Form 8-K
8-K — Riot Platforms, Inc.
Accession: 0001104659-26-093406
Filed: 2026-08-10
Period: 2026-08-10
CIK: 0001167419
SIC: 6199 (FINANCE SERVICES)
Item: Results of Operations and Financial Condition
Item: Other Events
Item: Financial Statements and Exhibits
Documents
8-K — riot-20260810x8k.htm (Primary)
EX-99.1 (riot-20260810xex99d1.htm)
EX-99.2 (riot-20260810xex99d2.htm)
GRAPHIC (riot-20260810xex99d2g001.jpg)
GRAPHIC (riot-20260810xex99d2g002.jpg)
GRAPHIC (riot-20260810xex99d2g003.jpg)
GRAPHIC (riot-20260810xex99d2g004.jpg)
GRAPHIC (riot-20260810xex99d2g005.jpg)
GRAPHIC (riot-20260810xex99d2g006.jpg)
GRAPHIC (riot-20260810xex99d2g007.jpg)
GRAPHIC (riot-20260810xex99d2g008.jpg)
GRAPHIC (riot-20260810xex99d2g009.jpg)
GRAPHIC (riot-20260810xex99d2g010.jpg)
GRAPHIC (riot-20260810xex99d2g011.jpg)
GRAPHIC (riot-20260810xex99d2g012.jpg)
GRAPHIC (riot-20260810xex99d2g013.jpg)
GRAPHIC (riot-20260810xex99d2g014.jpg)
GRAPHIC (riot-20260810xex99d2g015.jpg)
GRAPHIC (riot-20260810xex99d2g016.jpg)
GRAPHIC (riot-20260810xex99d2g017.jpg)
GRAPHIC (riot-20260810xex99d2g018.jpg)
GRAPHIC (riot-20260810xex99d2g019.jpg)
GRAPHIC (riot-20260810xex99d2g020.jpg)
GRAPHIC (riot-20260810xex99d2g021.jpg)
GRAPHIC (riot-20260810xex99d2g022.jpg)
GRAPHIC (riot-20260810xex99d2g023.jpg)
GRAPHIC (riot-20260810xex99d2g024.jpg)
GRAPHIC (riot-20260810xex99d2g025.jpg)
GRAPHIC (riot-20260810xex99d2g026.jpg)
GRAPHIC (riot-20260810xex99d2g027.jpg)
GRAPHIC (riot-20260810xex99d2g028.jpg)
GRAPHIC (riot-20260810xex99d2g029.jpg)
GRAPHIC (riot-20260810xex99d2g030.jpg)
GRAPHIC (riot-20260810xex99d2g031.jpg)
GRAPHIC (riot-20260810xex99d2g032.jpg)
GRAPHIC (riot-20260810xex99d2g033.jpg)
XML — IDEA: XBRL DOCUMENT (R1.htm)
8-K
8-K (Primary)
Filename: riot-20260810x8k.htm · Sequence: 1
Riot Platforms, Inc._August 10, 2026
0001167419false0001167419dei:FormerAddressMember2026-08-102026-08-1000011674192026-08-102026-08-10
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 8-K
CURRENT REPORT
PURSUANT TO SECTION 13 OR 15(D) OF
THE SECURITIES EXCHANGE ACT OF 1934
Date of Report (Date of earliest event reported): August 10, 2026
Riot Platforms, Inc.
(Exact name of registrant as specified in its charter)
Nevada
001-33675
84-1553387
(State or other jurisdiction of incorporation)
(Commission File Number)
(I.R.S. Employer Identification No.)
85 Rio Grande Drive, Suite 200
Castle Rock, CO 80104
(Address of principal executive offices)
(303) 794-2000
(Registrant’s telephone number, including area code)
3855 Ambrosia Street, Suite 301
Castle Rock, CO 80109
(Former name or former address, if changed since last report)
Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:
☐ Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
☐ Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
☐ Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
☐ Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))
Securities registered pursuant to Section 12(b) of the Exchange Act:
Title of each class
Trading Symbol(s)
Name of each exchange on which registered
Common Stock, no par value per share
RIOT
Nasdaq Capital Market
Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§240.12b-2 of this chapter).
Emerging growth company ☐
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Item 2.02 - Results of Operations and Financial Condition.
On August 10, 2026, Riot Platforms, Inc. (together with its consolidated subsidiaries, the “Company”) issued a press release (the “Press Release”) announcing an update on the Company’s business and financial results and results of operations for the three months ended June 30, 2026. The Company also published on its website, www.riotplatforms.com, under the “Investor Relations” tab a presentation providing, among other things, an update on the Company’s business and financial results and results of operations for the three months ended June 30, 2026 (the “Q2 2026 Earnings Deck”) and that the Company has entered into a non-binding letter of intent with respect to a proposed lease for the Company’s Corsicana Facility. The full text of the Press Release and the Q2 2026 Earnings Deck are attached to this Current Report on Form 8-K (this “Report”) as Exhibit 99.1 and 99.2, respectively.
The information under this Item 2.02 of this Report, including Exhibits 99.1 and 99.2 attached hereto, is furnished and shall not be deemed “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended, (the “Exchange Act”) nor shall it be deemed incorporated by reference in any filing under the Securities Act of 1933, as amended, or the Exchange Act, except as shall be expressly set forth by specific reference.
Item 8.01 – Other Events.
The information included in Exhibit 99.1 under the heading “191 IT MW Data Center Lease with a Leading Frontier AI Lab at Rockdale” shall be incorporated by reference into this Item 8.01 of this Report.
Item 9.01 – Financial Statements and Exhibits.
(d)Exhibits.
EXHIBIT INDEX
Exhibit No.
Description
99.1
Press Release, dated August 10, 2026.
99.2
Q2 2026 Earnings Deck, dated as of August 10, 2026.
104
Cover Page Interactive Data File (embedded within the Inline XBRL document)
S I G N A T U R E
Pursuant to the requirements of the Securities Exchange Act of 1934, as amended, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.
RIOT PLATFORMS, INC.
By:
/s/ Jason Chung
Name:
Jason Chung
Title:
Chief Financial Officer
Date: August 10, 2026
EX-99.1
EX-99.1
Filename: riot-20260810xex99d1.htm · Sequence: 2
Exhibit 99.1
Riot Platforms Reports Second Quarter 2026 Financial Results and Strategic Highlights
Executed 20-year data center lease with a leading frontier AI lab for 191 MW of critical IT capacity at Riot’s Rockdale campus, expected to generate approximately $9.1 billion in total contract revenue over the initial term
Completed delivery of the initial 25 critical IT MW to AMD on time and on budget, with the second 25 critical IT MW expansion under construction
Together with the AMD lease, the Company has contracted 241 MW of critical IT capacity with two of the most significant companies in the AI ecosystem
Quarterly revenue of $174.2 million, a 14% increase year-over-year, including $23.2 million in Data Center revenue
CASTLE ROCK, Colo., August 10, 2026 (GLOBE NEWSWIRE) — Riot Platforms, Inc. (NASDAQ: RIOT) (“Riot” or “the Company”), a vertically-integrated industry leader in digital infrastructure, specializing in the development of large-scale data centers and bitcoin mining applications, reported financial results for the three-month period ended June 30, 2026. The accompanying presentation materials are available on Riot’s website.
“Today's announcement of a landmark 20-year, 191-megawatt data center lease with a leading frontier AI lab marks a defining moment in our evolution into a leading developer of large-scale data centers,” said Jason Les, CEO of Riot. “It builds directly on a strong second quarter, in which we completed delivery of the initial 25 megawatts to AMD on time and on budget. In just over six months, Riot has now executed leases totaling 241 megawatts of capacity, representing approximately $9.8 billion of long-term, contracted revenue with two of the most important companies in the AI ecosystem.
“Our platform stands apart through three elements working together: multi-gigawatt-scale power capacity that is already fully approved and energized, in-house data center development expertise, and the ability to engineer custom infrastructure for computing's most demanding workloads. With all three, and the financial resources to deploy them already secured, we are positioned to convert strong market demand from high-quality tenants into compounding shareholder value.”
191 IT MW Data Center Lease with a Leading Frontier AI Lab at Rockdale
Subsequent to quarter end, Riot announced the execution of a Data Center Lease and Services Agreement (the “Data Center Lease”) with one of the world’s leading frontier AI labs, for 191 MW of critical IT capacity at Riot’s Rockdale campus. The Data Center Lease carries an initial term of 20 years, running through June 2048, and is expected to generate approximately $9.1 billion in total initial contract revenue. The Data Center Lease also includes two five-year extension options at the tenant’s election, representing a total potential contract value of approximately $16.1 billion if both extensions are fully exercised.
This transaction secures the Company’s second tenant at the Rockdale campus, following the lease with Advanced Micro Devices, Inc. (“AMD”) announced on January 16, 2026. Together, the two agreements firmly establish Riot as a leading contracted AI data center developer.
Transaction highlights:
• Capacity Leased: 191 MW critical IT build-to-suit Tier 3 data center at Riot’s Rockdale campus.
• Total Contract Value: $9.1 billion over the initial 20-year term, with a total potential contract value of approximately $16.1 billion if both five-year extension options are exercised.
• NOI Contribution: Estimated cumulative NOI range of $7.3 to $8.2 billion over the base lease term, with an estimated average annual NOI contribution of $365 to $411 million.
• Delivery Schedule: Phased delivery schedule, with the initial 96 IT MW expected in December 2027 and full 191 IT MW deployment expected by June 2028, leveraging Riot’s existing, fully approved interconnection at the Rockdale campus.
• Financing: $573 million interim financing facility provided by Morgan Stanley to fund initial development costs while the investment-grade credit backstop is finalized.
Second Quarter 2026 Financial and Operational Highlights
Key financial and operational highlights for the quarter include:
• Total revenue of $174.2 million, as compared to $153.0 million for the same three-month period in 2025, a 14% increase year-over-year.
• Data Center revenue of $23.2 million for the quarter, comprised of $4.9 million in operating lease revenue and $18.3 million in tenant fit-out services revenue, reflecting the Company’s second quarter of Data Center segment revenue and the completed delivery of the initial 25 MW to AMD.
• Produced 1,587 bitcoin, as compared to 1,426 during the same three-month period in 2025.
• The average cost to mine bitcoin, excluding depreciation, was $49,912 in the quarter, as compared to $48,992 per bitcoin in the same three-month period in 2025. The increase was primarily driven by higher power costs and the expansion at Riot’s Kentucky facilities.
• Bitcoin Mining revenue of $113.7 million for the quarter, as compared to $140.9 million for the same three-month period in 2025, primarily driven by lower average bitcoin prices and an increase in global network hash rate, partially offset by an increase in Riot’s average operating hash rate.
• Engineering revenue of $37.3 million for the quarter, as compared to $10.6 million for the same three-month period in 2025.
• Ended the quarter with over $1.2 billion in liquid assets, including 11,380 bitcoin (of which 5,821 were held as collateral), equating to approximately $666.0 million based on the market price for one bitcoin on June 30, 2026 of $58,527, and $548.9 million in cash (of which $77.5 million is restricted).
AMD Deployment Progress at Rockdale
During the quarter, Riot completed delivery of the final 20 MW of AMD’s initial deployment, bringing the full 25 MW of commissioned capacity online, on time and on budget, and converting the lease to recurring revenue at full initial scale. Construction is now underway on the 25 MW expansion, with the 10 MW Phase 3 on track for delivery in November 2026 and the 15 MW Phase 4 to follow in May 2027, at which point AMD's total contracted capacity of 50 MW will be fully deployed. Riot’s in-house procurement, engineering and construction capabilities continue to underpin this delivery record.
Conference Call
Riot will host a conference call on August 10, 2026 at 4:30 p.m. ET to discuss its financial results.
This conference call will be available through audio-only webcast — please use this link to register: https://edge.media-server.com/mmc/p/xk5hszcg
Participants who choose to dial into the call in the United States or internationally to ask questions, please use this toll-free number: +1 (800) 715-9871 or toll number: +1 (646) 307-1963. For both dial in numbers, the audience passcode is 3868069.
About Riot Platforms, Inc.
Riot Platforms, Inc. (NASDAQ: RIOT) is a leading digital infrastructure company, specializing in the development of large-scale data centers and bitcoin mining applications. The Company operates digital infrastructure and Bitcoin mining facilities in central Texas and Kentucky, and engineering and fabrication facilities in Denver and Houston.
Riot’s vision is to be the world’s most trusted platform for powering and building the next digital world. Its mission is to empower the future of digital infrastructure by positively impacting the sectors, networks, and communities the Company touches.
For more information, visit Riot Platforms.
Safe Harbor
Statements in this press release that are not historical facts are forward-looking statements that reflect management’s current expectations, assumptions, and estimates of future performance and economic conditions. Such statements rely on the safe harbor provisions of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Because such statements are subject to risks and uncertainties, actual results may differ materially from those expressed or implied by such forward-looking statements. Words such as “anticipates,” “believes,” “plans,” “expects,” “intends,” “will,” “potential,” “hope,” similar expressions and their negatives are intended to identify forward-looking statements. These forward-looking statements may include, but are not limited to: plans to develop data centers, projections, objectives, expectations, and intentions about future events; short-term and long-term business operations and objectives and financial needs; the Company’s data center leases at the Rockdale Site; forecasted demand for energy at the sites; the Company’s expansion plans at the site; the Company’s anticipated financing plans, and the Company’s other plans, projections, objectives, expectations, and intentions more generally. These forward-looking statements are subject to a number of risks and uncertainties that may cause results, performance, or achievements to be materially different from those expressed or implied, including, without limitation: risks relating to the Company’s growth and developing the Company’s power capacity for data center purposes, including construction plans, delays, supply chain issues, permitting or regulatory hurdles, and unforeseen technical challenges; the anticipated demand for large data centers; changes in leasing arrangements; risks relating to the financing of new data centers; future economic conditions, performance, or outlooks; future political conditions; the outcome of contingencies; potential acquisitions or divestitures; our ability to maximize the value of our full power portfolio; the number and value of Bitcoin rewards and transaction fees we earn from our ongoing Bitcoin Mining operations; future self-mining hash rate capacity; expected cash flows or capital expenditures; our beliefs or expectations; activities, events or developments that we intend, expect, project, believe, or anticipate will or may occur in the future; unaudited estimates of bitcoin production; risks related to the success, schedule, cost and difficulty of integrating businesses we acquire; and our failure to realize anticipated efficiencies and strategic and financial benefits from our acquisitions. Detailed information regarding the factors identified by the Company’s management which they believe may cause actual results to differ materially from those expressed or implied by such forward-looking statements in this press release may be found in the Company’s filings with the U.S. Securities and Exchange Commission (the “SEC”), including the risks, uncertainties and other factors discussed under the sections entitled “Risk Factors” and “Cautionary Note Regarding Forward-Looking Statements” of the Company’s most recently filed periodic reports on Form 10-K and Form 10-Q, and the other filings the Company makes with the SEC, copies of which may be obtained from the SEC’s website, www.sec.gov. All forward- looking statements included in this press release are made only as of the date of this press release, and the Company disclaims any intention or obligation to update or revise any such forward-looking statements to reflect events or circumstances that subsequently occur, or of which the Company hereafter becomes aware, except as required by law. Persons reading this press release are cautioned not to place undue reliance on such forward-looking statements.
Additional Information and Communications
For important news and information regarding the Company, including presentations and other news and events, visit the Investor Relations section of the Company’s website, riotplatforms.com/investors, and the Company’s social media accounts, including on X and LinkedIn.
Contacts:
Investor Contact:
Joshua Kane
IR@Riotplatforms.com
Media Contact:
Becca Rincon
PR@Riotplatforms.com
Non-U.S. GAAP Measures of Financial Performance
In addition to financial measures presented under generally accepted accounting principles in the United States of America (“GAAP”), we consistently evaluate our use of and calculation of non-GAAP financial measures such as “Adjusted EBITDA.” EBITDA is computed as net income before interest, taxes, depreciation, and amortization. Adjusted EBITDA is a financial measure defined as EBITDA, adjusted to eliminate the effects of certain non-cash and/or non-recurring items that do not reflect our ongoing strategic business operations, which management believes results in a performance measurement that represents a key indicator of the Company’s core business operations of Bitcoin mining. The adjustments include fair value adjustments such as derivative power contract adjustments, equity securities fair value changes, and non-cash stock-based compensation expense, in addition to financing and legacy business income and expense items. We believe Adjusted EBITDA can be an important financial performance measure because it allows management, investors, and our board of directors to evaluate and compare our operating results, including our return on capital and operating efficiencies from period-to-period by making such adjustments. Additionally, Adjusted EBITDA is used as a performance metric for share-based compensation.
Adjusted EBITDA is provided in addition to, and should not be considered a substitute for, or superior to, net income, the most comparable measure under GAAP to Adjusted EBITDA. Further, Adjusted EBITDA should not be considered as an alternative to revenue growth, net income, diluted net income per share or any other performance measure derived in accordance with GAAP, or as an alternative to cash flow from operating activities as a measure of our liquidity. Adjusted EBITDA has limitations as an analytical tool, and you should not consider this financial measure either in isolation or as a substitute for analyzing our results as reported under GAAP.
The following table reconciles Adjusted EBITDA to Net income (loss), the most comparable GAAP financial measure:
Three Months Ended
Six Months Ended
June 30,
June 30,
2026
2025
2026
2025
Net income (loss)
$
(237,170)
$
219,454
$
(737,647)
$
(76,913)
Interest income
(3,623)
(3,334)
(5,936)
(6,731)
Interest expense
2,687
6,093
5,305
8,401
Income tax expense (benefit)
(105)
320
186
757
Depreciation and amortization
97,784
83,197
195,518
161,123
EBITDA
(140,427)
305,730
(542,574)
86,637
Adjustments:
Stock-based compensation expense
35,582
30,120
74,748
59,696
Acquisition-related costs
—
111
—
187
Change in fair value of derivatives
8,362
42,747
60,214
853
Change in fair value of contingent consideration
—
(9,390)
—
(17,642)
Loss (gain) on equity method investment - marketable securities
—
(6,143)
—
57,095
Loss (gain) on sale of equipment
—
350
—
479
Casualty-related charges (recoveries), net
3
(119)
3
(119)
Loss on contract settlement
—
158,137
—
158,137
Gain on acquisition post-close dispute settlement
—
(26,007)
—
(26,007)
Impairment of property and equipment
27,972
—
27,972
—
Other (income) expense
(1,221)
(244)
(1,209)
(337)
Amortization of license fee revenue
—
(24)
—
(24)
Adjusted EBITDA
$
(69,729)
$
495,268
$
(380,846)
$
318,955
The Company defines Cost to Mine as the cost to mine one Bitcoin, excluding Bitcoin miner depreciation, as calculated in the table below.
Three Months Ended
Six Months Ended
June 30,
June 30,
2026
2025
2026
2025
Cost of power for self-mining operations
$
73,499
$
62,170
$
145,816
$
123,999
Other direct cost of revenue for self-mining operations(1)(2), excluding bitcoin miner depreciation
15,765
16,005
30,210
28,994
Cost of revenue for self-mining operations, excluding bitcoin miner depreciation
89,264
78,175
176,026
152,993
Less: power curtailment credits(3)
(10,054)
(8,313)
(31,077)
(16,114)
Cost of revenue for self-mining operations, net of power curtailment credits, excluding bitcoin miner depreciation
79,210
69,862
144,949
136,879
Bitcoin miner depreciation(4)(5)
64,622
60,252
140,708
117,314
Cost of revenue for self-mining operations, net of power curtailment credits, including bitcoin miner depreciation
$
143,832
$
130,114
$
285,657
$
254,193
Quantity of bitcoin mined
1,587
1,426
3,060
2,956
Production value of one bitcoin mined(6)
$
71,667
$
98,800
$
73,736
$
95,991
Cost to mine one bitcoin, excluding bitcoin miner depreciation
$
49,912
$
48,992
$
47,369
$
46,305
Cost to mine one bitcoin, excluding bitcoin miner depreciation, as a % of production value of one bitcoin mined
69.6
%
49.6
%
64.2
%
48.2
%
Cost to mine one bitcoin, including bitcoin miner depreciation
$
90,631
$
91,244
$
93,352
$
85,992
Cost to mine one bitcoin, including bitcoin miner depreciation, as a % of production value of one bitcoin mined
126.5
%
92.4
%
126.6
%
89.6
%
(1)
Other direct cost of revenue includes compensation, insurance, repairs, and ground lease rent and related property tax.
(2)
For the three months ended June 30, 2026 and 2025, we paid cash of $25.2 million and $71.3 million, respectively, and for the six months ended June 30, 2026 and 2025, we paid cash of $48.7 million and $92.3 million, respectively, in total deposits and payments for the purchase of miners. Costs to finance the purchase of miners were zero in all periods presented as the miners were paid for with cash from the Company’s cash balance. The seller did not provide any financing, nor did the Company borrow from a third-party to purchase the miners.
(3)
Power curtailment credits are credited against our power invoices as a result of temporarily pausing our operations to participate in ERCOT’s Demand Response Service Programs. Our fixed-price power purchase contracts enable us to strategically curtail our mining operations and participate in these programs, which significantly lower our cost to mine bitcoin. These credits are recognized in Power curtailment credits on our Condensed Consolidated Statements of Operations, outside of cost of revenue, but significantly reduce our overall cost to mine bitcoin.
(4)
We capitalize the acquisition cost of our miners and include these costs in Property and equipment, net on our Condensed Consolidated Balance Sheets. The miners are depreciated over an estimated useful life of three years, during which time, they are expected to contribute to the generation of bitcoin revenue. We do not consider depreciation expense in determining whether it is economical to operate our miners because depreciation is a non-cash expense and is not a variable operating cost that can be avoided even if we curtail operations temporarily. Depreciation expense incurred is disclosed for each respective period in the table above.
(5)
The following table presents the future depreciation expense of all of our bitcoin miners:
Remainder of 2026
$
133,593
2027
219,902
2028
99,312
2029
19,258
Total
$
472,065
(6)
Computed as revenue recognized from bitcoin mined divided by the quantity of bitcoin mined during the same period.
EX-99.2
EX-99.2
Filename: riot-20260810xex99d2.htm · Sequence: 3
Exhibit 99.2
Conceptual rendering
RIOT PLATFORMS
Q2 2026 EARNINGS
August 10, 2026 NASDAQ: RIOT
TABLE OF
CONTENTS
S E C T I O N 2 :
BUSINESS UPDATE DATA CENTERS
S E C T I O N 1 :
Q2 2026 KEY HIGHLIGHTS
S E C T I O N 4 :
Q2 2026 FINANCIAL UPDATE
S E C T I O N 3 :
FINANCING UPDATE
3
S E C T I O N 5 :
CLOSING REMARKS
Q2 2026
K E Y H I G H L I G H T S
S E C T I O N 1 :
4
• Executed Data Center Lease with a leading frontier AI lab for 191 MW of
critical IT capacity
• 20-year lease expected to generate $9.1B in total initial contract revenue
with two 5-year extension options, if exercised, would generate $16.1B in
total potential contract revenue
• Commissioned and delivered first 25 MW of capacity in May 2026
• 25 MW expansion exercised by AMD is under construction and scheduled for
full delivery in May 2027
• Advanced commercial and design discussions with full site under non-binding LOI to single tenant
• Continued development and critical path procurement processes to maintain
delivery timelines and derisk future execution
• Continued sale of BTC inventory as primary funding source for equity
component of data center total capital expenditures
• Maintained strong liquidity position with $1.2B in total liquidity consisting of
$666M in BTC and $549M of cash 1
KEY ACCOMPLISHMENTS
5
1.Bitcoin value based on a closing price of $58,527 on June 30, 2026, sourced from Coinbase. Cash balance is as of June 30, 2026, and includes restricted cash of $77.5 million and 5,821 in restricted bitcoin.
Lease Signed with Leading
Frontier AI Lab
Corsicana Site
Under LOI
AMD Deployment
On Track
Strong Financial
Position
BUSINESS
UPDATE
D A T A C E N T E R S
S E C T I O N 2 :
6
191 MW
Critical IT
Capacity
Dec 2027
Initial Deployment and Rent
Commencement
Two 5-Year
Extension
Options
$9.1 Billion
Total Contract
Revenue 1
June 2028
Full Deployment
$11.0-12.0M / IT MW
Illustrative Capex Range4
80% – 90%
Anticipated
NOI Margin Range
20 Year Initial Term
Upon Full Deployment2
1. Contract value for deployment over the entire term of the lease, including phased development starting Dec 2027.
2. Deployment will be delivered in phases, with the full deployment estimated to be delivered on the listed month above.
3. Morgan Stanley interim financing facility of up to $573 million.
4. Represents costs of new construction beyond existing infrastructure.
DEAL HIGHLIGHTS
Morgan Stanley
Interim Financing3
IG-Backstop in Finalization
RIOT SIGNS
$9.1 BILLION DEAL
WITH LEADING
FRONTIER AI LAB AT
ROCKDALE CAMPUS
7
Initial Capacity On-Schedule and De-Risked
for Delivery in December 2027
Signed Lease with
Leading Frontier AI
Lab
Phase 1 96 MW
Delivered
December 2027
Phase 2 95 MW
Delivered
June 2028
96 MW 191 MW
TODAY
Accelerated Design
Strategy Defined
Tenant BoD incorporated to reduce
design timelines and enable rapid
procurement. Full design and internal
architecture completed.
1
Delivery Partners Selected
Preferred partners with
this specific leading frontier
AI lab engaged to support execution
and GMP development.
2
Vertical Integration
Advantage Leveraged
ESS Metron and E4A capabilities
integrated into the delivery plan,
accelerating substation development
and reducing long-lead equipment risk.
3
Power Capacity Confirmed
Required power availability
secured and aligned with
project delivery milestones.
4
Interim Financing Secured
$573M interim financing
provided by Morgan Stanley to
fund procurement of LLE and
maintain delivery milestones.
5
8
P R O G R E S S U P D A T E S
9
• Nearly complete design for second 25 MW deployment, enabling construction
execution.
• Construction is underway, with the initial 10 MW RFS expected in November
2026 and the remaining 15 MW RFS expected in May 2027.
• Leveraging Riot’s vertically integrated engineering capabilities through ESS
Metron to support execution and schedule certainty.
• Strategic general contractor alignment continues to support disciplined project
execution.
Rockdale Campus
Successfully Delivered
Initial 25 MW to AMD
On Schedule and On Budget
AMD – 50 MW
Average
Annual
Revenue1
$63.6 million $457 million $520 million
Average
Annual NOI
Total
Capital
Expenditures3
1. Total Revenue based on contract value of the total length of each lease term, including annual escalators.
Represents 50 MW currently contracted under the AMD lease.
2. Estimation based on an 80 – 90% NOI Margin range.
3. Excludes tenant fit out costs.
4. Represents the expected timeline of full capacity delivery on each respective lease shown.
AMD
(50 IT MW)
Leading Frontier
AI Lab
(191 IT MW)
Total
(241 IT MW)
Rockdale
Pro Forma
Critical IT
MW Leased
$51.0 million $365 – 411 million2 $416 – 462 million
May 2027 June 2028 -
Rockdale
391 IT MW
Contract
Potential
Leading
Frontier
AI Lab
Capacity
191 IT MW
Contracted
AMD
Capacity
50 IT MW
Contracted
AMD
Expansion
Capacity
150 IT MW
In 2026, Riot Has Secured $9.8 Billion of Data Center Revenue
With Leading Players in the AI Ecosystem
Full
Deployment4
$170.2 million $2.1-2.3 billion $2.3-2.5 billion
10
S E C T I O N 3 :
11
FINANCING
UPDATE
Q 2 2 0 2 6
Strong Balance Sheet
Allows Riot to deploy capital into current and future data
center projects
Capital Recycling
Expected debt proceeds from initial 25 MW deployment will
nearly double Riot’s initial equity contribution1
, with
additional capacity for AMD’s second 25 MW deployment
Capital Redeployment
Proceeds from above will be redeployed into funding the
equity requirement under the leading frontier AI lab project,
avoiding any need for new equity issuance, while further
extending the runway of our balance sheet
Capital Recycling & Redeployment
Disciplined Balance Sheet, and Recycling Lower Cost
Proceeds to Fund Higher Return Projects
1.Based on previously announced $89.5 million capex budget
12
CAPITAL
STRATEGY
Riot’s financing strategy drives development growth by leveraging
a strong balance sheet and debt financing proceeds, reducing the
need for external equity
13
1
REFINANCE STABILIZED CAPACITY
INITIAL 25 MW DELIVERED - EXPECTED TERM LOAN
Expected term loan ~$180M
Less: initial 25 MW equity requirement already spent ~$90M
NET NEW PROCEEDS ~$90M
SECOND 25 MW - $69M DELAYED DRAW TERM LOAN (DDTL)
Drawdown facility preserves balance sheet liquidity for new projects
Expected capex ~$81M
Less: DDTL proceeds (@85% LTC) ~$69M
NET EQUITY REQUIREMENT ~$12M
2
FUND NEW LEADING FRONTIER AI LAB PROJECT BUILDOUT
Expected capital expenditures $2.1 – $2.3B
Less: estimated debt (@80% - 90% LTC) $1.7 – $2.1B
Equity requirement $210 – $460M
Less: expected term loan from AMD $180M
NET EQUITY REQUIRED $30 – $280M
T O T A L B A L A N C E SH E E T L IQ U ID IT Y $1.2B
NET EQUITY REQUIRED
Net project equity required for the leading frontier AI lab buildout will be funded primarily through
existing liquidity position and expected debt financing
• $180 million expected gross proceeds to redeploy into the leading
frontier AI lab project
• Net project equity to fund buildout is fully covered by
existing balance sheet and expected term loan from AMD
financing
R E D E P L O Y E D
$30M - $280M
Disciplined
Capital
Recycling
13
FINANCIAL
UPDATE
Q 2 2 0 2 6
S E C T I O N 4 :
14
1. Net income per share figure based on diluted shares outstanding.
2. See Appendix slides 28-29 for definitions, terms, and reconciliations.
3. Bitcoin value based on a closing price of $58,527 on June 30, 2026,
sourced from Coinbase.
4. ‘Global Network Hash Rate’ quarter average sourced from Blockchain.com
as of June 30, 2026.
FINANCIAL
METRICS
POWER
STATISTICS
Net Cost of Power
Represents one of the lowest costs
of power in the industry2
Power Credits Equivalent of
$6,335 per BTC mined
RIOT PLATFORMS
Q2 2026
BY THE
NUMBERS
3.6 c/kWh
$10M
Net Income
Reflects several non-cash
charges and mark to market
pricing on BTC held
Diluted EPS
Includes D&A, SBC,
unrealized loss on BTC held1
Adjusted EBITDA
Adjusted for non-cash and
unusual items2
Total Revenue
14% increase
year-over-year
Approx. Available Total
Power Capacity
1,700 MW in Texas and 300
MW in Kentucky
15
DATA CENTER
STATISTICS
End-of-quarter Critical IT
contracted and delivered
Total Revenue
Reflects RFS of Riot’s first data
center deployment & fit-out
25 MW
$23M
Operating Lease Revenue
Reflects delivery of full 25 MW
AMD deployment in mid-May
$5M
15
BTC MINING
STATISTICS
BTCHeld
Quarter-end value of
$666.0M3
BTC Produced
Production of 17.4 BTC
per day
Hash Rate Deployed
Accounting for ~4.6% of
the global network4
Cost to Mine per Bitcoin
Vertical-integration and
power strategy drive low
cost to mine2
Operating Lease Gross Margin
84%
1,587
11,380
44.4 EH/s
$49,912
$174M
$(237)M
$(0.68)
$(70)M
2.0 GW
DATA CENTER | Q2 2026 Data Center Revenues
16
• Delivered 84% operating lease
gross margin / 91% base rent gross
margin and grew AMD contracted
capacity to 50 MW in Q2
• 25 MW of capacity delivered on
schedule in May, with construction
of next 25 MW underway
• Tenant fit-out services include the
procurement and installation of
customer-specific equipment,
reimbursed by the tenant on
a cost-plus basis
Q2 2026 Q1 2026 Q/Q
Revenue Gross
Profit
Gross
Margin Revenue Gross
Profit
Gross
Margin Revenue Gross
Profit
Operating Lease
(Recurring) $4.9M $4.1M 84% $0.9M $0.8M 91% +428% +389%
Tenant Fit Out
Services $18.3M $2.4M 13% $32.2M $1.5M 5% -43% +56%
Total $23.2M $6.5M 28% $33.2M $2.4M 7% -30% +174%
Base Rent1
(Recurring) $4.5M $4.1M 91% $0.9M $0.8M 94% +405% +389%
1. Base Rent is base rent as defined in the lease and recognized on a GAAP-basis, and excludes power reimbursement and Tenant Fit Out Services revenue and related costs.
Riot Engineering Provides a Key Competitive Advantage in the Delivery
of Critical Data Center Components
17
Riot Engineering provides
significant operational
synergies
• ESS Metron manufactures low and medium voltage
switchgear and power distribution units – critical
long lead-time components
• Riot engineering supporting the procurement
process for our data center strategy
• Drives greater control of the supply chain and
creates cost savings
• Derisksthe delivery of a critical data center
component
• Servicing and maintenance expertise leads to
operational efficiencies
Data center
sector
represents
90% of current
backlog
17
$10.6
$19.1 $21.1 $22.2
$37.3
Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026
$118.7
$159.6
$227.0
$193.4 $177.1
Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026
Conversion cycle of backlog to revenue has improved dramatically with a 25%
expansion of manufacturing capacity in 2026
Engineering
Backlog ($M)
Engineering Revenues Continue
to Increase ($M)
CLOSING
REMARKS
S E C T I O N 5 :
18
Riot Maintains
Strong
Development
Momentum
Jan 2026
Announced
Rockdale land
acquisition and
execution of first data
center
Lease with AMD
May 2026
Phased AMD
deployment
of 25 MW
May 2027
Additional
phased AMD
deployment
of 25 MW
Dec 2027
Phase 1 of
leading frontier
AI lab deployment
of 96 MW
241
MW
June 2028
Phase 2 of
leading frontier
AI lab deployment
of 95 MW
Fully developed
portfolio of BTS data
centers
AMD Lease
Phase 1-2
AMD Lease
Phase 3-4
Leading Frontier
AI Lab Lease
Phase 1
146
MW
50
MW
25
MW
~1 GW
Corsicana
Full Campus
LOI signed
Corsicana
LOI
1.3 GW+
Leading Frontier
AI Lab Lease
Phase 2
19
FUTURE
FOCUS &
THEMES
20
DELIVER CONTRACTED MEGAWATTS TO AMD AND ADVANCE THE LEADING FRONTIER
AI LAB BUILDOUT ON SCHEDULE AND ON BUDGET
CONVERT OUR CORSICANA LOI INTO AN EXECUTED LEASE
CLOSE LOWER-COST PROJECT FINANCING THAT REFLECTS
THE HIGH QUALITY OF OUR TENANTS AND OUR SITES
ACTIVELY PURSUE GROWTH OF OUR POWER PIPELINE AND EXECUTE ACCRETIVE
INVESTMENTS THAT COMPOUND VALUE IN OUR PORFOLIO
Q2 2026
DATA
OPERATIONAL
A P P E N D I X
21
$140.9
$160.8
$131.7
$111.9 $113.7
50% 59%
39% 41%
30%
Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026
35.4 EH/s 36.5 EH/s 38.5 EH/s
42.5 EH/s 44.4 EH/s
87% 86% 89% 90% 87%
Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026
• Q2 2026 Bitcoin Mining Revenue of
$113.7M and Gross Profit – Bitcoin Mining
of $34.5M
• Industry leading Bitcoin Mining margins
with an Q2 2026 Cost to Mine of $49,912
due to Riot’s power strategy driving an all-in
cost of power of 3.6c/kWh
• Strong hash rate utilization averaging 87% in
Q2 2026, partially impacted by miner
downtime in Kentucky during the month of
May
Metric Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026
Avg. Hash Price ($/PH/s/Day) $51 $56 $42 $34 $34
Avg. Network Hash Rate¹ 876 EH/s 948 EH/s 1,071EH/s 994 EH/s 957 EH/s
Cost to Mine² $48,992 $46,324 $60,619 $44,629 $49,912
# of BTC produced 1,426 1,406 1,324 1,473 1,587
Ending
Hash Rate
Capacity /
Uptime (%)
Bitcoin Mining
Increasing Efficiency and Scale of Operations
Bitcoin Mining Revenue /
Gross Margin –
Bitcoin Mining2
(%)
Ending Hash Rate Capacity
Bitcoin Mining Revenue ($ million)
1. Sourced fromBlockchain.comas of June 30, 2026.
2. See Appendix slides 28-29 for definitions, terms, and reconciliations.
3. Three months ended as of June 30, 2026.
22
14% 65%
21%
Bitcoin Mining
Data Centers
Engineering
Riot Revenue
Breakdown Q2
20261
$46,313
$49,912
$9,934 $6,335
Q2 2026
Total Direct
Costs
per BTC
Q2 2026
Power Credits
Per BTC
Q2 2026
Net Direct
Costs
per BTC
$43,597
$48,992
$11,224
$5,829
Q2 2025
Total Direct
Costs
per BTC
Q2 2025
Power Credits
Per BTC
Q2 2025
Net Direct
Costs
per BTC
Q2 2025 vs. Q2 2026 Cost to Mine per BTC
Q2 2025 1
1,426 BTC Mined
Avg. BTC Price of $98,800
Q2 2026 2
1,587 BTC Mined
Avg. BTC Price of $71,667
23 1.Three months ended as of June 30, 2025. See Appendix on slides 28-29 for definitions, terms, and reconciliations.
2.Three months ended as of June 30, 2026. See Appendix on slides 28-29 for definitions, terms, and reconciliations.
Despite BTC Mining Headwinds, Lost Cost to Mine
Drives Continued Profitability • Average global network hash rate up 9%
in Q2 2026 vs Q2 2025
• Global network hash rate avg.
957 EH/s in Q2 2026 versus 876
EH/s in Q2 2025
• ‘Non-Power’ includes direct labor, miner
insurance, miner and miner-related
equipment repair, land lease, property
taxes, network costs and other utilities
expenses
• Riot’s power strategy generated
significant power curtailment credits of
$10.1 million in Q2 2026, driving an all-in
cost of power of 3.6c/kWh
• Equates to $6,335 per BTC for the
quarter
Non-Power
Power
Non-Power
Power
$10.6
$19.1 $21.1 $22.2
$37.3
7%
28%
26% 18%
28%
0%
10%
20%
30%
40%
50%
$-
$10.0
$20.0
$30.0
$40.0
Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026
• Since the acquisition of ESS Metron in
December of 2021, Riot has already realized
$23.8M in capex savings alone
• Backlog of $177.1M, with 90% of this
backlog originating from the data center
sector
• Strategically holding back capacity for Riot
data center growth and continued
integration of the Riot platform
Cumulative
Capex
Savings to
Riot
Backlog
Revenue /
Gross Margin
(%)
24
Engineering – A Key Component
of Riot’s Vertical Integration Strategy
1. Three months ended as of June 30, 2026.
$12.4
$23.0 $23.2 $23.8 $23.8
Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026
$118.7
$159.6
$227.0
$193.4 $177.1
Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026
14% 65%
21%
Bitcoin Mining
Data Centers
Engineering
Riot Revenue
Breakdown Q2
20261
Company Profile
25
COMPANY SNAPSHOT
Headquarters Denver, Colorado – ESS Metron
Houston, Texas – E4A Solutions
Employees 244 – ESS Metron
60 – E4A Solutions
Key Leadership Beck Jonson, CEO – ESS Metron
Alexandre Chacara, CEO – E4A Solutions
Acquisition Dates December 2021 – ESS Metron
December 2024 – E4A Solutions
ESS METRON
KEY OFFERINGS
Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026
Revenue $10.6 $19.1 $21.1 $22.2 $37.3
% growth - 80.2% 10.5% 5.2% 68.0%
Gross Profit $0.7 $5.4 $5.6 $4.0 $10.3
% margin 6.8% 28.2% 26.4% 18.2% 27.5%
SUMMARY FINANCIALS ($M)
SELECT CLIENTS
MANUFACTURING
Designs and manufactures power
distribution equipment and engineered-to-order electrical products for large-scale industrial and governmental clients
across the data center, power
generation, utility, water, industrial, and
alternative energy markets
E4A SOLUTIONS
KEY OFFERINGS
SERVICES
Provides electrical engineering
solutions and services
supporting the full lifecycle of
electrical infrastructure, from
design and engineering to
commissioning and ongoing
operations & maintenance
R I O T E N G I N E E R I N G
Utilized by AMD as their Megalab for
testing new products. Site of the first
installation and testing of Helios,
AMD’s next
-generation AI GPU
architecture.
ROCKDALE
DATA CENTER
CAMPUS
26
Q2 2026
DATA
FINANCIAL
A P P E N D I X
27
Definitions, Terms, and Reconciliations (Unaudited)
1.Other direct cost of revenue includes compensation, insurance, repairs, and ground lease rent and related property tax.
2.Costs to finance the purchase of miners were zero in all periods presented as the miners were paid for with cash from the Company’s cash balance. The seller did not provide any financing, nor did the Company borrow from a third-party to purchase the miners.
3.Power curtailment credits are credited against our power invoices as a result of temporarily pausing our operations to participate in ERCOT’s Demand Response Service Programs. Our fixed-price power purchase contracts enable us to strategically curtail our mining operations and participate in these programs,
which significantly lower our cost to mine bitcoin. These credits are recognized in Power Curtailment Credits on our Consolidated Statement of Operations, outside of cost of revenue.
4.Computed as revenue recognized from bitcoin mined divided by the quantity of bitcoin mined during the same period.
28
COST TO MINE
The Company defines Cost to Mine as the
direct cost to mine one Bitcoin, excluding
Bitcoin miner depreciation, as calculated in the
table below
COST OF POWER
The Company defines Cost of Power as the cost of
power directly used in the process of mining Bitcoin,
less power curtailment credits, divided by kilowatt
("kWh") hours used
June 30, September 30, December 31, March 31, June 30,
2025 2025 2025 2026 2026 2026 2025
Total Cost of Power $ 62,170 $ 82,370 $ 75,027 $ 72,317 $ 73,499 $ 145,816 $ 123,999
less: Power curtailment credits (8,313) (30,634) (9,981) (21,023) (10,054) (31,077) (16,114)
Net Cost of Power $ 53,857 $ 51,736 $ 65,046 $ 51,294 $ 63,445 $ 114,739 $ 107,885
kWh used 1,538,273,540 1,592,798,508 1,669,276,467 1,735,496,392 1,785,649,387 3,521,145,779 2,556,632,711
Cost of Power (c/kWh) $ 3.5 $ 3.2 $ 3.9 $ 3.0 $ 3.6 $ 3.3 $ 4.2
Three Months Ended Six Months Ended
June 30,
June 30, September 30, December 31, March 31, June 30,
2025 2025 2025 2026 2026 2026 2025
Cost of power for self-mining operations $ 62,170 $ 82,370 $ 75,027 $ 72,317 $ 73,499 $ 145,816 $ 123,999
Other direct cost of revenue for self-mining operations(1)(2), excluding Bitcoin miner depreciation 16,005 13,395 15,226 14,445 15,765 30,210 28,994
Cost of revenue for self-mining operations, excluding Bitcoin miner depreciation 78,175 95,765 90,253 86,762 89,264 176,026 152,993
Less: power curtailment credits(3)
(8,313) (30,634) (9,981) (21,023) (10,054) (31,077) (16,114)
Cost of revenue for self-mining operations, net of power curtailment credits, excluding Bitcoin miner depreciation 69,862 65,131 80,272 65,739 79,210 144,949 136,879
Bitcoin miner depreciation 60,252 60,106 60,154 76,086 64,622 140,708 117,314
Cost of revenue for self-mining operations, net of power curtailment credits, including Bitcoin miner depreciation $ 130,114 $ 125,237 $ 140,426 $ 141,825 $ 143,832 $ 285,657 $ 254,193
Quantity of Bitcoin mined 1,426 1,406 1,324 1,473 1,587 3,060 2,956
Production value of one Bitcoin mined(4) $ 98,800 $ 114,361 $ 99,482 $ 75,964 $ 71,667 $ 73,736 $ 95,991
Cost to mine one Bitcoin, excluding Bitcoin miner depreciation $ 48,992 $ 46,324 $ 60,619 $ 44,629 $ 49,912 $ 47,369 $ 46,305
Cost to mine one Bitcoin, excluding Bitcoin miner depreciation, as a % of production value of one Bitcoin mined 49.6% 40.5% 60.9% 58.8% 69.6% 64.2% 48.2%
Cost to mine one Bitcoin, including Bitcoin miner depreciation $ 91,244 $ 89,074 $ 106,045 $ 96,283 $ 90,631 $ 93,352 $ 85,992
Cost to mine one Bitcoin, including Bitcoin miner depreciation, as a % of production value of one Bitcoin mined 92.4% 77.9% 106.6% 126.7% 126.5% 126.6% 89.6%
Three Months Ended Six Months Ended
June 30,
Definitions, Terms, and Reconciliations (Unaudited)
29
GROSS PROFIT (NON-GAAP)
The Company defines Gross Profit as Fully Costed Gross
Profit plus Power Curtailment Credits plus Depreciation and
Amortization expense. The Company defines Fully Costed
Gross Profit as Revenue less Cost of Revenue (excluding
Depreciation and Amortization)
GROSS MARGIN (NON-GAAP)
The Company defines Gross Margin as Gross Profit divided
by Revenue
June 30, September 30, December 31, March 31, June 30,
Riot Platforms, Inc.: 2025 2025 2025 2026 2026 2026 2025
Revenue $ 152,988 $ 180,229 $ 152,831 $ 167,219 $ 174,235 $ 341,454 $ 314,375
less Bitcoin Mining Cost of revenue (78,175) (95,765) (90,253) (86,762) (89,264) (176,026) (152,993)
less Data Center Cost of revenue - - - (30,773) (16,700) (47,473) -
less Engineering Cost of revenue (9,858) (13,707) (15,522) (18,141) (27,030) (45,171) (21,664)
less Other Cost of revenue (3,006) - - - - - (11,971)
less Depreciation and amortization expense (83,197) (82,929) (102,759) (97,734) (97,784) (195,518) (161,123)
Fully Costed Gross Profit $ (21,248) $ (12,172) $ (55,703) $ (66,191) $ (56,543) $ (122,734) $ (33,376)
plus Power curtailment credits 8,313 30,634 9,981 21,023 10,054 31,077 16,114
plus Depreciation and amortization 83,197 82,929 102,759 97,734 97,784 195,518 161,123 Gross Profit $ 70,262 $ 101,391 $ 57,037 $ 52,566 $ 51,295 $ 103,861 $ 143,861
Gross Margin 45.9% 56.3% 37.3% 31.4% 29.4% 30.4% 45.8%
Bitcoin Mining:
Bitcoin Mining Revenue $ 140,889 $ 160,792 $ 131,736 $ 111,895 $ 113,736 $ 225,631 $ 283,748
less Bitcoin Mining Cost of revenue (78,175) (95,765) (90,253) (86,762) (89,264) (176,026) (152,993)
less Depreciation and amortization expense of Bitcoin miners (60,252) (60,106) (60,154) (76,086) (64,622) (140,708) (117,314)
Fully Costed Gross Profit - Bitcoin Mining $ 2,462 $ 4,921 $ (18,671) $ (50,953) $ (40,150) $ (91,103) $ 13,441
plus Power curtailment credits 8,313 30,634 9,981 21,023 10,054 31,077 16,114
plus Depreciation and amortization expense of Bitcoin miners 60,252 60,106 60,154 76,086 64,622 140,708 117,314 Gross Profit - Bitcoin Mining $ 71,027 $ 95,661 $ 51,464 $ 46,156 $ 34,526 $ 80,682 $ 146,869
Gross Margin - Bitcoin Mining 50.4% 59.5% 39.1% 41.2% 30.4% 35.8% 51.8%
Data Center:
Data Center Revenue $ - $ - $ - $ 33,150 $ 23,213 $ 56,363 $ -
less Data Center Cost of revenue - - - (30,773) (16,700) (47,473) -
less Depreciation and amortization expense - - - (212) (574) (786) -
Fully Costed Gross Profit - Data Center $ - $ - $ - $ 2,165 $ 5,939 $ 8,104 $ -
plus Depreciation and amortization expense - - - 212 574 786 - Gross Profit - Data Center $ - $ - $ - $ 2,377 $ 6,513 $ 8,890 $ -
Gross Margin - Data Center - - - 7.2% 28.1% 15.8% 0.0%
Data Center - Operating Leases:
Data Center Operating Lease Revenue $ - $ - $ - $ 927 $ 4,895 $ 5,822 $ -
less Data Center Operating Lease Cost of revenue - - - (85) (775) (860) -
less Depreciation and amortization expense - - - (212) (574) (786) -
Fully Costed Gross Profit - Data Center - Operating Leases $ - $ - $ - $ 630 $ 3,546 $ 4,176 $ -
plus Depreciation and amortization expense - - - 212 574 786 - Gross Profit - Data Center - Operating Leases $ - $ - $ - $ 842 $ 4,120 $ 4,962 $ -
Gross Margin - Data Center - Operating Leases - - - 90.8% 84.2% 85.2% 0.0%
Data Center - Tenant Fit-Out Services:
Data Center Tenant Fit-Out Services Revenue $ - $ - $ - $ 32,222 $ 18,318 $ 50,541 $ -
less Data Center Tenant Fit-Out Services Cost of revenue - - - (30,688) (15,925) (46,613) -
less Depreciation and amortization expense - - - - - - -
Fully Costed Gross Profit - Data Center - Tenant Fit-Out Services $ - $ - $ - $ 1,534 $ 2,393 $ 3,928 $ -
plus Depreciation and amortization expense - - - - - - - Gross Profit - Data Center - Tenant Fit-Out Services $ - $ - $ - $ 1,534 $ 2,393 $ 3,928 $ -
Gross Margin - Data Center - Tenant Fit-Out Services - - - 4.8% 13.1% 7.8% 0.0%
Engineering:
Engineering Revenue $ 10,576 $ 19,097 $ 21,095 $ 22,174 $ 37,286 $ 59,460 $ 24,496
less Engineering Cost of revenue (9,858) (13,707) (15,522) (18,141) (27,030) (45,171) (21,664)
less Depreciation and amortization expense (1,237) (1,340) (1,275) (1,305) (1,337) (2,642) (2,562)
Fully Costed Gross Profit - Engineering $ (519) $ 4,050 $ 4,298 $ 2,728 $ 8,919 $ 11,647 $ 270
plus Depreciation and amortization 1,237 1,340 1,275 1,305 1,337 2,642 2,562 Gross Profit - Engineering $ 718 $ 5,390 $ 5,573 $ 4,033 $ 10,256 $ 14,289 $ 2,832
Gross Margin - Engineering 6.8% 28.2% 26.4% 18.2% 27.5% 24.0% 11.6%
Three Months Ended Six Months Ended
June 30,
Q2 2026
Statement
of Operations
(Unaudited)
30
Q2 2026
Balance
Sheet
(Unaudited)
31
Non-GAAP
Adjusted
EBITDA
(Unaudited)
32
* Indicates Non-GAAP measure. We use Adjusted EBITDA to eliminate the effects of certain non-cash and/or non-recurring items, that do not reflect our
ongoing strategic business operations. Adjusted EBITDA is provided in addition to, and not as a substitute for, or as superior to, the comparable GAAP
measure, Net Income. For a full reconciliation of the Non-GAAP measures we use to their comparable GAAP measures, see the discussion under the heading
“Non-GAAP Measures”, under Item 2, “Management’s Discussion and Analysis of Financial Condition and Results of Operations” in our June 30, 2026, Form
10-Q.
Riot Currently Trades Among the Lowest
EV / MW Multiples in the Sector
$8.9
$7.8
$6.3
$8.6
$5.4
$7.1
$3.7 $3.5 $2.9
EV / 2027 Available MW
$3.5
($M) 1,2
1. Sourced from FactSet as of August 3, 2026. Cash & Cash Equivalents, LT Debt, and BTC value used in calculation as of March 31, 2026.
2. Sourced from company filings, company presentations, press releases, management commentary, and S&P-451 Data Center Knowledge Base (DCKB). Includes only power capacity that is currently operational and under construction in North America.
33
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g001.jpg · Sequence: 4
Binary file (160273 bytes)
Download riot-20260810xex99d2g001.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g002.jpg · Sequence: 5
Binary file (339053 bytes)
Download riot-20260810xex99d2g002.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g003.jpg · Sequence: 6
Binary file (76282 bytes)
Download riot-20260810xex99d2g003.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g004.jpg · Sequence: 7
Binary file (47301 bytes)
Download riot-20260810xex99d2g004.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g005.jpg · Sequence: 8
Binary file (163121 bytes)
Download riot-20260810xex99d2g005.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g006.jpg · Sequence: 9
Binary file (50646 bytes)
Download riot-20260810xex99d2g006.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g007.jpg · Sequence: 10
Binary file (121703 bytes)
Download riot-20260810xex99d2g007.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g008.jpg · Sequence: 11
Binary file (120945 bytes)
Download riot-20260810xex99d2g008.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g009.jpg · Sequence: 12
Binary file (215841 bytes)
Download riot-20260810xex99d2g009.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g010.jpg · Sequence: 13
Binary file (134161 bytes)
Download riot-20260810xex99d2g010.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g011.jpg · Sequence: 14
Binary file (50078 bytes)
Download riot-20260810xex99d2g011.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g012.jpg · Sequence: 15
Binary file (158305 bytes)
Download riot-20260810xex99d2g012.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g013.jpg · Sequence: 16
Binary file (149515 bytes)
Download riot-20260810xex99d2g013.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g014.jpg · Sequence: 17
Binary file (49656 bytes)
Download riot-20260810xex99d2g014.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g015.jpg · Sequence: 18
Binary file (152082 bytes)
Download riot-20260810xex99d2g015.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g016.jpg · Sequence: 19
Binary file (127514 bytes)
Download riot-20260810xex99d2g016.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g017.jpg · Sequence: 20
Binary file (154835 bytes)
Download riot-20260810xex99d2g017.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g018.jpg · Sequence: 21
Binary file (49210 bytes)
Download riot-20260810xex99d2g018.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g019.jpg · Sequence: 22
Binary file (103354 bytes)
Download riot-20260810xex99d2g019.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g020.jpg · Sequence: 23
Binary file (104734 bytes)
Download riot-20260810xex99d2g020.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g021.jpg · Sequence: 24
Binary file (48681 bytes)
Download riot-20260810xex99d2g021.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g022.jpg · Sequence: 25
Binary file (135963 bytes)
Download riot-20260810xex99d2g022.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g023.jpg · Sequence: 26
Binary file (132021 bytes)
Download riot-20260810xex99d2g023.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g024.jpg · Sequence: 27
Binary file (119523 bytes)
Download riot-20260810xex99d2g024.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g025.jpg · Sequence: 28
Binary file (156861 bytes)
Download riot-20260810xex99d2g025.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g026.jpg · Sequence: 29
Binary file (166748 bytes)
Download riot-20260810xex99d2g026.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g027.jpg · Sequence: 30
Binary file (48311 bytes)
Download riot-20260810xex99d2g027.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g028.jpg · Sequence: 31
Binary file (179993 bytes)
Download riot-20260810xex99d2g028.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g029.jpg · Sequence: 32
Binary file (181011 bytes)
Download riot-20260810xex99d2g029.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g030.jpg · Sequence: 33
Binary file (160856 bytes)
Download riot-20260810xex99d2g030.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g031.jpg · Sequence: 34
Binary file (151515 bytes)
Download riot-20260810xex99d2g031.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g032.jpg · Sequence: 35
Binary file (148403 bytes)
Download riot-20260810xex99d2g032.jpg
GRAPHIC
GRAPHIC
Filename: riot-20260810xex99d2g033.jpg · Sequence: 36
Binary file (71582 bytes)
Download riot-20260810xex99d2g033.jpg
XML — IDEA: XBRL DOCUMENT
XML
Filename: R1.htm · Sequence: 42
v3.26.1
Document and Entity Information
Aug. 10, 2026
Document Information [Line Items]
Document Type
8-K
Document Period End Date
Aug. 10, 2026
Entity Registrant Name
Riot Platforms, Inc.
Entity Incorporation, State or Country Code
NV
Securities Act File Number
001-33675
Entity Tax Identification Number
84-1553387
Entity Address, Address Line One
85 Rio Grande Drive
Entity Address, Address Line Two
Suite 200
Entity Address, City or Town
Castle Rock
Entity Address, State or Province
CO
Entity Address, Postal Zip Code
80104
City Area Code
(303)
Local Phone Number
794-2000
Written Communications
false
Soliciting Material
false
Pre-commencement Tender Offer
false
Pre-commencement Issuer Tender Offer
false
Title of 12(b) Security
Common Stock, no par value per share
Trading Symbol
RIOT
Security Exchange Name
NASDAQ
Entity Emerging Growth Company
false
Entity Central Index Key
0001167419
Amendment Flag
false
Former Address [Member]
Document Information [Line Items]
Entity Address, Address Line One
3855 Ambrosia Street
Entity Address, Address Line Two
Suite 301
Entity Address, City or Town
Castle Rock
Entity Address, State or Province
CO
Entity Address, Postal Zip Code
80109
X
- Definition
Boolean flag that is true when the XBRL content amends previously-filed or accepted submission.
+ References
No definition available.
+ Details
Name:
dei_AmendmentFlag
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Area code of city
+ References
No definition available.
+ Details
Name:
dei_CityAreaCode
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Line items represent financial concepts included in a table. These concepts are used to disclose reportable information associated with domain members defined in one or many axes to the table.
+ References
No definition available.
+ Details
Name:
dei_DocumentInformationLineItems
Namespace Prefix:
dei_
Data Type:
xbrli:stringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
For the EDGAR submission types of Form 8-K: the date of the report, the date of the earliest event reported; for the EDGAR submission types of Form N-1A: the filing date; for all other submission types: the end of the reporting or transition period. The format of the date is YYYY-MM-DD.
+ References
No definition available.
+ Details
Name:
dei_DocumentPeriodEndDate
Namespace Prefix:
dei_
Data Type:
xbrli:dateItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The type of document being provided (such as 10-K, 10-Q, 485BPOS, etc). The document type is limited to the same value as the supporting SEC submission type, or the word 'Other'.
+ References
No definition available.
+ Details
Name:
dei_DocumentType
Namespace Prefix:
dei_
Data Type:
dei:submissionTypeItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Address Line 1 such as Attn, Building Name, Street Name
+ References
No definition available.
+ Details
Name:
dei_EntityAddressAddressLine1
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Address Line 2 such as Street or Suite number
+ References
No definition available.
+ Details
Name:
dei_EntityAddressAddressLine2
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the City or Town
+ References
No definition available.
+ Details
Name:
dei_EntityAddressCityOrTown
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Code for the postal or zip code
+ References
No definition available.
+ Details
Name:
dei_EntityAddressPostalZipCode
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the state or province.
+ References
No definition available.
+ Details
Name:
dei_EntityAddressStateOrProvince
Namespace Prefix:
dei_
Data Type:
dei:stateOrProvinceItemType
Balance Type:
na
Period Type:
duration
X
- Definition
A unique 10-digit SEC-issued value to identify entities that have filed disclosures with the SEC. It is commonly abbreviated as CIK.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityCentralIndexKey
Namespace Prefix:
dei_
Data Type:
dei:centralIndexKeyItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Indicate if registrant meets the emerging growth company criteria.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityEmergingGrowthCompany
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Commission file number. The field allows up to 17 characters. The prefix may contain 1-3 digits, the sequence number may contain 1-8 digits, the optional suffix may contain 1-4 characters, and the fields are separated with a hyphen.
+ References
No definition available.
+ Details
Name:
dei_EntityFileNumber
Namespace Prefix:
dei_
Data Type:
dei:fileNumberItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Two-character EDGAR code representing the state or country of incorporation.
+ References
No definition available.
+ Details
Name:
dei_EntityIncorporationStateCountryCode
Namespace Prefix:
dei_
Data Type:
dei:edgarStateCountryItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The exact name of the entity filing the report as specified in its charter, which is required by forms filed with the SEC.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityRegistrantName
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The Tax Identification Number (TIN), also known as an Employer Identification Number (EIN), is a unique 9-digit value assigned by the IRS.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityTaxIdentificationNumber
Namespace Prefix:
dei_
Data Type:
dei:employerIdItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Local phone number for entity.
+ References
No definition available.
+ Details
Name:
dei_LocalPhoneNumber
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 13e
-Subsection 4c
+ Details
Name:
dei_PreCommencementIssuerTenderOffer
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 14d
-Subsection 2b
+ Details
Name:
dei_PreCommencementTenderOffer
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Title of a 12(b) registered security.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b
+ Details
Name:
dei_Security12bTitle
Namespace Prefix:
dei_
Data Type:
dei:securityTitleItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the Exchange on which a security is registered.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection d1-1
+ Details
Name:
dei_SecurityExchangeName
Namespace Prefix:
dei_
Data Type:
dei:edgarExchangeCodeItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as soliciting material pursuant to Rule 14a-12 under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 14a
-Subsection 12
+ Details
Name:
dei_SolicitingMaterial
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Trading symbol of an instrument as listed on an exchange.
+ References
No definition available.
+ Details
Name:
dei_TradingSymbol
Namespace Prefix:
dei_
Data Type:
dei:tradingSymbolItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as written communications pursuant to Rule 425 under the Securities Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Securities Act
-Number 230
-Section 425
+ Details
Name:
dei_WrittenCommunications
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Details
Name:
dei_EntityAddressesAddressTypeAxis=dei_FormerAddressMember
Namespace Prefix:
Data Type:
na
Balance Type:
Period Type: