003.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005049634.jpg · Sequence: 103
Binary file (95984 bytes)
Download g29391g0920005049634.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005102618.jpg · Sequence: 104
Binary file (73923 bytes)
Download g29391g0920005102618.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005103799.jpg · Sequence: 105
Binary file (107520 bytes)
Download g29391g0920005103799.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005104722.jpg · Sequence: 106
Binary file (127311 bytes)
Download g29391g0920005104722.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005105190.jpg · Sequence: 107
Binary file (33298 bytes)
Download g29391g0920005105190.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005105963.jpg · Sequence: 108
Binary file (64405 bytes)
Download g29391g0920005105963.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005106574.jpg · Sequence: 109
Binary file (68114 bytes)
Download g29391g0920005106574.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005107292.jpg · Sequence: 110
Binary file (55660 bytes)
Download g29391g0920005107292.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005109262.jpg · Sequence: 111
Binary file (135480 bytes)
Download g29391g0920005109262.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005110337.jpg · Sequence: 112
Binary file (22244 bytes)
Download g29391g0920005110337.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005112153.jpg · Sequence: 113
Binary file (50331 bytes)
Download g29391g0920005112153.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005606249.jpg · Sequence: 114
Binary file (39039 bytes)
Download g29391g0920005606249.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005606745.jpg · Sequence: 115
Binary file (35399 bytes)
Download g29391g0920005606745.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005607126.jpg · Sequence: 116
Binary file (40825 bytes)
Download g29391g0920005607126.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005607520.jpg · Sequence: 117
Binary file (49106 bytes)
Download g29391g0920005607520.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005607899.jpg · Sequence: 118
Binary file (68616 bytes)
Download g29391g0920005607899.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005608216.jpg · Sequence: 119
Binary file (44686 bytes)
Download g29391g0920005608216.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005608589.jpg · Sequence: 120
Binary file (68899 bytes)
Download g29391g0920005608589.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005608936.jpg · Sequence: 121
Binary file (43711 bytes)
Download g29391g0920005608936.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005610280.jpg · Sequence: 122
Binary file (78691 bytes)
Download g29391g0920005610280.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005610752.jpg · Sequence: 123
Binary file (107946 bytes)
Download g29391g0920005610752.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005611158.jpg · Sequence: 124
Binary file (84309 bytes)
Download g29391g0920005611158.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005611636.jpg · Sequence: 125
Binary file (104392 bytes)
Download g29391g0920005611636.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005612065.jpg · Sequence: 126
Binary file (65018 bytes)
Download g29391g0920005612065.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005612540.jpg · Sequence: 127
Binary file (83985 bytes)
Download g29391g0920005612540.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005615688.jpg · Sequence: 128
Binary file (95971 bytes)
Download g29391g0920005615688.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005616158.jpg · Sequence: 129
Binary file (99149 bytes)
Download g29391g0920005616158.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005616600.jpg · Sequence: 130
Binary file (70623 bytes)
Download g29391g0920005616600.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920005617052.jpg · Sequence: 131
Binary file (51578 bytes)
Download g29391g0920005617052.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010012213.jpg · Sequence: 132
Binary file (52530 bytes)
Download g29391g0920010012213.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010012550.jpg · Sequence: 133
Binary file (51371 bytes)
Download g29391g0920010012550.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010013100.jpg · Sequence: 134
Binary file (51469 bytes)
Download g29391g0920010013100.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010013846.jpg · Sequence: 135
Binary file (55685 bytes)
Download g29391g0920010013846.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010014188.jpg · Sequence: 136
Binary file (28846 bytes)
Download g29391g0920010014188.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010014492.jpg · Sequence: 137
Binary file (53455 bytes)
Download g29391g0920010014492.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010014824.jpg · Sequence: 138
Binary file (45984 bytes)
Download g29391g0920010014824.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010015124.jpg · Sequence: 139
Binary file (31019 bytes)
Download g29391g0920010015124.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010016329.jpg · Sequence: 140
Binary file (41271 bytes)
Download g29391g0920010016329.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010016640.jpg · Sequence: 141
Binary file (36894 bytes)
Download g29391g0920010016640.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010016956.jpg · Sequence: 142
Binary file (31053 bytes)
Download g29391g0920010016956.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010017313.jpg · Sequence: 143
Binary file (31168 bytes)
Download g29391g0920010017313.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010017637.jpg · Sequence: 144
Binary file (38469 bytes)
Download g29391g0920010017637.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010017968.jpg · Sequence: 145
Binary file (38476 bytes)
Download g29391g0920010017968.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010018321.jpg · Sequence: 146
Binary file (35214 bytes)
Download g29391g0920010018321.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010019596.jpg · Sequence: 147
Binary file (48785 bytes)
Download g29391g0920010019596.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010020022.jpg · Sequence: 148
Binary file (37162 bytes)
Download g29391g0920010020022.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010020578.jpg · Sequence: 149
Binary file (110901 bytes)
Download g29391g0920010020578.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010021018.jpg · Sequence: 150
Binary file (56138 bytes)
Download g29391g0920010021018.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010021489.jpg · Sequence: 151
Binary file (77193 bytes)
Download g29391g0920010021489.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010021976.jpg · Sequence: 152
Binary file (86778 bytes)
Download g29391g0920010021976.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010022472.jpg · Sequence: 153
Binary file (90295 bytes)
Download g29391g0920010022472.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010023056.jpg · Sequence: 154
Binary file (78831 bytes)
Download g29391g0920010023056.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010023641.jpg · Sequence: 155
Binary file (196084 bytes)
Download g29391g0920010023641.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010024069.jpg · Sequence: 156
Binary file (64696 bytes)
Download g29391g0920010024069.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010024483.jpg · Sequence: 157
Binary file (88767 bytes)
Download g29391g0920010024483.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010538356.jpg · Sequence: 158
Binary file (46216 bytes)
Download g29391g0920010538356.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010602141.jpg · Sequence: 159
Binary file (37951 bytes)
Download g29391g0920010602141.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010602704.jpg · Sequence: 160
Binary file (41333 bytes)
Download g29391g0920010602704.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010603263.jpg · Sequence: 161
Binary file (73744 bytes)
Download g29391g0920010603263.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010603753.jpg · Sequence: 162
Binary file (30487 bytes)
Download g29391g0920010603753.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010604327.jpg · Sequence: 163
Binary file (50906 bytes)
Download g29391g0920010604327.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010605044.jpg · Sequence: 164
Binary file (25553 bytes)
Download g29391g0920010605044.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010605681.jpg · Sequence: 165
Binary file (51715 bytes)
Download g29391g0920010605681.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010608465.jpg · Sequence: 166
Binary file (52366 bytes)
Download g29391g0920010608465.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010608976.jpg · Sequence: 167
Binary file (38486 bytes)
Download g29391g0920010608976.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010610195.jpg · Sequence: 168
Binary file (117171 bytes)
Download g29391g0920010610195.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010610941.jpg · Sequence: 169
Binary file (69519 bytes)
Download g29391g0920010610941.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010611893.jpg · Sequence: 170
Binary file (21682 bytes)
Download g29391g0920010611893.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920010958549.jpg · Sequence: 171
Binary file (4776 bytes)
Download g29391g0920010958549.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920011000501.jpg · Sequence: 172
Binary file (48517 bytes)
Download g29391g0920011000501.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920011000904.jpg · Sequence: 173
Binary file (96318 bytes)
Download g29391g0920011000904.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920023810870.jpg · Sequence: 174
Binary file (81032 bytes)
Download g29391g0920023810870.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920024059039.jpg · Sequence: 175
Binary file (78035 bytes)
Download g29391g0920024059039.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920024733318.jpg · Sequence: 176
Binary file (42365 bytes)
Download g29391g0920024733318.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920024743418.jpg · Sequence: 177
Binary file (192268 bytes)
Download g29391g0920024743418.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920024745256.jpg · Sequence: 178
Binary file (185297 bytes)
Download g29391g0920024745256.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920024747113.jpg · Sequence: 179
Binary file (145837 bytes)
Download g29391g0920024747113.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920024748935.jpg · Sequence: 180
Binary file (146615 bytes)
Download g29391g0920024748935.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920024751492.jpg · Sequence: 181
Binary file (107777 bytes)
Download g29391g0920024751492.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920024753379.jpg · Sequence: 182
Binary file (66396 bytes)
Download g29391g0920024753379.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920024755097.jpg · Sequence: 183
Binary file (139644 bytes)
Download g29391g0920024755097.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920024756867.jpg · Sequence: 184
Binary file (115112 bytes)
Download g29391g0920024756867.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920024758578.jpg · Sequence: 185
Binary file (33072 bytes)
Download g29391g0920024758578.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920033544669.jpg · Sequence: 186
Binary file (91822 bytes)
Download g29391g0920033544669.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920033544947.jpg · Sequence: 187
Binary file (29864 bytes)
Download g29391g0920033544947.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920033545241.jpg · Sequence: 188
Binary file (71145 bytes)
Download g29391g0920033545241.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920033545506.jpg · Sequence: 189
Binary file (60092 bytes)
Download g29391g0920033545506.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920033546058.jpg · Sequence: 190
Binary file (32773 bytes)
Download g29391g0920033546058.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920033547424.jpg · Sequence: 191
Binary file (38857 bytes)
Download g29391g0920033547424.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920034521476.jpg · Sequence: 192
Binary file (31508 bytes)
Download g29391g0920034521476.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920034521860.jpg · Sequence: 193
Binary file (33121 bytes)
Download g29391g0920034521860.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920034522251.jpg · Sequence: 194
Binary file (39194 bytes)
Download g29391g0920034522251.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920034522548.jpg · Sequence: 195
Binary file (39797 bytes)
Download g29391g0920034522548.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920050457197.jpg · Sequence: 196
Binary file (33249 bytes)
Download g29391g0920050457197.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920050457990.jpg · Sequence: 197
Binary file (116193 bytes)
Download g29391g0920050457990.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920050458575.jpg · Sequence: 198
Binary file (131248 bytes)
Download g29391g0920050458575.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920050459207.jpg · Sequence: 199
Binary file (99563 bytes)
Download g29391g0920050459207.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0920050459714.jpg · Sequence: 200
Binary file (52706 bytes)
Download g29391g0920050459714.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0922102101789.jpg · Sequence: 201
Binary file (67735 bytes)
Download g29391g0922102101789.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0922102102377.jpg · Sequence: 202
Binary file (64087 bytes)
Download g29391g0922102102377.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0922102102770.jpg · Sequence: 203
Binary file (55274 bytes)
Download g29391g0922102102770.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0922102103037.jpg · Sequence: 204
Binary file (30458 bytes)
Download g29391g0922102103037.jpg
GRAPHIC
GRAPHIC
Filename: g29391g0922102103305.jpg · Sequence: 205
Binary file (26184 bytes)
Download g29391g0922102103305.jpg
GRAPHIC
GRAPHIC
Filename: g29391g12p53.jpg · Sequence: 206
Binary file (50050 bytes)
Download g29391g12p53.jpg
GRAPHIC
GRAPHIC
Filename: g29391g21w47.jpg · Sequence: 207
Binary file (26432 bytes)
Download g29391g21w47.jpg
GRAPHIC
GRAPHIC
Filename: g29391g36j30.jpg · Sequence: 208
Binary file (39420 bytes)
Download g29391g36j30.jpg
GRAPHIC
GRAPHIC
Filename: g29391g39v72.jpg · Sequence: 209
Binary file (41583 bytes)
Download g29391g39v72.jpg
GRAPHIC
GRAPHIC
Filename: g29391g41j55.jpg · Sequence: 210
Binary file (66060 bytes)
Download g29391g41j55.jpg
GRAPHIC
GRAPHIC
Filename: g29391g49p29.jpg · Sequence: 211
Binary file (60989 bytes)
Download g29391g49p29.jpg
GRAPHIC
GRAPHIC
Filename: g29391g52o46.jpg · Sequence: 212
Binary file (52299 bytes)
Download g29391g52o46.jpg
GRAPHIC
GRAPHIC
Filename: g29391g61e03.jpg · Sequence: 213
Binary file (32327 bytes)
Download g29391g61e03.jpg
GRAPHIC
GRAPHIC
Filename: g29391g70n57.jpg · Sequence: 214
Binary file (80485 bytes)
Download g29391g70n57.jpg
GRAPHIC
GRAPHIC
Filename: g29391g72d14.jpg · Sequence: 215
Binary file (44923 bytes)
Download g29391g72d14.jpg
GRAPHIC
GRAPHIC
Filename: g29391g80m01.jpg · Sequence: 216
Binary file (97019 bytes)
Download g29391g80m01.jpg
GRAPHIC
GRAPHIC
Filename: g29391g93q72.jpg · Sequence: 217
Binary file (78025 bytes)
Download g29391g93q72.jpg
GRAPHIC
GRAPHIC
Filename: g29391page282.jpg · Sequence: 218
Binary file (86122 bytes)
Download g29391page282.jpg
GRAPHIC
GRAPHIC
Filename: g29391page283.jpg · Sequence: 219
Binary file (206731 bytes)
Download g29391page283.jpg
GRAPHIC
GRAPHIC
Filename: g29391page284.jpg · Sequence: 220
Binary file (207441 bytes)
Download g29391page284.jpg
XML — IDEA: XBRL DOCUMENT
XML
Filename: R1.htm · Sequence: 222
v3.26.3
Document and Entity Information
Sep. 21, 2026
Document And Entity Information [Line Items]
Document Type
8-K
Document Period End Date
Sep. 21, 2026
Entity Registrant Name
i-80 GOLD CORP.
Entity Incorporation State Country Code
A1
Entity File Number
001-41382
Entity Tax Identification Number
00-0000000
Entity Address Address Line 1
150 York Street
Entity Address Address Line 2
Suite 1802
Entity Address City Or Town
Toronto
Entity Address State Or Province
ON
Entity Address Postal Zip Code
M5H 3S5
City Area Code
775
Local Phone Number
525-6450
Written Communications
false
Soliciting Material
false
Pre Commencement Tender Offer
false
Pre Commencement Issuer Tender Offer
false
Entity Emerging Growth Company
true
Entity Ex Transition Period
false
Entity Central Index Key
0001853962
Amendment Flag
false
Common Shares [Member]
Document And Entity Information [Line Items]
Security 12b Title
Common Shares
Trading Symbol
IAUX
Security Exchange Name
NYSEAMER
Warrants to Purchase Common Shares [Member]
Document And Entity Information [Line Items]
Security 12b Title
Warrants to Purchase Common Shares
Trading Symbol
IAUX.WS
Security Exchange Name
NYSEAMER
X
- Definition
Boolean flag that is true when the XBRL content amends previously-filed or accepted submission.
+ References
No definition available.
+ Details
Name:
dei_AmendmentFlag
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Area code of city
+ References
No definition available.
+ Details
Name:
dei_CityAreaCode
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
For the EDGAR submission types of Form 8-K: the date of the report, the date of the earliest event reported; for the EDGAR submission types of Form N-1A: the filing date; for all other submission types: the end of the reporting or transition period. The format of the date is YYYY-MM-DD.
+ References
No definition available.
+ Details
Name:
dei_DocumentPeriodEndDate
Namespace Prefix:
dei_
Data Type:
xbrli:dateItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The type of document being provided (such as 10-K, 10-Q, 485BPOS, etc). The document type is limited to the same value as the supporting SEC submission type, or the word 'Other'.
+ References
No definition available.
+ Details
Name:
dei_DocumentType
Namespace Prefix:
dei_
Data Type:
dei:submissionTypeItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Address Line 1 such as Attn, Building Name, Street Name
+ References
No definition available.
+ Details
Name:
dei_EntityAddressAddressLine1
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Address Line 2 such as Street or Suite number
+ References
No definition available.
+ Details
Name:
dei_EntityAddressAddressLine2
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the City or Town
+ References
No definition available.
+ Details
Name:
dei_EntityAddressCityOrTown
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Code for the postal or zip code
+ References
No definition available.
+ Details
Name:
dei_EntityAddressPostalZipCode
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the state or province.
+ References
No definition available.
+ Details
Name:
dei_EntityAddressStateOrProvince
Namespace Prefix:
dei_
Data Type:
dei:stateOrProvinceItemType
Balance Type:
na
Period Type:
duration
X
- Definition
A unique 10-digit SEC-issued value to identify entities that have filed disclosures with the SEC. It is commonly abbreviated as CIK.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityCentralIndexKey
Namespace Prefix:
dei_
Data Type:
dei:centralIndexKeyItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Indicate if registrant meets the emerging growth company criteria.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityEmergingGrowthCompany
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Indicate if an emerging growth company has elected not to use the extended transition period for complying with any new or revised financial accounting standards.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Securities Act
-Number 7A
-Section B
-Subsection 2
+ Details
Name:
dei_EntityExTransitionPeriod
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Commission file number. The field allows up to 17 characters. The prefix may contain 1-3 digits, the sequence number may contain 1-8 digits, the optional suffix may contain 1-4 characters, and the fields are separated with a hyphen.
+ References
No definition available.
+ Details
Name:
dei_EntityFileNumber
Namespace Prefix:
dei_
Data Type:
dei:fileNumberItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Two-character EDGAR code representing the state or country of incorporation.
+ References
No definition available.
+ Details
Name:
dei_EntityIncorporationStateCountryCode
Namespace Prefix:
dei_
Data Type:
dei:edgarStateCountryItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The exact name of the entity filing the report as specified in its charter, which is required by forms filed with the SEC.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityRegistrantName
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The Tax Identification Number (TIN), also known as an Employer Identification Number (EIN), is a unique 9-digit value assigned by the IRS.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityTaxIdentificationNumber
Namespace Prefix:
dei_
Data Type:
dei:employerIdItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Local phone number for entity.
+ References
No definition available.
+ Details
Name:
dei_LocalPhoneNumber
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 13e
-Subsection 4c
+ Details
Name:
dei_PreCommencementIssuerTenderOffer
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 14d
-Subsection 2b
+ Details
Name:
dei_PreCommencementTenderOffer
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Title of a 12(b) registered security.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b
+ Details
Name:
dei_Security12bTitle
Namespace Prefix:
dei_
Data Type:
dei:securityTitleItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the Exchange on which a security is registered.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection d1-1
+ Details
Name:
dei_SecurityExchangeName
Namespace Prefix:
dei_
Data Type:
dei:edgarExchangeCodeItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as soliciting material pursuant to Rule 14a-12 under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 14a
-Subsection 12
+ Details
Name:
dei_SolicitingMaterial
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Trading symbol of an instrument as listed on an exchange.
+ References
No definition available.
+ Details
Name:
dei_TradingSymbol
Namespace Prefix:
dei_
Data Type:
dei:tradingSymbolItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as written communications pursuant to Rule 425 under the Securities Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Securities Act
-Number 230
-Section 425
+ Details
Name:
dei_WrittenCommunications
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- References
No definition available.
+ Details
Name:
iaux_DocumentAndEntityInformationLineItems
Namespace Prefix:
iaux_
Data Type:
xbrli:stringItemType
Balance Type:
na
Period Type:
duration
X
- Details
Name:
us-gaap_StatementClassOfStockAxis=us-gaap_CommonStockMember
Namespace Prefix:
Data Type:
na
Balance Type:
Period Type:
X
- Details
Name:
us-gaap_StatementClassOfStockAxis=us-gaap_WarrantMember
Namespace Prefix:
Data Type:
na
Balance Type:
Period Type: